IV. Early College Academy Innovation Plan Budget Budget Narrative Early College Academy intends to be funded with per pupil funding. No additional federal or private funds will be utilized in the startup or operation of the school. No additional grants were sought to fund the school and we do not anticipate that this school will be a title school at this time. Should the school qualify under the requirements of a Title 1 school those funds and corresponding services would be sought on behalf of the students. In addition Early College Academy will not collect or seek to collect student fees for any of its educational programming. The economic environment of the community is such that collecting fees from our students would create a barrier to enrollment and student participation. As such, it is imperative that all services offered at the school be offered free of charge for parents and students. While Early College Academy does not anticipate significant cost savings as a result of the innovations illustrated in this plan, it will remain cost neutral. Budget projections indicate that Early College Academy will be able to operate well within the financial parameters of a typical district school and there is a favorable comparison to other comprehensive high schools in District 6. Partnership The relationship between Aims Community College and Greeley-Evans Weld County School District 6 will offer students of Early College Academy the opportunity to access a variety of services currently available to concurrent enrollment and Aims college students. A past history of concurrent enrollment and a program called “the Career Academy scholarship program” established a precedent for tuition and contract costs between the school district and Aims Community College. Aims is able to offer significant services to students for very low costs which Early College Academy is able to take advantage. The Memorandum of Understanding established a flat rate of $100 per credit which includes not only tuition but also books, fees and any other costs associated with the concurrent enrollment aspect of the school. This rate structure outlined in the Memorandum of Understanding allows the district to establish a consistent and stable cost estimate for the school. Included in services for college students is access to both technology, academic support services and unique training classes such as financial planning, computer software, and study skills. As part of the partnership Aims Community College will support each student receiving a laptop computer for school use. Aims Community College students have always been offered these services as an option. At Early College Academy we requested these services become part of the required educational program. By extending concurrent enrollment to 9 th and 10 th grade students and using concurrent enrollment for 75% of a student’s educational programming Aims Community College is able to provide the same efficient service they currently provide to all students throughout the college. The building Early College Academy will occupy was completely furnished by Aims Community College in the late 1990s and includes classrooms, and office spaces with desks, chairs, and whiteboards. We anticipate that there will be additional expenses for repair and replacement but those expenses would not be beyond those for a typical school of comparable size. In addition there are several costs associated with running all of District 6 schools were not reflected in this budget. Items such as snow removal, insurance, landscaping, parking lot striping, maintenance equipment purchases, web site hosting, school logo design, signs, student information and data services (such as Infinite Campus) and other administrative and logistical support services. Security for Early College Academy will be addressed by District 6 Safety and Security Office and may incur additional costs as the school increases in size. Costs for these services is shared across the district and typically not reflected in an individual school’s budget.
Transcript
Page 1: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

IV. Early College Academy Innovation Plan

Budget

Budget Narrative

Early College Academy intends to be funded with per pupil funding. No additional federal or private funds

will be utilized in the startup or operation of the school. No additional grants were sought to fund the

school and we do not anticipate that this school will be a title school at this time. Should the school qualify

under the requirements of a Title 1 school those funds and corresponding services would be sought on

behalf of the students.

In addition Early College Academy will not collect or seek to collect student fees for any of its educational

programming. The economic environment of the community is such that collecting fees from our students

would create a barrier to enrollment and student participation. As such, it is imperative that all services

offered at the school be offered free of charge for parents and students.

While Early College Academy does not anticipate significant cost savings as a result of the innovations

illustrated in this plan, it will remain cost neutral. Budget projections indicate that Early College Academy

will be able to operate well within the financial parameters of a typical district school and there is a

favorable comparison to other comprehensive high schools in District 6.

Partnership

The relationship between Aims Community College and Greeley-Evans Weld County School District 6 will

offer students of Early College Academy the opportunity to access a variety of services currently available

to concurrent enrollment and Aims college students. A past history of concurrent enrollment and a

program called “the Career Academy scholarship program” established a precedent for tuition and

contract costs between the school district and Aims Community College. Aims is able to offer significant

services to students for very low costs which Early College Academy is able to take advantage. The

Memorandum of Understanding established a flat rate of $100 per credit which includes not only tuition

but also books, fees and any other costs associated with the concurrent enrollment aspect of the school.

This rate structure outlined in the Memorandum of Understanding allows the district to establish a

consistent and stable cost estimate for the school.

Included in services for college students is access to both technology, academic support services and

unique training classes such as financial planning, computer software, and study skills. As part of the

partnership Aims Community College will support each student receiving a laptop computer for school

use. Aims Community College students have always been offered these services as an option. At Early

College Academy we requested these services become part of the required educational program. By

extending concurrent enrollment to 9th and 10th grade students and using concurrent enrollment for 75%

of a student’s educational programming Aims Community College is able to provide the same efficient

service they currently provide to all students throughout the college.

The building Early College Academy will occupy was completely furnished by Aims Community College in the late 1990s and includes classrooms, and office spaces with desks, chairs, and whiteboards. We anticipate that there will be additional expenses for repair and replacement but those expenses would not be beyond those for a typical school of comparable size. In addition there are several costs associated with running all of District 6 schools were not reflected in this budget. Items such as snow removal, insurance, landscaping, parking lot striping, maintenance equipment purchases, web site hosting, school logo design, signs, student information and data services (such as Infinite Campus) and other administrative and logistical support services. Security for Early College Academy will be addressed by District 6 Safety and Security Office and may incur additional costs as the school increases in size. Costs for these services is shared across the district and typically not reflected in an individual school’s budget.

Page 2: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 3: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

Early College Academy

Weld County School District 6 Budget

Staffing FTE Salaries and Benefits Administration 1.0 $140,000 Office 1.0 $50,000

Certified 3.0 $255,000

Custodial 2.0 $80,000

Total 7.0 $525,000 Per Pupil Funding 2014-2015 $7117 Revenue

Year 1 Year 2 Year 3 Year 4

Student Enrollment 170

(9, 10 Only) 300

(9, 10, 11 Only) 425

All Grades 9-12 500

All Grades 9-12

Total Revenue $1,209,890 $2,056,800 $2,913,800 $3,428,000

Expenditures

Year 1 Year 2 Year 3 Year 4

Salaries & Benefits $ 525,000 $ 1,050,000 $ 1,080,000 $ 1,115,000

Aims Tuition $ 136,000 $ 338,000 $ 613,000 $ 775,000

Building Lease $ 10,000 $ 10,000 $ 10,000 $ 10,000

Building Misc. Expense $ 35,800 $ 53,700 $ 76,000 $ 89,500

Utilities $ 50,000 $ 55,000 $ 60,000 $ 65,000

Facilities Cost $ 365,000 $ 310,00 $ 231000 $ 234000

Indirect Costs $ 100,000 $ 205,700 $ 270,000 $ 326000

Total Cost $1,216,800 $ 1,747,400 $ 2,330,000 $ 2,614,500 (Note: Increase certified staff and administration staff in year 2. Staff remains constant in year 3 and 4.

Budget increases represent concurrent enrollment.

Early College Academy Concurrent Enrollment $100/credit - Cost per student 9th Grade 8 Aims Credits = $800 10th Grade 8 Aims Credit = $800 11th Grade 22 Aims Credits = $2200 12th Grade 24 Aims Credits = $2400 Total Credits 62 Credits = $6200 (Note the average student is expected to complete 62 credits. Students are eligible to complete up to 75 credits maximum.) Building Allocation Copier $5000 Instructional Supplies $13,800 Student Activities $3600 Office Supplies $1400 Student Transportation $12,000 Total $35,800

Page 4: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

Additional Costs

Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan Estimated Laptop or Chromebooks est. $350 each 125 $45, 000 Technology supplies and repair $30,000 Total $75,000 Additional Facilities Expenses - District 6 Division of Business Operations

The lease agreement between Aims Community College and Greeley Evans School District 6 indicates that

the school district will appropriately maintain Early College Academy facilities. The following narrative

attempts to illustrate the intent behind the lease and estimate the actual costs of appropriately

maintaining the facility.

The District 6 Division of Business Operations estimates that appropriate maintenance of the facility will cost approximately $230,000 per year. It is estimated that an additional $210,000 will be necessary to update the building and prepare it for student use. District 6 estimates that it will invest between $10,000-$55,000 in maintenance of mechanicals, plumbing, and electrical systems of the building each year. The total annual facilities maintenance costs of the building range from $365,000 to $336,000. The primary reason for this variance is the ability to spread start-up costs over two years. An example of this is the fire alarm system. The alarm is certified for one more year and will be replaced by District 6 in year two. Other expenses such as updating floor surfacing in the health room and science lab to meet code will be performed before students arrive in the fall. Additionally, contracts for security services increase dramatically in year two. During the first school year Early College Academy will share security resources with other schools in the district and rely on the district security office, local police departments and 911 for emergency services. During year two we hope to add a school resource officer and a campus monitor to increase security on the campus. The District 6 Division of Business Operations has not yet established the age of the mechanical systems in the facility. They estimate that a minimum of $6,000 will be spent maintaining the heating mechanicals in the building alone. They also stress that replacement of parts is more prevalent with older equipment. The estimate of $55,000 given represents annual costs on an older facility and actual costs could vary widely. The mechanical door locks and electronic door locking system will be replaced before year one begins and the annual expense indicated only covers maintenance. Food Services equipment will not be new purchases. Food services currently has warehoused donated and used equipment. As such the costs for equipment does not represent actual costs which Early College Academy will pay. In similar fashion furniture, fixtures and repair are estimated as we expect to utilize used and repurposed furniture instead of buying new. In the lease it outlines how District 6 expects to spend money creating and maintaining a safe work environment for students, staff and guests. Capital expenditures which add to the overall value of the facility will be the responsibility of the building owner, Aims Community College. Should the facility need a roof replacement the significant expenditure would be the responsibility of Aims Community College. Parking lot restriping and the replacement of handicapped signs to maintain ADA requirements will fall under District 6 costs, but removing and replacing the parking lot surface would be a capital expenditure which would remain the responsibility of the building owner.

Page 5: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

There are additional expenses which will be addressed throughout the year. Food Services will be providing lunches to interested students at the facility. It is estimated that food cost for 170 students will be $50,000. Although District 6 does not anticipate bussing students to the facility, several students have requested transportation assistance. This may involve bussing at a later date. Other potential expenses are listed below and were not included in our original plan.

Facility Costs Year 1 Year 2 Year 3 Year 4

Rent $10,000 $10,000 $10,000 $10,000

Building Maintenance $55,000 $55,000 $55,000 $55,000

Carpet Replacement- Science Room/Health Room $10,000 Custodial Equipment Carpet Shampooer $3,000 $500 $500 $500

Custodial Services- Snow Removal/ Summer Landscaping $50,000 $50,000 $50,000 $50,000

Custodial Supplies $3,700 $5,000 $10,000 $10,000

Mechanical Door Lock Replacement and Repair $10,000 $500

$500

Electronic Door Lock Replacement and Repair $15,000 $500 $500 $500

Fire alarm and Intrusion alarm monitoring $24,000 $12,000 $12,000 $12,000

Fire Alarm Replacement

$85,000 Insurance-Property/Casualty/Vehicle $50,000 $50,000 $50,000 $50,000

Security $7,000 $21,000 $21,000 $21,000

Signs $50,000 $1,000 $1,000 $1,000

Trash Removal $7,000 $9,000 $10,000 $12,000

Furniture/Fixtures/Repair and Replacement $50,000 $10,000 $10,000 $10,000

Food Services- Equipment $20,000 $1,000 $1,000 $1,000

Total $364,700 $310,500 $231,000 $233,500

Other Indirect Costs Transportation: $40,000 per route per year. $40,000 $80,000 $120,000 $160,000

Food Services Lunch Program Food and Prep Costs. $50,000 $100,000 $100,000 $100,000

Testing

$5,000 $5,000 $5,000

Website Costs

$1,000 $1,000 $1,000

Advertising

$2,000 $2,000 $2,000

Welcome to school shirts and expenses

$1,700 $2000 $12000

Extra-Curricular activities

$6,000 $6,000 $6,000

Graduation Expenses

$5,000 $20,000

Yearbook Printing $10,000 $10,000 $30,000 $30,000

Total $100,000 $205,700 $271,000 $326,000

Page 6: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 7: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 8: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 9: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 10: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 11: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 12: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 13: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 14: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 15: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 16: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 17: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

Early College Academy Technology Addendum

Addendum to the Memorandum of Understanding for Early College Academy (ECA) between Aims Community College and Weld County School District 6

Overall Investment

Representatives from the Aims Information Resources Management Department and District 6 Office of

Information Technology met and agreed that an essential part of the learning experience at Early College

Academy (ECA) is having access to a high level of technology. Appropriate technology will give students

the best opportunity for academic success. It is also important that faculty teaching college level classes

and students enrolled in those classes have access to similar technological options they would experience

at other Aims Community College campuses. The cost for establishing technology at ECA during the first

year is estimated not to exceed $460,050. Members of the committee agreed that shared technology costs

to establish adequate technology in the building will not exceed $266,000.

Aims has agreed to provide 75% of the shared technology costs as outlined in the technology plan and

District 6 will correspondingly assume responsibility for 25% of these shared technology costs. In addition

to providing 75% of shared technology costs, Aims has requested $195,000 in upgrades to improve

performance and access required for the college level coursework.

Aims Investment

While the ECA computer networks will be under the responsibility of District 6, Aims has agreed to

provide 75% of the shared technology costs outlined in the attached plan specifications. Aims and District

6 agree that shared costs will not exceed $266,000; therefore, Aims’ responsibility would not exceed

$199,500. In addition, Aims has made recommendations for $195,000 in upgrades to the instructional,

safety and network capabilities bringing additional functionality to the ECA computer networks. Aims

total investment in the technology plan will not exceed $394,500.

District 6 Investment

District 6 will assume responsibility for implementation of the network and assume 25% of the shared

technology costs. This cost would not exceed $66,476.

Plan Execution

Upon execution of the plan, Aims will order and install classroom equipment, a virtual private network,

standard Aims safety devices (called Alertus Beacons) and internet access. This purchase is not to exceed

$90,100.

Upon execution of this plan, District 6 will invoice Aims Community College the balance or up to

$304,400 to execute the remainder of the technology plan as outlined in the attached list. District 6 will

order and install the technology as outlined in the following plan specifications.

Page 18: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

Early College Academy Technology Addendum

Item

Num.

Order

Responsibility QTY Description

Cost per

Item Total Cost

* Aims

requested

upgrade

Shared Student/Admin

and Teaching

1 District 6 7 B/W Printer $400.00 $2,800.00

2 District 6 2 Color Printer $800.00 $1,600.00

Classroom Instructional

Technology

3 Aims 7

Epson 99W - Widescreen Ceiling

Mount Projectors w/Warranty $1,126.55 $7,885.85 *

4 Aims 7 Samsung SDP 960 Document Cameras $1,785.00 $12,495.00 *

5 Aims 7 Smartboard SBX885 wide screen $866.47 $6,095.00 *

6 Aims 7 Projector plates and mounts $1,688.00 $11,816.00 *

7 Aims 7 video players (DVD/Bu-Ray) $150.00 $1,050.00 *

8 Aims 1 485i Short Throw projector $1,499.00 $1,499.00 *

9 Aims 7 Crestron DMPS-100-C $2,410.00 $16,870.00 *

10 Aims 7 FT-TS600B Touch Panel $1,507.00 $10,549.00 *

11 Aims 7 5-Port POE switch $241.00 $1,687.00 *

12 Aims 14 Speaker package $189.17 $2,648.38 *

13 Aims 7 Emitter probe $34.00 $238.00 *

14 Aims 1 Labor (install, support and

programming)

$6,048.00 $6,048.00 *

15 District 6 7 Miracast or Chromecasts $40.00 $280.00

Student Technology

16 District 6

250 Student device plus case $660.00 $165,000.00

17 District 6 250 Student software $50.00 $12,500.00

Infrastructure

18 District 6 20 Wireless Access Points $1,000.00 $20,000.00 *

19 District 6

1

Controller and licensing for wireless

access points $15,000.00 $15,000.00 *

20 District 6 1 Internet connection 1GBPS fiber $13,200.00 $13,200.00

21 District 6 1 PSU CSU (Telephone infrastructure) $500.00 $500.00

22 District 6 4 Switch 48P $9,000.00 $36,000.00

23 District 6

1

100 Mbs Traffic Shaper (Optional,

Recommended by Aims) $30,000.00 $30,000.00 *

24 District 6 3 2 post universal racks (124) $350.00 $1,050.00

25 District 6 1 4 post rack (124) $1,200.00 $1,200.00

26 District 6 2 Servers (DHCP, DNS, RADIUS) & $8,000.00 $16,000.00 *

Page 19: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

(file/print)

27 District 6 3 Uninterrupted Power Source $1,020.00 $3,060.00 *

Teacher Technology

28 District 6 12 Dell Latitude ES440 or similar for

teachers

$800.00 $9,600.00

29 District 6 12 23" Monitors $160.00 $1,920.00

30 District 6 12 Laptop dock $110.00 $1,320.00

31 District 6 12 USB Keyboard and mouse $30.00 $360.00

32 District 6 12 Software staff $50.00 $600.00

33 District 6 12 Laptop bags $36.00 $432.00

Item

Num.

Order

Responsibility QTY Description

Cost per

Item Total Cost

* Aims

requested

upgrade

Telephones and

Safety

34 District 6 50 Telephones $200.00 $10,000.00

35 District 6 1 District 6 Block DIDs $144.00 $145.00

36 District 6 1 POE Midspan (Infrastructure for

Telephone)

$1,400.00 $1,400.00

37 District 6 1 TDM (Infrastructure for Telephone) $3,000.00 $3,000.00

38 District 6 1 PRI Circuit (Infrastructure for

Telephone)

$3,000.00 $3,000.00

39 Aims 8 Alertus Beacons $800.00 $6,400.00 *

40 Aims 2 Cisco ASA 5500 series $1,800.00 $3,600.00 *

41 Aims 12 Aims VPN circuit (monthly) $100.00 $1,200.00 *

Building

Infrastructure

42 District 6 1 Building rewire 200 drops $20,000.00 $20,000.00 *

Total: $460,050.00

Page 20: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 21: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 22: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 23: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 24: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 25: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan
Page 26: IV. Early College Academy Innovation Plan Budget Budget ... · Additional Costs Technology (Computer, Network, Phone) $67,000 (See Technology Plan Addendum) Ongoing Technology Plan

Recommended