PD Form 79 ((/00) JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) 1 Subcontract No: 10-C0162 Date: 8/18/2011 2 Project Title: Technology and Engineering Development Facility Project 3 CCR No: 18 PR No. FTCCT, FTCCL 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in Drawings/Sketches: TLR – A2.1.1.7 – Revised routing of storm drain pipe at column lines L & 23. Added elevation #3 for clarification. TLR – A2.1.1.8 – Revised routing of storm drain location at column line E2 & 23. TED – A4.3.2.5 – Clarification of dimensions for curtainwall CW16. TED – A5.2.4.2 – Clarification of location of recessed light fixture and are diffuser on elevation L2 TED – A5.2.4.4 – Clarification of location of recessed light fixture and are diffuser on elevation L5 TED – A7.2.1.2 – New section details 5, 6, & 7 for clarification TLR – M2.1.1B2 – Revised return air ductwork routed below access floor to accommodate floor support spacing. TLR – M2.1.1C2 – Revised location of 58-EF-6 and 58-EF-4-2 E6.1.2 – Update location of luminaire ‘A25’ in elevation. CP – S17 – Joist bridging required to brace columns in the TED high bay. CP – S20 – Sketch showing requirements for re-located pipe chase in the first floor of segment G. 7 Changes in Specifications: N/A
Transcript
Page 1: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

PD Form 79 ((/00)

JSA/JEFFERSON LAB

CONSTRUCTION CHANGE REQUEST (CCR)

1 Subcontract No: 10-C0162 Date: 8/18/2011 2 Project Title: Technology and Engineering Development Facility Project 3 CCR No: 18 PR No. FTCCT, FTCCL 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in Drawings/Sketches: TLR – A2.1.1.7 – Revised routing of storm drain pipe at column lines L & 23. Added elevation #3 for clarification. TLR – A2.1.1.8 – Revised routing of storm drain location at column line E2 & 23. TED – A4.3.2.5 – Clarification of dimensions for curtainwall CW16. TED – A5.2.4.2 – Clarification of location of recessed light fixture and are diffuser on elevation L2 TED – A5.2.4.4 – Clarification of location of recessed light fixture and are diffuser on elevation L5 TED – A7.2.1.2 – New section details 5, 6, & 7 for clarification TLR – M2.1.1B2 – Revised return air ductwork routed below access floor to accommodate floor support spacing. TLR – M2.1.1C2 – Revised location of 58-EF-6 and 58-EF-4-2 E6.1.2 – Update location of luminaire ‘A25’ in elevation. CP – S17 – Joist bridging required to brace columns in the TED high bay. CP – S20 – Sketch showing requirements for re-located pipe chase in the first floor of segment G. 7 Changes in Specifications: N/A

Page 2: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
CCR NO. 18
sshamaa
Text Box
06/30/11
Page 3: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
CCR NO. 18
sshamaa
Text Box
06/30/11
Page 4: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
06/30/11
sshamaa
Text Box
CCR NO. 18
Page 5: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
CCR NO. 18
sshamaa
Text Box
06/30/11
Page 6: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
06/30/11
sshamaa
Text Box
CCR NO. 18
Page 7: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
CCR NO. 18
sshamaa
Text Box
06/30/11
Page 8: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
06/30/11
sshamaa
Text Box
CCR NO. 18
Page 9: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

sshamaa
Text Box
06/30/11
sshamaa
Text Box
CCR NO. 18
Page 10: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

2

A

B

C

D

A

B

C

D

654321

654321

TEDF TWO - FINAL 05/24/10

1

1

1

ADDENDUM NO. 1 - TEDF TWO 06/18/10

CONSOLIDATED SET 04/01/11

BULLETIN NO. 50 06/__/112

CCR-18

sshamaa
Text Box
CCR NO. 18
sshamaa
Text Box
06/30/11
Page 11: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18

Page 12: JSA/JEFFERSON LAB CONSTRUCTION CHANGE REQUEST (CCR) … · 4 CCR Title: Responses to RFI’s and miscellaneous 5 Description: Clarifications and responses to RFI’s 6 Changes in

CCR-18