47
J.B. Lojko J.B. Lojko Engineer II Engineer II H.F. Smith H.F. Smith Sr. Structural Specialist Engr. Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Lockheed Martin Aeronautics Company - Marietta Company - Marietta Modeling and Simulation Modeling and Simulation of the C-5 Aft of the C-5 Aft Cargo Loading System Cargo Loading System Title
Transcript
Page 1: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

J.B. LojkoJ.B. LojkoEngineer IIEngineer II

H.F. SmithH.F. SmithSr. Structural Specialist Engr.Sr. Structural Specialist Engr.

Lockheed Martin Aeronautics Lockheed Martin Aeronautics Company - MariettaCompany - Marietta

Modeling and SimulationModeling and Simulationof the C-5 Aftof the C-5 Aft

Cargo Loading SystemCargo Loading System

Title

Page 2: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

AgendaAgenda

•System Description & BackgroundSystem Description & Background

•DADS ModelDADS Model

•EASY5 ModelEASY5 Model

•Solution DevelopmentSolution Development

•TestingTesting

•Solutions, Part 2Solutions, Part 2

-NASTRAN ModelNASTRAN Model

•Conclusions & Lessons LearnedConclusions & Lessons Learned

Page 3: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

System DescriptionSystem Description& Background& Background

Page 4: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

C-5 Aft Pressure DoorC-5 Aft Pressure Door

Page 5: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Mechanical System Mechanical System DescriptionDescription

• Plug-type Door - Seals Aft Cargo EnvelopePlug-type Door - Seals Aft Cargo Envelope

- HeightHeight - 11.4 ft- 11.4 ft

- WidthWidth - 19.0 ft- 19.0 ft

- Door Weight 1845 lbDoor Weight 1845 lb

• Carries Cabin Pressure Loads in Flight & Cargo or Vehicle Carries Cabin Pressure Loads in Flight & Cargo or Vehicle Loads for Drive-in LoadingLoads for Drive-in Loading

• Pressure Door Opens Up for Aerial Delivery & Truck-bed or Pressure Door Opens Up for Aerial Delivery & Truck-bed or Down for Drive-in LoadingDown for Drive-in Loading

• 2 Sets of Hinges and Actuators, Upper and Lower, Left and 2 Sets of Hinges and Actuators, Upper and Lower, Left and RightRight

Page 6: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Mechanical System Mechanical System DescriptionDescription

• Aerial Delivery SystemAerial Delivery System

- Aerial Delivery System (ADS) Requires Installation of a Aerial Delivery System (ADS) Requires Installation of a Pilot Parachute on the Lower Half of the DoorPilot Parachute on the Lower Half of the Door

- Pilot Parachute and Associated Hardware Weight 558 lbPilot Parachute and Associated Hardware Weight 558 lb

• Supporting Fuselage Structure Found to be Very FlexibleSupporting Fuselage Structure Found to be Very Flexible

Page 7: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Hydraulic System Hydraulic System DescriptionDescription

• 3000 psi System3000 psi System

• OpeningOpening

- 2 gpm Split to 1 gpm at 2 gpm Split to 1 gpm at ActuatorsActuators

- Ramp Blocker ValveRamp Blocker Valve

- Balanced Relief ValveBalanced Relief Valve

• ClosingClosing

- Initial Lift - FuseInitial Lift - Fuse

- Slow Down - FuseSlow Down - Fuse

Page 8: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

First ContractFirst Contract

• Fatigue Problems with Upper Hinge Prompted USAF to Fatigue Problems with Upper Hinge Prompted USAF to Place LM Aero-Marietta Under Contract to Improve the Place LM Aero-Marietta Under Contract to Improve the Reliability of this SystemReliability of this System

• Initial Contract 1996 - Less Than Four Month ProjectInitial Contract 1996 - Less Than Four Month Project

- Geometry and Kinematics Created in CATIAGeometry and Kinematics Created in CATIA

- Ground Test Performed to Validate SimulationsGround Test Performed to Validate Simulations

- Analysis Performed in CATIA Using CAT/DADSAnalysis Performed in CATIA Using CAT/DADS

- Several Solutions ProposedSeveral Solutions Proposed

• Hydraulic Modifications - Slow Door OpeningHydraulic Modifications - Slow Door Opening

• Structural Modifications - Increase Strength in Selected Structural Modifications - Increase Strength in Selected AreasAreas

Page 9: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

First ContractFirst Contract

Page 10: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

First ContractFirst Contract

Actuator Load Comparison, Normal Actuator Load Comparison, Normal Operation, Test vs. DADSOperation, Test vs. DADS

Page 11: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

First ContractFirst Contract

Actuator Load Comparison, Slow Actuator Load Comparison, Slow Operation, Test vs. DADSOperation, Test vs. DADS

Page 12: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Second ContractSecond Contract

• Follow On Contract 1999Follow On Contract 1999

- Incorporate Hydraulic Modifications to Reduce Door Incorporate Hydraulic Modifications to Reduce Door Opening SpeedOpening Speed

• First Attempt FailedFirst Attempt Failed

• Use DADS/Plant & EASY5 to Analyze All Proposed Use DADS/Plant & EASY5 to Analyze All Proposed Hydraulic Modifications Prior to TestingHydraulic Modifications Prior to Testing

• Using Analysis-Led Design the Second Attempt at Using Analysis-Led Design the Second Attempt at Modifying the Hydraulics was a SuccessModifying the Hydraulics was a Success

Page 13: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

DADS ModelDADS Model

Page 14: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model DefinitionModel Definition

• Model Simplified - Flexibility Greatly ReducedModel Simplified - Flexibility Greatly Reduced

• 16 Bodies 16 Bodies

• 6 Control Elements6 Control Elements

- Left & Right Actuator Distance, DistanceD, ForceLeft & Right Actuator Distance, DistanceD, Force

• ForcesForces

- 1 Contact Force - Door Stop1 Contact Force - Door Stop

- 2 TSDAs - Lower & Upper Fuselage Stops2 TSDAs - Lower & Upper Fuselage Stops

- 2 RSDAs - Flexibility in Torque Arm/Hook2 RSDAs - Flexibility in Torque Arm/Hook

Page 15: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model DefinitionModel Definition

• Approximately 20 JointsApproximately 20 Joints

• OtherOther

- Curves - Door Stop DriverCurves - Door Stop Driver

Page 16: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

EASY5 ModelEASY5 Model

Page 17: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model DefinitionModel Definition

Page 18: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model DefinitionModel Definition

• 62 Components62 Components

• Main Control ValveMain Control Valve

- Custom - HV LibraryCustom - HV Library

• Balanced Relief Valve (Simplification)Balanced Relief Valve (Simplification)

- Pilot-to-Open Check ValvePilot-to-Open Check Valve

• Fuses - Variable Orifice that Closes After Specified Fuses - Variable Orifice that Closes After Specified Volume of Flow is SensedVolume of Flow is Sensed

Page 19: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model Definition, cont.Model Definition, cont.

• Actuators - AP Component for use with DADS Model Actuators - AP Component for use with DADS Model Extension ComponentExtension Component

• Ramp Blocker Valve - Critical that Pressure was Ramp Blocker Valve - Critical that Pressure was MeasuredMeasured

- Simple Fixed OrificeSimple Fixed Orifice

Page 20: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Solution DevelopmentSolution Development

Page 21: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

SimulationsSimulations

• Conduct Simulations to Determine the Best Combination Conduct Simulations to Determine the Best Combination of Flow Regulatorsof Flow Regulators

- Performance Criteria - Load Reduction vs. Opening Performance Criteria - Load Reduction vs. Opening TimeTime

- Constraint - Slowing Opening Time Could Impact Constraint - Slowing Opening Time Could Impact Aircraft OperationAircraft Operation

• Current Flight Profile Could Change for ADS Current Flight Profile Could Change for ADS PreparationPreparation

Page 22: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

EASY5 Results - EASY5 Results - Actuator Pressures & Actuator Pressures & PositionPosition

Page 23: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

EASY5 Results - Ramp EASY5 Results - Ramp Position Valve, Pilot Position Valve, Pilot LineLine

Page 24: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

DADS/Plant Results - DADS/Plant Results - Actuator LoadActuator Load

Page 25: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

TestingTesting

Page 26: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Flow RegulatorsFlow Regulators

• Manifold, Cartridge Valve Flow RegulatorManifold, Cartridge Valve Flow Regulator

- Fluid RegulatorsFluid Regulators

- Modify Current 2.0 gpm Flow RegulatorsModify Current 2.0 gpm Flow Regulators

- .5 gpm & 1.0 gpm.5 gpm & 1.0 gpm

• MS-Type Flow RegulatorMS-Type Flow Regulator

- Parker HannifinParker Hannifin

- 1.5 gpm & 2.0 gpm1.5 gpm & 2.0 gpm

Page 27: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Cartridge Valve Flow Cartridge Valve Flow RegulatorRegulator

Two-Way Flow Regulator Response

0

0.2

0.4

0.6

0.8

1

1.2

1.4

0 500 1000 1500 2000 2500 3000

Valve Differential Pressure (psi)

Flo

w (

gp

m)

1 gpm Valve

.5 gpm Valve

Page 28: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

TestsTests

• Baseline TestBaseline Test

- Verify Door Operates ProperlyVerify Door Operates Properly

• 1st Test1st Test

- 1.0/2.0 gpm Flow Regulators1.0/2.0 gpm Flow Regulators

- Regulators Delivered as SpecifiedRegulators Delivered as Specified

• 2nd Test2nd Test

- .5/1.5 gpm Flow Regulators.5/1.5 gpm Flow Regulators

- Modified 2.0 -> .5 gpm Could Not Perform as DesiredModified 2.0 -> .5 gpm Could Not Perform as Desired

Page 29: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

C-5 Aft Pressure DoorC-5 Aft Pressure Door

Page 30: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

C-5 Aft Pressure DoorC-5 Aft Pressure Door

Page 31: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

C-5 Aft Pressure DoorC-5 Aft Pressure Door

Page 32: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Test ResultsTest Results

• BaselineBaseline

- Operated ProperlyOperated Properly

- Approximately 10 second OpeningApproximately 10 second Opening

• 1st Test1st Test

- Approximately 19 second OpeningApproximately 19 second Opening

- Predicted 21.29 second OpeningPredicted 21.29 second Opening

Page 33: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Test Results, cont.Test Results, cont.

• 2nd Test2nd Test

- Approximately 22 second OpendingApproximately 22 second Opending

- Predicted 40 seconds with Constant .5 gpm FlowPredicted 40 seconds with Constant .5 gpm Flow

- 2nd Test - Better Performance2nd Test - Better Performance

• Re-Run Simulations with Variable Flow Rate Re-Run Simulations with Variable Flow Rate RegulatorRegulator

Page 34: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

SolutionsSolutionsPart 2Part 2

Page 35: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Loads & PressuresLoads & Pressures

• Goal of First ModelGoal of First Model

- Hydraulic Modification Will It Work?Hydraulic Modification Will It Work?

- How Long to Open & Close DoorHow Long to Open & Close Door

- Not Concerned with LoadsNot Concerned with Loads

• After Test, Model Fidelity Improved to Assist Loads & After Test, Model Fidelity Improved to Assist Loads & Structural Analysis OrganizationsStructural Analysis Organizations

- Variable Flow Regulator SimulatedVariable Flow Regulator Simulated

- Balanced Relief Valves AddedBalanced Relief Valves Added

Page 36: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model DefinitionModel Definition

• Structural Flexibility in Fuselage ModeledStructural Flexibility in Fuselage Modeled

• DADS/Flex Used to Model Torque Arm/HookDADS/Flex Used to Model Torque Arm/Hook

• ForcesForces

- 10 Bushings10 Bushings

• MSC NASTRAN Model Used to Find Spring ConstantsMSC NASTRAN Model Used to Find Spring Constants

- 4 RSDAs - Damping Only - Friction, Any Uncertainties4 RSDAs - Damping Only - Friction, Any Uncertainties

Page 37: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Model DefinitionModel Definition

• Flexible BodiesFlexible Bodies

- Left & Right Torque Arm & HookLeft & Right Torque Arm & Hook

- MSC NASTRANMSC NASTRAN

- 1st Simulation Craig-Bampton Modes not Defined 1st Simulation Craig-Bampton Modes not Defined ProperlyProperly

- Continue Work Upon Return to MariettaContinue Work Upon Return to Marietta

Page 38: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

DADS/FlexDADS/Flex

• Craig-Bampton Mode ErrorsCraig-Bampton Mode Errors

- Fixed ConstraintsFixed Constraints

- Free ConstraintsFree Constraints

• Axis OrientationAxis Orientation

- Local z-axis Parallel to Global y-axis for Revo & Cyli Local z-axis Parallel to Global y-axis for Revo & Cyli JointsJoints

- Several Axes Rotated about Global y-axis to Achieve Several Axes Rotated about Global y-axis to Achieve Correct Load PathCorrect Load Path

Page 39: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

NASTRAN ModelNASTRAN Model

Page 40: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Torque Fitting Torque Fitting RepresentationRepresentation

• Torque Fitting and Arms IsolatedTorque Fitting and Arms Isolated

• Interface Points DefinedInterface Points Defined

- Shaft Inboard and Outboard BearingsShaft Inboard and Outboard Bearings

- Actuator AttachActuator Attach

- Door/Arm ContactDoor/Arm Contact

- Inboard RollerInboard Roller

- Restraint HookRestraint Hook

• Structure Idealized in NASTRANStructure Idealized in NASTRAN

• Mirrored for Right SideMirrored for Right Side

Page 41: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Fitting Back-Up Fitting Back-Up RepresentationRepresentation

• Fuselage Plug from FS 1964 to 2178 Used. Detailed Fuselage Plug from FS 1964 to 2178 Used. Detailed Idealization of Back-up Frame Included.Idealization of Back-up Frame Included.

• Five Interface Points ChosenFive Interface Points Chosen

- Actuator PointActuator Point

- Inboard Upper Support PointInboard Upper Support Point

- Outboard Upper Support PointOutboard Upper Support Point

- Inboard Lower Support PointInboard Lower Support Point

- Outboard Lower Support PointOutboard Lower Support Point

• Mirrored for Right SideMirrored for Right Side

Page 42: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

NASTRAN Analysis RunNASTRAN Analysis Run

• Normal ModesNormal Modes

• Imposed Deflection Force Matrix GenerationImposed Deflection Force Matrix Generation

- Unit deflections imposed on interface point DOF’s one Unit deflections imposed on interface point DOF’s one at a time with remaining interface point DOF’s at a time with remaining interface point DOF’s constrained.constrained.

• Analyses performed for each side separately for each Analyses performed for each side separately for each substructure.substructure.

Page 43: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Fitting IdealizationFitting Idealization

Page 44: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Back-Up IdealizationBack-Up Idealization

Page 45: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Conclusion &Conclusion &Lessons LearnedLessons Learned

Page 46: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

MethodologyMethodology

MECHANICALSYSTEM

PROTOTYPE

MONODETAILMODELS

KINEMATICS(CAT/DADS)

MECHANICALSYSTEMBUILDUP

DYNAMICS

HYDRAULICS& CONTROLS

Page 47: J.B. Lojko Engineer II H.F. Smith Sr. Structural Specialist Engr. Lockheed Martin Aeronautics Company - Marietta Modeling and Simulation of the C-5 Aft.

Integrated CAEIntegrated CAE

• CATIACATIA

- Work From One Geometry Model (CATIA)Work From One Geometry Model (CATIA)

• DADSDADS (CAT/DADS)(CAT/DADS)

- Define Load PathsDefine Load Paths

• NASTRANNASTRAN

• EASY5EASY5

• Clearly Define Requirements for InterfacesClearly Define Requirements for Interfaces

• INTEGRATED CAE WILL SAVE TIME & MONEYINTEGRATED CAE WILL SAVE TIME & MONEY


Recommended