+ All Categories
Home > Documents > ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John...

ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John...

Date post: 19-Mar-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
13
1 ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations
Transcript
Page 1: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

1

ITS and Integrated Road Network Operations

Dr John Miles

Chair PIARC Technical Committee 1-4 Management of Road Network Operations

Page 2: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

Traffic control 100 years ago

Page 3: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

Traffic control in the 21st century

Real-Time Operations

24 hours x 7 days a week

Page 4: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

4

Traffic situationanalysis / forecast

(problem sample)

.... to remove and reduce traffic problemsRichtung Basel bis18 22

Vollsperrung nach Unfall

Umleitung über Offenbacher Kreuz

5

661 5 661

Frankfurt

WiesbadenOberurselBad Homburg

KölnF. KreuzBad Vilbel

661

accidents road workscapacity overload events

Dynamic measures……

Page 5: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

5

Role of ITS in Integrated Road Network Operations

Page 6: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

6

Some high level goals

Safe roadsInformed travellersReliable Journeys

= Intelligent Transport SystemsITS

Page 7: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

7

Scope of the Euro-Regional Projects

1. Road Monitoring Infrastructure

and Control

2. European Network of Traffic Centres

4. Traveller InformationServices

3. Traffic Management

Page 8: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

25

The role of Travel Logistics Products

TrafficMaster

Page 9: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

The role of the Internet

MultilingualMultilingual

Links to FEDRO siteLinks to FEDRO site

TruckinfoTruckinfo MenuMenuTraffic infoTraffic infoTraffic bulletinTraffic bulletinRoutingRoutingRestrictionsRestrictionsAdviceAdviceContactContact

Terminals for piggyback Terminals for piggyback service service

Map controlMap control

Truckinfo web site

Page 10: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

10

The role of Traffic Demand Management (TDM) in network operations

Road User Charging

Page 11: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

11

Future developmentsGlobal Navigation Satellite Systems (Galileo)

Page 12: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

12

Integrated Network Operations

Levels of serviceEconomic performanceIncreasing demandRising public expectationsSafe, reliable journeysStandards & procurementInternational road trafficInter-modal connectionsAir quality and environmental impact

The challenges

Page 13: ITS and Integrated Road Network Operations...ITS and Integrated Road Network Operations Dr John Miles Chair PIARC Technical Committee 1-4 Management of Road Network Operations Traffic

13

PIARC Technical Committee 1-4 Management of Network Operations

International SeminarKuala Lumpur 14-16 August 2006


Recommended