Page ITER Magnet Systems from Qualification to Full Scale Construction H. Nakajima 1 , T. Hemmi 1 , M. Iguchi 1 , T. Nabara 1 , K. Matsui 1 , Y. Chida 1 , H. Kajitani 1 , K. Takano 1 , T. Isono 1 , N. Koizumi 1 , Y. Nunoya 1 , K. Hamada 1 , K. Okuno 1 , A. Foussat 2 , R. Gallix 2 , A. Devred 2 , P. Libeyre 2 , N. Mitchell 2 , A Bonito Oliva 3 , B. Bellesia 3 , E. Boter 3 , M. Cornelis 3 , J. Cornella 3 , R. Harrison 3 , L. Poncet 3 , T. Boutboul 3 , H. Rajainmaki 3 , P. Valente 3 , C. Sborchia 3 , M. Losasso 3 , I Rodin 4 , V. S. Vysotsky 5 , K. Chan 6 , N. Martovetsky 6 , S. H. Park 7 , H. Li 8 , Y. Wu 9 , J. Wei 9 1 Japan Atomic Energy Agency (JAEA), Japan Domestic Agency (JA), Naka, Japan 2 ITER Organization (IO), Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance, France 3 Fusion for Energy (F4E), European Domestic Agency (EU), Barcelona, Spain 4 Efremov Scientific Research Institute, Russian Federation Domestic Agency (RF), St.-Petersburg, Russia 5 Russian Scientific R&D Cable Institute (VNIIKP), Moscow, Russia 6 US ITER Project Office (USIPO), United States Domestic Agency (US), Oak Ridge, USA 7 National Fusion Research Institute, Korean Domestic Agency (KO), Daejeon, Korea 8 China Domestic Agency (CN), Beijing, China 9 Institute for Plasma Physics, Chinese Academy Science (ASIPP), Hefei, China 24 th IAEA FUSION ENERGY CONFERENCE 8-13 October 2012 San Diego, USA ITR/2-4 1
Transcript
Page 1: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

ITER Magnet Systems –

from Qualification to Full Scale Construction

H. Nakajima1, T. Hemmi1, M. Iguchi1, T. Nabara1, K. Matsui1, Y. Chida1, H. Kajitani1, K. Takano1,

T. Isono1, N. Koizumi1, Y. Nunoya1, K. Hamada1, K. Okuno1, A. Foussat2, R. Gallix2, A. Devred 2,

P. Libeyre 2, N. Mitchell 2, A Bonito Oliva 3, B. Bellesia 3, E. Boter 3, M. Cornelis 3, J. Cornella 3, R. Harrison 3, L. Poncet 3, T. Boutboul 3, H. Rajainmaki 3, P. Valente 3, C. Sborchia 3, M. Losasso3, I Rodin4, V. S. Vysotsky5, K. Chan6, N. Martovetsky 6, S. H. Park7, H. Li8, Y. Wu9, J. Wei9

1 Japan Atomic Energy Agency (JAEA), Japan Domestic Agency (JA), Naka, Japan 2 ITER Organization (IO), Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance, France 3 Fusion for Energy (F4E), European Domestic Agency (EU), Barcelona, Spain 4 Efremov Scientific Research Institute, Russian Federation Domestic Agency (RF), St.-Petersburg, Russia 5 Russian Scientific R&D Cable Institute (VNIIKP), Moscow, Russia 6 US ITER Project Office (USIPO), United States Domestic Agency (US), Oak Ridge, USA 7 National Fusion Research Institute, Korean Domestic Agency (KO), Daejeon, Korea 8 China Domestic Agency (CN), Beijing, China 9 Institute for Plasma Physics, Chinese Academy Science (ASIPP), Hefei, China

24th IAEA FUSION ENERGY CONFERENCE

8-13 October 2012

San Diego, USA

ITR/2-4

1

Page 2: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

ITER magnet system

• 18 Toroidal Field (TF) Coils

• 1 Central Solenoid (CS, 6-module)

• 6 Poloidal Field (PF) Coils

• 9 pairs of Correction Coils (CCs)

• 31 Feeders and Magnet Structures

ITR/2-4

2

Page 3: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

US

RF

JA

CN

KO

EU

33 Conductors

27 Conductors

11 Conductors

27 Conductors

26 Conductors

9 Conductors

9 WP 19 TFCS

10 WP

9 TFC

10 TFC

Procurement sharing in TF coil

33

27

3

8

26

9

27

10

① 9 TFC including facility

(TFC = RPs + WPs + TFCS

+Assembly of WP into TFCS)

② 10 TFCS

① 10 WPs including facility

② 10 RPs including facility

③ 10 Assembly including facility

Sub-Assembly

RP: Radial Plate, WP: Winding Pack

TFCS: TF Coil Structure, TFC: TF Coil

Radial plate

AU

BU AP

BP

ITR/2-4

3

Page 4: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Supplying DA CN EU JA KO RF US Total

Amount of TF strands (tons) 28.0 95.3 108.0 93.0 97.0 44.7 437.5

Completion as of 2012.9 0.6 71.8 100.5 69.4 64.8 40.5 347.6

Number of TF Cables 11 27 33 27 26 9 133

Completion as of 2012.9 0 2 27 13 7 0 49

Number of TF Conductors 11 27 33 27 26 9 133

Completion as of 2012.9 0 2 26 9 6 0 43

Manufacturing status of TF conductors

(Courtesy of IO, CNDA, F4E, RFDA, USDA)

ITR/2-4

4

Page 5: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Transportation of 760-m Dummy Conductor

(Courtesy of CNDA)

(Courtesy of F4E)

CNDA JADA in March, 2012

KODA JADA in July, 2012

EUDA EUDA in July, 2012

ITR/2-4

5

Page 6: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Qualification of radial plate in EU and JA

F4E JAEA

Type of radial

plates

Side

Regular

Regular

Material Forged plates HIP Plates Hot rolled plate

No. of sections 7 16 10

Welding Electron beam Narrow gap TIG Laser (Cross

shaped section)

Final Machining Local machining of

welded region Full region

No (Local grinding

of welded region)

(Courtesy of F4E)

(Courtesy of F4E)

flatness of 1 mm

ITR/2-4

6

Page 7: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Pre-qualification of TFC WP with 1/3 DP prototype (JA)

7.0m

4.5m

Winding

Completion of winding

Turn insulation

Transfer of conductor

Impregnation and cure

DP insulation

Completed 1/3 DP

• Trial winding, heat treatment, and impregnation of 1/3

Double pancake (DP) have been carried out.

• Feasibly of automatic winding technique with high

accuracy, deformation control after heat treatment,

and impregnation using CE resign have been

demonstrated.

ITR/2-4

7

Page 8: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Vacuum Chamber

TF coil DP winding line

Heat treatments furnace

Qualification of tooling for TFC WP in EU

New building for WPs

(Courtesy of F4E)

• The commissioning tests of the winding

line have been successfully completed

in July 2012.

• The full size manufacture of one turn

winding with EU 100-m Nb3Sn

conductors have been started.

• The qualification with full size DP

winding will be completed by the

beginning of 2013.

ITR/2-4

8

Page 9: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Optimization and industrialization of TFCS manufacture

200

400

600

800

1000

1200

1400

1600

1800

0 50 100 150 200 250 300

Yie

ld s

tren

gth

[M

Pa

]

Ult

ima

te e

nsi

le s

tren

gth

[M

Pa

]

Temperature [K]

ITER

Requirement

ITR/2-4

9

• Trial manufactures of two different

types of structures have been

completed in Phase II.

• Technical data and manufacturing

knowledge to finalize the

manufacturing plan has been

established.

• Material qualification has been

completed to use QC at room

temperature.

Page 10: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Status of manufacture of CS conductor and winding

JK2LB jacket

• JA manufactured a 200-m dummy CS conductor to confirm a design and

performance of jacketing line for the CS conductors. JA has been manufacturing

several types of conductors for manufacturing trials to be performed in US.

• JA has awarded a contract on CS conductors for the first module in August 2012.

ITR/2-4

10

Page 11: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Status of qualification of CS manufacture

• Bending trials to demonstrate manufacturability of radial and axial

transitions have been completed.

• The VPI process has been established and valuable inputs to actual

fabrication have been obtained.

• Two types joints, interpancake and bus joints, which satisfy ITER

requirement have been developed.

Impregnation trial

Cross-section after dissection

14x40 VPI

mockup

Interpancake joints

Sintered joint 6x6 Butt joint

6-finger

ITR/2-4

Axial transitions

(vertical joggles)

11

(Courtesy of USDA)

Page 12: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

ITER PF Conductor Status

• RF/F4E and CN have completed 65 t of strands 1 & 2 (25% of supply).

• CN has completed PF tube and PF welding qualification and has

manufactured 800 m PF5 Cu dummy.

NbTi Str

and

Regis

tration

NbTi Str

and

Dis

trib

ution

PF5 Cu Dummy Cable at Changton Com

pact

ion &

Spoolin

g o

f PF5 C

u

Dum

my a

t ASIP

P

(Courtesy of A. Devred, IO)

ITR/2-4

12

Page 13: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Status of manufacture of PF1 coil

(Courtesy of RFDA)

Conductor turn insulation trial

• The winding/insulation facility of the PF1 double pancakes is

practically assembled and put into operation.

• Pre-qualification of the winding/insulation facility is completed and

ready for the qualification with PF1 dummy conductor lengths, which

will be delivered from EU.

• The VPI equipment of the PF1 double pancakes has already been

manufactured.

Winding equipment

ITR/2-4

13

Page 14: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Building for PF2 - PF6 coil winding

A building for the manufacture of the EU PF coils (PF2 – PF6) has

been constructed at the ITER site in February 2012.

45mW x 252 mL (Courtesy of IO)

ITR/2-4

14

Page 15: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

ITER CC Conductor Status

• CN has completed 920 m CC Cu dummy, which was delivered to CC coil

manufacturing facility in May 2012.

Pressure Drop Test

At ASIPP

Truck Leaving ASIPP Storage at CC coil

Manufacturing Facility

• CN has also completed 200 m

CC Phase II sc UL.

• Phase II SULTAN sample

(CCCN3) to be tested in October

2012. CC sc Cable

at ASIPP Spooled CC Phase II

Conductor at ASIPP (Courtesy of A. Devred, IO)

ITR/2-4

15

Page 16: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Status of manufacture of correction coil

(Courtesy of CNDA and IO)

• Procurement of the manufacturing equipment is near completion and

qualification of manufacturing processes has already started.

• The winding equipment has been installed and is now under commissioning

with a 920-m CC dummy conductor.

• Prototype segments of the coil case have been produced and assembled by

using qualified TIG welding process.

• Procurement of two 4 kW fiber laser machines for the final closure welding

has been performed and qualification trials are underway.

CC winding table with Side

Correction Coils mold

Prototype segment of

coil case for the bottom

Correction Coils

Welding robot with a 4kW

fiber laser welding

equipment

ITR/2-4

16

Page 17: ITER Magnet Systems from Qualification to Full Scale ... Magnet Systems – from Qualification to Full Scale Construction H. Nakajima 1, ... Welding Electron beam Narrow gap TIG Laser

Page

Conclusions

• The qualifications and constructions of ITER superconducting magnets including

components are going well in collaboration between the ITER organization and 6

Domestic Agencies (DA).

• Conductors:

For the TF conductors, the qualification phase is over and full scale construction of

30% conductors has been completed in 6 DAs. For PF and CC conductors, the

qualification phase is almost over and full scale construction will start soon. For CS

conductors, the qualification phase is under way.

• TF Coil:

The manufacture of the TF coil and structure is also ready for full scale construction in

both EU and JA. Final qualification using actual size prototypes are under way at the

EU and JA manufacturers, and full scale constructions will start in 2013.

• Correction Coil:

The procurement of the manufacturing equipment is near completion and the

qualification of the manufacturing processes is going well..

• The qualification processes for other magnets and components are also

progressing towards the main goal of first plasma in 2020.