+ All Categories
Home > Documents > ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972...

ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972...

Date post: 18-Jan-2016
Category:
Upload: arlene-bennett
View: 231 times
Download: 0 times
Share this document with a friend
Popular Tags:
30
ITIHADI INFRA… is formerly known as Hassim Al- Mossawi Establishment for Trading, General Contracting & Support Services. For more information you can visit our web site www.hmcsa.com Hasim Al-Mosawi has started its operation by 1991 to do Manpower Services, General Contracting & Industrial Trading from Saihat office. After the reach market experience of 17 years in Saudi Arabia, The Chairman & Promoter, Mr. Hasim Al- Mossawi has decided to put further professional steps. In 2009 the company name has been changed to ITIHADI INFRA… by enhancing the capital value of the company to SR 5,000,000.000 (SR Five Million) to run the Infrastructure Development Projects Business, Facility management & Industrial Trading & Support Services in Saudi Arabia. ITIHADI INFRA… is aiming to become pioneer in their field within this decade i.e. 2020. G R O W T H A S S O C I A T I O N S WITH ABOUT ITIHADI INFRA…
Transcript
Page 1: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

ITIHADI INFRA… is formerly known as Hassim Al-Mossawi Establishment for Trading, General Contracting & Support Services. For more information you can visit our web site www.hmcsa.com

Hasim Al-Mosawi has started its operation by 1991 to do Manpower Services, General Contracting & Industrial Trading from Saihat office.

After the reach market experience of 17 years in Saudi Arabia, The Chairman & Promoter, Mr. Hasim Al-Mossawi has decided to put further professional steps. In 2009 the company name has been changed to ITIHADI INFRA… by enhancing the capital value of the company to SR 5,000,000.000 (SR Five Million) to run the Infrastructure Development Projects Business, Facility management & Industrial Trading & Support Services in Saudi Arabia. ITIHADI INFRA… is aiming to become pioneer in their field within this decade i.e. 2020.

GROWTH

ASSOCIATIONS

WITH

ABOUT ITIHADI INFRA…

Page 2: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

STRENGTH ITIHADI INFRA…

EASTERN PROVINCE

•17 Years of rigorous experience in Saudi Market & strong clientele data bank as well as Market Relations

•Branch office at Jubail, Khobar & Yanbu

•1600 Work force

•Two no own separate camp facilities for Engineers & Officers as well as Workers at Saihat (Outer Skirt of Dammam)

•Developing our own Fabrication Work shop in 20,000 Sq. Mtr. of land in Saihat.

•Having available block visa to start the project even on urgent basis

NEAR FUTURE PLAN

•Set-up our staff & Camp in Jubail by increasing our work force

•Set-up and shift of our Corporate Office at Business Hub of Saudi Arabia i.e. Al-Khobar

Page 3: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

OUR BUSINESS AREA

ITIHADI

POWER & ENERGY

MINING &

MINRAL

OIL

& GAS

CIVIL & INFRAST.

IT & TELECOM

Page 4: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

OUR BUSINESS PARAMETER

ITIHADIINFRA....

Page 5: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

SAUDI OVERVIEW

GROWTH WITH ASSOCIATION

ITIHADIINFRA....

Page 6: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

POWER SECTOR MARKET

With a population of approx 28.5 million, which is growing at the rate of 2.4% per year, demand for electricity is increasing by approx 6-7%

Saudi Arabia has one of the largest per capita electricity consumption rate in the middle east, even in the world

Saudi Arabia requires $624 billion investment over the next 15 years to cope with the increasing demand, largely due to the booming population.

$46.9 billion of this investment is needed for power generation only.

$4.5 - $6 billion investment is needed annually in Saudi Arabia over the next fifteen years to cope with demand.

GROWTH

ASSOCIATIONS

WITH

GLIMPSES OF SAUDI POWER MARKET

Page 7: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

Saudi Arabia needs to expand its power & network capacity to support the country’s industrialization plan as power demand grows by 7% or more each year –Transmission & Distribution Business Potential

As per the estimate of ministry of electricity & water plus Saudi Arabia's industry estimates that the country will require up to 25gw of additional power generating capacity by 2019 - nearly the same amount as today's 26.6 GW.

Rate of transmission & distribution network is growing average by 6.5 to 7% annually or more.

To offer trouble free services to power customer, maintenance of generation, transmission & distribution network is getting increased by 6 to 7%

GROWTH

ASSOCIATIONS

WITH

GLIMPSES OF SAUDI POWER MARKET

Page 8: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

Saudi Arabia is home of ENERGY to the worlds The strategic role of Saudi Arabia in the energy

market will remain influential by the Year 2020:

the average annual growth rate of oil-GDP is likely to fluctuate around 2.19% in the next fifteen years

demand for crude oil is expected to increase by 47.4% (115 MBD in 2020)

OPEC share is likely to approach 85%of the world production (78%in 2007)

GROWTH

ASSOCIATIONS

WITH

GLIMPSES OF SAUDI ARABIA ENERGY MARKET

Page 9: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

Page 10: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

INFRASTRUCTURE SECTORHousing sector approach 7.81 million units by

2020 (comparing to 3.12 million units in 2000Saudi Government has fixed the plan to invest

333.22 Billion USD for the development of Saudi during 10th & 11th development plan i.e. by 2020. ( Plan in 2008)

Due to world financial melt down and to take advantage of this crunch, KSA revised its plan to invest USD 400 Billion in next five year to save 30 to 40% from investment (MEANAFN – 02.02.2009)

Ministry of Education launched a SR 20 Billion plan to develop 3200 School all around the KSA. 200 School of SR 2 Billion has already signed with Chinese company.

GLIMPSES OF SAUDI INFRA MARKET

GROWTH

ASSOCIATIONS

WITH

Page 11: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

Saudi Arabia is the fastest growing economy in the region. The economy is set to become one of the top ten global investment centres. This determination for growth is fuelling expansion on infrastructure as it tries to keep pace with an ambitious development plan.  Amidst a year of global economic challenges, construction projects in Saudi Arabia have remained relatively untroubled with as little as 1% of projects delayed or put on hold. There are few countries in the world who can boast the scale and scope of some of the landmark projects in the Kingdom, including:•Economic Cities – King Abdullah, Eastern, Talbuk, Rabigh, Hail, Medina, Jizan•Jeddah Gate•Jubail Industrial City Phase Two•King Abdullah University of Science & Technology•Aramco- Sumitomo Chemical Refining Plant•Aramco- Total Export Refinery•Aramco- ConocoPhillips export refinery•SABIC Saudi Kayan Petrochemicals company (Kayan)•Maadens Ras Al Zour Mining Ind’. City•Saudi Land Bridge Project, Aramco Expansion Project,• Sipchem

GLIMPSES OF SAUDI INFRA MARKET

GROWTH

ASSOCIATIONS

WITH

Page 12: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

MINING, MINERAL & ENVIRONMENT SECTORMa'aden signed two milestone agreements for

its mine to metal Aluminium Project, with Alcan and develop the fully integrated Aluminium smelter at Ras Az Zawr with Power Plant.

SABIC & MAADEN jointly formed MA’ADEN PHOSPHATE COMPANY and got financed by IFC to develop, design, construction and subsequent operation of two primary sites - The first, Al Jalamid mine site in the north of the Kingdom, & second, Ras Az Zawr site, approx. 90km north of Jubail with a fertilizer production facility comprising DAP, ammonia, sulphuric acid and phosphoric acid processing plants; with each site supported by appropriate industrial and social infrastructure.

Ten (10) no of Cement Plant of value USD 3.54 Billion is underway to finalize starting from 2009 to 2014.

GLIMPSES OF SAUDI MINERAL & ENVIRONMENT MARKET

GROWTH

ASSOCIATIONS

WITH

Page 13: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

2000

2002

2004

2006

2008

2010

2013

2015

2017

2019

0

20

40

60

80

100

120

140

160

180

200

ACTUAL POP-ULATION GROWTH

ESTIMATED POPULATION GROWTH

ACTUAL POWER GROWTH

ESTIMATED POWER DEMAND

OIL & GAS CONSUMPTION

OIL & GAS DEMAND

POWER DEMAND LINE - GW

POPULATION LINE - MIL-

LION

ANNUAL GROWTH – 6%

ANNUAL GROWTH – 2.4%

OIL & G

AS DEMAND LI

NE – BLB

/MONTH

AN

NU

AL G

ROW

TH R

ATE –

9 –

10%

FORCAST ZONE

ACTUAL ZONE

GROWTH RATE & FORCAST OF INFRASTRUCTURE DEVELOPMENT BUSINESS IN

KSA WITH RESPECT TO POPULATION

Page 14: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

39%

19%

15%

13%

14%

9TH & 10TH DEVEL-OPMENT PLAN

(2010-20)

INFRA

POWER

OIL

PETROCHEM

OTHER

DEVELOPMENT AREA

TOTAL INVESTMENT

(Bn. USD)

TARGET MARKET (Bn. USD)

INFRA333.22 66.644

POWER 162.34 162.34

OIL 128.16 25.63

PETROCHEM 111.07 22.214

OTHER119.62 23.92

TOTAL 854.4 300.74

INVESTMENT PROJECT IN SAUDI ARABIA

Page 15: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

MIDDLE EAST FUTURE POWER MARKET

Gulf Co-operation Council countries in US$217 billion power capacity expansion

Saudi Arabia – US$111 billion

United Arab Emirates – US$55 billion

Qatar – US$14 billion

Oman – US$10 billion

Bahrain – US$10 billion

Demand for electricity in Abu Dhabi alone is expected to grow at an annual rate of 6.7 per cent until 2030. Abu Dhabi Water & Electricity Authority (ADWEA) is working to prevent a forecasted 774MW shortfall in power capacity by 2012.

Page 16: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

BUSINESS AIM

GROWTH WITH ASSOCIATION

ITIHADIINFRA....

Page 17: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

ITIHADI INFRA… MAIN BUSINESS SECTOR

•T & D•SUBSTATION•MEP•RAILWAYS ELECTRIFICATION•OIL FIELD DEVELOPMENT•FIRE FIGHTING & DETECTIONPOWER & ENERGY

• HOUSEING SECTOR• ROAD & BRIDGE• REAL EASTATE & MALL• AIRPORT, RAILWAY STATION & LINE, SEA

PORT• CIVIL & STRUCTURAL – PLANT BUILDING

CIVIL & INFRASTRUCTURE

• OFC NETWORK BUILDING• BTS TOWER INSTALLATION• MCN CONSTRUCTION• PA SYSTEM• SECURITY SYSTEM• HARDWARE & NETWORKING

IT & TELECOM

Page 18: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

ITIHADI INFRA… MAIN BUSINESS SECTOR

• CRUSSING & AGGREGATE• MINING• CEMENT• LIME & LIME STONE• GOLD• SILVER• PHOSPHATE• BAUXITE• PULP & PAPER• CHEMICAL• INDUSTRIAL MINRAL• POWER GENERATION• ENERGY• OTHER BASE METAL

MINARAL & ENVIRONMENT

•HVAC CUNSULTING•PLANT & BUILDING PACKAGE UNITS•AIR VENTILATION & DUCTING•AIR CURTAINS

HVAC

Page 19: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

ITIHADI INFRA…Vision 2020

GROWTH WITH ASSOCIATION

ITIHADIINFRA....

Page 20: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

ITIHADI INFRA BUSINESS OPERATION PLAN

ALL MEA COUNTRIES

IRAN

UAE

QATAR

SAUDI ARABI

A

ITIHADI INFRA BUSINESS DEVELOPMENT AIM

2010 TO 2020 DEVELOP THE OPERATION IN ALMOST ALL

POTENTIAL MIDDLE EAST COUNTRIES

Page 21: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

ITIHADI INFRA ORGANIZATION DEVELOPMENT PLAN

CEO - INFRA

Page 22: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

TARGET PROJECTSIn ksa

ITIHADIINFRA....

Page 23: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

SL NO PROJECT NAME DESCRIPTION UPDATE STATUS

1

Refinery Upgrade Project-7 (Continued)-6

EPC contract ,Upgrading of a 400,000-b/d refinery, as well as the construction of a major petrochemicals complex, including a world-scale ethane cracker. 11-Oct-09 CURRENT PROJECT

2Manifa Oil Field Re-development Project (Continued)-4

EPC contract ,Re-development of the existing offshore Manifa oil field to produce 900,000 b/d of Arabian heavy crude, including construction of a causeway, as well as bridges, culverts and dredging 9-Nov-09 CURRENT PROJECT

3Ethylene Di-Chloride Complex Development Project

EPC contract, Ethylene Di-Chloride (EDC) complex with capacity to produce 245,000 t/y of EDC and 250,000 t/y of caustic soda.

9-Mar-09 CURRENT PROJECT

4

Yanbu Gas Plant Expansion Project (Continued)

LSTK contract ,Expansion of Yanbu gas plant through the installation of a new de-ethanising process system; a new 600 pound steam boiler and modifications to the utility systems to accommodate the new processing equipment, thereby aiming to increase fractionation capacity to 555 million cubic feet a day.

March 5, 09 CURRENT PROJECT

5

Jubail Export Refinery Project (Continued)-3IMMEDIATE TARGET PROJECT OF ITIHADI

EPC contract to build an export refinery at Jubail with nameplate capacity of 400,000 barrels a day (b/d) has awarded in 13 package to different EPC ContractorITIHADI is targetting at least one E&I Projects from Spanish Company

Nov 17,09

Current projectBid for Sub Contract

from main contractor is in process.

6 Saudi Aramco Five Year Plan from 2009 to 2014 to invest 129 Billion USD

7Aramco & DOW Chemical JV is investing USD 70 Billion for National & International refining & Petrochemical

8 Rabigh Complex Projects   9

Integrated refining and petrochemical project at Rabigh (PETRORabigh).

TARGET E&I PROJECT OF ITIHADI INFRA…

10Export refineries on the East and West coasts of Saudi Arabia (Jubail and Yanbu’).

TARGET PROJECT OF ITIHADI INFRA…

11 Integrated refining and petrochemical project at Ras Tanura

Project is getting awarded in Q1, 2010

12Expansion of the Yanbu refinery and potential integration with petrochemicals at a later stage.

AIMING E&I WORKS

GROWTH

ASSOCIATIONS

WITH

TARGET ENERGY PRJECTS - KSA

Page 24: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

SL NO PROJECT NAME DESCRIPTION UPDATE STATUS

POWER PLANT PROJECT 1 GE Energy has been awarded on 16th May

2008, an USD 500 Million from SEC to to provide Generator and Gas turbine for Power Plant Projects at Rabigh, Jizan, Qunfutha, Al-Jouf, and Tabuk.

2 Power Plant Project - Yanbu Industrial City EPC CONTRACT FOR 2 X 250 MW STEAM TURBINE CURRENT PROJECT

3 Yanbu IWPP Project (Continued) BOOT CONTRACT FOR IWPP AT YANBU, CAPACITY 1,700 MW & 33 MILLION GALLON SALINATED WATER/ DAY

9TH MARCH

2009CURRENT PROJECT

4 Jubail IWPP Project - Phase 1 (Continued)-3 BOOT contract for the setting up of a new gas-fired IWPP at Jubail, Capacity of 2,750 MW and 800,000 cubic metres per day of desalinated water.

15TH MARCH

2009CURRENT PROJECT

5PP11 Independent Power Plant Project

BOO contract,gas-fired power plant, capacity 2000 MW. 9-Nov-09 Bidding Stage

6 PP10 Power Generation Plant Project Construction 2,000 MW Gas Power Plant. 8-Mar-09 CURRENT PROJECT

7 Rabigh IPP Project BOO contract, gas-fired IPP at Rabigh, capacity 1,200 MW. 20-Dec-08 CURRENT

PROJECT8 Jizan Economic City Power Development

Project2 x 4000 MW Power Plant 3-Dec-08 CURRENT

PROJECT T & D PROJECTS West Qassim - East Medina Overhead Line

ProjectEPC contract for 417 KM 380-kV D/C OHTL-West Qassim - East Medina substations. 6-Oct-08 CURRENT

PROJECT

GROWTH

ASSOCIATIONS

WITH

TARGET POWER PROJECTS - KSA

Page 25: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

TARGET POWER PROJECTS - KSA

Year ACTIVITIES PROJECTSPOWER

(MW)INSERVICE

DATE

2010 GENERATION Rabigh Steam Power Plant Extension and connection with the main grid (2nd Stage)

630 2013

2010 GENERATION Tenth Power Plant Extension (Steam Section) 990 2013

2010 GENERATION Al-Sheqaiq Steam Power Plant and connection with thw main grid (1st Stage)

1200 2014

2010 GENERATION Tabouk Power Plant Extension 120 2012

2010 GENERATION Al-Wajh Power Plant Extension 30 2012

2010 GENERATION Tabarjal Power Plant Extension 25 2012

2010 GENERATION Deba Power Plant(1st Stage) 500 2014

2010 Interconnection OHTL

Connection of the Eleventh Power Plant in Riyadh 380KV 2012

2010 Interconnection OHTL

Jezan - Najran Interconnection 380 KV 2013

2010 Interconnection OHTL

The Fifth Interconnection Line Between Eastern and Central Regions

380 KV 2012

2010 Interconnection OHTL

Several Projects of Substations and Transmission lines of Voltage levels Extra High & High

110-380 KV 2013

2010 Interconnection OHTL

Several Distribution Projects 110-380 KV 2013

Page 26: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

SL NO PROJECT DESCRIPTION UPDATE STATUS

1 Jizan Economic City Development Project

EPC contract,development of Jizan Economic City (JEC) comprising an industrial zone with a port, an aluminium smelter, steel and copper processing plants, an oil refinery, and fish processing and agricultural factories and a non industrial zone with a business district, residential areas, a marina, educational and hospitality facilities, including (2 Nos.) 4,000-MW power and desalination plants.

3-Dec-08 CURRENT PROJECT

2 Sudair Industrial City Development Project

$40 Billion, Development of 258 Million Sq. Mtr. Sudair Industrial City, which will have specialist zones for commercial, technical, educational, industrial and residential activities. 12-Nov-09 NEW TENDERS

4 Haramain High-Speed Railway Network Project (Continued)-1

Construction of 444-kilometre-long Haramain high-speed electrified railway line between the holy cities of Makkah and Medina equipped with modern signalling and telecommunications systems, including the provision of state-of-the-art train sets.

19-Mar-09 CURRENT PROJECT

5 Railway Network Project

BOT contract, 950 KM rail link and a 115-kilometre connection between ports and industrial cities.

9-Mar-09 CURRENT PROJECT

6

Railway Network Project-1

EPC contract, 2,400 KM railway line to transport minerals for a mining company. 21-Feb-09 CURRENT PROJECT

7 GCC Railway Project (Continued)

Construction of 1,500-kilometre-long railway transportation system to connect the Gulf Co-operation Council (GCC) countries, which will comprise (16) lines totalling 19,000 kilometres.

8-Mar-09 NEW TENDER

8 High-Speed Railway Project - King Abdulaziz International Airport Expansion

Build-operate-transfer (BOT) contract for the development of a 25-kilometre-long high-speed railway transportation system at an international airport.

22-Dec-08 NEW TENDER

9 Animal Feed Factory Construction Project

Construction of animal feed factory for an organisation

31-Mar-09 New Tender

GROWTH

ASSOCIATIONS

WITH

TARGET INFRA PROJECTS - KSA

Page 27: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

SL NO PROJECT DESCRIPTION UPDATE STATUS

1 Phosphate Project at Al Jalamid & their Infrastructure

Proposed expansion Phosphate EPC Project from 12 Mtpy to

CURRENT PROJECT

2 Phosphate Project at Ras Az Zawr & their Infrastructure (Integrated Furtilizer & Chemical Facility

The Ras Az Zawr site comprises a plot of land 90km north of Jubail on the coast of the Arabian gulf. A segment of the site is proposed to be used for the construction of the integrated chemical and fertilizer facility and related infrastructure for the Phosphate Project.

Upcoming Tender

3 Alumina Refinery & Aluminium Smelting Plant & Infrastructure Project at Ras Az Zawr

Aluminium Project it is estimated that approximately 3.5 Mtpy of bauxite will be extracted from the Az Zabirah Deposit to produce approximately 1.4 Mtpy of alumina from the refinery and approximately 0.65 Mtpy of aluminium from the smelter. Investigations into increasing these capacities to approximately 4.0 Mtpy of bauxite, 1.8 Mtpy of alumina and 0.74 Mtpy of aluminium have recently been conducted and the company intends to proceed with the Aluminium Project on this basis.

Feasibility Study over and project is in

planning stage

4 Aluminium Plant at Alz Zabirah

The site for the Az Zabirah bauxite mine is located in the Qassim province in the north-eastern region of Saudi Arabia.The mine plan has been prepared based upon current estimated capacities of the refinery and smelter reviewed in completed technical studies and envisages production at an annual mining rate of 3.5 Mtpy of bauxite to meet the annual alumina supply target of 1.4 Mtpy and aluminium production of 0.65 Mtpy for a period in excess of 30 years. Feasibility studies have confirmed the economic feasibility of increasing these capacities to approximately 4.0 Mtpy of bauxite, 1.8 Mtpy of alumina and 0.74 Mtpy of Aluminium.

Upcoming Project

GROWTH

ASSOCIATIONS

WITH

TARGET MINARAL & ENVIRONMENTAL PROJECTS - KSA

Page 28: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

TARGET RAILWAY PROJECTS - KSA

Page 29: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH

ASSOCIATIONS

WITH

ITIHADI INFRA PROFIT, ASSATE & BUSINESS GROWTH PLAN

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

0

200

400

600

800

1000

1200

1400

PROFIT

BUSINESS

MIL

LIO

N S

R

Page 30: ITIHADI EPC BUSINESS PLAN KSA INFRA.... Eastern Province, PO Box No.1190,Saihat – 31972 Ph.:+966-3-8378011, Fax: +966-3-8378012 ,

GROWTH WITH ASSOCIATIONS

GROWTH WITH PROMOTIONS

ITIHADIINFRA....


Recommended