JICA's Activities for Development of Infrastructure in Mongolia. Japan International Cooperation Agency Mongolia Office October,2013. Railway Flyover (Narnii Guur). Project Period: Aug 2013 – Sep 2015 Project Purpose: - PowerPoint PPT Presentation
Popular Tags:
20
JICA's Activities for Development of Infrastructure in Mongolia Japan International Cooperation Agency Mongolia Office October,2013
Transcript
Page 1: JICA's Activities for Development of Infrastructure in Mongolia

JICA's Activities for Development of Infrastructure in Mongolia

Japan International Cooperation AgencyMongolia Office

October,2013

Page 2: JICA's Activities for Development of Infrastructure in Mongolia

Railway Flyover (Narnii Guur)

Page 3: JICA's Activities for Development of Infrastructure in Mongolia

Project Period: Aug 2013 – Sep 2015

Project Purpose:Ministry of roads, transportation's and municipality of UB's capacity for planning skills of bridge maintenance is improved.

Targeted Outputs: 1) Concept of "Bridge management cycle" is widely understood, and guidelines and/or manuals are developed.2) Database system to record information of bridges is developed in nation-wide and UB.3) National policy on bridge maintenance and management are developed.4) Staff members related to bridge / structure maintenance and management in MRT and MUB are trained, and trainings are conducted by Mongolian side.

TA for Sustainable Bridge Maintenance and Management

Page 4: JICA's Activities for Development of Infrastructure in Mongolia

• Urban development master plan is one of JICA’s technical cooperation activities which support 1)analysis of urbanization trend, 2)planning concepts, 3)development land use, and 4)formulation of prior project plan.

Urban Development Master PlanUrban Development Master Plan

Country City Year

Lao PDR Vientiane 2011

Indonesia Surabaya 2011

Afghanistan Kabul 2009

Mongolia Ulaanbaatar 2009

Vietnam Hanoi 2007

Kazakhstan Astana 2001

JICA's Experience of Infrastructure Projects

Page 5: JICA's Activities for Development of Infrastructure in Mongolia

• Activate economic development by enhancing aerial transportation for the logistics and movements of passengers

AirportAirport

Country Airport Name Year

Mongolia New Ulaanbaatar Intl Airport 2016

Kazakhstan Astana Intl Airport 2011

Thailand Suvarnabhumi Intl Airport(Bangkok) 2007

Kyrgyz Manas Intl Airport(Bishkek) 2001

Sri Lanka Bandaranaike Intl Airport(Colombo) 1999

Malaysia Kuala Lumpur Intl Airport 1998

JICA's Experience of Infrastructure Projects

Page 6: JICA's Activities for Development of Infrastructure in Mongolia

• Reduce traffic congestion and environmental load• Revitalize economic activity of the urbanized area

Urban Mass Rapid TransitUrban Mass Rapid Transit

Country City Year

India Delhi 2004

Thailand Bangkok 2004

Vietnam Ho Chi Minh 2006

China Beijing 1995

Korea Seoul 1974

JICA's Experience of Infrastructure Projects

Page 7: JICA's Activities for Development of Infrastructure in Mongolia

• Formulate hazard map• Construction of evacuation facility• Emergency assistance (Japan Disaster Relief team)

Disaster ManagementDisaster ManagementJICA's Experience of Infrastructure Projects

Country City Year

Thailand Comprehensive Flood Management Plan for the Chao Phraya River Basin

2011

Indonesia Self-Sustainable Community Empowerment Network Formulation in Aceh Province

2009

China Dispatch of JDR team to Sichuan earthquake 2007

Page 8: JICA's Activities for Development of Infrastructure in Mongolia

JICA’s Priority Areas in Mongolia

Page 9: JICA's Activities for Development of Infrastructure in Mongolia

Ulaanbaatar Master Plan

2020

JICA’s Master Plan in 2009

Approval on February 2013

JICA’s Infrastructure Projects in Mongolia

Page 10: JICA's Activities for Development of Infrastructure in Mongolia

◎□Narangiin Enger Disposal Site

◎Railway Fly-over (Narnii guur)

◎Improving the Roads ( Narnii Zam )

◎△□Thermal Power Plant #4

◎Solar Power Generation

△New UB International Airport

◎Water Supply Facilities in UB

Railway

◎Grant Aid△Yen Loan□T/A

On-going/Planned

Completed

△ Ajilchin Flyover Study

△ Metro Study

JICA’s Infrastructure Projects in Mongolia

□water supply and sewerage Study

□Seismic Disaster Risk Study

Page 11: JICA's Activities for Development of Infrastructure in Mongolia

RAILWAY FLYOVER (NARNII GUUR)• Grant Aid Project• Project Cost: 3.6 Billion JPY• Bridge Length: 260m• Connecting Road: 630m• First Large Metal Bridge in Mongolia

JICA’s Infrastructure Projects in Mongolia

Page 12: JICA's Activities for Development of Infrastructure in Mongolia

NEW ULAANBAATAR INTERNATIONAL AIRPORT• Yen Loan Project• Solution for demand increase of aviation movements• Construction of new global gateway to Mongolia as landlocked

country

JICA’s Infrastructure Projects in Mongolia

Page 13: JICA's Activities for Development of Infrastructure in Mongolia

FEASIBILITY STUDY OF UB METRO

• PPP-FS Scheme• Proposed by Master Plan 2020• To reduce traffic congestion• To promote underground development in Ulaanbaatar

JICA’s Infrastructure Projects in Mongolia

Page 14: JICA's Activities for Development of Infrastructure in Mongolia

IMPROVEMENT OF CAPACITY OF 4TH POWER PLANT• Collaboration of Yen Loan, Grant Aid, TA and Volunteers• Supporting the economic development as basic

infrastructure since 1990

JICA’s Infrastructure Projects in Mongolia

Page 15: JICA's Activities for Development of Infrastructure in Mongolia

Water project by WB  under USIP2

New Water Pipe (18.8km)

New Water Sources (21 wells)

WATER SUPPLY DEVELOPMENT IN GACHUURT

• Grant Aid project• Scheduled for completion in November 2014• Benefit 390,000 ger area and 40,000 urban area residents• To provide the basic social service to ger area residents

JICA’s Infrastructure Projects in Mongolia

Page 16: JICA's Activities for Development of Infrastructure in Mongolia

NARANGIIN ENGER DISPOSAL SITE & SOLID WASTE MANAGEMENT• Collaboration of Grant aid and TA• Construction of new disposal Site • Provision of equipment, garbage trucks• Capacity development for maintenance and management• First sanitary landfill in Mongolia

JICA’s Infrastructure Projects in Mongolia

Page 17: JICA's Activities for Development of Infrastructure in Mongolia

TA: Strengthening the Capacity of Seismic Disaster Risk Management (2012-2013)To enhance disaster prevention ability by risk mapping , formulating disaster prevention planning, and, capacity development

Grant Aid: Improvement of Capacity of Fire Fighting Techniques and Equipment(2013)Provision of 22 units fire truck, water tank car, car lighting etc.

Grant Aid: Improvement of Fire Fighting Equipment and Maintenance Workshop(2001)Maintenance of equipment and provision of 17 units fire fighting vehicle

•Countermeasure against urbanization risks

JICA’s Infrastructure Projects in Mongolia

Page 18: JICA's Activities for Development of Infrastructure in Mongolia

CAPACITY DEVELOPMENT PROJECT FOR URBAN RE-DEVELOPMENT

• Technical Assistance Project• Technology transfer the concept of land readjustment in Japan • Formulating urban re-development legal system• To reduce traffic congestion and air pollution in Ulaanbaatar

JICA’s Infrastructure Projects in Mongolia

Page 19: JICA's Activities for Development of Infrastructure in Mongolia

JICA will support infrastructure development;-as new solutions for challenges in Mongolia, -as contribution for people’s life in Mongolia

Page 20: JICA's Activities for Development of Infrastructure in Mongolia

Thank You For Your Kind Attention!