    ues Log

    Last Updated: 16 July 2012

    Item Issue DescriptionWhen

    IdentifiedImpact on Project

    O

    w

    n

    e

    r

    Action taken Date: Action Taken Action

    1. The bath tub sanitary fittings will not bedirectly on top of drain pipe installed, this will be

    the cause of future leakage and it is difficult to

    terminate the two item. D

    e

    p

    a

    We reminded as peragreement last 9

    July 2012, depa to

    enlarge the coring

    size or hole beside

    the first coring16 July 2012

    Enlargement must be impl

    2. The required clearance on the floor drain

    cannot be realized because of covering the gap

    of coring and drain pipe

    We are asking for

    confimation

    concerning the final

    size of floor drain

    15 July 2012

    Solve and fina

    drain size

    3. The pipe of floor gully is not directly on center

    therefore, the drain will not be alligned on tile

    layout

    We are going to

    issue work

    statement for

    drainage work

    17 July 2012

    Coordinate w

    and during co

    to assist the m

    assure the pip

    2

    Provision of wall

    cladding for DB at

    type "T" rooms

    15 July 2012

    The return duct and grille of guess rooms

    airconsitioning system will clash with the

    additional wall cladding at all type 'T' rooms

    D

    e

    p

    a

    I explained to Ms.

    Mais the effect of

    additional wall

    cladding for db

    location and stated

    that it is not

    possible to relocate

    the return grille

    otherwise the air

    channel will be tight

    and may cause echo

    15 July 2012

    Relocate the

    all type "T" ro

    3

    Installation of gypsum

    board on pipe chase

    of 10th floor

    16 July 2012

    Drainage pipes installation cannot be installed

    and because of this, it will slow down the

    progressD

    e

    p

    a

    We emailed depa

    concerning this

    matter, emphazising

    the prior to

    enclosure of walls,

    work clearance must

    be forwarded for

    confirmation

    17 July 2012

    Coordinate w

    to avoid over

    works likewis

    sequence wil

    1Coring and Drainage

    gap has been sealed14 July 2012

  • 7/29/2019 Issues Log Contruction

    2/24

    4Box bracket for water

    supply30 June 2012

    We will exceed in our budget for plumbing works R

    a

    m

    a

    d

    a

    We prepared a

    mock-up sample

    adopting the

    alternative box

    bracket

    16 July 2012

    Alternative b

    be use like m

    5Leak testing of

    drainage14 July 2012

    The leak testing is not practical because of the

    numerous fittings that were damaged due to

    dismantling and reassembly of drainage pipes in

    connecting to the existing soil branchR

    am

    a

    d

    a

    We explained to

    judson if we can skip

    the leak testing due

    to the time

    consumed in leak

    testing and also the

    numerous fittings

    damaged sue to

    disassembly and

    reassembly

    14 June 2012

    Directly conn

    and old soil

    conduct flow

    for any leaks

    6Reversed soil branch

    slope16 July 2012

    Drainage piping of this particular cannot proceed R

    a

    m

    a

    d

    a

    Submit RFI to

    ramada for the

    resolution17 July 2012

    Just termina

    existing pipe

    to far from s

    7 Delivery of ducts 3 July 2012

    FAD cannot be connected

    M

    e

    s

    Ramada project

    team will help infollowing up the

    delivery of

    fabrication and the

    fabrication should

    be expedited

    15 July 2012

    Forward all t

    fabricate incpay the fabr

    8 P-trap for AC drain 1 June 2012

    AC drain cannot proceed unless these will be

    resolved

    M

    e

    s

    We asked for a

    confirmation letter

    from supplier

    confirming that

    there is no available

    ready made p-trap

    1 July 2012

    1. I ask a cer

    availability o

    authorized h

    pipes supplie

    knowledge o

    DCT/MCV/A

    help of cedri

    supplier andour request

    send the lett

    certification

    received the

    from cedric,

    in the issuan

    simultaneou

    instruction t

    commitmen

    prefab p-tra

  • 7/29/2019 Issues Log Contruction

    3/24

    9

    Insternal lining

    bumitaw sa

    pagkakakapit sa PIR

    board

    25 July 2012

    Rectification of all installed and delivered ducts

    for guess rooms, thus the ceiling works cannot

    be closed unless resolved

    M

    e

    s

    Discussed to

    EOM/DCT and

    purchasing dept

    likewise the

    fabricator so as to

    prevent wastage of

    work and delaying

    of the whole project

    25 July 2012

    Use fastener

    adherance o

    pir board

    10Reducer for floor

    drain17 July 2012

    Pex fittings 7 July 2012

    Walls cannot be enclosed unless proper water

    supply fittings are usedM

    e

    s

    We discussed this

    matter to melvin for

    necessary action8 July 2012

    Prepare revi

    for pex fittin

    the previous

    Bath tub sanitary

    fittings25 July 2012

    All bath tubs cannot be installed unless new

    coring for bath tub is done

    D

    e

    p

    a

    EOM and khaled

    already discussed

    this matter28 July 2012

    Prepare revi

    layout for ba

    Switching of pex

    fittings to each others

    Replacement of Fire

    fighting branches and

    main branches

    Ceiling cannot be closed and some ducts cannot

    be installed unless all branches and fittings are

    installed

    Rerouting of chilled

    water pipes that

    clashes with the AC

    ducts

    AC Ducts cannot be installed and ceiling will

    remain naked unless all necessary utilities are

    intact

    C

    l

    i

    e

    n

    t

    We submitted RFI to

    determine

    necessary action to

    solve the conflict

    Verify RFI date

    submitted

    Reroute chw

    are not in pr

    orientation

    GRMS control panel

    location

    Cannot finish the piping of electrical D

    e

    p

    a

    Wifi access point

    location

    D

    e

    pa

    Schematic diagram

    for IP tv, Phone and

    CBS

    D

    e

    p

    a

    Cable trunking

    location at corridor

    M

    e

    s

    Return ducts

    rectification in type T

    rooms

    10 July 2012

    All installed ducts must be dismantle again

    causing the completion of work to be poseponed

    again

    M

    e

    s

    We advised and

    formalized the

    problem

    Electrical Shop

    Drawing 15 July 2012

    Cannot permanently install the ducts and close

    the ceiling or walls unless all the pipes are laid

    out

    M

    es

    Expedite the

    drawing

    simultaneous withthe execution of

    work

    16 July 2012

    Proceed as p

    received

  • 7/29/2019 Issues Log Contruction

    4/24

  • 7/29/2019 Issues Log Contruction

    5/24

    ues Log

    Item Issue DescriptionWhen

    CommittedImpact on Project

    O

    w

    n

    e

    r

    1. The bath tub sanitary fittings will not be

    directly on top of drain pipe installed, this will be

    the cause of future leakage and it is difficult to

    terminate the two item. D

    e

    pa

    2. The required clearance on the floor drain

    cannot be realized because of covering the gap of

    coring and drain pipe

    3. The pipe of floor gully is not directly on center

    therefore, the drain will not be alligned on tile

    layout

    2

    Provision of wall

    cladding for DB attype "T" rooms

    15 July 2012

    The return duct and grille of guess rooms

    airconsitioning system will clash with the

    additional wall cladding at all type 'T' rooms

    D

    e

    p

    a

    1Coring and Drainage

    gap has been sealed14 July 2012

  • 7/29/2019 Issues Log Contruction

    6/24

    3

    Installation of gypsum

    board on pipe chase

    of 10th floor

    16 July 2012

    Drainage pipes installation cannot be installed

    and because of this, it will slow down the

    progressD

    e

    p

    a

    4Box bracket for water

    supply30 June 2012

    We will exceed in our budget for plumbing works R

    a

    m

    a

    d

    a

    5Leak testing of

    drainage14 July 2012

    The leak testing is not practical because of the

    numerous fittings that were damaged due to

    dismantling and reassembly of drainage pipes in

    connecting to the existing soil branchR

    a

    m

    a

    d

    a

    6Reversed soil branch

    slope16 July 2012

    Drainage piping of this particular cannot proceed R

    am

    a

    d

    a

    7 Delivery of ducts 3 July 2012

    FAD cannot be connected

    M

    e

    s

  • 7/29/2019 Issues Log Contruction

    7/24

    8 P-trap for AC drain 1 June 2012

    AC drain cannot proceed unless these will be

    resolved

    M

    e

    s

    9

    Insternal lining

    bumitaw sa

    pagkakakapit sa PIR

    board

    25 July 2012

    Rectification of all installed and delivered ducts

    for guess rooms, thus the ceiling works cannot be

    closed unless resolved

    M

    e

    s

    10

  • 7/29/2019 Issues Log Contruction

    8/24

    Hindrances Action taken Date: Action Taken Action to resolve

    Date to be

    resolved

    (Projected)

    We reminded as per

    agreement last 9

    July 2012, depa to

    enlarge the coring

    size or hole beside

    the first coring16 July 2012

    Enlargement of coring size

    must be implemented

    Asap

    We are asking for

    confimation

    concerning the final

    size of floor drain

    15 July 2012

    Solve and finalize the floor

    drain size

    We are going to

    issue work

    statement for

    drainage work

    17 July 2012

    Coordinate with MES prior

    and during covering of gaps

    to assist the mason and

    assure the pipe allignment

    I explained to Ms.

    Mais the effect of

    additional wall

    cladding for db

    location and stated

    that it is not possible

    to relocate thereturn grille

    otherwise the air

    channel will be tight

    and may cause echo

    15 July 2012

    Relocate the DB location for

    all type "T" rooms

    Asap

    Last Updated: 16 July 2012

  • 7/29/2019 Issues Log Contruction

    9/24

    We emailed depa

    concerning this

    matter, emphazising

    the prior to

    enclosure of walls,

    work clearance must

    be forwarded forconfirmation

    17 July 2012

    Coordinate with MES prior

    to avoid over lapping of

    works likewise proper

    sequence will be observed

    Asap

    We prepared a mock-

    up sample adopting

    the alternative box

    bracket16 July 2012

    Alternative box bracket will

    be use like metal stud

    Asap

    We explained to

    judson if we can skip

    the leak testing due

    to the time

    consumed in leak

    testing and also the

    numerous fittings

    damaged sue to

    disassembly and

    reassembly

    14 June 2012

    Directly connect the new

    and old soil branch and

    conduct flow test to check

    for any leaks

    Asap

    Submit RFI to

    ramada for theresolution

    17 July 2012

    Just terminate on the

    existing pipe since it is not tofar from soil stack

    Asap

    Ramada project

    team will help in

    following up the

    delivery of

    fabrication and the

    fabrication should

    be expedited

    15 July 2012

    Forward all the figures to

    fabricate including regularly

    pay the fabricator

    19 July 2012

  • 7/29/2019 Issues Log Contruction

    10/24

    We asked for a

    confirmation letter

    from supplier

    confirming that

    there is no available

    ready made p-trap

    1 July 2012

    1. I ask a certificate of non-

    availability of material from

    authorized hp and non-hp

    pipes supplier with the

    knowledge of

    DCT/MCV/ALF. With the

    help of cedric we called thesupplier and shortly after

    our request Mr. goodwin

    send the letter of

    certification 2. When I

    received the certification

    from cedric, DCT held the us

    in the issuance of the letter

    simultaneous to his

    instruction to lakay and

    commitment to provide

    prefab p-trap

    01 July 2012

    Discussed to

    EOM/DCT and

    purchasing dept

    likewise the

    fabricator so as to

    prevent wastage of

    work and delaying of

    the whole project

    25 July 2012

    Use fastener to ensure the

    adherance of insulation on

    pir board

    26 July 2012

  • 7/29/2019 Issues Log Contruction

    11/24

    Date resolved

    (Actual)Update due

    Status

    (O/C)

    Depa is waiting for special

    equipment to enlarge the coring

    size, meanwhile, they are

    blaming mes for the crong

    layout however, bathtub

    dimension was given by depa,since the finish wall cannot be

    decided for reference, depa

    made all the layout at site.

    O

    Awaiting for response from

    Depa

    O

    Awaiting for response from

    Depa

    O

    Awaiting for response from

    Depa (Ms. Mais committed to

    give us the solution or possible

    location of DB after an hour of

    our discussion but nothing

    arrived - time of discussion is

    2:30pm at their office) O

  • 7/29/2019 Issues Log Contruction

    12/24

    Awaiting for response from

    Depa

    O

    Awaiting for depa to response

    O

    As per judson, its up for MES just

    ensure all connections not to

    leak

    C

    Awaiting for depa to response

    O

    On-going fabrication and follow-

    up the fabrication

    O

  • 7/29/2019 Issues Log Contruction

    13/24

    Ask lakay

    O

    On-going dismantling and

    rectification of ducts internal

    ling or rockwool sound

    insulation

    O

  • 7/29/2019 Issues Log Contruction

    14/24

    Task Numb WBS Numb Task Description Predecessor Effort (delay) Who does it Start

    1 1 Select contractor to

    work with

    2 1.1 Document needs (what

    you want the contractor

    to do)

    0.5 Dave 31-May

    3 1.2 Write tender (convert

    needs to a formal

    tender document)

    1.1 0.5 Dave 31-May

    4 1.3 Select possible

    contractors

    1.2 0.5 Dave I June

    5 1.4 Send to possible

    contractors

    1.3 0.5 Dave 1-Jun

    6 1.5 Wait for responses 1.4 10 Delay 2-Jun

    7 1.6 Review responses 1.5 2 Dave 16-Jun

    8 1.7 Select contractor 1.6 1 Dave 20-Jun9 2 Prepare office

    10 2.1 Design office layout 1.7 3 Contractor 21-Jun

    11 2.2 Install new sockets 2.1 2 Contractor 24-Jun

  • 7/29/2019 Issues Log Contruction

    15/24

    End

    31-May

    31-May

    1-Jun

    1-Jun

    15-Jun

    17-Jun

    20-Jun

    23-Jun

    27-Jun

  • 7/29/2019 Issues Log Contruction

    16/24

    Task

    number

    WBS

    number

    Task descripton Predeces

    sor

    Effort Who

    does it

    Start End

    15 2.4 Install phones 3.5 4 Adam 9-Aug 12-Aug

    10 2.1 Design office

    layout

    1.7 3 Contracto

    r

    21-Jun 23-Jun

    12 2.2.1 Install new lights 2.1 3 Contracto

    r

    24-Jun 28-Jun

    13 2.2.2 Install new

    sockets

    2.1 2 Contracto

    r

    29-Jun 30-Jun

    20 3.4 Remove old

    furniture

    4 Contracto

    r

    1-Jul 6-Jul

    14 2.3 Fit carpets 2.1, 3.4 2 Contracto

    r

    6-Jul 7-Jul

    21 3.5 Fit new furniture 2.3, 3.3 12 Contracto

    r

    22-Jul 8-Aug

    2 1.1 Document needs

    (what you want

    the contractor to

    do)

    0.5 Dave 31-May 31-May

    Table 3.9. Plan sorted by person

  • 7/29/2019 Issues Log Contruction

    17/24

    Task

    number

    WBS

    number

    Task descripton Predeces

    sor

    Effort

    (Delay)

    Who

    does it

    Start

    1 1 Select contractor to work with

    2 1.1 Document needs (what you want the

    contractor to do)

    0.5 Dave 31-May

    3 1.2 Write tender (convert needs to a

    formal tender document)

    1.1 0.5 Dave 31-May

    4 1.3 Select possible contractors 1.2 0.5 Dave I June

    5 1.4 Send to possible contractors 1.3 0.5 Dave 1-Jun

    6 1.5 Wait for responses 1.4 10 Delay 2-Jun

    Table 3.8. The critical path

  • 7/29/2019 Issues Log Contruction

    18/24

    End

    31-May

    31-May

    1-Jun

    1-Jun

    15-Jun

  • 7/29/2019 Issues Log Contruction

    19/24

    Task

    number

    WBS

    number

    Task description Predeces

    sor

    Estimate

    d effort

    (Man-

    days)

    Notes

    1 1 Select contractor towork with

    See sub-tasks

    2 1.1 Document needs

    (what you want the

    contractor to do)

    0.5

    3 1.2 Write tender

    (convert needs to a

    formal tender

    document)

    1.1 0.5 This task can't

    be started until

    task 1.1 is

    complete.

    4 1.3 Select possible

    contractors

    1.2 0.5 This task can't

    be started untiltask 1.2 is

    complete.

    5 1.4 Send to possible

    contractors

    1.3 0.5 This task can't

    be started until

    task 1.3 is

    complete.

    6 1.5 Wait for responses 1.4 0 After ordering

    there will be a

    delay as we

    wait forresponses. This

    task can't be

    started until

    task 1.4 is

    complete. This

    task has

    duration, but

    zero effort.

    7 1.6 Review responses 1.5 2 This task can't

    be started untiltask 1.5 is

    complete.

    Table 3.4. Predecessors and task lengths

  • 7/29/2019 Issues Log Contruction

    20/24

    Initial Skeleton Plan

    Task NumbWBS NumbTask Description

    3 1.2 Write tender (convert needs to a formal

    tender document)

    4 1.3 Select possible contractors

    5 1.4 Send to possible contractors

    6 1.5 Review responses7 1.6 Select contractor

    8 2 Prepare office

    9 2.1 Design office layout

    10 2.2 Fit electrics

    11 2.2.1 Install new lights

    12 2.2.2 Install new sockets

    13 2.3 Fit carpets

    14 2.4 Install telephones

    15 3 Install furniture

    16 3.1 Choose new furniture17 3.2 Order furniture

    18 3.3 Remove old furniture

    19 3.4 Fit new furniture

    20 4 Install new PCs

    21 4.1 Choose new PCs

    22 4.2 Select software

    23 4.3 Order PCs and software

    24 4.4 Install software on PCs

    25 4.5 Install configured PCs

  • 7/29/2019 Issues Log Contruction

    21/24

    Project One Project Two Project Three

    Project

    Descripti

    on

    Building your own

    house

    Developing a

    computer system

    Producing a short film

    in a school

    1. Completionof foundations.

    1.Requirements

    gathered.

    1. Scriptfinalised.

    2. Completion

    of walls and roof.

    2. System

    designed.

    2. Cast

    selected.

    3. Completion

    of internal walls,

    plumbing and

    electrics.

    3.

    Programming

    code written.

    3. Script learnt.

    4. Completion

    of internal fitting

    and decorating.

    4. System

    tested.

    4. Filming

    completed.

    5. Bugs fixed

    and system

    handed over

    for live use.

    5. Editing

    completed.

    6. Film shown.

    Table 3.2. Examples of milestones

    Possiblemilestone

    s

  • 7/29/2019 Issues Log Contruction

    22/24

    Insufficient

    Detail Sufficient detail Too much detail

    Decorate room. Select and buy paint. Go to DIY store.

    Prepare walls. Get sample pots of paint.

    Paint first coat. Try on wall.Paint second coat. Wait for it to dry.

    Select option.

    Estimate how much paint you want.

    Return to DIY store.

    Buy paint.

    Survey walls.

    Identify all bits of walls that need to be

    fixed.

    Mark the places to fix.

    Fill cracks.Fix paper etc. . .

    Table 3.1. Example of task decompositions

    Final touch up.

  • 7/29/2019 Issues Log Contruction

    23/24

    PROJECT NAME/REFERENCE

    What assumptions (if any) are you making?

    The wallpaper is OK to paint over.

    I will paint the left-hand wall of the hall outside the front room as this was missed out in the previous

    decorating project.

    Table 2.2. Example of a Project Definition for a simple personal project

    Maximise house price

    WHY do you want to do this project?

    Because we want to sell our house at a maximum price and the current state of the decoration in the

    front room will reduce the price we get.

    WHAT will you have at the end that you don't have now?

    We will have a newly decorated front room.

    Will you (should you) deliver anything else?

    Yes I will also replace the broken light fitting by the side window.

    Is anything explicitly excluded from the project?

    I will not decorate the skirting boards or the door.

    Are there any gaps or overlaps with other projects or changes to the

    boundaries of your project?

  • 7/29/2019 Issues Log Contruction

    24/24

    Completed On Completed By Agreed By

    26/05/06 Eric Angela

    The whole thing must be finished by September.

    Are there any significant problems you are aware of that you must

    overcome?

    The crack in the wall by the door needs to be plastered before it can be painted. As the plaster must be

    dry before decorating, this must happen at least a week before decorating starts.

    Has your customer, or the situation, set any conditions on the way you

    do this project?

    I cannot work over the next weekend when we have guests.