IT Sourcing AssessmentSteering Committee
September 12, 2007
Georgia Technology Authority
Agenda
• What Problems Are We Trying to Solve?
• GTA’s Strategy
• GTA’s Approach
• Steering Committee Role and Expectations
• Special Briefing #1 (of 3)
2
Georgia Technology Authority
What Problems Are We Trying To Solve?
• GTA needs a new business model
• GTA’s IT operations do not meet industry standards
• GTA lacks processes and automation to operate effectively
• State’s IT enterprise has not been managed well
3
Georgia Technology Authority
All Agencies Face Similar Challenges
• Aging infrastructure
• Meeting minimum standards
• Security and disaster recovery
• Systems development
4
Georgia Technology Authority
Enterprise Spend
• 2.42% of state budget spent on IT in FY 06▪ $522.6 million out of $21.6 billion*▪ Range of 1.43% to 4% in 12-state NASCIO survey▪ Compares to 5.3% in Gartner survey of state and local
governments
• $4,301 spent per end user annually (Hackett)▪ Compares to $5,070 in Gartner survey▪ $8,734 spent by private-sector peer group (Hackett)▪ $9,024 spent by world-class peer group (Hackett)
Note: FY 06 IT expenditures do not include Board of Regents. The total is an estimate that uses FY 05 expenditures for agencies that did not submit FY 07 reports.
Georgia Technology Authority
Governor’s IT Vision and Mission
Vision• To lead the nation’s state governments in IT
enterprise management and the innovative use of technology
Mission• To create value for Georgia’s governments
through superb management of the state’s enterprise technology solutions
5
Georgia Technology Authority
GTA’s Strategy
Georgia Technology Authority
GTA’s Two-Prong Strategy
• Create an investment-driven IT enterprise
• Fix the infrastructure▪ Sourcing assessment▪ Operational improvements
7
Georgia Technology Authority
Fix the Infrastructure
• Creates opportunities for the enterprise
• Sourcing assessment will set criteria for minimum infrastructure standards
• Everyone will be graded against the same criteria
8
Georgia Technology Authority
Why focus on Infrastructure
• Easiest component of IT to leverage
• Simplest to centralize
• Presents the best economic opportunities for Shared Services delivery
Georgia Technology Authority
What Change Will Enable Us to Do
• Reach a minimum level of operational performance
• Focus on the state’s business needs
• Manage the state’s investment in IT
9
Georgia Technology Authority
4/1/2007 12/31/20097/1/2007 10/1/2007 1/1/2008 4/1/2008 7/1/2008 10/1/2008 1/1/2009 4/1/2009 7/1/2009 10/1/2009
Georgia Technology Authority Assessment and Transition Plan
April 2007
Governor’s Briefing
Q2 FY2010
New GTA in Place
April 2007
GTA Briefings
May / June 2007
Agency Briefings
Stakeholder Briefings
Strategic Sourcing Assessment
May 07
Issue RFP for Sourcing Consultant
June 07
Sign Contract with Sourcing
Consultant
Q3 FY2008
Complete Sourcing Assessment
Q2 FY2008
Draft RFP for Sourcing
Provider
Q4 FY2008
Issue RFP for Sourcing
Provider
Q1 FY2009
Evaluate and
Negotiate
Q2 FY2009
Sign Deal
Q1 FY2009
Transition Planning
Q2 FY2009
Transition Begins
Q4 FY2009
Transition Complete
Strategic Sourcing Solicitation
Transition to New Vendor
Wrap-up Phase
Go / No GoDecision Points
Fiscal Year 2007 Fiscal Year 2008 Fiscal Year 2009 Fiscal Year 2010
Pending Outcome of Sourcing Assessment and Permission
to Proceed
10
Assessment and Transition Timeline
Georgia Technology Authority
GTA’s Approach
Georgia Technology Authority
IT Services Assessment Consultant
• TPI of Woodlands, Texas
• Niche experience in IT services assessments and implementations
• TPI project director has performed 31 engagements with 22 clients over 8 years▪ TPI led the State of Texas consolidation project
• Would work with GTA through implementation of recommendations
12
Georgia Technology Authority
Our Approach to the Assessment
• This is a GTA-led initiative
• TPI is a resource to assist
• TPI will▪ provide an objective view ― “solution agnostic”▪ draw on its experience to recommend
executable strategies▪ Work with agencies in a “sleeves rolled up,”
collaborative way
• Information collected can be used in subsequent phases
13
Georgia Technology Authority
IT Sourcing AssessmentParticipating Agencies
• Community Health
• Corrections
• DOAS
• Driver Services
• GBI
• GTA
• Human Resources
• Juvenile Justice
• Natural Resources
• OPB
• Revenue
• SAO
• DTAE
14
Georgia Technology Authority
Sourcing Assessment Objectives
• Create a plan for GTA and the state to manage IT infrastructure services investments
• Develop a stable, predictive financial model for IT services
• Identify options for who should provide IT infrastructure services
15
Georgia Technology Authority
Scope of Sourcing Assessment
• Covers IT processes, assets, facilities for 13 agencies▪ Data center services▪ Desktop services▪ Telecommunications▪ Support functions
• Determines how services compare to minimum standards▪ Service delivery and service level targets▪ Business continuity and disaster recovery▪ Condition, life cycle, cost to refresh and maintain IT assets
• Best practices provide comparison of operational IT functions and processes
16
Georgia Technology Authority
Steering CommitteeRoles and Expectations
Georgia Technology Authority
Role of the Steering Committee
• Provide oversight, counsel and guidance
• Review direction, progress, milestones and end products
• Examine key decisions
• Ensure:▪ risks are identified and addressed▪ organizational support is in place▪ transition and transformation plans are
comprehensive
18
Georgia Technology Authority
Assessment Team Next Steps
• Lead the sourcing assessment and coordinate with agency partners
• Continue our communications across all stakeholder groups
• Reach out to legislature
19
Georgia Technology Authority
Assessment Timeline
• Gather data: Aug 23 – Oct 26• First round of agency interviews: Aug 28 – Oct 3• Second round of agency interviews: Oct 10 – Nov 6• Agencies confirm data collected: Oct 8 – 30• Agencies comment on observations: Oct 9 – 30• GTA validates assessment data: Nov 5 – 12• Complete business case: Dec. 21
20
Special Briefing Session #1
Georgia Technology Authority
• Briefing Session #1 - September▪ A ssessm ent scope and r ange of options
– IT Services included– Assessment Categories – Primary and Secondary Options to address– Sourcing Assessment Roadmap
▪ Methodology (incl. M2M) and for m of r epor ts
– Quantitative Data Points / Qualitative Review– Sourcing Assessment Tools– Mark to Market – database profiling– Outcomes - Segments of final report – level of detail/summarization– Deliverables to Agencies
▪ E lem ents of the Business Case
– Structure– Source data – the Base year and adjustments– A different view – Towers of Service– Constructing a multi-year view– Scenario Analysis
▪ G over nance and Inter -A gency A gr eem ents
– Assessment of Service Management & Governance capabilities– Developing a Service Management Operating Model– The role of Inter-Agency Agreements
Agenda
22
Georgia Technology Authority
• Briefing Session #2 – October
▪ Assessment Options/Sourcing Alternatives – a look at the Shared Services Model
– A review of the objectives of a Shared Services Model– How Assessment Options are impacted by the delivery model– Potential and issues to address in a Shared Services Model
▪ Governance – a deeper dive on best practices
– An overview of the three primary approaches– An overview of the impacted processes– Reconciling overlap and interfaces with Agencies
▪ Sourcing Assets – best practices (intro only)
– Overview of best practices by category of Asset– Risks and issues to address
▪ Resource Units – best practices (intro only)
– Usage based charging structures– Efficient pricing – Risk transfer
Agenda
23
Georgia Technology Authority
• Briefing Session #3 – November
▪ Inter Agency Agreements – possible structure
– Serv ices and Serv ice Levels– Treatment of Hardware, Software, Contracts and Leases– Use of Agency fac ilities– Polic ies and Procedures– Payment & Chargeback– Agency Participation Model
▪ Approach to Federal Funding
– Lessons learned from other States – Issues to address in s truc turing pricing and charge-back– Advance Planning Documents (APDs)
▪ Retaining Accountability and Control Rights
– A rev iew of key prov is ions and rights to preserve– A description of how accountability is preserved in practice
▪ Progress Report on Agency engagement in the Assessment Process
– A rev iew of Agency issues identified in the Assessment and how they are being addressed
Agenda
24
Assessment Scope and Range of Options
Georgia Technology Authority
IT Services included
• Mainframe
• Servers
• End User Computing
• Help Desk
• Managed Network Services – Data & Voice
• Cross Functional
We are looking at how the IT infrastructure serves and supports the business functions of each agency.
_______________________________________________
26
Georgia Technology Authority
Assessment Categories
• Operational Assessment
▪ Process Assessment (Info Technology Infrastructure Library, ITIL)
▪ Disaster Recovery and Business Continuity Assessment
▪ Data Center Facility Assessment
▪ Sourcing Management, Governance & Change Management Assessment
• Sourcing Analysis
▪ Mark to Market
▪ Scenarios
• Business Case
The assessment methodology is comprehensive – the outcome will be the first complete picture of Georgia’s investment in IT infrastructure
with an executable roadmap to make best use of that investment._________________________________________________________
27
Georgia Technology Authority
Possible Outcomes
▪ Retain state service delivery but make improvements
▪ Outsource services: GTA manages vendor and state owns IT assets
▪ Outsource services: GTA manages vendor and vendor owns IT assets
Only options that meet Georgia’s criteria for a best-managed State will be included in the final Business Case.
__________________________________________________
28
Georgia Technology Authority
Sourcing Assessment Roadmap: We employ a structured, outcome-oriented approach towards uncovering the spectrum of
transformational opportunities and their related virtues/risks._______________________________________________________________________
29
Methodology and Form of Reports
Georgia Technology Authority
Quantitative Data Points/Qualitative Review
• Fact-based Decision Making▪ Getting the complete picture▪ A basis for making “apple for apple” comparisons▪ Filtering out the IT myths and folklore
• Mapping the Operating Model to the Business Model
▪ Taking account of the unique issues in each Agency
▪ Testing for “Do no harm”
• Recognizing the Opportunities and the Risks
▪ Market testing with relevant data
▪ Mature and proven approach to manage complexity
31
Georgia Technology Authority
Sourcing Alternatives Assessment Tool
An operational assessment will identify how the current operation is functioning and key gaps that need to be addressed.
__________________________________________________
28
Georgia Technology Authority
Sourcing Readiness Filter
An experience-based assessment of readiness for change.__________________________________________________
28
Georgia Technology Authority
Current State Analysis & Opportunity Report
The Mark to Market (M2M) analysis delivers comparative financial and operational metrics – compared to relevant and current market data.
__________________________________________________
28
Georgia Technology Authority
Example Output – Recommending Sourcing Alternatives
__________________________________________________
28
Georgia Technology Authority
Assessment Deliverables to Agencies
• Operations Assessment Report
▪ Information Technology Infrastructure Library (ITIL) process implementation assessment
▪ IT Business Continuity / Disaster Recovery process assessment
▪ IT assets and data center facility assessment
• Agency Baseline Report
▪ Scope of work and associated service levels – volumes and utilization
▪ Performance quality – performance metrics
• Mark to Market Analysis
▪ GTA Shared Services
▪ The Enterprise
▪ Select agency managed towers, where applicable
36
Elements of the Business Case
Georgia Technology Authority
What is a Base Case?
• Multi-year financial model representing State of Georgia’s full operational scope (services and volumes) of assessment
• The Base Case measures the internal cost of performing the services for business-as-usual projected over the multi-year term
38
A Base Case is the ‘Business-as-Usual’ hypothesis. __________________________________________________________________
Georgia Technology Authority
Total IT
Expense
In-scope Activities
Out of Scope Activities
In-Scope AssumedExpense
Retained &Pass Thru Expense
BaseCase
• Provides multi-year projected internal costs to provide in-scope services in a business-as-usual scenario
• Provides the financial information needed for M2M/RFP purposes
• Delineates State-retained expense, pass-through expense, and in-scope assumed expense
Base Case Composition
39
Georgia Technology Authority
• Dimension 1 – Agency• Dimension 2 – Tower• Dimension 3 – Expense Categories
▪ Salary
▪ Benefits
▪ Other Employee Related expenses (Training, Travel, Subscriptions, etc)
▪ H/W Lease
▪ H/W Maintenance
▪ H/W Purchase
▪ S/W Lease / Maintenance
▪ Computer Supplies
▪ Telecom Carrier Expenses
▪ Facilities and Occupancy
▪ FTE Employees
▪ Contractors
Base Case Design
DHR
GTA
DOAS
DNR
DOR
Etc.
Sal
ary
Exp
ense
s
Etc
.
2nd D
: Tow
erM
ainf
ram
e
Serve
rsEnd U
ser C
omputin
g
3rd D
: E
xpen
se C
ate
gor
ies
Sof
twa
re M
ain
ten
ance
1st D: Agency
Networ
k
DCH
Financial data will be organized based on three dimensions:
40
Georgia Technology Authority
Total Base Case
Category Base Year Year 1 Year 2 Year 10
Direct Staff - Overhead 0 0 0 0Direct Staff - Countable 0 0 0 0Consultants - Countable 0 0 0 0 Total 0 0 0 0
Salary 0 0 0 0Fringe Benefits 0 0 0 0Other (salary related) 0 0 0 0Contractors 0 0 0 0Facilities / Premises 0 0 0 0Training 0 0 0 0Telecommunications 0 0 0 0Furniture 0 0 0 0Equipment 0 0 0 0Travel and expenses 0 0 0 0Data Center 0 0 0 0Other ______________ 0 0 0 0Other ______________ 0 0 0 0
0 0 0 0
Grand Total 0 0 0 0
Category Base Year Year 1 Year 2 Year 10
Direct Staff - Overhead 0 0 0 0Direct Staff - Countable 0 0 0 0Consultants - Countable 0 0 0 0 Total 0 0 0 0
Salary 0 0 0 0Fringe Benefits 0 0 0 0Other (salary related) 0 0 0 0Contractors 0 0 0 0Facilities / Premises 0 0 0 0Training 0 0 0 0Telecommunications 0 0 0 0Furniture 0 0 0 0Equipment 0 0 0 0Travel and expenses 0 0 0 0Data Center 0 0 0 0Other ______________ 0 0 0 0Other ______________ 0 0 0 0
0 0 0 0
Grand Total 0 0 0 0
Retained andPass-thru Costs Net New Costs
+ + =
GeorgiaGeorgiaTotal Total
Cost of Cost of SourcingSourcing
Category Base Year Year 1 Year 2 Year 10
Direct Staff - Overhead 0 0 0 0Direct Staff - Countable 0 0 0 0Consultants - Countable 0 0 0 0 Total 0 0 0 0
Salary 0 0 0 0Fringe Benefits 0 0 0 0Other (salary related) 0 0 0 0Contractors 0 0 0 0Facilities / Premises 0 0 0 0Training 0 0 0 0Telecommunications 0 0 0 0Furniture 0 0 0 0Equipment 0 0 0 0Travel and expenses 0 0 0 0Data Center 0 0 0 0Other ______________ 0 0 0 0Other ______________ 0 0 0 0
0 0 0 0
Grand Total 0 0 0 0
Category Base Year Year 1 Year 2 Year 10
Direct Staff - Overhead 0 0 0 0Direct Staff - Countable 0 0 0 0Consultants - Countable 0 0 0 0 Total 0 0 0 0
Salary 0 0 0 0Fringe Benefits 0 0 0 0Other (salary related) 0 0 0 0Contractors 0 0 0 0Facilities / Premises 0 0 0 0Training 0 0 0 0Telecommunications 0 0 0 0Furniture 0 0 0 0Equipment 0 0 0 0Travel and expenses 0 0 0 0Data Center 0 0 0 0Other ______________ 0 0 0 0Other ______________ 0 0 0 0
0 0 0 0
Grand Total 0 0 0 0
Category Base Year Year 1 Year 2 Year 10
Direct Staff - Overhead 0 0 0 0Direct Staff - Countable 0 0 0 0Consultants - Countable 0 0 0 0 Total 0 0 0 0
Salary 0 0 0 0Fringe Benefits 0 0 0 0Other (salary related) 0 0 0 0Contractors 0 0 0 0Facilities / Premises 0 0 0 0Training 0 0 0 0Telecommunications 0 0 0 0Furniture 0 0 0 0Equipment 0 0 0 0Travel and expenses 0 0 0 0Data Center 0 0 0 0Other ______________ 0 0 0 0Other ______________ 0 0 0 0
0 0 0 0
Grand Total 0 0 0 0
Category Base Year Year 1 Year 2 Year 10
Direct Staff - Overhead 0 0 0 0Direct Staff - Countable 0 0 0 0Consultants - Countable 0 0 0 0 Total 0 0 0 0
Salary 0 0 0 0Fringe Benefits 0 0 0 0Other (salary related) 0 0 0 0Contractors 0 0 0 0Facilities / Premises 0 0 0 0Training 0 0 0 0Telecommunications 0 0 0 0Furniture 0 0 0 0Equipment 0 0 0 0Travel and expenses 0 0 0 0Data Center 0 0 0 0Other ______________ 0 0 0 0Other ______________ 0 0 0 0
0 0 0 0
Grand Total 0 0 0 0
Delta = Investment Opportunity
Business Case Analysis – Interpreting the Results
The Investment Opportunity is derived from comparing the Base Case to the Total Cost of Sourcing (TCOS).
______________________________________________________________________
Total Cost of Sourcing includes:• Delivery of Services Costs• Transformation Investments• Governance Costs• State Retained and Pass-Through Costs
Alternative Scenario
FiltersM2M, Asset Currency
Analysis, SLA, etc
Recommended Scenario
Sourcing Costs
41
Georgia Technology Authority
Infrastructure Scenario Comparison–Impact SummarySpend + Risk + Change = Recommendation
GTA/Agencies Risk & Accountability
Shared or Supplier Risk & Accountability
Amount of Change
Transition Risk
Low High1 53
Financial ImpactLow High1 53
-$0M $10M
Scenario #1
Amount of Change
Transition Risk
Low High1 53
Financial ImpactLow High1 53
-$0M $10M
Scenario #2
Amount of Change
Transition Risk
Low High1 53
Financial ImpactLow High1 53
-$0M $10M
Scenario #3
Amount of Change
Transition Risk
Low High1 53
Financial ImpactLow High1 53
-$0M $10M
Scenario #8
42
Governance and Inter-Agency Agreements
Georgia Technology Authority
Assessing Service Management & Governance Capabilities
• Understanding the “As Is” and the “To Be”▪ Service Management & Governance Gap Analysis
• Making a Strategy Executable▪ Designing the Model▪ Skills Set▪ Managing Change
• Implementing the Model▪ Measuring for Success▪ Mitigating Value Leakage
44
Georgia Technology Authority
Governance is the Cornerstone of any Solution
45
Sourcing Management best-practice addresses the interfaces between GTA, Agency and 3rd Party Service Providers.
______________________________________________________________________
► Governance
► Forecasting and Demand Management
► Regulatory
► Workplace Services
► Customer Satisfaction Survey Management
► Communications Management
► Project Spend Pool Management
► Performance Analysis & Service Delivery Management
► Service Requests & Authorization
► Security, Architecture & Standards Management
► Risk Management
► Asset Management
► Incident, Problem, Escalation, Change Management
Satisfaction andDirection Setting
Right Work,Done Right
RelationshipManagement
PerformanceManagement
► Invoice Management.
► Performance Credits, Earnbacks, and Critical Milestones
► Financial Analysis & Planning
► Procurement
► Contract Pricing Adjustments
► Value Leakage Mitigation
► Chargeback
► Contract Administration
► Contract Change Management
► Contract Issue Management
► Dispute Resolution
► Service Provider Audit
► Governance Library
Validate andManage Costs
EnsureCompliance
FinancialManagement
ContractAdministration
Georgia Technology Authority
The Role of Inter-Agency Agreements
A collaborative approach for a complex journey▪ Planning for change▪ Mapping the journey ▪ Confirming what needs to change and what should
remain the same▪ Building a model for participation
IAAs will provide a detailed model for interaction between agencies and GTA, needed for all potential outcomes.
__________________________________________________
47
Georgia Technology Authority
• Briefing Session #2 - October
▪ Assessment Options/Sourcing Alternatives – a look at the Shared Services Model
– A review of the objectives of a Shared Services Model– How Assessment Options are impacted by the delivery model– Potential and issues to address in a Shared Services Model
▪ Governance – a deeper dive on best practices
– An overview of the three primary approaches– An overview of the impacted processes– Reconciling overlap and interfaces with Agencies
▪ Sourcing Assets – best practices (intro only)
– Overview of best practices by category of Asset– Risks and issues to address
▪ Resource Units – best practices (intro only)
– Usage based charging structures– Efficient pricing – Risk transfer
Next Session - Agenda
48