+ All Categories
Home > Documents > JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp...

JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp...

Date post: 15-Sep-2019
Category:
Upload: others
View: 12 times
Download: 1 times
Share this document with a friend
38
June 2012
Transcript
Page 1: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

June 2012

Page 2: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Agendag

Section 11 Jaypee Group Overview

Company Overview

Section 11Section 22

Jaypee Group Overview

p y

Yamuna Expressway Progress

22Section 33Section 44 Real Estate Development

Section 5566

Financial Overview

Key HighlightsSection 66

2

Page 3: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section Jaypee Group Overview11

3

Page 4: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Jaypee Group at a Glanceyp p

Jaypee Group is a leading integrated infrastructure conglomerate in India with exposure to the power generation, cement, construction and real estate sectors,

JAL has participated in projects that have added 8840 MW to the national

Largest Private Hydropower Group

1700 MW operational

Power GenerationEngineering & Construction

grid between 2002 and 2009

Thermal Power

1700 MW operational3920 MW under various stages of development

Construction 2x250 MW at Bina 2x660 MW at Nigrie with captive coal 3x660 MW Bara Project2x660 MW Karchana Project

3rd Largest Cement Group with 33 3 MTPA

165 km Yamuna Expressway (N id t A )

Real Estate & E

Cement

with 33.3 MTPAcapacity operational & 35.9 MTPA by FY 2013

(Noida to Agra)

Real Estate DevelopmentY ExpresswaysYamuna expressway:530 Mn. Sq feet expected to be developed33.3 MTPA capacity in operation

4

Page 5: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Jaiprakash Associates Limited (JAL)

Corporate StructureJaiprakash Associates Limited (JAL)

E&CCement – 31.6 MTPA

Real Estate & Hospitality Listed company

BOO Power Infrastructure67 9%

Cement67.9%

Cement JVs (4.3 MTPA)

Jaypee Infratech Limited (JIL)

165 Km long expressway

Jaiprakash Power Ventures Ltd (JPVL)300 MW Baspa – II HEP #

400 MW Vishnuprayag HEP #

83.1%( )

Coal Mining (Cement)

Mandla (N) - JAL

165 Km long expresswaywith 530 mn sq ft Real Estate Development(Yamuna Expressway)

400 MW Vishnuprayag HEP1,000 MW Karcham Wangtoo HEP #

1,320 MW Nigrie TPP (UI)*1200 MW Bina TPP (500 MW UI)*

100%

( )Mandla (S) – JV of JAL & MPSMCL

Coal Mining (Power)

Himalayan Expressway Limited

(NHAI BOOT Project)Sangam Power Generation Co. Ltd. (1)

1 980 MW K h TPP100%

Prayagraj Power Generation Co. Ltd (1)

3,300 MW Bara TPP - 1980 MW (UI*)100%

g ( )JVs of JAL &

MPSMCL(For Nigrie Thermal)

Jaypee Sports Int’l Limited.

(Formula-1)90.5%

1,980 MW Karchana TPP

Jaypee Arunachal Power Ltd.2,700 MW Lower Siang HEP

500 MW Hirong HEP

%

89%

Jaypee Meghalaya Power Ltd450 MW Kynshi – II HEP270 MW Umngot - I HEP

74%Jaypee Fertilizer s & Industries

Limited (JFIL)(Fertilizer Plant at Kanpur)

100%

5

(1) JAL has the right to subscribe up to 26% equity in this project.Jaypee Powergrid Limited

214 KM Long Transmission System* UI - Under Implementation

# In Operation

74%

Market Cap. (30 Apr’12) – JAL INR 158.74 Bn (USD 3.17Bn); JPVL INR 105.91 Bn (USD 2.11 Bn) ); JIL INR 64.17 Bn (USD 1.28Bn)

Page 6: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Demonstrated Execution Capabilityp y

JAL is the leader in the construction of multi-purpose river valley and hydropower projects and has been involved in construction of major engineering projects over the last 4 decadesbeen involved in construction of major engineering projects over the last 4 decades

Largest Concrete

Proud To Participate InProud To Participate In

Dulhasti

Baghalihar I **450MW

Karcham Wangtoo1000 MW

Nathpa Jhakri gDam In India –Sardar Sarovar

390 MW

Baspa-II*300 MW

Vishnuprayag*400 MWTehri

Teesta510 MW

1,500 MW

Largest Rockfill Dam In India –Tehri

Chamera II**300 MW

1,000 MW

BHUTAN

Largest Underground Powerhouse In India–nathpa-jhakri

Sardar Sarovar1,450 MW

Omkareshwar**

Second Largest Surface Powerhouse In India –Indira-sagar

B A Y O FB E N G A L

520 MW

Indira Sagar1,000 MW

Tala1,020 MW

g

Projects completed between 2002-2009

*BOO projects

**EPC contracts

6

JAL has participated in projects that have added 9840 MW to the national grid between 2002 and 2011

Page 7: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section Company Overview22

7

Page 8: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Jaypee Infratech – Unique Balance of Toll & Real Estateyp q

Unique Infrastructure company with balance of Toll & Real Estate revenuesUnique Infrastructure company with balance of Toll & Real Estate revenues

Jaiprakash Associates Ltd.83.1%

Jaypee Infratech Limited

Expressway Real Estate Development along Yamuna Expressway#

Noida (NCR) – 1,235 Acres*

Jaganpur (NCR) 1 235 Acres

Development of Expressway On BOOT Basis

(165 km Yamuna Jaganpur (NCR) – 1,235 Acres

Mirzapur (NCR) – 1,235 Acres

Expressway)

Listed companies

Tappal – 1,235 Acres

Agra 1 235 Acres

8

Listed companies Agra – 1,235 Acres* JIL has sold/ sub-leased 349 acres of the Noida land and plans to develop the remaining 885 acres

# As of Mar 31, 2012, JIL had signed lease deeds and taken possession of approximately 6,043 acres (98.0%) for Real Estate Development

Page 9: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Largest Expressway Under Construction in India nearing completionp

165 km long 6 Lane Access Controlled Expressway connecting Noida to AgraEstimated total cost*: Rs. 13,300 Crs.

AGRA

DISTRICTSADABAD

5

,Rights to concessionaire for toll collection of 36 years

Ribbon development of 25 Million Sq mts of land along the Expressway 90 year lease spread over 5 or more locations

MATHURA

DISTRICTAGRA

DISTRICT Mahamaya Nagar

SADABADDISTRICT MATHURA

DISTRICT ALIGARH

PROPOSED INTERNATIONALSPORTS SDZ (1000 Ha.)

90 year lease spread over 5 or more locations

AIRPORTGAUTAM BUDH NAGAR

GREATER NOIDA

SPORTS SDZ (1000 Ha.)

HARYANA

CHHATA TAHSIL

43

2LEGEND :

•NOIDA 2GREATER NOIDA TO AGRA – YAMUNAEXPRESSWAY

NOIDA TO GREATER NOIDA EXPRESSWAY-COMPLETED

1

LAND FOR DEVELOPMENT AT 5 LOCATIONS TOTALLING 6175 ACRES ** #

PROPOSED METRO UPTO JEWAR

METRO up to Noida City Centre operationalMETRO extension proposed upto planned Airport in JEWAR

E t d T O F T ffi B 2012 A A i t S h d l d COD f A 2013

9

Expected To Open For Traffic By 2012 As Against Scheduled COD of Apr 2013* Total cost includes cost of land acquired for development and excludes the cost of real estate development

** JIL has sold/ sub-leased 349 acres of the Noida land and plans to develop the remaining 885 acres# As of Mar 31, 2012 JIL had signed lease deeds and taken possession of approximately 6,043 crs (98.0%) for Real Estate Development

Page 10: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Amongst the Largest Land Banks in Nat. Capital Region PROPOSED NIGHTSAFARI

JAYPEE GREENS MIRZAPUR - DIST. GAUTAM BUDH NAGAR(500 Ha)

PROPOSED INTERNATIONAL AIRPORT (2314 Ha)

JAYPEE GREENS G.NOIDA (182 Ha)

km km km km km

km

50 k

m

52 k

m

SDZ

km

Ch

5km C

h 15

Ch

20

Ch

25 k

Ch

30 k

mC

h 40

Ch

45

Ch

5

Ch

5

ZERO POINT(0 KM)

115 km3 5

Ch

10 k

JAYPEE SPORTS INT’L - DIST GAUTAM BUDH

JAYPEE GREENS TAPPAL

Ch

35 k

m

JAYPEEGREENSAGRA

24

M

PROPOSED

6 km

DIST. GAUTAM BUDHNAGAR(1000 Ha)

JAYPEE GREENS JAGANPUR - DIST. GAUTAM BUDH NAGAR(500 Ha)

(500 Ha)

165 km 6 LANE YAMUNA

(500 Ha)PROPOSEDMETRO LINK

CE:

14

km

JAYPEE GREENS - 165 km 6 LANE YAMUNA

EXPRESSWAYPROPOSED EASTERN PERIPHERAL EXPRESSWAY

DA M PROPOSED

METRO LINK

DIS

TAN

C

NCRBOUNDARY

GREENSAMAN

JAYPEE GREENS NOIDALAND PARCEL( 00 H )EA

TER

NO

IDR

ESSW

AY

METRO LINK

TOTAL(500 Ha)

NO

IDA

-GR

EEX

PR

MAP NOT TO SCALE

1 530 Mn Sq Ft

6175Acres

311 Mn 3705

TOTALAREA

NCR

10Real Estate under development

Sq FtAcresAREA

Page 11: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section Yamuna Expressway Progress33

11

Page 12: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Physical Progress on the Expressway (As on 31 Jan 2012)

Total Quantity

(As on 31 Jan 2012)

100% 0%EarthWork (411 Lac Cum.)411 Lac Cum.

100% 0%Culverts (0.78 Lac Cum.)0.78 Lac Cum.

100% 0%Bridges (1.86 Lac Cum.)1.86 Lac Cum.

100% 0%Underpasses (2.60 Lac Cum.)2.60 Lac Cum.

100% 0%Interchanges (4.00. Lac Cum.)4.00 Lac Cum.

100% 0%PQC/DLC (22.63 Lac Cum.)22.63 Lac Cum.

Complete Under Execution

12Work on toll Plazas and electronic traffic controls is currently under progress and is to be completed by 31st March 2012

Page 13: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Construction Highlights - A Few BenchmarksConstruction Highlights A Few Benchmarks

Largest Quantity of Earthwork and Structures for any Road of Equiv. Length in India

ParameterParameter QuantitiesQuantities HighlightsHighlights

EQUIPMENTSUTILISATION AT PEAK

EQUIPMENTSUTILISATION AT PEAK

Over 2000 nos. including Dumpers, Excavators, Compactors, Concreting Pumps, DG Sets, Compressors, Crushing and Batching Plants etc.

Over 2000 nos. including Dumpers, Excavators, Compactors, Concreting Pumps, DG Sets, Compressors, Crushing and Batching Plants etc.

2000 nos2000 nos

HANDLING OF FLY ASHHANDLING OF FLY ASH

Largest for any Expressway / Highway Project by taking care of Environmental protection in Substantial manner

Largest for any Expressway / Highway Project by taking care of Environmental protection in Substantial manner

27 lac Cum.27 lac Cum.

EARTHWORKEARTHWORKEquiv. to Kashmir – Kanyakumari 1 lane road of 1.5 m height.250 lac Cum in 2009 - Largest in any road work for equiv. lengthanywhere in India

Equiv. to Kashmir – Kanyakumari 1 lane road of 1.5 m height.250 lac Cum in 2009 - Largest in any road work for equiv. lengthanywhere in India

411 lac Cum.411 lac Cum.

CONCRETINGPAVEMENTCONCRETINGPAVEMENT

Equivalent to Kashmir – Kanyakumari Single lane road of 1.5 m h i ht b d

Equivalent to Kashmir – Kanyakumari Single lane road of 1.5 m h i ht b d

anywhere in Indiaanywhere in India

25 lac Cum.25 lac Cum.PAVEMENTPAVEMENT height above ground.height above ground.

STRUCTURESSTRUCTURES 380 Nos380 Nos Average length between 2 structures 450 m is also high wrt anyAverage length between 2 structures 450 m is also high wrt anySTRUCTURESSTRUCTURES 380 Nos.380 Nos. g g g yequivalent road.

g g g yequivalent road.

13

Page 14: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Scale of Works: Yamuna Expressway vs. Mumbai-Pune Expway and Delhi Intl. Airport (T3)Mumbai Pune Expway and Delhi Intl. Airport (T3)

ParticularsParticularsDelhi Intl. Delhi Intl.

Airport (T3)Airport (T3)MumbaiMumbai -- PunePune

ExpresswayExpresswayYamunaYamuna

ExpresswayExpresswayAirport (T3)Airport (T3) ExpresswayExpressway ExpresswayExpressway

1) DescriptionIndia’s Largest

Intl Airport

India’s 1st 6 lane Access Controlled Concrete

India’s Longest 6 lane Access Controlled

Intl. AirportExpressway Concrete Expressway

2) Total Length NA 95 Km 165 Km

3) Land Required 2023 hectares 640 hectares 4100 hectares

3) Earth Work 1.1 Mn. Cum. 7.84 Mn. Cum. 40.6 Mn. Cum.

4) Cement 0.45 Mn. MT 0.72 Mn. MT 1.25 Mn. MT

5) Steel 1 00 000 MT 28 200 MT 1 55 000 MT5) Steel 1,00,000 MT 28,200 MT 1,55,000 MT

6) Construction Period

37 MonthsStart : Jan-1998

Finish : Mar-2002 Start : May-2008Finish : Dec 2011

Period (52 months) (44 months)

7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300 Crs

Much Larger Scale of Works of Yamuna Expressway when compared with notable infrastructure projects of India14

Page 15: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Construction Package -1 (0 - 55 km)g ( )

EXPRESSWAY COMPLETED AT KM 2+000

15

Page 16: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Construction Package -2 (55 - 110 km)g ( )

16

Page 17: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Construction Package -3 (110 - 165 km)g ( )

17

Page 18: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Project Expenditure & Fundingj p g

Project ExpenditureProject ExpenditureAll fi i R C

Description Total Incurred till Mar 2012

Project Cost 13 300 12 534**

All figures in Rs. Crs

FundingFunding

Project Cost 13,300 12,534**

Description Total Incurred till Mar 2012All figures in Rs. Crs

Equity from Promoters and Others 1,250 1,250

IPO proceeds 1,500 1000IPO proceeds 1,500 1000

Accruals from real estate development incl. advances & sales of land 3,550 3,685

Debt 7,000 6,000

Total 13 300 12 534**Total 13,300 12,534

18# IPO of Jaypee Infratech Ltd. successfully completed in May 2010. Total proceeds raised by Jaypee Infratech Ltd.– Rs. 1,650 Crs ; ** Includes Rs 599 Cr of outstanding liabilities

Page 19: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section Real Estate Development44

19

Page 20: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Land Acquisition completed for all 5 land parcels

LocationsLocations AreaAreaSaleableSaleableArea (Area (MnMn

Land Leased Land Leased as at Mar as at Mar

Remaining Land Remaining Land as of Mar 2012as of Mar 2012

(Acres)(Acres)((

Sq Ft)Sq Ft) 2012 (Acres)2012 (Acres) (Acres)(Acres)

1. Noida 1,235 78 1,232* 3 Located

2.District GautamBudh Nagar (parcel 2)

1,235 116 1,212 23

In NCR

(parcel 2)

3.District GautamBudh Nagar ( l 3)

1,235 116 1,159 76(parcel 3)

4. District Aligarh 1,235 116 1225 10

5. District Agra 1,235 103 1215 20

TOTAL 6,175 530 6043 132

20Out of Total 530 Mn Sq Ft developable area, 311 Mn Sq Ft is in NCR alone

* Includes 341.56 acres that was sold as undeveloped land and 8.20 acres that was sub-leased.

Page 21: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Yamuna Expressway: Hub of Noida Real Estate ActivityYAMUNA

EXPRESSWAYPROPOSEDINTERNATIONAL AIRPORT (2314 Ha)

JAYPEE GREENS G NOIDA (182 Ha)

p y yJAYPEE SPORTS INT’L -

DIST. GAUTAM BUDH NAGAR

NCRBOUNDARY AIRPORT (2314 Ha)G.NOIDA (182 Ha)

m km km km km km km 0 km

2 kmZERO POINT

(0 KM) km

SDZPROPOSEDNIGHT SAFARI

(1000 Ha)

Ch

5km

Ch

10 k

Ch

15

km Ch

20

Ch

25 k

Ch

30 k

km

Ch

40 k

Ch

45 k

Ch

50

Ch

52(0 KM)

115 km

4 5

Ch

15 k

MTRANSPORT HUB6 k

3

OID

A

Ch

35 k2

MTRANSPORT HUB

14 k

m

6 km

Established Destination for IT/ ITES & Commercial

PROPOSED EASTERN PERIPHERAL EXPRESSWAY

GR

EATE

R N

OPR

ESSW

AY

PROPOSED METRO LINK

ISTA

NC

E:

500 acre GB University, F1, Night Safari and SDZs in areaMetro Connectivity upto Greater Noida and Jewar by 2013

JAYPEE GREENS

NO

IDA

-GEX

P

M

D

Noida’s Preferred Commercial, Residential & Institutional Destination / S Off C

JAYPEE GREENSNOIDALAND PARCEL(500 Ha)

1

IT / ITES Offices include DELL, NIIT, HCL, METLIFE, HEWITT etcHub of Educat. Instn. from Primary to PG level (AMITY university etc)All New Residential Dev. located in vicinity of expresswayNoida Land Parcel: only Integrated Development in the area with the

21MAP NOT TO SCALE

1 y g plargest Residential, Commercial and Institutional dev.

Page 22: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Infrastructure Initiatives in the Region driving Demandg g

Distance from Jaypee GreensDevelopment Location Jaypee Greens

NOIDAIn KM (Appx.)

Noida – Greater N iYamuna Expressway Noida GreaterNoida 15

Planned Ganga Expressway Noida – Greater Noida 21

NearingCompletion

Noida

Formula 1 Greater Noida 30

Jaypee Greens Championship Golf G t N id 17

First Race in 2011

O ti lJaypee G ee s C a p o s p GoCourse (5 Star Resort & Six Senses Spa) Greater Noida 17

Proposed International Airport Jewar 51

Operational

Planned Metro Rail Link Noida – Greater Noida – Jewar 8

Planned Boraki Railway Station and Noida – Greater 28yTransport Hub Noida 28

Planned Night Safari Greater Noida 25

2222Proposed Amusement Park Greater Noida 18

Page 23: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Jaypee Greens, Noida: Preferred real estate destination of Noidayp ,

R id i l

First land parcel of the Yamuna Expressway: 1,235 Acres of Contiguous Land DevelopmentApprox. 18 km from South Delhi and 20 kms from Central Delhi

Green Area of nearly 70% covering 903 acres approx Residential

Commercial

Institutional

Green Area of nearly 70% covering 903 acres approx.

Integrated City - “Opportunity to Live, Learn and Leisure within 5 minutes proximity”Residential - 61 Mn sq ftCommercial - 10 Mn Sq ft

23

Institutional - 7 Mn Sq ft

Road network of over 20 kms, 126 MVA of captive power generation, 30,000 klpd capacity sewage treatment plants

Page 24: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

61 Mn Sq ft of Residential Development – Strong Sales Momentum

PARTICULARS (As on PARTICULARS (As on 31st Mar 2012)31st Mar 2012) LAUNCHED (Mn Sq Ft)LAUNCHED (Mn Sq Ft) SOLD (SOLD (MnMn Sq Ft)Sq Ft)Aman –I Apartments 3.24 3.24Aman – II Apartments 1.27 1.27Klassic Apartments 5.53 5.00Kosmos Apartments 8.50 8.04

Kensington Park Apartments 2.86 2.72Kensington Boulevard Apartments 2.87 2.72

Kingswood Oriental 0.19 0.17Kasa Isles Apartments 2.35 2.25

Kube Apartments 1.51 1.32Krescent Homes 4.32 3.20

Orchard 2.72 1.72Anant 1.88 0.37

Pebble Beach 0.30 0.26Garden Isle 4.85 1.75

Sports City: Built Up 1.12 0.70Residential Plots 6.04 5.37

24

Commercial Plots 3.13 3.13TOTAL 52.68 43.23

Page 25: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Kasa Isles & Kensington Boulevard – Recent Launchesg

KASA ISLESKASA ISLES No. of Units No. of Units AreaArea

Launched 1894 2.3 Mn Sq Ft

KENSINGTON BLVDKENSINGTON BLVD No. of Units No. of Units AreaArea

Launched 1926 2.8 Mn Sq Ft

Sold 1855 2.2 Mn Sq ft.

Average Rate Rs 3,410 per sq ft

Sold 1867 2.7 Mn Sq ft.

Average Rate Rs 3,297 per sq ft

Number of Towers 15 towers(Ground + 27 floors)

Deli er May 2013

Number of Towers 21 towers(Ground + 19-29 floors)

Delivery May 2013

25

Delivery y(3 yrs from launch) Delivery y

(3 yrs from launch)

Page 26: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

KUBE & Krescent Homes – Recent Launches

KUBEKUBE No. of Units No. of Units AreaArea

Launched 840 1.5 Mn Sq FtKrescentKrescent HomesHomes No. of Units No. of Units AreaArea

Launched 2568 4.3 Mn Sq Ft

Sold 774 1.3 Mn Sq ft.

Average Rate Rs 3,823 per sq ft

Sold 2034 3.2 Mn Sq ft.

Average Rate Rs 4,309 per sq ft

15 tNumber of Towers 8 towers

(Ground + 31 floors)

D liSeptember 2013

Number of Towers 15 towers(Ground + 27 floors)

DeliverySeptember 2014

26

Delivery(3 yrs from launch)

Delivery(3.5 yrs from launch)

Page 27: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Orchard & Garden Isles – Recent Launches

OrchardOrchard No. of Units No. of Units AreaArea

Launched 1226 2.7 Mn Sq Ft

Sold 770 1 7 Mn Sq ft

Garden IslesGarden Isles No. of Units No. of Units AreaArea

Launched 3087 4.8 Mn Sq Ft

S ld 1148 1 7 M S ftSold 770 1.7 Mn Sq ft.

Average Rate Rs 4,829 per sq ft

8 towers

Sold 1148 1.7 Mn Sq ft.

Average Rate Rs 4,141 per sq ft

26 towersNumber of Towers 8 towers(Ground + 31 floors)

DeliverySeptember 2014

Number of Towers 26 towers(Ground + 32-38 floors)

DeliveryApril 2015

27

Delivery(3.5 yrs from launch)

Delivery(3.5 yrs from launch)

Page 28: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

JUIT - Noida, Engineering College Operational since 2009 Jaypee Public School by 2011yp y

Around 40 schools & colleges planned

Pre-Nursery to Post Graduation courses

Accessible within 5 minutes fromAccessible within 5 minutes fromresidential communities

First Engineering College already ti l

28

operational

Page 29: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Super Specialty Medical & Research Centrep p y

Complete Health Care solutionsp

450 bed super specialty hospital

Well –equipped with the best of medical equipments

29

Page 30: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Commercial - approx. 10 mn sq ft of Development Plannedpp q p

Walk to work conceptPure commercial belt fronting the Noida – Greater Noida ExpresswayUsage for office space, shopping malls, hotels, restaurants, etc.Integrated retail & recreation areas

30

Page 31: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Recreation - Multiple Facilities Plannedp

Jaypee Greens Wish Town offers multiple recreational facilities such as:18-hole & 9-hole golf course18 hole & 9 hole golf courseMultiple & dedicated social clubsSports facilities & kids play areasThematic parks

31

Thematic parksTown Centre with facilities like cultural galleries, restaurants & café’s, etc.

Page 32: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

REAL ESTATE PERFORMANCE

PERIODPERIOD No. of No. of SS

Area Sold Area Sold (( S )S )

Average Average Gross RateGross Rate

Average Net Average Net RateRate

Gross Sales Gross Sales ValueValue

AdvancesAdvancesReceivedReceivedPERIODPERIOD Units SoldUnits Sold ((MnMn Sq Ft)Sq Ft) Gross RateGross Rate

(Rs / Sq Ft)(Rs / Sq Ft)RateRate

(Rs / Sq Ft)(Rs / Sq Ft)Value Value

( Rs ( Rs MnMn))ReceivedReceived(Rs(Rs MnMn))

2008-09(Dec ’08 Mar’09) 700 0.95 3,644 3,328 3,280 630(Dec. 08 – Mar 09) , , ,

2009-10(Apr ’09 Mar’10) 13,205 20.35 2,937 2,858 59,916 16,699(Apr. 09 – Mar 10)

2010-11(Apr ’10 Mar’11) 7,906 12.38 3,668 3,308 45,420 31,455(Apr. 10 – Mar 11)

2011-12(Apr’11 March ’12) 5,701 9.54 4,111 4,081 39,221 29,378(Apr 11- March 12)

TOTAL 27,512 43.22 3,421 3,267 14,78,37 78,162

32

Page 33: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section Financial Overview55

Page 34: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Profit & Loss Account

For the For the YearYear

For the For the YearYear

For the For the YearYear For the For the

Y E d dY E d d % Growth% Growth For Q4For Q4 For Q4For Q4

All figures in Rs. Mn

ParticularsParticularsYearYear

EndedEndedMarch 31, March 31,

20092009

YearYearEndedEndedMarchMarch

31, 2010 31, 2010

YearYearEndedEndedMarchMarch

31, 201131, 2011

Year EndedYear EndedMarch 31, March 31,

20122012

% Growth% Growthover FY over FY 20092009--1010

For Q4For Q4

FY ’11FY ’11

For Q4For Q4

FY ’12FY ’12

Revenues 5,563 6,529 27,787 31,559 120% 9,027 9,205

Expenditure 2 387 493 9 840 15 715 465% 4 158 4 999Expenditure 2,387 493 9,840 15,715 465% 4,158 4,999

EBITDA 3,176 6,035 18,134 16,492 65% 4,972 4,357

Depreciation 140 162 86 16 -69% 39 41

Profit /(Loss) 3 036 5 874 18 146 15 974 65% 4 902 4 217( )before Tax 3,036 5,874 18,146 15,974 65% 4,902 4,217

Tax 369 999 3,796 3,077 76% 981 724

Net Profit/(Loss) after tax 2,667 4,875 14,351 12,897 63% 3,921 3,493

EPS 2 76 4 33 10 48 9 29 46% 2 82 2 52

34

EPS 2.76 4.33 10.48 9.29 46% 2.82 2.52

Page 35: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section Key Highlights66

Page 36: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Jaypee Infratech Limited – USPsypAmongst India’s first Six Lane (expandable to Eight lanes) Access Controlled Expressway with Concrete Pavement connecting NCR to Agra.

A i t th t d ti ti f t i t i th tAgra is amongst the top destinations for tourists in the countryExpected Reduction in travel time between New Delhi and Agra from present 4 hrs to 2 hrsIndia has the 3rd highest growth in number of vehicles in the world in the first 3 quarters of FY 2009-10

Expected Ribbon Development along the expressway by Yamuna Expressway Authority Special Development Zones for IT, Industries, Biotechnology, Service Sectors & CommercialFive integrated townships with total real estate development of 530 mn sq ft of which 311 mn sq ft isFive integrated townships with total real estate development of 530 mn sq ft of which 311 mn sq ft isin NCR.

Unique Infrastructure Company enjoying 80 I(A) tax benefit with two revenue streams - toll income and real estate revenuesestate revenues.

Real Estate Demand 2009-13 – NCR is expected to have 2nd highest Real Estate Demand in this periodNCR – 1.02 mn units for residential and 24.9 mn sq ft for office space*Mumbai – 1.64 mn units for residential and 23.7 mn sq ft for office space*

* Source : Cushman & Wakefield India Real Estate Investment Report 2009

Jaypee Infratech has successfully sold 43.22 mn sq ft in 40 months (Dec 08 – Mar 12)yp y q ( )

Developing integrated townships (a city in itself) Offering a bouquet of products catering to high-mid segment

Walk to work concept with world class institutional recreational & commercial facilities within walking

36

Walk to work concept with world class institutional, recreational & commercial facilities within walkingdistance of residential options.

Page 37: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Key Highlightsy g g

Ability to leverage Jaypee’s Group’s well documented technical, project management & execution skills

Strength of Brand JaypeeStrength of Brand Jaypee

Integrated development with real estate projects being developed alongside an expresswayIntegrated development with real estate projects being developed alongside an expressway

Strong Regional Growth ProspectsStrong Regional Growth Prospects

Large & mostly contiguous land reserves among 3 parcels in the NCR with significant land use flexibility

Single state location of the entire Yamuna ExpresswaySingle state location of the entire Yamuna Expressway

Strong & experienced management team, well-trained workforce and

37

streamlined operating processes

Page 38: JIL Investor Presentation - Jun'12.ppt - Jaypee Groupjaypeeinfratech.com/jp infratech/JIL-investor-presentation-jun-12.pdf · 7) Project Cost Rs 10,200 Crs Rs 1,600 Crs Rs. 13,300

Section THANK YOU


Recommended