Date post: | 30-Dec-2015 |
Category: |
Documents |
Upload: | nicole-finch |
View: | 38 times |
Download: | 0 times |
IT Empowerment(under DACNET project)
“ Knowledge is power”
IT Empowerment
• IT empowerment is one of the minimum agenda points and Thrust Areas in the implementation of e-Governance
• DACNET : A Scheme for bringing E-Governance in the Directorates and Field Units of Department of Agriculture & Cooperation (DAC), Ministry of Agriculture
DACNET Training
One of the major components of the DACNET project is to provide IT training to officials of the Directorates and Field Units of DAC.
To accomplish this huge task within the timeframe, this component has been entrusted [Vide Order No. 7(11)/1/2001-PS(T)/4694,4695&4696 dated April 02,2002] to three organisations of the Ministry of Communications & Information Technology Viz. RCC-Kolkatta, RCC-Chandigarh, ER&DCI-Noida
Objectives
• Effective utilization of IT resources at Directorates/field units
• Active participation in Information Systems Development
• Efficient management of Information systems
• Capability building for Systems enhancement
Objectives (contd.)
• Database Creation and maintenance
• Development of Knowledge based systems
• Further strengthening Decision Support Systems
• Enhancement of Portals and
Ultimately to contribute in IT led Agricultural
Development
Course material
• Uniform course content
• Meet the specific requirement for e-governance
• Interactive subject specific illustrations
• Familiarize with the latest IT tools
• Self explanatory for wider usage
Training at the door steps
• Reduced training over heads
• Decentralized approach
• Wider spatial coverage
• Adequate training infrastructure
• Sufficient practice sessions
• Trained instructors
Training Centres
DOEACC Centre- Chandigarh
Delhi, Faridabad, Chandigarh, Shimla,
Jammu & Nagpur
DOEACC Centre - Kolkata
Gangtok, Kolkata, Patna, Gorakhpur, Hyderabad,
Chennai & Gandhi Nagar
C-DAC - Noida
Delhi, Faridabad, Noida, Jaipur, Bhopal & Mumbai,
Trivandrum
Additional/Shifting of Centres
• On the recommendations of PMC of DACNET project additional / shifting of centres were proposed to ensure Cent percent participation and to overcome TA/DA problems faced by the Directorates and field units.
Additional Centres Shifting of Centres
Bikaner Gorakhpur to Lucknow
Guwahati Bhopal to Budini
Bangalore Trivandrum to Cochin
Anantapur
Guntur
Training Modules Courses Level • Office Productivity Tools A, B and C• Database Management A, B and C• Decision Support System A, B [G & NG] *• GIS & Remote Sensing A, B[G] *• CAD/CAM and SPSS A *(* More nominations can also be accommodated based on
the needs of the Directorates and field units by the Training organisations)
Present Status (as on 15th Feb, 2003)
Course Participation (in %)
• OPT ~ 65• DCA ~ 45• DSS ~ 35• GIS Started on 17/02• SPSS to be started• CAD/CAM to be started
Status of DACNET Training
4115
2593
843
1469
2371
284
0
700
1400
2100
2800
3500
4200
4900
OPT DCA DSS
Course
Participants
Projected
Attended
Status of Various Courses by C-DAC,Noida
289
919
1441
135
742920
0
300
600
900
1200
1500
1800
OPT DCA DSSCourse
No.o
f Pa
rticip
ants
Projected
Attended
Status of Various Courses by DOEACC-Kolkata
268
492
1307
94
268
691
0
300
600
900
1200
1500
OPT DCA DSSCourse
No.o
f Par
ticipa
nts
Projected
Attended
Status of Various Courses by DOEACC-Chandigarh
13671182
286
760
55
459
030060090012001500
OPT DCA DSSCourse
No.of
Pa
rticipa
nts
Projected
Attended
Status Report
• Directorate, field unit-wise
• course-wise
• Group-wise (A, B and C)
details are available on website
http://dacnet.nic.in/
Future plan of action• A survey will be Conducted at various levels in all
the Directorates and field units on various courses. A proforma will be circulated soon in this regard.
• A comprehensive analytical report on DACNET training will be submitted by NIC to the Ministry of Agriculture after completion of the project.
• Remaining training programmes on DCA and DSS and GIS will be completed by April, 2003 by the agencies positively.
• SPSS for Dte. Of E &S and CAD/CAM for four Farm Machinery Training and Testing Institutes will be completed by end of April, 2003.
Future plan of action
• A refresher course will be conducted in the identified centres.
• All modules of DACNET training will be put on DACNET portal as a part of e-learning.
• Few Specialized DACNET training courses will be conducted in the Phase II of DACNET project for Directorates and field units in the identified centres by NIC and DAC.
Responsibilities
• Training Schedules are to be circulated to the concerned Directorates/units at least 15 days in advance to get nominations by the Agencies with a copy to DACNET State Coordinator.
• DACNET State Coordinators are requested to inform to all the concerned Directorates/field units located in their state. Address along with telephone numbers are available in the DACNET website.
Thank you