INTERNAT IONAL UNIVERSITY School of Computer Science and Engineering PROJECT REPORT Course IT543 – IT PROJECT MANAGEMENT Date: March 14, 2014 To pic (6.1 ): TIME MANAGEMENT EXERCISE Student Name: Do Nhu Tai Student ID: MITM05016 1. Network di ag ram a) Draw an AOA network diagra m repres enting the pro ject Figure 1: AOA Network Diagram b) Identif a !! of the paths on the net work"iagram Note: Assume all durations are in days. Path 1: A – D F – G J Length = 10 + 4 + + 4 + 1! = " Page 1 o# #
Transcript
Page 1: IT543 - Do Nhu Tai - Project 6.1

8/10/2019 IT543 - Do Nhu Tai - Project 6.1

http://slidepdf.com/reader/full/it543-do-nhu-tai-project-61 1/4

INTERNATIONAL UNIVERSITY

School of Computer Science and Engineering

PROJECT REPORT

Course IT543 – IT PROJECT MANAGEMENT

Date: March 14, 2014 Topic (6.1): TIME MANAGEMENT EXERCISE 

Student Name: Do Nhu Tai  Student ID: MITM05016 

1. Network diagram

a) Draw an AOA network diagram representing the project

Figure 1: AOA Network Diagram

b) Identif a!! of the paths on the network"iagram

Note: Assume all durations are in days.

Path 1: A – D – F – G – J Length = 10 + 4 + + 4 + 1! = "

Page 1 o# #

Page 2: IT543 - Do Nhu Tai - Project 6.1

8/10/2019 IT543 - Do Nhu Tai - Project 6.1

http://slidepdf.com/reader/full/it543-do-nhu-tai-project-61 2/4

Path !: A – D – F – G – $ – % – L Length = 10 + 4 + + 4 + + & + 10 = 4&

Path ": A – D – F – ' – % – L Length = 10 + 4 + + & + & + 10 = 4

Path 4: A – ( – $ – % – L Length = 10 + & + + & + 10 = 4!

Path ): A – ( – J Length = 10 + & + 1! = "0

Path : * – F – G – $ – % – L Length = 1! + + 4 + + & + 10 = 4

Path : * – F – G – J Length = 1! + + 4 + 1! = "4

Path &: * – F – ' – % – L Length = 1! + + & + & + 10 = 44Path ,: - – G – $ – % – L Length = & + 4 + + & + 10 = "

Path 10: - – G – J Length = & + 4 + 1! = !4

Path 11: - – ' – % – L Length = & + & + & + 10 = "4

c) $hat is the critica! path for this project and how !ong is it%

in/e the /riti/al ath is the longest ath through the netor2 diagram3 Path !3 A – D – 

F – G – $ – % – L3 is the /riti/al ath #or this roe/t ith 4& days.

d) $hat is the shortest possib!e time needed to comp!ete this project%

(5en though the /riti/al ath is thelongest ath3 it reresents the shortest time re6uired

to /omlete a roe/t. 7here#ore3 the shortest ossi8le time needed to /omlete this roe/t is

4& days.&. 'antt chart

a) (sing the information in ab!e *+#, draw hori-onta! bars to i!!ustrate when ou think 

each task wou!d !ogica!! start and end. hen use roject &/1/ to create a 'antt chart and

network diagram based on this information.

b) Identif at !east two mi!estones that cou!d be inc!uded under each of the process groups

in ab!e *+#. hen write a detai!ed description of each of these mi!estones that meets the

0A2 criteria.

Page & o# #

Page 3: IT543 - Do Nhu Tai - Project 6.1

8/10/2019 IT543 - Do Nhu Tai - Project 6.1

http://slidepdf.com/reader/full/it543-do-nhu-tai-project-61 3/4

3ori-onta! bars

"O4O5 "on6ersion roject 0chedu!e

asks ar Apr a 7un 7u! Aug 0ep Oct No6

Initiating  Develop project charter

  Meet with stakeholders

  Project charter signed

Planning

  Create detailed WBS and schedule

  Estimate project costs

  Create project team

  Create communication plan  Organize a comprehensive projectplan

  Project proposal signedExecuting  ward and manage contract !orso!tware conversion  "nstall new so!tware on servers  "nstall new hardware and so!twareon clients# machines  $est new %illing s&stem

  $rain users on new s&stem

  cceptance contract signed

Controlling

  Writing user guide  Progress reports

Closing

  Prepare 'nal project reports

'antt chart

Page 8 o# #

Page 4: IT543 - Do Nhu Tai - Project 6.1

8/10/2019 IT543 - Do Nhu Tai - Project 6.1

http://slidepdf.com/reader/full/it543-do-nhu-tai-project-61 4/4

Network diagram

i!estone 1: Proe/t /harter signed 9 A;7 /riteria• e/i#i/: o##i/ial /ommitment

• easura8le: e##e/t at the time o# signature

• Assigna8le: sonsors and resonsi8le arties

• ;ealisti/: alloing roe/t to start

• 7ime9#ramed: aroriate time #or a//etan/e or remo5al roe/ts

i!estone &: Proe/t roosal signed 9 A;7 /riteria• e/i#i/: o##i/ial /ommitment• easura8le: roe/t lanning details /on#irmed 8y signatures

• Assigna8le: roe/t manager3 sonsors3 /orrelati5e sta## 

• ;ealisti/: an e5ent to e<e/ute roe/t

• 7ime9#ramed: durations #or o8 details to #inish

i!estone 8: A//etan/e /ontra/t signed 9 A;7 /riteria• e/i#i/: A o##i/ial /ommitment

• easura8le: All details set to a//et roe/t and /on#irmed 8y signatures

• Assigna8le: sonsors and resonsi8le arties

• ;ealisti/: imortant time to a//et roe/t

• 7ime9#ramed: aroriate time to do/ument #inal reort a8out the roe/t