Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation
Transcript
Page 1: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Jeff Lerud, PE, CPMSenior Project Manager

Nevada Department of Transportation

Page 2: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

• Design Bid Build vs. Design Build • I80 Robb Drive to Vista Blvd. Project• Major Elements• Challenges/ Successes of Project

• Question/ Answer

Discussion Points:

Page 3: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

BUT FIRST…Tell me about you• Name• Where you’re from• NDOT or I80 Project experience

Page 4: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

• Innovation• Builder input

• Faster Delivery• Design/construction overlap

• Risk Allocation• Shifting risk

• Cost Certainty• Upfront

Design Bid Build vs. Design Build

Page 5: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Advantages• Traditional delivery• Facilitates bidder competition• Department controls design• Right-of-Way and Utilities managed during design

Design Bid Build vs. Design Build

Design Bid Build

Page 6: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Disadvantages• Little risk transfer to contractor• Contractor has no input during design phase• Department responsible for design/constructability risks• Minimal opportunity for innovation• Public funding required upfront

Design Bid Build vs. Design Build

Design Bid Build

Page 7: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Advantages• One entity is responsible for delivery of entire project• Risk is transferred from Department to DB team• Construction may begin before final design• DB participates in design phase

Design Bid Build vs. Design Build

Design Build

Page 8: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Disadvantages• Department has less control over design• Risk allocation• Administrative costs greater• Best value may not be lowest bid• Public funding required upfront

Design Bid Build vs. Design Build

Design Build

Page 9: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

I-80 Robb Drive to Vista Boulevard Project

Page 10: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Page 11: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Concept 1

Pavement Reconstruction: Keystone Ave. to 4th St.

Keysto

ne

Ave.

4th S

t.

Page 12: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Existing Pavement Conditions

Page 13: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Existing Pavement Conditions

Page 14: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Concept 2

Concept 2: Intelligent Transportation System (ITS)

Page 15: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

ITS Devices Dynamic Message Signs

(DMS) Travel Time Signs (TTS) Ramp Meters

Intelligent Transportation System

Benefits Quicker Incident

Response Times Informing the Motorists of

Accidents and Travel Times

TRIP RELIABILITY

Page 16: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Concept 4 and 5

Concept 4Restripe I-80 EB to I-580 SB on-ramp

Concept 5Widen Virginia St. WB off-ramp to two lanes

Page 17: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Concept 8

Sparks Blvd: Loop Ramp; Triple Lefts

Page 18: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Concept 9Auxiliary Lanes: E. McCarran Blvd to Vista Blvd.

Page 19: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

July 2011

Page 20: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

August 2011

Page 21: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

September 2011

Page 22: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

September 2011

Page 23: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

September 2011

Page 24: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

September 2011

Page 25: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

• New Processes• Design Bid Build • Resources• 3 DB projects • Preferences• Risk Transfer• Subgrade

Project Successes/ Challenges

• Traffic Control• Construction Meters• Design Complete• Ahead of Schedule• Stakeholder Participation• Public Outreach

Page 26: Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.

Questions?

Thank you!Jeff Lerud, Project [email protected]