212(A8) 180(A7) 101(A4) 504(A18) 404(A14) 310(A11) 549(A19 ) 0(A) = 225 W1840 A87661 3 2 1 9 8 7 6 5 4 17 16 15 14 13 12 11 10 JUN005 Harvest and Tenure Line Split located in the field with falling boundary ribbon. 40 20 60 80 60 40 80 JUN1200 QC_JUN1000 JUN1100 JUN1220 JUN1300 Str 1 JUN1211 JUN1210 NAD 83 BC Albers 0 50 100 150 200 250 Metres 1:5,000 DRAFT Map Updated: September 26, 2011 Map By: S.Duncan / Updates By: S. Janzen JUNW01 W1840 TBA=SA ROAD INSTRUCTION MAP Geographic Centre: (Block Centre) 53° 21' 48"N Lat. / 131° 57' 26"W Long. Road Name Inside Setting (m) Outside Setting (m) Start Station(m) Start Station(HUB) End Station(m) End Station(HUB) Length(m) Type of Construction JUN1211 369 180 0 A 549 A19 549 New Construction Sub-total (m) 369 180 549 Road Construction Summary Total Length ALL ROADS(m) WL T/M TBA (Block) WL T/M TBA (Road) DV4 003 (Block) Legend Contours (10m interval) Index Contour and Label Intermediate Contour Harvest Method / Features Proposed R/W Existing R/W Single Tree Retention Lakes / Wetlands Forested Swamp Non-Forested Swamp Type 1 Habitat (Lake/Wetland) Type 2 Habitat (Lake/Wetland) Non-Fish (Lake/Wetland) Riparian Features Type 1 Stream Type 2 Stream Upland Stream Non-Classified Drainage Unknown Fish Sensitive Feature Wet Ground/Swamp Reach Break or Road Features Culvert (Existing / Proposed) Wood (Existing / Proposed) Replace or Repair (Metal / Wood) Bridge (Existing / Proposed) Waterbar or or or or Road Construction End Haul Spoil Site Large Fill Special Road Instructions Borrow Pit Quarry Bird Nest Wildlife Tree Permanent Sample Plot Resource Features Bear Den CMT Pacific Crab Apple Yew Tree (Single) Yew Tree (Group) Monumental Cedar(>120cm DBH) Monumental Cedar(<120cm DBH) Karst Feature LUO Features Roads Road Station (Hub) Engineered Road Existing Road Recce Road Adjacent Engineered Road FSR Road Old Grade Old Skid Trail De-activated Road Boundaries Falling Corner Falling Boundary Adjacent Proposed Block Tenure Boundary TAUP Other Features Dangerous Tree Windthrow Rock Rock Bluff Slide Gully Heli Pad Heli Service Landing Gate Adjacent Retention Adjacent WTRA Greened Up Block Non-Greened Up Block Growth & Yield Plot Buffer Reserves Includes all internal WTRA, LUO Reserves and Management Zones. For a further break-down of areas please see the SP map. Management Features Tree Crown Modification Machine Free Zone Sensitive Soils DV4 OR1 (Road)
Transcript
Page 1: J ROAD INSTRUCTION MAP Road... · Taan Template Revision date: December 1, 2010 Page 1 of 1 In addition to the site specific strategy which may be included in this document, all operations

212(A8)

180(A7)

101(A4)

504(A18)

404(A14)

310(A11)

549(A19 )

0(A) = 225

W184

0A87661321

9

8

7

6

5

417

16

15

14

13

12

11 10

JUN005

Harvest and TenureLine Split located inthe field with fallingboundary ribbon.

40

20

60

80

60

40

80

JUN1

200

QC_JUN1000

JUN1100

JUN1220

JUN1300Str

1

JUN1211

JUN1

210

NAD 83 BC Albers0 50 100 150 200 250

Metres1:5,000

DRAFT

Map Updated: September 26, 2011Map By: S.Duncan / Updates By: S. Janzen

JUNW01W1840 TBA=SA

ROAD INSTRUCTION MAPGeographic Centre:

(Block Centre)53° 21' 48"N Lat. / 131° 57' 26"W Long.

Road Name

Inside Setting (m)

Outside Setting (m)

Start Station(m)

Start Station(HUB)

End Station(m)

End Station(HUB) Length(m) Type of

ConstructionJUN1211 369 180 0 A 549 A19 549 New Construction

Sub-total (m) 369 180 549

Road Construction Summary

Total Length ALL ROADS(m)

WLT/MTBA

(Block)WLT/MTBA

(Road)

DV4003

(Block)

Legend

Contours (10m interval)Index Contour and LabelIntermediate Contour

Harvest Method / FeaturesProposed R/WExisting R/WSingle Tree Retention

Lakes / WetlandsForested SwampNon-Forested SwampType 1 Habitat (Lake/Wetland)Type 2 Habitat (Lake/Wetland)Non-Fish (Lake/Wetland)

Riparian FeaturesType 1 Stream Type 2 StreamUpland StreamNon-Classified DrainageUnknown Fish Sensitive FeatureWet Ground/SwampReach Break

or

Road FeaturesCulvert (Existing / Proposed)Wood (Existing / Proposed)Replace or Repair (Metal / Wood)Bridge (Existing / Proposed)Waterbar

or

or

or

or

Road ConstructionEnd HaulSpoil SiteLarge FillSpecial Road InstructionsBorrow PitQuarry

Bird NestWildlife TreePermanent Sample Plot

Resource Features

Bear DenCMTPacific Crab AppleYew Tree (Single)Yew Tree (Group)Monumental Cedar(>120cm DBH)Monumental Cedar(<120cm DBH)Karst Feature

LUO Features

RoadsRoad Station (Hub)Engineered RoadExisting RoadRecce RoadAdjacent Engineered RoadFSR RoadOld GradeOld Skid TrailDe-activated Road

BoundariesFalling CornerFalling BoundaryAdjacent Proposed BlockTenure BoundaryTAUP

Other FeaturesDangerous TreeWindthrowRockRock BluffSlideGullyHeli PadHeli Service LandingGateAdjacent RetentionAdjacent WTRAGreened Up BlockNon-Greened Up BlockGrowth & Yield Plot Buffer

ReservesIncludes all internal WTRA, LUO Reserves and Management Zones. For a further break-down of areas please see the SP map.

Management FeaturesTree Crown ModificationMachine Free ZoneSensitive Soils

DV4OR1

(Road)

Page 2: J ROAD INSTRUCTION MAP Road... · Taan Template Revision date: December 1, 2010 Page 1 of 1 In addition to the site specific strategy which may be included in this document, all operations

DRAFT Instructions Cut block: JUNW01 Road: JUN1211

Taan Template Revision date: December 1, 2010 Page 1 of 1

In addition to the site specific strategy which may be included in this document, all operations carried out under this road construction plan must be in accordance with the information within the Contract. This document is only a map representation of the road profile document. The road construction designs, Terrain Stability Field Assessment Report and other applicable documents must be referenced in conjunction with this plan.

ROAD CONSTRUCTION STRATEGIES AND CONSTRAINTS

Construction Plan: Reference Taan road design and profiles - All road construction requires the employment of sediment control measures (silt fencing, hay bales and sediment catchment basins/sumps) - Culverts should be installed 30cm below road surface, on the existing streambed where possible and armored at the outlet - Strippings and organics must be kept out of the sub-grade except in the case of over-landing techniques - Fill material should be keyed-in after all organic material has been removed - Alternatives to ditching include: sub-drains (French drains), natural dips and swales, in-sloping and out-sloping Special Construction Requirements:

Road Start Station End Station Prescription

If anything is unclear in this plan, contact Taan’s Operation Manager or designate

THE FOLLOWING ROADS ARE APPROVED FOR CONSTRUCTION

JUN1211 0+000 to 0+549 SEE APPLICABLE DESIGNS / PROFILES/TSFA REPORTS etc

ISSUES OR CONCERNS ACTIONS TO ACCOMMODATE

Safety

Refer to Taan Pre-work document prior to starting Falling and Harvesting activities. Dangerous Trees outside of the harvest boundary – Operations will be in accordance with Work Safe BC Regulations. Where possible “No Work Zones” will be established. If the Dangerous Tree must be felled, mark an “X” on the stump in the field and mark an “X” on the map in the office. Danger Trees felled within a Wildlife Tree Retention Area (WTRA) or Reserve are not to be utilized. Adhere to Rainfall shut down criteria

Wildlife

A Wildlife Tree Retention Area (WTRA) & Land Use Order Reserve (LUOR) are adjacent to this cut block to allow for wildlife habitat and protection of a Type II Fish habitat stream. No trees are to be felled within the WTRA or LUOR except for safety reasons. The tree that is situated within the WTRA or LUOR (after falling) must remain in the WTRA or LUOR area. If any raptor nests, heron rookeries or other previously unidentified features are found operations within the immediate vicinity of the feature must be stopped until a plan to manage the feature is developed. If a bear den tree is found, contact a Taan representative immediately. No action is to be taken on the newly discovered bear den until Taan has reviewed the den. Rare Plant Species: N/A

Visual Quality N / A

Cultural Heritage If a CMT is encountered within the opening, whether alive or dead, standing or fallen, during any phase, logging will cease in the immediate vicinity of the CMT. Notification will be sent to Taan (Operations Manager), Natural Resources (MoFR, MSRM (Archeology and Registry Services Branch)) and the Haida Nation. Taan direction must be received prior to operations proceeding.

TSFA Prescriptions A TSFA was not necessary for this cut block.

Blasting Appropriate signage and closures are required.

RAINFALL SHUTDOWN CRITERIA Activities must shut down when:

- The total rainfall reaches 50 mm in 12 hours or less, or

- The total rainfall reaches 60 mm in 24 hours, or

- The total rainfall reaches 100 mm in 72 hours

Activities may start back-up when:

- The total rainfall is equal to or less than 30 mm in 48 hours, or

- The total rainfall is equal to or less than 60 mm in 72 hours

QUARRIES, PITS, AND SPOIL SITES DO NOT EXCAVATE A PIT, QUARRY OR SPOIL MATERIAL WITHIN THE RIPARIAN MANAGEMENT AREA OF ANY STREAM.

Pit is located on Lawn Hill Road managed by Big Dog Enterprises

STREAMS

There are no streams within the road construction area.

Page 3: J ROAD INSTRUCTION MAP Road... · Taan Template Revision date: December 1, 2010 Page 1 of 1 In addition to the site specific strategy which may be included in this document, all operations

PROFILE

PLAN

Plan Scale 1:2000

Profile Vert Scale 1:200Profile Horz Scale 1:2000

Page 1 of 1

0A

32

68

102

15

7

214

246

280

314

34

8

384 4

38

469

510

555

A19=548

A1

9=

54

8554.91 0 2 1 3

42

24

30 -2

-4

-6

-5

L-Stn

40

60

80

10

0

12

0

14

0

16

0

18

0

20

0

22

0

24

0

26

0

28

0

30

0

32

0

34

0

36

0

38

0

40

0

42

0

44

0

46

0

48

0

50

0

52

0

54

0

56

0

58

0

60

0

94

96

98

100

102

104

106

108

110

112

Lyr1 Gnd: OM 100

Ssl: (Av) 0 -3 0 +5 -1 0 -5 0

Ssr: (Av) -1 -3 -0 -3 +2 +5 -5 0 +5 -3 0 +5 0

Mass Haul (Cu. m.)

-500

Legend

Plan L-line Location

Plan P-line Location

Plan Slope Stakes

Plan Road Edges

Plan Culverts

Profile Topopgraphy

Profile Subgrade

Profile P-line Topography

Profile Slope Stakes

Profile Culverts

WATCHMEN

ENGINEERING

CULVERTS

CUTBLOCK: JUN006

ROAD: JUN1211

Date: August 4, 2011

No Culverts

Page 4: J ROAD INSTRUCTION MAP Road... · Taan Template Revision date: December 1, 2010 Page 1 of 1 In addition to the site specific strategy which may be included in this document, all operations

ROADENG Section P. 1

E:\Taan Blocks\JUN006\RoadEng\JUN006 Road Design JUN1211

Scale 1:300

11/07/26

L-Stn: -0.0

P-Stn: 0.0

Grd.Nxt. 1

Grd.Lst: n/a

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: 0.0

-0.0 -

5

0 5

95

100

105

L-Stn: 14.8

P-Stn: 14.6

Grd.Nxt. 1

Grd.Lst: 1

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: -0.4

14.8

-5

0 5

95

100

105

L-Stn: 32.2

P-Stn: 31.8

Grd.Nxt. 0

Grd.Lst: 1

Ssl: (Av) 0

Ssr: (Av) -1

Cut Dp: 0.0

32.2

-5

0 5

95

100

105

L-Stn: 68.0

P-Stn: 67.2

Grd.Nxt. 0

Grd.Lst: 0

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: -0.5

68.0

-5

0 5

95

100

105

L-Stn: 102.3

P-Stn: 101.1

Grd.Nxt. 2

Grd.Lst: 0

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: 0.0

102.3

-5

0 5

95

100

105

L-Stn: 130.5

P-Stn: 129.0

Grd.Nxt. 1

Grd.Lst: 2

Ssl: (Av) -3

Ssr: (Av) -3

Cut Dp: 0.0

130.5

-5

0 5

100

105

L-Stn: 157.3

P-Stn: 155.5

Grd.Nxt. 1

Grd.Lst: 1

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: -0.2

157.3

-5

0 5

100

105

L-Stn: 182.2

P-Stn: 180.1

Grd.Nxt. 4

Grd.Lst: 3

Ssl: (Av) 5

Ssr: (Av) 0

Cut Dp: 0.0

182.2

-5

0 5

100

105

L-Stn: 213.9

P-Stn: 211.5

Grd.Nxt. 2

Grd.Lst: 2

Ssl: (Av) -1

Ssr: (Av) -3

Cut Dp: 0.2

213.9

-5

0 5

100

105

110

Page 5: J ROAD INSTRUCTION MAP Road... · Taan Template Revision date: December 1, 2010 Page 1 of 1 In addition to the site specific strategy which may be included in this document, all operations

ROADENG Section P. 2

E:\Taan Blocks\JUN006\RoadEng\JUN006 Road Design JUN1211

Scale 1:300

11/07/26

L-Stn: 246.3

P-Stn: 243.5

Grd.Nxt. 2

Grd.Lst: 2

Ssl: (Av) 0

Ssr: (Av) 2

Cut Dp: -0.2

246.3 -

5

0 5 100

105

110

L-Stn: 280.2

P-Stn: 277.0

Grd.Nxt. 4

Grd.Lst: 4

Ssl: (Av) 0

Ssr: (Av) 5

Cut Dp: -0.3

280.2

-5

0 5

100

105

110

L-Stn: 313.9

P-Stn: 310.3

Grd.Nxt. 4

Grd.Lst: 4

Ssl: (Av) 0

Ssr: (Av) -5

Cut Dp: -0.3

313.9

-5

0 5

105

110

L-Stn: 348.0

P-Stn: 344.1

Grd.Nxt. 0

Grd.Lst: 3

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: 0.0

348.0

-5

0 5

105

110

L-Stn: 383.6

P-Stn: 379.3

Grd.Nxt. 0

Grd.Lst: 0

Ssl: (Av) 0

Ssr: (Av) 5

Cut Dp: -0.4

383.6

-5

0 5

105

110

L-Stn: 408.7

P-Stn: 404.1

Grd.Nxt. -2

Grd.Lst: 0

Ssl: (Av) 0

Ssr: (Av) -3

Cut Dp: 0.0

408.7

-5

0 5

105

110

L-Stn: 438.5

P-Stn: 433.5

Grd.Nxt. -4

Grd.Lst: -2

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: 0.0

438.5

-5

0 5

105

110

L-Stn: 469.0

P-Stn: 463.7

Grd.Nxt. -6

Grd.Lst: -4

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: 0.0

469.0

-5

0 5

105

110

L-Stn: 484.2

P-Stn: 478.7

Grd.Nxt. -6

Grd.Lst: -6

Ssl: (Av) -5

Ssr: (Av) 0

Cut Dp: 0.5

484.2

-5

0 5

100

105

110

Page 6: J ROAD INSTRUCTION MAP Road... · Taan Template Revision date: December 1, 2010 Page 1 of 1 In addition to the site specific strategy which may be included in this document, all operations

ROADENG Section P. 3

E:\Taan Blocks\JUN006\RoadEng\JUN006 Road Design JUN1211

Scale 1:300

11/07/26

L-Stn: 509.9

P-Stn: 504.2

Grd.Nxt. -5

Grd.Lst: -6

Ssl: (Av) -5

Ssr: (Av) 5

Cut Dp: 0.0

509.9 -

5

0 5 100

105

110

L-Stn: 554.9

P-Stn: 548.8

Grd.Nxt. n/a

Grd.Lst: -5

Ssl: (Av) 0

Ssr: (Av) 0

Cut Dp: -2.0

554.9

-5

0 5

100

105