+ All Categories
Home > Documents > jotne_krakeroy

jotne_krakeroy

Date post: 29-Mar-2016
Category:
Upload: pitch-marketing
View: 215 times
Download: 1 times
Share this document with a friend
Description:
jotne_krakeroy
Popular Tags:
12
1 Fabrication Facilities Jotne Kråkerøy
Transcript
Page 1: jotne_krakeroy

1

Fabrication Facilities Jotne Kråkerøy

Page 2: jotne_krakeroy

Jotne Kråkerøy Fabrication Yard - Fredrikstad

2

Page 3: jotne_krakeroy

Jotne Kråkerøy Fabrication Yard

3

Jotne Eiendom Property

Page 4: jotne_krakeroy

Jotne Kråkerøy Area

4

Fabrication Hall 3

Dry-Dock

Module Deck

Load-out Area

Page 5: jotne_krakeroy

5

Assembly and Fabrication Hall III

Hall ll: 1600 m² 2 x 35

Hall lll: 4500 m² 2 x 50

1 x 10

Cranes at Quay no.4: 1 x 50

Dry Dock

Area Crane Capacity (T)

Length 288 m

Width 40 m

Depth(gate) 7 m

Depth (water) 9 m Cranes at Dock Side 1 x 127 T

1 x 50 T

Hall no. III with Dry Dock Assembly and Fabrication Hall II

Page 6: jotne_krakeroy

Main Dimensions Fabrication Hall no. 3

6

Page 7: jotne_krakeroy

7

Welding Hall 3

• Length 160 meter

• Width 28 meter

• Heigth 15 meter to crane hook in main part of hall

• Height 18 meter to crane hook in lowered part of the hall -

approx 450 m2

• Certified cranes 2 x 50 tonn

• Main port, heigth 10 meter

• Main port, width 25 meter

• For large constructions the west or east wallports will be lifted off.

Page 8: jotne_krakeroy

Welding hall 3

8

Page 9: jotne_krakeroy

Assembly and testing

9

Erection of complete structures:

• 60 tons max weight from Industriveien • 1200 tons max weight from Hall 3

FAT • Internal pressure tests (Performed up to 1700 bar) • External pressure test up to 100 bar • Hydraulic strain test (Performed up to 300 tons)

Function tests

• System testing according to customer requirements • Shallow water testing at quay side

Page 10: jotne_krakeroy

Loading/unloading and internal transport

1. Unloading

Unloading from ship at quay outside dockport

Transport from quay to east gateway of hall 3 by flat-bed trailer

2. Loading

Alternative 1

Transport from east gateway of hall 3 to dockport by flat-bed trailer

Loading to ship by taklift or from the shipcrane

Alternative 2

Transport from east gateway of hall 3 to moduledeck by flat-bed trailer

Loading to ship by taklift

10

Page 11: jotne_krakeroy

Transport route to module deck

11

Page 12: jotne_krakeroy

Alternative lifting – sea lift. For modules above 130T

Heavy lift from dockport

area – Welding hall 3

12

Heavy lift from module deck area