  • Jal Jeevan Mission Har Ghar Jal

    Annual Action Plan of

    State/ UT _________________

    FY 20-21

  • Annual Action Plan of _______________ for FY 20-21

    Page 2 of 21

    Jal Jeevan Mission Annual Action Plan for FY 20-21

    Contents

    1.) General Information

    2.) Planning for FHTC Coverage

    A.) Functional Household Tap Connection (FHTC) details

    B.) Analysis of balance HHs to be covered with FHTCs

    C.) FHTC coverage plan

    D.) Monthly and quarterly action plan for providing FHTCs (FY 20-21)

    3.) Priority Area Planning

    A.) Water Quality-Affected (QA) habitations/ villages

    B.) Arsenic/ Fluoride affected habitations/ villages

    C.) JE-AES affected districts

    D.) Drought-prone and desert areas

    E.) SAGY villages

    F.) Aspirational districts

    G.) PVTG habitations

    H.) SC/ ST dominated villages

    I.) Any other priority area

    4.) Schematic Planning

    A.) Retrofitting/ source augmentation

    B.) Source strengthening

    C.) New schemes

    5.) Planning for Support Activities (up to 5% JJM fund)

    6.) Planning for WQM&S (up to 2% JJM fund)

    A.) Planning for WQMS activities

    B.) Financial planning for WQMS activities

    C.) Laboratories proposed for PPP

    D.) IEC activities

    E.) Training and capacity building activities of various stakeholders

    F.) Any other innovation

    G.) Fund required for WQMS activities

    7.) Financial Planning

    A.) Fund required for JE-AES, RWSSP-LIS and NWQSM (wherever applicable)

    B.) Budgetary provision for FHTCs for FY 20-21

    C.) Quarterly financial action plan for providing FHTCs (FY 20-21)

    D.) Monthly plan for FY 20-21

    E.) Convergence planning

    8.) Summary

    Annex-I

    Part-A: Institutional Arrangements Part-B: Implementation Arrangements Part-C: Operation & Maintenance (O&M) Arrangements

    Annex-II: Detailed information of staff/ officials at SWSM, DWSM

  • Annual Action Plan of _______________ for FY 20-21

    Page 3 of 21

    Jal Jeevan Mission

    Annual Action Plan for FY 20-21 State/ UT of ___________

    1. General information

    Nodal department for implementing JJM: _______________________________

    i.) Total no. of Households (HHs)

    ii.) Total no. of census-coded revenue villages (as

    per Census, 2011)

    iii.) Total no. of Gram Panchayats (GPs)

    iv.) Total no. of blocks

    v.) Total no. of districts

    2. Planning for FHTC coverage

    A. Functional Household Tap Connection (FHTC) details

    No. of HHs with

    FHTCs as on

    01.04.19

    Balance no. of

    HHs as on

    01.04.19

    Target no. of HHs

    for FY 19-20

    [20% of (ii.)]

    No. of HHs actually

    covered in FY 19-20

    Shortfall/ excess

    = (iv.) - (v.)

    No. of HHs with

    FHTCs as on

    01.04.20

    Balance no. of HHs as

    on 01.04.20

    Target no. of HHs for FY 20-21

    [min. 40% of (ii.)]

    (i.) (ii.) (iii.) (iv.) (v.) (vi.) (vii.) (viii.)

    B. Analysis of balance HHs to be covered with FHTCs

    a.) Village-wise analysis

    FHTC coverage status

    No PWS

    >0 and 90 and 0 and 90 and 0 and 90 and 0 and 90 and

  • Annual Action Plan of _______________ for FY 20-21

    Page 4 of 21

    C. FHTC coverage plan

    S.No. Details

    Year-wise FHTC coverage plan

    As on 01.04.20

    FY 20-21 (Plan)

    FY 21-22 (Plan)

    FY 22-23 (Plan)

    FY 23-24 (Plan)

    Total

    i.) No. of HHs with FHTCs

    ii.) % of HH coverage iii.) No. of villages to be

    provided with 100% FHTCs

    iv.) No. of GPs to be provided with 100% FHTCs

    v.) No. of blocks to be provided with 100% FHTCs

    vi.) No. of districts to be provided with 100% FHTCs

    D. Monthly and quarterly action plan for providing FHTCs (FY 20-21)

    Quarters Month

    (FY 20-21) No. of FHTCs planned to be

    provided Total

    Quarter - I April

    May

    June

    Quarter - II July

    August

    September

    Quarter - III October

    November

    December

    Quarter - IV January

    February

    March

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 5 of 21

    3.) Priority Area Planning

    A.) Water Quality-Affected (QA) habitations/ villages

    a.) Quality-affected areas yet to be provided with FHTCs

    Contamination Fluoride Arsenic Iron Salinity Nitrate Heavy Metals

    Total

    Affected Habitations

    Affected villages

    Affected population

    b.) Current status

    FHTC coverage status

    NIL PWS

    >0 and 90 and

  • Annual Action Plan of _______________ for FY 20-21

    Page 6 of 21

    b.) Coverage of Arsenic/ Fluoride affected habitations under NWQSM

    coverage plan FY 20-21

    Total Q1 Q2 Q3 Q4

    No. of As affected habitations

    NA

    Balance FHTCs

    No. of F affected habitations

    Balance FHTCs

    c.) Coverage plan for As/ F affected habitations other than NWQSM

    coverage plan FY 20-21

    Total Q1 Q2 Q3 Q4

    No. of As affected habitations

    NA

    Balance FHTCs NA No. of F affected habitations

    Balance FHTCs

    c.) JE-AES affected districts (No. of affected districts:_____)

    a.) Current status

    FHTC coverage status

    No PWS

    >0 and 90 and 0 and 90 and 0 and 90 and

  • Annual Action Plan of _______________ for FY 20-21

    Page 7 of 21

    b.) Coverage plan

    FHTC coverage plan

    FY 20-21 Total

    Q1 Q2 Q3 Q4

    No. of villages

    Balance FHTCs

    F.) Aspirational districts (No. of aspirational districts: ____)

    a.) Current status

    FHTC coverage status

    No PWS

    >0 and 90 and 0 and 90 and 0 and 90 and

  • Annual Action Plan of _______________ for FY 20-21

    Page 8 of 21

    I.) Any other priority area [as decided by the State Govt. in accordance to provision of

    Operational Guidelines for implementation of JJM para 3.3 (ii.)]

    a.) Current status

    FHTC coverage status

    No PWS

    >0 and 90 and

  • Annual Action Plan of _______________ for FY 20-21

    Page 9 of 21

    4. Schematic Planning

    A.) Retrofitting/ source augmentation a.) Analysis of ongoing/ completed schemes that need retrofitting/ source augmentation

    PWS schemes with service level ≥ 40 lpcd and < 55 lpcd PWS schemes with service level > 55 lpcd

    No. of schemes

    Design population

    No. of HHs covered (design

    popn/ 5)

    No. of FHTCs

    provided

    Balance no. of FHTCs

    to be provided

    Fund required (in Rs.Crore)

    No. of schemes

    Design population

    No. of HHs covered (design

    popn/ 5)

    No. of FHTCs

    provided

    Balance no. of FHTCs

    to be provided

    Fund required

    (in Rs.Crore)

    SVS

    MVS

    Solar energy-based

    Total

    Note: Only those PWS schemes that are ongoing and completed & functional within its design period are to be considered for retrofitting. Augmentation means enhancement of source in order to meet the service level requirement of min. 55 lpcd and retrofitting means last-mile connections through distribution network and FHTC.

    b.) Retrofitting coverage plan for FY 20-21

    Q1 Q2 Q3 Q4 Total

    No. of schemes

    No. of FHTCs

    Fund required

    No. of schemes

    No. of FHTCs

    Fund required

    No. of schemes

    No. of FHTCs

    Fund required

    No. of schemes

    No. of FHTCs

    Fund required

    No. of schemes

    No. of FHTCs

    Fund required

    SVS MVS

    Solar energy-based

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 10 of 21

    B.) Source strengthening a.) Analysis of ongoing/ completed schemes that need source strengthening

    No. of schemes No. of borewell

    recharge structures Fund required (Rs. in Crore)

    SVS

    Solar energy-based

    Total

    b) Source strengthening coverage plan

    FY 20-21

    Total Q1 Q2 Q3 Q4

    SVS

    Solar energy-based

    Total

    C.) New schemes

    a.) Schemes taken up in FY 19-20

    S.No. Type of scheme

    Scheduled for completion during FY 20-21

    Scheduled for completion post FY 20-21

    No. of Schemes

    Proposed FHTCs

    No. of Schemes

    Proposed FHTCs

    i.) SVS

    ii.) MVS

    iii.) Solar energy-based

    Total

    b.) Schemes proposed for FY 20-21

    S.No. Type of scheme

    Scheduled for completion during FY 20-21

    Scheduled for completion post FY 20-21

    No. of Schemes

    Proposed FHTCs

    No. of Schemes

    Proposed FHTCs

    i.) SVS

    ii.) MVS

    iii.) Solar energy-based

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 11 of 21

    5.) Planning for Support Activities (up to 5% of JJM fund)

    S.No. Activities proposed Amount proposed

    (in Rs. Lakh)

    i.)* Engaging Implementation Support Agencies (ISAs)

    ii.)* IEC/ BCC activities

    iii.)* HRD - Engaging experts/ support staff (SPMU, DPMU, etc.)

    iv.)* Capacity building activities

    v.)* Skill development (masons, plumbers, electricians, fitters, etc.)

    vi.) Mobilization of local communities

    vii.) Third-party inspection

    viii.) Establishment of public grievance redressal system/ setting up of call centre

    ix.) Documentation

    x.) Setting up knowledge centres/ centres of excellence

    xi.) Organizing conferences/ workshops, etc.

    xii.) Innovation/ R&D/ sensor based real time monitoring systems, etc.

    Xiii.) Social audits

    Total

    *i.) Engaging ISAs

    No. of villages without PWS

    No. of ISAs to be engaged in FY 20-21 based on no. of villages to be covered (40-60 villages per ISA)

    Fund required (in Rs. Lakh)

    *ii.) IEC/ BCC/ IPC activities

    S.No. Activities proposed No. of activities Fund required (in Rs. Lakh)

    a.) Wall writings/ paintings

    b.) Hoardings & banners

    c.) Radio jingles

    d.) TV spots

    e.) Folk songs

    f.) Nukkad natak/ drama/ street plays

    g.) Engaging volunteers

    h.) Exhibitions

    i.) World water day event

    j.) School competitions

    k.) Innovation conferences/ events

    l.) IEC material preparation, production & dissemination

    m.) IPC activities

    n.) Other ________________________

    Total

    *iii.) HRD - Engaging experts/ support staff (SPMU, DPMU, etc.)

    S.No. Details of engaging experts/ support staff No. of persons to

    be engaged

    Fund required (in Rs. Lakh)

    a.) State level

    b.) District level

    c.) Others(e.g:State policy of paying Jal doots, etc.)

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 12 of 21

    *iv.) Capacity building and training activities

    S.No. Activities proposed No. of persons to

    be trained Fund required (in Rs. Lakh)

    a.) Change management for SWSM/ DWSM officials

    b.) Contractual staff at SWSM/ DWSM

    c.) Engineers

    d.) ISAs

    e.) VWSCs/ Paani Samitis, etc.

    f.) Key stakeholders at block level

    g.) Key stakeholders at GP level

    h.) Capacity building material preparation & production

    i.) Others ______

    Total

    *v.) Skilling activities to increase human resource availability in villages

    Skilling (No. of human resource to be trained in each quarter) Fund required (in Rs. Lakh)

    Quarter I

    Quarter II

    Quarter III

    Quarter IV

    Total

    Masonry

    Plumbing Electricity

    Fitter

    Others

    Total vi.) Mobilization of local communities

    No. of villages to be covered Fund required (in Rs. Lakh)

    Quarter I

    Quarter II

    Quarter III

    Quarter IV

    Total

    PRA activities

    Rallies

    VAP preparation

    Gram Sabhas Water audit

    Total 6. Plan for Water Quality Monitoring & Surveillance (up to 2% of JJM fund)

    A.) Planning for WQMS activities

    a.) Laboratory details

    Details of laboratories

    Total no. of laboratories

    No. of NABL accredited

    laboratories

    No. of laboratories planned to be set

    up in FY 20-21

    No. proposed for NABL accreditation

    in FY 20-21

    State-level

    District-level

    Sub-division level

    Block level

    Mobile

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 13 of 21

    b.) Water quality monitoring

    Total No. of drinking water sources in the

    state

    No. of tests for drinking water sources planned during FY 20-21

    No. of tests for delivery point planned to be conducted

    during FY 20-21 Chemical contamination

    Bacteriological contamination

    C.) Water quality surveillance

    i.) Sanitary inspections/ surveys

    Total No. of drinking water sources in the state

    No. of source sanitary surveys planned in FY 20-21

    Total no. of sanitary surveys planned during FY 20-21

    ii.)Field Test Kits (FTKs)

    No. of villages

    No. of Schools/

    Anganwadis

    No. of FTKs tests planned at

    source/ GP level

    No. of FTKs tests planned at School/

    Anganwadi

    No. of FTKs to be procured

    No. of refills/ reagents to be procured

    B.) Financial planning for WQMS activities

    a.) Setting up/ Up-gradation/ operation of laboratories (State/ district/ Sub-Divisional/

    Block level/ mobile laboratories)

    S.No. Details

    Proposed amount (in Rs. Lakh) State level lab

    District level lab

    Sub-divisional level lab

    Block level lab

    Mobile lab

    a.) Building construction cost of State lab N/A N/A N/A N/A b.) Procurement of equipments/ instruments

    c.) Rental charges

    d.) Maintenance of equipments/ instruments

    e.) Chemicals/ reagent/ glassware/ consumables

    f.) Hiring of outsourced human resources g.) Hiring of vehicles for transportation of

    water samples

    h.) NABL accreditation process (consultant fee, audit cost, application fee and annual fee)

    i.) Others Total

    b.) Details of FTKs/ reagents to be procured

    S.No. Details For GPs

    (in number) For Anganwadis/

    Schools Proposed amount

    (in Rs. Lakh)

    a.) Chemical Kits b.) Bacteriological vials

    c.) Refill kits- chemical

    d.) Refill kits- bacteriological

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 14 of 21

    C.) Laboratories proposed for Public Private Partnership (PPP)

    Laboratory details Numbers Proposed amount

    (in Rs. Lakh)

    State-level

    District-level

    Sub-division level

    Block level

    Mobile

    Total

    D.) IEC Activities

    S.No. Type of activity No. of proposed

    activities Proposed amount

    (in Lakh)

    a.) Display of water quality testing laboratory details in prominent locations in villages

    b.) Awareness generation on water quality issues, water-borne diseases and health impacts

    c.) Water safety planning

    d.) Behavioural change communication

    e.) Audio-visual publicity on ill effects of consuming contaminated water, process of getting water quality sources tested, importance of sanitary inspection, etc.

    f.) Wall writings promoting tap water

    g.) Slogans, group meeting, street plays, exhibits, etc on water quality

    h.) Others

    Total

    E.) Training and capacity building activities of various stakeholders

    S.No. Level Number of

    proposed trainings Proposed amount

    (in Rs. Lakh)

    a.) Five women from each GP on leading water quality surveillance activities

    b.) Department stakeholders on WQM&S

    c.) GP and its sub-committees

    d.) ISAs, PRIs, GRWs, etc.

    e.) Others

    Total

    F.) Any other innovation

    S.No. Activities (details) Amount (in Rs. Lakh)

    a.) Engaging laboratories in college institutions, etc.

    b.) Others

    G.) Fund required for WQM&S Activities (total fund required from A to F)

    S.No. Details Amount (in Rs. Lakh)

    a.) Central share

    b.) State share

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 15 of 21

    7.) Financial planning

    A.) Fund required for JE-AES, RWSSP-LIS and NWQSM FY 20-21 (wherever applicable)

    S.No. Financial Provision Quarter

    I Quarter

    II Quarter

    III Quarter

    IV Total

    (in Rs. Crore)

    i.) JE-AES

    a.) Central share

    b.) State share

    ii.) RWSSP-LIS

    a.) Central share N/A N/A N/A

    b.) State share N/A N/A N/A

    iii.) NWQSM

    a.) Central share

    b.) State share

    Total

    B.) Budgetary provision for FHTCs for FY 20-21

    S.No. Financial Provision Amount

    (in Rs. Crore) i.) JJM

    a.) Central share

    b.) State share

    c.) Community contribution

    i.) Cash

    ii.) Kind (monetary value)

    iii.) Labour (monetary value)

    ii.) 100% State Govt.

    iii.) Other source of funding

    a.) Finance commission fund

    b.) LAD

    c.) Mining fund

    d.) CAMPA

    e.) CSR

    f.) Individual donations

    g.) Other sources

    iv.) Externally Aided Project (EAP)*

    Total (sum of i. to iv.)

    *Externally Aided Project format

    S. No.

    Project name and

    identification code number

    Lending Agency

    Original/ Revised

    approved costs

    Project implementat

    ion period

    Cumulative Expenditure Incurred till March 2020

    Fund provision for FY

    20-21

    FHTCs under project

    From To Total Provided

    so far FY

    20-21

    In case the project does not have the ultimate objective as FHTC, then number of piped water supply schemes and population covered in various districts may be provided.

  • Annual Action Plan of _______________ for FY 20-21

    Page 16 of 21

    C.) Quarterly financial action plan for providing FHTCs for FY 20-21

    S.No. Financial Provision Quarter

    I Quarter

    II Quarter

    III Quarter

    IV Total

    (in Rs. Crore)

    i.) JJM

    a.) Central share

    b.) State share

    c.) Community contribution

    i.) Cash

    ii.) Kind (monetary value)

    iii.) Labour (monetary value)

    Total (sum of i. to iii.)

    D.) Monthly plan for FY 20-21

    Quarters Month

    (FY 20-21) Fund required (in Rs. Crore)

    Total

    Quarter - I April

    May

    June

    Quarter - II July

    August

    September

    Quarter - III October

    November

    December

    Quarter - IV January

    February

    March

    Total

    E.) Convergence planning ( Amount in Rs. Crore)

    S.No. Source of fund

    Source strengthening (like borewell

    recharge structures)

    Water harvesting and aquifer

    recharge

    Grey water treatment &

    reuse

    Others (Cattle troughs,

    washing/ bathing places, etc.)

    i. SBM(G)

    ii.) MGNREGS

    iii.) 15th Finance

    Commission

    iv.) Others

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 17 of 21

    8. Summary - Monthly physical and financial plan for FHTCs

    (Note: This table is to reflect the planning, especially based on 2.D. and 7.D.)

    S.No. Month

    (FY 20-21) No. of FHTCs planned to be

    provided Fund required (in Rs. Crore)

    1. April

    2. May

    3. June

    4. July

    5. August

    6. September

    7. October

    8. November

    9. December

    10. January

    11. February

    12. March

    Total

  • Annual Action Plan of _______________ for FY 20-21

    Page 18 of 21

    Annex-I

    Part-A

    Institutional Arrangements

    Copies of relevant orders/ notifications may be attached in PDF format.

    1.) Constitution of SWSM Apex Committee

    2.) Constitution of SWSM Executive Committee

    3.) Appointment of Mission Director

    4.) Constitution/ strengthening of DWSM

    5.) Constitution/ strengthening of VWSCs/ Paani Samitis, etc.

    6.) Details of SPMU, DPMU and other support staff

  • Annual Action Plan of _______________ for FY 20-21

    Page 19 of 21

    Annex-I

    Part-B

    Implementation Arrangements

    For implementation at scale and speed, preparation/ arrangement, preparation

    regarding following implementation aspects may be attached:

    1.) Unit type designs 2.) Cost estimates of water supply scheme components 3.) Firming up of item rate contracts 4.) Centralized tendering process 5.) Procurement through EPC mode 6.) Empanelment of third-party inspection agencies 7.) Community participation regarding in-village infrastructure

  • Annual Action Plan of _______________ for FY 20-21

    Page 20 of 21

    Annex-I

    Part-C

    Operation & Maintenance (O&M) Arrangements

    i.) Annual fund requirement for O&M

    ii.) Provisions for: a.) Energy costs b.) Preventive maintenance c.) Breakdown maintenance d.) Payment for O&M staff (wages) e.) Chemical Costs

    iii.) Tariff/ pricing/ user charge a.) Tariff collected: yes/ no b.) Unit of collection: c.) Average tariff: d.) Actual tariff charges collected (collection efficiency):

    iv.) Availability of skilled human resource to operate and maintain the water supply infrastructure at village level and planning of skilling activity to have village wise human resource

    v.) Source(s) of funding:

  • Annual Action Plan of _______________ for FY 20-21

    Page 21 of 21

    Annex-II

    Detailed information of staff/ officials at SWSM, DWSM

    S.No. Staff suggested Availability Financial Implication (in Rs.) under JJM

    State level

    Names of Institutions involved in JJM implementation:

    i.) Director in-charge of strategy & implementation

    ii.) Project manager(s) for technical, financial and monitoring

    iii.) Coordinator for ISAs

    iv.) Coordinator for IEC

    v.) Coordinator for capacity building & training

    vi.) Coordinator for IMIS

    vii.) Coordinator for WQM&S

    viii.) Hydrogeologist

    ix.) Other _________________

    District level

    i.) Project manager(s) for technical, financial and monitoring

    ii.) Coordinator for ISAs

    iii.) Coordinator for IEC

    iv.) Coordinator for capacity building & training

    v.) Coordinator for IMIS

    vi.) Coordinator for WQM&S

    Implementation Support Agency (ISA) (6-8 members)

    Gram Panchayat level

    Total

    Note:

    Rows to be added for ISA details as per requirement.

    Rows to be added below GP level for any manpower being proposed at GP level, e.g: Jal Sathis, pump operators, etc.

    It is reiterated that JJM does not advocate creation of any particular post. SWSM to take a decision as to how the desired services will be procured whether through out-sourcing, PPP arrangements, creation of post depending on the requirement of the State.