Date post: | 05-Jul-2018 |
Category: |
Documents |
Upload: | subrat-patnaik |
View: | 227 times |
Download: | 0 times |
of 23
8/16/2019 IT Project Report on HPCL
1/23
HINDUSTAN PETROLEUM
CORPORATION LIMITED
A
Project Report on
Management Information Systems
Submitted by: Group: A-1[BATCH NO 2011-13]
NAME O!! NO"TESH ASHA 11002
N"#"TA BA!" 1100$NEETH" NA" 110$$CHAN%AN
&AHE!'AN"
110$(
H"MAN" &A"HA 110)0
Submitted to:
Prof.Hitendra Lachhwani
Tolani Institte !f Management Stdies" Adipr. Page #
8/16/2019 IT Project Report on HPCL
2/23
AC#NO'!E%GEMENT
$e are greatly than%fl to Prof. Hitendra Lachhwani for giding
s throghot or MIS project. His e&pertise is also of great help
to or project.
$e are also than%fl to the SR.INSTALLATION MANAGER MR.J.M
NAIK and the sta' of (A)*LA T+RMI)AL ,HP-L for all theircooperation and for their spport for ma%ing or project.
Tolani Institte !f Management Stdies" Adipr. Page /
8/16/2019 IT Project Report on HPCL
3/23
CONTENTS
1* "NTO%+CT"ON*******************************************************************$
2* M"SS"ON, "S"ON AN% .+A!"T/ &O!"C/********************************
3* ST+CT+E O OGAN"SAT"ON O %"EENT %E&ATMENT
$* THE +NCT"ONS AT %"EENT %E&ATMENTS AE AS
+N%E:-*****************************************************************************(
)* "NOMAT"ON !O'*********************************************************11
* TANS&OTAT"ON MO%ES*************************************************13
* E&OT S/STEM***************************************************************1)
(* "NOMAT"ON TOO!S********************************************************1* %EC"S"ON TA#EN AT EACH !EE! AN% "NOMAT"ON
E.+"E% O THAT AE AS O!!O'S:*****************************1
10****************************************************************SEC+"T/ S/STEM
****************************************************************************************20
11***********************************ECOMMEN%AT"ON AN% S+GGEST"ON
****************************************************************************************21
Tolani Institte !f Management Stdies" Adipr. Page 0
8/16/2019 IT Project Report on HPCL
4/23
"NTO%+CT"ON
HI)*1STA) P+TR!L+1M -!RP!RATI!) LIMIT+* 2HP-L3 is a 4o5ernment
of India +nterprise with )a5ratna Stats. It6s an oil indstry which was
fond in #789. HP-L is a ortne 4lo;al aled ?rand in India. HP-L is ha5ing /=@ Mar%eting share in India
among PS16s 2P1?LI- S+-T!R 1)ITS3 and a strong infrastrctre. It
operates / major reneries prodcing a wide 5ariety of petrolem
prodcts: one in Mm;ai" Maharashtra 2west Bone3 which is also the Head
!Cce of HP-L and second in >isha%hapatnam 2east Bone3 .It holds eDity
sta%e of #E.7
8/16/2019 IT Project Report on HPCL
5/23
#. P+TR!L K Petrol is %nown as Motor Spirit 2MS3 in oil indstry" which is
mar%eted throgh its retail pmp and is reglarly sed in personal
5ehicles./. *I+S+L *iesel is %nown as High Speed *iesel 2HS*3 in oil indstry.
This prodct is mar%eted throgh its retail pmps as well as terminal
and depots .It6s consmer6s are not only ato owner6s ;t also
transport agencies" indstries etc.0. L1?RI-A)TS K HP-L is the mar%et leader in l;ricants and the
associated prodcts. The prodct commands o5er 0=@ of the Mar%et
Share in this sector. The poplar ;rands of HP l;es are Laal 4hoda"
Milcy" Thanda Raja" (oolgard etc.9. LP4 K LP4 is LiDeed Petrolem 4as which is sed for hosehold
prpose ;asically as a coo%ing gas and it6s in liDid form.IATI!) T1R?I)+ 1+L K AT ser5ices is pro5ided at 5arios
airports in India for more than half centry. HP-L facilitates to spplyto J+T A# at Indian Ports.
E. 1R)A-+ !IL It6s ;lac% oil which is sed in ships.
The (A)*LA T+RMI)AL is ;asically in5ol5ed in recei5ing" storing and
distri;tion of the inished Prodcts li%e MS" HS*" rnace oil and l;es.
In (andla Terminal there are total /9 tan%s in the terminal in that 0 tan%s
are ndergrond and the rest /# tan%s are a;o5e grond and there is
specic tan% for e5ery specic prodct.
Tolani Institte !f Management Stdies" Adipr. Page
8/16/2019 IT Project Report on HPCL
6/23
M"SS"ON, "S"ON AN% .+A!"T/ &O!"C/
M"SS"ON: The mission of HP-L is to enhance their prodcti5ity"
proti;ity and Dality of the prodcts so that they can ;e the )o.# in
!il Indstry ;y ta%ing into care the cltral heritage and the
en5ironment and the cstomers and employee.
Tolani Institte !f Management Stdies" Adipr. Page E
8/16/2019 IT Project Report on HPCL
7/23
"S"ON: The 5ision of HP-L is to ;e $orld -lass +nergy -ompany to
;e %nown for its caring and delighting its cstomers with good
Dality prodcts in domestic and international mar%et. The company
will ;e e&cellence in social commitments" en5ironment" employee
welfare and relations" health and safety norms.
.+A!"T/ &O!"C/ : The -ompany is committed to deli5er ality
Petrolem ProdctsN to the costmers on time" e5ery time in order to
achie5e Total -stomer *elightN. As it6s important for all companies
to o;tain cstomer6s satisfaction.
ST+CT+E O OGAN"SAT"ON O
%"EENT %E&ATMENT
Tolani Institte !f Management Stdies" Adipr. Page 8
8/16/2019 IT Project Report on HPCL
8/23
He4dO56e
Nort7Ce8tr49:o8e
Nort7:o8e
E4;t:o8e
'e;t:o8e
#48d94Termi849
Se8iori8;t4994tio8
m484*M*N4i?@
&9488i8<A
Oper4tio8;
%ep4rtme8t
M4i8te8486e A
&ur674;e
%ep4rtme8t
1i8486e%ep4rtm
e8t
Hum48e;our6e
%ep4rtme8t
S4Bety ASe6urity%ep4rtm
e8t
Sout7:o8e
Nort7'e;t:o8e
THE +NCT"ONS AT %"EENT
%E&ATMENTS AE AS +N%E:-
#3Planning F !perational department/3Maintenance F Prchase department03inance department93Hman Resorce department
8/16/2019 IT Project Report on HPCL
9/23
1@ &9488i8<
Oper4tio849 dep4rtme8t: Planning is the rst
and foremost acti5ity of any organiBation. Rest all
acti5ity are depended pon it.)o organiBation can sr5i5e for a long period withot
proper planning of the di'erent nderta%ing at adi'erent department. At e5ery stage planning has to
;e done. irst of all planning is made relating to the
goal of an organiBation and accordingly the department
at a di'erent le5el plan and accomplishes the goal.In the same way at HP-L also according to the
reDirement of the dealer and consmption they plan
for the ftre reDirement. Again here also they shold;e aware of the stoc% which is a5aila;le with them in
the tan%s" order recei5ed from cstomer" goods in
transit etc. Their planning again depend pon the retail otlet i.e.
their petrol pmps" what is the Dantity a5aila;le with
them" how mch order is recei5ed" how mch they are
going to recei5e the prodct from head oCce etc. Hereagain they %eep in mind the total mar%et of the region"
li%e other retail otlets trno5er their share in the
mar%et and at what rate the reDirement will increase.
Here planning changes e5ery month. !5er here in this
organiBation the normal capacity of the tan% is #/0==
(L ;ased on this prodct is recei5ed and spplied.
2@ M4i8te84
86e &ur674;e dep4rtme8t:Maintenance is also a
prime acti5ity for any organiBation. At HP-L also they
need to go throgh the same. Here also maintenance is
reDired for the fel tan%" pipe lines ;oth within the
organiBation and also of those which are coming from
(andla port to HP-L" water tan%s" motors" other
Tolani Institte !f Management Stdies" Adipr. Page 7
8/16/2019 IT Project Report on HPCL
10/23
machinery etc. The fel tan% is sed for < years for
storage and then after e5ery < years maintenance is
done for it. or that they need to empty the whole tan%
and nderta%e the whole maintenance wor%s which
inclde chec%ing the thic%ness of the plate form
otside" inside" downward" chec%ing of any lea%age orwea% area of the tan%" painting etc. There are two
manholes in the tan% which is %ept open for some days
so that the gas which is present in it gets e&hast in
air. Also there are hge nm;ers of motors of
8/16/2019 IT Project Report on HPCL
11/23
department is to pro5ide the man power to the
di'erent departments. There are reDirement of
di'erent employees" la;ors" some technical e&perts
etc. The management according to the reDirement
as%s to the department to ma%e arrangement for the
same. The recritment process is also nderta%en atthis stage" right from the recei5ing application to the
nal selection and the placement of employees. As and
when there is a reDirement of man power at di'erent
le5els of the department" there wor%s start right from
allotting tas%" timing" specialiBation etc.
5) S4ety Se6urity dep4rtme8t: Safety here is themost important %ey of the organiBation. +5en a mintemista%e can trn into the ;ig disaster. So 5arios safetymethods are adopted to a5oid sch sitation. Li%e rightfrom the entering into the premises of HP-L there is astrict restriction on carrying cell phones" match ;o&"cigarettes" and any gadgets that can lead to spar%s etc.or employees also di'erent safety arrangements are
ta%en. $hile going to their respecti5e jo; they sed towear safety helmet" Safety glo5es" safety shoes etc andwor% is nderta%en ;y the e&pert6s sper5ision. Theyneed to %eep chec% on the electricity part also as it alsomay trn disastros" for that 5oltage inpt and otpt ista%en into the accont. ire e&tingishers are %ept ina;ndance Dantity e5erywhere. There is a siren alsowhich immediately informs to the employees if any re
;rea%s ot. There are two water tan%s a5aila;le in thepremises.
Tolani Institte !f Management Stdies" Adipr. Page ##
8/16/2019 IT Project Report on HPCL
12/23
"NOMAT"ON !O'Informational Oow plays an important part in an organiBation to
commnicate easily with other departments and get proper" correct and
easy way to wor% in ;ig organiBation sch as HP-L.
In HP-L the information Oows from top management to lower
management li%e a S+&&!/ CHA"N MANAGEMENT so that the
process of information spread easily in organiBation. The prodct is
send ;y head Darter and H! wor% as a top management they pass it
on information a;ot the prodct to the planning and operational
department a;ot it.
I. How mch Dantity of the prodct is comingII. $hich prodct is comingIII. In which shipQ5essel its comingI>. At what time it6s going to reach the destination port
This information is send ;y head Darter to planning and !perational
department then its Oow ;y planning and operational department to
port so that they easily get there prodct at proper time .Then afterrecei5ing the information from H! the wor% of Planning and
!perational department is to pass the information to nance
department that H! has sent the prodct throgh 5essel so do all the
formalities of port" now here planning and operational Oow the
information to the port athorities also at same le5el so that port
athorities get the information that at what time the 5essel is coming
In which ship it6s coming After that the port commnicates to nance
department that flll all the formality of -stom so that prodct geteasily departed from 5essel to pipeline for the terminal.
After that port athorities again commnicate to planning and
operational department ;efore # hor ;y sending mail that they are
now starting to pmp the prodct throgh pipeline. After recei5ing the
mail Planning and !perational department again commnicate" after
recei5ing the prodct they mail to Port athorities that we recei5e the
prodct. After Hman Resorce department is ready with the wor%ers
who are ta%ing care of the prodct is send to the correct terminal
Tolani Institte !f Management Stdies" Adipr. Page #/
8/16/2019 IT Project Report on HPCL
13/23
which is allotted for the specic prodct and see that the tan% is not
o5er loaded ;y the prodct if there is sCcient prodct in the tan%
then it6s a responsi;ility of the employee to %eep that prodct in the
pipeline only" so that prodct is properly adjsted in the tan% and not
;e access in the tan% so that it does not ;rst in tan%. Then hman
resorce department also Oow the information to the Maintenance and
Prchase department ;efore storing the prodct in the tan%. It6s a
responsi;ility of the Maintenance department that the tan% is not
ha5ing any pro;lem in storing the prodct and see that prodct is
properly adjsted in the tan%. After that Maintenance department is
responsi;le to commnicate with the Safety and Secrity department
that when the wor%er6s are wor%ing in the terminal area the wor%er are
sppose to wear safety helmet and safety ;oots also so that all the
mishaps are a5oida;le and they insre their wor%ers are on safe side.
In this terminal the type of networ% se to commnicate is B+S
TO&O!OG/*
In this way the information Oows smoothly in these mch di'erent
department.
Tolani Institte !f Management Stdies" Adipr. Page #0
8/16/2019 IT Project Report on HPCL
14/23
TANS&OTAT"ON MO%ES
There is only one mode of transportation for recei5ing the prodct for the
storage in terminal that is as follows:
• >essel system
Ep9484tio8:
e;;e9 ;y;tem: Head Darter send the prodct throgh 5essel
;ecase the prodct is easily recei5ed to the terminal throgh it.
Then throgh the pipeline it is directly connected to ports and with
terminal. So when the ship reaches the port there is pre decided
jetty where the ship placed and from that it is connected to the
terminal pipeline then from there the pmping of prodct starts and
after that it directly reaches to the specic tan% in terminal.
There are three way of transportation mode for the distri;tion of the
prodct which is stored in the warehose. They are as follows:
• Tan% trc%2TT3
• Tan% wagon6s
• A5iation facilities
Ep9484tio8:
T48? tru6?: or distri;tion of prodct in local mar%et or in retail
mar%et the mode of transportation mostly sed is tan% trc%. They
load optimm le5el capacity of the tan% trc% so that it is easily
Tolani Institte !f Management Stdies" Adipr. Page #9
8/16/2019 IT Project Report on HPCL
15/23
distri;ted and can ;e carried safely to di'erent locations. Mostly
the trc%s ha5e the capacity of /= (L 2/="=== Liters3. In that there
are for compartments" in which di'erent prodcts can ;e lled in
each department or same prodct can ;e lled as reDired.
T48? D4
8/16/2019 IT Project Report on HPCL
16/23
E&OT S/STEMReport system is also the easy and formal mode of commnication in an
organiBation. If any information is send to H! regarding to the
organiBation then it is to ;e send throgh reports only. There are < type of
report system is to ;e sed they are as follows:
Sto6? mo8t79y report
Sto6? d4i9y report
S49e; report
&ur674;e report
Mo8t79y %i;tributio8 &948
EF&!ANAT"ON:
Sto6? mo8t79y report: This report says a;ot the monthly stoc%%ept for the prodct. It %eeps the record of how mch prodct is
there" how mch is needed" how mch can ;e stored and how mch
left after spply done at the end of the month. The report is send to
H! ;y the planning department.
Sto6? d4i9y report: This report says a;ot the daily stoc% %ept for
the prodct. It %eeps the record in day to day spply of the prodct"
daily how mch sale done and sees how mch prodct remainingafter the spply. The report is send to H! on a daily ;ases.
S49e; report: This report is made of sales done of the prodct to
di'erent dealers ;y trc% tan%" tan% wagon and a5iation facilities.
How mch to ;e done" to whom and when.
Tolani Institte !f Management Stdies" Adipr. Page #E
8/16/2019 IT Project Report on HPCL
17/23
&ur674;e reportre6ei4b9e produ6t report: In this report the
detail of prodct is mentioned that how mch goods recei5ed in the
terminal when the prodct recei5ed the appro&imate gaging is
done and get noted after when the prodct settles in the tan% proper
gaging is done and after that report is send to H!.
Mo8t79y di;tributio8 p948 =M%&@: This report is done ;y H! so
that departments are informed a;ot the stoc%" distri;tion of the
prodct and a;ot how mch the prodct going to ;e recei5ed in the
whole month so the all the employees set their target ;y seeing the
monthly plan.
"NOMAT"ON TOO!S
Tolani Institte !f Management Stdies" Adipr. Page #8
8/16/2019 IT Project Report on HPCL
18/23
Information Tools
Indent Management system
2IMS3
Manal IdentiAcation System
Internet
Hindstan Portal
Sms
"NOMAT"ON TOO!: - At HP-L di'erent information tools are sed
to commnicate within as well as to commnicate with otside
people. ew information tools are as nder:
• E-m4i9:- +mail wor% as an information tool in the organiBation it is
;een sed ;etween H! and manager to pass the information a;ot
what is going on in the organiBation on daily ;ases and on monthly
;ases also.
Tolani Institte !f Management Stdies" Adipr. Page #
8/16/2019 IT Project Report on HPCL
19/23
• "8ter8et: - Internet facilities ha5e made the Oow of information
easy. $ith the help of internet 5ehicle monitoring system 2>MS3 is
sed to get the e&act information of location of Trc% Tan% 2TT3 so
that the theft of fel and other illegal acti5ities are a5oided and the
cstomer can get the deli5ery on time. Also a loc% along with the
sensor is t on the e5ery compartment of the trc% tan% so that if
someone try to open that it he can ;e caght red handed. )ot only
that sensor is installed at the dri5er6s place to monitor the speed at
which trc% tan% is mo5ing" whether it is in the right direction or
de5iating from the trac%.
• M48u49 "de8ti64tio8 Sy;tem: - Here some information6s are
ta%en manally ;y employees. Li%e measring the fel in the tan%"
temperatre of the fel" water le5el in the tan% .In manal
identication system there is specic tool they are sing that is
measrement copper tap and copper gaging.
• Hi8du;t48 port49: - There is an internet facility at the HP-L which
is sed ;y their employee to get them pdated. In this system
information relating to employees at di'erent department with their
jo; prole is a5aila;le.
• "8de8t M484
8/16/2019 IT Project Report on HPCL
20/23
%EC"S"ON TA#EN AT EACH !EE! AN% "NOMAT"ON
E.+"E% O THAT AE AS O!!O'S:
In sch a ;ig organiBation li%e HP-L the decision is mostly ta%en ;y
head Darter ;ecase in %andla port terminal the prodct is only
Tolani Institte !f Management Stdies" Adipr. Page /=
8/16/2019 IT Project Report on HPCL
21/23
stored and H! only decide that where the prodct is distri;ted
How mch is distri;ted
The information also Oow from HP-L terminal to H! a;ot the
prodct that how mch stoc% is there if there is access in stoc% then
they gi5e information to H! that please don6t send the prodct
;ecase we ha5e ma&imm stoc% in the terminal now the H! ta%e
the decision where to send the prodct and in which terminal of
there they send the prodct.
Here the department only ta%es the decision to distri;te the
prodct to the local retailer whether to sell or not. And whether to
allow them any discont.
They also deal with local prchaser in the mar%et they ta%e the
decision that which prchasers are gi5en rst preference to
distri;te the prodct and that decision is ta%en ;y planning and
operational department. Here t7e 6o86ept o C+STOME
E!AT"ONSH"& MANAGEMENT S/STEM applies.
They also ta%e decision regarding safety and secrity ;y their own
when any tan% trc% enter into the premises they ta%e all the detail
and that information Oow ahead.
Tolani Institte !f Management Stdies" Adipr. Page /#
8/16/2019 IT Project Report on HPCL
22/23
SEC+"T/ S/STEM
The safety policy of this company is:
#3 -arry ot the wor% in safe manner protecting the people and property.
/3 Also ensre awareness among the employees" contractors and others
for all responsi;ility and acconta;ility for safety on and o' at wor%
premises.
Many secrity things are %ept to pre5ent from disaster. As
inOamma;le prodct is stored at this terminal so protection and safety is
reDired. irst of all it shold ;e mentioned a;ot the IR+ SIR+). This
siren is made when the day starts and when the day comes to an end. If
the siren is for 0=seconds that means the oCce hors are complete forthe day and if this siren rings more than # minte then it means that
there is a re in the organiBation.
or any 5isitor to the company" the secrity gards at the entrance
chec%s the 5isitor6s ;ag if heQshe carries" cell phones are not allowed to
;e carried to the organiBation ;ecase de to the spar% in the cell phone
there can ;e chances of re in the organiBation. Then the information li%e
5isitor6s name" entry time" e&it time" place from where they ha5e come"reason for what they ha5e come and signatre of the 5isitor are recorded.
Then they are pro5ided with 5isitor ;adge for the entry to the company.
+arthing is also one type of secrity pro5ided for a5oiding static
electricity. The company pro5ides Oame proof torch" loc% of ;rass" Oame
proof wal%ietal%ie and wooden spanners.
If sddenly re occrs then to handle it two water tan%s are there" re
engines" foam containers and sprin%lers. There are PP+6s 2PersonalProtecti5e +Dipments3 also to protect the employee sch as safety
helmet" safety shoes" safety glo5es and re pro&imity sit.
There is also a re cloc% at entrance gate representing the 5arios
places in the terminal and the arrow in it 2hand3 shold always ;e in safe
Bone in normal condition.
To monitor the location of tan% trc% the '"E!ESS SENSO
NET'O# is sed which is placed on it for the secrity of the prodct.
Tolani Institte !f Management Stdies" Adipr. Page //
8/16/2019 IT Project Report on HPCL
23/23
ECOMMEN%AT"ON AN% S+GGEST"ON As this terminal of the organiBation is mainly wor%ing manally so it
shold ;e con5erted into flly atomation" to ma%e the wor% done
Dic%ly" easily" eCciently and smoothly. The atomation will help this
terminal to ta%e the decision e'ecti5ely and it will also help the
information Oow.
T l i I tit t !f M t St di Adi P /0