For discussion FCR(2019-20)5A on 13 December 2019 ITEM FOR FINANCE COMMITTEE RECOMMENDATION OF THE PUBLIC WORKS SUBCOMMITTEE ON PUBLIC WORKS PROGRAMME AND CAPITAL SUBVENTION PROJECTS PURPOSE This note recommends upgrading 780CL “Site formation and infrastructure works for public housing development at Wang Chau, Yuen Long” to Category A. This note also provides updates on the estimated project cost, estimated cash flows and implementation programme for 780CL. JUSTIFICATION 2. On 29 March 2019, the Public Works Subcommittee (PWSC) recommended the Finance Committee (FC) to approve the upgrading of 780CL to Category A at an estimated cost of $2,390.2 million in money-of-the-day (MOD) prices. Members have requested the recommendation on 780CL should be submitted to the FC for separate voting. 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the Civil Engineering and Development Department has invited tenders for the construction works listed in paragraphs 3(a), 3(b), part of 3(c) and part of 3(e) of the paper in order to enable early commencement of the proposed works. The returned tender price was lower than the original estimate which has reflected the prevailing market situation. Accordingly, the estimated project cost of the project is reduced from the original estimated $2,390.2 million to $1,800.2 million in MOD prices (about $590 million (24.7%) less than the earlier estimate) and the cash flows are also revised. The latest estimate should be adequate to deliver the proposed works. Opportunity has also been taken to update the implementation programme of the project. 4. The project scope as recommended in PWSC(2018-19)40 remains unchanged. /5 ….. Encl.
Transcript
Page 1: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

For discussion FCR(2019-20)5A

on 13 December 2019

ITEM FOR FINANCE COMMITTEE

RECOMMENDATION OF THE PUBLIC WORKS SUBCOMMITTEE ON

PUBLIC WORKS PROGRAMME AND CAPITAL SUBVENTION

PROJECTS

PURPOSE

This note recommends upgrading 780CL “Site formation and

infrastructure works for public housing development at Wang Chau, Yuen Long” to

Category A. This note also provides updates on the estimated project cost,

estimated cash flows and implementation programme for 780CL.

JUSTIFICATION

2. On 29 March 2019, the Public Works Subcommittee (PWSC)

recommended the Finance Committee (FC) to approve the upgrading of 780CL to

Category A at an estimated cost of $2,390.2 million in money-of-the-day (MOD)

prices. Members have requested the recommendation on 780CL should be submitted to

the FC for separate voting.

3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40),

with updates shaded in grey, is at Enclosure. As stated in the paper, the Civil

Engineering and Development Department has invited tenders for the construction

works listed in paragraphs 3(a), 3(b), part of 3(c) and part of 3(e) of the paper in

order to enable early commencement of the proposed works. The returned tender

price was lower than the original estimate which has reflected the prevailing market

situation. Accordingly, the estimated project cost of the project is reduced from the

original estimated $2,390.2 million to $1,800.2 million in MOD prices (about

$590 million (24.7%) less than the earlier estimate) and the cash flows are also

revised. The latest estimate should be adequate to deliver the proposed works.

Opportunity has also been taken to update the implementation programme of the

project.

4. The project scope as recommended in PWSC(2018-19)40 remains

unchanged.

/5 …..

Encl.

Page 2: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

FCR(2019-20)5A Page 2 5. In April 2019, we issued FCR(2019-20)5 inviting Members to approve

the upgrading of 780CL to Category A. The paper has not been discussed by the FC.

This paper supersedes FCR(2019-20)5.

6. Members are invited to approve the recommendation above.

--------------------------------------

Financial Services and the Treasury Bureau

December 2019

Page 3: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A

HEAD 711 - HOUSING

Civil Engineering – Land development

780CL – Site formation and infrastructure works for public housing

development at Wang Chau, Yuen Long

Members are invited to recommend to the Finance

Committee the upgrading of 780CL to Category A at an

estimated cost of $1,800.2 million in money-of-the-day

prices.

PROBLEM

We need to carry out site formation and infrastructure works to

support the proposed Wang Chau public housing development Phase 1, Yuen

Long (WCPHD1).

PROPOSAL

2. The Director of Civil Engineering and Development, with the

support of the Secretary for Transport and Housing, proposes to upgrade 780CL

to Category A, at an estimated cost of $1,800.2 million in money-of-the-day

(MOD) prices for the site formation and infrastructure works.

PROJECT SCOPE AND NATURE

3. The proposed scope of works under 780CL includes –

(a) formation of about 5.6 hectare of land platforms and

construction of associated retaining walls and slopes;

(b) construction of a new single two-lane carriageway of

about 400 metres long with a connected underpass,

footpaths and pick-up / drop-off areas;

/(c) …..

Page 4: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 2

(c) improvement works at the junction of Long Ping

Road and Fung Chi Road, and about 1.1 kilometres

long road resurfacing works along a section of Long

Ping Road;

(d) construction of a footbridge across Long Ping Road

with associated lifts; and

(e) ancillary works including drainage, sewerage,

waterworks and landscaping works.

A location and site plan of the proposed works are at Enclosure 1.

4. Subject to funding approval by the Finance Committee (FC), we

plan to commence the proposed works in early 2020. The site formation works

are expected to be completed in 2023, whereas the infrastructure works are

expected to be completed in 2024. In order to meet the tight schedule, we have

invited tenders for the construction works listed in paragraphs 3(a), 3(b), part of

3(c) and part of 3(e) to enable early commencement of the proposed works.

Tenders will only be awarded after obtaining FC’s funding approval.

JUSTIFICATION

5. WCPHD1 is planned to be completed in 2026-27 and will provide

about 4 000 units for a population of about 12 300. It is necessary to form land

and construct infrastructure to support WCPHD1. To tie in with the population

intake of WCPHD1, timely completion of the proposed works is necessary.

FINANCIAL IMPLICATIONS

6. We estimate the capital cost of the project to be $1,800.2 million in

MOD prices (please see paragraph 8 below), broken down as follows –

$ million

(in MOD prices)

(a) Site formation works and

retaining structures

736.5

(b) Road works including underpass

and footbridge

438.7

/$ million …..

Page 5: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 3

$ million

(in MOD prices)

(c) Ancillary works including

drainage, sewerage, waterworks

and landscaping works

247.0

(d) Consultants’ fees for 12.4

(i) contract administration 5.0

(ii) management of resident site

staff (RSS)

7.4

(e) Remuneration of RSS

201.9

(f) Contingencies 163.7

Total 1,800.2

7. Due to insufficient in-house resources, we propose to engage

consultants to undertake contract administration and site supervision of the

proposed works. A breakdown of the estimates for consultants’ fees and RSS

costs by man-months is at Enclosure 2.

8. Subject to funding approval, we plan to phase the expenditure as

follows –

Year $ million

(MOD)

2020 – 2021

130.6

2021 – 2022

336.7

2022 – 2023

507.1

2023 – 2024

2024 – 2025

2025 – 2026

425.5

302.8

86.9

/Year …..

Page 6: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 4

Year $ million

(MOD)

2026 – 2027 10.6

Total 1,800.2

9. We have derived the MOD estimates on the basis of the

Government’s latest set of assumptions on the trend rate of change in the prices

of public sector building and construction output for the period from 2020 to

2027. We will deliver the proposed works under New Engineering Contract1.

The contracts will provide for price adjustments.

10. We estimate the annual recurrent expenditure arising from the

proposed works to be about $3.5 million.

PUBLIC CONSULTATION

11. We consulted the Ping Shan Rural Committee (PSRC) on 12 May

2015 and the Traffic and Transport Committee of the Yuen Long District

Council (YLDC) on 21 May 2015 on the proposed road scheme and WCPHD1.

On 30 October 2015, we gazetted the proposed road works under the Roads

(Works, Use and Compensation) Ordinance (Cap. 370) (RO) and the proposed

sewerage works under RO as applied by Section 26 of the Water Pollution

Control (Sewerage) Regulation (Cap. 358AL). We received 159 objections2

after the gazettal, and met with the objectors between January and April 2016 to

explain the details of the project and the compensation package under the

prevailing policy, etc. At the end, four objectors withdrew their objections

unconditionally, while the remaining 155 objectors maintained their objections.

/12. …..

1 New Engineering Contract is a suite of contracts developed by Institution of Civil Engineers,

United Kingdom. It is a contract form that emphasises cooperation, mutual trust and collaborative

risk management between contracting parties.

2 The 159 objections do not include the three objections that explicitly objected to land resumption

in accordance with the Lands Resumption Ordinance (Cap. 124).

Page 7: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 5

12. We subsequently submitted the objections and the

correspondences with the objectors (including meeting minutes) to the Chief

Executive in Council for consideration. On 11 October 2016, the Chief

Executive in Council authorised the proposed road and sewerage works without

modification. The notice of authorisation was gazetted on 11 November 2016.

13. We consulted PSRC and the Town Planning and Development

Committee (TP&DC) of YLDC on 14 and 20 September 2017 respectively on

the proposed works. Members of the PSRC had in principle no objection to the

proposed works. Members of TP&DC generally supported the proposed works,

although some TP&DC members raised objections to the land resumption.

14. We consulted the Advisory Committee on the Appearance of

Bridges and Associated Structures3 (ACABAS) on the design of the proposed

underpass, retaining walls and footbridge on 17 October 2017. ACABAS

accepted the proposed design on 21 November 2017.

15. We consulted the Legislative Council (LegCo) Panel on Housing

on the proposed works on 6 November 2017. Members requested that the

compensation and rehousing arrangements should be discussed at a joint meeting

of Panel on Development and Panel on Housing before submitting the funding

proposal to the Public Works Subcommittee for consideration. The Government

announced the proposed enhancements to the ex-gratia compensation and

rehousing arrangements for eligible domestic occupants in squatters and business

undertakings affected by Government's development clearance exercises (New

Measures) on 10 May 2018. FC approved the New Measures on 18 July 2018,

which is also applicable to Wang Chau Project. We provided the latest

information on WCPHD1, at the LegCo Panel on Housing Subcommittee to

Follow up the Issues Related to the Wang Chau Development Project (the

Subcommittee) meeting on 25 April 2018, 30 November 2018 and 1 February

2019. We conducted a site visit with the Subcommittee on 19 June 2018. At the

joint meeting of Panel on Development and Panel on Housing on 29 June 2018,

the Panels supported the submission of the funding proposal to the Public Works

Subcommittee for consideration.

/ENVIRONMENTAL …..

3 The Advisory Committee on the Appearance of Bridges and Associated Structures, which

comprises representatives of the Hong Kong Institute of Architects, the Hong Kong Institution of

Engineers, the Hong Kong Institution of Planners, academic institutions, Architectural Services

Department, Highways Department, Housing Department and Civil Engineering and Development

Department, is responsible for vetting the design of bridges and other structures associated with

the public highway system, including noise barriers and semi-enclosures, from aesthetic and visual

impact points of view.

Page 8: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 6

ENVIRONMENTAL IMPLICATIONS

16. The project is not a designated project under the Environmental

Impact Assessment Ordinance (Cap. 499). We have completed the Preliminary

Environmental Review (PER) for the project. The PER concluded and the

Director of Environmental Protection agreed that the project would not cause any

long-term adverse environmental impacts with implementation of mitigation

measures including proper drainage systems with silt traps and oil interceptors,

low noise road surfacing, etc.

17. We have incorporated into the works contracts the mitigation

measures recommended in the PER to control environmental impacts arising

from the construction works to within established standards and guidelines.

These measures include the use of silencers, mufflers, acoustic lining or shields

for noisy construction activities, frequent cleaning and watering of the site, and

the provision of wheel-washing facilities. We have included in the project

estimate the cost to implement the environmental mitigation measures.

18. At the planning and design stages, we have considered the

alignment, design level and construction method of the proposed works so as to

reduce generation of construction waste where possible. In addition, we will

require the contractors to reuse inert construction waste (e.g. excavated soil and

rock fill) on site or in other suitable construction sites as far as possible, in order

to minimise disposal of inert construction waste at public fill reception facilities4

(PFRF). We will encourage the contractors to maximise the use of recycled or

recyclable inert construction waste as well as the use of non-timber formworks to

further minimise generation of construction waste.

19. At the construction stage, we will ensure that the day-to-day

operations on site comply with the approved plan to be submitted by the

contractors setting out the waste management measures. We will require the

contractors to separate the inert portion from non-inert construction waste on site

for disposal at appropriate facilities. We will control the disposal of inert and

non-inert construction waste at PFRF and landfills respectively through a trip-

ticket system.

/20. …..

4 Public fill reception facilities are specified in Schedule 4 of the Waste Disposal (Charges for

Disposal of Construction Waste) Regulation (Cap. 354N). Disposal of inert construction waste in

public fill reception facilities requires a licence issued by the Director of Civil Engineering and

Development.

Page 9: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 7

20. We estimate that the proposed works will generate in total about

400 000 tonnes of construction waste. Of these, we will reuse about

110 000 tonnes (27.5%) and 8 000 tonnes (2.0%) of inert and non-inert

construction wastes respectively on site and deliver about 254 000 tonnes

(63.5%) of inert construction waste to PFRF for subsequent reuse. In addition,

we will dispose of the remaining about 28 000 tonnes (7.0%) of non-inert

construction waste at landfills. The total cost for accommodating construction

waste at PFRF and landfill sites is estimated to be about $23.6 million for this

project (based on a unit charge rate of $71 per tonne for disposal at PFRF, and

$200 per tonne for disposal at landfills as stipulated in the Waste Disposal

(Charges for Disposal of Construction Waste) Regulation (Cap. 354N)).

HERITAGE IMPLICATIONS

21. The proposed works will not affect any heritage site, i.e. all

declared monuments, proposed monuments, graded historic sites or buildings,

sites of archaeological interest and government historic sites identified by the

Antiquities and Monuments Office.

TRAFFIC IMPLICATIONS

22. The proposed works will not cause any significant traffic impact

during the construction stage and operation stage. Temporary traffic

arrangements will be implemented to facilitate the construction works which will

require temporary partial road closures. We will display publicity boards on site

giving details of the temporary traffic arrangements, and the anticipated

completion dates of individual section of works. In addition, we will set up a

telephone hotline to respond to public enquiries or complaints.

LAND ACQUISITION

23. We posted on site and gazetted the land resumption notice on 2 and

5 May 2017 under the Lands Resumption Ordinance (Cap. 124) and RO

respectively. The land was resumed and reverted to the Government on

3 August 2017. The area resumed for the proposed works is about 34 528 square

metres (m2) and involves 79 private lots. The area of government land to be

cleared is about 33 920 m2. The estimated cost of land resumption and clearance

is about $311.1 million and will be charged to Head 701 – Land Acquisition.

A total of about 180 households, involving about 400 clearees, were registered in

the pre-clearance freezing survey. The clearance will also involve three graves

and 16 urns (Kam Taps). The breakdown of the estimate for land acquisition

cost is at Enclosure 3.

/BACKGROUND …..

Page 10: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure to FCR(2019-20)5A Page 8

BACKGROUND INFORMATION

24. We upgraded 780CL to Category B in September 2014.

25. We engaged consultants in March 2015 to undertake the detailed

design and site investigation for the proposed works at an estimated cost of about

$19.0 million (in MOD prices) under the block allocation Subhead B100HX

“Minor housing development related works, studies and investigations for items

in Category D of the Public Works Programme”. We have completed the

detailed design for the proposed works.

26. The proposed works will involve removal of approximately 1 057

no. of trees, including 1 032 no. of trees to be felled and 25 no. of trees to be

transplanted within the project site. Amongst them, three important trees5 will be

affected during the implementation of the project. A summary of important trees

affected is provided at Enclosure 4. We will incorporate planting proposals as

part of the proposed works, including estimated quantities of 1 057 no. of trees

and approximately 15 300 no. of shrubs.

27. We estimate that the proposed works will create 775 jobs (630 for

labourers and another 145 for professional/technical staff) providing a total

employment of 27 000 man-months.

----------------------------------------------

Transport and Housing Bureau

December 2019

5 “Important trees” refer to trees in the Register of Old and Valuable Trees, or any other trees that

meet one or more of the following criteria–

(a) trees of 100 years old or above;

(b) trees of cultural, historical or memorable significance e.g. Fung Shui tree, tree as landmark of

monastery or heritage monument, and trees in memory of an important person or event;

(c) trees of precious or rare species;

(d) trees of outstanding form (taking account of overall tree sizes, shape and any special features)

e.g. trees with curtain like aerial roots, trees growing in unusual habitat; or

(e) trees with trunk diameter equal to or exceeding 1.0 metre (m) (measured at 1.3 m above ground

level), or with height/canopy spread equal to or exceeding 25 m.

Page 11: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Cycle Track

Cycle Track

Long Pin

g

Co

mm

ercial C

entre

G

G

G

G

G

GG

GG

G

G

GG

G

GG

GG

GG

GG

GG

GG

G

GG

GG

GG

G

GG

GG

GG

GG

GG

GG

GG

GG

G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

G

GG

GG

GU

GG

G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

G

GG

GG

G

GG

GG

GG

GG

GG

G

GG

GG

GG

GG

GG

G

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

GG

G

GG

GG

GG

GG

G

G

GG

G

G

G

G

G

GG

GG

G

G

GG

G

GG

GG

GG

GG

GG

G

G

GG

G

G

GG

GG

GG

GG

GG

GG

GG

GG

GG

G

GG

GG

G

G

GG

GG

G

GG

GG

GG

GG

GG

G

GG

GG

GG

GG

G

G

GG

GG

G

GG

G

GG

U

G

GG

GG

G

GG

G

G

G

G

GG

G

G

G

G

GG

GG

G

G

GG

G

GG

GG

GG

GG

UG

GG

GG

G

GG

G

G

GG

GG

G

GG

G

G

GG

GG

GG

G

GG

G

G

G

GG

GG

G

GG

GG

GG

GG

G

G

GG

GG

GG

GG

GG

G

G

G

G

G

GG

G

GG

G

UG

GG

GG

GG

GG

GG

GG

GU

GG

G

G

G

GU

U

UG

G

GG

GG

G

GG

G

G

G

G

G

GU

GG

GG

G

GG

G

G

U

G

GG

G

GG

G

G

GG

GG

G

G

GGG

G

GG

G

GG

GG

GG

GG

GG

GG

GG

GG

UG

G

G

G

GG

G

GG

GU

G

G

G

G

G

G

G

G

UG

G

G

G

G

G

GG

G

G

G

G

U

G

G

G

G

GG

G

G

G

GG

GG

G

G

GG

G

G

G

G

G

G

G

G

G

G

U

G

G

G

GGG

G

G

GG

G

GG

G

GG

GG

G

G

GG

G

GG

GG

G

G

GG

GG

G

GG

G

GG

¿p

¥Á°ê

Um

ah Internatio

nal

Prim

ary School

³Õ·RÂå°|¾H

Pok Oi Hospital

Tang Pui King Memorial College

ªFµØ¤T°|¿c·

Tung Wah Group of Hospitals

Lo Kon Ting Memorial College

®Ô

«Ì

¡]

¤U

¼h°

±¨

®

(Car Park

&

Market under)

³æ¨

³æ¨

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

RT

SR

R

R

R

RR

TS

TS

TS

R

R

RR

R

8060

14

20

26

40

40

40

48

20

40

40

20

20

40

24

60

20

20

40

54

20

40

20

40

40

50

30

28

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

ÅS

¤Ñ

Open Storage

Open Storage

Open Storage

Open Storage

Open Storage

Open Storage

Open Storage

Open Storage

Open Storage

Open Storage

°©´

°©´

¹Ó

°©´

°©´

¹Ó

¹Ó

°©´

°©´

°©´

°©´

°©´

Burial U

rns

Burial U

rns

Graves

G

Burial U

rns

Burial U

rns

G

Graves

Burial U

rns

G

Graves

Burial U

rns

Burial U

rns

Burial U

rns

Burial U

rns

Burial U

rns

W

W

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

25.2

11.4

21.0

7.0

12.5

62.2

18.8

76.4

7.4

24.5

57.7

9.3

26.2

6.1

12.1

73.8

30.2

21.5

6.8

23.9

7.4

12.2

32.3

24.9

6.5

41.7

46.0

38.4

32.9

33.3

6.5

40.9

33.8

31.7

33.5

12.3

30.9

36.1

15.2

39.5

39.6

31.3

6.5

40.7

13.3

41.5

28.7

24.5

7.7

46.3

22.7

31.1

6.2

6.8

28.7

48.7

18.8

21.4

17.6

25.2

49.5

9.1

15.8

12.4

7.1

29.8

15.8

14.1

9.4

41.9

14.7

12.2

32.5

8.5

15.0

47.0

25.7

10.5

31.8

12.1

8.5

39.9

71.3

9.3

11.7

75.8

7.9

10.4

11.6

65.0

8.2

8.9

8.6

54.2

52.7

18.5

12.6

43.7

9.6

55.3

9.3

21.7

9.4

14.5

22.6

29.7

9.3

25.4

42.1

20.8

31.4

22.6

35.4

31.2

33.2

25.8

24.2

31.3

22.8

32.1

28.3

25.4

27.0

22.5

28.9

32.0

29.8

31.1

29.0

31.0

29.9

44.5

25.4

28.8

45.1

21.2

25.3

31.1

29.6

22.9

20.2

20.6

52.3

28.7

EE

EE

ET

EE

E

E

E

E

E

E

ET

E

E

L

LL

E

E

L

E

L

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

ªd

FP

FP

Track

FP

FP

FB

FP

FP

FP

FP

FP

Track

FP

FP

FP

FP

FP

Tra

ck

Track

Tra

ck

Track

Track

Track

FP

Track

FP

FP

Track

Track

FP

FP

Track

FP

Track

FP

FB

FP

FP

Tra

ck

FP

FP

FP

Track

FP

FB

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

FP

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

TS

TS

RT

S

R

TS

TS

TS

P

TS

TS

TS

TS

TS

TS

TS

RT

S

TS

TS

TS

TS

R

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

TS

TS

TS

TS

RT

S

TS

TS

VO

RC

P

R

TS

RR

TS

TS

RT

ST

S

TS

R

TS

R

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

TS

TS

TS

TS

Z

R

TS

TS

TS

R

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

RT

SR

TS

TS

TS

TS

TS

RT

ST

ST

ST

SR

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

RT

ST

ST

ST

ST

ST

ST

ST

ST

S

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

RT

ST

ST

ST

ST

S

TS

R

TS

TS

TS

TS

TS

TS

TS

TS

TS

VO

RT

ST

ST

ST

ST

STS

RT

ST

S

RT

S

TS

R

TS

¤¸

®Ô¯

¼Â´

«

¥Xª

©¤

§¤Í

ÀR­b

¢Ö¢Ï

¢Ð

¢Ó

¢Ñ

¢Ô

¢Ò

¢Õ

¢Ð

¶À

®L

¢Ï

«e

¾î

¬w¤

Yuen Long

Textile

Co., L

td.Pre

mier Printin

g

Group

Ltd.

Blo

ck

C

Blk A

Blo

ck

A

Blk B

Blo

ck

B

Blk C

Blk D

Blk E

Blk D

Blk F

Blk C

Blk B

Blk

A

Block F

Block P

Block

N

Block E

Block

MBlk G

Blk

CBlk H

Block D

Block L

Block A

Blk

B

Blk I

Block K

Blo

ck

C

Block B

Blk

A

Blo

ck

BBlk J

Block C

Block J

Blo

ck

ABlk K

Block D

Blk L

Block H

Block E

Block F

Blk.C

10

Blk.C

1

Blk.C

2

Blk.C

9Blk.C

3

Blk.C

4

Blk.A

1Blk.A

2Blk.C

8Blk.C

7Blk.A

3

Blk.C

6Blk.A

4Blk.C

5Blk.A

21

Blk.A

5

Blk.A

6Blk.A

22

Blk.A

20

Blk.A

25

Blk.E

1Blk.A

7

Blk.A

8

Blk.A

9Blk.A

23

Blk.E

9Blk.A

27

Blk.A

19

Blk.A

26

Blk.E

2

Blk.E

8

Blk.E

3Blk.A

18

Blk.A

17

Blk.A

16

Blk.A

15

Blk.A

13

Blk.A

12

Blk.A

11

Blk.A

10

Blk.E

5Blk.E

6Blk.E

7Blk.E

4

Blk.B

8

Blk.B

38

Blk.B

9Blk.E

Blk.D

Blk.C

Blk.B

Blk.A

Blk.B

37

Blk.B

1Blk.B

4Blk.B

5Blk.B

7Blk.B

2Blk.B

3Blk.B

6

Blk.B

10

Blk.B

36

Blk.B

29

Blk.B

30

Blk.B

31

Blk.B

28

Blk.B

17

Blk.B

27

Blk.B

11

Blk.B

35

Blk.B

18

Blk.B

12

Blk.B

26

Blk.B

33

Blk.B

21

Blk.B

20

Blk

ABlk.B

22

Blk.B

23

Blk

BBlk.B

25

Blk.B

19

Blk.B

13

Blk.B

32

Blk.B

15

Blk

DBlk

C

Blk.B

16

Blk.D

5Blk.D

6Blk.D

7Blk.D

1Blk.D

3Blk.D

4Blk.D

2Blk.D

8Blk.D

9Blk.D

10

Blk.D

13

Blk.D

11

Blk.D

12

Blk.D

15

50

51-53

208

204

209

204

205

92E

204

92

D

206

97

204

96

37

203

203

A

201

92

A

92

93

180

178

94

186

179

184

184

177

95

182

A

61

182

91

113A

17

6175

125

113B

252

160

159

60

164

158

165

113

251

166

59

D16

759

C16

816

9250

170

59

A

123

154

155

57

61C-

D56

151

156

59

122

150

157

56

A14

914

864

A61B

58

55

B14

714

6

115

55

A55

54

134

61A

133

45

121

62

63

132

137

64

45

A4

6

116

131

65

46

B138

66

142

139

120

48

140

49-50

14

167

43

A51

44

117

130

52

75

126

74

73

72

43

71-

70

119

42C

41

E4

1D

41

C4

1B

69

1184

1A76

42A-B

77

43

C78

79

189

80

81

42

190

82

191

248

202

199

38

82

A39

40

205

198

83-84

100

A85

41

86

100

B

36

35

90

A34

33

33A

32

90

89

100

C31

197

88

A30

29

88

28

A1

28

203

204

100

D87

27

26

25

86

A18

812

13

24

16-17

18

19

23

206

20

209

207

208

21

210

22

A

22

186

1110

9201

215

8200

76

5213

A

185

213

4212

3211

2

216

211

217

184

218

219

220

221

32

31

30

34-33

29

180

218A

275

272

270

157

27

28

22

226

273

271

21

22

179

24

23

17

8

18A

20A

18B

277

282

279

15

281

17-19

16

280

20

16B

278

25

02

49

157A

14

12

B13

A13

136

87

96

45

135

12

A

25

5

313

22

1

130-1

102

101

310

311

312

42

21A

313

43

44

45

35-34

315

36

321

21B

37

5A

104

320

38

21

322

639

27-26

46

125

323

20

28

330

224

29

1A

19

103

40

30

323

A10

54

102

23

5

18A

31

101

41

100

22

32

7A

11

18

10A

33

99

21

1782

17

7333

20

21A

27-26

350

16-15

12

80A

351

28

98

333

A81

20A

9-8

20

1819

352

30-29

80

1021A

97

14

79

31

21

33

83A

353

96

78

1832

13

84

34

95

177

77

353

A16

94

8

12

76

1585

75

35

A

11

14355

A13

986

74

14A

39

40

A

10

87

35

73

13A

72

356

36

40

1088

10B

70-71

71A

361

89

59

356

A38-37

90

105

58

6A

91

8

41

57

92

106

61

693

41A

56

114C

69

107

370

7-6

43-42

6B

68

54

44

23

108

371

53

67

24

52

25

5-4

6

20

40

52

40

14

10

40

20

20

10

10

1820

¤¤°ê

ÀË

Å禳­­

¤½

½Þ

ÅS

¤Ñ

´I

®

±sª

L

¾î

¹l¶

®

®¶¯qªá

ºÖ

ÄR

ºÖ

Á

ª÷

¾î

¬wº

ÅS

¤Ñ

ºÖ

ªá

®¶¯

q

º~

ºÖªá

¾î

¬w

©

¬ü¦

©wº

Ö

Ä_

¾î

¬w¦

¹Åº

Chin

a Inspectio

n

Co

mpany

Ltd

CH

U

WO

NG

LIN

G

Open Storage

The

Majesty

WA

NG

CH

AU

Ele

gant VillaC

hun

Yic

k

Garden

Fuk

Lai G

arden

Phase 2

Ka

m

Yuen

WA

NG

CH

AU

FU

K

HIN

G

TS

UE

N

Open Storage

Fuk

On

Garden

Chun

Yic

kGarden

WA

NG

CH

AU

CH

UN

G

SA

M

WAI

ES

S

Meon

Court

Tin

g Fook

Villa

sR

ose

Garden

WA

NG

CH

AU

SAI T

AU

WAI

WIP

Mar

2014

WIP

Mar

2014

SH

R

SH

R

WIPMar2014

WIP

Mar

2014

CU

L

SH

R

W

W

W

W

W

WW

´

´

Nullah

Nullah

PO

4.8

5.0

5.6

4.9

40.7

5.0

5.3

5.5

5.2

4.6

3.5

5.0

4.3

5.4

4.5

5.0

14.2

4.5

4.6

4.4

4.9

11.0

6.3

4.8

6.1

51.4

4.6

6.1

5.1

4.6

4.5

52.6

4.7

4.9

5.5

6.4

5.8

3.5

51.5

8.8

4.3

5.8

5.3

4.1

48.1

6.3

4.7

10.3

5.0

6.3

6.2

4.8

44.5

5.3

4.6

6.3

5.0

6.3

5.5

6.3

6.3

4.1

3.3

5.0

4.1

7.2

4.4

6.9

4.2

4.7

4.3

4.9

7.1

4.4

4.5

4.9

5.4

4.1

6.8

3.4

4.6

7.3

5.7

5.1

4.5

4.1

4.6

4.4

4.1

7.8

4.7

3.9

4.7

3.3

5.0

5.0

3.6

5.3

3.5

6.3

5.1

7.3

5.5

8.0

3.4

5.3

6.3

6.2

4.9

3.3

4.7

5.5

4.7

4.2

4.9

3.7

5.0

7.1

5.4

4.8

5.5

6.6

3.5

5.0

4.1

7.2

5.1

5.3

6.0

7.0

4.0

8.5

5.2

4.4

5.0

4.0

3.7

5.4

3.4

5.7

8.5

6.0

4.8

8.7

4.6

5.4

11.1

10.3

5.4

3.6

4.1

4.3

7.8

9.6

5.7

3.9

3.9

3.0

7.3

2.9

3.4

14.3

4.6

3.6

13.4

5.5

4.5

6.3

7.7

5.2

16.5

15.2

16.4

3.0

4.1

4.8

4.5

3.9

4.5

5.6

4.8

3.8

3.2

H

L

L

L

E

H

L

E

L

EE

L

E

E

L

H

H

EEE

EEL

ET

ET

L

L

H

L

LL

LL

LL

L

L

L

LL

LL

HL

EL

E

LL

EL

LE

HL

HL

L

LL

LL

L

LE

LE

EL

LL

ET

LE

LL

LE

LL

LE

LE

TE

HE

L

LL

EL

HL

EL

LL

EL

L

EL

E

L

E

L

L

L

EL

EL

HL

LE

L

LE

LL

LL

E

EH

EE

L

E

E

LE

EE

L

EE

EL

EL

E

LH

L

E

L

L

E

LE

LL

L

EL

L

LL

H

LL

L

LE

LL

LE

LH

L

LE

TL

L

ºÖ³

FUK HI STREET

ªd

ªd

³æ

ªd

ªd

ªd

ªd

¹D

¹D

¹D

¹D

¹D

³æ¨

¹D

Cycling Track

Track

Track

FP

FP

Track

FP

FP

Track

Track

Track

FP

Road

FP

Road

Road

FP

FP

FP

Road

FP

Road

FP

FP

FP

FP

FP

Blk.B

Blk.A

Blk.C

Blk.D

RTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

TS

TS

TS

TS

TS

TS

VO

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

RT

S

RT

ST

S

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

TS

TS

TS

RT

S

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTS

TS

TS

RCP

TS

VO

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

P

TS

TS

TS

TS

TS

Às

µ

¤Ñ¦

RC

P

Lung

Wah

Yuen

Tin

Hau

Te

mple

131

115

120

114

108

B

106

113

12

0

112

111

108

F10

8E

110

108

82

50A

74

73C

73

102

101

727170

80

6764A2

54A

62

64B

6160

26

64

54

68B

59

56

63

5857

68

A

62B

53

A-

B55

62C

52

98

18

7

51A

37A

6

100

16

5

51

48

50

49

14-15

3

64

A

21

1A

25

E

25

C25

A

25

F

25

D

25

B

20

21

6

43

42

5

41

40

39

38

1

42

A

17A

17B

17C

15B

15C

37

15A

13B

15D

17

15

13

A

13

18

83

12F

13D

12E

16A

12D

12C

24

34

40

24

40

22

32

20

40

24

20

20

40

20

22

°©´

¹Ó

¹Ó

¹Ó

¹Ó

Burial U

rns

Graves

G

Graves

Graves

Graves

SH

R

AR

CH

SH

R

CU

L

SH

R

CU

L

CU

L

AR

CH

W

W

W

W

W

´ä

ÅK¡]¦

MT

R (

West Rail Line)

MT

R (

West Rail Line)

Nulla

h

28.1

49.2

19.8

33.3

53.2

49.1

29.9

49.3

27.0

27.1

25.8

36.6

14.6

18.1

18.2

14.1

24.8

17.0

33.8

20.6

16.8

16.5

14.5

44.0

14.8

25.4

17.4

15.7

15.2

18.3

14.1

14.1

15.0

12.9

15.3

14.6

13.8

13.8

14.0

16.4

15.0

15.3

13.3

17.3

15.0

17.5

11.7

15.4

13.1

11.6

11.6

18.4

12.2

17.1

13.7

11.8

15.7

14.3

11.2

17.0

11.2

13.1

16.7

17.3

16.2

17.2

12.4

13.9

10.7

22.4

12.2

14.3

12.0

19.3

10.7

11.9

10.2

14.5

11.0

14.3

11.9

16.2

11.1

21.7

17.7

17.3

14.3

10.6

10.6

16.4

10.8

19.2

10.2

13.7

15.1

20.8

9.9

6.1

15.2

9.5

13.2

9.9

12.7

8.9

8.8

9.8

11.0

15.4

13.6

7.8

15.6

8.1

8.1

14.2

19.9

8.6

10.9

7.6

10.7

8.1

8.4

7.8

8.0

19.1

12.1

8.2

10.4

7.0

18.3

9.4

8.0

9.0

12.8

7.8

6.9

19.2

8.6

9.9

5.4

8.6

9.0

9.1

9.7

9.4

19.5

9.3

6.7

8.2

8.7

8.2

6.4

8.7

19.5

7.8

7.5

8.2

9.1

8.3

19.8

7.7

6.1

7.6

6.4

9.1

7.7

5.8

9.1

20.3

7.0

4.7

6.6

7.0

20.6

7.6

8.6

8.4

5.7

7.2

20.5

6.9

7.1

7.5

5.0

9.6

9.4

6.1

5.4

7.4

6.3

5.7

5.8

7.8

5.6

5.5

5.5

11.0

6.7

4.5

6.3

9.2

5.0

4.6

6.7

4.5

6.8

5.4

5.0

5.4

5.4

7.5

5.0

E

E

E

ET

E

E

L

LE

E

E

L

LE

EE

E

E

EE

L

L

E

LL

H

E

LL

E

E

E

L

E

EL

LE

EE

LE

EL

ET

LL

L

E

LE

L

EE

LL

L

E

E

L

L

L

H

L

LL

L

E

EL

L

EH

LE

LL

LL

EL

ET

EE

E

LL

EE

L

L

EL

EE

LL

LL

LL

LE

EL

LE

LH

LE

LH

EE

E

EL

ET

LL

LL

L

L

L

E

EL

LL

EL

LL

HL

H

ET

ET

EL

H

L

LL

EL

L

E

L

L

L

EE

EL

L

LL

E

L

E

L

H

EL

L

E

L

EL

EL

EE

EH

EL

E

EL

E

LE

EE

E

E

LL

L

HL

®Ô«

§»¹

LO

NG PIN

G

RO

AD

WA

NG

TAT

RO

AD

63

65-66

110-1

26B

114A

26

50

3-2

64

11427

48

28

112

115

47

118A

29

1

131

46

132

45

11330

44

11632

375

42

132

A

33

117

137

34

118

41

35

130

A

136

36

40

135

130

37

134

A39

134

38

133

138

392

129

150

119

128

A

123-12

4

395

128

393

128B

147

122

122

13

138A

393

A

12

126

145

120

127

14

11

1512

5

140

16

10

146

17

139C

9

1813

9A

19

8

139B

139

20

7

21

22

6

23

5

24

25

141

4

142

26

27

3

28

2

59

29

1

30

31

32

38

37

36

33

35

34

80

81

70

82

71

83

60

72

61

73

50

62

51

84

63

48

74

52

75

44

25

0

53

64

85

45

76

65

33

49

77

46

54

34

66

47

55

22

86

67

35

78

23

56

79

36

11

19

57

68

24

12

19A

69

25

37

58

13

38

14

59

26

1

39

27

40

2

15

28

16

29

41

3

17

42

4

18

30

43

5

31

6

19

32

20

7

21

8

9

10

22

7

11-13

29

17

118

106

102

101

107

117

10

108

114115

225-2

3

5-11

113

20

20

40

20

20

16

¹Ó

§»

¼Ö

µó

¾É

SH

R

CU

L

SH

R

Graves

CU

L

CU

L

WIP

Nov 2

014

Wang

Lok Street Cable

Brid

ge

Pip

elin

e

CU

L

CU

L

WIP

Nov 2

014

CU

L

±Æ¤

´

´

Outfall

F

Nullah

F

7.6

5.4

4.7

5.1

34.9

3.5

5.2

2.7

3.6

5.2

5.3

33.5

4.8

3.8

3.5

33.8

4.4

34.8

5.6

5.5

5.7

5.4

42.2

5.2

42.8

5.0

45.0

5.8

4.6

5.3

4.6

5.7

4.6

5.1

6.3

5.7

4.6

5.4

4.2

3.8

12.3

4.2

5.0

3.3

4.4

5.1

8.4

4.6

4.1

5.1

4.6

4.9

3.8

6.5

6.6

4.8

5.1

8.9

4.7

8.4

5.2

13.9

11.6

3.7

5.2

18.5

7.6

5.2

7.5

4.0

17.4

11.8

4.8

10.5

5.1

13.6

15.0

13.2

4.0

3.9

4.8

4.5

5.3

10.5

3.9

4.9

4.9

4.6

4.0

3.9

6.1

5.4

4.8

4.1

4.5

4.0

4.3

5.8

6.6

4.4

5.1

4.5

4.8

5.9

3.8

5.0

4.7

4.8

4.4

6.3

4.1

4.8

5.9

4.4

5.3

4.1

4.7

4.7

5.0

5.2

4.7

5.6

4.5

4.5

4.3

4.7

4.3

6.0

5.5

4.8

7.1

4.5

7.6

5.1

4.1

5.1

5.1

4.7

5.7

3.3

5.3

6.2

4.4

5.2

4.4

4.4

3.2

5.3

5.5

4.8

5.4

4.2

6.2

4.8

5.6

9.3

21.2

5.1

21.3

21.2

21.1

21.0

4.6

4.5

4.6

4.9

4.2

4.5

4.8

4.6

4.8

2.1

4.1

4.1

4.5

4.7

E

LL

LL

L

L

L

E

L

L

LH

L

L

E

L

H

L

LL

L

HL

E

LL

LL

L

E

HE

LL

L

H

H

EL

LE

LH

LL

LL

LL

L

L

L

L

EH

L

L

L

LL

L

LH

L

L

EL

EL

L

LH

L

L

L

HL

LL

LH

LL

L

LH

LL

LH

LE

L

L

LL

LE

L

LL

L

LL

L

L

LL

LL

HL

HL

HHL

LL

LL

L

LL

L

LH

LL

LL

LL

LL

LL

LL

L

HL

L

LL

LL

L

L

H

LH

LL

LL

L

L

LL

L

LL

HL

H

H

LL

LL

LL

L

LH

L

HL

LL

L

LL

L

LL

L

LL

HL

H

LL

L

LL

HL

LL

LL

LL

LL

H

LL

LL

LL

L

LL

LL

LH

LL

LL

LL

LL

LL

LL

LL

LL

LL

L

LL

LH

LL

LL

LL

LL

LL

LL

L

H

LL

LL

L

LL

LL

LL

L

LL

LL

L

LL

LL

LL

LL

HL

LL

LL

LL

LL

L

LH

LL

LL

LL

L

L

EL

L

RC

P

¡]¤

U¼h

©

ªÀ°Ï¶i­

¥­

¥­

¥­

¡]

¤U

¼h°

¿ì¨

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

Podiu

m

(Caritas

Yuen Long

Co

mm

unity Educatio

n

Centre under)

TS

PT

S

Podiu

m

TS

P

Podiu

m

(Car Park under)

TS

TS

Offic

e

TS

¤s¤

±d¤

Å|¤

´ò¤

¬Õ¤

¬u¤

²Ä

¤

Block

A

Block BBlock

A

San Shui H

ouse

Hong Shui H

ouse

Dip Shui H

ouse

Woo Shui H

ouse

Yin

g Shui H

ouse

Chuen Shui H

ouse

Blo

ck 1

1219

D

16B

12B

90

12A

16C

19E

19A

19

89

88

19F

19B

87

69-89

19C

86

85

84

83

82

24

81

96

95

94

92

93

78

23

80

91

76

79

74

77

72

75

73

44

71

70

22

68

43

66

69

58

42

64

67

62

65

41

57

60

63

37

40

56

61

38

59

39

55

20

36

1934

32

18

35

30

1754

33

1628

31

1526

29

53

27

52

25

1451

13

50

24

12

48

1123

46

49

1022

47

21

9

45

4

8

3

7

6

2

5

1

8

7

6

17

5

18

10

¹C

¼

©¯º

Ö¼

¯Ñ

®¶¿³

°±¨

ÅS

¤Ñ

¹C

¼

¤ô

Ãä

¤ô

Ãä³ò

¬

Pla

yground

Cultiv

atio

n

RCP

RC

P

ESS

CH

UN

HIN

G

SA

N

TS

UE

N

Car Park

Open

Storage

Pla

yground

ESS

SH

UI P

IN

WAI E

ST

AT

E

ESS

Shui Pin

Wai

Flo

od

water Pu

mpin

g Statio

n

CU

L

CU

L

ARCH

CU

L

CU

LC

UL

CU

L

CUL

CUL

W

´

Nulla

h

5.3

5.4

4.6

4.6

5.5

6.8

5.3

5.5

5.3

5.0

6.4

4.9

18.1

18.9

5.0

18.5

12.7

5.1

4.5

4.6

5.0

5.0

10.0

4.3

4.0

3.6

4.3

4.4

3.9

12.3

4.4

5.0

4.7

13.1

4.9

4.6

4.1

4.5

4.6

3.2

5.4

4.4

4.0

4.6

4.2

4.9

4.5

6.1

4.1

4.3

5.0

12.8

4.9

4.6

6.5

4.1

4.2

6.4

4.5

4.3

13.6

4.3

8.6

7.4

4.4

4.3

4.3

10.0

4.6

8.3

4.4

4.7

13.2

4.6

5.3

4.7

6.8

9.4

8.4

4.8

5.0

4.7

3.4

13.4

5.5

LL

L

LL

E

LL

L

LH

LL

L

LL

LE

EH

LL

L

L

LL

LL

LL

LE

HL

L

E

LE

LL

LL

L

LL

LL

LL

H

L

H

LL

LH

L

L

LL

HH

LL

LL

LL

LL

HL

L

LL

L

LL

LL

LL

H

LL

LL

H

L

LL

LH

L

L

LL

LL

L

HL

H

L

LL

LL

LL

LL

LL

LL

L

LL

LL

L

LL

LL

LH

LL

LL

LL

L

LL

L

LL

H

L

LL

LL

L

¶ý

¼

§»¹

¶ý

¾

¤Ã³

MA M

IU ROAD

WA

NG

TAT

RO

AD

MA

WA

NG

RO

AD

ªd

³æ¨

¹D

¹D

¹D

³æ¨

¦æ

ÀG

±×

FB

FB

FP

Cyclin

g Track

FP

FP

Road

Road

CW

Road

FB

CW

FP

CW

Cyclin

g Track

CW

CyclingTrack

Ramp

¥­

¡]¦h

¼h°

¥­

¥­

¥­

¥­

¥­

¥­

¥­

¥­

¥x¡]

¤U

¼

¥­

TS

TS

TS

TS

TS

TS

TS

P

TS

TS

TS

TS

TS

TS

TS

R

R

R

R

TS

TS

VO

(Multi-storey Car Park)

Podiu

m

R

Podiu

m

TS

TS

PH

Podiu

mT

S

TS

TS

TS

TS

Podiu

m

Podiu

m

Podiu

m

Podiu

m

Podiu

m

PH

Podiu

m (Car Park under)

TS

PH

ºÖ¶

¯u

¥ú

¥

ù´]

®É

Àï

¥ü¤

¤¤

µØ°

ò·

þ±

«Ì·|

¼Ö´I

¦w°

ò©

P§º

¥D·

¤Î

«C¦

¦w

§¤¯

»«

¦Pµo

ª÷«

¦w¹

ÄR

¬«Ì

¤s

¶m

¶m

¤j

§¤å·

´I²

·sº

¸Î

Â×

­»´ä

­p¹º

Ǽ

Ö¦

¸t¤

½·|

Æ

¦P

©

¶¶

µo

ºÖ·

¾ô

¼Ö

§¦

¦

¯©¼

¦P²

«H¸

q·|

¤¸

¤¸

®Ô

ÁÉ°¨

¸t

¤½·|¸t

º[¨

Ã

¤¸

®Ô

«H

¦n

¶¶º

¤¸

®Ô

«H¸

q·|

¤¸

®Ô

¬F

¤¸

®Ô

¥®¸

¤¸

®Ô

À»Ä[¸ô¼

t§B¦h S t«O

Blo

ck

ABlo

ck

CBlo

ck

BBlo

ck

D

Blo

ck 3

Block

G

Fook Shun Buildin

g

Chan

Kw

ong

Kin

dergarten

Block F

Block E

Sir

Denys

Roberts

Squash

Courts

Blo

ck 4

Block

D

Shiu Yat Building

Block C

Block B

Blo

ck 5

Yuen

Long

Church

(C

hurch of C

hrist in

Chin

a)

Ping Wui Centre

Block A

Blo

ck

BBlo

ck

C

Blo

ck

ABlo

ck

D

On

Ga

Buildin

g

Lok Fu Building

Blo

ck

A-

EBlo

ck

L-P

Block B

On

Lee

Buildin

gBlo

ck

AB

CD

EF

Blo

ck F-

KBlo

ck

GHJ

KL

MYen

Tsui G

ardens

Po

Fai

Buildin

g

Tung Fat Buildin

g

Ka

m

Shin

g

Buildin

g

On

Nin

g

Buildin

g

Lai C

hun

Buildin

gFu

Cheong

Buildin

gMan

Yip

Buildin

gY

ue Fung

Mansio

nFook

On

House

Tai L

ee

Buildin

gSheng

Kung

Hui Lin

g

Oi Prim

ary School

Sun

Win

gBuildin

gTung

Chong

Mansio

nT

he Fa

mily

Pla

nnin

gAssociatio

nof H

ong

Kong

Fuk

Yip

Buildin

g

Shun Fat

Mansio

n

Shung TakBuilding

Tung

Shin

gBuildin

g

Yuen

Long Jockey

Clu

bHealth

Centre

St. M

attia's

Church

Chiu

Chun

Kin

dergarten

Yuen

Long

Lutheran

Colle

ge

Yuen

Long

Lutheran

Life

Kin

dergarten

Ho

Shun Fuk

Buildin

g

Yuen

Long

Govern

ment Offic

es

Yuen

Long Sa

mY

uk

Kin

dergarten

Kik Yeung RoadCooked Food Market

S.S. Peter & Paul Church (Catholic Church)

112

44-2

67-45

7-9

19

131

14-28

1211

10

13-17

28

99B

927

97

826

7

99A

25

98B

24

42

95A

98

A23

41

22

40

95

39

93B

21

638

94

60

537

59

16

4

93

58

335

57

18

96

92

1756

33

55

89

516

34

-34

A54

32

91

88

53

15

1

8

87

1452

90

86

51

50

85

47A

49

61

84

30

83

48

29

82

62

47

81

46

18

80

28

90

B45

79

63

44

78

86

A43

77

64

76

75

65

74

63

C73

66

63

D72

9

71

67

70

69

42-12

68

5-3

160-13

813

6-110

108-100

98-7

67

4-7

0

1

2

168-16

2

14

7-13

9

109-93

15

3-14

9113-111

91-8

17

9-65

61

59

63

59

B

190-17

0

19-21

2

20-22

17

13

7-115

14-18

612

15

11C

9

11B

2

60

2

11A

¤j

Ápµ

«T

½å

§{

©¯º

Ö¼

«Ì·|

µó

¥°

±¨

Åv¯

q

¥Ãµo

°±¨

¦n´

µµ¯

ð¼

Ó

±Æ²

Äx²

Äx²

°±¨

À»

Ĥ­

¤H¨

°±¨

¤Ú

¤h

¤¸®Ô¥Á¬F¨Æ°

ES

ST

AI K

IU

Luen Fat House

RC

P

Chun

Yin Square Pla

yground

Car Park

Pin

g

Wui Street

Rest Garden

Kuen

Yic

k

Buildin

g

Wing Fat House

Car Park

Ho

Kin

g

Buildin

g

Basketball C

ourt

Volle

yball C

ourt

Car Park

Basketball C

ourt

Kik

Yueng

Road

5-a-sid

eFootball P

itch

Car Park

ES

S

Bus

Ter

min

us

Sitting-out Area Nest to Yuen Long District Office

CU

L

SH

R

ARCH

WIP Nov 2014

CU

L

WIP

Nov 2

014

WIP Jan 2

015

W

´

F

PO

Nullah

4.2

2.6

4.5

4.6

4.6

4.1

4.5

5.0

2.4

2.7

4.2

4.1

4.9

4.0

4.2

2.6

4.1

4.4

4.2

4.4

4.3

4.3

4.1

4.1

4.1

4.2

4.2

4.4

4.3

4.2

4.5

4.2

4.0

4.0

4.2

4.6

4.0

4.0

3.9

4.2

4.5

4.3

4.2

4.1

4.5

4.0

4.8

4.4

4.4

4.0

4.6

4.3

4.6

4.6

4.2

4.7

4.3

4.0

4.7

4.6

4.1

4.1

LH

LL

L

HL

LL

LL

H

LL

LL

LL

EL

L

LL

E

LL

LL

LH

L

LL

LL

L

LL

L

EL

LL

L

LL

L

LL

L

LL

LL

LL

L

LH

L

LL

LL

LL

L

LL

L

LL

LL

LL

LL

L

LH

LL

LL

L

E

HL

LH

LL

LL

L

L

LL

LL

L

L

LL

LL

LL

LL

HL

LL

H

L

LL

LH

LL

LH

L

L

L

LL

L

L

H

LL

LL

LL

LH

LL

LL

LL

LL

LL

LL

LL

LE

LL

HL

LH

HL

HL

L

LL

L

LL

LL

EL

LH

L

L

L

L

LL

L

LL

¶ý

¾

«Ì

½

«Ì·

«T½

ºÖ¥

ºÖ

¼

«T

½«

Ä_

¼

«Ì©

«Ì«

«T½

«O½

¤¸

®Ô¦

ºÖ²

¶ý

¼

¦w«

¦w«

¹Ø´

Ä_

¾

¦w¹

¾ô¼

ºÖ

¼

¾ô¼

¦w

«

À»Ä

¹Ø´

PIN

G

FAI P

AT

H

PING WUI STREET

FU

K

LO

K P

AT

H

PING CHEONG PATH

PING SHUN STREET

CH

UN

YIN

SQ

UA

RE

CH

UN

YIN

SQ

UA

RE

FUK TIN PATH

PO

LO

K

SQ

UA

RE

PO FAI PATH

CHUN YIN SQUARE

FU

K S

HIN

G

PA

TH

YU

EN

LO

NG

ON

NIN

G

RO

AD

MA

MIU

RO

AD

PO

SH

U

LA

NE

KIU LOK SQUARE

ON SHUN STREET

ON

TA

T

SQ

UA

RE

SAU FU STREET

KIU LOKS

Q

UA

RE

ON SHUN STREET

HI LEE PATH

KIK YEUNG ROAD

ON

SH

UN

ST

RE

ET

SA

UF

U

ON TAT SQUARE

±×

ªd

±×

¹D

±×

FB

EW

Ra

mp

Road

Ra

mp

Track

Ra

mp

Ra

mp

FB

EW

FB

CW

EW

¥­

¥x¡]

¤U

¼h

Podiu

m(Tai Kiu

Market under)

TS

TS

TS

TS

TS

VO

R

RR

R

R

RR

RR

TS

RR

R

RR

Te

mple

RR

R

R

R

TS

TS

TS

TS

TS

¢Ô

¢Ó

¢Ò

¢Ñ

¢Õ

¢Ö

¢×

¢Ø

¢Ù

¢Ñ

¢Ð

¢Ï

Blo

ck F

Blo

ck

E

Blo

ck

D

Blo

ck

C

Blo

ck

G

Blo

ck

H

Blo

ckI

Blo

ckJ

Blo

ck

K

Block

CBlock

B

Block

A

150

A15

6

150

B

25

C

25

B

525

A

150

C

154

4-4

A

151A

23B

23A

326

153

72

6A

151

813

22

114

921B

22

A

12

18A

1020

1821

1128

1529

1783

82

36-37

1935

1621A

43

29

A

132

30

34

136

60

44

42

A31

83

B42

38

45

47

41A4

1

228

32

83

E46

59

48

39

63

81B

47

A

58

49

66

A

70-69

62

66

247

80

67-68

76

65

61

71

75

64

81

72

57

74

251

79

73

67

A

54

78

252

55

78

B57

A56

50

78

A

51

56

A

53

56B

78

C

259

52

258

84

84

A

130

116

87

D

87

256

87

A

263

50

E

85

88

106

50

A10

910

7

86

110

129

128

87

B

113

127

125

126

87

C

112

124

89

123

115

114

201

200

202

120

203

205

51B

51A

51

40

10

20

110

60

80

100

6

40

48

10

100

120

80

60

40

100

¤j

¤

°±¨

´º¦

Ȭ

Àg

ÅS

¤Ñ

ÅS

¤Ñ

TAI T

SE

NG

WAI

Car Park

CA

RO

LE

GA

RD

EN

Lux

Court

KAI S

HA

NO

pen Storage

Open Storage

¹Ó

¹Ó

°©´

WIP

Apr

2014

Graves

Graves

Burial U

rns

SH

R

´

Nullah

4.2

4.0

4.6

3.7

4.9

3.4

4.4

3.8

3.6

3.7

3.8

3.6

4.0

2.8

3.2

3.6

3.5

3.5

3.7

3.6

4.6

4.2

3.6

3.4

4.3

4.2

3.5

3.6

3.1

3.9

3.7

4.5

3.0

3.7

3.5

3.8

4.1

4.9

4.9

16.1

109.6

5.6

110.3

6.2

5.8

5.2

113.5

19.7

39.1

5.8

97.0

111.3

50.0

24.9

50.1

47.9

111.0

52.0

87.3

6.5

6.0

63.2

17.0

85.8

120.7

6.1

6.7

16.7

30.5

29.8

22.0

25.0

14.9

18.0

5.9

L

L

H

E

L

L

L

L

L

L

H

L

LE

E

L

L

E

ET

L

L

L

E

E

E

E

ET

ET

EE

ET

¹D

¹D

ªd

ªd

Road

Road

Road

FP

FP

FP

FB

FB

FP

FP

FP

FP

Track

FP

FP

FP

FP

FP

FP

Track

Track

FP

FP

FP

FP

TS

TS

TS

TS

TS

TS

³ì¶øµ

ؤu·

ºÖ¶¶µó

­»´ä¥Í¤

O°à°

¨È

¬üºÏ

±a

ªF¹q¤

ƹq¤

¡]­»´ä¡^

¤¸

¤u·

¿ì¨

«H

©÷

¾÷

¾¹¤u

Áp¨¹

¶×¬u°ê»Ú¹ê

¤¤°ê

ÀË

Å禳­­

¤½

¥q

·~¸

󨋻

÷¤

¦³

¥Í¡]

¼Q¨

м

Blk 17

Blk 24

Blk 16

Blk 23

Blk 22

Blk 15

Blk 19

Blk6

Blk 2

1

Blk5

Blk

7Blk

8

Blk 18

Blk

9Blk

10

Blk4

Blk 2

0

Blk3

Blk2

Blk11

Blk12

Blk13

Blk1

Blk14

KY

OW

A Industria

l Co., L

td.

Fuk Shun Stre

et S

ubstatio

n

AC

ME

AG

EN

T

TD

K

Manufacturin

g (H

ong

Kong) C

o., L

td.

The

China Engineerers, Limited

United Laboratories

Telford International Industries Limited

Chin

a Inspectio

n

Co

mpany

Limited

Yip Shin

g

Diesel E

ngineerin

g

Co. Ltd.

Fashio

n Tress (A

meric

a) Engineerin

g

Co. Ltd.

213

209

208

233

232

22

221

220

222

91-

93

219

117

92

A

217

8

92B

216

215

248

213

24

9

250

92

253

91B

91A

591

90

255

90

A95

96

101

87-89

97

103

98

99

100

104

84

105

80-82

72-78

83

10

32

67-73

8

6

1

63

62

61

59

1-3

4

4

20

20

40

44

­»´ä

¥Ûª

Æ

ÄR¦

w

¦³¥Í¹]¤ô¡]

¼ö

®

­»´ä

¥Í

¤O°à°

°±¨

¥Yª

©¸ê°

T¡]­»

¤Ú¤h

°±¨

¥Yª

©¦

L¨ê¡]­

»

¤j©÷¦æ­¹«~¥[

¤Ú¤h

¤¸

®Ô

¤

Hong

Kong Petroche

mic

al C

o., L

td

Leon

Court

Yau Sang

Galvanizers (H

ot - Dip) C

o., L

td.

San

Mig

uel B

re

wery

Hong

Kong

Ltd.

Car Park

TO

PP

AN Forms (H

K) L

TD.

Bus Termin

us

Car Park

Toppan Printin

g

Co.,(

H.K.)

Ltd

DCH Food Processing & Logistics Center

Bus

Depot

YU

EN

LO

NG IN

DU

ST

RIA

L

ES

TA

TE

¬

¬

Âo

¤

¬¬

¬

Pipelines

Filt

er Bed

Tank

CU

L

Tank

Tank

ET

´

´

´

±Æ

¤

´

´

±Æ

¤

Nulla

h

Nulla

h

Nullah

Nullah

Nullah

5.3

4.7

4.6

3.9

3.9

4.8

4.0

4.6

5.0

4.9

4.5

4.7

4.5

4.1

4.1

4.6

4.2

4.2

4.7

5.1

4.5

4.4

4.2

5.5

5.0

4.2

4.4

4.5

4.3

4.9

4.8

3.9

4.5

4.4

4.4

4.2

4.3

5.3

4.6

4.5

4.5

5.0

4.8

4.2

4.7

4.3

4.5

4.2

4.4

3.4

4.3

4.6

5.5

4.7

4.8

4.0

4.7

3.9

3.4

4.6

4.7

4.8

4.2

4.3

6.2

4.8

4.3

3.9

4.5

4.2

4.3

4.8

4.5

4.3

4.7

4.8

4.4

4.3

4.3

4.1

4.8

5.1

4.5

5.0

4.4

4.5

4.2

4.9

4.9

4.5

5.2

4.2

4.9

4.8

4.7

4.6

4.2

4.0

4.2

5.3

5.0

4.8

4.4

4.4

4.5

4.4

4.7

4.4

4.3

4.7

4.1

4.2

4.1

4.3

4.2

4.3

4.2

4.5

4.3

4.3

4.5

4.7

4.4

4.6

4.2

4.5

4.7

4.7

4.7

5.1

4.2

4.4

4.7

4.8

4.0

3.4

4.6

4.6

39.2

4.3

4.0

4.6

4.5

5.5

4.4

4.4

4.9

4.5

5.0

4.9

4.8

4.3

5.3

45.7

4.5

3.9

4.3

4.3

4.3

4.5

5.3

44.5

3.4

4.5

4.6

4.3

4.9

4.5

5.6

4.4

4.5

H

H

LL

L

L

L

L

L

L

L

L

H

LL

L

LE

HL

L

HE

TL

L

L

L

L

L

LL

LL

H

L

L

LL

LL

LL

L

L

ET

LL

H

H

L

LL

L

L

H

L

L

LL

L

LH

LL

LH

LL

LH

LL

HL

L

LL

LL

L

LL

L

LL

HL

LL

L

LL

LL

LL

L

L

H

L

L

LH

L

L

L

L

L

LH

L

L

L

L

H

L

L

L

L

L

H

L

LL

H

L

L

ET

L

ET

L

L

L

E

L

L

ºÖ¶

§»§

ºÖ³

ºÖª

ºÖ³

ºÖ§

ºÖ«

FU

K S

HU

N STREET

WAN

G LE

E STREET

FU

K

HI S

TREET

FUK YAN STREET

FU

K

WA

NG

ST

RE

ET

FUK HI STREET

FU

K

HA

NG

ST

RE

ET

¹D

±×

¹D

ªd

¹D

¹D

³æ¨

³æ¨

±×

³æ¨

Road

Ra

mp

Road

Track

Track

Road

Road

EW

EW

EW

Cycling T

rack

Ra

mp

Cyclin

g Track

FP

FP

Ramp

FP

FP

Cycling Track

Manage

ment

Office

TS

¤T

¤Q

¤¤

ܤ

¢²

¢¤

Q

¢Ï

¤­

¤»

¤C

¤K

Blo

ck 3

A

Blo

ck22

Blo

ck13

A

Blo

ck 5

Blo

ck 6

Blo

ck 7

Blo

ck 8

159

157

150

158

WIP

Jan 2

015

9.0

5.2

5.7

ET

Block A

Block B

Block B

Block A

Block C

210

211

215

212

½ì

©É

ÅS

¤Ñ

ÅS

¤Ñ

ÄR¦

w

Open Storage

Open Storage

Leon

House

WIP

Sep 2

014

Tanks

5.0

4.9

4.4

5.2

4.6

3.9

4.7

5.2

5.1

4.8

4.0

4.8

L

L

L

N

朗屏

路L

ON

G PI

NG R

OA

D

鳳池

FUNG CHI

ROAD

福喜

連接至現有食水管

福喜街

FRESH WATER MAIN

CONNECT TO EXISTING

橫洲

FUK HI STREET

FUK HI STREET

朗屏邨

連接至現有箱形暗渠

連接至現有箱形暗渠

改善工程

擬議交界處

污水泵站

連接至朗屏

擬議上落客區

朗屏

連接至現有溪流

CONNECT TO EXISTING STREAMCOURSE

PROPOSED PICK UP/DROP OFF AREA

IMPROVEMENT WORKS

PROPOSED JUNCTION

AND ASSOCIATED LIFTS

PROPOSED FOOTBRIDGE

BOX CULVERT

CONNECT TO EXISTING

BOX CULVERT

CONNECT TO EXISTINGSEWAGE PUMPING STATION

CONNECT TO LONG PING

及相關升降機

擬議行人天橋

LO

NG PI

NG ST

ATI

ON

LONG PING ESTATE

WANG CHAU

121

52

19

31

76

53

31

28

50

100

40

121

52

19

31

76

53

31

28

50

100

40¤¸

®Ô

Park

Yuen

Long

ªa

Sw

P

¤¸

®Ô

Theatre

Yuen

Long

°t

¤Ser

Res

®Ô

«

Estate

Long Pin

g

°¨

¥

®¶

¿³

San T

suen

Chun H

ing

¯F

¤fº

®

»ñ¦

®Ô´

Del S

ol

Grand

§|

À

Tsuen

Hang T

au

«n

Ã

«Ì

PIN

G

SH

AN

¦è

Ã

·s

°San H

ei T

suen

¤ô

Ã

Tsuen

Shui P

in

¤ô

¥

¤jº

Leng

Tai K

ei

¤j

¤

Wai

Tai T

seng

¤Ñ·

Estate

Tin T

sz

ªF

ÀTung T

au W

ai

¥Ã¹

Tsuen

Win

g N

ing

·¨

«Î

San T

suen

Yeung U

k

­^

À

¤¸

¤

¨ª

Tsuen

Shui T

in

Yu M

an S

an T

suen

Chung H

au

Ȗ

®

Court

Fung Tin

g

ªF

À

Tsuen

Tung T

au

¥Õª

Tsuen

Pak F

a

Tsuen

Fung C

hi

Tsuen

Ma Tin

Wai

Sai P

in

¤¸

®Ô

KA

U

HUI

YU

EN

LO

NG

¤ô

Ãä

Estate

Shui P

in W

ai

ªö¸

The P

arcville

ºÖ

¼

¶¾

®Fung K

a W

ai

½¼

§À

San T

suen

Ha M

ei

¤U

§ñ

Tsuen

Ha Y

au Tin

Às

¥ ¦è

ÀSai T

au W

ai

¤s¨

©¯

Chung H

au T

suen

Shan P

ui

Wai

Sheung C

heung

¤W

§ñ

Tsuen

Sheung Y

au Tin

²±

«

Tsuen

Shin

g U

k

¤ô

Ã

Wai

Shui P

in

¤j

Tai K

iu

ªF

ÀY³

San T

suen

Tung T

au W

ai

Tin T

suen

Shan P

ui H

ung

¤s¨

©¬

©¾

¤C

hung S

am W

ai

·¨

«

ªL

«

Tsuen

La

m U

k

Tsuen

Fuk H

ing

Midto

wn

YO

HO

ªF

À

Yuen

Tung T

au

®Ô

Ãä

¤¤

Interim H

ousin

gLong Bin

Sun C

huen

Kwan L

ok

Wai

Na

m Pin

Tsuen

Yeung U

k

Yin

g L

ung W

ai

·s

¤¸

®

Centr

eSun Y

uen L

ong

¶v

¼Ö

Kensw

ood C

ourt

LIG

HT

RAIL

¤¸

Yue

n

Lo

ng

TIN TSZ ROAD¤Ñ·«Ì·

62

62

­»´

äÀ

ãH

on

g

Ko

ng

Wetla

nd

Par

k

§d

«

Ng U

k T

suen

¦Ã

¤ô³

Works

Treat

ment

Se

wage

KA

M

TIN

RIV

ER

SHAN PUI RIVER

朗屏

路L

ON

GPING

ROAD

路天

DAOR NIT GNOL

朗屏LONG PING

橫洲WANG CHAU

東頭工業區

INDUSTRIAL AREA

TUNG TAU

N

Enclosure 1 附

元朗橫洲公營房屋發展之工地平整及基礎設施工程

PUBLIC HOUSING DEVELOPMENT AT WANG CHAU, YUEN LONGSITE FORMATION AND INFRASTRUCTURE WORKS FOR

PWP ITEM NO. 780CL

780CL工務計劃項目編號

工地平面圖

SITE PLAN

METRES

0 250 500 750 1000 1250

LOCATION PLAN

位置圖

METRES

0 50 100 150 200 250

擬議排水管

擬議排污管

PROPOSED BOX CULVERT

PROPOSED STORMWATER DRAINAGE PIPE

圖例 LEGEND

擬議箱形暗渠

擴闊現有箱形暗渠

WIDENING OF EXISTING BOX CULVERT

擬議重鋪路面

PROPOSED RESURFACING WORKS

SITE FORMATION WORKS

WANG CHAU DEVELOPMENT PHASE 1

之工地平整工程

橫洲發展計劃第一期

擬議行車道及行人路 PROPOSED SEWER PIPE

擬議沖廁水管

PROPOSED FRESH WATER MAIN

PROPOSED FLUSHING WATER MAIN

擬議食水管WITH FOOTPATHS

PROPOSED CARRIAGEWAY

擬議護土構築物

PROPOSED RETAINING STRUCTURES

擬議地下通道

PROPOSED UNDERPASS

擬議路緣線

PROPOSED KERB LINE

1

Page 12: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure 2

780CL – Site formation and infrastructure works

for public housing development at Wang Chau, Yuen Long

Breakdown of the estimates for consultants’ fees and resident site staff costs

(in September 2018 prices)

Estimated

man-

months

Average

MPS*

salary

point

Multiplier (Note 1)

Estimated

fee

($ million)

(a) Consultants’ fees for

contract

administration (Note 2)

Professional

Technical

--

--

--

--

--

--

3.8

0.6

Sub-total

4.4#

(b) Resident site staff

(RSS) costs (Note 3)

Professional

Technical

656

2 029

38

14

1.6

1.6

86.0

93.3

Comprising –

Sub-total 179.3

(i) Consultants’ fees

for management

of RSS

6.6#

(ii) Remuneration of

RSS

172.7#

Total 183.7

* MPS = Master Pay Scale

Notes

1. A multiplier of 1.6 is applied to the average MPS salary point to estimate the cost of

RSS supplied by the consultants. (As at now, MPS point 38 = $81,975 per month and

MPS point 14 = $28,725 per month).

2. The consultants’ staff cost for the contract administration is calculated in accordance

with the existing consultancy agreement for the design and construction of 780CL. The

construction phase of the assignment will only be executed subject to Finance

Committee’s approval to upgrade 780CL to Category A.

3. We will only know the actual man-months and actual costs after completion of the

construction works.

Page 13: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure 2 Page 2

Remarks

The figures in this Enclosure are shown in constant prices to correlate with the MPS salary

point of the same year. The figures marked with # are shown in money-of-the-day prices in

paragraph 6 of the main paper.

Page 14: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure 3

780CL – Site formation and infrastructure works for public housing development at Wang Chau, Yuen Long

Breakdown of land acquisition cost $ million

(I) Estimated cost for land acquisition (resumption of

private land) 258.40

(II) Estimated cost for land clearance 47.54 (a) Ex-gratia allowances (EGAs) for domestic occupiers

(e.g. EGA for permitted occupiers of licensed structures and surveyed squatters affected by clearance and domestic removal allowance, etc.)

33.50

(b) Other ex-gratia allowances (e.g. crop compensation,

disturbance allowance for cultivators, EGA for miscellaneous permanent improvements to farms, EGA for shops, workshops, godowns, slipways, schools, churches and ornamental fish breeding undertakings, EGA for open-air/ outdoor business undertakings, EGA for clearance of graves, urns (“Kam Taps”) and shrines and EGA for “Tun Fu” ceremonial fees, etc.)

14.04

(III) Interest and Contingency Payment 5.20 Total 311.14

(say $311.10)

Note

The above estimated land acquisition cost is based on the prevailing rates as at April 2017.

Page 15: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure 4

780CL - Site formation and infrastructure works for public housing development at Wang Chau, Yuen Long Summary of “important tree” affected

Tree ref.

no. (1)

Species Measurements Amenity

Value (3) Form

Health

condition

Structural

conditionSuitability for Transplanting (4)

Conservation

Status (5)

Recommendation Department to

Provide Expert

Advice to

LandsD

Additional Remarks

Scientific Name Chinese NameHeight

(m)

DBH (2)

(mm)

Crown

Spread

(m)

(Good / Fair / Poor)

(High /

Medium /

Low)

Remarks

(Retain/transplant/fell)

T1118 Dimocarpus

longan

龍眼 9 1250 8 Fair Poor Fair Poor Low The tree trunk is restricted

by existing structures and

is leaning.

The tree has poor form and

structural conditions.

Due to the large size of the

tree, heavy pruning would

be required to facilitate

transplant which would

lead to permanent damage

to the form, health and

structure of the tree.

As the tree is mature, its

transplant survival rate

would be low. Therefore,

the tree is not considered

suitable for transplanting.

No Fell Agriculture,

Fisheries and

Conservation

Department

It is not practical to retain the tree as it

is located at the middle of the

proposed housing site, and there is a

large ground level difference of 2.3 m

between the current level

(+14.7 mPD) and the proposed level

(+17.0 mPD).

Page 16: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure 4 Page 2

Tree ref.

no. (1)

Species Measurements Amenity

Value (3) Form

Health

condition

Structural

conditionSuitability for Transplanting (4)

Conservation

Status (5)

Recommendation Department to

Provide Expert

Advice to

LandsD

Additional Remarks

Scientific Name Chinese NameHeight

(m)

DBH (2)

(mm)

Crown

Spread

(m)

(Good / Fair / Poor)

(High /

Medium /

Low)

Remarks

(Retain/transplant/fell)

T1125 Celtis sinensis 朴樹 11 1350 8 Fair Poor Fair Poor Low The tree is leaning and has

cracks on the trunk. The

tree has poor form and

structural conditions.

Due to the large size of the

tree, heavy pruning would

be required to facilitate

transplant which would

lead to permanent damage

to the form, health and

structure of the tree.

As the tree is mature, its

transplant survival rate

would be low. Therefore,

the tree is not considered

suitable for transplanting.

No Fell Agriculture,

Fisheries and

Conservation

Department

It is not practical to retain the tree as it

is located at the middle of the proposed

housing site, and there is a large ground

level difference of 2.0 m between the

current level (+16.0 mPD) and the

proposed level (+14.0 mPD).

T1303 Aquilaria

sinensis

土沉香 4 130 2 Fair Poor Poor Poor Low The tree is leaning. It has

co-dominant stems (a

structural defect), and is

heavily covered by vines.

The tree has poor form,

health and structural

conditions. Therefore, the

tree is not considered

suitable for transplanting.

Precious

and rare

species

Fell Agriculture,

Fisheries and

Conservation

Department

It is not practical to retain the tree as it

is located at the middle of the proposed

carriageway, and there is a large ground

level difference of 4.1 m between the

current level (+18.1 mPD) and the

proposed level (+14.0 mPD).

_______________

(1) The three trees are not in the Register of Old and Valuable Trees.

Page 17: ITEM FOR FINANCE COMMITTEE - LegCo · 3. The relevant paper considered by the PWSC (i.e. PWSC(2018-19)40), with updates shaded in grey, is at Enclosure. As stated in the paper, the

Enclosure 4 Page 3

(2) Diameter at Breast Height (DBH) of a tree refers to its trunk diameter at breast height (i.e. measured at 1.3 metres above ground level).

(3) Amenity value of the tree is assessed by its functional values for shade, shelter, screening, reduction of pollution and noise and also its fung shui significance, and classified into the following categories.

Good: important trees which should be retained by adjusting the design layout accordingly. Fair: trees that are desirable to be retained in order to create a pleasant environment, which includes healthy specimens of lesser importance than “Good” trees. Poor: trees that are dead, dying or potentially hazardous and should be removed. (4) Assessment has taken into account conditions of the tree at the time of survey (including health, structure, age and root conditions), site conditions (including topography and accessibility), and

intrinsic characters of tree species (survival rate after transplanting).

(5) Conservation status is based on the rarity and protection status of the species under relevant ordinances in Hong Kong, such as Rare and Precious Plants of Hong Kong, the International Union for Conservation of Nature Red List of Threatened Species and the Forests and Countryside Ordinance. Tree no. T1303 is Aquilaria sinensis, a precious or rare species. The species is protected under the Protection of Endangered Species of Animals and Plants Ordinance (Cap 586).


Recommended