July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE
Transcript
Page 1: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

July 2008 CPS2 Waiver SDT

Technical Workshopfor

Draft BAL-001-TRE-01

Judith A. JamesReliability Standards Manager

TRE

Page 2: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

2

Overview of this presentation

● Background of SAR-003 and BAL-001-TRE-01

● Process Overview

● The Team

● The Road Taken to this Draft

● The work product (draft standard)

Page 3: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

3

ERCOT Waiver for CPS2

ERCOT requested a Waiver for CPS2.

Stating that it “does not believe that frequency control within its new single control area interconnection is less reliable as a result of non-compliance with the CPS2 Standard following its conversion.”

NERC granted the request November 21, 2002.

Page 4: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

4

FERC NOPR on Mandatory Reliability Standards

● Docket No. RM06-16-000, October 20, 2006● Paragraphs 137-143

● Paragraph 141

• ERCOT’s Protocols concerning frequency control identify that the existing ERCOT approach to Interconnection frequency control is necessary to assure reliability in that interconnection. However, the existing waiver was filed prior to the formation of these procedures. ERCOT is both a single balancing authority and the smallest of the three Interconnections, approximately one tenth of the size of the Eastern Interconnection. As such, frequency control is more critical to its system reliability.

Page 5: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

5

FERC Order 693

● March 16, 2007

●Paragraphs 309 to 315

Page 6: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

6

Regional Standard Development

● Between March 16, 2007 and April 15, 2008, Texas RE was getting organized and getting the processes and procedures, as well as staff, ready for development of standards.

● Texas RE launched its Reliability Standards Tracking system in April 2008.

● Standard Authorization Request written by TRE April 15, 2008.

● SAR-003-TRE-01: FERC-Ordered Modification to ERCOT Waiver to R2 of BAL-001-0 CPS2

Page 7: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

7

Regional Standards Process Overview

SAR Submitted

RSC Evaluation and disposition of

SAR

RSC/ROSforms SDT

SDT

Page 8: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

8

Regional Standards Process Overview ( Cont.)

SDT drafts standard

RSC Evaluation

Posting for Comments(where we are now with BAL-001-TRE-01)

More work needed

SDT responds to comments and considers modification to the draft standard

Page 9: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

9

Regional Standards Process Overview ( Cont.)

RSC recommends posting for vote

RBB/BP

Forward the package for TRE BOD approval

Evaluation by NERC and approval by NERC BOT

NERC filing to seek FERC approval

Reject

Remand

Page 10: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

10

Standard Drafting Team

Typically includes a member of the Texas RE staff and the originator in addition to the field Subject Matter Experts (SME) assigned by RSC/ROS

Standard Drafting Team

A team of technical experts assigned by RSC and approved by ROS

Collectively have the necessary technical expertise and work process skills pertaining to the particular SAR subject

Review stakeholders comments and consider modification to the draft standard

Work on the technical aspect of the standard

Report to RSC on the work progress and make appropriate recommendations as needed

Page 11: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

11

Standard Drafting Team

● Team of Subject Matter Experts.● Use their specific expertise to lead the

development and refinement of the technical and detailed standards.

● Encourage and coordinate inter-industry examination and consensus.

● Ensure that Regional Standards are technically accurate, clear, enforceable, and provide an adequate level of reliability for the ERCOT Bulk Power System.

● Meetings of SDTs shall be open to all interested parties.

Page 12: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

12

SAR-003 Standard Drafting Team

Sydney Niemeyer*NRG Ind. GeneratorAnanth Palani** Optim IOUVann Weldon ERCOT ISOKen McIntyre ERCOT ISOHoward Illian Energy Mark ConsultantPam Zdenek BP Alternative Energy Ind. Generator

*Chair**Vice-Chair

Page 13: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

13

SAR-003-TRE-01: FERC-Ordered Modification to ERCOT Waiver to R2 of BAL-001-0 CPS2

SAR written by TRE April 15, 2008.Accepted by RSC on May 27, 2008.SDT slate was nominated and accepted by ROS on June 12, 2008.First team meeting July 10, 2008.Team has met 14 times (full day meetings) in nine months.Team has updated RSC about every other month.Posted initial work product (rough draft) in December for RSC.RSC approved final draft for public comment on March 4, 2009.Draft posted for public comment March 16-April 14.

Page 14: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

14

Meetings of SAR-003 SDT to Date

● 2008● July 10 ● August 14 ● September 2● September 9-10 (PDCWG) ● September 16 ● October 3 ● October 23 ● November 21 ● December 5

● 2009● February 5 ● February 27 ● March 10 ● March 31 (Workshop)

Page 15: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

15

SDT Work Product

● A draft Regional Standard consistent with the SAR on which it was based.

● An assessment of the impact of the SAR on neighboring regions and appropriate input from the neighboring regions if the SAR is determined to impact any neighboring region.

● Identification of any existing Regional Standard (or Protocols) that will be deleted, in part or whole, or otherwise impacted by the implementation of the draft Standard.

Page 16: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

16

SDT Work Product (Cont.)

● Technical reports and/or work papers that provide technical support for the draft Regional Standard under consideration.

● Document the perceived reliability impact should the Regional Standard be approved.

● SDT is also responsible for developing all required compliance and performance elements and associated questions for a Comment Form.

● An implementation plan, including the nature, extent and duration of field-testing, if any.

Page 17: July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.

17

Draft BAL-001-TRE-01

● The SAR-003 Standard Drafting Team will now present the technical background and need for this standard.

● Your questions are appreciated, and the team will make every effort to answer them today.

● But don’t forget to formally comment using the Reliability Standards Tracking Site.