JICA's Activities for Development of Infrastructure in Mongolia
Japan International Cooperation AgencyMongolia Office
October,2013
Railway Flyover (Narnii Guur)
Project Period: Aug 2013 – Sep 2015
Project Purpose:Ministry of roads, transportation's and municipality of UB's capacity for planning skills of bridge maintenance is improved.
Targeted Outputs: 1) Concept of "Bridge management cycle" is widely understood, and guidelines and/or manuals are developed.2) Database system to record information of bridges is developed in nation-wide and UB.3) National policy on bridge maintenance and management are developed.4) Staff members related to bridge / structure maintenance and management in MRT and MUB are trained, and trainings are conducted by Mongolian side.
TA for Sustainable Bridge Maintenance and Management
• Urban development master plan is one of JICA’s technical cooperation activities which support 1)analysis of urbanization trend, 2)planning concepts, 3)development land use, and 4)formulation of prior project plan.
Urban Development Master PlanUrban Development Master Plan
Country City Year
Lao PDR Vientiane 2011
Indonesia Surabaya 2011
Afghanistan Kabul 2009
Mongolia Ulaanbaatar 2009
Vietnam Hanoi 2007
Kazakhstan Astana 2001
JICA's Experience of Infrastructure Projects
• Activate economic development by enhancing aerial transportation for the logistics and movements of passengers
AirportAirport
Country Airport Name Year
Mongolia New Ulaanbaatar Intl Airport 2016
Kazakhstan Astana Intl Airport 2011
Thailand Suvarnabhumi Intl Airport(Bangkok) 2007
Kyrgyz Manas Intl Airport(Bishkek) 2001
Sri Lanka Bandaranaike Intl Airport(Colombo) 1999
Malaysia Kuala Lumpur Intl Airport 1998
JICA's Experience of Infrastructure Projects
• Reduce traffic congestion and environmental load• Revitalize economic activity of the urbanized area
Urban Mass Rapid TransitUrban Mass Rapid Transit
Country City Year
India Delhi 2004
Thailand Bangkok 2004
Vietnam Ho Chi Minh 2006
China Beijing 1995
Korea Seoul 1974
JICA's Experience of Infrastructure Projects
• Formulate hazard map• Construction of evacuation facility• Emergency assistance (Japan Disaster Relief team)
Disaster ManagementDisaster ManagementJICA's Experience of Infrastructure Projects
Country City Year
Thailand Comprehensive Flood Management Plan for the Chao Phraya River Basin
2011
Indonesia Self-Sustainable Community Empowerment Network Formulation in Aceh Province
2009
China Dispatch of JDR team to Sichuan earthquake 2007
JICA’s Priority Areas in Mongolia
Ulaanbaatar Master Plan
2020
JICA’s Master Plan in 2009
Approval on February 2013
JICA’s Infrastructure Projects in Mongolia
◎□Narangiin Enger Disposal Site
◎Railway Fly-over (Narnii guur)
◎Improving the Roads ( Narnii Zam )
◎△□Thermal Power Plant #4
◎Solar Power Generation
△New UB International Airport
◎Water Supply Facilities in UB
Railway
◎Grant Aid△Yen Loan□T/A
On-going/Planned
Completed
△ Ajilchin Flyover Study
△ Metro Study
JICA’s Infrastructure Projects in Mongolia
□water supply and sewerage Study
□Seismic Disaster Risk Study
RAILWAY FLYOVER (NARNII GUUR)• Grant Aid Project• Project Cost: 3.6 Billion JPY• Bridge Length: 260m• Connecting Road: 630m• First Large Metal Bridge in Mongolia
JICA’s Infrastructure Projects in Mongolia
NEW ULAANBAATAR INTERNATIONAL AIRPORT• Yen Loan Project• Solution for demand increase of aviation movements• Construction of new global gateway to Mongolia as landlocked
country
JICA’s Infrastructure Projects in Mongolia
FEASIBILITY STUDY OF UB METRO
• PPP-FS Scheme• Proposed by Master Plan 2020• To reduce traffic congestion• To promote underground development in Ulaanbaatar
JICA’s Infrastructure Projects in Mongolia
IMPROVEMENT OF CAPACITY OF 4TH POWER PLANT• Collaboration of Yen Loan, Grant Aid, TA and Volunteers• Supporting the economic development as basic
infrastructure since 1990
JICA’s Infrastructure Projects in Mongolia
Water project by WB under USIP2
New Water Pipe (18.8km)
New Water Sources (21 wells)
WATER SUPPLY DEVELOPMENT IN GACHUURT
• Grant Aid project• Scheduled for completion in November 2014• Benefit 390,000 ger area and 40,000 urban area residents• To provide the basic social service to ger area residents
JICA’s Infrastructure Projects in Mongolia
NARANGIIN ENGER DISPOSAL SITE & SOLID WASTE MANAGEMENT• Collaboration of Grant aid and TA• Construction of new disposal Site • Provision of equipment, garbage trucks• Capacity development for maintenance and management• First sanitary landfill in Mongolia
JICA’s Infrastructure Projects in Mongolia
TA: Strengthening the Capacity of Seismic Disaster Risk Management (2012-2013)To enhance disaster prevention ability by risk mapping , formulating disaster prevention planning, and, capacity development
Grant Aid: Improvement of Capacity of Fire Fighting Techniques and Equipment(2013)Provision of 22 units fire truck, water tank car, car lighting etc.
Grant Aid: Improvement of Fire Fighting Equipment and Maintenance Workshop(2001)Maintenance of equipment and provision of 17 units fire fighting vehicle
•Countermeasure against urbanization risks
JICA’s Infrastructure Projects in Mongolia
CAPACITY DEVELOPMENT PROJECT FOR URBAN RE-DEVELOPMENT
• Technical Assistance Project• Technology transfer the concept of land readjustment in Japan • Formulating urban re-development legal system• To reduce traffic congestion and air pollution in Ulaanbaatar
JICA’s Infrastructure Projects in Mongolia
JICA will support infrastructure development;-as new solutions for challenges in Mongolia, -as contribution for people’s life in Mongolia
Thank You For Your Kind Attention!