+ All Categories
Home > Documents > ister of the transfers and licensed production of major

ister of the transfers and licensed production of major

Date post: 16-Nov-2021
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
59
Appendix 13C. Register of the transfers and licensed production of major conventional weapons, 2002 BJÖRN HAGELIN, PIETER D. WEZEMAN, SIEMON T. WEZEMAN and NICHOLAS CHIPPERFIELD The register in table 13C.1 lists major weapons on order or under delivery, or for which the licence was bought and production was under way or completed during 2002. Sources and methods for data collection are explained in appendix 13D. Entries in table 13C.1 are alphabetical, by recipient, supplier and licenser. ‘Year(s) of deliveries’ includes aggregates of all deliveries and licensed production since the beginning of the contract. ‘Deal worth’ values in the Comments column refer to real monetary values as reported in sources and not to SIPRI trend-indicator values. Conventions, abbreviations and acronyms are explained below the table. For cross-reference, an index of recipients and licensees for each supplier can be found in table 13C.2. Table 13C.1. Register of transfers and licensed production of major conventional weapons, 2002, by recipients Recipient/ Year Year(s) No. supplier (S) No. Weapon Weapon of order/ of delivered/ or licenser (L) ordered designation description licence deliveries produced Comments Afghanistan S: Russia 1 An-12/Cub-A Transport aircraft (2002) 2002 (1) Ex-Russian; aid (5) Mi-24D/Mi-25/Hind-D Combat helicopter (2002) 2002 (5) Ex-Russian; aid (10) Mi-8T/Hip-C Helicopter (2002) 2002 (3) Ex-Russian; aid; delivery 2002–2003 (200) AT-4 Spigot/9M111 Anti-tank missile (2002) . . Ex-Russian; aid Albania S: Italy (1) Bell-206/AB-206 Light helicopter (2002) 2002 (1) Probably ex-Italian Algeria S: China (24) C-802/CSS-N-8 Saccade Anti-ship missile (1999) 2000–2002 (24) For Djebel Chinoise Class FAC Czech Republic 17 L-39Z Albatros Jet trainer aircraft 2001 2002 (17) Deal worth $30 m; L-39ZA version
Transcript

App

endi

x 13

C. R

egis

ter

of th

e tr

ansf

ers

and

licen

sed

prod

uctio

n of

maj

orco

nven

tiona

l wea

pons

, 200

2

BJÖ

RN

HA

GE

LIN

, P

IET

ER

D.

WE

ZE

MA

N,

SIE

MO

N T

. W

EZ

EM

AN

and

NIC

HO

LA

S C

HIP

PE

RF

IEL

D

The

reg

iste

r in

tabl

e 13

C.1

list

s m

ajor

wea

pons

on

orde

r or

und

er d

eliv

ery,

or

for

whi

ch th

e lic

ence

was

bou

ght a

nd p

rodu

ctio

n w

as u

nder

way

or

com

plet

eddu

ring

200

2. S

ourc

es a

nd m

etho

ds f

or d

ata

coll

ecti

on a

re e

xpla

ined

in

appe

ndix

13D

. E

ntri

es i

n ta

ble

13C

.1 a

re a

lpha

beti

cal,

by r

ecip

ient

, su

ppli

er a

ndli

cens

er. ‘

Yea

r(s)

of

deli

veri

es’

incl

udes

agg

rega

tes

of a

ll d

eliv

erie

s an

d li

cens

ed p

rodu

ctio

n si

nce

the

begi

nnin

g of

the

con

trac

t. ‘D

eal

wor

th’

valu

es i

n th

eC

omm

ents

col

umn

refe

r to

rea

l mon

etar

y va

lues

as

repo

rted

in s

ourc

es a

nd n

ot to

SIP

RI

tren

d-in

dica

tor

valu

es. C

onve

ntio

ns, a

bbre

viat

ions

and

acr

onym

s ar

eex

plai

ned

belo

w th

e ta

ble.

For

cro

ss-r

efer

ence

, an

inde

x of

rec

ipie

nts

and

licen

sees

for

eac

h su

pplie

r ca

n be

fou

nd in

tabl

e 13

C.2

.

Tab

le 1

3C.1

. Reg

iste

r of

tran

sfer

s an

d lic

ense

d pr

oduc

tion

of m

ajor

con

vent

iona

l wea

pons

, 200

2, b

y re

cipi

ents

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Afg

hani

stan

S:R

ussi

a1

An-

12/C

ub-A

Tra

nspo

rt a

ircr

aft

(200

2)20

02(1

)E

x-R

ussi

an; a

id(5

)M

i-24

D/M

i-25

/Hin

d-D

Com

bat h

elic

opte

r(2

002)

2002

(5)

Ex-

Rus

sian

; aid

(10)

Mi-

8T/H

ip-C

Hel

icop

ter

(200

2)20

02(3

)E

x-R

ussi

an; a

id; d

eliv

ery

2002

–200

3(2

00)

AT

-4 S

pigo

t/9M

111

Ant

i-ta

nk m

issi

le(2

002)

. .

Ex-

Rus

sian

; aid

Alb

ania

S:It

aly

(1)

Bel

l-20

6/A

B-2

06L

ight

hel

icop

ter

(200

2)20

02(1

)Pr

obab

ly e

x-It

alia

n

Alg

eria

S:C

hina

(24)

C-8

02/C

SS-N

-8 S

acca

deA

nti-

ship

mis

sile

(199

9)20

00–2

002

(24)

For

Dje

bel C

hino

ise

Cla

ss F

AC

Cze

ch R

epub

lic17

L

-39Z

Alb

atro

sJe

t tra

iner

air

craf

t 2

001

2002

(17)

Dea

l wor

th $

30 m

; L-3

9ZA

ver

sion

INTERNATIONAL ARMS TRANSFERS 477

Rus

sia

42

Mi-

17/H

ip-H

Hel

icop

ter

200

220

02(6

)D

eal w

orth

$18

0 m

; Mi-

171

arm

ed v

ersi

on; d

eliv

ery

2002

–200

322

Su

-24M

K/F

ence

r-D

Bom

ber

airc

raft

200

020

01–2

002

(22)

Ex-

Rus

sian

; pro

babl

y m

oder

nize

d be

fore

del

iver

y3

Dru

m T

iltFi

re c

ontr

ol r

adar

(199

7)20

001

For

mod

erni

zatio

n of

3 K

oni (

Mou

rad

Rai

s) C

lass

frig

ates

(24)

TE

ST-7

1 53

3mm

AS/

ASW

torp

edo

(199

7)20

00–2

002

(12)

For

mod

erni

zed

Kon

i (M

oura

d R

ais)

Cla

ss f

riga

tes;

desi

gnat

ion

unce

rtai

n6

Pozi

tiv-M

E1.

2A

ir/s

ea s

urv

rada

r(1

997)

2000

2 Fo

r m

oder

niza

tion

of 3

Kon

i (M

oura

d R

ais)

Cla

ssfr

igat

es a

nd 3

Nan

uchk

a (H

amid

ou)

Cla

ss c

orve

ttes

3 Pl

ank

Shav

eA

ir s

urv

rada

r(1

997)

2000

1 Fo

r m

oder

niza

tion

of 3

Nan

uchk

a (H

amid

ou)

Cla

ssco

rvet

tes

(96)

SS-N

-25/

Kh-

35 U

ran

Ant

i-sh

ip m

issi

le 1

998

2000

–200

2(4

8)Fo

r m

oder

nize

d N

anuc

hka

(Ham

idou

) C

lass

corv

ette

sU

SA6

Bee

ch-1

900D

HIS

AR

AG

S ai

rcra

ft 2

000

2001

–200

2(6

)In

cl f

or S

IGIN

T a

nd u

se a

gain

st G

IA r

ebel

sU

krai

ne(3

6)M

iG-2

9/Fu

lcru

m-A

Figh

ter

airc

raft

(199

8)20

005

Ex-

Ukr

aini

an; s

tatu

s of

last

31

unce

rtai

n

Ang

ola

S:B

elar

us(1

5)Su

-27S

/Fla

nker

-BFi

ghte

r ai

rcra

ft(1

999)

. .Pr

obab

ly e

x-B

elar

ussi

an; s

uppl

ier

coul

d be

Ukr

aine

;st

atus

unc

erta

inPe

ru2

EM

B-1

20 B

rasi

liaT

rans

port

air

craf

t 2

002

2002

2 E

x-Pe

ruvi

an; E

MB

-120

ER

ver

sion

6 E

MB

-312

Tuc

ano

Tra

iner

air

craf

t 2

002

. .

Ex-

Peru

vian

; dea

l wor

th $

4.8

m

Arg

enti

naS:

Ital

y(1

6)R

AT

-31S

/LA

ir s

urv

rada

r 1

999

2000

–200

2(1

6)Pa

rt o

f $1

85 m

dea

l with

US

com

pany

for

civi

lian/

mili

tary

NR

P ai

r su

rvei

llanc

e sy

stem

Net

herl

ands

6 D

A-0

5Su

rvei

llanc

e ra

dar

(197

9)19

85–2

002

6 Fo

r 6

ME

KO

-140

Typ

e (E

spor

a C

lass

) fr

igat

es6

WM

-28

Fire

con

trol

rad

ar(1

979)

1985

–200

26

For

6 M

EK

O-1

40 T

ype

(Esp

ora

Cla

ss)

frig

ates

Spai

n18

C

-212

Avi

ocar

Tra

nspo

rt a

ircr

aft

200

2. .

E

x-Sp

anis

h

L:

Ger

man

y 6

ME

KO

-140

Typ

eFr

igat

e 1

979

1985

–200

26

Arg

entin

e de

sign

atio

n E

spor

a C

lass

; del

iver

y of

last

2 de

laye

d so

me

10 y

ears

for

lack

of

fund

ing

478 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Aus

tral

iaS:

Can

ada

68

Pira

nha

8x8

APC

199

820

02(2

5)D

eal w

orth

$18

0–21

0 m

incl

lice

nsed

pro

duct

ion

of82

IFV

ver

sion

; inc

l 5 a

mbu

lanc

e, 5

AR

V, 1

6 C

P,5

rada

r re

conn

aiss

ance

and

11

repa

ir v

ersi

on;

Aus

tral

ian

desi

gnat

ions

ASL

AV

-PC

/R/A

/C/S

/F;

asse

mbl

ed in

Aus

tral

ia; d

eliv

ery

2002

–200

5G

erm

any

259

War

anA

PC 2

002

. .

Proj

ect L

and-

106

Phas

e-2;

Aus

tral

ian

M-1

13A

1A

PCs

rebu

ilt to

War

an; d

eliv

ery

until

200

9Is

rael

(18)

EL

/M-2

022

MP

airc

raft

rad

ar 1

995

2002

6 Pa

rt o

f Pr

ojec

t Air

-527

6 w

orth

$37

2–49

5 m

for

mod

erni

zatio

n of

18

P-3C

ASW

/MP

airc

raft

toA

P-3C

Sea

Sen

tinel

ver

sion

by

US

com

pany

;de

liver

y of

air

craf

t 200

2–20

04M

ultip

le s

elle

rs22

A

S-66

5 T

iger

Com

bat h

elic

opte

r 2

001

. .

Proj

ect A

ir-8

7 w

orth

$67

0 m

(of

fset

s in

cl p

rodu

ctio

nof

com

pone

nts

and

prod

uctio

n of

EC

-120

helic

opte

r fo

r A

sian

mar

ket)

; bou

ght f

rom

Fra

nce

and

Ger

man

y; A

ussi

e T

iger

ver

sion

; inc

l 4as

sem

bled

in F

ranc

e an

d 18

ass

embl

ed in

Aus

tral

ia; d

eliv

ery

2004

–200

7(2

00)

MU

-90

Impa

ctA

SW to

rped

o 2

000

. .

Proj

ect D

jimin

di w

orth

$88

m o

r $2

00 m

; pro

duce

rsar

e G

erm

any,

Ita

ly a

nd F

ranc

eN

orw

ay(6

0)Pe

ngui

n M

k-2-

7A

nti-

ship

mis

sile

199

820

01–2

002

(60)

Proj

ect S

ea-1

414

Phas

e-1

wor

th $

40–4

9 m

(of

fset

sin

cl p

rodu

ctio

n of

war

head

s in

Aus

tral

ia);

for

SH-2

G h

elic

opte

rs(6

0)Pe

ngui

n M

k-2-

7A

nti-

ship

mis

sile

199

920

02(2

0)Pr

ojec

t Sea

-141

4 Ph

ase-

2 w

orth

$36

–49

m; f

orSH

-2G

hel

icop

ters

; del

iver

y 20

02–2

003

Swed

en8

9LV

Fire

con

trol

rad

ar(1

991)

1996

–200

24

9LV

453

vers

ion;

for

8 M

EK

O-2

00A

NZ

Typ

e (A

nzac

Cla

ss)

frig

ates

; inc

l for

use

with

Sea

spar

row

SA

M8

Sea

Gir

affe

-150

Air

/sea

sur

v ra

dar

199

119

96–2

002

4 Fo

r 8

ME

KO

-200

AN

Z T

ype

(Anz

ac C

lass

) fr

igat

esU

K6

MST

AR

Bat

tlefi

eld

rada

r 1

999

2002

(6)

Proj

ect N

INO

X w

orth

$32

m in

cl 5

5 lic

ense

dpr

oduc

tion;

Aus

tral

ian

desi

gnat

ion

AM

STA

R

INTERNATIONAL ARMS TRANSFERS 479

20

Rap

ier

SAM

sys

tem

200

120

02(2

0)E

x-U

K; P

roje

ct L

and-

140

wor

th $

8 m

; mod

erni

zed

befo

re d

eliv

ery;

Rap

ier

B1M

ver

sion

(400

)A

SRA

AM

SRA

AM

199

820

00–2

002

(400

)D

eal w

orth

$62

m; f

or F

/A-1

8 FG

A a

ircr

aft

USA

4 B

oein

g-73

7 A

EW

AE

W&

C a

ircr

aft

200

0. .

W

edge

tail

prog

ram

me

wor

th $

1.6–

1.8

b; A

ustr

alia

nde

sign

atio

n A

-30;

opt

ion

on 2

mor

e; d

eliv

ery

from

2007

7 K

ing

Air

-350

/C-1

2SL

ight

tran

spor

t ac

200

2. .

L

ease

wor

th $

170

m; f

or tr

aini

ng; d

eliv

ery

from

200

311

SH

-2G

Sup

er S

easp

rite

AS/

ASW

hel

icop

ter

199

720

01–2

002

(8)

Ex-

US

SH-2

F re

built

to S

H-2

G(A

) ve

rsio

n; P

roje

ctSe

a 14

11 w

orth

$42

1–57

4 m

(in

cl $

67 m

for

10-y

ear

supp

ort)

; inc

l som

e as

sem

bly

in A

ustr

alia

71

AN

/APG

-73

Com

bat a

c ra

dar

200

020

02(3

0)Fo

r m

oder

niza

tion

of 7

1 F/

A-1

8 FG

A a

c; d

eliv

ery

2002

–200

3(4

00)

AIM

-120

B A

MR

AA

MB

VR

AA

M(2

000)

2001

–200

2(2

50)

Proj

ect A

ir-5

400

(676

)Ja

velin

Ant

i-ta

nk m

issi

le(2

002)

. .

Proj

ect L

and-

40-1

wor

th $

90–1

02 m

; con

trac

t not

yet

sign

ed51

Po

peye

-1A

SM 1

998

2001

–200

2(3

0)Pr

ojec

t Air

-539

8 w

orth

$90

m; A

GM

-142

E v

ersi

on;

for

F-11

1C/G

bom

ber

airc

raft

8 M

k-45

127

mm

/54

Nav

al g

un(1

989)

1996

–200

24

Mk-

45 M

od-2

ver

sion

; for

8 M

EK

O-2

00A

NZ

Typ

e(A

nzac

Cla

ss)

frig

ates

8 A

N/S

PS-4

9A

ir s

urv

rada

r 1

993

1996

–200

24

AN

/SPS

-49V

(8)

vers

ion;

for

8 M

EK

O-2

00A

NZ

Typ

e (A

nzac

Cla

ss)

frig

ates

(64)

RG

M-8

4 H

arpo

onA

nti-

ship

mis

sile

(200

2). .

D

eal w

orth

$90

m; R

GM

-84L

ver

sion

; for

ME

KO

-20

0AN

Z T

ype

(Anz

ac C

lass

) fr

igat

es; c

ontr

act n

otye

t sig

ned

(672

)R

IM-7

PTC

ESS

MSA

M 2

002

. .

For

ME

KO

-200

AN

Z T

ype

(Anz

ac C

lass

) an

dm

oder

nize

d A

dela

ide

(Per

ry)

Cla

ss f

riga

tes;

deliv

ery

prob

ably

fro

m 2

003

L:

Can

ada

82

Pira

nha/

LA

V-2

5IF

V 1

998

. .

Dea

l wor

th $

180–

210

m in

cl d

irec

t del

iver

y of

68

APC

ver

sion

; Aus

tral

ian

desi

gnat

ion

ASL

AV

-25;

deliv

ery

2003

–200

5

480 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Ger

man

y 8

ME

KO

-200

AN

Z T

ype

Frig

ate

198

919

96–2

002

4 D

eal w

orth

$3.

2 b

(inc

l $55

5 m

for

2 o

rder

ed b

y N

ewZ

eala

nd);

Aus

tral

ian

desi

gnat

ion

Anz

ac C

lass

;de

liver

y 19

96–2

006;

par

t of

deal

incl

2 p

rodu

ced

inA

ustr

alia

for

New

Zea

land

Ital

y6

Gae

ta C

lass

MC

M s

hip

199

419

99–2

002

6 Se

a-15

55 p

rogr

amm

e w

orth

$51

5–63

6 m

; Aus

tral

ian

desi

gnat

ion

Huo

n C

lass

UK

55

MST

AR

Bat

tlefi

eld

rada

r 1

999

2002

(10)

Proj

ect N

INO

X w

orth

$32

m in

cl d

irec

t del

iver

y of

6; A

ustr

alia

n de

sign

atio

n A

MST

AR

; del

iver

y fr

om20

02

Aus

tria

S:U

K3

C-1

30K

Her

cule

sT

rans

port

air

craf

t 2

002

2002

1 E

x-U

K; d

eal w

orth

$36

m; m

oder

nize

d be

fore

deliv

ery;

del

iver

y 20

02–2

003

USA

9 S-

70A

/UH

-60L

Hel

icop

ter

200

020

02(9

)D

eal w

orth

$18

3 m

(in

cl $

47 im

port

dut

ies;

off

sets

wor

th $

394

m);

incl

for

SA

R; S

-70A

-42

vers

ion;

optio

n on

3 m

ore

Bah

rain

S:U

K6

Haw

k-10

0FG

A/tr

aine

r ac

(200

2). .

H

awk-

127

vers

ion;

pos

sibl

y op

tion

on 6

mor

e3

T-6

7 Fi

refl

yT

rain

er a

ircr

aft

200

220

023

T-6

7M26

0 ve

rsio

nU

SA26

A

IM-1

20B

AM

RA

AM

BV

RA

AM

199

920

02(1

3)D

eal w

orth

$11

0 m

; del

iver

y pr

obab

ly 2

002–

2003

30

MG

M-1

40A

AT

AC

MS

SSM

200

020

0230

D

eal w

orth

$20

m

Ban

glad

esh

S:It

aly

(8)

Oto

mat

Mk-

2A

nti-

ship

mis

sile

(199

8)20

02(8

)Fo

r D

W-2

000H

Typ

e (B

anga

band

hu C

lass

) fr

igat

eR

ussi

a78

B

TR

-80

APC

200

120

01–2

002

78

Dea

l wor

th $

16 m

; fin

ance

d by

UN

for

use

by

Ban

glad

eshi

UN

pea

ceke

epin

g fo

rces

INTERNATIONAL ARMS TRANSFERS 481

Bel

gium

S:Is

rael

18

B-H

unte

r U

AV

UA

V 1

998

2001

–200

2(1

8)D

eal w

orth

$72

.7 m

incl

3 c

ontr

ol s

yste

ms

USA

(92)

AN

/APG

-66

Com

bat a

c ra

dar

199

319

96–2

002

(74)

For

ML

U m

oder

niza

tion

of 9

2 F-

16A

/B F

GA

ac

toF-

16A

M/B

M (

F-16

C/D

) ve

rsio

n; d

eliv

ery

1996

–20

04(5

62)

BG

M-7

1 T

OW

Ant

i-ta

nk m

issi

le 2

001

2002

(281

)B

GM

-71E

TO

W-2

A v

ersi

on; d

eliv

ery

2002

–200

3

Bos

nia

and

Her

zego

vina

S:U

nkno

wn

5 M

i-24

V/M

i-35

/Hin

d-E

Com

bat h

elic

opte

r 1

998

. .Se

cond

-han

d; a

id; p

ossi

bly

in s

tora

ge in

Tur

key;

stat

us u

ncer

tain

Bra

zil

S:C

anad

a3

IRIS

AG

S ra

dar

199

720

02(2

)D

eal w

orth

$14

3 m

; par

t of

SIV

AM

air

-sur

veila

nce

netw

ork;

for

ER

J-14

5RS/

R-9

9B A

GS

airc

raft

prod

uced

in B

razi

lFr

ance

8 A

S-53

2U2/

AS-

332L

2H

elic

opte

r 2

001

2002

(2)

Dea

l wor

th $

160

m; a

ssem

bled

in B

razi

l; de

liver

y20

02–2

004

9 O

cean

Mas

ter

MP

airc

raft

rad

ar(2

002)

. .

Part

of

deal

wor

th $

326

m f

or m

oder

niza

tion

of 9

P-3A

ASW

/MP

airc

raft

to P

-3B

R v

ersi

on;

desi

gnat

ion

unce

rtai

n; d

eliv

ery

from

200

5(8

)M

M-4

0 E

xoce

tA

nti-

ship

mis

sile

(199

5). .

Fo

r B

arro

so C

lass

fri

gate

Isra

el12

K

fir

C7

FGA

air

craf

t 2

002

. .

Ex-

Isra

eli K

fir

C7

mod

erni

zed

to K

fir

C10

ver

sion

befo

re d

eliv

ery;

5-y

ear

leas

e w

orth

$91

mIt

aly

54

Gri

foC

omba

t ac

rada

r(2

000)

. .

For

mod

erni

zatio

n of

AM

X (

A-1

A)

FGA

air

craf

t48

G

rifo

Com

bat a

c ra

dar

200

020

02(1

)Fo

r m

oder

niza

tion

of F

-5E

FG

A a

ircr

aft t

o F-

5BR

vers

ion

by I

srae

li co

mpa

ny; d

eliv

ery

2002

–200

67

RA

N-2

0SA

ir/s

ea s

urv

rada

r 1

995

2001

–200

23

Dea

l wor

th $

111.

5 m

incl

13

RT

N-3

0X r

adar

s an

d 6

Alb

atro

s SA

M s

yste

ms;

for

1 B

arro

so C

lass

fri

gate

prod

uced

in B

razi

l and

mod

erni

zatio

n of

6 N

itero

iC

lass

fri

gate

s; d

eliv

ery

of s

hips

200

1–20

0613

R

TN

-30X

Fire

con

trol

rad

ar 1

995

2001

–200

26

See

prev

ious

com

men

t(1

44)

Asp

ide

Mk-

1SA

M 1

996

2001

–200

2(7

2)D

eal w

orth

$48

.5 m

; for

6 m

oder

nize

d N

itero

i Cla

ssfr

igat

es; d

eliv

ery

of s

hips

200

1–20

04

482 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Spai

n12

C

ASA

C-2

95M

Tra

nspo

rt a

ircr

aft

200

2. .

C

L-X

pro

gram

me

(par

t of

Phoe

nix

Prog

ram

me)

wor

th $

270

m; d

eliv

ery

from

200

4Sw

eden

5 PS

-890

Eri

eye

AE

W r

adar

199

720

02(3

)D

eal w

orth

$14

3 m

; par

t of

SIV

AM

pro

gram

me;

for

ER

J-14

5AE

W&

C/R

-99A

AE

W a

ircr

aft p

rodu

ced

in B

razi

l. .

T

orpe

do-2

000

AS/

ASW

torp

edo

199

9. .

D

eal w

orth

$59

.7 m

; for

Typ

e-20

9/14

00 (

Tik

una

and

poss

ibly

Tup

i Cla

ss)

subm

arin

esU

K(1

2)L

-118

Tow

ed g

un(2

000)

2002

(12)

USA

10

C-1

30H

Her

cule

sT

rans

port

air

craf

t 2

001

2001

–200

2(1

0)E

x-It

alia

n ai

rcra

ft b

ough

t bac

k by

US

prod

ucer

and

sold

to B

razi

l; C

-X p

rogr

amm

e w

orth

$66

–70

m9

P-3A

Ori

onA

SW/M

P ai

rcra

ft 2

002

. .

Ex-

US;

P-X

pro

gram

me;

mod

erni

zed

in S

pain

toP-

3BR

bef

ore

deliv

ery;

3 m

ore

for

spar

es o

nly

20

RG

M-8

4 H

arpo

onA

nti-

ship

mis

sile

(199

9). .

D

eal w

orth

$39

m; c

ould

be

AG

M-8

4 ve

rsio

n; s

tatu

sun

cert

ain

L:

Ger

man

y1

Typ

e-20

9/14

00Su

bmar

ine

199

5. .

B

razi

lian

desi

gnat

ion

Tik

una

Cla

ss; 1

mor

e pl

anne

dbu

t can

celle

d; d

eliv

ery

afte

r 20

06

Bru

nei

S:Fr

ance

(19)

VA

B-V

TT

NG

APC

(199

9)20

01–2

002

(19)

Incl

6 a

mbu

lanc

e ve

rsio

n(3

6)M

M-4

0 E

xoce

tA

nti-

ship

mis

sile

200

0. .

Fo

r 3

Yar

row

-95m

Typ

e fr

igat

es; M

M-4

0 B

lock

-2ve

rsio

nIn

done

sia

3 C

N-2

35M

PAM

P ai

rcra

ft(1

995)

. .

Stat

us u

ncer

tain

UK

3 Y

arro

w-9

5m T

ype

Frig

ate

199

8. .

B

rune

ian

desi

gnat

ion

Nak

hoda

Rag

am C

lass

;de

liver

y fr

om 2

003

(96)

Seaw

olf

VL

SAM

(200

1). .

Fo

r 3

Yar

row

-95m

Typ

e fr

igat

es

INTERNATIONAL ARMS TRANSFERS 483

Can

ada

S:It

aly

15

EH

-101

-500

Hel

icop

ter

199

820

01–2

002

(11)

Dea

l wor

th $

404–

500

m (

offs

ets

110%

); f

or S

AR

;C

anad

ian

desi

gnat

ion

CH

-149

or

AW

-520

Cor

mor

ant;

deliv

ery

2001

–200

3U

K4

Haw

k-10

0FG

A/tr

aine

r ac

200

02

For

civi

lian

com

pany

for

trai

ning

of

pilo

ts f

rom

Can

adia

n an

d ot

her

air

forc

es u

nder

NA

TO

Fly

ing

Tra

inin

g in

Can

ada

(NFT

C)

prog

ram

me;

Haw

kM

k-11

5 ve

rsio

n; C

anad

ian

desi

gnat

ion

CT

-155

4 U

phol

der

Cla

ssSu

bmar

ine

199

820

00–2

002

3 E

x-U

K; l

ease

wor

th $

504

m; i

n ex

chan

ge f

or 8

-yea

rU

K u

se o

f C

anad

ian

base

s fo

r tr

aini

ng; C

anad

ian

desi

gnat

ion

Vic

tori

a C

lass

; del

iver

y 20

00–2

003

USA

2 PC

-9/T

-6A

Tex

an-2

Tra

iner

air

craf

t 2

002

. .

For

civi

lian

com

pany

for

trai

ning

of

pilo

ts f

rom

Can

adia

n an

d ot

her

air

forc

es u

nder

NA

TO

Fly

ing

Tra

inin

g in

Can

ada

(NFT

C)

prog

ram

me;

T-6

A-1

vers

ion;

Can

adia

n de

sign

atio

n C

T-1

56 H

arva

rd-2

80

AN

/APG

-73

Com

bat a

c ra

dar

200

1. .

Fo

r m

oder

niza

tion

of 8

0 C

F-18

(F/

A-1

8) F

GA

airc

raft

to C

F-18

IMP

vers

ion;

del

iver

y fr

om 2

003

47

MST

AR

Bat

tlefi

eld

rada

r 2

001

2002

(23)

Dea

l wor

th $

13 m

; for

Pir

anha

-3 A

PC (

artil

lery

fir

eco

ntro

l ver

sion

); d

eliv

ery

2002

–200

312

R

GM

-84

Har

poon

Ant

i-sh

ip m

issi

le 1

998

2000

–200

2(1

2)D

eal w

orth

$20

m12

R

IM-6

6M S

tand

ard-

2SA

M 2

002

. .

Dea

l wor

th $

19 m

(288

)R

IM-7

PTC

ESS

MSA

M 2

001

. .

For

12 m

oder

nize

d H

alif

ax C

lass

fri

gate

s; d

eliv

ery

2004

–201

0

L:

Switz

erla

nd17

1 Pi

ranh

a/L

AV

-25

IFV

(199

9)20

02(8

0)In

cl 7

1 ta

nk-d

estr

oyer

, 39

AE

V a

nd 4

7 ar

tille

ry f

ire

cont

rol v

ersi

on; C

anad

ian

desi

gnat

ion

Kod

iak;

deliv

ery

2002

–200

4

Chi

leS:

Fran

ce4

AS-

350/

550

Fenn

ecL

ight

hel

icop

ter

200

120

02(4

)A

S-35

0B v

ersi

on(1

6)M

M-4

0 E

xoce

tA

nti-

ship

mis

sile

(200

2). .

Fo

r B

oxer

(W

illia

ms)

Cla

ss f

riga

te; c

ontr

act n

ot y

etsi

gned

484 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

1 Sc

orpe

ne C

lass

Subm

arin

e 1

997

. .

Nep

tune

Pro

gram

me

wor

th $

400

m in

cl 1

fro

mSp

ain;

Chi

lean

des

igna

tion

Hya

tt C

lass

; del

iver

y20

04Is

rael

(84)

Der

byB

VR

AA

M(2

001)

2002

(42)

For

mod

erni

zed

F-5E

(T

igre

-3)

FGA

air

craf

t(8

4)Py

thon

-4B

VR

AA

M(2

001)

2001

–200

2(8

4)Fo

r T

igre

-3 (

mod

erni

zed

F-5E

) FG

A a

ircr

aft

Ital

y(1

14)

M-1

13A

2A

PC(1

996)

2002

(114

)E

x-It

alia

n; d

eal i

ncl a

lso

14 M

-548

A1

vehi

cles

Net

herl

ands

6 B

rPz-

1 B

iber

AB

L(2

001)

2002

6 E

x-D

utch

; mod

erni

zed

befo

re d

eliv

ery;

incl

3 b

ridg

e-ca

rryi

ng v

ersi

on2

Leo

pard

-1 c

hass

isT

ank

chas

sis

200

120

02(2

)E

x-D

utch

; Leo

pard

-1 ta

nks

mod

ifie

d to

min

e-cl

eare

r/A

EV

bef

ore

deliv

ery

3 Pi

Pz-1

AE

V 2

001

2002

3 E

x-D

utch

; mod

erni

zed

befo

re d

eliv

ery

Spai

n1

Scor

pene

Cla

ssSu

bmar

ine

199

7. .

N

eptu

ne P

rogr

amm

e w

orth

$40

0 m

incl

1 f

rom

Fran

ce; C

hile

an d

esig

natio

n H

yatt

Cla

ss; d

eliv

ery

2006

UK

(24)

Seaw

olf

SAM

(200

2). .

Fo

r B

oxer

(W

illia

ms)

Cla

ss f

riga

te; c

ontr

act n

ot y

etsi

gned

1 B

oxer

Cla

ssFr

igat

e(2

002)

. .

Ex-

UK

; dea

l wor

th $

15 m

; con

trac

t not

yet

sig

ned;

deliv

ery

2003

USA

10

F-16

CFG

A a

ircr

aft

(200

2). .

C

aza-

2000

or

F-20

00 P

roga

mm

e w

orth

$66

0 m

(off

sets

100

%);

F-1

6C/D

Blo

ck-5

0/52

ver

sion

;co

ntra

ct n

ot y

et s

igne

d; d

eliv

ery

from

200

5–20

07

Chi

naS:

Fran

ce(1

4)C

asto

r-2

Fire

con

trol

rad

ar(1

986)

1994

–200

2(1

4)Fo

r 2

Luh

u C

lass

(T

ype-

052)

, 1 L

uhai

Cla

ss a

ndm

oder

niza

tion

of 3

Lud

a-1

Cla

ss (

Typ

e-05

1)de

stro

yers

and

for

8 J

iang

wei

-2 C

lass

fri

gate

s;pr

obab

ly a

ssem

bled

or

prod

uced

in C

hina

; for

use

with

Cro

tale

ED

IR (

Chi

nese

des

igna

tion

HQ

-7)

SAM

sys

tem

(336

)R

-440

Cro

tale

SAM

198

619

90–2

002

(336

)Se

e pr

evio

us c

omm

ent

INTERNATIONAL ARMS TRANSFERS 485

Isra

el. .

E

L/M

-203

2C

omba

t ac

rada

r(2

000)

. .

For

FC-1

FG

A a

ircr

aft;

stat

us u

ncer

tain

Rus

sia

(4)

A-5

0U M

ains

tay

AE

W&

C a

ircr

aft

(200

1). .

N

o. o

rder

ed c

ould

be

up to

5; o

rder

ed a

fter

Isr

ael

(und

er U

S pr

essu

re)

refu

sed

deliv

ery

of o

rder

edA

EW

&C

air

craf

t; de

liver

y po

ssib

ly f

rom

200

3(1

)Il

-76M

/Can

did-

BT

rans

port

air

craf

t(2

000)

2002

1 Po

ssib

ly n

ewly

pro

duce

d ai

rcra

ft f

rom

Uzb

ekis

tan

sold

via

Rus

sia;

pos

sibl

y m

oder

nize

d in

Rus

sia

befo

re d

eliv

ery

28

Su-2

7SK

/Fla

nker

-BFG

A a

ircr

aft

199

920

00–2

002

28

Dea

l wor

th $

1 b;

pay

men

t for

Rus

sian

deb

t to

Chi

na;

Su-2

7UB

K tr

aine

r ve

rsio

n50

Su

-27S

K/F

lank

er-B

FGA

air

craf

t 1

996

1998

–200

2(3

2)A

ssem

bled

in C

hina

; dea

l wor

th $

1.46

–2.5

b in

cl 1

50lic

ense

d pr

oduc

tion;

Chi

nese

des

igna

tion

J-11

;de

liver

y 19

98–2

007/

2008

incl

150

lice

nsed

prod

uctio

n38

Su

-30M

K/F

lank

erFG

A a

ircr

aft

200

120

02(1

9)D

eal w

orth

$2

b; S

u-30

MK

K v

ersi

on; d

eliv

ery

2002

–20

0324

Su

-30M

K/F

lank

erFG

A a

ircr

aft

(200

2). .

D

eal w

orth

$1

b; S

u-30

MK

2 na

val a

ttack

ver

sion

(3 7

20)

AA

-11

Arc

her/

R-7

3SR

AA

M(1

995)

1996

–200

2(1

400

)Fo

r Su

-27S

K a

nd S

u-30

MK

K F

GA

air

craf

t(1

00)

AA

-12

Add

er/R

-77

BV

RA

AM

(200

0)20

02(1

00)

For

Su-3

0MK

K a

nd S

u-27

UB

K F

GA

air

craf

t;C

hine

se d

esig

natio

n R

-129

. .

AS-

17/K

h-31

A1

Ant

i-sh

ip m

issi

le(1

997)

. .

For

Su-3

0MK

K, J

-8M

IIM

and

/or

JH-7

FG

A a

ircr

aft;

may

incl

ass

embl

y or

lice

nsed

pro

duct

ion

in C

hina

;st

atus

unc

erta

in. .

A

S-17

/Kh-

31P1

Ant

i-ra

dar

mis

sile

(199

8)20

01–2

002

(20)

Incl

for

Su-

30M

KK

FG

A a

ircr

aft;

poss

ibly

lice

nsed

prod

uctio

n as

KR

-1(4

)SA

-10e

/S-3

00PM

U-2

SAM

sys

tem

200

1. .

D

eal w

orth

$40

0 m

(pa

rtly

pay

men

t for

Rus

sian

deb

tto

Chi

na)

. .

SA-1

0 G

rum

ble/

48N

6SA

M 2

001

. .

For

SA-1

0e/S

-300

PMU

-2 S

AM

sys

tem

s10

0 Z

huk

Com

bat a

c ra

dar

200

120

01–2

002

(11)

Zhu

k-8

vers

ion;

for

mod

erni

zatio

n of

J-8

-II

figh

ter

ac1

Zm

ei/S

ea D

rago

nA

irbo

rne

MP

rada

r 2

002

. .

For

use

on b

allo

on f

or s

urve

illan

ce o

f T

aiw

an S

trai

t(6

4)SS

-N-2

7/3M

54E

1A

nti-

ship

mis

sile

200

2. .

Fo

r m

oder

nize

d K

ilo C

lass

sub

mar

ines

8 K

ilo C

lass

/Typ

e-63

6ESu

bmar

ine

200

2. .

D

eal w

orth

$1.

5–1.

6 b;

del

iver

y be

fore

200

82

Sovr

emen

ny C

lass

Des

troy

er 2

002

. .

Typ

e-95

6EM

ver

sion

; dea

l wor

th $

1–1.

4 b;

opt

ion

on2

mor

e; d

eliv

ery

2006

486 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

(132

)SA

-17

Gri

zzly

/9M

38M

2SA

M(2

001)

. .

SA-N

-12/

9M38

M2

vers

ion

for

Sovr

emen

ny C

lass

dest

roye

rs; d

esig

natio

n un

cert

ain

UK

(6)

Sear

chw

ater

AE

W r

adar

199

619

99(1

)D

eal w

orth

$62

–66

m; f

or Y

-8 A

EW

and

MP

airc

raft

or p

ossi

bly

SA-3

41/Z

-8 h

elic

opte

rsU

krai

ne4

Kol

chny

aA

ir s

urv

syst

em(2

000)

2002

(4)

Als

o de

sign

ated

Kol

chug

a(1

860

)A

A-1

0a/b

Ala

mo/

R-2

7B

VR

AA

M(1

995)

1996

–200

2(7

00)

For

Su-2

7SK

and

Su-

30M

KK

FG

A a

ircr

aft;

som

eco

uld

be d

eliv

ered

fro

m R

ussi

a(1

860

)A

A-1

0c/d

Ala

mo/

R-2

7EB

VR

AA

M(1

995)

1996

–200

2(7

00)

For

Su-2

7SK

and

Su-

30M

KK

FG

A a

ircr

aft

L:

Fran

ce. .

A

S-36

5/A

S-56

5H

elic

opte

r 1

988

1992

–200

2(2

1)C

hine

se d

esig

natio

n Z

-9A

or

Z-9

A-1

00 H

aitu

n an

dZ

-9B

/C/G

; inc

l Z-9

C A

SW a

nd W

Z-9

ant

i-ta

nkve

rsio

nsR

ussi

a(1

50)

Su-2

7SK

/Fla

nker

-BFG

A a

ircr

aft

199

6. .

D

eal w

orth

$1.

46 b

–$2.

5 b

incl

50

asse

mbl

ed in

Chi

na; C

hine

se d

esig

natio

n J-

11; d

eliv

ery

1998

–20

07/2

008

incl

50

asse

mbl

ed in

Chi

na

Col

ombi

aS:

Rus

sia

6 M

i-17

/Hip

-HH

elic

opte

r 2

001

2002

6 D

eal w

orth

$36

m; M

i-17

-1V

ver

sion

Spai

n2

CN

-235

Tra

nspo

rt a

ircr

aft

(200

1)20

022

Seco

nd-h

and;

CN

-235

-200

ver

sion

; for

nav

y; f

oran

ti-na

rcot

ic o

pera

tions

; dea

l wor

th $

11 m

USA

(42)

Bel

l-20

5/U

H-1

HH

elic

opte

r(2

000)

2002

(21)

Ex-

US;

dea

l wor

th $

323

m; p

art o

f $1

.3 b

Pla

nC

olom

bia

anti-

narc

otic

s ai

d; m

oder

nize

d to

Hue

y-II

bef

ore

deliv

ery;

del

iver

y fr

om 2

002

1 C

-130

B H

ercu

les

Tra

nspo

rt a

ircr

aft

200

220

021

Ex-

US;

aid

; for

ant

i-na

rcot

ics

oper

atio

ns1

Ces

sna-

560

AE

WA

EW

air

craf

t(2

002)

2002

1 5

K-1

200

K-M

AX

Hel

icop

ter

200

220

025

Ori

gina

lly f

or P

eru;

for

pol

ice

anti-

narc

otic

sop

erat

ions

(2)

OV

-10A

Bro

nco

Gro

und

atta

ck a

c(2

000)

2002

2 E

x-U

S; a

id

INTERNATIONAL ARMS TRANSFERS 487

5 SA

-2-3

7R

econ

nais

sanc

e ac

200

020

01–2

002

(5)

Part

of

$1.3

b P

lan

Col

ombi

a an

ti-na

rcot

ics

aid;

SA-2

-37B

ver

sion

Con

go (

DR

C)

S:B

elgi

um1

Mi-

26/H

alo

Hel

icop

ter

(200

1)20

021

Seco

nd-h

and

Côt

e d’

Ivoi

reS:

Ang

ola

(2)

BM

P-2

IFV

200

220

02(2

)E

x-A

ngol

an; t

o fi

ght r

ebel

sU

nkno

wn

(2)

Mi-

24D

/Mi-

25/H

ind-

DC

omba

t hel

icop

ter

(200

2)20

02(2

)Se

cond

-han

d; le

ased

fro

m a

nd o

pera

ted

by S

outh

Afr

ican

mer

cena

ry c

ompa

ny to

fig

ht r

ebel

s

Cro

atia

S:It

aly

4 Fa

lcon

-2Se

a su

rv r

adar

199

820

01–2

002

(4)

For

coas

tal s

urve

illan

ce

Cze

ch R

epub

licS:

Ital

y72

G

rifo

Com

bat a

c ra

dar

(199

8)20

00–2

002

(52)

For

72 L

-159

A F

GA

/trai

ner

ac; G

rifo

-L v

ersi

on2

RA

T-3

1S/L

Air

sur

v ra

dar

200

2. .

Pa

rt o

f N

AD

GE

(N

AT

O A

ir D

efen

ce G

roun

dE

nvir

onm

enta

l) n

etw

ork;

RA

T-3

1DL

ver

sion

Rus

sia

3 A

n-70

Tra

nspo

rt a

ircr

aft

200

2. .

D

eal w

orth

$19

5 m

; pay

men

t for

Rus

sian

deb

t to

Cze

ch R

epub

lic; d

eliv

ery

2005

–200

62

Mi-

17/H

ip-H

Hel

icop

ter

(200

2). .

Pa

ymen

t for

Rus

sian

deb

ts to

Cze

ch R

epub

lic;

deliv

ery

2003

7 M

i-24

V/M

i-35

/Hin

d-E

Com

bat h

elic

opte

r 2

002

. .

Ex-

Rus

sian

; pay

men

t for

Rus

sian

deb

t to

Cze

chR

epub

lic; d

eliv

ery

2006

USA

(150

)A

IM-9

M S

idew

inde

rSR

AA

M 2

002

2002

(150

)D

eal w

orth

$35

m; f

or p

rote

ctio

n of

NA

TO

sum

mit

mee

ting

in P

ragu

e; f

or L

-159

FG

A/tr

aine

r ai

rcra

ft

Den

mar

kS:

Finl

and

11

XA

-185

APC

200

120

01–2

002

11

Ex-

Finn

ish;

am

bula

nce

vers

ion;

leas

e fo

r us

e w

ithD

anis

h pe

acek

eepi

ng f

orce

s in

Bos

nia

and

Kos

ovo

Ger

man

y (1

6)M

U-9

0 Im

pact

ASW

torp

edo

199

920

01–2

002

(8)

For

Flyv

efis

ken

FAC

488 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

UK

14

EH

-101

-500

Hel

icop

ter

200

1. .

D

eal w

orth

$32

9 m

(of

fset

s in

cl p

rodu

ctio

n of

EH

-101

com

pone

nts

in D

enm

ark)

; inc

l for

SA

R;

deliv

ery

2004

–200

6U

SA3

C-1

30J-

30 H

ercu

les

Tra

nspo

rt a

ircr

aft

200

0. .

D

eliv

ery

from

200

3; o

ptio

n on

1 m

ore

2 M

k-45

127

mm

/54

Nav

al g

un 2

002

. .

Ex-

US;

mod

erni

zed

to M

od-4

ver

sion

bef

ore

deliv

-er

y; d

eal w

orth

$30

m; f

or 2

LSS

-FS

Typ

e fr

igat

es(3

6)R

IM-7

PTC

ESS

MSA

M 2

002

. .

For

LSS

-FS

Typ

e fr

igat

es(1

80)

RIM

-7M

Sea

spar

row

SAM

(199

4)19

98–2

002

(150

)Fo

r Fl

yvef

iske

n C

lass

FA

C/M

CM

shi

ps a

ndm

oder

nize

d N

iels

Jue

l Cla

ss f

riga

tes

Dom

inic

an R

epub

licS:

Bra

zil

10

EM

B-3

14 S

uper

Tuc

ano

Tra

iner

air

craf

t(2

001)

. .

Incl

for

ant

i-na

rcot

ics

oper

atio

ns; d

eliv

ery

2003

–20

04

Ecu

ador

S:C

hile

4 T

-35

Pilla

nT

rain

er a

ircr

aft

(200

2)20

02(4

)

Egy

ptS:

Aus

tria

170

M-6

0A1

Patto

n-2

Mai

n ba

ttle

tank

200

120

0217

0 E

x-A

ustr

ian;

dea

l wor

th $

27 m

Chi

na35

K

-8 K

arak

orum

-8Je

t tra

iner

air

craf

t 1

999

2001

–200

2(2

4)D

eal w

orth

$34

5 m

incl

45

licen

sed

prod

uctio

n;K

-8E

ver

sion

; inc

l 25

asse

mbl

ed in

Egy

ptG

erm

any

74

G-1

15D

Tra

iner

air

craf

t 2

000

2000

–200

2(7

4)G

-115

EG

ver

sion

5 C

omba

ttant

e-2

Typ

eFA

C(M

)(2

002)

2002

1 E

x-G

erm

an; G

erm

an d

esig

natio

n T

ype-

148

or T

iger

Cla

ss; d

eliv

ery

2002

–200

31

Lün

ebur

g C

lass

Supp

ort s

hip

200

2. .

E

x-G

erm

an; d

eliv

ery

2003

1 W

este

rwal

d C

lass

Supp

ort s

hip

200

2. .

E

x-G

erm

an; d

eliv

ery

2003

USA

1 E

-2C

Haw

keye

AE

W&

C a

ircr

aft

200

1. .

E

x-U

S; a

id; m

oder

nize

d to

Haw

keye

-200

0 be

fore

deliv

ery

unde

r de

al w

orth

$25

m

INTERNATIONAL ARMS TRANSFERS 489

24

F-16

CFG

A a

ircr

aft

199

920

01–2

002

(24)

Peac

e V

ecto

r-6

deal

wor

th $

1.2

b; in

cl 1

2 F-

16D

vers

ion

201

M-1

09A

2Se

lf-p

rope

lled

gun

(200

1). .

E

x-U

S; d

eal w

orth

$77

m; s

tatu

s un

cert

ain

26

M-2

70 M

LR

SM

RL

200

1. .

D

eal w

orth

$35

4 m

incl

roc

kets

, 3 M

-88A

2 A

RV

san

d 30

M-1

13A

2 A

PC/C

Ps; F

MF

aid;

del

iver

ypr

obab

ly 2

003

30

M-1

13A

2A

PC 2

001

2001

–200

2(3

0)Se

e pr

evio

us c

omm

ent

3 M

-88A

2 H

ercu

les

AR

V 2

001

. .

See

prev

ious

com

men

t50

M

-88A

2 H

ercu

les

AR

V 1

998

2000

–200

2(5

0)D

eal w

orth

$19

7.9

m; a

ssem

bled

in E

gypt

13

M-8

8A2

Her

cule

sA

RV

(200

1). .

D

eal w

orth

$73

m; a

ssem

bled

in E

gypt

5 A

N/A

PS-1

45A

EW

rad

ar 1

999

2002

(1)

Dea

l wor

th $

138

m; f

or m

oder

niza

tion

of 5

E-2

CA

EW

&C

air

craf

t to

Haw

keye

-200

0 ve

rsio

n6

AN

/SPS

-48

Air

sur

v ra

dar

200

1. .

D

eal w

orth

$14

3 m

; AN

/SPS

-48E

ver

sion

; del

iver

yby

200

64

Phal

anx

Mk-

15C

IWS

200

1. .

E

x-U

S; d

eal w

orth

$0.

83 m

; mod

erni

zed

befo

rede

liver

y in

cl 1

to B

lock

-1B

ver

sion

(576

)FI

M-9

2A S

tinge

rPo

rtab

le S

AM

200

020

02(2

63)

For

24 A

veng

er S

AM

sys

tem

s(4

2)R

GM

-84

Har

poon

Ant

i-sh

ip m

issi

le 1

998

2000

–200

2(4

2)4

Am

bass

ador

Typ

eFA

C(M

) 2

000

. .

Dea

l wor

th $

400

m; A

mba

ssad

or M

k-3

vers

ion;

deliv

ery

2004

–200

5

L:

Chi

na45

K

-8 K

arak

orum

-8T

rain

er a

ircr

aft

200

0. .

D

eal w

orth

$34

5 m

incl

dir

ect d

eliv

ery

of 3

5; K

-8E

vers

ion

Finl

and

. .

155-

GH

-52

Tow

ed g

un(1

999)

2002

(1)

Dea

l wor

th $

17–2

1 m

incl

dir

ect d

eliv

ery

of 2

USA

100

M-1

A1

Abr

ams

Mai

n ba

ttle

tank

199

920

02(4

5)D

eal w

orth

$56

4 m

; del

iver

y 20

02–2

003

100

M-1

A1

Abr

ams

Mai

n ba

ttle

tank

200

1. .

D

eal w

orth

$59

0 m

; del

iver

y 20

04–2

005

Eri

trea

S:R

ussi

a(8

)M

iG-2

9S/F

ulcr

um-C

FGA

air

craf

t(1

999)

2001

–200

2(8

)

Est

onia

S:U

SA4

R44

Hel

icop

ter

200

120

024

Aid

wor

th $

2 m

490 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

1 A

N/T

PS-1

17A

ir s

urv

rada

r 2

001

. .

Dea

l wor

th $

12 m

; par

t of

BA

LT

NE

T a

ir-

surv

eilla

nce

netw

ork

Eth

iopi

aS:

Bul

gari

a(1

40)

T-5

5M

ain

battl

e ta

nk(1

998)

1999

–200

2(1

40)

Ex-

Bul

gari

an; m

ay in

cl s

ome

from

Ukr

aine

and

/or

Rom

ania

sol

d vi

a B

ulga

ria;

sta

tus

of la

st 4

0un

cert

ain

Fin

land

S:Fr

ance

(540

)M

istr

alPo

rtab

le S

AM

(198

9)19

90–2

002

(540

)Fo

r Sa

ko (

mod

ifie

d SA

DR

AL

) SA

M s

yste

m o

nH

amin

a, H

amee

nma

and

Pohj

anm

aa C

lass

min

elay

ers

and

on H

elsi

nki a

nd R

aum

a C

lass

FA

CG

erm

any

124

Leo

pard

-2A

4M

ain

battl

e ta

nk 2

002

. .

Ex-

Ger

man

; dea

l wor

th $

66 m

; del

iver

y 20

03–2

004

2 T

RM

L-C

SA

ir/s

ea s

urv

rada

r 2

002

. .

For

2 H

amin

a C

lass

FA

C; a

ssem

bled

in F

inla

ndIs

rael

. .

Spik

e-M

R/L

RA

nti-

tank

mis

sile

200

0. .

D

eal w

orth

$30

m; a

ssem

bled

or

prod

uced

inG

erm

any;

Spi

ke-2

.5 v

ersi

onM

ultip

le s

elle

rs2

NH

-90

TT

HH

elic

opte

r 2

001

. .

Dea

l wor

th $

350

m (

$520

m in

cl s

uppo

rt)

incl

licen

sed

prod

uctio

n of

18;

sup

plie

d by

Fra

nce

and

Ger

man

y; d

eliv

ery

2004

Net

herl

ands

2 Sc

out

Sea

surv

rad

ar 1

998

1998

1 Fo

r 2

Ham

ina

Cla

ss F

AC

Sout

h A

fric

a. .

U

mkh

onto

-1R

SAM

200

2. .

D

eal w

orth

$17

m; f

or H

amin

a an

d T

-200

0 C

lass

FAC

Swed

en57

C

V-9

030

IFV

200

020

02(1

0)D

eal w

orth

$17

6 m

(of

fset

s in

cl p

rodu

ctio

n of

com

pone

nts

in F

inla

nd);

TA

-200

0 pr

ojec

t; de

liver

y20

02–2

005

2 9L

VFi

re c

ontr

ol r

adar

(199

7)19

981

9LV

225

vers

ion

for

2 H

amin

a C

lass

FA

C p

rodu

ced

in F

inla

nd(1

6)R

BS-

15SF

Ant

i-sh

ip m

issi

le(1

997)

1998

–200

2(1

6)Fo

r H

amin

a C

lass

FA

C

INTERNATIONAL ARMS TRANSFERS 491

. .

RB

S-15

Mk-

3A

nti-

ship

mis

sile

200

1. .

D

eal w

orth

SE

K 5

00 m

($5

0 m

) in

cl m

oder

niza

tion

of e

xist

ing

Finn

ish

RB

S-15

mis

sile

to M

k-3

vers

ion;

Fin

nish

des

igna

tion

RB

S-15

SF-3

(4)

HA

RD

Air

sur

v ra

dar

200

2. .

Fo

r A

SRA

D S

AM

sys

tem

s(6

0)R

BS-

70 M

k-2

Port

able

SA

M 2

002

. .

For

use

with

ASR

AD

-R S

AM

sys

tem

L:

Mul

tiple

sel

lers

18

NH

-90

TT

HH

elic

opte

r 2

001

. .

Dea

l wor

th $

350

m (

$520

m in

cl s

uppo

rt)

incl

dir

ect

deliv

ery

of 2

; sup

plie

d by

Fra

nce

and

Ger

man

y;de

liver

y fr

om 2

004

Fra

nce

S:G

erm

any

12

CL

-289

UA

V 2

002

2002

12

Ex-

Ger

man

Isra

el3

Eag

leU

AV

200

1. .

M

AL

E U

AV

pro

gram

me;

del

iver

y 20

03Sp

ain

2 C

N-2

35T

rans

port

air

craf

t(2

001)

2002

2 3

CN

-235

Tra

nspo

rt a

ircr

aft

200

2. .

D

eliv

ery

2003

Swed

en4

Gir

affe

AM

B-3

DA

ir s

urv

rada

r 2

001

. .

Del

iver

y fr

om 2

003

USA

1 E

-2C

Haw

keye

AE

W&

C a

ircr

aft

199

9. .

D

eal w

orth

$89

4 m

incl

2 o

rder

ed in

199

5 (o

ffse

tsw

orth

$44

0 m

incl

Fre

nch

prod

uctio

n of

com

pone

nts)

; del

iver

y 20

03

Ger

man

yS:

Net

herl

ands

3 A

PAR

Mul

ti-fu

nctio

n ra

dar

(199

7). .

Fo

r 3

Sach

sen

Cla

ss (

F-12

4 or

Typ

e-12

4) f

riga

tes;

deliv

ery

2003

–200

53

SMA

RT

-LA

ir/s

ea s

urv

rada

r (

1997

). .

Se

e pr

evio

us c

omm

ent

Swed

en31

B

v-20

6SA

PC 2

002

2002

(5)

Dea

l wor

th $

12 m

; am

bula

nce

vers

ion;

del

iver

y20

02–2

004

10

HA

RD

Air

sur

v ra

dar

199

820

01–2

002

(7)

For

Oze

lot (

LeF

laSy

s or

ASR

AD

) SA

M s

yste

ms

prod

uced

in G

erm

any;

del

iver

y 20

01–2

003

. .

RB

S-15

Mk-

3A

nti-

ship

mis

sile

(200

2). .

Fo

r K

-130

Cla

ss c

orve

ttes;

incl

ass

embl

y in

Ger

man

y; c

ontr

act n

ot y

et s

igne

dU

K(1

5)Se

aspr

ay-3

000

MP

airc

raft

rad

ar(1

999)

2002

(3)

Part

of

$125

m m

oder

niza

tion

of 1

7 L

ynx

Mk-

88he

licop

ters

to S

uper

Lyn

x M

k-88

A v

ersi

on

492 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

USA

. .

RIM

-66M

Sta

ndar

d-2

SAM

200

1. .

Fo

r Sa

chse

n C

lass

(F-

124

or T

ype-

124)

fri

gate

s

L:

USA

(1 4

00)

FIM

-92C

Stin

ger

Port

able

SA

M 1

986

1998

–200

2(1

400

)G

erm

an d

esig

natio

n Fl

iege

rfau

st-2

; par

t of

Eur

opea

nSt

inge

r Pr

oduc

tion

Prog

ram

me

incl

fin

al a

ssem

bly

in G

erm

any

Gre

ece

S:B

razi

l4

EM

B-1

45A

EW

&C

AE

W&

C a

ircr

aft

199

9. .

D

eal w

orth

$47

6–50

0 m

incl

4 P

S-89

0 E

riey

e ra

dars

from

Sw

eden

; del

iver

y fr

om 2

003;

opt

ion

on 2

mor

eC

anad

a2

CL

-415

Tra

nspo

rt a

ircr

aft

199

8. .

Fo

r co

mba

t SA

R; d

eliv

ery

2003

Fran

ce4

AS-

532U

L/A

S-33

2L1

Hel

icop

ter

200

0. .

D

eal w

orth

$90

m (

offs

ets

100%

); f

or c

omba

t SA

R;

optio

n on

2 m

ore

tran

spor

t ver

sion

; del

iver

y 20

03(8

)C

rece

relle

UA

V 2

002

. .

Dea

l wor

th $

35 m

15

Mir

age-

2000

-5FG

A a

ircr

aft

200

0. .

D

eal w

orth

$1.

4 b

incl

200

MIC

A a

nd 5

6 SC

AL

P-E

G m

issi

les

and

mod

erni

zatio

n of

10

Gre

ekM

irag

e-20

00E

G to

Mir

age-

2000

-5; d

eliv

ery

2003

–20

0420

0 M

ICA

BV

RA

AM

200

0. .

M

ICA

-EM

and

MIC

A-I

R v

ersi

on; o

ptio

n on

50

mor

e; s

ee a

lso

prev

ious

com

men

t56

St

orm

Sha

dow

/SC

AL

PA

SM 2

001

. .

SCA

LP-

EG

ver

sion

; del

iver

y fr

om 2

003;

see

als

opr

evio

us c

omm

ents

70

VB

LR

ecce

veh

(200

2). .

G

erm

any

60

Eur

ofig

hter

/Typ

hoon

FGA

air

craf

t(2

002)

. .

Dea

l wor

th $

4.5–

4.9

b; c

ontr

act n

ot y

et s

igne

d24

Pz

H-2

000

155m

mSe

lf-p

rope

lled

gun

200

1. .

D

eal w

orth

$16

4–22

8 m

(of

fset

s 12

0%)

incl

28

AL

Vs;

del

iver

y 20

03–2

004

28

PZH

-200

0 A

LV

AL

V 2

001

. .

See

prev

ious

com

men

t17

0 L

eopa

rd-2

A5

Mai

n ba

ttle

tank

200

2. .

L

eopa

rd-2

HE

L v

ersi

on; d

eliv

ery

2003

–200

824

B

uffe

lA

PC 2

002

. .

Ass

embl

ed in

Gre

ece

(12)

PSB

-2A

BL

200

2. .

INTERNATIONAL ARMS TRANSFERS 493

(36)

AN

/APG

-65

Com

bat a

c ra

dar

199

720

02(1

0)Pa

rt o

f $3

15 m

Pea

ce I

caru

s-20

00 m

oder

niza

tion

prog

ram

me

of 3

6 F-

4E F

GA

air

craf

t; de

liver

y20

02–2

003

(350

)FI

M-9

2C S

tinge

rPo

rtab

le S

AM

198

619

98–2

002

(350

)Pa

rt o

f E

urop

ean

Stin

ger

Prod

uctio

n Pr

ogra

mm

ein

volv

ing

prod

uctio

n of

com

pone

nts

in T

urke

y(4

32)

FIM

-92C

Stin

ger

Port

able

SA

M 2

000

2002

(216

)D

eal w

orth

$13

4 m

incl

54

ASR

AD

SA

M s

yste

ms

(350

)IR

IS-T

SRA

AM

(200

2). .

C

ontr

act n

ot y

et s

igne

d; d

eliv

ery

from

200

4(1

26)

RIM

-116

A R

AM

SAM

200

0. .

D

eal w

orth

$25

m in

cl 3

laun

cher

s; f

or 3

Sup

er V

itaC

lass

FA

C1

Typ

e-21

4Su

bmar

ine

200

0. .

D

eal w

orth

$0.

92–1

.26

b in

cl 2

lice

nsed

pro

duct

ion

(off

sets

115

%);

Gre

ek d

esig

natio

n K

atso

nis

Cla

ss;

deliv

ery

2005

Ital

y12

C

-27J

Spa

rtan

Tra

nspo

rt a

ircr

aft

(200

2). .

D

eal w

orth

$31

2 m

(of

fset

s 36

0%);

del

iver

y 20

04–

2005

1 R

AT

-31S

/LA

ir s

urv

rada

r(2

002)

. .

Part

of

NA

DG

E (

NA

TO

Air

Def

ence

Gro

und

Env

iron

men

tal)

net

wor

k; R

AT

-31D

L v

ersi

onM

ultip

le s

elle

rs42

N

H-9

0 T

TH

Hel

icop

ter

(200

2). .

D

eal w

orth

$65

5 m

; to

be d

eliv

ered

fro

m F

ranc

ean

d/or

Ger

man

y; o

ptio

n on

4 m

ore;

con

trac

t not

yet

sign

edN

ethe

rlan

ds8

PiPz

-1A

EV

200

220

028

Ex-

Dut

ch(7

)L

IRO

DFi

re c

ontr

ol r

adar

200

020

02(1

)Fo

r 3

Supe

r V

ita C

lass

and

4 m

odif

ied

Osp

rey-

55T

ype

(Pir

polit

is C

lass

) FA

C(7

)V

aria

ntA

ir/s

ea s

urv

rada

r 2

000

2002

(1)

See

prev

ious

com

men

t3

MW

-08

Air

sur

v ra

dar

200

0. .

Fo

r 3

Supe

r V

ita C

lass

FA

C3

STIN

GFi

re c

ontr

ol r

adar

200

0. .

Fo

r 3

Supe

r V

ita C

lass

FA

C3

Scou

tSe

a su

rv r

adar

200

0. .

Fo

r 3

Supe

r V

ita C

lass

FA

C3

Kor

tena

er C

lass

Frig

ate

200

220

021

Ex-

Dut

ch; i

n tw

o de

als

wor

th $

34 m

and

$55

m;

Gre

ek d

esig

natio

n E

lli C

lass

Rus

sia

19

SA-1

5/9A

331

Tor

-M1

Mob

ile S

AM

sys

tem

(20

02)

. .

Dea

l wor

th $

400

m o

r $7

00 m

incl

mis

sile

s; s

tatu

sun

cert

ain

(323

)SA

-15

Gau

ntle

t/9M

338

SAM

(200

2). .

Se

e pr

evio

us c

omm

ent

10

SA-1

5/9A

331

Tor

-M1

Mob

ile S

AM

sys

tem

200

020

00–2

002

10

Dea

l wor

th $

300

m; r

epla

cing

6 o

f 19

99 o

rder

for

21 tr

ansf

erre

d to

Cyp

rus

(170

)SA

-15

Gau

ntle

t/9M

338

SAM

(200

0)20

00–2

002

(170

)Fo

r SA

-15/

9A33

1 T

or-M

1 SA

M s

yste

ms

494 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

1 10

0 A

T-1

4/9M

133

Kor

net

Ant

i-ta

nk m

issi

le 2

001

2002

(50)

Dea

l wor

th $

95 m

1 Po

mor

nik

Cla

ssA

CV

/land

ing

craf

t 2

002

. .

Dea

l wor

th $

64 m

; Gre

ek d

esig

natio

n K

efal

linia

Cla

ss; d

eliv

ery

2004

Swed

en(6

)A

RT

HU

RA

rty

loca

ting

rada

r 2

002

. .

Dea

l wor

th $

43–4

4 m

; del

iver

y 20

044

PS-8

90 E

riey

eA

EW

air

craf

t rad

ar 1

999

. .

For

4 E

MB

-145

AE

W&

C A

EW

air

craf

t ord

ered

fro

mB

razi

l; de

al w

orth

$47

6–50

0 m

incl

air

craf

t; op

tion

on 2

mor

e; d

eliv

ery

from

200

3U

SA12

A

H-6

4D A

pach

eC

omba

t hel

icop

ter

(200

2). .

D

eal w

orth

$68

0 m

; opt

ion

on 4

mor

e; c

ontr

act n

otye

t sig

ned

2 C

-130

H H

ercu

les

Tra

nspo

rt a

ircr

aft

200

2. .

E

x-It

alia

n ai

rcra

ft b

ough

t bac

k by

US

prod

ucer

and

sold

to G

reec

e50

F-

16C

FGA

air

craf

t 2

000

. .

Peac

e X

enia

-3 d

eal w

orth

$2.

1 b;

F-1

6C B

lock

-52+

vers

ion;

incl

16

F-16

D v

ersi

on; d

eliv

ery

2003

–20

0410

F-

16C

FGA

air

craf

t 2

001

. .

Peac

e X

enia

-3 d

eal w

orth

$18

3 m

; inc

l 4 F

-16D

vers

ion;

del

iver

y 20

0445

PC

-9/T

-6A

Tex

an-2

Tra

iner

air

craf

t 1

999

2000

–200

2(3

0)D

eal w

orth

$22

3–24

0 m

(of

fset

s 12

0% in

clpr

oduc

tion

in G

reec

e of

par

ts f

or 3

00 P

C-9

/T-6

A);

incl

25

T-6

A a

nd 2

0 T

-6B

arm

ed v

ersi

ons;

opt

ion

on 5

mor

e; d

eliv

ery

2000

–200

32

S-70

B/S

H-6

0B S

eaha

wk

AS/

ASW

hel

icop

ter

200

0. .

S-

70B

-6 A

egea

n H

awk

vers

ion;

opt

ion

on 2

mor

e10

T

-2E

Buc

keye

Jet t

rain

er a

ircr

aft

199

820

01–2

002

10

Ex-

US;

aid

; T-2

C v

ersi

on7

M-7

28A

EV

(200

0)20

02(7

)E

x-U

S; a

id; s

tatu

s un

cert

ain

4 Pa

trio

tSA

M s

yste

m 1

999

2002

(1)

Dea

l wor

th $

887

m (

$1.1

3 b

incl

opt

ion

on 2

mor

e;of

fset

s 12

0%)

. .

MIM

-104

PA

C-3

SAM

(199

9). .

Fo

r Pa

trio

t SA

M s

yste

ms

2 Ph

alan

x M

k-15

CIW

S 2

002

. .

Ex-

US;

Pha

lanx

Blo

ck-1

A v

ersi

on; d

eliv

ery

2004

100

AIM

-7M

Spa

rrow

BV

RA

AM

(200

0)20

02(1

00)

Ex-

US;

aid

; des

igna

tion

unce

rtai

n; s

tatu

s un

cert

ain

. .

FIM

-92A

Stin

ger

Port

able

SA

M 2

001

. .

Part

of

deal

wor

th $

89 m

for

100

7 m

issi

les

for

Gre

ece,

Ita

ly a

nd U

K; d

eliv

ery

2003

–200

4

INTERNATIONAL ARMS TRANSFERS 495

(51)

MG

M-1

40A

AT

AC

MS

SSM

199

920

01–2

002

(51)

208

RIM

-66B

Sta

ndar

d-1M

RSA

M 1

999

2002

(208

)E

x-U

S; a

id; s

tatu

s un

cert

ain

Ukr

aine

2 Po

mor

nik

Cla

ssA

CV

/land

ing

craf

t 2

000

2001

–200

22

Dea

l wor

th $

98.5

m; G

reek

des

igna

tion

Kef

allin

iaC

lass

L:

Den

mar

k4

Osp

rey-

55 T

ype

Patr

ol c

raft

199

920

02(1

)G

reek

des

igna

tion

Pirp

oliti

s C

lass

or

Hel

leni

c-56

Typ

eG

erm

any

2 T

ype-

214

Subm

arin

e 2

000

. .

Dea

l wor

th $

0.92

–1.2

6 b

incl

dir

ect d

eliv

ery

of 1

(off

sets

115

%);

Gre

ek d

esig

natio

n K

atso

nis

Cla

ss;

deliv

ery

2007

–200

81

Typ

e-21

4Su

bmar

ine

200

2. .

D

eal w

orth

$70

0 m

incl

mod

erni

zatio

n of

3 G

reek

Typ

e-20

9 su

bmar

ines

Ital

y1

Etn

a C

lass

Supp

ort s

hip

199

9. .

D

eal w

orth

$12

8 m

; Gre

ek d

esig

natio

n Pr

omet

heus

;de

liver

y 20

03U

K3

Supe

r V

ita ty

peFA

C(M

) 1

999

. .

Dea

l wor

th $

324

m; o

ptio

n on

4 m

ore;

del

iver

y20

03–2

004

Hun

gary

S:It

aly

3 R

AT

-31S

/LA

ir s

urv

rada

r 2

002

. .

Part

of

NA

DG

E (

NA

TO

Air

Def

ence

Gro

und

Env

iron

men

tal)

net

wor

k; R

AT

-31D

L v

ersi

onSw

eden

14

JAS-

39 G

ripe

nFG

A a

ircr

aft

200

1. .

E

x-Sw

edis

h; m

oder

nize

d be

fore

del

iver

y to

NA

TO

stan

dard

; 10-

year

leas

e w

orth

$50

0 m

(of

fset

s11

0%);

to b

e bo

ught

aft

er le

ase;

incl

2 J

AS-

39B

vers

ion;

del

iver

y 20

06U

SA16

0 A

IM-9

M S

idew

inde

rSR

AA

M 2

002

. .

Dea

l wor

th $

55m

; AIM

-9M

-8/9

ver

sion

, for

JA

S-39

FGA

air

craf

t

Indi

aS:

Fran

ce10

M

irag

e-20

00E

FGA

air

craf

t 2

000

. .

Dea

l wor

th $

312–

353

m; M

irag

e-20

00H

ver

sion

; inc

l6

Mir

age-

2000

TH

ver

sion

; Ind

ian

desi

gnat

ion

Vaj

ra; d

eliv

ery

2003

–200

4(3

6)SM

-39

Exo

cet

Ant

i-sh

ip m

issi

le(2

002)

. .

Dea

l wor

th $

150

m; f

or S

corp

ene

subm

arin

es;

cont

ract

not

yet

sig

ned

496 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Isra

el(6

)H

eron

-2U

AV

200

120

02(2

)32

Se

arch

er U

AV

UA

V(2

000)

2001

–200

2(3

2)8

Sear

cher

UA

VU

AV

200

2. .

Se

arch

er-2

ver

sion

(14)

EL

/M-2

022

MP

airc

raft

rad

ar(2

000)

2000

–200

2(1

4)Fo

r D

o-22

8 M

P ai

rcra

ft3

EL

/M-2

080

AE

W a

ircr

aft r

adar

(200

2). .

Fo

r m

odif

icat

ion

of 3

Il-

76 tr

ansp

ort a

ircr

aft

deliv

ered

fro

m U

zbek

ista

n vi

a R

ussi

a to

Il-

76/

A-5

0EI

AE

W&

C a

ircr

aft;

cont

ract

not

yet

sig

ned

(7)

EL

/M-2

221

Fire

con

trol

rad

ar(2

001)

2001

(1)

Dea

l wor

th $

280

m; f

or m

oder

niza

tion

of 1

Vir

aat

Cla

ss a

ircr

aft c

arri

er a

nd p

ossi

bly

5 R

ajpu

t Cla

ssde

stro

yers

and

oth

er s

hips

; for

use

with

Bar

akSA

M. .

B

arak

SAM

(200

1)20

01(2

4)D

eal w

orth

$28

0 m

; for

1 m

oder

nize

d V

iraa

t Cla

ssai

rcra

ft c

arri

er a

nd p

ossi

bly

5 m

oder

nize

d R

ajpu

tC

lass

des

troy

ers

and

othe

r sh

ips

2 G

reen

Pin

eA

ir s

urv

rada

r 2

002

. .

Ital

y9

Seag

uard

TM

XFi

re c

ontr

ol r

adar

199

320

00–2

001

6 Fo

r 3

Bra

hmap

utra

Cla

ss (

Proj

ect-

16A

) fr

igat

es(3

6)A

244/

S 32

4mm

ASW

torp

edo

(199

3)20

00–2

002

(18)

For

Bra

hmap

utra

Cla

ss (

Proj

ect-

16A

) fr

igat

es;

poss

ibly

pro

duce

d in

Ind

ia a

s N

ST-5

8N

ethe

rlan

ds4

DA

-05

Air

sur

v ra

dar

(198

9)19

95–2

001

(3)

For

mod

erni

zatio

n of

1 V

iraa

t Cla

ss a

ircr

aft c

arri

eran

d fo

r 3

Bra

hmap

utra

Cla

ss (

Proj

ect-

16A

)fr

igat

es; i

ncl a

ssem

bly

in I

ndia

7 L

W-0

8A

ir s

urv

rada

r(1

989)

1997

–200

1(6

)Fo

r m

oder

niza

tion

of 1

Vir

aat C

lass

air

craf

t car

rier

and

for

3 D

elhi

Cla

ss (

Proj

ect-

15 )

des

troy

ers

and

3 B

rahm

aput

ra C

lass

(Pr

ojec

t-16

A)

frig

ates

; inc

las

sem

bly

in I

ndia

(10)

ZW

-06

Sea

surv

rad

ar(1

989)

1997

–200

1(8

)Se

e pr

evio

us c

omm

ent

Pola

nd80

W

ZT

-3A

RV

200

220

02(1

4)D

eal w

orth

$60

–75

m; i

ncl 4

0 as

sem

bled

in I

ndia

and

all f

itted

with

Ind

ian

engi

nes;

Ind

ian

desi

gnat

ion

AR

V-3

; opt

ion

on 1

20 m

ore;

del

iver

y 20

02–2

004

Rus

sia

4 K

a-31

/Hel

ixA

EW

hel

icop

ter

199

920

02(2

)D

eal w

orth

$92

m; d

eliv

ery

2002

–200

3

INTERNATIONAL ARMS TRANSFERS 497

5 K

a-31

/Hel

ixA

EW

hel

icop

ter

200

1. .

D

eal w

orth

$10

8 m

; del

iver

y 20

0340

Su

-30M

K/F

lank

erFG

A a

ircr

aft

199

619

97–2

002

(28)

Dea

l wor

th $

1.55

–1.8

b; S

u-30

MK

I ve

rsio

n; o

rder

edw

hile

stil

l bei

ng d

evel

oped

and

fir

st 1

6 de

liver

ed a

sSu

-30K

ver

sion

to b

e m

odif

ied

to S

u-30

MK

I af

ter

deliv

ery;

del

iver

y 19

97–2

003

10

Su-3

0MK

/Fla

nker

FGA

air

craf

t 1

998

. .

Su-3

0MK

I ve

rsio

n; d

eliv

ery

2003

/200

4(1

140

)A

A-1

0c/d

Ala

mo/

R-2

7EB

VR

AA

M 1

996

1997

–200

2(3

00)

For

Su-3

0MK

I FG

A a

ircr

aft

(3 9

00)

AA

-11

Arc

her/

R-7

3SR

AA

M(1

996)

1997

–200

2(6

00)

For

Su-3

0MK

FG

A a

nd m

oder

nize

d M

iG-2

1bis

(MiG

-21-

93)

figh

ter

airc

raft

and

pos

sibl

y fo

rM

iG-2

9 fi

ghte

r an

d m

oder

nize

d M

iG-2

7ML

FG

Aac

(750

)A

A-1

2 A

dder

/R-7

7B

VR

AA

M(2

000)

. .

See

prev

ious

com

men

t(4

)T

u-22

M3/

Bac

kfir

e-C

Bom

ber

airc

raft

(200

2). .

E

x-R

ussi

an; l

ease

; con

trac

t not

yet

sig

ned

(4)

140m

m R

LN

aval

MR

L(1

992)

1997

(2)

For

2 M

agar

Cla

ss la

ndin

g sh

ips;

des

igna

tion

unce

rtai

n(1

4)B

M-9

A52

Sm

erch

MR

L(2

002)

. .

Dea

l wor

th R

s12

b; c

ontr

act n

ot y

et s

igne

d(1

4)2S

6M T

ungu

ska

AA

V(G

/M)

(200

1)20

02(1

4)D

eal w

orth

Rs6

b in

cl S

A-1

9 m

issi

les

(224

)SA

-19

Gri

som

/9M

111

SAM

(200

1)20

02(2

24)

Dea

l wor

th R

s6 b

incl

14

AA

V(G

/M)s

310

T-9

0SM

ain

battl

e ta

nk 2

001

2001

–200

2(1

24)

Dea

l wor

th $

600–

700

m (

incl

55%

adv

ance

paym

ent)

; ord

ered

as

reac

tion

to P

akis

tani

acqu

isiti

on o

f 32

0 T

-80U

B ta

nks;

incl

186

asse

mbl

ed in

Ind

ia; d

eliv

ery

2001

–200

410

B

ass

Tilt

Fire

con

trol

rad

ar(1

992)

1997

–200

210

Fo

r 3

Del

hi C

lass

(Pr

ojec

t-15

) de

stro

yers

and

4 K

ora

Cla

ss (

Proj

ect-

25A

) co

rvet

tes

7 Pl

ank

Shav

eA

ir s

urv

rada

r(1

993)

1997

–200

27

For

3 D

elhi

Cla

ss (

Proj

ect-

15)

dest

roye

rs a

nd 4

Kor

aC

lass

(Pr

ojec

t-25

A)

corv

ette

s; f

or u

se w

ithSS

-N-2

5 m

issi

les

4 C

ross

Dom

eA

ir s

urv

rada

r(1

992)

1998

–200

24

For

4 K

ora

Cla

ss (

Proj

ect-

25A

) co

rvet

tes

(416

)SS

-N-2

5/K

h-35

Ura

nA

nti-

ship

mis

sile

(199

2)19

97–2

002

(300

)Fo

r D

elhi

Cla

ss (

Proj

ect-

15)

and

mod

erni

zed

Kas

hin-

2 (R

ajpu

t) C

lass

des

troy

ers,

Bra

hmap

utra

Cla

ss(P

roje

ct-1

6A)

frig

ates

, Kor

a C

lass

(Pr

ojec

t-25

A)

corv

ette

s an

d T

aran

tul-

1 (V

ibhu

ti) C

lass

FA

C

498 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

(125

)K

opyo

Com

bat a

c ra

dar

199

620

01–2

002

(28)

Part

of

deal

wor

th $

428–

626

m f

or m

oder

niza

tion

ofup

to 1

25 M

iG-2

1bis

fig

hter

ac

to M

iG-2

1bis

UPG

(MiG

-21I

) ve

rsio

n; o

ptio

n on

50

mor

e; d

eliv

ery

2001

–200

4/20

05(4

)SA

-12/

S-30

0VSA

M s

yste

m(2

002)

. .

Dea

l wor

th $

1.5

or $

2.5

b in

cl 1

50 m

issi

les;

con

trac

tpr

obab

ly n

ot y

et s

igne

d15

0 SA

-12b

Gia

nt/9

M82

SAM

(200

2). .

Se

e pr

evio

us c

omm

ent

(27)

Zm

ei/S

ea D

rago

nM

P ai

rcra

ft r

adar

(200

0)20

02(3

)Fo

r m

oder

niza

tion

of 8

Tu-

142

and

ASW

/MP

ac to

Tu-

142J

, and

som

e 14

Ka-

28 A

SW h

elic

opte

rs a

nd5

Il-3

8 A

SW/M

P ai

rcra

ft(1

440

)A

T-1

6/9M

120

Ant

i-ta

nk m

issi

le(2

000)

2002

(480

)Fo

r M

i-17

hel

icop

ters

3 K

riva

k-4

Cla

ssFr

igat

e 1

997

. .

Dea

l wor

th R

s35.

4 b

($0.

82–1

b);

Ind

ian

desi

gnat

ion

Tal

war

Cla

ss; R

ussi

an d

esig

natio

n T

ype-

1135

.6;

orde

red

due

to p

robl

ems

with

Ind

ian

prod

uctio

n of

maj

or w

arsh

ips;

del

iver

y to

200

3/20

04(1

08)

SA-1

1 G

adfl

y/9M

38M

1SA

M(2

000)

. .

SA-N

-7/9

M38

M1

vers

ion

for

Kri

vak-

4 (T

alw

ar)

Cla

ss f

riga

tes

(96)

SS-N

-27/

3M54

E1

Ant

i-sh

ip m

issi

le(1

998)

2001

–200

2(3

8)Fo

r K

riva

k-4

Cla

ss f

riga

tes

and

new

and

mod

erni

zed

Kilo

Cla

ss s

ubm

arin

es(2

500

)SA

-18

Gro

use/

Igla

Port

able

SA

M 2

001

2001

–200

2(1

500

)D

eal w

orth

$32

–50

m1

Gor

shko

v C

lass

Air

craf

t car

rier

(200

2). .

E

x-R

ussi

an; m

oder

nize

d be

fore

del

iver

y; c

ontr

act n

otye

t sig

ned;

del

iver

y 20

04/2

005

(360

)SA

-19

Gri

som

/9M

111

SAM

(200

2). .

SA

-N-1

1/9M

111

vers

ion

for

6 K

asht

an A

D/S

AM

syst

ems

on 1

Gor

shko

v C

lass

air

craf

t car

rier

;co

ntra

ct n

ot y

et s

igne

d(3

60)

SA-1

9 G

riso

m/9

M11

1SA

M(1

997)

. .

SA-N

-11/

9M11

1 ve

rsio

n fo

r 6

Kas

htan

AD

/SA

Msy

stem

s on

3 K

riva

k-4

(Tal

war

) C

lass

fri

gate

s2

Aku

la-2

Cla

ssN

ucle

ar s

ubm

arin

e(2

002)

. .

Poss

ibly

ex-

Rus

sian

; lea

se; d

eliv

ery

2004

; con

trac

tno

t yet

sig

ned

Slov

akia

42

VT

-72B

AR

V 1

999

2001

–200

2(4

2)D

eal w

orth

$30

.4 m

INTERNATIONAL ARMS TRANSFERS 499

UK

2 H

arri

er T

-4FG

A/tr

aine

r ac

199

720

021

Ex-

UK

; dea

l wor

th $

24 m

; mod

erni

zed

to H

arri

erT

-4(I

) ve

rsio

n be

fore

del

iver

y; d

eliv

ery

2002

–200

3U

SA8

AN

/TPQ

-37

Fire

find

erA

rty-

loca

ting

rada

r 2

002

. .

Dea

l wor

th $

146

m(6

)A

N/T

PQ-3

7 Fi

refi

nder

Art

y-lo

catin

g ra

dar

(200

2). .

D

eal w

orth

$14

2 m

Ukr

aine

(1 1

40)

AA

-10a

/b A

lam

o/R

-27

BV

RA

AM

(199

6)19

97–2

002

(370

)Fo

r Su

-30M

KI

FGA

air

craf

t; de

sign

atio

n un

cert

ain

Uzb

ekis

tan

3 Il

-76M

/Can

did-

BT

rans

port

air

craf

t 2

002

. .

Sold

via

Rus

sia;

for

mod

ific

atio

n to

A-5

0EhI

AE

W&

C a

ircr

aft i

n Is

rael

; del

iver

y fr

om 2

005;

cont

ract

not

yet

sig

ned

6 Il

-78M

/Mid

asT

anke

r ai

rcra

ft 2

001

. .

Dea

l wor

th $

150

m; I

l-78

MK

ver

sion

; no.

ord

ered

coul

d be

4; d

eliv

ery

2003

L:

Fran

ce. .

M

ILA

NA

nti-

tank

mis

sile

(198

1)19

84–2

002

(50

500)

MIL

AN

-2 v

ersi

on; i

ncl f

or B

MP-

2 IF

Vs

6 Sc

orpe

ne C

lass

Subm

arin

e(2

002)

. .

Proj

ect-

75 w

orth

$1.

8 b;

con

trac

t not

yet

sig

ned

Ger

man

y 47

D

o-22

8MP

MP

airc

raft

198

319

93–2

002

(32)

Incl

11

for

coas

tgua

rdR

ussi

a14

0 Su

-30M

K/F

lank

erFG

A a

ircr

aft

200

0. .

D

eal w

orth

$3–

4.2

b; S

u-30

MK

I ve

rsio

n; f

or d

eliv

ery

2005

–201

4 or

200

5–20

17/2

018

. .

AT

-5 S

pand

rel/9

M11

3A

nti-

tank

mis

sile

(198

8)19

92–2

002

(4 8

00)

For

BM

P-2

IFV

s; o

rder

ed f

rom

Sov

iet U

non

and

prod

uced

und

er R

ussi

an li

cenc

e af

ter

brea

k-up

of

Sovi

et U

non

UK

17

Jagu

ar I

nter

natio

nal

FGA

air

craf

t 1

999

. .

Jagu

ar I

nter

natio

nal-

IT v

ersi

on; I

ndia

n de

sign

atio

nSh

amsh

er; d

eliv

ery

prob

ably

fro

m 2

003/

2004

20

Jagu

ar I

nter

natio

nal

FGA

air

craf

t(2

000)

. .

Jagu

ar I

nter

natio

nal-

IS v

ersi

on; d

eliv

ery

until

200

71

Mag

ar C

lass

Lan

ding

shi

p(1

996)

. .

Indo

nesi

aS:

Fran

ce(1

3)A

S-33

2B S

uper

Pum

aH

elic

opte

r 1

997

2001

–200

2(1

1)In

cl 6

for

SA

R; 3

mor

e or

dere

d fo

r V

IP tr

ansp

ort

15

EC

-120

B C

olib

riL

ight

hel

icop

ter

(200

0)20

02(1

1)Fo

r tr

aini

ng3

Oce

an M

aste

rM

P ai

rcra

ft r

adar

200

120

02(1

)D

eal w

orth

$50

m; f

or 3

CN

-235

MPA

ac

prod

uced

inIn

done

sia;

del

iver

y of

air

craf

t 200

2–20

03N

ethe

rlan

ds4

LIR

OD

Fire

con

trol

rad

ar(1

994)

2000

2 D

eal w

orth

$42

m in

cl 4

Var

iant

rad

ars;

for

4 P

B-5

7T

ype

(Sin

ga C

lass

) pa

trol

cra

ft4

Var

iant

Air

/sea

sur

v ra

dar

(199

9)20

002

See

prev

ious

com

men

tR

ussi

a(8

)M

i-17

/Hip

-HH

elic

opte

r 2

002

. .

Dea

l wor

th $

11–1

2 m

incl

2 M

i-2

helic

opte

rs

500 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

2 M

i-2/

Hop

lite

Lig

ht h

elic

opte

r 2

002

. .

Ex-

Rus

sian

; dea

l wor

th $

11–1

2 m

incl

8 M

i-17

Ihe

licop

ters

Sing

apor

e19

SF

-260

MT

rain

er a

ircr

aft

(200

1)20

02(1

9)E

x-Si

ngap

orea

nSo

uth

Kor

ea7

KT

-1 W

oong

Bee

Tra

iner

air

craf

t 2

001

. .

Dea

l wor

th $

60 m

(of

fset

s fo

r K

orea

n or

der

for

CN

-235

tran

spor

t air

craf

t); d

eliv

ery

from

200

3U

SA16

A

N/A

PG-6

6C

omba

t ac

rada

r 1

996

1999

10

For

16 H

awk-

200

FGA

air

craf

t del

iver

ed f

rom

UK

;la

st 6

em

barg

oed

by U

SA

L:

Ger

man

y 4

PB-5

7 T

ype

Patr

ol c

raft

199

320

002

Dea

l wor

th $

260

m; I

ndon

esia

n de

sign

atio

n Si

nga

Cla

ss; d

eliv

ery

2000

–200

4

Iran

S:C

hina

14

Y-7

Tra

nspo

rt a

ircr

aft

199

619

98(2

)D

eliv

ery

1998

and

200

3–20

06. .

FL

-6 I

RA

Ant

i-sh

ip m

issi

le(2

000)

2002

(10)

Iran

ian

desi

gnat

ion

Fajr

-e D

arya

; inc

l for

use

on

SH-3

D h

elic

opte

rsR

ussi

a(2

0)M

i-17

/Hip

-HH

elic

opte

r 2

001

2002

(10)

Dea

l wor

th $

150

m; M

i-17

1Sh

vers

ion;

del

iver

y20

02–2

003

(540

)A

T-6

Spi

ral/9

M11

4A

nti-

tank

mis

sile

(199

9)20

00–2

002

(425

)Fo

r M

i-17

1Sh

helic

opte

rs; p

ossi

bly

incl

AT

-9ve

rsio

nU

krai

ne(1

2)A

n-74

/Coa

ler-

BT

rans

port

air

craf

t(1

997)

1998

–200

2(4

)D

eal w

orth

$13

3 m

; An-

74T

-200

ver

sion

L:

Rus

sia

(1 4

20)

BM

P-2

IFV

(199

1)19

94–2

002

(420

)D

eal w

orth

$2.

2 b

for

1500

BM

P-2

IFV

s an

d 10

00T

-72

tank

s pr

obab

ly in

cl d

irec

t del

iver

y of

som

e(8

74)

T-7

2S1

Mai

n ba

ttle

tank

(199

6)19

97–2

002

(420

)Se

e pr

evio

us c

omm

ent

. .

AT

-3 S

agge

r/9M

14M

Ant

i-ta

nk m

issi

le(1

995)

1996

–200

2(1

750

)Ir

ania

n de

sign

atio

n R

AA

D; i

ncl I

-RA

AD

ver

sion

. .

AT

-4 S

pigo

t/9M

111

Ant

i-ta

nk m

issi

le 2

000

2001

–200

2(2

00)

. .

AT

-5 S

pand

rel/9

M11

3A

nti-

tank

mis

sile

(199

8)19

99–2

002

(400

)Ir

ania

n de

sign

atio

n T

owsa

n-1

Ukr

aine

. .

An-

140

Tra

nspo

rt a

ircr

aft

199

7. .

Ir

ania

n de

sign

atio

n Ir

an-1

40; s

tatu

s un

cert

ain

INTERNATIONAL ARMS TRANSFERS 501

Irel

and

S:N

ethe

rlan

ds9

Flyc

atch

erFi

re c

ontr

ol r

adar

200

220

02(9

)E

x-D

utch

Switz

erla

nd8

PC-9

Tra

iner

air

craf

t(2

002)

. .

Dea

l wor

th $

63 m

; PC

-9M

ver

sion

; del

iver

y 20

0440

Pi

ranh

a-3

8x8

APC

199

920

01–2

002

40

Dea

l wor

th $

50.8

m; i

ncl 4

CP,

1 A

RV

and

1am

bula

nce

vers

ion;

Pir

anha

-3H

ver

sion

25

Pira

nha-

3 8x

8A

PC(2

002)

. .

Pira

nha-

3H v

ersi

on; i

ncl 4

CP

and

1 am

bula

nce

vers

ion

Isra

elS:

Ger

man

y 27

G

-115

T A

cro

Tra

iner

air

craf

t 2

002

2002

3 O

wne

d an

d op

erat

ed b

y ci

vilia

n co

mpa

ny f

or I

srae

liar

med

for

ces;

G-1

20A

-I v

ersi

on; I

srae

lide

sign

atio

n Sn

unit

2 Pa

trio

tSA

M s

yste

m(2

002)

. .

Ex-

Ger

man

; 2-y

ear

loan

in r

eact

ion

to p

ossi

ble

war

in M

iddl

e E

ast;

deliv

ery

2003

128

MIM

-104

Pat

riot

SAM

(200

2). .

Se

e pr

evio

us c

omm

ent

USA

8 A

H-6

4D A

pach

eC

omba

t hel

icop

ter

200

1. .

D

eal w

orth

$50

9 m

incl

mod

erni

zatio

n of

10

Isra

eli

AH

-64A

s to

AH

-64D

; Isr

aeli

desi

gnat

ion

Shar

af;

optio

n on

12

mor

e; d

eliv

ery

2005

(480

)A

GM

-114

K H

ellf

ire

Ant

i-ta

nk m

issi

le(2

000)

. .

For

AH

-64D

hel

icop

ters

(1)

AN

/APG

-78

Lon

gbow

Com

bat a

c ra

dar

200

1. .

Fo

r m

oder

niza

tion

of 1

Isr

aeli

AH

-64A

hel

icop

ter

toA

H-6

4D; d

eliv

ery

2003

50

F-16

IFG

A a

ircr

aft

199

9. .

Pe

ace

Mar

ble-

5 de

al w

orth

$2.

5 b

(off

sets

25%

);fi

nanc

ed b

y U

SA; I

srae

li de

sign

atio

n Su

efa;

deliv

ery

2003

–200

552

F-

16I

FGA

air

craf

t 2

001

. .

Peac

e M

arbl

e-5

deal

wor

th $

2 b

(inc

l $1.

3 b

for

acan

d $3

00 m

for

eng

ines

); d

eliv

ery

2006

–200

93

Gul

fstr

eam

-5T

rans

port

air

craf

t 2

001

. .

Dea

l wor

th $

174–

206

m; m

odif

ied

in I

srae

l to

EL

INT

ac;

del

iver

y fr

om 2

003

8 K

ing

Air

B20

0/C

12L

ight

tran

spor

t ac

200

120

02(3

)B

200C

T v

ersi

on; m

odif

ied

in I

srae

l for

SIG

INT

;Is

rael

i des

igna

tion

Zuf

it-3;

del

iver

y 20

02–2

003

(6)

Kin

g A

ir B

200/

C12

Lig

ht tr

ansp

ort a

c 2

002

. .

B20

0CT

ver

sion

; for

trai

ning

; Isr

aeli

desi

gnat

ion

Zuf

it

502 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

24

S-70

A/U

H-6

0LH

elic

opte

r 2

001

2002

(24)

Dea

l wor

th $

212

m; S

-70A

-55

vers

ion;

Isr

aeli

desi

gnat

ion

Yan

shuf

-3(4

2)A

IM-1

20B

AM

RA

AM

BV

RA

AM

199

920

01–2

002

(42)

48

AIM

-120

C A

MR

AA

MB

VR

AA

M 2

001

. .

Del

iver

y 20

032

030

BG

M-7

1 T

OW

Ant

i-ta

nk m

issi

le 2

002

. .

Dea

l wor

th $

80 m

40

Pope

ye-1

ASM

200

120

02(2

0)D

eal w

orth

$31

m16

R

GM

-84

Har

poon

Ant

i-sh

ip m

issi

le(1

998)

2001

–200

2(1

6)D

eal w

orth

$26

m

Ital

yS:

Fran

ce14

V

AB

-VT

TA

PC(1

999)

2000

–200

2(1

4)N

BC

rec

onna

issa

nce

vers

ion

18

Igun

ae/V

aran

MP

airc

raft

rad

ar(1

994)

1997

–200

2(1

7)Fo

r m

oder

niza

tion

of 1

8 A

tlant

ic-1

ASW

/MP

airc

raft

Ger

man

y 2

PzH

-200

0 15

5mm

Self

-pro

pelle

d gu

n 2

002

. .

Dea

l wor

th $

455–

510

m in

cl 6

8 lic

ense

d pr

oduc

tion;

deliv

ery

2003

. .

IRIS

-TSR

AA

M(2

002)

. .

Con

trac

t not

yet

sig

ned

Swed

en58

B

v-20

6SA

PC(2

002)

. .

Con

trac

t pro

babl

y no

t yet

sig

ned

UK

(200

)St

orm

Sha

dow

/SC

AL

PA

SM 1

999

. .

Del

iver

y fr

om 2

003

USA

4 C

-130

J-30

Her

cule

sT

rans

port

air

craf

t 2

000

2002

(4)

6 C

-130

J-30

Her

cule

sT

rans

port

air

craf

t 1

997

2001

–200

2(6

)34

F-

16A

FGA

air

craf

t 2

001

. .

Ex-

US;

$76

0 m

leas

e un

til E

urof

ight

er e

nter

s se

rvic

ein

201

0; F

-16A

Blo

ck-1

5AD

F ve

rsio

n; in

cl 4

F-16

B v

ersi

on; m

oder

nize

d be

fore

del

iver

y; 4

mor

eor

dere

d fo

r sp

ares

onl

y; d

eliv

ery

2003

–200

44

KC

-767

Tan

ker/

tran

spor

t ac

200

2. .

D

eal w

orth

$61

9 m

(of

fset

s w

orth

up

to $

1.1

b);

optio

n on

2 m

ore;

del

iver

y 20

05–2

008

4 R

Q-1

A P

reda

tor

UA

V 2

001

2002

4 D

eal w

orth

$55

m; o

ptio

n on

2 m

ore

9 L

VT

P-7A

1/A

AV

-7A

1A

PC 1

999

2002

(9)

Ex-

US;

dea

l wor

th $

90 m

incl

mod

erni

zatio

n w

ithU

S-su

pplie

d eq

uipm

ent a

fter

del

iver

y an

dm

oder

niza

tion

of 2

5 It

alia

n L

VT

P-7A

12

AN

/FPS

-117

Air

sur

v ra

dar

200

2. .

A

N/T

PS-1

17 v

ersi

on23

3 A

IM-1

20B

AM

RA

AM

BV

RA

AM

199

720

00–2

002

(153

)D

eal w

orth

$11

6 m

; for

AV

-8B

+ FG

A a

ircr

aft

INTERNATIONAL ARMS TRANSFERS 503

(150

)FI

M-9

2A S

tinge

rPo

rtab

le S

AM

200

020

02(1

50)

Dea

l pro

babl

y w

orth

$10

m; f

or A

-129

hel

icop

ters

. .

FIM

-92A

Stin

ger

Port

able

SA

M 2

001

. .

Part

of

deal

wor

th $

89 m

for

100

7 m

issi

les

for

Gre

ece,

Ita

ly a

nd U

K; d

eliv

ery

2003

–200

4

L:

Ger

man

y 68

Pz

H-2

000

Self

-pro

pelle

d gu

n 2

002

. .

Dea

l wor

th $

455

m in

cl d

irec

t del

iver

y of

2; d

eliv

ery

2004

–200

82

Typ

e-21

2Su

bmar

ine

199

7. .

It

alia

n de

sign

atio

n T

odar

o C

lass

; opt

ion

on 2

mor

e;de

liver

y 20

04–2

005

Japa

nS:

Fran

ce2

Oce

an M

aste

rM

P ai

rcra

ft r

adar

(200

1). .

Fo

r 2

Gul

fstr

eam

-5 M

P ai

rcra

ft d

eliv

ered

fro

m U

SAIt

aly

5 12

7mm

/54

Nav

al g

un(1

999)

. .

For

5 T

akan

ami C

lass

fri

gate

sU

K13

E

H-1

01-5

00H

elic

opte

r(2

002)

. .

MC

H-X

pro

gram

me

for

tran

spor

t/min

esw

eepi

nghe

licop

ter;

opt

ion

on m

ore;

con

trac

t not

yet

sig

ned

USA

(20)

AH

-64D

Apa

che

Com

bat h

elic

opte

r 2

001

. .

AH

-X p

rogr

amm

e; d

eliv

ery

from

200

5(2

1)B

Ae-

125/

RH

-800

MP

airc

raft

199

519

97–2

002

(15)

H-X

pro

gram

me;

for

SA

R; J

apan

ese

desi

gnat

ion

U-1

25A

2 G

ulfs

trea

m-5

Tra

nspo

rt a

ircr

aft

200

1. .

D

eal w

orth

$10

0 m

; for

coa

stgu

ard

long

-ran

ge M

Pin

cl a

gain

st p

irac

y in

Sou

th-E

ast A

sia

4 K

C-7

67T

anke

r/tr

ansp

ort a

c(2

002)

. .

KC

-X p

rogr

amm

e; d

eliv

ery

from

200

6; c

ontr

act n

otye

t sig

ned

(20)

Kin

g A

ir-3

50/C

-12S

Lig

ht tr

ansp

ort a

c 1

997

1999

–200

2(4

)In

cl f

or r

econ

nais

sanc

e; J

apan

ese

desi

gnat

ion

LR

-2(7

2)M

-270

ML

RS

MR

L 1

993

1995

–200

2(7

2)A

ssem

bled

in J

apan

(13)

AN

/APS

-145

AE

W a

ircr

aft r

adar

200

0. .

Fo

r m

oder

niza

tion

of E

-2C

AE

W&

C a

c; d

eliv

ery

from

200

46

AN

/SPG

-62

Fire

con

trol

rad

ar(2

002)

. .

For

2 Im

prov

ed K

ongo

u C

lass

des

troy

ers

2 A

N/S

PY-1

DA

ir s

urv

rada

r 2

002

. .

For

2 Im

prov

ed K

ongo

u C

lass

des

troy

ers

(34)

Phal

anx

Mk-

15C

IWS

(199

3)19

96–2

002

(22)

For

9 M

uras

ame

Cla

ss a

nd 5

Tak

anam

i Cla

ss f

riga

tes

and

3 O

osum

i Cla

ss A

AL

S; in

cl s

ome

Blo

ck-1

Bve

rsio

n. .

B

GM

-71

TO

WA

nti-

tank

mis

sile

200

2. .

16

R

IM-6

6M S

tand

ard-

2SA

M 2

001

. .

Dea

l wor

th $

27 m

; pos

sibl

y B

lock

-3B

ver

sion

(16)

RIM

-66M

Sta

ndar

d-2

SAM

(200

1). .

D

eal w

orth

$27

m; B

lock

-3A

ver

sion

; del

iver

y 20

03

504 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

16

RIM

-66M

Sta

ndar

d-2

SAM

(200

2). .

D

eal w

orth

$24

m, B

lock

-3A

ver

sion

(336

)R

IM-7

M S

easp

arro

wSA

M 1

993

1996

–200

2(2

01)

For

Mur

asam

e C

lass

and

Tak

anam

i Cla

ss f

riga

tes

L:

Fran

ce. .

M

O-1

20-R

T-6

1 12

0mm

Mor

tar

199

219

93-2

002

(335

)In

cl f

or u

se w

ith T

ype-

96 m

orta

r ca

rrie

r pr

oduc

ed in

Japa

nU

SA(4

0)A

H-6

4D A

pach

eC

omba

t hel

icop

ter

200

1. .

A

H-X

pro

gram

me;

del

iver

y fr

om 2

005

79

CH

-47D

Chi

nook

Hel

icop

ter

198

619

88–2

002

(60)

CH

-47J

and

CH

-47J

A v

ersi

ons

(203

)F-

15C

Eag

leFG

A/tr

aine

r ac

197

819

82–9

9(1

91)

F-15

J ve

rsio

n; in

cl 3

8 F-

15D

J ve

rsio

n; d

eliv

ery

1982

–200

6(6

4)S-

70/U

H-6

0J B

lack

haw

kH

elic

opte

r 1

988

1991

–200

2(4

3)(8

0)S-

70/U

H-6

0J B

lack

haw

kH

elic

opte

r 1

995

1998

–200

2(2

1)U

H-6

0JA

ver

sion

; dea

l wor

th $

2.67

b10

1 S-

70B

/SH

-60J

Sea

haw

kA

SW h

elic

opte

r 1

988

1991

–200

2(9

3)(2

7)Se

a V

ueM

P ai

rcra

ft r

adar

199

219

95–2

002

(21)

For

27 B

Ae-

125-

800/

RH

-800

(U

-125

A)

SAR

ac

Jord

anS:

Fran

ce9

EC

-135

/EC

-635

Hel

icop

ter

(200

2). .

Fo

r bo

rder

pat

rol;

cont

ract

not

yet

sig

ned

Net

herl

ands

(18)

MO

BA

T 1

05m

mSe

lf-p

rope

lled

gun

(200

2). .

O

ptio

n on

20

mor

e; d

eliv

ery

2004

UK

16

T-6

7 Fi

refl

yT

rain

er a

ircr

aft

200

120

02(1

6)T

-67M

260

vers

ion

(288

)C

halle

nger

Mai

n ba

ttle

tank

199

919

99–2

002

(276

)E

x-U

K; J

orda

nian

des

igna

tion

Al H

usse

inU

SA17

F-

16A

FGA

air

craf

t(2

002)

. .

Ex-

US;

F-16

A B

lock

-15

vers

ion;

aid

as

rew

ard

for

Jord

ania

n su

ppor

t aga

inst

Ira

q; c

ontr

act n

ot y

etsi

gned

(562

)B

GM

-71

TO

WA

nti-

tank

mis

sile

200

120

02(2

81)

BG

M-7

1E T

OW

-2A

ver

sion

; del

iver

y 20

02–2

003

110

Jave

linA

nti-

tank

mis

sile

200

120

02(5

5)D

eal w

orth

$12

m in

cl 3

0 la

unch

ers

Kaz

akhs

tan

S:R

ussi

a. .

M

i-17

/Hip

-HH

elic

opte

r(2

002)

2002

1 M

i-17

V5

vers

ion

INTERNATIONAL ARMS TRANSFERS 505

(38)

Su-2

7S/F

lank

er-B

Figh

ter

airc

raft

(199

5)19

96–2

002

(22)

Ex-

Rus

sian

; pay

men

t for

Rus

sian

deb

t to

Kaz

akhs

tan

Kuw

ait

S:C

hina

(24)

PZL

-45

155m

mSe

lf-p

rope

lled

gun

200

120

02(1

2)D

eal w

orth

$20

0 m

incl

PC

V-4

5 A

LV

s, T

ype-

84(T

ype-

653)

AR

V, a

nd Z

CY

-45

and

ZC

L-4

5 (T

ype

YW

-531

H)

APC

/CPs

(24)

PCZ

-45

AL

V 2

001

2002

(12)

See

prev

ious

com

men

t(4

)T

ype

YW

-531

/Typ

e-85

APC

200

120

02(2

)Se

e pr

evio

us c

omm

ent

(1)

Typ

e-65

3A

RV

200

1. .

Se

e pr

evio

us c

omm

ent

Ger

man

y 11

T

pz-1

Fuc

hsA

PC 2

000

2002

(5)

NB

C r

econ

nais

sanc

e ve

rsio

nU

SA16

A

H-6

4D A

pach

eC

omba

t hel

icop

ter

200

2. .

D

eal w

orth

$86

8 m

incl

8 A

H-6

4D w

ith L

ongb

owra

dar

($2.

1 b

incl

trai

ning

, AG

M-1

14 m

issi

les,

spar

es a

nd s

uppo

rt);

del

iver

y fr

om 2

005

384

AG

M-1

14K

Hel

lfir

eA

nti-

tank

mis

sile

200

2. .

D

eal w

orth

$86

8 m

incl

16

AH

-64D

hel

icop

ters

Lat

via

S:N

orw

ay1

Vid

ar C

lass

MC

M s

hip

200

2. .

E

x-N

orw

egia

n, d

eliv

ery

2003

USA

1 A

N/T

PS-1

17A

ir s

urv

rada

r 2

001

. .

Dea

l wor

th $

12.6

m; p

art o

f B

AL

TN

ET

air

-su

rvei

llanc

e ne

twor

k; d

eliv

ery

2003

Unk

now

n1

Mi-

17/H

ip-H

Hel

icop

ter

(200

1)20

021

Prob

ably

sec

ond-

hand

; inc

l for

SA

R

Lib

yaS:

Ukr

aine

2 A

n-12

4 C

ondo

rT

rans

port

air

craf

t 2

000

2001

1 A

n-12

4-10

0 ve

rsio

n; o

ffic

ially

del

iver

ed to

civ

ilian

com

pany

Lit

huan

iaS:

Den

mar

k72

M

-101

A1

Tow

ed g

un 2

001

2002

72

Ex-

Dan

ish;

aid

Ger

man

y (3

)T

RM

L-C

SA

ir/s

ea s

urv

rada

r 2

002

. .

USA

60

FIM

-92A

Stin

ger

Port

able

SA

M 2

002

. .

Dea

l wor

th $

31 m

; inc

l 8 la

unch

ers

and

2 ra

dars

75

Jave

linA

nti-

tank

mis

sile

200

1. .

D

eal w

orth

$10

m; d

eliv

ery

2004

506 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Lux

embo

urg

S:U

SA. .

B

GM

-71

TO

WA

nti-

tank

mis

sile

200

2. .

Pa

rt o

f de

al w

orth

$52

m f

or 1

689

TO

W-2

A/2

Bve

rsio

n an

d tr

aini

ng m

issi

les

for

Isra

el, J

apan

,Jo

rdan

, Lux

embo

urg

and

Spai

n

Mal

aysi

aS:

Bra

zil

18

Ast

ros-

2M

RL

(200

0)20

02(1

8)D

eal w

orth

$19

7 m

Fran

ce6

AS-

555U

N F

enne

cL

ight

hel

icop

ter

200

1. .

D

eal w

orth

$38

m; d

eliv

ery

2003

11

AS-

555U

N F

enne

cL

ight

hel

icop

ter

(200

2). .

D

eal w

orth

$52

m; c

ontr

act p

roba

bly

not y

et s

igne

d1

Scor

pene

Cla

ssSu

bmar

ine

200

2. .

D

eal w

orth

$94

7 m

–$1.

1 b

incl

1 d

eliv

ered

by

Spai

n;de

liver

y 20

0740

SM

-39

Exo

cet

Ant

i-sh

ip m

issi

le 2

002

. .

For

Scor

pene

sub

mar

ines

; del

iver

y 20

07–2

008

1 A

gost

a C

lass

Subm

arin

e 2

002

. .

Ex-

Fren

ch; m

oder

nize

d be

fore

del

iver

y; d

eliv

ery

prob

ably

200

3G

erm

any

2 M

EK

O-A

100

Typ

eFr

igat

e 1

999

. .

New

Gen

erat

ion

Patr

ol V

esse

l (N

GPV

) pr

ogra

mm

ew

orth

$1.

42 b

incl

4 li

cens

ed p

rodu

ctio

n; M

EK

O-

100R

MN

ver

sion

; ass

embl

ed in

Mal

aysi

a; d

eliv

ery

2004

6 T

RS-

3DA

ir/s

ea s

urv

rada

r(2

000)

. .

For

6 M

EK

O-A

100

Typ

e fr

igat

esIn

done

sia

2 C

N-2

35M

PAM

P ai

rcra

ft 2

002

. .

Dea

l wor

th $

34.2

m; d

eliv

ery

2004

Ital

y1

RA

T-3

1SA

ir s

urv

rada

r 2

001

. .

Dea

l wor

th $

54 m

; RA

T-3

1DL

ver

sion

6 Sk

ygua

rdFi

re c

ontr

ol r

adar

(200

0). .

Fo

r 6

ME

KO

-A10

0 T

ype

frig

ates

; des

igna

tion

unce

rtai

n. .

B

lack

Sha

rk 5

33m

mA

S to

rped

o 2

002

. .

For

Scor

pene

Cla

ss s

ubm

arin

esPa

kist

an(1

00)

HN

-5A

/Anz

a-1

Port

able

SA

M 2

001

2002

(100

)D

eal w

orth

$12

.8 m

(250

)R

ed A

rrow

-8A

nti-

tank

mis

sile

200

120

02(2

50)

Dea

l wor

th $

8.1

mPo

land

4 PM

C-9

0A

BL

200

2. .

D

eal w

orth

up

to $

250–

400

m; i

ncl 4

8 PT

-91t

anks

and

10 W

ZT

-4 A

RV

s; d

eliv

ery

2003

–200

448

PT

-91

Mai

n ba

ttle

tank

200

2. .

Se

e pr

evio

us c

omm

ent

10

WZ

T-4

AR

V 2

002

. .

See

prev

ious

com

men

t

INTERNATIONAL ARMS TRANSFERS 507

Rus

sia

(10)

Mi-

17/H

ip-H

Hel

icop

ter

200

220

02(1

0)M

i-17

-1V

ver

sion

17

N-0

19M

E T

opaz

Com

bat a

c ra

dar

(199

9)20

02(5

)Fo

r m

oder

niza

tion

of 1

7 M

iG-2

9N F

GA

air

craf

t(2

04)

AA

-12

Add

er/R

-77

BV

RA

AM

(199

7). .

Fo

r M

iG-2

9N F

GA

air

craf

t; st

atus

unc

erta

in(5

00)

AT

-13

Saxh

orn/

9M13

1A

nti-

tank

mis

sile

200

120

01–2

002

(500

)D

eal w

orth

$30

m. .

SA

-16

Gim

let/I

gla-

1Po

rtab

le S

AM

200

2. .

D

eal w

orth

$48

mSo

uth

Afr

ica

22

G-5

Tow

ed g

un 2

000

2002

(22)

Dea

l wor

th $

50 m

; G-5

Mk-

3 ve

rsio

nSp

ain

1 Sc

orpe

ne C

lass

Subm

arin

e 2

002

. .

Dea

l wor

th $

947

m–$

1.1

b in

cl 1

del

iver

ed b

yFr

ance

; del

iver

y 20

08T

urke

y44

A

IFV

IFV

200

020

02(1

5)D

eal w

orth

$27

8–30

0 m

incl

167

oth

er v

ersi

ons;

Mal

aysi

an d

esig

natio

n A

dnan

; opt

ion

on m

ore;

deliv

ery

2002

–200

316

7 A

IFV

-APC

APC

200

020

02(5

0)Se

e pr

evio

us c

omm

ent;

incl

am

bula

nce,

AL

V, 8

1mm

mor

tar

carr

ier

and

CP

vers

ion;

incl

ass

embl

y of

65

in M

alay

sia

UK

6 Su

per

Lyn

xA

S/A

SW h

elic

opte

r 19

9920

02(2

)D

eal w

orth

$15

8 m

; del

iver

y 20

02–2

003

(48)

Sea

Skua

Ant

i-sh

ip m

issi

le 2

001

2002

(48)

For

6 Su

per

Lyn

x he

licop

ters

(12)

Jern

asSA

M s

yste

m 2

002

. .

Dea

l wor

th $

316

m (

offs

ets

incl

pro

duct

ion

ofco

mpo

nent

s in

Mal

aysi

a); d

eliv

ery

from

200

4. .

R

apie

r M

k-2

SAM

200

2. .

Fo

r Je

rnas

SA

M s

yste

m

L:

Ger

man

y 4

ME

KO

-A10

0 T

ype

Frig

ate

199

9. .

N

ew G

ener

atio

n Pa

trol

Ves

sel (

NG

PV)

prog

ram

me

wor

th $

1.42

b in

cl d

irec

t del

iver

y of

2;

ME

KO

-100

RM

N v

ersi

on; d

eliv

ery

from

200

5

Mex

ico

S:B

razi

l1

EM

B-1

45A

EW

&C

AE

W&

C a

ircr

aft

200

1. .

D

eal w

orth

$23

0–25

0 m

incl

2 M

P ve

rsio

n; m

ainl

yfo

r an

ti-na

rcot

ics

oper

atio

ns; d

eliv

ery

2004

2 E

MB

-145

MP

MP

airc

raft

200

1. .

Se

e pr

evio

us c

omm

ent

Can

ada

1 D

HC

-8 D

ash-

8T

rans

port

air

craf

t 2

000

2002

1 Q

200

vers

ion;

opt

ion

on 1

mor

eC

zech

Rep

ublic

10

Zlin

-242

LT

rain

er a

ircr

aft

(200

2)20

02(1

0)Is

rael

3 E

-2C

Haw

keye

AE

W&

C a

ircr

aft

200

2. .

E

x-Is

rael

i; de

al w

orth

$18

mR

ussi

a2

Mi-

17/H

ip-H

Hel

icop

ter

200

2. .

D

eal w

orth

$8

m; M

i-17

-V1

vers

ion

508 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

(50)

SA-1

8 G

rous

e/Ig

laPo

rtab

le S

AM

200

2. .

D

eal w

orth

$2.

14 m

; to

prot

ect o

ffsh

ore

oil

inst

alla

tions

Swed

en1

PS-8

90 E

riey

eA

EW

air

craf

t rad

ar 2

001

. .

For

1 E

MB

-145

AE

W a

ircr

aft o

rder

ed f

rom

Bra

zil;

deliv

ery

2004

USA

(10)

Exp

lore

rH

elic

opte

r(1

998)

1999

–200

210

A

rmed

ver

sion

; for

ant

i-na

rcot

ics

oper

atio

ns2

Sea

Vue

MP

airc

raft

rad

ar 2

001

. .

For

2 E

MB

-145

MP

airc

raft

del

iver

ed f

rom

Bra

zil

8 Se

a V

ueM

P ai

rcra

ft r

adar

200

2. .

Fo

r m

oder

niza

tion

of 8

C-2

12 M

P ai

rcra

ft

Mor

occo

S:Fr

ance

2 Fl

orea

l Cla

ssO

PV 1

998

2002

(2)

Dea

l wor

th $

130–

140

m; M

oroc

can

desi

gnat

ion

Moh

amm

ed V

Cla

ss(8

)M

M-3

8 E

xoce

tA

nti-

ship

mis

sile

(199

9)20

02(8

)Pr

obab

ly s

econ

d-ha

nd; f

or F

lore

al (

Moh

amm

ed V

)C

lass

OPV

s2

AS-

365/

565M

BH

elic

opte

r(2

000)

2002

(2)

For

use

on F

lore

al (

Moh

amm

ed V

) C

lass

OPV

s

Mya

nmar

(B

urm

a)S:

Rus

sia

10

MiG

-29S

/Ful

crum

-CFG

A a

ircr

aft

200

120

01–2

002

10

Dea

l wor

th $

130

m; i

ncl 2

MiG

-29U

B v

ersi

on(6

0)A

A-1

1 A

rche

r/R

-73

SRA

AM

(200

1)20

01–2

002

(60)

For

MiG

-29

FGA

air

craf

tU

krai

ne(6

0)A

A-1

0c/d

Ala

mo/

R-2

7EB

VR

AA

M(2

002)

2002

(60)

For

MiG

-29

FGA

air

craf

t

Nam

ibia

S:It

aly

1 A

B-1

39H

elic

opte

r 2

002

. .

Dea

l wor

th $

8 m

Lib

ya2

Mi-

24D

/Mi-

25/H

ind-

DC

omba

t hel

icop

ter

(200

1)20

022

Ex-

Lib

yan;

aid

2 M

i-8T

/Hip

-CH

elic

opte

r(2

001)

2002

2 E

x-L

ibya

n; a

id

Nep

alS:

Aus

tral

ia2

Mi-

24D

/Mi-

25/H

ind-

DC

omba

t hel

icop

ter

200

2. .

Se

cond

-han

d; d

eal w

orth

$6.

2 m

; for

use

aga

inst

Mao

ist r

ebel

s

INTERNATIONAL ARMS TRANSFERS 509

Indi

a(3

)C

assp

irA

PC 2

002

2002

(3)

Ex-

Indi

an; a

id; n

o. d

eliv

ered

cou

ld b

e up

to 3

1Po

land

1 M

-28

Skyt

ruck

Lig

ht tr

ansp

ort a

c 2

002

2002

1 D

eal w

orth

$4

m; p

roba

bly

fina

nced

par

tly b

y U

Kan

ti-te

rror

ist a

idU

krai

ne(2

)M

i-17

/Hip

-HH

elic

opte

r(2

002)

2002

(2)

Net

herl

ands

S:G

erm

any

57

PzH

-200

0 15

5mm

Self

-pro

pelle

d gu

n 2

002

. .

Dea

l wor

th $

420

m (

offs

ets

100%

); d

eliv

ery

2004

–20

0987

4 FI

M-9

2C S

tinge

rPo

rtab

le S

AM

(199

2)19

98–2

002

(874

)Pa

rt o

f E

urop

ean

Stin

ger

Prod

uctio

n Pr

ogra

mm

ein

volv

ing

prod

uctio

n of

com

pone

nts

in N

ethe

rlan

ds3

Patr

iot

SAM

sys

tem

200

220

02(1

)E

x-G

erm

an; d

eal w

orth

$79

m in

cl 9

6 M

IM-1

04m

issi

les

(inc

l $42

m in

cas

h an

d $2

7 m

in s

ervi

ces)

;de

liver

y 20

02–2

003

96

MIM

-104

Pat

riot

SAM

200

220

02(3

2)Se

e pr

evio

us c

omm

ent

Isra

el2

400

Spik

e-M

R/L

RA

nti-

tank

mis

sile

200

1. .

D

eal w

orth

$15

0–22

5 m

; del

iver

y fr

om 2

003

Ital

y4

127m

m/5

4N

aval

gun

199

620

021

Ex-

Can

adia

n gu

ns s

old

back

to p

rodu

cer

and

mod

erni

zed

befo

re d

eliv

ery;

for

4 D

e Z

even

Prov

inci

en C

lass

des

troy

ers

USA

30

AH

-64D

Apa

che

Com

bat h

elic

opte

r 1

995

1998

–200

2(3

0)D

eal w

orth

$68

6 m

(of

fset

s $8

73 m

)60

5 A

GM

-114

K H

ellf

ire

Ant

i-ta

nk m

issi

le 1

995

1996

–200

2(6

05)

Dea

l wor

th $

127

m; f

or A

H-6

4D h

elic

opte

rs13

9 A

N/A

PG-6

6C

omba

t ac

rada

r 1

993

1996

–200

2(1

38)

For

ML

U m

oder

niza

tion

of 1

39 F

-16A

/B F

GA

airc

raft

to F

-16A

M/B

M (

F-16

C/D

) ve

rsio

n;de

liver

y 19

96–2

003

16

RIM

-66M

Sta

ndar

d-2

SAM

(199

8)20

02(1

6)D

eal w

orth

$24

m in

cl 8

trai

ning

mis

sile

s; f

orD

e Z

even

Pro

vinc

ien

Cla

ss d

estr

oyer

s(2

40)

RIM

-7PT

C E

SSM

SAM

200

2. .

Fo

r D

e Z

even

Pro

vinc

ien

Cla

ss d

estr

oyer

s

New

Zea

land

S:C

anad

a10

5 Pi

ranh

a/L

AV

-25

IFV

200

1. .

D

eal w

orth

$26

3 m

(of

fset

s w

orth

$3

m);

del

iver

y20

03–2

004

USA

1 SH

-2G

Sup

er S

easp

rite

AS/

ASW

hel

icop

ter

1999

2002

1 D

eal w

orth

$23

m; S

H-2

G(N

Z)

vers

ion

(164

)Ja

velin

Ant

i-ta

nk m

issi

le(2

002)

. .

Dea

l wor

th $

15–3

2 m

; del

iver

y 20

03/2

004;

con

trac

tno

t yet

sig

ned

510 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Unk

now

n2

Boe

ing-

757-

200

Tra

nspo

rt a

ircr

aft

(200

2). .

Se

cond

-han

d; c

ontr

act n

ot y

et s

igne

d; d

eliv

ery

from

2003

2 K

ing

Air

B20

0/C

12L

ight

tran

spor

t ac

200

220

022

Seco

nd-h

and;

bou

ght a

nd o

pera

ted

by c

ivili

anco

mpa

ny f

or tr

aini

ng a

nd tr

ansp

ort

Nig

eria

S:R

ussi

a4

Mi-

17/H

ip-H

Hel

icop

ter

(200

2). .

M

i-17

1(Sh

) ar

med

ver

sion

; del

iver

y 20

03(9

)M

i-34

S/H

erm

itL

ight

hel

icop

ter

199

920

00–2

002

(9)

For

trai

ning

Nor

th K

orea

L:

Rus

sia

. .

AT

-4 S

pigo

t/9M

111

Ant

i-ta

nk m

issi

le(1

987)

1992

–200

2(1

100

)O

rder

ed f

rom

Sov

iet U

nion

and

pro

duce

d un

der

Rus

sian

lice

nce

afte

r br

eak-

up o

f So

viet

Uni

on. .

SA

-16

Gim

let/I

gla-

1Po

rtab

le S

AM

(198

9)19

92–2

002

(550

)M

ore

poss

ibly

pro

duce

d fo

r ex

port

; pro

babl

y or

dere

dfr

om S

ovie

t Uni

on a

nd p

rodu

ced

unde

r R

ussi

anlic

ence

aft

er b

reak

-up

of S

ovie

t Uni

on

Nor

way

S:Fi

nlan

d2

XA

-200

APC

200

2. .

X

A-2

03M

CP

vers

ion

Ger

man

y . .

IR

IS-T

SRA

AM

(200

2). .

C

ontr

act n

ot y

et s

igne

dM

ultip

le s

elle

rs6

NH

-90

NFH

AS/

ASW

hel

icop

ter

200

1. .

D

eal w

orth

$42

5 m

incl

8 N

H-9

0 T

TH

ver

sion

; for

coas

tgua

rd; o

rder

ed f

rom

Fra

nce

and

Ger

man

y an

dpr

oduc

ed in

Fin

land

; del

iver

y 20

05–2

008

8 N

H-9

0 T

TH

Hel

icop

ter

200

1. .

Fo

r SA

R; o

ptio

n on

10

mor

e; s

ee p

revi

ous

com

men

tN

ethe

rlan

ds1

Buf

fel

APC

200

120

021

Ex-

Dut

ch52

L

eopa

rd-2

A4

Mai

n ba

ttle

tank

200

020

01–2

002

(52)

Ex-

Dut

ch; d

eal w

orth

$16

8 m

incl

am

mun

ition

5 L

eopa

rd-2

A4

Mai

n ba

ttle

tank

200

120

025

Ex-

Dut

ch

INTERNATIONAL ARMS TRANSFERS 511

Spai

n5

Mod

. F-1

00 C

lass

Frig

ate

200

0. .

D

eal w

orth

$1.

5 b

incl

rad

ars

from

USA

(of

fset

s10

0% in

10

year

s in

cl N

ASA

MS

SAM

sys

tem

and

Peng

uin

mis

sile

s fo

r Sp

ain)

; inc

l 3 a

ssem

bled

or

licen

sed

prod

uctio

n in

Nor

way

; Nor

weg

ian

desi

gnat

ion

Nan

sen

Cla

ss; d

eliv

ery

2005

–200

9Sw

eden

12

AR

TH

UR

Art

y lo

catin

g ra

dar

199

719

99–2

002

(12)

Dea

l wor

th $

85 m

UK

12

Tac

tica

APC

200

2. .

T

actic

a-20

00E

OD

ver

sion

; del

iver

y 20

03U

SA3

AN

/SPS

-67

Sea

surv

rad

ar(2

000)

2001

–200

23

AN

/SPS

-67(

V)3

ver

sion

; for

mod

erni

zatio

n of

3N

ordk

app

Cla

ss O

PVs

5 A

N/S

PY-1

FA

ir s

urv

rada

r(2

000)

. .

Dea

l wor

th $

500

m in

cl A

EG

IS c

omba

t sys

tem

and

Mk-

41 S

AM

laun

cher

s; f

or 5

Nan

sen

Cla

ss f

riga

tes

(240

)R

IM-7

PTC

ESS

MSA

M(2

000)

. .

For

5 F-

100

(Nan

sen)

Cla

ss f

riga

tes

Om

anS:

Paki

stan

5 M

FI-1

7 Su

ppor

ter

Tra

iner

air

craf

t 2

002

2002

5 Su

per

Mus

hsha

k ve

rsio

nU

K16

Su

per

Lyn

xA

SW h

elic

opte

r 2

002

. .

80

Pira

nha

8x8

APC

200

020

01–2

002

(80)

Incl

AR

V, C

P, 8

1mm

mor

tar

carr

ier,

am

bula

nce,

artil

lery

obs

erva

tion

vers

ion

(2)

Mar

tello

S-7

43D

Air

sur

v ra

dar

199

920

02(2

)U

SA12

F-

16C

FGA

air

craf

t 2

002

. .

Dea

l wor

th $

1.12

b in

cl a

rmam

ent a

nd L

AN

TIR

Nra

dars

; F-1

6C/D

Blo

ck-5

0 ve

rsio

n; d

eliv

ery

2005

–20

0614

L

AN

TIR

NC

omba

t ac

rada

r 2

002

. .

For

F-16

C F

GA

air

craf

t80

A

GM

-65D

Mav

eric

kA

SM(2

002)

. .

For

F-16

C F

GA

air

craf

t; A

GM

-65D

/E v

ersi

on50

A

IM-1

20C

AM

RA

AM

BV

RA

AM

200

2. .

Fo

r F-

16C

FG

A a

ircr

aft;

deliv

ery

2004

100

AIM

-9M

Sid

ewin

der

SRA

AM

200

2. .

Fo

r F-

16C

FG

A a

ircr

aft;

AIM

-9M

-8/9

ver

sion

20

RG

M-8

4 H

arpo

onA

nti-

ship

mis

sile

(200

2). .

Fo

r F-

16C

FG

A a

ircr

aft;

AG

M-8

4D v

ersi

on(5

62)

BG

M-7

1 T

OW

Ant

i-ta

nk m

issi

le 2

001

2002

(400

)B

GM

-71E

TO

W-2

A v

ersi

on; d

eliv

ery

2002

–200

3

Pak

ista

nS:

Chi

na46

F-

7MG

Figh

ter

airc

raft

(200

1)20

0246

Pa

kist

ani d

esig

natio

n F-

7PG

; inc

l 6 F

T-7

PG v

ersi

on11

F-

7MG

Figh

ter

airc

raft

(200

2)20

0211

Pa

kist

ani d

esig

natio

n F-

7PG

512 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Fran

ce40

M

irag

e-5

FGA

air

craf

t 1

996

1998

–200

240

E

x-Fr

ench

; Blu

e Fl

ash-

6 de

al w

orth

$12

0 m

;m

oder

nize

d be

fore

del

iver

y; in

cl 6

Mir

age-

3Dve

rsio

n2

Ago

sta-

90B

Typ

eSu

bmar

ine

199

419

99–2

002

2 D

eal w

orth

$75

0 m

(+

$200

m f

or m

oder

niza

tion

ofPa

kist

an N

aval

Doc

kyar

d to

bui

ld s

ubm

arin

es)

incl

1 lic

ense

d pr

oduc

tion;

incl

1 a

ssem

bled

inPa

kist

an; P

akis

tani

des

igna

tion

Kha

lid C

lass

(96)

F-17

PA

S to

rped

o(1

996)

1999

–200

2(6

4)F-

17P

Mod

-2 v

ersi

on; f

or 3

Ago

sta-

90B

Typ

e(K

halid

Cla

ss)

subm

arin

es(2

4)SM

-39

Exo

cet

Ant

i-sh

ip m

issi

le 1

994

1999

–200

2(2

1)D

eal w

orth

$10

0 m

; for

Ago

sta-

90B

Typ

e (K

halid

Cla

ss)

subm

arin

esIn

done

sia

4 C

N-2

35T

rans

port

air

craf

t 2

001

2002

(1)

Dea

l wor

th $

49 m

; CN

-235

-220

ver

sion

; del

iver

ybe

fore

200

5It

aly

(45)

Gri

foC

omba

t ac

rada

r(2

001)

2002

(45)

Gri

fo-7

PG v

ersi

on; f

or 4

5 F-

7MG

(F-

7PG

) fi

ghte

r ac

Rus

sia

12

Mi-

17/H

ip-H

Hel

icop

ter

200

120

02(1

2)D

eal w

orth

$50

m in

cl 4

sec

ond-

hand

Mi-

17s;

deliv

ery

2002

–200

34

Mi-

17/H

ip-H

Hel

icop

ter

200

120

024

Seco

nd-h

and;

mod

erni

zed

befo

re d

eliv

ery;

dea

lw

orth

$50

m in

cl 1

2 ne

w M

i-17

sSw

eden

. .

RB

S-70

Port

able

SA

M(1

985)

1988

–200

2(3

75)

Ass

embl

ed in

Pak

ista

n(2

4)T

ype-

43A

SW to

rped

o 1

994

1999

–200

2(1

6)T

ype-

43X

2 ve

rsio

n; f

or m

oder

nize

d T

ariq

(A

maz

on)

Cla

ss f

riga

tes

USA

5 B

ell-

205/

UH

-1H

Hel

icop

ter

(200

1)20

025

Des

igna

tion

unce

rtai

n; p

roba

bly

ex-U

S; p

art o

f$7

3 m

US

aid

for

Afg

han

bord

er p

atro

l6

C-1

30E

Her

cule

sT

rans

port

air

craf

t 2

002

. .

Ex-

Aus

tral

ian

airc

raft

sol

d ba

ck to

US

prod

ucer

and

tran

sfer

red

to P

akis

tan

(6)

AN

/FPS

-88

Air

sur

v ra

dar

(200

2). .

D

eal w

orth

$15

5 m

; L-8

8 ve

rsio

n on

bal

loon

; for

Afg

han

bord

er p

atro

l; co

ntra

ct n

ot y

et s

igne

d

L:

Chi

na(1

50)

FC-1

FGA

air

craf

t 1

999

. .

Dev

elop

ed f

or P

akis

tan;

del

iver

y po

ssib

ly f

rom

200

4. .

Q

W-1

Van

guar

dPo

rtab

le S

AM

(199

3)19

94–2

002

(650

)Pa

kist

ani d

esig

natio

n A

nza-

2

INTERNATIONAL ARMS TRANSFERS 513

. .

Red

Arr

ow-8

Ant

i-ta

nk m

issi

le 1

989

1990

–200

2(9

600

)Pa

kist

ani d

esig

natio

n B

akta

r Sh

ikan

Fran

ce1

Ago

sta-

90B

Typ

eSu

bmar

ine

199

4. .

Se

e en

try

abov

e on

dir

ect d

eliv

ery

of 2

Ital

y(1

35)

Gri

fo-7

Com

bat a

c ra

dar

199

520

00–2

002

(131

)Fo

r m

oder

niza

tion

of s

ome

35 M

irag

e-3

and

100

F-7M

P fi

ghte

r ai

rcra

ft(1

2)G

rifo

-7C

omba

t ac

rada

r(2

002)

. .

Gri

fo-7

PG v

ersi

on; f

or 1

2 F-

7MG

(F-

7PG

) fi

ghte

rai

rcra

ft; c

ontr

act n

ot y

et s

igne

d

Per

uS:

USA

2 A

-37B

Dra

gonf

lyG

roun

d at

tack

ac

200

220

022

Ex-

US;

loan

for

ant

i-na

rcot

ic o

pera

tions

1 C

essn

a-52

5 C

itatio

nL

ight

tran

spor

t ac

200

220

021

Ex-

US;

loan

for

ant

i-na

rcot

ic o

pera

tions

Phi

lippi

nes

S:U

SA3

Bel

l-20

5/U

H-1

HH

elic

opte

r(2

001)

2002

3 E

x-U

S; a

id4

C-1

30K

Her

cule

sT

rans

port

air

craf

t(2

002)

. .

Ex-

UK

air

craf

t sol

d ba

ck to

US

prod

ucer

; dea

l wor

th$4

1 m

; mod

erni

zed

befo

re d

eliv

ery;

incl

for

MP

1 C

yclo

ne C

lass

Patr

ol c

raft

(200

1)20

021

Ex-

US;

aid

Pol

and

S:G

erm

any

23

MiG

-29S

/Ful

crum

-CFG

A a

ircr

aft

200

2. .

E

x-G

erm

an; a

id; M

iG-2

9G v

ersi

on; i

ncl 4

MiG

-29G

T v

ersi

on; d

eliv

ery

2003

–200

4(1

00)

AA

-10a

/b A

lam

o/R

-27

BV

RA

AM

200

2. .

E

x-G

erm

an; a

id; p

art o

f de

al f

or 2

3 M

iG-2

9 fi

ghte

rai

rcra

ft(4

00)

AA

-11

Arc

her/

R-7

3SR

AA

M 2

002

. .

See

prev

ious

com

men

t(1

50)

AA

-8 A

phid

/R-6

0SR

AA

M 2

002

. .

See

prev

ious

com

men

t12

8 L

eopa

rd-2

A4

Mai

n ba

ttle

tank

200

220

02(1

5)E

x-G

erm

an; p

art o

f ai

d w

orth

$30

0–38

0 m

; for

use

with

Pol

ish

brig

ade

oper

atin

g as

par

t of

Ger

man

divi

sion

6 B

rPz-

1 B

iber

AB

L 2

002

. .

See

prev

ious

com

men

t10

B

uffe

lA

RV

200

2. .

Se

e pr

evio

us c

omm

ent

4 K

eile

rA

MV

200

2. .

Se

e pr

evio

us c

omm

ent

35

M-1

13A

2A

PC 2

002

. .

See

prev

ious

com

men

t

514 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Isra

el(1

80)

Spik

e-M

R/L

RA

nti-

tank

mis

sile

200

2. .

D

eal w

orth

$25

0 m

incl

lice

nsed

pro

duct

ion;

Spi

ke-

MR

and

pro

babl

y Sp

ike-

LR

ver

sion

s; d

eliv

ery

2003

Ital

y3

RA

T-3

1S/L

Air

sur

v ra

dar

(200

2). .

D

eal w

orth

$90

m; p

art o

f N

AT

O N

AD

GE

air

-su

rvei

llanc

e ne

twor

k; d

eliv

ery

2006

–200

7L

ithua

nia

1 M

i-17

/Hip

-HH

elic

opte

r(2

001)

2002

1 Se

cond

-han

d; M

i-8M

TV

-1 v

ersi

on; p

artly

fin

ance

dby

Pol

ish

oil c

ompa

nyM

ultip

le s

elle

rs. .

M

U-9

0 Im

pact

ASW

torp

edo

(200

2). .

In

cl f

or M

i-14

PL h

elic

opte

rs a

nd M

EK

O-A

100

Typ

ean

d Pe

rry

(Pul

aski

) C

lass

fri

gate

s; p

rodu

cers

are

Fran

ce, G

erm

any

and

Ital

yN

ethe

rlan

ds3

STIN

GFi

re c

ontr

ol r

adar

200

1. .

Fo

r m

oder

niza

tion

of 3

Ork

an C

lass

cor

vette

sN

orw

ay(3

4)M

k-37

533

MM

AS

torp

edo

200

220

02(1

5)E

x-N

orw

egia

n; a

id; f

or T

ype-

207

Cla

ss s

ubm

arin

es(3

0)T

ype-

613

AS

torp

edo

200

220

02(1

5)E

x-N

orw

egia

n; a

id; f

or T

ype-

207

Cla

ss s

ubm

arin

es4

Typ

e-20

7Su

bmar

ine

200

220

022

Ex-

Nor

weg

ian;

aid

; 1 m

ore

deliv

ered

for

spa

res

only

;de

liver

y 20

02–2

004

Spai

n8

CA

SA C

-295

MT

rans

port

air

craf

t 2

001

. .

Dea

l wor

th $

212

m (

offs

ets

100%

); o

ptio

n on

4;

deliv

ery

2003

–200

5Sw

eden

3 G

iraf

fe A

MB

-3D

Air

sur

v ra

dar

200

1. .

Fo

r m

oder

niza

tion

of 3

Ork

an C

lass

cor

vette

s(6

0)R

BS-

15 M

k-3

Ant

i-sh

ip m

issi

le(2

001)

. .

For

3 O

rkan

Cla

ss c

orve

ttes

and

prob

ably

for

2M

EK

O-A

100

Typ

e fr

igat

es; c

ontr

act n

ot y

et s

igne

dU

K6

AS-

90 tu

rret

Tur

ret

199

9. .

Pr

ior

to li

cens

ed p

rodu

ctio

n; f

or u

se o

n Po

lish

chas

sis;

Pol

ish

desi

gnat

ion

Chr

obry

or

Kra

b;de

liver

y 20

04U

SA48

F-

16C

FGA

air

craf

t(2

002)

. .

Dea

l wor

th $

3.48

b (

offs

ets

wor

th $

9.8

b); d

eliv

ery

2006

–200

8; c

ontr

act n

ot y

et s

igne

d4

SH-2

G S

uper

Sea

spri

teA

S/A

SW h

elic

opte

r 2

001

2002

2 E

x-U

S; d

eal w

orth

$20

–22

m; d

eliv

ery

2002

–200

3(1

08)

RIM

-66B

Sta

ndar

d-1M

RSA

M(1

999)

2000

–200

2(1

08)

Ex-

US;

for

Per

ry (

Pula

ski)

Cla

ss f

riga

tes

. .

RIM

-7PT

C E

SSM

SAM

(200

1). .

Fo

r M

EK

O-A

100

Typ

e fr

igat

es; c

ontr

act n

ot y

etsi

gned

INTERNATIONAL ARMS TRANSFERS 515

2 Pe

rry

Cla

ssFr

igat

e 1

999

2000

–200

22

Ex-

US;

aid

; Pol

ish

desi

gnat

ion

Pula

ski C

lass

L:

Finl

and

313

AM

VIF

V(2

002)

. .

Suha

k pr

ogra

mm

e w

orth

$1.

25 b

incl

32

reco

nnai

ssan

ce a

nd 3

45 A

PC v

ersi

on; d

eliv

ery

2004

–201

3; c

ontr

act n

ot y

et s

igne

d34

5 A

MV

APC

(200

2). .

Se

e pr

evio

us c

omm

ent

32

AM

VR

ecce

veh

(200

2). .

Se

e pr

evio

us c

omm

ent

Ger

man

y 2

ME

KO

-A10

0 T

ype

Frig

ate

200

1. .

Po

lish

desi

gnat

ion

Proj

ect-

621

or G

awro

n-2

Typ

e;op

tion

on 2

–5 m

ore;

del

iver

y 20

03–2

005

Isra

el(5

000

)Sp

ike

MR

/LR

Ant

i-ta

nk m

issi

le 2

002

. .

Dea

l wor

th $

250

m in

cl d

irec

t del

iver

y; S

pike

-MR

and

prob

ably

Spi

ke-L

R v

ersi

ons;

del

iver

y fr

om20

03/2

004

Rus

sia

10

An-

28T

D B

ryza

-1T

DL

ight

tran

spor

t ac

200

120

01–2

002

(8)

UK

(72)

AS-

90 tu

rret

Tur

ret

199

9. .

Fo

r us

e on

Pol

ish

chas

sis;

Pol

ish

desi

gnat

ion

Chr

obry

or

Kra

b; d

eliv

ery

2004

–201

6

Por

tuga

lS:

Mul

tiple

sel

lers

12

EH

-101

-500

Hel

icop

ter

200

1. .

D

eal w

orth

$28

7–31

5 m

(in

cl 1

fin

ance

d by

EU

for

fish

ery

prot

ectio

n); f

or S

AR

; sup

plie

rs I

taly

and

UK

; del

iver

y 20

04–2

006

USA

20

F-16

AFG

A a

ircr

aft

199

820

01–2

002

(12)

Ex-

US;

Pea

ce A

tlant

is-2

dea

l wor

th $

268

m;

mod

erni

zed

to F

-16A

M (

F-16

C)

vers

ion

inPo

rtug

al a

fter

del

iver

y; in

cl 4

F-1

6B v

ersi

on;

5 m

ore

deliv

ered

for

spa

res

only

; del

iver

y20

01–2

003

20

AN

/APG

-66

Com

bat a

c ra

dar

(200

0)20

01–2

002

(12)

For

ML

U m

oder

niza

tion

of 2

0 F-

16A

FG

A a

ircr

aft

12

AIM

-120

C A

MR

AA

MB

VR

AA

M(2

002)

. .

Qat

arS:

Fran

ce(4

8)A

pach

eA

SM 1

994

1999

–200

2(4

0)Fo

r M

irag

e-20

00-5

FG

A a

ircr

aft;

Bla

ck P

earl

ver

sion

516 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Rom

ania

S:Fr

ance

(660

)R

-550

Mag

ic-2

SRA

AM

(199

6)20

01–2

002

(200

)Fo

r M

iG-2

1 L

ance

r (m

oder

nize

d M

iG-2

1MF)

and

poss

ibly

for

MiG

-29

figh

ter

airc

raft

; may

incl

asse

mbl

y or

lice

nsed

pro

duct

ion

in R

oman

iaG

erm

any

(32)

Gep

ard

AA

V(G

)(1

997)

1999

–200

2(3

2)E

x-G

erm

an; a

id w

orth

$37

m; p

roba

bly

mod

erni

zed

befo

re d

eliv

ery;

11

mor

e de

liver

ed f

or s

pare

s on

lyIs

rael

25

EL

/M-2

032

Com

bat a

c ra

dar

199

319

96–2

002

(25)

For

mod

erni

zatio

n of

25

MiG

-21M

F fi

ghte

r ai

rcra

ftto

MiG

-21

Lan

cer-

A(9

60)

Spik

e-M

R/L

RA

nti-

tank

mis

sile

(199

8)19

99–2

002

(400

)Fo

r m

oder

nize

d SA

-330

(IA

R-3

30)

helic

opte

rsU

K2

Box

er C

lass

Frig

ate

(200

2). .

E

x-U

K; d

eal w

orth

$14

0–18

7 m

(of

fset

s 80

–90%

);m

oder

nize

d be

fore

del

iver

y; d

eliv

ery

2004

–200

5

Rus

sia

S:U

zbek

ista

n(6

)Il

-76M

/Can

did-

BT

rans

port

air

craf

t(2

001)

2002

(2)

No.

ord

ered

cou

ld b

e 7

Saud

i Ara

bia

S:C

anad

a(8

)B

ell-

412

Hel

icop

ter

200

120

02(8

)D

eal w

orth

$15

0 m

incl

8 f

rom

Ita

ly13

0 Pi

ranh

a/L

AV

-90

AFS

V 2

000

2000

–200

1(6

6)D

eal w

orth

$41

6 m

incl

182

7 B

GM

-71

mis

sile

s;or

dere

d vi

a U

SA a

s pa

rt o

f 19

90 d

eal w

orth

$70

0m

incl

udin

g 98

7 ot

her

vers

ion;

for

Nat

iona

l Gua

rdFr

ance

3 F-

3000

S T

ype

Frig

ate

199

420

021

Saw

ari-

2 de

al w

orth

$3.

42 b

incl

oth

er w

eapo

ns a

ndco

nstr

uctio

n of

a n

aval

bas

e (o

ffse

ts 3

5%);

als

ode

sign

ated

Mod

ifie

d L

a Fa

yette

Typ

e; S

audi

desi

gnat

ion

Al R

iyad

h C

lass

; del

iver

y 20

02–2

004

(72)

AST

ER

-15

SAA

MSA

M(1

997)

2002

(24)

For

F-30

00S

Typ

e (A

l Riy

adh

Cla

ss)

frig

ates

(24)

F-17

PA

S to

rped

o(1

997)

2002

(8)

For

F-30

00S

Typ

e (A

l Riy

adh

Cla

ss)

frig

ates

(48)

MM

-40

Exo

cet

Ant

i-sh

ip m

issi

le 1

994

2000

–200

2(2

0)Fo

r F-

3000

S T

ype

(Al R

iyad

h C

lass

) fr

igat

es;

MM

-40

Blo

ck-2

ver

sion

Ital

y(8

)B

ell-

412/

AB

-412

Hel

icop

ter

200

120

02(8

)D

eal w

orth

$15

0 m

incl

8 f

rom

Can

ada

INTERNATIONAL ARMS TRANSFERS 517

USA

105

AG

M-6

5D M

aver

ick

ASM

200

120

02(5

0)D

eal w

orth

$21

m; i

nclu

ding

7 A

GM

-65G

ver

sion

500

AIM

-120

C A

MR

AA

MB

VR

AA

M 2

000

. .

For

F-15

FG

A a

ircr

aft;

deliv

ery

2003

1 82

7 B

GM

-71

TO

WA

nti-

tank

mis

sile

200

020

01–2

002

(1 8

27)

Dea

l wor

th $

416

m in

cl 1

32 P

iran

ha I

FV f

rom

Can

ada;

BG

M-7

1E T

OW

-2A

ver

sion

; for

Nat

iona

lG

uard

(562

)B

GM

-71

TO

WA

nti-

tank

mis

sile

200

120

02(2

81)

BG

M-7

1E T

OW

-2A

ver

sion

; del

iver

y 20

02–2

003

Sing

apor

eS:

Fran

ce1

La

Faye

tte C

lass

Frig

ate

200

0. .

Pr

ojec

t Del

ta; d

eliv

ery

2005

(144

)A

STE

R-1

5 SA

AM

SAM

(200

1). .

Fo

r L

a Fa

yette

Cla

ss f

riga

tes

Isra

el(6

00)

Pyth

on-4

BV

RA

AM

(199

7)19

97–2

002

(460

)Fo

r F-

5S a

nd F

-16

FGA

air

craf

t. .

Sp

ike-

MR

/LR

Ant

i-ta

nk m

issi

le 1

999

2001

–200

2(3

50)

Prob

ably

Spi

ke-L

R v

ersi

on; a

ssem

bled

in S

inga

pore

USA

8 A

H-6

4D A

pach

eC

omba

t hel

icop

ter

199

920

02(8

)Pe

ace

Van

guar

d de

al w

orth

$62

0 m

(in

cl $

25.9

m f

orL

ongb

ow r

adar

s) in

cl 1

92 A

GM

-114

K m

issi

les;

stat

ione

d in

USA

unt

il 20

0812

A

H-6

4D A

pach

eC

omba

t hel

icop

ter

200

1. .

Pe

ace

Van

guar

d de

al w

orth

$61

7 m

; del

iver

y by

2005

; sta

tione

d in

USA

unt

il 20

08(1

92)

AG

M-1

14K

Hel

lfir

eA

nti-

tank

mis

sile

(200

1). .

Fo

r A

H-6

4D h

elic

opte

rs20

F-

16C

FGA

air

craf

t 2

000

. .

Del

iver

y fr

om 2

003

100

AIM

-120

C A

MR

AA

MB

VR

AA

M 2

001

2002

(50)

Dea

l wor

th $

100

m; f

or F

-16

and

poss

ibly

F-5

S FG

Aai

rcra

ft; s

tore

d in

USA

2 S-

70A

/UH

-60L

Hel

icop

ter

200

020

02(2

)54

M

-109

cha

ssis

Gun

cha

ssis

(200

1)20

01–2

002

(29)

Fitte

d in

Sin

gapo

re w

ith 1

55m

m tu

rret

L:

Fran

ce5

La

Faye

tte C

lass

Frig

ate

200

0. .

Pr

ojec

t Del

ta, d

eliv

ery

2006

–200

9R

ussi

a(3

000

)SA

-16

Gim

let/I

gla-

1Po

rtab

le S

AM

(200

1). .

St

atus

unc

erta

in

Slov

akia

S:R

ussi

a4

Mi-

17/H

ip-H

Hel

icop

ter

200

220

024

Mi-

171

vers

ion;

pay

men

t for

Rus

sian

deb

t to

Slov

akia

518 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Slov

enia

S:Fr

ance

2 A

S-53

2UL

/AS-

332L

1H

elic

opte

r 2

001

. .

Dea

l wor

th $

24 m

; AS-

532A

L v

ersi

on; d

eliv

ery

2003

2 A

S-53

2UL

/AS-

332L

1H

elic

opte

r 2

002

. .

Dea

l wor

th $

35 m

; for

troo

p tr

ansp

ort a

nd S

AR

;A

S-53

2AL

ver

sion

; del

iver

y 20

04

L:

Aus

tria

(20)

Pand

urA

PC 1

998

1999

–200

2(2

0)Sl

oven

ian

desi

gnat

ion

Val

uk; o

ptio

n on

50

mor

e

Sout

h A

fric

aS:

Fran

ce(6

4)M

M-4

0 E

xoce

tA

nti-

ship

mis

sile

200

0. .

Fo

r M

EK

O-A

200

Typ

e fr

igat

es. .

M

istr

alPo

rtab

le S

AM

(200

2). .

Fo

r R

ooiv

alk

com

bat h

elic

opte

r; c

ontr

act n

ot y

etsi

gned

Ger

man

y 4

ME

KO

-A20

0 T

ype

Frig

ate

(200

0). .

D

eal w

orth

$0.

8–1.

115

b (o

ffse

ts $

3.2

b in

cl $

403

mfo

r ar

ms

indu

stry

); S

outh

Afr

ican

des

igna

tion

Am

atol

a C

lass

; del

iver

y 20

04–2

005

3 T

ype-

209/

1400

Subm

arin

e 1

999

. .

Dea

l wor

th $

600–

795

m (

offs

ets

375–

430%

); T

ype-

209/

1400

MO

D v

ersi

on; d

eliv

ery

2005

–200

7It

aly

30

A-1

09 H

irun

doL

ight

hel

icop

ter

199

9. .

D

eal w

orth

$24

0 m

(of

fset

s $9

77 m

incl

$19

1 m

for

arm

s in

dust

ry; i

ncl t

rans

fer

of p

rodu

ctio

n-lin

e of

A-1

09 a

nd A

-119

to S

outh

Afr

ica)

; A-1

09U

LH

vers

ion;

incl

25

asse

mbl

ed in

Sou

th A

fric

a; o

ptio

non

10

mor

e; d

eliv

ery

2003

–200

5N

ethe

rlan

ds. .

PA

GE

Air

sur

v ra

dar

(200

2). .

Pa

rt o

f G

roun

d B

ased

Air

Def

ence

Sys

tem

(G

BA

DS)

prog

ram

me;

con

trac

t not

yet

sig

ned

Swed

en9

JAS-

39 G

ripe

nFG

A a

ircr

aft

199

9. .

D

eal w

orth

$1.

16 b

incl

12

Haw

k-10

0 fr

om U

K(o

ffse

ts $

8.7

b in

cl $

1.5

b fo

r ar

ms

indu

stry

);JA

S-39

B v

ersi

on; f

or d

eliv

ery

2006

/200

7–20

09;

optio

n on

19

mor

eU

K12

H

awk-

100

FGA

/trai

ner

ac 1

999

. .

Part

of

deal

incl

9 J

AS-

39 f

rom

Sw

eden

; ass

embl

edin

Sou

th A

fric

a; H

awk-

100L

IFT

/Haw

k-12

0ve

rsio

n; d

eliv

ery

2005

INTERNATIONAL ARMS TRANSFERS 519

12

Haw

k-10

0FG

A/tr

aine

r ac

200

2. .

H

awk-

100L

IFT

/Haw

k-12

0 ve

rsio

n; a

ssem

bled

inSo

uth

Afr

ica

. .

Star

stre

akPo

rtab

le S

AM

(200

2). .

Pa

rt o

f G

roun

d B

ased

Air

Def

ence

Sys

tem

(G

BA

DS)

prog

ram

me;

con

trac

t not

yet

sig

ned

Sout

h K

orea

S:Fr

ance

(48)

Cro

tale

-NG

SAM

sys

tem

(199

9)19

99–2

002

(30)

Part

of

Kor

ean

Chu

n M

a or

Peg

asus

AA

V(M

); f

orus

e w

ith K

orea

n-de

velo

ped

SAM

Indo

nesi

a8

CN

-235

Tra

nspo

rt a

ircr

aft

199

720

01–2

002

8 D

eal w

orth

$12

0–14

3 m

(of

fset

s in

cl I

ndon

esia

nor

der

for

KT

-1 tr

aine

r ac

and

oth

er m

ilita

ry e

quip

-m

ent f

rom

Kor

ea);

CN

-235

-220

ver

sion

; inc

l 2 f

orV

IP tr

ansp

ort

Net

herl

ands

3 G

oalk

eepe

rC

IWS

199

9. .

Fo

r 3

KD

X-2

Typ

e fr

igat

es; d

eliv

ery

from

200

45

Goa

lkee

per

CIW

S(2

002)

. .

Dea

l wor

th $

50 m

; for

1 L

PX C

lass

AA

LS

and

3K

DX

-2 C

lass

fri

gate

sR

ussi

a23

Il

-103

Lig

ht a

ircr

aft

200

2. .

D

eal w

orth

$9

m; i

ncl $

4.5

m p

aym

ent o

f R

ussi

ande

bt to

Sou

th K

orea

; for

trai

ning

; del

iver

y 20

0330

B

MP-

3IF

V 2

002

. .

Paym

ent o

f R

ussi

an d

ebt t

o So

uth

Kor

ea; d

eliv

ery

2003

–200

63

T-8

0UM

ain

battl

e ta

nk 2

002

. .

See

prev

ious

com

men

t. .

A

T-1

3 Sa

xhor

n/9M

131

Ant

i-ta

nk m

issi

le 2

002

. .

See

prev

ious

com

men

tU

SA40

F-

15K

Figh

ter/

bom

ber

ac 2

002

. .

F-X

pro

gram

me

wor

th $

4.4

b (o

ffse

ts 6

5%);

F-1

5Kve

rsio

n; d

eliv

ery

2005

–200

814

7 A

IM-1

20C

AM

RA

AM

BV

RA

AM

200

2. .

D

eal w

orth

$11

0 m

incl

AIM

-9X

mis

sile

s; d

eliv

ery

2004

. .

AIM

-9X

Sid

ewin

der

SRA

AM

200

2. .

Se

e pr

evio

us c

omm

ent

29

M-2

70 M

LR

SM

RL

200

2. .

D

eal w

orth

$49

8 m

; del

iver

y 20

03–2

004

(44)

AN

/APG

-67

Com

bat a

c ra

dar

(200

1). .

Fo

r 44

A-5

0 FG

A a

ircr

aft p

rodu

ced

in S

outh

Kor

ea4

AN

/FPS

-117

Air

sur

v ra

dar

200

020

02(4

)D

eliv

ery

2002

3 A

N/S

PS-4

9A

ir s

urv

rada

r(1

999)

. .

For

3 K

DX

-2 T

ype

frig

ates

pro

duce

d in

Sou

th K

orea

64

RIM

-116

A R

AM

SAM

200

1. .

Fo

r K

DX

-2 T

ype

frig

ates

; del

iver

y pr

obab

ly 2

003

110

RIM

-66M

Sta

ndar

d-2

SAM

200

0. .

D

eal w

orth

$15

9 m

; for

KD

X-2

Typ

e fr

igat

es3

AN

/SPY

-1D

Air

sur

v ra

dar

(200

2). .

Fo

r 3

KD

X-3

Typ

e de

stro

yers

520 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

3 A

N/T

PS-1

17A

ir s

urv

rada

r 2

002

. .

Dea

l wor

th $

39 m

; del

iver

y 20

0411

1 M

GM

-140

A1

AT

AC

MS

SSM

200

1. .

D

eal w

orth

$81

m; d

eliv

ery

2004

100

Pope

ye-1

ASM

(199

7)20

00–2

002

(75)

Dea

l wor

th $

125

m in

cl m

oder

niza

tion

of 3

0 F-

4EFG

A a

ircr

aft;

US

desi

gnat

ion

AG

M-1

42; d

eliv

ery

2000

–200

3(7

2)R

GM

-84

Har

poon

Ant

i-sh

ip m

issi

le(1

994)

1998

–200

2(4

0)U

GM

-84

vers

ion;

for

Typ

e-20

9 (C

hang

Bog

o C

lass

)su

bmar

ines

L:

Ger

man

y 3

Typ

e-21

4Su

bmar

ine

200

0. .

K

SS-2

Pro

gram

me

wor

th $

1.1

b (i

ncl $

711

m im

port

from

Ger

man

y); d

eliv

ery

2007

–200

9N

ethe

rlan

ds3

MW

-08

Air

sur

v ra

dar

199

9. .

Fo

r 3

KD

X-2

Typ

e fr

igat

es p

rodu

ced

in S

outh

Kor

ea6

STIR

Fire

con

trol

rad

ar 1

999

. .

For

3 K

DX

-2 T

ype

frig

ates

pro

duce

d in

Sou

th K

orea

USA

20

F-16

CFG

A a

ircr

aft

200

0. .

D

eal w

orth

$66

3 m

; F-1

6 B

lock

-52

vers

ion;

Kor

ean

desi

gnat

ion

KF-

16; d

eliv

ery

2003

–200

43

Mk-

45 1

27m

m/5

4N

aval

gun

199

9. .

D

eal w

orth

$22

m; M

k-45

Mod

-4 v

ersi

on; f

orK

DX

-2 T

ype

frig

ates

pro

duce

d in

Sou

th K

orea

67

LV

TP-

7A1/

AA

V-7

A1

APC

200

020

01-–

2002

(22)

Dea

l wor

th $

99–1

20 m

; KA

AV

(K

orea

n de

sign

atio

nK

orea

n A

rmou

red

Am

phib

ious

Veh

icle

); d

eliv

ery

2001

–200

6

Spai

nS:

Can

ada

4 A

N/A

PS-5

04(V

)M

P ai

rcra

ft r

adar

(199

9)20

02(1

)Fo

r 4

CN

-235

MP

MP

airc

raft

Fran

ce2

A31

0T

rans

port

air

craf

t 2

000

2002

(2)

Seco

nd-h

and;

A31

0-30

4 ve

rsio

n; m

odif

ied

to ta

nker

airc

raft

in S

pain

15

AS-

532U

2/A

S-33

2L2

Hel

icop

ter

199

719

98–2

002

(15)

Dea

l wor

th $

205

m (

offs

ets

100%

)G

erm

any

30

Leo

pard

-2A

5M

ain

battl

e ta

nk 1

998

2002

(1)

Dea

l wor

th $

2.2

b (o

ffse

ts 8

0%)

incl

189

lice

nsed

prod

uctio

n an

d 16

Buf

fel A

RV

s; L

eopa

rd-2

A5E

vers

ion;

del

iver

y 20

02–2

003

4 B

uffe

lA

RV

199

8. .

Se

e pr

evio

us c

omm

ent

INTERNATIONAL ARMS TRANSFERS 521

Ital

y22

B

-1 C

enta

uro

Arm

oure

d ca

r 1

999

2000

–200

2(2

2)D

eal w

orth

$70

m (

offs

ets

100%

); S

pani

shde

sign

atio

n V

RC

-105

62

B-1

Cen

taur

oA

rmou

red

car

200

2. .

D

eal w

orth

$18

5 m

; Spa

nish

des

igna

tion

VR

C-1

05;

deliv

ery

2004

–200

64

RA

N-1

2L/X

Air

/sea

sur

v ra

dar

(199

6)20

011

For

4 D

e B

azán

(F-

100)

Cla

ss f

riga

tes

prod

uced

inSp

ain

2002

–200

6N

orw

ay(2

0)Pe

ngui

n M

k-2-

7A

nti-

ship

mis

sile

(200

0). .

D

eal w

orth

$26

.3 m

(of

fset

s fo

r N

orw

egia

n or

der

for

5 fr

igat

es);

opt

ion

on m

ore;

for

S-7

0/SH

-60B

helic

opte

rsSw

eden

20

Bv-

206S

APC

200

020

02(5

)In

cl 1

0 or

dere

d in

200

1 fo

r $5

m; o

ptio

n on

up

to 3

0m

ore

Switz

erla

nd18

Pi

ranh

a-3

8x8

APC

200

1. .

D

eliv

ery

2003

–200

4U

SA6

S-70

B/S

H-6

0B S

eaha

wk

ASW

hel

icop

ter

200

0. .

D

eal w

orth

$77

m in

cl m

oder

niza

tion

of 6

Spa

nish

S-70

Bs§

; Spa

nish

des

igna

tion

HS-

234

Mk-

45 1

27m

m/5

4N

aval

gun

199

920

021

Ex-

US;

mod

erni

zed

befo

re d

eliv

ery;

for

4 D

e B

azán

(F-1

00)

Cla

ss f

riga

tes

prod

uced

in S

pain

4 A

N/S

PY-1

FA

ir s

urv

rada

r 1

996

2002

1 D

eal w

orth

$75

0 m

; par

t of

AE

GIS

com

bat s

yste

mfo

r D

e B

azán

(F-

100)

Cla

ss f

riga

tes

8 A

N/S

PG-6

2Fi

re c

ontr

ol r

adar

(199

6)20

022

For

use

with

Sta

ndar

d an

d E

SSM

SA

Ms

on 4

De

Baz

án (

F-10

0) C

lass

fri

gate

s(8

0)R

IM-6

6M S

tand

ard-

2SA

M(1

998)

2001

–200

2(8

0)D

eal w

orth

$10

5 m

incl

32

trai

ning

mis

sile

s; S

M-2

Blo

ck-3

A v

ersi

on; f

or F

-100

(D

e B

azán

) C

lass

frig

ates

29

RIM

-66M

Sta

ndar

d-2

SAM

(200

2). .

D

eal w

orth

$29

m; S

M-2

Blo

ck-3

A v

ersi

on; f

or D

eB

azán

(F-

100)

Cla

ss f

riga

tes

(384

)R

IM-7

PTC

ESS

MSA

M(2

001)

. .

For

F-10

0 (D

e B

azán

) C

lass

fri

gate

s; c

ontr

act n

ot y

etsi

gned

4 A

N/M

PQ-6

4A

ir s

urv

rada

r(2

000)

. .

Ord

ered

via

Nor

way

as

part

of

4 N

ASA

MS

SAM

syst

ems

. .

AIM

-120

A A

MR

AA

MSA

M(2

000)

. .

For

4 N

ASA

MS

SAM

sys

tem

s or

dere

d fr

om N

orw

ay31

A

IM-1

20C

AM

RA

AM

BV

RA

AM

(200

2). .

D

eal w

orth

$21

m; f

or F

/A-1

8 FG

A a

ircr

aft

. .

BG

M-7

1F T

OW

-2B

Ant

i-ta

nk m

issi

le 2

002

. .

226

Jave

linA

nti-

tank

mis

sile

(200

1). .

D

eal w

orth

$25

m in

cl 1

2 la

unch

ers;

sta

tus

unce

rtai

n

522 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

L:

Ger

man

y 18

9 L

eopa

rd-2

A5+

Mai

n ba

ttle

tank

199

8. .

D

eal w

orth

$2.

2 b

(off

sets

80%

) in

cl d

irec

t del

iver

yof

30

and

16 B

uffe

l AR

Vs;

Leo

pard

-2A

5E v

ersi

on;

deliv

ery

from

200

312

B

uffe

lA

RV

199

8. .

Se

e pr

evio

us c

omm

ent

Sri L

anka

S:U

SA1

Bee

ch-2

00 H

ISA

RA

GS

airc

raft

200

020

021

For

use

agai

nst L

TT

E r

ebel

s2

AN

/TPQ

-36

Fire

find

erA

rty

loca

ting

rada

r(2

000)

. .

Dea

l wor

th $

22 m

; sta

tus

unce

rtai

n

Suda

nS:

Rus

sia

12

MiG

-29S

/Ful

crum

-CFG

A a

ircr

aft

200

2. .

D

eal w

orth

$12

0 m

; del

iver

y pr

obab

ly 2

003

Swed

enS:

Finl

and

104

XA

-200

APC

200

020

01–2

002

(60)

Dea

l wor

th $

67 m

; for

pea

ceke

epin

g fo

rces

; XA

-20

3S v

ersi

on; i

nclu

ding

18

XA

-202

S C

P ve

rsio

n63

X

A-2

00A

PC 2

002

. .

Dea

l wor

th $

37 m

; XA

-202

5 ve

rsio

n; d

eliv

ery

2003

–20

08G

erm

any

14

Buf

fel

AR

V 1

999

2002

(8)

Dea

l wor

th $

125

m; S

wed

ish

desi

gnat

ion

Bgb

v-12

0;de

liver

y 20

02–2

003

. .

IRIS

-TSR

AA

M(2

002)

. .

Con

trac

t not

yet

sig

ned

Ital

y20

A

-109

ML

ight

hel

icop

ter

200

120

02(2

)D

eal w

orth

$11

3 m

; A-1

09 P

ower

ver

sion

; Sw

edis

hde

sign

atio

n H

kp-1

5; f

or tr

aini

ng; i

ncl c

ompo

nent

sm

ade

in S

outh

Afr

ica

as o

ffse

ts f

or S

outh

Afr

ican

orde

r fo

r JA

S-39

com

bat a

c; d

eliv

ery

2002

–200

7M

ultip

le s

elle

rs18

N

H-9

0 T

TH

Hel

icop

ter

200

1. .

D

eal w

orth

$66

0 b

(off

sets

100

% in

cl p

rodu

ctio

n of

part

s fo

r 20

0 N

H-9

0 w

orth

$22

0 m

); in

cl 5

for

SAR

; Sw

edis

h de

sign

atio

n H

kp-1

4; o

rder

ed f

rom

INTERNATIONAL ARMS TRANSFERS 523

Fran

ce a

nd G

erm

any

and

prod

uced

in F

inla

nd;

deliv

ery

2005

–200

9Sw

itzer

land

5 Pi

ranh

a-3

10x1

0A

PC 2

000

2002

5 Fi

tted

with

Gir

affe

air

sur

veill

ance

rad

ar in

Sw

eden

USA

(5)

AN

/APS

-143

(V)

MP

airc

raft

rad

ar 2

002

. .

Dea

l wor

th $

7.6

m; f

or N

H-9

0 he

licop

ters

L:

Ger

man

y 91

L

eopa

rd-2

A5+

Mai

n ba

ttle

tank

199

419

98–2

002

(91)

Dea

l wor

th $

770

m in

cl 1

60 e

x-G

erm

an L

eopa

rd-2

tank

s (o

ffse

ts 1

20%

); o

ptio

n on

90

mor

e; S

wed

ish

desi

gnat

ion

Strv

-122

Swit

zerl

and

S:Fr

ance

12

AS-

532U

C/A

S-33

2H

elic

opte

r 1

998

2000

–200

2(1

2)D

eal w

orth

$20

8 m

; inc

l 10

asse

mbl

ed in

Sw

itzer

land

Ger

man

y 25

B

uffe

lA

RV

200

1. .

D

eal w

orth

$63

-70

m (

offs

ets

10.5

%);

del

iver

y20

04–2

005

UK

(2 0

00)

Rap

ier

Mk-

2SA

M(2

002)

. .

Ass

embl

ed in

Sw

itzer

land

; del

iver

y 20

04–2

007

USA

24

PST

AR

-ER

Air

sur

v ra

dar

(200

2). .

D

eal w

orth

$24

m; d

eliv

ery

2004

(222

)A

IM-9

X S

idew

inde

rSR

AA

M 2

002

. .

Dea

l wor

th $

104

m; f

or F

/A-1

8CD

air

craf

t

L:

Swed

en18

5 C

V-9

030C

HIF

V 2

000

2002

(4)

Schu

tzen

panz

er-2

000

prog

ram

me

wor

th $

424

m in

cldi

rect

del

iver

y of

1; i

ncl 3

2 C

V-9

030C

H-C

OM

CP

vers

ion;

del

iver

y 20

02-2

005;

opt

ion

on 1

24 m

ore

Syri

aS:

Rus

sia

(14)

Su-2

7SK

/Fla

nker

-BFG

A a

ircr

aft

(199

9)20

02(4

)St

atus

unc

erta

in

Tai

wan

S:U

SA30

A

H-6

4D A

pach

eC

omba

t hel

icop

ter

200

2. .

D

eal w

orth

$1.

29 b

(21)

Bel

l-20

9/A

H-1

WC

omba

t hel

icop

ter

199

720

00–2

002

(21)

Dea

l wor

th $

479

m9

CH

-47D

Chi

nook

Hel

icop

ter

199

920

01–2

002

(9)

Dea

l wor

th $

300–

486

m2

E-2

C H

awke

yeA

EW

&C

air

craf

t 1

999

. .

Dea

l wor

th $

400

m; E

-2T

ver

sion

; del

iver

y 20

03–

2004

/200

514

6 M

-109

A5

Self

-pro

pelle

d gu

n(2

001)

. .

Dea

l wor

th $

405

m; s

tatu

s un

cert

ain

300

M-6

0A3

Patto

n-2

Mai

n ba

ttle

tank

199

619

98–2

002

(300

)E

x-U

S; d

eal w

orth

$22

3 m

524 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

11

AN

/FPS

-117

Air

sur

v ra

dar

200

2. .

In

cl 4

AN

/TPS

-117

ver

sion

40

AG

M-6

5G M

aver

ick

ASM

(200

1). .

D

eal w

orth

$18

m; f

or F

-16

FGA

air

craf

t20

0 A

IM-1

20C

AM

RA

AM

BV

RA

AM

200

020

01–2

002

(100

)D

eal w

orth

$15

0 m

; for

F-1

6 FG

A a

ircr

aft;

stor

ed in

USA

unt

il C

hina

intr

oduc

es s

imila

r m

issi

les

290

BG

M-7

1F T

OW

-2B

Ant

i-ta

nk m

issi

le 2

002

. .

Dea

l wor

th $

18 m

360

Jave

linA

nti-

tank

mis

sile

(200

2). .

D

eal w

orth

$51

m in

cl 4

0 la

unch

ers;

sta

tus

unce

rtai

n(7

7)R

GM

-84

Har

poon

Ant

i-sh

ip m

issi

le 2

001

. .

Del

iver

y pr

obab

ly 2

003

4 K

idd

Cla

ssD

estr

oyer

(200

2). .

E

x-U

S; d

eal w

orth

$75

0–84

0 m

; con

trac

t not

yet

sign

ed

L:

USA

8 Pe

rry

Cla

ssFr

igat

e 1

989

1993

–98

7 T

aiw

anes

e de

sign

atio

n C

heng

Kun

g C

lass

; Kw

ang

Hua

-1 p

roje

ct; d

eliv

ery

1993

–200

4

Tan

zani

aS:

UK

1 W

atch

man

Air

sur

v ra

dar

200

1. .

D

eal w

orth

$40

m

Tha

iland

S:C

hina

2 O

PV-8

5mO

PV 2

002

. .

Dea

l wor

th $

66-8

8 m

Ital

y2

RA

N-3

0XA

ir s

urv

rada

r(2

002)

. .

For

2 O

PVs

deliv

ered

fro

m C

hina

UK

2 Su

per

Lyn

xA

SW h

elic

opte

r 2

001

. .

Dea

l wor

th $

25 m

(of

fset

s 50

%)

USA

30

Bel

l-20

5/U

H-1

HH

elic

opte

r 2

001

. .

Ex-

US;

aid

; mod

erni

zed

befo

re d

eliv

ery

for

abou

t$3

7 m

; del

iver

y 20

02–2

003/

2004

6 B

ell-

209/

AH

-1F

Com

bat h

elic

opte

r 2

001

. .

Ex-

US;

aid

; mod

erni

zed

befo

re d

eliv

ery

for c.

$7

m;

deliv

ery

2002

–200

416

F-

16A

FGA

air

craf

t 2

000

2002

(10)

Ex-

US;

Pea

ce N

ares

uan-

4 de

al w

orth

$13

0–15

7 m

;m

oder

nize

d be

fore

del

iver

y; in

cl 1

F-1

6B v

ersi

on;

incl

2 m

ore

for

spar

es o

nly

8 A

IM-1

20C

AM

RA

AM

BV

RA

AM

(200

1). .

Fo

r F-

16 F

GA

air

craf

t; to

be

stor

ed in

USA

INTERNATIONAL ARMS TRANSFERS 525

3 S-

70A

/UH

-60L

Hel

icop

ter

200

120

01–2

002

(3)

Dea

l wor

th $

30 m

; for

pat

rol a

nd a

nti-

narc

otic

sop

erat

ions

alo

ng b

orde

r w

ith M

yanm

ar2

S-70

A/U

H-6

0LH

elic

opte

r 2

001

. .

Del

iver

y 20

03

Tun

isia

S:U

SA1

C-1

30B

Her

cule

sT

rans

port

air

craf

t(2

001)

2002

1 E

x-U

S

Tur

key

S:Fr

ance

19

Oce

an M

aste

rM

P ai

rcra

ft r

adar

200

2. .

D

eal w

orth

$40

0 m

incl

19

FIT

S su

rvei

llanc

esy

stem

s; f

or 1

9 C

N-2

35M

PA M

P ai

rcra

ft19

200

E

ryx

Ant

i-ta

nk m

issi

le 1

998

1998

–200

2(2

512

)D

eal w

orth

$48

5 m

incl

160

0 la

unch

ers;

del

iver

y19

98–2

007

6 D

’Orv

es C

lass

Cor

vette

200

020

01–2

002

6 E

x-Fr

ench

; Tur

kish

des

igna

tion

Bur

ak C

lass

; dea

lw

orth

$21

0 m

(in

cl $

150

m f

or r

eact

ivat

ion

of 5

)(2

4)M

M-3

8 E

xoce

tA

nti-

ship

mis

sile

(200

0)20

02(2

4)Se

cond

-han

d; f

or D

’Orv

es C

lass

cor

vette

sG

erm

any

(1 5

00)

FIM

-92C

Stin

ger

Port

able

SA

M 1

986

1998

–200

2(1

500

)Pa

rt o

f E

urop

ean

Stin

ger

Prod

uctio

n Pr

ogra

mm

ein

volv

ing

prod

uctio

n of

com

pone

nts

in T

urke

y1

Fran

kent

hal C

lass

MC

M s

hip

199

9. .

D

eal w

orth

$62

5 m

incl

5 li

cens

ed p

rodu

ctio

n;T

urki

sh d

esig

natio

n A

lany

a C

lass

; del

iver

y 20

031

Kili

ç C

lass

FAC

(M)

200

0. .

D

eliv

ery

2003

Isra

el54

E

L/M

-203

2C

omba

t ac

rada

r 1

997

2001

(10)

For

54 F

-4E

FG

A a

ircr

aft m

oder

nize

d in

dea

l wor

th$6

00-7

00 m

in I

srae

l to

F-4E

-202

0(1

10)

Har

pyA

nti-

rada

r U

AV

199

920

00–2

002

(83)

(46)

Pope

ye-1

ASM

(199

8)20

00–2

001

(15)

For

F-4E

-202

0 FG

A a

ircr

aft

Ital

y9

Bel

l-41

2EP/

AB

-412

EP

Hel

icop

ter

199

820

01–2

002

(6)

Tw

o de

als

wor

th $

52 m

and

$35

m; f

or S

AR

;A

B-4

12E

P ve

rsio

n; f

or c

oast

guar

d4

RA

T-3

1S/L

Air

sur

v ra

dar

200

2. .

Pa

rt o

f N

AD

GE

(N

AT

O A

ir D

efen

ce G

roun

dE

nvir

onm

ent)

net

wor

k; R

A-3

1DL

ver

sion

Net

herl

ands

4 L

IRO

DFi

re c

ontr

ol r

adar

200

1. .

Fo

r 4

Kili

ç C

lass

FA

C4

MW

-08

Air

sur

v ra

dar

200

1. .

Fo

r 4

Kili

ç C

lass

FA

C4

STIN

GFi

re c

ontr

ol r

adar

200

1. .

Fo

r 4

Kili

ç C

lass

FA

CN

orw

ay16

Pe

ngui

n M

k-2-

7A

nti-

ship

mis

sile

200

020

01–2

002

(16)

Dea

l wor

th $

34–4

0 m

; for

S-7

0/SH

-60B

hel

icop

ters

526 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Sout

h K

orea

(20)

K-9

Thu

nder

155

mm

Self

-pro

pelle

d gu

n 2

001

2002

(8)

Dea

l wor

th $

67 m

; pri

or to

lice

nsed

pro

duct

ion;

asse

mbl

ed in

Tur

key;

Tur

kish

des

igna

tion

Firt

ina;

deliv

ery

2002

–200

3U

SA4

Boe

ing-

737

AE

WA

EW

&C

air

craf

t 2

002

. .

Dea

l wor

th $

1.1

b (o

ffse

ts w

orth

$50

0 m

); o

ptio

n on

2 m

ore;

del

iver

y fr

om 2

005

50

S-70

A/U

H-6

0LH

elic

opte

r 1

999

1999

–200

2(5

0)D

eal w

orth

$56

1 m

(of

fset

s w

orth

$11

0 m

); T

urki

shde

sign

atio

n K

arak

u8

S-70

B/S

H-6

0B S

eaha

wk

AS/

ASW

hel

icop

ter

199

820

028

S-70

B-2

8 ve

rsio

n; o

rgin

ally

4 o

rder

ed 1

997

but

chan

ged

to 8

in 1

998

(140

)D

rago

onA

PC(1

998)

2002

(40)

Dea

l wor

th $

45 m

; for

pol

ice;

del

iver

y 20

02–2

004

72

AG

M-1

14B

Hel

lfir

e-2

ASM

200

020

01–2

002

(72)

For

Bel

l-20

9/A

H-1

W h

elic

opte

rs14

4 A

GM

-114

B H

ellf

ire-

2A

SM 2

002

. .

For

Bel

l-20

9/A

H-1

W h

elic

opte

rs16

R

GM

-84

Har

poon

Ant

i-sh

ip m

issi

le 1

995

2002

(16)

Dea

l wor

th $

15.3

m; f

or M

EK

O-2

00T

-2 T

ype

(Bar

baro

s C

lass

) fr

igat

e1

Perr

y C

lass

Frig

ate

200

120

021

Ex-

US;

leas

e w

orth

$28

m; T

urki

sh d

esig

natio

nG

azia

ntep

Cla

ss

L:

Fran

ce30

A

S-53

2UL

/AS-

332L

1H

elic

opte

r 1

997

2000

–200

2(2

8)Ph

oeni

x-2

deal

wor

th $

430

m in

cl d

irec

t del

iver

y of

2 (o

ffse

ts 5

0%);

incl

18

for

SAR

and

5 f

or c

omba

tSA

R; d

eliv

ery

2000

–200

3G

erm

any

5 Fr

anke

ntha

l Cla

ssM

CM

shi

p 1

999

. .

Dea

l wor

th $

625

m in

cl d

irec

t del

iver

y of

1; T

urki

shde

sign

atio

n A

lany

a C

lass

; del

iver

y 20

04–2

007

3 K

iliç

Cla

ssFA

C(M

) 2

000

. .

Del

iver

y fr

om 2

005

4 T

ype-

209/

1400

Subm

arin

e 1

998

. .

Dea

l wor

th $

556

m; T

urki

sh d

esig

natio

n G

u r

Cla

ss;

deliv

ery

2004

–200

6/20

07So

uth

Kor

ea(2

80)

K-9

Thu

nder

155

mm

Self

-pro

pelle

d gu

n(2

001)

. .

Dea

l wor

th $

1 b;

del

iver

y 20

03–2

012

Spai

n9

CN

-235

MP

MP

airc

raft

199

820

02(6

)M

elte

m p

rogr

amm

e w

orth

$10

3–12

0 m

; inc

l 3 M

SAve

rsio

n fo

r co

astg

uard

; Tur

kish

des

igna

tion

CN

-235

D/K

INTERNATIONAL ARMS TRANSFERS 527

UK

840

Rap

ier

Mk-

2SA

M 1

999

2002

(50)

Dea

l wor

th $

130–

150

m; f

or u

se w

ith R

apie

r SA

Msy

stem

s m

oder

nize

d to

Rap

ier

B1X

(R

apie

r-2)

vers

ion;

del

iver

y 20

02–2

010

USA

551

AIF

VIF

V 2

000

2001

–200

2(2

02)

Dea

l wor

th $

338

m; i

ncl A

PC a

nd m

orta

r ca

rrie

rve

rsio

ns; d

eliv

ery

2001

–200

4

UA

ES:

Fran

ce(4

)A

S-36

5F/5

65SA

Pan

ther

ASW

hel

icop

ter

199

720

01–2

002

(4)

For

Dub

ai(3

2)A

S-15

TT

Ant

i-sh

ip m

issi

le(1

997)

2001

–200

2(3

2)Fo

r A

S-56

5SB

hel

icop

ters

; for

Dub

ai30

M

irag

e-20

00-5

Mk-

2FG

A a

ircr

aft

199

8. .

D

eal w

orth

$3.

4 b

incl

mod

erni

zatio

n of

33

UA

EM

irag

e-20

00 to

Mir

age-

2000

-5 M

k-2

vers

ion;

incl

11 M

irag

e-20

00D

AD

ver

sion

; inc

l 12

ex-F

renc

hM

irag

e-20

00 r

ebui

lt to

Mir

age-

2000

-5 M

k-2

vers

ion;

del

iver

y 20

03–2

005

(756

)M

ICA

BV

RA

AM

199

8. .

Fo

r M

irag

e-20

00-5

Mk-

2 FG

A a

ircr

aft;

MIC

A-E

Mve

rsio

n; d

eliv

ery

2003

500

R-5

50 M

agic

-2SR

AA

M(1

998)

. .

For

Mir

age

2000

-5 M

k-2

FGA

air

craf

t39

0 L

ecle

rcM

ain

battl

e ta

nk 1

993

1994

–200

2(3

90)

Dea

l wor

th $

3.4

b in

cl 4

6 L

ecle

rc A

RV

s (o

ffse

ts60

%);

incl

2 L

ecle

rc D

rive

r T

rain

ing

Tan

k ve

rsio

n46

L

ecle

rc D

NG

AR

V 1

993

1997

–200

2(4

5)Se

e pr

evio

us c

omm

ent

4 O

cean

Mas

ter

MP

airc

raft

rad

ar(2

001)

. .

For

4 C

N-2

95M

PA M

P ai

rcra

ft1

P-37

BR

L T

ype

FAC

(M)

200

2. .

B

aynu

nah

prog

ram

me

wor

th $

776

m in

cl 5

lice

nsed

prod

uctio

n; f

or A

bu D

habi

; als

o de

sign

ated

Com

batta

nte-

1 T

ype

Ger

man

y (6

4)T

pz-1

Fuc

hsA

PC(2

001)

. .

Dea

l wor

th $

25 m

, NB

C r

econ

nais

sanc

e ve

rsio

nR

ussi

a50

96

K9

Pant

zyr-

S1A

AV

(G/M

) 2

000

2002

(10)

Dea

l wor

th $

734

m; d

eliv

ery

prob

ably

200

2–20

04(1

200

)SA

-19

Gri

som

/9M

111

SAM

200

020

02(4

00)

For

50 9

6K9

Pant

zyr-

S1 S

AM

AA

V(G

/M)s

Spai

n4

C-2

95M

PAA

SW/M

P ai

rcra

ft 2

001

. .

Shah

een-

1 pr

ogra

mm

e w

orth

$11

4 m

; for

Abu

Dha

biU

K. .

B

lack

Sha

hine

ASM

199

8. .

Fo

r M

irag

e-20

00-5

Mk-

2 FG

A a

ircr

aft;

deliv

ery

2003

–200

4U

SA80

F-

16C

Blo

ck-6

0FG

A a

ircr

aft

200

0. .

D

eal w

orth

$5

b (i

ncl $

400

m f

or e

ngin

es);

incl

40

F-16

D v

ersi

on; d

eliv

ery

2004

–200

7(2

67)

AIM

-9M

Sid

ewin

der

SRA

AM

200

2. .

Fo

r F-

16C

FG

A a

ircr

aft

528 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Ukr

aine

(80)

BT

R-3

UIF

V 2

002

2002

(40)

No.

ord

ered

cou

ld b

e 90

L:

Fran

ce5

P-37

BR

L T

ype

FAC

(M)

200

2. .

B

aynu

nah

prog

ram

me

wor

th $

776

m in

cl d

irec

tde

liver

y of

1; f

or A

bu D

habi

; als

o de

sign

ated

Com

batta

nte-

1 T

ype

UK

S:C

anad

a5

BD

-700

Glo

bal E

xpre

ssT

rans

port

air

craf

t 1

999

. .

Dea

l wor

th $

1.3

b (o

ffse

ts 1

00%

) in

cl A

STO

Rra

dars

; for

mod

ific

atio

n to

AG

S ai

rcra

ft in

USA

and

UK

with

AST

OR

rad

ars;

del

iver

y 20

056

Bel

l-41

2EP

Hel

icop

ter

200

220

02(2

)O

pera

ted

by c

ivili

an c

ompa

ny f

or th

e U

K a

rmed

forc

es p

ilot t

rain

ing

and

SAR

; del

iver

y 20

02–2

003

Ger

man

y 4

Ro-

Ro

2000

0-to

n T

ype

Car

go s

hip

200

020

022

Dea

l wor

th $

1.8

b in

cl 2

lice

nsed

pro

duct

ion;

ope

r-at

ed b

y ci

vilia

n co

mpa

ny f

or U

K a

rmed

for

ces;

UK

desi

gnat

ion

Hur

st P

oint

Cla

ss; d

eliv

ery

2002

–200

3N

ethe

rlan

ds2

Goa

lkee

per

CIW

S(1

996)

. .

For

2 A

lbio

n C

lass

AA

LSs

pro

duce

d in

UK

Nor

way

4 FB

RV

AR

V(1

999)

2002

(1)

Dea

l wor

th $

12.4

m; o

ptio

n on

1 m

ore;

del

iver

y20

02–2

003

Sout

h A

fric

a6

SA-3

30 P

uma

Hel

icop

ter

200

220

026

Ex-

Sout

h A

fric

anSw

eden

108

BvS

-10

APC

200

020

012

Dea

l wor

th $

86 m

(ar

mou

r pr

oduc

ed in

UK

); in

cl C

Pan

d A

RV

ver

sion

; del

iver

y 20

01 a

nd 2

003–

2005

4 A

RT

HU

RA

rty

loca

ting

rada

r 2

002

. .

MA

MB

A p

rogr

amm

e; o

ptio

n on

4 m

ore;

del

iver

y20

03–2

004

4 A

RT

HU

RA

rty

loca

ting

rada

r(2

001)

2002

4 L

ease

incl

for

use

in A

fgha

nist

anU

SA8

Cou

gar

APC

200

1. .

D

eal w

orth

$3.

6 m

; UK

des

igna

tion

Tem

pest

;de

liver

y 20

0398

0 A

GM

-114

Lon

gbow

Ant

i-ta

nk m

issi

le 1

995

2000

–200

2(6

70)

Dea

l wor

th $

3.95

b (

offs

ets

100%

) in

cl 6

7 A

H-6

4Dhe

licop

ters

; ass

embl

ed in

UK

; del

iver

y 20

00–2

003

(1 6

00)

AG

M-1

14K

Hel

lfir

eA

nti-

tank

mis

sile

(199

6)20

00–2

002

(800

)Fo

r A

H-6

4D h

elic

opte

rs; a

ssem

bled

in U

K. .

A

IM-1

20B

AM

RA

AM

BV

RA

AM

200

020

02(2

5)D

eal w

orth

$28

5 m

INTERNATIONAL ARMS TRANSFERS 529

20

BG

M-1

09 T

omah

awk

SLC

M 1

999

2001

–200

220

D

eal w

orth

$50

m; B

GM

-109

T-L

AM

Blo

ck-I

IIC

vers

ion;

for

Sw

ifts

ure

and

Tra

falg

ar C

lass

subm

arin

es22

B

GM

-109

Tom

ahaw

kSL

CM

200

2. .

D

eal w

orth

$30

m; e

x-U

S U

GM

-109

C v

ersi

onm

oder

nize

d to

BG

M-1

09 T

-LA

M B

lock

-III

Cve

rsio

n; d

eliv

ery

2004

. .

FIM

-92A

Stin

ger

Port

able

SA

M 2

001

. .

Part

of

deal

wor

th $

89 m

for

100

7 m

issi

les

for

Gre

ece,

Ita

ly a

nd U

K; d

eliv

ery

2003

–200

4(5

000

)Ja

velin

Ant

i-ta

nk m

issi

le(2

002)

. .

NL

AW

(N

ext G

ener

atio

n L

ight

Arm

our

Wea

pon)

prog

ram

me

wor

th $

485

m (

offs

ets

100%

); d

eliv

ery

from

200

5; c

ontr

act n

ot y

et s

igne

d

L:

Ger

man

y 2

Ro-

Ro

2000

0-to

n T

ype

Car

go s

hip

200

020

021

Dea

l wor

th $

1.8

b in

cl d

irec

t del

iver

y of

4 a

nd25

-yea

r op

erat

ion

by c

ivili

an c

ompa

ny f

or U

KJo

int R

apid

Rea

ctio

n Fo

rce;

UK

des

igna

tion

Hur

stPo

int C

lass

; del

iver

y 20

02–2

003

Net

herl

ands

4 M

od. R

otte

rdam

Cla

ssA

AL

S 2

000

. .

Dea

l wor

th $

300

m; U

K d

esig

natio

n B

ay C

lass

;de

liver

y 20

04–2

005

USA

59

AH

-64D

Apa

che

Com

bat h

elic

opte

r 1

996

2001

–200

2(3

2)D

eal w

orth

$2.

8–3.

95 b

(of

fset

s 10

0%)

incl

dir

ect

deliv

ery

of 8

and

980

AG

M-1

14 m

issi

les;

WA

H-

64D

Apa

che

Mk-

1 ve

rsio

n; d

eliv

ery

2001

–200

45

AST

OR

AG

S ra

dar

199

9. .

D

eal w

orth

$1.

3 b

(off

sets

100

%)

incl

5 B

D-7

00ai

rcra

ft f

rom

Can

ada

used

as

plat

form

for

the

rada

r

USA

S:A

ustr

alia

1 W

estp

ac C

lass

Tra

nspo

rt s

hip

200

220

021

3-ye

ar le

ase

wor

th $

80 m

; US

desi

gnat

ion

HSV

-X1

Bra

zil

14

AM

T-1

00T

rain

er a

ircr

aft

200

120

025

Dea

l wor

th $

2.5

m; U

S de

sign

atio

n T

-14;

del

iver

y to

be c

ompl

eted

by

2003

Can

ada

164

Bel

l-20

6 Je

tRan

ger

Lig

ht h

elic

opte

r 1

993

1993

–200

1(1

49)

For

trai

ning

; Bel

l-20

6B-3

ver

sion

; US

desi

gnat

ion

TH

-67A

Cre

ek; d

eliv

ery

1993

–200

3

530 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

366

Pira

nha/

LA

V-2

5IF

V 2

000

2002

(290

)IA

V p

rogr

amm

e w

orth

$4

b in

cl o

ptio

n on

176

5m

ore;

incl

APC

, mor

tar

carr

ier

and

arm

oure

d ca

rve

rsio

n; a

ssem

bled

in U

SA; U

S de

sign

atio

nSt

ryke

r; d

eliv

ery

2002

–200

3Is

rael

2 K

fir

C2

FGA

air

craf

t(2

001)

2002

2 E

x-Is

rael

i; le

ased

by

civi

lian

com

pany

for

trai

ning

of

US

arm

ed f

orce

s; K

fir

TC

2 ve

rsio

n2

Kfi

r C

7FG

A a

ircr

aft

200

220

022

Ex-

Isra

eli;

mod

erni

zed

befo

re d

eliv

ery;

del

iver

ed to

civi

lian

com

pany

for

trai

ning

of

US

arm

ed f

orce

sN

orw

ay6

Peng

uin

Mk-

2-7

Ant

i-sh

ip m

issi

le 1

997

2000

–200

2(6

)D

eal w

orth

$6

m; U

S de

sign

atio

n A

GM

-119

BSp

ain

(35)

CN

-235

MP

Pers

uade

rM

P ai

rcra

ft 2

002

. .

Dee

pwat

er-2

000

prog

ram

me;

for

coa

stgu

ard

Swed

en2

Gir

affe

AM

B-3

DA

ir s

urv

rada

r 2

002

. .

Del

iver

y 20

04Sw

itzer

land

32

F-5E

Tig

er-2

FGA

air

craf

t(2

002)

. .

Ex-

Swis

s; f

or u

se in

trai

ning

; con

trac

t not

yet

sig

ned

Unk

now

n(2

)M

i-17

/Hip

-HH

elic

opte

r(2

002)

2002

(2)

Seco

nd-h

and;

sup

plie

r co

uld

be R

ussi

a; u

sed

by U

Sfo

rces

in A

fgha

nist

an

L:

Aus

tria

(50)

Pand

urA

PC 1

999

2000

–200

2(3

5)D

eal w

orth

$51

m; U

S de

sign

atio

n A

GM

S; d

eliv

ery

2000

–200

3; m

ore

prod

uced

for

exp

ort

Isra

el. .

Po

peye

-1/A

GM

-142

ASM

199

820

02(2

5)U

S de

sign

atio

n A

GM

-142

A H

ave

Nap

or

Rap

tor

Switz

erla

nd(7

10)

PC-9

/T-6

A T

exan

-2T

rain

er a

ircr

aft

199

619

99–2

002

(84)

JPA

TS

prog

ram

me

wor

th $

7 b

(inc

l $4.

7 b

for

airc

raft

onl

y); d

eliv

ery

1999

–201

7U

K18

7 H

awk/

T-4

5A G

osha

wk

Jet t

rain

er a

ircr

aft

198

119

90–2

002

(150

)V

TX

TS

or T

-45T

S pr

ogra

mm

e; d

eliv

ery

1990

–200

5(6

45)

UFH

Tow

ed g

un(2

000)

2002

(2)

US

desi

gnat

ion

M-7

77; d

eliv

ery

2004

–201

0

Unk

now

nS:

Unk

now

n(3

)SA

-7 G

rail/

Stre

la-2

Port

able

SA

M(2

002)

2002

(3)

SA-7

b/St

rela

-2M

ver

sion

; use

d by

reb

el/te

rror

ist g

roup

,po

ss. b

in L

aden

/al-

Qae

da, i

n un

succ

essf

ul a

ttack

on

poss

. US

mili

tary

air

craf

t in

S.A

rabi

a an

d pr

ob.

bin

Lad

en/a

l-Q

aeda

or

poss

. Arm

y of

Pal

estin

e in

unsu

cces

sful

atta

ck o

n Is

rael

i civ

ilian

ac

in K

enya

INTERNATIONAL ARMS TRANSFERS 531

Uru

guay

S:U

K2

Wes

sex

HC

-2/H

U-5

Hel

icop

ter

200

220

022

Ex-

UK

; Wes

sex

HC

-2 v

ersi

on; a

id; i

ncl f

or S

AR

Uzb

ekis

tan

S:R

ussi

a50

B

TR

-80

APC

200

120

01–2

002

(50)

Dea

l wor

th $

30 m

incl

oth

er w

eapo

ns

Ven

ezue

laS:

Bra

zil

12

AM

X-T

FGA

/trai

ner

ac 2

002

. .

AM

X-A

TA

ver

sion

; del

iver

y fr

om 2

005

Isra

el(2

)E

L/M

-223

8A

ir s

urv

rada

r 1

999

2002

2 Fo

r m

oder

niza

tion

of 2

Suc

re (

Lup

o) C

lass

fri

gate

s(5

4)B

arak

SAM

199

920

02(5

4)D

eal w

orth

$20

m in

cl 3

AD

AM

S la

unch

ers;

opt

ion

on m

ore;

ord

ered

via

Dut

ch c

ompa

nyIt

aly

12

SF-2

60M

Tra

iner

air

craf

t 1

998

2000

–200

2(1

2)D

eal w

orth

$12

m; S

F-26

0EU

ver

sion

Net

herl

ands

3 Fl

ycat

cher

Mk-

2Fi

re c

ontr

ol r

adar

199

920

01–2

002

(3)

For

use

with

3 A

DA

MS

SAM

laun

cher

s de

liver

edfr

om I

srae

l; op

tion

on 3

mor

eU

SA4

F28/

280

Lig

ht h

elic

opte

r 2

001

2002

4 F2

80FX

ver

sion

; for

Nat

iona

l Gua

rd; f

or tr

aini

ng

Vie

t N

amS:

Pola

nd4

An-

2T/C

olt

Lig

ht tr

ansp

ort a

c 1

999

2002

4 R

ussi

a(7

2)SA

-16

Gim

let/I

gla-

1Po

rtab

le S

AM

(199

6)20

01–2

002

(48)

SA-N

-10

vers

ion

for

BPS

-500

Typ

e (H

o-A

Cla

ss)

FAC

; des

igna

tion

unce

rtai

n(3

2)SS

-N-2

5/K

h-35

Ura

nA

nti-

ship

mis

sile

(199

6)20

01–2

002

(16)

For

BPS

-500

Typ

e (H

o-A

Cla

ss)

FAC

2 Sv

etly

ak C

lass

Patr

ol c

raft

200

120

02(1

)

L:

Rus

sia

(2)

BPS

-500

/Typ

e-12

41A

FAC

(M)

199

620

01(1

)V

ietn

ames

e de

sign

atio

n H

o-A

Cla

ss

Yem

enS:

Cze

ch R

epub

lic12

Z

lin-2

42L

Tra

iner

air

craf

t 2

001

2001

–200

2(1

0)N

orth

Kor

ea15

SS

-1 S

cud-

CSS

M(1

994)

2002

15

Pola

nd1

Poln

ocny

Cla

ssL

andi

ng s

hip

199

920

021

Dea

l wor

th $

50 m

incl

3 D

eba

Cla

ss la

ndin

g cr

aft;

Yem

eni d

esig

natio

n B

ilqui

s C

lass

532 MILITARY SPENDING AND ARMAMENTS, 2002

Rec

ipie

nt/

Yea

rY

ear(

s)N

o.su

pplie

r (S

)N

o.W

eapo

nW

eapo

nof

ord

er/

ofde

liver

ed/

or li

cens

er (

L)

orde

red

desi

gnat

ion

desc

ript

ion

licen

cede

liver

ies

prod

uced

Com

men

ts

Rus

sia

(15)

MiG

-29S

/Ful

crum

-CFG

A a

ircr

aft

(200

1)20

02(1

5)D

eal w

orth

$30

0–43

7 m

; no.

ord

ered

cou

ld b

e up

to24

Acr

onym

s an

d ab

brev

iati

ons

acA

ircr

aft

AA

LS

Am

phib

ious

ass

ault

land

ing

ship

AA

VA

nti-

airc

raft

veh

icle

AB

LA

rmou

red

brid

ge-l

ayer

AC

VA

ir-c

ushi

on v

esse

l(h

over

craf

t)A

EV

Arm

oure

d en

gine

er v

ehic

leA

EW

Air

born

e ea

rly-

war

ning

AE

W&

CA

irbo

rne

earl

y-w

arni

ng a

ndco

ntro

lA

FSV

Arm

oure

d fi

re s

uppo

rt v

ehic

leA

GS

Air

born

e gr

ound

-sur

veill

ance

AL

VA

rmou

red

logi

stic

veh

icle

AM

VA

nti-

min

e ve

hicl

eA

PCA

rmou

red

pers

onne

l car

rier

APC

/CP

Arm

oure

d pe

rson

nel c

arri

er/

com

man

d po

star

tyA

rtill

ery

AR

VA

rmou

red

reco

very

veh

icle

AS

Ant

i-sh

ipA

SMA

ir-t

o-su

rfac

e m

issi

leA

SWA

nti-

subm

arin

e w

arfa

reB

VR

AA

MB

eyon

d vi

sual

ran

ge a

ir-t

o-ai

rm

issi

le

CIW

SC

lose

-in

wea

pon

syst

emC

PC

omm

and

post

EL

INT

Ele

ctro

nic

inte

llige

nce

EU

Eur

opea

n U

nion

FAC

Fast

atta

ck c

raft

FGA

Figh

ter/

grou

nd a

ttack

FMF

Fore

ign

Mili

tary

Fun

ding

(US)

(G)

Gun

-arm

edG

IAG

roup

e Is

lam

ique

Arm

éIF

VIn

fant

ry f

ight

ing

vehi

cle

incl

Incl

udin

g/in

clud

e(s)

LT

TE

Lib

erat

ion

Tig

ers

of T

amil

Eel

am(M

)M

issi

le-a

rmed

MC

MM

ine

coun

term

easu

res

ML

UM

id-l

ife

upda

teM

PM

ariti

me

patr

olM

RL

Mul

tiple

roc

ket l

aunc

her

NB

CN

ucle

ar, b

iolo

gica

l and

chem

ical

no.

Num

ber

OPV

Off

shor

e pa

trol

ves

sel

Rec

ceR

econ

nais

sanc

eSA

MSu

rfac

e-to

-air

mis

sile

SAR

Sear

ch a

nd r

escu

eSI

GIN

TSi

gnal

s in

telli

genc

eSL

CM

Subm

arin

e-la

unch

ed c

ruis

em

issi

leSR

AA

MSh

ort-

rang

e ai

r-to

-air

mis

sile

SSM

Surf

ace-

to-s

urfa

ce m

issi

lesu

rvsu

rvei

llanc

eU

AE

Uni

ted

Ara

b E

mir

ates

UA

VU

nman

ned

air

vehi

cle

(dro

ne)

VIP

Ver

y im

port

ant p

erso

nV

TO

LV

ertic

al ta

ke-o

ff a

nd la

ndin

g(a

ircr

aft)

Con

vent

ions

. .D

ata

not a

vaila

ble

or n

ot

appl

icab

le(

)U

ncer

tain

dat

a or

SIP

RI

estim

ate

mm

illio

n (1

06 )b

billi

on (

109)

‘Con

trac

t no

t ye

t si

gned

’ is

use

d in

the

com

men

ts f

ield

whe

n so

urce

s in

dica

te th

atpr

elim

inar

y ag

reem

ents

hav

e be

en s

igne

d,bu

t w

hen

the

fina

l co

ntra

ct h

as n

ot y

etbe

en s

igne

d.

‘Sta

tus

unce

rtai

n’ is

use

d in

the

com

men

tsfi

eld

whe

n so

urce

s ar

e co

ntra

dict

ory

abou

tth

e (c

onti

nued

) ex

iste

nce

of t

he r

epor

ted

deal

.

‘Unk

now

n’ i

s us

ed i

n ca

ses

whe

re i

t ha

sno

t be

en p

ossi

ble

to i

dent

ify

a su

pplie

r or

reci

pien

t w

ith

an a

ccep

tabl

e de

gree

of

cert

aint

y.

‘Mul

tipl

e se

ller

s’ i

s us

ed i

n ca

ses

whe

reth

e w

eapo

n is

a c

o-pr

oduc

tion

of

two

orm

ore

coun

trie

s an

d w

here

it

has

not

been

poss

ible

to

iden

tify

the

fin

al s

uppl

ier;

the

co-p

rodu

cing

cou

ntri

es a

re m

enti

oned

in

the

com

men

ts f

ield

and

the

fin

al s

uppl

ier

will

be

know

n w

hen

actu

al d

eliv

erie

s w

illta

ke p

lace

.

INTERNATIONAL ARMS TRANSFERS 533

Tab

le 1

3C.2

. Ind

ex o

f su

pplie

rs o

f m

ajor

con

vent

iona

l wea

pons

, 200

2T

his

inde

x lis

ts r

ecip

ient

s an

d lic

ense

es b

y su

pplie

rs o

f m

ajor

wea

pons

on

orde

r or

und

er d

eliv

ery,

or

for

whi

ch th

e lic

ence

was

bou

ght a

nd p

rodu

ctio

n w

asun

der

way

or

com

plet

ed d

urin

g 20

02. T

he ty

pes

of w

eapo

n in

volv

ed in

the

tran

sfer

s ca

n be

fou

nd b

y cr

oss-

refe

renc

ing

with

tabl

e 13

C.1

. ‘U

nkno

wn’

is u

sed

whe

re it

has

not

bee

n po

ssib

le to

iden

tify

a su

pplie

r or

rec

ipie

nt w

ith a

n ac

cept

able

deg

ree

of c

erta

inty

.

Supp

lier

Rec

ipie

nts

(R)

and

licen

sees

(L

)

Ang

ola

R:

Côt

e d’

Ivoi

reA

ustr

alia

R:

Nep

al, U

SAA

ustr

iaR

:E

gypt

L:

Slov

enia

, USA

Bel

arus

R:

Ang

ola

Bra

zil

R:

Dom

inic

an R

epub

lic, G

reec

e, M

alay

sia,

Mex

ico,

USA

, Ven

ezue

laB

ulga

ria

R:

Eth

iopi

aC

anad

aR

:A

ustr

alia

, Bra

zil,

Gre

ece,

Mex

ico,

New

Zea

land

, Sau

di A

rabi

a, S

pain

, UK

, USA

L:

Aus

tral

iaC

hile

R:

Ecu

ador

Chi

naR

:A

lger

ia, E

gypt

, Ira

n, K

uwai

t, Pa

kist

an, T

haila

ndL

:E

gypt

, Pak

ista

nC

zech

Rep

.R

:A

lger

ia, M

exic

o, Y

emen

Den

mar

kL

:G

reec

e, L

ithua

nia

Finl

and

R:

Den

mar

k, N

orw

ay, S

wed

enL

:E

gypt

, Pol

and

Fran

ceR

:B

razi

l, B

rune

i, C

hile

, Chi

na, F

inla

nd, G

reec

e, I

ndia

, Ind

ones

ia, I

taly

, Jap

an, J

orda

n, M

alay

sia,

Mor

occo

, Pak

ista

n, Q

atar

, Rom

ania

, Sau

di A

rabi

a, S

inga

pore

, Slo

veni

a, S

outh

A

fric

a, S

outh

Kor

ea, S

pain

, Sw

itzer

land

, Tur

key,

UA

EL

:C

hina

, Ind

ia, J

apan

, Pak

ista

n, S

inga

pore

, Tur

key,

UA

EG

erm

any

R:

Aus

tral

ia, D

enm

ark,

Egy

pt, F

inla

nd, F

ranc

e, G

reec

e, I

srae

l, It

aly,

Kuw

ait,

Lith

uani

a, M

alay

sia,

Net

herl

ands

, Nor

way

, Pol

and,

Rom

ania

, Sou

th A

fric

a, S

pain

, Sw

eden

, Sw

itzer

land

, Tur

key,

UA

E, U

KL

:A

rgen

tina,

Aus

tral

ia, B

razi

l, G

reec

e, I

ndia

, Ind

ones

ia, I

taly

, Mal

aysi

a, P

olan

d, S

outh

Kor

ea, S

pain

, Sw

eden

, Tur

key,

UK

Indi

aR

:N

epal

Indo

nesi

aR

:B

rune

i, M

alay

sia,

Pak

ista

n, S

outh

Kor

eaIs

rael

R:

Aus

tral

ia, B

elgi

um, B

razi

l, C

hile

, Chi

na, F

inla

nd, F

ranc

e, I

ndia

, Mex

ico,

Net

herl

ands

, Pol

and,

Rom

ania

, Sin

gapo

re, T

urke

y, U

SA, V

enez

uela

L:

Pola

nd, U

SAIt

aly

R:

Alb

ania

, Arg

entin

a, B

angl

ades

h, B

razi

l, C

anad

a, C

hile

, Cro

atia

, Cze

ch R

epub

lic, G

reec

e, H

unga

ry, I

ndia

, Jap

an, M

alay

sia,

Nam

ibia

, Net

herl

ands

, Pak

ista

n, P

olan

d, S

audi

A

rabi

a, S

outh

Afr

ica,

Spa

in, S

wed

en, T

haila

nd, T

urke

y, V

enez

uela

L:

Aus

tral

ia, G

reec

e, P

akis

tan

534 MILITARY SPENDING AND ARMAMENTS, 2002

Lib

yaR

:N

amib

iaL

ithua

nia

R:

Pola

ndN

ethe

rlan

dsR

:A

rgen

tina,

Chi

le, F

inla

nd, G

erm

any,

Gre

ece,

Ind

ia, I

ndon

esia

, Ire

land

, Jor

dan,

Nor

way

, Pol

and,

Sou

th A

fric

a, S

outh

Kor

ea, T

urke

y, U

K, V

enez

uela

L:

Sout

h K

orea

, UK

Nor

th K

orea

R:

Yem

enN

orw

ayR

:A

ustr

alia

, Lat

via,

Pol

and,

Spa

in, T

urke

y, U

K, U

SAPa

kist

anR

:M

alay

sia,

Om

anPe

ruR

:A

ngol

aPo

land

R:

Indi

a, M

alay

sia,

Nep

al, V

iet N

am, Y

emen

Rus

sia

R:

Afg

hani

stan

, Alg

eria

, Ban

glad

esh,

Chi

na, C

olom

bia,

Cze

ch R

epub

lic, E

ritr

ea, G

reec

e, I

ndia

, Ind

ones

ia, I

ran,

Kaz

akhs

tan,

Mal

aysi

a, M

exic

o, M

yanm

ar, N

iger

ia, P

akis

tan,

Sl

ovak

ia, S

outh

Kor

ea, S

udan

, Syr

ia, U

AE

, Uzb

ekis

tan,

Vie

t Nam

, Yem

enL

:C

hina

, Ind

ia, I

ran,

Nor

th K

orea

, Pol

and,

Sin

gapo

re, V

iet N

amSi

ngap

ore

R:

Indo

nesi

aSl

ovak

iaR

:In

dia

Sout

h A

fric

aR

:Fi

nlan

d, M

alay

sia,

UK

Sout

h K

orea

R:

Indo

nesi

a, T

urke

yL

:T

urke

ySp

ain

R:

Arg

entin

a, B

razi

l, C

hile

, Col

ombi

a, F

ranc

e, M

alay

sia,

Nor

way

, Pol

and,

UA

E, U

SAL

:T

urke

ySw

eden

R:

Aus

tral

ia, B

razi

l, Fi

nlan

d, F

ranc

e, G

erm

any,

Gre

ece,

Hun

gary

, Ita

ly, M

exic

o, N

orw

ay, P

akis

tan,

Pol

and,

Sou

th A

fric

a, S

pain

, UK

, USA

L:

Switz

erla

ndSw

itzer

land

R:

Irel

and,

Spa

in, S

wed

en, U

SA, u

nkno

wn

L:

Can

ada,

USA

Tur

key

R:

Mal

aysi

aU

KR

:A

ustr

alia

, Aus

tria

, Bah

rain

, Bra

zil,

Bru

nei,

Can

ada,

Chi

le, C

hina

, Den

mar

k, G

erm

any,

Ind

ia, I

taly

, Jap

an, J

orda

n, M

alay

sia,

Nor

way

, Om

an, P

olan

d, R

oman

ia, S

outh

Afr

ica,

Sw

itzer

land

, Tan

zani

a, T

haila

nd, U

AE

, Uru

guay

L:

Aus

tral

ia, G

reec

e, I

ndia

, Pol

and,

Tur

key,

USA

Ukr

aine

R:

Alg

eria

, Chi

na, G

reec

e, I

ndia

, Ira

n, L

ibya

, Mya

nmar

, Nep

al, U

AE

L:

Iran

USA

R:

Alg

eria

, Aus

tral

ia, A

ustr

ia, B

ahra

in, B

elgi

um, B

razi

l, C

anad

a, C

hile

, Col

ombi

a, C

zech

Rep

ublic

, Den

mar

k, E

gypt

, Est

onia

, Fra

nce,

Ger

man

y, G

reec

e, H

unga

ry, I

ndia

, Ind

ones

ia,

Isra

el, I

taly

, Jap

an, J

orda

n, K

uwai

t, L

atvi

a, L

ithua

nia,

Lux

embo

urg,

Mex

ico,

Net

herl

ands

, New

Zea

land

, Nor

way

, Om

an, P

akis

tan,

Per

u, P

hilip

pine

s, P

olan

d, P

ortu

gal,

Saud

i A

rabi

a, S

inga

pore

, Sou

th K

orea

, Spa

in, S

ri L

anka

, Sw

eden

, Sw

itzer

land

, Tai

wan

, Tha

iland

, Tun

isia

, Tur

key,

UA

E, U

K, V

enez

uela

L:

Egy

pt, G

erm

any,

Jap

an, S

outh

Kor

ea, T

aiw

an, T

urke

y, U

KU

zbek

ista

nR

:In

dia,

Rus

sia

Mul

tiple

sel

lers

R:

Aus

tral

ia, F

inla

nd, G

reec

e, N

orw

ay, P

olan

d, P

ortu

gal,

Swed

enL

:Fi

nlan

dU

nkno

wn

R:

Bos

nia

and

Her

zego

vina

, Côt

e d’

Ivoi

re, L

atvi

a, N

ew Z

eala

nd, U

SA, u

nkno

wn


Recommended