JBF ARCTIC SEMI-SUBMERSIBLE DRILLING UNIT HUISMAN PRODUCT BROCHURE
Transcript
Page 1: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

JBF ARCTICSEMI-SUBMERSIBLE

DRILLING UNITHUISMAN PRODUCT BROCHURE

Page 2: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

1. DESCRIPTION

1.1 Unit general

The Huisman designed JBF Arctic allows operations at two

operating drafts. The unique design combines the advantages

of a conventional semi-submersible resulting in very low

motions in waves and a heavily strengthened ice resistant unit

when operating in ice at deep draft.

The JBF Arctic drilling unit is designed to drill wells in arctic

conditions, moored in ice infested waters with ice thickness

up to approximately 2.0-3.0 meter. The unit consists of a

round floater, eight columns and a round deckbox. When

operating in ice the unit will ballast to ice draft (partly

submerged deckbox) to protect the riser against level ice,

rubble and ice ridges. The round conical shaped deckbox has

a heavily strengthened structure at waterline level to deflect

and break the ice. The round floater is also strengthened for

transit through broken ice (icebreaker assisted).

When no ice is present the unit operates at its operating draft

as a conventional semi-submersible unit. Station keeping in

ice infested waters is achieved by a twenty (20) point mooring

system. The unit can operate in water-depths between 50 and

1500m (160 and 5000ft). The JBF Arctic is designed for year

round operations in the Arctic. Depending on ice conditions,

ice breaker support can be required.

In order to increase the efficiency and minimize the time

required for drilling as much as possible, the unit is outfitted

with double drilling systems. The two well construction

centres have the same capacity, allowing various activities

to be done at each well centre. This allows for simultaneous

operations and provides an extremely high level of

redundancy. The complete drilling system is enclosed to

provide an acceptable working environment. Because of

JBF ARCTIC

2

SEMI-SUBMERSIBLE DRILLING UNIT

Page 3: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

JBF ARCTIC ADVANTAGES

Large drillers payload of 25000mt - efficiency

Excellent ice resistance due to round conical shape of deckbox - workability

Excellent motion characteristics when at open water draft - workability

High mooring capacity utilising 20 point mooring system - workability

Double drilling system for simultaneous and backup operations - efficiency, redundancy

Drill floor flush with main deck allowing safe and easy operations - safety

Dual ROV stations each with an individual maintenance garage and protected launching - redundancy, safety

Enclosed working and survival areas - safety, workability

Heat tracing on exposed walk ways, stairs and handrails - safety

JBF ARCTIC

3

SEMI-SUBMERSIBLE DRILLING UNIT

the integrated design of the BOP handling system, the

substructure is flush with the main deck of the vessel.

Materials can therefore be handled in a safe way.

If required the design can be customized for setting the unit

on the sea bed in shallow water. The upward breaking conical

shape of the columns will be beneficial for breaking ice.

Page 4: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

JBF ARCTIC

4

SEMI-SUBMERSIBLE DRILLING UNIT

1.2 Winterization

The design of the unit includes the following low temperature

features:

Enclosed derrick and working areas (approx. 4400 m2);

Enclosed lifeboats, life rafts and MOB boat, mooring

windlasses and loading hose stations;

Enclosed ROV areas and protected launching;

Heat tracing of the heli-decks;

Enclosed riser storage and pipe rack area;

Heat tracing and snow covers on exposed escape ways;

Heat tracing of exposed pipes, sealing of exposed doors

and hatches;

Heat tracing of all exposed stairs and walkways;

Insulation and/or heat tracing on all fluid piping which may

freeze;

Heating coils for exposed tanks;

Thermal insulation of upper hull.

Furthermore the vessel is designed for zero spill and

emissions to air according to Arctic requirements.

1.3 Accommodation

The unit has accommodation for 250 persons in single and

twin cabins. Further, the accommodation is outfitted with

offices, changing rooms and laundry facilities, mess room,

galley and provision stores, hospital, cinema, games room,

library, internet room, gymnasium and saunas.

1.4 Power

The unit will be fitted with two engine rooms. Each engine

room is fitted with three engines. The unit will be fitted out

with a vessel management system. Almost all equipment is

AC electric driven. Power regeneration and high efficiency

result in lower fuel consumption.

Closed working areas of 4400m2

Page 5: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

Cylindrical Type Unit

JBF Arctic

Maximum RAO

Range of typical wave periods

JBF ARCTIC

5

SEMI-SUBMERSIBLE DRILLING UNIT

1.5 Motions Characteristics

The JBF Arctic has excellent motion characteristics. The

heave motion of the JBF Arctic is even better than the heave

motion of a conventional semi-submersible.

Excellent seakeeping performance is confirmed by extensive

model testing in a seakeeping tank. The tests are performed

for operating, survival, transit and ice drafts. The motions

were monitored. The sufficiency of airgap is verified.

Model tests of JBF Arctic in irregular waves in survival

condition meeting the wave Hsig=17.4m

JBF 14000 (typical semi)

Page 6: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

1.6 Ice resistance

The investigation on the ice loads and the behaviour in ice

is conducted in an ice tank. The unit has been tested at two

drafts. The tests at the operational ice draft provided the

global ice loads necessary for the design of the mooring

system. The tests at the transit draft allowed checking the

feasibility of the transit in ice.

1.8 Drilling equipment

Since the unit will operate in arctic conditions, the complete

drilling system is enclosed to provide an acceptable working

environment. The design of the drilling equipment set is

new but it is based on proven components. The complete

functioning package comprises:

2 x 2.4 million pound double derrick system

Vertical pipe handling gear, capable of handling 135ft

stands

Substructure with 2 x 2.7 million pound riser tensioning

system

Electric and hydraulic power and control systems

Horizontal pipe handling gear (catwalk machines, pipe and

riser overhead cranes)

Skid systems, BOP overhead cranes and deck cranes

1.7 Mooring system

A 20 point mooring system is utilized. On the vessel side

20 chain lines are provided. Depending on the water depth

different pre-laid systems will be utilized. In shallow water the

chain lines will be sufficient. In deeper waters polyester lines

will be required for a chain/polyester/chain configuration.

The mooring system is designed to withstand the forces from

the drifting ice with thickness up to approximately 2.0-3.0m.

JBF ARCTIC

6

Photo caption

SEMI-SUBMERSIBLE DRILLING UNIT

Model tests of JBF Arctic in ice (ice draft and transit draft)

Page 7: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

Efficiency

The Drilling Equipment Set (DES) contains two complete

drilling systems. Two well bores can be drilled simultaneously

to be as efficient as possible. The system has dual drawworks

allowing transferring of the drill line from one drum to the

other eliminating slip-cut procedures, saving several hours

each time the wire would normally be cut. The system has

splittable blocks on both travelling blocks. The splittable

blocks allow push button reeving change from 16 to 12, 8 or

4 falls when handling lighter loads, increasing the block speed

and the effective stroke of the passive heave compensation

cylinders. Because of the design of the BOP handling

system, the substructure can be flush with the main deck of

the vessel, approximately 15m lower than on a conventional

semisubmersible. The reduced height of the substructure

lowers the centre of gravity.

Safety

Since the drill floor and catwalks are flush with the main

deck, materials can be handled much safer. Most machinery

(drawworks, heave compensators etc.) is located inside the

enclosed derrick providing a safe and protected area for

maintenance.

Redundancy

The complete system is designed with an extreme high

redundancy:

Two well centres with the same capacity, allowing various

activities to be done at each well centre (for simultaneous

operations and backup).

Identical components for both sides.

Dual drawworks, allowing 100% load to be handled at half

the speed with one drawworks drum out of order.

Dual Passive Heave Compensator cylinders, allowing 100%

load to be compensated at half the stroke with one cylinder

blocked.

Active Heave Compensation with Passive Heave

compensation as backup.

Three pipe rackers, providing redundant pipe handling.

Two identical catwalk machines, allowing to pick-up and lay

down at two locations.

Electrical and hydraulic power units split into two sections

and fed from two vessel switchboards, securing power at

all times.

Redundant PLC and SCADA network.

JBF ARCTIC

7

SEMI-SUBMERSIBLE DRILLING UNIT

EQUIPMENT ADVANTAGES

The system has dual drawworks allowing transferring the

drill line from one drum to the other eliminating slip-cut

procedures - time saving

When one of the Dual drawworks drums is out of order,

the full load can still be hoisted although at half the speed -

redundancy

The system has Active Heave Compensation on the

drawworks as well as Passive compensation with Hydraulic

cylinders - efficiency, redundancy

The system has splittable blocks on both travelling blocks

allowing push button reeving change from 16 to 12, 8 or 4

falls when handling lighter loads, increasing the block speed

with a factor of maximal 4 - time saving

The system has three pipe rackers and a large setback -

redundancy, efficiency

Page 8: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

1.9 Integrated control system

An in-house developed integrated control and monitoring

system ensures trouble free operation of the rig. This means

full control of all equipment from a single control system

without any third party interfaces.

The drilling system is controlled mainly from the driller’s cabin

and the aft driller’s cabin. However, in case of malfunction

of the control system, most equipment can be controlled

manually as well.

The control system consists of the following main

components:

Central PLC

Remote Input/Output stations

Operator chairs and SCADA screens

All regularly used controls, switches and joysticks are located

on the operator control chairs. To keep the control chairs as

simple as possible, the readout of process-measured values,

status, warning, alarms and job dependent settings are

incorporated in the SCADA system.

Included in the control system is the Huisman Geolograph.

This system is used during drilling and evaluation of the drilling

data. The system is developed with the following features:

Monitoring of all relevant drilling parameters on the rig

Exporting of drilling data in Excel format for in-depth

evaluation enabling the driller and the company man to

make decisions during critical operations

Integration with the rig control system, making use of the

sensors already present.

The control system is prepared for a satellite/telephone

modem connection for service engineers to log on to the

system from the office. This utility can be used for providing

real time drilling data to the office, troubleshooting, software

updates, and for remote service assistance from Huisman’s

engineers. The layout of the control system links all devices

to one single network which is connected to the satellite /

telephone modem. To ensure safe operation, the connection

to the rig uses a secure VPN tunnel.

JBF ARCTIC

8

SEMI-SUBMERSIBLE DRILLING UNIT

FEATURES

Complete control system from single supplier

Equipment outfitted with local backup controls

Remote access and troubleshooting

Huisman Geolograph included

Drillers cabin interior

Page 9: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

JBF ARCTIC

9

SEMI-SUBMERSIBLE DRILLING UNIT 2. TECHNICAL SPECIFICATION

GENERALGENERAL

MAIN DIMENSIONS

MARINE SYSTEMS

PAYLOAD

Maximum water depth

Max. drilling depth from water line

Classification

Deckbox top diameter

Deckbox bottom diameter

Deckbox height

Column length

Column width

Lower hull outer diameter

Lower hull width

Lower hull height

Height of main deck above

base line

Deck area

Draught operational (ice)

Draught operational (open

water)

Draught survival

Draught transit

Lightweight

Displacement at transit

draught

Displacement at operational

open water draught

Displacement at operational

ice draught

Main engines

Total installed engine power

No. of independent engine rooms

Marine diesel oil tanks

Fresh water tanks

Drill water tanks

No. of ROV’s

Complement in one and two person cabins

No. of helicopter decks

Helicopter decks, max. type helicopter

Drillers payload operational (incl. drilling

fluids in pontoon, but excl. consumables,

and mooring chain)

Transit payload (incl. drilling fluids in

pontoon, but excl. consumables, and

mooring chain)

Mooring chain (20 x 300m / D = 162mm)

Mud tanks (pontoon)

Brine / Base oil tanks

Bulk silos

Bulk in sacks

1500 [m]

12000 [m]

1A1 Column Stabilized Drilling Unit (N),

MDAT(-20), WINTERIZED ARCTIC (-20,

-40), CLEAN, DEICE, HELDK, CRANE,

E0, POSMOOR, PC2 (ice draught),

ICE-1A (pontoon), ICE-1C (columns)

6 x 4.84 [eMW]

29.04 [MW]

2 [-]

5000 [cu m]

2400 [cu m]

3600 [cu m]

2 [-]

250 [-]

2 [-]

S-92, EH101 or similar

25000 [mt]

10000 [mt]

3450 [mt]

2000 [cu m]

2000 [cu m]

1200 [cu m]

10000 [sacks]

27557 [st]

11023 [st]

3803 [st]

12579 [bbl]

12579 [bbl]

42384 [cu ft]

106.0 [m]

90.0 [m]

17.0 [m]

20.0 [m]

17.2 [m]

116.0 [m]

28.8 [m]

12.0 [m]

49.0 [m]

6000 [sq m]

39.0 [m]

18.0-22.0 [m]

18.0 [m]

11.7 [m]

70200 [mt]

90000 [mt]

124000 [mt]

180000 [mt]

5000 [ft]

40000 [ft]

6 x 6488 [HP]

38928 [HP]

31447 [bbl]

15094 [bbl]

22642 [bbl]

347.8 [ft]

295.3 [ft]

55.8 [ft]

65.6 [ft]

56.4 [ft]

380.6 [ft]

94.5 [ft]

39.4 [ft]

160.8 [ft]

64590 [sq ft]

128.0 [ft]

59.1–72.2 [ft]

59.1 [ft]

38.4 [ft]

77382 [st]

99210 [st]

136687 [st]

198420 [st]

2.1 Unit

Page 10: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

JBF ARCTIC

10

TECHNICAL SPECIFICATION

DOUBLE DRILLING TOWER

HEAVE COMPENSATION

PIPE HANDLING SYSTEMS

SUBSTRUCTURE AND HOISTABLE CONSTRUCTION FLOOR

RISER TENSIONERS

SKID CARTS

Static hook load

Clear height (under crown)

Free lifting height (under topdrive)

Stand length minimal, quad RII, 4 x 30 [ft]

Stand length maximal, triple RIII, 3 x 45 [ft]

Overall height above main deck

Power draw works

Power top drive

Max. capacity compensation system

Max. compensation stroke (AHC), 8 falls 550 [mt]

Based on regular waves with 15 [sec] period

Max. compensation stroke (PC), 8 falls 550 [mt]

Max. capacity total

Size of drill pipe

Size of casing or drill collar

Total length of drill pipe, triple RIII

Total length of casing, triple RIII

Height of drill floor above main deck (flush)

Rotary table internal diameter

Iron roughneck, type AR5000, max. torque

No. of riser tensioners

Total installed capacity

Max. total operation capacity

Maximum stroke on wire

Moonpool skid cart hang off capacity

Capacity X-mas tree skid cart

Static hook load

Clear height (under crown)

Free lifting height (under topdrive)

Stand length minimal, quad RII, 4 x 30 [ft]

Stand length maximal, triple RIII, 3 x 45 [ft]

Overall height above main deck

Power draw works

Power top drive

2 x 1090 [mt]

61 [m]

48.0 [m]

Min.

Max.

69.6 [m]

4600 [kW]

860 [kW]

1090 [mt]

7.0 [m]

6.0 [m]

1500 [mt]

3 1/2 up to

5 up to

14630 [m]

6096 [m]

0 [m]

1536 [mm]

136000 [Nm]

6 [-]

1225 [mt]

918 [mt]

15.24 [m]

800 [mt]

80 [mt]

0 [ft]

60.5 [inch]

100000 [ft*lbs]

per well center

2700 [kips]

2025 [kips]

50 [ft]

1760 [kips]

176 [kips]

2 x 2400 [kips]

200 [ft]

157 [ft]

119 [ft]

141 [ft]

225 [ft]

6160 [HP]

1150 [HP]

2400 [kips]

23 [ft]

19.7 [ft]

3300 [kips]

6 5/8 [inch]

14 [inch]

48000 [ft]

20000 [ft]

2.2 Drilling Equipment

Page 11: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

JBF ARCTIC

11

TECHNICAL SPECIFICATION

SUBSEA BOP (1 FOR EACH WELL CENTER + 1 SPARE)

MARINE DRILLING RISER

CHOKE AND KILL MANIFOLD (1 FOR EACH WELL CENTER)

DIVERTER (1 FOR EACH WELL CENTER)

MUD SYSTEM (FOR TWO WELL CENTERS)

Internal diameter

Pressure rating

Number of ram preventers

Number of annular preventers

Control system

Diameter main tube

Outer diameter buoyancy

Depth rating

Riser joint length

Number of joints simultaneous on board (can be

utilised for both well centers)

Stroke telescopic joint

Outer diameter telescopic joint

Pressure rating

Number of chokes

Diverter housing internal diameter

Diverter internal diameter

Diverter pressure rating

Outlet ball valves size

Gumbo box

Number of shakers (one mud cleaner)

Number of degasser

Mud treatment tanks, total volume (7 tanks)

Active mud tanks, total volume (10 tanks)

Reserve mud tanks, total volume

Number of mud pumps

Mud pump power (each)

Mud pump pressure

Dual stand pipe manifold pressure rating

Cement manifold pressure rating

1034 [bar]

6 [-]

2 [-]

MUX type

1270 [mm]

1500 [m]

27.43 [m]

72 [-]

19.81 [m]

1499 [mm]

21 [inch]

50 [inch]

5000 [ft]

90 [ft]

65 [ft]

59 [inch]

1034 [bar]

2 remote, 2 manual

1536 [mm]

540 [mm]

69 [bar]

406 [mm]

2 [-]

12 [-]

4 [-]

140 [cu m]

955 [cu m]

2000 [cu m]

6 [-]

1640 [kW]

520 [bar]

517 [bar]

1034 [bar]

60.5 [inch]

21 1/4 [inch]

1000 [psi]

16 [inch]

900 [bbl]

6006 [bbl]

12579 [bbl]

2200 [HP]

7500 [psi]

7500 [psi]

15000 [psi]

18 3/4 [inch]

15000 [psi]

15000 [psi]

2.3 Well control equipment

2.4 Mud system

Note: Specifications might be subject to changes as the design progresses

Page 12: JBF ARCTIC - Huisman Equipment · JBF ARCTIC ADVANTAGES Large drillers payload of 25000mt - efficiency Excellent ice resistance due to round conical shape of deckbox - workability

072015

HUISMAN EQUIPMENT BV

Admiraal Trompstraat 2

3115 HH Schiedam

P.O. Box 150

3100 AD Schiedam

The Netherlands

Harbour no. 561

Phone: +31 (0)88 070 22 22

Fax: +31 (0)88 070 22 20

E-mail: [email protected]

www.huismanequipment.com


Recommended