JERSEY FUTURE HOSPITAL CO004 SITE OPTION REPORT APPENDIX 4 Site Appraisal Plans April 2015 QUALITY ASSURANCE Sign off: Kieren Morgan Position: Principal:
Transcript
Page 1: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

JERSEY FUTURE HOSPITAL

CO004 – SITE OPTION REPORT

APPENDIX 4 Site Appraisal Plans

April 2015

QUALITY ASSURANCE

Sign off: Kieren Morgan

Position: Principal:

Page 2: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

_ Jersey General Hospital Site

_ Site Analysis

Page 3: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

Electrical

S3 - Final Preliminary Issue

237035 SK-E-OPTA-001 P2

Jersey Future Hospital

States of Jersey

Option A - Existing Site ExistingElectrical Infrastructure

P2

P1

20/03/15Final Preliminary Issue

13/02/15For Internal Review and Comments

DF

DF

PT

PT

DP

DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

OPTION A - DUAL SITE | EXISTING GENERAL HOSPITAL SITE Existing JEC HV route

Notes:

1. Removal / relocationof existing JECequipment to bedeveloped followingreceipt of informationfrom JEC andarchitectural phasingplans.

LV switchgear servingbuilding (existing)

Hospital HV / LVSubstation /Transformers (existing)

Hospital HV Route

Hospital LV Route

Hospital LV BuildingInterconnections

Block A

Block BBlock C

Block D

Block H

Block E

Block F

Block G

JEC HV Switchgear(existing)

Generator Compound(existing)

Role

Legend

Page 4: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

Mechanical

237035 SK-M-OPTA-001 P4

Jersey Future Hospital

States of Jersey

Option A - Existing Site Existing Mechanical Equipmentand Infrastructure

P1 13/02/15For Internal Review and Comments

AH PT DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Block A

Block B

Block C

Block D

Block E

Block F

Energy Centre(existing)

HWS CalorifierPlantrooms(existing)

Heating DistributionRoute (existing)

Below ground JerseyWater main (existing)

Below ground JerseyGas main (existing)

PSA OxygenGeneration plantroom (existing)

Medical Gasesplantroom (existing)

Chiller / CoolingPlantrooms(existing)

Cold WaterStorage Tanks(existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Legend

S3 - Final Preliminary Issue

Role

P4

P3

P220/03/15 AH PT DPFinal Preliminary Issue

08/04/15 AH PT DPFinal Preliminary Issue

02/04/15 AH PT GWFinal Preliminary Issue

Air Handling andVent Plant (existing)

Page 5: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing
gerallt.hughes
Rectangle
gerallt.hughes
Rectangle
gerallt.hughes
Rectangle
gerallt.hughes
Rectangle
gerallt.hughes
Snapshot
gerallt.hughes
Text Box
NTS
gerallt.hughes
Text Box
Electrical
gerallt.hughes
Text Box
S3 - Final Preliminary Issue
gerallt.hughes
Text Box
237035
gerallt.hughes
Text Box
SK-E-OPTA-002
gerallt.hughes
Text Box
P3
gerallt.hughes
Text Box
Jersey Future Hospital
gerallt.hughes
Text Box
States of Jersey
gerallt.hughes
Text Box
Option A - Existing Site Electrical Schematic
gerallt.hughes
Text Box
P3 P2 P1
gerallt.hughes
Text Box
09/04/15 Final Preliminary Issue 20/03/15 Final Preliminary Issue 13/02/15 For Internal Review and Comments
gerallt.hughes
Text Box
DF DF DF
gerallt.hughes
Text Box
PT PT PT
gerallt.hughes
Text Box
DP DP DP
gerallt.hughes
Group
gerallt.hughes
Text Box
OPTION A - DUAL SITE | EXISTING GENERAL HOSPITAL SITE
david.finley
Image
david.finley
Snapshot
david.finley
PolyLine
david.finley
PolyLine
david.finley
PolyLine
david.finley
Text Box
Tx 500kVA
david.finley
Text Box
200A
david.finley
Text Box
800A
david.finley
Text Box
400A
david.finley
Text Box
400A
david.finley
Text Box
400A
david.finley
Text Box
400A
david.finley
Text Box
200A
david.finley
Text Box
Tx 500kVA
david.finley
Text Box
800A
david.finley
Text Box
200A
david.finley
Text Box
400A
david.finley
Text Box
200A
david.finley
Text Box
250A
david.finley
Text Box
250A
david.finley
Text Box
800A
david.finley
Text Box
400A
david.finley
Text Box
800A
david.finley
Text Box
800A
david.finley
Text Box
Tx 500kVA
david.finley
Text Box
800A
david.finley
Text Box
Tx 500kVA
david.finley
Text Box
800A
david.finley
Text Box
200A
david.finley
Text Box
400A
david.finley
Text Box
Tx 500kVA
david.finley
Text Box
800A
david.finley
PolyLine
david.finley
Text Box
Existing JEC HV route
david.finley
Snapshot
david.finley
Text Box
Hospital HV Route
david.finley
Snapshot
david.finley
Text Box
Hospital LV Route
david.finley
PolyLine
david.finley
PolyLine
david.finley
PolyLine
david.finley
PolyLine
david.finley
PolyLine
david.finley
Text Box
Hospital LV Interlinks
david.finley
PolyLine
david.finley
Text Box
Role
david.finley
Text Box
Notes
david.finley
Text Box
1. Schematic based on information obtained from Henderson Green 'Main LV Distribution Network' drawing - J250101-E/001 Revision P2
david.finley
PolyLine
david.finley
Text Box
400A
david.finley
Text Box
400A
Page 6: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

Notes:

1. Blue denotesproposed site boundary

2. Below ground mainswater servicesbackground provided byJersey Water

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

237035 SK-M-OPTA-006 P1

Jersey Future Hospital

States of Jersey

Option A Existing Site Existing Mains Water Layout

P1 20/03/15 Final Preliminary Issue

AH PT DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Legend

MechanicalRole

S3 - Final Preliminary Issue

Notes:

1. Blue denotesproposed site boundary

2. Below ground mainswater servicesbackground provided byJersey Water

Jersey Water supply tobe retained. Noupgrades required

Jersey Water supply to beretained and modified tosuit new building layout

Jersey Water supply to beretained and modified tosuit new building layout

Jersey Water supply to beretained and modified tosuit new building layout

Jersey Water supplyto be retained. Noupgrades required

Jersey Water supplyto be retained. Noupgrades required

Page 7: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

_ Overdale Site

_ Site Analysis

Page 8: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing
Page 9: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

Electrical

S3 - Final Preliminary Issue

237035 SK-E-OPTA-003 P2

Jersey Future Hospital

States of Jersey

Option A - Overdale ExistingElectrical Infrastructure

P2

P1

20/03/15Final Preliminary Issue

13/02/15For Internal Review and Comments

DF

DF

PT

PT

DP

DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

JEC 11kV Network

JEC LV Network

Existing Overdale HospitalJEC Substation1 No. 800kVA JECTransformerContains 3 No. outgoing LVsupplies to Overdale Hospitaland 2 No. LV supplies for JECLV Network.Substation to remain.

Hospital LV Network

Existing Ocean HotelJEC Substation (tobe retained)

Domestic LV Supply

400A supply to boiler housesupplied from remote JECsubstation. Supply to beremoved as part of works.

Notes:

1. Existing hospital sitein ground infrastructureroutes to be provided bySoJ to assess impact ofworks. Informationrequested.

2. Implications ofdemolishing boiler houseto be discussed withJEC.

3. Existing in-groundinfrastructure servingbuildings to bedemolished to beremoved back to source.

Role

Legend

Page 10: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

237035 SK-M-OPTA-002 P3

Jersey Future Hospital

States of Jersey

Option A - Overdale SiteExisting Mechanical Equipmentand Infrastructure

P1 13/02/15For Internal Review and Comments

AH PT DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Existing RedundantBoiler Plantroom

Existing BoilerPlantroom

Existing BoilerPlantroom

Existing BoilerPlantroom

Boiler Plantroom(existing)

Below groundmains water(existing)

HeatingDistributionRoute(existinglocated inservice duct)

Legend

S3 - Final Preliminary Layout

Role Mechanical

P2 20/03/15 AH PT DP Final Preliminary Layout

Existing BoilerPlantroom

P3 08/04/15 AH PT DP Final Preliminary Layout

Page 11: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

237035 SK-M-OPTA-005 P1

Jersey Future Hospital

States of Jersey

Option A Overdale Existing Mains Water Layout

P1 20/03/15 Final Preliminary Issue

AH PT DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Legend

Mechanical

S3 - Final Preliminary Issue

Notes:

1. Blue denotesproposed site boundary

2. Below ground mainswater servicesbackground provided byJersey Water

Jersey Water supply fromWestmount tanks to be be upgraded

Jersey Water supply to bemodified to suit newbuilding layout

Jersey Water supply to beextended to supply newbuilding layout

Jersey Water supplyto be retained

New Jersey Water supplyconnections to be carriedout at this location to servenew 1no. energy centre

New Jersey Water supplyconnections to be carriedout at this location to servenew building and 1no.energy centre

Role

Jersey Water supply fromWestmount tanks to be upgraded

Jersey Water supplybranch connection tobe retained

Jersey Water supplybranch connection tobe retained

Page 12: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing
Page 13: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

_ Overdale Site

_ Site Analysis

Page 14: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing
Page 15: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

Electrical

S3 - Final Preliminary Issue

237035 SK-E-OPTA-003 P2

Jersey Future Hospital

States of Jersey

Option A - Overdale ExistingElectrical Infrastructure

P2

P1

20/03/15Final Preliminary Issue

13/02/15For Internal Review and Comments

DF

DF

PT

PT

DP

DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

JEC 11kV Network

JEC LV Network

Existing Overdale HospitalJEC Substation1 No. 800kVA JECTransformerContains 3 No. outgoing LVsupplies to Overdale Hospitaland 2 No. LV supplies for JECLV Network.Substation to remain.

Hospital LV Network

Existing Ocean HotelJEC Substation (tobe retained)

Domestic LV Supply

400A supply to boiler housesupplied from remote JECsubstation. Supply to beremoved as part of works.

Notes:

1. Existing hospital sitein ground infrastructureroutes to be provided bySoJ to assess impact ofworks. Informationrequested.

2. Implications ofdemolishing boiler houseto be discussed withJEC.

3. Existing in-groundinfrastructure servingbuildings to bedemolished to beremoved back to source.

Role

Legend

Page 16: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

237035 SK-M-OPTB-003 P2

Jersey Future Hospital

States of Jersey

Option B - Overdale SiteExisting Mechanical Equipmentand Infrastructure

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Existing RedundantBoiler Plantroom

Existing BoilerPlantroom

Existing BoilerPlantroom

Existing BoilerPlantroom

Boiler Plantroom(existing)

Below groundmains water(existing)

HeatingDistributionRoute(existinglocated inservice duct)

Legend

S3 - Final Preliminary Layout

RoleMechanical

P1 20/03/15 AH PT DP Final Preliminary Layout

Existing BoilerPlantroom

P2 08/04/15 AH PT DP Final Preliminary Layout

Page 17: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

_ Jersey General Hospital Site

_ Site Analysis

Page 18: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing
Page 19: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

Electrical

S3 - Final Preliminary Issue

237035 SK-E-OPTA-001 P2

Jersey Future Hospital

States of Jersey

Option A - Existing Site ExistingElectrical Infrastructure

P2

P1

20/03/15Final Preliminary Issue

13/02/15For Internal Review and Comments

DF

DF

PT

PT

DP

DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

OPTION A - DUAL SITE | EXISTING GENERAL HOSPITAL SITE Existing JEC HV route

Notes:

1. Removal / relocationof existing JECequipment to bedeveloped followingreceipt of informationfrom JEC andarchitectural phasingplans.

LV switchgear servingbuilding (existing)

Hospital HV / LVSubstation /Transformers (existing)

Hospital HV Route

Hospital LV Route

Hospital LV BuildingInterconnections

Block A

Block BBlock C

Block D

Block H

Block E

Block F

Block G

JEC HV Switchgear(existing)

Generator Compound(existing)

Role

Legend

Page 20: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

Mechanical

237035 SK-M-OPTA-001 P3

Jersey Future Hospital

States of Jersey

Option A - Existing Site Existing Mechanical Equipmentand Infrastructure

P1 13/02/15For Internal Review and Comments

AH PT DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Block A

Block B

Block C

Block D

Block H

Block E

Block F

Energy Centre(existing)

HWS CalorifierPlantrooms(existing)

Heating DistributionRoute (existing)

Below ground JerseyWater main (existing)

Below ground JerseyGas main (existing)

PSA OxygenGeneration plantroom (existing)

Medical Gasesplantroom (existing)

Chiller / CoolingPlantrooms(existing)

Cold WaterStorage Tanks(existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Air Handling andVent Plant (existing)

Legend

S3 - Final Preliminary Issue

Role

P3

P220/03/15 AH PT DPFinal Preliminary Issue

02/04/15 AH PT GWFinal Preliminary Issue

Page 21: JERSEY FUTURE HOSPITAL CO004 SITE OPTION ... and...NTS Electrical\ S3 - Final Preliminary Issue 237035 SK-E-OPTA-002 P3 Jersey Future Hospital\ States of Jersey\ Option A - Existing

Notes:

1. Blue denotesproposed site boundary

2. Below ground mainswater servicesbackground provided byJersey Water

A3 A B C D E F

1

2

3

4

6

© Arup

Issue Date By Chkd Appd

Client

Job Title

Drawing Status

Job No Drawing No Issue

Scale at A3

G

5

Level 17, 1 Nicholson StMelbourne, Victoria, 3000

Tel +61(03)9668 5500 Fax +61(03)9663 1546www.arup.com.au

Arup Pty LtdABN 18 000 966 165

Drawing Status

_

NTS

237035 SK-M-OPTA-006 P1

Jersey Future Hospital

States of Jersey

Option A Existing Site Existing Mains Water Layout

P1 20/03/15 Final Preliminary Issue

AH PT DP

4 Pierhead St, Capital Waterside

Cardiff, CF10 4QP

T +44(0)29 20473727 F +44(0)29 20472277

www.arup.com

Legend

MechanicalRole

S3 - Final Preliminary Issue

Notes:

1. Blue denotesproposed site boundary

2. Below ground mainswater servicesbackground provided byJersey Water

Jersey Water supply tobe retained. Noupgrades required

Jersey Water supply to beretained and modified tosuit new building layout

Jersey Water supply to beretained and modified tosuit new building layout

Jersey Water supply to beretained and modified tosuit new building layout

Jersey Water supplyto be retained. Noupgrades required

Jersey Water supplyto be retained. Noupgrades required