+ All Categories
Home > Documents > July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R...

July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R...

Date post: 22-Dec-2015
Category:
Upload: aleesha-bennett
View: 214 times
Download: 0 times
Share this document with a friend
Popular Tags:
20
July 10, 2013 Space Weather Product Team (SWPT)
Transcript
Page 1: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

July 10, 2013

Space Weather Product Team(SWPT)

Page 2: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Outline

2

• SWPT Roster

• SWPT Timeline (1)

• GOES-R Pre-launch Timeline (1)

• SPADES Overview (2)

• Cal/INR/Product Science – Farida (8)

• Pre-launch Test Datasets (1)

• Product Monitoring – GOES NOP (1)

• Product Monitoring – GOES-R (1)

Page 3: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

3

SWPT RosterSWPT RosterFirst Last 26-Mar 15-May 10-Jul Representing Telephone e-mailFarida Adimi Ground 301 286-4195 [email protected] Bysal OSPO 301-817-4088 [email protected] Cao CWG 301 683-2561 [email protected] Chesters Flight [email protected] Coakley MIT/LL 781 981-0616 [email protected] Comeyne Flight [email protected] Darnel NGDC 303 497-4280 [email protected] Denig NGDC 303 497-6323 [email protected] Flanagan Flight 301 286-3387 [email protected] Frederick MOST 301 817-3938 [email protected] Garhart MOST 301 817-4277 [email protected] Iacovazzi POSSM 301 286-5944 [email protected] Loto'aniu NGDC 303 497-7616 [email protected] Machol NGDC 303 497-6686 [email protected] Markelov MOST [email protected] Moore MOST 301 286-1947 [email protected] Race Ground [email protected] Redmon NGDC 303 497-4331 [email protected] Reinard SWPC 303 497-4748 [email protected] Rich MIT/LL 781 981-2596 [email protected] Ripley DOST [email protected] Rodriguez NGDC 303 497-4604 [email protected] Rowland NGDC 303 497-3708 [email protected] Singer SWPC 303 497-6959 [email protected] Tadikonda Flight 301 286-2159 [email protected] Todirita Flight 301 286-3284 [email protected] Viereck SWPC 303 497-7348 [email protected]

Last updated: 08 Jul 14Send corrections/updates/additions to Bill Denig ([email protected])

Page 4: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

4

SWPT Timeline

Page 5: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

MOR - Jun 14/ SIR - Jul 14

GOES-R CVCT Timeline

5

GOES-R Series Pre-launch CVCT Activities

• Continue pre-launch instrument cal test assessment and reporting

• Develop and implement the GOES-R System-level Cal/Val CONOPS/OPSCON

• Cal/INR/Product Science (CIPS) PLT Planning

• Define CIPS-related data operations validation objectives to be carried out during Data Ops Exercises (DOEs) and GS Integration and Test (GSIT)

• Support SIR and MOR reviews

• Complete CIPS tool development planning and begin implementation

• Ground Segment Training for relevant personnel

• Clarify CIPS validation schedules and milestones

• Identify CIPS resource needs and risks

Cal/INR/Product Science Ops

Cal/INR/Product Science (CIPS) Val Tool Development

4 months 6 months 9 months

Mission Operations Review (MOR) and System Integration Review (SIR)

Flight Operations Review (FOR)

6 Months

CIPS Val Tool Testing

Post-Launch Test (PLT) Planning/ Preparation & System-Level Test Planning/Implementation

Cal&INR PLT Procedure Development

ETE I-V Testing

DOE/GSIT

Cal&INR PLT Definition

Data Operations Tests (DOT) Planning & Ground Segment Training

CIPS Val Maturity Stage Definitions

Launch

*Post-Launch Product Test (PLPT) Definition and Development

CVCT Kick-Off

Sep13 Apr15 Oct15

CIPS CONOPS/OPSCON Development CIPS OPSCON Rehearsals

Bob’s Pre-launch Schedule

Page 6: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

6

Satellite Product Analysis & Distribution Enterprise

System (SPADES)

Page 7: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

7

SPADES Timeline

Page 8: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Cal/INR/Product Science(CIPS)

Operations Validation and Transition/Handover - Draft

Farida Adimi

7/8/2014

Note: This is presented within an ABI perspective. Significant differences are anticipated for SWx (WFD)

Farid

a’s

Slides

Page 9: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Product Science Operations

• Validate science products

• Access to the GOES-R Ground System (GS)

• Real time product monitoring and evaluation through the GS tools

• Offline product monitoring and evaluation through CalVal tools within the Development Environment (DE)

• Update processing parameters, including calibration parameters in DE.

• Update algorithms in the DE

• Integrate and test algorithms in the DE

Farid

a’s

Slides

Page 10: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Preparing for science validation

Pre-launch activities• Support Ground test activities such as GS contractor

Interim Releases when possible• Assess products associated with the GS Interim

Releases• Assess GS tools associated with the GS Interim

Releases• Assess access to the GS during the GS Interim

Releases• Support the DOST testing (DOEs) such test data needs

and assess products, tools, and GS access

• Develop CalVal tools

Farid

a’s

Slides

Page 11: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

GS Interim Releases

Ground Contractor Verification Tests - GSP

• Participate in Day In The Life (DITLs) during GS testing for IPS, FPS, and DE site testing

• Attend training associated with of the above interim releases

• Assess products from ground contractor testing events (IPS, FPS, and DE)

• Assess access to GS during the DE testing events

• Develop CalVal tools using test data generated from the above testing events

GS Release

Capabilities Training & DITL

IPS Initial Product Set, ABI L1 & CMI distribution to AWIPS

9/8/14 – 10/16/14

FPS Final Product Set, L2 + and non ABI L1 2/16/15 – 3/26/15

DE NSOF and WCDAS Development Environment 5/18/15 – 5/29/15

Farid

a’s

Slides

Page 12: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

DOEsData Operation Exercises (DOEs) - DOST

• Support the planning of the DOEs (test data, products maturity, and product availability,…)

• Participate in DOEs testing.

• Assess products from the DOEs

• Assess GS access during the DOEs

• Develop and assess Cal-Val tools

Capabilities Date

DOE-0 Initial generation of GRB ABI products and initial testing with AWIPS

9/2014

DOE-1 Data flow with PDA/AWIPS/LZSS in nominal configuration, with some anomalies inserted

05/2015

DEO-2 Data flow with PDA/AWIPS/LZSS in nominal and non-nominal configurations, with anomalies inserted

6/2015

DE-03 Data flow injected from the antenna to PDA/AWIPS/LZSS in nominal and non-nominal configurations, with anomalies inserted

7/2015

DE-04 Data flow with PDA/AWIPS/LZSS in nominal and non-nominal configurations, with anomalies inserted, to demonstrate system stability

10/2015

Farid

a’s

Slides

Page 13: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Test data for the DOEs

• Test data for the DOEs is under development

• Provide input for test data needs

• Test data under consideration: instrument vendor (CDRL82), Triplet data set from Wisconsin, SC level thermal Vac test data,…

Farid

a’s

Slides

Page 14: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Algorithm and Calibration Data Update

• Next…

• Roles and responsibilities during algorithm and table update, need input from the CalVal team

• Process for algorithm and Table update (TBD)

• Tools development for algorithm and Cal Data update

Farid

a’s

Slides

Page 15: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

CalVal Team

POC Role Organization

Products Location GS access need

Mike WeinrebKen MitchellPaul Douglas

Radiometric engineer

OSPO ABI L0, L1, PP, PM NSOF, Suitland MD

OE PPZDE PPZDE SOZ

Dave Pogorzala CWG STAR ABI L0 & L1, PP, PM Center for STAR, College Park MD.

DE PPZ - remote

Bill Denig

William Rowland

Space Weather Lead

NGDC EXIS, MAG, SEISS, and SUVI L0, L1, PP, PM

NGDCBoulder, CO

Jamie Daniels L2+ lead STAR/AWG ABI & GLM L2+ Center for STAR, College Park MD.

DE PPZ - remote

Ricky Irving Product Area Lead

STAR? OSPO? L0, L1, and L2+ Center for STAR, College Park MD.

OE PPZ - remoteDE PPZ – remote

Farid

a’s

Slides

Page 16: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Discu

ssio

n Topic

16

Pre-launch Test Datasets

Assumptions: Form-Fit-Function datasets are currently available (Yes/No?) Valid proxy datasets will be available to support DOE 2 (Jun ‘15) L2b proxy data available via PDA during DOE 2-4 and GSIT 1-2 No SWPT participation expected during ETE 1-5 SPADES will be available for L1b data receipt NGDC interface to LZSS (Ingest to archive) will be available

Questions: Will L0 proxy data be available via the LZSS? Will independent L1b algorithms will be available for GS validation

Page 17: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Discu

ssio

n Topic

17

Product Monitoring – GOES NOP

OSPO roles and responsibilities SWx sensor health and safety monitoring Basic instrument functionality – data within range Sensor commanding

NGDC/SWPC roles and responsibilities Raw data receipt via local antennas Data product generation Product performance and oversight Instrument calibration and algorithm updates

Page 18: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

Discu

ssio

n Topic

18

Product Monitoring – GOES RUnderstanding new roles and responsibilities

OSPO roles and responsibilities SWx sensor health and safety monitoring L1b data product generation L1b calibration table updates Sensor commanding

NWS IDP roles and responsibilities L2+ data product generation GRB/Boulder receipt and de-coding

NGDC/SWPC roles and responsibilities L1b/2+ data product performance and oversight Sensor calibration monitoring and updates L2+ algorithm updates and configuration control

Page 19: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

19

Backups

Page 20: July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.

20

Bob’s Chart


Recommended