ITRP the building of Collaboration
March 2009
Networks for 21st Century Learning
22
The California State University
Biggest higher education system in the US
23 campuses and the chancellor office ~450K Students ~45K faculty and staff
33
History of the Infrastructure Terminal Resource Project
Phase 1 –Telecommunication Infrastructure Initiative (TII) the bricks and mortar.
Phase 2 Infrastructure Terminal Resource Project (ITRP) the blinking lights, refresh, NMS and training.
Before TII
44
After TII
~300 Million
66
ITRP 1
Integrator selected (remember Pac Bell, SBC and now AT&T)
Recommended Cisco for Switching and Routing
The NTA was formed The birth of collaboration
Section Header
I will make the decision if you do not come to consensus. (M. Crase)
23 directors (one from each campuses) of Networking and Telecommunication formed the Network and Technology Alliance (NTA)
“Encouraged” to make recommendation
77
First working group formed
Network Management System – The first bake off
Strategic engineering (SE) working group
2005-6 restructured to get aligned with ITIL
88
The next generation of WG
ITRP 2 steering group The bake off
– Security – Wireless– NMS
99
Security
Design Best practices Deployment
1010
ITRP 3How we work together and lessoned learned
1111