Jason Horning, ENP NDACo 6/3/2015 Next Generation 9-1-1
Update
Slide 2
Review of the NG9-1-1 Program Objective To achieve Baseline
Next Generation 9-1-1 Status Emergency Services IP network GIS Data
to support validation and call delivery Publication of
authoritative validation databases and location information servers
Geospatially controlled call delivery Ability to control routing
based on PSAP policy Ability to interconnect with other NG9-1-1
systems & interwork with E9-1-1 systems Support for system
monitoring/logging/discrepency reporting to troubleshoot
operation
Slide 3
The ESInet
Slide 4
Emergency Services IP Network (ESInet) ESInet has been deployed
for 15 of the 22 PSAPs Fully Deployed PSAPs (All calls delivered
via ESInet) Williams/Williston Pembina Walsh Traill Richland Valley
City Stutsman Bismarck / Burleigh Morton Mercer / Oliver
McLean
Slide 5
Emergency Services IP Network (ESInet) Partially Deployed (All
wireless calls delivered via ESInet but some wireline trunks still
bypass ESInet) Mountrail Lake Region State Radio Ward
Slide 6
Emergency Services IP Network (ESInet) Remaining PSAPs to be
connected to ESInet Stark RRRDC (Fargo) Grand Forks
Bottineau/Renville Pierce Rolette Cavalier
Slide 7
ESInet Deployment Status Map
Slide 8
How does the 9-1-1 System CURRENTLY work? Telco Legacy SR
Caller LSRG/LNG IPSR CenturyLink Network PSAP ALI Database Terms SR
Selective Router LSR - Legacy Selective Router LSRG Legacy
Selective Router Gateway LNG Legacy Network Router IPSR IP
Selective Router PSAP CAMA SIP SS7/CAMA
Slide 9
Where are we at in the Transition? Call Flow Transition
Slide 10
GIS Data to Support Validation and Call Delivery
Slide 11
GIS Data to support Validation and Call Delivery Have begun
migration towards GIS-based 9-1-1 database maintenance First Step
Create a common GIS Database Second Step Create a common MSAG Third
Step Implement a common ALI Database Last Step Implement NG9-1-1
Functional Elements
Slide 12
GIS Data to support Validation and Call Delivery First Step
Create a common GIS Database The Seamless Basemap Project, complete
in October of 2015 Second Step Create a common statewide MSAG
Unenhanced/Local vs. Intrado ALI Database MSAG development
prioritized for Counties with unenhanced status Enhanced counties
with local ALI databases Counties with GIS data availability from
seamless basemap project Third Step Implement a common ALI Database
Done in sequence with common MSAG development
Slide 13
MSAG Phase One (outlined in BLACK)
Slide 14
MSAG Phase Two (outlined in BLACK)
Slide 15
MSAG Phase Three (outlined in BLACK)
Slide 16
GIS Data to support Validation and Call Delivery More details
on MSAG activity to come in next presentation!!
Slide 17
Geospatially Controlled Call Delivery
Slide 18
Geospatially-Controlled Call Delivery Will start with
Text-to-9-1-1 Point in Polygon analysis Based on Cell Sector
Centroid and PSAP boundary Will become more geospatially controlled
in the future. Need GIS to be complete statewide first Need 9-1-1
Service Provider to set up ECRF/LVF Need Carriers to use ECRF/LVF
for validation and call routing.
Slide 19
Text-to-911 Coverage and Text-Capable PSAPs Note: All areas of
ND will have text to 911 service except for Sioux. Sioux will be
covered when SD deploys its text-to-911 service.
Slide 20
Text-to-911 Call Routing 101 Call would route to RRRDC
Slide 21
Text-to-911 Call Routing 101 Call would route to Bismarck /
Burleigh Combined Communications Center
Slide 22
Ability to Interconnect with E9-1-1 and other NG9-1-1
networks
Slide 23
Ability to Interconnect (NG9-1-1 & E9-1-1) Calls still
transfer between PSAPs on the ESInet and PSAPs that are not.
Testing underway between ND / MN for call transfers along the state
boundary. Common ESInet vendor makes this relatively easy
Developing a template for other PSAPs to use 9-1-1 Program Office
created an Interstate Playbook working group to help create
methodology for other states re: state to state transfers ND, MN,
SD, IA Will provide guidance for how to Interconnect between states
With a common NG9-1-1 System Service Provider Without a common
NG9-1-1 System Service Provider Interim IP-based E9-1-1 methods and
NG9-1-1 methods
Slide 24
Support for System Monitoring
Slide 25
Support for System Monitoring / Logging/ Discrepancy Reporting
CenturyLink Control Center For network connections from Legacy
Selective Router through the ESInet to the PSAP Circuit Management
& Testing Repair Tickets Network Performance Intrado ClearView
Monthly TN Census, ALI retrieval, ANI failure reports System
performance, No record found, SOI reports Anything reports relating