+ All Categories
Home > Documents > Javelin Industrial – Javelin Industrial · Web viewbefore welding WCR Safety 4 - M10 flathead...

Javelin Industrial – Javelin Industrial · Web viewbefore welding WCR Safety 4 - M10 flathead...

Date post: 24-Jan-2021
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
2
Transcript
Page 1: Javelin Industrial – Javelin Industrial · Web viewbefore welding WCR Safety 4 - M10 flathead socket mounting bolts are supplied. You will need a 17mm wrench and 6mm hex key wrench.
Page 2: Javelin Industrial – Javelin Industrial · Web viewbefore welding WCR Safety 4 - M10 flathead socket mounting bolts are supplied. You will need a 17mm wrench and 6mm hex key wrench.

WCR Safety

Tighten locking knob before welding

Check welding cable insulationregularly and replace damaged cable immediately.

Caution: Insure welding cable lug is shrink wrapped to insulatestem of lug from the reel

• Caution: Take all precautions to avoid electric shock. Welding produces 20 to 100 volts. Even 50 volts is enough to stop a persons heart.

• Javelin welding cable reels are insulated. Insure they remain insulated by checking that the insulators are in good condition and cable cover is not cracked.

• Always tighten lock knob before beginning to weld to prevent damage to the contact plates.

4 - M10 flathead socket mounting bolts are supplied. You will need a 17mm wrench and 6mm hex key wrench.

Mount WCR-2 and WCR1 with reel to the right of mounting post. Mount WCRLR as marked on reels. This will insure locking nut will tighten when turned rotating lock knob towards you.

•Mount welding cable connection lugs between brass nuts and use the steel nut as locking nut.

• Insure all connections are insulatedfrom the reel by heat shrink insulation.

2


Recommended