Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

Date post: 15-Jan-2016
Category:
Upload: elysia
View: 39 times
Download: 0 times
Share this document with a friend
Description:
Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures. Summary and action list. D. Macina TS/LEA/INT. LEMIC 91. Machine protection at the LHC : ‘organization’. - PowerPoint PPT Presentation
Popular Tags:
24
1 Joint LHC Machine- Joint LHC Machine- Experiments Meeting on Experiments Meeting on Experiment Protection from Experiment Protection from Beam Failures Beam Failures Summary and action list D. Macina TS/LEA/INT LEMIC 91
Transcript
Page 1: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

1

Joint LHC Machine-Experiments Joint LHC Machine-Experiments Meeting on Experiment Meeting on Experiment

Protection from Beam FailuresProtection from Beam FailuresSummary and action list

D. Macina TS/LEA/INT

LEMIC 91

Page 2: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

2

Machine protection at the LHC :Machine protection at the LHC :‘organization’‘organization’

• Machine protection activities of the LHC and the SPS are coordinated by the LHC Machine Protection Working Group (MPWG), co-chaired by R. Schmidt & J. Wenninger.

• The MPWG WEB site (only from inside CERN !)http://lhc-mpwg.web.cern.ch/lhc-mpwg/

• The detailed description of the commissioning of the LHC Machine Protection System and the record the test results is the mandate of the Commissioning of the Machine Protection System Sub-Working-Group. It reports to the LHCCWG. Web site:

http://lhccwg.web.cern.ch/lhccwg/MPS/mps.htm• New :

• The MPWG has asked each LHC experiment to provide a contact person (BISU) to interface on machine protection issues between machine and experiments. Antonello Di Mauro (ALICE)Siegfried Wenig (ATLAS)Alick Macpherson (CMS)

Richard Jacobsson (LHCb)Anne-Laure Perrot (LHCf)Mario Deile (TOTEM)

Page 3: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

3

ProgramProgram

Page 4: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

4

Safe beamSafe beam

The MPWG has adopted for the LHC a limit for safe beams (nom. emittance) of

1012 protons at 450 GeV ( <~ Cu melting point)1010 protons at 7 TeV (scaled from 450 GeV) - under

discussion!!

Standard procedure: if empty machine => inject pilot bunch (5x109 p) BUT it is technically possible to inject a safe beam into an empty machine (no interlock forbids it)

If safe beams no injection protection required and, in case of circulating beam, absorbers and collimators at relaxed settings/not required. Safe beams are used for the fine tuning of the machine protection elements at each new fill.

Some interlock may/will be masked IF and ONLY IF beam is safe

Page 5: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

5

Beam cleaningBeam cleaning

The protons that are lost must be intercepted with very high efficiency before they can quench a superconducting magnet : collimation!

Unlike HERA, TEVATRON, RHIC.. the LHC cannot be operated without collimators (except at injection with low intensity).

At the LHC the collimators must define the aperture (primary + secondary) which has an important impact for MP : for most multi-turn failures the beam will hit collimators first !

Page 6: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

6

Machine Machine ApertureAperture

6

450 GeV

7 TeV, * 0.5 m

Vertical axis :Machine aperture in units of beam sigma (), including alignment errors and other tolerances.

Horizontal axis :Longitudinal position on left side of ATLAS (seen from the ring center).Arc

ATLAS

Injection :•Aperture limit is the LHC ARCs (~ 7-8 ).•The triplet magnets in front of ATLAS/CMS are slightly behind the ARC (~ 8-9 ).

Collimators @ ~5-6 !

Collisions, squeeze to * 0.5 m :•Aperture limit is defined by the triplet magnets in front of ATLAS/CMS (~ 8 )..

Collimators @ ~6 !Triplet

Experiments-Machine WS / June 07

End of the squeeze (* < 6 m) bottleneck in the triplets => TCT needs to be closed

Page 7: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

7

Additional general itemsAdditional general items

Software interlock– The reaction time of this system will be at the level of a few seconds.– The systems rely entirely on the machine technical network,

databases, etc – clearly not as safe as HW systems !– The Injection SIS will complement the Injection Interlock

Systems:• - Active from the beginning.• - Stops injection through the Injection Interlock Systems.• -Receives the experiments injection inhibits, either through our

middleware (preferred) or through DIP.

Post Mortem Analysis– All machine user systems connected to the LHC BIS must provide Post-

Mortem information for diagnostics, even systems that have NOT triggered the dump.

• To resume beam operation after a beam dump, the PM data must be analysed and ‘understood’

Page 8: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

8

Injection - ExtractionInjection - Extraction Same principle for injection and

extraction: – “kicker” magnets: fast rise time

→ much less than one turn, large (~ mrad) angles

– septa: two(/more) apertures with different magnetic fields

Injection: – Beam 1: IR 2– Beam 2: IR 8

Extraction:– Both beams in IR 6

Injection process and extraction process can lead to single turn beam loss!! =>

– Everything” required for injection/(extraction) plus the LHC ring must have the right value/state

– Dedicated passive protection

Page 9: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

9

MSI

Q5 Q4 D2MKITransfer line

IP2

Injection overviewInjection overview The injection septum MSI bends the beam into the LHC in the horizontal

plane The injection kicker MKI kicks the beam in the vertical plane onto the LHC

orbit

Possible injection failures: – Wrong current setting in the transfer line magnets + injection septum, fast trip

of power supply, failure of SPS extraction kicker (MKE) during extraction, fast trip of power supply – e.g. downstream of transfer line collimators (protection: current surveillance, fast current monitors, absorbers)

– Injection kicker failures in the LHC => caught by DEDICATED MOVEABLE ABSORBER TDI behind kicker and auxiliary

movable collimators TCLI in the injection regions

Page 10: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

10

Error settings at injectionError settings at injection Error settings at injection (empty machine) of D1/D2 and

orbit correctors in the LSS may drive in beam in the experimental areas. It affects all experimental insertions.

Not possible to hit directly the detectors if only one failure considered (at least in IR1/IR5)

Ex. MCBXH wrong settings (30-100%) nominal at injection is 5%Ex. MCBXH wrong settings (30-100%) nominal at injection is 5%

Page 11: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

11

LHC Extraction (IR6)LHC Extraction (IR6)

Q5R

Q4R

Q4L

Q5L

Beam 2

Beam 1

Beam Dump Block

Septum magnet deflecting the extracted beamMSD H-V kicker

for painting the beam

about 700 m

about 500 m

15 kicker magnetsMKD

Clean dump•Synchronisation: the kicker rise time must coincide with the particle free abort gap•Particle free abort gap•Energy Tracking – (required kick strength from the beam energy via magnet currents)

Page 12: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

12

Possible failures at Possible failures at extractionextraction

Lost synchronisation with the abort gap Pre-fire of one of the 15 kicker modules (hard-wired

system triggers all remaining 14 in 0.7-1.3 µs ) Frequency: once per year possible Solution: dedicated passive protection;

– TCDQ (movable) and TCS protect Q4 and general LHC apertures

– TCDS protects the MSD septa In case of problems during extraction coupled with

TCDQ settings, orbit or optics errors, “some” beam loss at the tertiary collimators/triplets in IR5 may occur.

Difficult to quantify - detailed analysis ongoing. PhD thesis of Thomas Kramer, AB/BT.

If abort gap (re-)population => caught by TCDQ and interlocking on abort gap monitor signal

Page 13: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

13

Possible failures with circulating Possible failures with circulating beambeam

(magnet failures including operation mistakes)(magnet failures including operation mistakes)

Usually slow and detected first in the aperture restrictions of the machine (cleaning insertions)

Potential danger for the experiments (VELO and RP): uncontrolled closed bumps since they could affect only experimental areas. However:– Extremely difficult to create at 7 TeV (less difficult

at 450 GeV)– They build up slowly: first losses seen by the BLMs

and beam extraction before damage threshold– Only critical if combined with a fast failure => low

probability

Page 14: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

14

Summary of machine Summary of machine failuresfailures

Errors/failures which may drive the beam into the experimental areas;– Settings errors at injection– Undetected closed bump & fast magnet failures

(highly unprobable) Errors/failures which may drive the beam in

the aperture restrictions in the LSS:– Injection errors (IR2, IR8)– Asynchronous beam dump (IR5)

Page 15: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

15

Experiments (1)Experiments (1) ATLAS

– BCM+ LUCID used for beam abort– Injection errors: ok for pilot bunch, concern for Safe

Beam. What is the structure of Safe Beam?– Questions: mechanism for beam blow up at the IP? How

loss of vacuum close to IP is treated? ALICE

– BCM used for beam dump (same system developed by LHCb). Position dictated by available space. Needs failures/error simulations to show the position is valid for the most relevant scenarios

– Consequences of injection errors: old analysis. Still valid?– During injection: only BCM ON and possibly a few

detectors at safe setting to monitor the losses in the experimental areas

– Concern about Safe Beam

Page 16: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

16

Experiments (2)Experiments (2) CMS

– BCM with standard LHC BLM Readout and Interface

– Worry particularly about high rates of loss rather than integrated doses

– Needed updated simulation (most realistic worst case scenario) for asynchronous beam dump and injection

– IF BCM OFF (no protection system) => no beam allowed in the machine

– IF CMS OFF but BCM ON => beam allowed– BCM and CIBU on machine power (no local UPS)– Concern about Safe Beam

Page 17: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

17

Experiments (3)Experiments (3) LHCb

– BCM for beam dump. Readout front end same as BLMs

– Entire BCM system under UPS– Concern On Safe Beam– Needs simulation for beam failures

LHCf– Beam dump based on the detector itself. All

scintillators hit => beam dump– The experiment will run only for a few days per

year: disconnected from the BIC when not in the TAN

– The whole system is on ATLAS UPS– Scintillators always ON at injection

Page 18: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

18

Experiments (4)Experiments (4)

TOTEM– T1 and T2 should be protected by the CMS

system– RP: simulation for bunch hitting the pot:

• For β*=1540 m only ok for bunch <= 6x1010 p• For β*=90-0.5 m beam wider, depends on number of

bunches

– TOTEM CIBU only used for the positioning of the RP. The other CIBU forced TRUE, may be used later

Page 19: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

19

Open issues and action list Open issues and action list (1)(1)

Safe Beam– This is a concern for all experiments. If not absolutely

needed, experiments ask to lower to 1.1-1.5x1011 p. Is this OK or just a feeling? Can be simulated/calculated?

– Action: MPWG Post Mortem Data

– Data from the experiments for all dumps– Experiments need PM Data from the Machine?– Details to be discussed– Action: AB/CO+ AB/OP + LEADE

Safe Beam Flag to the experiments– Technically all experiments can receive it via the GMT

receiver– Only LHCb has requested it– Action: BISU

Page 20: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

20

Open issues and action list Open issues and action list (2)(2)

Injection inhibit– By SW: decide on protocol– New idea for HW with fiber-CIBU– Action: MPWG + AB/CO + LEADE

CIBU (and Protection System) Power– On UPS on two different power sources– Survive a power cut for 10 minutes– CMS philosophy: BCM must be ON whenever the

machine is ON => machine power and not CMS power

– Apply to all experiments?– Action: MPWG + LEADE + BISU

Page 21: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

21

Open issues and action list Open issues and action list (3)(3)

CMS Philosophy– No beam allowed if CMS protection system is OFF– Beam allowed if CMS not operational– Adopted by all experiments?– What is the reliability of the experiment’s

protection system? Is it there a backup solution? How many unjustified dump per

experiments?– Aim for 1/year/exp?

Procedure after emergency beam dump– CMS request to latch their input until PM check is

done. Check re-arm time scale

Action?

Page 22: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

22

Open issues and action list Open issues and action list (4)(4)

How to detect direct hit in experimental area at injection if detector off?– Possible with BCM even if may be not always

sufficient– A few additional detectors ON at safe settings?– Action: BISU

TCTs for 2008– Missing Vertical TCT in IR2 and IR8. Is this a problem

for small *?– Action: MPWG + Collimation WG

Bump scenarios and wrong settings at injection– Software Interlock surveillance of D1/D2/correctors

in the experimental insertions at injection & collision– Action: SIS + MPWG

Page 23: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

23

Open issues and action list Open issues and action list (5)(5)

Abort gap monitor– Status + connection to BIC– Action: MPWG + AB/BI

Simulations– Asynchronous beam dump (including RP) => AB/BT– Consequences of the failure scenarios at injection

=> (AB/BT? TS/LEA? BISU?)– Error settings at injection (in particular IR2/IR8) => (TS/LEA?)- Additional failure scenarios when circulating beam

(beam steering) => (AB/ABP?, AB/CO/MI??)- RP: simulations including mechanical stresses =>

(TS/LEA-MME?)

Page 24: Joint LHC Machine-Experiments Meeting on Experiment Protection from Beam Failures

24

To be done in addition…To be done in addition…

Get more information and check consistency of the radiation damage threshold for similar detectors in different experiments

Better define the injection inhibit philosophy

Define/organize the test procedures Define/organize the commissioning

procedures together with the Commissioning of the Machine Protection System Sub-Working-Group