About UsJ.R. Manufacturing, LP is a packaging and fabrication company focused on Safety, Quality and On-Time Delivery. We have been serving the Sub-Sea, onshore and offshore oil & gas industry since 2006. We are an ISO 9001 certified shop with solid QA and HSE programs. Our team has decades of experience serving the Oil &Gas and Sub-Sea industries.We transform customer engineering plans into final products, ready for installation. We provide our customers with turnkey fabrication and packaging services. We are focused on achieving the highest level of customer satisfaction by delivering projects of the highest quality and craftsmanship. Our fabrication and packaging capabilities include a variety of product options such as Umbilical Termination Heads, Hydraulic and Electrical Distribution Manifolds, Subsea Mud Mats, Compressor Packages, Gas Treatment Packages, Platform Nitrogen Units, etc.
3
Facilities and Capacity• ISO 9001-2008 Certified • 45,000 Square Foot Floor
Space• High Bay with 60’ Ft under
hook• 5, 10, 20, & 50 ton Overhead
Cranes• Pull Test bed 200,000 lbs.• 30 Welding Units – ( Miller &
Lincoln )• Hydro Testing• Saw Cutting• 4,400 SQ/FT of Secure Indoor
Customer Storage Area
Customer Storage Area
4
WeldingJRMFG has a variety of Welding Procedures on file Qualified to AWS, ASME Section IX & DNV. These are qualified to different welding processes GTAW, SMAW, SAW, FCAW as well as Cladding. Five welding positioners from 56,000 Lbs. to 420,000 Lbs. Along with 10 ton to 40 ton automatic rollers.JRMFG is aggressive in our Welding Program we believe in continued training of our welding staff. We conduct random weld audits on a weekly basis. The audit forms are kept on file and used to support our Welder Continuity Log as well.
5
Pull TestHere at JRMFG Safety & Quality are our top concerns. When performing pull test JSA (Job Safety Analysis) as well as pull test procedures are wrote around customer requirements. JSA as well as Pull Test Procedures are reviewed and signed off on by all participants involved. COC’s are provided with pictures as well as load cell calibration certs.
6
Client Roster