Joe Boivin Cormetrics Limited
Transcript
Page 1: Joe Boivin Cormetrics Limited

Joe Boivin Cormetrics Limited

Page 2: Joe Boivin Cormetrics Limited

Failure Occurrence Proper System Design and Startup Cautionary Tale I Sound Management ◦ Good production practices ◦ Cost effective corrosion inhibition ◦ Effective monitoring

Cautionary Tale II Aging Systems Cautionary Tale III

Page 3: Joe Boivin Cormetrics Limited

Most pipeline failures caused by internal corrosion

Improved QA in steel and pipe mills Improved construction practices Improved mitigation technologies Aging infrastructure More aggressive environments

Page 4: Joe Boivin Cormetrics Limited
Page 5: Joe Boivin Cormetrics Limited
Page 6: Joe Boivin Cormetrics Limited

Failures early in service life more likely to be materials related

Later failures almost certainly corrosion unless service conditions change drastically

SCC an amalgam of both

Page 7: Joe Boivin Cormetrics Limited

Corrosion ◦Inadequate inhibition, inadequate solids removal, production of completion fluids to pipeline

Inadequate Design ◦Failure to address mechanical and/or thermal stresses, improper anchoring, improper backfilling specification

Faulty Construction and Inspection ◦Welding faults, high installed stresses, inadequate pipe support, backfilling, and inspection

Improper Operation ◦Operating outside of design, no consideration for operational changes, inadequate records

Page 8: Joe Boivin Cormetrics Limited

20 7 16 155 1110

154

18

Internal Corrosion External CorrosionDamage by Others Construction DamageWeld Failure Earth MovementOverpressure Pipe Body FailureValve Failure Other

All sour gas pipeline incidents, 1991-2001 inclusive 247 failures total, of which: 214 were leaks, 21 were ruptures, 12 were hits.

Page 9: Joe Boivin Cormetrics Limited

Age of Sour Gas Pipeline Failures, 1997 - 2001

08/23/1996

03/11/1997

09/27/1997

04/15/1998

11/01/1998

05/20/1999

12/06/1999

06/23/2000

01/09/2001

07/28/2001

02/13/2002

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

Age (0 equals a failure in same calendar year as construction)

Failu

re D

ate

Page 10: Joe Boivin Cormetrics Limited

323.9 x 9.4 mm pipe 323.9 x 17.1 mm riser 30% H2S, dehyd. 10 days service SSC on pipe side Small root bead flaw

Page 11: Joe Boivin Cormetrics Limited

323.9 x 9.4 mm pipe 323.9 x 17.1mm riser 30% H2S, dehyd. 10 days service SSC on pipe side Small root bead flaw

Page 12: Joe Boivin Cormetrics Limited

Avoid Spent acid Methanol batching System Gas and Fluid Analysis Flow modelling and Risk Assessment Corrosion inhibitor selection Commissioning batch inhibition Corrosion monitoring system

Page 13: Joe Boivin Cormetrics Limited

Factor Temperature 59 Pressure 2528 kPa H2S 17% CO2 2.85% Failure corrosion rate 175 mm per year

Page 14: Joe Boivin Cormetrics Limited

Acid used in wellbore cleanup entered flowline

Solids Concern over flaring/rush to production

Inadequate commissioning batch Indiscriminate use of methanol Insufficient continuous corrosion inhibitor

Page 15: Joe Boivin Cormetrics Limited

Pipeline Operating Manual Pipeline Integrity Manual Chemical application procedure Pigging procedures Hydrate control (Methanol, Line heat) Well fluids control after workovers Management of Change

Page 16: Joe Boivin Cormetrics Limited

Product effective and compatible with system Clean system Management of change Continuous added at effective concentration No interruptions Batch protocols adhered to Pitting damage is forever

Page 17: Joe Boivin Cormetrics Limited

Extremely damaging to inhibitor films

Introduces oxygen Damages protective sulfide films Condenses with water Retains acid gases Methanol – use only inhibited product

Page 18: Joe Boivin Cormetrics Limited
Page 19: Joe Boivin Cormetrics Limited

sour gas stream from a compressor rich in hydrocarbons and has a CO2 of 4.8 %

and 1.4% H2S. discharge 5200 kPa exit temperature of about 35 oC. laminar flow with long water transit times water and condensate volume of about 0.6

m3 per day. methanol is injected at the compressor

discharge for hydrate control.

Page 20: Joe Boivin Cormetrics Limited
Page 21: Joe Boivin Cormetrics Limited
Page 22: Joe Boivin Cormetrics Limited

Failure caused by CO2 attack Wet gas cooled rapidly after compressor discharge Water drops condense in the top quadrant of the pipe Water pH well below 4 Corrosion rate of 100 mpy based on deWaard

Milliams model. Hydrocarbon condensing from gas stream and

creating a layer in the bottom. Once the water droplets reach the condensate layer,

they will fall to the bottom of the line without creating any further corrosion to the walls which are now hydrocarbon wetted.

Page 23: Joe Boivin Cormetrics Limited

NACE RMH SEMINAR 23

People Pipelines Reliability Issues ۷ Chemicals needed for continued function

۷

More frequent Inspections required

۷

Unexpected Failures ۷ Paying for Past Sins ۷

Page 24: Joe Boivin Cormetrics Limited

40 e3m3 per day of gas (21% H2S, 2% CO2) 50 m3 of condensate 20 m3 per day of produced water (50K TDS) Pressure 1400 kPa Temperature 27 oC. Laminar flow Batch corrosion inhibitor 5 L/d continuous corrosion inhibitor

Page 25: Joe Boivin Cormetrics Limited
Page 26: Joe Boivin Cormetrics Limited
Page 27: Joe Boivin Cormetrics Limited
Page 28: Joe Boivin Cormetrics Limited
Page 29: Joe Boivin Cormetrics Limited
Page 30: Joe Boivin Cormetrics Limited
Page 31: Joe Boivin Cormetrics Limited
Page 32: Joe Boivin Cormetrics Limited

Poor shut in protocols, brine remained in the system

Batch protocols-poor inhibitor coverage at onset due to pig launch procedures

Poor management of change –increases in water production not matched by inhibitor adjustments

Page 33: Joe Boivin Cormetrics Limited

Pay attention to changes in production Limit or mitigate shut in time Review corrosion inhibitor programs Monitor changes in water chemistry and microbiology

Monitor corrosion and inspect critical lines

33

Page 34: Joe Boivin Cormetrics Limited

Early nurturing important-avoid work over fluids, well-designed inhibition and commissioning batches

Management of changes in production volumes and system chemistry

Use of inhibited methanol Corrosion monitoring Effective corrosion inhibition

Page 35: Joe Boivin Cormetrics Limited

Thank you Questions?