TWA TERMINAL CONSTRUCTION DETAILS
Tunnel Plenum
Claim & ticketlobby
Caf
ofce
outgoingbaggage
parking
outgoingbaggage
Caf
outgoingbaggage
Tunnel Plenum
Metal Waterproong
Vinyl Floor tile
BaggageConveyor
Acoustical Tile onmetal lathand plaster
suspended cementplaster
concrete slab
concrete slabutility racewayutility raceway
cement ll
baggage scale
plywood with laminatenish
laminate plasticnish
plywood nish
vinyl tile over midgetceramic tile
SECTION THROUGHTICKET COUNTER
ELEVATION OF TICKETCOUNTER SECTION DETAIL
SECTION
SIDE ELEVATION
FRONT ELEVATION
Typical Cove Line
entrance doors
glass entrancevestibule
cement cove base
ceramic tile
brace hung from brace
built up roong
recessed lightingxtures
concrete slab
cement plasteron metal lath
furring chanels
template channels
carrier channels hungfrom metal brackets
SOUTH WINGPLAN
WALL SECTION B
WALL SECTION A
SECTION
7/24/2019 jfk airport ,usa
2/8
TWA TERMINAL CONSTRUCTION DETAILS
RECONSTRUCTION OFRUNWAY
Instead of using asphalt , concrete wasbeing used .Asphalt, the material of choice at JFKairport, has a lifespan of ve to 10 years.Concrete's is nearly 40, but installing
concrete costs about 10 percent moreover asphalt and takes out the runwayunder reconstruction out of commissionfor a signicantly longer time.Asphalt is typically overlayed in sections,which means part of the runway can beused for ights during construction, whileworking with concrete requires taking outthe entire runway for the length of theconstruction cycle, drastically impactingoverall airport operations, potentiallycausing those dreaded minutes andhours on the tarmac.
7/24/2019 jfk airport ,usa
3/8
TWA TERMINAL SECTION
7/24/2019 jfk airport ,usa
4/8
TWA TERMINAL CONSTRUCTION DETAILS
23
1
5
4
1. ReinforcedConcrete Roof2. ReinforcedConcrete Column3. Concrete Pour Line4. Curtain Wall5. Raised walkways to
terminalELEVATION
EXPLODED AXON
PLAN
7/24/2019 jfk airport ,usa
5/8
Solar board - Flightinformation
Midget Ceramic Tilenish
Solar board - Flightinformation
Mechanical Grill Vent.
Plaster nish
Marble Desktop
MidgetCeramic tiles
MidgetCeramic tiles
Duct
Metal Platetemplates
Framing
Channels
TWA TERMINAL CONSTRUCTION DETAILS
Solar boardPlaster nish
Midget Ceramictile nish
Midget Ceramic Tile nishMarble Desktop
PARTIAL SECTION AND FINISH ELEVATION
FINISH ELEVATION PROFILESOLAR BOARD FINISH PLAN
7/24/2019 jfk airport ,usa
6/8
TRANSVERSE SECTION
TWA TERMINAL CONSTRUCTION DETAILS
7/24/2019 jfk airport ,usa
7/8
Baggagecheck
Entrancestair
Mezzanine Bridgeand Concrete Pillar
Mezzanine Stair
TWA TERMINAL CONSTRUCTION DETAILS
Tunnel Plenum
Claim & ticketlobby
Caf
ofce
outgoingbaggage
parking
outgoingbaggage
7/24/2019 jfk airport ,usa
8/8
TWA TERMINAL CONSTRUCTION DETAILS
SOUPLA
Typical Cove Line
entrance doors
glass entrancevestibule
WALL SECTION B
cement cove base
ceramic tile
brace hung from brace
built up roongrecessed lightingxtures
concrete slab
cement plasteron metal lath
furring chanels
template channels
carrier channels hungfrom metal brackets
WALL SECTION A