+ All Categories
Home > Documents > John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily...

John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily...

Date post: 05-Nov-2019
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
70
John Comey B.Eng. M.Eng. M.Sc. MIEI Comsec Protection Systems Ltd.] IOSH Regency Hotel 17th June 2015
Transcript
Page 1: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

John Comey B.Eng. M.Eng. M.Sc. MIEI Comsec Protection Systems Ltd.]

IOSH Regency Hotel

17th June 2015

Page 2: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person” in building life safety systems, or those who advise, train or audit building users/owners/occupiers on fire safety.

Manager/Owner/User Responsibilities:

Assessing competence of service providers

Proper certification of systems

common deficiencies in life safety systems

Page 3: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

1. Introduction (background)

2. User Responsibilities

3. Reducing False Alarms

4. Fire Detection and Alarm Systems (IS.3218:2013) i. Sound Levels

ii. Zone charts

iii. Callpoints

iv. Detectors/ System Categories

v. Cabling

5. Certification Overview (Fire Alarm )

6. Fire Alarm Maintenance & Testing

7. Emergency Lighting Standard IS3217:2013

8. Certification Overview (Emergency Lights )

9. Em. Lights Maintenance & Testing

10. Competency: i. (Emergency Lights )

ii. Fire Alarm

iii. 3rd Party Certification

iv. Lessons to be learned

v. Future Improvements

Page 4: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 5: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Are they recognised?

Are They Heard?

Do people have confidence in the system?

Page 6: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Alarm Recognition test

Page 7: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Temporal-3 (ISO 8201)

Page 8: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

French Fire Sound

Page 9: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Fire Bell

Page 10: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Temporal-3 (ISO 8201)

French Fire Sound

Fire Bell

All valid fire Alarm sounds under Irish Standard 3218 (Tone Between 500Hz - 1000Hz)

Page 11: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

The need to devise a unique, universally recognizable fire alarm signal has been discussed for many years.

The temporal 3 pattern, described by ISO 8201, has been adopted in North America.

T-3 does not limit the signal to any one sound (such as a bell, horn, chime or electronic sound). It is instead a specific sound pattern.

T-3 had been in compulsory in Canada since 1995, and the following study shows interesting results.

Page 12: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

0

20

40

60

80

100

Heard Signal

Before

Correctly

Identified

Public Recognition Levels

(Canadian study)

Car horn

Reverse alarm

Buzzer

T-3

Bell

Slow Whoop

Study conducted by Dr. Guylène Proulx of IRC's Fire Risk Management Program and Dr. Chantal Laroche of the University of Ottawa

Page 13: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

People are unlikely to take action when alarm signal is activated.

Social interactions tend to occur first:

people observe what others are doing and if no one is paying attention to the alarm, they are reluctant to take any action that would make them appear out of place or over-reacting.

“Visitors” to large public buildings generally feel it is their role to wait for instructions from staff or a figure of authority. They expect to be told what to do if something truly serious is happening.

Proulx Strategies for Ensuring Appropriate Occupant Response to Fire Alarm Signals

https://www.nrc-cnrc.gc.ca/ctu-sc/files/doc/ctu-sc/ctu-n43_eng.pdf

Page 14: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Research by the University of Ulster, found that staff response had the most determining effect on the occupant’s time to start their evacuation.

They conducted unannounced evacuations of Marks & Spencer’s stores, floor staff were not aware of the drill. The fire alarm was activated in the entire store. Video cameras were used to record the behaviour and movement of occupants. Questionnaires were administered to evacuees after the drill. When Interviewed 52% of occupants said that they were prompted to evacuate, only when requested to do so by staff. The average time to start moving for customers after the sound of the alarm was 25 s with a maximum of 55 s.

Reference: Boyce, Silcock, Shields, University of Ulster “Fire Evacuations in Retail Stores”

Page 15: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

1. Use Consistent Alarm Signal Pattern, and ensure building occupants are familiar with sound. 2. Develop a fire-safety plan and post it in strategic locations. 3. Conduct evacuation drills twice every year. 4. Limit the number of nuisance alarms to less than three per year. 5. Quickly change the ambience of the environment when the fire alarm sounds. 6. Use live messages, aided by closed circuit television if possible, to broadcast precise information to occupants. 7. Train floor fire wardens to prompt occupant movement. 8. Give feedback to occupants on any alarm activation.

Items 2-8 by Guylène Proulx Strategies for Ensuring Appropriate Occupant Response to Fire Alarm Signals Construction Technology Update No. 43, Dec. 2000

Page 16: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 17: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 18: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Fire Alarm IS3218 Definition:

• [The Responsible Person is the] person having control of the building and/or premises, whether as occupier or otherwise, or any person delegated by the person having control of the premises to be responsible for the fire alarm system and the fire procedures:

Fire Alarm IS3218 Clause 9.1.1.1

The person having control over the premises shall ensure that work necessary to maintain the system is carried out and that records referred to in 7.3.5, 7.5 and 9.2, are maintained. This should be done by appointing a responsible person (see definition) to supervise the system. The responsible person should have sufficient authority to ensure that the above measures are taken.

Page 19: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Clause 7.3.5 : building is Suitable managed to avoid false alarms.

Every event is recorded in a Logbook.

All events notified to Maintenance/Service personnel for advice/resolution.

Clause 7.5 Action by the User to limit false alarms:

Clause 9.2 Servicing and maintenance

Page 20: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

9.2.1. ... The Responsible Person shall ensure in accordance with statutory requirements that a FDAS is inspected, maintained and serviced by a Competent Person in accordance with this Standard. ...

Maintenance Schedule ( I.S. 3218:2013 9.2.2.x)

Daily Visual Inspection by user. Test at least one device weekly by user. ( A different zone should be tested each week and no more than 13 weeks between zones). Servicing/Testing by competent person should happen quarterly, (+/- 4 weeks) It requires testing of 100% of the system annually, usually in 25% blocks. At least once a year sound levels checked. Every Event Logged, and steps taken to rectify problems. Additional Servicing e.g. Following fire alarm

Page 21: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Emergency Lighting:

Clause 15 Managerial responsibilities

It is the responsibility of the owner/occupier/management of the building to ensure that the emergency lighting system is maintained in accordance with Clauses 14 and 16.

Clause 14 Handover documentation and logbook

Clause 16 Commissioning, maintenance, inspection and testing

Page 22: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Check Logbook to confirm previous repairs complete.

Check indicators on central battery system.

Check indicators on automatic test systems

Record any deficiencies in Logbook.

IS3218 Clause 6.2.1

Page 23: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Check the following on at least 25% of system:

Visual check each lamp in maintained/sustained system. Check status LED on self contained or stand alone self-test systems Ensure lamps are replaced.

100% should be tested over 4 week period. (note in 2008 100% inspected weekly)

Page 24: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 25: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

The “Cry Wolf” syndrome occurs when someone is subjected to a high ratio of false-to-real alerts When a real (fire or other threat) activation of the alarm system occurs, occupant response and behavior depends on their confidence in the system. The “Cry Wolf” syndrome causes occupants to question the validity of the alarm. Any strategy to reduce the ratio of false-to-real alerts is likely to increase occupant confidence in the system or at least reduce the loss of credibility. Systems that are properly designed, installed and maintained tend to be very stable and free of false and nuisance alarms.

Fire Protection Engineering Magazine Autumn 2003 “Fire Alarm Testing Strategies Can Increase Occupant Response and Reduce the "Cry Wolf" Syndrome”

Page 26: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Analogue – Addressable preferable due to better signal analysis.

Systems controls should be locked, and alarm dealt with by suitably trained personnel.

Log and track all system events.

Procedures in place for “Hot Work”.

Compatible interconnected systems installed throughout building.

Page 27: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Design Stage:

Competent designers: (Is3218 2013 6.2.9) Ideally, a single party should maintain overall responsibility for the system design, development and implementation process. Where a single party does not maintain overall responsibility, the verification process

set out in 7.5.11.2 should be considered for inclusion in the specification.

Careful use of standards.

Documented variations allowable with risk assessment.

Appropriate detector choice for environment:

Take into account the evacuation strategy to be achieved.

Page 28: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

New Limit table

Page 29: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 30: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Published 17th December.

Old standard revoked on that date. All new systems to be designed/installed to IS3218:2013

Works “in progress” with fire certificate already granted may continue with old standard but new certificates must be used stating the 2009 revision of the standard used for the design and installation.

Where reasonably practicable new standard should be used.

I.S.3218:2013 Clause 4

Page 31: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

All existing systems should be Serviced/Maintained in accordance with IS3218:2013 standard.

No Requirement to upgrade old systems to new standard unless, a) the owner agrees to a fully up-to-date installation, or

b) the existing installation cannot be incorporated in a new system and would detrimentally affect either its operation or the effective operation of the new upgrade, or

c) an upgrade is required by a Fire Safety Certificate under the Building Control Regulations for material alterations, extensions or change of use of the premises. (IS3218 Clause 4)

Page 32: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 33: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Irish standard 3218 is specific about the sound level requirement:

65 dB(A) or 5 dB(A) above background noise (whichever is higher).

To wake a sleeping person 75 dB(A) at the bed head.

In all accessible areas of the building.

Tone ideally between 500 and 1000 Hz

Exceptions: “Allowable Variations” to minimum level added to standard in 2013 to 60dB(A) for non residential areas i.e. in stairwells, corridors <3m, and Enclosures < 25m2

Use of other codes e.g. Should be noted on design cert where thy deviate from IS3218 e.g. HTM05-03 Part B areas where patients require assistance to evacuate 45 –55 dB(A), (should be listed as variation on design cert).

Page 34: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

“Allowable Variations” to minimum level added to standard in 2013 for non residential areas:

in stairwells, corridors <3m, and Enclosures < 25m2. sound level reduced to 60dB(A)

in enclosures between 25 m2 and 60 m2 sound levels as per figure 2

Use of other codes e.g. Should be noted on design cert where thy deviate from IS3218

e.g. HTM05-03 Part B areas where patients require assistance to evacuate 45 –55 dB(A), (should be listed as variation on design cert).

Page 35: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

The installation of the fire alarm system to IS3218 L3X, escape routes and rooms leading onto escape routes.

Detectors in Stairwells, corridors and Apartment lobbies.

Internal layout, may contain numerous partitions and doors. Sounders in lobbies alone often not sufficient to reach required sound level in bedroom. Note: Different requirement for individual apartments’ (or houses’) stand alone “Domestic Systems” Lower limit of 85dB(A) in open bedroom door applies

sounder

Page 36: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Prefabricated Medical Records building.

Actual measurements, majority of sound absorbed by shelves

densely packed with paper.

1 2 3 45 6

11

12 13

ToiletToilet

Med Records Prefab

92 dB(A)64dB(A) 51dB(A)

67dB(A)62dB(A)66dB(A)

10m

Page 37: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

• Design considerations: • Sound strength is greatly influenced by

structure, finishes and contents.

• Systems are more likely to pass a sound level test in an empty building, than in a fully furnished one.

• Note sound level tests required annually (IS3218:2013)

• Usually a large number of quieter sounders gives a better overall sound level.

Page 38: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

(Clause 6.6.3) In buildings which are not permanently manned, the external sounder shall automatically silence after a period of 15 min*, but any visual indicator associated with the entrance or acting as guidance to the location of the control panel (see 6.12.3.2) shall continue to operate.

*Reduced from 30min since IS3218:2009

Page 39: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Each system shall comprise a minimum of two sounder circuits within the building (excluding the panel

ensure that no excessive sound level greater than 118 dB(A) are exceeded at any accessible levels.

*Reduced from 120dB(A) since 2009

Page 40: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Where it has been determined (on the basis of consideration of hearing impairment) that a visual alarm device (VAD) is to be employed then the VAD equipment shall comply with the requirements of I.S. EN 54-23.

Page 41: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 42: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Zone Chart: “On or adjoining to the CIE shall be a diagrammatic representation of the building (zone chart), showing at least the division into detection zones, and the Access and Egress points to the building”. (Clause 6.12.8.2 )

Page 43: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Required since 1989 standard.

How important are they?

How often do you see zone charts?

Also required in UK under their BS5839 standard. The following findings from a Scottish sheriff’s report into Rosepark Care Home fire illustrate their importance*.

*Reference: SHERIFFDOM OF SOUTH STRATHCLYDE DUMFRIES AND GALLOWAY Fatal Accident Inquiry http://www.scotcourts.gov.uk/opinions/2011FAI18.pdf

Page 44: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Rosepark Care Home Fire

10 People killed, January 2004.

Several factors found to have contributed to the deaths.

One being the delay in locating source of fire:

Building split across two levels.

Main Entrance on upper level.

Fire Panel Labelled “Ground Floor and Lower Ground Floor.

Staff used “ground” and “First”

Staff Searching Lower Level while fire was on upper level

Photo from BBC news website. http://news.bbc.co.uk/2/hi/uk_news/scotland/4213535.stm

Page 45: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

One of the findings of the report

“RP4.1: It would have been a reasonable precaution to have provided clear information at the fire alarm panel (and, in particular, a diagrammatic representation) such as would enable staff to identify quickly and accurately the location of the detector which had been activated.”*

*(SHERIFFDOM OF SOUTH STRATHCLYDE DUMFRIES AND GALLOWAY Fatal Accident Inquiry Report http://www.scotcourts.gov.uk/opinions/2011FAI18.pdf)

Photo from BBC news website. http://news.bbc.co.uk/2/hi/uk_news/scotland/4213535.stm

Page 46: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 47: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Configuration of manual call points for coincidence (double knock) operation shall be prohibited. (Clause 6.7.1).

Where manual call points with covers are used in a system then this shall be noted as a variation on the Certificate of Commissioning. (Clause 6.7.2).

Page 48: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Manual call points shall be located at all exits to open air (except as permitted in 6.7.3), on defined escape routes (to comply with travel distances), at all final exits, storey exits, accommodation stairways and within refuge areas.

Manual call points shall also be located in the stairwell enclosure unless:

a manual call point is located inside each storey exit, and

additional call points are located on selected stairwell landings as per Table 1.( Clause 6.7.2)

Page 49: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Some call point may be omitted if Less than 500m2 and protected by detection and subject to risk assessment.

Callpoint removed from

diagram in this revision

must be an error as it

contradicts text.

Page 50: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 51: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 52: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

CO detectors suitable for supplementing smoke detectors only.

Carbon monoxide fire detectors shall not be used as the primary detector for the purpose of detecting carbon monoxide as a toxic gas where generated by defective heating or other appliances (boilers etc). (Clause 6.9.5).

Page 53: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

levels remain unchanged: Manual call points only (Category M)

protection of escape routes only (Category L4 system),

protection of escape routes and adjoining rooms (Category L3 system),

protection of vulnerable areas with significantly high life hazard (Category L2/L3 or L2/L4 system),

and total coverage (Category L1 system).

Page 54: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Bedroom Bathroom

BedroomBedroomLiving

Kitchen Dining

Bath. Bath.

Control Panel

BG

BG

BG

Living

Page 55: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Bedroom Bathroom

BedroomBedroomLiving

Kitchen Dining

Bath. Bath.

Control Panel

BG

BG

BG

Living

S S

H

Page 56: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Bedroom Bathroom

BedroomBedroomLiving

Kitchen Dining

Bath. Bath.

Control Panel

BG

BG

BG

Living

S S

H S

S S

Page 57: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Bedroom Bathroom

BedroomBedroomLiving

Kitchen Dining

Bath. Bath.

Control Panel

BG

BG

BG

Living

S S

H S H

S S S

S H

S

S

s

Page 58: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Bedroom Bathroom

BedroomBedroomLiving

Kitchen Dining

Bath. Bath.

Control Panel

BG

BG

BG

Living

S S

H S H

S S S

S H

S

S

s

S

S

Page 59: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 60: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Void ≥ 800 mm

Treated as Normal Spaces:

Can be omitted on these conditions:

If “Low” fire risk found following a Risk Assessment.

with the agreement of the interested parties (see 6.2.8.4), is granted.

Must be recorded as a variation on the relevant system certificate.

voids ≤ 800 mm

Detection can be obmitted if “extensive spread of fire or fire products, particularly between areas, rooms or compartments, cannot take place within it before detection”.

Page 61: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Escape route voids less than 800mm must be covered unless the fire rating between the void and corridor is the same as the fire rating of the structure.

All voids onto escape route over 800mm must be covered.

Page 62: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

10% of Ceiling may

be up to this height

New Limit for

Enhanced

detectors

Page 63: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Horizontal limits remain unchanged

Page 64: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Room is 350 m2 therefore a minimum 4 detectors required (1 per 100 m2 ) i.e. one more than required by Table 2 Limits

35.0m

10

.0mS SS

6.0m 6.0m

12.0m 12.0m

0.5m

A

A

10

.0m

Elevation A-A

S

Page 65: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Room is still 350 m2 but the roof is now pitched at 220. Therefore a minimum 6 detectors is required. First 3 mounted at high point. Next 3 required so there are detectors no more than 7.3 meters from the wall. (table 2 limit increases by 1% per degree because of slope as per caluse 6.10.5.1 )

35.0m

10

.0m

S S

A

A

10

.0m

Elevation A-A

S

6.1

m

22 o

7.3

m

6.0m

12.0m 12.0m

6.0m

S S S

Page 66: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 67: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 68: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Opens onto

Escape Route.

Required L1 or

L3

Omitted by Risk

assessment

Provided less

than 2m2

Cubicle does not

reach to within

300mm of ceiling.

Page 69: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”
Page 70: John Comey IOSH - Comsec · IOSH Regency Hotel 17th June 2015 . This presentation is primarily aimed at Health & Safety professionals who fulfil the role of “Responsible person”

Clarification issued in 2010 incorporated into 2013 Revision:

“Standard” fire alarm cable is the minimum requirement i.e. Cable that passed En50200 PH 30 test.

Enhanced fire alarm cable i.e. Cable that passed both the EN 50200 PH120 and BS 8434-2 * tests. shall be employed in the following cases:

safe evacuation not within limits of fire authority.

Phased evacuation

cables routed trough different areas that may remain occupied.

Buildings over 30m

Places of assembly subject to risk assessment

(I.S.3218:2013 clause 6.2.3)


Recommended