IWCF Well Intervention
Email : [email protected] Web: www.pvdtraining.com.vn
Theoretical & practical course providing candidates on the operating or supervisory levels
with an understanding of pressure control methods relating to the various well servicing
operations, and to prepare candidates to IWCF testing.
Personnel who have a role in the operation or supervision or planning of well intervention
(well servicing) activities in all or one of completion, coiled tubing, wireline, snubbing.
- Overview of completions
- Well control methods
- Reasons for well interventions
- Overview of well intervention services
(wire line/coiled tubing/snubbing)
- Pressure basics
- Production well kill fundamentals
- Well kill simulation and verification
- Equipment and operating procedures
- Hydrates (formation & prevention)
- Flanges and gaskets
- Failures and effects (wireline/coiled tubing/snubbing)
Course Outline
Course Objectives
Designed For
Course Outline
Email : [email protected] Web: www.pvdtraining.com.vn
08:00 – 08:30 Course Registration
08:30 – 09:00 IWCF Well Control Theory
09:00 – 09:30 IWCF Philosophy & Concepts
09:30 – 10:00 Barrier Classification, Types And Requirements
10:00 – 10:20 Morning Break
10:20 – 12:00 Formation Damage, Well Killing And Hydrates
12:00 – 13:00 LUNCH BREAK
13:00 – 15:00 Calculations of Pressure & Volume
08:00 – 08:30 Recap
08:30 – 10:00 Completion Accessories
10:00 – 10:30 Morning Break
10:30 – 12:00 Wellhead & X-Trees
12:00 – 13:00 Lunch Break
13:00 – 15:00 Wireline – Equipment
08:00 – 08:30 Recap
08:30 – 10:00 Continue Wireline Equipment
10:00 – 10:30 Morning Break
10:30 – 12:00 Coiled Tubing Equipment
12:00 – 13:00 Lunch Break
13:00 – 15:00 Continue Coiled Tubing Equipment
Day 01
Day 02
Day 03
08:00 – 08:30 Recap
08:30 – 10:00 Snubbing Unit
10:00 – 10:30 Morning Break
10:30 – 12:00 Snubbing Unit Equipment
12:00 – 13:00 Lunch Break
13:00 – 14:00 Exercises
14:00 – 15:00 Exercises
Day 04
Day 05
Final Exam