Date post: | 01-Jun-2018 |
Category: |
Documents |
Upload: | yoga-rikumoro |
View: | 217 times |
Download: | 0 times |
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 1/26
PetroChina International Jabung Ltd.
Weekly Report
Date: March 23, 2014(Period: March 16 ~ March 22, 2014)
To : General Manager – Jaarta
!ro" : !ield Manager – Geragai
1.0 PRODUCTION
FIELD OIL OIL GAS GAS WATER WATER
PROD. (BBLS) CUMM. (MCFD) CUMM. (BBL) CUMM.
N. Geragai 154 1,!" #,$1 4%,44 %,#5" $5,#1$
Ma&'r $1" 1,5%% ,1"1 5!,%%" 1$,115 4,% Ge'a* "15 #,44 4",#1 %4!,!## 1,#4 11,4$
NE Be+ara "15 #,45 1#,%#! 1,1!,5! #! 4,#
N. Be+ara #1# 4,%1$ 11,# !!,4!! $ 14
Ria* 1"4 1,%5" $,"5 $,$#5 # 4$
SW Be+ara !%1 5,1$ %,"4# $!,#$4 14# 1,$%
W. Be+ara # 5,#45 $,## $,#4 5#1
S. Be+ara 1,#45 11,51! ",!# #",1%1 5" 4,1$1
Mar'-
Pae 151 1,55 14% 1,1 "1 #%#
TOTAL #,%4! 44,4$"
C-/e0a+e ,!$# #1,$
Pr-ae 11,!%1 $,114
B+ae #,1# 4$,!44
TOTAL GENERAL %$,"1 $%,%#" $#%,$%4 1,4$,#41 1",14 1%%,1
MMCFD BOE (BBLS)MMCFD(CUMM)
BOE(CUMM) BBTU/
BBTU(C'')
Ga0 De2i3er +- TGI GSPL
1$$.4" $,41# 5!.4 14$,"15 1%.14% "1.""
MMCFD BOE (BBLS) MMCFD(CUMM) BOE(CUMM) MMBTU/ MMBTU(CUMM)
Ga0 De2i3er +- PT. TP 1."%# %$% 1%.554 $,$5" $,55$.4$" 1!,#!.%
CPS PROD. FACILITIES Pre00 Li6i/ Oi2 Wa+er Ga0OPERATINGPARAMETERS P0i B720 B720 B720 M089
P:;%44 Pr-/8+i- Seara+-r 14$ 1%,#!# #44 1%,%$ 1",!5$
P:;%41 $/ S+age Seara+-r %! 1,!1" 1,4$% $"# $$#
P:;%4$ Te0+ Seara+-r 14% 5!%
P:;%4% <P Seara+-r 4"" $! 1%,"!
1
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 2/26
Total Producing Oil Wells: ! Wells Total Producing "as Wells: !# Wells
#G 10 $ell% #G 6 $ell%
M& 6 $ell% M& ' $ell%
G 1 $ell% G 14 $ell%
#* 24 $ell% #* 3+ $ell%
#* 4 $ell% #* 4 $ell%
i-ah 6 $ell%
.$* / $ell%
$* $ell%
.* 10 $ell%
Mar"o $ell
Panen 1 $ell
1.1 Nort$ %a&ung Operations '"e(a$) N*) Ripa$) +ar(o and N,*-
• *ac on line Ge"ah+ inter"etten lo to %%te"
• *ac on line Ge"ah30,32 inter"etten lo to %%te"
• .h5t in #*2+ d5e to no lo
• Monitor Ge"ah in%tr5"ent cre di%conected n%tr5"entation at -5"- #*21,and .P #*
6,10
• Monitor *GP electric di%conect electric %%te" at -5"- #*21
• Monitor *GP "echanic di%"antle -5"- at -5"- #*21
• Monitor !a7 %ho- n%tall acilitie% at "ar"o1 or %85are tan,container,ga% 7oot,"aniold
co"-lete or 49lo line and %e-arator %till in-rogre%%
• Monitor a7 %ho- in%tall acilitie% at #*/6 -ad or ga% 7oot,%85are tan,or 49 lo line
"aniold %till in-rogre%%
• Monitor Ge"ah in%tr5"ent re-air control -anel at i-ah TJPP d5e to -oer %5-le tri-
• i-ah1' .P ell %h5t don d5e to ga% engine -ro7le"
• !loing i-ah10 .P ell% ro" ca%%ing ann5l5% to %%te"
1. West %a&ung Operations '/W*W*/*Panen-
• ontin5e *;< $*D2 ell (.P) or 24 hr% e=er 2 da%, on an inter"ittent -rod5ction -attern
(1 da >on? and 1 da >o?)
• ;n March 16, 2014 *;< $*D1 inter"ittent lo ell directl to ga% 7oot .T@P: 4'0 -%i
• ;n March 16, 2014 A%%i%t Drilling on%tr5ction in%tall 2/B+C t57ing -i-e or te"-orar lare line
o ell te%t at .*D10D (..) to cond5ct ell te%t .*D/ .*D10D
• ;n March 16, 2014 n%tall $@ acce%%orie% o .*D1D (..) and .*D12D (..) ell% or
te"-orar hoo 5- te%t %e-arator at ell %ite or collect %a"-le% and %-eciication ga% re=ie
• ;n March 16, 2014 A%%i%t .$* o"-re%%or Mechanic cond5ct eel r5nning $* 1'P&
100B102 AGB<G o"-re%%or at $* PP!
• ;n March 16 1, 2014 oo-eration ith Pi-e <ine Maint and relate De-t to re-air ra--ing
eE-o%ed 12C $* 5ndergro5nd -i-e line% to .$*F -ad at '0 "eter% ater .aragi 7ridge or 200
"eter% ater .*F3 inter%ection toard% #*F -ad co"-leted
• ;n March 1/, 2014 @oo 5- ga% te%t %e-arator 140 on .*F3 @P "aniold or .*D1D (..)
ell te%t and collect %a"-le or %-eciication ga% re=ie
• ;n March 1+, 2014 %5c o5t a%te ater 7 ac55" Tr5c in the .$* %l5dge -ond and ater
conta"inated ith oil total Ht +0 *7l% at .$* and $* PP! $ater Treat"ent and ha5ling to
Geragai %e=en -ond%
• ;n March 1+, 2014 at 1330 2030 hr% .h5t don 1+'P101 I o"-re%%or .$* PP! d5e
to P< "od5le -ro7le" and te"-orar re-lace ith $* I o"-re%%or
• ;n March 1+, 2014 Di%connect and 7orro $*D tree to- ada-ter co"-leted ith lange to 7e
te"-orar in%tall at .*D1 ell or -5ll o5t *P and P -l5g -rong
• ;n March 1+, 2014 in%tall ell head acce%%orie% .*D12D (..) ell or te"-orar hoo 5- ga%
te%t %e-arator 140 at ell %ite or collect %a"-le% and %-eciication ga% re=ie
2
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 3/26
• ;n March 1+, 2014 Acco"-an Mr Pre%ident Petrochina ntl <td cond5ct ield =i%it at $* PP!
and .$* PP!
• ;n March 1, 2014 n%tall ell head acce%%orie% .*D10D (..), .*D/D (..) and $*2 ell%
• ;n March 1 22, 2014 cond5cted .a"-ling Ga%B;ilB$ater and Parar"eter% on .*D1D,.*D
10 .*D/ 7 5%ing ga% te%t %e-arator 140 a% -er Jaarta ngineering re85e%ted
• ;n March 1+22, 2014 A%%i%t A<# (Artha <inta% #5%a) re%et 5- *P o .*D1D, .*D10
.*D / ell ( o"-leted )
• ;n March 1, 2014 At 1':4' hr% Pigging 6KK oil %hi--ing line ( -ig no1) ro" .$* PP! to #*F -ad ( recei=er .$* ) ater -5"-ing '' gln% o che"ical P /01+ %hi--ing line -re%%
%hon 32' -%i
• ;n March 1, 2014 Mo=e and %et 5- oil te%t .e-arator 114 ro" #*/+ to Panen ItaraF1 or
-re-aration re-lace"ent rental .e-arator MPM001 ith ne P %e-arator +00
• ;n March 20, 2014 n%tall te"-orar 3B+KK t57ing line ro" .*D1' ell to .*D10 ell and
inLect -re%% into t57ing %tring .*D10 ell or e85alie -re%% 7eteen 7otto" hole and t57ing
%tring to -5ll o5t P -l5g Prong ( -acing -re%% 1'00 -%i )
• ;n March 20, 2014 Pre-are connection oil te%t .e-arator 114 at Panen ItaraF1 -ad or
-re-aration re-lace"ent rental .e-arator MPM001 ith ne P %e-arator +00
• ;n March 20, 2014 Di%"antle te"-orar L5"-er line ro" .*D1D to .*D1 ell ater
co"-leted %-eciication non a%%o ga% re=ie• ;n March 21, 2014 At 0/00 hr% !o5nd .$*2 ell no lo $@P dro- to ero -%i and at 111'
hr% 5nload to lare -it ith o-en choe al%o no lo and then at 1/00 hr% %h5t in the ell 7
clo%e ing =al=e
• ;n March 1 22, 2014 A%%i%t necal $ire line to -5ll o5t and e%et the P Pl5g and Prong at
<anding #i--le at 43'3? MD o .*D1D, .*D10D,.*D/(..) ell%
• ;n March 21, 2014 at 000 1100 hr% .itch 1+'P&100 AG o"- to 1+'P&102 <G o"-
to re-lace 2 ea 7roen 7elt an o cooler At 1600 164' hr% .h5t don 1+'P&100 AG
o"-re%%or .$* PP! d5e to .10' cooler @igh =i7ration Total don ti"e 0/' hr%
• ;n March 21, 2014 a%%i%t A<# (artha linta% n5%a) -5ll o5t *P on $*2 ell co"-leted
• ;n March 21 22, 2014 ontin5e %et 5- oil te%t .e-arator 114 at Panen ItaraF1 -ad or
-re-aration re-lace"ent rental .e-arator MPM001 ith ne P %e-arator +00• ;n March 22, 2014 at 1000 hr% 6C ;AP -ig #o 1 a% arri=ed at #*F Pad (.$* ecei=er)
good and clean condition d5ration ti"e 662' hr%
• ;n March 22, 2014 A%%i%t A<# (artha linta% n5%a) -5ll o5t *P on .*D/ $*' ell and re
%et 5- *P o .*D10D ell ( co"-leted)
• ;n March 22, 2014 in%tall te"-orar t57ing ro" .$*' ell to .$*2 ell and at 030 hr%
inLect -re%% into t57ing %tring .$*2 ell 5ntil '00 -%i at 131' hr% 5nload to lare -it and then
at 1400 hr% %itch to te%t tan 100 77l% ith choe 30B64P nor"al $@P at 40 -%i
• ;n March 22, 2014 At 0+30 hr% Inload .$*1 inter"ittent lo directl to lare -it at
.$*F1' -ad .T@P /2' -%i and then at 0+4' hr% %itch to %%te" gro5- %e-arator 1+'200 at
.$* PP! ith choe 36B64CA $@P nor"al at 3'0 -%i
•
;n March 22, 2014 ontin5e %et 5- oil te%t .e-arator 114 at Panen ItaraF1 -ad or -re-arationre-lace"ent rental .e-arator MPM001 ith ne P %e-arator +00
• ;n March 22, 2014 At 0+:30 hr% .itch Panen Itara1 ell lo directl to oil te%t %e-arator
114 and relea%e -re%% and loering le=el in the %e-arator MPM001
• ;n March 22, 2014 Di%"antle rental %e-arator MPM001 at Pan5tF1 -ad and "o=e to
Mar"oF1 -ad
1. /out$ %a&ung Operations 'N"+2 3 Oil +o4e(ent-
• Monitor 75ild 5- -re%%5re -otential .B ell :
o #G0+:0 P%i, #G10: 460 P%i, #G2D : +0 P%i, #G30:1120 P%i, #G30D: 640 P%i, #G
33 : 0 P%i, #G3': 1300 P%i, #G3/: /30 P%i, #G3+D: 40 P%i, #G41:1240 P%i, #G41D:
1220 P%i
o M&04 : 41' P%i, M&': 1360 P%i, M&06: 1120 P%i, M&11: 0 P%i, M&12 T$D: '30 P%i,
M&31D: 00 P%i
3
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 4/26
• Monitor eccle cr5de oil %a"-le at to-, "iddle and 7otto" o all cr5de oil tan (contin5e)
• AdL5%t che"ical rate d5e to %igniicant higher and loer rate than reco""ended 7 <a7 o #G
M& area 7 -rod5ction ield cre%
• lean5- %trainer% o Ge"ah Pig ecei=er, eccle P5"-%, ater oil o5tlet 2 nd .tage .e-arator
at P. 7 Prod !ield re
• Monitor =ac55" tr5c T4/' or 5nload a%te ater ro" Ti5ng Itara01 drilling ell to / -ond
P. area
• lean5- r5de ;il Tan T+410 and re-air le=el indicator =arec 7 n%tr5"ent Tea"(co"-leted)o Inloading %l5dge ro" cr5de oil tan T+410 to %l5dge -ond 7 =ac55" tr5c T1++ and T
20 total N 3 load
o P5rging cr5de oil tan T+410 ater clean 5- (co"-leted) and clean 5- tra%h aro5nd cr5de oil
tan T+410 at P.
o <oering li85id o ce"ent 7oEe% 7 =ac55" tr5c and 5nload to %l5dge -ond P.
• At 1/th March 2014 2400 hr% !o5nd #G40 ell no lo and ga% lit no lo At 1+ th March
2014, 0/00 hr% *ac on line #G40 ell lo directl to %%te" .@P N +00 -%i
• Deli=er 3 ea eE%85are tan% che"ical a% re85e%ted * @.n=iron"ent to %5--ort acti=it at
$$T! P.
• @and o=er %85are tan that e"-t ro" conta"ination oil %-ill, 7roen condition to @.
en=iron"ent, or %ending to Jaarta 7 d5"- tr5c PT $a%tec• 36 ea ere deli=ered on 1/th Mar 2014 and 14 ea ere taen on 21%t Mar 2014
• .5--ort =i%it ro" .&&Miga% Tea" (.57 Dina% Pengha-5%an A%et) to cond5ct -h%ical chec
eEche"ical tan at &M06 ard or -ra!IPP -roce%%
• <oering li85id eEche"ical all %85are tan total N 134 ea N O 1' 77l% and 5nload ro"
Prod5ction ard &M6 to %l5dge -ond P. 7 =ac55" tr5c T1++
• eill 5- che"ical at .o5th Ja75ng area, a% ollo :
o *+132 at Pig recei=er, Prod "aniold and #G ell% and te%t %e- M&' Total : 5 dru(s
o $T104+ at inlet Tan T121, Total : dru(s
o &'331 at o5tlet tan T126 at P. Total : dru(s
o .64/' at o5tlet 1%t .tage .e-arator and o5tlet T126 at P. Total : 7 dru(s
o Methanol at #G614,22 34 and M&16 ell% Total : # dru(so "rand Total: 0 dru(s
• Monitor JM tran%er conden%ate to onden%ate .torage Tan T101 at P.
• Monitor Ja"7i Merang contractor (PT*.P) -eror"ing %ite -re-aration ne conden%ate tan
location
• Monitor MD 12 MD 14 Pre%%5re Den%it "eter
• Monitor ree ater content at ;T !.; !ederal
• onden%ate liting to MT .5cce%% hallenger
• .itching tran%er lo cr5de oil and conden%ate ro" P. to !.; !ederal
1.7 Well testing 3 Production %a&ung +onitoring
• Monitoring reg5lar Geragai ell te%t 7 %e-arator P – 3420 at #G (6, /, 14, 1', 23, 34D, 3D,
40)
• Monitoring reg5lar Ma"5r ell te%t 7 te%t %e-arator P11'0 at M& (16, 1+, 24)
• The -eror"ance -rod5ction reg5lar ell te%t #orth, $e%t, Ja75ng ell%:
o Ge"ah 7 %e-arator 600 (G, 3/)
o Ge"ah 7 %e-arator 130 (G16, ')
o Ge"ah 7 %e-arator 1000 (G 3')
o Ge"ah 7 %e-arator 2000 (G11, 1+)
o Ge"ah 7 %e-arator 1120 (G44)
o Ge"ah 7 %e-arator '00 (G4)
o #orth *etara 7 %e-arator 120 (#*4)
o #orth *etara 7 %e-arator 100 (#*1')
o #orth a%t *etara 7 %e-arator 300 (#*0', 11)
4
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 5/26
o #orth a%t *etara 7 %e-arator 116 (1+, 2')
o #orth a%t *etara 7 %e-arator 600 (#*2, 3, '/)
o $e%t *etara De=elo-"ent * %e-arator A*. 2000 ($*D 0+,)
o .* and .*D 7 %e-arator MPM 1000 – 300 ( .*01 and .*D13,14,)
o $* 6 Pad 7 .e-arator MPM200 ( .*D16D )
o .*D ' -ad 7 %e-arator Di-a 02 ( .*D')
o i-ahPP! 7 %e-arator 1160 (',+,,10, 21,)
o .o5th $e%t *etara 7 T.T %e-arator 1+4 100 ( .$* +,21,)o .o5th *etara 3 Pad 7 %e-arator 600 ( .*3,.*D+,.*D13 and .*D13D )
o .o5th *etara 1 -ad 7 %e-arator /00 -re-are or ne ell (Pi-e line in-rogre%%)
• Monitor Peror"ance reg5lar ell te%t o %o5th, north, e%t, i-ah ell
• Peror" P*I .5r=e ith "5lti rate te%t #*'2 7 oil te%t %e-arator 114
• Mo=e and %et 5- oil te%t %e-arator 114 ro" #*+ -ad to #*' -ad and te%t #*' ell
• ontin5e "onitor *GP a7 %ho- cre %et 5- Mar"o1 acilitie% at Mar"o1 -ad
• ontin5e "onitor *GP a7 %ho- cre %et 5- #*/+ acilitie% at #*/6 -ad
• Mo=e and %et 5- ga% te%t %e-arator 140 ro" G1 -ad to #* -ad (e-air 3B4C ni--le o oil
7ridle 7roen 7 *GP a7%ho-)
• Mo=e and %et 5- ga% te%t %e-arator 140 ro" #* -ad to .*3 -ad
• ond5ct ell te%t% .*D1 ell, %a"-ling Progra" 7 Ga% te%t %e-t 140
• Mo=e oil te%t %e-arator 114 ro" #*' -ad to Panen 5tara 1 -ad or re-lace %e-arator MPM
001 and than %e-arator at -anen 5tara1(MPM001) "o=e and %et5- to Mar"o1 acilitie%
• Mo=e ga% te%t %e-arator 140 ro" .*3 -ad to .*D10 ell or %a"-ling -rogra" and contin5e
te%t the ell: 6 hr%
• March 21,03,2014 Mo=e and %et5- #e %e-arator +00 ro" Geragai n%tr5"ent %ho- to Panen
5tara1 acilitie%
• Mo=e Ga% te%t %e-arator 140 r" .*D10 to .*D/ ell or Ga% %a"-ling Progra" and
contin5e te%t the ell, 6 hr%
• .tat5% ig F 02, Drilling %tand 7 at G12 (ig 7a%e ca"-)
• .tat5% ig F 3 Drilling %tand 7 at #*1 at #*/6 -ad
• .tat5% ig F 11 o"-letion .tand 7 at Ti5ng Itara1 -ad
• .tat5% ig F 12 o"-letion F .tand 7 at *GP rig 7a%e ca"-
1.5 +o4e(ent 'Crude Oil) Condensate-
• onden%ate liting to MT .5cce%% hallenger F 130 36,0+/ *7l%
• Pro-ane liting to MT #. @A<<#G 1/,000330 MT
• *5tane liting to MT #. @A<<#G 10,00020 MT
1.! P+T) Petro/tar 3 8ederal 9ccu(ulati4e 8igure
• Total r5de ;il Taner handled N 1,/3 Taner% (r5de oil)
•
Total r5de oil lited N //,+6+,6/+ *7l% (E-ort Do"e%tic)
• Total onden%ate Taner handled N 12 Taner% (onden%ate)
• Total onden%ate lited N 26,041,6' *7l% (E-ort Do"e%tic)
• Total <PG Taner handled N 16' Taner% (<PG) – no "ore <PG liting
• Total <PG lited N 264,'+1//+ MT – no "ore <PG
liting
• Total Pro-ane lited N 2,46+,+/26'/ MT
• Total *5tane lited N 1,'/,3/1263 MT
.0 8I,D ,N"IN,,RIN".1 Production ,ngineering
'
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 6/26
• N"6 '/I Well- – Peror"ed .*@P .5r=e ro" loer one (4'20? 4'34? MD G43 ) &ee- it
on .B hile "onitoring it% .T@P
• /*6D1D '"as Well- – Peror"ed %licline -rogra" to o-en inter=al 6034? – 6044? MD ITA!
or taing li85id and ga% %a"-le a% re85e%t ro" Jaarta Proce%% ng ro" thi% one and -5t it
7ac on clo%ed -o%ition aterard%
• /*6D10D '"as Well not produced yet- – Peror" %licline -rogra" to o-en inter=al 4+'0K
4+60K MD GI! or taing li85id and ga% %a"-le a% re85e%t 7 Jaarta Proce%% ng ro" thi%
one and -5t it 7ac on clo%ed -o%ition aterard%• N"670 '" Well- – !o5nd the ell no lo on March 16, 2014, -5t it on .B or 75ilding 5- it%
-re%%5re and then *;< on March 1+, 2014 ater 5nloading the hea= li85id to lare
• N,*6; 'Oil Well- – !o5nd the ell no lo on March 1+, 2014, ee- it on .B hile "onitoring
it% .T@P
+ onitoring /RP <ells :
• /RP producing ' <ells- :
o P5"-ing ith nor"al o-eration: W*D6 3 5) Ripa$615.
• /RP s$ut6in '1 <ells- :
o ",6 0) ) N*6) !) #) 10) , Ripa$6) #) ) 10) 17) 1!) 1#) 1) and WP61) 7) #o N,*61: The -5"- %t5c hile tring to *;< or inter"ittent -rod5ction -attern (-ro-o%e
or $B;ga%)
o N,*651: .h5t don -5"-, 100Q $ater
. a&oratory
• /out$ %a&ung area acti4ities
• ollected glcol %a"-le ro" inletBo5tlet o h-oconcentrator o @a"ilton -lant to
deter"ine o ater content in Glcol ater -roce%% a--lication into @a"ilton -lant at #G!
-lant area
• ollected and analed conden%ate JM onden%ate %a"-le ro" I-%trea" at "etering
Tali%"an 7eore loading or AP, .G, P, *. $ anal%i%• ollected #G! .ale% ga% "etering, nlet Ga% @a"ilton and o5tlet ga% JT -lant %a"-le% or
co"-o%ition anal%i% (eel re-ort)
• ollected conden%ate %a"-le ro" Ja"7i Merang %hi--ing line or @g content anal%i%
• Anal%i% ater %a"-le ro" @; De-t or anal%i% %tandard clean ater re85e%ted
• Analed ater %a"-le total + -oint% ro" @. De-art"ent a% Monthl re-ort
• ollected analed co"-leted re-ort -ro-ertie% or liting taner MT R#.
hallenger9<iting #o : <PGB!.;J*B20+0314 7a%ed on <oading ad=ice <PG J*G March
2014 Pt" 20+
• ollected analed (inletBo5tlet -ro-ane 75tane treater%) ga% co"-o%ition or @g content
and Total .5l5r anal%i%
•De-o%itBaE dentiication ro" Mar"o ell ith %e=eral =i%5al and t-e "aterial contentdeter"ine analed o de-o%t %a"-le
• Analed ater %a"-le ro" G34 -i-e line or corro%ion i"-acted identiied
• Analed .hell Ther"ia * <57e ;il %a"-le or @eat Tran%er o @ot oil ith total 4 dr5"%
or "ea%5ring the &ine"atic i%co%it anal%i% -ara"eter
• Nort$ %a&ung area acti4ities
• ollected <i85id %a"-le ro" 7otto" deethanier, 7otto" conden%ate %tri--er and #G< to
#G! in the "orning or co"-o%ition anal%i%
• ontin5ed anal%i% ater content ro" inlet -ro-ane drer and o5tlet -ro-ane drer ro"
#G! area
• Analed a"ine %a"-le or ater content, oa"ing and %ol=ent %trength anal%i%• ollected and analed ga% %a"-le ro" i-ah TanL5ng Ja75ng Poer Plant Metering d5e to
Prod nginering re85e%ted a% $eel re-ort
6
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 7/26
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 8/26
• Monitoring ill 5- and ence con%tr5ction at Geragai *a%e a"- (;n @old)
• n%-ection ero%ion at 5ndergro5nd -i-eline Parit Gar5da 2 (o"-leted)
• Ci4il ,ngineering
• De%ign o-en drain -5"- %%te" o oil a%te at #G!, #G< P. (n Progre%%)
• !ea%i7ilit %t5d Ga% o"-re%%or %helter or ;=er @ead rane (M;) (n Progre%%)
• !ea%i7ilit %t5d o %tr5ct5re #*F'4 *ridge (n Progre%%)
• e=ie de%ign draing e%ti"ate "eeting training roo" doc5"ent 75ilding (n Progre%%)
• Pre-are =ol5"e e%ti"ate co%t co"-ari%on or doc5"ent ategor (n Progre%%)
• De%ign and draing lao5t %e-arator at Panen ItaraF1 (n Progre%%)
• e=ie oil tra- at Panen ItaraF1 (n Progre%%)
• De%ign and draing o5ndation or %e-arator at Panen Itara F 1 (n Progre%%)
• De%ign and draing -lator" or %id "aniold at #* F + (n Progre%%)
• >C ,lectrical and Instru(ent 9cti4ities
•• Monitoring electrical in%tallation at .$* -er"anent ca"-, aiting in%tall %itch, rece-tacle,
T and Telo" line in door A and etc (On ?old)
••
Monitoring electrical in%tallation at #G $ater Treat"ent I- Grade (On ?old) PreparationCTR )
•• Pre-are "aterial and "onitoring or #* PP! I- Grade (In Progress, need to c$ange =loter
o= e4el "auge due to di==erent density &et<een =loter and actual li@uid. 9ction &y
8acilities %kt)
•• Monitoring -5nch li%t at *GP li=ing 85arter at *etara Joint in%-ection ha=e done,
co""i%%ioning ha=e 7een cond5cted, an -5nch li%t ill 7e clo%ed 'In Progress-
•• Pre-are engineering *etara !ield ngineering ne 75ilding oice or #e Tran%or"er,
ca7ling and co""5nication (In Progress)
•• Monitoring in%tr5"ent in%tallation %e-arator 100+00 (Co(pleted)
•• De%ign or <ightning Protection *etara E-lo%i=e *5ner (In progress) CR/ Preparation)
••
e=ie De%ign ngineering Pre-aring .AT TI Pacage 7 PT Trig5na (In progress)•• Monitoring #G <agan .taging Poer I-grade (In progress-
•• Pre-aring .AT i-ah Metering 7 PT . 'Co(pleted-
•• Pre-are ngineering doc5"ent and "aterial or $ell @oo5- #* F/+ $ell (In
Progress)
•• Pre-are ngineering doc5"ent and "aterial or $ell @oo5- Ge"ah F' $ell (Co(pleted-
•• Pre-are ngineering doc5"ent and "aterial or $ell @oo5- #* F'2 $ell (Co(pleted-
•• De%ign or <ightning Protection #e *etara !5el .tation (In Progress) CR/ Preparation)
•• De%ign or <ightning Protection <agan .taging (In Progress) CR/ Preparation)
•• De%ign or <ightning Protection <agan <ogi%tic (In Progress) CR/ Preparation)
•• Ja75ng Ma%ter ali7rator ertiication (In Progress) /econd Deli4ery)
•• Monitoring .$* $T "-ro=e"ent (In Progress)
•• e=ie de%ign Ge"ah 1%t .tage .e-arator,
o hange direction o .enior ;riice (In Preparation-
o hec recalc5late all control =al=e% %iing (In Progress)
o Pre-are or hange all -ne5"atic %%te" to electronic %%te" (In Preparation)
• Monitoring Ge"ah 2nd .tage .e-arator (In Progress) Root cause pro&le( preparation-
• Ge"ah PP! I-grade ne %torage tan -5rcha%e (In Progress) &idding process)
• Monitoring #G P. 2nd .tage .e-arator (Co(pleted 8,,D =ro( CTR-
• >C Corrosion Pipeline 3 9sset Integrity
•• $all thicne%% orro%ion Monitoring lo line #* Area (n Progre%%)
• +anage(ent o= C$ange
+
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 9/26
• e=ie and 5-date %tat5% M; ro" 20062013 (n Progre%%)
• M; coordination ith related de-art"ent or a--ro=al (n Progre%%)
.0 +9INT,N9NC,
.1 CP/?a(ilton Plant/W* W* "as Co(pressors
•• MaLor ;=erha5l erigerant Ga% o"-re%%or &'60 Continued
••hec And e-lace Motor ; De75tani%er onden%er !1 D5e To #oi%e F/10M10'!1
•• Init P'100 Man5al %h5tdon to re%et *K% ro" JT %%te" to @a"ilton to 7ac online
@a"ilton -lant a% -er e85e%t 7 #G< ;-erator
•• &''0 Don d5e to highhigh .5ction -re%%5re and lolo ngine oil -re%%5re indication in -anel
and recali7ration 5el ratio, ngine ti"ing and re-lace %o"e co"-re%%or clinder =al=e% leaing
•• Init P'200 Don to .ol=e Pro7le" on 2nd .tage .5ction .cr577er @@ <e=el
•• and iE ir%t and third %tage Di%charge -re%%5re P.K% -o--ing
•• e-laced engine clinder head F4 d5e to lea and re-aired clinder head F' * ater L5"-er d5e
to lea
•• MaLor ;=erha5l Init P'300 o"-re%%or 7 PT G;<T#.
. N"8N"%T Plantagan• hec And e-lace Motor ; De75tani%er onden%er !1 D5e To #oi%e F/10M10'!1
• n%tall 2 a lectric Eha5%t !an o"-leted $ith n%tallation Acce%%orie%
• e-air ontrol al=e ; Media !ilter !//00 FP//04
• e-lace i7ration .itch ; eda P5"- P-/6'' F.@/6''
• n%tall T57ing onnection !or .a"-ling "i%ion ; Gar7age D5"-
• ;=erha5l .tea" leaner &archer FPM<011
• $$T! Pre.tart IPF$$T!
• Tae 5nti"e @o5r% .at5rda F/00..100
• I-date Anti=ir5% ; .. .%te" a7inet F/00..100
• ali7rate JT Plant Prod5ct !lo Meter !H002 n-5t #e !actor 85al $ith !actor At
@a"ilton Plant !H110F!H002
• eonig5red Data Trending !or ach De=ice% ; JTPlant D5e #ot .hon F$.
• reate .creen Di%-la ; Total .5" *eteen !H100 !H200 F$.
• n%-ect ontrol al=e ;n Di%charge Glcol At #G<FT'0
• ecali7rate Pre%%5re .itch Ga5ge ; !ir%t .5ctionF&''0
. 8PU 8/OPetrostar 8ederal +ak(ur*/9 9sa( Pipi$/i(&ur Naik
• heced electric ca-%tan hince% *D13 at !ederal Jett
• A%%i%ted !a7 .ho- cre to -ro=ided -oer %5--l or elding tran%or"er at !ederal Lett
• A%%i%ted o-eration logi%tic cre to tran%er 5el ro" Petro .tar to !PI 5el %torage a% "5ch
12206, 04 <iter%• $eel PM %er=ice and r5nning te%t ire ater -5"-% 2'P116AB* and te%t r5nning Loce
-5"-
• Peror"ed ho5%eee-ing aro5nd !PI co"-leE 7 collecting r577i%h and 5n5%ed "aterial% and
%end to ;n%hore =ia * na .ela
• Tae r5n ti"e ho5r% o e85i-"ent% e=er .at5rda "orning and %end to #G!B*etara -lanner
• PM .er=ice oil 7oo" and %i""er -5"- at . na T5ni
• A%%i%ted o-eration cre d5ring %itch o=er in%tr5"ent air co"-re%%or ro" 5nit 2'P&101A to
2'P&101* a% -er PM %ched5le
• A%%i%ted o-eration cre d5ring %itch o=er Die%el engine generator ro" 5nit 2'DG101A to
2'DG101* a% -er PM %ched5le
• A%%i%ted !a7%ho- cre to checed elding tran%or"er d5e to lo%e connection at !ederal Lett• Peror"ed 1/' @r% PM %er=ice in%tr5"ent air co"-re%%or 5nit 2'P&101A
• heced and re-laced engine ca-%tan ince% MD11 at !ederal Jett
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 10/26
• <iting "aterial 2 ea Dr5" <57e ;il and 1 ea electric "otor eEchanger ro" $ na .ela to
!PI %57 cellar dec
• A%%i%ted o-eration cre d5ring %itch o=er the o-eration o h-ochlorinator 7loer incl5ding
cleaned 5- 7loer ire "e%h, %trainer and area
• H5arterl 7ac 5- trigger log @M t5r7ine 5nit 20GT101A
• A%%i%ted "ooring cre d5ring MT #. hallenger 7erthing at !PI Lett
• A%%i%ted o-eration cre d5ring %itch o=er 3 7oo%ter -5"- 5nit 20P101* to 20P101A a%
-er PM %ched5le• $eel PM .er=ice 3 7oo%ter -5"- 5nit 20P101*
• ontrol al=e H5arterl PM 20<111B!10/,2'P20/
• A%%i%ted o-eration cre .tarting Ga% T5r7ine o"- A d5e to inlet "aniold -etro .tar clo%e
• heced and te%t 5nning oil 7oo" and %i""er -5"- at . na T5ni d5e to "al5nction
• H5arterl PM .er=ice "aintenance loo- !la"e detector 5nit M<20!D (20!D001,002,
004,00',006,00/,011,012,013,014,01',016
• A%%i%ted "ooring cre d5ring MT .5cce%% hallenger 7erthing at !ederal Lett
• A%%i%ted o-erator crane d5ring liting "aterial% ro" ellar dec to ;n%hore =ia * na .ela
• $eel PM Pede%tal crane 5nit 2'S001
• hec and re-air DG 5nit 2'DG101* d5e to o5nd ater cooler "iEed ith l57e oil in
radiator
• heced and re-laced -re%%5re dierential %itch 2'DP.11/ on GT101* d5e to re85entl
%t5c -rior %tart 5-
• hec And e-air Pre%%5re .itch ; Porta7le Air o"-re%%or FP2421
.7 *"P*etara 8ields
• n%tall MI -acage at *GP Peror"ing -art contractor PT Mega Prata"a Ingg5l
• A%%i%t MI contractor to -5ll -oer and in%tr5"ent ca7le%
• n%-ect M5lti Media !ilter 6'P&10/ 7otto" %creen d5e to high DP
• hec and re-aire =al=e at "5lti "edia ilter 6'&234B244B23'B24' %5%-ect -a%%ing
•
e-lace P @M o %ale% ga% co"-re%%or i% hang inter"ittentl 6'0&101• e-lace lo "eter G analer o 6''AT126
• n%tall adar <TK% (4ea) or Ga% !ilter oale%cer
• n Progre%% hec Alar" ;P Min5% (or reading A"- or nlet o"-re%%or *)
• ;2 Analer Monthl cali7ration 610AT100
• hec and cali7rate le=el tran%"itter at #G< *5llet 6/0<T100B101 d5e to di%cre-anc reading
.5 N,*"e(a$Ripa$/a&ar/W* 8ields
• n%tall Tran%"itter% or #*6+B/2B// and connect to ne TI to 5-grade and co""5nicate to
*GP a% ell a% .D %%te"
• n%tall the in%tr5"entation re85ired to Mar"o1
• o""i%%ioning #* and Ge"ah !!G Model 300• e-lace eEi%ting %e-arator ith #e .e-arator +00 at Panen Itara1
• e-lace P @M o #* G! i% hang inter"itenl 14'&102
• hec and re-air o 1'1TI11+ at #*F' d5e to indication .D clo%ed 75t act5al in ield i%
nor"al
• .et *ig Joe P130!GI at .$* d5e to o5t-5t -re%%5re 5n%ta7le (%et 124 P%i, co"-lete)
• e-aired 1B2C ni--le or in%tr5"ent ga% %5--l line d5e to leaing and re-aired P, < o
ater,< d5e to -l5gging 7 cr5de oil o oil o te%t %e-arator 114 at #* F0'
• hange in-5t -ara"eter o ga% contain on !loco" o ne Metering i-ah at i-ah Poer Plant
ater get ne -ara"eter ro" anal in Ga% hro"atogra-h
.! "eragai *ase Ca(p• "ergenc Generator $eel te%t r5n and %%te" chec%
• o5tine $ater Plant acti=itie%
10
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 11/26
• e-air *ain"er At &itchen Geragai *a%e a"-
• Di%connect And econnect Parti%i Ad"in Per%onalia
• $eel PM .er=ice #G $TP !iltration FInit/01
• $eel PM .er=ice $TP !iltration FInit/01
• $eel PM .er=ice $ater Threat"ent FInit/01
.# *"P *ase Ca(p
• "ergenc Generator $eel te%t r5n and %%te" chec%• o5tine $ater Plant acti=itie%
• Te%t Poer 5- P$ generator to *GP 75%7ar
• .i"5lated P$ generator to -oer 5- * a"-
.; IT 3 Co((unication
• o5tinel Peror"ed Maintaining @ardare and .otare o all o"-5ter% and
o""5nication% at Ja75ng !ield, *GP, !PI and Ja"7i
• .etting% conig5re e"ail eEchange or !M Ja75ng, ontract Ad"in, Ad"in .5-t, !ield o%t
ontrol, Ad"in Per%onel, Ja75ng linic, !ield Acco5nting, !or"alit Ja75ng, !or"alit .5-=
Ja75ng, and <ogi%tic .5-t
• .ol=ed e"ail -ro7le" o *5er Ja75ng, !M Ja75ng, !ield Acco5nting, @. .5-t, Ja75ng linic• .ol=ed JD Pro7le" o co"-5ter <and conde"nation, Training Ja75ng and a"- Maintenance
• .er=iced Printer @P <a%erJet 42'0 o rechange Geragai roo"
• n%talled %o5nd %%te" or aero7ic g"na%tic at i=il on%t, Geragai *a%e a"- and *GP
echall
• n%talled internet -rotocol o -rinter @P <a%erJet M''1 at P. Prod5ction
• .ol=ed #etor and o""5nication o P. Mechanic .ho-
• elocate radio "o7ile o P. Prod5ction ield cre
• e-air the TG Ja75ng %tation direct line -hone at *GP
• e-laced the 7roen @57 %itch o *GP Maintenance cler roo" hec and re-air radio "o7ile
5nit .20• hec and re-air radio 7a%e at .*F3 .tation
• e"o=e and in%tall Printer .canner ro" o"-re%%or .-eciali%t oice to o"- .5-= oice
• A%%i%t to relocate co"-5ter 5nit 7elong to @. Doc5"ent control at @. Geragai ;ice
. Pipeline +aintenance
• ontin5e coordinate ith Prod5ction $e%tB#orth area to -eror" -igging -rogra" 69 r5de
;il line ro" .$* to #* F0 PAD (Continue periodic schedule, Last pigging on March 05
- 08, 2014).
• ontin5e coordinate ith Prod5ction #orthB.o5th area to -eror" cleaning -igging -rogra"
o 69 r5de ;il line ro" #* %tn to Ge"ah %tn and Ge"ah %tn to P. (Continue periodic
schedule, Last pigging on Januar 28 - 2!, 2014.)
• ontin5e "onitoring gra%% c5tting -rogra" 7 local -eo-le o all -i-eline ;$ at Ja75ng
("tatus # Continue)
• ontin5e coordinate ith HABH to Pi-eline orro%ion Monitoring and a%%e%%"ent o all
-i-eline% and ell -ad gathering line ("tatus # $n progress % Continue)
• ontin5e coordinate ith Maintenance lectric and Mechanical to "onitoring PM %er=ice%
and re5eling Generator or Pi-eline athodic -rotection %%te" at .i"75r #ai ("tatus #
Continue Monitoring)
• Monitoring con%5"-tion rate o corro%ion inhi7itor inLection o 129 -i-eline <P "ode ro"
Ge"ah L5"- o=er line at *GP ("tatus # Continue &onitoring)
• Monitoring ontractor -rogre%% o contract PJ13+A Ron%tr5ction %er=ice% o eE-ort
-i-eline 7ridge <agan i=er9 ("tatus # $n 'rogress !)
• Joint n%-ection ith .ec5rit to en%5re there are no illegal hot ta--ing i%%5ed on -i-eline%
("tatus # Continue)
11
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 12/26
• Pre-are cre, e85i-"ent% and tool% or "ergenc re%-on%e o Pi-eline Maintenance
Pro7le"% (<eaage, llegal @ot ta-, etc) ("tatus # Continue)
• Monitoring -rogre%% in%tall 7raing -iling #e E-ort Pi-eline *ridge, <agan i=er ("tatus #
Continue &onitoring)
• e-air da"age eEternal coating Pi-eline &P +'00 $* to #*F (n Progre%%)
• ontin5e coordination ith !ield ngineering and Prod5ction De-art"ent -ro-o%ed or
re-lace leaing lo line Ge"ahF34 (n Progre%% ngineering %t5d)
7.0 ?,O 3 CON/TRUCTION
7.1 Drilling Construction/ur4ey
• o""ence and contin5e to -re-are location #* 21 o #* 4 -ad ~ 31,/0 Q co"-leted
• o""ence and contin5e to -re-are location #* 1+ o #* -ad ~ 2,40 Q co"-leted
• ontin5e reg5larl to %5--ort acti=itie% o @P. ig F 11 at Ti5ng Itara 1 (.tand7), @P. ig
F 2 at Ge"ah F 12 (.tand7), @P. ig F 3 at #* F 1 (.tand7)
7. 8a&rication /$op and Pipeline
• ontin5e to a7ricate and in%tall 6CPi-eline ro" #*F to #* %tation incl5de Pig <a5ncher
and ecei=er ~ 34' Q co"-leted (e= Q)• o""ence and contin5e to in%tall loline and te"-orar acilit or #* /+ ~ 226 Q
co"-leted (e= Q)
• o""ence and contin5e to di%connect %85are tan and g% 7oot at .* 3 -ad and in%tall at Ma"o
1 -ad location ~ 261' Q co"-leted (e= Q)
7. Ci4il Construction
• ontin5e to con%tr5ct %er=ice% o T %ho- 75ilding at *GP (PJ1+/A) ~ 24' Q co"-leted
• ontin5e to con%tr5ct .er=ice% o !5el .tation at *etara Sard ( PJ132A ) ~ 60 Q co"-leted
• ontin5ed to con%tr5ct %er=ice% o drilling 75ilding at <ogi%tic <agan .taging (PJ114A) ~
+4 Q co"-leted
•ontin5ed to con%tr5ct tran%or"er %helter at P., Geragai *a%e a"- and <agan .taging ~ 4+Q co"-leted
• ontin5ed to re-air cellar 7oE at #* 01, 04, 21, 2+, 2, 30, 3+, 3, 40, 6' ell% and #* 02,
13, 14 ell% ~ /' Q co"-leted (#o Progre%% aiting ino re85e%tor)
7.7 ?,O 3 8acilities
• !ill 5- and in%tall encing at additional <and #orth Geragai a"- ~ '0/Q co"-leted
• ontin5e to "aintenance, Patching <e=elling the a%-halt road ro" o5ter Portal .ec5rit
toard% <agan .taging ~ 22/' Q co"-leted
• o5tine to re-air road, anal, Ditch, *ridge ell Pad Ja75ng *loc
5.0 ?,9T?) /98,TA) ,NBIRON+,NT 3 /,CURITA
5.1 /a=ety and ,n4iron(ent /ection
• *etara "as Plant) *etara) "e(a$ 3 Well6sites 9cti4ities ' N. ,. *etara) N. *etara) "e(a$)
Ripa$) /. W. *etara 3 Panen-
• @. Per%onnel %5-er=i%ed, ad=i%ed, %5--orted, a%%i%ted and %tand 7 or an critical Lo7
acti=itie% o other De-art"ent, ontractor% %5ch a% !a7rication .ho-, i=il on%tr5ction,
*GP ;-eration%, Prod5ction, @; on%tr5ction, <ogi%tic, <a7orator, T, <a7orator,
Maintenance, Maint Ga% o"-re%%or, !ield ngineering, HABH, .5r=eor, J;* Perta"ina
Ja"7i Merang, PT necal, PT *, <MA, PT .A., PT P$., PT Meindo, PT T
and PT #P on March 1'21, 2014
• !olloed 5- or-orate @. A5dit 2013 !inding% eco""endation% or *GP area on
March 1'21, 2014
12
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 13/26
• !olloed 5- .5r=eillance A5dit o .; 14001 ;@.A. 1+001 inding% on March 1'21,
2014
• ond5cted "onthl @. e85i-"ent in%-ection or March -eriod
• ond5cted ire ho%e hdro te%t 7e%ide *GP @. ;ice on March 1', 2014
• Pre-ared or -re%entation and acco"-an or P %ite =i%it ro" *eiLing on March 1/1+,
2014
• !olloed 5- reco""endation re-ort or 5nit .101 accident at *GP on March 20, 2014
• "eragai 8ield 'N"8) %T Plant) CP/ 3 Well sites 9cti4ities-
• @. Per%onnel %5-er=i%ed, ad=i%ed, %5--orted, a%%i%ted and %tand 7 or an critical Lo7
acti=itie% o other De-art"ent, ontractor% %5ch a% !a7rication .ho-, i=il on%tr5ction,
#G! ;-eration%, Prod5ction, @; on%tr5ction, <ogi%tic, <a7orator, T, <a7orator,
Maintenance, Maint Ga% o"-re%%or, !ield ngineering, HABH, J;* Perta"inaJa"7i
Merang, PT A&A, "-at *er%a5dara, M5lti G5na, JM, PT .ertco H5ait, PT
G*I, PT PAD and PT *.P on March 1'21, 2014
• ond5cted "onthl %aet e85i-"ent in%-ection or March -eriod
• !olloed 5- or-orate @. A5dit 2013 inding% reco""endation% or Geragai area on
March 1'21, 2014
• !olloed 5- .5r=eillance A5dit o .; 14001 ;@.A. 1+001 on March 1'21, 2014• Attended %e=eral "eeting a% ollo:
o &ic o Meeting or PJ21/0A (on%tr5ction P57lic @ealth .er=ice% at Pandan
Ma"5r illage) at @; !acilitie% Meeting oo" on March 1/, 2014
o Pre7id "eeting to inor" and di%c5%% a7o5t .M. ith tender -artici-ant% or tender no
D261B P F/231B H F1++3 – ;=erhead rane on March 1+, 2014
o lo%ing Date *id ;-ening or Tender #o: D261B;F1240BHF132 (.A!TS
*;;T.) at Ja"7i ;ice on March 1, 2014
• ond5ct %e=eral Loin in%-ection a% ollo:
o !5el Die%el Tr5c in%-ection 5nder J;* Perta"ina Tali%"an at #G! P on March 1+,
2014
o raler rane 4' ton Loin in%-ection or PT *.P (J;* PTJM ontractor) at %ite oicePT *.P on March 1+, 2014
• A%%i%ted .&&Miga% to cond5ct -h%ical chec !IPP or %e=eral a%%et% at <ogi%tic &M F6
Sard on March 20, 2014
• 8PU O==6s$ore 9cti4ities
• ollecting data or @. Pa%%-ort re85ire"ent at ;%hore !acilitie% on March 1'21, 2014
• Monitored PT .*. -roLect d5ring ater LettingB7la%ting, re-ainting and %caolding
di%"antleBerection on the 7ridge o Lett at <PG Marine ter"inal
• Peror"ed %e=eral @. n%-ection a% ollo @. 85i-"ent n%-ection at !PI area or
March Period
• ontin5ed to ollo 5- or-orate @. A5dit 2013 inding% reco""endation% or !PIarea on March 1'21, 2014
• ond5cted %aet in%-ection a% ollo:
o .aet n%-ection -rior -ro-ane 75tane liting 7elong% to MT hallenge at <PG
Marine ter"inal on March 1'21, 2014
o .aet n%-ection or "otor taner 7elong% to MT .5cce%% hallenger at ;il Marine
Ter"inal on March 20, 2014
• ond5cted ire ater -5"- and Loce -5"- r5nning and te%t at !PI on March 21, 2014
• Weat$erRain=all Record
13
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 14/26
UThe A$;. at *GP Geragai @. are 5nder re-aration and aiting "aterial
• Record o= 9ccidents
• +otor Be$icle 9ccident
;n March 1+, 2014 aro5nd 014' PM, light =ehicle 5nit .101 (*@ 601 TA) ent ro"
Geragai to *GP $hen going thro5gh J< 220, the car anted to -a%% a logging trailer The
road condition i% %li--er ater rained in the accident location The dri=er cannot control thecar, then he hit die o $&. nd5%tr ore%t The ront 75"-er in the let %ide, radiator, and
ront ind%hield are 7roen The dri=er and the -a%%enger do not get an inL5r in the
incident
Direct Cause:
• In%ae act or condition (the road a% %li--er ater rain)
• I%ing deecti=e e85i-"ent
Indirect Cause:
• <ac o noledge B %ill%
• <ac o %-are -art in .#P .torage
Reco((endations 'to pre4ent repeated or si(ilar occurrence-• ond5ct %aet "eeting (%ae dri=ing) ith all dri=er% 7elong to PT .#P
• Gi=e the arning letter to the dri=er
• 9ccident /tatistic
Total da% itho5t a lo%t ti"e accident 5- to March 21, 2014 at 1+00 a% 7elo:
• ;-eration%BProd5ction .er=ice%: 2412 da% e85al to 3+0'/4/3 "an ho5r% %ince la%t <TA
occ5rred on A5g5%t 13th 200/
• E-loration Drilling .5--ort: +2+ da% e85al to 3'430'3 "an ho5r% %ince la%t <TA
occ5rred on Dece"7er 14th 2011
• *GP (*GP Plant, Ge"ah G! #* G!): 3230 da% %ince Ma 1th 200'
5. /ecurity /ection
• %corted die%el 5el or %5--ort Drilling hea= e85i-"ent acti=it at a%t .5o F 1 &5"-eh lir
location on March 1', 2014
• %corted hea= e85i-"ent 5nder drilling con%tr5ction (Doer, .BA Eca=ator, Motor grader,
a"-actor) ro" a%t .5o F 1 location at &5"-eh lir Ma Ja"7i to *etara area on March, 1'
thr5 1+, 2014
• ond5ct coordination ith Police ro" ntela" Polda Ja"7i cond5ct to e%cort P ro" P
Manage"ent Jaarta on March 16, 2014
• %corted P ro" P Manage"ent d5ring ield =i%it to Ja75ng !ield on March 1/ thr5 1+, 2014
• Acco"-anied .r .ec5rit .5-= Jaarta to Polre% $e%t TanLa7 regarding illegal cr5de oil inding
ca%e at Pe"atang <5"5t illage &ec *etara &a7 TanLa7 *arat• Attended "eeting 75dget ith @.. .5-erintendent at *GP Ad"in 75ilding on March 1, 2014
• %corted .e-arator te%t ro" #* F ' location to Panen Itara F 1 location on March 1, 2014
• Joint ith ire"an to -5t don a ire di%a%ter at Mendahara lir =illage (*loc A) a% -er re85e%ted
7 head o ore%tr de-t $e%t TanLa7 on March 1, 2014 5ntil no
• %corted 5el die%el or %5--ort o-erational Generator at .i"75r #ai athodic on March 20, 2014
5. ?ealt$ /ection
• Pro=ide health care %er=ice% to e"-loee% ho or in the ield =ia Petro%tar, !ederal, Geragai,
*GP and .$* linic
• ond5cted the "edical -a%%-ort -rogra" at *GP and Geragai linic
•
ond5cted Aero7ic -rogra" at Geragai (e=er !rida) *GP (e=er $edne%da)• Proce%% "edical ad"ini%tration (Medical co%t rei"75r%e"ent, G5arantee letter o ho%-italiation
;5t-atient, n=oice ro" @o%-ital, eE-en%e re-ort Pett ca%h)
14
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 15/26
• ontin5ed -rinting and di%tri75ted "edical card to all PJ< e"-loee%
• =al5ated the MI re%5lt 10 Per%on% or Pre"-lo"ent 3 Per%on% !or Ann5al "-loee
• Monitoring the 5%e o "edical card to all cor-orate ho%-ital in Ja"7i
• ond5cted ro5tine "edical eel in%-ection:
o $eel hgiene n%-ection at *GP, Petro%tar Geragai a"-
o $eel acti=itie% o !rida linic n%-ection at *GP, Petro%tar Geragai clinic
o $eel in%-ection a"75lance "edical in=entor at Geragai, *GP And .$* linic
• Proce%%ed Doctor clinic -er"it in $e%t TanL5ng Ja75ng @ealth De-art"ent• ond5cted %e=eral "onitoring a% ollo:
o #oi%e Monitoring at Ge"ah .tation generator and -re-are the re-ort on March 1', 2014
o Merc5r Monitoring d5ring 7aca%h at $$T! and -re-are the re-ort on March 1+1,
2014
!.0 8I,D 9D+INI/TR9TION
!.1 "eneral 9d(in 3 Personnel
• Deli=ering "an-oer re-ort to Di%naer .arolang5n
• Dail reg5lar acti=itie% (re=ieing eE-en%e re-ort%, ann5al lea=e%, "edical rei"75r%e"ent%,
ti"e%heet%, etc)• Man-oer a% o March 22, 2014:
National: 9ssigned Present
Per"anent .ta N 14' -er%on% +1 -er%on%
#. Per"anent N 6' -er%on% 4 -er%on%
.ta DB N 4/ -er%on% 26 -er%on%
#. DB N 10' -er%on% /0 -er%on%
Total N 362 -er%on% 226 -er%on%
T$ird Party:
PT .IPA; (#on .ta) N 6'0 -er%on% 4/1 -er%on%
PT .*. (#on .ta) N 4/' -er%on% 3/4 -er%on%
PT .*. (.ta) N 2 -er%on% 6' -er%on%
Total N 121/ -er%on% 10 -er%on%
,patriate:
Per"anent .ta N 1 -er%on% 1 -er%on%
.ta Direct ontract N + -er%on% 3 -er%on%
Total N -er%on% 4 -er%on%
"rand total 1.5;; persons 1.170 persons
!. Training De4elop(ent
• Training ertiication Progra"
o Arranging inho5%e training o A"dal and Gantr rane or @. and <ogi%tic -er%onnel
• ecr5it"ent .electiono o"-iling a--lication letter%
• Practical Training .t5dent% A%%i%tance
o Der ;toraPerdana and S5di Trion !aLar o Poltechnic Padang
o &5%5"a $ardani and Dei P5%-ita%ari o Aa"iga% Pale"7ang
o !arah .a5ia #or"a%ti !o5ri #o=ianti aani o IP# eteran Sogaarta
!. Contract 9d(in
•• Pre-ared . .co-e o .er=ice% or . .co-e o .er=ice% or DoortoDoor Air !reight
Tran%-ortation .er=ice% (<ogi%tic)
•• Pre-ared e85e%t eTender or PJ2062A (on%t .er=ice% o 2 5nit% J5nior <a7or a"- at
#orth Geragai)•• Pre-ared o""ence"ent Date #otiication or PJ2044A (etroit I-grade and Ga%
Detector .%te" .er=ice% at #G< Plant)
1'
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 16/26
•• Pre-ared $or A5thoriation or Deoa"er he"ical !ield Te%t .er=ice% (Prod5ctionB !
ngineering)
•• Pre-ared $or A5thoriation or "5l%ion *reaer he"ical !ield Te%t .er=ice% (Prod5ctionB !
ngineering)
•• Pre-ared $or A5thoriation or e-air .er=ice% Prod5ction <D Di%-la *oard (MaintenanceB
T)
•• Pre-ared $or A5thoriation or a-acit *5ilding or Go=ern"ent .ta o E-an%ion illage
(o"de=)•• Pre-ared $or A5thoriation or <ocal 5tting Gra%% .er=ice% at &a"-5ng .inge- illage
(Pi-eline Maintenance)
•• Pre-ared *id H5otation e85e%t or .-ecial oating (<a"ination) to *5ild 5- Pi-e $ell o 49, 69
+9 ;il Pi-eline orroded (Pi-eline Maintenance)
•• Pre-ared *id H5otation e85e%t or *ird% e-elling Progra" .er=ice% at *GP Plant (*GP ;-%)
•• Pre-ared *id H5otation e85e%t or A"dal <e=el 1 n@o5%e Training .er=ice% (Training
De=elo-"ent)
•• Pre-ared H5otation e85e%t or .er=ice% o eriication or Medicine Phar"ac P5rcha%ed 7
Phar"aci%t (@..B linic)
•• To Pre-are $or A5thoriation(%) or <ocal 5tting Gra%% .er=ice% at &5ala .i"75r illage,
.5ngai To"an illage, Mencolo illage and Pandan Jaa illage (Pi-eline Maintenance)•• To Pre-are $or A5thoriation(%) or Jero"e 431 Merc5r a-o5r Analer Ann5al ali7ration
.er=ice% and @drote%t Maintenance Porta7le !ire Eting5i%her .er=ice% (@..)
•• To Pre-are $or A5thoriation or one (1) 5nit 2' &A Die%el Generator ental .er=ice% (@;B
Prod5ction)
•• To Pre-are $or A5thoriation or De%igning lean $ater .anitation Progra" .er=ice% or <ocal
Peo-le at a%t $e%t TanL5ng Ja75ng egenc (o"de=)
•• To -re-are $or A5thoriation or MGA. ertiication .er=ice% o 2 5nit% Gantr rane (!
ngineeringB H)
•• To -re-are $or A5thoriation or 1+ 5nit% GP. Tracing .%te" ental .er=ice% (T o"")
•• To -re-are $or A5thoriation(%) or Di%naertran% ecertiication .er=ice% o <iting 85i-"ent
at Ja75ng !acilitie% and Di%naertran% ecertiication .er=ice% o *oiler Manlit% (!ngineeringB H)
•• To Pre-are $or A5thoriation or Door to Door Air !reight Tran%-ortation .er=ice%
(Ad"ini%tration B Per%onnel)
•• To -re-are $or A5thoriation% or the P57li%h o Ad=erti%e"ent Ad=ertorial .er=ice%
(o""5nit De=elo-"ent)
!.7 %a(&i O==ice
• Dail inco"ing and o5tgoing re change handling
Arri=al:
o Petrohina "-loee : 4/ Per%on%
o
3rd PartB.er=ice o"-anBother%: 0+ Per%on%o .&&Miga% B Miga% B Go=ern"ent : 00 Per%on%
Total : 55 PersonsDe-art5re:
o Petrohina "-loee : 41 Per%on%
o 3rd -artB.er=ice o"-anBother% : 03 Per%on%
o .&&Miga% BMiga% B Go=ern"ent : 00 Per%on%
Total : 77 Persons
#.0 "OB,RN+,NT 3 R,9TION
#.1 and Conde(nation
1 +enda$ara Ri4er: Pa"ent or land conde"nation ha% 7een done The co"-letion o the -roce%% i% %till aiting or %ignat5re ro" a"at Mendahara Il5
E-en%e re-ort a% %ent to Acco5nting .ection on #o=e"7er 14, 2013(Done)
16
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 17/26
2 N,* *ase(ent E 1: Pre-are re85ire"ent doc5"ent% or land certiication, incl5ded or -artic5lar
land %e-aration -roce%% regarding one o the land oner% a% onl conde"ned hal o the land
3 and 9c@uisition Progra( '9P- =or N,* E ;);7);5) N,* E ;#) N,* E ;;)0) "e(a$ E 57)
Pipeline +ar(o E to +ar(o E 1:
• <AP had 7een di%c5%%ed in the "eeting ith .&& Miga% Jaarta ;n Jan5ar 2+, 2014
• ;n !e7r5ar 21, 2014, e recei=ed <AP MoM (7 e"ail) hich had 7een %igned
• <and Ac85i%ition Plan (encana Pengadaan TanahPT) a% %ent to <egal Jaarta (c8
Ah"ad *ala) on !e7r5ar 24, 2014• .tate"ent letter a% %ent to <egal Jaarta (c8 Ah"ad *ala) on March 4, 2014
• $e are aiting ollo 5- ro" <egal Jaarta to .&& Miga% or getting location
deter"ination ro" Go=ernor
• <and Ac85i%ition Plan (PT) and re85e%t letter or location deter"ination (#* F +3,+4,+',
#* F +/, #* F ++, 0, Ge"ah F '4) hich ill 7e i%%5ed 7 Ja"7i Go=ernor ere %ent to
.&& Miga%, on March 11, 2014
• The re85e%t letter or Poer o Attorne (Pi-eline Mar"o F 2 to Mar"o F 1) a% %ent to
.&& Miga%, on March 11, 2014
4 and 9c@uisition Progra( '9P- =or "e(a$ E # and "e(a$ E ;0:
• ;n Jan5ar 2+, 2014, <AP Ge"ah F / and Ge"ah F +0 ha=e 7een di%c5%%ed ith .&&
Miga% Jaarta
• MoM <AP ha% not 7een %igned %ince the A! or thi% <AP ha% not 7een a--ro=ed 7 .&&
Miga%
• $e are aiting or the A! to 7e a--ro=ed 7 .&& Miga%
' and conde(nation Clai( o.&.o. Pak +uFiono:
• ;n !e7r5ar 21, 2014, e "et Pa .5rah"an (Pa M5Liono?% 7rother) ho in=ol=ed and ha%
good 5nder%tanding on the PJ<?% acti=it %ince the earl %te- $e eE-lained that e ill not
-a to M5Liono?% clai" or land conde"nation co"-en%ation
• $e -ro-o%e to "eet and eE-lain to M5Liono to eE-lain the re%5lt o the "eeting on !e7r5ar
21, 2014
• ;n March ', 2014, e "et M5Liono and eE-lained that Petrohina nternational Ja75ng <td
co5ld not gi=e an land co"-en%ation 7eca5%e there i% no legal L5%tiication o the clai"ed
land
• M5Liono %till ant% Petrohina nternational Ja75ng <td to -a the clai"ed land
6 Data DigitaliGation
• All land conde"nation doc5"entation% ill 7e digitalied and %tored in co"-an?% %er=er
• $e ha=e ini%hed aro5nd 1 location% (ontin5e)
/ and 9c@uisition Progra( '9P- =or Pipeline ROW =ro( N,* *ase(ent E1 to N,* E#!
• ;n !e7r5ar 1+, 2014, location %5r=e a% cond5cted 7 a tea" con%i%t o .5r=eor,
!or"alit and <and conde"n Ja75ng
• <AP i% %igned, aiting or the late%t location "a- ro" .5r=eor ead to 7e %ent to <egal
Jaarta (c8 Ah"ad *ala)
• ;n March 6, 2014, @ead =illage o TerL5n GaLah ca"e to Petrohina nternational Ja75ng,
<td and ga=e -rice 85otation letter ro" land oner% The land -rice i% D '0000,BM2 and
-al" tree% -rice i% D 2'00000,Btree
• $e ill "eet the head =illage o TerL5n GaLah to inor" that the l5"- %5" -rice i% the %a"e
a% #* *a%e"ent F1 hich a% D '0000,
#. egal
• i-ah F6 ci=il ca%e %ettle"ent, !ore%tr <egal %57"itted ontra Me"or a%%ation o i-ah F6
i=il a%e at TanL5ng Ja75ng Di%trict o5rt on !e7r5ar 1, 2013 $aiting or a%%ation erdict
ro" .5-re"e o5rt
• i-ah F6 ad"ini%trati=e ca%e %ettle"ent <a%5it -ro-o%ed to *P# a%t TanLa7 Ad"ini%trati=e
o5rt o Ja"7i on <and ight% ertiicate #o 262, 263 and 264 o7o &aradi, .@, a%%ation
Me"or a% %57"itted on Jan5ar 24, 2014, at Ja"7i Ad"ini%trati=e o5rt $aiting or a%%ation erdict ro" .5-re"e o5rt
• a%t Geragai F1, Perdie" or Polda Ja"7i in=e%tigator ha% 7een di%tri75ted 7 !e7r5ar 21, 2014
1/
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 18/26
a"o5nt D 000000,
• ;$ #* F4 Ah"ad Acil, A--eal "e"or alread %57"itted on #o=e"7er 2/, 2013 ecei=ed
contra "e"or a--eal ro" Acil?% ad=ocate on Jan5ar 21, 2014 $aiting or a%%ation erdict
ro" .5-re"e o5rt
• Ger7ang F1, Meeting ith Pa @ani (@ead o !or"alit De-art"ent) .&& Miga% a% cond5cted
on !e7r5ar 1/, 2014 @andled 7 <egal Jaarta
• *orro Pit .i"-ang &iri, ;n March 3, 2014, Pa Ariin, <egal (Marcel), Pa Aran ent to
Polda Ja"7i or Medical hec I- and .5%-ect?% inger-rint% record ;n March 4, 2014, <egal(Marcel *ala), Pa Ariin, Pa Aran, Pa r, Pa !ai%al (Pa Ariin?% %on), Di%h5t Ja"7i
n=e%tigator and &ora% Polda ent to @igh Pro%ec5tor o Ja"7i to cond5cted -ha%e 2 o P21,
aterard tea" ent to Pro%ec5tor o M5ara .a7a to hando=er the %5%-ect 75t occ5r% little
conlict 7eca5%e the %5%-ect "5%t 7e arre%ted .econd -ha%e o P21 -ending te"-orarl 5ntil ater
there an agree"ent the %5%-ect on?t 7e arre%ted and inor"ed 7 Pa Aran and Pa r ho
handled thi% ca%e ;n March 21, 2014, %econd -ha%e o P21 a% cond5cted
• #* F3 <ocal Peo-le o"-lain, .eda TanL5ng Ja75ng *arat %ent letter #o '00B1+0BAB2014
hich ad=i%ed Petrohina nternational Ja75ng <td to %ettle local -eo-le co"-lained ith dialog
%o that e=erone i% %ati% ith the %ol5tion ;n March ', 2014, <ocal -eo-le?% a5thoried ca"e
to Petrohina nternational Ja75ng, <td and a%ed a7o5t the ollo 5- o local -eo-le?%
co"-lain Petrohina nternational Ja75ng, <td %aid that e ill re85e%t to <ocal Go=ern"ent o
TanL5ng Ja75ng *arat to 7e "ediator or thi% co"-lain $e ha=e "ade letter to egent o TanL5ngJa75ng *arat c8 egional .ecretar o TanL5ng Ja75ng *arat and -ro7le" chronolog a% the
attach"ent ;n March 1/, 2014, e %ent the letter to egent o TanL5ng Ja75ng *arat c8
egional .ecretar o TanL5ng Ja75ng *arat
• ;n March 1+, 2014, !aLar and <and onde"n tea" ent to Pa !red Al"ano?% oice (notar)
$e ent there to a% the ta7le o taEe% that PJ< %ho5ld -a or the -roce%% o certiication %o
that it co5ld 7e -roce%%ed @e al%o %aid that neEt ee on March 2+B2, 2014, *P# and Pa !red
ill co"e to cond5ct land "ea%5ring at P. and Geragai ca"- $e %aid that he %ho5ld inor" 5%
to da% 7eore "ea%5ring 7eca5%e e need to "ae coordination ith other %ection% or the
"ea%5ring
#. 8or(ality• 8orestry
• D9/ *ra( ?ita( re$a&ilitation: !PM ill -re-are technical de%ign o reha7ilitation
acti=it @andled 7: !PM Soddie rinaldo
• /eis(ic D 2aFen) Tiung *eFo) N" Ruka( '8orestry 9rea- :
;n !e7r5ar 1+1, 2014, Ph%ical chec a% cond5cted 7 tea" ro" !ore%tr De-art"en
o a%t TanL5ng Ja75ng, M5aro Ja"7i, Ja"7i Pro=ince, and *P&@ Thi% Ph%ical chec i%
cond5cted to get technical con%ideration ro" *P&@ Pangal Pinang, !ore%tr De-art"ent o
Ja"7i Pro=ince and Go=ernor eco""endation $e are %till aiting technical con%ideration
ro" *P&@ Pangal-inang The e%ti"ation ti"e i% neEt ee
• /uper4ise Ti(&er Cruising Ripa$ E and "e(a$ E5:
.5-er=i%ion o Ti"7er r5i%ing i-ah F 3 and Ge"ah F 2' ere cond5cted on ;cto7er 30,
2013 7 a tea" ro" !ore%tr De-art"ent o Ja"7i Pro=ince, *P2@P, !ore%tr De-t a%t
TanL5ng Ja75ng, and PT $&. Di%trict 2 .PP P.D@D a% recei=ed ro" !ore%tr
De-art"ent o a%t TanL5ng Ja75ng on Jan5ar 21, 2014 .PP P.D@D a% tran%erred 7
Geragai Acco5nting to !ore%tr acco5nt on Jan5ar 24, 2014 !ore%tr Per"it Matter
De-art"ent ill -re-are A. o <oan I%e Per"it to !ore%tr Mini%tr
• Recla(ation o= /iantang E1 location
;n March 101', 2014, Ph%ical chec a% cond5cted 7 tea" ro" !ore%tr De-t o Ja"7i
Pro=ince, .DM, *i-h5t, *P2@P, *PDA., *P&@ Pangal-inang and !ore%tr De-t o $e%t
TanL5ng Ja75ng ;icial -h%ical chec re-ort ha=e 7een recei=ed on March 16, 2014, ith
=al5e o recla"ation re%5lt i% %5cce%% $e got ++ hich i% good and acce-ta7le recla"ation
re%5lt% The =al5e o recla"ation ill 7e con=eed to DirLen Planologi o !ore%tr "ini%tr a%
the 7a%i% or con%ideration -rior to the hando=er to !ore%tr Mini%tr
• Non 8orestry
1+
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 19/26
• /W* E15 =or ?O Per(it: .&D i% %till 7eing -roce%%ed in Acco5nting
• Per(its =or 10 locations in West TanFung %a&ung (#* F'4, #* F3, #* Ga% nLection
FA, #* F', #* F2+, #* F 4, #* F , #* F1, i-ah F20, i-ah F2 ):
o T$e tec$nical considerations =or 5 locations 'N,* E 57) N,* E ) N,* "as E 9)
N,* E;) and N* E5- ere co"-leted on Dece"7er 12, 2013
o $aiting or o7taining <ocation% Per"it ro" *5-ati c8 ntegrated Per"it .er=ice ;ice
(&antor Pelaanan Periinan Te-ad5&PPT) o $e%t TanL5ng Ja75ng egenc
o T$e ocation Per(it =or 't$ree- locations 'N,* E 7) N,* E ) N* E1- ereco"-leted on !e7r5ar 2+ (#* F) and March 4, 2014 (#* F4 and #* F1)
o T$e ?O Per(it =or 't$ree- locations 'N,* E 7) N,* E ) N* E1- ere co"-leted on
March 13, 2014 &PPT?% in=oice or ad"ini%tration, %5r=e and coordination "eeting
co%t a% recei=ed on March 1, 2014 $e are -re-aring ca%h ad=ance to -a &PPT?%
in=oice
o Ripa$ E) Ripa$ E0 =or ?O Per(it: .&D i% %till 7eing -roce%%ed in Acco5nting
&PPT?% in=oice or ad"ini%tration, %5r=e and coordination "eeting co%t a% recei=ed on
March 1, 2014 $e are -re-aring ca%h ad=ance to -a &PPT?% in=oice
• Per(its =or ! locations in West TanFung %a&ung hich con%i%t o 55 F1, Ger7ang F1,
.enerang F1, <5"75ng F1, Merta F1, Gang%al F1 are 7eing -roce%%ed 7 ntegrated Per"it
.er=ice ;ice (&antor Pelaanan Periinan Te-ad5&PPT)
• Ripa$ E 1
Technical on%ideration *P# ha% 7een acce-ted. $e are aiting or the -roce%% o egion
etri75tion Pro=i%ion <etter (.5rat &eteta-an etri75%i Daerah.&D) in acco5nting
• Tiung E
Technical on%ideration ro" .DM i% %till aiting or n=iron"ent Per"it ro" *<@D
• ,ast TanFung %a&ung ocation Per(it =or ; 'eig$t- locations:
All relatedBre85ired %te- and doc5"ent% ha=e alread %ettled $e are aiting or -er"it
location relea%ed 7 *5-ati o a%t TanL5ng Ja75ng .ince the 7eginning, Per"it a--lication%
or 10 location% are handled 7 Third Part (contractor)
• +ak(ur E7 and +ak(ur E1 ocation Per(it ,tension: $e ha=e recei=ed A. ro"
.&& Miga% regarding the Per"it eEten%ion or Ma"5r F4 and Ma"5r F12 #eed to chec ith ntegrated Per"it .er=ice ;ice (&antor Pelaanan Periinan Te-ad5&PPT) and *P#
regarding the eEi%ting Technical on%ideration (Perti"7angan Teni%) and it% correlation ith
the -er"it eE-iration
#.7 Co((unication and De4elop(ent
• Construction o= Ways and +edian Road /er4ices =ro( Pe(atang u(ut and 9ccess Road
to *"P Contract PC%61;7!6C: .till aiting or TanL5ng Ja75ng *arat Go=ern"ent to clear land
ac85i%ition o local co""5nit, relocation o the eEi%ting electrical -ole on the road, ho ill 7e
aected the de=elo-"ent o 2 a% in Pe"atang <5"5t =illage
• Construct generator $ouse and road access at Pe(ping Island In=rastructure harita7le
PP;J*0162012 or -rogre%% i% 0Q co"-leted• /a(isake '/atu +ilyar Rupia$ /atu 2eca(atan- Progra( at ,ast TanFa&) West TanFa& 3
+uaro %a(&i. +oU <it$ Depart(ent o= Pu&lic Work /er4ice 'PU-: P57lic $or .er=ice
(PI) ha% co"-leted the Lo7 $e recei=ed their re-ort in %ot co-
• Construction ,lectrical Net<ork Installation at Rantau karya Billage CR/ IO+
No.11!8C96"o4RelHI1 : *.D i% -re-aring tender -roce%%
• Training Centre De4elop(ent =or Wo(en OrganiGation at West TanFa& Regency
Reconciliation Progra( Contract PC%61!!6C9: The la%t training a% cond5cted on March
1'th, 2014
• /er4ices =or De4elop(ent o= progra( pro=ile in *ooklet and Bideo Contract PC%606C9
PT. 2reasi 5 Perdana: The contractor i% inaliing =ideo, 7oolet and lealet
•9d4ertising ser4ices <it$: PT $ahana .e"e%ta Ja"7i – Ja"7i %-re%% PT $ahana adar TanLa7 PT Ja"7i nde-endent Pre%% PT *erita Metro Ja"7i Digital PT Ja"7i Po%"etro (The
1
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 20/26
ha=e %ent the la%t in=oice ) PT Ja"7i Media Graia – Tri75n Ja"7i PT Per5" Antara Ja"7i
!o5% Media no Ja"7i
• 9d4ertising 3 C/R Bideo Presentation /er4ice o= PetroC$ina International %a&ung td.:
#aha reati=e i% cond5cting thi% -rogra" %ince Jan5ar 20, 2014 n=oice Proce%%
• /tudy on /ocial Risks) Co((unication) and +edia in PetroC$ina Operation 9rea: <ingar
.5r=e ndone%ia (<.) ha% %ent the inal re-ort to PJ<
• *uilding Constructi4e ,ngage(ent t$roug$ /erial Works$op: co"-letel cond5cted $e are
%till re=ieing 7oolet% a% o5t-5t o the or%ho-%• /ponsors$ips Progra( 01. $e %-on%ored:
o ;ice "aterial% or =illage% aro5nd PJ< ;-eration Area
o Material% *5ilding or .MA Aradal @a8 Pe"atang <5"5t illage, *etara %57di%trict, $e%t
TanLa7 egenc $e ill re-lace thi% charita7le to $A d5e to technical i%%5e ((Thi% ind o
%-on%or%hi- %5--ort (in or" o con%tr5ction) "5%t 7e ith $A))
o Material% or Per%adaan &el5arga &aro Arih r%ada (P&&A) a%t TanLa7 egenc
o .5--ort .ain% Magaine or le"entar .chool in ;-eration Area
o .5--ort AleEandra A%"a%oe7rata in 2013 !or"5la acing ha"-ion%hi-
• /ponsors$ip Progra( 017 $e %-on%ored:
o #e Sear ele7ration in TanL5ng Ja75ng Ti"5r egenc
o
.5--ort *ait5rrah"an Mo%85e regarding Ma5lid #a7io .5--ort Geragai %57di%trict regarding *5-ati o a%t TanJa7K% =i%it
o .5--ort Act=it or Anni=er%ar o ""igration ;ice
o .5--ort Theatre Art in e=olt (A) Ja"7i – ndone%ia RMonolog Peror"ance9
o Material% (co%t5"e) or <ocal Go=ern"ent o a%t TanLa7 (.eda) regarding *5lan &3 a%t
TanLa7 egenc =ent% o egenc
o .-on%or%hi- or =ent o egenc .till aiting or "anage"ent?% a--ro=al%
o .5--ort Acti=it or General <ect5re 7 .&& Miga% .till ro5ting or a--ro=al -roce%% in
Jaarta
o .5--ort Acti=it or **GM and @&GP&& 42nd Ja"7i Pro=ince 2014
o .5--ort Acti=it or ;2.# and !<.2# .MP# or Geragai %57 di%trict a%t TanL5ng Ja75ng
egenco .5--ort Acti=it or ;2.# and !<.2# .D# or Geragai %57 di%trict a%t TanL5ng Ja75ng
egenc
o .5--ort Acti=it or M5%a7a8ah Tilaatir H5r?an (MTH) e Pe"atang *5l5h =illage
*etara %57 di%trict
o .5--ort Acti=it or RGe7ar Ana .e&a75-aten9 $e%t TanL5ng Ja75ng *arat or PAID and
.D
o .5--ort Acti=it or M5%a7a8ah Tilaatir H5r?an (MTH) e Mandala Jaa =illage *etara
%57 di%trict
• 8ar(ers ,(po<er(ent t$roug$ i4estock Cooperati4es ha% 7een co"-leted
• Pro(oting ,ntrepreneurs$ip a(ong 4illagers PetroC$ina Operation area Contract PC%
0# C9: $e ill cond5ct ic o "eeting in March 2014
• ,n$ancing 9griculture Producti4ity thro5gh Gro5- *a%ed Mechaniation ontract PJ – 20+1
– A The %er=ice -ro=ider i% c5rrentl i"-le"enting the -rogra" in the -ha%e o training and
ield %chool
• Re4italiGation o= Integrated /er4ices 'Posyandu- ontract PJ – 20+0 – A $e cond5cted
ic o "eeting on !e7r5ar 1/, 2014 ontractor i% cond5cting ield a%%e%%"ent
• Pro(oting ,cological 9<areness 9(ong ?ig$ /c$ool /tudents and T$eir 8a(ilies in
PetroC$ina Operation 9rea: ontract PJ – 20+ – A $e are aiting or <; agree"ent
ro" *5%ine%% .5--ort De-t
• Pro4ision o= 9ccess to =inancial ser4ices =or s(all &usiness $olders in Petrohina ;-eration
Area ontract PJ – 2101 – A Ater the contract re=ieed 7 *.D, e need to re=i%e .;$
and %ti"ation o%t
• 9sp$alt Road /i(pang IB to +enda$ara Ilir 15 2+ lengt$ Contract PC% 110 C9
*idding -roce%%
20
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 21/26
• Construct /teel *ridge at *lok C) "eragai PJ – 210+ –A eTender -roce%% 7eca5%e ater
negotiation, all the -ro-o%al -rice ere 10Q higher than o"-anK% Alread technical
re=i%ion 7 con%tr5ction, e -re7id in *.D Jaarta
• Construction o= Teac$er ?ouse o= /D !5 /ungai *eras) +enda$ara Ulu $A 03+/'B on%tB
J*B 2013 and Construction o= Teac$er ?ouse o= /D 1) /ungai *eras) +enda$ara Ulu $A
03+/6B on%tB J*B 2013 Tho%e -rogra"% are co"-leted
• *ridge Construction =or Teluk Nilau: The 7ridge con%tr5ction a% relocated to Parit F2 *ridge,
P5la5 Pinang, &5ala *etara $e are coordinating ith P57lic $or% .er=ice (PI) @; illre=i%e thi% -rogra" 75dget
• *ridge Construction =or Teluk Nilau . The 7ridge con%tr5ction a% relocated to Parit F2
*ridge in .enerang illage $e are coordinating ith P57lic $or% .er=ice (PI), $e%t TanL5ng
Ja75ng @; ill re=i%e thi% -rogra" 75dget
• Tec$nical o= 9gricultural Organic 8ar( Training =or /elected 8ar(ers in Operation 9rea.
$e are aiting or or %ched5le ro" !ilantro-i !ir%t training a% cond5cted in March 1 th
– 20th, 2014
• /ocialiGation and ,ducation to T$e Dangers o= Drug 9&use 9(ong t$e Aoung "eneration
The ir%t %ocialiation a% cond5cted on !e7r5ar 2/, 2014 at .M& 1 a%t TanL5ng Ja75ng 2 nd
%ocialiation a% cond5cted on March 1, 2014 at .MA 1 &5ala T5ngal, $e%t TanL5ng Ja75ng
and 3rd %ocialiation a% cond5cted on March 3rd, 2014 at .M& 1 Ja"7i
• Designing o= Clean Water and /anitation Progra" at $e%t TanL5ng Ja75ng egenc and a%t
TanL5ng Ja75ng egenc ontract ad"in %ent e85e%t or H5otation (!H) letter to Saa%an
Dian De%a on !e7r5ar 16, 2014 ;n !e7r5ar 2'26, 2014 Mr i=ani Mr !eri raan
cond5cted a "eeting in Sogaarta ith Mr Anton .oedLaro ro" Dian De%a and acilitated 7
Mr *an5 .57ago
• Construction o= *asic O&stetric Neonatal ,(ergency /er4ice 'Pelayanan O&stetri Neonatal
,(ergency Dasar6PON,D- P5%e%"a% .5oreLo PJ22'6A Pre7id Meeting a% cond5cted
on March 12, 2014
• Construction o= a&oratory IP9 at /+P *etara PJ2261A Pre7id Meeting a%
cond5cted on March 12, 2014
• Construction o= a&oratory IP9 at /+P 7 Teluk 2ul&i. PJ22'/A Pre7id Meeting a%
cond5cted on March 12, 2014• Construction Integrated /er4ice Post 'PO/A9NDU- at /erdang %aya "-le"entation
Progra" i% in -rogre%%
• Construction o= +inistrant Pu&lic ?ealt$ Center 'Pustu- Pandan +ak(ur PJ 21/0 – A
The inner i% .er5"-5n #i75ng 5rrent %tat5% i% aiting or <;
• Capacity &uilding =or go4ern(ent sta== in eig$t ne< de4elop(ent 4illages around
PetroC$ina Operational 9rea $A. e#o001BGo=elB$ABB14 $e are aiting or
-rogra" i"-le"entation
• /trengt$ening Relations$ip <it$ ocal %ournalist in %a(&i $A.
e#o002BGo=elB$ABB14 $e are %till re=i%ing e%ti"ation co%t and %co-e o %er=ice% d5e to
%o"e ad=ice% ro" !M The ir%t e=ent a% cond5cted on March 11th, 2014
• Construct Pu&lic ?ealt$ 'Pustu- at 2uala *aru /e&erang 2ota. . ro5ting a--ro=al• Construct Pu&lic ?ealt$ 'Pustu- at agan Tenga$ 4illage. . ro5ting a--ro=al
• Construct ea Class roo( /DN 1;; at 2a(pung *aru) P.u(ut. . ro5ting a--ro=al
• Construct Polindes at agan Tenga$ 4illage. . ro5ting a--ro=al
• Construct +os@ue at Pe(atang u(ut. $A. ro5ting a--ro=al
• Construct electrical net<ork installation at /epakat Inda$ Billage o= ,ast TanFung %a&ung
Regency. . ro5ting a--ro=al
• De4elop(ent o= i4estock Center in PetroC$ina Operation 9rea. . ro5ting a--ro=al
• Increasing 9ccess to ?ig$er ,ducation t$roug$ /c$olars$ip Progra( in PetroC$ina
Operation 9rea. . ro5ting a--ro=al
• Increasing 9ccess to ?ig$er ,ducation t$roug$ /c$olars$ip Progra( in PetroC$ina
Operation 9rea. . ro5ting a--ro=al
• De4elop(ent o= Co((unity Center in PetroC$ina Operation 9rea. . ro5ting a--ro=al
21
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 22/26
• Capacity De4elop(ent =or Teac$er and /c$ool +anage(ent and Pro4ision o= earning
,@uip(ent in PetroC$inaJs Operation 9rea . ro5ting a--ro=al
• Posyandu Re4italiGation o= PetroC$inaJs Operation 9rea . ro5ting a--ro=al
• /er4ices =or Capacity De4elop(ent o= PetroC$inaJs /take$older on Participatory
De4elop(ent . ro5ting a--ro=al
;.0 O"I/TIC;.1 ?ig$lig$ts and (aFor acco(plis$(ent
• <T *ahari Jaa <e%tari i% %ailing ro" <agan %taging area to Perta"inaPale"7ang to load
@.D 5el (e March 2014 no"ination or the 1%t %hi-"ent)
• Pett a%h -roce%% ith total a"o5nt i% - 20,46,00000
• Mr o77 @5to"o, Mr .5nardi and Mr &a%"ad $ari% attended training or E-lo%i=e
handling -roced5re ith DitLen Miga% on 1+ thr5 22 March, 2014 in *ali
• Mr !ran% M5nt55nt5 attended RPer"ohonan Per-anLangan in Pe"7elian dan
Pengg5naan *ahan Peleda9 "eeting ith .&& MGA. in Pale"7ang on 1 March 2014
• Mr Aan Mailana and Mr @adi A7adi ro" Material Jaarta and Mr 5ll a ro" .&&
MGA. =i%itted Ja75ng or Pre$;P Material Ph%ical hec at &M06 on 20 March 2014
The inal "eeting i% held on 21 March 2014 in Ja"7i, Mr !err Matita and Mr Ari .5-riadi attended the "eeting
• Tran%erring "aterial o oc 7it (2 a) ro" Petrohina Ja75ng (PJ<) to Petrohina
*er"5da (P<D) on 20 March 2014 and co=ered 7 A. #o 01BTMP<DB2014
;. Upco(ing +eeting and ,4ent
• .ched5ling or 10 -er%on% o <ogi%tic De-art"ent Training Gantr rane ;-erator
ere%h"ent and ertiication on March 2014 at Geragai and *GP Pending d5e to aiting
a--ro=al ro" "anage"ent Jaarta 7a%ed on inor"ation ro" training and Per%onnel
.ection Ja75ng
• .toc ;-ti"iation Progra" "eeting ill 7e held on 26 March 2014 at *GP ec @all and
attended 7 Material Jaarta and all Ja75ng De-art"ent
• Mr IL5 J5naedi ill attend ro%% 5lt5re Training to *eiLing on 03 12 A-ril 2014
• Mr Dana A Soeana, Mr J5lri Porang, and Mr Soo .5%"iadi ill attend training or
E-lo%i=e handling -roced5re ith DitLen Miga% on 1' thr5 1 A-ril, 2014 in *and5ng
;. Ne< Issues and concern
• Minor on%tr5ction o !5el .tation *etara at *GP <adon Sard (A! 26112110+) 5nder
contract PJ132A i% %till 60 Q in -rogre%%
• Minor Drilling *5ilding .er=ice% and Drilling .helter .er=ice% (A! 261121101) 5nder
contract PJ114A i% %till +4 Q in -rogre%%
• All 5%er realiation to 5tilie %5r-l5% and dead %toc "aterial%
• e85e%t o ontract Agree"ent or Door To Door oad Tran%-ortation .er=ice% i% %till
-roce%%ing o tender %-ec 7 *.D
• e85e%t o ontract Agree"ent or Ga%e% .5--l (PJ2112A) alread <; and contract
%till circ5lated or 5rther a--ro=al o Manage"ent Jaarta
;.7 9dditional In=or(ation
• .aet Meeting held reg5larl e=er Monda "orning 7eteen <ogi%tic, @., and
ontractor in <ogi%tic Area to ca"-aign ;@.A. +001 .; 14001 and -ro"ote Ge"7a
i"-le"entation
• oordination "eeting o inco"ing %toc "aterial -lan 7eteen .toc ontrol, <agan
$areho5%e, and *GP $areho5%e i% held e=er ee
.0 +9RIN,
Net <eek =orecast:
22
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 23/26
• r5de ;il: MT Andhia Ar%anti, A<D Mar 23 – 24, 2014 cargo N 6',000 **<.
• onden%ate: #o <iting
• <PG: #o <iting
10.0 89CIITI,/ OP,R9TION
10.1 *"P Operation
•
"eneral +aFor 9cti4ities o= Pre4ious Week • MI or i=il BP and Pre!a7 area
• @ot ;il !ilter% B;
• MM! * o-ened and in%-ected Etre"el Dirt e%toc on order
• MM! A in%-ection cond5cted March 23, 2014 e%5lt% %a"e a% MM! *
• #* G! tri- on .econd %tage <VT ent to o-en loo- 14'A12+
• .itch GTG oline d5e to oil te"-erat5re TD aiting on -art% GTG *;< March 21
• *GP contin5e% to r5n at or a7o=e de%ign rate% 75t at the%e rate% ha=e i%%5e% ith li85id%
-roce%%ing
• Plant nlet Ga% i% reg5lated 7 De%ign o A"ine ontractor and Mole%ei=e ca-acitie%
• .BD -lanningB-re-aration on going to -eror" "aintenance ta%% %o *GP can "aintain rate%
• @P .l5g atcher Plent ilter cleaned• lectric !ire P5"- co5-ling ail5re e-air% in -rogre%%
• *GP Per"anent a"- =ac5ation @orn and <ight% 5nction te%t cond5cted, re-air% re85ired
• "R8Js
• .till aiting or contract to re-air #* <Po"-
• #* G! Tri--ed March 16 on .econd %tage <VT ent to o-en loo- 14'A12+
• #* G! @M ailing reg5larl, B re-laced March 1th
• Pretreat(ent and Inlet 8acilities
• <i85id -roce%%ing to onden%ate .tri--er d5ring heat o da c5rtailed
• CO Re(o4al 3 "as Treat(ent
• ;-eration% o5tine and %tead
• harcoal ilter in %er=ice ro" March 1/ to March 1+
• N" Reco4ery 3 /$ipping
• ;-eration ro5tine and %tead
• A7%or7er *otto"% P5"-A i% an e"ergenc %-are in e=ent * -5"- ailed Te"-orar M;
i% in -lace or Pri"ar .eal <ea .ince Ma 20 th, 2013 *GP ;-% 5na7le to i%olate -5"- d5e
to -a%%ing %5ction =al=e
• /ales "as Co(pression and +etering
• ;-eration% ro5tine and %tead
• .G @M ailing $; to Proc5re ne A.AP
• Po<er "eneration W?RUJs
• GTG AB online
• $eel DG no <oad 5n te%t% co"-leted
• GTG?% oline to iE oil te"-erat5re TD and no -art%
• GTG A Generator inlet ilter% B;
•
Utilities• !ield trial% or ne "e"7rane ele"ent che"ical cleaner ongoing
• !ire $ater P5"- r5n te%t% co"-leted
23
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 24/26
• @ot ;il !ilter% B;
• MM! AB* o-ened and in%-ected Etre"el Dirt e%toc Media on order
• Produced <ater disposal• !la"e arre%tor on Prod5ced $ater Di%-o%al Tan 660T102 re85ire% re-lace"ent – no %toc
• $; i%%5ed to in%tall L5"-er line to allo Prod5ced $ater Di%-o%al Tan 660T102 to 7e
7-a%%ed i re85ired .-ool !a7rication i% %tarted
•Aaiting o%t e%ti"ate to re-air Di%-o%al $ater Tan 660T102 and .lo- TanT101 ater o-ened or in%-ection
• Personnel• *GP ;-eration% %till =er 5nder%taed, re85ire additional %ta a% -er -ro-o%ed PT&
re=i%ion
• .57"itted one March 1th ater inter=ie%
• *GP ;-% organiation no ha% 12 =acancie% – liel to "ore o-erator% ill re%ign ithin
the co"ing ee !M a--ro=ed re-lace"ent $ill or ith Ja75ng -er%onnel to %olicit
candidate%
• nter=ie% or -otential candidate% ill cond5ct March 1/ thand 1+th
• ngineering %t5dent% on %ite ro" 121 or or eE-erience training
• Te%ting or TP to D con=er%ion 7a%ed on the 6 o + %-ace% a=aila7le on *GP ;P. TP& on
March 16
• e=i%ed TP& -rogre%% i% ongoing
• ?/,
• J.; card% %57"itted or the ee
• .aet "eeting on PT$
• =ac5ation Tone or *GP Per"anent a"- !5nction te%t March 22, 2014 e-air% re85ired
• *GP lectric !ire P5"- had co5-ling ail5re, ncident e-ort cond5cted, $; to iE
• Upco(ing Planned 9cti4ities:
• Prod5ction ;-ti"iation neEt "eeting in J5l 2014• Ja75ng .BD -lanned ;cto7er 6 to 1 ;ngoing -lanning
• TMB;M A-ril 23,2014Plant Data %ent to *riLe%h MA@ 1+
• #;D %aet n%-ection %ched5le% or A-ril
• ,@uip(ent Una4aila&ility
• onden%ate .tri--er 7otto"% li85id% chro"atogra-h 60'AT1+2 !ailed .AT in J5l 2013 –
no orard -rogre%%
• A7%or7er *otto"% P5"-Ai% an e"ergenc %-are in e=ent * -5"- ailed Te"-orar M;
i% in -lace or Pri"ar .eal <ea .ince Ma 20 th, 2013 *GP ;-% Ina7le to i%olate -5"-
d5e to -a%%ing %5ction =al=e
• #*<P o"- ;5t %ince .e-t 22 – aiting contract a--ro=al to re-air
• einLection * @M D! no %-are%
• +aterials• 1' o5t o 200 e"ergenc %-are "e"7rane (;2 re"o=al) ele"ent% recei=ed
• #o %toc or re-lace"ent 10"icron a"ine "echanical ilter% ele"ent%
• P5rcha%ing locall a=aila7le ; "e"7rane cleaner thro5gh Pett a%h
• #e A"ine Plate eEchanger <; %igned March, 22 ee% or deli=er %o ill "ae .BD
2014
• Mole%ei=e *ed Media on%ite .e-t
10. N"8 and 8PU Operation
• N"8 Plant
24
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 25/26
• PM .er=ice n%tr5"ent air co"- /'&101*
• e-laced reg5lator o 3 drer //0&26'
• .itch o=er 5el ga% ro" re%id5e to %ale% ga% -i-e line d5e erigerant co"- &''0 ail5re
• ein%talled %%te" %en%or alar" o !A<P
• PM .er=ice 3 regeneration drer -5"-% /10P103* and @ot oil circ5lation -5"- /'P
102
• n%-ect and re-aired $.P
• ontin5ed con%tr5ction or Ja"7i Merang Tan ProLect at #G< area 7 PT *.P
• ?a(ilton %T Plant
• PM .er=ice glcol 7oo%ter -5"- 4''P12/* and @ot oil circ5lation -5"- 4''P132A
• *oth @ot oil circ5lation -5"-% P6/0B6+0 ail d5e leaing thoro5gh on ga%et o the ca%ing
• erigerant co"-re%%or &''0 re85entl tri- d5e %5ering -ro7le" on t5r7o charger hich
carring load
• Mae 5- 3 dr5"% ther"ia * on @a"ilton -lant hot oil tan
• erigerant co"- &''0 "an5al e"ergenc %to- d5e to -ro7le" on l57e oil cooling hich
lead Lacet ater cooler conta"ination ith l57e oil
• ero5ted eed ga% to JT -lant d5e @a"ilton -lant -ro7le" ith erigerant co"- &''0
• ontin5e Acti=it ;=erha5l erigerant o"-re%%or &'60
• 8PU
• PM .er=ice n%tr5"ent air co"-re%%or 5nit 2'P&101A
• PM .er=ice 2'0 hr% on Die%el engine generator 5nit 2'DG101A
• o"-lete o loading to MT #. @A<#G 3 loaded 1/,000330 MT and 4
10,00020 MT
• T5rn don Ga% t5r7ine co"-re%%or 20GT101* d5e to inlet "aniold Petro%tar clo%e
• hange o=er Die%el engine generator 2'DG101* to A d5e to o5nd lea on;il cooler
hich lead cooling ater "iE ith l57e oil
•e-laced -re%%5re dierential %itch 2'DP.11/ on GT 101* d5e re85entl %t5c atga% -re%%5riation %e85ence
• ontin5ed rig don %caolding at MDF3 and rig 5- %caolding, ater Letting, and -ainting at
7ridge MDF2!PI 7 .*. contractor
• Operational Issue
• #G! n%tr5"ent Air %%te" de%ign co5ld lead to 5rther 5nnece%%ar P. %h5tdon% #G!
.D on 4 J5ne a% ca5%ed 7 lo in%tr5"ent air header -re%%5re – P. contin5ed -rod5ction
a% in%tr5"ent air %5--l a% 85icl ree%ta7li%hed olloing #G! .D Ja"7i Merang Tan
ProLect to -ro=ide additional n%tr Air o"-re%%or at #G!
• !PI @A identiied a% additional noncla%%iied electrical e85i-"ent that "5%t 7e
•addre%%ed in ca%e o =a-or relea%e ro" Petro%tar or E-ort Taner J&T ng %ite =i%itcond5cted 1+ J5ne 200 !ollo 5- re85ired ith Jaarta ngineering
• Pro-ane onden%er Init A (to- 5nit) changed o5t ith re-lace"ent Titani5" 5nit d5ring Ma
2011 .h5tdon Peror"ance i% li"iting !PI ca-acit *otto" 5nit -5t 7ac into %er=ice to
increa%e conden%ing ca-acit *otto" 5nit ha% de=elo-ed %hell lea (%eaater) Man5act5rer
in%-ection J5ne 2013 Te"-orar lea re-air carried o5t on 2 ;ct 2013 er %light %eaater
lea detected at re-air %ite
• D. interace ith JT and @a"ilton P< control %%te"% JT and @a"ilton Plant can no 7e
"onitored ro" #G! , hoe=er it "a not 7e -o%%i7le to ade85atel control ro" #G!
, e%-eciall d5ring %tart5- ccle%, d5e to %lo data tran%er rate% n%tr5"ent Maint De-t
cocoordinating ith $iga% to o7tain 85otation or @a"ilton control %%te" P< @M to 7e
located in #G! n%tr5"ent Maint De-t ha% 5-graded D. @M "e"or to allo or
@a"ilton Plant Trending in #G!
2'
8/9/2019 Jabung Weekly Rpt. Mar. 16 ~ Mar. 22, 2014
http://slidepdf.com/reader/full/jabung-weekly-rpt-mar-16-mar-22-2014 26/26
• @a"ilton Plant Glcol .%te" i%%5e% #eed -lan or cleaning o5t re7oiler and -o%%i7le
re-lace"ent o re7oiler -acing e-lace"ent Pall ring% on %ite $aiting on conir"ation o
a--ro=al or neEt -lanned .h5tdon, -ro7a7l ;ct 2014
• @a"ilton Plant @ot ;il @eater @60 high -oint =ent lea "-t dr5"% located on %ite or
draining o heater d5ring re-air or Proced5re and J.A 7eing de=elo-ed Material% 7eing
%o5rced ontin5e "onitoring lea
•
Ot$er Issue• ;5t%tanding engineering inor"ation and doc5"entation related to ne e85i-"ent in%talled on
Petro%tar d5ring drdocing ;5t%tanding .;$ i%%5e% ater Petro%tar ret5rned to ter"inal
.eaater ooling Pi-ing to Generator% de=elo-ed lea% d5e to -re"at5re corro%ion, re85iring
5n-lanned %h5tdon on ' .e-t Thi% -i-ing re-laced d5ring dr docing in 2010 oncern%
on E-ort Maniold Pro-ane -i-ing corro%ion Petro%tar re85e%ted to -ro=ide additional
in%-ectionBengineering inor"ation or P re=ie !5rther inor"ation re85e%ted ro" ;-%
.5--ort De-t related to Pi-ing .-ec% in harter Agree"ent
• Man-oer, lo%ing trained %ta and -ro7le"% 7eing a7le to re-lace the" ;-erator Training
Progra" 5-dated and %tarted again !o5rth Mod5le training "aterial i%%5ed to !PI and #G!
;-erator% !o5rth Mod5le te%ting -rogra" 7eg5n Mentoring co""it"ent ro" eE-erienced
-er%onnel to 7e increa%ed e=i%ed ;rg hartBPro-o%ed PT& %57"itted on 1' Jan 2014
E-ect %e=eral TP to 7e con=erted to D• <ac o -rogre%% on M;% e=ie and 5rther ollo 5- re85ired
• RA% *5ilt9 doc5"ent% not reall a% 75ilt in "an ca%e%
• @igh ear rate on -ig% – -artic5larl in the 6 inch 75tane -i-eline #eed to eE-edite intelligent
-igging -rogra" to identi ca5%e
• <ac o -rogre%% ro" Petro%tar to reco=er and rein%tate dro--ed anchor chain #o ' %ince
re"ooring in A5g5%t 2010 !ailed atte"-t to locate chain in #o= 2011 #eed -lan going
orard, or eE-ert ri% a%%e%%"ent on c5rrent "ooring condition
• JT Plant a% re%tarted 4 !e7 to allo or erig o"-re%%or% to 7e o=erha5led one at a ti"e
• #G! and !PI J.; Progra" 7eing "onitored to "aintain and enco5rage -artici-ation 7 all
;-eration% re
• Ja"7i Merang no oring on %ite – re85ire% additional "onitoring and control o or ro"
#G! .5-er=i%or%
• ontin5e "onitoring and %o"e adL5%t"ent at Dehdration %%te" o Glcol econcentrator
WWWWWWWWWWWW
<iang @ailong