Date post: | 10-Oct-2015 |
Category: |
Documents |
Upload: | sanjay-rout |
View: | 25 times |
Download: | 0 times |
of 37
IVRCL: CORPORATE PROFILEPan- India presencePremier EPC & LSTK Service Provider with front-end engineering capabilitiesBrief OverviewGROWTH HISTORYStrong presence in Water, Transportation, Buildings & Industrial Structures and Power sector; Order book of INR 276.63 Billion (USD 5.53 Billion) as on 31st December 2012Significant EPC, LSTK & FEED capabilitiesProven Project Execution Skills and presence across 25 states in India and Overseas viz. Nepal, Abu Dabhi, Sri Lanka and AfricaUndertaking BOT/ BOOT / DBFOT Type PPP contractsHighly qualified and well trained human resource baseINR 800 Crores worth of sophisticated Construction EquipmentListed in 1995, proven dividend paying track recordExpanding our presence in Railways, Metro Systems and Mining InfrastructureAcquired Davy Markham of UKAcquires and initiates steps to turnaround Hindustan Dorr OliverTOLL Collection StartedCommences commercial operations19901995IVRCL IPO and Listing on Indian Stock Exchanges2001Forays into BOT/ BOOT / DBOOT type PPP Projects2002Completes National Games Village20052006Expansion of Realty Business through IVR Prime2010Executes first water project1992Acquired ALKOR PETROO For Ownership of OIL & GAS Blocks in EGYPT & YEMEN2007100 MLD Desalination plant Commissioned20102010
MANAGEMENTMR. E. SUDHIR REDDY, CHAIRMAN & MANAGING DIRECTORFounder Promoter of IVRCL.
MR. E. SUNIL REDDY, VICE CHAIRMAN
MR. R. BALARAMI REDDY, EXECUTIVE DIRECTOR FINANCE & GROUP CFO
MR. K. ASHOK REDDY, EXECUTIVE DIRECTOR
MR. S RAMACHANDRAN, DIRECTOR Business Development & Corporate Strategy
MR. D. DEVARAJA RAO DIRECTOR- TECHNICALMR. VENKATARAGHAVAN R DEPUTY DIRECTOR - Operations & PMC MR. PRASAD K.H.K COO - WATERMR. RAJKUMAR SINGH COO - TRANSPORTATION MR. M.S.RAO COO - MININGMR. VIJAY KUMAR REDDY HEAD BUILDINGS & INDUSTRIAL STRUCTURES MR. KRISHNA REDDY COO - IRRIGATIONMr. S. RAJAGOPALAN HEAD - POWER
Current IVRCL Group manpower across all regions in the country is 7932
Management team with deep industry experienceHuman resource development by :Quality intake / recruitmentTraining & skill up-gradingHealth, safety & quality managementEmployee Mix HUMAN RESOURCES
Area: 23 acres ( 93281 Sq.m ) Installed capacity : 36000 MT / per annumSalient features: With State-of-art infrastructure.Mix & match type having CNC & manual machines.Galvanising Bath (75m x 1m x 2m)Combines highly skilled manpower deployment with modern manufacturing infrastructure to ensure products of highest quality. An environment / pollution free plantProduction planned for current fiscal : 24000 MTOur Product Range :Transmission line towers (66kV to 765 kV)Substation Structures (Lattice & Pipe) Structural steel for Rural electrificationMicro wave towersStructural steel for AC Traction (OHE) TRANSMISSION LINE TOWER FACTORY, NAGPUR
HINDUSTAN DORR-OLIVER
HDO COMPANY OVERVIEWHDO was acquired by IVRCL LIMITED in 2005, currently operates as a majority-owned subsidiary of the IVRCL groupHDO is a diversified engineering company providing customized turnkey solutions, technology and EPC installationsMajor business verticals:Manufacturing of Engineering equipmentEngineering EPCDesign and Engineering Recently acquired 100% stake in UK-based Davy Markham , a specialist in the heavy engineering & manufacturing spaceMajor clients include UCIL*, Vedanta Group, IOCL , HMEL*, IFFCO*, RCF*, GAPINSAT (Turkey)UCIL - Uranium Corporation of IndiaHMEL HPCL Mittal Energy Ltd.IFFCO - Indian Farmers Fertiliser Cooperative Ltd.RCF Rashtriya Chemical Fertilizers Ltd.
HDO BUSINESS SEGMENTS
5 parallel bays 60 x 300 ft2 new bays with under-the-hook height 10.5 mHaving crane facility of 50 + 50 and 20 + 20 MTTotal area under crane: 15, 125 sq mMANUFACTURING FACILITYSeparate bay, 50 x 394 ftMachine ShopShell Welding machine
HDO is executing its largest and prestigious order for 3000 tpd Ground Uranium Ore Processing Plant which includes 17 sub packages.
First time in India, HDO is building the Uranium ore processing plant with Alkaline Leaching technology.ScopeDetailed Engineering, Procurements, Supply, Erection & Performance Testing of 3000 TPD ore processing plantProcurement and installation of major packages like Boilers, Evaporation plants, Spray Drying Plants and many more.Inhouse production of Autoclaves, Proprietary equipments etc.Order Value: Rs. 4410 MillionsURANIUM CORPORATIONTUMMALAPALLE, ANDHRA PRADESH3000 TPD URANIUM ORE PROCESSING PLANT Technology Provider: Bateman Engineering, South Africa
SOME EXPORT ORDERS FROMAlaqua Inc., USAG.E. InfrastructureBest Wide, MalaysiaPan African Paper Mills, KenyaEthiopia Sugar, EthiopiaHumBoldt Wedag, GermanyTCI Sanmar, Egypt
L & T, KenyaSky Moon, SingaporeYaslik Projects, TurkeyEnmass Projects, TurkeyChemenol Project, Saudi ArabiaAquatech Asia Ltd., Madagascar
Key StatisticsKey Financial Figures (2009-2010)2008-092009-102010-11Revenue:522 Crores871 Crores955 CroresEBITDA:58 Crores107 Crores107 CroresPAT:30 Crores55 Crores54 CroresHuman Assets (as on 1st June 2010)Design Engineering:320EPC:306Manufacturing:413Services:269Marketing / Business Dev:86Finance:58Supply Chain:42Quality Assurance:12HR / Admin:29IT:14Others:28TOTAL:1308
Chart1
975
30
74
Human Assets
Sheet1
Human Assets
Engineers975
Professionals30
Others74
To resize chart data range, drag lower right corner of range.
Davy Markham OverviewHDO acquired Sheffield, UK-based Davy Markham (DM) for GBP 9.5 mn in Feb 2010DM is engaged in design, manufacture, fabrication and machining of heavy and complex engineering components and assembliesHeavy engineering and manufacturing facilities spread across 16,000 sq mt with capability of handling large structuresDM caters to industries like:Mining & tunnelingCivil constructionSteel and metal processingWater control, storage & barrier solutionsPower generation & renewable energyNuclear storage & movementDM provides HDO an entry into nuclear engineering space backed by a manufacturing & machining facility along with technical qualificationsManufacturing baysManufacturing facility, Sheffield
DAVY MARKHAM INDUSTRY SEGMENTS
CUMULATIVE QUALIFICATIONS IN WATER SECTORLaying of Pipelines undertaken:25000 Kms.Canals:2300 Kms.Largest Seawater Desalination plant catering about 2.5 Million families every day (100 Million Litres per day)Water Treatment Plants Cumulative:1300 MLDSingle Largest: 153 MLDPumping MachineryDischarge :917156 Cum./Hr.MW : 214Type:VT & HSC Pumps
INDUSTRIAL WATER SUPPLY PROJECTS ESTABLISHEDWater Carrier System Package (RA8) for Neyveli Lignite Corporation Limited
Stand Alone Water Supply Scheme for Kochi Refineries Limited
Circulating Water System for Maharashtra State Electricity Board and Karnataka Power Corporation Limited
Vindhyachal Super Thermal Power Project, Stage III (2x500 MW) Pre-Water Treatment Package on EPC for NTPC
Make up Water System for Sipat Thermal Power Station for NTPC
Bailadilla Iron Ore Water Supply Project on EPC for NMDC
Neyveli Lignite Corporation Ltd, Rajasthan Barsingsar Thermal Project (2X 125MW) Water Carrier SystemThe project for Indira Gandhi Nahar Pariyojana Canal of Neyveli Lignite Corporation (NLC) Limited, Thermal Power Project at Barsingsar, Rajasthan (2x125 MW). Design, Civil Structures like intake channels, settling tanks, forebay, Raw water intake sump, Raw water pump house, Raw water reservoirs of 1.50 Lac and 5.40 Lac cum capacity, Hydraulics for Vertical Turbine pumps of 1850 cum/hr capacity; and Laying, Jointing, Hydro testing and Commissioning of GRP pipeline over 60km.It also included designing of PLC/SCADA and commissioning of 33 KV transmission lines stretching approximately 60km.IVRCL BRINGS HOPE AND LIFE TO THE DESERT OF RAJASTHAN
Vindhyachal Super Thermal Power Project NTPC-2X500MW Pre Water Treatment PlantThe project comprised construction of a 160-MLD water treatment plant involving central monitoring basin, clarification plant, chemical house and filters. This caters to the industrial water needs of the thermal power plant.Sipat Thermal Power Project NTPC - Stagelll-3x660MW on EPC basisThe project consists of a Make-Up Water System Package including supply and erection of 3 vertical turbine pumps (8500 m/hr) water pump house with a depth of 30 metres, stop log gates and traveling screens. The 1400 mm twin line 26 km pipes have been internally painted with bitumen, hydro-tasted, back-filled and provided with cathodic protection.Raw Water Supply Pipeline APGENCO Rayalaseema Thermal Power ProjectDesigned to transport 40 cusecs of water, the project Involved construction of pipe bridges across rivers and canals from Sri Pothuluri Veerabrahmendra Swamy Reservoir to Rayalaseema Thermal Power Project (2X500MW) along with Construction of a storage reservoir in the plant premises in Cuddapah District Andhra Pradesh.MS Pipeline of 1100 mm dia = 34 Kms.Sluice & Surplus weir / Spillway in Plant Premises
INDUSTRIAL WATER SUPPLY PROJECTS
SEWAGE TREATMENT PLANTSALANDUR SEWAGE TREATMENT PLANTRUIDP SEWAGE SCHEME IN RAJASTHAN STATESEWAGE PUMPING STATION IN CHENNAIALLAHABAD STP
TUNNEL FROM GUNDOVALI TO BHANDUP COMPLEX IN MUMBAI
Construction of Inlet Shaft and Outlet Shaft by drilling and controlled blasting of following details
Inlet Shaft at Kaprbawadi (K2)
Diameter of shaft : 11.8 mDepth of Shaft : 108 m
Outlet Shaft at Bhandup
Diameter of shaft : 11.8 mDepth of Shaft : 125 m
Excavation for tail tunnel and TBM assembly area, at Kapurbawdi (K2) and at tail and TBM removal area at Bhandup by drilling and controlled blasting method and disposal of muck
Boring of Tunnel from Kapurbawdi (K2) to Bhandup with upward gradient 4.5 : 1000 by TBMCONSTRUCTION OF ABOVE ROCK TUNNEL USING MODERN FULL-FACE ROCK TUNNEL BORING MACHINE (TBM).
Length of Tunnel : 8.30 Km (Between Kapurbawadi to Bhandup Complex)
Bored Dia of Tunnel: 6.25 m
RCC Lined Dia of Tunnel: 5.50 m
TUNNEL FROM GUNDOVALI TO BHANDUP COMPLEX IN MUMBAI
TUNNEL FROM GUNDOVALI TO BHANDUP COMPLEX IN MUMBAI
MAJOR IRRIGATION TUNNEL PROJECTS UNDER EXECUTIONGandikota Tunnel Investigation, Design, Excavation and lining of Gandikota Tunnel for Feeding to Gandikota Reservoir from Km.52.184 of G.N.S.S. Flood flow canal (From Owk Reservoir to Gandikota Reservoir) including construction of Adit in Kadapa District Project Cost Rs.376.14 CroresTotal Length of Tunnels (dia 8 M, 12.55 M & 18 Mtrs.) = 14.65 Kms. Largest Dia. 18 Mtrs. Length in Meters 5275
100 MLD DESALINATION PLANT FOR CHENNAI METRO WATER SUPPLY & SEWERAGE BOARD
TRANSPORTATION DIVISION : HIGHLIGHTSSRIKAKULAM PROJECT FOR NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI)RAJAMUNDRY PROJECT FOR NATIONAL HIGHWAYS AUTHORITY OF INDIA (NHAI) ONGOING MAJOR PROJECTSNHAI BOT PROJECTS
MAJOR INTERCHANGE AT CHENNAIMajor Interchange (Trumpet Type) at Kondalampatti as part of 4-Laning of Salem to Kumarapalayam of NH-47Total Length of Interchange 2619 MtrsNo. of Spans - 93
MOHAL SHOLAPUR RAILWAY PROJECTTRANSPORTATION DIVISION : RAILWAY PROJECTSSupply and Installation of Road, bed, facilities, Bridges, Track (Excluding, Supply of Rails, Track Sleepers), Signaling and General Electric works in connection with doubling of MoholSolapur B.G. Line (33.16 ms) on Chennai Mumbai Trunk Route of Maharashtra State India
HILL RIDGE - GACHIBOWLI, HYDERABADCHITRAPURI HOUSING SOCIETY Rs.550 CroresCIDCO-SEAWOODS ESTATES NAVI MUMBAI, RS. 215 Crores5552 EWS HOUSES MASS HOUSING FORDSIIDC AT DELHI RS.113.45 CroresSTATE SECRETARIAT BUILDING AT NAYA RAIPUR RS.179 CroresNATIONAL INSTITUTE OF BIOMEDICAL GENOMICS CAMPUS AT KOLKATA RS.105 49 CroresONGOING MAJOR PROJECTSBUILDINGS DIVISION : HIGHLIGHTSCIVIL & STRUCTURAL WORKS OF MAIN PLANT NTPC RS.878 Crores
GENERAL HOSPITAL CAMPUS AT VALSAD RS.167 Crores
OLD MLA QUARTERS, HYDERABAD, GOVT. AP R&BRS. 126 Crores
BMRCL ELEVATED METRO STATIONSName of work:- Constrution of two elevated metro stations CMH road station and Byappanahalli Stations Value of work: - 92 CroresConstrution of two elevated metro stations R V Road station and Jayanagar Stations Value of work: - 71.52 CroresConstruction of two elevated metro stations Old Madras road station and Ulsoor Stations Value of work :- 75.77 Crores
EXTERNAL COAL HANDLING SYSTEM (ECHS) - GUJARATDESIGN AND CONSTRUCTION OF ALL MAIN CIVIL AND STRUCTURAL WORKS FOR EXTERNAL COAL HANDLING SYSTEM AT-MUNDRA, GUJARAT. (INDIA). SALIENT FEATURES OF THE PROJECTDesign, preparation of Designed & Construction Drawings, Fabrication Drawings etc. of Civil & Structural Work.Detailed Geo-Technical Investigation and Preparation of Report.All Foundations are supported on piles.Piling Work 450 / 600 / 750 mm Dia x 25 M Depth - 4,800 Nos. RCC M10 to M30 - 90,000 Cum.Stacker Cum Reclaimer Foundation - 1,200 M Length.Stock Pile Area 1,200 x 100 M- 12,000 Sq. Mtr.Supply,Fabrication,Sand-Blast - Structural Steel- 3,800 MT.Supply & Installation of Sheeting / Cladding- 58,000 Sq.Mtr.On Ground & Above Ground Conveyor Galleries- 11,876 Mtr.Junction Towers - 11 Nos. Construction of SWGR & Control Room, Dozer Shed- 18 Nos.Construction of Roads, Drains around Builds.Project Cost: Rs. 214.37 Crores
22.5 MW Bhilangana Hydro Power Project,Tehri Garhwal, UttarakhandClient-Swasti Power Engineering limitedValue of Contract-INR 83 CroresScope of work :Surface Power House3.25 m dia x 381 m long Penstock16 m dia x 39 m deep Vertical Surge Shaft4.75 m dia x 1870 m long TunnelIntake StructureOutlet StructureBoulder WeirGates & HoistQuantities of major items :Earthwork: 238,700 CumBoulder Filling: 7,200 CumConcrete: 60,700 CumBrick/ Stone Masonry: 1,700 MTStructural Steel: 2,691 MTIVRCL HYDRO POWER - TUNNEL PROJECTS COMPLETED
Construction of 4100 Housing units (under Phase-I of 15,000 units) for relocation of underserved settlements in Colombo, Sri Lanka Contd.., Construction of 4100 units for relocation of under served settlements in Colombo, initiated by the Government of Sri Lanka, through their Urban Development Authority (UDA).The site is spread over 14.52 acres at Angoda in the Kolonnawa DS division in Colombo district, in the Western Province of Sri Lanka. The project will have 23 residential blocks of G+11 floors, comprising 191 residential apartments per block.
Major Water Pipeline Project in Kuwait, Middle EastProject Construction and maintenance of 4 X 1600 mm Dia fresh water Pipelines from AZZOUR WDC II to MINA WDC II Department Ministry of Electricity & Water MEW State of Kuwait Principal Contractor - The Arab Contractor Location of Work Azzour WDC II to Mina Abdullah WDC II Contract Value INR 490 Crores. (Kuwait Dinar 25 Millions)
ScopeQuantityInstallation of DI Pipe 1600 mm Dia.139,900 MtrsSoil Cut 14,500 CumSoil Fill12,700 CumDirect Pipe Jacking940 Mtrs Supplying and laying of Fibre Optic Cable- 2 nos-12 Core in Mtrs609420 Mtr.Cathodic Protection100,000 Mtr.
Irrigation project in Kuwait, Middle EastName of work: Construction & Completion & Maintenance of Irrigation Water Tanks in the Project of Sabah Al Ahmad CityScope of Work: Construction of Irrigation Water Tank type 1 and Type 3 including annexed Building & Infrastructures Type 1 Reservoir 4 Nos.Type 3 Reservoir 1 No. Total Capacity of the all the Reservoirs 12 MLDClient: Public Authority for Housing Welfare, Government of KuwaitLocation of Work: Sabah Al Ahmad City - KuwaitContract Value: INR 130 Crores (Kuwait Dinar 6.55 Millions)
*IVRCL is part of Indias Infrastructure construction sector The construction sector in India has historically maintained at about 5% of the GDPWith the Indian GDP growing around 6%pa over the last 10 years, the construction industry too has grown at similar rates to keep pace with the overall growthSince Indias growth rates is now considered amongst the highest in the world, the construction industry too is being considered as amongst the fastest growing construction industries in the world**IVRCL is part of Indias Infrastructure construction sector The construction sector in India has historically maintained at about 5% of the GDPWith the Indian GDP growing around 6%pa over the last 10 years, the construction industry too has grown at similar rates to keep pace with the overall growthSince Indias growth rates is now considered amongst the highest in the world, the construction industry too is being considered as amongst the fastest growing construction industries in the world*********