+ All Categories
Home > Documents > Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Date post: 31-Mar-2015
Category:
Upload: keegan-thaxter
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
15
Jelsa Project 25.06.2009
Transcript
Page 1: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Jelsa Project

25.06.2009

Page 2: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Primary Crusher – 2.600 t/h feed from two sides

25.06.2009

Page 3: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Material flow from PPP to SPP – mostly direct feed

Page 4: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Secondary plant – Building Ensemble

Page 5: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Tertiary plant feed stock – Total 250.000 tons for 5 process days

Page 6: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Tertiary Screening + Crushing – Compact Design

Page 7: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Crusher Building

Page 8: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Screening Building – 2 parallel processing lines

Page 9: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Wet Sand – Free loading access from all sides

Page 10: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Dry Sand – Dust reduction through complete covering

Page 11: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Stock Area – 500.000 tons on 2 x 450m tunnels possible

Page 12: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Stacker – Flexible two arm stock feeding

Page 13: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Off-Shore stock – 150.000 tons for 4 vessels

Page 14: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Shiploader – High flexibility for short ship loading time

Page 15: Jelsa Project 25.06.2009. Primary Crusher – 2.600 t/h feed from two sides 25.06.2009.

Recommended