Line Sizing
Utility
PERTAMINA – TALISMAN Jambi Merang
DOCUMENT REVIEW STATUS
Review Code :
A. Accepted
B. Accepted as Noted – Resubmit Required
C. Not Accepted
D. Information Only
THIS REVIEW OF THIS DOCUMENT DOES NOT RELIEVE THE CONTRACTOR OR VENDOR FROM ITS OBLIGATION TO COMPLETE ALL THE WORKS, INCLUDING THE RESPONSIBILITY FOR ENGINEERING AND DETAIL DESIGN.
JOB PERTAMINA TALISMAN JAMBI
MERANG
DATE BY
C 06-Sept-12 AE AFI MW/JH Issued for approval JM PCI
B 13-Aug-12 AE AFI MW/JH Issued for review JM
A 07-Aug-12 AE AFI MW/JH Inter discipline check - -
REVDATE PREP CHECK APPR.
DESCRIPTIONJM PCI
CONTRACTOR COMPANY APPROVAL
STATUS CODE :A = Inter discipline check – B = Issued for review – C = Issued for approval – 0 = Issued for bid
TOTAL OR PARTIAL REPRODUCTION AND/ OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER
Petrochina International Jabung, Ltd JOB Pertamina Talisman Jambi Merang
Front End Engineering DesignNGF Liquid Handling Phase 3B Onshore – New Fractionation Plant (NGF-2)
Document Number
JM3-720-42-CAL-4-104-00
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 2 of 16
RECORD OF REVISIONS
Rev No
Section Page Company CommentImplemented
(Y/N)Explanation
C 1 5 Please make standart and proper introduction
Y
C 9 Attachment liquid hot oil Y
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 3 of 16
TABULATION OF REVISED PAGES
SHEETREVISIONS
SHEETREVISIONS
A B C D E F G H A B C D E F G H
1 X 512 X 523 X 534 X 545 X X 556 X 567 X 578 X 589 X 59
10 X 6011 X 6112 X 6213 X 6314 X 6415 X 6516 X 6617 X 6718 X 6819 X 6920 X 7021 7122 7223 7324 7425 7526 7627 7728 7829 7930 8031 8132 8233 8334 8435 8536 8637 8738 8839 8940 9041 9142 9243 9344 9445 9546 9647 9748 9849 9950 100
The revisions listed above have been incorporated in this copy of the document.
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 4 of 16
TABLE OF CONTENTS
Page
1. INTRODUCTION..........................................................................................5
2. PURPOSE...................................................................................................5
3. GENERAL REFERENCES...............................................................................5
4. DEFINITIONS..............................................................................................5
5. DESIGN DATA............................................................................................6
6. LINE SIZING CRITERIA.................................................................................6
6.1. Liquid Line Sizing........................................................................................................................6
6.2. Gas Line Sizing............................................................................................................................7
6.3. Mixed Phase Flow Line Sizing....................................................................................................7
7. RESULT.....................................................................................................9
7.1. Liquid Line Sizing........................................................................................................................9
7.2. Gas Line Sizing..........................................................................................................................11
8. CONCLUSION...........................................................................................12
9. ATTACHMENT...........................................................................................13
ATTACHMENT – 1...........................................................................................14
“LIQUID LINE SIZING HOT OIL”.......................................................................14
ATTACHMENT – 2...........................................................................................15
“LIQUID LINE SIZING WATER SYSTEM”............................................................15
ATTACHMENT –3............................................................................................16
“GAS LINE SIZING FUEL GAS”.........................................................................16
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 5 of 16
1. INTRODUCTION
Joint operation between Pertamina, Talisman, and Pacific Oil & Gas, called as JOB PERTAMINA-TALISMAN, has been assigned as the operator for development of Jambi Merang Block, which is located in South Sumatra region. The existing fields, Pulau Gading and Sungai Kenawang, have been explored to produce Natural Gas Liquid (NGL) and stabilized condensate, and directly exported as sales products. In order to increase the sales value, the bulk of Natural Gas Liquid stream is stripped into high purity propane and butane, plus condensate (heavier components).
The JOB PERTAMINA-TALISMAN agreed to build a typical new fractionation plant which is located in North Geragai Fractionation (NGF) Plant at Jabung Block, owned by Petrochina International Jabung Ltd (PCI). However, during construction phase, NGL from Pulau Gading and Sungai Kenawang could be combined and processed in existing NGF Plant at feed rate maximum equivalent to 250 kilo Tonnes per Annum (kTA) of propane & butane products.
The new fractionation, owned by JOB PERTAMINA-TALISMAN, is designed to produce pure propane and butane at combined production rate (propane & butane) of 250 kTA.
This document is performed to discuss the simulation results of fractionation NGF-2 with capacity 250 kTA.
2. PURPOSE
The purpose of this document is to: Provide Line Sizing Calculation for new lines at New Fractionation Plant (NGF 2).
3. GENERAL REFERENCES
1. Engineering Data Book, Section 17, Gas Processors Suppliers Association, 11th Edition, FPS Volume I & II, 1998.
2. Hysys Simulation Report, Document No. JM3-700-42-RPT-4-102-00-Rev.B.3. Process Design Basis, Document No. JM3-720-42-DBM-4-101-00 Rev. A. 4. Project Design Criteria, PetroChina International Jabung Ltd., Document Number BCD3-01-
00-42-CRT-012-1 (BCD3-000-42-CRT-4-012-00) Rev.1, July 18, 20055. Recommended Practice for Design and Installation of Offshore Production Platforms Piping
Systems, American Petroleum Institute RP 14E, 5th Edition, October 1, 1991.
4. DEFINITIONS
JM : Jambi MerangJOB : Joint Operating BodykTA : Kilo Ton per Annum
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 6 of 16
5. DESIGN DATA
1. The design flow rate, operating conditions and fluid physical properties for all utility lines are taken from Heat and Material Balance of New Fractionation Plant Project Drawing no.: JM3-795-42-UFD-3-101-02 JM3-795-42-UFD-3-102-02 JM3-795-42-UFD-3-103-01
6. LINE SIZING CRITERIA
The design criteria are based on maximum allowable fluid velocity and pressure drop along the pipe for 100 ft. The criteria are taken from the Process Design Basis, Document no.:JM3-720-42-DBM-4-101-00 Rev. A.
6.1. Liquid Line Sizing
The following line sizing criteria will apply for liquid services.
Table 6.1Line Sizing Criteria for Liquid
Service Line SizeMaximum
Velocity (ft/s)
Pressure DropNormal
(psi/100 ft)Maximum (psi/100 ft)
Pump suction, bubble point (1)
≤ 2”3” – 10”12” – 18”
≥ 20”
2345
0.30.30.30.3
0.40.40.40.4
Pump Suction, sub cooled
≤ 2”3” – 10”12” – 18”
≥ 20”
3456
1.01.01.01.0
1.61.61.61.6
Pump discharge,P ≤ 725 PsigPump discharge,P ≥ 725 Psig
Up to 20” 5 to 20
5 to 20
1.6
3.0
2.0
4.0
Gravity flow 2 0.1 0.2Side stream draw-off (2) ≤ 2”
≥ 3”23
0.30.3
0.40.4
Cooling water 10 1.0 0.2BFW Up to 20” 20 1.6 2.0Column Outlet ≤ 2”
≥ 3”23
0.30.3
0.40.4
Re-boiler Feed (for Indication)
0.1 0.2
Notes :1. Applicable to liquid to Thermo-syphon Re-boiler and liquid containing dissolved gas.2. Provide a vertical run of 10 ft minimum from nozzle, at nozzle size, before reducing the size of the
line.3. For non gravity flow lines, not pumped, use pump discharge criteria.4. For heating medium service line, a velocity of 15 ft/s shall not exceed. In order to avoid erosion
corrosion and shall not be less than 5 ft/s to avoid fouling deposit.
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 7 of 16
6.2. Gas Line Sizing
For gases, final line sizing shall be based on the pressure drop calculations. For tentative line sizing, the following criteria can be used:
Table 6.2Line Sizing Criteria for Gas
Service Pressure (Psig)Maximum
Velocity (ft/s) ρV2 (lb/ft.s2)
Gases: General (1) P < 290290 < P < 725725 < P < 1160
P > 1160
200160130100
10000100001000010000
Column Overhead 10000Compressor: Suction Discharge
(2)(3)
(4)(4)
Stripper Vapor ReturnKettle Vapor Return
(5)(5)
Notes :1. The above indicated line sizing criteria are valid for continuous operation. The pressure drop in
psi/100ft shall be less than 5 % of the absolute static pressure for long headers and 10 % for short header. For intermittent operation, these limits may be exceeded on a case by case basis.
2. Allowable pressure drop between 0.1 and 0.3 psi/100ft3. Allowable pressure drop between 0.2 and 0.5 psi/100ft. In addition to these criteria, the noise from
excessive flowing velocity has also to be considered.4. Maximum ρV2 to be comparable with values above.5. Allowable pressure drop between 0.1 and 0.2 psi/100 ft
6.3 Mixed Phase Flow Line Sizing
In general, avoiding undesirable flow regimes within the maximum allowable pressure drop are the main objective of two phase flow piping design. Undesirable flow regimes are not limited to slug flow. Slug flow regime may be acceptable of no degradation of system performance occurs. For instance, in higher pressure system (over 100 psig), it is not adversely affected by operating in the slug flow regime; however, the systems must be mechanically supported to operate in this regime. If slug flow regime occurs, minimizing line sizes (maximize velocity) within allowable pressure drop are permitted. The maximum velocity must be less than or equal to the erosional velocity.
Empirical Equation:Um ≤ Ve
V e=C
√ρmWhere:
Um = Mixture velocity (ft/sec)= ULS + UGS
ULS = Superficial liquid velocityUGS = Superficial gas velocityVe = Erosional velocity (ft/sec)C = Empirical constant
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 8 of 16
= 150 for continuous service= 200 for intermittent service
ρm = Mixture density (lb/ft3) (from properties hysys)Λ = Liquid volume fractionρL = Liquid densityρG = Gas density
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 9 of 16
7. RESULTThe following are the line sizes that meet the velocity and pressure drop criteria.
7.1. Liquid Line Sizing
Table 7.1Liquid Line Sizing Hot Oil
NO.
SERVICE LINE NUMBER
OPERATING CONDITIONS
SELECTED NOMINAL PIPE SIZE
VELOCITYPRESS.
DROP/100ftTEMP. PRESS.
oF psia in ft/s psi
1SLIP STREAM to HOT OIL
FILTER (795-F-201)
795-3-HM-BCB-204-HO62 316.4 123.9 3 4.22 0.736
2HOT OIL FILTER to HOT OIL EXPANSION VESSEL
(795-F-201) 795-23-HM-BCB-205-HO62 316.4 123.9 3 4.22 0.736
3SLIP STREAM to HOT OIL
HEATER (795-PK-201A)
795-4-HM-BCB-266-H062
316.4 123.9 4 5.51 0.854795-4-HM-BCB-267-H062
795-34-HM-BCB-268-H062
4SLIP STREAM to FEED
HOT OIL HEATER (795-PK-201B)
795-6-HM-BCB-254-H062 316.4 123.9 6 4.85 0.415
5SLIP STREAM to HOT
OIL HEATER (795-PK-201B)
795-4-HM-BCB-255-H062
316.4 123.9 4 5.51 0.854795-4-HM-BCB-256-H062
795-4-HM-BCB-257-H062
6
HOT OIL DISTRIBUTION HEADER to
DEPROPANIZER REBOILER (720-E-103)
795-6-HM-BCB-273-H085 428.0 60.1 6 7.50 0.774
7
HOT OIL DISTRIBUTION HEADER to
DEBUTANIZER REBOILER (720-E-103)
795-4-HM-BCB-274-H075 428.0 60.1 4 5.02 0.608
8EXPANSION VESSEL to
SUCTION PUMPS 795-8-HM-BCB-238-HO75 316.1 50.1 8 6.23 0.468
9SUCTION OF HOT OIL CIRCULATION PUMPS
(795-P-202A/B)
795-6-HM-BCB-239-HO75 316.1 50.1 6 5.39 0.500
795-6-HM-BCB-240-HO75
10
SUCTION OF HOT OIL CIRCULATION PUMPS
FOR STAND BY (795-P-202C)
795-6-HM-BCB-226-HO75 316.1 50.1 6 5.39 0.500
11PUMP DISCHARGE to
HEADER
795-6-HM-BCB-241-HO62 795-6-HM-BCB-242-HO62 795-6-HM-BCB-228-HO62
316.1 123.9 6 5.39 0.501
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 10 of 16
12
HOT OIL HEATER A(795-PK-201A) to
HOT OIL DISTRIBUTION HEADER
795-6-HM-BCB-243-HO75 428.0 60.1 6 4.85 0.367
13
HOT OIL HEATER B (795-PK-201B) to
HOT OIL DISTRIBUTION HEADER
795-6-HM-BCB-261-H085 428.0 60.1 6 4.85 0.367
14
DEPROPANIZER REBOILER to
REBOILER HEADER (720-E-103)
795-6-HM-BCB-275-H075 316.0 50.1 6 7.50 0.910
15DEBUTANIZER REBOLER
to REBOILER HEADER (720-E-106)
795-4-HM-BCB-276-H075 316.0 50.1 4 5.02 0.722
16
HOT OIL RETURN HEADER to HOT OIL EXPANSION VESSEL
(795-V-203)
795-8-HM-BCB-283-H075 316.0 50.1 8 5.61 0.195
Table 7.2Liquid Line Sizing Water System
NO. SERVICE LINE NUMBER
OPERATING CONDITIONS
SELECTED NOMINAL PIPE SIZE
VELOCITY
PRESS. DROP/100ft
TEMP. PRESS.oF psia in ft/s psi
1
UTILITY WATER WELLBORE PUMP
DISCHARGE (795-P-204)
795-3-WU-ACC-401 73.0 74.70 2 2.36 0.479
2
RAW WATER FILTRATION to UTILITY
WATER TANK (795-T-202)
795-2-WU-ACC-402 73.0 74.70 2 2.36 0.479
3UTILITY WATER PUMP
SUCTION (795-P-209)
795-3-WU-ACC-403 73.0 13.85 3 2.31 0.285
4UTILITY WATER PUMP
DISCHARGE (795-P-209)
795-2-WU-ACC-406 73.0 172.4 2 5.08 1.89
5
UTILITY WATER TO PORTABLE WATER
PUMP SUCTION(795-P-210A/B)
795-2-WU-ACC-404 73.0 14.58 2 0.50 0.032
6PORTABLE WATER PUMP DISCHARGE
(795-P-210A/B)795-2-WT-ASA-407 73.0 109.2 2 0.56 0.038
7.2 Gas Line Sizing
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 11 of 16
Table 7.3Gas Line Sizing Fuel Gas
NO. SERVICE LINE NUMBER
OPERATING CONDITIONS SELECTED
NOMINAL PIPE SIZE
VELOCITYPRESS.
DROP/100ftTEMP.
PRESS.
oF psia in ft/s psi
1FUEL GAS to HOT OIL HEATER
795-2-GF-ACB-326 -26.6 64.7 2 66.051 1.02
2BLANGKET GAS to HOT OIL EXPANSION VESSEL
795-2-GF-ACB-328 -26.6 64.7 2 0.183 0.00
3PURGE GAS to HP FLARE
795-2-GF-ACB-329 -26.6 64.7 2 0.275 0.00
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 12 of 16
8. CONCLUSION
The recommendation of line sizes on NGF-2 utility unit are shown in following table :
Table 8.3Liquid Line Size Hot Oil
Electronic File Name: document.docx
C1
C1
NO.
SERVICESELECTED NOMINAL PIPE
SIZE
in
1SLIP STREAM to HOT OIL FILTER (795-F-201)
3
2HOT OIL FILTER to HOT OIL EXPANSION VESSEL (795-F-201)
3
3SLIP STREAM to HOT OIL HEATER (795-PK-201A)
4
4SLIP STREAM to FEED HOT OIL HEATER (795-PK-201B)
6
5SLIP STREAM to HOT OIL HEATER (795-PK-201B)
4
6HOT OIL DISTRIBUTION HEADER to DEPROPANIZER REBOILER (720-E-103)
6
7HOT OIL DISTRIBUTION HEADER to DEBUTANIZER REBOILER (720-E-103)
4
8EXPANSION VESSEL to SUCTION PUMPS
8
9SUCTION OF HOT OIL CIRCULATION PUMPS (795-P-202A/B)
6
10SUCTION OF HOT OIL CIRCULATION PUMPS FOR STAND BY (795-P-202C)
6
11 PUMP DISCHARGE to HEADER 6
12HOT OIL HEATER A (795-PK-201A) to HOT OIL DISTRIBUTION HEADER
6
13HOT OIL HEATER (795-PK-201B) to HOT OIL DISTRIBUTION HEADER
6
14DEPROPANIZER REBOILER to REBOILER HEADER (720-E-103)
6
15DEBUTANIZER REBOLER to REBOILER HEADER (720-E-106)
4
16HOT OIL RETURN HEADER to HOT OIL EXPANSION VESSEL (795-V-203)
8
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 13 of 16
Table 8.2Liquid Line Size Water System
Table 8.3Gas Line Size Fuel Gas
1 FUEL GAS to HOT OIL HEATER 2
2 BLANGKET GAS to HOT OIL EXPANSION VESSEL 2
3 PURGE GAS to HP FLARE 2
.
9. ATTACHMENT
Attachment – 1 : Liquid Line Sizing Hot Oil
Attachment – 2 : Liquid Line Sizing Water System
Attachment – 3 : Gas Line Sizing Fuel Gas
Electronic File Name: document.docx
NO. SERVICESELECTED NOMINAL PIPE SIZE
in
1UTILITY WATER WELLBORE PUMP DISCHARGE (795-P-204)
2
2RAW WATER FILTRATION to UTILITY WATER TANK (795-T-202)
2
3UTILITY WATER PUMP SUCTION (795-P-209)
3
4UTILITY WATER PUMP DISCHARGE (795-P-209)
2
5UTILITY WATER TO PORTABLE WATER PUMP SUCTION(795-P-210A/B)
2
6PORTABLE WATER PUMP DISCHARGE(795-P-210A/B)
2
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 14 of 16
ATTACHMENT – 1
“Liquid Line Sizing Hot Oil”
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 15 of 16
ATTACHMENT – 2
“Liquid Line Sizing Water System”
Electronic File Name: document.docx
NGF Liquid Handling Phase 3B Onshore
New Fractionation Plant (NGF-2)
Doc. Title : Line Sizing Utility
Doc. No : JM3-720-42-CAL-4-104-00 Page 16 of 16
ATTACHMENT – 3
“Gas Line Sizing Fuel Gas”
Electronic File Name: document.docx