25
File: k:\water resource eng\adams county\friendship dam\2018 grant app with dfa\orip\2018-02-20l_behlen.docx 3433 Oakwood Hills Parkway Eau Claire, WI 54701-7698 800.666.3103 www.AyresAssociates.com February 20, 2018 Joe Behlen, Dam Safety Engineer Wisconsin Department of Natural Resources Wisconsin Rapids Service Center 473 Griffith Avenue Wisconsin Rapids, WI 54494 Bob Berry, Chairman Friendship Lake District 404 Hillwood Lane Friendship, WI 53934 Re: Friendship Dam inspection, FF 1.01, KSN 00062 Dear Mr. Behlen: Ayres Associates was retained by Friendship Lake District to conduct an inspection of Friendship Dam (FF 1.01) on February 13, 2016. A follow-up embankment survey was completed on February 16, 2013, following a snowmelt. We have attached the original inspection report as well as a compact disk with photographs and the scanned inspection report. The dam in in fair condition, and we recommend maintenance as noted below. Action Reason Deadline Add two benchmarks on the dam that are correlated to the original project datum and to the current Flood Insurance Study Datum. The only benchmark found on the site was the STH 13 bridge BM. This was also the only BM found during the last ORIP. December 31, 2019 Replace the staff gauge with a legible one. Staff gauge is illegible. December 31, 2019 Install OSHA-approved fence along the 16 ft high tailrace walls to prevent public from walking off top of wall Fall height greater than 6 feet and public is able to access this area on both sides December 31, 2018 Investigate flows and provide new flow capacity because the dam cannot pass the Q500 or Q1000 floods. The estimated hazard rating is Significant but could be High due to cabins in the floodplain. FIS Q100 is 1335 cfs below the dam. Ratioing the FIS flows at CTHZ to STH13 yields an estimate of 2033 cfs for the Q500 and 2610 cfs for the Q1000 at the dam. Capacity is currently only 1522 cfs. December 31, 2018 Add riprap to design pool (top of embankment) and make upstream slopes stable for riprap Riprap does not extend to top of beaching areas of upstream embankment. December 31, 2019 Monitor embankment movement, ideally by installing one survey pin in each of the two movement areas Powerpole (abt 15 deg lean) and bridge abutment (2.5 inches of displacement) indicate bank movement December 31, 2018 and thereafter during ORIPs
Transcript
Page 1: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

File: k:\water resource eng\adams county\friendship dam\2018 grant app with dfa\orip\2018-02-20l_behlen.docx

3433 Oakwood Hills Parkway ● Eau Claire, WI 54701-7698 ● 800.666.3103 ● www.AyresAssociates.com

February 20, 2018 Joe Behlen, Dam Safety Engineer Wisconsin Department of Natural Resources Wisconsin Rapids Service Center 473 Griffith Avenue Wisconsin Rapids, WI 54494 Bob Berry, Chairman Friendship Lake District 404 Hillwood Lane Friendship, WI 53934 Re: Friendship Dam inspection, FF 1.01, KSN 00062 Dear Mr. Behlen: Ayres Associates was retained by Friendship Lake District to conduct an inspection of Friendship Dam (FF 1.01) on February 13, 2016. A follow-up embankment survey was completed on February 16, 2013, following a snowmelt. We have attached the original inspection report as well as a compact disk with photographs and the scanned inspection report. The dam in in fair condition, and we recommend maintenance as noted below. Action Reason Deadline Add two benchmarks on the dam that are correlated to the original project datum and to the current Flood Insurance Study Datum.

The only benchmark found on the site was the STH 13 bridge BM. This was also the only BM found during the last ORIP.

December 31, 2019

Replace the staff gauge with a legible one.

Staff gauge is illegible. December 31, 2019

Install OSHA-approved fence along the 16 ft high tailrace walls to prevent public from walking off top of wall

Fall height greater than 6 feet and public is able to access this area on both sides

December 31, 2018

Investigate flows and provide new flow capacity because the dam cannot pass the Q500 or Q1000 floods. The estimated hazard rating is Significant but could be High due to cabins in the floodplain.

FIS Q100 is 1335 cfs below the dam. Ratioing the FIS flows at CTHZ to STH13 yields an estimate of 2033 cfs for the Q500 and 2610 cfs for the Q1000 at the dam. Capacity is currently only 1522 cfs.

December 31, 2018

Add riprap to design pool (top of embankment) and make upstream slopes stable for riprap

Riprap does not extend to top of beaching areas of upstream embankment.

December 31, 2019

Monitor embankment movement, ideally by installing one survey pin in each of the two movement areas

Powerpole (abt 15 deg lean) and bridge abutment (2.5 inches of displacement) indicate bank movement

December 31, 2018 and thereafter during ORIPs

Page 2: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

File: k:\water resource eng\adams county\friendship dam\2018 grant app with dfa\orip\2018-02-20l_behlen.docx

3433 Oakwood Hills Parkway ● Eau Claire, WI 54701-7698 ● 800.666.3103 ● www.AyresAssociates.com

Raise low areas of embankment to design pool

Embankment has low area near sheetpile and near leaning power pole

December 31, 2019

Regularly monitor for rodents and burrows

Dams with design pools at the embankment crest are very susceptible to piping via burrows

At least monthly May to Sept, every year

Regularly monitor toe seepage for sediment passage and changes in color or clarity

Toe ditch below STH13 was seeping with iridescence (biological indication) in winter. More expected in spring/summer.

At least monthly May to Sept, every year

Repair deteriorated concrete areas (upstream and downstream faces of dam)

Some areas deteriorated to 12 inches deep. Section loss may be severe enough to lower strength.

December 31, 2019

Paint gate and check chain strength

Chains rusted and gate is unpainted on upstream face. Gate and chain will quickly rust through if not painted.

December 31, 2019

Deice the gate arms and make ready for spring flood passage

Only one gate (no redundancy) so high risk of gate inoperability

April 15, 2018 and annually thereafter

Investigate provision of operator for lake drain

Dam lacks flow capacity and lake drain could add 10% flow capacity but lacks dedicated hoist

December 31, 2018

Remove jam from wicket gates and provide lubrication to unit

Turbine should not free spin without generator load

December 31, 2018

Replace trashrack 70% section loss in lower third December 31, 2019Monitor crack in NE wall of powerhouse superstructure, ideally with an Avongard gauge

Large crack in brick façade, could indicate water freezing within wall or foundation movement

December 31, 2018 and annually thereafter

Check roof for leakage Stains on interior of walls appear to be from rain entry

December 31, 2018

Investigate further the need top tuck point brick

Inspector could not see all brick but several areas appear to need tuck pointing

December 31, 2018

Fix broken doors and windows Secure building against animal and human entry

December 31, 2019

Clean trash rack Rack is plugged with debris, creating 24 inch differential which is too much for rack to handle

At least monthly May to Sept, every year

Investigate electrical compliance Inspector is not an electrician but old equipment appears to be not NEC compliant

December 31, 2018

Confirm that lake is still under drawdown order, pending compliance

DNR database indicates that drawdown order has not been lifted. Dam does not have Q500 or Q1000 capacity if lake is raised to normal pool. If drawdown order remains, coordinate compliance with DNR.

April 15, 2018

After years of non-compliance by the previous owner, this dam was just transferred to the Friendship Lake District, and the new owners look forward to completing the above as part of the municipal dam grant.

Page 3: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

File: k:\water resource eng\adams county\friendship dam\2018 grant app with dfa\orip\2018-02-20l_behlen.docx

3433 Oakwood Hills Parkway ● Eau Claire, WI 54701-7698 ● 800.666.3103 ● www.AyresAssociates.com

We appreciate the opportunity to assist the Department of Natural Resources with this dam safety inspection and look forward to answering any follow-up questions about this report’s conclusions. Sincerely, Ayres Associates Inc Peter E. Haug, PE Water Resources Engineer Direct: 715.831.7680 Cell: 715.271.1829 [email protected]

Page 4: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge
Page 5: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Friendship Dam Date:Pete Haug, Doug D'Jock, Bob Berry, Larry Swaziek F.F #:Friendship Lake Association Key Seq #: 404 Hillwood LaneFriendship, WI 53934AdamsOvercast, 31F, 4 inches of snow cover Email: [email protected]

Item N P M I R1 Monuments/Benchmarks X 1 3

Location: Elevation:

Datum:See below for missing benchmark on dam

2 Pool Level X 3Normal/Operating:

Maximum:Minimum:Staff Gage X Staff gage is not legible

3 Access Road X

4 Signage/ SecurityPortage/route: X

Dam Warning: XDownstream Hazard:

Fencing/Railings/Catwalks: X 2

Drawdown Condition:

DNR Database Review:

Structural height = 22 feet 27+ Feet as MeasuredHydraulic height = 19 feet 20+ Feet measured during drawdownCrest length = 400 feet

Benchmarks:

Another BM should be located on the gated outlet works to confirm stabilityWe also recommend one BM added to the embankment low area

OSHA fall hazards:

2. Plan to do soon

F.F #: 01.01 Date: 02/13/18 Page 1 of 11

County:

Dam Inspection Checklist

N= Noted; P= Photo; M= MonitorI= Investigate; R= Repair

Action Suggestion 1. Requires immediate action

Weather and Site conditions:

Maximum lake depth = 15 feet

GENERAL

WisDOT Disk on Downstream Rightbank Bridge B-01-0017 Abutment935.75NAVD88 which approximately equals LOCAL DATUM + 835.25 feet

Normal pool area = 114 acresPrincipal spillway capacity = 976 cfs

On upstream face of powerhouse

Additional Comments:

Insufficient per OSHA fall safety requirements, see belowNot required (no reverse roller) but would be a good idea for park

Normal storage = 681 acre feetMaximum storage = 1000 acre feet

Dam is under drawdown order dated 7/7/2016 until inspection directives met

On upstream face of powerhouse

Name of Dam: Inspectors: Owner's Name: Street:City, State, Zip Code:

2/13/201801.0100062

STH 13 is on dam, parking lot is south of powerhouse

None approved for this damNone approved for this dam

933.54 NAVD88 as measured today during drawn down conditionNormal listed at 937.49 NGVD29 per DNR database (937.39 NAVD88)

Action

Notes/ Observations

Owner's Phone: 608-548-2191 Cell

F.F.= Field File; RT = Right; LT = Left U/S = Upstream; D/S = Downstream

Drainage basin = 60 square miles

DNR requires one benchmark on dam and one off dam (possibly old BMs lost?)

3. Do when convenient

Friendship Dam

16' fall - Left downstream tailrace wall (upstream of bridge)16' fall - Right downstream tailrace wall (upstream of bridge)

The WisDOT BM qualifies as one BM off dam

Page 6: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

5 Hazard SectionA. D/S Development X 3

Density:Distance:

Type (Residential, Commercial,

Industrial): B. Channel Crossing X

Type:Dimensions:

D/S distance:Traffic Level (Local, CTH,

Rail Road, STH, Interstate, etc):C. Distance to nearest D/S Xcommunity/impoundment:

Name:

D. Anticipated Hazard (based Xon landuse and zoning):E. Dam Failure Analysis

Date Completed/Approved Not completed. Ayres is under contract to complete this by April 2018.Is map available?

Are map & profile adopted?List adoption date:

Verify validity of failure mode:

Verify validity of DFAconclusions:

F. Emergency Action Plan Y N M I R1. Current plan posted? x Ayres is under contract to complete this by April 2018.2. Understood by Operator? x3. Warning systems? x4. Certification of last test? x5. Remote operation? x6. Revision Date? x7. Habitable structures? ? Possibly. 20+ homes surveyed on 2/13/2018 to check LAG.8. Recreation areas? x Friendship park is 0.07 mi D/S9. Changed hazard potential? x10. New development? x11. Other comments? X Dam barely passes existing Q100 flowrate; cannot pass Q500 or Q1000 1 1

2. Plan to do soon

F.F #: 01.01 Date: 02/13/18 Page 2 of 11 Dam Inspection Checklist

Friendship Dam

GENERAL (Cont.)

Photo shows cabin that is <5 feet above normal river waterMultiple small cabins 4mi D/S are 1 acre lots and within 5 vert. ft. of river4 miles downstream, just below CTH J bridge P-01-0903Residential

U/S = Upstream; D/S = Downstream

FIS flowof 1335 cfs seems very high for this basin, likely a result of an uncalibrated HEC watershed model. A USGS gage comparison nearly halves the Q100 from the FIS 1335 cfs value. The Friendship Lake Stillwater FIS value of 936.9 must take credit for powerhouse flow. The embankment sheet pile is about 2 feet lower than the top of spillway deck. In 2017, the HW reached 939.49 and downstream discharges exceeded 1300 cfs as confirmed with a HECRAS model using high water marks downstream in the park. However, gate opening is not known for this condition. The right abutment overtops at HW = 940.79. The low level sluice can provide 200 cfs of additional outflow capacity, but it lacks a dedicated hoist and so cannot be counted toward flow capacity.

3. Do when convenient

Significant or High

F.F.= Field File; RT = Right; LT = Left

N= Noted; P= Photo; M= Monitor Action Suggestion 1. Requires immediate action I= Investigate; R= Repair

Comments, Explanation, and Description

Additional Comments:

If the hazard estimate is correct, the dam should be able to pass the Q500 as a significant hazard large dam. The dam cannot pass the existing-interpolated (FIS) Q500 without both a dedicated hoist for the sluice bay AND raising the earthen embankment.

Multiple bridges downstream. STH13 B-01-17 prestressed concrete girder bridge at 0.01 mi D/S. Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge 4 mi D/S. 17th Court non-vehicular steel thru truss is 4.1 mi D/S. CTH J P-01-0903 timber trestle bridge is 4.2 mi D/S. CTH Z P-01-0904 timber trestle bridge is 6 mi D/S at confluence with Wisconsin River.

Straight-line the distance is 6.1 miles to Castle Rock Lake on the Wisconsin River

Page 7: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

M I R

Item N P1 Vegetation: No problem

A. Trees X 4 3Quantity (<5,sparse,dense):

Diameter:Location:

B. Brush X 4 3Quantity (sparse,dense):

Location:

C. Ground cover XType (grass, crown vetch,other):

Quantity (bare, sparse,adequate,

dense): Appearance (too tall, too short,

good): 2 Erosion No problem Not applicable Could not inspect

A. Wave erosion (Beaching): X 5 3Scarp: Length/ Width:

Location:

B. Runoff Erosion (Gullies)Quantity:

Length/ Width/ Depth:Location:

3 Instabilities No problem Not applicable Could not inspectA. Slides X 5 3

Transverse:Longitudinal:

Scarp: Length/ Width:Crack Length/ Width:

B. Cracks: X 6 3Transverse:

Longitudinal:Length/ Width/ Depth:

Location:Other:

C. Bulges/ Depressions X 7 3Size:

Height/ Depth:D. Slope (Too Steep) X 2U/S, D/S

Action Suggestion 1. Requires immediate action 2 . Plan to do soon 3 . Do when convenient

Additional Comments:

Date: 02/13/18 Page 3 of 11

EMBANKMENTS

N= Noted; P= Photo; M= Monitor

Action

beaching is prevalent along entire upstream of dam. Riprap is at okay slope but there is

trees and woody vegetation to allow seepage monitoring.

Well established grass on slopes east of STH 13. Brushy riprap west of STH 13.

Location on Embankment and Deficiency

an 8- to 12-inch vertical section of embankment on upstream face above riprap.

densealong toe of embankment (west of STH 13) in toe ditch. Should clear toe ditch of all

None found

Friendship Dam F.F #: 01.01

too steep near D/S bridge abutments 1.8H:1V (2.2H:1V on average is still steep)

U/S = Upstream; D/S = Downstream

Low area near left end of embankmentSee survey notes

Description:

F.F.= Field File; RT = Right; LT = Left

none found, but it is difficult to inspect under grouted riprap near upstream of STH bridge

U/S slope is 1.3H:1V in places - too steep (1.9H:1V on average)

adequate

good

NW bridge abut parapet wall displaced 2.5" downstream. Very steep embankment slope.

I= Investigate; R= Repair

<5 along toe of embankment (west of STH 13)up to 8" DBH

Dam Inspection Checklist

No cracks found

Powerpole right of PH leans downstream. Mr. Berry claims it has leaned for 40 years.A low area was found on embankment right of PH

Toe ditch

No scarps found

Page 8: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Item N P M I R

4 Slope Protection No problem Not applicable Could not inspectA. Type (none, riprap, wave Xberm, concrete slabs, loose formed

concrete/asphalt):

B. Condition:

5 Other No problem Not applicable X Could not inspectA. Rodent burrows (few, many) 3

Location:B. Ruts 3

Length/ Width/ Depth: Location:

C. Other

6 Alignment No problem Not applicable Could not inspectA. Vertical X 7 3

Low area:Elevation Difference:

Location:

B. Horizontal

C. Width XToo narrow:

Location:7 Toe No problem Not applicable Could not inspect

Cracks/Slumps: 2Embankment drains:

Type/Flow:Location:

Seepage/ Wetness:Hummocky:

8 Seepage No problem Not applicable Could not inspectWet area: X south end of right toe ditch 3

Boil: none seenSinkhole: none seen

Aquatic vegetation: none seenRust colored deposits: X drain hole in right tailrace wall stained with iron bacteria

Other:Sediment in Flow: none seen

Flowrate: 1 gpm in right toe ditchLocation:

Action Suggestion 1. Requires immediate action 2 . Plan to do soon 3 . Do when convenient

Additional Comments:

Date: 02/13/18 Page 4 of 11

not hummocky, but certainly hydric soils

right toe ditch, increasing wetness with southward directiontoe ditch bottom was wet, some ice covered areas, some seeping water

Toe was seeping even after weeks of below Zero F temps1 gpm in ditch

Left end of embankment

snow cover obscured areas between riprap so this could not be inspected

The embankment increases in height to EL 940.79 at far right end of property

no obvious embankment deformity seen and embankment is generally straight

Too narrow, about 4 feet at narrowest

Two to three inch lower area about 63 feet north of north powerhouse wallEL 939.63 NAVD88 is lowest found crest pointJust north of powerhouse

Action

light riprap U/S slope; medium riprap D/S of STH 13

Notes/ Observations

EMBANKMENTS (Cont.)

U/S = Upstream; D/S = Downstream

N= Noted; P= Photo; M= Monitor

Friendship Dam F.F #: 01.01

A second trip was made to site on 2/16 after snow melt to check embankments

I= Investigate; R= Repair

Dam Inspection Checklist

F.F.= Field File; RT = Right; LT = Left

Page 9: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

ActionItem N P M I R

1 Fixed Crest No problem X Not applicableA. Dimensions 8

Top Width:Crest Elevation:

B. Materials 8

C. Shape (sharp-crested,

broad-crested, ogee, chute, gated,

overflow, morning glory,

dropbox, labyrinth)

D. DebrisPrevention (racks, booms, etc.):

E. Concrete Condition * X 9 3

F. Flashboards (none, number):

Type (Metal, wood):Dimensions:Operability:

G. Abutments Condition: *

Seepage/wetness:

H. Drains No problem Not applicableType: Weep holes, Relief

drains, Other:________Flow Rate:

I. Other

Controlled = Gated

*

F.F #: 01.01 Page 5 of 11

The right training wall for the construction closure is severely deteriorated. Concrete ismissing from 30% of the upstream wall surfaces, up to 12 inches deep in a 29.5" thick wall.

Uncontrolled = Overflow

Could not inspect

U/S = Upstream; D/S = DownstreamF.F.= Field File; RT = Right; LT = Left

It appears that this concrete wall between the powerhouse and the embankment is a closure wall, used to divert the stream during

filled with concrete. The closure wall has been raised 18" since originally placed. A cold joint exists along the right side ofdam construction. On the downstream face of the wall, two angles used to allow timber stoplogs, but these angles are now

Additional Comments:

SPILLWAY--PRINCIPAL - FIXED CREST

overtopped, thus initiating dam failure.

See above notes

Type of Concrete Problems: Spalling, cracks, exposed rebar, misalignment, joints, bug holes, efflorescence, popouts,

Date: 02/13/18

photograph 8. This cannot be a fixed crest weir because overtopping of this wall would occur only when the embankment was

Dam Inspection Checklist

Action Suggestion 1. Requires immediate action

3 . Do when convenient

none found

N= Noted; P= Photo; M= MonitorI= Investigate; R= Repair 2 . Plan to do soon

Friendship Dam

honeycombing, scaling, craze/map cracks, isolated crack, disintegration, other

Notes/ ObservationsCould not inspect

Contrary to the 2016 inspection report, there is NO fixed crest concrete spillway. This is a concrete wall equal height to the embankment. This appears to be the construction closure.

n/a

Concrete wall 11.25" wide and 2 ft above adjacent grades. Slots for closure logs on D/S face

Page 10: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Action Item N P M I R

1 Gates No problem Not applicableA. Types (lift/slide, tainter(radial), X

stoplogs, leaf, roller,

flashboards, needles, other):

Number and Size:B. Stoplogs X 10

Dimensions:Condition:

C. Abutments X 8 3Condition: *

Seepage/wetness:D. Piers (number, shape) X

Condition: *E. Operability X 10 3

Type of Operator:Condition(chain, cables,hoists):

Security(locked?):Backup Operator:

F. Access X

G. Condition X 11 3Rust:

Seals (leakage): H. Ice protection X 11 1Type (Heaters, Bubblers, Barriers, Other)I. DebrisPrevention (Rack, boom, etc.)

J. Condition of Flowway X 12 3

K. Drains XType (Weep holes/ Relief drains/

Other):Flow rate:Location:

L. Other X 13 3

Controlled = Gated

*

F.F #: 01.01 Page 6 of 11

Type of Concrete Problems: Spalling, cracks, exposed rebar, misalignment, joints, bug holes, efflorescence, popouts,

2 . Plan to do soonF.F.= Field File; RT = Right; LT = Left 3 . Do when convenient

good, inside locked fence

rusted chain; hoist paint in fair condition

1 pointed parabolic nose with angle iron at tip

One 12 ft wide tainter gate

0

Downstream flowway has severe concrete deterioration

Weep holes in downstream walls have iron bacteria staining but no flow today

seals are flat flap seal and leak significantly (note ice rooster tail along side walls)

None. Ice has built up on gate to point that gate is no longer safely operable.

gate is unpainted on upstream side

Could not inspect

SPILLWAY-PRINCIPAL - GATES Notes/ Observations

Right downstream tailrace wall is 16 feet high and has signficant spalls.

Slots are 5.375 by 11.75 inches and 167.5 inches out to outokay but rough on sealing surface

moderate concrete spall with significant section loss at right U/S training wall end

Date: 02/13/18

NoYes, locked chain

manual chain drum hoist

45 deg. U/S training wall has 1:12 batter on each side; has 19" wide top

Some areas of walls have lost 6 to 12 inches of concrete and no reinforcement is seen.

Gate is sole flood passage method and must be deiced before spring floods arrive.

Additional Comments and/or Sketch:

None.

U/S = Upstream; D/S = Downstream

I= Investigate; R= RepairN= Noted; P= Photo; M= Monitor

Uncontrolled = Overflow

Friendship DamDam Inspection Checklist

honeycombing, scaling, craze/map cracks, isolated crack, disintegration, other

Action Suggestion 1. Requires immediate action

Page 11: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Action Item N P M I R

1 Outlet Erosion Control X No problem Not applicableA. Type (none, endwall, plunge

pool, energy dissipation structure

rock lined channel, apron)

B. Scour

C. Material a. Riprap: Avg Diameter:

Condition (adequate, sparse,

displaced, weathered):Bedding fabric- (Yes/ No):

b. Concrete *Dimensions/Location:

D. Sidewall/Headwall X 6 3Misalignment:

Location:Description:

E. Separated Joint / Loss ofJoint Material:

Location:Description:

F. Natural X

2 Undermining X No problem Not applicableLocation:

Description:

Controlled = Gated

*

F.F #: 01.01 Page 7 of 11

Could not inspect

Surveys of STH 13 bridge have not noted scour but DOT has added riprap over the years

12" angularadequate but too steep near tailrace wing walls

none seentailrace walls are in good condition

SPILLWAY--PRINCIPAL - OUTLET EROSION CONTROL & UNDERMINING

Notes/ ObservationsCould not inspect

The spillway apron continues through bridge and then discharges to natural plunge pool

Additional Comments:

Bridge approach wall is 2.5" out of alignment but tailrace wing walls are not moving

Friendship Dam

honeycombing, scaling, craze/map cracks, isolated crack, disintegration, other Type of Concrete Problems: Spalling, cracks, exposed rebar, misalignment, joints, bug holes, efflorescence, popouts,

U/S = Upstream; D/S = Downstream Uncontrolled = Overflow

N= Noted; P= Photo; M= Monitor Action Suggestion 1. Requires immediate action I= Investigate; R= Repair 2 . Plan to do soon

DOT has not reported any undermining of apron in their inspections

Dam Inspection Checklist

3 . Do when convenient

Date: 02/13/18

F.F.= Field File; RT = Right; LT = Left

none seen

apronnatural pool, appears to be >8 feet deep in center but within 2 feet of apron grade at end of

Page 12: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Item N P M I R1 General None found Does not have one

A. Type of lake drain X 14 3(isolated control/intake tower,

valve vault with outlet conduit

valve in riser/drop inlet siphon):

Size:B. Operated (Yes/ No) 3

2 Lake drain componentsA.Concrete structure

Location:Description:*

Condition:* B. Valve control (operating 3device):No operating device; No stemBent/Broken Stem; Access

Other:Operability:

C. Valve/Sluice gate 3Quantity:

a. Metal deterioration (surface

rust, minor, moderate, extensive,

other): Location:Flow rate:

b. Misalignmentc. Leakage - Flow rateD. Outlet conduit

Size: 3x3 concreteMaterial:

Condition:E. Energy dissipater

Type (endwall, plunge pool

impact basin, stilling basin,

rock-lined channel, none):Condition:*

*

Date: 02/13/18 Page 8 of 11Friendship Dam

Additional Comments:U/S = Upstream; D/S = Downstream

Type of Concrete Problems: Spalling, cracks, exposed rebar, misalignment, joints bug holes, efflorescence, popouts, honeycombing, scaling, craze/map cracks, isolated crack, disintegration, other

Dam Inspection Checklist F.F #: 01.01

Concreteend looks okay

3 . Do when convenient

N= Noted; P= Photo; M= MonitorI= Investigate; R= Repair

Action Suggestion 1. Requires immediate action 2 . Plan to do soon

F.F.= Field File; RT = Right; LT = Lef

uses common apron and natural plunge pool downstream of bridge

could not inspect

Single panel of 40x55 inch dimensions, made from 4x4s

LAKE DRAINS

ActionNotes/ Observations

(Low level outlet, not a principle or aux. spillway)

A lake drain has an outfall on the bottom right toe of the tainter gate ogee.

The gate operator could not be located. The dam owner did not know about it.

could not inspect

No operating device, if used for flood capacity, this must have dedicated hoist

3x3 feet at downstream end, 4x3 feet at upstream end (broken back culvert)

Page 13: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Item N P M I R1 Est. Capacity (Kw): X 15 1 2

Date last used:Current Use:

2 Item: X 16 3A. Headrace general

Gates/ Trashracks:Vegetation/ Erosion:

Sloughs/Slides/Cracks:Seepage Wetness:Rodent Burrows:

Concrete:B. Tailrace X 14

Scour:Vegetation/Erosion:

Sloughs/Slides/Cracks:Seepage wetness:Rodent burrows:

Concrete:C. Foundation: general X 17

Concrete:Seepage:Integrity:

D. Superstructure X 3 3Condition:

Date: 02/13/18 Page 9 of 11Friendship Dam

n/a

See spillway tailrace as this is a common structure for both flows

ActionPowerhouse/ Mill Building

Notes/ Observations

2016? Not generating currently but wicket gates jammed open (see below notes)0 now

headrace concrete appears in good conditionn/a

No visible cracks in headwall or headrace or turbine pit walls

F.F #: 01.01

I= Investigate; R= Repair 2 . Plan to do soon

Photo 18 shows upstream face of headgate. Gate is rusted and small portal gate has unknown purpose.

Additional Comments:

Some staining on walls, either from roof leak or brick seepage (check roof and tuckpoint)

3 . Do when convenient

Dam Inspection Checklist

N= Noted; P= Photo; M= Monitor

Trashrack is 30% plugged with ice and debris. Head on rack is >12" which is probably more than design load. Remove debris.

Headrace is 7 foot wide inside finish and has 4" slot for raising headgates downstream of trashrack. Two gates (side by side) and one gate has 12" round port gate in it (photo 18). Inspector was unsure of purpose for having two gates and portal gate.

There is an access hole in the NE corner of PH and a camera was sent down this to look inside turbine pit. Manhole grab rungs provide entry but this area was not entered by inspector (possible confined space). Instead a camera was sent down with light.

Woodward No. 21 Rotary Governor per nameplate. Wicket gates were set at 50% open, and previous dam owner told new owner that a log or something was stuck in the wicket gates so they cannot be closed. Running the turbine at no load and at drawn down conditions may create maintenance issues for bottom thrust bearings and any intermediate water cooled bearings (if applicable, could not see any with camera). New owner reports that oil reservoir for top bearing is loosing oil slowly, so this may be excaserbated by no load operation of unit. Remove jam in gates and consult mechanical expert about turbine lubrication requirement. Photo 17 shows turbine pit.

Electrical may still not meet current code, and electrical hazards may exist. Inspector is not an electrician, but owner should consider having electrical inspected and updated as required

Action Suggestion 1. Requires immediate action

U/S = Upstream; D/S = Downstream

1/2" crack in brick façade in NE corner near abandoned chimney - monitor crack width

F.F.= Field File; RT = Right; LT = Left

Concrete looks to be in good condition as viewed through camera on pole in turbine pitnone seengood

several windows and bottom of entry door are broken. Fix door and windows.

n/a

4" thick head gates are 78" tall and split into two gates side by side. Trashrack is 2" spacing of 1/4x3" steel plates. Bottom of trashrack has 70% section loss and will need replacement.

Page 14: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Profile Leveling For: Instrument Person: Doug DJock, Ayres Associates

Rod Person: Doug DJock, Ayres Associates

Instrument Used: Note Taker: Pete Haug, Ayres Associates

Weather Conditions:

STATION B.S. + H.I. F.S. - ELEV.(measured)

ELEV.(plans)

REMARKS

Comments:

Low EmbankmentLt. GroinRt. GroinOutlet Pipe Invert

2/13/2018 Page 10 of 11

FIELD BOOK

D/S Channel (at toe) AbutmentsAux. Crest LT Aux. Crest RT

F.F #: 01.01Friendship DamDam Inspection Checklist

CrestHW Sill

Suggested Survey points:

TW

Downstream right bank abutment of STH 13 bridge over Little Roche A Cri. BM is not shown on WisDOT plans but is an embedded disk in top of concrete parapet wall.

Bench Mark Information (Location, Elevation, Datum):

939.49

933.54

933.25 Bridge deck at NE corner

Headwater (drawn down condition)

Tailwater

940.99

919.39

939.63 Low point of embankment crest

NAVD88

Overcast, 31F, 4 inches of snow cover

BM on STH 13 D/S RIGHT PARAPET935.75

941.53 Upstream deck of spillway gate

916.47

Top of sheet pile at left end of embankment

Tailrace Apron

Right end of embankment crest

Friendship Dam

RTK GPS with WISCORS

Page 15: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

Date: 02/13/18 Page 11 of 11Dam Inspection Checklist

Friendship Dam F.F #: 01.01

SKETCH (NORTH IS UP)

BM‐‐>

Low Pt‐‐>

Low Pt‐‐>

<‐‐ FLOW

Page 16: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 Friendship Dam 

0006202131801.jpg 

Permanent monument on bridge 

 

 

 Friendship Dam 

0006202131802.jpg 

Looking south at tailrace 

 

 

Page 17: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 Friendship Dam 

0006202131803.jpg 

One habitable structure likely in dam failure shadow (creek is 200 feet to left) 

 

 

 Friendship Dam 

0006202131804.jpg 

Looking north along toe ditch (seepage is in bottom left corner) 

Page 18: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 Friendship Dam 

0006202131805.jpg 

Looking south along upstream face of embankment 

 

 

 Friendship Dam 

0006202131806.jpg 

Looking north at displaced approach wall of bridge 

 

Page 19: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 

 Friendship Dam 

0006202161807.jpg 

Looking east at low spot in embankment (left quarter point of photo midline) 

 

 

 Friendship Dam 

0006202131808.jpg 

Looking at dewatered upstream of dam 

 

 

Page 20: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 Friendship Dam 

0006202131809.jpg 

Guide wall showing severe concrete deterioration at and below waterline 

 

 

 Friendship Dam 

0006202131810.jpg 

Looking downstream iced up spillway gate 

 

 

Page 21: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 Friendship Dam 

0006202131811.jpg 

Looking upstream at spillway gate (note ice in bottom right) 

 

 

 Friendship Dam 

0006202131812.jpg 

Looking down at powerhouse discharge works 

Page 22: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 

 Friendship Dam 

0006202131813.jpg 

Looking upstream at turbine discharge pit of powerhouse 

 

 Friendship Dam 

0006202131814.jpg 

Looking upstream at low level outlet in upper right of photo 

 

Page 23: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 

 Friendship Dam 

0006202131815.jpg 

Looking inside of powerhouse 

 

 Friendship Dam 

0006202131816.jpg 

Looking downstream at trash rack for powerhouse 

Page 24: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge

 

 

 Friendship Dam 

0006202131817.jpg 

Looking downstream at turbine bay 

 

 Friendship Dam 

0006202131818.jpg 

Looking downstream at headgate to powerhouse 

 

Page 25: Joe Behlen, Dam Safety Engineer - Friendship Lake · 2018-06-12 · Light Steel ped bridge in park 0.07 mi D/S. CTH N P-01-0046 timber trestle bridge 2 mi D/S. UPRR trestle bridge