Joe Rodota- Ives Connector Project Sebastopol Complete Streets Advisory Committee May 20, 2014
Transcript

Joe Rodota-Ives Connector

ProjectSebastopol Complete Streets Advisory CommitteeMay 20, 2014

Should be…•Direct•Safe•Public•Useful!

Four Alternatives Identified

Alternate Route ComparisonsRoute Who? Direct

?Currently Used?

Lighted Crosswalks

Accessible?

Safe?

Public?

Score

**A. “Petaluma Avenue Lot / Burnett”

Ped/Bike

B (1400 ft.)

B 1 A B A C+

B. “South Main / Burnett”

Ped only

C(1450 ft.)

C 2 C A A C-

C. “Willow / Calder”

Ped/Bike

A(1140 ft.)

C 2 F A A C-

D. “South High Lot”

Ped/Bike

A(1145 ft.)

A 2 D D F D

Recommended:Route A. “Petaluma Avenue Lot/Burnett”• Pro• Most accessible • In use• Public

• Con• South Main and Burnett crosswalk• Less direct• Parking lot traffic


Recommended