+ All Categories
Home > Documents > JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... ·...

JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... ·...

Date post: 10-Sep-2019
Category:
Upload: others
View: 4 times
Download: 0 times
Share this document with a friend
51
Ghana Bridge Power Project Environmental and Social Management System DOC 1 Manual Early Power Limited 91 Osu Badu Street West Airport Accra Version Record Record of Reviews and Amendments Revision Number Date of Issue Planned Review Date Reviewer Details of Amendments Approved by 1.0 24/08/2016 - Richard Hall, First issue D Cronin 2.0 28/10/2016 - M McBarron Update JP Wale 3.0 12/12/2017 - JP Wale Update to reflect project change J Willenbrock 4.0 09/01/18 09/01/2018 L. Turk Removal of section on Workforce Development Strategy - 5.0 09/01/18 09/01/2018 L. Turk Tracks in version 3.0 accepted final issue -
Transcript
Page 1: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

Gh

an

a B

rid

ge P

ow

er

Pro

jec

t

En

vir

on

me

nta

l a

nd

So

cia

l M

an

ag

em

en

t S

ys

tem

DO

C 1

Ma

nu

al

Ea

rly P

ow

er

Lim

ite

d

91

Os

u B

ad

u S

tree

t

We

st

Air

po

rt

Ac

cra

Vers

ion

Re

co

rd –

Re

co

rd o

f R

ev

iew

s a

nd

Am

en

dm

en

ts

Revis

ion

Num

be

r D

ate

of

Issu

e

Pla

nn

ed

Re

vie

w

Date

R

evie

we

r D

eta

ils o

f A

men

dm

en

ts

Ap

pro

ve

d b

y

1.0

2

4/0

8/2

016

- R

ich

ard

Ha

ll,

Fir

st is

su

e

D C

ron

in

2.0

2

8/1

0/2

016

- M

McB

arr

on

U

pd

ate

JP

Wale

3.0

1

2/1

2/2

017

- JP

Wale

U

pd

ate

to

re

fle

ct

pro

ject

ch

ang

e

J W

ille

nb

rock

4.0

0

9/0

1/1

8

09

/01

/20

18

L.

Tu

rk

Rem

ova

l of

se

ctio

n o

n

Work

forc

e D

eve

lopm

en

t S

tra

teg

y

-

5.0

0

9/0

1/1

8

09

/01

/20

18

L.

Tu

rk

Tra

cks in

ve

rsio

n 3

.0

acce

pte

d –

fin

al is

sue

-

Page 2: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

i

Co

nte

nts

1.

Intr

od

ucti

on

................................

................................

............................................................... 1

-1

1.1

P

urp

ose

of

the E

SM

S ..

..............................

................................................................

.... 1

-2

1.2

S

cope o

f th

e P

roje

ct .

................................

................................................................

..... 1

-2

2.

Ob

jecti

ves o

f th

e E

SM

S ..

..............................................................

................................

............ 2

-4

3.

Lis

t o

f A

bb

rev

iati

on

s ..

..............................................................

................................

................ 3

-5

4.

Co

nte

xt

of

the O

rgan

izati

on

................................

................................................................

..... 4

-6

4.1

U

nders

tandin

g t

he O

rganiz

atio

n a

nd its

Con

text ..........................................................

4-6

4.2

U

nders

tandin

g t

he n

ee

ds a

nd e

xp

ecta

tions o

f In

tere

ste

d P

art

ies ..

..............................

4-7

4.3

D

ete

rmin

ing t

he S

cop

e o

f th

e E

SM

S .................................

................................

........... 4

-9

5.

Lead

ers

hip

, R

ole

s a

nd

Re

sp

on

sib

ilit

y ..

..............................

................................

.................. 5

-10

5.1

Lead

ers

hip

an

d C

om

mitm

ent .

................................

..................................................... 5

-10

5.2

E

nviro

nm

enta

l a

nd S

ocia

l P

olic

y ..

..............................

................................

................. 5

-11

5.3

O

rganiz

atio

nal R

ole

s, R

esp

onsib

ilities a

nd A

uth

ority

.................................

................ 5

-13

6.

Pla

nn

ing

................................

................................

................................................................

..... 6

-4

6.1

A

ctio

ns to a

ddre

ss R

isks a

nd O

pp

ort

un

itie

s .................................................................

6-4

6.2

E

nviro

nm

enta

l O

bje

ctives a

nd P

lann

ing t

o A

chie

ve T

hem

................................

........... 6

-8

7.

Su

pp

ort

.................................

................................

................................................................

... 7

-10

7.1

R

esourc

es .................................................................

................................

.................. 7

-10

7.2

C

om

pete

nce

................................................................

................................

................ 7

-10

7.3

A

ware

ness ..

..............................................................

................................

................... 7

-11

7.4

C

om

munic

ation (

Inte

rna

l a

nd E

xte

rna

l S

takehold

ers

) ................................

................ 7

-12

7.5

D

ocum

ente

d info

rmation

................................

............................................................. 7

-18

8.

Op

era

tio

n ..

..............................

................................

................................................................

. 8-2

0

8.1

O

pera

tiona

l P

lann

ing

an

d C

ontr

ol .

................................

................................

.............. 8

-20

8.2

E

merg

ency P

repare

dness a

nd R

esponse

.................................................................

. 8-2

0

9.

Perf

orm

an

ce

Ev

alu

ati

on

................................................................

................................

......... 9

-22

9.1

M

on

itori

ng,

Me

asure

ment, A

na

lysis

an

d E

va

luation

................................

................... 9

-22

9.2

In

tern

al A

ud

it ..

..............................................................

................................

............... 9

-23

9.3

M

ana

gem

ent R

evie

w .................................

................................................................

. 9-2

6

10.

Imp

rov

em

en

t o

f P

roje

ct

Perf

orm

an

ce

.................................

................................

............... 1

0-2

7

10.1

G

enera

l .................................

................................

..................................................... 1

0-2

7

10.2

N

onconfo

rmity a

nd

Corr

ective A

ctio

n................................

................................

........ 1

0-2

7

10.3

C

ontinu

al Im

pro

vem

ent .

................................

............................................................

10-2

7

Ap

pen

dix

A –

Cu

rren

t In

dex o

f E

SM

S D

ocu

men

ts ..

..............................

................................

...... 1

0-2

8

Ap

pen

dix

B –

Co

nte

nt

of

Lab

ou

r an

d W

ork

ing

Co

nd

itio

ns P

oli

cy

.................................

........... 1

0-2

9

Ap

pen

dix

C –

Co

nte

nt

of

Lab

ou

r G

riev

an

ce P

roce

ss

................................................................

. 10-3

1

Ap

pen

dix

D –

Mo

nit

ori

ng

Req

uir

em

en

ts u

nd

er

the E

nv

iro

nm

en

tal

Perm

it .............................. 1

0-3

2

Page 3: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

ii

Fig

ure

s a

nd

Ta

ble

s

Tab

le 4

-1:

Sta

keh

old

ers

................................

................................

................................

...................... 4

-7

Fig

ure

5-1

: E

PL

Org

an

isati

on

al C

ha

rt ..

..............................

............................................................... 5

-1

Tab

le 5

-1:

Ro

les a

nd

Res

po

nsib

ilit

ies

.................................

............................................................. 5

-1

Fig

ure

6-1

: P

lan

nin

g A

cti

on

Pro

cess

................................

................................................................

6-7

Tab

le 6

-1:

SM

AR

T O

bje

cti

ve Q

uesti

on

s................................

............................................................

6-9

Fig

ure

7-1

: C

om

pete

nce P

roc

ess

................................

................................................................

.... 7

-11

Fig

ure

7-2

Co

mm

un

icati

on

typ

es

................................

................................................................

.... 7

-12

Tab

le 7

-1:

Inte

rnal

Co

mm

un

icati

on

................................

................................................................

. 7-1

3

Tab

le 7

-2:

Co

mm

un

icati

on

wit

h g

ov

ern

men

t b

od

ies

.................................................................

... 7

-16

Fig

ure

9-1

: A

ud

it P

roces

s .................................................................

................................

............... 9

-25

Page 4: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

1-1

1.

Intr

od

uc

tio

n

The G

hana B

ridge

P

ow

er

pro

ject

(‘th

e pro

ject’ or

‘the B

rid

ge P

ow

er

pro

ject’)

will

ena

ble

p

ow

er

genera

tion utilis

ing L

iqu

efied P

etr

ole

um

G

as (L

PG

) and h

as be

en d

evelo

pe

d to

de

plo

y add

itio

na

l

ele

ctr

icity t

o s

up

port

the d

em

and f

or

relia

ble

po

wer

in t

he a

rea.

The p

roje

ct

is b

ein

g d

eve

lop

ed a

nd

opera

ted b

y E

arl

y P

ow

er

Lim

ited (

EP

L)

in t

he

Tem

a r

egio

n o

f S

ou

thern

Ghan

a,

50 k

m e

ast

of

the

capita

l A

ccra

. T

he

pro

ject

inclu

des

two

po

wer

pla

nts

, separa

te

LP

G

sto

rag

e

facili

ties

an

d

the

develo

pm

ent of

a n

ew

pip

elin

e infr

astr

uctu

re f

or

supply

of

LP

G a

nd w

ate

r to

the

pla

nts

.

The p

urp

ose o

f th

e E

nviron

menta

l and S

ocia

l M

anag

em

ent

Syste

m (

ES

MS

) is

to p

rovid

e a

fra

mew

ork

for

the syste

matic assessm

ent, m

itig

atio

n and m

anagem

ent

of

environm

enta

l and socia

l risks in

accord

ance w

ith in-c

ou

ntr

y r

equirem

ents

as w

ell

as in

tern

ation

al go

od p

ractice.

The s

yste

m p

rovid

es

a m

echanis

m f

or

EP

L t

o i

dentify

and c

om

ply

with r

ele

vant

leg

isla

tio

n,

perm

ittin

g a

nd a

uth

ori

sation

oblig

atio

ns,

as w

ell

as e

nablin

g i

nte

rna

tio

na

l go

od pra

ctice s

tan

dard

s to

be

im

ple

mente

d w

ithin

a

consid

ere

d m

anagem

ent a

ppro

ach

.

The E

SM

S i

s i

nte

nded

to b

e a

liv

e p

rocess,

subje

ct

to r

evie

w a

t pla

nn

ed i

nte

rvals

or

in t

he e

vent

of

sig

nific

an

t pro

ject

or

con

textu

al

cha

nges.

T

his

w

ill

enab

le

the

continu

ous

impro

vem

ent

in

environm

enta

l an

d s

ocia

l ri

sk m

anagem

ent

to b

e eff

ective a

nd a

ligne

d t

o cha

ngin

g pro

ject

pla

ns,

pers

onn

el,

environm

enta

l conditio

ns,

socia

l circum

sta

nces,

sta

kehold

er

consid

era

tio

ns

and

leg

al

requirem

ents

.

This

E

nviro

nm

enta

l an

d

Socia

l M

ana

gem

ent

Syste

m

(ES

MS

) M

anu

al

has

been

pre

pare

d

in

com

plia

nce

with

the

In

tern

ation

al

Fin

ance

Corp

ora

tion

(IF

C)

Perf

orm

ance

Sta

nd

ard

s

for

En

viro

nm

enta

l a

nd S

ocia

l S

usta

ina

bili

ty,

the I

FC

EH

S G

uid

elin

es a

nd I

SO

1400

1:2

01

5.

The E

SM

S M

an

ual is

the k

ey d

ocum

ent

for

the p

roje

ct’s E

SM

S.

It a

cts

as a

n o

verv

iew

or

‘sig

npost’ f

or

the s

upp

ort

ing d

ocum

ents

and p

roce

dure

s t

ha

t pro

vid

e t

he d

eta

iled info

rmation o

n h

ow

th

e p

roje

ct

will

manage e

nviro

nm

enta

l, s

ocia

l, h

ea

lth a

nd s

afe

ty r

isks.

A l

ist

of

these p

roce

du

res a

nd s

up

port

ing

docum

ents

is d

eta

iled in t

he Ind

ex (

Ap

pen

dix

A).

The f

ollo

win

g IF

C s

tand

ard

s a

pply

and a

re a

dhe

red t

o in t

his

docum

ent;

Perf

orm

ance S

tandard

1:

Assessm

ent and M

anag

em

ent of

En

vir

onm

enta

l and S

ocia

l R

isks

and Im

pacts

Perf

orm

ance S

tandard

2:

Labo

ur

and

Work

ing C

on

ditio

ns

Perf

orm

ance S

tandard

3: R

esourc

e E

ffic

iency a

nd

Pollu

tio

n P

revention

Perf

orm

ance S

tandard

4: C

om

munity H

ea

lth,

Safe

ty a

nd S

ecurity

Perf

orm

ance S

tandard

5:

Land A

cqu

isitio

n a

nd

In

vo

lun

tary

Resettle

ment

The E

SIA

has c

onfirm

ed f

ollo

win

g I

FC

sta

ndard

s d

o n

ot

app

ly t

o t

his

pro

ject

an

d a

re e

xclu

ded

fro

m

the s

cope

of

this

ES

MS

;

Perf

orm

ance S

tandard

6:

Bio

div

ers

ity C

onserv

atio

n a

nd S

usta

inab

le M

an

agem

ent

of

Liv

ing

Natu

ral R

eso

urc

es

Perf

orm

ance S

tandard

7: In

dig

en

ous P

eop

les

Perf

orm

ance S

tandard

8: C

ultura

l H

erita

ge

Mana

gem

ent

of

occupatio

nal

hea

lth

an

d safe

ty,

inclu

din

g th

e re

levan

t part

s o

f IF

C P

erf

orm

ance

Sta

ndard

2,

sha

ll b

e b

ase

d o

n O

HS

AS

180

01 (

ISO

45001 a

s o

f 2017)

for

Occupation

al

Safe

ty a

nd

Health M

anag

em

ent

Syste

ms (

OH

SM

S).

The s

cope o

f th

is d

ocum

ent

or

the E

SM

S d

oes n

ot

cover

the

OH

SM

S th

oug

h c

ert

ain

docum

ents

are

refe

renced w

he

re r

ele

va

nt.

Page 5: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

1-2

1.1

P

urp

ose

of

the

ES

MS

The purp

ose

of

the E

SM

S is

to

set

out

ho

w

EP

L in

ten

ds to

m

eet

the

re

qu

irem

ents

of

the IF

C

Perf

orm

ance S

tandard

s f

or

En

viro

nm

enta

l and S

ocia

l S

usta

inabili

ty,

the I

FC

EH

S G

uid

elin

es a

nd i

n

com

plia

nce

with

ISO

14

001:2

01

5

and

to

pro

vid

e

a

syste

matic

appro

ach

to

en

viro

nm

enta

l

managem

ent.

T

he E

SM

S b

uild

s o

n t

he

Environm

enta

l a

nd S

ocia

l Im

pact

Assessm

ent

(ES

IA)

an

d t

he

En

viro

nm

enta

l an

d

Socia

l M

ana

gem

ent

Pla

n

(ES

MP

).

T

he

ES

MS

pro

vid

es

the

fram

ew

ork

fo

r

meeting t

he r

equ

irem

ents

of

these s

tandard

s t

hro

ugh

measure

s a

nd p

rocedure

s a

imed a

t pro

tecting

the e

nvironm

ent an

d m

itig

ating

ad

vers

e e

ffects

.

The f

ram

ew

ork

assis

ts t

he p

roje

ct

in m

eeting i

ts l

eg

al

req

uirem

ents

with t

he G

hana E

nvir

onm

enta

l

Pro

tection A

gency (

EP

A),

fulfill

ing c

om

plia

nce

ob

ligations a

nd e

nhancin

g e

nviro

nm

enta

l perf

orm

ance.

The f

ram

ew

ork

will

supp

ort

the l

ife c

ycle

of

the p

roje

ct

thro

ug

h e

ach s

tage

fro

m c

onstr

uctio

n t

hro

ugh

to d

ecom

mis

sio

nin

g a

nd s

hall

pro

vid

e a

ke

y r

efe

rence f

or

com

munic

ating e

nvir

onm

enta

l in

form

ation

to w

ork

ers

and inte

reste

d s

takehold

ers

.

Where

applic

ab

le,

rele

va

nt

sta

ndard

s a

re r

efe

renced d

irectly f

or

ease

of

identify

ing

whic

h s

tand

ard

, or

whic

h c

lause

of

the

sta

nd

ard

, is

bein

g m

et. I

n t

he

case o

f th

is M

anua

l, t

he c

lauses o

f th

is d

ocum

ent

have b

ee

n s

et

ou

t so

as t

o m

irro

r th

e r

eq

uirem

ents

of

ISO

14

001:2

01

5.

In

Septe

mber

2015

the

ne

w

ISO

14

001 s

tand

ard

w

as p

ublis

hed

. T

his

sta

nd

ard

intr

oduced th

e ne

w sim

plis

tic s

tructu

re w

hic

h i

s

desig

ned t

o i

mpro

ve a

lign

ment

with o

ther

managem

ent

syste

ms s

tandard

s a

nd b

e a

pplic

ab

le t

o a

ll

ne

w I

SO

sta

ndard

s a

nd a

ny r

evis

ions o

f sta

nd

ard

s.

The E

SM

S sha

ll b

e re

vie

wed as th

e pro

ject

an

d lif

e of

the pro

ject

chan

ges and th

e docum

ents

inclu

din

g t

his

Manu

al

ma

y t

here

fore

be s

ubje

ct

to c

hange a

nd r

evis

ion.

These c

hang

es m

ay r

eflect

the sta

ge of

the pro

ject, changes to

le

gis

latio

n,

impacts

and in

puts

fr

om

sta

kehold

ers

, or

sim

ply

changes in p

rocess a

nd o

pera

tio

ns w

hic

h t

ake p

lace o

n t

he p

roje

ct.

A

change a

nd d

ocum

ent

contr

ol

pro

cess (

Section 7

.5 D

ocu

menta

tion)

exis

ts w

ithin

th

is E

SM

S M

anu

al

whic

h s

ha

ll tr

ack a

mendm

ents

as these t

ake p

lace.

1.2

S

co

pe o

f th

e P

roje

ct

The p

roje

ct

inclu

des t

he d

eve

lopm

ent

of

po

wer

pla

nt

facili

ties t

o p

rovid

e c

om

merc

ially

ava

ilab

le p

ow

er

in fo

ur

ph

ases to

pro

vid

e a net

tota

l gen

era

tion capacity of

424 M

W at

site desig

n co

nditio

ns.

Thro

ughout

the d

evelo

pm

ent

phases,

LP

G w

ill b

e u

se

d a

s f

uel. I

t is

envis

ag

ed t

hat

within

fiv

e y

ears

of

opera

tio

n o

f phase 4

the p

lant

will

sw

itch t

o o

pera

tio

n u

sin

g n

atu

ral gas if

this

is m

ade a

vaila

ble

by t

he

Govern

ment of

Ghan

a.

The m

ain

pro

ject com

pone

nts

inclu

de

:

Po

wer

Pla

nts

:

o

Po

wer

Pla

nt

Site 1

(P

PS

1)

– P

PS

1 w

ill b

e d

eve

loped

in t

wo

sta

ges w

ith t

he

op

era

tio

n

of

five G

enera

l E

lectr

ic (

GE

) T

M2500 (

‘TM

units’) i

n o

pen

cycle

gas t

urb

ine (

OC

GT

)

mode (

Sta

ge

1a)

and

com

bin

ed c

ycle

gas t

urb

ine (

CC

GT

) genera

tin

g m

ode (

Sta

ge

1b).

o

Po

wer

Pla

nt

Site 2

(P

PS

2)

– P

PS

2 inclu

des f

or

4 L

M6000 P

C S

pri

nt

vari

ant

units (

‘LM

units’) o

pera

tin

g i

n C

CG

T m

ode.

It

is n

ot

expecte

d t

hat

Sta

ge 2

wo

uld

op

era

te i

n

open

cycle

mode;

ho

we

ve

r, t

he d

esig

n i

nclu

des b

yp

ass s

tacks t

o a

llow

ope

n c

ycle

opera

tio

n, if r

equ

ired

.

LP

G P

ipe

line –

A p

ipe

line w

ill t

ransp

ort

LP

G f

rom

the e

xis

ting T

em

a O

il R

efinery

(T

OR

) je

tty

to th

e T

OR

pla

nt

site,

thro

ugh to

the

ne

w p

roje

ct ta

nk farm

and then t

o th

e P

PS

1 a

nd P

PS

2.

Page 6: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

1-3

Tank F

arm

– A

ne

w t

ank f

arm

for

sto

rage o

f LP

G p

rior

to u

se b

y P

PS

1 a

nd P

PS

2.

Die

se

l fu

el

oil

(DF

O)

pip

elin

es –

requ

ired t

o t

ranspo

rt D

FO

sto

red a

t th

e ne

arb

y Q

uantu

m

Term

inals

Lim

ited f

uel sto

rage s

ite t

o P

PS

1 a

nd P

PS

2.

The p

ipelin

es w

ill f

ollo

w a

new

Rig

ht

of W

ay

(RoW

) alo

ng w

ith th

e L

PG

pip

elin

e b

etw

een t

he tank f

arm

and p

ow

er

site

s.

Po

wer

evacuatio

n -

Evacu

atio

n o

f th

e p

ow

er

for

Sta

ge 1

a w

ill b

e v

ia u

nderg

roun

d c

onn

ectio

n

to t

he e

xis

tin

g N

ew

Tem

a G

ridC

o s

ub s

tatio

n a

dja

ce

nt

to t

he E

lectr

icity C

om

pan

y o

f G

hana

(EC

G)

Sta

tio

n H

substa

tio

n,

at

16

1kV

. S

tage 1

b e

va

cuatio

n w

ill i

nitia

lly b

e v

ia a

ne

w 1

61kV

spur

into

a n

ew

doub

le c

ircuit 1

61kV

overh

ea

d l

ine t

o b

e c

onstr

ucte

d b

y G

RID

CO

by e

arl

y

2019

, w

hic

h w

ill ru

n a

dja

cent

to th

e exis

ting o

verh

ead lin

es th

at

run e

ast-

west

alo

ng th

e

nort

hern

b

oun

dary

of

the

S

tage

2

site

(PP

S2).

Sta

ge

2

evacuation

will

be

via

a

ne

w

substa

tion i

nto

th

e n

ew

GR

IDC

O 1

61kV

po

wer

lines.

The S

tage 1

b e

vacu

ation

spur

will

be

transfe

rred

to

the

Sta

ge

2

substa

tio

n

as

that

sw

itch

yard

is

com

ple

ted.

D

eta

ils

of

the

pro

pose

d p

ow

er

evacu

atio

n a

re p

rovid

ed in S

ection 2

.2.2

.

Wate

r P

ipe

lines –

A n

ew

pip

elin

e w

ill r

un f

rom

a G

hana W

ate

r C

om

pan

y (

GW

C)

munic

ipal

supply

netw

ork

connection

, appro

xim

ate

ly 9

00m

south

of

the L

PG

tank f

arm

. T

his

pip

elin

e

will

co

nnect

the

munic

ipa

l supply

netw

ork

to w

ate

r sto

rage

facili

ties t

o b

e c

onstr

ucte

d w

ith

in

the LP

G ta

nk fa

rm fo

r fire

pro

tectio

n purp

oses.

W

ate

r pip

elin

e sp

urs

fr

om

th

e p

ipe

line

connecting t

o t

he m

unic

ipa

l supply

will

sup

ply

wa

ter

sto

rage f

acili

ties locate

d w

ithin

the S

tage

2 s

ite t

o s

erv

e th

e w

ate

r n

eeds o

f both

the

Sta

ge 1

an

d S

tage 2

po

wer

facili

ties.

Page 7: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

2-4

2.

Ob

jec

tive

s o

f th

e E

SM

S

The o

bje

ctives o

f th

e E

SM

S M

anu

al are

as f

ollo

ws:

To s

et out an

d d

eta

il th

e E

nviro

nm

enta

l a

nd S

ocia

l P

olic

y f

or

the p

roje

ct;

To s

et

out

and d

eta

il th

e s

cope o

f th

e p

roje

ct

inclu

din

g t

he s

tages o

f th

e p

roje

ct

life c

ycle

to

whic

h t

his

ES

MS

app

lies;

To identify

an

d a

ddre

ss t

he

ris

ks a

nd o

pport

unitie

s a

pplic

able

to t

he p

roje

ct

in o

rder

to c

ontr

ol

and,

where

possib

le,

en

han

ce the p

roje

ct’s e

nvironm

enta

l perf

orm

ance

;

To esta

blis

h th

e re

so

urc

es re

quire

d to

im

ple

ment, m

ain

tain

and

contin

ually

im

pro

ve th

e

ES

MS

;

To e

sta

blis

h t

he r

ole

s a

nd r

esponsib

ilities a

pp

licab

le t

o the E

SM

S;

To

esta

blis

h

a

mechanis

m

and

pro

cess

to

pro

vid

e

aw

are

ness

an

d

com

munic

atio

n

to

em

plo

yees a

nd t

o a

ll sta

kehold

ers

an

d inte

reste

d p

art

ies;

To p

rovid

e a

meth

od a

nd

pro

cess f

or

docum

enta

tion

and

docum

enting

info

rmation

inclu

din

g

for

the pro

vis

ion of

update

s and contr

ol. T

he E

SM

S shall

als

o esta

blis

h w

ha

t in

form

ation

should

be

requ

ired

an

d d

ocum

ente

d f

or

each a

rea o

f th

e p

roje

ct a

nd t

he E

SM

S;

To e

sta

blis

h a

pro

cess t

o m

eet

opera

tio

nal

pla

nn

ing a

nd c

ontr

ol

thro

ugh

out

the

life c

ycle

of

the p

roje

ct;

To e

sta

blis

h a

pro

cess f

or

em

erg

ency p

rep

are

dn

ess a

nd r

espo

nse

;

To esta

blis

h a pro

cess fo

r an

y re

qu

irem

ents

fo

r m

onitorin

g,

measure

ment, analy

sis

a

nd

eva

luation

thro

ug

hou

t th

e life c

ycle

of

the p

roje

ct;

To e

sta

blis

h a

pro

cess f

or

inte

rna

l a

ud

it a

nd r

evie

w;

To e

sta

blis

h a

pro

cess o

f eff

ective a

nd r

egu

lar

manage

ment re

vie

w o

f th

e E

SM

S;

and

,

To e

sta

blis

h a

pro

cess f

or

identify

ing r

ele

vant

no

nconfo

rmity a

nd c

orr

ective

action

s.

Page 8: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

3-5

3.

Lis

t o

f A

bb

revia

tio

ns

BA

T

B

est

Availa

ble

Techniq

ues

DF

O

D

iese

l F

ue

l O

il

EC

G

E

lectr

icity C

om

pan

y o

f G

ha

na

EP

A

(G

hana)

Environm

enta

l P

rote

ctio

n A

gency

EP

L

E

arl

y P

ow

er

Lim

ited

ES

AP

En

viro

nm

enta

l a

nd S

ocia

l A

ctio

n P

lan

ES

IA

E

nviro

nm

enta

l a

nd S

ocia

l Im

pact A

ssessm

ent

ES

MP

En

viro

nm

enta

l a

nd S

ocia

l M

ana

gem

ent P

lan

ES

MS

En

viro

nm

enta

l S

ocia

l M

ana

gem

ent S

yste

m

GE

Genera

l E

lectr

ic

HR

Hum

an r

esourc

es

IFC

Inte

rna

tio

na

l F

inance C

orp

ora

tio

n

KP

I

K

ey P

erf

orm

ance Indic

ato

rs

KT

PP

(VR

A)

Kpo

ne T

herm

al P

ow

er

Pla

nt

LP

G

Liq

uefied P

etr

ole

um

Gas

OH

SM

S

Occupatio

nal H

ea

lth a

nd S

afe

ty M

ana

gem

ent S

yste

m

SE

P

S

takehold

er

Eng

agem

ent P

lan

SM

AR

T

Specific

, m

easura

ble

, att

ain

ab

le, re

leva

nt a

nd t

ime b

ound

TC

PD

Tow

n a

nd C

oun

try P

lann

ing D

eve

lopm

ent

TD

C

T

em

a D

evelo

pm

ent C

orp

ora

tio

n

TF

C

T

em

a F

uel C

om

pan

y

TT

PC

Tem

a T

herm

al P

ow

er

Pla

nt

Com

ple

x

TM

A

T

em

a M

etr

opolit

an A

ssem

bly

VR

A

V

olta R

iver

Auth

ority

Page 9: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

4-6

4.

Co

nte

xt

of

the

Org

an

iza

tio

n

The B

ridge P

ow

er

Pro

ject

was cre

ate

d to

a

ddre

ss th

e ne

ed fo

r a short

-term

solu

tion to

G

han

a’s

po

wer

cha

lleng

es. E

PL i

s t

he G

han

aia

n e

ntity

ow

ned

by B

ridge P

ow

er

Pro

ject

Spo

nsors

: E

nd

ea

vor

Energ

y, G

enera

l E

lectr

ic (

GE

), a

nd S

age

Petr

ole

um

.

The c

om

pan

y h

as b

ee

n e

sta

blis

hed

for

this

pro

ject

and

was s

et

up

to

ad

dre

ss the

po

wer

requ

irem

ents

of

Ghana t

hro

ug

h t

his

pro

ject

(and o

thers

) covere

d b

y t

his

ES

MS

.

4.1

U

nd

ers

tan

din

g t

he O

rga

niz

ati

on

an

d its

Co

nte

xt

The B

ridge P

ow

er

Pro

ject

will

be s

ubje

ct

to e

xte

rna

l and i

nte

rnal

issues t

ha

t could

im

pact

on t

he

eff

ectiveness o

f th

e E

SM

S,

issues a

s d

ivers

e a

s a

chang

e i

n g

overn

ment, w

ork

forc

e l

itera

cy an

d

clim

ate

change.

The c

onte

xt

with

in w

hic

h E

PL a

nd t

he B

ridge P

ow

er

Pro

ject

will

be c

onstr

ucte

d,

opera

ted and

d

ecom

mis

sio

ned

n

eeds to

be und

ers

tood in

ord

er

for

the

E

SM

S to

b

e su

itab

le fo

r

achie

vin

g its

obje

ctives.

The d

ete

rmin

atio

n o

f exte

rnal and inte

rna

l is

sues t

hat

pro

vid

e t

he c

on

text

for

the E

SM

S is u

nd

ert

aken

usin

g t

he

PE

ST

LE

an

d S

WO

T a

naly

sis

techniq

ues,

app

lied d

urin

g a

facili

tate

d m

eeting o

f com

pan

y

repre

senta

tives (

managem

ent, E

SM

S team

, w

ork

forc

e, m

ajo

r contr

acto

rs).

The P

ES

TLE

ana

lysis

consid

ers

the e

xte

rna

l fa

cto

rs t

hat

could

im

pact

on t

he E

SM

S e

ffective

ness

and inclu

des:

Polit

ical

Econom

ic

Socia

l

Technolo

gic

al

Lega

l

En

viro

nm

enta

l

Althou

gh s

pecific

econom

ic,

socia

l a

nd e

nvironm

enta

l im

pacts

have b

een a

na

lyse

d t

hro

ugh t

he E

SIA

pro

cess a

nd

lega

l com

plia

nce r

eq

uirem

ents

are

docu

mente

d i

n a

le

gal

reg

iste

r (E

SM

S D

OC

3),

the

PE

ST

LE

ana

lysis

is a

bro

ader

consid

era

tion

of

the s

tatu

s a

nd t

rends in e

xte

rna

l fa

cto

rs in r

egard

s t

o

their c

onte

xtu

al in

flu

ences o

n th

e E

SM

S f

unction

ing.

The r

esults o

f th

e P

ES

TLE

ana

lysis

are

th

en f

ed into

a S

WO

T a

naly

sis

, w

hic

h c

on

sid

ers

:

Str

en

gth

s

}

Weaknesses

}

Opport

un

itie

s

}

Thre

ats

}

The o

utc

om

e o

f th

e P

ES

TLE

an

d S

WO

T a

naly

ses e

nab

le t

he E

SM

S c

om

pone

nts

to b

e d

eve

lop

ed

and i

mple

mente

d i

n t

he m

ost

eff

ective m

anner

for

the c

onte

xt

within

wh

ich E

PL w

ill o

pera

te.

This

should

inclu

de a

ppro

pri

ate

buff

ers

to p

rote

ct th

e E

SM

S f

unctio

nalit

y a

ga

inst sig

nific

ant risks.

The r

esults f

rom

the a

na

lysis

will

be d

ocum

ente

d o

n E

SM

S D

OC

01

a O

rgan

isatio

nal C

onte

xt

and f

ed

into

the

dete

rmin

ation

of

the E

SM

S s

cope (

section 4

.3)

and r

evie

we

d a

t le

ast e

ve

ry 5

years

.

Inte

rnal fa

cto

rs t

ha

t w

ill a

ffe

ct

the

ES

MS

eff

ective

ne

ss

Exte

rna

l fa

cto

rs th

at

will

aff

ect th

e E

SM

S e

ffe

ctive

ne

ss

(re

su

lts o

f th

e P

ES

TL

E a

na

lysis

)

Page 10: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

4-7

4.2

U

nd

ers

tan

din

g t

he

ne

ed

s a

nd

ex

pe

cta

tio

ns

of

Inte

res

ted

Pa

rtie

s

EP

L

has

identified

and

engag

ed

with

a

wid

e

ran

ge

of

pro

ject

sta

kehold

ers

duri

ng

the

pro

ject

develo

pm

ent

pro

cess.

T

he

needs

an

d

exp

ecta

tio

ns

of

inte

reste

d

part

ies

will

b

e

taken

into

consid

era

tio

n thro

ug

hout

the life o

f th

e p

roje

ct.

The f

ollo

win

g t

ab

le s

ets

out

the s

takeho

lders

iden

tified

to d

ate

.

Tab

le 4

-1:

Sta

keh

old

ers

Go

vern

men

t an

d

Co

mm

un

ity S

takeh

old

ers

S

takeh

old

er

Pro

file

Min

istr

y o

f P

ow

er

Min

istr

y o

f P

ow

er

is the

nationa

l au

thori

ty o

n p

rod

uctio

n o

f po

wer.

En

erg

y C

om

mis

sio

n

The E

nerg

y C

om

mis

sio

n r

egula

te a

nd m

anag

e th

e d

evelo

pm

ent

and u

tiliz

atio

n o

f en

erg

y r

esourc

es in G

han

a. T

he

y a

lso p

rovid

e th

e

leg

al, r

egu

lato

ry a

nd s

uperv

isory

fra

mew

ork

for

pro

vid

ers

of

energ

y

in t

he c

ou

ntr

y,

specific

ally

by g

ranting lic

ences f

or

the e

lectr

icity

transm

issio

n.

Min

istr

y o

f H

ea

lth

M

etr

op

olita

n H

ealt

h

Dir

ecto

rate

The M

inis

try o

vers

ees c

om

munity a

nd w

ork

er

hea

lth a

nd th

e

vari

ous a

gencie

s f

or

Rig

ht

of W

ay

ap

plic

ations. T

he

y a

lso

rep

ort

on

HIV

and a

ids.

To

wn

an

d C

ou

ntr

y

Pla

nn

ing

Dev

elo

pm

en

t (T

CP

D)

TC

PD

is the n

ation

al auth

ority

on d

evelo

pm

enta

l is

sue

s.

Tem

a D

ev

elo

pm

en

t C

orp

ora

tio

n (

TD

C)

(Tem

a

off

ice)

TD

C is a

go

vern

ment in

stitu

tio

n s

et

up t

o a

ssis

t in

develo

pm

ent of

Tem

a. It is

the e

nd

ow

ner

of

larg

e a

reas o

f la

nd in T

em

a,

inclu

din

g

TH

IA, w

hic

h it

leases t

o b

usin

ess o

r in

div

idu

als

inclu

din

g th

e V

RA

.

Tem

a M

etr

op

olita

n

As

sem

bly

(T

MA

) T

MA

are

th

e a

uth

ori

ty in

ch

arg

e o

f th

e T

em

a r

egio

n.

Tem

a E

ast

Su

b

Metr

op

olita

n A

ssem

bly

Part

of

the T

MA

. Its jurisd

iction

inclu

des the p

roje

ct

infr

astr

uctu

re

locations. T

he

ir k

ey a

ctivitie

s inclu

de p

rovis

ion o

f socio

econ

om

ic

infr

astr

uctu

re a

nd s

erv

ices in the

are

a,

responsib

ility

fo

r a

cle

an,

safe

and h

ealth

y e

nvironm

ent a

nd p

rom

otion o

f socio

-econom

ic

activitie

s, esp

ecia

lly f

or

the v

uln

era

ble

an

d e

xclu

de

d.

Gh

an

a E

nv

iro

nm

en

tal

Pro

tecti

on

Ag

en

cy (

EP

A)

EP

A g

ave p

erm

issio

n to

co

mm

ence p

lan

nin

g p

rocess a

nd e

nfo

rce

environm

enta

l re

gu

latio

ns, in

clu

din

g issue o

f th

e e

nviro

nm

enta

l perm

its w

hic

h c

onta

ins m

onitori

ng a

nd r

eport

ing r

eq

uir

em

ents

.

EP

A-

Ac

cra

East

Reg

ion

E

PA

Accra

East R

egio

n is t

he e

nvironm

enta

l auth

ority

responsib

le

for

the a

rea w

here

the

pro

ject is

locate

d.

Min

istr

y o

f E

ne

rgy a

nd

P

etr

ole

um

T

he M

inis

try o

f E

nerg

y a

nd P

etr

ole

um

is the n

ation

al a

uth

ori

ty

aim

ing to im

pro

ve th

e d

istr

ibutio

n o

f ele

ctr

icity a

cro

ss the c

ou

ntr

y.

Kp

on

e-K

ata

man

so

Dis

tric

t A

ssem

bly

(K

KD

A)

KK

DA

was c

arv

ed f

rom

the T

em

a M

etr

opo

litan A

ssem

bly

in 2

012

and is the

munic

ipa

l au

thori

ty f

or

the k

ey p

roje

ct po

wer

pla

nt a

nd

tank f

arm

sites.

Dep

art

men

t o

f U

rban

R

oad

s (

Tem

a)

Sub-d

epart

ment of

the M

inis

try f

or

Ro

ads a

nd H

igh

wa

ys,

responsib

le f

or

urb

an r

oads w

ith

in t

he T

em

a a

nd K

KD

A a

rea.

Lo

cal co

mm

un

itie

s a

nd

T

he p

roje

ct te

am

shall

und

ert

ake r

egula

r dia

logue

with loca

l com

munitie

s a

nd inte

rest g

roups in

lin

e w

ith th

e a

ppro

ach d

eta

iled

Page 11: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

4-8

inte

rest

gro

up

s

in t

he p

roje

ct

Sta

keho

lder

Eng

agem

ent P

lan (

SE

P)

to m

inim

ise the

pro

ject im

pacts

and p

rovid

e b

en

efits

such a

s e

mplo

ym

ent. F

urt

her

info

rmation o

n t

his

typ

e o

f sta

kehold

er

is d

eta

iled in S

ection 7

.4.3

.4

Exte

rna

l S

takehold

ers

.

Oth

er

rep

res

en

tati

ve

gro

up

s f

rom

Go

vern

men

t o

f G

han

a

Oth

er

de

part

ments

and g

roups w

ith a

n inte

rest

in t

he d

eliv

ery

schedule

of

the p

roje

ct an

d o

ng

oin

g o

pera

tion

.

Uti

liti

es a

nd

In

du

str

ial

Sta

keh

old

ers

S

takeh

old

er

Pro

file

GR

IDC

o

GR

IDC

o is the t

ransm

issio

n c

om

pan

y w

hic

h w

ill r

ece

ive t

he p

ow

er

genera

ted

by t

he p

lant.

Ele

ctr

icit

y C

om

pan

y o

f G

han

a (

EC

G)

EC

G p

rim

arily

bu

ys a

nd s

ells

ele

ctr

icity a

s th

e s

tate

-ow

ned

dis

trib

uto

r.

Gh

an

a W

ate

r C

om

pan

y

Sup

plie

r of

wate

r to

the p

roje

ct.

Cen

po

wer

Gen

era

tio

n,

Kp

on

e In

dep

en

den

t P

ow

er

Pla

nt

The tri-f

uel 35

0 M

W C

CG

T turb

ine p

lant is

und

er

de

ve

lopm

ent

appro

xim

ate

ly 1

.9km

to the

east, t

o b

e c

om

mis

sio

ned 2

017

. A

imin

g

to s

witch t

o g

as in

qu

art

er

2, 201

8..

T

he p

lant

is r

ele

vant

in r

eg

ard

to

cum

ula

tive im

pacts

.

Sen

tuo

Ste

el C

om

pan

y

Sentu

o S

teel is

locate

d a

dja

cent to

th

e s

outh

ern

end o

f th

e T

TP

C

site, a

ppro

xim

ate

ly 6

00m

south

west of

the p

lant site. I

t is

a s

teel

scra

p p

rocessin

g p

lant

whic

h p

roduces c

ast ste

el bill

ets

and r

ods.

Su

no

n A

so

gli P

ow

er

Sun

on A

sog

li P

ow

er

is a

n o

pera

ting g

as/L

CO

-fired p

ow

er

pla

nt

locate

d in th

e K

po

ne D

istr

ict in

the v

icin

ity o

f th

e s

ite. T

he c

om

pan

y

is join

tly o

wn

ed b

y S

hen

zh

en E

nerg

y G

rou

p C

om

pan

y L

imited

(60%

) an

d C

hin

a A

fric

an D

eve

lopm

ent F

und (

40%

). P

hase 1

has a

n

insta

lled c

ap

acity o

f 20

0M

W a

nd e

mplo

y a

ppro

xim

ate

ly 1

50

pers

onn

el. T

he c

om

pan

y p

lans is in th

e p

rocess o

f exp

and t

he

ir

insta

lled c

ap

acity t

hro

ugh

a P

hase

2 d

evelo

pm

ent.

Tem

a F

uel T

rad

e C

om

pan

y

(TF

C)

TF

C is locate

d 6

00m

south

of

the p

rop

osed p

lant site

with a

second

site 1

.7km

nort

hw

est.

T

FC

is p

rivate

ly o

wned

.

Tem

a O

il R

efi

nery

(T

OR

) T

OR

is locate

d 8

00m

west

of

PP

S2 a

nd c

om

prises a

n o

il re

finery

and m

ulti-fu

el ta

nk f

arm

with jett

y f

acili

ties a

nd d

eliv

ery

pip

elin

e

infr

astr

uctu

re. P

art

of

EP

L’s

LP

G p

ipe

line w

ill b

e locate

d w

ith

in

TO

R’s

pip

elin

e c

orr

idor

betw

een t

he jett

y a

nd

the

refin

ery

.

Tem

a S

teel C

om

pan

y

Tem

a S

teel C

om

pan

y is a

ste

el m

akin

g c

om

pan

y t

hat

is locate

d

clo

se to t

he G

ridC

o tra

nsm

issio

n insta

llation

, a

ppro

xim

ate

ly 1

.7km

nort

h o

f P

PS

2.

Esta

blis

hed in 1

964

, th

e c

om

pan

y is p

rivate

ly

ow

ne

d.

Tem

a S

pecia

l S

teel

Ste

el pro

duction,

reduce

d o

pera

tion,

loca

ted

1.6

km

nort

hw

est of

PP

S2.

Tro

jan

Po

wer

P

ow

er

pla

nt com

prisin

g T

em

a I, T

em

a II and T

em

a III (

or

Tro

jan V

P

ow

er)

. T

he c

losest pla

nt

is 1

10m

south

west of

PP

S2

. T

em

a I

opera

tes a

t lim

ited c

ap

acity (

opera

ting

on a

gas / d

iese

l m

ix w

ith

only

aro

un

d 5

0%

of

the m

achin

es o

pera

tin

g a

t one

tim

e).

VA

LC

O

Alu

min

ium

sm

elter

locate

d a

bou

t 0.7

km

south

of

the

pro

ject.

Pro

duction

capacity o

f 200,0

00 m

etr

ic tons/

yr.

T

he c

om

pan

y

em

plo

ys a

bout

200

0 p

eop

le. C

urr

en

tly, th

ey a

re o

pera

ting

at

20%

Page 12: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

4-9

pro

duction c

apacity b

ecause o

f po

wer

availa

bili

ty.

VR

A (

TT

PC

)

The V

RA

Tem

a T

herm

al P

ow

er

Com

ple

x is locate

d a

ppro

xim

ate

ly

150m

to the w

est

of

PP

S1 a

nd inclu

des v

ari

ous p

ow

er

pla

nts

(T

roja

n P

ow

er

Lim

ited,

VR

A a

nd C

enit p

ow

er

pla

nts

, V

RA

Sta

tion 3

and M

ines R

eserv

e P

lants

).

VR

A K

po

ne

Th

erm

al

Po

wer

Pla

nt

(KT

PP

)

VR

A K

TP

P is a

therm

al po

wer

pla

nt

locate

d a

ppro

xim

ate

ly 7

km

nort

hw

est

of

the p

roje

ct site

. T

he c

onstr

uction

of

the p

lant

is n

eari

ng

com

ple

tion

. N

o c

um

ula

tive

im

pacts

with a

ir o

r nois

e a

re a

nticip

ate

d

with t

his

com

pan

y.

Ak

sa P

ow

er

Pro

ject

A H

eavy f

uel o

il (H

FO

) po

wer

pla

nt

locate

d 0

.8km

to the n

ort

h.

Curr

ently insta

lled c

apacity is 2

00

MW

, constr

ucte

d in 2

016

-17.

Gh

an

a O

il C

om

pan

y

(GO

IL)

GO

IL is a

go

vern

ment of

Ghana

-ow

ne

d f

uels

sup

ply

, m

ark

eting a

nd

reta

il com

pan

y.

Cir

rus

Oil S

erv

ice

s

C

irru

s O

il S

erv

ices L

imited,

a s

ubsid

iary

of W

oodfield

s E

nerg

y

Resourc

es L

td. It

is a

bulk

fuel an

d o

il dis

trib

uto

r w

ith t

wo

petr

ole

um

term

inals

, in

Tem

a a

nd T

akora

di re

spectively

.

In a

dditio

n t

o t

he a

bo

ve s

takehold

ers

, a n

um

ber

of

rounds o

f eng

agem

ent

has b

een u

ndert

aken w

ith

imm

edia

tely

surr

ou

ndin

g

busin

esses

in

the

vic

inity

of

the

pro

ject

footp

rint,

as

dis

cussed

in

the

consulta

tio

n c

ha

pte

r (S

ection 2

1)

of

the 2

01

7 a

mende

d E

SIA

.

Com

plia

nce ob

ligations re

leva

nt

to th

e nee

ds are

d

eta

iled in

th

e Leg

al

an

d O

ther

Re

qu

irem

ents

Regis

ter.

Requ

irem

ents

to c

om

munic

ate

with t

hese s

takehold

ers

regard

ing t

he

ES

MS

are

deta

iled

with

in S

ection 7

.4 C

om

munic

ation.

4.3

D

ete

rmin

ing

th

e S

co

pe o

f th

e E

SM

S

The s

cope o

f th

e E

SM

S is t

o s

upp

ort

th

e life c

ycle

of

the p

roje

ct

thro

ugh

each

sta

ge f

rom

constr

uction

thro

ug

h to d

ecom

mis

sio

nin

g.

The p

hysic

al pro

ject com

ponents

this

rela

tes t

o a

re:

The n

ew

po

wer

pla

nts

;

A n

ew

LP

G p

ipe

line

;

A n

ew

ta

nk f

arm

for

LP

G s

tora

ge;

an

d

A

ne

w

pip

elin

e

to

tra

nsp

ort

w

ate

r to

th

e

po

wer

pla

nt

from

th

e

Ghana W

ate

r C

om

pan

y

munic

ipal su

pply

netw

ork

.

In t

he f

urt

her

develo

pm

ent

of

the E

SM

S s

cop

e,

the m

anagem

ent

team

will

als

o h

ave r

eg

ard

to t

he

org

an

isationa

l co

nte

xt

and

sphere

of

influe

nce (

section 4

.1),

re

gula

tory

and c

om

plia

nce o

blig

atio

ns

(section 4

.2 a

nd 6

.1.3

), c

om

pan

y o

rgan

isation

(sectio

n 5

.3)

and c

om

pan

y s

erv

ices.

Page 13: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-1

0

5.

Le

ad

ers

hip

, R

ole

s a

nd

Re

sp

on

sib

ilit

y

5.1

L

ea

ders

hip

an

d C

om

mit

men

t

The E

PL

team

have t

he u

ltim

ate

responsib

ility

for

the E

SM

S a

nd

set

the p

olic

y,

resourc

es a

nd

role

s

and r

esp

onsib

ilities w

ith t

he

pro

ject. T

he m

anagem

ent m

ake the f

ollo

win

g c

om

mitm

ents

:

a)

To ta

ke accounta

bili

ty fo

r th

e eff

ectiveness of

the e

nvironm

enta

l and

socia

l m

anag

em

ent

syste

m;

b)

To e

nsure

that

the e

nviron

menta

l and s

ocia

l po

licy a

nd e

nviro

nm

enta

l an

d s

ocia

l obje

ctive

s

are

esta

blis

hed a

nd

are

co

mpatible

with

the

str

ate

gic

direction a

nd t

he c

onte

xt

of

the p

roje

ct;

c)

To e

nsure

the inte

gra

tio

n o

f th

e E

SM

S r

equ

irem

ents

into

the

pro

ject a

nd b

usin

ess p

rocesses;

d)

To e

nsure

that

the

resourc

es n

ee

ded f

or

the E

SM

S a

re a

vaila

ble

;

e)

To c

om

munic

ate

th

e i

mport

ance o

f eff

ective e

nviron

menta

l an

d s

ocia

l m

anage

ment

and o

f

confo

rmin

g to t

he E

SM

S r

equirem

ents

;

f)

To

ensure

th

at

the

E

SM

S

ach

ieves

its

inte

nd

ed

outc

om

es

by

directing

an

d

sup

port

ing

pers

ons to c

ontr

ibute

to t

he

eff

ectiveness o

f th

e E

SM

S;

g)

To

pro

mote

continu

al

impro

vem

ent

and

(where

p

racticable

) en

vironm

enta

l and

socia

l

enha

ncem

ent;

and

h)

To s

upport

the r

ele

vant

ES

MS

role

s,

thus d

em

onstr

atin

g l

ea

ders

hip

in t

he m

anagem

ent

of

environm

enta

l an

d s

ocia

l consid

era

tions.

Page 14: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-11

En

vir

on

me

nta

l a

nd

So

cia

l P

olic

y

The G

hana B

ridg

e P

ow

er

Pro

ject

is c

om

mitte

d t

o p

rom

oting r

esponsib

le e

nviro

nm

enta

l ste

ward

ship

and s

ocia

lly r

esp

onsib

le d

eve

lopm

ent

for

the b

en

efit

of

pre

sent

an

d f

utu

re g

enera

tions,

and im

pro

vin

g

the q

ua

lity of

life fo

r th

e com

munity w

ith

in th

e T

em

a M

etr

opolit

an A

rea.

F

or

Earl

y P

ow

er

Ltd

,

environm

enta

l an

d c

om

munity p

rote

ctio

n is

a p

riority

an

d, to

th

is e

nd, w

e w

ill s

triv

e to m

axim

ise p

ositiv

e

opport

un

itie

s a

ssocia

ted w

ith o

ur

work

and m

inim

ise the r

isks a

nd im

pacts

.

Specific

ally

, fo

r th

e G

han

a B

rid

ge P

ow

er

Pro

ject

we w

ill:

Com

ply

and,

where

possib

le, excee

d a

ll o

ur

en

vironm

enta

l an

d s

ocia

l ob

ligatio

ns to a

pplic

ab

le

local, n

atio

na

l an

d i

nte

rnationa

l en

vironm

enta

l and s

ocia

l le

gis

latio

n a

nd s

tandard

s i

nclu

din

g

Equ

ato

r P

rincip

les

III

an

d

IFC

P

erf

orm

ance

Sta

ndard

s

of

En

viro

nm

enta

l and

Socia

l

Susta

ina

bili

ty;

Work

with

our

sta

kehold

ers

to e

nsure

due

consid

era

tion

of

the e

nvironm

enta

l, s

usta

inab

ility

and socia

l is

sues associa

ted w

ith

th

is pro

ject

durin

g desig

n,

constr

uction,

op

era

tio

n a

nd

decom

mis

sio

nin

g;

Pro

vid

e

ad

equ

ate

re

sourc

es

to

ensure

th

at

our

work

ers

are

aw

are

of

environm

enta

l,

susta

ina

bili

ty

and

socia

l is

sues

thro

ugh

the

deliv

ery

of

eff

ective

com

munic

ation

and

environm

enta

l tr

ain

ing;

Seek o

pp

ort

un

itie

s t

o s

up

port

econ

om

ic a

nd s

ocia

l d

eve

lopm

ent

in s

urr

ound

ing

com

munitie

s,

there

by enh

ancin

g th

e so

cia

l co

nte

xt

of

our

pro

ject

and

pro

moting th

e he

alth

, safe

ty a

nd

security

of

both

our

work

ers

and t

he local com

munity;

Contr

ibute

positiv

ely

with d

irect and

in

direct em

plo

ym

ent op

port

unitie

s to the loca

l w

ork

forc

e a

t

each p

roje

ct sta

ge;

Respect

hum

an r

ights

and

im

ple

ment ap

pro

pri

ate

labo

ur

rig

hts

, in

clu

din

g p

rovid

ing a

safe

and

hea

lth

y w

ork

environm

ent. T

ake s

teps to

ensure

that

opera

tions d

o n

ot

have n

eg

ative im

pacts

on c

om

munity m

em

bers

and w

ork

ers

, and a

ttem

pt

to m

itig

ate

and

rem

edia

te a

ny a

dvers

e

impacts

th

at

ma

y arise;N

ot

dis

crim

inate

in

te

rms of

recru

itm

ent, pro

gre

ssio

n,

term

s and

conditio

ns o

f w

ork

and r

epre

senta

tio

n o

n t

he b

asis

of

pers

onal ch

ara

cte

ristics u

nre

late

d t

o t

he

inh

ere

nt jo

b r

eq

uirem

ents

, in

clu

din

g g

ender,

race, co

lour,

dis

abili

ty, ag

e, re

ligio

n, m

arita

l sta

tus

or

HIV

sta

tus e

tc.;

Pro

vid

e f

airness a

nd tra

nsp

are

ncy in la

nd a

cq

uis

itio

n a

nd r

esett

lem

ent;

Opera

te in

a m

anner

com

plia

nt

with nation

al

and in

tern

ation

al

anti-b

rib

ery

a

nd corr

uptio

n

leg

isla

tio

n,

an

d w

ith a

ppro

priate

consid

era

tio

n o

f audit,

due d

iligence

and p

ote

ntial conflic

ts o

f

inte

rest;

Deliv

er

safe

, re

liable

and

eff

icie

nt

opera

tions in a

manner

wh

ich

contr

ibute

s t

o o

ur

goa

l of

no

dam

age to th

e e

nvironm

ent;

Str

ive t

o u

se p

rove

n,

com

merc

ially

feasib

le s

tate

-of-

the-a

rt t

echn

olo

gy.

Targ

et

hig

h e

nerg

y

eff

icie

ncy,

reduce w

ate

r consum

ption,

and m

axim

ise w

aste

re

use an

d re

cyclin

g,

there

by

reducin

g

the

qu

antities

of

waste

g

oin

g

to

landfill;

M

onitor,

m

easure

and

im

pro

ve

our

environm

enta

l perf

orm

ance thro

ug

h a

ris

k-b

ased a

ppro

ach to e

nviro

nm

enta

l p

rote

ction;

Define a

nd a

do

pt a d

ecom

mis

sio

nin

g a

nd r

em

edia

tio

n s

trate

gy, e

arl

y in th

e p

roje

ct, to c

onsid

er

site a

fterc

are

wh

en o

pera

tions h

ave e

nd

ed;

an

d,

Page 15: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-12

Revie

w o

ur

environm

enta

l and s

ocia

l po

licy a

nd o

bje

ctives a

nnua

lly i

n o

rder

to c

onsid

er

the

need

for

an

y a

mendm

ents

in the

lig

ht

of

chang

ing

circu

msta

nces.

In o

rder

to a

ch

ieve t

he

aim

s o

f th

is p

olic

y a

nd

contin

ually

im

pro

ve o

ur

environm

enta

l perf

orm

ance,

we

will

build

and m

ain

tain

th

is m

anagem

ent syste

m in a

ccord

ance w

ith th

e p

rincip

les o

f IS

O140

01:2

01

5.

Sin

ce

rely

,

On

be

half o

f M

an

ag

em

en

t E

arl

y P

ow

er

Lim

ite

d

Page 16: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-1

3

5.3

O

rga

niz

ati

on

al R

ole

s, R

es

po

nsib

ilit

ies a

nd

Au

tho

rity

5.3

.1

Ke

y p

os

itio

ns

an

d r

es

po

ns

ibilit

ies

The p

lant

ow

ner

an

d o

pera

tor

will

be E

PL. A

manage

ment

org

anis

ation

al chart

for

EP

L is s

ho

wn in

Fig

ure

5-1

. T

he r

ole

s, re

sp

onsib

ility

an

d a

uth

ority

of

EP

L a

nd p

roje

ct pers

on

ne

l a

re d

escribe

d in

Table

5-1

.

Page 17: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-1

Fig

ure

5-1

: E

PL

Org

an

isati

on

al C

ha

rt

Page 18: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

Moto Driver

EHS Officer

Driver

QQA/Q

C Officer

Civil Engineer

Cleaners

Mechanical 

Engineer

Cleaners

Electrical 

Engineer

C&I Engineer

Mechanical 

Engineer

 Drivers

Driver

C & I Engineer

Drivers

Driver

Electrical 

Engineer

Drivers

Accountant

Operations Team

Maintenance 

Team

Administration 

Team

Project 

Sched

uler

Office Manager 

Accountant 

Assistant

Contract 

Manager

Documen

Controller

Admin Assistant

Driver

PA to Executive 

Team

Construction 

Managem

ent 

Team

Dep

uty Finance 

Manager (Local 

Citizen

)

Plant Manager 

Site 1 and 2

Construction Site 

Manager

Endeavor Energy 

Home Office 

Support Legal, 

Accounting, Tax, 

Treasury, 

Commercial, 

Finanace, 

Technical, 

Human

 

Resources, EHS 

Driver

Assistant

QA/Q

C M

anager

Commercial 

Managem

ent 

Support

Project 

Compa

ny 

Board(EP

L)

Executive Mgm

t  Chief Executive 

Officer + Chief 

Finance Officer

Commercial & 

Contracts 

Manager / CLO

Dep

uty Gen

eral 

Manger 

(Local Citizen)

Bridge O&M 

Team

 (EE

 / GE)

Page 19: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-1

5.3

.2

Qu

alifi

cati

on

s a

nd

te

am

ma

ke

up

The c

om

pete

nce o

f th

e E

SM

S c

oord

inato

r, c

om

pany/p

roje

ct

pers

onne

l, c

onsu

ltants

an

d c

ontr

acto

rs

shall

be

managed

by t

he p

rocess a

s s

et

out

in S

ection

7.2

Com

pete

nce

an

d a

dd

itio

na

lly d

eta

iled

with

in t

he G

han

a B

ridg

e E

SM

S R

EC

02 T

rain

ing M

atr

ix.

The r

ole

s a

nd r

espo

nsib

ilities o

f specific

part

ies a

re s

et

out

in t

he t

able

be

low

.

Tab

le 5

-1:

Ro

les a

nd

Re

sp

on

sib

ilit

ies

Part

y

Resp

on

sib

ilit

ies

Earl

y P

ow

er

Lim

ited

Ado

pting

the E

SM

S. T

his

docum

ent

shall

be u

sed a

s a

guid

e in t

he d

evelo

pm

ent

of

subsequen

t E

SM

S p

lans f

or

all

pro

ject phases. T

his

ES

MS

must be a

dopte

d

and inte

rnation

al IF

C s

tan

dard

s m

et fo

r th

e d

ura

tion t

he p

roje

ct.

EP

L s

ha

ll

appo

int

an O

wner’s E

ngin

eer

whose r

esp

onsib

ilities s

hall

inclu

de r

evie

w a

nd

overs

ight

of

the E

PC

Con

tracto

r’s e

nvironm

enta

l, h

ea

lth a

nd s

afe

ty p

lans a

nd

syste

ms c

onfo

rmance w

ith t

he p

relim

inary

ES

MP

and t

he E

SM

S.

EP

L

Mana

gem

ent

an

d

Lead

ers

hip

The S

en

ior

Mana

gem

ent of

EP

L s

ha

ll ha

ve u

ltim

ate

responsib

ility

for

the E

SM

S

and s

hall

dem

onstr

ate

lea

ders

hip

and c

om

mitm

ent w

ith r

espect to

the

environm

enta

l an

d s

ocia

l m

anag

em

ent syste

m a

s s

et out in

Sectio

n 5

.1. T

he

managem

ent te

am

shall

de

monstr

ate

lead

ers

hip

by s

ettin

g th

e E

SM

S p

olic

y,

role

s, re

spo

nsib

ility

and a

uth

ority

as w

ell

as a

ppo

intin

g a

suitab

ly q

ua

lifie

d

ind

ivid

ual to

le

ad t

he E

SM

S team

and e

nsuring

tha

t ad

equa

te r

eso

urc

es a

re

made a

va

ilable

for

the E

SM

S o

pera

tio

n. T

he m

anage

ment te

am

shall

lead a

nd

undert

ake the m

anagem

ent re

vie

w a

t le

ast

on a

n a

nnu

al b

asis

. T

he

y a

lso

ho

ld

responsib

ility

for

appro

va

l o

f E

SM

S p

lans a

nd p

rocedure

s p

repare

d b

y t

he E

PC

contr

acto

r(s).

ES

MS

Coord

inato

r

The E

SM

S c

oord

inato

r sh

all

be

responsib

le f

or

the E

SM

S im

ple

menta

tion a

nd

furt

her

develo

pm

ent,

inclu

din

g lia

iso

n w

ith t

he S

en

ior

Mana

gem

ent T

eam

of

EP

L.

This

pers

on m

ust be s

uita

bly

qualif

ied (

as p

er

Section 7

.2)

an

d w

ill a

lso lead

the

ES

MS

team

(s).

EP

C c

ontr

acto

r(s)

The c

ontr

acto

rs’ ro

le a

t each s

tage

of

the p

roje

ct

shall

adhere

to t

he E

SM

S

polic

y,

ES

MS

obje

ctives, com

plia

nce o

blig

atio

ns a

nd a

ny o

ther

requ

irem

ents

set

out

in t

his

ES

MS

or

in t

he

ir c

ontr

act.

T

he c

ontr

acto

r w

ill a

pp

oin

t an

ES

MS

te

am

to d

eve

lop a

nd im

ple

ment

deta

iled E

nviro

nm

enta

l, H

ealth

an

d S

ocia

l

Mana

gem

ent P

lans f

or

spe

cific

managem

ent aspects

of

the c

onstr

uction p

hase

of

the p

roje

ct.

These w

ill b

e a

ppro

ved b

y E

PL.

ES

MS

team

for

the c

onstr

uction

phase

The E

SM

S t

eam

for

the c

onstr

uction p

hase s

hall

be m

ade u

p o

f re

pre

senta

tive

s

of

EP

L

reflective

of

the

com

pan

y’s

e

arl

y

sta

ges

of

develo

pm

ent,

as

well

repre

senta

tives of

the m

ain

E

PC

contr

acto

r w

hic

h re

flect

a w

ide ra

ng

e of

job

functions inclu

din

g o

pera

tives.

The c

onstr

uction p

hase E

SM

S t

eam

will

be r

esp

onsib

le f

or:

Dra

ftin

g th

e d

eta

iled E

SM

Ps f

or

specific

aspects

of

the c

onstr

uction

phase,

whic

h w

ill inclu

de a

ll of

the a

sp

ects

covere

d in t

his

ES

MS

and

Page 20: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-2

Part

y

Resp

on

sib

ilit

ies

pre

limin

ary

ES

MP

;

The im

ple

menta

tion a

nd e

nfo

rcem

ent of

actions r

equ

ired b

y t

he d

eta

iled

managem

ent pla

ns,

inclu

din

g a

ny m

onitoring

requ

irem

ents

an

d r

ep

ort

ing

;

The tra

inin

g o

f w

ork

ers

in t

he p

erf

orm

ance o

f ta

sks r

equire

d b

y th

e

deta

iled m

anagem

ent p

lan

s;

The p

rovis

ion o

f all

requ

ire

d m

ate

rials

an

d r

esourc

es,

inclu

din

g s

afe

ty

equ

ipm

ent and

em

erg

ency r

esponse e

qu

ipm

ent re

qu

ired b

y t

he

managem

ent pla

ns;

Mana

gem

ent of

waste

con

tracto

rs a

nd o

ther

exte

rna

l contr

acto

rs a

nd

consulta

nts

used

in

the

con

str

uction / d

ecom

mis

sio

nin

g p

hases o

f th

e

pro

ject;

and

Updatin

g th

e m

anagem

ent pla

ns w

ith a

ny r

equ

ired c

ha

nges a

s t

he

pro

ject pro

gre

sses.

Constr

uction

Mana

ger

The

Constr

uction

Ma

nag

er

will

le

ad

re

gula

r p

roje

ct

meetings

duri

ng

the

constr

uction

phase a

nd

sha

ll in

clu

de E

nviro

nm

enta

l an

d S

ocia

l (a

s w

ell

as H

ea

lth

and S

afe

ty)

Man

ag

em

ent as a

sta

nd

ing

ite

m o

n the a

genda

.

Waste

Contr

acto

rs

The w

aste

contr

acto

r sh

all

be r

espo

nsib

le f

or

the

colle

ction a

nd d

isp

osal of

waste

s to a

ppro

priate

dis

po

sal fa

cili

ties. T

he c

ontr

acto

rs m

ust abid

e b

y th

e

sta

ndard

s s

pecifie

d w

ith

in t

his

ES

MS

and w

ith

in t

he d

eta

iled m

anag

em

ent pla

ns.

Pla

nt O

wn

er

/

Opera

tor

The o

wner

sha

ll ap

poin

t a

n E

MS

te

am

to d

eve

lop a

nd im

ple

ment E

nvironm

enta

l,

Health a

nd S

ocia

l M

anag

em

ent P

lans f

or

the o

pera

tio

nal phase

.

Pla

nt

Man

ager

The P

lant M

ana

ger

will

lea

d r

egu

lar

meetin

gs d

uri

ng t

he o

pera

tion

al phase

an

d

shall

inclu

de E

nvironm

enta

l and S

ocia

l (a

s w

ell

as H

ea

lth a

nd S

afe

ty)

Mana

gem

ent as a

sta

nd

ing

ite

m o

n the

ag

end

a.

ES

MS

team

for

the O

pera

tiona

l phase.

The E

SM

S t

eam

shall

be m

ade u

p o

f re

pre

senta

tive

s o

f E

PL f

rom

a w

ide r

ang

e

of

job f

unctions inclu

din

g o

pera

tives.

The E

SM

S t

eam

will

be r

esponsib

le f

or:

Dra

ftin

g th

e d

eta

iled E

SM

S o

r equ

iva

lent

docum

ents

, w

hic

h s

hall

inclu

de

all

of

the o

pera

tio

na

l aspects

require

d in th

e E

SM

S;

The im

ple

menta

tion a

nd e

nfo

rcem

ent of

actions r

equ

ired b

y t

he d

eta

iled

managem

ent pla

ns,

inclu

din

g a

ny m

onitoring

requ

irem

ents

an

d r

ep

ort

ing

as s

et out

in S

ectio

n 9

.1 M

onitorin

g a

nd M

easure

ment

with

in t

his

docum

ent;

The tra

inin

g o

f w

ork

ers

in t

he p

erf

orm

ance o

f ta

sks r

equire

d b

y th

e

deta

iled m

anagem

ent p

lan

s a

nd s

pecifie

d in t

he E

SM

S;

The p

rovis

ion o

f all

requ

ire

d m

ate

rials

an

d r

esourc

es inclu

din

g s

afe

ty

equ

ipm

ent and

em

erg

ency r

esponse e

qu

ipm

ent re

qu

ired b

y t

he

managem

ent pla

ns;

Page 21: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

5-3

Part

y

Resp

on

sib

ilit

ies

Mana

gem

ent of

waste

con

tracto

rs a

nd o

ther

exte

rna

l contr

acto

rs a

nd

consulta

nts

used

in

the

op

era

tion

al ph

ase o

f th

e p

roje

ct;

an

d;

Updatin

g th

e m

anagem

ent pla

ns w

ith a

ny r

equ

ired c

ha

nges a

s t

he

pro

ject pro

gre

sses.

ES

MS

Au

dit

Team

T

he E

SM

S A

ud

it te

am

shall

be m

ade u

p of

repre

senta

tives of

EP

L w

ho are

ind

epe

nde

nt of

the

ES

MS

team

and m

ay inclu

de

exte

rnal co

nsultants

.

The E

SM

S A

ud

it t

eam

shall

pro

vid

e inde

pen

dence f

or

aud

itin

g p

urp

oses. T

he

y

are

requ

ired

to e

sta

blis

h a

nd m

ain

tain

an

au

dit p

lan a

nd e

nact th

is p

lan a

t th

e

require

d inte

rva

ls. T

he a

ud

it team

shall

als

o a

rrang

e a

nd o

rgan

ise th

e inputs

into

the m

anagem

ent re

vie

w.

This

te

am

shall

be

responsib

le f

or

com

munic

ating t

he

results o

f aud

its to t

he p

roje

ct.

Exte

rna

l

Consultants

Exte

rna

l C

onsultants

sh

all

be u

se

d to u

nd

ert

ake m

onitoring w

ork

s a

nd r

eport

ing

in b

oth

the c

onstr

uctio

n a

nd o

pera

tiona

l p

hase. T

he c

onsultants

must abid

e b

y

the s

tandard

s s

pecifie

d w

ithin

this

ES

MS

an

d w

ithin

th

e d

eta

iled

managem

ent

pla

ns d

raft

ed b

y t

he r

ele

va

nt E

SM

S t

eam

s a

nd b

e c

om

pete

nt in

lin

e w

ith

the

requirem

ents

set o

ut in

Section

7.2

Com

pete

nce

. E

xte

rnal co

nsultants

ma

y a

lso

be r

eq

uire

d to u

nd

ert

ake a

udits.

EP

A / R

egu

latin

g

Bod

ies

Ensure

that m

onitoring

an

d r

eport

ing r

equ

irem

ents

(as r

equir

ed b

y t

he E

MS

P a

nd

deta

iled m

anagem

ent p

lan

s in a

ccord

ance w

ith E

PA

sta

nd

ard

s a

nd g

uid

elin

es)

are

fully

dis

charg

ed

.

Enfo

rce a

ny a

ctions t

hat

sh

all

be r

equ

ired

to e

nsure

en

viro

nm

enta

l q

ualit

y

sta

ndard

s a

re n

ot bre

ached

and p

erm

it r

equirem

ents

are

main

tain

ed.

Inte

rna

tio

na

l

Fin

ancin

g

Institu

tio

n

The Inte

rnatio

nal F

inance I

nstitu

tio

n s

ha

ll de

ve

lop its

ow

n E

nvironm

enta

l an

d

Socia

l A

ctio

n P

lan (

ES

AP

) th

at

will

inclu

de c

onditio

ns t

o b

e m

et. T

he E

SA

P s

ha

ll

inclu

de t

he r

equ

irem

ent to

com

ply

with,

am

ong o

ther

pla

ns, th

e E

SM

S.

Page 22: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

6-4

6.

Pla

nn

ing

The

ES

MS

has

been

desig

ned

to

ensure

th

e

pro

ject

achie

ves

its

inte

nde

d

outc

om

es

inclu

din

g

mitig

atio

n o

f risks a

nd c

ontin

ua

l im

pro

vem

ent. T

he fo

llow

ing sections set

out

ho

w th

e E

SM

S h

as

assessed th

e risks and opport

unitie

s a

nd p

ut

in pla

ce m

easure

s to

m

itig

ate

risks and enh

ance

benefits

.

6.1

A

cti

on

s t

o a

dd

res

s R

isk

s a

nd

Op

po

rtu

nit

ies

6.1

.1

Ge

ne

ral

Ris

ks a

nd o

pport

unitie

s a

ssocia

ted w

ith t

his

pro

ject

are

assessed w

ith

in t

his

ES

MS

ag

ain

st

sig

nific

ant

environm

enta

l an

d

socia

l aspects

, th

e

environm

enta

l and

socia

l p

olic

y

for

the

ES

MS

an

d

the

com

plia

nce o

blig

ations s

et

out

in t

his

docum

ent. T

he a

im o

f th

is a

ssessm

ent

is t

o p

reve

nt

unin

ten

ded

eff

ects

and p

rovid

e c

ontinu

al or

enh

anced

en

vir

onm

enta

l and s

ocia

l be

nefits

.

Em

erg

ency r

esponse

ap

plic

able

to t

hese s

ignific

an

t e

nvironm

enta

l and s

ocia

l aspects

is d

eta

iled i

n

Section 8

.2.

6.1

.2

En

vir

on

men

tal

Asp

ects

En

viro

nm

enta

l aspects

ha

ve

be

en

develo

ped

for

the

ES

MS

(s

ee

Gha

na

Bri

dge

ES

MS

D

OC

2

Aspects

Reg

iste

r) f

or

the a

ctivitie

s a

ssocia

ted w

ith a

ll th

ree s

tag

es o

f th

e p

roje

ct

with t

he o

bje

ctive o

f

contr

olli

ng t

hose a

sp

ects

over

wh

ich t

he p

roje

ct an

d E

SM

S c

an

exert

influence.

The thre

e p

hases a

re:

Constr

uction

;

Opera

tion

; and

,

Decom

mis

sio

nin

g.

The E

nvironm

enta

l A

spects

pro

cedure

d

eta

iled in

E

SM

S D

OC

2 is

desig

ne

d to

id

entify

th

e m

ost

sig

nific

an

t e

nvironm

enta

l and socia

l aspects

ena

blin

g th

em

to

be contr

olle

d and w

here

possib

le

mitig

ate

d.

Sig

nific

ant

en

vironm

enta

l an

d s

ocia

l aspects

can r

esult i

n t

hre

ats

such a

s e

nviro

nm

enta

l

impacts

; and o

pport

unitie

s s

uch a

s e

nh

anced

or

beneficia

l en

vironm

enta

l and

socia

l perf

orm

ance.

For

the

purp

ose o

f cate

gori

zin

g r

isk,

a s

coring m

atr

ix h

as b

ee

n d

evelo

pe

d in a

ccord

ance w

ith

industr

y

sta

ndard

s,

whic

h e

na

ble

s a

naly

sis

of

the s

everity

and lik

elih

ood o

f each im

pact.

Score

s a

re a

llocate

d

based o

n t

he m

itig

ate

d r

isk,

follo

win

g t

he

ap

plic

ation o

f both

en

gin

eere

d m

itig

atio

n a

nd

managem

ent

contr

ols

w

hic

h are

alr

ead

y in

clu

de

d in

th

e desig

n or

are

outlin

ed w

ithin

th

e E

SIA

. T

he re

leva

nt

mitig

atio

n m

easure

s a

re d

eta

iled

within

Sectio

n 2

of

the A

spect

Reg

iste

r.

In t

he e

ve

nt

that

ade

qua

te m

itig

ation m

easure

s a

re n

ot

ye

t in

pla

ce

to

red

uce r

isk t

o a

n a

ccepta

ble

level (e

.g.

where

the

y a

re y

et

to b

e d

esig

ne

d i

n d

eta

il),

or

where

the d

esig

n is n

ot

suff

icie

ntly m

atu

re

to e

nab

le c

onfirm

ation o

f m

itig

ation,

a c

onserv

ative a

ppra

isa

l of

risk h

as b

een a

pp

lied.

6.1

.3

Co

mp

lia

nc

e O

blig

ati

on

s

Com

plia

nce o

blig

atio

ns m

ay r

esult in r

isks a

nd o

pport

unitie

s t

o t

he p

roje

ct

and t

o t

he E

SM

S.

A L

eg

al

and

Oth

er

Req

uirem

ents

Regis

ter

(Ghan

a B

rid

ge E

SM

S D

OC

3)

has b

een

pro

duced w

hic

h p

rovid

es a

list

of

the c

om

plia

nce o

blig

atio

ns r

ele

van

t to

th

e p

roje

ct. T

hese c

om

plia

nce o

blig

atio

ns a

re r

ele

va

nt

to

the e

nvironm

enta

l and s

ocia

l asp

ects

(part

icula

rly s

ignific

ant

environm

enta

l an

d s

ocia

l asp

ects

) an

d

the leg

isla

tion a

ffecting t

he

se e

nviro

nm

enta

l and

socia

l aspects

and t

he

pro

ject. T

he L

ega

l and

Oth

er

Requ

irem

ents

Regis

ter

sets

out th

ese c

om

plia

nce

ob

ligations to

dete

rmin

e:

Page 23: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

6-5

Their r

ele

vance

to t

he e

nvir

onm

enta

l a

nd s

ocia

l aspects

;

Com

plia

nce o

blig

ations th

at app

ly to t

he p

roje

ct;

That th

ese o

blig

atio

ns a

re t

aken into

co

nsid

era

tion in

:

o

the

pla

nnin

g,

opera

tion

, m

ain

ten

ance

and

con

tinu

al

impro

vem

ent

of

the

environm

enta

l an

d s

ocia

l m

anag

em

ent syste

m; and,

o

the p

lannin

g, co

nstr

uctio

n,

opera

tio

n a

nd d

ecom

mis

sio

nin

g s

tag

e o

f th

e p

roje

ct.

Ho

w th

e p

roje

ct com

plie

s o

r shall

com

ply

with th

e o

blig

atio

ns;

Tra

inin

g r

equ

irem

ents

for

the o

blig

atio

ns; an

d,

Mon

itori

ng r

egim

es (

deta

iled f

urt

her

in S

ectio

n 9

.1 M

on

itori

ng,

measure

ment, a

na

lysis

and

eva

luation

).

Where

com

plia

nce o

blig

ations are

no

t dir

ectly re

levant

to th

e aspects

or

to le

gis

lation th

ese are

deta

iled in t

he s

ection o

f th

e le

ga

l re

gis

ter

- “o

ther

req

uirem

ents

”.

Sett

ing

the

com

plia

nce o

blig

ations s

ha

ll co

nstitu

te o

ne

or

more

of

the f

ollo

win

g:

a)

Requ

irem

ents

fro

m g

ove

rnm

enta

l entities o

r oth

er

rele

vant

auth

ori

ties;

b)

Inte

rnationa

l, n

ation

al an

d loca

l la

ws a

nd r

egula

tion

s;

c)

Requirem

ents

specifie

d in p

erm

its, lic

enses o

r oth

er

form

s o

f auth

ori

zatio

n;

d)

Ord

ers

, ru

les o

r gu

ida

nce f

rom

regula

tory

agencie

s;

and,

e)

Judgem

ents

of

court

s o

r adm

inis

trative tri

bu

na

ls.

Com

plia

nce ob

ligations a

lso in

clu

de re

qu

irem

ents

of

oth

er

sta

kehold

ers

. T

he fo

llow

ing sho

uld

b

e

taken into

consid

era

tion w

hen s

ett

ing

these

ob

ligations:

Agre

em

ents

with c

om

munity g

roups o

r n

on

-govern

menta

l org

aniz

atio

ns;

Agre

em

ents

with p

ublic

au

thorities o

r custo

mers

;

Pro

ject

or

com

pan

y r

equir

em

ents

;

Volu

nta

ry p

rincip

les o

r cod

es o

f pra

ctice

;

Oblig

ations a

risin

g u

nder

contr

actu

al arr

angem

ents

; a

nd,

Rele

va

nt

ind

ustr

y s

tandard

s.

The c

om

plia

nce o

blig

ations a

s s

et

out

in t

he L

eg

al

an

d O

ther

Requ

irem

ents

Reg

iste

r (G

hana B

ridg

e

ES

MS

DO

C 3

) sha

ll b

e r

evie

wed o

n a

6 m

onth

ly b

asis

thro

ugh t

he u

se o

f a r

egu

lato

ry a

ccess o

r

info

rmation p

ort

al

(on

line j

ourn

al

or

sim

ilar)

or

thro

ug

h t

he a

ppo

intm

ent

of

a l

egal

serv

ice p

rovid

er

or

exte

rnal consu

ltan

ts.

Co

mm

un

icati

on

of

ch

an

ges t

o c

om

pli

an

ce o

blig

ati

on

s

Chan

ges i

n l

eg

isla

tio

n a

nd

oth

er

com

plia

nce o

blig

atio

ns s

hall

be c

om

munic

ate

d t

o t

he p

roje

ct

team

,

contr

acto

rs o

r oth

er

inte

reste

d p

art

ies o

n a

n a

d-h

oc b

asis

or

at

6 m

onth

ly i

nte

rva

ls w

hen t

he L

eg

al

and O

ther

Re

qu

irem

ents

Regis

ter

(Gh

ana B

ridge

ES

MS

DO

C 3

) is

up

date

d.

Page 24: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

6-6

6.1

.4

Pla

nn

ing

Ac

tio

n

All

actions t

aken t

hro

ugh t

he l

ife o

f th

e p

roje

ct

sha

ll consid

er

the e

nvironm

enta

l and s

ocia

l asp

ects

associa

ted w

ith t

he p

roje

ct. E

ach p

rocess u

ndert

aken

at

the p

lann

ing,

constr

uction,

opera

tiona

l and

decom

mis

sio

nin

g p

hase,

shall

be r

eq

uire

d t

o i

nte

gra

te a

nd c

onsid

er

this

thin

kin

g i

nto

the o

pera

tio

ns

of

the E

SM

S.

Fig

ure

6-1

: b

elo

w s

ets

out th

e p

rocess t

o b

e u

nd

ert

aken f

or

pla

nnin

g a

ctio

n.

Page 25: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

6-7

Fig

ure

6-1

: P

lan

nin

g A

cti

on

Pro

cess

New

Act

ivit

y /

Ch

ange

to

Exi

stin

g A

ctiv

ity

In-l

ine

wit

h

pro

ject

/ESM

S O

bje

ctiv

es?

Yes?

Co

nti

nu

e

No

?R

evie

w a

nd

sta

rt

pro

cess

aga

in

Po

ten

tial

En

v/So

cial

Imp

act?

Envi

ron

men

tal a

nd

So

cial

Co

nsi

der

atio

ns

are

det

aile

d in

th

e A

spec

ts a

nd

Imp

acts

R

egis

ter

Car

ry o

ut

pro

cess

Yes?

Co

nti

nu

e

No

?C

on

sid

er a

n

alte

rnat

ive

pro

cess

Co

nsi

der

co

ntr

ols

?-M

itig

atio

n-T

rain

ing

req

ts-P

roce

ss r

eqts

-Ob

ject

ives

an

d t

arge

tsA

re t

hey

acc

epta

ble

?

Co

nsi

der

Po

siti

ve

and

Neg

ativ

e

Imp

lem

ent

con

tro

ls

and

fee

d in

to E

SMS

Co

nsi

der

pro

cess

7

.2.1

Co

mp

eten

ce

pro

cess

Page 26: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

6-8

6.2

E

nvir

on

me

nta

l O

bje

cti

ve

s a

nd

Pla

nn

ing

to

Ac

hie

ve

Th

em

6.2

.1

En

vir

on

me

nta

l a

nd

So

cia

l O

bje

cti

ve

s

The

pro

ject

has

de

ve

lope

d

en

vir

onm

enta

l and

socia

l o

bje

ctives

(Ghan

a

Brid

ge

ES

MS

R

EC

01

En

viro

nm

enta

l an

d S

ocia

l O

bje

ctives &

Targ

ets

) th

at

have t

aken in

to c

onsid

era

tio

n t

he s

ign

ific

ant

environm

enta

l aspects

and

associa

ted c

om

plia

nce o

blig

ations w

hils

t a

lso c

onsid

ering a

ny r

isks a

nd

opport

un

itie

s th

at

ha

ve

be

en id

entified.

Pro

gra

mm

es and pro

cesses are

re

quir

ed to

enact

these

obje

ctives thro

ugh

out

the c

onstr

uctio

n, o

pera

tion

an

d d

ecom

mis

sio

nin

g p

hase o

f th

e p

roje

ct.

Obje

ctives a

nd t

arg

ets

sha

ll be S

MA

RT

(specific

, m

easura

ble

, a

tta

ina

ble

, re

leva

nt

and t

ime b

ound)

in

ord

er

to a

chie

ve m

axim

um

success.

Cle

ar

ow

ners

hip

shall

be a

ssig

ned f

or

each

obje

ctive a

nd t

arg

et,

with a

de

qua

te r

eso

urc

es m

ade a

vaila

ble

for

their a

ch

ievem

ent.

The o

bje

ctives s

hall

be c

onsis

tent

with t

he E

SM

S a

nd w

ith t

he e

nvironm

ent

an

d s

ocia

l po

licy,

and

shall

be

measura

ble

, m

onitore

d a

nd

com

munic

ate

d.

The o

bje

ctives sha

ll a

lso b

e u

pda

ted

at

least

annu

ally

(and

more

fre

quen

tly w

here

requ

ired)

to e

nsure

the

y a

re r

ele

vant

and

not

ou

tdate

d.

6.2

.2

Pla

nn

ing

acti

on

s t

o a

ch

ieve E

nvir

on

me

nta

l O

bje

cti

ve

s

The f

ollo

win

g p

rocess s

ets

out h

ow

the o

bje

ctives s

ha

ll be s

et

and

achie

ved f

or

the E

SM

S:

Obje

ctives a

nd t

arg

ets

shall

be c

onsid

ere

d a

nd s

et

as a

min

imum

at

each s

tage o

f th

e p

roje

ct

(constr

uction/o

pera

tio

n/d

ecom

mis

sio

n);

Obje

ctives s

ha

ll b

e r

evie

wed a

t re

gula

r in

terv

als

as p

er

the r

eq

uirem

ents

of

the i

nd

ivid

ua

l

obje

ctives.

This

revie

w p

eri

od s

hall

be s

et

aga

inst

the

obje

ctive t

hou

gh t

his

shall

be n

o l

ess

than 6

month

ly;

Where

Ke

y P

erf

orm

ance I

ndic

ato

rs (

KP

Is)

are

re

qu

ired t

o m

onitor

pro

gre

ss t

hese s

ha

ll b

e

monitore

d a

s p

er

the

pro

ce

ss in S

ection

9.1

Mo

nitorin

g a

nd M

easure

ment;

Obje

ctives a

nd

targ

ets

sha

ll b

e s

et

takin

g c

onsid

era

tio

n o

f th

e p

roje

ct

aspects

inclu

din

g t

hose

deem

ed s

ignific

ant,

as w

ell

as o

ther

risks a

ssocia

ted

with t

he p

roje

ct. T

his

may i

nclu

de

a

pro

ject risk r

egis

ter

whic

h h

igh

lights

exis

ting

pro

cesses o

r re

qu

irem

ents

for

the p

roje

ct;

When c

onsid

eri

ng e

nviro

nm

enta

l and

socia

l o

bje

ctives t

he p

riori

ty s

hou

ld b

e f

or

obje

ctives

whic

h r

educe

the

im

pact

of

sig

nific

ant

en

viro

nm

enta

l and

socia

l aspects

(risks)

and

wh

ere

possib

le

enh

ance

the

environm

ent

(opport

unitie

s).

A

dd

itio

nally

, e

nvironm

enta

l and

socia

l

aspects

or

oth

er

risks a

ssocia

ted w

ith t

he r

isk r

egis

ter,

as w

ell

as t

hose d

irectly r

ele

va

nt

to

leg

isla

tio

n, sho

uld

be

a p

rio

rity

;

Where

possib

le

best

availa

ble

te

ch

niq

ues

(BA

T)

shou

ld

be

ado

pte

d

to

en

hance

these

opport

un

itie

s a

nd

ne

gate

th

e r

isks;

Inte

reste

d p

art

ies a

nd s

takeho

lders

as w

ell

as o

ther

requ

irem

ents

in t

he E

SM

S o

r th

e p

roje

ct

should

be

consid

ere

d in t

he

settin

g o

f obje

ctives;

Pro

gra

mm

es or

pla

ns shall

be de

ve

lop

ed to

de

tail

the re

qu

irem

ents

th

at

shall

enable

th

e

obje

ctives a

nd t

arg

ets

to b

e a

chie

ved.

The p

rogra

mm

es s

hall

desig

nate

the

resp

onsib

ility

for

achie

vin

g o

bje

ctives a

nd t

arg

ets

at

each f

unction a

nd l

eve

l of

the

pro

ject, t

oge

ther

with t

he

means a

nd tim

e f

ram

e b

y w

hic

h t

he

y a

re to b

e a

ch

ieved

; a

nd,

The S

MA

RT

obje

ctive q

ue

stions p

rese

nte

d i

n T

able

6-1

shall

be c

onsid

ere

d i

n t

he s

ett

ing o

f

obje

ctives.

Page 27: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

6-9

Tab

le 6

-1:

SM

AR

T O

bje

cti

ve Q

uesti

on

s

Te

rm

Qu

es

tio

ns

to

co

ns

ide

r

S

Sp

ec

ific

W

hat

is th

e g

oa

l o

f th

e o

bje

ctive

?

What ca

n o

r w

ill b

e a

ch

ieve

d?

Whic

h a

rea

s o

f th

e p

roje

ct

does t

he o

bje

ctive

app

ly t

o?

Where

th

e o

bje

ctive

is id

entified

in

on

e o

f co

nstr

uctio

n,

ope

ratio

n o

r d

ecom

mis

sio

nin

g p

ha

ses,

do

es t

his

ap

ply

to a

fu

rth

er

sta

ge

of

the

pro

ject

M

Me

asu

rab

le

How

ca

n t

he

ob

jective

be

qu

an

tifie

d o

r m

ea

su

red

?

What

is th

e b

est

wa

y t

o m

ea

sure

(to

tal am

oun

t, r

atios,

inte

nsity m

etr

ics)?

How

is p

erf

orm

ance

ag

ain

st

an

ob

jective

(in

clu

din

g c

lose

ou

t) b

e

me

asu

red?

Is t

he

curr

en

t b

ase

line

kn

ow

n to

com

pa

re p

rog

ress?

A

Ac

hie

va

ble

C

an

th

is b

e o

bje

ctive

re

alis

tically

be

ach

ieve

d?

Who s

hal

l do

th

e w

ork

to a

ch

ieve

th

e o

bje

ctive

?

Who s

hal

l it

be

assig

ned

to?

Are

th

ere

ad

eq

uate

reso

urc

es a

nd

su

ppo

rt a

va

ilable

(o

r can

th

ey b

e

acq

uir

ed

)?

Are

ta

rgets

re

alis

tic a

nd

lik

ely

to

be

achie

ve

d?

R

Rele

va

nt

Is

this

im

po

rta

nt

to th

e p

roje

ct, in

tere

ste

d p

art

ies a

nd

oth

er

sta

ke

ho

lde

rs?

Is it

rele

va

nt

to th

e p

roje

ct a

nd t

he

pro

ject

go

als

?

Why a

re w

e d

oin

g t

his

?

Is t

his

th

e r

igh

t tim

e?

Is t

his

th

e c

orr

ect

prio

rity

?

T

Tim

e b

ou

nd

W

hen

must

this

be

ach

ieve

d b

y?

When

must

we

sta

rt?

When

sh

all w

e r

evie

w?

The O

bje

ctive

an

d T

arg

ets

are

docum

ente

d in

G

ha

na B

rid

ge E

SM

S R

EC

0

1 E

nvir

onm

enta

l and

Socia

l O

bje

ctives &

Targ

ets

. P

rogre

ss a

gain

st

the a

ch

ievem

ent

of

obje

ctives s

ha

ll be

de

taile

d a

gain

st

each o

bje

ctive i

n t

his

reg

iste

r at

the

rele

vant

tim

efr

am

e.

A r

evie

w o

f th

e o

bje

ctives a

nd t

arg

ets

sha

ll

take p

lace a

t le

ast

6 m

onth

ly.

Page 28: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

0

7.

Su

pp

ort

7.1

R

es

ou

rces

The p

roje

ct

has d

eve

lop

ed t

he r

esourc

es n

ee

ded f

or

the e

sta

blis

hm

ent, im

ple

menta

tion,

main

tenance

and c

on

tin

ua

l im

pro

vem

ent

of

the E

SM

S.

The d

eta

ils f

or

com

pete

nce,

aw

are

ness a

nd c

om

munic

atio

n

are

set o

ut in

th

e r

ele

vant

sections b

elo

w.

7.2

C

om

pe

ten

ce

The pro

ject

shall

assess,

stipu

late

an

d con

trol

the

com

pete

nce of

all

em

plo

ye

es and

contr

acto

rs

work

ing o

n b

eha

lf o

f th

e p

roje

ct

accord

ing

to t

he

ir a

pp

ropriate

ed

ucation,

train

ing o

r experi

ence.

Each

role

sha

ll ha

ve s

pecific

req

uirem

ents

and a

level of

com

pete

nce t

hat

em

plo

ye

es a

nd c

ontr

acto

rs m

ust

meet.

Tra

inin

g n

eeds s

ha

ll be d

ete

rmin

ed t

hro

ugh t

he u

se o

f th

e p

rocess b

elo

w (

7.2

.2 C

om

pete

nce

Pro

cess)

inclu

din

g h

ow

to

measure

and e

valu

ate

th

e e

ffectiveness o

f th

is t

rain

ing.

Tra

inin

g is r

equir

ed

for

a n

um

ber

of

purp

oses b

ut

sha

ll fa

ll u

nder

two d

istin

ct cate

gori

es:

Cate

gory

1 s

ha

ll be f

or

the

requirem

ents

un

der

the o

pera

tio

n o

f th

e E

SM

S; a

nd

,

Cate

gory

2

sh

all

be

dire

ctly

rele

va

nt

to

the

sta

ge

s

and

opera

tion

of

the

pro

ject

from

constr

uction t

o d

ecom

mis

sio

nin

g.

The C

ate

gory

1 E

SM

S t

rain

ing is t

o e

nsure

that

the

ES

MS

functions e

ffective

ly,

whils

t th

e C

ate

gory

2

train

ing fo

r th

e co

nstr

uctio

n and opera

tiona

l w

ork

forc

e is

re

quir

ed to

ensure

th

ey ca

n safe

ly and

eff

ectively

carr

y o

ut

the

ir r

ole

with

in t

he p

roje

ct. I

n b

oth

insta

nces t

rain

ing s

ha

ll fo

llow

th

e p

rocess

deta

iled in S

ection 7

.2.2

be

low

.

7.2

.1

Co

mp

ete

nc

e p

roc

es

s

The f

ollo

win

g p

rocess s

ho

uld

be

ad

here

d t

o i

n o

rder

to a

ssess c

om

pete

nce a

nd

tra

inin

g n

eeds.

This

pro

cess m

ay f

ollo

w th

e P

lann

ing

Action

P

rocess deta

iled

in

S

ection 6.1

.4 w

he

n a

ne

w activity is

ide

ntifie

d.

Page 29: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

1

Fig

ure

7-1

: C

om

pete

nce P

roc

ess New

ro

le o

r ta

sk

iden

tifi

ed w

ith

a

trai

nin

g re

qt

Ass

ess

trai

nin

g n

eed

s o

f al

l sta

ff a

nd

co

ntr

acto

rs

Rec

ord

info

rmat

ion

Trai

nin

g M

atri

x

Imp

lem

ent

trai

nin

g p

rogr

amm

e

Dev

elo

p t

rain

ing

pro

gram

me

and

tr

ain

ing

mat

eria

l

Imp

lem

ent

the

po

licy,

co

ntr

ol t

he

envi

ron

men

tal a

nd

so

cial

asp

ects

o

r co

mp

lian

ce o

blig

atio

ns,

ad

her

e to

pro

cess

es, m

eet

targ

ets,

en

han

ce im

pro

vem

ent

Set

pro

gram

me

sch

edu

le (

Wee

kly,

m

on

thly

, qu

arte

rly,

6

mo

nth

ly, a

nn

ual

ly)

Trai

nin

g re

cord

s in

clu

din

g at

ten

dan

ce

reco

rds

Eval

uat

e tr

ain

ing

effe

ctiv

essn

ess

-Reg

ula

r re

view

-Man

agem

ent

revi

ew

Rela

ted d

ocum

ents

inclu

de

;

Ghana B

ridge E

SM

S R

ec 0

2 T

rain

ing M

atr

ix

Ghana B

ridge E

SM

S R

ec 0

3 T

rain

ing P

rogra

mm

e

Ghana B

ridge E

SM

S R

ec0

4 T

rain

ing A

tten

dance

Tem

pla

te

Ghana B

ridge E

SM

S R

ec0

5 T

rain

ing A

tten

dance

Record

s &

Cert

ific

ate

s

7.3

A

wa

ren

es

s

The p

roje

ct shall

ensure

th

at a

ll sta

ff u

ndert

akin

g w

ork

on b

eh

alf o

f th

e p

roje

ct

are

aw

are

of:

The e

nvironm

enta

l and

socia

l po

licy a

ssocia

ted w

ith th

e p

roje

ct an

d t

he E

SM

S;

The s

ignific

ant

en

viro

nm

enta

l a

nd s

ocia

l aspects

and im

pacts

associa

ted w

ith th

eir

work

;

Ho

w t

heir c

on

trib

ution a

ffects

the E

SM

S i

nclu

din

g t

he b

en

efits

of

enha

nced e

nviro

nm

enta

l

perf

orm

ance

; and,

Ho

w a

ctio

ns c

ould

resu

lt i

n a

no

n-c

onfo

rmance u

nd

er

the

ES

MS

inclu

din

g n

onfu

lfill

ment

of

com

plia

nce o

blig

ations.

Page 30: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

2

The a

bove r

eq

uirem

ents

shall

be d

eliv

ere

d t

hro

ugh t

he m

ost

appro

priate

induction (

an

d r

efr

esher)

train

ing.

Tra

inin

g r

equ

irem

ents

sha

ll be

assessed w

ithin

th

e T

rain

ing

Ma

trix

(G

hana

Bri

dg

e E

SM

S

Rec 0

2).

Induction

tra

inin

g s

hall

consis

t of

thre

e p

art

s:

Induction T

rain

ing

Ma

teri

al fo

r S

taff

;

Induction T

rain

ing

Ma

teri

al fo

r C

ontr

acto

rs; an

d,

Induction T

rain

ing

Ma

teri

al fo

r V

isitors

.

The a

bove r

eq

uirem

ents

are

dete

rmin

ed w

ithin

th

e T

rain

ing M

atr

ix.

7.4

C

om

mu

nic

ati

on

(In

tern

al

an

d E

xte

rnal

Sta

ke

ho

lde

rs)

7.4

.1

Ge

ne

ral

A p

rocess h

as b

een

esta

blis

hed

within

the E

SM

S w

hic

h e

na

ble

s t

he u

ser

to e

sta

blis

h t

he f

ollo

win

g

princip

les:

what

is t

o b

e c

om

munic

ate

d,

when

to c

om

munic

ate

and h

ow

to c

om

munic

ate

with

in

tern

al

and exte

rna

l sta

keho

lders

. F

igure

7-2

be

low

sets

o

ut

the ty

pes of

com

mu

nic

atio

n th

at

are

to

b

e

undert

aken.

Fig

ure

7-2

Co

mm

un

icati

on

typ

es

7.4

Co

mm

un

icat

ion

7

.4.2

Inte

rnal

co

mm

un

icat

ion

7.4

.3.4

Ext

ern

al

com

mu

nic

atio

n

(Sta

keh

old

ers

)7

.4.2

.2 P

roje

ct m

ee

tin

gs:

Op

era

tio

nal

ph

ase

7.4

.2.3

Re

po

rtin

g fo

r sp

eci

fic

or

sign

ific

ant

eff

ect

s

7.4

.3.1

Lab

ou

r an

d w

ork

ing

con

dit

ion

s p

olic

y

7.4

.3.3

Lab

ou

r gr

ieva

nce

p

roce

ss

7.4

.3.5

Ext

ern

al g

rie

van

ce

pro

cess

7.4

.3.6

Co

mm

un

icat

ion

w

ith

go

vern

me

nt

bo

die

s

7.4

.3.7

Co

mm

un

icat

ion

w

ith

co

ntr

acto

rs

7.4

.2.1

Pro

ject

me

eti

ngs

: C

on

stru

ctio

n p

has

e

7.4

.3 E

xte

rnal

C

om

mu

nic

atio

n

7.4

.3.2

Liv

elih

oo

d

rest

ora

tio

n p

lan

Page 31: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

3

7.4

.2

Inte

rnal

Co

mm

un

icati

on

Deta

iled b

elo

w a

re t

he v

ari

ous t

ypes o

f in

tern

al com

munic

atio

n t

hat

sha

ll ta

ke p

lace w

ithin

the E

SM

S

thro

ug

h th

e vari

ous sta

ge

s of

the pro

ject.

G

han

a B

ridge

E

SM

S R

EC

07 In

tern

al

Com

mu

nic

ation

Tem

pla

te s

hou

ld b

e u

sed t

o c

om

munic

ate

inte

rna

lly.

Tab

le 7

-1:

Inte

rnal

Co

mm

un

icati

on

Co

mm

un

icati

on

T

o w

ho

m

Ho

w o

ften

W

hen

Com

plia

nce

Oblig

ations

To inclu

de th

e E

PL S

enio

r M

ana

gem

ent, r

ele

vant

em

plo

yees, co

ntr

acto

rs

(wh

ere

applic

ab

le)

6 m

onth

ly o

r ad

-hoc a

s

and w

hen

chan

ges

take p

lace

6 m

onth

ly o

r ad

-hoc a

s

and w

hen

chan

ges

take p

lace

. S

ix-m

onth

ly

revie

ws a

re s

uggeste

d

to take p

lace in

April

and O

ct

Update

s to

pro

cesses o

r oth

er

requirem

ents

in

th

is E

SM

S

Rele

va

nt em

plo

yees a

nd

contr

acto

rs (

where

app

licab

le)

ES

MS

team

ES

MS

Au

dit t

eam

As a

nd

whe

n r

eq

uire

d

As a

nd

whe

n r

eq

uire

d

Aud

it f

ind

ings

Rele

va

nt em

plo

yees a

nd

contr

acto

rs (

where

app

licab

le)

ES

MS

team

ES

MS

Au

dit t

eam

and

oth

ers

to b

e d

ete

rmin

ed b

y

aud

it r

esu

lts

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach a

ud

it b

ut

annu

ally

as a

min

imum

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach a

ud

it b

ut

annu

ally

as a

min

imum

Nonconfo

rmitie

s

(wh

en r

equir

ed)

Rele

va

nt em

plo

yees a

nd

contr

acto

rs (

where

app

licab

le)

ES

MS

team

ES

MS

Au

dit t

eam

and

oth

ers

to b

e d

ete

rmin

ed b

y

aud

it r

esu

lts

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach a

ud

it b

ut

annu

ally

as a

min

imum

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach a

ud

it b

ut

annu

ally

as a

min

imum

Mana

gem

ent

revie

w o

utc

om

es

To b

e d

ete

rmin

ed b

y a

udit

results

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach

managem

ent re

vie

w

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach

managem

ent re

vie

w

Pro

gre

ss a

gain

st

obje

ctives a

nd

targ

ets

Rele

va

nt em

plo

yees a

nd

contr

acto

rs (

where

app

licab

le)

ES

MS

team

ES

MS

Au

dit t

eam

and

oth

ers

to b

e d

ete

rmin

ed

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach a

ud

it b

ut

annu

ally

as a

min

imum

As a

nd

whe

n r

eq

uire

d

follo

win

g e

ach a

ud

it b

ut

annu

ally

as a

min

imum

Em

erg

ency

situations o

r occurr

ences

Pote

ntially

all

em

plo

ye

es

and c

ontr

acto

rs.

Dete

rmin

ed b

y e

ve

nt

As a

nd

whe

n r

eq

uire

d

– a

d-h

oc,

with a

nnu

al

sum

mary

As a

nd

whe

n r

eq

uire

d

– a

d-h

oc,

with a

nnu

al

sum

mary

Page 32: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

4

7.4

.2.1

P

roje

ct

Meeti

ng

s:

Co

nstr

ucti

on

Ph

as

e

Pro

ject m

eetings s

ha

ll be p

lanne

d t

o take p

lace

at re

gu

lar

inte

rvals

(e

.g.

weekly

or

month

ly)

duri

ng

the

constr

uction p

hase a

nd s

ha

ll in

clu

de E

nvironm

enta

l an

d S

ocia

l (a

s w

ell

as H

ea

lth

and S

afe

ty)

Mana

gem

ent as a

sta

nd

ing

ite

m o

n the

ag

end

a.

T

he m

eeting s

hall

be led b

y the C

onstr

uction M

an

ager

in c

onju

nctio

n w

ith a

mem

ber

of

the E

SM

S

team

who s

hal

l pro

vid

e f

eed

back a

nd r

ais

e issues to b

e a

ddre

ssed,

inclu

din

g th

e f

ollo

win

g:

1.

En

viro

nm

enta

l, S

ocia

l, H

ea

lth a

nd S

afe

ty p

erf

orm

ance (

based o

n m

onitori

ng r

esu

lts)

– inclu

din

g

both

positiv

e a

nd n

eg

ative

and t

hose c

ontr

olli

ng o

r aff

ecting

the

en

vir

onm

enta

l a

nd s

ocia

l asp

ects

of

the p

roje

ct;

2.

Lega

l con

traventions;

3.

ES

MS

Non-c

onfo

rmances r

esultin

g f

rom

:

a.

Aud

its;

b.

Com

pla

ints

; and/o

r,

c.

Incid

ents

.

4.

Sta

kehold

er

enga

gem

ent in

clu

din

g c

om

pla

ints

;

5.

Inspections b

y a

uth

ori

ties;

6.

Inte

rna

l a

nd e

xte

rna

l a

ud

its r

esults; a

nd,

7.

Tra

inin

g r

equ

irem

ents

inclu

din

g to

ol box ta

lks w

hic

h s

hall

be d

eliv

ere

d a

s p

art

of

the m

eetings,

if

require

d.

7.4

.2.2

P

roje

ct

Meeti

ng

s –

Op

era

tio

nal P

ha

se

Pro

ject m

eetings s

hall

be p

lanne

d t

o t

ake p

lace

at

regu

lar

inte

rva

ls (

e.g

. w

eekly

or

month

ly)

durin

g t

he

opera

tio

nal

phase

an

d

shall

inclu

de

Environm

enta

l and

Socia

l (a

s

well

as

Health

and

Safe

ty)

Mana

gem

ent as a

sta

nd

ing

ite

m o

n the

ag

end

a.

The m

eetings s

hall

be l

ed

by t

he P

roje

ct/P

lant

Ma

nager

an

d i

nvo

lve

the E

nvir

onm

enta

l an

d S

ocia

l

Pers

onn

el (l

ist

team

s a

nd r

ole

s h

ere

), o

pera

tion

al

pers

onne

l, a

nd (

if r

ele

vant)

co

ntr

acto

rs w

ork

ing o

n

site.

The a

gen

da o

f th

e m

eeting s

hall

inclu

de th

e f

ollo

win

g:

1.

En

viro

nm

enta

l a

nd S

ocia

l p

erf

orm

ance (

based

on m

onitoring

results)

– inclu

din

g b

oth

positiv

e

and n

eg

ative r

esults a

nd t

hose c

ontr

olli

ng

or

aff

ecting t

he e

nvironm

enta

l an

d s

ocia

l aspects

of

the

pro

ject;

2.

Lega

l con

traventions;

3.

ES

MS

Non-c

onfo

rmances;

4.

Sta

kehold

er

enga

gem

ent in

clu

din

g c

om

pla

ints

;

5.

Inspections b

y a

uth

ori

ties;

6.

Incid

ents

;

7.

Inte

rna

l a

nd e

xte

rna

l a

ud

its; and

,

8.

Tra

inin

g r

equ

irem

ents

.

7.4

.2.3

R

ep

ort

ing

fo

r sp

ecif

ic o

r sig

nif

ican

t ev

en

ts

The

follo

win

g

typ

es

of

even

ts

shall

be

rep

ort

ed

to

th

e

Pro

ject/P

lant

Man

ager

by

the

ES

MS

coord

inato

r, E

SM

S team

and th

e S

en

ior

Mana

gem

ent T

eam

of

EP

L im

media

tely

:

Page 33: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

5

1.

Incid

ents

with s

ignific

ant risks o

r pote

ntia

l of

sig

nific

ant

risk to p

eople

or

the e

nviro

nm

ent

(this

shall

be h

an

dle

d in a

ccord

ance w

ith th

e E

merg

ency P

repare

dness a

nd R

esp

onse P

lan

– s

ee

Section 8

.2);

2.

Notification o

f aud

its o

r in

spectio

ns b

y a

uth

ori

ties; an

d,

3.

Notification o

f contr

aventio

n o

f th

e e

nviro

nm

enta

l p

erm

it o

r oth

er

regu

lato

ry infr

ingem

ents

.

Pro

cess

The r

eport

ing a

nd n

otification p

rocess s

hall

be d

eve

loped b

efo

re t

he p

roje

ct

com

mences i

n l

ine w

ith

the h

ea

lth a

nd s

afe

ty r

eq

uir

em

ents

of

the p

roje

ct and

the O

HS

MS

.

7.4

.2.4

L

ab

ou

r an

d W

ork

ing

Co

nd

itio

ns

Po

lic

y

The

pro

ject

will

d

evelo

p

a

Lab

our

and

Work

ing

Cond

itio

ns

Polic

y

wh

ich

dem

onstr

ate

s

EP

L’s

com

mitm

ent

to c

om

ply

with

the la

ws o

f G

hana a

nd t

he

requ

irem

ents

of

IFC

Perf

orm

ance S

tand

ard

2.

This

will

ha

ve

obje

ctives t

o p

rom

ote

equa

l opp

ort

un

itie

s a

nd f

air t

reatm

ent

of

work

ers

. A

n o

verv

iew

of

the esse

ntial

co

nte

nts

of

the p

olic

y is

pro

vid

ed in

A

ppen

dix

B

. T

he po

licy sh

all

rem

ain

in

p

lace

thro

ug

hou

t th

e life o

f th

e p

roje

ct.

As a

ppro

priate

, po

licie

s a

nd p

rocedure

s f

or

manage

ment

of

specific

aspects

of

labour

and w

ork

ing

conditio

ns w

ill b

e a

do

pte

d a

nd im

ple

mente

d.

One

of

these

will

be

a

grievance

reso

lution

mechanis

m

for

em

plo

yees,

kno

wn

as

the

“Labo

ur

Grieva

nce P

rocess”

(LG

P).

T

he p

rocess w

ill b

e u

sed

to e

nsure

that

an

y p

rob

lem

, com

pla

int

or

ca

use

for

dis

satisfa

ction a

risin

g b

etw

ee

n t

he e

mplo

ye

e a

nd a

noth

er

em

plo

ye

e o

r th

e C

om

pan

y i

s r

esolv

ed

as q

uic

kly

as p

ossib

le.

Fu

rther

deta

ils o

f th

e m

inim

um

requirem

ents

of

this

pro

cess a

re o

utlin

ed i

n

App

end

ix C

.

It is

note

d th

at

the LG

P is

fo

r in

tern

al

work

-rela

ted gri

evances and

is

se

pa

rate

to

th

e exte

rna

l

grie

vance

mechanis

m p

rocess d

escribed in t

he f

ollo

win

g s

ection.

In a

dditio

n t

o t

he L

GP

, th

e d

eve

lopm

ent

of

the L

ab

our

and W

ork

ing C

on

ditio

ns P

olic

y w

ill i

nclu

de

pre

para

tio

n o

f a C

ode o

f B

eha

vio

ur

Polic

y.

7.4

.3

Ex

tern

al C

om

mu

nic

ati

on

7.4

.3.1

C

om

mu

nic

ati

on

wit

h S

tak

eh

old

ers

A S

EP

(G

ha

na B

ridge

ES

MS

DO

C 6

Sta

kehold

er

Engag

em

ent

Pla

n)

has b

ee

n d

eve

loped

, d

efinin

g

the

requ

irem

ents

fo

r com

munic

ation

w

ith

sta

tuto

ry

bod

ies,

the

com

munity

and

oth

er

exte

rna

l

sta

kehold

ers

. G

han

a B

rid

ge E

SM

S R

EC

08 E

xte

rna

l C

om

munic

ation T

em

pla

te s

hou

ld b

e u

sed

for

exte

rnal com

munic

ation.

The S

EP

sets

out

an

d d

efin

es a

fra

mew

ork

of

sta

ndard

ised m

easure

s to

be

un

dert

aken f

or

pro

active

ly

enga

gin

g a

nd c

om

munic

ating w

ith e

xte

rna

l pro

ject

sta

kehold

ers

an

d t

o g

uid

e t

he s

trate

gie

s t

o e

ng

ag

e

with t

hem

accord

ing t

o t

he

ir r

espective n

eeds a

nd i

nte

rests

. It i

s d

esig

ned t

o d

em

onstr

ate

that

EP

L

will

und

ert

ake

consultation

and

part

icip

ation

tha

t is

m

eanin

gfu

l,

co

nsis

tent,

com

pre

hensiv

e,

coord

inate

d a

nd c

ultura

lly a

ppro

priate

in l

ine w

ith a

ll th

e r

ele

vant

legal

an

d r

egu

lato

ry c

om

mitm

ents

inclu

din

g inte

rnation

al goo

d p

ractice,

nation

al sta

nd

ard

s a

nd t

he r

eq

uirem

ents

of

this

ES

MS

.

For

the p

urp

ose o

f th

is E

SM

S, sta

keho

lders

are

split

out

into

the

follo

win

g t

wo g

roups:

Sta

tuto

ry

or

Inte

reste

d

(part

y)

Sta

keho

lder:

Sta

tuto

ry

or

Inte

reste

d

Sta

kehold

ers

m

ay

constitu

te p

ub

lic a

nd

go

vern

ment

bod

ies,

com

panie

s (

mediu

m o

r la

rge

or

multin

atio

na

ls)

or

Page 34: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

6

oth

er

inte

reste

d p

art

ies t

hat

the p

roje

ct

ma

y h

ave

an

im

pact

on o

r th

at

ma

y h

ave

a m

ate

rial or

non-m

ate

rial in

tere

st in

th

e p

roje

ct;

and

,

Com

munity

Sta

kehold

er:

-

A com

munity sta

kehold

er

can be a m

em

ber

of

the pub

lic

or

mem

ber

of

a l

ocal

org

an

isatio

n o

r oth

er

inte

reste

d p

art

y t

ha

t th

e p

roje

ct

is h

avin

g a

n i

mpact

upon

(positiv

e

or

negative);

in

clu

din

g

sm

all

com

pan

ies

or

‘one

man

ba

nds’.

Local

com

munitie

s a

nd w

ork

ers

would

fall

within

th

is c

ate

go

ry o

f sta

kehold

er.

7.4

.3.2

C

om

mu

nic

ati

on

wit

h g

overn

men

t b

od

ies

Deta

iled b

elo

w a

re t

he v

ari

ous t

yp

es o

f com

munic

ation w

ith g

overn

ment

bodie

s t

hat

shall

take p

lace

with

in t

he E

SM

S thro

ugh t

he v

arious s

tages o

f th

e p

roje

ct.

Tab

le 7

-2:

Co

mm

un

icati

on

wit

h g

ov

ern

men

t b

od

ies

Co

mm

un

icati

on

T

o w

ho

m

Ho

w o

ften

W

hen

Ann

ua

l E

nviro

nm

enta

l R

eport

EP

A

Ann

ua

lly

Ann

ivers

ary

of

sta

rt o

f opera

tio

ns

En

viro

nm

enta

l C

ert

ific

ate

E

PA

O

nce

Subm

it w

ithin

18

month

s o

f sta

rt o

f opera

tio

ns

Decom

mis

sio

nin

g

and s

ite c

losure

pla

n

EP

A

Once

6 m

onth

s p

rior

to d

ecom

mis

sio

nin

g th

e

pro

ject

Perm

it r

ene

wa

l E

PA

E

very

18 m

onth

s

18 m

onth

s p

ost-

th

e f

ina

l d

ate

inclu

ded

on late

st

perm

it a

t tim

e o

f C

OD

.

Oth

er

G

overn

ment

bod

ies a

nd

inspecto

rs

Ad-h

oc /

as

require

d

Upon r

equ

est

Only

pers

onn

el

with t

he a

uth

ority

to d

o s

o w

ith

in t

heir r

ole

are

able

to c

om

munic

ate

with g

overn

ment

bod

ies.

This

sha

ll b

e lim

ite

d t

o t

he E

PL M

ana

gem

ent

Team

and t

he E

SM

S c

oord

inato

r u

nle

ss a

s p

art

of

an inspection o

r au

dit.

All

com

munic

ation w

ith g

overn

ment

bodie

s w

ill b

e u

ndert

aken b

ased o

n t

he

follo

win

g p

rincip

les:

Honesty

and I

nte

gri

ty;

Eth

ical C

on

duct;

Fair P

rese

nta

tio

n;

Due P

rofe

ssio

na

l C

are

; an

d,

Evid

ence b

ased

.

All

record

s r

eg

ard

ing c

orr

esponde

nce w

ith a

uth

orities,

inclu

din

g e

mails

, shall

be r

eta

ined

.

7.4

.3.3

C

om

mu

nic

ati

on

wit

h c

on

tracto

rs

The r

equirem

ents

of

the E

SM

S s

ha

ll b

e c

om

munic

ate

d t

o a

ll contr

acto

rs,

where

rele

vant.

This

ma

y

inclu

de:

Page 35: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

7

1.

Tra

inin

g,

inclu

din

g

ind

uction

, ge

nera

l en

vir

onm

enta

l m

anag

em

ent,

enviro

nm

enta

l an

d

socia

l

contr

ols

(a

ll to

adh

ere

to

th

e E

SM

S p

olic

y,

en

viro

nm

ent

and socia

l aspects

and o

bje

ctives)

(see

Section 7

.2 C

om

pete

nce);

2.

Issuin

g (a

nd sig

n off

) of

ES

MS

pro

cesses (s

ee

S

ection 7.5

D

ocum

enta

tion)

rele

va

nt

to th

eir

contr

acte

d s

cop

e o

f w

ork

;

3.

Mo

nitorin

g r

equ

irem

ents

rela

ted t

o e

nvironm

enta

l, s

ocia

l, h

ea

lth a

nd s

afe

ty (

Se

ction 9

.1 M

onitorin

g,

Measure

ment an

d A

na

lysis

);

4.

Info

rmation r

equir

ed f

rom

contr

acto

rs to

fulfil

their

requirem

ents

, in

clu

din

g c

om

pete

ncy (

Section

7.2

) an

d L

ega

l a

nd O

ther

Requ

irem

ents

(E

SM

S D

OC

3);

5. R

egula

r en

vironm

enta

l a

nd s

ocia

l pro

ject

meetings (

see S

ection

7.4

Com

munic

atio

n);

an

d

6. G

rie

vance

Mech

an

ism

s d

eta

iled u

nder

the g

rie

va

nce

pro

cess (

Section 7

.4.3

.5).

All

contr

acto

rs w

hose a

ctivitie

s m

ay h

ave t

he p

ote

ntia

l to

cre

ate

a s

ignific

an

t im

pact

(dete

rmin

ed b

y

the E

SM

S D

OC

2 A

sp

ects

Regis

ter)

to t

he e

nvir

onm

ent

or

com

munity s

ha

ll b

e r

equire

d t

o p

rovid

e a

n

environm

enta

l and s

ocia

l p

lan i

n a

ccord

ance w

ith t

he

Ghana B

ridg

e E

SM

S R

EC

06 E

nvironm

enta

l

and S

ocia

l P

lan (

incorp

ora

ting h

ea

lth a

nd s

afe

ty)

Tem

pla

te,

wh

ich s

hall

be r

evie

wed a

nd a

ppro

ve

d b

y

the E

SM

S T

eam

.

7.4

.3.4

A

bb

rev

iate

d R

esett

lem

en

t A

cti

on

Pla

n

An A

bbre

via

ted R

esettle

ment

Action P

lan (A

RA

P)

has been de

ve

loped

fo

r S

tage 1

of

the pro

ject

(Ghana B

rid

ge E

SM

S D

OC

4 A

bbre

via

ted R

esett

lem

ent

Action P

lan)

to p

rovid

e t

hose a

ffecte

d b

y t

he

pro

ject w

ith th

e m

eans to s

ecure

com

pensatio

n a

nd r

elo

cation p

rior

to th

e p

roje

ct

com

mencin

g.

An A

RA

P w

ill b

e p

roduced

for

Sta

ge 2

of

the

pro

ject.

7.4

.3.5

E

xte

rnal g

riev

an

ce p

roce

ss

EP

L has pro

duce

d a gri

evance m

echanis

m fo

r th

e pro

ject

that

enab

les sta

keho

lders

to

m

ake a

com

pla

int

or

a s

uggestion

about

the w

ay a

pro

ject

is b

ein

g i

mple

mente

d.

This

is i

nclu

ded in

the

pro

ject S

EP

.

Grieva

nces m

ay ta

ke th

e fo

rm of

specific

com

pla

ints

fo

r dam

ages/inju

ry,

con

cern

s abo

ut

routine

pro

ject

activitie

s,

perc

eiv

ed

incid

en

ts o

r im

pacts

and/o

r suggestions o

r positiv

e f

eedback a

bou

t a

part

of

the p

roje

ct.

The id

entification

a

nd re

sponse

to

grie

va

nces sup

port

s th

e de

ve

lopm

ent

of

positiv

e re

lationsh

ips

betw

een t

he pro

ject

an

d t

he c

om

munitie

s an

d o

ther

sta

kehold

ers

th

ey m

ay aff

ect. T

he grieva

nce

mechanis

m e

nable

s a

ffecte

d p

art

ies t

o lod

ge c

om

pla

ints

, concern

s o

r positiv

e f

ee

dback r

egard

ing t

he

pro

ject, w

ithout

cost, an

d w

ith th

e assura

nce of

a tim

ely

a

nd satisfa

cto

ry re

so

lution of

the is

sue

,

com

pla

int

or

feedb

ack.

The

gri

evance

mechanis

m

shall

not

repla

ce

exis

tin

g

legal

pro

cesses.

Ho

we

ver,

based o

n c

onsen

sus,

the

pro

cess s

ha

ll se

ek t

o r

esolv

e issues p

rom

ptly,

with

out

resort

ing t

o

expensiv

e a

nd

tim

e-c

onsum

ing lega

l actions.

The

grievance

mechanis

m

is

desig

ned

to

ensure

th

at

all

grie

va

nces

that

are

re

ceiv

ed

are

acknow

ledge

d a

nd

logg

ed

, and t

hat

the c

om

pla

inant

kno

ws w

hat

to e

xpect

in t

erm

s o

f a r

esponse a

nd

when.

The g

rie

vance

mechanis

m s

ets

out

the f

ull

pro

cess a

nd r

esponsib

ilities f

or

manag

ing

th

e g

rie

vance

pro

cess.

Page 36: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

8

7.5

D

ocu

me

nte

d in

form

ati

on

7.5

.1

Gen

era

l

Docum

ente

d i

nfo

rmation s

hall

be p

roduced r

ele

van

t to

the o

pera

tion o

f th

e p

roje

ct

and t

his

ES

MS

.

This

in

form

ation

shall

be

re

quired

as

per

the

req

uirem

ents

of

the

Inte

rnationa

l S

tandard

IS

O

1400

1:2

015,

the I

FC

sta

ndard

s,

and o

ther

info

rmation r

ele

va

nt

to t

he p

roje

ct

and o

pera

tion o

f th

e

managem

ent

syste

m,

inclu

din

g l

ega

l com

plia

nce.

An

ind

ex o

f th

e E

SM

S d

ocu

ments

is p

rovid

ed i

n

App

end

ix A

.

The E

nvironm

enta

l and S

ocia

l M

ana

gem

ent

Syste

m,

polic

ies,

pla

ns,

pro

gra

mm

es,

work

instr

uctio

ns

and r

ecord

s a

re c

ontr

olle

d a

ccord

ing

to p

rocess b

elo

w in 7

.5.3

.

7.5

.2

Cre

ati

ng

an

d u

pd

ati

ng

Record

s s

hall

be c

reate

d,

upda

ted a

nd m

ain

tain

ed

to

keep t

rack o

f th

e G

ha

na B

rid

ge E

SM

S i

n l

ine

with th

e IF

C sta

ndard

s a

nd IS

O 1

40

01:2

015

. R

ecord

s

shall

track th

e environm

enta

l an

d socia

l

perf

orm

ance

of

the p

roje

ct

to d

em

onstr

ate

confo

rmity to

the r

equ

irem

ents

of

the E

SM

S,

inclu

din

g

leg

al com

plia

nce.

The r

esponsib

le p

ers

on

shall

main

tain

and

up

date

a G

ha

na B

rid

ge E

SM

S R

EC

09 M

aste

r L

ist

of

Record

s,

whic

h specifie

s th

e ty

pe /

nam

e of

record

s,

the fo

rm num

ber

(if

applic

ab

le),

th

e part

y

responsib

le f

or

keepin

g th

e r

ecord

, an

d th

e r

ete

ntion t

ime.

The r

equirem

ents

for

record

cre

ation

, is

sue

and u

pda

ting a

re o

utlin

ed b

elo

w.

All

pro

cesses m

ust

use

the s

am

e T

em

pla

te a

s p

er

Ghana B

ridge E

SM

S R

EC

10 T

em

pla

te.

All

record

s s

ha

ll be leg

ible

;

All

record

s s

ha

ll ha

ve a

n o

wner;

All

record

s s

ha

ll ha

ve a

nu

mber

record

;

To i

ndic

ate

th

e s

tatu

s o

f each d

ocum

ent, a

nd t

o p

reve

nt

the use o

f obsole

te or

outd

ate

d

docum

ents

, th

e f

ollo

win

g in

form

ation s

hall

be s

tate

d f

or

pro

cedure

s a

nd m

anage

men

t pla

ns:

o

Title

(subje

ct)

;

o

Docum

ent num

ber;

o

Revis

ion n

um

ber;

an

d,

o

Date

;

All

record

s s

ho

uld

pro

vid

e d

eta

ils o

f th

e c

han

ges w

hic

h h

ave t

aken p

lace u

pon r

e-issue;

All

record

s s

ho

uld

be r

evie

wed a

nd a

ppro

ve

d b

y t

he o

wner

pri

or

to r

e-i

ssue;

No r

ecord

s s

hou

ld b

e issue

d w

ithou

t th

e a

gre

em

ent an

d a

ppro

val of

the d

ocum

ent o

wner.

7.5

.3

Co

ntr

ol o

f d

ocu

men

ted

in

form

ati

on

Record

s s

hall

be a

ppro

pria

tely

sto

red

at

the

EP

L P

roje

ct

Off

ice

(91 O

su B

ad

u S

treet,

West

Airport

),

the

Bri

dge

Po

wer

Site

(T

em

a),

and

on

the

EP

L

website

(h

ttp

://e

arl

yp

ow

erltd

.com

/wp

-

conte

nt/

up

loa

ds/E

SM

S-D

OC

-1-M

an

ual-R

ev-3

-201

7-c

cj.pdf)

to p

reserv

e d

ocum

ent

accessib

ility

an

d t

o

pro

vid

e s

ecurity

fro

m l

oss o

f confidentia

lity,

impro

per

use,

or

loss o

f in

tegrity

. In

add

itio

n t

o a

ccess

contr

ol

(described f

urt

her

under

7.5

.3),

oth

er

requ

ire

ments

are

desig

ne

d t

o p

reserv

e t

he

docum

ent

accessib

ility

an

d inte

grity

.

Page 37: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

7-1

9

Record

s g

enera

ted a

s o

utp

ut

from

the im

ple

menta

tion

of

the E

SM

S M

anua

l an

d i

ts s

upport

ing p

lans

and

pro

ced

ure

s

shall

als

o

be

file

d

here

u

nder

the

direction

and

manage

ment

of

the

ES

MS

coord

inato

r.

Only

curr

en

t is

sues o

f docu

ments

should

be liv

e a

nd h

eld

on h

ard

or

soft

copie

s (

apart

fro

m in a

rchiv

e

fold

ers

). O

ld is

sues sh

ou

ld be pla

ce

d in

arc

hiv

e fo

lders

w

ith an

‘a

rch

ived

’ w

ate

rmark

dis

pla

yed

acro

ss t

he d

ocum

ent.

D

ocum

ents

of

exte

rnal ori

gin

whic

h a

re h

eld

by t

he

pro

ject

should

be identified

as s

uch a

nd

the

ir d

istr

ibutio

n c

ontr

olle

d.

Record

s s

ha

ll be

kept in

ap

pro

pria

te s

tora

ge

for

the

follo

win

g m

inim

um

rete

ntion p

eriods (

whic

hever

is

the g

reate

st)

:

1. A

s r

equire

d b

y la

w;

2. A

s s

pecifie

d in t

his

Manu

al or

associa

ted p

roce

dure

s a

nd r

ecord

s;

3. A

s s

pecifie

d in t

he M

aste

r Lis

t of

Record

s; a

nd,

4. O

therw

ise, th

ree y

ears

.

Ele

ctr

onic

record

s s

ha

ll be

sto

red o

n a

serv

er

that

is b

acked u

p o

n a

reg

ula

r basis

. O

nce t

he r

ete

ntio

n

perio

d h

as e

xpir

ed t

he r

esponsib

le p

ers

onne

l m

ay d

ecid

e w

heth

er

rele

vant

record

s c

an b

e d

ele

ted

. In

this

insta

nce a

record

sh

ou

ld b

e k

ept of

wh

o h

as d

ele

ted the

record

and w

hen t

his

was u

nd

ert

aken.

Page 38: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

8-2

0

8.

Op

era

tio

n

The p

roje

ct

has p

rod

uced a

pro

cess f

or

opera

tion

al pla

nn

ing a

nd

contr

ol w

hic

h s

hou

ld b

e a

dhere

d t

o

thro

ug

h e

ach p

hase

of

the p

roje

ct (c

onstr

uctio

n,

opera

tion

al an

d d

ecom

mis

sio

nin

g).

The p

rocess s

hall

contr

ol an

d a

im to r

ea

lise t

he r

isks a

nd o

pp

ort

un

itie

s a

s d

eta

iled in

Sectio

n 6

.1 a

nd th

e O

bje

ctives a

nd

Targ

ets

associa

ted w

ith

the

se (

as d

eta

iled in S

ection 6

.2)

risks a

nd o

pport

un

itie

s.

The p

roje

ct

shall

ensure

th

at

all

op

era

tions a

nd a

ctivitie

s,

carr

ied o

ut

by e

mplo

ye

es o

r contr

acto

rs a

re

pro

perl

y c

ontr

olle

d,

and t

hat

appro

pria

te p

rocesses a

re c

om

munic

ate

d t

o p

ers

onne

l in

lin

e w

ith t

he

pro

cess s

et out

in S

ection 7

.4 C

om

munic

ation

.

To achie

ve th

is aim

, envir

onm

enta

l and socia

l, as w

ell

as health and safe

ty pro

cesses

shall

be

pro

duce

d in

ad

ditio

n to

m

anag

em

en

t pla

ns and

pro

gra

mm

es to

contr

ol

the o

pera

tion

’s sig

nific

ant

environm

enta

l a

nd socia

l aspects

as id

entified in

th

e aspects

and pro

ject

risk re

gis

ter,

th

e le

ga

l

regis

ter,

ES

IA a

nd t

he E

SM

P.

The r

egula

r up

datin

g o

f op

era

tio

na

l con

trol

pro

cesses s

hall

take p

lace

as a

nd w

hen r

equ

ired

within

the E

SM

S and as a m

inim

um

w

hen th

ere

are

cha

nges in

th

e opera

tio

n of

the pro

cesses.

The

responsib

ility

for

upd

ating t

he p

rocesses i

s s

et

out

in S

ection 5

.3 O

rga

nis

atio

n R

ole

s,

Resp

onsib

ility

and A

uth

ority

.

8.1

O

pe

rati

on

al P

lan

nin

g a

nd

Co

ntr

ol

The f

ollo

win

g p

rocesses e

xis

t in

the

ES

MS

for

opera

tio

nal pla

nn

ing

an

d c

ontr

ol.

Ghana B

ridg

e E

SM

S p

rocedure

PR

O 1

-Esta

blis

hin

g t

he e

nvironm

enta

l re

quir

em

ents

in t

he d

esig

n

and d

evelo

pm

ent:

This

pro

cess i

s d

esig

ned

to e

nsure

th

at

the p

roje

ct

and E

SM

S e

nviro

nm

enta

l re

qu

irem

ents

are

ad

dre

ssed thro

ug

h a

life c

ycle

pers

pective

, in

the d

esig

n a

nd d

evelo

pm

ent of

the p

roje

ct.

Ghana B

ridge E

SM

S P

RO

2-P

rocure

ment E

nvir

onm

enta

l R

equ

irem

ents

:

This

pro

cess i

s d

esig

ned

to e

nsure

th

at

the p

roje

ct

and E

SM

S e

nviro

nm

enta

l re

qu

irem

ents

are

ad

here

d

to

thro

ug

h

the

pro

cure

ment

of

the

pro

ject’s

pro

ducts

a

nd

serv

ices.

The

environm

enta

l re

quirem

ents

and c

redentials

for

the s

upp

liers

on t

he p

roje

ct

are

deta

iled i

n

this

pro

cess a

nd m

ust

be a

dhere

d t

o b

y t

he p

roje

ct

team

. T

his

pro

cess a

lso p

rovid

es d

eta

ils

of

how

the p

roje

ct’s e

nviro

nm

enta

l re

quirem

ents

are

com

munic

ate

d t

o e

xte

rnal pro

vid

ers

and

supplie

rs as w

ell

as th

e sig

nific

ant

en

viro

nm

enta

l im

pacts

associa

ted

w

ith th

eir

pro

vis

ion,

inclu

din

g b

ut

not

limited t

o:

use,

transport

ation,

dis

posal an

d e

nd

-of-

life t

reatm

ent. A

dh

ere

nce

to

the

pro

ject

and

leg

al

requ

irem

ents

of

the

serv

ice

pro

vis

ion

requir

e

a

two-w

ay

com

munic

ation cha

nne

l b

etw

ee

n th

e pro

ject

and th

e supplie

rs;

ho

we

ver

each supplie

r is

require

d t

o a

dhere

to a

ll le

gis

lation a

nd p

rovid

e t

he r

ele

van

t in

form

ation a

nd d

ocu

ments

to t

he

pro

ject specific

to t

he r

eg

ula

tory

regim

e f

or

the s

erv

ice

the

y a

re p

rovid

ing.

Pro

cesses r

ele

va

nt to

en

vir

onm

enta

l o

pera

tio

nal pla

nn

ing a

re d

eta

iled in S

ection 6

.

Pro

cesses

rele

van

t to

o

pera

tion

al

pla

nn

ing

and

contr

ol

els

ew

here

in

th

e

ES

MS

and

at

the

constr

uction,

op

era

tion

al a

nd d

ecom

mis

sio

nin

g s

tag

e a

re d

eta

iled in th

e G

ha

na B

ridge E

SM

S In

dex.

8.2

E

me

rge

ncy P

rep

are

dn

es

s a

nd

Re

sp

on

se

Em

erg

ency re

sp

onse

pla

nnin

g is

a re

quirem

ent

of

this

E

SM

S,

the E

nvironm

enta

l P

erm

it and th

e

Sched

ule

of

En

viro

nm

enta

l P

erm

it (

perm

it r

efe

rence C

E00

49

560

102).

EP

L a

nd t

heir r

epre

senta

tives

Page 39: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

8-2

1

should

consid

er

the

req

uire

ments

for

em

erg

ency r

espo

nse f

or

rele

vant

en

viro

nm

enta

l a

nd s

ocia

l risks

and o

pp

ort

un

itie

s p

ose

d b

y the p

roje

ct

an

d identified w

ith

in t

he E

SM

S A

spects

Re

gis

ter.

When c

onsid

erin

g e

merg

ency r

esponse

, E

PL a

nd t

heir r

epre

sen

tatives s

hall

consid

er

the f

ollo

win

g

ste

p-b

y-s

tep p

rocess:

a)

The m

ost appro

pri

ate

meth

ods f

or

respond

ing t

o a

n e

merg

ency s

ituation

;

b)

Inte

rna

l a

nd e

xte

rna

l com

munic

atio

n p

rocesses;

c)

The a

ctions r

eq

uire

d to

pre

ven

t or

mitig

ate

environm

enta

l an

d s

ocia

l im

pacts

;

d)

Mitig

atio

n a

nd r

esp

onse a

ctions t

o b

e taken r

ele

vant to

the t

yp

e o

f em

erg

ency s

itu

atio

n;

e)

The need fo

r post-

em

erg

ency e

valu

atio

n to

dete

rmin

e an

d im

ple

ment

corr

ective actions,

especia

lly t

o h

elp

pre

vent

re-o

ccurr

ence

;

f)

The

requirem

ent

for

peri

odic

te

sting

of

pla

nne

d

em

erg

ency

respo

nse

actions.

Where

em

erg

ency r

esponse is r

eq

uired,

set re

vie

w p

erio

ds s

hould

be

set u

p to t

est th

e r

esponse

;

g)

Tra

inin

g r

equ

irem

ents

for

em

erg

ency r

esp

onse p

ers

on

nel;

h)

Pro

vis

ion o

f a lis

t of

ke

y pers

onn

el, aid

ag

encie

s,

em

erg

ency conta

cts

, ne

are

st

hospitals

,

inclu

din

g c

onta

ct

deta

ils (

for

exam

ple

the

fire d

epart

ment, a

mbula

nce

or

sp

illa

ge

respo

nse

unit);

i)

An

y p

rovis

ion t

hat

is r

eq

uir

ed f

or

conta

inm

ent and

cle

an-u

p s

erv

ices (

for

exam

ple

spill

kits);

j)

Evacuation r

oute

s a

nd a

ssem

bly

poin

ts a

nd o

ther

consid

era

tio

ns (

i.e.

do t

hese

need t

o b

e

diffe

rent to

fire e

vacu

ation);

k)

The p

ossib

ility

of m

utu

al assis

tance f

rom

neig

hbo

urs

and s

urr

oun

din

g b

usin

esses; and

,

l)

A m

eth

od o

f com

munic

atin

g a

ll of

the a

bove to

in

tere

ste

d a

nd (

pote

ntially

) aff

ecte

d p

ers

on

ne

l.

Page 40: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

9-2

2

9.

Pe

rfo

rma

nc

e E

va

lua

tio

n

Mon

itori

ng a

nd

measure

ment

is r

equ

ired t

o b

e u

ndert

aken w

ith

in t

his

ES

MS

to a

ssess p

erf

orm

ance

.

This

measure

s t

he e

ffectiveness o

f th

e E

SM

S i

n a

ch

ievin

g i

ts e

nvironm

enta

l a

nd s

ocia

l obje

ctives

thro

ug

hou

t all

phases o

f th

e p

roje

ct.

Where

additio

na

l m

onitorin

g t

akes p

lace t

his

shall

adhere

to t

he

pro

cess d

eta

iled in S

ection 9

.1.

Record

s s

ha

ll be

main

tain

ed f

or

all

monitorin

g i

n l

ine

with t

he d

ocum

ent

contr

ol

pro

cess d

eta

iled i

n

Section 7.5

D

ocum

enta

tio

n and com

munic

ate

d to

th

e re

leva

nt

part

ies as outlin

ed in

S

ection 7

.4

Com

munic

atio

ns.

A p

relim

inary

ES

MP

has b

een

de

velo

ped a

s p

art

of

the E

SIA

pro

cess f

or

all

of

the r

equirem

ents

on

the p

roje

ct

inclu

din

g t

hose s

et o

ut

in S

ection 9

.1.

Mo

nitoring

, M

easure

ment, A

naly

sis

and E

valu

ation

.

The E

SM

S a

nd m

onitorin

g p

lans s

ha

ll cover

the r

eq

uirem

ents

as s

et

out

in t

he E

nvir

onm

enta

l a

nd

Socia

l A

sp

ects

(G

hana B

rid

ge E

SM

S D

OC

2 A

sp

ects

Regis

ter)

; th

e E

SIA

/ES

MP

and;

the S

ch

edu

le o

f

En

viro

nm

enta

l P

erm

it

(perm

it

refe

rence

CE

0049

56

0102)

(sum

marised

in

Appen

dix

D

to

th

is

docum

ent)

in

accord

ance w

ith IF

C S

tan

dard

3 R

esourc

e E

ffic

iency an

d P

ollu

tion

P

reve

ntion and

Sta

ndard

4 C

om

munity H

ealth

, S

afe

ty,

and S

ecuri

ty.

9.1

M

on

ito

rin

g,

Mea

su

rem

en

t, A

naly

sis

an

d E

va

lua

tio

n

The f

ollo

win

g p

rocess s

hou

ld b

e r

evie

we

d in o

rder

to d

ete

rmin

e w

ha

t, h

ow

, w

he

n a

nd f

or

wh

at

reason

monitoring,

measure

ment

and a

naly

sis

eva

luation s

hould

take p

lace

for

the

ES

MS

and

pro

ject.

A

num

ber

of

the m

onitoring a

nd m

easure

ment

requirem

ents

are

deri

ved f

rom

the E

SIA

and S

ched

ule

of

En

viro

nm

enta

l P

erm

it (

perm

it r

efe

rence C

E004

956

01

02);

1.

What needs to

be m

onitore

d a

nd m

easure

d;

2.

For

accura

te r

esults,

wha

t m

eth

ods f

or

monitoring,

measure

ment

and a

naly

sis

shou

ld t

ake

pla

ce;

3.

The crite

ria fo

r e

valu

atin

g th

e en

viro

nm

enta

l or

socia

l perf

orm

ance,

inclu

din

g appro

priate

ind

icato

rs;

4.

When t

he m

onitori

ng a

nd m

easure

ment shall

take p

lace

;

5.

When the r

esu

lts s

hall

be a

naly

sed a

nd

evalu

ate

d;

and

,

6.

Where

and to w

hom

results s

hould

be c

om

munic

ate

d in lin

e w

ith S

ectio

n 7

.4 C

om

munic

ation

.

Results

sha

ll be

ade

quate

ly

docum

ente

d

an

d

he

ld

on

the

ap

pro

pri

ate

file

. W

here

re

quired

a

monitoring t

em

pla

te s

ha

ll b

e a

do

pte

d u

sin

g t

he a

ppro

ved E

SM

S t

em

pla

te G

han

a B

ridge E

SM

S R

EC

10 T

em

pla

te.

9.1

.1

Ge

ne

ral

The f

ollo

win

g m

onitori

ng s

hall

take p

lace

un

der

the E

SM

S;

Mon

itori

ng o

f E

nvironm

enta

l an

d S

ocia

l ke

y p

erf

orm

ance ind

icato

rs (

KP

Is);

Mon

itori

ng o

f le

ga

l com

plia

nce a

nd c

om

plia

nce o

blig

ation

s,

inclu

din

g t

he s

pecific

monitoring

and re

port

ing re

qu

irem

ents

sta

ted in

th

e S

ched

ule

to

th

e E

nvironm

enta

l P

erm

it (lis

ted in

Attachm

ent C

);

A

lega

l e

va

luation

of

com

plia

nce

au

dit

as

deta

iled

within

S

ectio

n

9.1

.2

Eva

luatio

n

of

Com

plia

nce

;

Page 41: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

9-2

3

Mon

itori

ng of

the pro

gre

ss aga

inst

the obje

ctives an

d ta

rge

ts shall

take pla

ce

as per

the

pro

cess d

eta

iled i

n S

ectio

n 6

.2 E

nvironm

enta

l an

d s

ocia

l obje

ctives a

nd

pla

nnin

g t

o a

chie

ve

them

;

Mon

itori

ng o

f th

e r

eq

uirem

ents

to p

rovid

e o

ngo

ing c

ert

ific

ation

in

accord

ance w

ith

IS

O1

400

1

and t

he

IF

C s

tandard

s a

s w

ell

as t

he o

ng

oin

g i

mple

menta

tion o

f th

e E

SM

S.

This

inclu

des a

regula

r in

tern

al

au

ditin

g (

see S

ection 9

.2)

to a

ssess a

dh

ere

nce

to t

he

req

uire

ments

of

the

ES

MS

;

En

viro

nm

enta

l,

Socia

l,

He

alth

a

nd

Safe

ty

perf

orm

ance

(base

d

on

monitori

ng

results)

inclu

din

g b

oth

positiv

e a

nd

nega

tive

results in

lin

e w

ith

the

ris

ks a

nd o

pp

ort

un

itie

s o

utlin

ed

in

the G

hana B

ridge E

SM

S D

OC

2 A

sp

ects

Reg

iste

r; a

nd

,

Mon

itori

ng o

f contr

acto

rs, th

eir w

ork

and a

ny c

ontr

act

oblig

atio

ns b

y th

e r

ele

vant

team

.

Mon

itori

ng P

lans (

incorp

ora

tin

g t

hre

sho

lds a

nd lim

its,

and m

onitorin

g r

equ

ired t

o b

e c

onducte

d b

y t

he

leg

al re

qu

irem

ents

and a

uth

orisations)

will

be d

eve

lop

ed f

or

the p

roje

ct.

Mon

itori

ng

of

the

E

SM

S

shall

be

carr

ied

out

by

specifie

d

pers

onne

l as

set

out

in

Section

5.3

Org

anis

atio

n R

ole

s, R

espo

nsib

ility

and

Auth

ori

ty.

All

monitori

ng r

equ

irem

ents

are

set

out

in a

nd r

evie

wed b

y t

he

ES

MS

te

am

and a

re d

ocum

ente

d i

n

the p

relim

inary

ES

MP

(th

ough c

urr

ently t

he E

SM

P d

oes n

ot

pre

sently c

aptu

re a

ll of

the m

onitori

ng

requirem

ents

an

d s

ha

ll re

quire u

pd

ating a

nd r

egu

lar

revie

w).

9.1

.2

Eva

lua

tio

n o

f C

om

pli

an

ce

The p

roje

ct

shall

monitor

and m

easure

the e

nviron

menta

l and s

ocia

l p

erf

orm

ance o

f its o

pera

tio

ns

and

activitie

s o

n a

regu

lar

basis

to a

ssess w

heth

er

the p

roje

ct

is c

om

ply

ing

with

le

ga

l re

quirem

ents

(as set

out

in th

e Le

ga

l a

nd O

ther

Req

uirem

ents

R

egis

ter)

, achie

vin

g esta

blis

hed obje

ctives a

nd

targ

ets

, is

meeting i

ts p

olic

y c

om

mitm

ents

, and c

onfo

rmin

g t

o t

he r

equ

irem

ents

of

the E

SM

S a

nd

associa

ted p

rocesses.

This

shall

be c

ond

ucte

d t

hro

ug

h t

he e

sta

blis

hm

ent

of

a m

onitorin

g p

rogra

mm

e,

inte

rnal au

dits a

nd a

pro

ce

ss t

o a

ddre

ss n

on

-confo

rmances r

ais

ed a

resu

lt o

f th

e a

ud

its o

r e

lse

where

in t

he m

anagem

ent syste

m.

To m

eet

the p

roje

ct’s c

om

plia

nce c

om

mitm

ents

, th

e p

roje

ct’s r

egu

lato

ry c

om

plia

nce s

tatu

s s

ha

ll be

subje

ct

to a

n inte

rnal au

dit (

see S

ection

9.2

) at

least

annua

lly in

accord

ance

with t

he L

eg

al and

Oth

er

Requ

irem

ents

Regis

ter

(Ghana

Bri

dg

e E

SM

S D

oc 3

). T

he E

SM

S t

eam

additio

nally

shall

regu

larl

y

monitor

and e

va

lua

te t

he c

om

plia

nce s

tatu

s o

f th

e a

pplic

able

en

vir

onm

enta

l le

gal

req

uirem

ents

an

d

oth

er

req

uirem

ents

that

the c

om

pan

y s

ubscribes t

o t

hro

ug

h m

onitorin

g r

eg

imes,

wh

ere

applic

ab

le.

Add

itio

nally

, th

e

Lega

l an

d

Oth

er

Re

quirem

ents

R

egis

ter

shall

be

revie

wed

6

month

ly

for

ne

w

leg

isla

tio

n a

s s

et

out

in S

ection 6

.1.

The r

ecord

s o

f th

e r

esults o

f th

e p

eri

od

ic e

va

luations s

ha

ll b

e

record

ed.

9.2

In

tern

al

Au

dit

9.2

.1

Ge

ne

ral

Aud

its s

hall

be u

ndert

aken

inte

rna

lly b

y t

he E

SM

S A

udit t

eam

to d

ete

rmin

e t

hat

the p

roje

ct

is b

ein

g

opera

ted

in

accord

ance

with

the

requir

em

ents

of

the

ES

MS

, IS

O1

400

1:2

015

and

the

IFC

Perf

orm

ance S

tand

ard

s.

Aud

its a

re s

et

to c

over

ea

ch a

rea o

f th

e E

SM

S i

nclu

din

g a

n e

valu

ation o

f

leg

al com

plia

nce a

ga

inst

the c

om

plia

nce o

blig

ations a

nd le

ga

l re

gis

ter.

Inte

rnal a

udits a

nd inspections

are

req

uired

thro

ugh

out

ea

ch p

roje

ct

ph

ase,

on a

reg

ula

r b

asis

, to

ensure

th

at

the

requ

irem

ents

of

the

Page 42: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

9-2

4

ES

MS

and E

SM

P a

re b

ein

g m

et. T

he a

ud

its a

nd i

nsp

ections s

ho

uld

be u

nd

ert

aken t

o t

he s

tandard

s

of

this

ES

MS

. T

he f

reque

ncy o

f in

spections s

hall

vary

depen

din

g o

n the

na

ture

of

activitie

s. In

sp

ectio

n

record

s s

hould

be

main

tain

ed a

nd k

ept up

to d

ate

.

Exte

rna

l au

dits a

nd insp

ections b

y r

egu

lating a

uth

orities (

e.g

. th

e E

PA

) and p

roje

ct

lenders

sha

ll a

lso

be u

ndert

aken thro

ug

hou

t th

e lifetim

e o

f th

e p

roje

ct.

Section 9

.2.2

sets

out

the p

rocess f

or

undert

akin

g a

udits i

nclu

ded w

ith

in t

he a

udit p

lan.

Oth

er

aud

its

for

the e

ffective m

anagem

ent

of

the p

roje

ct an

d E

SM

S inclu

de

but

are

not lim

ited t

o;

Contr

acto

r/su

pplie

r aud

it;

Health a

nd s

afe

ty a

udits a

nd insp

ectio

ns; an

d,

Socia

l a

ud

its a

nd inspectio

ns.

9.2

.2

Inte

rnal

au

dit

pro

gra

mm

e

All

au

dits u

ndert

aken o

n b

eha

lf o

f th

e E

SM

S s

ha

ll be

undert

aken a

ccord

ing t

o t

he p

rocess s

ho

wn i

n

Fig

ure

9-1

.

Page 43: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

9-2

5

Fig

ure

9-1

: A

ud

it P

roces

s

The p

rogra

mm

es o

f audits u

ndert

aken o

n t

he pro

ject

and m

anage

d b

y th

e E

SM

S a

ud

it t

eam

are

deta

iled in t

he G

hana B

ridg

e E

SM

S R

EC

11 A

ud

it P

lan.

Rela

ted d

ocum

ents

:

Ghana B

ridge E

SM

S R

EC

11 A

ud

it P

lan

;

Ghana B

ridge E

SM

S R

EC

12 In

tern

al A

ud

it S

um

mary

Report

; and

,

Ghana B

ridge E

SM

S R

EC

13 N

on

-Confo

rmance R

epo

rt.

Page 44: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

9-2

6

9.2

.3

Ex

tern

al

Au

dit

Where

exte

rnal aud

its o

f th

e E

SM

S o

r th

e p

roje

ct

are

require

d t

hese s

ha

ll be m

anage

d o

n t

he G

hana

Brid

ge E

SM

S R

EC

11 A

ud

it P

lan

. C

ert

ific

ation a

udits s

hall

be r

equ

ired f

or

the E

SM

S t

o b

e c

ert

ifie

d in

accord

ance w

ith In

tern

atio

nal

Sta

ndard

s such as IS

O1400

1 (e

nvironm

ent)

or

oth

er

sta

nd

ard

s to

whic

h t

he p

roje

ct or

ES

MS

subscribes.

In a

ll in

sta

nces a m

em

ber

of

the E

SM

S te

am

shall

be pre

se

nt

on th

e aud

it a

nd accom

pan

y th

e

exte

rnal a

udit. It

is r

ecogn

ised t

hat

exte

rnal aud

its o

r in

spections m

ay a

lso

take p

lace w

hic

h c

annot

be

pla

nne

d.

In t

his

insta

nce a

mem

ber

of

the E

SM

S o

r E

PL M

anag

em

ent

Team

shall

be m

ade a

va

ilab

le

for

the a

ud

it in t

he e

vent

that an

ES

MS

te

am

mem

ber

cannot

be a

vaila

ble

.

9.3

M

an

ag

em

en

t R

evie

w

An a

nnua

l m

anagem

ent

revie

w o

f th

e E

SM

S s

hall

be

undert

aken b

y t

he s

en

ior

managem

ent

of

the

pro

ject and E

PL,

with s

upp

ort

fro

m the E

SM

S team

.

The m

anagem

ent re

vie

w s

hall

inclu

de c

onsid

era

tion o

f:

1.

The s

tatu

s o

f actions f

rom

pre

vio

us m

anagem

ent re

vie

ws,

where

ap

plic

ab

le;

2.

Chan

ges in:

Exte

rna

l a

nd inte

rnal is

sue

s that are

rele

vant to

th

e E

SM

S;

The n

eeds a

nd e

xpecta

tion

s o

f in

tere

ste

d p

art

ies,

inclu

din

g c

om

plia

nce o

blig

ation

s;

The P

roje

ct’s s

ign

ific

ant

en

viro

nm

enta

l a

nd s

ocia

l asp

ects

; and,

Ris

ks a

nd o

pport

un

itie

s.

3.

The e

xte

nt to

wh

ich e

nviron

men

tal and s

ocia

l obje

ctive

s h

ave b

een a

chie

ved;

4.

Info

rmation o

n th

e p

roje

ct’s e

nvironm

enta

l an

d s

ocia

l p

erf

orm

ance, in

clu

din

g tre

nd

s in:

Nonconfo

rmitie

s a

nd c

orr

ective a

ctions;

Mon

itori

ng a

nd m

easure

ment re

sults;

Fulfilm

ent

of

its c

om

plia

nce

oblig

ations; a

nd,

Aud

it r

esu

lts.

5.

Ade

quacy o

f re

sourc

es;

6.

Rele

va

nt com

munic

atio

n f

rom

inte

reste

d p

art

ies, in

clu

din

g c

om

pla

ints

; and

,

7.

Opport

un

itie

s f

or

continua

l im

pro

vem

ent.

The o

utp

uts

of

the m

anage

ment re

vie

w s

hall

inclu

de:

Conclu

sio

ns o

n th

e c

on

tin

uin

g s

uitab

ility

, a

deq

uacy a

nd e

ffectiven

ess o

f th

e E

SM

S;

Decis

ions r

ela

ted t

o c

on

tin

ual im

pro

vem

ent opp

ort

un

itie

s;

Decis

ions r

ela

ted t

o a

ny n

eed f

or

chang

es to t

he E

SM

S, in

clu

din

g r

esourc

es;

Actio

ns, if n

ee

de

d,

wh

en e

nvironm

enta

l and s

ocia

l obje

ctives h

ave n

ot

bee

n a

ch

ieve

d;

and,

Opport

un

itie

s to im

pro

ve inte

gra

tion o

f th

e E

SM

S w

ith o

ther

busin

ess p

rocesses, if n

eeded

.

An

y i

mplic

ations f

or

the d

irection o

f th

e p

roje

ct

or

ES

MS

follo

win

g t

he m

anage

ment

revie

w s

ha

ll b

e

revie

we

d a

s p

art

of

the m

anagem

ent re

vie

w a

nd c

om

munic

ate

d to r

ele

va

nt p

ers

ons.

Page 45: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-2

7

10. I

mp

rove

me

nt

of

Pro

jec

t P

erf

orm

an

ce

10

.1 G

en

era

l

Continu

al

impro

vem

ent

is t

he g

oal

of

the E

SM

S i

n a

dditio

n t

o e

nh

anced e

nviro

nm

enta

l an

d s

ocia

l

perf

orm

ance,

thro

ug

h th

e im

ple

menta

tion of

the obje

ctives and ta

rge

ts re

leva

nt

to th

e sig

nific

an

t

environm

enta

l an

d s

ocia

l a

spects

.

10

.2 N

on

co

nfo

rmit

y a

nd

Co

rre

cti

ve

Ac

tio

n

Nonconfo

rmitie

s shall

be ra

ised o

n th

e E

SM

S duri

ng an aud

it or

oth

erw

ise w

here

an occurr

ence

arises w

hic

h c

ontr

ave

nes t

he r

equ

irem

ents

of

the E

SM

S.

In a

ll in

sta

nces t

he A

udit P

rocess in S

ection

9.2

.2 w

ill be im

ple

mente

d so eff

ective no

nconfo

rmity an

d corr

ective actio

n is

undert

aken

on th

e

ES

MS

.

10

.3 C

on

tin

ual

Imp

rove

me

nt

Continu

al

impro

vem

ent

sh

all

be

assessed t

hro

ugh a

range

of

measure

s a

s o

utlin

ed

in

th

is E

SM

S

Manu

al. A

udits s

ha

ll assess t

he c

ontin

ued e

ffectivene

ss o

f th

e E

SM

S in c

ontr

olli

ng

and e

nha

ncin

g t

he

environm

enta

l an

d s

ocia

l a

spects

and im

pacts

associa

ted w

ith t

he p

roje

ct

as w

ell

as a

dhere

nce t

o t

he

goa

ls s

et

out

in t

he e

nviro

nm

enta

l and s

ocia

l p

olic

y.

Ris

ks a

nd o

pport

un

itie

s s

hall

be a

ssessed t

o

dete

rmin

e if

continu

al im

pro

vem

ent of

en

viro

nm

enta

l perf

orm

ance is takin

g p

lace

.

Page 46: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-2

8

Ap

pen

dix

A –

Cu

rren

t In

dex o

f E

SM

S D

ocu

men

ts

Po

lic

y

Ghana B

ridge E

SM

S P

olic

y

Labo

ur

an

d W

ork

ing C

onditio

ns P

olic

y

Code o

f B

eh

avio

ur

Po

licy

Do

cu

men

t

Ghana B

ridge E

SM

S D

OC

1 M

anua

l

Ghana B

ridge E

SM

S D

OC

2 A

spects

Reg

iste

r

Ghana B

ridge E

SM

S D

OC

3 L

egal an

d O

ther

Req

uire

ments

Regis

ter

Ghana B

ridge E

SM

S D

OC

4 A

bbre

via

ted R

esett

lem

ent A

ction P

lan

Pro

ject

risk r

eg

iste

r

Pro

cess

Ghana B

rid

ge E

SM

S P

RO

1

-

Esta

blis

hin

g th

e E

nvironm

enta

l R

equ

irem

ents

in

th

e D

esig

n and

Develo

pm

ent

Ghana B

ridge E

SM

S P

RO

2 -

Pro

cure

ment E

nvironm

enta

l R

eq

uirem

ents

Reco

rd

Ghana B

ridge E

SM

S R

EC

01 E

nvironm

enta

l an

d S

ocia

l O

bje

ctives &

Targ

ets

Ghana B

ridge E

SM

S R

EC

02 T

rain

ing M

atr

ix

Ghana B

ridge E

SM

S R

EC

03 T

rain

ing P

rogra

mm

e

Ghana B

ridge E

SM

S R

EC

04 T

rain

ing A

tte

nda

nce T

em

pla

te

Ghana B

ridge E

SM

S R

EC

05 T

rain

ing

Atte

nda

nce R

ecord

s &

Cert

ific

ate

s

Ghana

Brid

ge

ES

MS

R

EC

06

En

vironm

enta

l a

nd

Socia

l P

lan

(incorp

ora

ting

health

an

d

safe

ty)

Tem

pla

te

Ghana B

ridge E

SM

S R

EC

07 In

tern

al C

om

munic

ation T

em

pla

te

Ghana B

ridge E

SM

S R

EC

08 E

xte

rna

l C

om

munic

atio

n T

em

pla

te

Ghana B

ridge E

SM

S R

EC

09 M

aste

r L

ist of

Record

s

Ghana B

ridge E

SM

S R

EC

10 T

em

pla

te

Ghana B

ridge E

SM

S R

EC

11 A

ud

it P

lan

Ghana B

ridge E

SM

S R

EC

12 In

tern

al A

ud

it S

um

mary

Report

Ghana B

ridge E

SM

S R

EC

13 N

on

-Confo

rmance R

epo

rt

Page 47: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-2

9

Ap

pen

dix

B –

Co

nte

nt

of

Lab

ou

r an

d W

ork

ing

Co

nd

itio

ns P

olic

y

A Lab

our

an

d W

ork

ing C

ond

itio

ns P

olic

y sh

all

be develo

pe

d fo

r th

e pro

ject.

P

ers

onne

l shall

be

train

ed r

eg

ard

ing t

he c

onte

nts

of

the p

olic

y a

t th

e t

ime o

f hire

.

The p

olic

y w

ill inclu

de c

om

mitm

ents

to:

Pro

mote

the f

air t

reatm

ent, n

on-d

iscrim

ination,

and e

qua

l opp

ort

un

ity o

f w

ork

ers

as w

ell

as t

he

beha

vio

ur

of

sta

ff t

ow

ard

s t

he c

om

munity a

nd l

oca

l culture

s (

in-lin

e w

ith t

he C

ode o

f B

eh

avio

ur

Polic

y);

Esta

blis

h, m

ain

tain

, an

d im

pro

ve

the

work

er-

managem

ent re

lationsh

ip;

Pro

mote

com

plia

nce w

ith n

atio

na

l em

plo

ym

ent a

nd lab

our

law

s;

Pro

tect

work

ers

, in

clu

din

g v

uln

era

ble

cate

gori

es of

work

ers

such a

s child

ren m

igra

nt

work

ers

,

work

ers

engaged b

y th

ird p

art

ies, a

nd w

ork

ers

in the c

lient’s s

upp

ly c

ha

in;

Pro

mote

safe

and h

ea

lth

y w

ork

ing c

ond

itio

ns, a

nd t

he

hea

lth o

f w

ork

ers

; and,

Avoid

the

use o

f fo

rced lab

our.

To m

eet th

e o

bje

ctives, th

e p

roje

ct

shall:

Ado

pt

and im

ple

ment

hu

man re

sourc

es,

polic

ies a

nd pro

ce

dure

s a

ppro

priate

to

its siz

e a

nd

work

forc

e t

hat

set

out

its a

ppro

ach t

o m

anagin

g w

ork

ers

consis

tent

with t

he r

eq

uirem

ents

of

this

Perf

orm

ance S

tandard

2 (

PS

2)

from

the IF

C s

tandard

s a

nd n

ation

al la

w;

Pro

vid

e w

ork

ers

with d

ocu

mente

d i

nfo

rmation t

ha

t is

cle

ar

and u

nd

ers

tand

able

, re

gard

ing t

he

ir

rights

under

nation

al la

bour

and e

mplo

ym

ent

law

;

Identify

mig

rant

work

ers

and e

nsure

that

the

y a

re e

ng

aged o

n s

ubsta

ntia

lly e

quiv

ale

nt

term

s a

nd

conditio

ns to n

on

-mig

rant

work

ers

;

Imple

ment

the IF

C /

Euro

pean B

ank fo

r R

econstr

uction a

nd D

eve

lopm

ent

tem

pora

ry w

ork

ers

polic

ies o

n th

e q

ua

lity a

nd m

anagem

ent of

the a

ccom

modation o

ffere

d to w

ork

ers

, if a

pplic

ab

le;

Com

ply

w

ith nation

al

law

re

gard

ing w

ork

ers

’ rights

to

jo

in org

anis

atio

ns fo

r w

ork

ers

of

their

choosin

g a

nd to

allo

w w

ork

ers

to e

lect re

pre

se

nta

tives;

Make

em

plo

ym

en

t decis

ions

rela

ted

to

inhere

nt

job

chara

cte

ristics

and

not

on

the

basis

of

pers

ona

l chara

cte

ristics;

Com

ply

w

ith

natio

nal

law

on

no

n-d

iscrim

inatio

n

and

em

plo

y

requir

em

ents

of

PS

2

with

out

contr

aven

ing n

ation

al la

w;

Ensure

that

all

work

ers

receiv

e n

otice o

f d

ism

issal an

d t

imely

severa

nce

pa

ym

ents

mandate

d b

y

law

and a

ny o

uts

tan

din

g b

ack p

ay a

nd s

ocia

l securi

ty b

enefits

an

d p

ensio

n c

on

trib

utio

ns;

Carr

y o

ut a

n a

ltern

ative t

o r

etr

enchm

ent p

rior

to im

ple

menting a

ny d

ism

issals

;

Pro

vid

e a

grie

va

nce m

echanis

m for

work

ers

to r

ais

e w

ork

pla

ce c

oncern

s;

Not em

plo

y c

hild

ren in a

ny m

anner

that

is e

con

om

ically

exp

loitative,

or

is lik

ely

to

be h

azard

ous o

r

to i

nte

rfere

with t

he c

hild

’s e

ducation,

or

to b

e h

arm

ful

to t

he c

hild

’s h

ea

lth o

r ph

ysic

al, m

enta

l,

spiritu

al, m

ora

l, o

r socia

l d

eve

lopm

ent. I

dentify

th

e p

resence o

f all

pers

ons u

nd

er

the a

ge o

f 18.

Follo

w t

he a

pp

licab

le n

atio

nal

law

s i

n c

hild

labo

ur.

Ensure

child

ren u

nder

the a

ge o

f 18 a

re n

ot

Page 48: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-3

0

em

plo

yed i

n h

azard

ous w

ork

. U

ndert

ake a

ppro

pria

te r

isk a

ssessm

ent

and r

egu

lar

monitori

ng o

f

hea

lth,

work

ing c

ond

itio

ns,

and h

ours

of

work

for

all

child

ren u

nder

the a

ge o

f 18

;

Ensure

there

is n

o f

orc

ed labour,

th

is inclu

des n

ot

withho

ldin

g t

he

passport

s /

id

entification

card

s

of m

igra

nt

work

ers

during

the term

of

their c

ontr

act;

Pro

vid

e a

safe

and h

ea

lth

y w

ork

ing e

nvironm

ent

takin

g into

accoun

t in

here

nt

risks.

This

inclu

des

the i

de

ntification o

f pote

ntial

ha

zard

s a

nd p

rovis

ion o

f pre

venta

tive a

nd p

rote

ctive m

easure

s a

nd

appro

priate

tra

inin

g f

or

em

plo

ye

es;

Ensure

co

ntr

acto

rs a

re leg

itim

ate

ente

rpri

ses w

ith a

ppro

priate

ES

MS

;

Esta

blis

h p

roced

ure

s f

or

manag

ing a

nd m

onitoring

th

e p

erf

orm

ance o

f such th

ird p

art

y e

mplo

yers

;

and

Ensure

co

ntr

acto

rs h

ave a

ccess to a

gri

eva

nce m

echanis

m.

All

of

the a

bove s

hall

be a

dopte

d t

hro

ug

hou

t th

e life o

f th

e p

roje

ct. W

here

these a

re n

ot

met

or

where

a w

ork

er

feels

these a

re n

ot m

et, the la

bour

grie

va

nce p

rocess s

hall

ap

ply

.

Page 49: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-3

1

Ap

pen

dix

C –

Co

nte

nt

of

Lab

ou

r G

riev

an

ce P

roce

ss

A L

abour

Grie

va

nce P

roce

ss s

hall

be d

evelo

pe

d f

or

the p

roje

ct.

E

PL w

ill b

e r

esp

onsib

le f

or

info

rmin

g

every

em

plo

ye

e (i

nclu

din

g contr

acto

rs)

about

the la

bour

gri

evance pro

cess and m

akin

g it e

asily

accessib

le t

o th

em

. P

ers

on

nel sh

all

be tra

ine

d r

eg

ard

ing th

e p

olic

y a

t th

e tim

e o

f hire

.

The G

rieva

nce P

rocess s

hall

incorp

ora

te the

follo

win

g:

1. T

he m

eth

od in

wh

ich e

mplo

ye

es m

ay r

ais

e c

oncern

s o

r com

pla

ints

, in

clu

din

g:

Thro

ugh the

use o

f H

R (

all

issues);

Thro

ugh the

use o

f m

anag

ers

, superv

isors

or

sim

ilar;

and,

Thro

ugh the

use o

f th

e E

SM

S t

eam

for

Enviro

nm

enta

l, S

ocia

l (a

nd

Hea

lth a

nd S

afe

ty issues);

2. T

he g

rie

va

nce p

rocess s

hall

pro

tect th

e c

onfid

entially

of

the w

ork

er;

3.

The com

pan

y sha

ll co

mm

it to

re

solv

ing th

e grie

vance

in

a m

anner

that

is accepta

ble

to

th

e

em

plo

yees a

ffecte

d a

nd c

om

pan

y;

4. T

he c

om

pan

y s

ha

ll com

mit to r

esolv

ing

the

gri

evan

ce in a

fair a

nd p

roper

manner;

5.

The p

olic

y sh

all

ha

ve specific

tim

efr

am

es in

w

hic

h a grie

va

nce sh

all

be re

solv

ed

e.g

. to

b

e

addre

ssed

w

ithin

3 w

ork

ing d

ays f

rom

th

e in

itia

l su

bm

issio

n b

y th

e em

plo

ye

e.

If not

sa

tisfa

cto

rily

addre

ssed

within

th

e t

imefr

am

e t

he e

mplo

ye

e m

ay e

scala

te t

he issue

to

the

sup

erior

of

the p

ers

on t

o

whom

the g

rie

va

nce w

as m

ade,

whic

h s

hall

be a

ddre

ssed w

ithin

7 w

ork

ing d

ays;

6.

If n

o r

esolu

tion c

an b

e f

ound i

nte

rna

lly b

etw

ee

n t

he e

mplo

ye

e a

nd t

he c

om

pan

y,

the e

mplo

ye

e

shall

be a

fford

ed the u

se o

f an e

xte

rnal re

solu

tion m

echan

ism

as g

overn

ed b

y lab

our

regu

latio

n;

7. T

he p

rocess s

hall

allo

w f

or

repre

senta

tion w

here

a g

rievance

in

vo

lves a

gro

up o

f em

plo

ye

es;

8. F

ee

dback s

hall

be p

rovid

ed to

those

in

vo

lved;

an

d

9.

The pro

cess shall

pro

hib

it re

trib

utio

n fo

r filin

g co

mpla

ints

; an

d th

e pro

cess shall

be alig

ned to

lab

our

reg

ula

tion.

Page 50: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-3

2

Ap

pen

dix

D –

Mo

nit

ori

ng

Req

uir

em

en

ts u

nd

er

the E

nv

iro

nm

en

tal

Perm

it

Constr

uction,

opera

tio

nal

and d

ecom

mis

sio

nin

g p

hase e

nviro

nm

enta

l, s

ocia

l an

d h

ea

lth

an

d s

afe

ty

requirem

ents

are

set

out

in t

he S

ched

ule

of

Environ

menta

l P

erm

it.

To e

nsure

com

plia

nce w

ith t

he

perm

it, th

e f

ollo

win

g r

equ

irem

ents

must be

im

ple

mente

d a

nd m

onitore

d;

Co

nstr

ucti

on

ph

as

e

Constr

uction b

arr

iers

Com

mitm

ent

to p

revention,

min

imis

ation a

nd

mitig

atio

n

Land

an

d w

ate

r qu

alit

y m

anage

me

nt

Tra

ffic

ma

nag

em

ent

Constr

uction/w

ork

s p

rogra

mm

e

Acquis

itio

n a

nd P

rote

ctio

n o

f R

ights

of W

ay C

om

pe

nsatio

n

Nois

e a

nd s

anitation

Occupatio

nal he

alth a

nd s

afe

ty

Pub

lic h

ea

lth r

isks

Solid

an

d liq

uid

waste

man

agem

ent

Constr

uction a

ir e

mis

sio

ns, nois

e a

nd v

ibra

tio

n m

ana

gem

en

t

Waste

oil

mana

gem

ent

Constr

uction p

hase e

nviro

nm

enta

l m

on

itori

ng

:

o

Constr

uction tra

ffic

o

Dust

o

Nois

e

o

Soil

ero

sio

n

o

Occupatio

nal he

alth a

nd s

afe

ty

o

Oil

waste

genera

tio

n a

nd m

anag

em

ent

o

Socia

l im

pacts

Op

era

tio

nal p

ha

se

Cle

aner

pro

duction o

ptions d

urin

g test ru

ns a

nd o

pera

tiona

l ph

ase

Energ

y m

an

age

me

nt

Air e

mis

sio

ns

Opera

tiona

l p

hase e

nviro

nm

enta

l m

on

itori

ng

;

o

Fire p

rep

are

dness

o

Am

bie

nt n

ois

e

o

Waste

wate

r

o

Sta

ck e

mis

sio

ns (

NO

x)

Page 51: JP Wale - earlypowerltd.comearlypowerltd.com/wp-content/uploads/ESMS-DOC-1-Manual-Rev-6-2018... · JP Wale Ghana Bridge Power Project E nvironmental and S ocial M anagement S ystem

10-3

3

o

Slu

dg

e m

anag

em

ent

o

Waste

oil

mana

gem

ent

o

Use o

f p

ers

ona

l pro

tective e

qu

ipm

ent (P

PE

)

o

Solid

waste

gen

era

tion a

nd

dis

posa

l

o

Accid

en

ts, w

ork

er

inju

ry a

nd h

ealth

o

Spill

conta

inm

en

t syste

ms

o

Fire r

isk h

azard

s

o

Tra

ffic

ma

nag

em

ent

and v

ehic

ula

r accid

ents

o

Occupatio

nal an

d p

ublic

he

alth

an

d s

afe

ty

Insta

llation

of

an

on

-lin

e

continuo

us

mo

nitorin

g

syste

m

an

d

monitori

ng

of

atm

ospheri

c

em

issio

ns

Sub

mis

sio

n o

f ha

lf y

earl

y m

onitorin

g r

ep

ort

s to t

he A

ge

ncy for

revie

w a

nd c

om

men

ts

Enviro

nm

enta

l p

erf

orm

ance r

ating a

nd p

ub

lic d

isclo

su

re s

chem

e

Oil

sp

ill r

isk

Waste

oil

mana

gem

ent

Fire, risk a

nd e

xp

losio

n

Vola

tile

org

anic

com

pou

nd (

VO

C)

em

issio

ns

Nois

e leve

ls

Oily

wate

r tr

eatm

ent syste

m a

nd u

nit

Waste

wate

r tr

eatm

ent

and

mana

ge

ment

Solid

waste

man

ag

em

ent

Enviro

nm

enta

l p

erm

it a

ware

ness

Inte

gri

ty c

hecks (

fuel)

Sto

rm w

ate

r m

an

ag

em

ent

Neig

hbo

urin

g/a

djo

inin

g lan

d u

ses

Sta

keh

old

er

consu

ltatio

ns

Em

erg

ency r

esponse

pla

n

En

d o

f E

SM

S M

an

ual


Recommended