+ All Categories
Home > Documents > ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project...

ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project...

Date post: 22-Sep-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
25
ITEA 3 - the EUREKA Cluster on Software-intensive Systems and Services Philippe Letellier, ITEA Vice-Chairman SSF - Vinnova third joint conference on Software for Competitiveness Stockholm, 14 November 2017
Transcript
Page 1: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

ITEA 3 - the EUREKA Cluster on

Software-intensive Systems and Services

Philippe Letellier, ITEA Vice-Chairman

SSF - Vinnova third joint conference on Software for Competitiveness

Stockholm, 14 November 2017

Page 2: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

2

ITEA the cluster for the digital transition

ITEA supports companies and innovators:

▪ To develop new partnerships

▪ To access new customers and new markets

▪ To develop new products and technologies

in international, collaborative and industry-driven R&D projects with a

focus on results

ITEA ambitions

EUREKA Cluster ITEA 3

Innovation Business impact Fast exploitation Seizing the

high ground

Happiness

Page 3: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

3

ITEA Key challenges

Safety and security

Smart engineering

Smart mobility

Smart industrySmart communities

Smart health

Smart city

Page 4: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

4

▪ Open and strong community with large industry and SMEs

▪ Strong and trustful relationship with the Public Authorities of the

funding countries

▪ Focus on supporting the projects to maximise their impact

▪ Industry-driven project ideas based on customer needs

▪ High hit rate for project consortia

ITEA strengths

Page 5: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

5

The growth of our community

Facts & figures

Growing number of partners:

– ITEA (Call 1-8):

• 545 unique partners

• 228 SMEs

– ITEA 2 (Call 1-8):

• 986 unique partners

• 485 SMEs

– ITEA 3 (Call 1-3):

• 642 unique partners

• 352 SMEs

Effort per partner type per year (in person years)

Incl. Canada & South Korea

Page 6: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

6

High-level vision 2030

Opportunities for Europe

▪ Seven areas of major

change

▪ The need for software

innovation

▪ The economic impact of

software innovation on

revenues and jobs

Page 7: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

7

Global number of jobs in Digital Technology is 50M with 9.1M in Europe, of which 8.9M in software innovation

Page 8: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

Participate in ITEA

Page 9: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

9

Basic principles

▪ ITEA projects are industry driven, technically innovative and focused on

business results

▪ ITEA projects involve between 40 and 350 person-years and typically last up

to three years

▪ Project consortia can be composed of representatives from

- large industry

- small and medium-sized enterprises (SMEs)

- research institutes

- universities and

- user organisations (profit or non-profit)

▪ Project consortia need to have at least two different organisations from two

different countries (one must be a EUREKA Member Country and another

one either a EUREKA Member Country or a EUREKA Associated Country)

- Partners from non-EUREKA countries may participate in a project provided all

partners agree

Page 10: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

10

Yearly call process

How to participate?

▪ Consortium building – Project Outline Preparations Days event

▪ Submit a Project Outline (PO)

- Short project overview: project goals, innovation, targeted business impact and consortium

- Project Outlines which are positively evaluated are invited for the second step

▪ Submit a Full Project Proposal (FPP)

- Description of project plan, management and execution

- Approved FPPs will receive the ITEA label

▪ Funding & Project Start-up

- Each ITEA project partner can apply for national funding in their own country

- Project start-up after national approvals

▪ Strong cooperation between ITEA and the PAs all along the process

Page 11: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

11

▪ Poster session to have a face-to-face introduction of your idea to a

small group

▪ Brainstorm session to form the rough Project Outline and consortium

▪ Plenary session to present rough project outlines

▪ Community messages (innovation, customers, market impact, …)

ITEA Project Outline Preparation Days

Format

Page 12: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

12

ITEA annual event

Digital Innovation Forum 2017

▪ Keynotes and thematic workshops (Smart energy, Smart health,

Smart manufacturing, Smart mobility)

▪ Family sessions

- ITEA award for business impact, standardisation, special SME award

▪ SME / Startup innovation sessions

- Pitch in front of large customers CEO, VCs

- Quotes

▪ Exhibition (2 days)

- ITEA, ARTEMIS, ECSEL/H2020 projects, SMEs / Startup stands

Page 13: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

13

International customer workshops

Format

▪ Target audience:

- About 50 participants invited around a dedicated theme:

- International key customers and end users where the challenges are most demanding

- European global industry players from ITEA who can provide solutions

- Innovative SMEs involved in related ITEA projects

▪ Format:

- Presentations of challenges by the customers

- Innovations by the big players and SMEs

- Dedicated site visit

- Parallel brainstorm sessions, presentation of conclusions

- Networking lunch & dinner

Page 14: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

ITEA success stories

Page 15: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

15

SoRTS - System of Real-Time Systems

Improved cancer treatment

The goal of the SoRTS project was to develop a System of Real-Time Systems to

support healthcare professionals in the transition from invasive, open surgery to

minimally invasive, image-guided intervention and treatment

Start date: January 2014

End date: December 2016

Page 16: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

16

SoRTS

Impact

▪ One of the main project outcomes was the Elekta Unity, a

MR-linac system designed to improve the targeting of tumour

tissue while reducing exposure of healthy tissue to radiation.

The system allows physicians to precisely target a tumour,

even when tumour tissue changes shape, location, size or

composition during treatment

- In May 2017, the University Medical Centre (UMC) Utrecht (NL)

treated the first patient as part of a clinical study with Elekta Unity.

Analysis of the first clinically derived data shows that visibility of

the treatment target and radiation beam accuracy is excellent.

In total, five planned patients in a clinical study will receive therapy

for spine metastases.

▪ Boost of productivity and effectiveness of cancer treatment

▪ Reduction of patient risk

▪ Significant decrease of healthcare costs through shorter

hospital stays and higher throughput

Page 17: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

17

MODELISARSetting a global standard in the automotive domain

Modelling and simulation is essential in the automotive industry. The

MODELISAR project developed a worldwide open standard (FMI) to

integrate different simulation environments in the automotive domain

Start date: July 2008

End date: December 2011

Page 18: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

18

MODELISAR

Seizing the high ground

BMW, Daimler and Ford started in Q2 2012 an initiative to establish FMI as the

standard for simulation model exchange between OEMs and suppliers

These OEMs as well as Chrysler, Fiat, GM, Jaguar Land Rover, Nissan, Renault,

Toyota and Volkswagen signed at GAAG conference in Oct 2012 a

commitment to support this initiative

Up to date, it was signed in addition by Audi, HKMC, Honda, Isuzu, PSA, Suzuki,

Tata, Volvo and Volvo Cars

Page 19: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

19

MODELISAR

Impact

▪ The FMI standard is currently supported by some 100 modelling, simulation,

code generation and testing tools offered by more than 50 tool - free or

commercial - suppliers

▪ Dassault Systèmes delivered six FMI compatible tools to dozens

of customers who are leading manufacturers of complex

systems like aircraft, cars and energy systems. These ‘open’

tools are key enablers in these companies‘ product development

processes.

▪ FMI reduced the Volvo Cars tool compatibility matrix

considerably to increase the ROI of simulation models. Together

with Volvo Group, they developed a tool for ECU software

development called ADAPT.

▪ Siemens Industry Software NV (Belgium) has created two new

product categories in its business: Virtual Sensing, and

Hardware-in-the-loop & Human-in-the-loop simulations, that

have contributed significantly to entry into new, rapidly growing

markets.

Page 20: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

20

SEAS

Smart Energy Aware Systems

Start date: February 2014

End date: December 2016

The project set out to enable interoperability of energy, ICT and automation

systems at consumption sites, introducing dynamic and intricate ICT-based

solutions to control, monitor and estimate energy consumption

Page 21: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

21

SEAS

Impact

▪ In terms of revenues, exploitation short-term (2017) is expected to be €2

million, with medium-term exploitation (2018) anticipated to be €25 million and

long-term revenues (2019 to 2021) as much as €600 million

▪ The DAPM architecture, a result from the SEAS project, has

been chosen by ENGIE as the reference architecture for the

company’s overall service platform. The market potential is

approx. $70 billion.

▪ Empower has incorporated dynamic microgrid strategies into its

future roadmap and has enabled interaction of flexible energy

resources with the Enerim EMS solution. It is deployed now to

enable upcoming datahub enabled retail markets in Finland with

over 45% of the national distribution metering points being

managed by it in the next years.

▪ Asema’s IT solutions use the Smart API to coordinate and share

information between resourcing and planning systems used by

cities. Coordination between departments and organisations can

now be made much more effortlessly and automatically.

Page 22: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

ITEA structure

Page 23: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

23

The EUREKA framework

41 full members

(40 countries + European Commission)

▪ EUREKA is a pan-European network for market-oriented, industrial R&D

▪ Every member country has a EUREKA national project coordinator (NPC)

▪ Following the EUREKA structure, each ITEA project partner can apply for national

funding in their own country

Page 24: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

24

ITEA governance

Trustful relationship

ITEA is an association, with industry board members:

Public authorities in the ITEA Directors Committee are:

Page 25: ITEA 3 - the EUREKA Cluster on Software-intensive Systems and ...€¦ · One of the main project outcomes was the Elekta Unity, a MR-linac system designed to improve the targeting

ITEA: when Innovation meets the Market


Recommended