+ All Categories
Home > Documents > Item 10. Rail Update Great Western Franchise 7 March 2012.

Item 10. Rail Update Great Western Franchise 7 March 2012.

Date post: 16-Jan-2016
Category:
Upload: frederick-powell
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
13
Item 10. Rail Update Great Western Franchise 7 March 2012
Transcript
Page 1: Item 10. Rail Update Great Western Franchise 7 March 2012.

Item 10. Rail UpdateGreat Western Franchise

7 March 2012

Page 2: Item 10. Rail Update Great Western Franchise 7 March 2012.

Great Western Franchise

Consultation Dec 2011 to March 2012

Invitation to tender May 2012

Bids submitted Aug 2012

Award announced End 2012

Franchise starts April 2013

Page 3: Item 10. Rail Update Great Western Franchise 7 March 2012.
Page 4: Item 10. Rail Update Great Western Franchise 7 March 2012.

Franchise objectives

•Effectively manage franchise changes

•Provide appropriate capacity

•Improve passenger experience

•Punctuality and reliability

•Cost effective and efficient

•Possible devolution

Page 5: Item 10. Rail Update Great Western Franchise 7 March 2012.

West of England prioritiesRail Conference Top Three

•Greater Bristol Metro

•Re-open Portishead line

•Additional rolling stock

Other

•Electrification – extensions and EMUs

•Services, ticketing, stations, future aspirations

Page 6: Item 10. Rail Update Great Western Franchise 7 March 2012.

Key franchise issues•15 year franchise

•Current level of service = baseline

•Modest objectives

•Increment/decrement = ‘priced option’ approach

•Operator determine rolling stock and timetable

•Devolution to follow?

•34 Questions

Page 7: Item 10. Rail Update Great Western Franchise 7 March 2012.

Franchise Questions

•Factors influencing local passenger demand (Q2)•Investment priorities (Q5)•Devolved train services (Q8)•Franchise specification – mandated/discretion (Q10)•Train service changes (Q21)•Performance areas of concern (Q24)•Station enhancements and accessibility (Q25 and Q33)•Security (Q28), Ticketing (Q29) and Catering (Q31)

Page 8: Item 10. Rail Update Great Western Franchise 7 March 2012.

Neighbouring authorities•Additional Cardiff to Portsmouth stopping service and Wiltshire towns

•Train lengthening (Cardiff/Portsmouth/Taunton/Gloucester/Westbury)

•Four tracking of Filton Bank

•Bristol to Oxford service

•Ebbw Vale to Bristol Parkway

•New diesel fleet for the South West

Page 9: Item 10. Rail Update Great Western Franchise 7 March 2012.

Potential Bidders

•First Great Western

•Arriva (Deutsche Bahn)

•Network Express

•South West Trains (Stagecoach)

•Go-ahead (with SNCF) – withdrew

•Renfe (Spanish state company)

Page 10: Item 10. Rail Update Great Western Franchise 7 March 2012.

Implementing prioritiesDfT criteria

•Deliverability, robustness and operational impact

•Value for money

•Phased approach – 15 year franchise

•Evidence and business case – technical work

= Art of the possible!

Page 11: Item 10. Rail Update Great Western Franchise 7 March 2012.

Greater Bristol MetroEvidence and business case

Technical work David Crockett and Graeme

Pollard

Halcrow

Page 12: Item 10. Rail Update Great Western Franchise 7 March 2012.

Franchise response

•Covering letter and report

•Priorities for new franchise

•Greater Bristol Metro Phase 1 and 2

•Detailed response to 34 questions

• Technical evidence

Page 13: Item 10. Rail Update Great Western Franchise 7 March 2012.

Recommended