Los Angeles County Metropolitan Transportation Authority One GatewayPlaza Los Angeles,CA 900~2 213.922.6000 Mailing Address: RO. Box Los Angeles, CA 90053 TO: FROM: SUBJECT: JULY3, 1996 BOARD OF DIRECTORS ~ /\t -. JA;SpERPoH V~.LD~Aw,MCE~TM F ~E C~TIVE OFFNT_~ FOR CONFI2~TION MANAGEMENT SERVICES ON THE METRO RAIL PROJECTS RECOMMENDATION Approve Amendment No. 2 to Contract No. CM001 for Configuration Management Servicesto: Contract Work Order (CWO) No. 1 for Metro Red Line, Segment 1 with LKG- CMC Inc., in the amount of $16,817, which increases the total CWO value to $516,028 and is within the current BoardapprovedAuthorization For Expenditure (AFE) amountof $573,821; b) CWO No. 2 for Metro Red Line, Segment 2 with LKG-CMC Inc., in the amount of $6,574, whichincreases the total CWO value to $1,104,530and is within the current Board approved AFE amount of $1,279,649; c) CWO No. 3 for Metro Red Line, Segment 3, North Hollywood with LKG-CMC Inc., in the amount of $53,382, whichincreases the total CWO value to $1,069,820 and is within the current Board approved AFE amount of $1,155,549; d) CWO No. 5 for Pasadena Line with LKG-CMC Inc., for Configuration Management Services in the amountof$11,657, which increases the total CWO value to $1,135,898 and is within the current Board approvedAFE amount of $1,349,070; e) CWO No. 6 for Metro Green Line with LKG-CMC Inc., in the amount of $3,382, which increases total CWO value to $625,663and is within the current Board approved AFE amount of $709,141; CWO No. 7 for Metro Rail Projects with LKG-CMC Inc., for Configuration Management Services in the amountof $3,382, which increases the total CWO value to $1,236,459 and is within the current Board approvedAFE amount of $1,394,504; and g) Approve an all-inclusive increase to the total contract value in the amount of $95,194whichincreases the total contract value from $8,044,704 to $8,139,898.
Transcript
Page 1: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

Los Angeles CountyMetropolitan

Transportation

Authority

One Gateway Plaza

Los Angeles, CA

900~2

213.922.6000

Mailing Address:

RO. Box

Los Angeles, CA 90053

TO:

FROM:

SUBJECT:

JULY 3, 1996

BOARD OF DIRECTORS ~/\t -.

JA;SpERPoHV~.LD~Aw,MCE~TMF ~E C~TIVE OFFNT_~ FOR CONFI2~TION

MANAGEMENT SERVICES ON THE METRO RAILPROJECTS

RECOMMENDATION

Approve Amendment No. 2 to Contract No. CM001 for Configuration ManagementServices to:

Contract Work Order (CWO) No. 1 for Metro Red Line, Segment 1 with LKG-CMC Inc., in the amount of $16,817, which increases the total CWO value to$516,028 and is within the current Board approved Authorization ForExpenditure (AFE) amount of $573,821;

b) CWO No. 2 for Metro Red Line, Segment 2 with LKG-CMC Inc., in the amountof $6,574, which increases the total CWO value to $1,104,530 and is within thecurrent Board approved AFE amount of $1,279,649;

c) CWO No. 3 for Metro Red Line, Segment 3, North Hollywood with LKG-CMCInc., in the amount of $53,382, which increases the total CWO value to$1,069,820 and is within the current Board approved AFE amount of $1,155,549;

d) CWO No. 5 for Pasadena Line with LKG-CMC Inc., for ConfigurationManagement Services in the amount of$11,657, which increases the total CWOvalue to $1,135,898 and is within the current Board approved AFE amount of$1,349,070;

e) CWO No. 6 for Metro Green Line with LKG-CMC Inc., in the amount of $3,382,which increases total CWO value to $625,663 and is within the current Boardapproved AFE amount of $709,141;

CWO No. 7 for Metro Rail Projects with LKG-CMC Inc., for ConfigurationManagement Services in the amount of $3,382, which increases the total CWOvalue to $1,236,459 and is within the current Board approved AFE amount of$1,394,504; and

g) Approve an all-inclusive increase to the total contract value in the amount of$95,194 which increases the total contract value from $8,044,704 to $8,139,898.

Page 2: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ORGANIZATIONAL IMPACT

This action will provide for the continued support required for contract document distribution andhandling, general document control, and configuration management of project documents, fromJuly 1996 through July 1998.

BUDGET IMPACT

The funds for this action are budgeted within the FY 1997 MTA budget.

ALTERNATES CONSIDERED

The Board has the option to disapprove this action. Disapproval will delay the preparation andissuance of the solicitation documents for construction of the Metro Rail Projects.

BACKGROUND

Contract No. CM001 with LKG-CMC, which includes document control services for all MetroRail Projects for a five year period, was approved by the Board in July 1993, with a contract termfrom July 1993 through July 1998. A single contract was recommended as the most cost efficientand effective method for providing consistent bid and contract document handling on all projects.

This amendment incorporates various work scope changes approved by Project Managers aswork authorizations. Specific changes being incorporated are listed in Attachment 2.

DBE PARTICIPATION

The DBE goal for this contract was set at 25%. LKG-CMC Inc. has consistently exceeded theDBE goal.

ATTACHMENTS

1. Contract Value Status2. Consultant Change Request List3. Change Status Report

Prepared by: Jerry Kiper, Sr. Contract Administration, C.P.M.Louisa Simpson, Program Management

Stanley G. PhernambucqExecutive Officer, Construction

BoardCMO01

Page 3: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT 1PROFESSIONAL SERVICES CONTRACT VALUE STATUS

RSO - Metro Red Line Seg-1

CM001 - LKG-CMC, INC.CONTRACT WORK ORDER #01 - AMENDMENT #02

PROJECT CUMULATIVE CWO VALUE FOR CONTRACT CMO01

1. TOTAL INITIAL CWO VALUE:2. TOTAL PREVIOUS AMENDMENTS:3. TOTAL CURRENT CONTRACT VALUE (1 +2)4. VALUE OF THIS AMENDMENT5. PROPOSED BOARD APPROVED CONTRACT VALUE (3 +4)6. STAFF APPROVED CCN NTE VALUE7. CCN NTE’S INCLUDED IN AMENDMENT8. CCN NTE’S IN OUTSTANDING CCN’S (6-7)9. NEW CONTRACT EXPENDITURE CEILING (5 +8)

$521,655($22,444)

$499,211$16,817

$516,028$18,533$16,817

$1,716$517,744

AUTHORIZAT/ON FOR EXPEND/TURE STATUS ." TOTAL PROJECT R80 CMO01

10. EXPENDED TO DATE11. UNEXPENDED CWO VALUE (9-10)12. NTE ALLOWANCE (From Table)13. PROPOSED AFE (5+12)14. CURRENT AFE15. AFE ADJUSTMENT REQUIRED (13-14)

$0$ 517,744

$50,000$566,028 *$573,821

$0 Not Required

BUDGET STATUS : TOTAL PROJECT R80 CMO01

16. CURRENT CONTRACT BUDGET $017. PROPOSED BOARD APPROVED CONTRACT VALUE $516,02818. OUTSTANDING CCN’S $1,716 as of 06/20/9619. TRENDS AND CONTINGENCIES ($517,744)20. FORECAST FINAL COST (17+18+19) $0 as of [1]

REVIEWED BY:

* - Allows future AWA NTE authorizations up to: $48,284[1] Forecast will be revised end of July

CWOXPROJ - MULTI RRev 1,6 06/20/96 kam DATA AS OF:06/20/96 12:56:21

Page 4: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT 1PROFESSIONAL SERVICES CONTRACT VALUE STATUS

R81 - Metro Red Line- Segment 2

CMO01 - LKG-CMC, INC.CONTRACT WORK ORDER #02 - AMENDMENT #02

PROJECT CUMULATIVE CWO VALUE FOR CONTRACT CMO01

1. TOTAL INITIAL CWO VALUE:2. TOTAL PREVIOUS AMENDMENTS:3. TOTAL CURRENT CONTRACT VALUE (1 + 2)4. VALUE OF THIS AMENDMENT5. PROPOSED BOARD APPROVED CONTRACT VALUE (3 +4)6. STAFF APPROVED CCN NTE VALUE7. CCN NTE’S INCLUDED IN AMENDMENT8. CCN NTE’S IN OUTSTANDING CCN’S (6-7)9. NEW CONTRACT EXPENDITURE CEILING (5 + 8)

$1,163,317($65,361)

$1,097,956$6,574

$1,104,530$15,926

$6,600$9,326

$1,113,856

AUTHORIZATION FOR EXPEND/TURE STATUS : TOTAL PROJECT R81 CMO01

10. EXPENDED TO DATE11. UNEXPENDED CWO VALUE (9-10)12. NTE ALLOWANCE (From Table)13. PROPOSED AFE (5 + 12)14. CURRENT AFE15. AFE ADJUSTMENT REQUIRED (13-14)

$592,509$521,347

$50,000$1,154,530 *$1,279,649

$0 Not Required

BUDGET STATUS : TOTAL PROJECT R81 CMO01

16. CURRENT CONTRACT BUDGET $548,31717. PROPOSED BOARD APPROVED CONTRACT VALUE $1,104,53018. OUTSTANDING CCN’S $17,000 as of 06/20/9619. TRENDS AND CONTINGENCIES ($573,213)20. FORECAST FINAL COST (17+18+19) $548,317 as of [1]

REVIEWED BY:

* - Allows future AWA NTE authorizations up to: $40,674[1] Forecast will be revised end of July

CWOXPROJ - MULTI RRev 1.6 06/20/96 kamDATA AS OF:06/20/96 12:57:03

Page 5: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT 1PROFESSIONAL SERVICES CONTRACT VALUE STATUS

R82 - Metro Red Line-Segment3-N

CMO01 - LKG-CMC, INC.CONTRACT WORK ORDER #03 - AMENDMENT #02

PROJECT CUMULATIVE CWO VALUE FOR CONTRACT CMO01

1. TOTAL INITIAL CWO VALUE:2. TOTAL PREVIOUS AMENDMENTS:3. TOTAL CURRENT CONTRACT VALUE (1 +2)4. VALUE OF THIS AMENDMENT5. PROPOSED BOARD APPROVED CONTRACT VALUE (3 +4)6. STAFF APPROVED CCN NTE VALUE7. CCN NTE’S INCLUDED IN AMENDMENT8. CCN NTE’S IN OUTSTANDING CCN’S (6-7)9. NEW CONTRACT EXPENDITURE CEILING (5+8)

$1,050,499($34,061)

$1,016,438$53,382

$1,069,820$65,045$53,400$11,645

$1,081,465

AUTHORIZATION FOR EXPENDITURE STATUS : TO TAL PROJECT R82 CMO01

10. EXPENDED TO DATE11. UNEXPENDED CWO VALUE (9-10)12. NTE ALLOWANCE (From Table)13. PROPOSED AFE (5+12)14. CURRENT AFE15. AFE ADJUSTMENT REQUIRED (13-14)

$532,452$549,013

$5O,OOO$1,119,820 *$1,155,549

$0 Not Required

BUDGET STATUS : TOTAL PROJECT R82 CMO01

16. CURRENT CONTRACT BUDGET $1,503,00017. PROPOSED BOARD APPROVED CONTRACT VALUE $1,069,82018. OUTSTANDING CCN’S $18,645 as of 06/20/9619. TRENDS AND CONTINGENCIES $414,61820. FORECAST FINAL COST (17+18+19) $1,503,083 as of [1]

REVIEWED BY:

* - Allows future AWA NTE authorizations up to: $38,355[1] Forecast will be revised end of July

CWOXPROJ - MULTI RRev 1.6 06/20/96 kam DATA AS OF:06/20/96 12:57:39

Page 6: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT 1PROFESSIONAL SERVICES CONTRACT VALUE STATUS

R05 - Metro Blue Line - Pasadena

CM001 - LKG-CMC, Inc.CONTRACT WORK ORDER #05 - AMENDMENT #02

PROJECT CUMULATIVE CWO VALUE FOR CONTRACT CMO01

1. TOTAL INITIAL CWO VALUE:2. TOTAL PREVIOUS AMENDMENTS:3. TOTAL CURRENT CONTRACT VALUE (1 +2)4. VALUE OF THIS AMENDMENT5. PROPOSED BOARD APPROVED CONTRACT VALUE (3 +4)6. STAFF APPROVED CCN NTE VALUE7. CCN NTE’S INCLUDED IN AMENDMENT8. CCN NTE’S IN OUTSTANDING CCN’S (6-7)9. NEW CONTRACT EXPENDITURE CEILING (5 +8)

$1,226,427($102,186)

$1,124,241$11,657

$1,135,898$27,328$11,682$15,646

$1,151,544

AUTHORIZAT/ON FOR EXPENDITURE STATUS : TOTAL PROJECT R05 CMO01

10. EXPENDED TO DATE11. UNEXPENDED CWO VALUE (9-10)12. NTE ALLOWANCE (From Table)13. PROPOSED AFE (5+ 12)14. CURRENT AFE15. AFE ADJUSTM ENT REQUIRED (13-’14)

$188,661$962,883

$50,000$1,185,898 *$1,349,070

$0 Not Required

BUDGET STATUS : TOTAL PROJECT R05 CMO01

16. CURRENT CONTRACT BUDGET $3,041,20017. PROPOSED BOARD APPROVED CONTRACT VALUE $1,135,89818. OUTSTANDING CCN’S $31,288 as of 06/20/9619. TRENDS AND CONTINGENCIES $1,874,01420. FORECAST FINAL COST (17+18+19) $3,041,200 as of [1]

REVIEWED BY:

* - Allows future AWA NTE authorizations up to: $34,354[1] Forecast will be revised end of July

CWOXPROJ - MULTI RRev 1.6 06/20/96 kam DATA AS OF:6 06/20/96 12:55:59

Page 7: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT 1PROFESSIONAL SERVICES CONTRACT VALUE STATUS

R23 - Metro Green Line

CM001 - LKG-CMC, Inc.CONTRACT WORK ORDER #06 - AMENDMENT #02

PROJECT CUMULATIVE CWO VALUE FOR CONTRACT CMO01

1. TOTAL INITIAL CWO VALUE:2. TOTAL PREVIOUS AMENDMENTS:3. TOTAL CURRENT CONTRACT VALUE (1 +2)4. VALUE OF THIS AMENDMENT5. PROPOSED BOARD APPROVED CONTRACT VALUE (3 +4)6. STAFF APPROVED CCN NTE VALUE7. CCN NTE’S INCLUDED IN AMENDMENT8. CCN NTE’S IN OUTSTANDING CCN’S (6-7)9. NEW CONTRACT EXPENDITURE CEILING (5 + 8)

$644,674($22,393)

$622,281-$3,382

$625,663$36,678

$3,382$33,296

$658,959

AUTHORIZAT/ON FOR EXPEND/TURE STATUS : TOTAL PROJECT R23 CMO01

10. EXPENDED TO DATE11. UNEXPENDED CWO VALUE (9-10)12. NTE ALLOWANCE (From Table)13. PROPOSED AFE (5 + 12)14. CURRENT AFE15. AFE ADJUSTMENT REQUIRED (13-14)

$31,949$627,010

$50,000$675,663 *$709,141

$0 Not Required

BUDGET STATUS : TOTAL PROJECT R23 CMO01

16. CURRENT CONTRACT BUDGET $017. PROPOSED BOARD APPROVED CONTRACT VALUE $625,66318. OUTSTANDING CCN’S $35,067 as of 06/20/9619. TRENDS AND CONTINGENCIES ($10,730)20. FORECAST FINAL COST (17+18+19) $650,000 as of [1]

REVIEWED BY:

* - Allows future AWA NTE authorizations up to: $16,704[1] Forecast will be revised end of July

CWOXPROJ - MULTI RRev 1.6 06/20/96 kamDATA AS OF:

7 06/20/96 12:58:57

Page 8: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT 1PROFESSIONAL SERVICES CONTRACT VALUE STATUS

R92 - Systemwide

CM001 - LKG-CMC, INC.CONTRACT WORK ORDER #07 - AMENDMENT #02

PROJECT CUMULATIVE CWO VALUE FOR CONTRACT CMO01

1. TOTAL INITIAL CWO VALUE:2. TOTAL PREVIOUS AMENDMENTS:3. TOTAL CURRENT CONTRACT VALUE (1 +2)4. VALUE OF THIS AMENDMENT5. PROPOSED BOARD APPROVED CONTRACT VALUE (3 +4)6. STAFF APPROVED CCN NTE VALUE7. CCN NTE’S INCLUDED IN AMENDMENT8. CCN NTE’S IN OUTSTANDING CCN’S (6-7)9. NEW CONTRACT EXPENDITURE CEILING (5 +8)

$1,267,731($34,654)

$1,233,077$3,382

$1,236,459$33,396$3,200

$30,196$1,266,655

AUTHORIZAT/ON FOR EXPENDITURE STATUS : TOTAL PROJECT R92 CMO01

10. EXPENDED TO DATE11. UNEXPENDED CWO VALUE (9-10)12. NTE ALLOWANCE (From Table)13. PROPOSED AFE (5+12)14. CURRENT AFE15. AFE ADJUSTMENT REQUIRED (13-14)

$0$1,266,655

$100,000$1,336,459 *$1,394,504

$0 Not Required

BUDGET STATUS : TOTAL PROJECT R92 CMO01

16. CURRENT CONTRACT BUDGET $300,00017. PROPOSED BOARD APPROVED CONTRACT VALUE $1,236,45918. OUTSTANDING CCN’S $86,975 as of 06/20/9619. TRENDS AND CONTINGENCIES ($1,323,434)20. FORECAST FINAL COST (17+18+ 19) $0 as of [1]

REVIEWED BY:

* - Allows future AWA NTE authorizations up to: $69,804[1] Forecast will be revised end of July

CWOXPROJ - MULTI RRev 1.6 06/20/96 kam DATA AS OF:8 06/20/96 12:58:26

Page 9: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

06/20/96 12:04:23 ATTACHMENT # ~’~CONSULTANT CHANGE REQUESTS

CONSULTANT: LKG-CMC, Inc.

CONTRACT:CMO01 CONFIGURATION MANAGEMENT CONSULTANT (CMC)

AMEND # PROJECT CCN NO. CHANGE TITLE NEGOTIATED CCN AMENDMENT BOARDVALUE APPROVED DATE DATE NOTICE DATE

R05 - Metro Blue Line - Pasadena

CWO #: 5.00

R05 2.00 MTA CONSTRUCTION PLAN ROOMSUPPORT

R05 4.01 LKG-CMC REVIEW OF 85% DESIGNREVIEW PACKAGES

$3,382.00 06/02/95

$8,275.00 05/22/95

TOTAL CWO 5.00: $11,657.00

TOTAL PROJECT R05: $11,657.00

AMENDMENT REPORTRREV 4,1, 06/20/96 kamPAGE 1 C~

Page 10: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

06/20/96 12:04:23 ATTACHMENT # ~CONSULTANT CHANGE REQUESTS

CONSULTANT: LKG-CMC, Inc.

CONTRACT:CM001 CONFIGURATION MANAGEMENT CONSULTANT

AMEND # PROJECT CCN NO. CHANGE TITLE NEGOTIATED CCN AMENDMENT BOARDVALUE APPROVED DATE DATE NOTICE DATE

R23 - Metro Green Line

CWO #: 6.00

R23 2.00 MTA CONSTRUCTION PLAN ROOMSUPPORT

R23 9.00 GREENLINE CALTRANS CONTRACTRECORDS: O&M MANUALS ANDCORRESPONDENCE

$3,382.00 06/02/95

05/08/95

TOTAL CWO 6.00: $3,382.00

TOTAL PROJECT R23: $3,382.00

AMENDMENT REPORTRREV 4.1, 06/20/96 kamPAGE 1

Page 11: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

06/20/96 12:04:23 ATTACHMENT # ~CONSULTANT CHANGE REQUESTS

CONSULTANT: LKG-CMC, INC.

CONTRACT:CM001 CONFIGURATION MANAGEMENT CONSULTANTS (CMC)

AMEND # PROJECT CCN NO. CHANGE TITLE NEGOTIATED CCN AMENDMENT BOARDVALUE APPROVED DATE DATE NOTICE DATE

R80 - Metro Red Line Seg-1

CWO #: 1.00

R80 2.00 MTA CONSTRUCTION PLAN ROOMSUPPORT

R80 10.00 ADD CONTRACT SERVICES FOR CO180:RED LINE SEG-1 MAINTENANCECONTRACT

$16,817.00

06/02/95

06/26/95

TOTAL CWO 1.00: $16,817.00

TOTAL PROJECT RS0: $16, 817.00

AMENDMENT REPORTRREV 4.1, 06/20/96 kamPAGE 1 11

Page 12: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

06/20/96 12:04:23 ATTACHMENT #CONSULTANT CHANGE REQUESTS

CONSULTANT: LKG-CMC, INC.

CONTRACT:CM001 CONFIGURATION MANAGEMENT CONSULTANTS (CMC)

AMEND # PROJECT CCN NO. CHANGE TITLE NEGOTIATED CCN AMENDMENT BOARDVALUE APPROVED DATE DATE NOTICE DATE

R81 - Metro Red Line - Segment 2

CWO #: 2.00

R81 2.00 MTA CONSTRUCTION PLAN ROOMSUPPORT

$6,574.00 06/02/95

TOTAL CWO 2.00: $6,574.00

TOTAL PROJECT R81 : $6,574.00

AMENDMENT REPORTRREV 4.1, 06/20/96 kamPAGE 1 12

Page 13: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

06/20/9612:04:23 ATTACHMENT # ~-~CONSULTANT CHANGE REQUESTS

CONSULTANT: LKG-CMC, INC.

CONTRACT:CM001 CONFIGURATION MANAGEMENT CONSULTANT (CMC)

AMEND # PROJECT CCN NO. CHANGE TITLE NEGOTIATED CCN AMENDMENT BOARDVALUE APPROVED DATE DATE NOTICE DATE

R82 - Metro Red Line - Segment 3 - N

CWO #: 3.00

R82 2.00 MTA CONSTRUCTIONPLANROOMSUPPORT

R82 6.00 R82 MAILING COST

$3,382.00 06/02/95

$50,000.00 12/15/94

TOTAL CWO 3.00: $53,382.00

TOTAL PROJECT R82: $53,382.00

AMENDMENTREPORTRREV 4.1, 06/20/96 kamPAGE 1 13

Page 14: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

06/20/96 12:04:23 ATTACHMENT # ~CONSULTANT CHANGE REQUESTS

CONSULTANT: LKG-CMC, INC.

CONTRACT:CM001 CONFIGURATION MANAGEMENT CONSULTANT

AMEND # PROJECT CCN NO. CHANGE TITLE NEGOTIATEDVALUE

CCN AMENDMENT BOARDAPPROVED DATE DATE NOTICE DATE

R92 - Systemwide

CWO #: 7.00

2 R92 2.00 MTA CONSTRUCTION pLAN ROOM $3,382.00SUPPORT

06/02/95

TOTAL CWO 7.00: $3,382.00

TOTAL PROJECT R92: $3,382.00

TOTAL CONTRACT CM001 : $95,194.00

AMENDMENT REPORTRREV 4.1, 06120/96 kamPAGE 1 14

Page 15: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT # ~R05 Metro Blue Line - Pasadena

CONSULTANT CHANGE STATUS REPORTCONTRACT: CM001 -

AMENDMENT # 02 AS OF 06/20/96

A. B. C. D. E. F. G. H. I. J. K. L.

MTA BOARD ---THIS AMENDMENT- ................ OUTSTANDING .............. CURRENT WORK# CCN # CWO # CCN TITLE APPROVED CCRB APPROVED NTE CCRB APPROVED PENDING NTE CCN ESTIMATE STATUS

CWO 2 INITIAL CWO VALUE:

1 9002.02 2 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 2 $0 $0 $0 $0 $0 $0 $0

CWO 3 INITIAL CWO VALUE:

2 9002.01 3 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 3 $0 $0 $0 $0 $0 $0 $0

CWO 5 CONFIGURATION MANAGEMENT CONSULTANT (CMC| INITIAL CWO VALUE: $1,226,427.00

3 0,01 5 AMENDMENT 1: 5% REDUCTION ($102,186) ($102,186) In Process

4 2.00 5 MTA CONSTRUCTION PLAN ROOM SUPPORT $3,382 $3,382 $3,382

5 2.01 5 MTA CONSTRUCTION PLAN ROOM SUPPORT $7,000 $7,000 $7,000EXTENSION

6 4.00 5 LKG-CMC REVIEW OF 85% DESIGN REVIEW CANCELEDPACKAGES

7 4.01 5 LKG-CMC REVIEW OF 85% DESIGN REVIEW $8,275 $8,300 $8,275 In ProcessPACKAGES

8 11.00 5 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES CANCELED

9 12.00 5 PROCESSING OF PASADENA CONTRACT $15,642 $15,642IMPLEMENTATION PACKAGE DESCRIPTIONS

10 13.00 5 LKG OFFICE LEASE EXTENSION - 707 WILSHIRE $8,646 $8,646 $8,646OFFICES

SUBTOTALCWO 5 CONFIGURATION MANAGEMENT ($102,186) $11,657 $11,682 $0 $31,288 $15,646 ($59,241)CONSULTANT (CMC)

TOTALS R05 CM001 ($102,186) $11,687 $11,682 $31,288 $15,646 ($59,241)

1 2 0 3 4 CANCELED

CWO 6 CONFIGURATION MANAGEMENT CONSULTANT INITIAL CWO VALUE: $644,674.001 0.01 6 AMENDMENT 1: 5% REDUCTION ($22,393) ($22,393) In Process

2 2.00 6 MTA CONSTRUCTION PLAN ROOM SUPPORT $3,382 $3,382 $3,382

PAGE 106/20/96 12:51:39

15

RREV 1.3 06/20196 kam

Page 16: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT #R23 Metro Green Line

CONSULTANT CHANGE STATUS REPORTCONTRACT: CM001 - LKG-CMC, Inc.

AMENDMENT # 02 ~,S OF 06/20/96

A. B. C. D. E. F. G. H. I. J. K. L.

MTA BOARD ---T H I S A M E N D M E N T- ................ O U T S T A N O I N G .............. CURRENT WORK# CCN # CWO # CCN TITLE APPROVED CCRB APPROVED NTE CCRB APPROVED PENDING NTE CCN ESTIMATE STATUS

3 2.01 6 MTA CONSTRUCTION PLAN ROOM SUPPORT $7,000 $7,000 $7,000EXTENSION

4 9.00 6 GREENLINE CALTRANS CONTRACT RECORDS: O&MMANUALS AND CORRESPONDENCE

5 13.00 6 LKG OFFICE LEASE EXTENSION - 707 WlLSHIRE $1,296 $1,296 $1,296OFFICES

6 16.00 6 ADDITIONAL MICROFILM FUNDING FOR CALTRANS $26,771 $25,000 $26,771CONTRACTS, AS-BUILTS, & 0 & M MANUALS

SUBTOTALCWO 6 CONFIGURATION MANAGEMENT ($22,393) $3,382 $3,382 $0 $35,067 $33,296 $16,056CONSULTANT

TOTALS R23 CM001 ($22,393) $3,382 $3,382 $36,067 $33,296 $16,056

1 1 0 3 0 CANCELED

CWO 1 CONFIGURATION MANAGEMENT CONSULTANTS (CMC) INITIAL CWO VALUE: $521,655.00

1 0.01 1 AMENDMENT 1: 5% REDUCTION ($22,444) ($22,~.~.~.,~ In Process

2 2.00 1 MTA CONSTRUCTION PLAN ROOM SUPPORT

3 2.01 I MTA CONSTRUCTION PLAN ROOM SUPPORTEXTENSION

4 10.00 1 ADD CONTRACT SERVICES FOR CO180: RED LINE $16,817 $16,817 $16,817 CompletedSEG-1 MAINTENANCE CONTRACT

5 13.00 1 LKG OFFICE LEASE EXTENSION- 707 WlLSHIRE $1,716 $1,716 $1,716OFFICES

SUBTOTALCWO 1 CONFIGURATION MANAGEMENT ($22,444) $16,817 $16,817 $0 $1,716 $1,716 ($3,911)CONSULTANTS (CMC)

TOTALS R80 CM001 ($22,444) $16.817 $16,817 $1,716 $1,716 ($3,811)

1 1 0 1 0 CANCELED

CWO 2 CONFIGURATION MANAGEMENT CONSULTANTS (CMC) INITIAL CWO VALUE: ’$1,1 63,31 7.00

1 0.01 2 AMENDMENT 1: 5% REDUCTION ($65,361) ($65,361) In Process

06/20/96 12:51:39RREV 1.3 06/20/96 kamPAGE 2

16

Page 17: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT # ~R81 Metro Red Line - Segment 2

CONSULTANT CHANGE STATUS REPORTCONTRACT: CM001 - LKG-CMC, INC.

AMENDMENT # 02 AS OF 06/20/96

A. B. C. D. E. F. G. H. I. J. K. L.

MTA BOARD ---THIS AMENDMENT ................. OUTSTANDING .............. CURRENT WORK

# CCN # CWO # CCN TITLE APPROVED CCRB APPROVED NTE CCRB APPROVED PENDING NTE CCN ESTIMATE STATUS

2 2.00 2 MTA CONSTRUCTION PLAN ROOM SUPPORT $6,574 $6,600 $6,674

3 2.01 2 MTA CONSTRUCTION PLAN ROOM SUPPORT $12,000 $12,000EXTENSION

4 8.00 2 REVISE CWO-O02 TO INCLUDE SUPPORT SERVICES CANCELEDFOR CONTRACT CR062, "HOLLYWOODBOULEVARD TROLLEY*, TO BE CHARGED TOPROJECT R8M, "HOLLYWOOD MITIGATION"

5 11.00 2 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES CANCELED

6 13.00 2 LKG OFFICE LEASE EXTENSION - 707 WILSHIRE $4,326OFFICES

7 9002.02 2 Provide Assistant Technical Editor Services CANCELED

8 9003.00 2 REVISE CWO-002 TO iNCLUDE SUPPORT SERVICES $5,000 $5,000 $5,000FOR CONTRACT CR062, "HOLLYWOODBOULEVARD TROLLEY", TO BE CHARGED TOPROJECT R8M, *HOLLYWOOD MITIGATION"

SUBTOTALCWO 2 CONFIGURATION MANAGEMENT ($66,361) $6,574 $6,600 $0 $17,000 $9,326 ($41,787)CONSULTANTS (CMC}

CWO 3 INITIAL CWO VALUE:

9 9002.01 3 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 3 $0 $0 $0 $0 $0 $0 $0

TOTALS R81 CM001 ($65,361) $6,574- $6,600 $17,000 $9,326 ($41,787)

1 1 0 2 4 CANCELED

CWO 2 INITIAL CWO VALUE:

1 9002.01 2 Provide Assistant Technical Editor Services CANCELED

2 9002.02 2 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 2 $0 $0 $0 $0 $0 $0 $0

CWO 3 CONFIGURATION MANAGEMENT CONSULTANT (CMC) INITIAL CWO VALUE: $1,050,499.00

3 0.01 3 AMENDMENT 1: 5% REDUCTION ($34,061) ($34,061) In Process

4 2.00 3 MTA CONSTRUCTION PLAN ROOM SUPPORT $3,382 $3,400 $3,382

PAGE 3RREV 1.3 06/20/96 kam 06/20/96 1 2:51:39

17

Page 18: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

AMENDMENT # 02

ATTACHMENT # ~R82 Metro Red Line - Segment 3 - N

CONSULTANT CHANGE STATUS REPORTCONTRACT: CM001 - LKG-CMC, INC.

AS OF 06/20/96

A. B. C. D. E. F. G. H. I. J. K. L,

MTA BOARD ---T H I S A M E N D M E N T ................. O U T S T A N D I N G .............. CURRENT WORK# CCN # CWO # CCN TITLE APPROVED CCRB APPROVED NTE CCRB APPROVED PENDING NTE CCN ESTIMATE STATUS

5 2.01 3 MTA CONSTRUCTION PLAN ROOM SUPPORT $7,000 $7,000EXTENSION

6 3.00 3 LKG-CMC REVIEW OF 85% DESIGN REVIEW CANCELEDPACKAGES

7 3.O1 3 LKG-CMC REVIEW OF 85% DESIGN REVIEW CANCELEDPACKAGES

8 6.00 3 R82 MAILING COST $50,000 $50,000 $90,000

9 7.00 3 COVER LABELS - REPLACE RCC LOGO WITH MTA CANCELEDON CONTRACT DOCUMENT COVERS FOR C0301AND C0351

10 11.00 3 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES CANCELED

11 13.00 3 LKG OFFICE LEASE EXTENSION - 707 WILSHIRE $5,400 $5,400 $5,400OFFICES

12 9000.02 3 COVER LABELS- REPLACE RCC LOGO WITH MTA $3,500 $3,500 $3,500ON CONTRACT DOCUMENT COVERS FOR C0301AND C0351

13 9001.01 3 LKG-CMC REVIEW OF 85% DESIGN REVIEW $2,745 $2,745 $2,745PACKAGES

SUBTOTALCWO 3 CONFIGURATION MANAGEMENT ($34,061) $53,382 $53,400 $0 $18,645 $11,645 $37,966CONSULTANT (CMC)

TOTALS R82 CM001 ($34,061| $53,382 $53,400 $18,645 $11,645 $37,966

1 2 0 4 6 CANCELED

CWO 2 INITIAL CWO VALUE:

1 9002.02 2 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 2 $0 $0 $0 $0 $0 $0 $0

CWO 3 INITIAL CWO VALUE:

2 9002.01 3 Provide Assistant Technical Editor Services CANCELED

SUBTOTALCWO 3 $0 $0 $0 $0 $0 $0 $0

RREV 1.3 06/20/96 kamPAGE 4

06/20/96 1 2:51:39

Page 19: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENTR84 Metro Red Line - Segment 3 - E

CONSULTANT CHANGE STATUS REPORTCONTRACT: CM001 - LKG-CMC, INC.

AMENDMENT # 02 AS OF 06/20/96

A. B. C. D. E. F. G.

MTA BOARD ---THIS AMENDMENT---# CCN # CWO # CCN TITLE APPROVED CCRB APPROVED NTE

CWO 12 CONFIGURATION MANAGEMENT CONSULTANT (CMC)

H. I. J. K. L.

.............. O U T S T A N D I N G .............. CURRENT WORKCCRB APPROVED PENDING NTE CCN ESTIMATE STATUS

INITIAL CWO VALUE: $35,312.00

3 0.01 12 AMENDMENT 1: 5% REDUCTION In Process

4 2.01 12 MTA CONSTRUCTION PLAN ROOM SUPPORT $7,000 $1,750 $7,000EXTENSION

5 11.00 12 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES CANCELED

6 15.00 12 INCREASE TO NUMBER OF CONTRACTS FOR $56,000 $12,500 $56,000PROVISION OF BID PHASE DOCUMENT CONTROLSUPPORT

SUBTOTALCWO 12 CONFIGURATION MANAGEMENT $0 $0 $0 $0 $63,000 $14,250 $63,000CONSULTANT (CMC)

TOTALS R84 CM001 $0 $0 $63,000 $14,260 $63,000

0 0 0 2 3 CANCELED

CWO 2 INITIAL CWO VALUE:

1 8.00 2 REVISE CWO-O02 TO INCLUDE SUPPORT SERVICES CANCELEDFOR CONTRACT CR062, "HOLLYWOODBOULEVARD TROLLEY*, TO BE CHARGED TOPROJECT RSM, *HOLLYWOOD MITIGATION*

SUBTOTAL CWO 2 $0 $0 $0 $0 $0 $0 $0

TOTALS R8M CM001 $0 $0

0 0 0 0 1 CANCELED

CWO 2 INITIAL CWO VALUE:

1 9002.02 2 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 2 $0 $0 $0 $0 $0 $0 $0

CWO 3 INITIAL CWO VALUE:

2 9002.01 3 Provide Assistant Technical Editor Services CANCELED

SUBTOTAL CWO 3 $0 $0 $0 $0 $0 $0 $0

PAGE 5RREV 1.3 06/20/96 kam 06/20/96 1 2:51:39

19

Page 20: July 1996 Board Meeting - Item 35boardarchives.metro.net/Items/1996/07_July/Items_A_0836.pdf · 2006. 6. 19. · cm001 - lkg-cmc, inc. contract work order #01 - amendment #02 project

ATTACHMENT #R92 Systemwide

CONSULTANT CHANGE STATUS REPORTCONTRACT: CM001 - LKG-CMC, INC.

AMENDMENT # 02 AS OF 06/20/96

A. B. C. D. E. F. G. H. I. J. K. L.

MTABOARD ---THIS A MEN D M ENT ................. O UTSTAN DING .............. CURRENT WORK# CCN # CWO # CCN TITLE APPROVED CCRB APPROVED NTE CCRB APPROVED PENDING NTE CCN ESTIMATE STATUS

CWO 7 CONFIGURATION MANAGEMENT CONSULTANT INITIAL CWO VALUE’. ,~1,267,731.00

3 0.01 7 AMENDMENT t: 5% REDUCTION ($34,654) ($34,654) In Process

4 1.00 7 SYSTEMWlDE BASELINE DOCUMENT CANCELEDMAINTENANCE - INCREASED VOLUME OFDOCUMENTS

5 2.00 7 MTA CONSTRUCTION PLAN ROOM SUPPORT $3,382 $3,200 $3,382

6 2.01 7 MTA CONSTRUCTION PLAN ROOM SUPPORT $7,000 $7,000EXTENSION

7 5.00 7 ADDITIONAL PROFESSIONAL SERVICES $12,480 $12,480CONTRACTS

8 11.00 7 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES CANCELED

9 13,00 7 LKG OFFICE LEASE EXTENSION- 707 WILSHIRE $2,196 $2,196 $2,196OFFICES

10 14.00 7 INCREASE TO NUMBER OF PROFESSIONAL $42,000 $28,000 $42,000SERVICES CONTRACT BID SUPPORT

11 9004.00 7 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES $I0,900 $10,900 Not Started

12 9004.01 7 PROVIDE ASSISTANT TECHNICAL EDITOR SERVICES $3,270 $3,270 In Process(EXTENSION OF SERVICES)

13 9004.02 7 PROVIDE ASSlSTANT TECHNICAL EDITOR SERVlCES $9,129 $9,129(EXTENSION)

SUBTOTALCWO 7 CONFIGURATION MANAGEMENT ($34,6~1-) $3,382 $3,200 $0 $86,975 $30,196 $59,703CONSULTANT

TOTALS R92 CM001 ($34,654) $3,382 $3,200 $86,975 $30,196 $55,703

1 1 0 7 4, CANCELED

GRAND TOTAL: ($281,099) $95,194 $95,081 $253,691 $116,075 $67,7866 8 0 ’ 22 22 CANCELED

RREV 1.3 06/20/96 kamPAGE 6

2006/20/96 12:51:39


Recommended