+ All Categories
Home > Documents > It takes a Village to Build a Windmill -...

It takes a Village to Build a Windmill -...

Date post: 04-Oct-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
20
It takes a Village to Build a Windmill: Community Renewables’ role in Nova Scotia’s transition from King Coal to Cleaner Energy November 11, 2016 Paul Black © Fisherwick Collaborations Inc. 2016
Transcript
Page 1: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

It takes a Village to

Build a Windmill:

Community Renewables’ role in Nova Scotia’s transition from King Coal to Cleaner Energy

November 11, 2016

Paul Black

© Fisherwick Collaborations Inc. 2016

Page 2: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Where Our

Story is Set • One of

Canada’s four

founding

provinces

• Population ~ 1

million

• Major

industries: - Resources

- PSE

- Government

• Peak electrical

demand

(winter) ~2200

MW

© Fisherwick Collaborations Inc. 2016

Page 3: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Nova Scotia’s Journey

© Fisherwick Collaborations Inc. 2016

Page 4: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Pace of Change is Quickening

Around the World

© Fisherwick Collaborations Inc. 2016

Page 5: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

But before you set off....

© Fisherwick Collaborations Inc. 2016

Page 6: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Strategy Goal = 100% renewable energy in

Barbados

What “job(s)”are you hiring a sustainable transition

strategy to do? © Fisherwick Collaborations Inc. 2016

Page 7: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

FROM KING COAL TO THE BEST

GREENHOUSE GAS TRAJECTORY IN

CANADA IN UNDER A DECADE

Nova Scotia A Case Study

© Fisherwick Collaborations Inc. 2016

Page 8: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Nova Scotia ~2005: A Standing

Start

The Policy & Politics

• Vertically-integrated,

monopoly electrical

utility

• ‘Pocketbook’ issues

front & centre for

public

• Commodity

fluctuations

• Environmental

consciousness

increasing

Electricity Supply

© Fisherwick Collaborations Inc. 2016

Page 9: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

© Fisherwick Collaborations Inc. 2016

Liberals

All Party Support

Page 10: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

COMFIT:

The

Program The Parameters

• Distribution connect

(no additional

transmission build-out

costs)

• Secure financing -

fixed price through

FIT rate, allow private

sector to own up to

49% to facilitate cost

of capital

• Multiple sources of

generation - wind,

hydro, forest

biomass; *but not

solar*

• Soft ceiling of

available generation

~100 MW

© Fisherwick Collaborations Inc. 2016

Page 11: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

COMFIT: Who is Eligible

• First Nations/Indigenous bands

• Municipal governments

• Universities

• CEDIFs

• Non-profits

© Fisherwick Collaborations Inc. 2016

Page 12: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

COMFIT: How to Power

It • Wind energy: ≤50kW (w/ 5MW cap);

primary focus >50kW

• Biomass combined heat and power

(Not restricted to eligible groups

where heat is used by owner)

• Small-scale in-stream tidal energy

• Run-of-river hydroelectric

© Fisherwick Collaborations Inc. 2016

Page 13: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

COMFIT: Results In Brief

Program “closed” effective Summer 2015

Approximately ~204.6 MW awarded to 105

sponsors - not all will ultimately be

commissioned

Technologies = vast majority wind projects, +

• 16 Biomass

• 3 Tidal

• 1 Hydro

Project sizes range from 0.05 to 7.05 MW

© Fisherwick Collaborations Inc. 2016

Page 14: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Results: Who Generates

© Fisherwick Collaborations Inc. 2016

Page 15: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Transition Impact = Among the

Most Renewables in North

America

© Fisherwick Collaborations Inc. 2016

Page 16: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Transition Impact:

GHG Reductions = Best in

Canada

© Fisherwick Collaborations Inc. 2016

Page 17: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Transition Impact:

Electricity Rates

© Fisherwick Collaborations Inc. 2016

Page 18: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

Silver buckshot v. Silver bullet

© Fisherwick Collaborations Inc. 2016

Fossil Fuels

Wind, Hydro, Solar, Biomass, Tidal, Natural Gas, Coal

Page 19: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

© Fisherwick Collaborations Inc. 2016

Page 20: It takes a Village to Build a Windmill - BREAbrea.bb/wp-content/uploads/2017/01/PAUL-BLACK-FINAL... · 2018. 2. 26. · COMFIT: The Program The Parameters • Distribution connect

© Fisherwick Collaborations Inc. 2016

http://www.fisherwick.ca

[email protected]

902.221.6729


Recommended