January 30, 2012
CERTIFICATE 24342
RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 386-390 Fulton Street, southeast corner of Fulton Street and Smith Street, Brooklyn, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7048-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 201
Jackie Snyder Executive Director
January 30, 2012
CERTIFICATE 24343
RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 180 West 9J!h Street, southeast corner of West 971h Street and Columbus Avenue, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7049-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30,
<,Jackie Snyder Executive Director
January 30, 2012
CERTIFICATE 24344
RESOLVED That the Design Commission, having considered designs for the installation of a fish handling and return system, Consolidated Edison East River Generating Station, 801 East 141
h Street, Manhattan, submitted by the Department of Citywide Administration, represented by exhibits 6853-F, G, H & I of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that Consolidated Edison agreed to submit revised drawings, once the Coast Guard has approved them, that (1) correct the discrepancies between the renderings and the drawings with regard to the (a) shed roof design and (b) fish trough as it exits the Screenwell House; (2} clarify the rendering of the Screenwell House with regard to the rooftop equipment and gantry crane; and (3) specify a 9' H Anthracite Grey LegiFit fence (instead of the Legi-R fence} with no return and a lower concrete curb.
Preliminary approval is conditioned upon submission of this project for final review and approval before January 30, 2014.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
~ \~ \ "'~~~,-~--
\ ,,,_,~ __ ,,_wff
Jackie Snyder Executive Director
January 30, 2012
CERTIFICATE 24345
RESOLVED That the Design Commission, having considered designs for the construction of an entrance plaza, New York Botanical Garden, Bedford Park Boulevard and Southern Boulevard, Bronx, submitted by the Department of Cultural Affairs and the Department of Parks & Recreation, represented by exhibits 1950-KI, KJ, KK & KL of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
January 30, 2012
CERTIFICATE 24346
RESOLVED That the Design Commission, having considered designs for the rehabilitation of 1400 Williamsbridge Road (formerly Westchester Square Municipal Courthouse), Bronx, submitted by the Department of Design and Construction, represented by exhibits 1341-J, K, M & N of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N YORK
January 30, 2012
CERTIFICATE 24347
RESOLVED That the Design Commission, having considered designs for the construction of Knickerbocker Plaza, Knickerbocker Avenue, Greene Avenue and Myrtle Avenue, Brooklyn, submitted by the Department of Design and Construction and the Department of Transportation, represented by exhibits 6338-L, M, N, 0 & P of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 20J2.
()
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24348
RESOLVED That the Design Commission, having considered designs for the construction of a low level outlet system and an overlook, including a boat launch, and adjacent site work, Schoharie Reservoir, adjacent to Route 990V, Gilboa, Schoharie County, submitted by the Department of Environmental Protection, represented by exhibits 6090-V, W, X & Y of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
NIICD IGN YORf<
January 30, 2012
CERTIFICATE 24349
RESOLVED That the Design Commission, having considered designs for the construction of a sound attenuation wall, Brooklyn 12 District Garage, 5602 191h Avenue, Brooklyn, submitted by the Department of Sanitation, represented by exhibits 6563-J & K of record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 201/?.
Jackie Snyder Executive Director
N¥CDESIGN YORK
January 30, 2012
CERTIFICATE 24350
RESOLVED That the Design Commission, having considered designs for the installation of security bollards, Fulton Street Transit Center, Fulton Street, Broadway and John Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 6639-E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and final approval, including the distinctive 4'-9 3/8" scoring, so the bollards are centered within the flags, and the joints align with the Transit Center's columns.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 201
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24351
RESOLVED That the Design Commission, having considered a proposal for repainting the 236th Street Pedestrian Bridge over the Henry Hudson Parkway, Bronx, submitted by the Department of Transportation, represented by exhibits 6377 -C, D & E of record in this matter, hereby gives to the same unanimous preliminary and final approval to Dark Green, which is the approved standard for bridges on or over the Henry Hudson Parkway.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 201
Jackie Snyder Executive Director
January 30, 2012
CERTIFICATE 24352
RESOLVED That the Design Commission, having considered a proposal for repainting the Henry Hudson Parkway Bridge over Broadway, Bronx, submitted by the Department of Transportation, represented by exhibits 6379-C, D & E of record in this matter, hereby gives to the same unanimous preliminary and final approval to Dark Green, which is the approved standard for bridges on or over the Henry Hudson Parkway.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24353
RESOLVED That the Design Commission, having considered a proposal for repainting the Grand Concourse Bridge over Burnside Avenue, Bronx, submitted by the Department of Transportation, represented by exhibits 6380-M, N & 0 of record in this matter, hereby gives to the same unanimous preliminary and final approval to Munsel Grey, which is the approved standard for bridges on or over the Grand Concourse north of the Walton Avenue Bridge over Metro North because it is the predominant color of the City-owned bridges that is available in the current palette.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24354
RESOLVED That the Design Commission, having considered a proposal for repainting the Grand Concourse Bridge over East 2041
h Street, Bronx, submitted by the Department of Transportation, represented by exhibits 6380-P, Q & R of record in this matter, hereby gives to the same unanimous preliminary and final approval to Munsel Grey, which is the approved standard for bridges on or over the Grand Concourse north of the Walton Avenue Bridge over Metro North because it is the predominant color of the City-owned bridges that is available in the current palette.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24355
RESOLVED That the Design Commission, having considered the final report for the repair of the Heinrich Heine Monument(1888) by Ernst Herter, Joyce Kilmer Park, Grand Concourse, East 161 st Street, Walton Avenue and East 164th Street, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 1982-AP, AQ & AR of record in this matter, hereby gives to the same unanimous final approval.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24356
RESOLVED That the Design Commission, having considered designs for the reconstruction of a plaza and adjacent site work, Athens Square Park, 30th Street and 30th Avenue, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 3809-AL & AM of record in this matter, hereby gives to the same unanimous final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24357
RESOLVED That the Design Commission, having considered designs for the installation of rooftop mechanical equipment, 70 Police Precinct Station House, 154 Lawrence Avenue, Brooklyn, submitted by the Police Department, represented by exhibits 5590-D, E, F & G of record in this matter, hereby gives to the same unanimous preliminary and final approval, noting that the equipment is set back sufficiently, so it will not be visible from the street.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N YORK
January 30, 2012
CERTIFICATE 24358
RESOLVED That the Design Commission, having considered designs for the installation of a louver, 122 Police Precinct Station House, 2320 Hylan Boulevard, Staten Island, submitted by the Police Department, represented by exhibits 2602-0, P, Q & R of record in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N¥CD N
January 30, 2012
CERTIFICATE 24359
RESOLVED That the Design Commission, having considered designs for the installation of rooftop mechanical equipment, Forensic Investigations Division Lab, 150-14 Jamaica Avenue, Queens, submitted by the Police Department, represented by exhibits 5982-D, E, F & G of record in this matter, hereby gives to the same unanimous preliminary and final approval, noting that the equipment will not be visible from the street.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
January 30, 2012
CERTIFICATE 24361
RESOLVED That the Design Commission, having considered designs for the construction of a bioretention basin and adjacent site work (Sponge Park), Second Street west of the Gowanus Canal, Brooklyn, submitted by the Department of Transportation, the Department of Environmental Protection and the Department of Park & Recreation, represented by exhibits 6952-D, E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the Department of Transportation will stockpile the unused Belgian Block in a secure location that will be confirmed when the project is submitted for final review.
Preliminary approval is conditioned upon submission of this project for final review and approval before January 30, 2014.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 2012.
Jackie Snyder Executive Director
N
January 30, 2012
CERTIFICATE 24362
RESOLVED That the Design Commission, having considered designs for the construction of a salt shed, 297 West Street between Canal Street and Spring Street, Manhattan, submitted by the Department of Sanitation, represented by exhibits 6030-AH, AI, AJ, AK, AL & AM of record in this matter, hereby gives to the same unanimous final approval with the understanding that (1) the fence identification graphic with the smaller lettering will be used; (2) the reflectors set into the form tie holes will be eliminated; (3) the concrete will be whiter; (4) a revised street tree planting plan that meets the Department of Parks & Recreation's standards will be submitted for committee review; and (5) a site visit will be scheduled to review the concrete mock up when it is ready.
Final approval is conditioned upon commencement of work before January 30, 2014 and submission of comprehensive photographic documentation consisting of 8" x 1 0" archivalquality color photographs.
A true copy of resolution adopted by the Design Commission at its meeting on January 30, 201
Jackie Snyder Executive Director