AN ISO 9001 : 2008 COMPANY Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office no.: 264, 265, 266, Akurdi, Pune-411 035.Maharashtra-India Email: [email protected] , Website : www.groupsurya.in
Transcript
Page 1: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

AN ISO 9001 : 2008 COMPANY

Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office no.: 264, 265, 266, Akurdi,

Pune-411 035.Maharashtra-India Email: [email protected],

Website : www.groupsurya.in

Page 2: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

In the field of construction where Precision, Agility, Reliability andQuality are the critical aspects for success. GROUP SURYA PEBENGINEERING & CONSTRUCTION is passionate towards its missionto deliver only the best to its customers.

Capability to execute Turnkey projectsAssociated with reliable agencies and consultantsStrong financial support from BankersOwn construction Plant & Machinery with sufficient Shuttering materialDedicated and qualified engineering and administrative staff

Page 3: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Group Surya PEB Engineering & Constructions comprises a team ofqualified construction professionals with varied experience in execution ofIndustrial, Commercial, Institutional & Residential Projects. We make surethat the project is managed, executed professionally and the delivery isbeyond client’s expectations.

Adopting latest techniques, using latest plant & machinery Skilled workforce managed by experienced project managers Projects are planned and tracked using Microsoft Project Total Quality Management System Processes and documentation as per ISO 9008 Cordial relations with all stakeholders Vigilant about Industrial Safety. Housekeeping monitored by dedicated safety officersModern safety equipment is provided to all workers and staff

Page 4: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Name of Company :- GROUP SURYA PEB ENGINEERING AND CONSTRUCTIONS, PUNE.Date Of Estab. :- April 2009Corporate Office :- Jai Ganesh Vision Complex, ‘B’ Wing, 2nd

Floor, office no.: 264, 265, 266, Akurdi, Pune-411 035.Maharashtra-India.

Factory Address :- Gat No. 175, Behind M.S.E.B. Office, Ganesh Nagar, Talwade, Pune-411 038.

Director :- Mr. Yogesh Wake +91 9823444119: +91 9960900219Mail-Id :[email protected] ; [email protected] :- www.groupsurya.inContact’s No. :- +91 7507778565 /+91 7507778559 /91 7507778265Turnover :- Rs. 55 Crores ( 550 Million INR)Bankers :- Thane Janata Saha. (TJSB) Bank LtdPAN :- AAKFG4754DVAT TIN :- 27910867840V w.e.f. 23.11.2011CST TIN :- 27910867840C w.e.f. 23.11.2011EXCISE REG NO. :- AAKFG4754DEM001SERVICE TAX NO. :- AAKFG4754DSD001RANGE :- AKURDI 1DIVISION :- PUNE 1COMMISSIONARATE :- PUNE 1

Page 5: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,
Page 6: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

In process project details

Sr no Year Name of Client Nature of works Duration

1 2013-14 Rudrapratap Indian Logistics , Yelwadi Chakan, Pune

Industiral Shed in PEB (2,41,000 sq.ft.) 8 month

2 2013-14 Mahindra Logistics, Chakan, Pune Industrial Shed in PEB (1,07,000 sq.ft.) 6 month

3 2013-14 Killick Engineering Pvt. Ltd., Malegaon MIDC Sinner, Nashik

Industrial Shed in PEB with civil work (60,000 sq.ft.) 6 month

4 2013-14 Ram Corrugates Boxes Pvt, LTd. , ChakanPhase2 , Bhamboli .

Industrial Shed in PEB with Maizzenaine Floor (32,000 sq.ft.)

6 month

5 2013-14 M Plus CNC Tech Pvt. Ltd, Chakan Industrial Shed in PEB with civil work (22,000 sq.ft.) 4 month

6 2013-14 Success Engineers, Bhosari Industrial Shed in PEB with civil work (20,000 sq.ft.) 3 month

7 2012-13 Ramdas Botre, Chakan, Pune Industrial Shed in PEB (16,000 sq.ft.) 3 month

8 2013-14 Hyudai Showroom, Sangmner,Ahmednagar Industrial Shed in PEB with civil work (25,000 sq.ft.) 4 month

9 2013-14 Kisan dongare, Rohkal Industrial Shed in PEB (15,000 sq.ft.) 3 month

10 2013-14 S. M .Construction, Chakan Industrial Shed in PEB (12,000 sq.ft.) 3 month

11 2013-14 Mr. Desai, Waghajai Chakan Industrial Shed in PEB (10,000 sq.ft.) 3 month

12 2013-14 Rajhans Milk Dairy Sangamner , Ahmednagar Industrial Shed in PEB (60,000 sq.ft.) 4 month

13 2013-14 Henkel Adhesive Tachnologies P Ltd, Jejuri, Pune

Industrial Shed in PEB with civil work (20,000 sq.ft.) 3 month

14 2013-14 Govind Agro, Lonand ,Satara Industrial Shed in PEB (13,000 sq.ft.) 3 month

15 2013-14 Praksh Pawar, Chakan Industrial Shed in PEB with civil work (20,000 sq.ft.) 3 month

16 2013-14 M/S S.P. Moulds Pvt. Ltd., Khalumbre ,Chakan. Industrial Shed in PEB with civil work (20,000 sq.ft.) 3 month

17 2013-14 Mr. A.K.Gupts ., Malegaon MIDC Sinner, Nashik

Industrial Shed in PEB with civil work (10,000 sq.ft.) 2 month

Page 7: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Completed project details

Sr. No

Year Name of Client Site Picture Consultants Nature of work Duration

12012-

13Rinder India Pvt. Ltd. MIDC Chakan, Pune.

SA architect.Industrial Shed in PEB with

civil work.(35000 Sq.ft)4 months

22012-

13Arofine Polymers.

MIDC Chakan, Pune.Architects

United, Pune.Industrial Shed in PEB with

civil work.(20000 Sq.ft)3 months

32011-

12

BridgeStone, Near Hyundai, Savardari,

Chakan.

Shimzu &Geodesic

Industrial Shed in PEB with civil work and office

building.(75000 Sq.ft)6 months

Page 8: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Completed project details

Sr. No

Year Name of Client Site Picture Consultants Nature of work Duration

42012-

13

Elite Plasto-Mech Industries,

Savardari, ChakanGroup Surya

Industrial Shed in PEB with civil work

(37500 sq ft)5 months

52011-

12

DTL Ancillaries Pvt. Ltd. Gat No.373, Plot No. 1 & 2,

Ambethan MIDC, Chakan

Architect Mr. Shah

Conventional Industrial Shed with

mezzanine floor. ( 55000 sq ft)

6 months

62011-

12

Lotus Engineers, MIDC Chinchwad,

Pune.Group surya

Industrial Shed with PEB and civil work(

27500 sq ft)4 months

Page 9: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Completed project details

Sr. No Year Name of Client Consultants Nature of work Duration

1 2012-13Creative Ashtech Power Projects Ltd.

Aundh, Group Surya

Industrial Shed in PEB at Dahanu Power Plant.(12500 Sq.ft)

2 months

2 2012-13 ABB Electricals, Nashik Group Surya Industrial Shed in PEB with civil work (6500 sq ft) 1 month

3 2012-13Mahadevi industrial Park, Kharabwadi,

Chakan. Group Surya Industrial shed with PEB and civil work.( 65000 sq ft) 6 months

4 2012-13Sadguru Auto Comp. Pvt. Ltd.

Mahalunge, ChakanGroup surya Industrial shed with PEB and civil work.( 35000 sq ft) 4 months

5 2011-12Mauli Fabricators, Ambethan MIDC,

ChakanArchitect Mr. Oak

Industrial Shed in PEB with civil work and office building ( 38000 sq ft)

5 months

6 2011-12Vighnaharta Warehouse, Waghjai

nagar, Chakan.Group Surya

Ware House in PEB with civil work and office building ( 35000sq ft)

4 months

7 2012-13 Rajyog Showroom, Latur. SA architect.General Motors Vehicle showroom with PEB

work.(12000 sq ft)3 months

8 2012-13Mahalunkar Estate, Mahalunge,

ChakanGroup surya Industrial shed with PEB and civil work.( 35000 sq ft) 4 months

9 2012-13Banashankari Warehouse KDBIA,

Bijapur, KarnatakaGroup surya Ware House with civil and PEB work.( 22000 sq ft) 3 months

102012-13 Acme Industries Group surya Industrial Shed in PEB with civil work (35,000 sq.ft.) 4 month

112012-13 Ashok Leyland Wagholi , Pune Group surya Industrial Shed in PEB (22,000 sq.ft.) 4 month

122012-13 Honda Showroom , Sangamner,

AhmednagarGroup surya Industrial Shed in PEB (16,000 sq.ft.) 3 month

132012-13 Shree Elecricals Group surya Industrial Shed in PEB (26,000 sq.ft.) 3 months

14 2011-12 Mangal Industries, Talwade Group surya Industrial Shed in PEB with civil work( 20000 sq ft) 3 months

15 2007-08 GKN Sintered Metals Ltd, Pimpri, PuneArc-Aids Architectural

Consultant - Pune.Construction of shed (22500 sq.ft) 6 months

16 2012-13 Precision weighing system Jejuri Group surya Industrial shed with PEB and civil work.( 5000 sq. ft) 2 month

Page 10: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Completed project details

Sr. No Year Name of Client Consultants Nature of work Duration

18 2012-13 Pragati Engineers, Talwade Group suryaIndustrial shed with PEB and civil work.( 6000 sq.

ft)2 month

19 2012-13 Vijeta Press Tools, Talwade Group SuryaIndustrial shed with PEB and civil work.( 5000 sq.

ft)2 month

20 2012-13 Om Engineers, Talawade Group suryaIndustrial shed with PEB and civil work.( 5000 sq.

ft)2 month

21 2012-13Chavan Industries, Waghjai Nagar,

Chakan. Group surya

Industrial shed with PEB and civil work.( 34000 sq. ft)

4 months

222012-13 KTA Spindle Tooling , Hinjewadi ,

PuneGroup surya Industrial Shed in PEB (45,000 sq.ft.) 4 month

23 2011-12Padmavati Fly Ash & Bricks, Undari

Pisoli, Katraj, PuneGroup Surya Ware House in PEB with civil work ( 35000 sq. ft) 4.5 months

24 2012-13 Sahyadri Technomech Group surya Industrial shed with PEB work. (6000 sq. ft) 2 month

25 2011-12Kirpekar Engineering Pvt. Ltd -

HinjawadiArchicon Associates -

Pune.construction of Factory Shed PEB and civil(23500

sq. ft) 3 months

26 2010-11 Hotel orchid Client itself Structural Glazing & Alcomate Paneling 3 months

27 2010-11EMS Technologies Pvt. Ltd.

Pirangut

Environs - Architects, Planners Landscape &

Interior Designers –Pune

Factory Shed, Compound wall, Internal Roads,& Site Development Etc.(22500 sq. ft)

5 months

28 2010-11Francois Compressors India Pvt.

Ltd. PirangutArchicon Associates -

Pune.Tremix Flooring,Toilet Block,Temperory Shed &

other Misc. works( 15000 sq. ft)4 months

29 2010-11Elpro International Ltd.

ChinchawadElpro constrution of extention building 27000 sq. ft. 6 months

30 2010-11 J P Engg, Hadapsar, PuneArchicon Associates -

Pune.

Construction of RCC office bldg @ 37500 sft, Internal Trimix Concrete Roads, miscellanious

civil works. 8 months

31 2009-10Sungwoo Automotive India Pvt.

Ltd, Takave, PuneSungwoo Automotive

India Pvt.Ltd.Construction of shed with civil work (40000 sq.ft) 7 months

32 2008-09Mould Tech Pvt Ltd Supa MIDC,

AhmednagarPawan gandhi

Construction of shed in fabricated structure (45000 sq.ft)

7 months

Page 11: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,
Page 12: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

On Going Project Pics

Page 13: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

On Going Project Pics

Page 14: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

QUALITY CONTROL EXCAVATION EQUP'S WITH OUR ASOCIATES

Theodofite 05 Nos Tata Hitachi Wx 200 + Wx 350 06 Nos

Autolevel 06 Nos JCB Excort 3 D 4 Nos

Concrete Moulds 70 Nos D 40 Kamatsu Bulldozers 01 Nos

Slump Test Cones 10 Nos Dumpers (Tata & Leyland ) 18 Nos

Cube Testing Machine 02 Nos Excort Bibro Roller ( 5250 ) 01 Nos

Moisture Meter 03 Nos BEML Motor Grader 02 Nos

Weigh Balance 08 Nos Hydraulic Breaker Atlas Capcc 03 Nos

Sand Sieve 05 Set Crup Hydaulic Breaker MB1600 & 2200 06 Nos

Metal Sieve 06 Set Hyva & Tata 1613 (TC) Dumpers. 04 Nos

STEEL SHUTTERING OTHER MACHINERY

Cup - Lock Scaffolding 0650 Sqm Generator Set (125 KVA,30 KVA ) 04 Nos

Acro Spans 3200 Nos Earth Compactor 04 Nos

Props 7250 Nos Drill Machine 11 Nos

Plates 6200 Nos Grinder 08 Nos

Bressing Pipe 3100 Nos Welding Machine 24 Set

M S Couplers 6800 Nos Ele. Breaker 05 No

M S Shikanja 1300 Nos FLOORING

H Frame Scaffolding 00850 Set Tremix Flooring System 03 Nos

Ply Wood Formwork 14500 Sqm Tile Polishing Machine 04 Nos

Page 15: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

GROUP SURYA PEB ENGINEERING & CONSTRUCTION is committed to control accidents at its construction sites by providing Personal Protective Equipment (PPE) and constant awareness on preventive measures. Safety committee is formed on each and every site which take cares of all the safety norms to avoid accidents.

Safety Helmets

Safety belts used for workmen working on heights Hand gloves used for material handling, gas cutter etc Safety goggles used for welding, grinding, concrete breaking Gumboots concrete works, cutting hard rocks, asphalting

Dressing cotton

General Medicines 1” & 3’’roller BandagePotassium Permanganate Iodine bottle, Dettol, Burnol / Sofromycene Knife, Scissors

Page 16: Jai Ganesh Vision Complex ,‘ B’ Wing,2nd Floor, office … · Internal Trimix Concrete Roads, miscellanious civil works. 8 months 31 2009-10 Sungwoo Automotive India Pvt. Ltd,

Excavation-Barricade the excavated area by barricading tapesConcreting in foundations-Shoring & Strutting of trench/pitSlab form work-Fix props truly vertical with proper bracing-Center steel span pin to be tightened properly- One attendant should be there where materials are likely to fallConcreting of slab- Ensure the lift scaffolding installed / remains vertical- Avoid throwing of unused materials from upper floors- Walkways to be used for walking on slab reinforcementWelding

- Welding work should be away from the damp area- Temporary cables to be installed at height and not on floor- Cable joints to be properly insulated- Welding work should be done using gloves and protective eye gearMasonry & Plaster

- Throwing of waste materials should be avoided- Scaffolding should be sturdy & properly bracedHousekeeping

- Empty cement bags should be stacked properly after work- All shuttering materials should be stacked in defined areas- Neatness should be maintained at entire siteMandatory

- Use hooked/anchored safety belts when working on height- Use of helmets is must while on site