  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    1/15

    Granite

    ConstructionCompany

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND BACKFILLING

    WORKS FOR ASAB SUBSTATION PREPARATION

    FOR UNDERGROUND SERVICESDUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    Document No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.B!$B!

     

     Abu Dhabi Gas Industries

    Limited (GASCO)

      Power Generation Units

    R ti t P j t

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    2/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!

    B1B1

    Issued For First

    Reie!/Co""entsFirst Issuedfor C#MP$N% Reie! and

    Co""ents

    1/11/20151/0/2015

     $VIN&S'$VIN$S'(N(P

    M#'$M&)I*B$+SIR$,-))IN

    .$'IRN(V(IRI

     $1Issued for

    infor"ation / internal Reie!1503/011/2

    015 $VIN&S'$VI

    N$S'(N(P

    M#'$M&)I*B$+SIR$,-))IN

    .$'IRN(V(IRI

    Rev. Description Date Prepared by Cec!ed by "pproved by

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    3/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!

    Rev.

    DatePage $umber Description

     $1 151403(0110(2015

    1 6aes Issued for Infor"ation / Internal Reie!

    B1B1 1(11(20151(

    0(2015

    18 Paes1

    6aes

    Issued For First Reie!/Co""entsFirst

    Issued for C#MP$N% Reie! andCo""ents

    B2B21(12(201512(

    05(2015184 Paes1 7

    6aes

    Issued For SecondReie!/Co""entsSecond Issued

    for C#MP$N% Reie! andCo""ents

    0 12(07(2015 1 7 6aes Final Issue / Issued for Construction

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    4/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!

    %"&'( )* C)$%($%+

    %. DEFINITIONS AND ABBREVIATIONS+

    CO,PAN GASCO (Abu Dhabi Gas Industries Limited)

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    5/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!

    W-W3tne11+A !erication method that permits the obser!ance o- inspection and % ortestin': A -orma #e.uest -or inspection (#*I) sha be 'i!en to Company:I- Company does not attend the witness; wor9 may proceed without theCompany presence:Contractor .uaity inspector(s) sha pro!ide construction chec9 sheet %

    test report to Company/ -or re!iew:H-Ho45+A point where no -urther acti!ities may proceed unti !erication o- compiance to theproect specied re.uirements:R-Re(3e6+A !erication method that permits the e

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    6/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    7/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!

    1. D(*-$-%-)$+ "$D "&&R(-"%-)$+:C)0P"$: $SC# :$;u )$ Po!er Pro?ects )iision

    DG+: )esin eneral S6ecification

    (DDR: &nineerin )ocu"ent )eliera;le Reister -+): International #rani@ation for Standardi@ation

    -%P: Ins6ection >est Plan

    0"$*"C%R(R / +PP'-(R/ ($D)R: >

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    8/15

    Granite Construction Company

    INSPECTION AND TEST PLAN FOR DUCT BANK 

    CONSTRUCTION WORKS AT ASAB SUBSTATION

    INSPECTION AND TEST PLAN FOR OPEN

    TRENCH EXCAVATION AND PREPARATION FOR

    UNDERGROUND SERVICESINSPECTION AND

    TEST PLAN FOR EXCAVATION AND

    BACKFILLING WORKS FOR ASAB

    SUBSTATIONDocument No. PP-!"#-AS-$$$-%&%&-%$%$-

    $!%$'$

    Re(.

    B!$B!C#N>R$C>#R *ualitA Ins6ector:s= s

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    9/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%$). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/"pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

     $1

    'S&

    Reuire"entsCarrAo

    ut Field SureA

    ors/ Settin #ut

    ors

    )S81280039 Re 2

     $66roed IFC )ra!ins

    Met

    18001 Re 0(

    Met

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    10/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%$). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/"pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

     $

    &Ecaation and

    Su;rade

    Co"6action and

    >estin +eel9

    di"ensions and

    Su;rade Pre6aration +ocation and

    coordinates erification

    )S818001 Re 2Cl 12(0

     $nd its addendu" 5238$B8$))8

    180018 Re 0 )S818002G

    Clause 13

    Met

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    11/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%$). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/"pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

     $7

    Place"ent ofreinforce"ent steel 9-PVC 6i6es HFor"!or

    Suita;le Beddin Material Placed as 6er

    reuire"entSite ru;;in

    )S8180029Re2

    Cl( 1591 H 17

    Met

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    12/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%

    $). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/

    "pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

    PP85238$S800081810803

    Re 0

    Re6ort Structural concretin

    • Mini"u" t

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    13/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%

    $). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/

    "pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

    139$S>M )1557

    )S818002 Re 29 Cl 1(2

    • Bacfillin !it< a66roed eEcaated "aterial / co""on fill in laAers of

    200"" t

    S6ecification

    Settin out to lines and leels(

    Protection of -nderround serices(

    Site Settin out Plan

    CC8C3507$B8SF802 R(01 8 2

     $4 Cut

    )S818001 Re 29 Cl 13(0

    and its addendu" 5238$B8

     $))818001 Re(0

    PP85238$S8000818108013

    eneral Reuire"ents of

    S6ecification and )ra!ins

    round!ater leel ;elo! 500"" fro" ;otto" of eEcaation leel(

    )e!aterin sAste" in 6lace if !ater ta;le not !it

    5238$B8$))818001 Re(0

    )S818002 Re 29 Cl139$S>M )1557

    )S818002 Re 29 Cl 1(2

    PP85238$S8000818108013

    Co"6liance to/

    S6ecification

    >

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    14/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%

    $). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/

    "pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

    )S818002 Re 29 Cl

    17(0

    PP85238$S8000818108013

    Release for furt

    fro" t/C or +a; re6orts 1 FI M

    SU,,AR OF INSPECTION FOR,S ATTACHED

    FOR, NO DESCRIPTION FOR, NO DESCRIPTION

    3CL+C+556 0ateria Inspection #eport 3CL+C+55Concrete Cube Specimen Compressi!e Stren'th Test #esut 0onitorin'

    #ecord

    3CL+C+55? Inspection #eport -or $indin' Concrete or9s 3CL+C+55> Concrete Protectin' Coatin' $G Appication #eport

    3CL+C+55@ Chec9ist -or Structura concrete H Pre+pour 3CL+C+554 Chec9ist -or Sub'rade Preparation aterproon' or9s

    Page 1, of 15

  • 8/19/2019 ITP for Cast in Situ Duct Bank Construction

    15/15

    Granite Construction Company I1SPECTIO1 A1D TEST PLA1 *O# CAST I1 SIT" D"CT $A1 CO1ST#"CTIO1 O#S AT ASA$

    PR)3(C%: Po8er Generation nits Retirement Pro;ects < 52#

    C)0P"$ : "& D7"&- G"+ -$D+%R-(+ '%D.=G"+C)> "greement $o. : 1,52#?1G"+C)Pro;ect $o.

    52#

    C)$%R"C%)R: (%" P)6(R PR)3(C%+ D--+-)$Doc. $o.: PP52#"+???1,1,1?1??21?@?PP52#"+???1,1??21

    Rev. $o.: 

    &2?&2+&C)$%R"C%)R: GR"$-%( C)$+%RC%-)$ C)0P"$(%" +%"R

    "C%--%

    $). 4uality Related "ctivity Reference Document "ttribute to be erified "cceptance criteria

    erifying documents/

    "pplicable %est *orms

    -$%(R($%-)$+

    +C '"& C)0A%P-

    3CL+C+55= Structura Concrete $atch Tic9et #eport 3CL+C+565 Chec9ist -or $G Protecti!e coatin' wor9s

    3CL+C+55 Daiy Concrete Pourin' #ecord 3CL+C+566 Chec9ist -or *i + $ac9in' wor9s

    3CL+C+55B Chec9ist -or Concrete Inspection #eport H Post+pour 3CL+C+56? Settin' out or9s

    '(G($D+ :

    SUB-CONTRACTOR CONTRACTOR CO,PAN / TPI

    NA,E NA,E NA,E

    POSITION POSITION POSITION

    SIGNATURE SIGNATURE SIGNATURE

    DATE DATE DATE

    Page 15 of 15

     $R $PPR#V$+ R&*-IR&) PM>C PR#,&C> M$N$&M&N> >&C'NIC$+ C#NS-+>$N> $1 8$2 $C>-$+ INSP&C>I#N C#M/>PI C#MP$N% $PP#IN>&) >'IR) P$R>%FI F-++ INSP&C>I#N C C#N>R$C>#RR1 8 R2 R&VI& #F )#C-M&N>$>I#N SC S-B8C#N>R$C>#R1 8 2 I>N&SS INSP&C>I#N +$B #N SI>& >&S>IN +$B#R$>#R%S #P&R$>I#N S-RV&I++$NC& >PI$ >'IR) P$R>% INSP&C>I#N $->'#RI>%' FI

    '#+) P#IN>SF-++ INSP&C>I#N

    >/C >&S> C&R>IFIC$>& R&*-IR&)

     M M#NI>#RIN 1 O 100J9 2O10J