Date post: | 18-Jan-2016 |
Category: |
Documents |
Upload: | peregrine-shields |
View: | 217 times |
Download: | 0 times |
IV&V Program
AMF
Supporting Project Management with AMF
Jeremy FienholdDon Kranz
IV&V Program
AMF
Introductions
• Don Kranz– Lead Architect for AMF & AWB
• Jeremy Fienhold– Lead Analyst on a project using AWB
2
IV&V Program
AMF
Analysis & Management Framework
• Provides a high level assurance based ontology that allows information to be shared between IV&V tools.
• Too much decomposition reduces flexibility, modularity and portability of design.
• At the simplest level we deal with:– Projects– Participants
3
– Artifacts– Assessments– Actions
IV&V Program
AMF
IVV 09-1 Manage Responsibilities
• “A continual review of the IV&V effort• Revision of the IPEP as necessary based upon updated Mission
Project schedules and development status• Coordination of the IV&V results with the developer and other
appropriate management groups• Promotion of technical exchange between IV&V and the
developer (to improve technical knowledge transfer and increase IV&V effectiveness)
• Identification of process improvement opportunities in the conduct of IV&V”
4
IV&V Program
AMF
Project Organization
5
IV&V Program
AMF
Superior Tracing
Any Artifact
Any ActionAny Assessment
6
IV&V Program
AMF
Scoping
7
Behaviors
Scoping Modules
IV&V Program
AMF
Scoping
8
IV&V Program
AMF
Coverage
9
IV&V Program
AMF
Assessing Completion
10
IV&V Program
AMF
Change Impact
11
Modified Artifact(s)
Previous Assessment(s)
IV&V Program
AMF
Tasking ground work
12
IV&V Program
AMF
Future of Architecture
13
IV&V Program
AMF
Future Functionality
• Improve ORBIT integration• Add reporting capabilities• Add Admin UI for project configuration• Improve support of EBA & TR• Integration with COMPASS
14
IV&V Program
AMF 15
Thank You
IV&V Program
AMF
References
• IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012
• IVV 09-4 Version AF: Project Management, May 2, 2013
• T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013
• S3106 Version D: PBRA and RBA Process, October 4, 2012
• AWB User’s Guide• AMF Architecture & Design document
16