+ All Categories
Home > Documents > JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Date post: 01-Apr-2015
Category:
Upload: chaya-conte
View: 212 times
Download: 0 times
Share this document with a friend
Popular Tags:
7
JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools
Transcript
Page 1: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

JOHNSON WING RENOVATION& BREEZEWAY

Manassas City Public Schools

Page 2: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Johnson Wing

Page 3: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Johnson Wing

Page 4: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Johnson Wing

Page 5: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Johnson Wing

Page 6: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Johnson Wing

Location of future Osbourn HS ballfields, support buildings, and

Johnson Wing connecting

breezeway/canopy

Location of new Baldwin School

Johnson Wing

Page 7: JOHNSON WING RENOVATION & BREEZEWAY Manassas City Public Schools.

Johnson Wing

Project Schedule:

Design Schedule: Aug 2013 – Dec 2013 Bidding period: Jan 2014 Award for construction: Feb 2014 Construction: Feb 2014 – Aug

2014 Occupy new space: Aug 2014 - Sep

2014 Construction of breezeway: Jun 2016 – Aug

2016 (with construction of Osbourn HS ball fields)


Recommended