Post-Closure Care Objective  Monitoring & maintenance a landfill and all its components until it is biologically stable 2/19/2016Lesson 11 3
21
Jim Lapp City of Edmonton SWANA Northern Lights Chapter 06/19/22 Lesson 11 1
Transcript
Page 1: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Jim Lapp

City of Edmonton

SWANA Northern Lights Chapter

05/04/23Lesson 11 1

Page 2: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Outline

Definitions Post-Closure Objectives Issues Post-closure Activities Minimizing Risk Financial Planning

Page 3: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Post-Closure Care Objective

Monitoring & maintenance a landfill and all its components until it is biologically stable

05/04/23Lesson 11 3

Page 4: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Post-Closure Period

Longest conventional landfills

Shorter Bio-reactor landfills

Minimal 25 to 30 years

Possible indefinite

05/04/23Lesson 11 4

Page 5: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Issues

Settlement Cover erosion and failure Groundwater contamination Landfill gas emission & migration Leachate outbreaks Vegetation growth

05/04/23Lesson 11 5

Page 6: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Environmental Risks

05/04/23Lesson 11 6

Page 7: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Settlement

Breach of Final Cover Disrupts final use

activities Potential for

infiltration

05/04/23Lesson 11 7

Page 8: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

05/04/23Lesson 11 8

Cover Failures

•Desiccation•Shear settling•Rotation settling•Erosion•Slope failure

Page 9: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Landfill Gas

05/04/23Lesson 11 9

Page 10: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Leachate Outbreaks

05/04/23Lesson 11 10

Page 11: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Plan For Closure in Design

05/04/23Lesson 11 11

Active landfill operation Conceptual end-use plan

Page 12: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Design to Reduce Risk

05/04/23Lesson 11 12

Page 13: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Conventional Design

05/04/23Lesson 11 13

Page 14: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Bioreactor Design

05/04/23Lesson 11 14

Page 15: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

05/04/23Lesson 11 15

Post-Closure Activities

Final cover maintenance Environmental

monitoring Operate leachate

management systems Operate gas

management systems Undertake remedial

activities Record Keeping

Page 16: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

05/04/23Lesson 11 16

Inspection & Monitoring Plan

Final Cover Inspections Spring and Fall

Drainage Systems After intense rainfalls

Groundwater 2 x per year

Landfill Gas Detection gov’d

Page 17: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Vegetation Maintenance

Irrigation Weed control Grass cutting Replant damaged

areas

05/04/23Lesson 11 17

Page 18: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Monitoring & Remediation

05/04/23Lesson 11 18

Page 19: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

05/04/23Lesson 11 19

Corrective Action

Groundwater Drainage systems Leachate seepages Corrective

response confirm investigate evaluate implement

Page 20: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

Financial Planning

GAAP – “Unfunded liabilities”

Estimate Closure Costs Estimate Post-Closure

Cost – 25 to 30 yr. Invest in Reserves –

finance from operating revenues

Private companies – assurance financing

05/04/23Lesson 11 20

Page 21: Jim Lapp City of Edmonton SWANA Northern Lights Chapter 2/19/2016Lesson 11 1.

In Summary

Plan early Design to reduce

liability Be prepared Financial

Security Funding

05/04/23Lesson 11 21


Recommended