598
Detail Report Weighing Transaction Periode 01 June 2012 - 30 June 2012 ( All Transaction) Based On Date In Date In Time In Date Out Time Out TruckID Shift In Shift OutMaterial ---------------------------------------------------------------------------- 6/1/2012 09:03:37 6/1/2012 09:09:22 703-- 1 1 COAL -- 6/1/2012 09:04:20 6/1/2012 09:11:45 709-- 1 1 COAL -- 6/1/2012 09:04:56 6/1/2012 09:11:47 714-- 1 1 COAL -- 6/1/2012 09:06:57 6/1/2012 09:23:44 812 1 1 COAL -- 6/1/2012 09:22:30 6/1/2012 09:27:16 818 1 1 COAL -- 6/1/2012 09:22:52 6/1/2012 09:30:58 708-- 1 1 COAL -- 6/1/2012 09:28:47 6/1/2012 09:46:15 850 1 1 COAL -- 6/1/2012 09:30:19 6/1/2012 09:49:17 701-- 1 1 COAL -- 6/1/2012 09:35:17 6/1/2012 09:54:10 820 1 1 COAL -- 6/1/2012 09:35:49 6/1/2012 09:54:16 830 1 1 COAL -- 6/1/2012 09:36:10 6/1/2012 09:49:23 707-- 1 1 COAL -- 6/1/2012 09:36:43 6/1/2012 10:00:15 713-- 1 1 COAL -- 6/1/2012 09:39:34 6/1/2012 10:00:18 712-- 1 1 COAL -- 6/1/2012 09:42:33 6/1/2012 10:05:34 852 1 1 COAL -- 6/1/2012 09:43:04 6/1/2012 10:08:12 710-- 1 1 COAL -- 6/1/2012 09:44:28 6/1/2012 10:10:14 704-- 1 1 COAL -- 6/1/2012 09:47:07 6/1/2012 10:10:18 706-- 1 1 COAL -- 6/1/2012 09:56:54 6/1/2012 10:15:35 836 1 1 COAL -- 6/1/2012 09:57:50 6/1/2012 10:17:39 817 1 1 COAL -- 6/1/2012 09:58:15 6/1/2012 10:20:45 855 1 1 COAL -- 6/1/2012 09:58:39 6/1/2012 10:22:09 868 1 1 COAL -- 6/1/2012 09:59:07 6/1/2012 10:23:30 839 1 1 COAL -- 6/1/2012 09:59:31 6/1/2012 10:25:41 815 1 1 COAL -- 6/1/2012 10:01:12 6/1/2012 10:26:46 856 1 1 COAL -- 6/1/2012 10:01:33 6/1/2012 10:26:49 851 1 1 COAL -- 6/1/2012 10:06:35 6/1/2012 10:28:34 853 1 1 COAL -- 6/1/2012 10:21:28 6/1/2012 10:37:29 831 1 1 COAL -- 6/1/2012 10:31:38 6/1/2012 10:37:34 838 1 1 COAL -- 6/1/2012 10:44:52 6/1/2012 10:49:35 832 1 1 COAL -- 6/1/2012 10:45:16 6/1/2012 10:54:04 714-- 1 1 COAL -- 6/1/2012 10:46:55 6/1/2012 10:54:06 703-- 1 1 COAL -- 6/1/2012 10:47:19 6/1/2012 10:56:02 812 1 1 COAL -- 6/1/2012 10:52:54 6/1/2012 11:01:22 709-- 1 1 COAL -- 6/1/2012 10:53:24 6/1/2012 11:05:10 818 1 1 COAL -- 6/1/2012 11:02:27 6/1/2012 11:08:10 708-- 1 1 COAL -- 6/1/2012 11:07:25 6/1/2012 11:11:27 701-- 1 1 COAL -- 6/1/2012 11:10:49 6/1/2012 11:14:24 850 1 1 COAL -- 6/1/2012 11:18:28 6/1/2012 11:22:14 713-- 1 1 COAL -- 6/1/2012 11:37:28 6/1/2012 11:43:05 817 1 1 COAL -- 6/1/2012 11:39:53 6/1/2012 11:44:04 710-- 1 1 COAL -- 6/1/2012 11:40:52 6/1/2012 11:47:59 704-- 1 1 COAL -- 6/1/2012 11:41:53 6/1/2012 11:48:13 707-- 1 1 COAL --
Transcript
Page 1: June Per Shift (Truckscale Port)

Detail Report Weighing TransactionPeriode 01 June 2012 - 30 June 2012( All Transaction)

Based On Date In

Date In Time In Date Out Time Out TruckID Shift In Shift Out Material Kontraktor--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

6/1/2012 09:03:37 6/1/2012 09:09:22 703-- 1 1 COAL -- Harita Para6/1/2012 09:04:20 6/1/2012 09:11:45 709-- 1 1 COAL -- Harita Para6/1/2012 09:04:56 6/1/2012 09:11:47 714-- 1 1 COAL -- Harita Para6/1/2012 09:06:57 6/1/2012 09:23:44 812 1 1 COAL -- MIL6/1/2012 09:22:30 6/1/2012 09:27:16 818 1 1 COAL -- MIL6/1/2012 09:22:52 6/1/2012 09:30:58 708-- 1 1 COAL -- Harita Para6/1/2012 09:28:47 6/1/2012 09:46:15 850 1 1 COAL -- MIL6/1/2012 09:30:19 6/1/2012 09:49:17 701-- 1 1 COAL -- Harita Para6/1/2012 09:35:17 6/1/2012 09:54:10 820 1 1 COAL -- MIL6/1/2012 09:35:49 6/1/2012 09:54:16 830 1 1 COAL -- MIL6/1/2012 09:36:10 6/1/2012 09:49:23 707-- 1 1 COAL -- Harita Para6/1/2012 09:36:43 6/1/2012 10:00:15 713-- 1 1 COAL -- Harita Para6/1/2012 09:39:34 6/1/2012 10:00:18 712-- 1 1 COAL -- Harita Para6/1/2012 09:42:33 6/1/2012 10:05:34 852 1 1 COAL -- MIL6/1/2012 09:43:04 6/1/2012 10:08:12 710-- 1 1 COAL -- Harita Para6/1/2012 09:44:28 6/1/2012 10:10:14 704-- 1 1 COAL -- Harita Para6/1/2012 09:47:07 6/1/2012 10:10:18 706-- 1 1 COAL -- Harita Para6/1/2012 09:56:54 6/1/2012 10:15:35 836 1 1 COAL -- MIL6/1/2012 09:57:50 6/1/2012 10:17:39 817 1 1 COAL -- MIL6/1/2012 09:58:15 6/1/2012 10:20:45 855 1 1 COAL -- MIL6/1/2012 09:58:39 6/1/2012 10:22:09 868 1 1 COAL -- MIL6/1/2012 09:59:07 6/1/2012 10:23:30 839 1 1 COAL -- MIL6/1/2012 09:59:31 6/1/2012 10:25:41 815 1 1 COAL -- MIL6/1/2012 10:01:12 6/1/2012 10:26:46 856 1 1 COAL -- MIL6/1/2012 10:01:33 6/1/2012 10:26:49 851 1 1 COAL -- MIL6/1/2012 10:06:35 6/1/2012 10:28:34 853 1 1 COAL -- MIL6/1/2012 10:21:28 6/1/2012 10:37:29 831 1 1 COAL -- MIL6/1/2012 10:31:38 6/1/2012 10:37:34 838 1 1 COAL -- MIL6/1/2012 10:44:52 6/1/2012 10:49:35 832 1 1 COAL -- MIL6/1/2012 10:45:16 6/1/2012 10:54:04 714-- 1 1 COAL -- Harita Para6/1/2012 10:46:55 6/1/2012 10:54:06 703-- 1 1 COAL -- Harita Para6/1/2012 10:47:19 6/1/2012 10:56:02 812 1 1 COAL -- MIL6/1/2012 10:52:54 6/1/2012 11:01:22 709-- 1 1 COAL -- Harita Para6/1/2012 10:53:24 6/1/2012 11:05:10 818 1 1 COAL -- MIL6/1/2012 11:02:27 6/1/2012 11:08:10 708-- 1 1 COAL -- Harita Para6/1/2012 11:07:25 6/1/2012 11:11:27 701-- 1 1 COAL -- Harita Para6/1/2012 11:10:49 6/1/2012 11:14:24 850 1 1 COAL -- MIL6/1/2012 11:18:28 6/1/2012 11:22:14 713-- 1 1 COAL -- Harita Para6/1/2012 11:37:28 6/1/2012 11:43:05 817 1 1 COAL -- MIL6/1/2012 11:39:53 6/1/2012 11:44:04 710-- 1 1 COAL -- Harita Para6/1/2012 11:40:52 6/1/2012 11:47:59 704-- 1 1 COAL -- Harita Para6/1/2012 11:41:53 6/1/2012 11:48:13 707-- 1 1 COAL -- Harita Para

Page 2: June Per Shift (Truckscale Port)

6/1/2012 11:50:26 6/1/2012 11:55:30 836 1 1 COAL -- MIL6/1/2012 11:53:32 6/1/2012 11:57:57 706-- 1 1 COAL -- Harita Para6/1/2012 11:53:53 6/1/2012 11:59:27 868 1 1 COAL -- MIL6/1/2012 11:54:18 6/1/2012 12:01:07 815 1 1 COAL -- MIL6/1/2012 12:07:02 6/1/2012 12:10:29 839 1 1 COAL -- MIL6/1/2012 12:11:16 6/1/2012 12:14:24 856 1 1 COAL -- MIL6/1/2012 12:15:05 6/1/2012 12:18:20 806 1 1 COAL -- MIL6/1/2012 12:19:11 6/1/2012 12:24:38 855 1 1 COAL -- MIL6/1/2012 12:21:03 6/1/2012 12:25:57 852 1 1 COAL -- MIL6/1/2012 12:29:56 6/1/2012 12:33:24 833 1 1 COAL -- MIL6/1/2012 12:37:21 6/1/2012 12:43:22 853 1 1 COAL -- MIL6/1/2012 12:40:03 6/1/2012 12:45:38 709-- 1 1 COAL -- Harita Para6/1/2012 12:48:56 6/1/2012 12:53:41 831 1 1 COAL -- MIL6/1/2012 12:52:56 6/1/2012 12:58:06 830 1 1 COAL -- MIL6/1/2012 12:55:45 6/1/2012 13:01:10 812 1 1 COAL -- MIL6/1/2012 12:56:06 6/1/2012 13:01:05 818 1 1 COAL -- MIL6/1/2012 13:00:05 6/1/2012 13:08:03 850 1 1 COAL -- MIL6/1/2012 13:18:01 6/1/2012 13:22:57 851 1 1 COAL -- MIL6/1/2012 13:30:09 6/1/2012 13:34:23 838 1 1 COAL -- MIL6/1/2012 13:32:24 6/1/2012 13:37:02 714-- 1 1 COAL -- Harita Para6/1/2012 13:34:57 6/1/2012 13:37:25 703-- 1 1 COAL -- Harita Para6/1/2012 13:43:34 6/1/2012 13:47:53 839 1 1 COAL -- MIL6/1/2012 13:54:29 6/1/2012 13:58:23 832 1 1 COAL -- MIL6/1/2012 14:03:13 6/1/2012 14:09:12 808 1 1 COAL -- MIL6/1/2012 14:15:10 6/1/2012 14:18:37 833 1 1 COAL -- MIL6/1/2012 14:28:28 6/1/2012 14:33:37 855 1 1 COAL -- MIL6/1/2012 14:29:49 6/1/2012 14:48:08 713-- 1 1 COAL -- Harita Para6/1/2012 14:40:10 6/1/2012 14:56:11 709-- 1 1 COAL -- Harita Para6/1/2012 14:42:54 6/1/2012 14:48:03 710-- 1 1 COAL -- Harita Para6/1/2012 14:43:18 6/1/2012 14:54:54 704-- 1 1 COAL -- Harita Para6/1/2012 14:43:42 6/1/2012 14:55:29 812 1 1 COAL -- MIL6/1/2012 14:44:04 6/1/2012 14:55:48 707-- 1 1 COAL -- Harita Para6/1/2012 14:44:36 6/1/2012 14:56:14 701-- 1 1 COAL -- Harita Para6/1/2012 14:52:50 6/1/2012 14:57:55 852 1 1 COAL -- MIL6/1/2012 14:53:16 6/1/2012 14:59:56 818 1 1 COAL -- MIL6/1/2012 14:53:38 6/1/2012 15:00:52 868 1 1 COAL -- MIL6/1/2012 14:53:59 6/1/2012 15:01:04 853 1 1 COAL -- MIL6/1/2012 14:57:11 6/1/2012 15:05:40 706-- 1 1 COAL -- Harita Para6/1/2012 14:59:08 6/1/2012 15:05:43 831 1 1 COAL -- MIL6/1/2012 15:03:38 6/1/2012 15:16:51 712-- 1 1 COAL -- Harita Para6/1/2012 15:04:54 6/1/2012 15:16:54 714-- 1 1 COAL -- Harita Para6/1/2012 15:06:38 6/1/2012 15:19:39 708-- 1 1 COAL -- Harita Para6/1/2012 15:07:25 6/1/2012 15:29:52 815 1 1 COAL -- MIL6/1/2012 15:09:28 6/1/2012 15:22:28 703-- 1 1 COAL -- Harita Para6/1/2012 15:13:49 6/1/2012 15:29:56 817 1 1 COAL -- MIL6/1/2012 15:19:01 6/1/2012 16:16:41 856 1 2 COAL -- MIL6/1/2012 15:26:28 6/1/2012 16:19:38 839 1 2 COAL -- MIL6/1/2012 15:28:18 6/1/2012 16:19:42 850 1 2 COAL -- MIL6/1/2012 15:31:08 6/1/2012 16:16:54 851 1 2 COAL -- MIL6/1/2012 15:40:59 6/1/2012 16:24:35 838 1 2 COAL -- MIL

Page 3: June Per Shift (Truckscale Port)

6/1/2012 15:56:59 6/1/2012 16:18:06 808 1 2 COAL -- MIL6/1/2012 15:57:18 6/1/2012 16:24:38 830 1 2 COAL -- MIL6/1/2012 15:57:46 6/1/2012 16:24:43 832 1 2 COAL -- MIL6/1/2012 16:04:39 6/1/2012 16:35:03 833 2 2 COAL -- MIL6/1/2012 16:15:06 6/1/2012 16:35:15 711-- 2 2 COAL -- Harita Para6/1/2012 16:17:25 6/1/2012 16:36:16 702-- 2 2 COAL -- Harita Para6/1/2012 16:33:43 6/1/2012 16:42:29 868 2 2 COAL -- MIL6/1/2012 16:36:55 6/1/2012 16:40:48 710-- 2 2 COAL -- Harita Para6/1/2012 17:22:39 6/1/2012 17:26:04 712-- 2 2 COAL -- Harita Para6/1/2012 18:07:52 6/1/2012 18:12:08 704-- 2 2 COAL -- Harita Para6/1/2012 18:14:00 6/1/2012 18:17:45 711-- 2 2 COAL -- Harita Para6/1/2012 18:16:18 6/1/2012 18:21:43 708-- 2 2 COAL -- Harita Para6/1/2012 18:27:30 6/1/2012 19:06:44 714-- 2 2 COAL -- Harita Para6/1/2012 18:35:57 6/1/2012 19:10:04 703-- 2 2 COAL -- Harita Para6/1/2012 18:36:14 6/1/2012 19:10:09 710-- 2 2 COAL -- Harita Para6/1/2012 18:45:40 6/1/2012 19:17:34 709-- 2 2 COAL -- Harita Para6/1/2012 18:48:04 6/1/2012 20:53:16 818 2 2 COAL -- MIL6/1/2012 20:54:38 6/1/2012 21:02:12 712-- 2 2 COAL -- Harita Para6/1/2012 20:55:29 6/1/2012 21:02:32 812 2 2 COAL -- MIL6/1/2012 20:56:08 6/1/2012 21:05:48 855 2 2 COAL -- MIL6/1/2012 20:56:36 6/1/2012 21:06:16 853 2 2 COAL -- MIL6/1/2012 20:57:17 6/1/2012 21:06:40 836 2 2 COAL -- MIL6/1/2012 20:57:58 6/1/2012 21:07:20 850 2 2 COAL -- MIL6/1/2012 20:58:22 6/1/2012 21:09:46 711-- 2 2 COAL -- Harita Para6/1/2012 20:58:52 6/1/2012 21:11:38 704-- 2 2 COAL -- Harita Para6/1/2012 20:59:21 6/1/2012 21:13:21 851 2 2 COAL -- MIL6/1/2012 21:00:03 6/1/2012 21:15:24 839 2 2 COAL -- MIL6/1/2012 21:00:30 6/1/2012 21:16:36 852 2 2 COAL -- MIL6/1/2012 21:01:04 6/1/2012 21:19:40 815 2 2 COAL -- MIL6/1/2012 21:03:27 6/1/2012 21:21:25 820 2 2 COAL -- MIL6/1/2012 21:04:01 6/1/2012 21:23:45 832 2 2 COAL -- MIL6/1/2012 21:05:00 6/1/2012 21:23:48 830 2 2 COAL -- MIL6/1/2012 21:08:20 6/1/2012 21:32:01 714-- 2 2 COAL -- Harita Para6/1/2012 21:08:41 6/1/2012 21:41:49 817 2 2 COAL -- MIL6/1/2012 21:12:27 6/1/2012 21:23:55 831 2 2 COAL -- MIL6/1/2012 21:12:45 6/1/2012 21:33:44 868 2 2 COAL -- MIL6/2/2012 09:54:57 6/2/2012 09:58:51 707-- 1 1 COAL -- Harita Para6/2/2012 09:55:18 6/2/2012 10:01:25 709-- 1 1 COAL -- Harita Para6/2/2012 09:55:40 6/2/2012 10:03:51 701-- 1 1 COAL -- Harita Para6/2/2012 09:56:05 6/2/2012 10:05:47 706-- 1 1 COAL -- Harita Para6/2/2012 09:56:28 6/2/2012 10:10:03 702-- 1 1 COAL -- Harita Para6/2/2012 09:56:55 6/2/2012 10:14:58 703-- 1 1 COAL -- Harita Para6/2/2012 10:13:24 6/2/2012 10:18:21 714-- 1 1 COAL -- Harita Para6/2/2012 10:34:32 6/2/2012 10:38:31 711-- 1 1 COAL -- Harita Para6/2/2012 11:19:36 6/2/2012 11:22:58 707-- 1 1 COAL -- Harita Para6/2/2012 11:26:50 6/2/2012 11:31:52 709-- 1 1 COAL -- Harita Para6/2/2012 11:30:58 6/2/2012 11:34:21 706-- 1 1 COAL -- Harita Para6/2/2012 11:41:21 6/2/2012 11:46:43 708-- 1 1 COAL -- Harita Para6/2/2012 11:44:48 6/2/2012 11:49:26 702-- 1 1 COAL -- Harita Para6/2/2012 11:47:23 6/2/2012 11:52:10 714-- 1 1 COAL -- Harita Para

Page 4: June Per Shift (Truckscale Port)

6/2/2012 11:54:57 6/2/2012 12:10:03 701-- 1 1 COAL -- Harita Para6/2/2012 11:58:08 6/2/2012 12:04:10 851 1 1 COAL -- MIL6/2/2012 11:58:57 6/2/2012 12:06:11 852 1 1 COAL -- MIL6/2/2012 12:05:20 6/2/2012 12:09:26 833 1 1 COAL -- MIL6/2/2012 12:07:08 6/2/2012 12:13:56 703-- 1 1 COAL -- Harita Para6/2/2012 12:30:23 6/2/2012 12:36:47 853 1 1 COAL -- MIL6/2/2012 12:30:48 6/2/2012 12:38:23 829 1 1 COAL -- MIL6/2/2012 12:36:06 6/2/2012 12:40:52 850 1 1 COAL -- MIL6/2/2012 12:47:27 6/2/2012 12:50:43 707-- 1 1 COAL -- Harita Para6/2/2012 12:48:25 6/2/2012 12:53:05 709-- 1 1 COAL -- Harita Para6/2/2012 12:48:54 6/2/2012 12:54:49 832 1 1 COAL -- MIL6/2/2012 13:04:37 6/2/2012 13:10:09 812 1 1 COAL -- MIL6/2/2012 13:21:21 6/2/2012 13:25:05 708-- 1 1 COAL -- Harita Para6/2/2012 13:26:52 6/2/2012 13:32:00 714-- 1 1 COAL -- Harita Para6/2/2012 13:29:09 6/2/2012 13:38:31 701-- 1 1 COAL -- Harita Para6/2/2012 13:39:24 6/2/2012 13:46:41 868 1 1 COAL -- MIL6/2/2012 13:56:39 6/2/2012 14:01:09 703-- 1 1 COAL -- Harita Para6/2/2012 14:04:00 6/2/2012 14:07:24 837 1 1 COAL -- MIL6/2/2012 14:04:21 6/2/2012 14:09:31 707-- 1 1 COAL -- Harita Para6/2/2012 14:08:11 6/2/2012 14:12:02 713-- 1 1 COAL -- Harita Para6/2/2012 14:16:51 6/2/2012 14:22:27 712-- 1 1 COAL -- Harita Para6/2/2012 14:23:26 6/2/2012 14:27:58 709-- 1 1 COAL -- Harita Para6/2/2012 14:42:31 6/2/2012 14:48:49 817 1 1 COAL -- MIL6/2/2012 14:42:54 6/2/2012 14:48:08 708-- 1 1 COAL -- Harita Para6/2/2012 14:43:13 6/2/2012 14:51:13 839 1 1 COAL -- MIL6/2/2012 14:50:32 6/2/2012 14:54:28 830 1 1 COAL -- MIL6/2/2012 14:55:52 6/2/2012 15:00:33 714-- 1 1 COAL -- Harita Para6/2/2012 14:57:14 6/2/2012 15:00:36 838 1 1 COAL -- MIL6/2/2012 14:57:39 6/2/2012 15:02:48 701-- 1 1 COAL -- Harita Para6/2/2012 15:01:26 6/2/2012 15:02:55 710-- 1 1 COAL -- Harita Para6/2/2012 15:13:55 6/2/2012 15:18:37 856 1 1 COAL -- MIL6/2/2012 15:30:25 6/2/2012 15:32:24 703-- 1 1 COAL -- Harita Para6/2/2012 15:30:48 6/2/2012 15:32:28 707-- 1 1 COAL -- Harita Para6/3/2012 02:37:23 6/3/2012 02:41:27 850 3 3 COAL -- MIL6/3/2012 02:50:03 6/3/2012 02:54:06 832 3 3 COAL -- MIL6/3/2012 02:51:40 6/3/2012 02:59:10 853 3 3 COAL -- MIL6/3/2012 02:52:05 6/3/2012 02:54:14 839 3 3 COAL -- MIL6/3/2012 02:58:18 6/3/2012 03:08:02 830 3 3 COAL -- MIL6/3/2012 03:03:25 6/3/2012 03:11:01 708-- 3 3 COAL -- Harita Para6/3/2012 03:04:10 6/3/2012 03:15:10 701-- 3 3 COAL -- Harita Para6/3/2012 03:09:13 6/3/2012 03:18:43 817 3 3 COAL -- MIL6/3/2012 03:11:42 6/3/2012 03:19:53 852 3 3 COAL -- MIL6/3/2012 03:12:17 6/3/2012 03:22:33 836 3 3 COAL -- MIL6/3/2012 03:12:50 6/3/2012 03:25:52 710-- 3 3 COAL -- Harita Para6/3/2012 03:16:11 6/3/2012 03:20:00 851 3 3 COAL -- MIL6/3/2012 03:16:44 6/3/2012 03:25:58 709-- 3 3 COAL -- Harita Para6/3/2012 03:21:42 6/3/2012 03:27:40 808 3 3 COAL -- MIL6/3/2012 03:23:53 6/3/2012 03:30:39 711-- 3 3 COAL -- Harita Para6/3/2012 07:28:11 6/3/2012 07:33:04 709-- 3 3 COAL -- Harita Para6/3/2012 07:28:32 6/3/2012 07:35:21 701-- 3 3 COAL -- Harita Para

Page 5: June Per Shift (Truckscale Port)

6/3/2012 07:28:52 6/3/2012 07:37:11 707-- 3 3 COAL -- Harita Para6/3/2012 07:33:42 6/3/2012 07:38:50 710-- 3 3 COAL -- Harita Para6/3/2012 08:11:51 6/3/2012 08:15:26 702-- 1 1 COAL -- Harita Para6/3/2012 08:18:23 6/3/2012 08:22:32 711-- 1 1 COAL -- Harita Para6/3/2012 08:25:01 6/3/2012 08:29:27 708-- 1 1 COAL -- Harita Para6/3/2012 08:41:33 6/3/2012 08:45:33 704-- 1 1 COAL -- Harita Para6/3/2012 08:42:47 6/3/2012 08:47:14 853 1 1 COAL -- MIL6/3/2012 08:53:03 6/3/2012 08:57:45 709-- 1 1 COAL -- Harita Para6/3/2012 09:06:08 6/3/2012 09:11:46 856 1 1 COAL -- MIL6/3/2012 09:13:48 6/3/2012 09:18:47 710-- 1 1 COAL -- Harita Para6/3/2012 09:15:00 6/3/2012 09:20:01 701-- 1 1 COAL -- Harita Para6/3/2012 09:18:10 6/3/2012 09:22:13 707-- 1 1 COAL -- Harita Para6/3/2012 09:22:52 6/3/2012 09:24:16 714-- 1 1 COAL -- Harita Para6/3/2012 09:34:05 6/3/2012 09:37:40 702-- 1 1 COAL -- Harita Para6/3/2012 09:34:39 6/3/2012 09:42:47 713-- 1 1 COAL -- Harita Para6/3/2012 09:41:23 6/3/2012 09:45:01 711-- 1 1 COAL -- Harita Para6/3/2012 10:00:01 6/3/2012 10:04:36 708-- 1 1 COAL -- Harita Para6/3/2012 10:01:38 6/3/2012 10:06:12 850 1 1 COAL -- MIL6/3/2012 10:03:36 6/3/2012 10:08:08 704-- 1 1 COAL -- Harita Para6/3/2012 10:13:47 6/3/2012 10:17:36 709-- 1 1 COAL -- Harita Para6/3/2012 10:23:32 6/3/2012 10:29:24 868 1 1 COAL -- MIL6/3/2012 10:23:52 6/3/2012 10:47:27 855 1 1 COAL -- MIL6/3/2012 10:36:07 6/3/2012 10:42:56 817 1 1 COAL -- MIL6/3/2012 10:38:36 6/3/2012 10:45:44 832 1 1 COAL -- MIL6/3/2012 10:39:24 6/3/2012 10:51:51 710-- 1 1 COAL -- Harita Para6/3/2012 10:41:47 6/3/2012 10:51:59 707-- 1 1 COAL -- Harita Para6/3/2012 10:46:53 6/3/2012 10:54:05 714-- 1 1 COAL -- Harita Para6/3/2012 10:48:52 6/3/2012 10:57:31 818 1 1 COAL -- MIL6/3/2012 10:56:42 6/3/2012 11:00:59 702-- 1 1 COAL -- Harita Para6/3/2012 11:02:54 6/3/2012 11:09:50 820 1 1 COAL -- MIL6/3/2012 11:13:31 6/3/2012 11:17:19 711-- 1 1 COAL -- Harita Para6/3/2012 11:22:44 6/3/2012 12:04:13 851 1 1 COAL -- MIL6/3/2012 11:24:21 6/3/2012 11:49:54 708-- 1 1 COAL -- Harita Para6/3/2012 11:24:48 6/3/2012 11:43:30 838 1 1 COAL -- MIL6/3/2012 11:25:10 6/3/2012 11:44:54 839 1 1 COAL -- MIL6/3/2012 11:25:36 6/3/2012 11:47:53 713-- 1 1 COAL -- Harita Para6/3/2012 11:26:02 6/3/2012 11:49:50 704-- 1 1 COAL -- Harita Para6/3/2012 11:27:09 6/3/2012 11:53:41 815 1 1 COAL -- MIL6/3/2012 11:35:22 6/3/2012 11:57:21 833 1 1 COAL -- MIL6/3/2012 11:36:18 6/3/2012 12:02:53 709-- 1 1 COAL -- Harita Para6/3/2012 11:44:15 6/3/2012 12:04:19 856 1 1 COAL -- MIL6/3/2012 11:55:56 6/3/2012 12:16:54 850 1 1 COAL -- MIL6/3/2012 12:02:06 6/3/2012 12:19:04 712-- 1 1 COAL -- Harita Para6/3/2012 12:10:55 6/3/2012 12:24:17 707-- 1 1 COAL -- Harita Para6/3/2012 12:13:56 6/3/2012 12:26:07 710-- 1 1 COAL -- Harita Para6/3/2012 12:14:16 6/3/2012 12:27:58 714-- 1 1 COAL -- Harita Para6/3/2012 12:21:26 6/3/2012 12:32:04 830 1 1 COAL -- MIL6/3/2012 12:22:43 6/3/2012 12:34:05 706-- 1 1 COAL -- Harita Para6/3/2012 12:32:42 6/3/2012 12:36:36 702-- 1 1 COAL -- Harita Para6/3/2012 12:35:40 6/3/2012 12:42:42 818 1 1 COAL -- MIL

Page 6: June Per Shift (Truckscale Port)

6/3/2012 12:37:14 6/3/2012 12:46:39 711-- 1 1 COAL -- Harita Para6/3/2012 12:43:40 6/3/2012 12:48:53 817 1 1 COAL -- MIL6/3/2012 12:50:04 6/3/2012 12:54:54 820 1 1 COAL -- MIL6/3/2012 13:02:55 6/3/2012 13:06:59 832 1 1 COAL -- MIL6/3/2012 13:05:35 6/3/2012 13:09:18 704-- 1 1 COAL -- Harita Para6/3/2012 13:20:29 6/3/2012 13:24:10 815 1 1 COAL -- MIL6/3/2012 13:21:11 6/3/2012 13:26:55 709-- 1 1 COAL -- Harita Para6/3/2012 13:30:11 6/3/2012 13:35:11 868 1 1 COAL -- MIL6/3/2012 13:35:56 6/3/2012 13:39:41 833 1 1 COAL -- MIL6/3/2012 13:40:44 6/3/2012 13:43:55 714-- 1 1 COAL -- Harita Para6/3/2012 13:48:51 6/3/2012 13:52:58 838 1 1 COAL -- MIL6/3/2012 13:49:28 6/3/2012 13:54:20 706-- 1 1 COAL -- Harita Para6/3/2012 13:49:51 6/3/2012 13:56:08 856 1 1 COAL -- MIL6/3/2012 13:58:16 6/3/2012 14:01:42 850 1 1 COAL -- MIL6/3/2012 13:59:16 6/3/2012 14:07:47 708-- 1 1 COAL -- Harita Para6/3/2012 14:06:49 6/3/2012 14:29:44 839 1 1 COAL -- MIL6/3/2012 14:20:41 6/3/2012 14:24:48 702-- 1 1 COAL -- Harita Para6/3/2012 14:21:26 6/3/2012 14:29:47 711-- 1 1 COAL -- Harita Para6/3/2012 14:22:43 6/3/2012 14:32:50 818 1 1 COAL -- MIL6/3/2012 14:46:11 6/3/2012 14:51:19 830 1 1 COAL -- MIL6/3/2012 14:46:30 6/3/2012 14:51:24 704-- 1 1 COAL -- Harita Para6/3/2012 14:48:32 6/3/2012 14:52:25 709-- 1 1 COAL -- Harita Para6/3/2012 14:49:16 6/3/2012 14:57:14 820 1 1 COAL -- MIL6/3/2012 14:49:44 6/3/2012 14:52:29 712-- 1 1 COAL -- Harita Para6/3/2012 14:50:39 6/3/2012 14:54:33 707-- 1 1 COAL -- Harita Para6/3/2012 14:58:10 6/3/2012 15:04:49 832 1 1 COAL -- MIL6/3/2012 14:59:29 6/3/2012 15:04:52 710-- 1 1 COAL -- Harita Para6/3/2012 15:11:44 6/3/2012 15:13:56 713-- 1 1 COAL -- Harita Para6/3/2012 15:18:03 6/3/2012 15:22:44 706-- 1 1 COAL -- Harita Para6/3/2012 15:20:07 6/3/2012 15:26:23 815 1 1 COAL -- MIL6/3/2012 15:23:57 6/3/2012 15:26:47 833 1 1 COAL -- MIL6/3/2012 15:25:35 6/3/2012 15:31:19 856 1 1 COAL -- MIL6/3/2012 15:30:31 6/3/2012 15:34:33 708-- 1 1 COAL -- Harita Para6/3/2012 15:37:44 6/3/2012 15:41:03 850 1 1 COAL -- MIL6/3/2012 15:38:23 6/3/2012 15:41:09 714-- 1 1 COAL -- Harita Para6/3/2012 15:51:52 6/3/2012 15:55:52 851 1 1 COAL -- MIL6/3/2012 15:53:12 6/3/2012 15:56:59 838 1 1 COAL -- MIL6/3/2012 15:57:43 6/3/2012 16:01:44 818 1 2 COAL -- MIL6/3/2012 16:01:02 6/3/2012 16:05:50 711-- 2 2 COAL -- Harita Para6/3/2012 18:02:37 6/3/2012 18:06:24 708-- 2 2 COAL -- Harita Para6/3/2012 18:03:01 6/3/2012 18:07:51 712-- 2 2 COAL -- Harita Para6/3/2012 18:04:03 6/3/2012 18:14:37 707-- 2 2 COAL -- Harita Para6/3/2012 18:23:18 6/3/2012 18:27:09 702-- 2 2 COAL -- Harita Para6/3/2012 18:25:21 6/3/2012 18:33:13 709-- 2 2 COAL -- Harita Para6/3/2012 18:37:52 6/3/2012 18:42:29 713-- 2 2 COAL -- Harita Para6/3/2012 18:38:28 6/3/2012 18:42:32 711-- 2 2 COAL -- Harita Para6/3/2012 19:06:28 6/3/2012 19:11:00 703-- 2 2 COAL -- Harita Para6/3/2012 19:08:11 6/3/2012 19:13:05 701-- 2 2 COAL -- Harita Para6/3/2012 19:10:15 6/3/2012 19:13:07 704-- 2 2 COAL -- Harita Para6/3/2012 19:25:57 6/3/2012 19:30:41 706-- 2 2 COAL -- Harita Para

Page 7: June Per Shift (Truckscale Port)

6/3/2012 19:26:55 6/3/2012 19:32:07 708-- 2 2 COAL -- Harita Para6/3/2012 19:29:13 6/3/2012 19:34:40 712-- 2 2 COAL -- Harita Para6/3/2012 19:33:43 6/3/2012 19:36:57 707-- 2 2 COAL -- Harita Para6/3/2012 19:45:28 6/3/2012 19:50:16 702-- 2 2 COAL -- Harita Para6/3/2012 19:55:02 6/3/2012 19:58:45 709-- 2 2 COAL -- Harita Para6/3/2012 20:02:26 6/3/2012 20:06:47 711-- 2 2 COAL -- Harita Para6/3/2012 20:11:21 6/3/2012 20:16:31 856 2 2 COAL -- MIL6/3/2012 20:20:47 6/3/2012 20:26:07 855 2 2 COAL -- MIL6/3/2012 20:29:17 6/3/2012 20:34:20 701-- 2 2 COAL -- Harita Para6/3/2012 20:35:00 6/3/2012 20:39:10 703-- 2 2 COAL -- Harita Para6/3/2012 20:36:02 6/3/2012 20:41:34 851 2 2 COAL -- MIL6/3/2012 20:36:43 6/3/2012 20:43:49 704-- 2 2 COAL -- Harita Para6/3/2012 20:52:14 6/3/2012 20:57:10 850 2 2 COAL -- MIL6/3/2012 20:53:12 6/3/2012 20:58:58 812 2 2 COAL -- MIL6/3/2012 20:54:08 6/3/2012 21:02:09 706-- 2 2 COAL -- Harita Para6/3/2012 20:55:20 6/3/2012 21:03:07 708-- 2 2 COAL -- Harita Para6/3/2012 20:56:28 6/3/2012 21:05:31 712-- 2 2 COAL -- Harita Para6/3/2012 21:00:49 6/3/2012 21:08:13 852 2 2 COAL -- MIL6/3/2012 21:01:29 6/3/2012 21:10:05 707-- 2 2 COAL -- Harita Para6/3/2012 21:06:49 6/3/2012 21:11:52 702-- 2 2 COAL -- Harita Para6/3/2012 21:09:04 6/3/2012 21:13:05 818 2 2 COAL -- MIL6/3/2012 21:09:27 6/3/2012 21:15:24 709-- 2 2 COAL -- Harita Para6/3/2012 21:11:07 6/3/2012 21:17:05 837 2 2 COAL -- MIL6/3/2012 21:32:12 6/3/2012 21:38:13 853 2 2 COAL -- MIL6/3/2012 21:33:00 6/3/2012 21:44:51 832 2 2 COAL -- MIL6/3/2012 21:36:25 6/3/2012 21:40:26 711-- 2 2 COAL -- Harita Para6/3/2012 21:47:46 6/3/2012 21:51:49 701-- 2 2 COAL -- Harita Para6/3/2012 21:53:49 6/3/2012 22:00:22 839 2 2 COAL -- MIL6/3/2012 21:58:14 6/3/2012 22:02:32 703-- 2 2 COAL -- Harita Para6/3/2012 22:08:33 6/3/2012 22:13:10 704-- 2 2 COAL -- Harita Para6/3/2012 22:10:53 6/3/2012 22:16:52 830 2 2 COAL -- MIL6/3/2012 22:24:12 6/3/2012 22:29:58 856 2 2 COAL -- MIL6/3/2012 22:24:54 6/3/2012 22:30:55 706-- 2 2 COAL -- Harita Para6/3/2012 22:25:33 6/3/2012 22:33:18 812 2 2 COAL -- MIL6/3/2012 22:28:16 6/3/2012 22:33:26 818 2 2 COAL -- MIL6/3/2012 22:35:20 6/3/2012 22:39:42 708-- 2 2 COAL -- Harita Para6/3/2012 22:38:07 6/3/2012 22:45:01 852 2 2 COAL -- MIL6/3/2012 22:39:01 6/3/2012 22:45:24 712-- 2 2 COAL -- Harita Para6/3/2012 22:40:40 6/3/2012 22:47:45 707-- 2 2 COAL -- Harita Para6/3/2012 22:46:09 6/3/2012 22:50:06 709-- 2 2 COAL -- Harita Para6/3/2012 22:46:47 6/3/2012 22:53:48 855 2 2 COAL -- MIL6/3/2012 22:54:28 6/3/2012 22:58:19 702-- 2 2 COAL -- Harita Para6/3/2012 22:56:59 6/3/2012 23:01:29 851 2 2 COAL -- MIL6/3/2012 22:59:48 6/3/2012 23:03:16 711-- 2 2 COAL -- Harita Para6/3/2012 23:26:21 6/3/2012 23:33:20 701-- 2 2 COAL -- Harita Para6/3/2012 23:34:57 6/3/2012 23:40:44 853 2 2 COAL -- MIL6/3/2012 23:35:47 6/3/2012 23:43:20 703-- 2 2 COAL -- Harita Para6/3/2012 23:49:45 6/3/2012 23:54:31 812 2 2 COAL -- MIL6/4/2012 00:01:17 6/4/2012 00:05:56 818 3 3 COAL -- MIL6/4/2012 00:12:32 6/4/2012 00:17:36 706-- 3 3 COAL -- Harita Para

Page 8: June Per Shift (Truckscale Port)

6/4/2012 00:19:46 6/4/2012 00:24:13 702-- 3 3 COAL -- Harita Para6/4/2012 00:22:15 6/4/2012 00:28:02 707-- 3 3 COAL -- Harita Para6/4/2012 00:23:13 6/4/2012 00:28:05 712-- 3 3 COAL -- Harita Para6/4/2012 00:31:38 6/4/2012 00:36:00 831 3 3 COAL -- MIL6/4/2012 00:34:54 6/4/2012 00:37:39 708-- 3 3 COAL -- Harita Para6/4/2012 00:48:59 6/4/2012 00:53:22 701-- 3 3 COAL -- Harita Para6/4/2012 00:56:10 6/4/2012 01:00:36 711-- 3 3 COAL -- Harita Para6/4/2012 00:58:59 6/4/2012 01:02:34 709-- 3 3 COAL -- Harita Para6/4/2012 01:18:01 6/4/2012 01:22:52 820 3 3 COAL -- MIL6/4/2012 01:19:39 6/4/2012 01:24:55 703-- 3 3 COAL -- Harita Para6/4/2012 01:37:20 6/4/2012 01:42:52 852 3 3 COAL--IN MIL6/4/2012 01:41:48 6/4/2012 01:45:55 704-- 3 3 COAL -- Harita Para6/4/2012 01:49:16 6/4/2012 01:55:31 706-- 3 3 COAL -- Harita Para6/4/2012 01:52:30 6/4/2012 01:55:43 707-- 3 3 COAL -- Harita Para6/4/2012 02:08:52 6/4/2012 02:14:45 712-- 3 3 COAL -- Harita Para6/4/2012 02:10:53 6/4/2012 02:15:30 701-- 3 3 COAL -- Harita Para6/4/2012 02:57:32 6/4/2012 03:03:13 703-- 3 3 COAL -- Harita Para6/4/2012 03:37:02 6/4/2012 03:42:21 818 3 3 COAL -- MIL6/4/2012 03:40:04 6/4/2012 03:46:47 853 3 3 COAL--IN MIL6/4/2012 03:40:28 6/4/2012 03:46:51 855 3 3 COAL--IN MIL6/4/2012 03:53:29 6/4/2012 03:58:23 812 3 3 COAL -- MIL6/4/2012 03:53:59 6/4/2012 04:00:32 851 3 3 COAL--IN MIL6/4/2012 03:56:30 6/4/2012 04:00:36 856 3 3 COAL--IN MIL6/4/2012 04:04:35 6/4/2012 04:11:09 852 3 3 COAL--IN MIL6/4/2012 04:06:03 6/4/2012 04:12:47 820 3 3 COAL -- MIL6/4/2012 04:09:58 6/4/2012 04:15:26 839 3 3 COAL -- MIL6/4/2012 07:10:09 6/4/2012 07:13:36 712-- 3 3 COAL -- Harita Para6/4/2012 07:10:32 6/4/2012 07:15:22 709-- 3 3 COAL -- Harita Para6/4/2012 07:15:58 6/4/2012 07:21:11 701-- 3 3 COAL -- Harita Para6/4/2012 07:16:43 6/4/2012 07:21:18 707-- 3 3 COAL -- Harita Para6/4/2012 07:22:31 6/4/2012 07:26:35 708-- 3 3 COAL -- Harita Para6/4/2012 07:29:57 6/4/2012 07:34:55 818 3 3 COAL -- MIL6/4/2012 07:32:38 6/4/2012 07:36:54 702-- 3 3 COAL -- Harita Para6/4/2012 07:34:14 6/4/2012 07:39:54 853 3 3 COAL--IN MIL6/4/2012 07:36:13 6/4/2012 07:41:38 855 3 3 COAL--IN MIL6/4/2012 07:38:46 6/4/2012 07:43:21 704-- 3 3 COAL -- Harita Para6/4/2012 07:47:13 6/4/2012 07:51:23 710-- 3 3 COAL -- Harita Para6/4/2012 07:47:33 6/4/2012 07:51:27 711-- 3 3 COAL -- Harita Para

6/4/2012 08:10:07 6/4/2012 08:14:28 706-- 1 1 COAL -- Harita Par6/4/2012 08:13:47 6/4/2012 08:17:50 703-- 1 1 COAL -- Harita Par6/4/2012 08:17:13 6/4/2012 08:21:14 714-- 1 1 COAL -- Harita Par6/4/2012 08:22:13 6/4/2012 08:27:15 852 1 1 COAL--INT MIL6/4/2012 08:40:27 6/4/2012 08:43:45 712-- 1 1 COAL -- Harita Par6/4/2012 08:48:58 6/4/2012 08:52:37 707-- 1 1 COAL -- Harita Par6/4/2012 08:53:34 6/4/2012 08:57:27 701-- 1 1 COAL -- Harita Par6/4/2012 08:58:16 6/4/2012 09:02:12 708-- 1 1 COAL -- Harita Par6/4/2012 08:58:49 6/4/2012 09:03:55 702-- 1 1 COAL -- Harita Par6/4/2012 09:05:19 6/4/2012 09:09:21 704-- 1 1 COAL -- Harita Par

Page 9: June Per Shift (Truckscale Port)

6/4/2012 09:11:13 6/4/2012 09:14:51 710-- 1 1 COAL -- Harita Par6/4/2012 09:13:34 6/4/2012 09:23:59 711-- 1 1 COAL -- Harita Par6/4/2012 09:29:18 6/4/2012 09:32:01 851 1 1 COAL--INT MIL6/4/2012 09:33:30 6/4/2012 09:36:58 706-- 1 1 COAL -- Harita Par6/4/2012 09:34:44 6/4/2012 09:38:15 703-- 1 1 COAL -- Harita Par6/4/2012 09:42:17 6/4/2012 09:45:53 714-- 1 1 COAL -- Harita Par6/4/2012 09:42:53 6/4/2012 09:48:32 853 1 1 COAL--INT MIL6/4/2012 09:47:51 6/4/2012 09:54:23 855 1 1 COAL--INT MIL6/4/2012 09:52:02 6/4/2012 09:55:16 712-- 1 1 COAL -- Harita Par6/4/2012 09:56:07 6/4/2012 10:02:11 852 1 1 COAL--INT MIL6/4/2012 09:58:22 6/4/2012 10:04:25 820 1 1 COAL -- MIL6/4/2012 10:05:51 6/4/2012 10:09:10 707-- 1 1 COAL -- Harita Par6/4/2012 10:10:29 6/4/2012 10:14:01 831 1 1 COAL -- MIL6/4/2012 10:20:14 6/4/2012 10:24:03 709-- 1 1 COAL -- Harita Par6/4/2012 10:27:02 6/4/2012 10:30:10 702-- 1 1 COAL -- Harita Par6/4/2012 10:27:34 6/4/2012 10:32:57 833 1 1 COAL -- MIL6/4/2012 10:29:31 6/4/2012 10:35:28 708-- 1 1 COAL -- Harita Par6/4/2012 10:33:42 6/4/2012 10:38:12 818 1 1 COAL -- MIL6/4/2012 10:36:34 6/4/2012 10:41:35 704-- 1 1 COAL -- Harita Par6/4/2012 10:39:34 6/4/2012 10:43:27 710-- 1 1 COAL -- Harita Par6/4/2012 10:42:18 6/4/2012 10:45:10 851 1 1 COAL--INT MIL6/4/2012 10:44:01 6/4/2012 10:48:22 711-- 1 1 COAL -- Harita Par6/4/2012 10:47:39 6/4/2012 10:52:12 838 1 1 COAL -- MIL6/4/2012 10:51:03 6/4/2012 10:54:34 706-- 1 1 COAL -- Harita Par6/4/2012 10:57:37 6/4/2012 11:03:54 853 1 1 COAL--INT MIL6/4/2012 10:57:57 6/4/2012 11:01:40 713-- 1 1 COAL -- Harita Par6/4/2012 11:02:18 6/4/2012 11:04:00 855 1 1 COAL--INT MIL6/4/2012 11:02:41 6/4/2012 11:08:14 714-- 1 1 COAL -- Harita Par6/4/2012 11:05:58 6/4/2012 11:08:30 852 1 1 COAL--INT MIL6/4/2012 11:10:42 6/4/2012 11:14:25 839 1 1 COAL -- MIL6/4/2012 11:11:05 6/4/2012 11:16:06 703-- 1 1 COAL -- Harita Par6/4/2012 11:11:57 6/4/2012 11:17:46 701-- 1 1 COAL -- Harita Par6/4/2012 11:13:45 6/4/2012 11:19:21 712-- 1 1 COAL -- Harita Par6/4/2012 11:27:19 6/4/2012 11:30:35 707-- 1 1 COAL -- Harita Par6/4/2012 11:28:21 6/4/2012 11:34:11 806 1 1 COAL--INT MIL6/4/2012 11:43:24 6/4/2012 11:49:30 709-- 1 1 COAL -- Harita Par6/4/2012 11:47:37 6/4/2012 11:52:20 702-- 1 1 COAL -- Harita Par6/4/2012 11:53:00 6/4/2012 11:55:35 851 1 1 COAL--INT MIL6/4/2012 12:00:25 6/4/2012 12:03:50 710-- 1 1 COAL -- Harita Par6/4/2012 12:08:21 6/4/2012 12:14:14 704-- 1 1 COAL -- Harita Par6/4/2012 12:09:01 6/4/2012 12:14:19 711-- 1 1 COAL -- Harita Par6/4/2012 12:12:38 6/4/2012 12:17:56 853 1 1 COAL--INT MIL6/4/2012 12:15:47 6/4/2012 12:26:15 706-- 1 1 COAL -- Harita Par

Page 10: June Per Shift (Truckscale Port)

6/4/2012 12:17:14 6/4/2012 12:25:54 855 1 1 COAL--INT MIL6/4/2012 12:20:21 6/4/2012 12:28:35 852 1 1 COAL--INT MIL6/4/2012 12:21:48 6/4/2012 12:32:01 713-- 1 1 COAL -- Harita Par6/4/2012 12:27:03 6/4/2012 12:33:01 820 1 1 COAL--INT MIL6/4/2012 12:30:05 6/4/2012 12:34:07 714-- 1 1 COAL -- Harita Par6/4/2012 12:31:09 6/4/2012 12:36:43 833 1 1 COAL -- MIL6/4/2012 12:35:12 6/4/2012 12:38:41 703-- 1 1 COAL -- Harita Par6/4/2012 12:39:20 6/4/2012 12:43:38 818 1 1 COAL -- MIL6/4/2012 12:51:02 6/4/2012 13:02:53 838 1 1 COAL -- MIL6/4/2012 12:51:24 6/4/2012 13:02:50 701-- 1 1 COAL -- Harita Par6/4/2012 12:53:00 6/4/2012 13:03:11 712-- 1 1 COAL -- Harita Par6/4/2012 12:56:11 6/4/2012 13:04:44 806 1 1 COAL--INT MIL6/4/2012 13:00:03 6/4/2012 13:15:05 812 1 1 COAL -- MIL6/4/2012 13:09:22 6/4/2012 13:19:41 709-- 1 1 COAL -- Harita Par6/4/2012 13:12:41 6/4/2012 13:18:35 851 1 1 COAL--INT MIL6/4/2012 13:14:27 6/4/2012 13:19:45 702-- 1 1 COAL -- Harita Par6/4/2012 13:28:13 6/4/2012 13:31:11 710-- 1 1 COAL -- Harita Par6/4/2012 13:33:03 6/4/2012 13:44:34 711-- 1 1 COAL -- Harita Par6/4/2012 13:42:35 6/4/2012 13:47:25 820 1 1 COAL--INT MIL6/4/2012 13:46:31 6/4/2012 13:52:32 839 1 1 COAL -- MIL6/4/2012 13:51:52 6/4/2012 13:58:38 855 1 1 COAL--INT MIL6/4/2012 13:56:54 6/4/2012 14:02:01 853 1 1 COAL--INT MIL6/4/2012 14:01:17 6/4/2012 14:06:31 706-- 1 1 COAL -- Harita Par6/4/2012 14:02:39 6/4/2012 14:06:33 703-- 1 1 COAL -- Harita Par6/4/2012 14:04:52 6/4/2012 14:08:52 713-- 1 1 COAL -- Harita Par6/4/2012 14:18:29 6/4/2012 14:21:56 806 1 1 COAL--INT MIL6/4/2012 14:19:49 6/4/2012 14:24:30 712-- 1 1 COAL -- Harita Par6/4/2012 14:21:14 6/4/2012 14:24:35 701-- 1 1 COAL -- Harita Par6/4/2012 14:23:47 6/4/2012 14:27:48 838 1 1 COAL--INT MIL6/4/2012 14:27:03 6/4/2012 14:32:37 833 1 1 COAL -- MIL6/4/2012 14:34:14 6/4/2012 14:38:42 818 1 1 COAL -- MIL6/4/2012 14:35:02 6/4/2012 14:40:04 812 1 1 COAL--INT MIL6/4/2012 14:41:21 6/4/2012 14:46:11 852 1 1 COAL--INT MIL6/4/2012 14:49:42 6/4/2012 14:54:48 709-- 1 1 COAL -- Harita Par6/4/2012 14:53:32 6/4/2012 14:57:22 831 1 1 COAL -- MIL6/4/2012 14:53:54 6/4/2012 14:59:25 820 1 1 COAL--INT MIL6/4/2012 14:56:24 6/4/2012 15:00:58 710-- 1 1 COAL -- Harita Par6/4/2012 15:07:59 6/4/2012 15:12:56 853 1 1 COAL--INT MIL6/4/2012 15:14:07 6/4/2012 15:17:10 851 1 1 COAL -- MIL6/4/2012 15:20:55 6/4/2012 15:25:17 704-- 1 1 COAL -- Harita Par6/4/2012 15:23:37 6/4/2012 15:27:40 714-- 1 1 COAL -- Harita Par6/4/2012 15:32:06 6/4/2012 15:36:02 713-- 1 1 COAL -- Harita Par6/4/2012 15:41:38 6/4/2012 15:46:00 838 1 1 COAL--INT MIL

Page 11: June Per Shift (Truckscale Port)

6/4/2012 15:48:37 6/4/2012 15:53:01 833 1 1 COAL--INT MIL6/4/2012 15:55:16 6/4/2012 16:01:10 808 1 2 COAL -- MIL6/4/2012 15:55:40 6/4/2012 16:01:20 855 1 2 COAL -- MIL6/4/2012 16:15:02 6/4/2012 16:19:23 836 2 2 COAL -- MIL6/4/2012 16:16:17 6/4/2012 16:21:25 820 2 2 COAL--INT MIL6/4/2012 18:01:36 6/4/2012 18:06:49 707-- 2 2 COAL -- Harita Par6/4/2012 18:05:07 6/4/2012 18:09:43 701-- 2 2 COAL -- Harita Par6/4/2012 18:08:41 6/4/2012 18:12:54 704-- 2 2 COAL -- Harita Par6/4/2012 18:14:57 6/4/2012 18:22:33 706-- 2 2 COAL -- Harita Par6/4/2012 18:15:18 6/4/2012 18:22:36 710-- 2 2 COAL -- Harita Par6/4/2012 18:43:21 6/4/2012 18:51:58 711-- 2 2 COAL -- Harita Par6/4/2012 18:44:26 6/4/2012 18:52:01 702-- 2 2 COAL -- Harita Par6/4/2012 18:49:50 6/4/2012 18:53:26 713-- 2 2 COAL -- Harita Par6/4/2012 18:50:34 6/4/2012 18:56:47 709-- 2 2 COAL -- Harita Par6/4/2012 18:50:59 6/4/2012 18:57:48 712-- 2 2 COAL -- Harita Par6/4/2012 19:00:27 6/4/2012 19:05:33 703-- 2 2 COAL -- Harita Par6/4/2012 19:11:53 6/4/2012 19:15:44 714-- 2 2 COAL -- Harita Par6/4/2012 19:29:57 6/4/2012 19:34:11 707-- 2 2 COAL -- Harita Par6/4/2012 19:33:14 6/4/2012 19:37:45 851 2 2 COAL -- MIL6/4/2012 19:35:10 6/4/2012 19:39:36 701-- 2 2 COAL -- Harita Par6/4/2012 19:36:39 6/4/2012 19:44:47 853 2 2 COAL -- MIL6/4/2012 19:46:30 6/4/2012 19:50:52 704-- 2 2 COAL -- Harita Par6/4/2012 20:05:21 6/4/2012 20:10:59 852 2 2 COAL -- MIL6/4/2012 20:08:49 6/4/2012 20:16:40 706-- 2 2 COAL -- Harita Par6/4/2012 20:20:17 6/4/2012 20:25:02 710-- 2 2 COAL -- Harita Par6/4/2012 20:23:24 6/4/2012 20:32:50 711-- 2 2 COAL -- Harita Par6/4/2012 20:33:53 6/4/2012 20:38:19 702-- 2 2 COAL -- Harita Par6/4/2012 20:36:33 6/4/2012 20:41:40 713-- 2 2 COAL -- Harita Par6/4/2012 20:40:12 6/4/2012 20:46:52 856 2 2 COAL--INT MIL6/4/2012 20:40:51 6/4/2012 20:47:12 709-- 2 2 COAL -- Harita Par6/4/2012 20:42:31 6/4/2012 20:48:08 703-- 2 2 COAL -- Harita Par6/4/2012 20:45:36 6/4/2012 20:51:42 855 2 2 COAL--INT MIL6/4/2012 20:46:06 6/4/2012 20:53:37 714-- 2 2 COAL -- Harita Par6/4/2012 20:57:04 6/4/2012 21:00:32 868 2 2 COAL--INT MIL6/4/2012 21:04:51 6/4/2012 21:08:28 701-- 2 2 COAL -- Harita Par6/4/2012 21:06:30 6/4/2012 21:10:51 838 2 2 COAL -- MIL6/4/2012 21:12:39 6/4/2012 21:15:53 707-- 2 2 COAL -- Harita Par6/4/2012 21:23:14 6/4/2012 21:30:31 853 2 2 COAL--INT MIL6/4/2012 21:25:48 6/4/2012 21:32:15 704-- 2 2 COAL -- Harita Par6/4/2012 21:27:02 6/4/2012 21:37:46 852 2 2 COAL--INT MIL6/4/2012 21:41:32 6/4/2012 21:47:21 818 2 2 COAL -- MIL6/4/2012 21:50:03 6/4/2012 21:53:51 851 2 2 COAL--INT MIL6/4/2012 21:58:15 6/4/2012 22:03:01 856 2 2 COAL--INT MIL

Page 12: June Per Shift (Truckscale Port)

6/4/2012 22:13:56 6/4/2012 22:18:19 706-- 2 2 COAL -- Harita Par6/4/2012 22:15:14 6/4/2012 22:18:25 710-- 2 2 COAL -- Harita Par6/4/2012 22:15:42 6/4/2012 22:21:28 702-- 2 2 COAL -- Harita Par6/4/2012 22:19:29 6/4/2012 22:26:16 855 2 2 COAL--INT MIL6/4/2012 22:22:36 6/4/2012 22:28:20 703-- 2 2 COAL -- Harita Par6/4/2012 22:24:17 6/4/2012 22:30:27 713-- 2 2 COAL -- Harita Par6/4/2012 22:25:02 6/4/2012 22:32:15 714-- 2 2 COAL -- Harita Par6/4/2012 22:29:19 6/4/2012 22:34:37 711-- 2 2 COAL -- Harita Par6/4/2012 22:38:34 6/4/2012 22:42:48 709-- 2 2 COAL -- Harita Par6/4/2012 22:42:04 6/4/2012 22:49:49 701-- 2 2 COAL -- Harita Par6/4/2012 22:48:57 6/4/2012 23:03:03 707-- 2 2 COAL -- Harita Par6/4/2012 22:57:42 6/4/2012 23:02:23 852 2 2 COAL--INT MIL6/4/2012 23:04:22 6/4/2012 23:10:28 704-- 2 2 COAL -- Harita Par6/4/2012 23:11:09 6/4/2012 23:36:40 851 2 2 COAL--INT MIL6/4/2012 23:17:20 6/4/2012 23:21:32 868 2 2 COAL--INT MIL6/4/2012 23:31:35 6/4/2012 23:36:36 856 2 2 COAL--INT MIL6/4/2012 23:34:14 6/4/2012 23:39:18 820 2 2 COAL -- MIL6/4/2012 23:46:24 6/4/2012 23:52:09 855 2 2 COAL--INT MIL6/5/2012 00:06:02 6/5/2012 00:12:10 703-- 3 3 COAL -- Harita Par6/5/2012 00:10:14 6/5/2012 00:14:19 833 3 3 COAL -- MIL6/5/2012 00:10:50 6/5/2012 00:16:38 702-- 3 3 COAL -- Harita Par6/5/2012 00:21:48 6/5/2012 00:28:22 706-- 3 3 COAL -- Harita Par6/5/2012 00:25:17 6/5/2012 00:29:37 701-- 3 3 COAL -- Harita Par6/5/2012 00:27:22 6/5/2012 00:31:07 707-- 3 3 COAL -- Harita Par6/5/2012 00:34:28 6/5/2012 00:38:31 830 3 3 COAL -- MIL6/5/2012 00:40:39 6/5/2012 00:56:55 838 3 3 COAL -- MIL6/5/2012 00:46:07 6/5/2012 00:51:17 704-- 3 3 COAL -- Harita Par6/5/2012 00:48:21 6/5/2012 00:53:11 713-- 3 3 COAL -- Harita Par6/5/2012 00:49:24 6/5/2012 00:55:49 710-- 3 3 COAL -- Harita Par6/5/2012 00:49:54 6/5/2012 00:58:31 714-- 3 3 COAL -- Harita Par6/5/2012 00:50:26 6/5/2012 01:00:43 711-- 3 3 COAL -- Harita Par6/5/2012 00:52:01 6/5/2012 01:03:01 829 3 3 COAL -- MIL6/5/2012 01:04:40 6/5/2012 01:10:02 818 3 3 COAL -- MIL6/5/2012 01:11:13 6/5/2012 01:16:39 855 3 3 COAL--INT MIL6/5/2012 01:14:02 6/5/2012 01:17:34 709-- 3 3 COAL -- Harita Par6/5/2012 01:45:58 6/5/2012 01:54:30 851 3 3 COAL--INT MIL6/5/2012 01:51:05 6/5/2012 01:56:15 856 3 3 COAL--INT MIL6/5/2012 01:51:21 6/5/2012 01:58:49 852 3 3 COAL--INT MIL6/5/2012 01:58:15 6/5/2012 02:03:40 702-- 3 3 COAL -- Harita Par6/5/2012 02:01:06 6/5/2012 02:10:13 828 3 3 COAL -- MIL6/5/2012 02:02:30 6/5/2012 02:09:04 703-- 3 3 COAL -- Harita Par6/5/2012 02:07:06 6/5/2012 02:10:52 868 3 3 COAL--INT MIL6/5/2012 02:14:01 6/5/2012 02:18:13 701-- 3 3 COAL -- Harita Par

Page 13: June Per Shift (Truckscale Port)

6/5/2012 02:22:36 6/5/2012 02:26:10 707-- 3 3 COAL -- Harita Par6/5/2012 02:42:39 6/5/2012 02:48:03 855 3 3 COAL--INT MIL6/5/2012 02:43:00 6/5/2012 02:49:31 714-- 3 3 COAL -- Harita Par6/5/2012 02:47:22 6/5/2012 02:52:36 818 3 3 COAL -- MIL6/5/2012 02:54:33 6/5/2012 02:59:35 711-- 3 3 COAL -- Harita Par6/5/2012 03:09:50 6/5/2012 03:14:35 852 3 3 COAL--INT MIL6/5/2012 03:13:41 6/5/2012 03:14:38 856 3 3 COAL--INT MIL6/5/2012 03:22:12 6/5/2012 03:26:18 851 3 3 COAL--INT MIL6/5/2012 03:24:56 6/5/2012 03:29:15 710-- 3 3 COAL -- Harita Par6/5/2012 03:34:11 6/5/2012 03:37:37 868 3 3 COAL--INT MIL6/5/2012 03:46:23 6/5/2012 03:50:05 833 3 3 COAL -- MIL6/5/2012 03:50:52 6/5/2012 03:54:57 706-- 3 3 COAL -- Harita Par6/5/2012 04:26:07 6/5/2012 04:31:22 818 3 3 COAL -- MIL6/5/2012 07:04:08 6/5/2012 07:08:02 709-- 3 3 COAL -- Harita Par6/5/2012 07:09:48 6/5/2012 07:13:28 701-- 3 3 COAL -- Harita Par6/5/2012 07:22:27 6/5/2012 07:26:01 710-- 3 3 COAL -- Harita Par6/5/2012 07:22:48 6/5/2012 07:28:08 704-- 3 3 COAL -- Harita Par6/5/2012 07:25:04 6/5/2012 07:29:43 702-- 3 3 COAL -- Harita Par6/5/2012 07:43:42 6/5/2012 07:48:31 711-- 3 3 COAL -- Harita Par6/5/2012 07:58:06 6/5/2012 08:01:30 703-- 3 1 COAL -- Harita Par6/5/2012 08:06:46 6/5/2012 08:10:46 708-- 1 1 COAL -- Harita Par6/5/2012 08:16:55 6/5/2012 08:23:13 855 1 1 COAL--INT MIL6/5/2012 08:19:49 6/5/2012 08:24:07 713-- 1 1 COAL -- Harita Par6/5/2012 08:25:13 6/5/2012 08:28:43 851 1 1 COAL--INT MIL6/5/2012 08:26:48 6/5/2012 08:30:02 868 1 1 COAL--INT MIL6/5/2012 08:28:04 6/5/2012 08:34:04 856 1 1 COAL--INT MIL6/5/2012 08:32:17 6/5/2012 08:36:16 709-- 1 1 COAL -- Harita Par6/5/2012 08:33:04 6/5/2012 08:38:40 706-- 1 1 COAL -- Harita Par6/5/2012 08:37:19 6/5/2012 08:41:32 828 1 1 COAL -- MIL6/5/2012 08:37:56 6/5/2012 08:43:06 852 1 1 COAL--INT MIL6/5/2012 08:39:14 6/5/2012 08:45:05 701-- 1 1 COAL -- Harita Par6/5/2012 08:48:11 6/5/2012 08:52:17 710-- 1 1 COAL -- Harita Par6/5/2012 08:51:29 6/5/2012 08:55:43 704-- 1 1 COAL -- Harita Par6/5/2012 08:54:15 6/5/2012 08:58:10 702-- 1 1 COAL -- Harita Par6/5/2012 11:40:31 6/5/2012 11:45:16 820 1 1 COAL -- MIL6/5/2012 11:41:25 6/5/2012 11:48:14 711-- 1 1 COAL -- Harita Par6/5/2012 11:50:56 6/5/2012 11:56:00 703-- 1 1 COAL -- Harita Par6/5/2012 12:28:22 6/5/2012 12:32:40 707-- 1 1 COAL -- Harita Par6/5/2012 12:46:26 6/5/2012 12:51:19 833 1 1 COAL -- MIL6/5/2012 12:46:57 6/5/2012 12:53:52 818 1 1 COAL -- MIL6/5/2012 13:17:57 6/5/2012 13:22:49 713-- 1 1 COAL -- Harita Par6/5/2012 14:06:38 6/5/2012 14:10:59 838 1 1 COAL -- MIL6/5/2012 15:13:35 6/5/2012 15:19:07 856 1 1 COAL -- MIL

Page 14: June Per Shift (Truckscale Port)

6/5/2012 15:17:44 6/5/2012 15:39:04 709-- 1 1 COAL -- Harita Par6/5/2012 15:18:26 6/5/2012 15:41:34 853 1 1 COAL--INT MIL6/5/2012 15:30:50 6/5/2012 15:39:32 820 1 1 COAL -- MIL6/5/2012 15:47:43 6/5/2012 15:52:08 839 1 1 COAL -- MIL6/5/2012 15:57:44 6/5/2012 16:02:12 836 1 2 COAL -- MIL6/5/2012 18:20:43 6/5/2012 18:24:47 701-- 2 2 COAL -- Harita Par6/5/2012 18:58:25 6/5/2012 19:03:25 704-- 2 2 COAL -- Harita Par6/5/2012 19:07:22 6/5/2012 19:13:32 855 2 2 COAL -- MIL6/5/2012 19:10:01 6/5/2012 19:13:36 856 2 2 COAL -- MIL6/5/2012 19:10:30 6/5/2012 19:16:13 706-- 2 2 COAL -- Harita Par6/5/2012 19:12:39 6/5/2012 19:18:05 708-- 2 2 COAL -- Harita Par6/5/2012 19:15:35 6/5/2012 19:19:59 707-- 2 2 COAL -- Harita Par6/5/2012 19:17:14 6/5/2012 19:23:46 853 2 2 COAL -- MIL6/5/2012 19:19:11 6/5/2012 19:25:01 851 2 2 COAL -- MIL6/5/2012 19:30:24 6/5/2012 19:34:27 868 2 2 COAL -- MIL6/5/2012 19:32:38 6/5/2012 19:36:53 830 2 2 COAL -- MIL6/5/2012 19:33:33 6/5/2012 19:39:06 703-- 2 2 COAL -- Harita Par6/5/2012 19:40:04 6/5/2012 19:44:26 712-- 2 2 COAL -- Harita Par6/5/2012 19:41:41 6/5/2012 19:44:29 710-- 2 2 COAL -- Harita Par6/5/2012 19:42:00 6/5/2012 19:47:38 714-- 2 2 COAL -- Harita Par6/5/2012 19:48:27 6/5/2012 19:52:31 713-- 2 2 COAL -- Harita Par6/5/2012 19:54:08 6/5/2012 19:58:04 701-- 2 2 COAL -- Harita Par6/5/2012 20:04:14 6/5/2012 20:08:11 833 2 2 COAL -- MIL6/5/2012 20:35:44 6/5/2012 20:40:35 704-- 2 2 COAL -- Harita Par6/5/2012 20:50:55 6/5/2012 20:54:49 708-- 2 2 COAL -- Harita Par6/5/2012 20:51:40 6/5/2012 20:54:52 706-- 2 2 COAL -- Harita Par6/5/2012 20:57:05 6/5/2012 21:00:49 707-- 2 2 COAL -- Harita Par6/5/2012 21:08:07 6/5/2012 21:16:51 838 2 2 COAL -- MIL6/5/2012 21:21:48 6/5/2012 21:27:11 703-- 2 2 COAL -- Harita Par6/5/2012 21:26:21 6/5/2012 21:32:54 818 2 2 COAL -- MIL6/5/2012 21:31:42 6/5/2012 21:36:18 710-- 2 2 COAL -- Harita Par6/5/2012 21:32:09 6/5/2012 21:37:53 713-- 2 2 COAL -- Harita Par6/5/2012 21:38:48 6/5/2012 21:42:31 712-- 2 2 COAL -- Harita Par6/5/2012 21:39:32 6/5/2012 21:44:43 850 2 2 COAL -- MIL6/5/2012 21:40:10 6/5/2012 21:42:35 701-- 2 2 COAL -- Harita Par6/5/2012 21:56:02 6/5/2012 22:00:27 714-- 2 2 COAL -- Harita Par6/5/2012 21:57:45 6/5/2012 22:03:14 836 2 2 COAL -- MIL6/5/2012 22:10:10 6/5/2012 22:14:14 704-- 2 2 COAL -- Harita Par6/5/2012 22:13:33 6/5/2012 22:17:30 833 2 2 COAL -- MIL6/5/2012 22:18:57 6/5/2012 22:23:20 706-- 2 2 COAL -- Harita Par6/5/2012 22:22:20 6/5/2012 22:26:18 708-- 2 2 COAL -- Harita Par6/5/2012 22:22:40 6/5/2012 22:28:57 856 2 2 COAL -- MIL6/5/2012 22:28:01 6/5/2012 22:38:32 831 2 2 COAL -- MIL

Page 15: June Per Shift (Truckscale Port)

6/5/2012 22:29:36 6/5/2012 22:38:26 707-- 2 2 COAL -- Harita Par6/5/2012 22:41:27 6/5/2012 23:00:52 855 2 2 COAL -- MIL6/5/2012 22:54:03 6/5/2012 22:59:54 703-- 2 2 COAL -- Harita Par6/5/2012 22:56:02 6/5/2012 23:00:57 853 2 2 COAL -- MIL6/5/2012 23:05:26 6/5/2012 23:09:18 818 2 2 COAL -- MIL6/5/2012 23:06:55 6/5/2012 23:13:13 713-- 2 2 COAL -- Harita Par6/5/2012 23:11:18 6/5/2012 23:15:58 852 2 2 COAL -- MIL6/5/2012 23:11:53 6/5/2012 23:21:58 851 2 2 COAL -- MIL6/5/2012 23:12:21 6/5/2012 23:23:33 701-- 2 2 COAL -- Harita Par6/5/2012 23:22:47 6/5/2012 23:27:15 850 2 2 COAL -- MIL6/5/2012 23:30:18 6/5/2012 23:34:56 830 2 2 COAL -- MIL6/5/2012 23:30:53 6/5/2012 23:36:00 828 2 2 COAL -- MIL6/5/2012 23:31:25 6/5/2012 23:39:06 712-- 2 2 COAL -- Harita Par6/5/2012 23:37:12 6/5/2012 23:47:43 710-- 2 2 COAL -- Harita Par6/5/2012 23:44:58 6/5/2012 23:49:41 706-- 2 2 COAL -- Harita Par6/5/2012 23:48:59 6/5/2012 23:53:39 856 2 2 COAL -- MIL6/5/2012 23:50:27 6/5/2012 23:55:50 704-- 2 2 COAL -- Harita Par6/5/2012 23:57:30 6/6/2012 00:04:24 711-- 2 3 COAL -- Harita Par6/6/2012 00:06:58 6/6/2012 00:10:37 707-- 3 3 COAL -- Harita Par6/6/2012 00:15:45 6/6/2012 00:20:01 708-- 3 3 COAL -- Harita Par6/6/2012 00:29:09 6/6/2012 00:33:39 855 3 3 COAL -- MIL6/6/2012 00:36:28 6/6/2012 00:41:06 829 3 3 COAL -- MIL6/6/2012 00:39:11 6/6/2012 00:44:34 703-- 3 3 COAL -- Harita Par6/6/2012 01:12:23 6/6/2012 01:18:13 818 3 3 COAL -- MIL6/6/2012 01:26:51 6/6/2012 01:32:52 828 3 3 COAL -- MIL6/6/2012 01:30:54 6/6/2012 01:35:03 701-- 3 3 COAL -- Harita Par6/6/2012 01:31:35 6/6/2012 01:40:10 853 3 3 COAL -- MIL6/6/2012 01:38:25 6/6/2012 01:42:10 704-- 3 3 COAL -- Harita Par6/6/2012 01:39:33 6/6/2012 01:43:57 706-- 3 3 COAL -- Harita Par6/6/2012 01:44:47 6/6/2012 01:48:34 707-- 3 3 COAL -- Harita Par6/6/2012 01:55:06 6/6/2012 01:59:16 713-- 3 3 COAL -- Harita Par6/6/2012 02:02:42 6/6/2012 02:07:16 710-- 3 3 COAL -- Harita Par6/6/2012 02:03:05 6/6/2012 02:07:19 708-- 3 3 COAL -- Harita Par6/6/2012 02:05:33 6/6/2012 02:11:29 851 3 3 COAL -- MIL6/6/2012 02:08:06 6/6/2012 02:15:00 711-- 3 3 COAL -- Harita Par6/6/2012 02:14:12 6/6/2012 02:15:02 703-- 3 3 COAL -- Harita Par6/6/2012 02:34:50 6/6/2012 02:39:26 712-- 3 3 COAL -- Harita Par6/6/2012 02:43:32 6/6/2012 02:47:48 830 3 3 COAL -- MIL6/6/2012 02:52:09 6/6/2012 02:57:27 701-- 3 3 COAL -- Harita Par6/6/2012 02:53:28 6/6/2012 03:01:45 856 3 3 COAL -- MIL6/6/2012 02:55:58 6/6/2012 03:09:20 855 3 3 COAL -- MIL6/6/2012 03:02:21 6/6/2012 03:09:22 852 3 3 COAL -- MIL6/6/2012 03:17:22 6/6/2012 03:21:06 707-- 3 3 COAL -- Harita Par

Page 16: June Per Shift (Truckscale Port)

6/6/2012 03:18:12 6/6/2012 03:27:08 853 3 3 COAL -- MIL6/6/2012 03:31:02 6/6/2012 03:35:50 818 3 3 COAL -- MIL6/6/2012 03:31:28 6/6/2012 03:38:33 713-- 3 3 COAL -- Harita Par6/6/2012 03:36:51 6/6/2012 03:41:24 828 3 3 COAL -- MIL6/6/2012 03:40:37 6/6/2012 03:44:48 838 3 3 COAL -- MIL6/6/2012 11:58:53 6/6/2012 12:02:55 708-- 1 1 COAL -- Harita Para6/6/2012 11:59:30 6/6/2012 12:04:41 710-- 1 1 COAL -- Harita Para6/6/2012 12:00:23 6/6/2012 12:06:30 701-- 1 1 COAL -- Harita Para6/6/2012 12:09:03 6/6/2012 12:13:41 711-- 1 1 COAL -- Harita Para6/6/2012 12:11:03 6/6/2012 12:15:01 703-- 1 1 COAL -- Harita Para6/6/2012 12:13:01 6/6/2012 12:20:00 706-- 1 1 COAL -- Harita Para6/6/2012 12:38:15 6/6/2012 12:43:08 836 1 1 COAL -- MIL6/6/2012 12:38:51 6/6/2012 12:45:15 850 1 1 COAL -- MIL6/6/2012 12:39:41 6/6/2012 12:47:40 712-- 1 1 COAL -- Harita Para6/6/2012 12:40:50 6/6/2012 12:51:46 704-- 1 1 COAL -- Harita Para6/6/2012 12:41:16 6/6/2012 12:54:11 853 1 1 COAL -- MIL6/6/2012 12:41:49 6/6/2012 12:54:59 707-- 1 1 COAL -- Harita Para6/6/2012 12:43:54 6/6/2012 12:59:51 713-- 1 1 COAL -- Harita Para6/6/2012 13:54:54 6/6/2012 14:02:38 855 1 1 COAL -- MIL6/6/2012 13:59:40 6/6/2012 14:03:07 868 1 1 COAL -- MIL6/6/2012 14:00:18 6/6/2012 14:04:44 852 1 1 COAL -- MIL6/6/2012 14:04:02 6/6/2012 14:07:40 808 1 1 COAL -- MIL6/6/2012 14:08:44 6/6/2012 14:13:16 818 1 1 COAL -- MIL6/6/2012 14:21:19 6/6/2012 14:26:02 851 1 1 COAL -- MIL6/6/2012 14:23:52 6/6/2012 14:28:06 704-- 1 1 COAL -- Harita Para6/6/2012 14:24:18 6/6/2012 14:29:57 850 1 1 COAL -- MIL6/6/2012 14:43:03 6/6/2012 14:49:05 710-- 1 1 COAL -- Harita Para6/6/2012 14:47:45 6/6/2012 14:51:56 836 1 1 COAL -- MIL6/6/2012 14:49:48 6/6/2012 14:54:10 833 1 1 COAL -- MIL6/6/2012 14:57:46 6/6/2012 15:01:29 713-- 1 1 COAL -- Harita Para6/6/2012 14:58:32 6/6/2012 15:03:09 703-- 1 1 COAL -- Harita Para6/6/2012 15:05:47 6/6/2012 15:09:47 701-- 1 1 COAL -- Harita Para6/6/2012 15:09:11 6/6/2012 15:14:39 853 1 1 COAL -- MIL6/6/2012 15:10:41 6/6/2012 15:16:04 819 1 1 COAL -- MIL6/6/2012 15:15:27 6/6/2012 15:19:28 815 1 1 COAL -- MIL6/6/2012 15:16:57 6/6/2012 15:21:58 706-- 1 1 COAL -- Harita Para6/6/2012 15:27:38 6/6/2012 15:31:56 707-- 1 1 COAL -- Harita Para6/6/2012 15:29:55 6/6/2012 15:33:36 832 1 1 COAL -- MIL6/6/2012 15:39:50 6/6/2012 15:43:59 714-- 1 1 COAL -- Harita Para6/6/2012 15:45:25 6/6/2012 15:49:53 828 1 1 COAL -- MIL6/6/2012 15:47:33 6/6/2012 15:53:15 856 1 1 COAL -- MIL6/6/2012 15:56:31 6/6/2012 15:59:58 868 1 1 COAL -- MIL6/6/2012 16:05:52 6/6/2012 16:10:06 852 2 2 COAL -- MIL6/6/2012 16:19:51 6/6/2012 16:23:33 808 2 2 COAL -- MIL6/6/2012 18:12:08 6/6/2012 18:15:39 706-- 2 2 COAL -- Harita Para6/6/2012 18:12:47 6/6/2012 18:18:28 701-- 2 2 COAL -- Harita Para6/6/2012 18:16:29 6/6/2012 18:20:29 712-- 2 2 COAL -- Harita Para6/6/2012 18:17:50 6/6/2012 18:23:23 708-- 2 2 COAL -- Harita Para6/6/2012 18:22:42 6/6/2012 18:28:05 704-- 2 2 COAL -- Harita Para

Page 17: June Per Shift (Truckscale Port)

6/6/2012 18:26:00 6/6/2012 18:31:20 703-- 2 2 COAL -- Harita Para6/6/2012 18:26:26 6/6/2012 18:33:11 702-- 2 2 COAL -- Harita Para6/6/2012 18:27:06 6/6/2012 18:35:19 713-- 2 2 COAL -- Harita Para6/6/2012 18:27:24 6/6/2012 18:37:02 709-- 2 2 COAL -- Harita Para6/6/2012 18:30:26 6/6/2012 18:38:49 707-- 2 2 COAL -- Harita Para6/6/2012 18:34:00 6/6/2012 18:40:54 710-- 2 2 COAL -- Harita Para6/6/2012 18:47:20 6/6/2012 18:51:05 818 2 2 COAL -- MIL6/6/2012 18:54:54 6/6/2012 19:00:08 852 2 2 COAL -- MIL6/6/2012 19:01:08 6/6/2012 19:05:48 856 2 2 COAL -- MIL6/6/2012 19:04:06 6/6/2012 19:10:15 855 2 2 COAL -- MIL6/6/2012 19:14:09 6/6/2012 19:17:57 833 2 2 COAL -- MIL6/6/2012 19:16:59 6/6/2012 19:20:53 850 2 2 COAL -- MIL6/6/2012 19:17:19 6/6/2012 19:21:51 851 2 2 COAL -- MIL6/6/2012 19:35:53 6/6/2012 19:43:04 853 2 2 COAL -- MIL6/6/2012 19:55:55 6/6/2012 20:00:57 714-- 2 2 COAL -- Harita Para6/6/2012 19:59:46 6/6/2012 20:03:13 706-- 2 2 COAL -- Harita Para6/6/2012 20:00:11 6/6/2012 20:07:44 815 2 2 COAL -- MIL6/6/2012 20:04:38 6/6/2012 20:10:33 839 2 2 COAL -- MIL6/6/2012 20:09:47 6/6/2012 20:14:14 819 2 2 COAL -- MIL6/6/2012 20:21:36 6/6/2012 20:26:07 712-- 2 2 COAL -- Harita Para6/6/2012 20:23:40 6/6/2012 20:27:57 818 2 2 COAL -- MIL6/6/2012 20:24:22 6/6/2012 20:29:24 701-- 2 2 COAL -- Harita Para6/6/2012 20:27:04 6/6/2012 20:31:05 708-- 2 2 COAL -- Harita Para6/6/2012 20:35:41 6/6/2012 20:40:43 704-- 2 2 COAL -- Harita Para6/6/2012 20:45:59 6/6/2012 20:50:24 703-- 2 2 COAL -- Harita Para6/6/2012 20:46:22 6/6/2012 20:52:21 709-- 2 2 COAL -- Harita Para6/6/2012 20:53:07 6/6/2012 20:57:46 710-- 2 2 COAL -- Harita Para6/6/2012 20:53:33 6/6/2012 20:58:11 833 2 2 COAL -- MIL6/6/2012 20:54:55 6/6/2012 20:59:38 713-- 2 2 COAL -- Harita Para6/6/2012 21:00:48 6/6/2012 21:05:43 850 2 2 COAL -- MIL6/6/2012 21:04:18 6/6/2012 21:09:06 829 2 2 COAL -- MIL6/6/2012 21:06:24 6/6/2012 21:11:23 707-- 2 2 COAL -- Harita Para6/6/2012 21:17:13 6/6/2012 21:23:53 838 2 2 COAL -- MIL6/6/2012 21:27:31 6/6/2012 21:33:33 831 2 2 COAL -- MIL6/6/2012 21:28:05 6/6/2012 21:39:00 815 2 2 COAL -- MIL6/6/2012 21:44:56 6/6/2012 21:50:10 714-- 2 2 COAL -- Harita Para6/6/2012 21:47:00 6/6/2012 21:50:52 839 2 2 COAL -- MIL6/6/2012 21:49:19 6/6/2012 21:53:03 819 2 2 COAL -- MIL6/6/2012 22:01:52 6/6/2012 22:06:07 706-- 2 2 COAL -- Harita Para6/6/2012 22:05:21 6/6/2012 22:10:48 818 2 2 COAL -- MIL6/6/2012 22:09:49 6/6/2012 22:14:55 712-- 2 2 COAL -- Harita Para6/6/2012 22:13:18 6/6/2012 22:17:49 701-- 2 2 COAL -- Harita Para6/6/2012 22:24:21 6/6/2012 22:28:07 708-- 2 2 COAL -- Harita Para6/6/2012 22:29:47 6/6/2012 22:33:33 704-- 2 2 COAL -- Harita Para6/6/2012 22:30:47 6/6/2012 22:35:42 709-- 2 2 COAL -- Harita Para6/6/2012 22:34:19 6/6/2012 22:54:00 850 2 2 COAL -- MIL6/6/2012 22:38:21 6/6/2012 22:59:14 829 2 2 COAL -- MIL6/6/2012 22:44:11 6/6/2012 22:49:11 703-- 2 2 COAL -- Harita Para6/6/2012 22:55:13 6/6/2012 23:29:37 833 2 2 COAL -- MIL6/6/2012 22:58:06 6/6/2012 23:05:06 710-- 2 2 COAL -- Harita Para

Page 18: June Per Shift (Truckscale Port)

6/6/2012 22:58:32 6/6/2012 23:05:57 713-- 2 2 COAL -- Harita Para6/6/2012 23:02:49 6/6/2012 23:08:24 707-- 2 2 COAL -- Harita Para6/6/2012 23:03:09 6/7/2012 00:16:52 815 2 3 COAL -- MIL6/6/2012 23:24:29 6/6/2012 23:32:08 851 2 2 COAL -- MIL6/6/2012 23:25:10 6/6/2012 23:29:31 714-- 2 2 COAL -- Harita Para6/6/2012 23:30:23 6/6/2012 23:37:24 853 2 2 COAL -- MIL6/6/2012 23:35:22 6/6/2012 23:39:05 706-- 2 2 COAL -- Harita Para6/6/2012 23:41:03 6/7/2012 00:14:21 839 2 3 COAL -- MIL6/6/2012 23:41:48 6/6/2012 23:47:46 856 2 2 COAL -- MIL6/6/2012 23:56:12 6/7/2012 00:02:11 712-- 2 3 COAL -- Harita Para6/6/2012 23:59:40 6/7/2012 00:07:57 855 2 3 COAL -- MIL6/7/2012 00:25:16 6/7/2012 00:31:16 703-- 3 3 COAL -- Harita Para6/7/2012 00:35:54 6/7/2012 00:40:08 829 3 3 COAL -- MIL6/7/2012 00:36:51 6/7/2012 00:41:31 701-- 3 3 COAL -- Harita Para6/7/2012 00:39:33 6/7/2012 00:43:37 708-- 3 3 COAL -- Harita Para6/7/2012 00:47:59 6/7/2012 00:52:15 713-- 3 3 COAL -- Harita Para6/7/2012 00:55:07 6/7/2012 01:01:47 831 3 3 COAL -- MIL6/7/2012 01:11:01 6/7/2012 01:15:24 850 3 3 COAL -- MIL6/7/2012 01:25:14 6/7/2012 01:29:25 819 3 3 COAL -- MIL6/7/2012 01:32:36 6/7/2012 01:36:34 709-- 3 3 COAL -- Harita Para6/7/2012 01:43:45 6/7/2012 01:50:54 710-- 3 3 COAL -- Harita Para6/7/2012 01:44:19 6/7/2012 01:49:41 818 3 3 COAL -- MIL6/7/2012 01:44:49 6/7/2012 01:54:00 707-- 3 3 COAL -- Harita Para6/7/2012 01:52:12 6/7/2012 01:59:15 839 3 3 COAL -- MIL6/7/2012 01:58:01 6/7/2012 02:02:18 833 3 3 COAL -- MIL6/7/2012 01:58:31 6/7/2012 02:02:56 815 3 3 COAL -- MIL6/7/2012 02:00:14 6/7/2012 02:04:34 714-- 3 3 COAL -- Harita Para6/7/2012 02:03:56 6/7/2012 02:07:21 706-- 3 3 COAL -- Harita Para6/7/2012 02:13:00 6/7/2012 02:16:47 829 3 3 COAL -- MIL6/7/2012 02:15:13 6/7/2012 02:23:18 856 3 3 COAL -- MIL6/7/2012 02:20:52 6/7/2012 02:27:07 703-- 3 3 COAL -- Harita Para6/7/2012 02:21:21 6/7/2012 02:28:43 701-- 3 3 COAL -- Harita Para6/7/2012 02:26:11 6/7/2012 02:30:28 851 3 3 COAL -- MIL6/7/2012 02:36:24 6/7/2012 02:40:06 708-- 3 3 COAL -- Harita Para6/7/2012 02:42:17 6/7/2012 02:48:27 852 3 3 COAL -- MIL6/7/2012 02:51:10 6/7/2012 02:55:40 819 3 3 COAL -- MIL6/7/2012 02:52:36 6/7/2012 02:58:09 855 3 3 COAL -- MIL6/7/2012 03:02:29 6/7/2012 03:08:31 853 3 3 COAL -- MIL6/7/2012 03:03:53 6/7/2012 03:12:11 704-- 3 3 COAL -- Harita Para6/7/2012 03:43:15 6/7/2012 03:47:21 713-- 3 3 COAL -- Harita Para6/7/2012 03:48:40 6/7/2012 03:53:57 714-- 3 3 COAL -- Harita Para6/7/2012 03:57:14 6/7/2012 04:01:05 710-- 3 3 COAL -- Harita Para6/7/2012 04:19:29 6/7/2012 04:26:05 852 3 3 COAL -- MIL6/7/2012 07:23:54 6/7/2012 07:31:54 855 3 3 COAL -- MIL6/7/2012 07:35:08 6/7/2012 07:39:39 851 3 3 COAL -- MIL6/7/2012 07:35:32 6/7/2012 07:39:43 853 3 3 COAL -- MIL6/7/2012 07:37:15 6/7/2012 07:41:59 852 3 3 COAL -- MIL6/7/2012 07:38:00 6/7/2012 07:44:13 704-- 3 3 COAL -- Harita Para6/7/2012 07:40:34 6/7/2012 07:46:31 709-- 3 3 COAL -- Harita Para6/7/2012 07:47:16 6/7/2012 07:51:16 836 3 3 COAL -- MIL

Page 19: June Per Shift (Truckscale Port)

6/7/2012 07:47:39 6/7/2012 07:52:55 856 3 3 COAL -- MIL6/7/2012 07:49:53 6/7/2012 07:55:59 713-- 3 3 COAL -- Harita Para6/7/2012 07:51:55 6/7/2012 08:01:50 701-- 3 1 COAL -- Harita Para6/7/2012 07:54:40 6/7/2012 08:04:14 710-- 3 1 COAL -- Harita Para6/7/2012 07:58:37 6/7/2012 08:06:58 706-- 3 1 COAL -- Harita Para6/7/2012 08:02:44 6/7/2012 08:08:37 708-- 1 1 COAL -- Harita Para6/7/2012 08:16:17 6/7/2012 08:20:28 819 1 1 COAL -- MIL6/7/2012 08:17:51 6/7/2012 08:22:53 830 1 1 COAL -- MIL6/7/2012 08:21:15 6/7/2012 08:25:16 714-- 1 1 COAL -- Harita Para6/7/2012 08:25:58 6/7/2012 08:30:53 833 1 1 COAL -- MIL6/7/2012 08:26:57 6/7/2012 08:32:07 702-- 1 1 COAL -- Harita Para6/7/2012 08:29:12 6/7/2012 08:34:12 815 1 1 COAL -- MIL6/7/2012 08:39:19 6/7/2012 08:42:36 703-- 1 1 COAL -- Harita Para6/7/2012 08:39:51 6/7/2012 08:43:59 828 1 1 COAL -- MIL6/7/2012 08:40:15 6/7/2012 08:44:18 850 1 1 COAL -- MIL6/7/2012 08:47:21 6/7/2012 08:51:00 707-- 1 1 COAL -- Harita Para6/7/2012 08:47:46 6/7/2012 08:51:32 868 1 1 COAL -- MIL6/7/2012 08:48:16 6/7/2012 08:56:02 818 1 1 COAL -- MIL6/7/2012 08:58:32 6/7/2012 09:06:54 831 1 1 COAL -- MIL6/7/2012 09:07:53 6/7/2012 09:11:50 704-- 1 1 COAL -- Harita Para6/7/2012 09:08:24 6/7/2012 09:15:42 855 1 1 COAL -- MIL6/7/2012 09:10:10 6/7/2012 09:16:51 709-- 1 1 COAL -- Harita Para6/7/2012 09:17:49 6/7/2012 09:25:09 712-- 1 1 COAL -- Harita Para6/7/2012 09:21:58 6/7/2012 09:26:05 851 1 1 COAL -- MIL6/7/2012 09:22:20 6/7/2012 09:40:12 713-- 1 1 COAL -- Harita Para6/7/2012 09:29:03 6/7/2012 09:42:15 710-- 1 1 COAL -- Harita Para6/7/2012 09:41:44 6/7/2012 09:45:38 853 1 1 COAL -- MIL6/7/2012 09:42:52 6/7/2012 09:47:29 852 1 1 COAL -- MIL6/7/2012 09:57:05 6/7/2012 10:02:04 836 1 1 COAL -- MIL6/7/2012 10:06:42 6/7/2012 10:10:39 706-- 1 1 COAL -- Harita Para6/7/2012 10:09:40 6/7/2012 10:14:25 701-- 1 1 COAL -- Harita Para6/7/2012 10:13:01 6/7/2012 10:17:58 702-- 1 1 COAL -- Harita Para6/7/2012 10:13:43 6/7/2012 10:19:53 714-- 1 1 COAL -- Harita Para6/7/2012 10:22:27 6/7/2012 10:25:52 850 1 1 COAL -- MIL6/7/2012 10:26:47 6/7/2012 10:30:52 707-- 1 1 COAL -- Harita Para6/7/2012 10:30:12 6/7/2012 10:35:19 856 1 1 COAL -- MIL6/7/2012 10:32:16 6/7/2012 10:36:53 838 1 1 COAL -- MIL6/7/2012 10:34:05 6/7/2012 10:38:44 810 1 1 COAL -- MIL6/7/2012 10:43:20 6/7/2012 10:50:17 819 1 1 COAL -- MIL6/7/2012 10:43:38 6/7/2012 10:47:16 704-- 1 1 COAL -- Harita Para6/7/2012 10:51:41 6/7/2012 10:55:46 709-- 1 1 COAL -- Harita Para6/7/2012 10:52:06 6/7/2012 10:56:10 815 1 1 COAL -- MIL6/7/2012 10:59:44 6/7/2012 11:03:40 713-- 1 1 COAL -- Harita Para6/7/2012 11:01:50 6/7/2012 11:05:57 712-- 1 1 COAL -- Harita Para6/7/2012 11:15:22 6/7/2012 11:19:30 818 1 1 COAL -- MIL6/7/2012 11:21:47 6/7/2012 11:25:38 828 1 1 COAL -- MIL6/7/2012 11:27:56 6/7/2012 11:32:33 833 1 1 COAL -- MIL6/7/2012 11:31:44 6/7/2012 11:34:48 868 1 1 COAL -- MIL6/7/2012 11:36:40 6/7/2012 11:42:17 820 1 1 COAL -- MIL6/7/2012 11:40:33 6/7/2012 11:46:50 706-- 1 1 COAL -- Harita Para

Page 20: June Per Shift (Truckscale Port)

6/7/2012 11:41:34 6/7/2012 11:45:04 701-- 1 1 COAL -- Harita Para6/7/2012 11:43:28 6/7/2012 11:48:11 702-- 1 1 COAL -- Harita Para6/7/2012 11:49:17 6/7/2012 11:53:06 714-- 1 1 COAL -- Harita Para6/7/2012 11:56:36 6/7/2012 12:00:03 707-- 1 1 COAL -- Harita Para6/7/2012 11:57:22 6/7/2012 12:02:11 830 1 1 COAL -- MIL6/7/2012 11:57:46 6/7/2012 12:04:57 855 1 1 COAL -- MIL6/7/2012 12:17:45 6/7/2012 12:23:34 851 1 1 COAL -- MIL6/7/2012 12:22:37 6/7/2012 12:26:06 838 1 1 COAL -- MIL6/7/2012 12:22:57 6/7/2012 12:27:55 709-- 1 1 COAL -- Harita Para6/7/2012 12:28:36 6/7/2012 12:35:33 704-- 1 1 COAL -- Harita Para6/7/2012 12:29:52 6/7/2012 12:33:52 853 1 1 COAL -- MIL6/7/2012 12:30:11 6/7/2012 12:35:38 712-- 1 1 COAL -- Harita Para6/7/2012 12:38:39 6/7/2012 12:43:01 852 1 1 COAL -- MIL6/7/2012 12:44:20 6/7/2012 12:48:16 819 1 1 COAL -- MIL6/7/2012 12:44:40 6/7/2012 12:48:49 713-- 1 1 COAL -- Harita Para6/7/2012 12:45:06 6/7/2012 12:50:08 703-- 1 1 COAL -- Harita Para6/7/2012 12:47:17 6/7/2012 12:53:26 856 1 1 COAL -- MIL6/7/2012 12:56:16 6/7/2012 13:00:17 815 1 1 COAL -- MIL6/7/2012 13:14:06 6/7/2012 13:18:40 828 1 1 COAL -- MIL6/7/2012 13:27:26 6/7/2012 13:32:40 706-- 1 1 COAL -- Harita Para6/7/2012 13:30:06 6/7/2012 13:35:25 714-- 1 1 COAL -- Harita Para6/7/2012 13:30:53 6/7/2012 13:37:02 702-- 1 1 COAL -- Harita Para6/7/2012 13:34:27 6/7/2012 13:38:59 707-- 1 1 COAL -- Harita Para6/7/2012 13:49:26 6/7/2012 13:54:20 833 1 1 COAL -- MIL6/7/2012 13:58:19 6/7/2012 14:03:27 836 1 1 COAL -- MIL6/7/2012 14:01:43 6/7/2012 14:05:47 701-- 1 1 COAL -- Harita Para6/7/2012 14:02:46 6/7/2012 14:07:05 820 1 1 COAL -- MIL6/7/2012 14:11:32 6/7/2012 14:16:53 812 1 1 COAL -- MIL6/7/2012 14:13:10 6/7/2012 14:17:52 712-- 1 1 COAL -- Harita Para6/7/2012 14:18:32 6/7/2012 14:22:55 713-- 1 1 COAL -- Harita Para6/7/2012 14:22:10 6/7/2012 14:27:49 830 1 1 COAL -- MIL6/7/2012 14:26:20 6/7/2012 14:30:39 709-- 1 1 COAL -- Harita Para6/7/2012 14:27:06 6/7/2012 14:35:24 810 1 1 COAL -- MIL6/7/2012 14:28:42 6/7/2012 14:34:01 838 1 1 COAL -- MIL6/7/2012 14:32:46 6/7/2012 14:37:26 703-- 1 1 COAL -- Harita Para6/7/2012 14:34:36 6/7/2012 14:40:25 818 1 1 COAL -- MIL6/7/2012 14:36:26 6/7/2012 14:40:55 819 1 1 COAL -- MIL6/7/2012 14:49:41 6/7/2012 14:56:38 855 1 1 COAL -- MIL6/7/2012 14:51:06 6/7/2012 14:55:05 832 1 1 COAL -- MIL6/7/2012 14:53:31 6/7/2012 14:57:53 815 1 1 COAL -- MIL6/7/2012 14:59:42 6/7/2012 15:03:53 714-- 1 1 COAL -- Harita Para6/7/2012 15:00:54 6/7/2012 15:07:34 851 1 1 COAL -- MIL6/7/2012 15:04:51 6/7/2012 15:09:24 828 1 1 COAL -- MIL6/7/2012 15:10:31 6/7/2012 15:14:23 853 1 1 COAL -- MIL6/7/2012 15:10:56 6/7/2012 15:16:36 706-- 1 1 COAL -- Harita Para6/7/2012 15:17:24 6/7/2012 15:21:44 852 1 1 COAL -- MIL6/7/2012 15:21:04 6/7/2012 15:26:34 856 1 1 COAL -- MIL6/7/2012 15:22:39 6/7/2012 15:38:36 707-- 1 1 COAL -- Harita Para6/7/2012 15:33:28 6/7/2012 15:46:31 701-- 1 1 COAL -- Harita Para6/7/2012 15:36:31 6/7/2012 15:47:35 702-- 1 1 COAL -- Harita Para

Page 21: June Per Shift (Truckscale Port)

6/7/2012 15:42:31 6/7/2012 15:47:02 836 1 1 COAL -- MIL6/7/2012 15:42:57 6/7/2012 15:48:20 850 1 1 COAL -- MIL6/7/2012 15:44:51 6/7/2012 15:49:25 704-- 1 1 COAL -- Harita Para6/7/2012 15:52:32 6/7/2012 15:56:28 812 1 1 COAL -- MIL6/7/2012 15:53:17 6/7/2012 15:58:51 712-- 1 1 COAL -- Harita Para6/7/2012 16:02:44 6/7/2012 16:06:45 830 2 2 COAL -- MIL6/7/2012 16:04:32 6/7/2012 16:08:13 810 2 2 COAL -- MIL6/7/2012 16:17:48 6/7/2012 16:21:36 838 2 2 COAL -- MIL6/7/2012 18:21:30 6/7/2012 18:24:55 704-- 2 2 COAL -- Harita Para6/7/2012 18:29:11 6/7/2012 18:33:23 701-- 2 2 COAL -- Harita Para6/7/2012 18:30:38 6/7/2012 18:36:29 703-- 2 2 COAL -- Harita Para6/7/2012 18:35:40 6/7/2012 18:40:57 713-- 2 2 COAL -- Harita Para6/7/2012 18:39:11 6/7/2012 18:42:37 709-- 2 2 COAL -- Harita Para6/7/2012 18:39:42 6/7/2012 18:49:41 712-- 2 2 COAL -- Harita Para6/7/2012 18:40:05 6/7/2012 18:47:28 710-- 2 2 COAL -- Harita Para6/7/2012 18:45:55 6/7/2012 18:50:07 706-- 2 2 COAL -- Harita Para6/7/2012 18:52:29 6/7/2012 18:57:21 707-- 2 2 COAL -- Harita Para6/7/2012 19:01:50 6/7/2012 19:05:43 818 2 2 COAL -- MIL6/7/2012 19:06:42 6/7/2012 19:13:28 856 2 2 COAL -- MIL6/7/2012 19:07:47 6/7/2012 19:12:30 819 2 2 COAL -- MIL6/7/2012 19:09:41 6/7/2012 19:15:15 851 2 2 COAL -- MIL6/7/2012 19:10:08 6/7/2012 19:21:36 855 2 2 COAL -- MIL6/7/2012 19:10:27 6/7/2012 19:21:38 852 2 2 COAL -- MIL6/7/2012 19:18:09 6/7/2012 19:22:51 830 2 2 COAL -- MIL6/7/2012 19:23:36 6/7/2012 19:27:43 850 2 2 COAL -- MIL6/7/2012 19:42:08 6/7/2012 19:48:58 853 2 2 COAL -- MIL6/7/2012 19:42:33 6/7/2012 19:50:27 702-- 2 2 COAL -- Harita Para6/7/2012 19:49:47 6/7/2012 19:53:19 704-- 2 2 COAL -- Harita Para6/7/2012 20:04:12 6/7/2012 20:09:00 701-- 2 2 COAL -- Harita Para6/7/2012 20:12:57 6/7/2012 20:17:04 703-- 2 2 COAL -- Harita Para6/7/2012 20:13:28 6/7/2012 20:17:46 812 2 2 COAL -- MIL6/7/2012 20:13:50 6/7/2012 20:18:54 709-- 2 2 COAL -- Harita Para6/7/2012 20:25:56 6/7/2012 20:29:29 706-- 2 2 COAL -- Harita Para6/7/2012 20:40:09 6/7/2012 20:47:54 707-- 2 2 COAL -- Harita Para6/7/2012 20:40:45 6/7/2012 20:48:43 710-- 2 2 COAL -- Harita Para6/7/2012 20:41:12 6/7/2012 20:45:30 818 2 2 COAL -- MIL6/7/2012 20:44:31 6/7/2012 20:49:16 820 2 2 COAL -- MIL6/7/2012 20:46:37 6/7/2012 20:51:28 832 2 2 COAL -- MIL6/7/2012 20:47:03 6/7/2012 20:53:47 819 2 2 COAL -- MIL6/7/2012 20:52:22 6/7/2012 20:56:27 868 2 2 COAL -- MIL6/7/2012 21:15:07 6/7/2012 21:18:38 838 2 2 COAL -- MIL6/7/2012 21:16:41 6/7/2012 21:20:47 702-- 2 2 COAL -- Harita Para6/7/2012 21:17:11 6/7/2012 21:22:53 714-- 2 2 COAL -- Harita Para6/7/2012 21:19:24 6/7/2012 21:23:38 852 2 2 COAL -- MIL6/7/2012 21:21:23 6/7/2012 21:25:30 704-- 2 2 COAL -- Harita Para6/7/2012 21:27:58 6/7/2012 21:32:09 837 2 2 COAL -- MIL6/7/2012 21:34:36 6/7/2012 21:38:53 851 2 2 COAL -- MIL6/7/2012 21:35:12 6/7/2012 21:42:36 701-- 2 2 COAL -- Harita Para6/7/2012 21:37:19 6/7/2012 21:43:57 850 2 2 COAL -- MIL6/7/2012 21:41:08 6/7/2012 21:46:43 855 2 2 COAL -- MIL

Page 22: June Per Shift (Truckscale Port)

6/7/2012 21:41:27 6/7/2012 21:48:08 709-- 2 2 COAL -- Harita Para6/7/2012 21:41:49 6/7/2012 21:45:16 815 2 2 COAL -- MIL6/7/2012 21:50:08 6/7/2012 21:54:37 812 2 2 COAL -- MIL6/7/2012 21:53:00 6/7/2012 21:58:31 853 2 2 COAL -- MIL6/7/2012 21:53:20 6/7/2012 22:00:47 703-- 2 2 COAL -- Harita Para6/7/2012 21:53:44 6/7/2012 22:02:14 706-- 2 2 COAL -- Harita Para6/7/2012 22:16:59 6/7/2012 22:21:31 708-- 2 2 COAL -- Harita Para6/7/2012 22:20:19 6/7/2012 22:23:57 818 2 2 COAL -- MIL6/7/2012 22:27:59 6/7/2012 22:33:14 707-- 2 2 COAL -- Harita Para6/7/2012 22:31:54 6/7/2012 22:37:05 710-- 2 2 COAL -- Harita Para6/7/2012 22:32:24 6/7/2012 22:37:25 820 2 2 COAL -- MIL6/7/2012 22:36:15 6/7/2012 22:40:59 819 2 2 COAL -- MIL6/7/2012 22:38:11 6/7/2012 22:42:22 832 2 2 COAL -- MIL6/7/2012 22:40:11 6/7/2012 22:44:42 712-- 2 2 COAL -- Harita Para6/7/2012 22:47:31 6/7/2012 22:51:31 856 2 2 COAL -- MIL6/7/2012 22:49:07 6/7/2012 22:54:35 702-- 2 2 COAL -- Harita Para6/7/2012 22:50:14 6/7/2012 22:54:53 852 2 2 COAL -- MIL6/7/2012 22:52:33 6/7/2012 22:56:39 868 2 2 COAL -- MIL6/7/2012 22:52:56 6/7/2012 22:58:30 714-- 2 2 COAL -- Harita Para6/7/2012 22:59:31 6/7/2012 23:03:59 704-- 2 2 COAL -- Harita Para6/7/2012 23:06:10 6/7/2012 23:09:56 838 2 2 COAL -- MIL6/7/2012 23:11:32 6/7/2012 23:17:34 855 2 2 COAL -- MIL6/7/2012 23:21:28 6/7/2012 23:26:27 810 2 2 COAL -- MIL6/7/2012 23:25:26 6/7/2012 23:29:07 837 2 2 COAL -- MIL6/7/2012 23:32:30 6/7/2012 23:37:26 851 2 2 COAL -- MIL6/7/2012 23:32:48 6/7/2012 23:38:33 706-- 2 2 COAL -- Harita Para6/7/2012 23:39:18 6/7/2012 23:43:21 830 2 2 COAL -- MIL6/7/2012 23:39:49 6/7/2012 23:46:08 701-- 2 2 COAL -- Harita Para6/7/2012 23:44:18 6/7/2012 23:49:47 703-- 2 2 COAL -- Harita Para6/7/2012 23:47:17 6/7/2012 23:52:30 709-- 2 2 COAL -- Harita Para6/7/2012 23:48:22 6/7/2012 23:55:47 853 2 2 COAL -- MIL6/7/2012 23:50:54 6/7/2012 23:55:28 812 2 2 COAL -- MIL6/8/2012 00:19:11 6/8/2012 00:24:12 712-- 3 3 COAL -- Harita Para6/8/2012 00:23:10 6/8/2012 00:27:53 852 3 3 COAL -- MIL6/8/2012 00:23:28 6/8/2012 00:30:59 856 3 3 COAL -- MIL6/8/2012 00:25:07 6/8/2012 00:33:50 707-- 3 3 COAL -- Harita Para6/8/2012 00:25:34 6/8/2012 00:29:55 850 3 3 COAL -- MIL6/8/2012 00:51:25 6/8/2012 00:56:27 832 3 3 COAL -- MIL6/8/2012 00:55:29 6/8/2012 01:00:34 820 3 3 COAL -- MIL6/8/2012 00:58:40 6/8/2012 01:02:19 704-- 3 3 COAL -- Harita Para6/8/2012 01:03:17 6/8/2012 01:09:23 855 3 3 COAL -- MIL6/8/2012 01:05:23 6/8/2012 01:09:42 819 3 3 COAL -- MIL6/8/2012 01:06:12 6/8/2012 01:10:58 702-- 3 3 COAL -- Harita Para6/8/2012 01:08:47 6/8/2012 01:12:48 714-- 3 3 COAL -- Harita Para6/8/2012 01:20:19 6/8/2012 01:25:26 810 3 3 COAL -- MIL6/8/2012 01:22:28 6/8/2012 01:28:35 851 3 3 COAL -- MIL6/8/2012 01:45:10 6/8/2012 01:48:52 837 3 3 COAL -- MIL6/8/2012 01:46:23 6/8/2012 01:50:26 710-- 3 3 COAL -- Harita Para6/8/2012 01:49:34 6/8/2012 01:53:13 706-- 3 3 COAL -- Harita Para6/8/2012 01:55:49 6/8/2012 02:00:07 818 3 3 COAL -- MIL

Page 23: June Per Shift (Truckscale Port)

6/8/2012 01:56:33 6/8/2012 02:02:24 701-- 3 3 COAL -- Harita Para6/8/2012 02:00:55 6/8/2012 02:07:10 812 3 3 COAL -- MIL6/8/2012 02:01:12 6/8/2012 02:06:00 852 3 3 COAL -- MIL6/8/2012 02:01:30 6/8/2012 02:06:04 856 3 3 COAL -- MIL6/8/2012 02:13:55 6/8/2012 02:19:37 709-- 3 3 COAL -- Harita Para6/8/2012 02:17:27 6/8/2012 02:19:40 703-- 3 3 COAL -- Harita Para6/8/2012 02:22:41 6/8/2012 02:27:30 707-- 3 3 COAL -- Harita Para6/8/2012 02:22:56 6/8/2012 02:26:53 830 3 3 COAL -- MIL6/8/2012 02:39:36 6/8/2012 02:46:07 820 3 3 COAL -- MIL6/8/2012 02:40:44 6/8/2012 02:46:46 855 3 3 COAL -- MIL6/8/2012 02:41:22 6/8/2012 02:55:42 702-- 3 3 COAL -- Harita Para6/8/2012 02:55:00 6/8/2012 03:00:19 851 3 3 COAL -- MIL6/8/2012 03:19:06 6/8/2012 03:24:18 810 3 3 COAL -- MIL6/8/2012 03:22:22 6/8/2012 03:26:23 710-- 3 3 COAL -- Harita Para6/8/2012 03:36:07 6/8/2012 03:41:34 852 3 3 COAL -- MIL6/8/2012 03:37:49 6/8/2012 03:43:51 850 3 3 COAL -- MIL6/8/2012 04:02:50 6/8/2012 04:06:49 868 3 3 COAL -- MIL6/8/2012 04:03:18 6/8/2012 04:07:14 837 3 3 COAL -- MIL6/8/2012 04:03:46 6/8/2012 04:09:04 856 3 3 COAL -- MIL6/8/2012 06:49:07 6/8/2012 06:52:44 707-- 3 3 COAL -- Harita Para6/8/2012 07:11:28 6/8/2012 07:19:25 855 3 3 COAL -- MIL6/8/2012 07:16:55 6/8/2012 07:20:43 703-- 3 3 COAL -- Harita Para6/8/2012 07:17:16 6/8/2012 07:22:38 852 3 3 COAL -- MIL6/8/2012 07:17:39 6/8/2012 07:21:54 820 3 3 COAL -- MIL6/8/2012 07:18:00 6/8/2012 07:23:51 850 3 3 COAL -- MIL6/8/2012 07:18:43 6/8/2012 07:23:15 704-- 3 3 COAL -- Harita Para6/8/2012 07:20:06 6/8/2012 07:25:27 709-- 3 3 COAL -- Harita Para6/8/2012 07:21:18 6/8/2012 07:28:26 710-- 3 3 COAL -- Harita Para6/8/2012 07:24:51 6/8/2012 07:30:02 812 3 3 COAL -- MIL6/8/2012 07:29:23 6/8/2012 07:35:52 856 3 3 COAL -- MIL6/8/2012 07:30:42 6/8/2012 07:34:18 702-- 3 3 COAL -- Harita Para6/8/2012 07:32:19 6/8/2012 07:38:07 714-- 3 3 COAL -- Harita Para6/8/2012 07:36:26 6/8/2012 07:41:52 712-- 3 3 COAL -- Harita Para6/8/2012 07:49:17 6/8/2012 07:53:07 819 3 3 COAL -- MIL6/8/2012 07:50:03 6/8/2012 07:55:51 831 3 3 COAL -- MIL6/8/2012 07:51:40 6/8/2012 07:56:10 713-- 3 3 COAL -- Harita Para

6/8/2012 08:09:28 6/8/2012 08:14:41 706-- 1 1 COAL -- Harita Par6/8/2012 08:12:51 6/8/2012 08:16:30 707-- 1 1 COAL -- Harita Par6/8/2012 08:23:58 6/8/2012 08:28:10 830 1 1 COAL -- MIL6/8/2012 08:30:51 6/8/2012 08:34:36 810 1 1 COAL -- MIL6/8/2012 08:31:15 6/8/2012 08:35:43 868 1 1 COAL -- MIL6/8/2012 08:32:40 6/8/2012 08:36:03 837 1 1 COAL -- MIL6/8/2012 08:37:53 6/8/2012 08:41:59 852 1 1 COAL -- MIL6/8/2012 08:38:21 6/8/2012 08:45:21 701-- 1 1 COAL -- Harita Par6/8/2012 08:42:38 6/8/2012 08:47:55 703-- 1 1 COAL -- Harita Par6/8/2012 08:46:12 6/8/2012 08:50:31 836 1 1 COAL -- MIL6/8/2012 08:46:44 6/8/2012 08:54:57 855 1 1 COAL -- MIL6/8/2012 08:47:06 6/8/2012 08:55:24 704-- 1 1 COAL -- Harita Par

Page 24: June Per Shift (Truckscale Port)

6/8/2012 08:51:14 6/8/2012 08:57:35 709-- 1 1 COAL -- Harita Par6/8/2012 08:56:12 6/8/2012 09:00:20 710-- 1 1 COAL -- Harita Par6/8/2012 08:59:42 6/8/2012 09:04:06 702-- 1 1 COAL -- Harita Par6/8/2012 09:01:05 6/8/2012 09:05:38 820 1 1 COAL -- MIL6/8/2012 09:03:23 6/8/2012 09:08:42 856 1 1 COAL -- MIL6/8/2012 09:04:52 6/8/2012 09:12:48 714-- 1 1 COAL -- Harita Par6/8/2012 09:10:45 6/8/2012 09:15:21 817 1 1 COAL -- MIL6/8/2012 09:11:12 6/8/2012 09:15:00 809 1 1 COAL -- MIL6/8/2012 09:11:59 6/8/2012 09:16:46 850 1 1 COAL -- MIL6/8/2012 09:17:19 6/8/2012 09:21:12 713-- 1 1 COAL -- Harita Par6/8/2012 09:24:22 6/8/2012 09:30:03 851 1 1 COAL -- MIL6/8/2012 09:25:14 6/8/2012 09:29:44 832 1 1 COAL -- MIL6/8/2012 09:26:17 6/8/2012 09:30:23 812 1 1 COAL -- MIL6/8/2012 09:33:41 6/8/2012 09:41:05 819 1 1 COAL -- MIL6/8/2012 09:37:03 6/8/2012 09:40:47 707-- 1 1 COAL -- Harita Par6/8/2012 09:42:49 6/8/2012 09:46:50 706-- 1 1 COAL -- Harita Par6/8/2012 09:57:18 6/8/2012 10:02:05 831 1 1 COAL -- MIL6/8/2012 10:02:47 6/8/2012 10:07:00 830 1 1 COAL -- MIL6/8/2012 10:03:29 6/8/2012 10:06:30 868 1 1 COAL -- MIL6/8/2012 10:08:49 6/8/2012 10:12:40 701-- 1 1 COAL -- Harita Par6/8/2012 10:13:49 6/8/2012 10:17:48 703-- 1 1 COAL -- Harita Par6/8/2012 10:14:51 6/8/2012 10:18:55 810 1 1 COAL -- MIL6/8/2012 10:15:31 6/8/2012 10:19:22 837 1 1 COAL -- MIL6/8/2012 10:16:03 6/8/2012 10:20:36 704-- 1 1 COAL -- Harita Par6/8/2012 10:16:31 6/8/2012 10:22:26 852 1 1 COAL -- MIL6/8/2012 10:21:29 6/8/2012 10:25:13 709-- 1 1 COAL -- Harita Par6/8/2012 10:25:55 6/8/2012 10:29:32 836 1 1 COAL -- MIL6/8/2012 10:26:24 6/8/2012 10:39:42 855 1 1 COAL -- MIL6/8/2012 10:26:49 6/8/2012 10:31:29 820 1 1 COAL -- MIL6/8/2012 10:33:42 6/8/2012 10:40:22 856 1 1 COAL -- MIL6/8/2012 10:35:30 6/8/2012 10:40:02 850 1 1 COAL -- MIL6/8/2012 10:36:56 6/8/2012 10:41:05 714-- 1 1 COAL -- Harita Par6/8/2012 10:39:03 6/8/2012 10:42:26 702-- 1 1 COAL -- Harita Par6/8/2012 10:44:15 6/8/2012 10:47:24 710-- 1 1 COAL -- Harita Par6/8/2012 10:50:55 6/8/2012 10:54:43 832 1 1 COAL -- MIL6/8/2012 10:51:28 6/8/2012 10:55:42 713-- 1 1 COAL -- Harita Par6/8/2012 11:01:42 6/8/2012 11:05:41 812 1 1 COAL -- MIL6/8/2012 11:14:32 6/8/2012 11:20:39 809 1 1 COAL -- MIL6/8/2012 11:15:02 6/8/2012 11:20:58 851 1 1 COAL -- MIL6/8/2012 11:15:20 6/8/2012 11:21:27 819 1 1 COAL -- MIL6/8/2012 11:24:03 6/8/2012 11:28:25 818 1 1 COAL -- MIL6/8/2012 11:25:30 6/8/2012 11:28:59 868 1 1 COAL -- MIL6/8/2012 11:27:32 6/8/2012 11:31:11 701-- 1 1 COAL -- Harita Par

Page 25: June Per Shift (Truckscale Port)

6/8/2012 11:41:54 6/8/2012 11:46:24 852 1 1 COAL -- MIL6/8/2012 11:52:37 6/8/2012 11:56:18 714-- 1 1 COAL -- Harita Par6/8/2012 11:56:55 6/8/2012 12:01:27 853 1 1 COAL -- MIL6/8/2012 12:00:59 6/8/2012 12:10:24 856 1 1 COAL -- MIL6/8/2012 12:02:56 6/8/2012 12:07:09 830 1 1 COAL -- MIL6/8/2012 12:13:49 6/8/2012 12:18:30 831 1 1 COAL -- MIL6/8/2012 12:16:22 6/8/2012 12:24:06 855 1 1 COAL -- MIL6/8/2012 12:23:18 6/8/2012 12:28:44 836 1 1 COAL -- MIL6/8/2012 12:27:43 6/8/2012 12:31:57 810 1 1 COAL -- MIL6/8/2012 12:32:49 6/8/2012 12:36:28 820 1 1 COAL -- MIL6/8/2012 12:45:16 6/8/2012 12:48:17 868 1 1 COAL -- MIL6/8/2012 12:51:14 6/8/2012 12:55:35 828 1 1 COAL -- MIL6/8/2012 12:54:50 6/8/2012 13:00:03 809 1 1 COAL -- MIL6/8/2012 13:02:09 6/8/2012 13:05:49 850 1 1 COAL -- MIL6/8/2012 13:14:02 6/8/2012 13:17:27 710-- 1 1 COAL -- Harita Par6/8/2012 13:15:21 6/8/2012 13:18:53 708-- 1 1 COAL -- Harita Par6/8/2012 13:29:36 6/8/2012 13:33:39 703-- 1 1 COAL -- Harita Par6/8/2012 13:32:55 6/8/2012 13:38:19 819 1 1 COAL -- MIL6/8/2012 13:36:14 6/8/2012 13:40:01 709-- 1 1 COAL -- Harita Par6/8/2012 13:37:09 6/8/2012 13:41:38 853 1 1 COAL -- MIL6/8/2012 13:37:34 6/8/2012 13:42:26 702-- 1 1 COAL -- Harita Par6/8/2012 13:41:04 6/8/2012 13:45:44 852 1 1 COAL -- MIL6/8/2012 13:54:16 6/8/2012 14:00:37 855 1 1 COAL -- MIL6/8/2012 13:56:47 6/8/2012 14:01:22 830 1 1 COAL -- MIL6/8/2012 13:59:23 6/8/2012 14:03:28 713-- 1 1 COAL -- Harita Par6/8/2012 14:10:01 6/8/2012 14:14:24 836 1 1 COAL -- MIL6/8/2012 14:10:29 6/8/2012 14:21:00 856 1 1 COAL -- MIL6/8/2012 14:13:42 6/8/2012 14:18:22 812 1 1 COAL -- MIL6/8/2012 14:17:37 6/8/2012 14:21:36 714-- 1 1 COAL -- Harita Par6/8/2012 14:19:35 6/8/2012 14:22:57 713-- 1 1 COAL -- Harita Par6/8/2012 14:27:35 6/8/2012 14:31:30 820 1 1 COAL -- MIL6/8/2012 14:34:50 6/8/2012 14:40:19 851 1 1 COAL -- MIL6/8/2012 14:37:08 6/8/2012 14:40:25 810 1 1 COAL -- MIL6/8/2012 14:46:35 6/8/2012 14:49:57 710-- 1 1 COAL -- Harita Par6/8/2012 14:52:29 6/8/2012 14:55:21 868 1 1 COAL -- MIL6/8/2012 14:57:20 6/8/2012 15:01:07 702-- 1 1 COAL -- Harita Par6/8/2012 14:59:15 6/8/2012 15:03:31 828 1 1 COAL -- MIL6/8/2012 15:00:23 6/8/2012 15:09:23 809 1 1 COAL -- MIL6/8/2012 15:02:01 6/8/2012 15:05:39 709-- 1 1 COAL -- Harita Par6/8/2012 15:02:24 6/8/2012 15:08:42 850 1 1 COAL -- MIL6/8/2012 15:11:49 6/8/2012 15:16:38 703-- 1 1 COAL -- Harita Par6/8/2012 15:15:58 6/8/2012 15:21:26 853 1 1 COAL -- MIL6/8/2012 15:20:53 6/8/2012 15:25:31 713-- 1 1 COAL -- Harita Par

Page 26: June Per Shift (Truckscale Port)

6/8/2012 15:24:28 6/8/2012 15:29:05 832 1 1 COAL -- MIL6/8/2012 15:46:36 6/8/2012 16:04:05 856 1 2 COAL -- MIL6/8/2012 15:58:24 6/8/2012 16:03:01 831 1 2 COAL -- MIL6/8/2012 16:31:50 6/8/2012 16:34:57 868 2 2 COAL -- MIL6/8/2012 18:18:36 6/8/2012 18:22:39 709-- 2 2 COAL -- Harita Par6/8/2012 18:27:44 6/8/2012 18:31:08 704-- 2 2 COAL -- Harita Par6/8/2012 18:32:01 6/8/2012 18:36:43 703-- 2 2 COAL -- Harita Par6/8/2012 18:35:08 6/8/2012 18:41:18 855 2 2 COAL -- MIL6/8/2012 18:39:30 6/8/2012 18:47:10 713-- 2 2 COAL -- Harita Par6/8/2012 18:44:44 6/8/2012 18:48:44 706-- 2 2 COAL -- Harita Par6/8/2012 18:50:18 6/8/2012 18:54:25 712-- 2 2 COAL -- Harita Par6/8/2012 18:50:40 6/8/2012 18:56:34 701-- 2 2 COAL -- Harita Par6/8/2012 18:57:26 6/8/2012 19:01:11 710-- 2 2 COAL -- Harita Par6/8/2012 19:03:30 6/8/2012 19:07:47 714-- 2 2 COAL -- Harita Par6/8/2012 19:14:44 6/8/2012 19:18:22 830 2 2 COAL -- MIL6/8/2012 19:22:24 6/8/2012 19:27:07 850 2 2 COAL -- MIL6/8/2012 19:25:30 6/8/2012 19:30:38 856 2 2 COAL -- MIL6/8/2012 19:27:50 6/8/2012 19:32:51 851 2 2 COAL -- MIL6/8/2012 19:28:30 6/8/2012 19:36:04 812 2 2 COAL -- MIL6/8/2012 19:34:43 6/8/2012 19:40:15 708-- 2 2 COAL -- Harita Par6/8/2012 19:35:16 6/8/2012 19:40:45 852 2 2 COAL -- MIL6/8/2012 19:38:49 6/8/2012 19:43:03 815 2 2 COAL -- MIL6/8/2012 19:39:29 6/8/2012 19:44:43 818 2 2 COAL -- MIL6/8/2012 19:47:06 6/8/2012 19:53:53 828 2 2 COAL -- MIL6/8/2012 19:47:39 6/8/2012 19:59:14 853 2 2 COAL -- MIL6/8/2012 19:47:56 6/8/2012 19:53:29 709-- 2 2 COAL -- Harita Par6/8/2012 19:51:08 6/8/2012 20:00:09 705-- 2 2 COAL -- Harita Par6/8/2012 19:52:34 6/8/2012 19:59:18 810 2 2 COAL -- MIL6/8/2012 19:55:52 6/8/2012 20:42:27 809 2 2 COAL -- MIL6/8/2012 19:57:01 6/8/2012 20:04:06 832 2 2 COAL -- MIL6/8/2012 19:57:51 6/8/2012 20:02:47 704-- 2 2 COAL -- Harita Par6/8/2012 19:58:26 6/8/2012 20:05:45 831 2 2 COAL -- MIL6/8/2012 20:06:39 6/8/2012 20:10:52 837 2 2 COAL -- MIL6/8/2012 20:07:16 6/8/2012 20:12:22 703-- 2 2 COAL -- Harita Par6/8/2012 20:11:33 6/8/2012 20:12:25 706-- 2 2 COAL -- Harita Par6/8/2012 20:13:51 6/8/2012 20:19:53 829 2 2 COAL -- MIL6/8/2012 20:25:22 6/8/2012 20:30:34 701-- 2 2 COAL -- Harita Par6/8/2012 20:29:23 6/8/2012 20:33:52 707-- 2 2 COAL -- Harita Par6/8/2012 20:29:44 6/8/2012 20:33:55 712-- 2 2 COAL -- Harita Par6/8/2012 20:39:11 6/8/2012 20:42:30 868 2 2 COAL -- MIL6/8/2012 20:44:05 6/8/2012 20:48:47 710-- 2 2 COAL -- Harita Par6/8/2012 20:45:33 6/8/2012 20:51:33 855 2 2 COAL -- MIL6/8/2012 20:46:23 6/8/2012 20:51:14 714-- 2 2 COAL -- Harita Par

Page 27: June Per Shift (Truckscale Port)

6/8/2012 20:52:19 6/8/2012 20:57:03 817 2 2 COAL -- MIL6/8/2012 20:52:42 6/8/2012 20:56:42 713-- 2 2 COAL -- Harita Par6/8/2012 21:11:19 6/8/2012 21:17:10 852 2 2 COAL -- MIL6/8/2012 21:13:47 6/8/2012 21:18:34 708-- 2 2 COAL -- Harita Par6/8/2012 21:14:29 6/8/2012 21:20:01 812 2 2 COAL -- MIL6/8/2012 21:23:03 6/8/2012 21:29:22 851 2 2 COAL -- MIL6/8/2012 21:28:40 6/8/2012 21:32:50 709-- 2 2 COAL -- Harita Par6/8/2012 21:33:38 6/8/2012 21:37:16 704-- 2 2 COAL -- Harita Par6/8/2012 21:37:56 6/8/2012 21:45:13 856 2 2 COAL -- MIL6/8/2012 21:44:12 6/8/2012 21:48:01 706-- 2 2 COAL -- Harita Par6/8/2012 21:44:40 6/8/2012 21:48:36 815 2 2 COAL -- MIL6/8/2012 21:49:18 6/8/2012 21:54:49 853 2 2 COAL -- MIL6/8/2012 21:53:00 6/8/2012 21:57:43 703-- 2 2 COAL -- Harita Par6/8/2012 21:53:34 6/8/2012 21:58:08 818 2 2 COAL -- MIL6/8/2012 22:02:09 6/8/2012 22:06:01 701-- 2 2 COAL -- Harita Par6/8/2012 22:10:25 6/8/2012 22:13:38 868 2 2 COAL -- MIL6/8/2012 22:11:10 6/8/2012 22:16:30 707-- 2 2 COAL -- Harita Par6/8/2012 22:12:01 6/8/2012 22:18:18 712-- 2 2 COAL -- Harita Par6/8/2012 22:14:26 6/8/2012 22:18:44 850 2 2 COAL -- MIL6/8/2012 22:25:55 6/8/2012 22:29:35 837 2 2 COAL -- MIL6/8/2012 22:26:25 6/8/2012 22:31:21 809 2 2 COAL -- MIL6/8/2012 22:30:42 6/8/2012 22:34:46 832 2 2 COAL -- MIL6/8/2012 22:33:21 6/8/2012 22:37:35 714-- 2 2 COAL -- Harita Par6/8/2012 22:33:42 6/8/2012 22:37:37 713-- 2 2 COAL -- Harita Par6/8/2012 22:34:03 6/8/2012 22:39:31 710-- 2 2 COAL -- Harita Par6/8/2012 22:36:29 6/8/2012 22:42:51 855 2 2 COAL -- MIL6/8/2012 22:38:34 6/8/2012 22:44:49 828 2 2 COAL -- MIL6/8/2012 22:53:33 6/8/2012 22:58:28 708-- 2 2 COAL -- Harita Par6/8/2012 22:54:06 6/8/2012 22:59:42 810 2 2 COAL -- MIL6/8/2012 22:55:28 6/8/2012 22:58:31 709-- 2 2 COAL -- Harita Par6/8/2012 22:56:04 6/8/2012 23:00:27 829 2 2 COAL -- MIL6/8/2012 23:01:05 6/8/2012 23:04:38 704-- 2 2 COAL -- Harita Par6/8/2012 23:06:20 6/8/2012 23:11:41 852 2 2 COAL -- MIL6/8/2012 23:12:32 6/8/2012 23:25:16 815 2 2 COAL -- MIL6/8/2012 23:13:29 6/8/2012 23:19:07 831 2 2 COAL -- MIL6/8/2012 23:18:20 6/8/2012 23:22:24 706-- 2 2 COAL -- Harita Par6/8/2012 23:20:05 6/8/2012 23:25:11 812 2 2 COAL -- MIL6/8/2012 23:20:54 6/8/2012 23:25:52 818 2 2 COAL -- MIL6/8/2012 23:27:25 6/8/2012 23:31:51 703-- 2 2 COAL -- Harita Par6/8/2012 23:29:01 6/8/2012 23:34:43 851 2 2 COAL -- MIL6/8/2012 23:39:32 6/8/2012 23:44:48 856 2 2 COAL -- MIL6/8/2012 23:39:49 6/8/2012 23:43:29 705-- 2 2 COAL -- Harita Par6/8/2012 23:47:13 6/8/2012 23:51:33 701-- 2 2 COAL -- Harita Par

Page 28: June Per Shift (Truckscale Port)

6/8/2012 23:52:18 6/8/2012 23:58:25 853 2 2 COAL -- MIL6/9/2012 00:00:38 6/9/2012 00:05:06 850 3 3 COAL -- MIL6/9/2012 00:09:50 6/9/2012 00:14:00 713-- 3 3 COAL -- Harita Par6/9/2012 00:18:53 6/9/2012 00:23:21 832 3 3 COAL -- MIL6/9/2012 00:20:39 6/9/2012 00:27:50 837 3 3 COAL -- MIL6/9/2012 00:26:21 6/9/2012 00:30:47 707-- 3 3 COAL -- Harita Par6/9/2012 00:26:39 6/9/2012 00:30:29 868 3 3 COAL -- MIL6/9/2012 00:29:35 6/9/2012 00:34:40 709-- 3 3 COAL -- Harita Par6/9/2012 00:37:10 6/9/2012 00:42:57 855 3 3 COAL -- MIL6/9/2012 00:40:39 6/9/2012 00:45:02 706-- 3 3 COAL -- Harita Par6/9/2012 00:44:29 6/9/2012 00:53:56 852 3 3 COAL -- MIL6/9/2012 00:52:24 6/9/2012 01:01:42 712-- 3 3 COAL -- Harita Par6/9/2012 00:55:36 6/9/2012 01:00:28 828 3 3 COAL -- MIL6/9/2012 00:58:27 6/9/2012 01:02:22 704-- 3 3 COAL -- Harita Par6/9/2012 01:09:34 6/9/2012 01:14:51 714-- 3 3 COAL -- Harita Par6/9/2012 01:09:57 6/9/2012 01:17:13 710-- 3 3 COAL -- Harita Par6/9/2012 01:13:58 6/9/2012 01:19:57 810 3 3 COAL -- MIL6/9/2012 01:28:39 6/9/2012 01:33:24 831 3 3 COAL -- MIL6/9/2012 01:31:00 6/9/2012 01:38:00 708-- 3 3 COAL -- Harita Par6/9/2012 01:36:22 6/9/2012 01:42:33 812 3 3 COAL -- MIL6/9/2012 01:36:59 6/9/2012 01:42:50 851 3 3 COAL -- MIL6/9/2012 01:39:59 6/9/2012 01:44:18 818 3 3 COAL -- MIL6/9/2012 01:40:35 6/9/2012 01:44:53 815 3 3 COAL -- MIL6/9/2012 01:46:23 6/9/2012 01:51:25 856 3 3 COAL -- MIL6/9/2012 01:49:58 6/9/2012 01:54:41 703-- 3 3 COAL -- Harita Par6/9/2012 02:12:28 6/9/2012 02:16:27 837 3 3 COAL -- MIL6/9/2012 02:17:16 6/9/2012 02:21:30 868 3 3 COAL -- MIL6/9/2012 02:29:41 6/9/2012 02:35:30 709-- 3 3 COAL -- Harita Par6/9/2012 02:31:22 6/9/2012 02:37:49 855 3 3 COAL -- MIL6/9/2012 02:33:02 6/9/2012 02:38:06 832 3 3 COAL -- MIL6/9/2012 02:33:28 6/9/2012 02:38:58 850 3 3 COAL -- MIL6/9/2012 02:33:49 6/9/2012 02:42:38 853 3 3 COAL -- MIL6/9/2012 02:34:39 6/9/2012 02:39:53 701-- 3 3 COAL -- Harita Par6/9/2012 02:37:07 6/9/2012 02:55:41 839 3 3 COAL -- MIL6/9/2012 02:40:44 6/9/2012 02:45:35 707-- 3 3 COAL -- Harita Par6/9/2012 02:43:32 6/9/2012 02:47:56 713-- 3 3 COAL -- Harita Par6/9/2012 02:58:46 6/9/2012 03:05:00 810 3 3 COAL -- MIL6/9/2012 03:25:15 6/9/2012 03:30:01 831 3 3 COAL -- MIL6/9/2012 04:53:52 6/9/2012 04:58:24 828 3 3 COAL -- MIL6/9/2012 06:54:36 6/9/2012 06:58:25 707-- 3 3 COAL -- Harita Par6/9/2012 07:13:47 6/9/2012 07:17:22 708-- 3 3 COAL -- Harita Par6/9/2012 07:22:34 6/9/2012 07:28:04 851 3 3 COAL -- MIL6/9/2012 07:25:12 6/9/2012 07:30:20 818 3 3 COAL -- MIL

Page 29: June Per Shift (Truckscale Port)

6/9/2012 07:25:34 6/9/2012 07:34:08 856 3 3 COAL -- MIL6/9/2012 07:28:42 6/9/2012 07:34:26 853 3 3 COAL -- MIL6/9/2012 07:29:42 6/9/2012 07:41:41 855 3 3 COAL -- MIL6/9/2012 07:32:31 6/9/2012 07:41:59 839 3 3 COAL -- MIL6/9/2012 07:33:27 6/9/2012 07:45:36 812 3 3 COAL -- MIL6/9/2012 07:37:41 6/9/2012 07:42:17 706-- 3 3 COAL -- Harita Par6/9/2012 07:38:15 6/9/2012 07:45:09 710-- 3 3 COAL -- Harita Par6/9/2012 07:38:57 6/9/2012 07:47:15 714-- 3 3 COAL -- Harita Par6/9/2012 07:39:40 6/9/2012 07:51:02 837 3 3 COAL -- MIL6/9/2012 07:40:37 6/9/2012 07:49:24 704-- 3 3 COAL -- Harita Par6/9/2012 07:41:09 6/9/2012 07:51:39 709-- 3 3 COAL -- Harita Par6/9/2012 07:50:18 6/9/2012 07:55:03 815 3 3 COAL -- MIL6/9/2012 07:56:09 6/9/2012 08:01:12 852 3 1 COAL -- MIL6/9/2012 07:56:45 6/9/2012 08:02:03 705-- 3 1 COAL -- Harita Par6/9/2012 08:19:26 6/9/2012 08:22:44 850 1 1 COAL -- MIL6/9/2012 08:20:10 6/9/2012 08:23:44 713-- 1 1 COAL -- Harita Par6/9/2012 08:21:26 6/9/2012 08:25:29 707-- 1 1 COAL -- Harita Par6/9/2012 08:32:23 6/9/2012 08:36:49 817 1 1 COAL -- MIL6/9/2012 08:40:57 6/9/2012 08:44:36 708-- 1 1 COAL -- Harita Par6/9/2012 08:50:15 6/9/2012 08:54:27 703-- 1 1 COAL -- Harita Par6/9/2012 08:51:43 6/9/2012 08:59:44 851 1 1 COAL -- MIL6/9/2012 08:58:42 6/9/2012 09:02:22 810 1 1 COAL -- MIL6/9/2012 09:03:21 6/9/2012 09:07:44 853 1 1 COAL -- MIL6/9/2012 09:22:52 6/9/2012 09:28:44 706-- 1 1 COAL -- Harita Par6/9/2012 09:26:57 6/9/2012 09:33:59 855 1 1 COAL -- MIL6/9/2012 09:27:22 6/9/2012 09:33:15 710-- 1 1 COAL -- Harita Par6/9/2012 09:27:45 6/9/2012 09:33:43 705-- 1 1 COAL -- Harita Par6/9/2012 09:28:04 6/9/2012 09:35:43 818 1 1 COAL -- MIL6/9/2012 09:29:30 6/9/2012 09:36:28 714-- 1 1 COAL -- Harita Par6/9/2012 09:30:16 6/9/2012 09:40:55 839 1 1 COAL -- MIL6/9/2012 09:34:43 6/9/2012 09:38:39 704-- 1 1 COAL -- Harita Par6/9/2012 09:35:01 6/9/2012 09:42:59 856 1 1 COAL -- MIL6/9/2012 09:37:11 6/9/2012 09:42:43 709-- 1 1 COAL -- Harita Par6/9/2012 09:41:35 6/9/2012 09:45:53 812 1 1 COAL -- MIL6/9/2012 09:42:10 6/9/2012 09:47:10 701-- 1 1 COAL -- Harita Par6/9/2012 09:45:17 6/9/2012 09:52:23 852 1 1 COAL -- MIL6/9/2012 09:46:24 6/9/2012 09:53:10 707-- 1 1 COAL -- Harita Par6/9/2012 09:50:35 6/9/2012 09:54:26 713-- 1 1 COAL -- Harita Par6/9/2012 09:51:13 6/9/2012 09:54:56 838 1 1 COAL -- MIL6/9/2012 09:51:38 6/9/2012 09:55:33 815 1 1 COAL -- MIL6/9/2012 09:56:24 6/9/2012 09:59:52 837 1 1 COAL -- MIL6/9/2012 09:58:57 6/9/2012 10:03:19 850 1 1 COAL -- MIL6/9/2012 10:04:40 6/9/2012 10:09:28 868 1 1 COAL -- MIL

Page 30: June Per Shift (Truckscale Port)

6/9/2012 10:15:34 6/9/2012 10:19:17 817 1 1 COAL -- MIL6/9/2012 10:16:00 6/9/2012 10:19:44 708-- 1 1 COAL -- Harita Par6/9/2012 10:20:27 6/9/2012 10:27:25 851 1 1 COAL -- MIL6/9/2012 10:24:11 6/9/2012 10:28:04 703-- 1 1 COAL -- Harita Par6/9/2012 10:36:19 6/9/2012 10:40:36 853 1 1 COAL -- MIL6/9/2012 10:47:23 6/9/2012 10:51:10 710-- 1 1 COAL -- Harita Par6/9/2012 10:50:31 6/9/2012 10:54:45 714-- 1 1 COAL -- Harita Par6/9/2012 10:54:03 6/9/2012 11:01:53 855 1 1 COAL -- MIL6/9/2012 10:57:49 6/9/2012 11:02:55 704-- 1 1 COAL -- Harita Par6/9/2012 11:00:28 6/9/2012 11:04:53 709-- 1 1 COAL -- Harita Par6/9/2012 11:03:43 6/9/2012 11:08:25 705-- 1 1 COAL -- Harita Par6/9/2012 11:06:18 6/9/2012 11:10:52 706-- 1 1 COAL -- Harita Par6/9/2012 11:06:37 6/9/2012 11:10:56 701-- 1 1 COAL -- Harita Par6/9/2012 11:10:10 6/9/2012 11:13:39 707-- 1 1 COAL -- Harita Par6/9/2012 11:14:51 6/9/2012 11:19:35 818 1 1 COAL -- MIL6/9/2012 11:16:29 6/9/2012 11:21:04 839 1 1 COAL -- MIL6/9/2012 11:16:49 6/9/2012 11:21:31 856 1 1 COAL -- MIL6/9/2012 11:25:01 6/9/2012 11:31:35 852 1 1 COAL -- MIL6/9/2012 11:34:04 6/9/2012 11:38:13 815 1 1 COAL -- MIL6/9/2012 16:39:47 6/9/2012 16:44:59 856 2 2 COAL -- MIL6/9/2012 18:42:56 6/9/2012 18:46:45 705-- 2 2 COAL -- Harita Par6/9/2012 18:43:37 6/9/2012 18:50:23 704-- 2 2 COAL -- Harita Par6/9/2012 18:44:04 6/9/2012 18:51:31 708-- 2 2 COAL -- Harita Par6/9/2012 18:44:30 6/9/2012 19:05:10 712-- 2 2 COAL -- Harita Par6/9/2012 18:44:55 6/9/2012 19:05:14 707-- 2 2 COAL -- Harita Par6/9/2012 18:45:21 6/9/2012 19:06:31 713-- 2 2 COAL -- Harita Par6/9/2012 18:46:06 6/9/2012 18:50:46 818 2 2 COAL -- MIL6/9/2012 18:49:36 6/9/2012 19:16:21 115 2 2 COAL -- Harita Par6/9/2012 18:52:20 6/9/2012 19:09:16 714-- 2 2 COAL -- Harita Par6/9/2012 18:55:00 6/9/2012 19:22:40 701-- 2 2 COAL -- Harita Par6/9/2012 18:59:11 6/9/2012 19:23:02 710-- 2 2 COAL -- Harita Par6/9/2012 19:12:51 6/9/2012 19:25:17 709-- 2 2 COAL -- Harita Par6/9/2012 19:20:28 6/9/2012 19:26:15 851 2 2 COAL -- MIL6/9/2012 19:21:38 6/9/2012 19:29:04 836 2 2 COAL -- MIL6/9/2012 19:23:58 6/9/2012 19:31:00 850 2 2 COAL -- MIL6/9/2012 19:24:36 6/9/2012 19:35:10 855 2 2 COAL -- MIL6/9/2012 19:28:02 6/9/2012 19:38:47 853 2 2 COAL -- MIL6/9/2012 19:36:53 6/9/2012 19:41:38 856 2 2 COAL -- MIL6/9/2012 19:43:28 6/9/2012 19:48:36 812 2 2 COAL -- MIL6/9/2012 19:47:48 6/9/2012 19:52:27 839 2 2 COAL -- MIL6/9/2012 19:51:29 6/9/2012 19:56:17 703-- 2 2 COAL -- Harita Par6/9/2012 20:05:21 6/9/2012 20:09:11 705-- 2 2 COAL -- Harita Par6/9/2012 20:08:27 6/9/2012 20:13:48 830 2 2 COAL -- MIL

Page 31: June Per Shift (Truckscale Port)

6/9/2012 20:11:12 6/9/2012 20:16:04 832 2 2 COAL -- MIL6/9/2012 20:11:46 6/9/2012 20:16:30 704-- 2 2 COAL -- Harita Par6/9/2012 20:19:05 6/9/2012 20:23:37 708-- 2 2 COAL -- Harita Par6/9/2012 20:21:01 6/9/2012 20:25:42 838 2 2 COAL -- MIL6/9/2012 20:26:36 6/9/2012 20:31:20 707-- 2 2 COAL -- Harita Par6/9/2012 20:28:48 6/9/2012 20:32:55 713-- 2 2 COAL -- Harita Par6/9/2012 20:29:12 6/9/2012 20:34:34 817 2 2 COAL -- MIL6/9/2012 20:33:40 6/9/2012 20:37:04 710-- 2 2 COAL -- Harita Par6/9/2012 20:39:18 6/9/2012 20:43:29 712-- 2 2 COAL -- Harita Par6/9/2012 20:45:25 6/9/2012 20:49:35 709-- 2 2 COAL -- Harita Par6/9/2012 20:47:24 6/9/2012 20:51:54 815- 2 2 COAL -- Harita Par6/9/2012 20:56:56 6/9/2012 21:01:11 818- 2 2 COAL -- Harita Par6/9/2012 20:57:58 6/9/2012 21:02:27 706-- 2 2 COAL -- Harita Par6/9/2012 21:11:51 6/9/2012 21:16:07 850- 2 2 COAL -- Harita Par6/9/2012 21:12:25 6/9/2012 21:17:53 702-- 2 2 COAL -- Harita Par6/9/2012 21:25:23 6/9/2012 21:33:06 115 2 2 COAL -- Harita Par6/9/2012 21:30:12 6/9/2012 21:35:02 703-- 2 2 COAL -- Harita Par6/9/2012 21:30:36 6/9/2012 21:37:33 701-- 2 2 COAL -- Harita Par6/9/2012 21:32:11 6/9/2012 21:38:45 705-- 2 2 COAL -- Harita Par6/9/2012 21:36:54 6/9/2012 21:41:04 704-- 2 2 COAL -- Harita Par6/9/2012 21:52:32 6/9/2012 21:56:22 713-- 2 2 COAL -- Harita Par6/9/2012 22:01:34 6/9/2012 22:06:20 712-- 2 2 COAL -- Harita Par6/9/2012 22:02:57 6/9/2012 22:08:22 708-- 2 2 COAL -- Harita Par6/9/2012 22:09:09 6/9/2012 22:15:20 707-- 2 2 COAL -- Harita Par6/9/2012 22:10:19 6/9/2012 22:17:27 817- 2 2 COAL -- Harita Par6/9/2012 22:14:35 6/9/2012 22:18:31 812- 2 2 COAL -- Harita Par6/9/2012 22:16:07 6/9/2012 22:19:55 710-- 2 2 COAL -- Harita Par6/9/2012 22:16:29 6/9/2012 22:21:54 815- 2 2 COAL -- Harita Par6/9/2012 22:19:23 6/9/2012 22:23:34 706-- 2 2 COAL -- Harita Par6/9/2012 22:24:50 6/9/2012 22:29:34 832- 2 2 COAL -- Harita Par6/9/2012 22:27:52 6/9/2012 22:32:56 702-- 2 2 COAL -- Harita Par6/9/2012 22:37:46 6/9/2012 22:41:23 818- 2 2 COAL -- Harita Par6/9/2012 22:47:21 6/9/2012 22:52:01 828 2 2 COAL -- MIL6/9/2012 22:56:50 6/9/2012 23:00:45 701-- 2 2 COAL -- Harita Par6/9/2012 22:59:20 6/9/2012 23:03:48 705-- 2 2 COAL -- Harita Par6/9/2012 23:02:56 6/9/2012 23:06:54 704-- 2 2 COAL -- Harita Par6/9/2012 23:08:01 6/9/2012 23:12:05 709-- 2 2 COAL -- Harita Par6/9/2012 23:13:41 6/9/2012 23:17:57 713-- 2 2 COAL -- Harita Par6/9/2012 23:18:44 6/9/2012 23:23:13 703-- 2 2 COAL -- Harita Par6/9/2012 23:19:23 6/9/2012 23:25:35 850- 2 2 COAL -- Harita Par6/9/2012 23:31:46 6/9/2012 23:36:59 115 2 2 COAL -- Harita Par6/9/2012 23:35:29 6/9/2012 23:40:35 839- 2 2 COAL -- Harita Par6/9/2012 23:39:37 6/9/2012 23:44:18 712-- 2 2 COAL -- Harita Par

Page 32: June Per Shift (Truckscale Port)

6/9/2012 23:39:57 6/9/2012 23:45:39 706-- 2 2 COAL -- Harita Par6/9/2012 23:43:15 6/9/2012 23:45:44 702-- 2 2 COAL -- Harita Par6/9/2012 23:48:12 6/9/2012 23:54:09 817- 2 2 COAL -- Harita Par6/9/2012 23:51:33 6/9/2012 23:56:51 708-- 2 2 COAL -- Harita Par6/9/2012 23:53:14 6/9/2012 23:58:16 812- 2 2 COAL -- Harita Par6/9/2012 23:54:54 6/9/2012 23:58:49 815- 2 2 COAL -- Harita Par

6/10/2012 00:10:38 6/10/2012 00:14:38 818- 3 3 COAL -- Harita Par6/10/2012 00:27:07 6/10/2012 00:31:03 832- 3 3 COAL -- Harita Par6/10/2012 00:29:06 6/10/2012 00:33:36 828- 3 3 COAL -- Harita Par6/10/2012 00:34:41 6/10/2012 00:38:49 709-- 3 3 COAL -- Harita Par6/10/2012 01:20:17 6/10/2012 01:24:03 701-- 3 3 COAL -- Harita Par6/10/2012 01:25:09 6/10/2012 01:29:45 707-- 3 3 COAL -- Harita Par6/10/2012 01:35:53 6/10/2012 01:39:34 706-- 3 3 COAL -- Harita Par6/10/2012 01:43:16 6/10/2012 01:47:52 712-- 3 3 COAL -- Harita Par6/10/2012 01:46:50 6/10/2012 01:50:35 702-- 3 3 COAL -- Harita Par6/10/2012 01:53:07 6/10/2012 01:58:09 713-- 3 3 COAL -- Harita Par6/10/2012 01:53:45 6/10/2012 01:59:57 850- 3 3 COAL -- Harita Par6/10/2012 01:54:11 6/10/2012 02:02:40 817- 3 3 COAL -- Harita Par6/10/2012 01:57:24 6/10/2012 02:05:04 815- 3 3 COAL -- Harita Par6/10/2012 02:04:22 6/10/2012 02:08:02 812- 3 3 COAL -- Harita Par6/10/2012 02:16:04 6/10/2012 02:19:43 818- 3 3 COAL -- Harita Par6/10/2012 02:27:52 6/10/2012 02:34:35 829- 3 3 COAL -- Harita Par6/10/2012 02:37:55 6/10/2012 02:43:04 828- 3 3 COAL -- Harita Par6/10/2012 02:41:53 6/10/2012 02:46:14 709-- 3 3 COAL -- Harita Par6/10/2012 02:44:13 6/10/2012 02:46:23 832- 3 3 COAL -- Harita Par6/10/2012 02:47:24 6/10/2012 02:52:18 115 3 3 COAL -- Harita Par6/10/2012 02:53:34 6/10/2012 02:58:13 703-- 3 3 COAL -- Harita Par6/10/2012 02:53:58 6/10/2012 02:58:16 707-- 3 3 COAL -- Harita Par6/10/2012 03:03:22 6/10/2012 03:09:25 712-- 3 3 COAL -- Harita Par6/10/2012 03:22:12 6/10/2012 03:26:12 704-- 3 3 COAL -- Harita Par6/10/2012 03:52:40 6/10/2012 03:56:55 850- 3 3 COAL -- Harita Par6/10/2012 04:00:25 6/10/2012 04:04:13 829- 3 3 COAL -- Harita Par6/10/2012 07:24:29 6/10/2012 07:29:05 713-- 3 3 COAL -- Harita Par6/10/2012 07:24:54 6/10/2012 07:30:55 707-- 3 3 COAL -- Harita Par6/10/2012 07:27:34 6/10/2012 07:32:57 115 3 3 COAL -- Harita Par6/10/2012 07:33:41 6/10/2012 07:37:52 712-- 3 3 COAL -- Harita Par6/10/2012 07:34:08 6/10/2012 07:42:30 702-- 3 3 COAL -- Harita Par6/10/2012 07:36:38 6/10/2012 07:42:06 704-- 3 3 COAL -- Harita Par6/10/2012 07:40:25 6/10/2012 07:44:14 708-- 3 3 COAL -- Harita Par6/10/2012 07:44:56 6/10/2012 07:52:58 706-- 3 3 COAL -- Harita Par6/10/2012 07:45:23 6/10/2012 07:53:03 703-- 3 3 COAL -- Harita Par6/10/2012 07:52:12 6/10/2012 08:04:45 818- 3 1 COAL -- Harita Par6/10/2012 07:59:42 6/10/2012 08:04:51 833 3 1 COAL -- MIL

Page 33: June Per Shift (Truckscale Port)

6/10/2012 08:01:56 6/10/2012 08:23:33 710-- 1 1 COAL -- Harita Par6/10/2012 08:03:16 6/10/2012 08:27:13 817- 1 1 COAL -- Harita Par6/10/2012 08:05:57 6/10/2012 08:25:30 714-- 1 1 COAL -- Harita Par6/10/2012 08:12:36 6/10/2012 08:29:15 850- 1 1 COAL -- Harita Par6/10/2012 08:49:16 6/10/2012 08:54:08 713-- 1 1 COAL -- Harita Par6/10/2012 08:51:13 6/10/2012 08:55:14 707-- 1 1 COAL -- Harita Par6/10/2012 08:59:19 6/10/2012 09:03:29 815- 1 1 COAL -- Harita Par6/10/2012 08:59:49 6/10/2012 09:05:40 115 1 1 COAL -- Harita Par6/10/2012 09:01:51 6/10/2012 09:10:34 712-- 1 1 COAL -- Harita Par6/10/2012 09:04:31 6/10/2012 09:13:20 704-- 1 1 COAL -- Harita Par6/10/2012 09:11:47 6/10/2012 09:15:31 702-- 1 1 COAL -- Harita Par6/10/2012 09:12:35 6/10/2012 09:18:30 708-- 1 1 COAL -- Harita Par6/10/2012 09:17:48 6/10/2012 09:22:29 820- 1 1 COAL -- Harita Par6/10/2012 09:21:43 6/10/2012 09:25:59 706-- 1 1 COAL -- Harita Par6/10/2012 09:25:05 6/10/2012 09:29:15 812- 1 1 COAL -- Harita Par6/10/2012 09:37:12 6/10/2012 09:40:48 832- 1 1 COAL -- Harita Par6/10/2012 09:38:04 6/10/2012 09:42:47 703-- 1 1 COAL -- Harita Par6/10/2012 09:49:38 6/10/2012 09:56:02 710-- 1 1 COAL -- Harita Par6/10/2012 09:51:00 6/10/2012 09:56:29 714-- 1 1 COAL -- Harita Par6/10/2012 09:55:13 6/10/2012 09:59:25 830- 1 1 COAL -- Harita Par6/10/2012 10:02:13 6/10/2012 10:06:08 817- 1 1 COAL -- Harita Par6/10/2012 10:04:10 6/10/2012 10:07:22 850- 1 1 COAL -- Harita Par6/10/2012 10:11:17 6/10/2012 10:14:26 713-- 1 1 COAL -- Harita Par6/10/2012 10:11:42 6/10/2012 10:18:30 707-- 1 1 COAL -- Harita Par6/10/2012 10:13:44 6/10/2012 10:17:47 705-- 1 1 COAL -- Harita Par6/10/2012 10:24:25 6/10/2012 10:28:32 820- 1 1 COAL -- Harita Par6/10/2012 10:27:53 6/10/2012 10:31:48 712-- 1 1 COAL -- Harita Par6/10/2012 10:37:04 6/10/2012 10:41:13 704-- 1 1 COAL -- Harita Par6/10/2012 10:39:42 6/10/2012 10:43:19 702-- 1 1 COAL -- Harita Par6/10/2012 10:40:12 6/10/2012 10:45:01 708-- 1 1 COAL -- Harita Par6/10/2012 10:48:25 6/10/2012 10:52:37 706-- 1 1 COAL -- Harita Par6/10/2012 10:59:20 6/10/2012 11:05:41 856 1 1 COAL -- MIL6/10/2012 11:07:27 6/10/2012 11:11:31 703-- 1 1 COAL -- Harita Par6/10/2012 11:08:40 6/10/2012 11:14:12 113 1 1 COAL -- Harita Par6/10/2012 11:12:12 6/10/2012 11:16:31 832- 1 1 COAL -- Harita Par6/10/2012 11:13:23 6/10/2012 11:18:02 812- 1 1 COAL -- Harita Par6/10/2012 11:19:18 6/10/2012 11:25:44 852 1 1 COAL -- MIL6/10/2012 11:22:26 6/10/2012 11:26:15 710-- 1 1 COAL -- Harita Par6/10/2012 11:23:05 6/10/2012 11:28:03 714-- 1 1 COAL -- Harita Par6/10/2012 11:28:52 6/10/2012 11:32:30 713-- 1 1 COAL -- Harita Par6/10/2012 11:31:53 6/10/2012 11:35:10 850- 1 1 COAL -- Harita Par6/10/2012 11:37:12 6/10/2012 11:41:10 833- 1 1 COAL -- Harita Par6/10/2012 11:48:33 6/10/2012 11:53:12 817- 1 1 COAL -- Harita Par

Page 34: June Per Shift (Truckscale Port)

6/10/2012 11:51:00 6/10/2012 11:56:12 705-- 1 1 COAL -- Harita Par6/10/2012 11:52:28 6/10/2012 11:57:12 820- 1 1 COAL -- Harita Par6/10/2012 11:53:59 6/10/2012 12:03:18 830- 1 1 COAL -- Harita Par6/10/2012 11:55:31 6/10/2012 12:01:44 712-- 1 1 COAL -- Harita Par6/10/2012 12:09:12 6/10/2012 12:13:51 815- 1 1 COAL -- Harita Par6/10/2012 12:11:14 6/10/2012 12:15:35 708-- 1 1 COAL -- Harita Par6/10/2012 12:44:48 6/10/2012 12:48:57 703-- 1 1 COAL -- Harita Par6/10/2012 12:49:49 6/10/2012 12:53:32 832- 1 1 COAL -- Harita Par6/10/2012 13:02:59 6/10/2012 13:06:19 850- 1 1 COAL -- Harita Par6/10/2012 13:25:18 6/10/2012 13:29:10 839- 1 1 COAL -- Harita Par6/10/2012 13:33:40 6/10/2012 13:38:05 113 1 1 COAL -- Harita Par6/10/2012 13:34:42 6/10/2012 13:41:26 710-- 1 1 COAL -- Harita Par6/10/2012 13:35:09 6/10/2012 13:42:46 706-- 1 1 COAL -- Harita Par6/10/2012 13:36:22 6/10/2012 13:44:45 704-- 1 1 COAL -- Harita Par6/10/2012 13:39:00 6/10/2012 13:46:09 714-- 1 1 COAL -- Harita Par6/10/2012 13:39:22 6/10/2012 13:47:42 830- 1 1 COAL -- Harita Par6/10/2012 13:40:03 6/10/2012 13:50:23 852 1 1 COAL -- MIL6/10/2012 13:40:40 6/10/2012 13:52:37 855 1 1 COAL -- MIL6/10/2012 13:42:03 6/10/2012 13:54:12 856 1 1 COAL -- MIL6/10/2012 13:43:31 6/10/2012 13:56:27 820- 1 1 COAL -- Harita Par6/10/2012 13:43:59 6/10/2012 13:58:10 713-- 1 1 COAL -- Harita Par6/10/2012 13:53:33 6/10/2012 13:59:57 702-- 1 1 COAL -- Harita Par6/10/2012 13:55:40 6/10/2012 14:01:52 815- 1 1 COAL -- Harita Par6/10/2012 14:09:45 6/10/2012 14:13:19 115 1 1 COAL -- Harita Par6/10/2012 14:15:00 6/10/2012 14:19:22 817- 1 1 COAL -- Harita Par6/10/2012 14:21:47 6/10/2012 14:25:56 708-- 1 1 COAL -- Harita Par6/10/2012 14:22:13 6/10/2012 14:27:59 712-- 1 1 COAL -- Harita Par6/10/2012 14:23:28 6/10/2012 14:30:29 828- 1 1 COAL -- Harita Par6/10/2012 14:35:01 6/10/2012 14:38:33 850- 1 1 COAL -- Harita Par6/10/2012 14:36:51 6/10/2012 14:41:22 703-- 1 1 COAL -- Harita Par6/10/2012 14:39:27 6/10/2012 14:44:07 810 1 1 COAL -- MIL6/10/2012 14:47:42 6/10/2012 14:53:14 709-- 1 1 COAL -- Harita Par6/10/2012 14:52:27 6/10/2012 14:56:27 807 1 1 COAL -- MIL6/10/2012 15:06:01 6/10/2012 15:10:20 710-- 1 1 COAL -- Harita Par6/10/2012 15:06:46 6/10/2012 15:12:32 706-- 1 1 COAL -- Harita Par6/10/2012 15:07:51 6/10/2012 15:15:05 704-- 1 1 COAL -- Harita Par6/10/2012 15:13:27 6/10/2012 15:17:05 714-- 1 1 COAL -- Harita Par6/10/2012 15:14:08 6/10/2012 15:20:13 852 1 1 COAL -- MIL6/10/2012 15:17:49 6/10/2012 15:23:39 713-- 1 1 COAL -- Harita Par6/10/2012 15:22:11 6/10/2012 15:25:47 702-- 1 1 COAL -- Harita Par6/10/2012 15:22:40 6/10/2012 15:28:00 820- 1 1 COAL -- Harita Par6/10/2012 15:29:56 6/10/2012 15:34:29 815- 1 1 COAL -- Harita Par6/10/2012 15:30:35 6/10/2012 15:49:07 115 1 1 COAL -- Harita Par

Page 35: June Per Shift (Truckscale Port)

6/10/2012 15:38:24 6/10/2012 15:41:54 839- 1 1 COAL -- Harita Par6/10/2012 15:49:48 6/10/2012 15:56:43 830- 1 1 COAL -- Harita Par6/10/2012 15:52:17 6/10/2012 16:00:02 812- 1 2 COAL -- Harita Par6/10/2012 16:07:09 6/10/2012 16:11:51 810 2 2 COAL -- MIL6/10/2012 18:20:39 6/10/2012 18:24:25 709-- 2 2 COAL -- Harita Par6/10/2012 18:25:16 6/10/2012 18:29:07 708-- 2 2 COAL -- Harita Par6/10/2012 18:27:01 6/10/2012 18:31:56 712-- 2 2 COAL -- Harita Par6/10/2012 18:28:16 6/10/2012 18:32:33 710-- 2 2 COAL -- Harita Par6/10/2012 18:30:29 6/10/2012 18:35:50 115 2 2 COAL -- Harita Par6/10/2012 18:30:52 6/10/2012 18:37:02 702-- 2 2 COAL -- Harita Par6/10/2012 18:31:13 6/10/2012 18:38:39 706-- 2 2 COAL -- Harita Par6/10/2012 18:34:36 6/10/2012 18:40:19 703-- 2 2 COAL -- Harita Par6/10/2012 18:35:02 6/10/2012 18:42:22 713-- 2 2 COAL -- Harita Par6/10/2012 18:49:18 6/10/2012 18:53:33 704-- 2 2 COAL -- Harita Par6/10/2012 18:56:08 6/10/2012 19:03:33 714-- 2 2 COAL -- Harita Par6/10/2012 19:00:09 6/10/2012 19:04:00 701-- 2 2 COAL -- Harita Par6/10/2012 19:09:20 6/10/2012 19:15:34 853 2 2 COAL -- MIL6/10/2012 19:16:30 6/10/2012 19:20:54 828- 2 2 COAL -- Harita Par6/10/2012 19:17:48 6/10/2012 19:24:26 852 2 2 COAL -- MIL6/10/2012 19:33:58 6/10/2012 19:37:27 850- 2 2 COAL -- Harita Par6/10/2012 19:36:10 6/10/2012 19:40:50 815- 2 2 COAL -- Harita Par6/10/2012 19:42:53 6/10/2012 19:47:50 709-- 2 2 COAL -- Harita Par6/10/2012 19:46:04 6/10/2012 19:51:25 812- 2 2 COAL -- Harita Par6/10/2012 19:47:00 6/10/2012 19:53:29 708-- 2 2 COAL -- Harita Par6/10/2012 19:49:15 6/10/2012 19:55:14 820- 2 2 COAL -- Harita Par6/10/2012 19:49:50 6/10/2012 19:56:57 710-- 2 2 COAL -- Harita Par6/10/2012 19:52:02 6/10/2012 19:59:29 712-- 2 2 COAL -- Harita Par6/10/2012 19:58:19 6/10/2012 20:03:11 115 2 2 COAL -- Harita Par6/10/2012 19:58:49 6/10/2012 20:05:38 706-- 2 2 COAL -- Harita Par6/10/2012 20:05:00 6/10/2012 20:10:21 830- 2 2 COAL -- Harita Par6/10/2012 20:08:12 6/10/2012 20:15:39 855 2 2 COAL -- MIL6/10/2012 20:18:50 6/10/2012 20:22:46 705-- 2 2 COAL -- Harita Par6/10/2012 20:20:24 6/10/2012 20:24:13 703-- 2 2 COAL -- Harita Par6/10/2012 20:20:45 6/10/2012 20:26:04 713-- 2 2 COAL -- Harita Par6/10/2012 20:21:05 6/10/2012 20:28:16 704-- 2 2 COAL -- Harita Par6/10/2012 20:31:30 6/10/2012 20:40:35 714-- 2 2 COAL -- Harita Par6/10/2012 20:45:45 6/10/2012 20:49:43 701-- 2 2 COAL -- Harita Par6/10/2012 21:06:27 6/10/2012 21:10:22 850- 2 2 COAL -- Harita Par6/10/2012 21:06:56 6/10/2012 21:12:28 709-- 2 2 COAL -- Harita Par6/10/2012 21:08:16 6/10/2012 21:14:36 828- 2 2 COAL -- Harita Par6/10/2012 21:09:38 6/10/2012 21:17:15 815- 2 2 COAL -- Harita Par6/10/2012 21:16:28 6/10/2012 21:20:42 708-- 2 2 COAL -- Harita Par6/10/2012 21:18:06 6/10/2012 21:22:01 710-- 2 2 COAL -- Harita Par

Page 36: June Per Shift (Truckscale Port)

6/10/2012 21:19:10 6/10/2012 21:23:34 712-- 2 2 COAL -- Harita Par6/10/2012 21:24:49 6/10/2012 21:27:53 706-- 2 2 COAL -- Harita Par6/10/2012 21:32:33 6/10/2012 21:36:59 812- 2 2 COAL -- Harita Par6/10/2012 21:35:42 6/10/2012 21:40:38 115 2 2 COAL -- Harita Par6/10/2012 21:36:18 6/10/2012 21:42:15 820- 2 2 COAL -- Harita Par6/10/2012 21:39:50 6/10/2012 21:43:36 705-- 2 2 COAL -- Harita Par6/10/2012 21:45:42 6/10/2012 21:49:58 853 2 2 COAL -- MIL6/10/2012 21:50:44 6/10/2012 21:53:57 703-- 2 2 COAL -- Harita Par6/10/2012 21:51:04 6/10/2012 21:55:34 704-- 2 2 COAL -- Harita Par6/10/2012 21:51:25 6/10/2012 21:57:35 713-- 2 2 COAL -- Harita Par6/10/2012 21:52:09 6/10/2012 22:00:04 852 2 2 COAL -- MIL6/10/2012 21:58:40 6/10/2012 22:06:17 855 2 2 COAL -- MIL6/10/2012 22:02:59 6/10/2012 22:12:41 714-- 2 2 COAL -- Harita Par6/10/2012 22:05:18 6/10/2012 22:10:48 856 2 2 COAL -- MIL6/10/2012 22:11:27 6/10/2012 22:15:26 701-- 2 2 COAL -- Harita Par6/10/2012 22:30:08 6/10/2012 22:34:01 709-- 2 2 COAL -- Harita Par6/10/2012 22:36:31 6/10/2012 22:40:59 817- 2 2 COAL -- Harita Par6/10/2012 22:39:13 6/10/2012 22:42:54 710-- 2 2 COAL -- Harita Par6/10/2012 22:40:18 6/10/2012 22:43:03 712-- 2 2 COAL -- Harita Par6/10/2012 22:41:48 6/10/2012 22:46:41 708-- 2 2 COAL -- Harita Par6/10/2012 22:42:15 6/10/2012 22:48:10 850- 2 2 COAL -- Harita Par6/10/2012 22:46:01 6/10/2012 22:49:28 706-- 2 2 COAL -- Harita Par6/10/2012 22:56:17 6/10/2012 23:00:18 707-- 2 2 COAL -- Harita Par6/10/2012 22:57:22 6/10/2012 23:02:32 828- 2 2 COAL -- Harita Par6/10/2012 22:58:36 6/10/2012 23:04:10 815- 2 2 COAL -- Harita Par6/10/2012 23:13:59 6/10/2012 23:17:51 705-- 2 2 COAL -- Harita Par6/10/2012 23:17:07 6/10/2012 23:20:21 703-- 2 2 COAL -- Harita Par6/10/2012 23:18:50 6/10/2012 23:23:06 812- 2 2 COAL -- Harita Par6/10/2012 23:20:59 6/10/2012 23:25:32 853 2 2 COAL -- MIL6/10/2012 23:21:27 6/10/2012 23:27:06 713-- 2 2 COAL -- Harita Par6/10/2012 23:23:53 6/10/2012 23:29:08 852 2 2 COAL -- MIL6/10/2012 23:27:42 6/10/2012 23:31:41 704-- 2 2 COAL -- Harita Par6/10/2012 23:32:54 6/10/2012 23:37:26 856 2 2 COAL -- MIL6/10/2012 23:34:45 6/10/2012 23:40:19 115 2 2 COAL -- Harita Par6/10/2012 23:35:12 6/10/2012 23:41:46 714-- 2 2 COAL -- Harita Par6/10/2012 23:35:33 6/10/2012 23:41:49 701-- 2 2 COAL -- Harita Par6/10/2012 23:47:43 6/10/2012 23:55:54 855 2 2 COAL -- MIL6/10/2012 23:58:56 6/11/2012 00:03:12 709-- 2 3 COAL -- Harita Par6/11/2012 00:28:25 6/11/2012 00:32:20 836- 3 3 COAL -- Harita Par6/12/2012 02:00:34 6/12/2012 02:06:55 812- 3 3 COAL -- Harita Par6/12/2012 02:01:44 6/12/2012 02:07:37 839- 3 3 COAL -- Harita Par6/12/2012 02:02:38 6/12/2012 02:10:31 815- 3 3 COAL -- Harita Par6/12/2012 02:03:45 6/12/2012 02:12:28 836- 3 3 COAL -- Harita Par

Page 37: June Per Shift (Truckscale Port)

6/12/2012 02:04:25 6/12/2012 02:14:25 828- 3 3 COAL -- Harita Par6/12/2012 02:05:03 6/12/2012 02:16:12 850- 3 3 COAL -- Harita Par6/12/2012 02:05:43 6/12/2012 02:19:30 817- 3 3 COAL -- Harita Par6/12/2012 02:09:24 6/12/2012 02:24:22 830- 3 3 COAL -- Harita Par6/12/2012 08:50:10 6/12/2012 08:54:19 707-- 1 1 COAL -- Harita Para6/12/2012 08:50:36 6/12/2012 08:56:54 703-- 1 1 COAL -- Harita Para6/12/2012 08:50:59 6/12/2012 08:57:59 705-- 1 1 COAL -- Harita Para6/12/2012 08:51:30 6/12/2012 09:07:07 704-- 1 1 COAL -- Harita Para6/12/2012 08:51:58 6/12/2012 09:07:12 712-- 1 1 COAL -- Harita Para6/12/2012 08:56:06 6/12/2012 09:11:08 817- 1 1 COAL -- Harita Para6/12/2012 08:59:01 6/12/2012 09:12:51 836- 1 1 COAL -- Harita Para6/12/2012 08:59:36 6/12/2012 09:08:31 710-- 1 1 COAL -- Harita Para6/12/2012 09:00:06 6/12/2012 09:36:36 709-- 1 1 COAL -- Harita Para6/12/2012 09:00:47 6/12/2012 09:26:22 713-- 1 1 COAL -- Harita Para6/12/2012 09:02:25 6/12/2012 09:36:41 706-- 1 1 COAL -- Harita Para6/12/2012 09:04:11 6/12/2012 09:37:57 839- 1 1 COAL -- Harita Para6/12/2012 09:04:52 6/12/2012 09:40:08 115 1 1 COAL -- Harita Para6/12/2012 09:05:14 6/12/2012 09:46:00 701-- 1 1 COAL -- Harita Para6/12/2012 09:05:39 6/12/2012 09:45:01 708-- 1 1 COAL -- Harita Para6/12/2012 09:27:34 6/12/2012 09:47:04 714-- 1 1 COAL -- Harita Para6/12/2012 09:28:23 6/12/2012 09:51:59 113 1 1 COAL -- Harita Para6/12/2012 09:53:58 6/12/2012 10:05:41 812- 1 1 COAL -- Harita Para6/12/2012 09:56:32 6/12/2012 10:05:35 815- 1 1 COAL -- Harita Para6/12/2012 10:54:24 6/12/2012 11:13:15 851 1 1 COAL -- MIL6/12/2012 10:54:46 6/12/2012 11:08:24 707-- 1 1 COAL -- Harita Para6/12/2012 10:55:11 6/12/2012 11:11:06 705-- 1 1 COAL -- Harita Para6/12/2012 10:56:55 6/12/2012 11:09:04 829- 1 1 COAL -- Harita Para6/12/2012 10:57:34 6/12/2012 11:08:44 850- 1 1 COAL -- Harita Para6/12/2012 10:58:01 6/12/2012 11:11:10 703-- 1 1 COAL -- Harita Para6/12/2012 10:58:32 6/12/2012 11:11:15 712-- 1 1 COAL -- Harita Para6/12/2012 10:58:50 6/12/2012 11:11:19 713-- 1 1 COAL -- Harita Para6/12/2012 10:59:19 6/12/2012 11:37:16 710-- 1 1 COAL -- Harita Para6/12/2012 11:00:24 6/12/2012 11:09:13 828- 1 1 COAL -- Harita Para6/12/2012 11:01:15 6/12/2012 11:13:19 856 1 1 COAL -- MIL6/12/2012 11:01:40 6/12/2012 12:35:51 830- 1 1 COAL -- Harita Para6/12/2012 11:02:08 6/12/2012 11:29:10 855 1 1 COAL -- MIL6/12/2012 11:02:29 6/12/2012 11:08:53 839- 1 1 COAL -- Harita Para6/12/2012 11:06:31 6/12/2012 11:42:39 706-- 1 1 COAL -- Harita Para6/12/2012 11:07:09 6/12/2012 12:39:09 115 1 1 COAL -- Harita Para6/12/2012 11:07:42 6/12/2012 11:29:04 810 1 1 COAL -- MIL6/12/2012 11:30:10 6/12/2012 11:35:18 701-- 1 1 COAL -- Harita Para6/12/2012 11:30:31 6/12/2012 11:35:23 708-- 1 1 COAL -- Harita Para6/12/2012 11:31:48 6/12/2012 11:40:35 853 1 1 COAL -- MIL6/12/2012 11:32:13 6/12/2012 11:42:34 714-- 1 1 COAL -- Harita Para6/12/2012 11:32:35 6/12/2012 11:40:39 852 1 1 COAL -- MIL6/12/2012 11:33:05 6/12/2012 11:48:11 113 1 1 COAL -- Harita Para6/12/2012 11:34:20 6/12/2012 11:50:17 837- 1 1 COAL -- Harita Para6/12/2012 11:59:45 6/12/2012 12:03:57 809 1 1 COAL -- MIL6/12/2012 12:30:23 6/12/2012 12:37:05 851 1 1 COAL -- MIL6/12/2012 12:30:56 6/12/2012 12:35:56 829- 1 1 COAL -- Harita Para

Page 38: June Per Shift (Truckscale Port)

6/12/2012 12:34:52 6/12/2012 12:39:13 705-- 1 1 COAL -- Harita Para6/12/2012 12:38:28 6/12/2012 12:42:14 707-- 1 1 COAL -- Harita Para6/12/2012 12:44:28 6/12/2012 12:48:53 836- 1 1 COAL -- Harita Para6/12/2012 12:45:29 6/12/2012 12:51:42 703-- 1 1 COAL -- Harita Para6/12/2012 12:50:07 6/12/2012 12:54:41 830- 1 1 COAL -- Harita Para6/12/2012 12:53:53 6/12/2012 13:00:23 855 1 1 COAL -- MIL6/12/2012 12:57:31 6/12/2012 13:02:28 839- 1 1 COAL -- Harita Para6/12/2012 13:07:17 6/12/2012 13:12:03 115 1 1 COAL -- Harita Para6/12/2012 13:10:27 6/12/2012 13:14:39 712-- 1 1 COAL -- Harita Para6/12/2012 13:17:33 6/12/2012 13:22:55 710-- 1 1 COAL -- Harita Para6/12/2012 13:20:01 6/12/2012 13:25:57 706-- 1 1 COAL -- Harita Para6/12/2012 13:31:00 6/12/2012 13:34:57 701-- 1 1 COAL -- Harita Para6/12/2012 13:31:37 6/12/2012 13:39:23 852 1 1 COAL -- MIL6/12/2012 13:33:32 6/12/2012 13:40:25 853 1 1 COAL -- MIL6/12/2012 13:36:57 6/12/2012 13:42:34 714-- 1 1 COAL -- Harita Para6/12/2012 13:38:36 6/12/2012 13:43:21 856 1 1 COAL -- MIL6/12/2012 13:41:00 6/12/2012 13:45:34 708-- 1 1 COAL -- Harita Para6/12/2012 13:50:21 6/12/2012 13:54:10 850- 1 1 COAL -- Harita Para6/12/2012 13:55:31 6/12/2012 14:00:04 702-- 1 1 COAL -- Harita Para6/12/2012 14:00:45 6/12/2012 14:05:09 809 1 1 COAL -- MIL6/12/2012 14:17:40 6/12/2012 14:21:40 830- 1 1 COAL -- Harita Para6/12/2012 14:18:43 6/12/2012 14:29:37 705-- 1 1 COAL -- Harita Para6/12/2012 14:24:01 6/12/2012 14:31:55 707-- 1 1 COAL -- Harita Para6/12/2012 14:26:56 6/12/2012 14:34:16 832- 1 1 COAL -- Harita Para6/12/2012 14:30:33 6/12/2012 14:38:54 829- 1 1 COAL -- Harita Para6/12/2012 14:40:16 6/12/2012 14:44:49 703-- 1 1 COAL -- Harita Para6/12/2012 14:47:04 6/12/2012 14:50:58 839- 1 1 COAL -- Harita Para6/12/2012 14:48:05 6/12/2012 14:53:39 712-- 1 1 COAL -- Harita Para6/12/2012 14:54:27 6/12/2012 14:58:52 710-- 1 1 COAL -- Harita Para6/12/2012 14:55:34 6/12/2012 15:08:01 855 1 1 COAL -- MIL6/12/2012 15:00:56 6/12/2012 15:07:41 851 1 1 COAL -- MIL6/12/2012 15:06:12 6/12/2012 15:10:07 115 1 1 COAL -- Harita Para6/12/2012 15:07:11 6/12/2012 15:13:28 714-- 1 1 COAL -- Harita Para6/12/2012 15:11:12 6/12/2012 15:17:42 828- 1 1 COAL -- Harita Para6/12/2012 15:11:58 6/12/2012 15:19:43 701-- 1 1 COAL -- Harita Para6/12/2012 15:12:21 6/12/2012 15:20:28 706-- 1 1 COAL -- Harita Para6/12/2012 15:12:43 6/12/2012 15:22:23 708-- 1 1 COAL -- Harita Para6/12/2012 15:14:37 6/12/2012 15:23:34 856 1 1 COAL -- MIL6/12/2012 15:16:46 6/12/2012 15:26:35 817- 1 1 COAL -- Harita Para6/12/2012 15:18:43 6/12/2012 15:28:23 853 1 1 COAL -- MIL6/12/2012 15:19:01 6/12/2012 15:30:23 808 1 1 COAL -- MIL6/12/2012 15:25:17 6/12/2012 15:31:20 836- 1 1 COAL -- Harita Para6/12/2012 15:27:25 6/12/2012 15:33:22 850- 1 1 COAL -- Harita Para6/12/2012 15:35:27 6/12/2012 15:41:27 852 1 1 COAL -- MIL6/12/2012 15:52:49 6/12/2012 15:57:27 707-- 1 1 COAL -- Harita Para6/12/2012 15:56:29 6/12/2012 16:00:06 829- 1 2 COAL -- Harita Para6/12/2012 15:59:28 6/12/2012 16:00:10 832- 1 2 COAL -- Harita Para6/12/2012 16:01:14 6/12/2012 16:11:07 705-- 2 2 COAL -- Harita Para6/12/2012 16:02:18 6/12/2012 16:03:20 830- 2 2 COAL -- Harita Para6/12/2012 16:05:34 6/12/2012 16:11:05 703-- 2 2 COAL -- Harita Para

Page 39: June Per Shift (Truckscale Port)

6/12/2012 16:08:26 6/12/2012 16:12:20 704-- 2 2 COAL -- Harita Para6/12/2012 16:10:16 6/12/2012 16:14:51 713-- 2 2 COAL -- Harita Para6/12/2012 18:21:22 6/12/2012 18:26:23 701-- 2 2 COAL -- Harita Para6/12/2012 18:21:50 6/12/2012 18:27:40 713-- 2 2 COAL -- Harita Para6/12/2012 18:24:54 6/12/2012 18:30:10 714-- 2 2 COAL -- Harita Para6/12/2012 18:25:41 6/12/2012 18:32:02 710-- 2 2 COAL -- Harita Para6/12/2012 18:28:25 6/12/2012 18:34:45 708-- 2 2 COAL -- Harita Para6/12/2012 18:33:56 6/12/2012 18:37:33 703-- 2 2 COAL -- Harita Para6/12/2012 18:35:29 6/12/2012 18:40:07 702-- 2 2 COAL -- Harita Para6/12/2012 18:38:43 6/12/2012 19:03:22 706-- 2 2 COAL -- Harita Para6/12/2012 18:40:50 6/12/2012 18:45:17 705-- 2 2 COAL -- Harita Para6/12/2012 18:52:22 6/12/2012 18:56:58 115 2 2 COAL -- Harita Para6/12/2012 18:52:44 6/12/2012 18:58:59 113 2 2 COAL -- Harita Para6/12/2012 18:59:49 6/12/2012 19:04:07 850- 2 2 COAL -- Harita Para6/12/2012 19:02:07 6/12/2012 19:09:06 855 2 2 COAL -- MIL6/12/2012 19:02:36 6/12/2012 19:09:37 856 2 2 COAL -- MIL6/12/2012 19:05:59 6/12/2012 19:13:31 852 2 2 COAL -- MIL6/12/2012 19:06:34 6/12/2012 19:13:16 709-- 2 2 COAL -- Harita Para6/12/2012 19:11:00 6/12/2012 19:17:03 836- 2 2 COAL -- Harita Para6/12/2012 19:11:26 6/12/2012 19:17:47 828- 2 2 COAL -- Harita Para6/12/2012 19:15:47 6/12/2012 19:25:04 851 2 2 COAL -- MIL6/12/2012 19:16:18 6/12/2012 19:21:58 810 2 2 COAL -- MIL6/12/2012 19:35:46 6/12/2012 19:40:57 812- 2 2 COAL -- Harita Para6/12/2012 19:47:23 6/12/2012 19:51:40 701-- 2 2 COAL -- Harita Para6/12/2012 19:50:32 6/12/2012 19:51:44 713-- 2 2 COAL -- Harita Para6/12/2012 19:55:58 6/12/2012 19:59:58 708-- 2 2 COAL -- Harita Para6/12/2012 19:56:18 6/12/2012 20:01:30 710-- 2 2 COAL -- Harita Para6/12/2012 20:06:55 6/12/2012 20:11:02 819- 2 2 COAL -- Harita Para6/12/2012 20:07:51 6/12/2012 20:11:10 703-- 2 2 COAL -- Harita Para6/12/2012 20:13:41 6/12/2012 20:17:55 702-- 2 2 COAL -- Harita Para6/12/2012 20:21:21 6/12/2012 20:25:39 705-- 2 2 COAL -- Harita Para6/12/2012 20:23:20 6/12/2012 20:30:05 707-- 2 2 COAL -- Harita Para6/12/2012 20:28:22 6/12/2012 20:30:09 712-- 2 2 COAL -- Harita Para6/12/2012 20:29:27 6/12/2012 20:39:00 850- 2 2 COAL -- Harita Para6/12/2012 20:37:24 6/12/2012 20:42:52 853 2 2 COAL -- MIL6/12/2012 20:37:51 6/12/2012 20:42:56 856 2 2 COAL -- MIL6/12/2012 20:41:46 6/12/2012 20:46:50 115 2 2 COAL -- Harita Para6/12/2012 20:43:31 6/12/2012 20:48:58 706-- 2 2 COAL -- Harita Para6/12/2012 20:49:46 6/12/2012 21:02:36 828- 2 2 COAL -- Harita Para6/12/2012 20:51:01 6/12/2012 21:04:00 852 2 2 COAL -- MIL6/12/2012 20:51:30 6/12/2012 21:02:42 839- 2 2 COAL -- Harita Para6/12/2012 20:52:11 6/12/2012 21:04:03 855 2 2 COAL -- MIL6/12/2012 21:01:54 6/12/2012 21:12:18 714-- 2 2 COAL -- Harita Para6/12/2012 21:04:47 6/12/2012 21:16:15 810 2 2 COAL -- MIL6/12/2012 21:05:23 6/12/2012 21:16:20 851 2 2 COAL -- MIL6/12/2012 21:13:15 6/12/2012 21:16:41 701-- 2 2 COAL -- Harita Para6/12/2012 21:17:30 6/12/2012 21:24:03 713-- 2 2 COAL -- Harita Para6/12/2012 21:23:24 6/12/2012 21:24:07 812- 2 2 COAL -- Harita Para6/12/2012 21:24:53 6/12/2012 21:26:56 710-- 2 2 COAL -- Harita Para6/12/2012 22:00:59 6/12/2012 22:05:41 819- 2 2 COAL -- Harita Para

Page 40: June Per Shift (Truckscale Port)

6/12/2012 22:17:56 6/12/2012 22:22:46 709-- 2 2 COAL -- Harita Para6/12/2012 22:26:29 6/12/2012 22:30:23 708-- 2 2 COAL -- Harita Para6/12/2012 22:26:48 6/12/2012 22:32:33 702-- 2 2 COAL -- Harita Para6/12/2012 22:27:06 6/12/2012 22:34:26 705-- 2 2 COAL -- Harita Para6/12/2012 22:27:30 6/12/2012 22:37:22 115 2 2 COAL -- Harita Para6/12/2012 22:27:57 6/12/2012 22:39:03 706-- 2 2 COAL -- Harita Para6/12/2012 22:28:19 6/12/2012 22:40:29 856 2 2 COAL -- MIL6/12/2012 22:28:44 6/12/2012 22:42:33 707-- 2 2 COAL -- Harita Para6/12/2012 22:31:29 6/12/2012 22:44:52 850- 2 2 COAL -- Harita Para6/12/2012 22:36:21 6/12/2012 22:46:59 836- 2 2 COAL -- Harita Para6/12/2012 22:41:24 6/12/2012 22:51:17 839- 2 2 COAL -- Harita Para6/12/2012 22:43:11 6/12/2012 22:51:49 701-- 2 2 COAL -- Harita Para6/12/2012 22:45:33 6/12/2012 22:53:26 852 2 2 COAL -- MIL6/12/2012 22:48:46 6/12/2012 22:53:30 851 2 2 COAL -- MIL6/12/2012 22:49:12 6/12/2012 22:56:05 828- 2 2 COAL -- Harita Para6/12/2012 22:49:39 6/12/2012 22:58:10 714-- 2 2 COAL -- Harita Para6/12/2012 22:50:07 6/12/2012 22:59:17 810 2 2 COAL -- MIL6/12/2012 22:50:25 6/12/2012 23:01:53 713-- 2 2 COAL -- Harita Para6/12/2012 22:52:42 6/12/2012 23:02:58 837- 2 2 COAL -- Harita Para6/12/2012 23:00:12 6/12/2012 23:06:07 712-- 2 2 COAL -- Harita Para6/12/2012 23:01:18 6/12/2012 23:06:47 710-- 2 2 COAL -- Harita Para6/12/2012 23:04:10 6/12/2012 23:12:40 855 2 2 COAL -- MIL6/12/2012 23:04:29 6/12/2012 23:10:24 812- 2 2 COAL -- Harita Para6/12/2012 23:26:48 6/12/2012 23:31:26 703-- 2 2 COAL -- Harita Para6/12/2012 23:33:56 6/12/2012 23:38:15 819- 2 2 COAL -- Harita Para6/12/2012 23:45:42 6/12/2012 23:50:34 709-- 2 2 COAL -- Harita Para6/12/2012 23:49:27 6/12/2012 23:53:34 708-- 2 2 COAL -- Harita Para6/12/2012 23:49:47 6/12/2012 23:56:27 705-- 2 2 COAL -- Harita Para6/12/2012 23:55:25 6/12/2012 23:59:57 702-- 2 2 COAL -- Harita Para6/13/2012 00:03:09 6/13/2012 00:08:51 856 3 3 COAL -- MIL6/13/2012 00:15:45 6/13/2012 00:20:36 701-- 3 3 COAL -- Harita Para6/13/2012 00:19:11 6/13/2012 00:23:24 836- 3 3 COAL -- Harita Para6/13/2012 00:22:14 6/13/2012 00:23:28 850- 3 3 COAL -- Harita Para6/13/2012 00:22:40 6/13/2012 00:25:59 839- 3 3 COAL -- Harita Para6/13/2012 00:28:48 6/13/2012 00:32:17 713-- 3 3 COAL -- Harita Para6/13/2012 00:33:07 6/13/2012 00:37:25 837- 3 3 COAL -- Harita Para6/13/2012 00:36:48 6/13/2012 00:40:31 828- 3 3 COAL -- Harita Para6/13/2012 00:38:32 6/13/2012 00:43:02 853 3 3 COAL -- MIL6/13/2012 00:41:15 6/13/2012 00:44:49 851 3 3 COAL -- MIL6/13/2012 00:41:36 6/13/2012 00:44:52 852 3 3 COAL -- MIL6/13/2012 00:51:05 6/13/2012 00:56:20 714-- 3 3 COAL -- Harita Para6/13/2012 01:03:02 6/13/2012 01:09:11 855 3 3 COAL -- MIL6/13/2012 01:03:22 6/13/2012 01:09:17 810 3 3 COAL -- MIL6/13/2012 01:26:17 6/13/2012 01:34:11 856 3 3 COAL -- MIL6/13/2012 01:32:50 6/13/2012 01:36:14 710-- 3 3 COAL -- Harita Para6/13/2012 01:41:10 6/13/2012 01:45:13 707-- 3 3 COAL -- Harita Para6/13/2012 01:49:08 6/13/2012 01:53:31 709-- 3 3 COAL -- Harita Para6/13/2012 01:49:51 6/13/2012 01:55:23 812- 3 3 COAL -- Harita Para6/13/2012 01:50:48 6/13/2012 01:57:29 832- 3 3 COAL -- Harita Para6/13/2012 01:51:15 6/13/2012 01:59:38 712-- 3 3 COAL -- Harita Para

Page 41: June Per Shift (Truckscale Port)

6/13/2012 01:51:44 6/13/2012 02:02:16 819- 3 3 COAL -- Harita Para6/13/2012 01:54:11 6/13/2012 02:02:41 705-- 3 3 COAL -- Harita Para6/13/2012 02:00:20 6/13/2012 02:04:50 115 3 3 COAL -- Harita Para6/13/2012 02:00:46 6/13/2012 02:06:30 703-- 3 3 COAL -- Harita Para6/13/2012 02:03:57 6/13/2012 02:09:30 836- 3 3 COAL -- Harita Para6/13/2012 02:05:22 6/13/2012 02:10:37 702-- 3 3 COAL -- Harita Para6/13/2012 02:08:43 6/13/2012 02:12:37 708-- 3 3 COAL -- Harita Para6/13/2012 02:11:43 6/13/2012 02:16:15 714-- 3 3 COAL -- Harita Para6/13/2012 02:14:15 6/13/2012 02:19:30 713-- 3 3 COAL -- Harita Para6/13/2012 02:17:02 6/13/2012 02:22:57 853 3 3 COAL -- MIL6/13/2012 02:18:33 6/13/2012 02:25:56 828- 3 3 COAL -- Harita Para6/13/2012 02:24:03 6/13/2012 02:26:02 837- 3 3 COAL -- Harita Para6/13/2012 02:24:35 6/13/2012 02:29:50 851 3 3 COAL -- MIL6/13/2012 02:25:05 6/13/2012 02:28:00 850- 3 3 COAL -- Harita Para6/13/2012 02:33:29 6/13/2012 02:38:01 839- 3 3 COAL -- Harita Para6/13/2012 02:42:35 6/13/2012 02:47:38 706-- 3 3 COAL -- Harita Para6/13/2012 03:08:17 6/13/2012 03:14:29 856 3 3 COAL -- MIL6/13/2012 03:13:25 6/13/2012 03:17:56 709-- 3 3 COAL -- Harita Para6/13/2012 03:13:50 6/13/2012 03:18:00 707-- 3 3 COAL -- Harita Para6/13/2012 03:27:11 6/13/2012 03:31:19 812- 3 3 COAL -- Harita Para6/13/2012 03:38:02 6/13/2012 03:42:07 832- 3 3 COAL -- Harita Para6/13/2012 07:37:35 6/13/2012 07:41:18 856 3 3 COAL -- MIL6/13/2012 07:38:13 6/13/2012 07:41:38 855 3 3 COAL -- MIL6/13/2012 07:38:36 6/13/2012 07:42:03 810 3 3 COAL -- MIL6/13/2012 07:39:04 6/13/2012 07:49:49 850- 3 3 COAL -- Harita Para6/13/2012 07:39:25 6/13/2012 07:52:21 839- 3 3 COAL -- Harita Para6/13/2012 07:39:46 6/13/2012 07:53:35 836- 3 3 COAL -- Harita Para6/13/2012 07:42:54 6/13/2012 07:59:12 851 3 3 COAL -- MIL6/13/2012 07:44:04 6/13/2012 08:18:00 852 3 1 COAL -- MIL6/13/2012 07:50:26 6/13/2012 08:03:20 704-- 3 1 COAL -- Harita Para6/13/2012 07:51:00 6/13/2012 07:54:58 853 3 3 COAL -- MIL6/13/2012 07:54:27 6/13/2012 07:58:42 714-- 3 3 COAL -- Harita Para6/13/2012 07:55:38 6/13/2012 08:02:30 702-- 3 1 COAL -- Harita Para6/13/2012 07:58:02 6/13/2012 08:02:33 707-- 3 1 COAL -- Harita Para6/13/2012 08:01:25 6/13/2012 08:08:26 706-- 1 1 COAL -- Harita Para6/13/2012 08:01:52 6/13/2012 08:11:38 701-- 1 1 COAL -- Harita Para6/13/2012 08:10:50 6/13/2012 08:14:57 703-- 1 1 COAL -- Harita Para6/13/2012 08:12:57 6/13/2012 08:17:36 115 1 1 COAL -- Harita Para6/13/2012 08:16:27 6/13/2012 08:22:13 113 1 1 COAL -- Harita Para6/13/2012 08:19:16 6/13/2012 08:23:17 837- 1 1 COAL -- Harita Para6/13/2012 08:21:07 6/13/2012 08:31:30 710-- 1 1 COAL -- Harita Para6/13/2012 08:21:27 6/13/2012 08:33:33 709-- 1 1 COAL -- Harita Para6/13/2012 08:29:56 6/13/2012 08:35:38 829- 1 1 COAL -- Harita Para6/13/2012 08:38:17 6/13/2012 08:42:01 713-- 1 1 COAL -- Harita Para6/13/2012 09:14:54 6/13/2012 09:18:31 704-- 1 1 COAL -- Harita Para6/13/2012 09:15:54 6/13/2012 09:21:10 836- 1 1 COAL -- Harita Para6/13/2012 09:20:27 6/13/2012 09:24:12 702-- 1 1 COAL -- Harita Para6/13/2012 09:23:04 6/13/2012 09:31:29 856 1 1 COAL -- MIL6/13/2012 09:28:32 6/13/2012 09:32:17 707-- 1 1 COAL -- Harita Para6/13/2012 09:30:18 6/13/2012 09:34:11 850- 1 1 COAL -- Harita Para

Page 42: June Per Shift (Truckscale Port)

6/13/2012 09:30:48 6/13/2012 09:35:54 807 1 1 COAL -- MIL6/13/2012 09:35:02 6/13/2012 09:38:29 706-- 1 1 COAL -- Harita Para6/13/2012 09:37:19 6/13/2012 09:44:14 852 1 1 COAL -- MIL6/13/2012 09:37:49 6/13/2012 09:43:53 810 1 1 COAL -- MIL6/13/2012 09:42:32 6/13/2012 09:46:25 701-- 1 1 COAL -- Harita Para6/13/2012 09:52:54 6/13/2012 09:58:29 812- 1 1 COAL -- Harita Para6/13/2012 09:57:11 6/13/2012 10:02:00 851 1 1 COAL -- MIL6/13/2012 09:57:49 6/13/2012 10:03:31 833- 1 1 COAL -- Harita Para6/13/2012 10:00:32 6/13/2012 10:05:59 855 1 1 COAL -- MIL6/13/2012 10:04:36 6/13/2012 10:08:21 829- 1 1 COAL -- Harita Para6/13/2012 10:15:12 6/13/2012 10:22:24 853 1 1 COAL -- MIL6/13/2012 10:24:07 6/13/2012 10:27:54 837- 1 1 COAL -- Harita Para6/13/2012 10:36:49 6/13/2012 10:40:17 714-- 1 1 COAL -- Harita Para6/13/2012 10:38:03 6/13/2012 10:42:47 832- 1 1 COAL -- Harita Para6/13/2012 10:38:57 6/13/2012 10:45:11 709-- 1 1 COAL -- Harita Para6/13/2012 10:41:37 6/13/2012 10:47:07 703-- 1 1 COAL -- Harita Para6/13/2012 10:44:35 6/13/2012 10:48:51 704-- 1 1 COAL -- Harita Para6/13/2012 10:45:59 6/13/2012 10:50:49 710-- 1 1 COAL -- Harita Para6/13/2012 10:46:27 6/13/2012 10:55:14 713-- 1 1 COAL -- Harita Para6/13/2012 10:53:04 6/13/2012 10:57:36 115 1 1 COAL -- Harita Para6/13/2012 10:53:25 6/13/2012 10:59:38 113 1 1 COAL -- Harita Para6/13/2012 10:53:48 6/13/2012 11:01:25 702-- 1 1 COAL -- Harita Para6/13/2012 11:02:23 6/13/2012 11:05:36 706-- 1 1 COAL -- Harita Para6/13/2012 11:06:24 6/13/2012 11:10:54 817- 1 1 COAL -- Harita Para6/13/2012 11:07:43 6/13/2012 11:14:15 856 1 1 COAL -- MIL6/13/2012 11:08:06 6/13/2012 11:12:54 707-- 1 1 COAL -- Harita Para6/13/2012 11:12:07 6/13/2012 11:15:25 836- 1 1 COAL -- Harita Para6/13/2012 11:13:32 6/13/2012 11:18:24 810 1 1 COAL -- MIL6/13/2012 11:16:46 6/13/2012 11:20:17 850- 1 1 COAL -- Harita Para6/13/2012 11:24:26 6/13/2012 11:27:46 833- 1 1 COAL -- Harita Para6/13/2012 11:29:22 6/13/2012 11:33:36 701-- 1 1 COAL -- Harita Para6/13/2012 11:34:12 6/13/2012 11:38:13 851 1 1 COAL -- MIL6/13/2012 11:34:35 6/13/2012 11:42:58 829- 1 1 COAL -- Harita Para6/13/2012 11:36:43 6/13/2012 11:45:26 852 1 1 COAL -- MIL6/13/2012 11:41:56 6/13/2012 11:46:33 712-- 1 1 COAL -- Harita Para6/13/2012 11:48:43 6/13/2012 11:52:42 831- 1 1 COAL -- Harita Para6/13/2012 11:49:04 6/13/2012 11:55:25 855 1 1 COAL -- MIL6/13/2012 11:50:38 6/13/2012 11:56:57 812- 1 1 COAL -- Harita Para6/13/2012 12:04:41 6/13/2012 12:11:50 853 1 1 COAL -- MIL6/13/2012 12:05:42 6/13/2012 12:12:44 837- 1 1 COAL -- Harita Para6/13/2012 12:10:48 6/13/2012 12:15:26 703-- 1 1 COAL -- Harita Para6/13/2012 12:21:27 6/13/2012 12:25:59 714-- 1 1 COAL -- Harita Para6/13/2012 12:42:39 6/13/2012 12:46:24 704-- 1 1 COAL -- Harita Para6/13/2012 12:44:37 6/13/2012 12:48:59 856 1 1 COAL -- MIL6/13/2012 12:47:25 6/13/2012 12:52:17 810 1 1 COAL -- MIL6/13/2012 12:53:14 6/13/2012 12:57:01 850- 1 1 COAL -- Harita Para6/13/2012 13:01:55 6/13/2012 13:08:58 817- 1 1 COAL -- Harita Para6/13/2012 13:09:43 6/13/2012 13:13:51 833- 1 1 COAL -- Harita Para6/13/2012 13:12:04 6/13/2012 13:16:14 706-- 1 1 COAL -- Harita Para6/13/2012 13:12:22 6/13/2012 13:18:23 702-- 1 1 COAL -- Harita Para

Page 43: June Per Shift (Truckscale Port)

6/13/2012 13:12:42 6/13/2012 13:19:10 707-- 1 1 COAL -- Harita Para6/13/2012 13:15:12 6/13/2012 13:21:11 709-- 1 1 COAL -- Harita Para6/13/2012 13:15:37 6/13/2012 13:23:33 113 1 1 COAL -- Harita Para6/13/2012 13:16:56 6/13/2012 13:27:02 115 1 1 COAL -- Harita Para6/13/2012 13:17:42 6/13/2012 13:27:22 710-- 1 1 COAL -- Harita Para6/13/2012 13:27:56 6/13/2012 13:31:48 701-- 1 1 COAL -- Harita Para6/13/2012 13:38:34 6/13/2012 13:45:54 852 1 1 COAL -- MIL6/13/2012 13:43:26 6/13/2012 13:47:27 703-- 1 1 COAL -- Harita Para6/13/2012 13:47:58 6/13/2012 13:52:44 829- 1 1 COAL -- Harita Para6/13/2012 13:52:06 6/13/2012 13:56:10 714-- 1 1 COAL -- Harita Para6/13/2012 14:01:25 6/13/2012 14:08:12 712-- 1 1 COAL -- Harita Para6/13/2012 14:01:55 6/13/2012 14:09:03 851 1 1 COAL -- MIL6/13/2012 14:07:15 6/13/2012 14:11:15 704-- 1 1 COAL -- Harita Para6/13/2012 14:09:50 6/13/2012 14:15:05 812- 1 1 COAL -- Harita Para6/13/2012 14:16:08 6/13/2012 14:22:15 855 1 1 COAL -- MIL6/13/2012 14:17:09 6/13/2012 14:23:45 837- 1 1 COAL -- Harita Para6/13/2012 14:18:41 6/13/2012 14:26:12 815- 1 1 COAL -- Harita Para6/13/2012 14:32:14 6/13/2012 14:35:32 706-- 1 1 COAL -- Harita Para6/13/2012 14:37:53 6/13/2012 14:41:31 833- 1 1 COAL -- Harita Para6/13/2012 14:38:37 6/13/2012 14:43:14 702-- 1 1 COAL -- Harita Para6/13/2012 14:44:17 6/13/2012 14:48:59 817- 1 1 COAL -- Harita Para6/13/2012 14:44:48 6/13/2012 14:52:54 853 1 1 COAL -- MIL6/13/2012 14:45:22 6/13/2012 14:56:45 707-- 1 1 COAL -- Harita Para6/13/2012 14:49:55 6/13/2012 14:56:48 709-- 1 1 COAL -- Harita Para6/13/2012 14:50:19 6/13/2012 14:58:29 839- 1 1 COAL -- Harita Para6/13/2012 14:54:51 6/13/2012 15:00:46 113 1 1 COAL -- Harita Para6/13/2012 14:57:50 6/13/2012 15:03:32 850- 1 1 COAL -- Harita Para6/13/2012 15:02:44 6/13/2012 15:07:39 115 1 1 COAL -- Harita Para6/13/2012 15:05:42 6/13/2012 15:08:13 701-- 1 1 COAL -- Harita Para6/13/2012 15:13:48 6/13/2012 15:18:27 831- 1 1 COAL -- Harita Para6/13/2012 15:22:36 6/13/2012 15:27:22 703-- 1 1 COAL -- Harita Para6/13/2012 15:23:21 6/13/2012 15:27:27 714-- 1 1 COAL -- Harita Para6/13/2012 15:26:38 6/13/2012 15:33:42 810 1 1 COAL -- MIL6/13/2012 15:40:54 6/13/2012 15:45:51 815- 1 1 COAL -- Harita Para6/13/2012 15:46:57 6/13/2012 15:50:51 713-- 1 1 COAL -- Harita Para6/13/2012 16:14:08 6/13/2012 16:22:11 712-- 2 2 COAL -- Harita Para6/13/2012 16:16:17 6/13/2012 16:24:01 817- 2 2 COAL -- Harita Para6/13/2012 19:02:54 6/13/2012 19:07:12 115 2 2 COAL -- Harita Para6/13/2012 19:03:15 6/13/2012 19:08:20 713-- 2 2 COAL -- Harita Para6/13/2012 19:06:12 6/13/2012 19:10:38 709-- 2 2 COAL -- Harita Para6/13/2012 19:11:29 6/13/2012 19:15:47 701-- 2 2 COAL -- Harita Para6/13/2012 19:12:26 6/13/2012 19:19:37 714-- 2 2 COAL -- Harita Para6/13/2012 19:14:03 6/13/2012 19:23:09 839- 2 2 COAL -- Harita Para6/13/2012 19:14:54 6/13/2012 19:23:33 837- 2 2 COAL -- Harita Para6/13/2012 19:16:44 6/13/2012 19:25:15 851 2 2 COAL -- MIL6/13/2012 19:17:12 6/13/2012 19:26:39 856 2 2 COAL -- MIL6/13/2012 19:20:41 6/13/2012 19:28:14 812- 2 2 COAL -- Harita Para6/13/2012 19:21:33 6/13/2012 19:29:38 852 2 2 COAL -- MIL6/13/2012 19:21:56 6/13/2012 19:31:37 702-- 2 2 COAL -- Harita Para6/13/2012 19:22:25 6/13/2012 19:32:44 853 2 2 COAL -- MIL

Page 44: June Per Shift (Truckscale Port)

6/13/2012 19:24:19 6/13/2012 19:36:20 855 2 2 COAL -- MIL6/13/2012 19:41:54 6/13/2012 19:47:05 850- 2 2 COAL -- Harita Para6/13/2012 19:42:20 6/13/2012 20:05:28 704-- 2 2 COAL -- Harita Para6/13/2012 19:42:40 6/13/2012 19:50:11 707-- 2 2 COAL -- Harita Para6/13/2012 19:43:16 6/13/2012 19:52:34 703-- 2 2 COAL -- Harita Para6/13/2012 19:51:22 6/13/2012 19:57:39 706-- 2 2 COAL -- Harita Para6/13/2012 19:51:46 6/13/2012 19:59:10 712-- 2 2 COAL -- Harita Para6/13/2012 20:04:45 6/13/2012 20:07:57 810 2 2 COAL -- MIL6/13/2012 20:11:06 6/13/2012 20:15:14 113 2 2 COAL -- Harita Para6/13/2012 20:30:25 6/13/2012 20:34:09 713-- 2 2 COAL -- Harita Para6/13/2012 20:36:27 6/13/2012 20:40:58 705-- 2 2 COAL -- Harita Para6/13/2012 20:39:05 6/13/2012 20:43:28 815- 2 2 COAL -- Harita Para6/13/2012 20:41:51 6/13/2012 20:46:03 709-- 2 2 COAL -- Harita Para6/13/2012 20:47:37 6/13/2012 20:51:30 701-- 2 2 COAL -- Harita Para6/13/2012 20:48:03 6/13/2012 20:54:00 818- 2 2 COAL -- Harita Para6/13/2012 20:48:27 6/13/2012 20:55:26 832- 2 2 COAL -- Harita Para6/13/2012 20:53:12 6/13/2012 20:57:13 714-- 2 2 COAL -- Harita Para6/13/2012 20:57:51 6/13/2012 21:03:16 851 2 2 COAL -- MIL6/13/2012 20:58:28 6/13/2012 21:05:36 817- 2 2 COAL -- Harita Para6/13/2012 21:04:01 6/13/2012 21:13:02 856 2 2 COAL -- MIL6/13/2012 21:10:40 6/13/2012 21:14:55 707-- 2 2 COAL -- Harita Para6/13/2012 21:11:09 6/13/2012 21:16:07 830- 2 2 COAL -- Harita Para6/13/2012 21:11:37 6/13/2012 21:17:56 712-- 2 2 COAL -- Harita Para6/13/2012 21:14:12 6/13/2012 21:20:20 839- 2 2 COAL -- Harita Para6/13/2012 21:18:38 6/13/2012 21:23:29 852 2 2 COAL -- MIL6/13/2012 21:21:22 6/13/2012 21:26:20 115 2 2 COAL -- Harita Para6/13/2012 21:24:34 6/13/2012 21:29:16 702-- 2 2 COAL -- Harita Para6/13/2012 21:25:26 6/13/2012 21:30:57 837- 2 2 COAL -- Harita Para6/13/2012 21:27:50 6/13/2012 21:32:51 853 2 2 COAL -- MIL6/13/2012 21:28:40 6/13/2012 21:33:51 703-- 2 2 COAL -- Harita Para6/13/2012 21:32:12 6/13/2012 21:37:12 812- 2 2 COAL -- Harita Para6/13/2012 21:35:16 6/13/2012 21:41:46 855 2 2 COAL -- MIL6/13/2012 21:36:00 6/13/2012 21:42:07 704-- 2 2 COAL -- Harita Para6/13/2012 21:36:25 6/13/2012 21:44:23 113 2 2 COAL -- Harita Para6/13/2012 21:43:11 6/13/2012 21:47:54 828- 2 2 COAL -- Harita Para6/13/2012 21:49:52 6/13/2012 21:53:40 713-- 2 2 COAL -- Harita Para6/13/2012 22:02:05 6/13/2012 22:06:32 706-- 2 2 COAL -- Harita Para6/13/2012 22:08:23 6/13/2012 22:12:44 709-- 2 2 COAL -- Harita Para6/13/2012 22:09:17 6/13/2012 22:15:22 850- 2 2 COAL -- Harita Para6/13/2012 22:14:35 6/13/2012 22:19:10 705-- 2 2 COAL -- Harita Para6/13/2012 22:18:24 6/13/2012 22:22:14 714-- 2 2 COAL -- Harita Para6/13/2012 22:23:31 6/13/2012 22:27:54 701-- 2 2 COAL -- Harita Para6/13/2012 22:26:09 6/13/2012 22:31:00 832- 2 2 COAL -- Harita Para6/13/2012 22:28:52 6/13/2012 22:33:32 815- 2 2 COAL -- Harita Para6/13/2012 22:30:01 6/13/2012 22:36:07 833- 2 2 COAL -- Harita Para6/13/2012 22:32:00 6/13/2012 22:37:37 851 2 2 COAL -- MIL6/13/2012 22:40:10 6/13/2012 22:44:06 817- 2 2 COAL -- Harita Para6/13/2012 22:40:59 6/13/2012 22:46:24 818- 2 2 COAL -- Harita Para6/13/2012 22:41:51 6/13/2012 22:47:27 856 2 2 COAL -- MIL6/13/2012 22:51:53 6/13/2012 22:58:12 115 2 2 COAL -- Harita Para

Page 45: June Per Shift (Truckscale Port)

6/13/2012 22:55:07 6/13/2012 22:59:19 830- 2 2 COAL -- Harita Para6/13/2012 22:56:33 6/13/2012 23:01:32 852 2 2 COAL -- MIL6/13/2012 22:57:02 6/13/2012 23:02:58 710-- 2 2 COAL -- Harita Para6/13/2012 22:57:23 6/13/2012 23:04:51 113 2 2 COAL -- Harita Para6/13/2012 23:00:24 6/13/2012 23:07:43 839- 2 2 COAL -- Harita Para6/13/2012 23:00:53 6/13/2012 23:09:18 810 2 2 COAL -- MIL6/13/2012 23:06:00 6/13/2012 23:10:52 713-- 2 2 COAL -- Harita Para6/13/2012 23:07:04 6/13/2012 23:12:18 837- 2 2 COAL -- Harita Para6/13/2012 23:08:39 6/13/2012 23:15:57 703-- 2 2 COAL -- Harita Para6/13/2012 23:13:04 6/13/2012 23:18:54 812- 2 2 COAL -- Harita Para6/13/2012 23:15:00 6/13/2012 23:21:44 704-- 2 2 COAL -- Harita Para6/13/2012 23:17:39 6/13/2012 23:23:45 853 2 2 COAL -- MIL6/13/2012 23:20:52 6/13/2012 23:27:59 855 2 2 COAL -- MIL6/13/2012 23:22:47 6/13/2012 23:29:35 828- 2 2 COAL -- Harita Para6/13/2012 23:26:23 6/13/2012 23:32:01 836- 2 2 COAL -- Harita Para6/13/2012 23:36:26 6/13/2012 23:39:57 702-- 2 2 COAL -- Harita Para6/13/2012 23:43:51 6/13/2012 23:49:10 709-- 2 2 COAL -- Harita Para6/13/2012 23:44:54 6/13/2012 23:50:43 850- 2 2 COAL -- Harita Para6/13/2012 23:47:26 6/13/2012 23:53:16 714-- 2 2 COAL -- Harita Para6/14/2012 00:02:16 6/14/2012 00:08:25 705-- 3 3 COAL -- Harita Para6/14/2012 00:04:06 6/14/2012 00:14:43 701-- 3 3 COAL -- Harita Para6/14/2012 00:06:20 6/14/2012 00:12:22 832- 3 3 COAL -- Harita Para6/14/2012 00:07:03 6/14/2012 00:14:52 706-- 3 3 COAL -- Harita Para6/14/2012 00:07:30 6/14/2012 00:16:47 851 3 3 COAL -- MIL6/14/2012 00:13:54 6/14/2012 00:20:34 815- 3 3 COAL -- Harita Para6/14/2012 00:17:43 6/14/2012 00:24:12 856 3 3 COAL -- MIL6/14/2012 00:23:23 6/14/2012 00:28:03 113 3 3 COAL -- Harita Para6/14/2012 00:25:33 6/14/2012 00:29:29 712-- 3 3 COAL -- Harita Para6/14/2012 00:27:17 6/14/2012 00:31:38 818- 3 3 COAL -- Harita Para6/14/2012 00:37:04 6/14/2012 00:42:12 830- 3 3 COAL -- Harita Para6/14/2012 00:41:11 6/14/2012 00:44:43 713-- 3 3 COAL -- Harita Para6/14/2012 00:41:33 6/14/2012 00:46:01 810 3 3 COAL -- MIL6/14/2012 00:55:24 6/14/2012 01:03:57 852 3 3 COAL -- MIL6/14/2012 01:01:59 6/14/2012 01:05:59 817- 3 3 COAL -- Harita Para6/14/2012 01:14:22 6/14/2012 01:18:57 853 3 3 COAL -- MIL6/14/2012 01:15:34 6/14/2012 01:22:56 115 3 3 COAL -- Harita Para6/14/2012 01:21:59 6/14/2012 01:25:59 703-- 3 3 COAL -- Harita Para6/14/2012 01:31:10 6/14/2012 01:38:24 855 3 3 COAL -- MIL6/14/2012 01:34:05 6/14/2012 01:40:02 702-- 3 3 COAL -- Harita Para6/14/2012 01:48:20 6/14/2012 01:52:32 705-- 3 3 COAL -- Harita Para6/14/2012 01:50:05 6/14/2012 01:56:30 851 3 3 COAL -- MIL6/14/2012 01:50:40 6/14/2012 01:58:04 710 3 3 COAL -- Harita Para6/14/2012 01:57:28 6/14/2012 02:03:22 701-- 3 3 COAL -- Harita Para6/14/2012 02:04:52 6/14/2012 02:10:56 712-- 3 3 COAL -- Harita Para6/14/2012 02:09:57 6/14/2012 02:15:02 812- 3 3 COAL -- Harita Para6/14/2012 02:10:17 6/14/2012 02:16:37 713-- 3 3 COAL -- Harita Para6/14/2012 02:13:18 6/14/2012 02:19:09 113 3 3 COAL -- Harita Para6/14/2012 02:14:19 6/14/2012 02:20:14 810 3 3 COAL -- MIL6/14/2012 02:15:57 6/14/2012 02:22:08 828- 3 3 COAL -- Harita Para6/14/2012 02:27:27 6/14/2012 02:32:21 839- 3 3 COAL -- Harita Para

Page 46: June Per Shift (Truckscale Port)

6/14/2012 02:33:32 6/14/2012 02:37:40 714-- 3 3 COAL -- Harita Para6/14/2012 02:35:50 6/14/2012 02:39:27 836- 3 3 COAL -- Harita Para6/14/2012 02:38:41 6/14/2012 02:42:43 850- 3 3 COAL -- Harita Para6/14/2012 02:41:00 6/14/2012 02:45:28 709-- 3 3 COAL -- Harita Para6/14/2012 02:41:57 6/14/2012 02:48:34 815- 3 3 COAL -- Harita Para6/14/2012 02:47:36 6/14/2012 02:51:56 818- 3 3 COAL -- Harita Para6/14/2012 02:53:06 6/14/2012 03:00:37 704-- 3 3 COAL -- Harita Para6/14/2012 02:53:30 6/14/2012 03:00:40 115 3 3 COAL -- Harita Para6/14/2012 03:10:04 6/14/2012 03:14:36 817- 3 3 COAL -- Harita Para6/14/2012 03:10:33 6/14/2012 03:16:50 830- 3 3 COAL -- Harita Para6/14/2012 03:27:06 6/14/2012 03:31:36 832- 3 3 COAL -- Harita Para6/14/2012 03:28:17 6/14/2012 03:34:08 712-- 3 3 COAL -- Harita Para6/14/2012 03:33:23 6/14/2012 03:37:04 713-- 3 3 COAL -- Harita Para6/14/2012 03:44:09 6/14/2012 03:48:22 113 3 3 COAL -- Harita Para6/14/2012 03:54:37 6/14/2012 03:58:55 828- 3 3 COAL -- Harita Para6/14/2012 04:00:35 6/14/2012 04:06:11 850- 3 3 COAL -- Harita Para6/14/2012 04:04:20 6/14/2012 04:08:20 706-- 3 3 COAL -- Harita Para6/14/2012 04:05:23 6/14/2012 04:09:56 710-- 3 3 COAL -- Harita Para6/14/2012 07:16:31 6/14/2012 07:20:58 113 3 3 COAL -- Harita Para6/14/2012 07:17:54 6/14/2012 07:21:01 115 3 3 COAL -- Harita Para6/14/2012 07:23:00 6/14/2012 07:26:59 701-- 3 3 COAL -- Harita Para6/14/2012 07:23:57 6/14/2012 07:31:33 709-- 3 3 COAL -- Harita Para6/14/2012 07:26:03 6/14/2012 07:31:25 713-- 3 3 COAL -- Harita Para6/14/2012 07:28:41 6/14/2012 07:34:05 703-- 3 3 COAL -- Harita Para6/14/2012 07:29:41 6/14/2012 07:37:21 810 3 3 COAL -- MIL6/14/2012 07:30:05 6/14/2012 07:45:44 702-- 3 3 COAL -- Harita Para6/14/2012 07:33:25 6/14/2012 07:41:55 855 3 3 COAL -- MIL6/14/2012 07:35:25 6/14/2012 07:42:26 856 3 3 COAL -- MIL6/14/2012 07:35:44 6/14/2012 07:43:46 851 3 3 COAL -- MIL6/14/2012 07:38:29 6/14/2012 07:45:50 714-- 3 3 COAL -- Harita Para6/14/2012 07:39:16 6/14/2012 07:48:25 707-- 3 3 COAL -- Harita Para6/14/2012 07:40:24 6/14/2012 07:50:30 815- 3 3 COAL -- Harita Para6/14/2012 07:44:53 6/14/2012 07:52:22 708-- 3 3 COAL -- Harita Para6/14/2012 07:47:44 6/14/2012 07:57:30 836- 3 3 COAL -- Harita Para6/14/2012 07:49:24 6/14/2012 07:56:56 839- 3 3 COAL -- Harita Para6/14/2012 07:49:53 6/14/2012 08:00:27 853 3 1 COAL -- MIL6/14/2012 07:58:45 6/14/2012 08:02:11 818- 3 1 COAL -- Harita Para6/14/2012 07:59:45 6/14/2012 08:05:31 712-- 3 1 COAL -- Harita Para6/14/2012 08:10:54 6/14/2012 08:15:32 817- 1 1 COAL -- Harita Para6/14/2012 08:28:50 6/14/2012 08:34:50 852 1 1 COAL -- MIL6/14/2012 08:43:53 6/14/2012 08:49:54 812- 1 1 COAL -- Harita Para6/14/2012 08:47:00 6/14/2012 08:52:36 113 1 1 COAL -- Harita Para6/14/2012 08:49:11 6/14/2012 08:54:28 115 1 1 COAL -- Harita Para6/14/2012 08:53:41 6/14/2012 08:58:45 832- 1 1 COAL -- Harita Para6/14/2012 08:57:40 6/14/2012 09:01:30 830- 1 1 COAL -- Harita Para6/14/2012 08:58:04 6/14/2012 09:03:54 709-- 1 1 COAL -- Harita Para6/14/2012 09:02:29 6/14/2012 09:07:34 713-- 1 1 COAL -- Harita Para6/14/2012 09:06:04 6/14/2012 09:12:32 837- 1 1 COAL -- Harita Para6/14/2012 09:06:45 6/14/2012 09:12:54 707-- 1 1 COAL -- Harita Para6/14/2012 09:10:32 6/14/2012 09:15:41 703-- 1 1 COAL -- Harita Para

Page 47: June Per Shift (Truckscale Port)

6/14/2012 09:11:28 6/14/2012 09:19:01 701-- 1 1 COAL -- Harita Para6/14/2012 09:13:50 6/14/2012 09:31:13 714-- 1 1 COAL -- Harita Para6/14/2012 09:16:40 6/14/2012 09:24:06 855 1 1 COAL -- MIL6/14/2012 09:17:03 6/14/2012 09:26:49 702-- 1 1 COAL -- Harita Para6/14/2012 09:23:41 6/14/2012 09:27:51 851 1 1 COAL -- MIL6/14/2012 09:24:50 6/14/2012 09:29:31 708-- 1 1 COAL -- Harita Para6/14/2012 09:25:10 6/14/2012 09:31:08 706-- 1 1 COAL -- Harita Para6/14/2012 09:25:35 6/14/2012 09:32:46 818- 1 1 COAL -- Harita Para6/14/2012 09:26:01 6/14/2012 09:34:08 856 1 1 COAL -- MIL6/14/2012 09:42:54 6/14/2012 09:46:54 839- 1 1 COAL -- Harita Para6/14/2012 09:43:52 6/14/2012 09:52:46 853 1 1 COAL -- MIL6/14/2012 09:46:12 6/14/2012 09:53:58 817- 1 1 COAL -- Harita Para6/14/2012 09:48:50 6/14/2012 09:55:51 831- 1 1 COAL -- Harita Para6/14/2012 10:00:29 6/14/2012 10:05:08 712-- 1 1 COAL -- Harita Para6/14/2012 10:12:32 6/14/2012 10:23:49 852 1 1 COAL -- MIL6/14/2012 10:12:56 6/14/2012 10:27:41 113 1 1 COAL -- Harita Para6/14/2012 10:13:33 6/14/2012 10:27:11 812- 1 1 COAL -- Harita Para6/14/2012 10:17:21 6/14/2012 10:29:23 115 1 1 COAL -- Harita Para6/14/2012 10:20:49 6/14/2012 10:29:28 709-- 1 1 COAL -- Harita Para6/14/2012 10:28:41 6/14/2012 10:32:59 832- 1 1 COAL -- Harita Para6/14/2012 10:30:55 6/14/2012 10:33:06 713-- 1 1 COAL -- Harita Para6/14/2012 10:35:57 6/14/2012 10:40:40 707-- 1 1 COAL -- Harita Para6/14/2012 10:37:59 6/14/2012 10:41:45 828- 1 1 COAL -- Harita Para6/14/2012 10:45:19 6/14/2012 10:52:36 701-- 1 1 COAL -- Harita Para6/14/2012 10:47:18 6/14/2012 10:54:20 703-- 1 1 COAL -- Harita Para6/14/2012 10:49:42 6/14/2012 10:55:30 702-- 1 1 COAL -- Harita Para6/14/2012 10:51:42 6/14/2012 10:57:27 818- 1 1 COAL -- Harita Para6/14/2012 10:53:27 6/14/2012 10:59:40 837- 1 1 COAL -- Harita Para6/14/2012 10:53:44 6/14/2012 11:01:08 851 1 1 COAL -- MIL6/14/2012 11:00:31 6/14/2012 11:03:51 706-- 1 1 COAL -- Harita Para6/14/2012 11:02:04 6/14/2012 11:05:54 850- 1 1 COAL -- Harita Para6/14/2012 11:03:08 6/14/2012 11:08:32 708-- 1 1 COAL -- Harita Para6/14/2012 11:07:51 6/14/2012 11:11:38 829- 1 1 COAL -- Harita Para6/14/2012 11:12:36 6/14/2012 11:15:11 856 1 1 COAL -- MIL6/14/2012 11:16:36 6/14/2012 11:21:30 855 1 1 COAL -- MIL6/14/2012 11:25:45 6/14/2012 11:28:59 839- 1 1 COAL -- Harita Para6/14/2012 11:26:02 6/14/2012 11:31:41 815- 1 1 COAL -- Harita Para6/14/2012 11:33:54 6/14/2012 11:38:10 817- 1 1 COAL -- Harita Para6/14/2012 11:34:22 6/14/2012 11:42:19 853 1 1 COAL -- MIL6/14/2012 11:44:57 6/14/2012 11:49:21 113 1 1 COAL -- Harita Para6/14/2012 11:50:20 6/14/2012 11:55:02 812- 1 1 COAL -- Harita Para6/14/2012 11:57:54 6/14/2012 12:11:14 852 1 1 COAL -- MIL6/14/2012 12:25:46 6/14/2012 12:32:41 837- 1 1 COAL -- Harita Para6/14/2012 12:30:05 6/14/2012 12:34:25 851 1 1 COAL -- MIL6/14/2012 12:39:54 6/14/2012 12:44:11 703-- 1 1 COAL -- Harita Para6/14/2012 12:46:23 6/14/2012 12:51:01 832- 1 1 COAL -- Harita Para6/14/2012 12:48:22 6/14/2012 12:55:13 855 1 1 COAL -- MIL6/14/2012 12:48:40 6/14/2012 12:56:11 850- 1 1 COAL -- Harita Para6/14/2012 12:57:39 6/14/2012 13:01:14 830- 1 1 COAL -- Harita Para6/14/2012 13:12:21 6/14/2012 13:17:59 712-- 1 1 COAL -- Harita Para

Page 48: June Per Shift (Truckscale Port)

6/14/2012 13:23:11 6/14/2012 13:30:10 706-- 1 1 COAL -- Harita Para6/14/2012 13:24:13 6/14/2012 13:30:48 702-- 1 1 COAL -- Harita Para6/14/2012 13:25:38 6/14/2012 13:33:00 713-- 1 1 COAL -- Harita Para6/14/2012 13:27:01 6/14/2012 13:37:20 701-- 1 1 COAL -- Harita Para6/14/2012 13:27:27 6/14/2012 13:37:55 115 1 1 COAL -- Harita Para6/14/2012 13:28:36 6/14/2012 13:40:05 709-- 1 1 COAL -- Harita Para6/14/2012 13:29:11 6/14/2012 13:41:55 707-- 1 1 COAL -- Harita Para6/14/2012 13:29:32 6/14/2012 13:43:53 708-- 1 1 COAL -- Harita Para6/14/2012 13:46:21 6/14/2012 13:50:42 852 1 1 COAL -- MIL6/14/2012 13:48:56 6/14/2012 13:51:43 856 1 1 COAL -- MIL6/14/2012 13:58:36 6/14/2012 14:03:19 113 1 1 COAL -- Harita Para6/14/2012 14:06:44 6/14/2012 14:10:47 819- 1 1 COAL -- Harita Para6/14/2012 14:07:06 6/14/2012 14:12:29 815- 1 1 COAL -- Harita Para6/14/2012 14:17:55 6/14/2012 14:22:34 839- 1 1 COAL -- Harita Para6/14/2012 14:21:42 6/14/2012 14:28:04 817- 1 1 COAL -- Harita Para6/14/2012 14:30:55 6/14/2012 14:37:02 853 1 1 COAL -- MIL6/14/2012 14:34:07 6/14/2012 14:41:15 850- 1 1 COAL -- Harita Para6/14/2012 14:38:48 6/14/2012 14:44:07 851 1 1 COAL -- MIL6/14/2012 14:39:14 6/14/2012 14:42:47 830- 1 1 COAL -- Harita Para6/14/2012 14:40:02 6/14/2012 14:49:04 855 1 1 COAL -- MIL6/14/2012 14:40:23 6/14/2012 14:46:11 818- 1 1 COAL -- Harita Para6/14/2012 14:50:00 6/14/2012 14:57:18 713-- 1 1 COAL -- Harita Para6/14/2012 14:50:43 6/14/2012 14:58:43 706-- 1 1 COAL -- Harita Para6/14/2012 14:53:20 6/14/2012 15:00:48 832- 1 1 COAL -- Harita Para6/14/2012 14:53:47 6/14/2012 15:03:08 812- 1 1 COAL -- Harita Para6/14/2012 14:54:08 6/14/2012 15:04:23 702-- 1 1 COAL -- Harita Para6/14/2012 14:56:10 6/14/2012 15:07:28 701-- 1 1 COAL -- Harita Para6/14/2012 14:59:35 6/14/2012 15:08:52 115 1 1 COAL -- Harita Para6/14/2012 14:59:54 6/14/2012 15:11:15 829- 1 1 COAL -- Harita Para6/14/2012 15:05:47 6/14/2012 15:17:12 707-- 1 1 COAL -- Harita Para6/14/2012 15:09:57 6/14/2012 15:17:15 703-- 1 1 COAL -- Harita Para6/14/2012 15:14:38 6/14/2012 15:21:13 837- 1 1 COAL -- Harita Para6/14/2012 15:15:14 6/14/2012 15:19:28 712-- 1 1 COAL -- Harita Para6/14/2012 15:15:32 6/14/2012 15:24:00 709-- 1 1 COAL -- Harita Para6/14/2012 15:16:02 6/14/2012 15:26:12 708-- 1 1 COAL -- Harita Para6/14/2012 15:18:29 6/14/2012 15:29:13 856 1 1 COAL -- MIL6/14/2012 15:27:22 6/14/2012 15:32:08 815- 1 1 COAL -- Harita Para6/14/2012 15:30:09 6/14/2012 15:33:55 836- 1 1 COAL -- Harita Para6/14/2012 15:30:35 6/14/2012 15:36:56 113 1 1 COAL -- Harita Para6/14/2012 15:37:53 6/14/2012 15:44:13 852 1 1 COAL -- MIL6/14/2012 15:41:52 6/14/2012 15:44:58 839- 1 1 COAL -- Harita Para6/14/2012 16:02:38 6/14/2012 16:06:06 806 2 2 COAL -- MIL6/14/2012 16:33:30 6/14/2012 16:37:16 829- 2 2 COAL -- Harita Para6/14/2012 18:11:42 6/14/2012 18:15:45 705-- 2 2 COAL -- Harita Para6/14/2012 18:22:06 6/14/2012 18:25:48 713-- 2 2 COAL -- Harita Para6/14/2012 18:22:58 6/14/2012 18:36:52 707-- 2 2 COAL -- Harita Para6/14/2012 18:26:51 6/14/2012 18:30:51 115 2 2 COAL -- Harita Para6/14/2012 18:27:18 6/14/2012 18:33:00 709-- 2 2 COAL -- Harita Para6/14/2012 18:28:41 6/14/2012 18:34:34 701-- 2 2 COAL -- Harita Para6/14/2012 18:31:37 6/14/2012 18:39:46 706-- 2 2 COAL -- Harita Para

Page 49: June Per Shift (Truckscale Port)

6/14/2012 18:32:13 6/14/2012 18:40:55 113 2 2 COAL -- Harita Para6/14/2012 18:35:31 6/14/2012 18:42:21 702-- 2 2 COAL -- Harita Para6/14/2012 18:39:00 6/14/2012 18:44:16 703-- 2 2 COAL -- Harita Para6/14/2012 18:56:08 6/14/2012 19:15:08 704-- 2 2 COAL -- Harita Para6/14/2012 18:59:24 6/14/2012 19:02:43 710-- 2 2 COAL -- Harita Para6/14/2012 19:08:50 6/14/2012 19:17:20 855 2 2 COAL -- MIL6/14/2012 19:10:55 6/14/2012 19:16:29 856 2 2 COAL -- MIL6/14/2012 19:11:57 6/14/2012 19:17:56 839- 2 2 COAL -- Harita Para6/14/2012 19:14:26 6/14/2012 19:21:00 832- 2 2 COAL -- Harita Para6/14/2012 19:15:47 6/14/2012 19:21:42 851 2 2 COAL -- MIL6/14/2012 19:18:45 6/14/2012 19:24:55 819- 2 2 COAL -- Harita Para6/14/2012 19:19:11 6/14/2012 19:25:17 712-- 2 2 COAL -- Harita Para6/14/2012 19:19:38 6/14/2012 19:27:31 853 2 2 COAL -- MIL6/14/2012 19:19:56 6/14/2012 19:35:04 708-- 2 2 COAL -- Harita Para6/14/2012 19:23:51 6/14/2012 19:31:04 837- 2 2 COAL -- Harita Para6/14/2012 19:38:23 6/14/2012 19:42:12 714-- 2 2 COAL -- Harita Para6/14/2012 19:45:35 6/14/2012 19:49:52 817- 2 2 COAL -- Harita Para6/14/2012 19:53:16 6/14/2012 19:57:03 707-- 2 2 COAL -- Harita Para6/14/2012 20:01:51 6/14/2012 20:05:41 836- 2 2 COAL -- Harita Para6/14/2012 20:02:17 6/14/2012 20:07:50 701-- 2 2 COAL -- Harita Para6/14/2012 20:02:45 6/14/2012 20:09:32 852 2 2 COAL -- MIL6/14/2012 20:03:19 6/14/2012 20:11:35 705-- 2 2 COAL -- Harita Para6/14/2012 20:06:16 6/14/2012 20:13:15 702-- 2 2 COAL -- Harita Para6/14/2012 20:06:37 6/14/2012 20:16:50 713-- 2 2 COAL -- Harita Para6/14/2012 20:12:23 6/14/2012 20:19:00 830- 2 2 COAL -- Harita Para6/14/2012 20:14:09 6/14/2012 20:20:38 703-- 2 2 COAL -- Harita Para6/14/2012 20:14:36 6/14/2012 20:22:42 709-- 2 2 COAL -- Harita Para6/14/2012 20:23:47 6/14/2012 20:27:47 706-- 2 2 COAL -- Harita Para6/14/2012 20:24:13 6/14/2012 20:30:14 115 2 2 COAL -- Harita Para6/14/2012 20:24:33 6/14/2012 20:31:23 710-- 2 2 COAL -- Harita Para6/14/2012 20:24:51 6/14/2012 20:33:27 113 2 2 COAL -- Harita Para6/14/2012 20:43:06 6/14/2012 20:47:32 856 2 2 COAL -- MIL6/14/2012 20:51:55 6/14/2012 20:59:34 832- 2 2 COAL -- Harita Para6/14/2012 20:55:41 6/14/2012 21:02:42 855 2 2 COAL -- MIL6/14/2012 20:56:10 6/14/2012 21:02:08 839- 2 2 COAL -- Harita Para6/14/2012 20:56:28 6/14/2012 21:04:45 712-- 2 2 COAL -- Harita Para6/14/2012 20:57:52 6/14/2012 21:06:44 704-- 2 2 COAL -- Harita Para6/14/2012 21:04:04 6/14/2012 21:08:42 851 2 2 COAL -- MIL6/14/2012 21:11:03 6/14/2012 21:15:50 819- 2 2 COAL -- Harita Para6/14/2012 21:12:20 6/14/2012 21:17:58 815- 2 2 COAL -- Harita Para6/14/2012 21:12:53 6/14/2012 21:20:17 714-- 2 2 COAL -- Harita Para6/14/2012 21:13:14 6/14/2012 21:21:12 853 2 2 COAL -- MIL6/14/2012 21:16:42 6/14/2012 21:22:54 707-- 2 2 COAL -- Harita Para6/14/2012 21:19:22 6/14/2012 21:25:14 829- 2 2 COAL -- Harita Para6/14/2012 21:31:54 6/14/2012 21:35:44 817- 2 2 COAL -- Harita Para6/14/2012 21:36:34 6/14/2012 21:40:17 701-- 2 2 COAL -- Harita Para6/14/2012 21:38:03 6/14/2012 21:45:11 713-- 2 2 COAL -- Harita Para6/14/2012 21:43:28 6/14/2012 21:51:28 705-- 2 2 COAL -- Harita Para6/14/2012 21:46:20 6/14/2012 21:51:50 708-- 2 2 COAL -- Harita Para6/14/2012 21:50:42 6/14/2012 21:55:18 709-- 2 2 COAL -- Harita Para

Page 50: June Per Shift (Truckscale Port)

6/14/2012 21:53:41 6/14/2012 21:57:20 702-- 2 2 COAL -- Harita Para6/14/2012 22:02:58 6/14/2012 22:07:17 836- 2 2 COAL -- Harita Para6/14/2012 22:04:21 6/14/2012 22:09:36 706-- 2 2 COAL -- Harita Para6/14/2012 22:05:07 6/14/2012 22:11:32 830- 2 2 COAL -- Harita Para6/14/2012 22:06:26 6/14/2012 22:13:12 703-- 2 2 COAL -- Harita Para6/14/2012 22:10:23 6/14/2012 22:16:06 710-- 2 2 COAL -- Harita Para6/14/2012 22:14:28 6/14/2012 22:19:20 115 2 2 COAL -- Harita Para6/14/2012 22:15:02 6/14/2012 22:22:03 856 2 2 COAL -- MIL6/14/2012 22:15:23 6/14/2012 22:21:29 113 2 2 COAL -- Harita Para6/14/2012 22:26:16 6/14/2012 22:30:11 712-- 2 2 COAL -- Harita Para6/14/2012 22:31:11 6/14/2012 22:36:26 704-- 2 2 COAL -- Harita Para6/14/2012 22:44:19 6/14/2012 22:51:14 855 2 2 COAL -- MIL6/14/2012 22:49:33 6/14/2012 22:54:50 851 2 2 COAL -- MIL6/14/2012 22:56:15 6/14/2012 22:59:53 707-- 2 2 COAL -- Harita Para6/14/2012 22:56:44 6/14/2012 23:01:49 853 2 2 COAL -- MIL6/14/2012 23:00:58 6/14/2012 23:05:50 832- 2 2 COAL -- Harita Para6/14/2012 23:03:55 6/14/2012 23:07:54 701-- 2 2 COAL -- Harita Para6/14/2012 23:11:08 6/14/2012 23:17:45 819- 2 2 COAL -- Harita Para6/14/2012 23:16:03 6/14/2012 23:21:17 713-- 2 2 COAL -- Harita Para6/14/2012 23:16:54 6/14/2012 23:24:53 829- 2 2 COAL -- Harita Para6/14/2012 23:19:47 6/14/2012 23:27:26 705-- 2 2 COAL -- Harita Para6/14/2012 23:22:19 6/14/2012 23:28:13 714-- 2 2 COAL -- Harita Para6/14/2012 23:24:12 6/14/2012 23:29:41 702-- 2 2 COAL -- Harita Para6/14/2012 23:31:34 6/14/2012 23:36:34 709-- 2 2 COAL -- Harita Para6/14/2012 23:32:16 6/14/2012 23:38:44 839- 2 2 COAL -- Harita Para6/14/2012 23:34:17 6/14/2012 23:41:59 706-- 2 2 COAL -- Harita Para6/14/2012 23:37:38 6/14/2012 23:43:21 703-- 2 2 COAL -- Harita Para6/14/2012 23:40:31 6/14/2012 23:43:50 710-- 2 2 COAL -- Harita Para6/14/2012 23:41:12 6/14/2012 23:47:40 817- 2 2 COAL -- Harita Para6/14/2012 23:45:55 6/14/2012 23:51:51 852 2 2 COAL -- MIL6/14/2012 23:46:23 6/14/2012 23:52:19 836- 2 2 COAL -- Harita Para6/14/2012 23:46:49 6/14/2012 23:53:45 856 2 2 COAL -- MIL6/14/2012 23:55:22 6/14/2012 23:59:20 708-- 2 2 COAL -- Harita Para6/15/2012 00:00:35 6/15/2012 00:04:09 830- 3 3 COAL -- Harita Para6/15/2012 00:05:49 6/15/2012 00:11:40 115 3 3 COAL -- Harita Para6/15/2012 00:09:15 6/15/2012 00:15:10 704-- 3 3 COAL -- Harita Para6/15/2012 00:09:41 6/15/2012 00:17:52 113 3 3 COAL -- Harita Para6/15/2012 00:10:09 6/15/2012 00:17:57 712-- 3 3 COAL -- Harita Para6/15/2012 00:19:12 6/15/2012 00:23:36 707-- 3 3 COAL -- Harita Para6/15/2012 00:32:24 6/15/2012 00:36:34 815- 3 3 COAL -- Harita Para6/15/2012 00:34:09 6/15/2012 00:40:15 851 3 3 COAL -- MIL6/15/2012 00:39:13 6/15/2012 00:43:26 701-- 3 3 COAL -- Harita Para6/15/2012 00:44:20 6/15/2012 00:48:39 853 3 3 COAL -- MIL6/15/2012 00:45:30 6/15/2012 00:54:52 855 3 3 COAL -- MIL6/15/2012 00:49:26 6/15/2012 00:54:13 713-- 3 3 COAL -- Harita Para6/15/2012 01:12:49 6/15/2012 01:16:32 710-- 3 3 COAL -- Harita Para6/15/2012 01:13:25 6/15/2012 01:21:03 829- 3 3 COAL -- Harita Para6/15/2012 01:14:19 6/15/2012 01:21:36 819- 3 3 COAL -- Harita Para6/15/2012 01:19:38 6/15/2012 01:24:00 714-- 3 3 COAL -- Harita Para6/15/2012 01:20:23 6/15/2012 01:27:18 852 3 3 COAL -- MIL

Page 51: June Per Shift (Truckscale Port)

6/15/2012 01:25:54 6/15/2012 01:35:53 856 3 3 COAL -- MIL6/15/2012 01:26:32 6/15/2012 01:44:57 818- 3 3 COAL -- Harita Para6/15/2012 01:41:02 6/15/2012 01:45:01 705-- 3 3 COAL -- Harita Para6/15/2012 01:49:30 6/15/2012 01:53:21 703-- 3 3 COAL -- Harita Para6/15/2012 01:54:32 6/15/2012 02:00:43 704-- 3 3 COAL -- Harita Para6/15/2012 01:59:04 6/15/2012 02:03:31 709-- 3 3 COAL -- Harita Para6/15/2012 02:04:38 6/15/2012 02:09:08 701-- 3 3 COAL -- Harita Para6/15/2012 02:06:30 6/15/2012 02:11:37 839- 3 3 COAL -- Harita Para6/15/2012 02:09:50 6/15/2012 02:13:39 702-- 3 3 COAL -- Harita Para6/15/2012 02:12:58 6/15/2012 02:18:23 836- 3 3 COAL -- Harita Para6/15/2012 02:15:21 6/15/2012 02:24:15 712-- 3 3 COAL -- Harita Para6/15/2012 02:16:36 6/15/2012 02:27:10 851 3 3 COAL -- MIL6/15/2012 02:19:34 6/15/2012 02:29:44 708-- 3 3 COAL -- Harita Para6/15/2012 02:20:03 6/15/2012 02:31:13 853 3 3 COAL -- MIL6/15/2012 02:20:52 6/15/2012 02:33:16 115 3 3 COAL -- Harita Para6/15/2012 02:23:15 6/15/2012 02:37:39 830- 3 3 COAL -- Harita Para6/15/2012 02:25:12 6/15/2012 02:35:17 707-- 3 3 COAL -- Harita Para6/15/2012 02:32:21 6/15/2012 02:37:45 832- 3 3 COAL -- Harita Para6/15/2012 02:39:41 6/15/2012 02:44:19 817- 3 3 COAL -- Harita Para6/15/2012 02:42:36 6/15/2012 02:48:38 855 3 3 COAL -- MIL6/15/2012 02:43:32 6/15/2012 03:01:58 706-- 3 3 COAL -- Harita Para6/15/2012 02:56:04 6/15/2012 03:05:07 852 3 3 COAL -- MIL6/15/2012 02:59:56 6/15/2012 03:06:28 819- 3 3 COAL -- Harita Para6/15/2012 03:03:29 6/15/2012 03:05:13 856 3 3 COAL -- MIL6/15/2012 03:55:19 6/15/2012 03:59:46 839- 3 3 COAL -- Harita Para6/15/2012 03:59:00 6/15/2012 04:00:01 815- 3 3 COAL -- Harita Para6/15/2012 07:21:41 6/15/2012 07:27:51 702-- 3 3 COAL -- Harita Para6/15/2012 07:22:46 6/15/2012 07:28:24 704-- 3 3 COAL -- Harita Para6/15/2012 07:25:35 6/15/2012 07:29:01 705-- 3 3 COAL -- Harita Para6/15/2012 07:26:02 6/15/2012 07:31:43 710-- 3 3 COAL -- Harita Para6/15/2012 07:26:31 6/15/2012 07:36:35 708-- 3 3 COAL -- Harita Para6/15/2012 07:27:07 6/15/2012 07:35:59 819- 3 3 COAL -- Harita Para6/15/2012 07:29:46 6/15/2012 07:38:46 855 3 3 COAL -- MIL6/15/2012 07:30:15 6/15/2012 07:40:26 856 3 3 COAL -- MIL6/15/2012 07:30:37 6/15/2012 07:41:15 853 3 3 COAL -- MIL6/15/2012 07:30:54 6/15/2012 07:43:21 709-- 3 3 COAL -- Harita Para6/15/2012 07:32:45 6/15/2012 07:43:16 703-- 3 3 COAL -- Harita Para6/15/2012 07:33:25 6/15/2012 07:43:18 701-- 3 3 COAL -- Harita Para6/15/2012 07:33:56 6/15/2012 07:50:38 817- 3 3 COAL -- Harita Para6/15/2012 07:34:26 6/15/2012 07:50:42 815- 3 3 COAL -- Harita Para6/15/2012 07:34:52 6/15/2012 07:46:11 714-- 3 3 COAL -- Harita Para6/15/2012 07:37:27 6/15/2012 07:46:16 706-- 3 3 COAL -- Harita Para6/15/2012 07:38:07 6/15/2012 07:57:46 851 3 3 COAL -- MIL6/15/2012 07:42:33 6/15/2012 07:47:49 713-- 3 3 COAL -- Harita Para6/15/2012 07:45:21 6/15/2012 07:53:07 115 3 3 COAL -- Harita Para6/15/2012 08:02:10 6/15/2012 08:09:27 839- 1 1 COAL -- Harita Para6/15/2012 08:04:02 6/15/2012 08:08:13 707-- 1 1 COAL -- Harita Para6/15/2012 08:07:10 6/15/2012 08:12:00 836- 1 1 COAL -- Harita Para6/15/2012 08:19:21 6/15/2012 08:25:26 852 1 1 COAL -- MIL6/15/2012 08:40:00 6/15/2012 08:44:23 702-- 1 1 COAL -- Harita Para

Page 52: June Per Shift (Truckscale Port)

6/15/2012 08:45:13 6/15/2012 08:48:32 704-- 1 1 COAL -- Harita Para6/15/2012 08:49:10 6/15/2012 08:52:20 705-- 1 1 COAL -- Harita Para6/15/2012 08:58:58 6/15/2012 09:03:52 710-- 1 1 COAL -- Harita Para6/15/2012 09:03:04 6/15/2012 09:07:29 712-- 1 1 COAL -- Harita Para6/15/2012 09:10:12 6/15/2012 09:14:57 855 1 1 COAL -- MIL6/15/2012 09:16:33 6/15/2012 09:21:19 853 1 1 COAL -- MIL6/15/2012 09:17:07 6/15/2012 09:23:13 703-- 1 1 COAL -- Harita Para6/15/2012 09:17:31 6/15/2012 09:25:53 701-- 1 1 COAL -- Harita Para6/15/2012 09:19:20 6/15/2012 09:30:26 708-- 1 1 COAL -- Harita Para6/15/2012 09:20:40 6/15/2012 09:31:02 856 1 1 COAL -- MIL6/15/2012 09:28:42 6/15/2012 09:34:02 817- 1 1 COAL -- Harita Para6/15/2012 09:29:05 6/15/2012 09:35:01 851 1 1 COAL -- MIL6/15/2012 09:29:43 6/15/2012 09:36:31 709-- 1 1 COAL -- Harita Para6/15/2012 09:39:04 6/15/2012 09:43:09 113 1 1 COAL -- Harita Para6/15/2012 09:41:08 6/15/2012 09:47:24 707-- 1 1 COAL -- Harita Para6/15/2012 09:48:07 6/15/2012 09:52:52 819- 1 1 COAL -- Harita Para6/15/2012 09:51:29 6/15/2012 09:55:31 832 1 1 COAL -- MIL6/15/2012 09:51:57 6/15/2012 09:57:36 815- 1 1 COAL -- Harita Para6/15/2012 09:56:33 6/15/2012 10:00:48 115 1 1 COAL -- Harita Para6/15/2012 09:59:14 6/15/2012 10:07:39 829- 1 1 COAL -- Harita Para6/15/2012 10:03:37 6/15/2012 10:09:21 810 1 1 COAL -- MIL6/15/2012 10:08:24 6/15/2012 10:12:28 713-- 1 1 COAL -- Harita Para6/15/2012 10:14:17 6/15/2012 10:18:20 706-- 1 1 COAL -- Harita Para6/15/2012 10:16:07 6/15/2012 10:22:55 852 1 1 COAL -- MIL6/15/2012 10:16:36 6/15/2012 10:21:58 839- 1 1 COAL -- Harita Para6/15/2012 10:16:55 6/15/2012 10:18:31 702-- 1 1 COAL -- Harita Para6/15/2012 10:20:48 6/15/2012 10:25:49 850- 1 1 COAL -- Harita Para6/15/2012 10:23:40 6/15/2012 10:24:22 704-- 1 1 COAL -- Harita Para6/15/2012 10:31:17 6/15/2012 10:34:45 705-- 1 1 COAL -- Harita Para6/15/2012 10:41:07 6/15/2012 10:44:52 710-- 1 1 COAL -- Harita Para6/15/2012 10:45:24 6/15/2012 10:50:22 855 1 1 COAL -- MIL6/15/2012 10:52:20 6/15/2012 10:57:47 836- 1 1 COAL -- Harita Para6/15/2012 10:52:43 6/15/2012 10:59:04 853 1 1 COAL -- MIL6/15/2012 10:55:23 6/15/2012 11:02:30 712-- 1 1 COAL -- Harita Para6/15/2012 10:55:52 6/15/2012 11:04:12 701-- 1 1 COAL -- Harita Para6/15/2012 10:56:42 6/15/2012 11:06:28 708-- 1 1 COAL -- Harita Para6/15/2012 11:01:05 6/15/2012 11:09:16 703-- 1 1 COAL -- Harita Para6/15/2012 11:01:33 6/15/2012 11:10:26 851 1 1 COAL -- MIL6/15/2012 11:13:08 6/15/2012 11:17:00 113 1 1 COAL -- Harita Para6/15/2012 11:17:38 6/15/2012 11:20:32 856 1 1 COAL -- MIL6/15/2012 11:21:19 6/15/2012 11:25:10 833- 1 1 COAL -- Harita Para6/15/2012 11:31:51 6/15/2012 11:44:48 832 1 1 COAL -- MIL6/15/2012 11:32:20 6/15/2012 11:38:14 819- 1 1 COAL -- Harita Para6/15/2012 11:35:44 6/15/2012 11:40:17 115 1 1 COAL -- Harita Para6/15/2012 11:41:02 6/15/2012 11:44:52 831- 1 1 COAL -- Harita Para6/15/2012 11:41:25 6/15/2012 11:47:21 810 1 1 COAL -- MIL6/15/2012 11:41:58 6/15/2012 12:27:04 817- 1 1 COAL -- Harita Para6/15/2012 11:42:20 6/15/2012 12:01:11 815- 1 1 COAL -- Harita Para6/15/2012 11:50:49 6/15/2012 11:55:10 706-- 1 1 COAL -- Harita Para6/15/2012 11:56:40 6/15/2012 12:21:38 852 1 1 COAL -- MIL

Page 53: June Per Shift (Truckscale Port)

6/15/2012 11:58:21 6/15/2012 12:04:54 705-- 1 1 COAL -- Harita Para6/15/2012 12:23:16 6/15/2012 12:27:07 839- 1 1 COAL -- Harita Para6/15/2012 13:13:25 6/15/2012 13:17:28 850- 1 1 COAL -- Harita Para6/15/2012 13:25:59 6/15/2012 13:29:17 702-- 1 1 COAL -- Harita Para6/15/2012 13:27:10 6/15/2012 13:31:52 704-- 1 1 COAL -- Harita Para6/15/2012 13:39:25 6/15/2012 13:43:40 710-- 1 1 COAL -- Harita Para6/15/2012 13:52:23 6/15/2012 13:58:33 852 1 1 COAL -- MIL6/15/2012 13:52:47 6/15/2012 13:58:17 713-- 1 1 COAL -- Harita Para6/15/2012 13:59:11 6/15/2012 14:03:06 705-- 1 1 COAL -- Harita Para6/15/2012 14:04:09 6/15/2012 14:07:49 832 1 1 COAL -- MIL6/15/2012 14:09:42 6/15/2012 14:14:45 853 1 1 COAL -- MIL6/15/2012 14:10:12 6/15/2012 14:16:41 708-- 1 1 COAL -- Harita Para6/15/2012 14:31:17 6/15/2012 14:35:08 706-- 1 1 COAL -- Harita Para6/15/2012 14:39:45 6/15/2012 14:46:20 855 1 1 COAL -- MIL6/15/2012 14:43:20 6/15/2012 14:49:26 851 1 1 COAL -- MIL6/15/2012 14:45:37 6/15/2012 14:51:19 712-- 1 1 COAL -- Harita Para6/15/2012 14:47:28 6/15/2012 14:51:36 856 1 1 COAL -- MIL6/15/2012 14:47:56 6/15/2012 14:54:10 113 1 1 COAL -- Harita Para6/15/2012 14:56:16 6/15/2012 15:01:04 704-- 1 1 COAL -- Harita Para6/15/2012 14:57:57 6/15/2012 15:03:47 703-- 1 1 COAL -- Harita Para6/15/2012 14:58:39 6/15/2012 15:05:51 115 1 1 COAL -- Harita Para6/15/2012 14:59:04 6/15/2012 15:08:59 702-- 1 1 COAL -- Harita Para6/15/2012 15:07:50 6/15/2012 15:17:36 701-- 1 1 COAL -- Harita Para6/15/2012 15:12:31 6/15/2012 15:30:19 810 1 1 COAL -- MIL6/15/2012 15:16:41 6/15/2012 15:20:50 710-- 1 1 COAL -- Harita Para6/15/2012 15:22:08 6/15/2012 15:27:39 819- 1 1 COAL -- Harita Para6/15/2012 15:22:57 6/15/2012 15:30:45 839- 1 1 COAL -- Harita Para6/15/2012 15:23:19 6/15/2012 15:30:55 818- 1 1 COAL -- Harita Para6/15/2012 15:26:46 6/15/2012 15:32:11 705-- 1 1 COAL -- Harita Para6/15/2012 15:35:34 6/15/2012 15:45:10 708-- 1 1 COAL -- Harita Para6/15/2012 15:39:42 6/15/2012 15:45:05 815- 1 1 COAL -- Harita Para6/15/2012 15:43:25 6/15/2012 15:47:00 833- 1 1 COAL -- Harita Para6/15/2012 15:46:24 6/15/2012 15:48:06 850- 1 1 COAL -- Harita Para6/15/2012 15:51:23 6/15/2012 15:55:29 831- 1 1 COAL -- Harita Para6/15/2012 15:54:42 6/15/2012 15:58:47 713-- 1 1 COAL -- Harita Para6/15/2012 15:57:04 6/15/2012 16:01:30 837- 1 2 COAL -- Harita Para6/15/2012 16:06:20 6/15/2012 16:11:26 812- 2 2 COAL -- Harita Para6/15/2012 16:20:28 6/15/2012 16:27:11 706-- 2 2 COAL -- Harita Para6/15/2012 16:22:41 6/15/2012 16:27:30 832- 2 2 COAL -- Harita Para6/15/2012 16:26:20 6/15/2012 16:30:08 817- 2 2 COAL -- Harita Para6/15/2012 18:11:38 6/15/2012 18:16:10 713-- 2 2 COAL -- Harita Para6/15/2012 18:14:24 6/15/2012 18:18:58 712-- 2 2 COAL -- Harita Para6/15/2012 18:14:50 6/15/2012 18:20:07 113 2 2 COAL -- Harita Para6/15/2012 18:17:39 6/15/2012 18:24:07 710-- 2 2 COAL -- Harita Para6/15/2012 18:18:12 6/15/2012 18:24:27 708-- 2 2 COAL -- Harita Para6/15/2012 18:21:10 6/15/2012 18:25:16 702-- 2 2 COAL -- Harita Para6/15/2012 18:22:17 6/15/2012 18:27:11 704-- 2 2 COAL -- Harita Para6/15/2012 18:23:07 6/15/2012 18:31:02 115 2 2 COAL -- Harita Para6/15/2012 18:23:32 6/15/2012 18:35:24 701-- 2 2 COAL -- Harita Para6/15/2012 18:26:07 6/15/2012 18:39:52 705-- 2 2 COAL -- Harita Para

Page 54: June Per Shift (Truckscale Port)

6/15/2012 18:30:06 6/15/2012 18:39:57 706-- 2 2 COAL -- Harita Para6/15/2012 18:32:44 6/15/2012 18:41:46 703-- 2 2 COAL -- Harita Para6/15/2012 19:00:40 6/15/2012 19:04:41 819- 2 2 COAL -- Harita Para6/15/2012 19:02:31 6/15/2012 19:08:00 851 2 2 COAL -- MIL6/15/2012 19:02:50 6/15/2012 19:09:24 810 2 2 COAL -- MIL6/15/2012 19:06:17 6/15/2012 19:11:58 855 2 2 COAL -- MIL6/15/2012 19:06:48 6/15/2012 19:13:22 714-- 2 2 COAL -- Harita Para6/15/2012 19:08:46 6/15/2012 19:16:06 852 2 2 COAL -- MIL6/15/2012 19:14:15 6/15/2012 19:18:35 839- 2 2 COAL -- Harita Para6/15/2012 19:19:16 6/15/2012 19:23:41 853 2 2 COAL -- MIL6/15/2012 19:19:44 6/15/2012 19:24:12 856 2 2 COAL -- MIL6/15/2012 19:38:18 6/15/2012 19:43:10 818- 2 2 COAL -- Harita Para6/15/2012 19:40:48 6/15/2012 19:46:26 831- 2 2 COAL -- Harita Para6/15/2012 19:45:15 6/15/2012 19:49:15 812- 2 2 COAL -- Harita Para6/15/2012 19:45:35 6/15/2012 19:50:32 710-- 2 2 COAL -- Harita Para6/15/2012 19:48:14 6/15/2012 19:53:33 815- 2 2 COAL -- Harita Para6/15/2012 19:55:03 6/15/2012 19:58:43 707-- 2 2 COAL -- Harita Para6/15/2012 19:56:13 6/15/2012 20:01:02 708-- 2 2 COAL -- Harita Para6/15/2012 19:56:35 6/15/2012 20:02:42 713-- 2 2 COAL -- Harita Para6/15/2012 20:00:20 6/15/2012 20:04:10 712-- 2 2 COAL -- Harita Para6/15/2012 20:01:39 6/15/2012 20:06:38 832- 2 2 COAL -- Harita Para6/15/2012 20:05:57 6/15/2012 20:09:59 113 2 2 COAL -- Harita Para6/15/2012 20:08:53 6/15/2012 20:12:12 703-- 2 2 COAL -- Harita Para6/15/2012 20:09:23 6/15/2012 20:13:59 837- 2 2 COAL -- Harita Para6/15/2012 20:13:02 6/15/2012 20:17:26 701-- 2 2 COAL -- Harita Para6/15/2012 20:15:53 6/15/2012 20:22:41 706-- 2 2 COAL -- Harita Para6/15/2012 20:16:29 6/15/2012 20:23:06 115 2 2 COAL -- Harita Para6/15/2012 20:20:06 6/15/2012 20:24:24 702-- 2 2 COAL -- Harita Para6/15/2012 20:20:59 6/15/2012 20:26:30 704-- 2 2 COAL -- Harita Para6/15/2012 20:21:58 6/15/2012 20:28:17 705-- 2 2 COAL -- Harita Para6/15/2012 20:36:35 6/15/2012 20:40:22 714-- 2 2 COAL -- Harita Para6/15/2012 20:41:03 6/15/2012 20:48:13 851 2 2 COAL -- MIL6/15/2012 20:41:34 6/15/2012 20:49:03 810 2 2 COAL -- MIL6/15/2012 20:47:09 6/15/2012 20:51:46 819- 2 2 COAL -- Harita Para6/15/2012 20:53:49 6/15/2012 20:59:32 855 2 2 COAL -- MIL6/15/2012 20:54:35 6/15/2012 21:02:34 839- 2 2 COAL -- Harita Para6/15/2012 21:03:53 6/15/2012 21:10:32 852 2 2 COAL -- MIL6/15/2012 21:08:49 6/15/2012 21:13:09 853 2 2 COAL -- MIL6/15/2012 21:14:12 6/15/2012 21:18:18 710-- 2 2 COAL -- Harita Para6/15/2012 21:16:01 6/15/2012 21:19:07 856 2 2 COAL -- MIL6/15/2012 21:16:22 6/15/2012 21:21:19 713-- 2 2 COAL -- Harita Para6/15/2012 21:17:39 6/15/2012 21:23:24 828- 2 2 COAL -- Harita Para6/15/2012 21:20:30 6/15/2012 21:25:24 818- 2 2 COAL -- Harita Para6/15/2012 21:21:54 6/15/2012 21:26:55 712-- 2 2 COAL -- Harita Para6/15/2012 21:26:04 6/15/2012 21:29:39 708-- 2 2 COAL -- Harita Para6/15/2012 21:28:53 6/15/2012 21:32:21 113 2 2 COAL -- Harita Para6/15/2012 21:31:02 6/15/2012 21:34:54 831- 2 2 COAL -- Harita Para6/15/2012 21:33:22 6/15/2012 21:37:28 812- 2 2 COAL -- Harita Para6/15/2012 21:39:33 6/15/2012 21:43:46 815- 2 2 COAL -- Harita Para6/15/2012 21:45:36 6/15/2012 21:49:11 703-- 2 2 COAL -- Harita Para

Page 55: June Per Shift (Truckscale Port)

6/15/2012 21:48:07 6/15/2012 21:51:56 817- 2 2 COAL -- Harita Para6/15/2012 21:48:33 6/15/2012 21:53:36 707-- 2 2 COAL -- Harita Para6/15/2012 21:55:11 6/15/2012 21:59:42 115 2 2 COAL -- Harita Para6/15/2012 21:58:58 6/15/2012 22:03:20 706-- 2 2 COAL -- Harita Para6/15/2012 22:00:36 6/15/2012 22:06:06 714-- 2 2 COAL -- Harita Para6/15/2012 22:01:10 6/15/2012 22:16:09 832- 2 2 COAL -- Harita Para6/15/2012 22:01:59 6/15/2012 22:10:01 705-- 2 2 COAL -- Harita Para6/15/2012 22:04:50 6/15/2012 22:11:13 704-- 2 2 COAL -- Harita Para6/15/2012 22:09:13 6/15/2012 22:13:29 701-- 2 2 COAL -- Harita Para6/15/2012 22:14:29 6/15/2012 22:22:33 702-- 2 2 COAL -- Harita Para6/15/2012 22:20:22 6/15/2012 22:27:39 851 2 2 COAL -- MIL6/15/2012 22:28:32 6/15/2012 22:32:35 819- 2 2 COAL -- Harita Para6/15/2012 22:30:16 6/15/2012 22:34:58 713-- 2 2 COAL -- Harita Para6/15/2012 22:33:18 6/15/2012 22:37:36 837- 2 2 COAL -- Harita Para6/15/2012 22:35:43 6/15/2012 22:39:07 712-- 2 2 COAL -- Harita Para6/15/2012 22:43:01 6/15/2012 22:46:35 113 2 2 COAL -- Harita Para6/15/2012 22:44:03 6/15/2012 22:49:38 855 2 2 COAL -- MIL6/15/2012 22:44:30 6/15/2012 22:50:32 710-- 2 2 COAL -- Harita Para6/15/2012 22:46:04 6/15/2012 22:52:51 852 2 2 COAL -- MIL6/15/2012 22:51:19 6/15/2012 22:55:09 856 2 2 COAL -- MIL6/15/2012 22:54:30 6/15/2012 22:58:29 708-- 2 2 COAL -- Harita Para6/15/2012 22:56:17 6/15/2012 23:00:46 818- 2 2 COAL -- Harita Para6/15/2012 23:06:52 6/15/2012 23:11:48 853 2 2 COAL -- MIL6/15/2012 23:09:38 6/15/2012 23:13:34 812- 2 2 COAL -- Harita Para6/15/2012 23:10:32 6/15/2012 23:15:41 828- 2 2 COAL -- Harita Para6/15/2012 23:16:49 6/15/2012 23:20:49 115 2 2 COAL -- Harita Para6/15/2012 23:17:30 6/15/2012 23:22:28 707-- 2 2 COAL -- Harita Para6/15/2012 23:23:41 6/15/2012 23:29:46 714-- 2 2 COAL -- Harita Para6/15/2012 23:28:14 6/15/2012 23:32:39 703-- 2 2 COAL -- Harita Para6/15/2012 23:28:46 6/15/2012 23:34:52 839- 2 2 COAL -- Harita Para6/15/2012 23:30:37 6/15/2012 23:36:51 817- 2 2 COAL -- Harita Para6/15/2012 23:39:34 6/15/2012 23:45:10 704-- 2 2 COAL -- Harita Para6/15/2012 23:40:23 6/15/2012 23:48:01 701-- 2 2 COAL -- Harita Para6/15/2012 23:46:07 6/15/2012 23:52:27 706-- 2 2 COAL -- Harita Para6/15/2012 23:51:33 6/16/2012 00:00:15 815- 2 3 COAL -- Harita Para6/15/2012 23:53:17 6/15/2012 23:59:13 831- 2 2 COAL -- Harita Para6/15/2012 23:54:39 6/16/2012 00:00:20 712-- 2 3 COAL -- Harita Para6/15/2012 23:55:51 6/16/2012 00:01:50 702-- 2 3 COAL -- Harita Para6/15/2012 23:56:25 6/16/2012 00:04:00 113 2 3 COAL -- Harita Para6/15/2012 23:56:42 6/16/2012 00:04:03 713-- 2 3 COAL -- Harita Para6/15/2012 23:57:42 6/16/2012 00:09:30 832- 2 3 COAL -- Harita Para6/15/2012 23:58:09 6/16/2012 00:11:58 851 2 3 COAL -- MIL6/16/2012 00:04:55 6/16/2012 00:14:21 705-- 3 3 COAL -- Harita Para6/16/2012 00:06:04 6/16/2012 00:14:25 819- 3 3 COAL -- Harita Para6/16/2012 00:17:57 6/16/2012 00:23:25 837- 3 3 COAL -- Harita Para6/16/2012 00:29:04 6/16/2012 00:33:27 710-- 3 3 COAL -- Harita Para6/16/2012 00:34:20 6/16/2012 00:38:48 818- 3 3 COAL -- Harita Para6/16/2012 00:39:39 6/16/2012 00:43:58 856 3 3 COAL -- MIL6/16/2012 00:40:47 6/16/2012 00:46:22 115 3 3 COAL -- Harita Para6/16/2012 00:47:50 6/16/2012 00:52:13 707-- 3 3 COAL -- Harita Para

Page 56: June Per Shift (Truckscale Port)

6/16/2012 00:56:00 6/16/2012 01:04:11 855 3 3 COAL -- MIL6/16/2012 00:56:26 6/16/2012 01:07:12 852 3 3 COAL -- MIL6/16/2012 00:56:53 6/16/2012 01:07:59 714-- 3 3 COAL -- Harita Para6/16/2012 01:28:38 6/16/2012 01:33:25 708-- 3 3 COAL -- Harita Para6/16/2012 01:29:55 6/16/2012 01:34:48 853 3 3 COAL -- MIL6/16/2012 01:32:40 6/16/2012 01:36:38 712-- 3 3 COAL -- Harita Para6/16/2012 01:41:46 6/16/2012 01:46:29 704-- 3 3 COAL -- Harita Para6/16/2012 01:42:14 6/16/2012 01:48:35 701-- 3 3 COAL -- Harita Para6/16/2012 01:42:37 6/16/2012 01:50:26 713-- 3 3 COAL -- Harita Para6/16/2012 01:43:16 6/16/2012 01:52:48 828- 3 3 COAL -- Harita Para6/16/2012 01:51:36 6/16/2012 01:55:30 703-- 3 3 COAL -- Harita Para6/16/2012 01:52:02 6/16/2012 01:57:17 812- 3 3 COAL -- Harita Para6/16/2012 02:00:58 6/16/2012 02:04:46 831- 3 3 COAL -- Harita Para6/16/2012 02:03:04 6/16/2012 02:07:24 839- 3 3 COAL -- Harita Para6/16/2012 02:05:26 6/16/2012 02:09:47 707-- 3 3 COAL -- Harita Para6/16/2012 02:09:06 6/16/2012 02:15:12 851 3 3 COAL -- MIL6/16/2012 02:10:22 6/16/2012 02:16:44 817- 3 3 COAL -- Harita Para6/16/2012 02:14:34 6/16/2012 02:16:49 837- 3 3 COAL -- Harita Para6/16/2012 02:24:22 6/16/2012 02:28:58 818- 3 3 COAL -- Harita Para6/16/2012 02:30:14 6/16/2012 02:34:38 115 3 3 COAL -- Harita Para6/16/2012 02:31:25 6/16/2012 02:36:54 819- 3 3 COAL -- Harita Para6/16/2012 02:33:40 6/16/2012 02:39:06 714-- 3 3 COAL -- Harita Para6/16/2012 02:51:15 6/16/2012 02:59:31 855 3 3 COAL -- MIL6/16/2012 02:53:56 6/16/2012 02:59:43 852 3 3 COAL -- MIL6/16/2012 02:57:53 6/16/2012 03:02:42 706-- 3 3 COAL -- Harita Para6/16/2012 02:58:38 6/16/2012 03:04:27 702-- 3 3 COAL -- Harita Para6/16/2012 03:10:23 6/16/2012 03:15:29 701-- 3 3 COAL -- Harita Para6/16/2012 03:23:00 6/16/2012 03:26:48 812- 3 3 COAL -- Harita Para6/16/2012 03:24:35 6/16/2012 03:28:45 707-- 3 3 COAL -- Harita Para6/16/2012 03:31:06 6/16/2012 03:35:07 828- 3 3 COAL -- Harita Para6/16/2012 03:37:01 6/16/2012 03:40:59 831- 3 3 COAL -- Harita Para6/16/2012 04:08:16 6/16/2012 04:12:21 832- 3 3 COAL -- Harita Para6/16/2012 07:14:45 6/16/2012 07:19:52 819- 3 3 COAL -- Harita Para6/16/2012 07:23:31 6/16/2012 07:29:37 707-- 3 3 COAL -- Harita Para6/16/2012 07:24:04 6/16/2012 07:30:02 712-- 3 3 COAL -- Harita Para6/16/2012 07:24:33 6/16/2012 07:31:08 701-- 3 3 COAL -- Harita Para6/16/2012 07:25:13 6/16/2012 07:33:24 113 3 3 COAL -- Harita Para6/16/2012 07:25:41 6/16/2012 07:35:08 706-- 3 3 COAL -- Harita Para6/16/2012 07:26:19 6/16/2012 07:36:48 708-- 3 3 COAL -- Harita Para6/16/2012 07:27:38 6/16/2012 07:40:24 115 3 3 COAL -- Harita Para6/16/2012 07:28:08 6/16/2012 07:40:44 851 3 3 COAL -- MIL6/16/2012 07:28:33 6/16/2012 07:42:55 855 3 3 COAL -- MIL6/16/2012 07:28:57 6/16/2012 07:45:15 713-- 3 3 COAL -- Harita Para6/16/2012 07:35:52 6/16/2012 07:46:23 703-- 3 3 COAL -- Harita Para6/16/2012 07:39:33 6/16/2012 07:46:29 702-- 3 3 COAL -- Harita Para6/16/2012 07:41:32 6/16/2012 07:52:12 853 3 3 COAL -- MIL6/16/2012 07:44:25 6/16/2012 07:48:28 710-- 3 3 COAL -- Harita Para6/16/2012 07:56:15 6/16/2012 08:00:08 714-- 3 1 COAL -- Harita Para6/16/2012 07:57:48 6/16/2012 08:00:12 812- 3 1 COAL -- Harita Para6/16/2012 08:05:02 6/16/2012 08:28:51 806 1 1 COAL -- MIL

Page 57: June Per Shift (Truckscale Port)

6/16/2012 08:17:24 6/16/2012 08:22:09 837- 1 1 COAL -- Harita Para6/16/2012 08:18:13 6/16/2012 08:22:51 818- 1 1 COAL -- Harita Para6/16/2012 08:20:58 6/16/2012 08:25:29 839- 1 1 COAL -- Harita Para6/16/2012 08:24:32 6/16/2012 08:28:55 810 1 1 COAL -- MIL6/16/2012 08:49:01 6/16/2012 08:52:30 833- 1 1 COAL -- Harita Para6/16/2012 08:49:27 6/16/2012 08:54:39 707-- 1 1 COAL -- Harita Para6/16/2012 09:00:47 6/16/2012 09:04:19 809 1 1 COAL -- MIL6/16/2012 09:05:06 6/16/2012 09:09:33 831- 1 1 COAL -- Harita Para6/16/2012 09:05:49 6/16/2012 09:09:37 832- 1 1 COAL -- Harita Para6/16/2012 09:06:33 6/16/2012 09:11:12 701-- 1 1 COAL -- Harita Para6/16/2012 09:07:09 6/16/2012 09:13:32 706-- 1 1 COAL -- Harita Para6/16/2012 09:07:38 6/16/2012 09:13:37 828- 1 1 COAL -- Harita Para6/16/2012 09:08:45 6/16/2012 09:15:17 819- 1 1 COAL -- Harita Para6/16/2012 09:10:16 6/16/2012 09:20:27 856 1 1 COAL -- MIL6/16/2012 09:14:19 6/16/2012 09:19:37 703-- 1 1 COAL -- Harita Para6/16/2012 09:14:38 6/16/2012 09:20:39 855 1 1 COAL -- MIL6/16/2012 09:18:03 6/16/2012 09:23:07 113 1 1 COAL -- Harita Para6/16/2012 09:22:29 6/16/2012 09:27:19 851 1 1 COAL -- MIL6/16/2012 09:23:56 6/16/2012 09:27:43 713-- 1 1 COAL -- Harita Para6/16/2012 09:26:43 6/16/2012 09:31:20 708-- 1 1 COAL -- Harita Para6/16/2012 09:29:39 6/16/2012 09:35:49 812- 1 1 COAL -- Harita Para6/16/2012 09:39:56 6/16/2012 09:47:44 815- 1 1 COAL -- Harita Para6/16/2012 09:50:32 6/16/2012 09:56:49 853 1 1 COAL -- MIL6/16/2012 09:51:10 6/16/2012 09:57:30 709-- 1 1 COAL -- Harita Para6/16/2012 09:53:14 6/16/2012 09:57:37 702-- 1 1 COAL -- Harita Para6/16/2012 10:07:16 6/16/2012 10:12:26 852 1 1 COAL -- MIL6/16/2012 10:07:42 6/16/2012 10:13:13 806 1 1 COAL -- MIL6/16/2012 10:08:25 6/16/2012 10:15:27 115 1 1 COAL -- Harita Para6/16/2012 10:10:02 6/16/2012 10:15:38 714-- 1 1 COAL -- Harita Para6/16/2012 10:10:30 6/16/2012 10:17:01 839- 1 1 COAL -- Harita Para6/16/2012 10:11:28 6/16/2012 10:19:00 710-- 1 1 COAL -- Harita Para6/16/2012 10:18:04 6/16/2012 10:21:43 707-- 1 1 COAL -- Harita Para6/16/2012 10:19:54 6/16/2012 10:24:48 837- 1 1 COAL -- Harita Para6/16/2012 10:23:02 6/16/2012 10:27:06 833- 1 1 COAL -- Harita Para6/16/2012 10:26:08 6/16/2012 10:30:34 809 1 1 COAL -- MIL6/16/2012 10:33:05 6/16/2012 10:37:53 829- 1 1 COAL -- Harita Para6/16/2012 10:35:11 6/16/2012 10:39:21 706-- 1 1 COAL -- Harita Para6/16/2012 10:40:31 6/16/2012 10:44:47 701-- 1 1 COAL -- Harita Para6/16/2012 10:45:25 6/16/2012 10:49:39 703-- 1 1 COAL -- Harita Para6/16/2012 10:46:24 6/16/2012 10:53:25 819- 1 1 COAL -- Harita Para6/16/2012 10:47:04 6/16/2012 10:53:42 828- 1 1 COAL -- Harita Para6/16/2012 10:52:40 6/16/2012 10:57:35 851 1 1 COAL -- MIL6/16/2012 10:58:54 6/16/2012 11:04:46 855 1 1 COAL -- MIL6/16/2012 11:02:30 6/16/2012 11:06:44 113 1 1 COAL -- Harita Para6/16/2012 11:03:20 6/16/2012 11:08:01 856 1 1 COAL -- MIL6/16/2012 11:03:55 6/16/2012 11:10:07 713-- 1 1 COAL -- Harita Para6/16/2012 11:07:30 6/16/2012 11:12:32 831- 1 1 COAL -- Harita Para6/16/2012 11:10:40 6/16/2012 11:15:25 812- 1 1 COAL -- Harita Para6/16/2012 11:11:51 6/16/2012 11:16:42 708-- 1 1 COAL -- Harita Para6/16/2012 11:14:09 6/16/2012 11:18:39 815- 1 1 COAL -- Harita Para

Page 58: June Per Shift (Truckscale Port)

6/16/2012 11:14:49 6/16/2012 11:21:26 702-- 1 1 COAL -- Harita Para6/16/2012 11:20:49 6/16/2012 11:25:12 709-- 1 1 COAL -- Harita Para6/16/2012 11:38:49 6/16/2012 11:45:25 853 1 1 COAL -- MIL6/16/2012 11:39:15 6/16/2012 11:45:58 714-- 1 1 COAL -- Harita Para6/16/2012 11:43:33 6/16/2012 11:50:10 707-- 1 1 COAL -- Harita Para6/16/2012 11:49:10 6/16/2012 11:52:55 710-- 1 1 COAL -- Harita Para6/16/2012 11:57:07 6/16/2012 12:00:52 706-- 1 1 COAL -- Harita Para6/16/2012 12:02:12 6/16/2012 12:07:34 115 1 1 COAL -- Harita Para6/16/2012 12:03:41 6/16/2012 12:08:18 806 1 1 COAL -- MIL6/16/2012 12:03:57 6/16/2012 12:10:02 833- 1 1 COAL -- Harita Para6/16/2012 12:04:45 6/16/2012 12:10:07 839- 1 1 COAL -- Harita Para6/16/2012 12:15:16 6/16/2012 12:19:37 703-- 1 1 COAL -- Harita Para6/16/2012 12:21:49 6/16/2012 12:27:26 852 1 1 COAL -- MIL6/16/2012 12:22:12 6/16/2012 12:27:46 832- 1 1 COAL -- Harita Para6/16/2012 12:25:59 6/16/2012 12:29:50 829- 1 1 COAL -- Harita Para6/16/2012 12:34:25 6/16/2012 12:39:12 812- 1 1 COAL -- Harita Para6/16/2012 12:34:42 6/16/2012 12:40:48 810 1 1 COAL -- MIL6/16/2012 12:42:03 6/16/2012 12:56:32 851 1 1 COAL -- MIL6/16/2012 12:42:42 6/16/2012 12:55:32 837- 1 1 COAL -- Harita Para6/16/2012 12:45:15 6/16/2012 12:56:48 818- 1 1 COAL -- Harita Para6/16/2012 12:49:09 6/16/2012 12:58:52 113 1 1 COAL -- Harita Para6/16/2012 12:54:35 6/16/2012 13:01:11 709-- 1 1 COAL -- Harita Para6/16/2012 12:57:28 6/16/2012 13:02:24 856 1 1 COAL -- MIL6/16/2012 13:01:45 6/16/2012 13:05:29 831- 1 1 COAL -- Harita Para6/16/2012 13:11:32 6/16/2012 13:18:17 855 1 1 COAL -- MIL6/16/2012 13:15:29 6/16/2012 13:19:22 713-- 1 1 COAL -- Harita Para6/16/2012 13:15:54 6/16/2012 13:21:30 819- 1 1 COAL -- Harita Para6/16/2012 13:26:23 6/16/2012 13:32:39 701-- 1 1 COAL -- Harita Para6/16/2012 13:31:21 6/16/2012 13:38:10 115 1 1 COAL -- Harita Para6/16/2012 13:31:51 6/16/2012 13:49:35 702-- 1 1 COAL -- Harita Para6/16/2012 13:35:56 6/16/2012 13:41:39 708 1 1 COAL -- Harita Parama Murti 6/16/2012 13:37:04 6/16/2012 13:42:29 706 1 1 COAL -- Harita Para6/16/2012 13:51:06 6/16/2012 13:57:35 853 1 1 COAL -- MIL6/16/2012 13:52:54 6/16/2012 14:00:29 703-- 1 1 COAL -- Harita Para6/16/2012 13:59:16 6/16/2012 14:03:16 852 1 1 COAL -- MIL6/16/2012 13:59:40 6/16/2012 14:05:19 714-- 1 1 COAL -- Harita Para6/16/2012 14:01:50 6/16/2012 14:05:23 707-- 1 1 COAL -- Harita Para6/16/2012 14:11:38 6/16/2012 14:15:26 712-- 1 1 COAL -- Harita Para6/16/2012 14:14:05 6/16/2012 14:17:01 839- 1 1 COAL -- Harita Para6/16/2012 14:23:00 6/16/2012 14:27:09 113 1 1 COAL -- Harita Para6/16/2012 14:24:35 6/16/2012 14:30:01 709-- 1 1 COAL -- Harita Para6/16/2012 14:34:02 6/16/2012 14:38:26 832- 1 1 COAL -- Harita Para6/16/2012 14:48:56 6/16/2012 14:53:24 819- 1 1 COAL -- Harita Para6/16/2012 14:49:37 6/16/2012 14:53:36 710-- 1 1 COAL -- Harita Para6/16/2012 14:50:03 6/16/2012 14:54:58 829- 1 1 COAL -- Harita Para6/16/2012 14:50:25 6/16/2012 14:55:01 713-- 1 1 COAL -- Harita Para6/16/2012 14:51:00 6/16/2012 15:02:29 856 1 1 COAL -- MIL6/16/2012 14:57:45 6/16/2012 15:01:23 115 1 1 COAL -- Harita Para6/16/2012 15:05:02 6/16/2012 15:08:58 831- 1 1 COAL -- Harita Para6/16/2012 15:05:19 6/16/2012 15:09:02 701-- 1 1 COAL -- Harita Para

Page 59: June Per Shift (Truckscale Port)

6/16/2012 15:05:46 6/16/2012 15:15:14 818- 1 1 COAL -- Harita Para6/16/2012 15:07:34 6/16/2012 15:11:11 702-- 1 1 COAL -- Harita Para6/16/2012 15:13:32 6/16/2012 15:18:03 812- 1 1 COAL -- Harita Para6/16/2012 15:14:22 6/16/2012 15:22:39 708-- 1 1 COAL -- Harita Para6/16/2012 15:17:24 6/16/2012 15:22:43 706-- 1 1 COAL -- Harita Para6/16/2012 15:20:29 6/16/2012 15:24:20 837- 1 1 COAL -- Harita Para6/16/2012 15:22:02 6/16/2012 15:24:23 704-- 1 1 COAL -- Harita Para6/16/2012 15:25:24 6/16/2012 15:27:26 703-- 1 1 COAL -- Harita Para6/16/2012 15:28:06 6/16/2012 15:46:40 810 1 1 COAL -- MIL6/16/2012 15:28:32 6/16/2012 15:34:38 714-- 1 1 COAL -- Harita Para6/16/2012 15:31:07 6/16/2012 15:42:30 850- 1 1 COAL -- Harita Para6/16/2012 15:32:05 6/16/2012 15:52:02 815- 1 1 COAL -- Harita Para6/16/2012 15:36:38 6/16/2012 15:46:45 852 1 1 COAL -- MIL6/16/2012 15:40:39 6/16/2012 15:46:50 806 1 1 COAL -- MIL6/16/2012 15:45:50 6/16/2012 15:52:06 712-- 1 1 COAL -- Harita Para6/16/2012 15:50:14 6/16/2012 15:53:53 833- 1 1 COAL -- Harita Para6/16/2012 15:51:10 6/16/2012 15:54:01 705-- 1 1 COAL -- Harita Para6/16/2012 15:56:02 6/16/2012 16:00:04 113 1 2 COAL -- Harita Para6/16/2012 15:56:58 6/16/2012 16:00:08 707-- 1 2 COAL -- Harita Para6/16/2012 16:09:45 6/16/2012 16:14:25 709-- 2 2 COAL -- Harita Para6/16/2012 16:20:08 6/16/2012 16:23:53 832- 2 2 COAL -- Harita Para6/16/2012 16:21:34 6/16/2012 16:23:57 710-- 2 2 COAL -- Harita Para6/16/2012 16:26:26 6/16/2012 16:30:37 829- 2 2 COAL -- Harita Para6/16/2012 18:17:40 6/16/2012 18:21:50 701-- 2 2 COAL -- Harita Para6/16/2012 18:18:10 6/16/2012 18:23:44 702-- 2 2 COAL -- Harita Para6/16/2012 18:18:35 6/16/2012 18:23:59 710-- 2 2 COAL -- Harita Para6/16/2012 18:18:58 6/16/2012 18:27:28 115 2 2 COAL -- Harita Para6/16/2012 18:19:33 6/16/2012 18:28:18 714-- 2 2 COAL -- Harita Para6/16/2012 18:19:58 6/16/2012 18:30:29 113 2 2 COAL -- Harita Para6/16/2012 18:24:36 6/16/2012 18:32:01 705-- 2 2 COAL -- Harita Para6/16/2012 18:26:51 6/16/2012 18:34:18 708-- 2 2 COAL -- Harita Para6/16/2012 18:29:11 6/16/2012 18:38:30 707-- 2 2 COAL -- Harita Para6/16/2012 18:29:37 6/16/2012 18:39:56 712-- 2 2 COAL -- Harita Para6/16/2012 18:32:40 6/16/2012 18:41:46 709-- 2 2 COAL -- Harita Para6/16/2012 18:42:31 6/16/2012 18:51:19 706-- 2 2 COAL -- Harita Para6/16/2012 19:06:46 6/16/2012 19:10:29 819- 2 2 COAL -- Harita Para6/16/2012 19:07:12 6/16/2012 19:12:00 713-- 2 2 COAL -- Harita Para6/16/2012 19:12:40 6/16/2012 19:23:19 855 2 2 COAL -- MIL6/16/2012 19:16:45 6/16/2012 19:24:19 851 2 2 COAL -- MIL6/16/2012 19:19:25 6/16/2012 19:26:03 839- 2 2 COAL -- Harita Para6/16/2012 19:20:51 6/16/2012 19:28:07 703-- 2 2 COAL -- Harita Para6/16/2012 19:22:36 6/16/2012 19:30:20 856 2 2 COAL -- MIL6/16/2012 19:29:36 6/16/2012 19:33:44 818- 2 2 COAL -- Harita Para6/16/2012 19:31:21 6/16/2012 19:35:31 704-- 2 2 COAL -- Harita Para6/16/2012 19:36:42 6/16/2012 19:43:37 701-- 2 2 COAL -- Harita Para6/16/2012 19:41:42 6/16/2012 19:45:50 702-- 2 2 COAL -- Harita Para6/16/2012 19:42:09 6/16/2012 19:46:08 710-- 2 2 COAL -- Harita Para6/16/2012 19:52:05 6/16/2012 19:56:18 705-- 2 2 COAL -- Harita Para6/16/2012 19:53:51 6/16/2012 19:58:09 815- 2 2 COAL -- Harita Para6/16/2012 20:00:38 6/16/2012 20:04:15 831- 2 2 COAL -- Harita Para

Page 60: June Per Shift (Truckscale Port)

6/16/2012 20:00:59 6/16/2012 20:06:09 708-- 2 2 COAL -- Harita Para6/16/2012 20:01:45 6/16/2012 20:07:47 714-- 2 2 COAL -- Harita Para6/16/2012 20:04:48 6/16/2012 20:09:56 709-- 2 2 COAL -- Harita Para6/16/2012 20:08:34 6/16/2012 20:12:53 837- 2 2 COAL -- Harita Para6/16/2012 20:10:40 6/16/2012 20:14:47 850- 2 2 COAL -- Harita Para6/16/2012 20:11:10 6/16/2012 20:17:52 115 2 2 COAL -- Harita Para6/16/2012 20:11:36 6/16/2012 20:19:15 113 2 2 COAL -- Harita Para6/16/2012 20:17:12 6/16/2012 20:21:04 853 2 2 COAL -- MIL6/16/2012 20:32:06 6/16/2012 20:38:06 706-- 2 2 COAL -- Harita Para6/16/2012 20:32:35 6/16/2012 20:40:14 713-- 2 2 COAL -- Harita Para6/16/2012 20:37:14 6/16/2012 20:41:41 712-- 2 2 COAL -- Harita Para6/16/2012 20:43:38 6/16/2012 20:47:46 832- 2 2 COAL -- Harita Para6/16/2012 20:44:03 6/16/2012 20:49:48 819- 2 2 COAL -- Harita Para6/16/2012 20:54:26 6/16/2012 20:57:37 703-- 2 2 COAL -- Harita Para6/16/2012 20:58:59 6/16/2012 21:03:18 704-- 2 2 COAL -- Harita Para6/16/2012 21:01:34 6/16/2012 21:06:20 839- 2 2 COAL -- Harita Para6/16/2012 21:07:04 6/16/2012 21:15:00 855 2 2 COAL -- MIL6/16/2012 21:07:34 6/16/2012 21:14:39 818- 2 2 COAL -- Harita Para6/16/2012 21:07:57 6/16/2012 21:16:06 701-- 2 2 COAL -- Harita Para6/16/2012 21:18:59 6/16/2012 21:22:42 856 2 2 COAL -- MIL6/16/2012 21:32:29 6/16/2012 21:36:16 810 2 2 COAL -- MIL6/16/2012 21:55:58 6/16/2012 22:00:15 853 2 2 COAL -- MIL6/16/2012 23:58:45 6/17/2012 00:02:32 819- 2 3 COAL -- Harita Para6/17/2012 00:00:18 6/17/2012 00:02:40 815- 3 3 COAL -- Harita Para6/17/2012 00:05:01 6/17/2012 00:10:09 832- 3 3 COAL -- Harita Para6/17/2012 00:05:34 6/17/2012 00:15:11 853 3 3 COAL -- MIL6/17/2012 00:28:00 6/17/2012 00:32:01 818- 3 3 COAL -- Harita Para6/17/2012 00:29:42 6/17/2012 00:34:39 713-- 3 3 COAL -- Harita Para6/17/2012 00:33:17 6/17/2012 00:44:31 702-- 3 3 COAL -- Harita Para6/17/2012 00:33:42 6/17/2012 00:44:59 704-- 3 3 COAL -- Harita Para6/17/2012 00:34:06 6/17/2012 00:45:24 709-- 3 3 COAL -- Harita Para6/17/2012 00:35:18 6/17/2012 00:47:02 712-- 3 3 COAL -- Harita Para6/17/2012 00:35:41 6/17/2012 00:47:44 701-- 3 3 COAL -- Harita Para6/17/2012 00:39:03 6/17/2012 00:49:55 703-- 3 3 COAL -- Harita Para6/17/2012 00:39:58 6/17/2012 00:52:53 115 3 3 COAL -- Harita Para6/17/2012 00:40:24 6/17/2012 00:54:38 113 3 3 COAL -- Harita Para6/17/2012 00:40:46 6/17/2012 00:56:17 708-- 3 3 COAL -- Harita Para6/17/2012 00:41:13 6/17/2012 01:00:22 714-- 3 3 COAL -- Harita Para6/17/2012 00:41:45 6/17/2012 01:02:38 705-- 3 3 COAL -- Harita Para6/17/2012 00:42:11 6/17/2012 01:04:30 831- 3 3 COAL -- Harita Para6/17/2012 00:43:03 6/17/2012 01:06:48 850- 3 3 COAL -- Harita Para6/17/2012 00:43:34 6/17/2012 01:09:15 856 3 3 COAL -- MIL6/17/2012 00:53:54 6/17/2012 01:10:55 837- 3 3 COAL -- Harita Para6/17/2012 00:55:27 6/17/2012 01:13:43 706-- 3 3 COAL -- Harita Para6/17/2012 01:19:58 6/17/2012 01:28:32 855 3 3 COAL -- MIL6/17/2012 01:23:08 6/17/2012 01:30:09 710-- 3 3 COAL -- Harita Para6/17/2012 01:29:12 6/17/2012 01:36:43 810 3 3 COAL -- MIL6/17/2012 01:42:44 6/17/2012 01:47:59 839- 3 3 COAL -- Harita Para6/17/2012 01:46:27 6/17/2012 01:51:33 815- 3 3 COAL -- Harita Para6/17/2012 01:50:09 6/17/2012 01:54:47 713-- 3 3 COAL -- Harita Para

Page 61: June Per Shift (Truckscale Port)

6/17/2012 01:57:16 6/17/2012 02:04:02 853 3 3 COAL -- MIL6/17/2012 02:02:04 6/17/2012 02:06:24 819- 3 3 COAL -- Harita Para6/17/2012 02:02:27 6/17/2012 02:31:39 709-- 3 3 COAL -- Harita Para6/17/2012 02:08:28 6/17/2012 02:33:51 712-- 3 3 COAL -- Harita Para6/17/2012 02:10:34 6/17/2012 02:38:21 702-- 3 3 COAL -- Harita Para6/17/2012 02:13:50 6/17/2012 02:38:50 832- 3 3 COAL -- Harita Para6/17/2012 02:16:51 6/17/2012 02:39:38 704-- 3 3 COAL -- Harita Para6/17/2012 02:25:49 6/17/2012 02:42:14 115 3 3 COAL -- Harita Para6/17/2012 02:26:13 6/17/2012 02:44:27 701-- 3 3 COAL -- Harita Para6/17/2012 02:26:35 6/17/2012 02:47:13 113 3 3 COAL -- Harita Para6/17/2012 02:30:58 6/17/2012 02:54:26 714-- 3 3 COAL -- Harita Para6/17/2012 02:36:40 6/17/2012 02:49:13 703-- 3 3 COAL -- Harita Para6/17/2012 02:37:10 6/17/2012 02:50:31 831- 3 3 COAL -- Harita Para6/17/2012 02:37:35 6/17/2012 02:52:08 850- 3 3 COAL -- Harita Para6/17/2012 02:47:59 6/17/2012 02:56:21 708-- 3 3 COAL -- Harita Para6/17/2012 03:04:48 6/17/2012 03:10:30 710-- 3 3 COAL -- Harita Para6/17/2012 03:12:00 6/17/2012 03:20:40 855 3 3 COAL -- MIL6/17/2012 03:15:05 6/17/2012 03:19:56 713-- 3 3 COAL -- Harita Para6/17/2012 03:24:02 6/17/2012 03:29:00 839- 3 3 COAL -- Harita Para6/17/2012 03:31:27 6/17/2012 03:36:35 815- 3 3 COAL -- Harita Para6/17/2012 03:48:04 6/17/2012 03:51:46 856 3 3 COAL -- MIL6/17/2012 07:19:08 6/17/2012 07:24:21 709-- 3 3 COAL -- Harita Para6/17/2012 07:23:39 6/17/2012 07:28:07 702-- 3 3 COAL -- Harita Para6/17/2012 07:25:00 6/17/2012 07:30:27 714-- 3 3 COAL -- Harita Para6/17/2012 07:25:25 6/17/2012 07:32:53 704-- 3 3 COAL -- Harita Para6/17/2012 07:25:46 6/17/2012 07:34:46 701-- 3 3 COAL -- Harita Para6/17/2012 07:26:05 6/17/2012 07:37:00 713-- 3 3 COAL -- Harita Para6/17/2012 07:26:53 6/17/2012 07:39:21 712-- 3 3 COAL -- Harita Para6/17/2012 07:27:27 6/17/2012 07:41:21 113 3 3 COAL -- Harita Para6/17/2012 07:35:41 6/17/2012 07:44:57 830- 3 3 COAL -- Harita Para6/17/2012 07:37:40 6/17/2012 07:43:10 708-- 3 3 COAL -- Harita Para6/17/2012 07:40:47 6/17/2012 07:48:43 851 3 3 COAL -- MIL6/17/2012 07:45:36 6/17/2012 07:49:42 856 3 3 COAL -- MIL6/17/2012 07:46:14 6/17/2012 07:55:22 855 3 3 COAL -- MIL6/17/2012 07:52:24 6/17/2012 07:57:10 710-- 3 3 COAL -- Harita Para6/17/2012 07:52:59 6/17/2012 07:59:55 819- 3 3 COAL -- Harita Para6/17/2012 07:53:37 6/17/2012 08:04:59 853 3 1 COAL -- MIL6/17/2012 07:59:06 6/17/2012 08:04:32 831- 3 1 COAL -- Harita Para6/17/2012 08:02:57 6/17/2012 08:07:16 703-- 1 1 COAL -- Harita Para6/17/2012 08:26:05 6/17/2012 08:31:54 115 1 1 COAL -- Harita Para6/17/2012 08:30:25 6/17/2012 08:35:13 815- 1 1 COAL -- Harita Para6/17/2012 08:38:45 6/17/2012 08:43:03 832- 1 1 COAL -- Harita Para6/17/2012 08:39:41 6/17/2012 08:44:40 852 1 1 COAL -- MIL6/17/2012 08:42:30 6/17/2012 08:47:02 709-- 1 1 COAL -- Harita Para6/17/2012 08:49:21 6/17/2012 08:56:08 714-- 1 1 COAL -- Harita Para6/17/2012 08:52:39 6/17/2012 08:56:15 701-- 1 1 COAL -- Harita Para6/17/2012 08:53:03 6/17/2012 08:57:43 706-- 1 1 COAL -- Harita Para6/17/2012 08:58:40 6/17/2012 09:00:04 704-- 1 1 COAL -- Harita Para6/17/2012 08:59:21 6/17/2012 09:03:03 113 1 1 COAL -- Harita Para6/17/2012 09:02:26 6/17/2012 09:06:37 839- 1 1 COAL -- Harita Para

Page 62: June Per Shift (Truckscale Port)

6/17/2012 09:04:13 6/17/2012 09:08:52 713-- 1 1 COAL -- Harita Para6/17/2012 09:11:21 6/17/2012 09:16:47 818- 1 1 COAL -- Harita Para6/17/2012 09:12:57 6/17/2012 09:19:01 708-- 1 1 COAL -- Harita Para6/17/2012 09:15:44 6/17/2012 09:21:55 851 1 1 COAL -- MIL6/17/2012 09:20:41 6/17/2012 09:24:42 830- 1 1 COAL -- Harita Para6/17/2012 09:22:33 6/17/2012 09:31:12 702-- 1 1 COAL -- Harita Para6/17/2012 09:26:08 6/17/2012 09:30:44 856 1 1 COAL -- MIL6/17/2012 09:28:48 6/17/2012 09:33:38 710-- 1 1 COAL -- Harita Para6/17/2012 09:29:14 6/17/2012 09:35:18 712-- 1 1 COAL -- Harita Para6/17/2012 09:29:40 6/17/2012 09:37:26 855 1 1 COAL -- MIL6/17/2012 09:30:01 6/17/2012 09:39:53 819- 1 1 COAL -- Harita Para6/17/2012 09:32:07 6/17/2012 09:46:57 831- 1 1 COAL -- Harita Para6/17/2012 09:38:41 6/17/2012 09:44:51 853 1 1 COAL -- MIL6/17/2012 09:41:45 6/17/2012 09:47:00 703-- 1 1 COAL -- Harita Para6/17/2012 10:05:07 6/17/2012 10:09:39 815- 1 1 COAL -- Harita Para6/17/2012 10:08:15 6/17/2012 10:12:24 709-- 1 1 COAL -- Harita Para6/17/2012 10:18:25 6/17/2012 10:23:55 852 1 1 COAL -- MIL6/17/2012 10:24:29 6/17/2012 10:28:18 832- 1 1 COAL -- Harita Para6/17/2012 10:25:05 6/17/2012 10:28:42 706-- 1 1 COAL -- Harita Para6/17/2012 10:25:31 6/17/2012 10:30:14 714-- 1 1 COAL -- Harita Para6/17/2012 10:25:54 6/17/2012 10:39:09 115 1 1 COAL -- Harita Para6/17/2012 10:32:30 6/17/2012 10:38:34 704-- 1 1 COAL -- Harita Para6/17/2012 10:37:20 6/17/2012 10:41:58 713-- 1 1 COAL -- Harita Para6/17/2012 10:40:56 6/17/2012 10:44:39 839- 1 1 COAL -- Harita Para6/17/2012 10:41:15 6/17/2012 10:46:49 850- 1 1 COAL -- Harita Para6/17/2012 10:45:23 6/17/2012 10:49:49 818- 1 1 COAL -- Harita Para6/17/2012 10:49:21 6/17/2012 10:53:21 708-- 1 1 COAL -- Harita Para6/17/2012 10:56:17 6/17/2012 11:00:07 830- 1 1 COAL -- Harita Para6/17/2012 10:57:14 6/17/2012 11:00:57 856 1 1 COAL -- MIL6/17/2012 10:59:30 6/17/2012 11:09:04 702-- 1 1 COAL -- Harita Para6/17/2012 11:03:27 6/17/2012 11:10:32 710-- 1 1 COAL -- Harita Para6/17/2012 11:04:09 6/17/2012 11:10:35 712-- 1 1 COAL -- Harita Para6/17/2012 11:07:07 6/17/2012 11:13:19 851 1 1 COAL -- MIL6/17/2012 11:11:19 6/17/2012 11:15:51 819- 1 1 COAL -- Harita Para6/17/2012 11:12:53 6/17/2012 11:20:26 855 1 1 COAL -- MIL6/17/2012 11:22:22 6/17/2012 11:26:01 113 1 1 COAL -- Harita Para6/17/2012 11:23:50 6/17/2012 11:28:21 703-- 1 1 COAL -- Harita Para6/17/2012 11:24:27 6/17/2012 11:30:13 831- 1 1 COAL -- Harita Para6/17/2012 11:34:48 6/17/2012 11:39:29 815- 1 1 COAL -- Harita Para6/17/2012 11:37:14 6/17/2012 11:42:53 853 1 1 COAL -- MIL6/17/2012 11:41:04 6/17/2012 11:45:36 709-- 1 1 COAL -- Harita Para6/17/2012 11:55:50 6/17/2012 11:59:32 706-- 1 1 COAL -- Harita Para6/17/2012 12:02:34 6/17/2012 12:06:27 115 1 1 COAL -- Harita Para6/17/2012 12:03:53 6/17/2012 12:07:00 713-- 1 1 COAL -- Harita Para6/17/2012 12:07:59 6/17/2012 12:12:34 852 1 1 COAL -- MIL6/17/2012 12:10:35 6/17/2012 12:14:55 704-- 1 1 COAL -- Harita Para6/17/2012 12:14:15 6/17/2012 12:17:55 818- 1 1 COAL -- Harita Para6/17/2012 12:19:14 6/17/2012 12:22:47 839- 1 1 COAL -- Harita Para6/17/2012 12:20:26 6/17/2012 12:22:51 850- 1 1 COAL -- Harita Para6/17/2012 12:26:00 6/17/2012 12:45:59 708-- 1 1 COAL -- Harita Para

Page 63: June Per Shift (Truckscale Port)

6/17/2012 12:37:42 6/17/2012 12:42:35 851 1 1 COAL -- MIL6/17/2012 12:40:23 6/17/2012 12:46:02 710-- 1 1 COAL -- Harita Para6/17/2012 12:40:47 6/17/2012 12:47:08 714-- 1 1 COAL -- Harita Para6/17/2012 12:52:01 6/17/2012 12:56:34 830- 1 1 COAL -- Harita Para6/17/2012 12:52:30 6/17/2012 12:58:10 810 1 1 COAL -- MIL6/17/2012 12:59:28 6/17/2012 13:04:05 712-- 1 1 COAL -- Harita Para6/17/2012 13:11:52 6/17/2012 13:18:25 703-- 1 1 COAL -- Harita Para6/17/2012 13:12:42 6/17/2012 13:19:07 831- 1 1 COAL -- Harita Para6/17/2012 13:29:36 6/17/2012 13:32:17 856 1 1 COAL -- MIL6/17/2012 13:37:04 6/17/2012 13:43:12 702-- 1 1 COAL -- Harita Para6/17/2012 13:38:01 6/17/2012 13:43:16 113 1 1 COAL -- Harita Para6/17/2012 13:38:30 6/17/2012 13:48:00 852 1 1 COAL -- MIL6/17/2012 13:38:47 6/17/2012 13:45:03 815- 1 1 COAL -- Harita Para6/17/2012 13:40:26 6/17/2012 13:50:30 706-- 1 1 COAL -- Harita Para6/17/2012 13:49:30 6/17/2012 13:53:08 850- 1 1 COAL -- Harita Para6/17/2012 13:49:51 6/17/2012 13:53:12 709-- 1 1 COAL -- Harita Para6/17/2012 13:55:00 6/17/2012 14:01:07 855 1 1 COAL -- MIL6/17/2012 13:55:16 6/17/2012 14:01:57 818- 1 1 COAL -- Harita Para6/17/2012 14:12:23 6/17/2012 14:18:24 713-- 1 1 COAL -- Harita Para6/17/2012 14:19:39 6/17/2012 14:23:37 851 1 1 COAL -- MIL6/17/2012 14:19:57 6/17/2012 14:23:50 853 1 1 COAL -- MIL6/17/2012 14:22:06 6/17/2012 14:28:26 839- 1 1 COAL -- Harita Para6/17/2012 14:30:30 6/17/2012 14:36:26 819- 1 1 COAL -- Harita Para6/17/2012 14:35:36 6/17/2012 14:39:18 830- 1 1 COAL -- Harita Para6/17/2012 14:44:30 6/17/2012 14:48:45 704-- 1 1 COAL -- Harita Para6/17/2012 14:56:33 6/17/2012 15:01:34 703-- 1 1 COAL -- Harita Para6/17/2012 15:02:21 6/17/2012 15:08:41 712-- 1 1 COAL -- Harita Para6/17/2012 15:02:47 6/17/2012 15:08:48 831- 1 1 COAL -- Harita Para6/17/2012 15:06:48 6/17/2012 15:11:37 714-- 1 1 COAL -- Harita Para6/17/2012 15:15:06 6/17/2012 15:20:59 710-- 1 1 COAL -- Harita Para6/17/2012 15:15:40 6/17/2012 15:21:02 115 1 1 COAL -- Harita Para6/17/2012 15:23:35 6/17/2012 15:28:58 113 1 1 COAL -- Harita Para6/17/2012 15:27:23 6/17/2012 15:29:03 706-- 1 1 COAL -- Harita Para6/17/2012 15:33:46 6/17/2012 15:41:22 709-- 1 1 COAL -- Harita Para6/17/2012 15:36:05 6/17/2012 15:43:43 818- 1 1 COAL -- Harita Para6/17/2012 15:38:18 6/17/2012 15:50:40 850- 1 1 COAL -- Harita Para6/17/2012 15:42:48 6/17/2012 15:53:27 713-- 1 1 COAL -- Harita Para6/17/2012 15:44:18 6/17/2012 15:50:44 832- 1 1 COAL -- Harita Para6/17/2012 16:20:28 6/17/2012 16:35:42 708-- 2 2 COAL -- Harita Para6/17/2012 18:05:16 6/17/2012 18:08:59 702-- 2 2 COAL -- Harita Para6/17/2012 18:21:14 6/17/2012 18:25:09 713-- 2 2 COAL -- Harita Para6/17/2012 18:23:42 6/17/2012 18:28:42 113 2 2 COAL -- Harita Para6/17/2012 18:27:29 6/17/2012 18:31:42 115 2 2 COAL -- Harita Para6/17/2012 18:29:27 6/17/2012 18:33:46 704-- 2 2 COAL -- Harita Para6/17/2012 18:32:52 6/17/2012 18:37:54 710-- 2 2 COAL -- Harita Para6/17/2012 18:33:12 6/17/2012 18:41:14 709-- 2 2 COAL -- Harita Para6/17/2012 18:34:32 6/17/2012 18:41:17 703-- 2 2 COAL -- Harita Para6/17/2012 18:35:20 6/17/2012 18:41:39 708-- 2 2 COAL -- Harita Para6/17/2012 18:42:15 6/17/2012 18:43:35 712-- 2 2 COAL -- Harita Para6/17/2012 18:56:00 6/17/2012 18:59:57 714-- 2 2 COAL -- Harita Para

Page 64: June Per Shift (Truckscale Port)

6/17/2012 19:22:00 6/17/2012 19:27:25 851 2 2 COAL -- MIL6/17/2012 19:22:27 6/17/2012 19:28:58 702-- 2 2 COAL -- Harita Para6/17/2012 19:25:34 6/17/2012 19:30:57 705-- 2 2 COAL -- Harita Para6/17/2012 19:35:26 6/17/2012 19:39:24 818- 2 2 COAL -- Harita Para6/17/2012 19:36:50 6/17/2012 19:41:09 713-- 2 2 COAL -- Harita Para6/17/2012 19:37:14 6/17/2012 19:43:28 819- 2 2 COAL -- Harita Para6/17/2012 19:37:51 6/17/2012 19:47:28 852 2 2 COAL -- MIL6/17/2012 19:40:22 6/17/2012 19:53:05 853 2 2 COAL -- MIL6/17/2012 19:44:30 6/17/2012 19:52:13 113 2 2 COAL -- Harita Para6/17/2012 19:59:43 6/17/2012 20:03:57 709-- 2 2 COAL -- Harita Para6/17/2012 20:02:28 6/17/2012 20:07:22 850- 2 2 COAL -- Harita Para6/17/2012 20:06:37 6/17/2012 20:13:18 706-- 2 2 COAL -- Harita Para6/17/2012 20:11:31 6/17/2012 20:16:19 710-- 2 2 COAL -- Harita Para6/17/2012 20:12:01 6/17/2012 20:18:23 812- 2 2 COAL -- Harita Para6/17/2012 20:12:32 6/17/2012 20:20:57 810 2 2 COAL -- MIL6/17/2012 20:15:07 6/17/2012 20:22:52 703-- 2 2 COAL -- Harita Para6/17/2012 20:19:13 6/17/2012 20:26:07 712-- 2 2 COAL -- Harita Para6/17/2012 20:24:56 6/17/2012 20:29:35 115 2 2 COAL -- Harita Para6/17/2012 20:25:23 6/17/2012 20:31:06 704-- 2 2 COAL -- Harita Para6/17/2012 20:26:49 6/17/2012 20:31:09 708-- 2 2 COAL -- Harita Para6/17/2012 20:32:43 6/17/2012 20:37:53 839- 2 2 COAL -- Harita Para6/17/2012 20:34:26 6/17/2012 20:41:06 714-- 2 2 COAL -- Harita Para6/17/2012 20:48:12 6/17/2012 20:53:01 707-- 2 2 COAL -- Harita Para6/17/2012 20:58:12 6/17/2012 21:04:35 855 2 2 COAL -- MIL6/17/2012 21:01:34 6/17/2012 21:05:40 713-- 2 2 COAL -- Harita Para6/17/2012 21:03:00 6/17/2012 21:08:38 829- 2 2 COAL -- Harita Para6/17/2012 21:03:57 6/17/2012 21:10:19 702-- 2 2 COAL -- Harita Para6/17/2012 21:08:00 6/17/2012 21:14:28 851 2 2 COAL -- MIL6/17/2012 21:13:53 6/17/2012 21:18:10 818- 2 2 COAL -- Harita Para6/17/2012 21:17:24 6/17/2012 21:22:28 113 2 2 COAL -- Harita Para6/17/2012 21:19:59 6/17/2012 21:25:23 837- 2 2 COAL -- Harita Para6/17/2012 21:28:25 6/17/2012 21:32:59 831- 2 2 COAL -- Harita Para6/17/2012 21:28:55 6/17/2012 21:46:34 853 2 2 COAL -- MIL6/17/2012 21:29:54 6/17/2012 21:39:26 709-- 2 2 COAL -- Harita Para6/17/2012 21:40:54 6/17/2012 21:46:38 852 2 2 COAL -- MIL6/17/2012 21:41:45 6/17/2012 21:47:51 850- 2 2 COAL -- Harita Para6/17/2012 21:43:08 6/17/2012 21:50:03 706-- 2 2 COAL -- Harita Para6/17/2012 21:43:34 6/17/2012 21:50:06 705-- 2 2 COAL -- Harita Para6/17/2012 21:51:16 6/17/2012 21:55:29 815- 2 2 COAL -- Harita Para6/17/2012 21:53:49 6/17/2012 21:58:40 812- 2 2 COAL -- Harita Para6/17/2012 21:57:57 6/17/2012 22:01:29 712-- 2 2 COAL -- Harita Para6/17/2012 22:08:55 6/17/2012 22:13:52 710-- 2 2 COAL -- Harita Para6/17/2012 22:09:25 6/17/2012 22:15:29 704-- 2 2 COAL -- Harita Para6/17/2012 22:10:19 6/17/2012 22:18:01 810 2 2 COAL -- MIL6/17/2012 22:12:40 6/17/2012 22:20:36 703-- 2 2 COAL -- Harita Para6/17/2012 22:19:20 6/17/2012 22:23:19 115 2 2 COAL -- Harita Para6/17/2012 22:19:46 6/17/2012 22:26:09 701-- 2 2 COAL -- Harita Para6/17/2012 22:25:30 6/17/2012 22:29:19 713-- 2 2 COAL -- Harita Para6/17/2012 22:27:37 6/17/2012 22:33:37 707-- 2 2 COAL -- Harita Para6/17/2012 22:32:55 6/17/2012 22:37:14 714-- 2 2 COAL -- Harita Para

Page 65: June Per Shift (Truckscale Port)

6/17/2012 22:35:27 6/17/2012 22:40:23 855 2 2 COAL -- MIL6/17/2012 22:51:56 6/17/2012 22:56:22 818- 2 2 COAL -- Harita Para6/17/2012 22:52:53 6/17/2012 22:58:30 829- 2 2 COAL -- Harita Para6/17/2012 22:53:32 6/17/2012 23:02:14 113 2 2 COAL -- Harita Para6/17/2012 23:04:39 6/17/2012 23:11:50 709-- 2 2 COAL -- Harita Para6/17/2012 23:21:32 6/17/2012 23:27:27 851 2 2 COAL -- MIL6/17/2012 23:33:38 6/17/2012 23:39:29 852 2 2 COAL -- MIL6/17/2012 23:34:02 6/17/2012 23:40:07 705-- 2 2 COAL -- Harita Para6/17/2012 23:35:51 6/17/2012 23:43:13 812- 2 2 COAL -- Harita Para6/17/2012 23:37:42 6/17/2012 23:43:41 712-- 2 2 COAL -- Harita Para6/17/2012 23:38:27 6/17/2012 23:46:35 850- 2 2 COAL -- Harita Para6/17/2012 23:41:04 6/17/2012 23:48:14 706-- 2 2 COAL -- Harita Para6/17/2012 23:42:15 6/17/2012 23:50:05 815- 2 2 COAL -- Harita Para6/17/2012 23:51:06 6/17/2012 23:55:27 704-- 2 2 COAL -- Harita Para6/17/2012 23:59:04 6/18/2012 00:02:45 831- 2 3 COAL -- Harita Para6/17/2012 23:59:25 6/18/2012 00:07:44 853 2 3 COAL -- MIL6/18/2012 00:03:44 6/18/2012 00:07:48 855 3 3 COAL -- MIL6/18/2012 00:06:24 6/18/2012 00:11:56 710-- 3 3 COAL -- Harita Para6/18/2012 00:06:48 6/18/2012 00:12:00 703-- 3 3 COAL -- Harita Para6/18/2012 00:09:04 6/18/2012 00:16:21 115 3 3 COAL -- Harita Para6/18/2012 00:09:25 6/18/2012 00:21:36 713-- 3 3 COAL -- Harita Para6/18/2012 00:09:47 6/18/2012 00:21:40 702-- 3 3 COAL -- Harita Para6/18/2012 00:10:10 6/18/2012 00:22:34 701-- 3 3 COAL -- Harita Para6/18/2012 00:20:05 6/18/2012 00:26:23 714-- 3 3 COAL -- Harita Para6/18/2012 00:20:48 6/18/2012 00:26:26 707-- 3 3 COAL -- Harita Para6/18/2012 00:30:16 6/18/2012 00:34:58 829- 3 3 COAL -- Harita Para6/18/2012 00:48:03 6/18/2012 00:52:46 810 3 3 COAL -- MIL6/18/2012 00:57:49 6/18/2012 01:07:22 113 3 3 COAL -- Harita Para6/18/2012 01:08:16 6/18/2012 01:15:00 851 3 3 COAL -- MIL6/18/2012 01:08:43 6/18/2012 01:42:43 709-- 3 3 COAL -- Harita Para6/18/2012 01:32:00 6/18/2012 01:39:00 852 3 3 COAL -- MIL6/18/2012 01:39:33 6/18/2012 01:44:55 855 3 3 COAL -- MIL6/18/2012 01:43:29 6/18/2012 01:50:12 853 3 3 COAL -- MIL6/18/2012 01:55:16 6/18/2012 01:59:30 705-- 3 3 COAL -- Harita Para6/18/2012 02:11:16 6/18/2012 02:15:37 829- 3 3 COAL -- Harita Para6/18/2012 02:14:36 6/18/2012 02:19:43 706-- 3 3 COAL -- Harita Para6/18/2012 02:18:55 6/18/2012 02:23:35 713-- 3 3 COAL -- Harita Para6/18/2012 02:21:08 6/18/2012 02:27:48 704-- 3 3 COAL -- Harita Para6/18/2012 02:22:43 6/18/2012 02:28:18 818- 3 3 COAL -- Harita Para6/18/2012 02:25:21 6/18/2012 02:31:14 812- 3 3 COAL -- Harita Para6/18/2012 02:32:18 6/18/2012 02:38:42 707-- 3 3 COAL -- Harita Para6/18/2012 02:32:41 6/18/2012 02:40:44 850- 3 3 COAL -- Harita Para6/18/2012 02:35:04 6/18/2012 02:43:41 810 3 3 COAL -- MIL6/18/2012 02:35:32 6/18/2012 02:45:30 701-- 3 3 COAL -- Harita Para6/18/2012 02:47:16 6/18/2012 02:52:04 115 3 3 COAL -- Harita Para6/18/2012 02:50:38 6/18/2012 02:54:10 815- 3 3 COAL -- Harita Para6/18/2012 02:55:14 6/18/2012 02:59:50 837- 3 3 COAL -- Harita Para6/18/2012 02:56:28 6/18/2012 03:02:20 703-- 3 3 COAL -- Harita Para6/18/2012 02:56:55 6/18/2012 03:02:26 702-- 3 3 COAL -- Harita Para6/18/2012 02:57:22 6/18/2012 03:03:49 113 3 3 COAL -- Harita Para

Page 66: June Per Shift (Truckscale Port)

6/18/2012 03:08:29 6/18/2012 03:13:17 851 3 3 COAL -- MIL6/18/2012 03:14:41 6/18/2012 03:19:17 710-- 3 3 COAL -- Harita Para6/18/2012 03:28:53 6/18/2012 03:34:27 852 3 3 COAL -- MIL6/18/2012 03:29:49 6/18/2012 03:38:22 855 3 3 COAL -- MIL6/18/2012 07:15:34 6/18/2012 07:26:30 707-- 3 3 COAL -- Harita Para6/18/2012 07:28:23 6/18/2012 07:31:25 710-- 3 3 COAL -- Harita Para6/18/2012 07:30:17 6/18/2012 07:33:43 704-- 3 3 COAL -- Harita Para6/18/2012 07:30:40 6/18/2012 07:36:17 713-- 3 3 COAL -- Harita Para6/18/2012 07:34:33 6/18/2012 07:41:02 855 3 3 COAL -- MIL6/18/2012 07:35:07 6/18/2012 07:44:37 113 3 3 COAL -- Harita Para6/18/2012 07:38:07 6/18/2012 07:45:12 701-- 3 3 COAL -- Harita Para6/18/2012 07:42:48 6/18/2012 07:49:50 812- 3 3 COAL -- Harita Para6/18/2012 07:45:56 6/18/2012 07:51:16 852 3 3 COAL -- MIL6/18/2012 07:49:11 6/18/2012 07:53:54 818- 3 3 COAL -- Harita Para6/18/2012 07:50:25 6/18/2012 07:55:42 837- 3 3 COAL -- Harita Para6/18/2012 08:10:05 6/18/2012 08:13:35 810 1 1 COAL -- MIL6/18/2012 08:20:41 6/18/2012 08:26:18 851 1 1 COAL -- MIL6/18/2012 08:24:46 6/18/2012 08:28:28 705-- 1 1 COAL -- Harita Para6/18/2012 08:27:12 6/18/2012 08:30:48 702-- 1 1 COAL -- Harita Para6/18/2012 08:29:48 6/18/2012 08:34:20 115 1 1 COAL -- Harita Para6/18/2012 08:37:19 6/18/2012 08:42:52 709-- 1 1 COAL -- Harita Para6/18/2012 08:45:34 6/18/2012 08:49:23 710-- 1 1 COAL -- Harita Para6/18/2012 08:48:21 6/18/2012 08:52:55 706-- 1 1 COAL -- Harita Para6/18/2012 08:48:42 6/18/2012 08:53:08 703-- 1 1 COAL -- Harita Para6/18/2012 08:50:01 6/18/2012 08:54:56 707-- 1 1 COAL -- Harita Para6/18/2012 08:57:02 6/18/2012 09:01:00 708-- 1 1 COAL -- Harita Para6/18/2012 08:57:29 6/18/2012 09:01:03 704-- 1 1 COAL -- Harita Para6/18/2012 09:02:21 6/18/2012 09:06:06 713-- 1 1 COAL -- Harita Para6/18/2012 09:08:22 6/18/2012 09:12:04 815- 1 1 COAL -- Harita Para6/18/2012 09:13:05 6/18/2012 09:17:13 701-- 1 1 COAL -- Harita Para6/18/2012 09:13:23 6/18/2012 09:19:34 714-- 1 1 COAL -- Harita Para6/18/2012 09:15:38 6/18/2012 09:21:49 113 1 1 COAL -- Harita Para6/18/2012 09:18:43 6/18/2012 09:19:42 833- 1 1 COAL -- Harita Para6/18/2012 09:20:20 6/18/2012 09:25:13 812- 1 1 COAL -- Harita Para6/18/2012 09:42:06 6/18/2012 09:49:56 855 1 1 COAL -- MIL6/18/2012 09:49:08 6/18/2012 09:49:59 852 1 1 COAL -- MIL6/18/2012 09:51:20 6/18/2012 09:55:30 837- 1 1 COAL -- Harita Para6/18/2012 10:00:42 6/18/2012 10:06:11 856 1 1 COAL -- MIL6/18/2012 10:05:43 6/18/2012 10:06:16 810 1 1 COAL -- MIL6/18/2012 10:07:22 6/18/2012 10:10:54 705-- 1 1 COAL -- Harita Para6/18/2012 10:12:12 6/18/2012 10:16:10 702-- 1 1 COAL -- Harita Para6/18/2012 10:20:17 6/18/2012 10:25:05 851 1 1 COAL -- MIL6/18/2012 10:24:04 6/18/2012 10:29:23 710-- 1 1 COAL -- Harita Para6/18/2012 10:27:45 6/18/2012 10:31:37 818- 1 1 COAL -- Harita Para6/18/2012 10:33:12 6/18/2012 10:37:24 115 1 1 COAL -- Harita Para6/18/2012 10:35:02 6/18/2012 10:40:30 709-- 1 1 COAL -- Harita Para6/18/2012 10:38:05 6/18/2012 10:40:34 839- 1 1 COAL -- Harita Para6/18/2012 10:47:34 6/18/2012 10:51:58 703-- 1 1 COAL -- Harita Para6/18/2012 10:50:50 6/18/2012 11:07:47 706-- 1 1 COAL -- Harita Para6/18/2012 10:54:23 6/18/2012 11:07:50 829- 1 1 COAL -- Harita Para

Page 67: June Per Shift (Truckscale Port)

6/18/2012 10:55:00 6/18/2012 11:15:29 707-- 1 1 COAL -- Harita Para6/18/2012 10:59:46 6/18/2012 11:15:32 708-- 1 1 COAL -- Harita Para6/18/2012 11:00:11 6/18/2012 11:18:54 815- 1 1 COAL -- Harita Para6/18/2012 11:06:51 6/18/2012 11:19:02 704-- 1 1 COAL -- Harita Para6/18/2012 11:11:15 6/18/2012 11:21:36 812- 1 1 COAL -- Harita Para6/18/2012 11:12:31 6/18/2012 11:21:38 712-- 1 1 COAL -- Harita Para6/18/2012 11:14:51 6/18/2012 11:24:13 714-- 1 1 COAL -- Harita Para6/18/2012 11:17:25 6/18/2012 11:26:12 830- 1 1 COAL -- Harita Para6/18/2012 11:22:26 6/18/2012 11:26:16 113 1 1 COAL -- Harita Para6/18/2012 11:25:05 6/18/2012 11:27:44 701-- 1 1 COAL -- Harita Para6/18/2012 11:32:38 6/18/2012 11:36:09 837- 1 1 COAL -- Harita Para6/18/2012 11:39:55 6/18/2012 11:50:31 833- 1 1 COAL -- Harita Para6/18/2012 11:48:28 6/18/2012 11:50:37 705-- 1 1 COAL -- Harita Para6/18/2012 11:54:29 6/18/2012 11:58:03 702-- 1 1 COAL -- Harita Para6/18/2012 12:00:58 6/18/2012 12:05:52 818- 1 1 COAL -- Harita Para6/18/2012 12:06:31 6/18/2012 12:10:56 710-- 1 1 COAL -- Harita Para6/18/2012 12:09:55 6/18/2012 12:18:35 855 1 1 COAL -- MIL6/18/2012 12:10:21 6/18/2012 12:18:56 115 1 1 COAL -- Harita Para6/18/2012 12:16:35 6/18/2012 12:20:24 850- 1 1 COAL -- Harita Para6/18/2012 12:16:55 6/18/2012 12:20:28 703-- 1 1 COAL -- Harita Para6/18/2012 12:17:12 6/18/2012 12:21:40 709-- 1 1 COAL -- Harita Para6/18/2012 12:17:47 6/18/2012 12:21:44 713-- 1 1 COAL -- Harita Para6/18/2012 12:19:49 6/18/2012 12:26:53 852 1 1 COAL -- MIL6/18/2012 12:28:19 6/18/2012 12:31:59 853 1 1 COAL -- MIL6/18/2012 12:30:37 6/18/2012 12:32:02 810 1 1 COAL -- MIL6/18/2012 12:36:43 6/18/2012 12:40:50 839- 1 1 COAL -- Harita Para6/18/2012 12:45:11 6/18/2012 12:49:49 856 1 1 COAL -- MIL6/18/2012 12:46:42 6/18/2012 12:51:49 706-- 1 1 COAL -- Harita Para6/18/2012 12:53:14 6/18/2012 13:09:19 851 1 1 COAL -- MIL6/18/2012 13:04:35 6/18/2012 13:11:11 829- 1 1 COAL -- Harita Para6/18/2012 13:05:08 6/18/2012 13:13:03 708-- 1 1 COAL -- Harita Para6/18/2012 13:08:44 6/18/2012 13:13:06 830- 1 1 COAL -- Harita Para6/18/2012 13:11:59 6/18/2012 13:14:51 714-- 1 1 COAL -- Harita Para6/18/2012 13:16:20 6/18/2012 13:19:57 704-- 1 1 COAL -- Harita Para6/18/2012 13:21:20 6/18/2012 13:25:37 812- 1 1 COAL -- Harita Para6/18/2012 13:24:58 6/18/2012 13:28:42 837- 1 1 COAL -- Harita Para6/18/2012 13:35:48 6/18/2012 13:40:33 113 1 1 COAL -- Harita Para6/18/2012 13:44:03 6/18/2012 13:47:37 707-- 1 1 COAL -- Harita Para6/18/2012 13:50:19 6/18/2012 13:54:11 712-- 1 1 COAL -- Harita Para6/18/2012 13:51:21 6/18/2012 13:55:52 818- 1 1 COAL -- Harita Para6/18/2012 13:52:34 6/18/2012 14:12:18 855 1 1 COAL -- MIL6/18/2012 13:53:25 6/18/2012 14:01:27 709-- 1 1 COAL -- Harita Para6/18/2012 13:55:03 6/18/2012 14:01:31 702-- 1 1 COAL -- Harita Para6/18/2012 13:58:30 6/18/2012 14:03:43 850- 1 1 COAL -- Harita Para6/18/2012 13:59:06 6/18/2012 14:03:47 705-- 1 1 COAL -- Harita Para6/18/2012 14:00:11 6/18/2012 14:05:28 713-- 1 1 COAL -- Harita Para6/18/2012 14:03:02 6/18/2012 14:05:32 710-- 1 1 COAL -- Harita Para6/18/2012 14:07:15 6/18/2012 14:10:16 701-- 1 1 COAL -- Harita Para6/18/2012 14:08:47 6/18/2012 14:12:20 810 1 1 COAL -- MIL6/18/2012 14:13:29 6/18/2012 14:17:20 115 1 1 COAL -- Harita Para

Page 68: June Per Shift (Truckscale Port)

6/18/2012 14:20:49 6/18/2012 14:26:10 706-- 1 1 COAL -- Harita Para6/18/2012 14:23:24 6/18/2012 14:26:15 703-- 1 1 COAL -- Harita Para6/18/2012 14:25:32 6/18/2012 14:28:17 833- 1 1 COAL -- Harita Para6/18/2012 14:29:17 6/18/2012 14:30:40 852 1 1 COAL -- MIL6/18/2012 14:36:45 6/18/2012 14:40:38 853 1 1 COAL -- MIL6/18/2012 14:41:58 6/18/2012 14:46:29 708-- 1 1 COAL -- Harita Para6/18/2012 14:45:49 6/18/2012 14:50:47 856 1 1 COAL -- MIL6/18/2012 14:47:21 6/18/2012 14:53:52 714-- 1 1 COAL -- Harita Para6/18/2012 14:49:22 6/18/2012 14:53:55 704-- 1 1 COAL -- Harita Para6/18/2012 15:01:40 6/18/2012 15:07:43 851 1 1 COAL -- MIL6/18/2012 15:04:10 6/18/2012 15:09:12 830- 1 1 COAL -- Harita Para6/18/2012 15:11:18 6/18/2012 15:16:54 113 1 1 COAL -- Harita Para6/18/2012 15:15:15 6/18/2012 15:18:48 707-- 1 1 COAL -- Harita Para6/18/2012 15:25:50 6/18/2012 15:29:50 818- 1 1 COAL -- Harita Para6/18/2012 15:27:05 6/18/2012 15:30:00 709-- 1 1 COAL -- Harita Para6/18/2012 15:33:38 6/18/2012 15:37:15 850- 1 1 COAL -- Harita Para6/18/2012 15:34:29 6/18/2012 15:37:20 712-- 1 1 COAL -- Harita Para6/18/2012 15:34:50 6/18/2012 15:39:37 713-- 1 1 COAL -- Harita Para6/18/2012 15:35:11 6/18/2012 15:41:39 702-- 1 1 COAL -- Harita Para6/18/2012 15:38:20 6/18/2012 15:41:43 839- 1 1 COAL -- Harita Para6/18/2012 15:40:39 6/18/2012 15:43:42 829- 1 1 COAL -- Harita Para6/18/2012 15:42:39 6/18/2012 15:48:08 705-- 1 1 COAL -- Harita Para6/18/2012 15:44:27 6/18/2012 15:46:07 710-- 1 1 COAL -- Harita Para6/18/2012 15:47:08 6/18/2012 15:49:49 701-- 1 1 COAL -- Harita Para6/18/2012 15:52:16 6/18/2012 15:52:59 115 1 1 COAL -- Harita Para6/18/2012 16:02:05 6/18/2012 16:05:59 703-- 2 2 COAL -- Harita Para6/18/2012 16:29:27 6/18/2012 16:34:50 833- 2 2 COAL -- Harita Para6/18/2012 18:22:15 6/18/2012 18:25:56 712-- 2 2 COAL -- Harita Para6/18/2012 18:27:55 6/18/2012 18:32:03 113 2 2 COAL -- Harita Para6/18/2012 18:30:31 6/18/2012 18:35:25 701-- 2 2 COAL -- Harita Para6/18/2012 18:32:47 6/18/2012 18:36:20 707-- 2 2 COAL -- Harita Para6/18/2012 18:34:14 6/18/2012 18:36:26 708-- 2 2 COAL -- Harita Para6/18/2012 18:34:52 6/18/2012 18:37:58 713-- 2 2 COAL -- Harita Para6/18/2012 18:43:04 6/18/2012 18:47:31 710-- 2 2 COAL -- Harita Para6/18/2012 18:43:34 6/18/2012 18:47:34 709-- 2 2 COAL -- Harita Para6/18/2012 18:44:01 6/18/2012 18:47:38 115 2 2 COAL -- Harita Para6/18/2012 18:45:01 6/18/2012 18:49:09 706-- 2 2 COAL -- Harita Para6/18/2012 18:45:29 6/18/2012 18:49:12 714-- 2 2 COAL -- Harita Para6/18/2012 18:46:05 6/18/2012 18:51:19 704-- 2 2 COAL -- Harita Para6/18/2012 18:46:42 6/18/2012 18:51:24 703-- 2 2 COAL -- Harita Para6/18/2012 19:05:40 6/18/2012 19:09:37 705-- 2 2 COAL -- Harita Para6/18/2012 19:12:00 6/18/2012 19:18:26 855 2 2 COAL -- MIL6/18/2012 19:13:15 6/18/2012 19:18:54 856 2 2 COAL -- MIL6/18/2012 19:15:34 6/18/2012 19:22:15 853 2 2 COAL -- MIL6/18/2012 19:19:57 6/18/2012 19:24:09 818- 2 2 COAL -- Harita Para6/18/2012 19:25:01 6/18/2012 19:33:56 836- 2 2 COAL -- Harita Para6/18/2012 19:34:59 6/18/2012 19:39:16 839- 2 2 COAL -- Harita Para6/18/2012 19:35:28 6/18/2012 19:41:27 812- 2 2 COAL -- Harita Para6/18/2012 19:37:34 6/18/2012 19:47:15 851 2 2 COAL -- MIL6/18/2012 19:44:07 6/18/2012 19:50:32 810 2 2 COAL -- MIL

Page 69: June Per Shift (Truckscale Port)

6/18/2012 20:01:45 6/18/2012 20:06:16 712-- 2 2 COAL -- Harita Para6/18/2012 20:04:52 6/18/2012 20:08:59 113 2 2 COAL -- Harita Para6/18/2012 20:05:32 6/18/2012 20:11:16 701-- 2 2 COAL -- Harita Para6/18/2012 20:13:35 6/18/2012 20:17:56 713-- 2 2 COAL -- Harita Para6/18/2012 20:16:05 6/18/2012 20:19:31 708-- 2 2 COAL -- Harita Para6/18/2012 20:17:18 6/18/2012 20:21:16 707-- 2 2 COAL -- Harita Para6/18/2012 20:23:47 6/18/2012 20:29:29 852 2 2 COAL -- MIL6/18/2012 20:24:05 6/18/2012 20:30:20 709-- 2 2 COAL -- Harita Para6/18/2012 20:25:08 6/18/2012 20:33:22 850- 2 2 COAL -- Harita Para6/18/2012 20:32:29 6/18/2012 20:36:50 710-- 2 2 COAL -- Harita Para6/18/2012 20:40:43 6/18/2012 20:44:59 706-- 2 2 COAL -- Harita Para6/18/2012 20:41:10 6/18/2012 20:48:21 714-- 2 2 COAL -- Harita Para6/18/2012 20:42:53 6/18/2012 20:49:31 829- 2 2 COAL -- Harita Para6/18/2012 20:47:33 6/18/2012 20:52:33 704-- 2 2 COAL -- Harita Para6/18/2012 20:53:47 6/18/2012 21:02:49 855 2 2 COAL -- MIL6/18/2012 20:56:32 6/18/2012 21:03:19 703-- 2 2 COAL -- Harita Para6/18/2012 21:00:04 6/18/2012 21:03:51 856 2 2 COAL -- MIL6/18/2012 21:02:12 6/18/2012 21:08:05 115 2 2 COAL -- Harita Para6/18/2012 21:05:55 6/18/2012 21:10:26 831- 2 2 COAL -- Harita Para6/18/2012 21:07:01 6/18/2012 21:14:16 853 2 2 COAL -- MIL6/18/2012 21:12:31 6/18/2012 21:20:39 818- 2 2 COAL -- Harita Para6/18/2012 21:18:56 6/18/2012 21:25:03 702-- 2 2 COAL -- Harita Para6/18/2012 21:27:37 6/18/2012 21:33:45 705-- 2 2 COAL -- Harita Para6/18/2012 21:31:52 6/18/2012 21:36:45 839- 2 2 COAL -- Harita Para6/18/2012 21:32:08 6/18/2012 21:36:27 851 2 2 COAL -- MIL6/18/2012 21:32:26 6/18/2012 21:39:33 810 2 2 COAL -- MIL6/18/2012 21:32:49 6/18/2012 21:39:54 812- 2 2 COAL -- Harita Para6/18/2012 21:33:06 6/18/2012 21:41:35 712-- 2 2 COAL -- Harita Para6/18/2012 21:38:39 6/18/2012 21:41:40 713-- 2 2 COAL -- Harita Para6/18/2012 21:40:36 6/18/2012 21:44:39 113 2 2 COAL -- Harita Para6/18/2012 21:40:57 6/18/2012 21:44:44 701-- 2 2 COAL -- Harita Para6/18/2012 21:56:11 6/18/2012 21:59:43 707-- 2 2 COAL -- Harita Para6/18/2012 22:00:59 6/18/2012 22:04:35 708-- 2 2 COAL -- Harita Para6/18/2012 22:04:01 6/18/2012 22:08:09 709-- 2 2 COAL -- Harita Para6/18/2012 22:15:30 6/18/2012 22:21:23 852 2 2 COAL -- MIL6/18/2012 22:18:29 6/18/2012 22:23:48 710-- 2 2 COAL -- Harita Para6/18/2012 22:22:06 6/18/2012 22:26:12 706-- 2 2 COAL -- Harita Para6/18/2012 22:29:59 6/18/2012 22:34:14 714-- 2 2 COAL -- Harita Para6/18/2012 22:31:07 6/18/2012 22:37:02 850- 2 2 COAL -- Harita Para6/18/2012 22:35:20 6/18/2012 22:42:41 855 2 2 COAL -- MIL6/18/2012 22:42:03 6/18/2012 22:52:20 704-- 2 2 COAL -- Harita Para6/18/2012 22:43:56 6/18/2012 22:59:01 829- 2 2 COAL -- Harita Para6/18/2012 22:47:46 6/18/2012 22:52:25 703-- 2 2 COAL -- Harita Para6/18/2012 22:48:59 6/18/2012 22:53:52 836- 2 2 COAL -- Harita Para6/18/2012 22:57:45 6/18/2012 23:03:18 115 2 2 COAL -- Harita Para6/18/2012 22:59:53 6/18/2012 23:03:39 856 2 2 COAL -- MIL6/18/2012 23:02:24 6/18/2012 23:08:55 853 2 2 COAL -- MIL6/18/2012 23:04:36 6/18/2012 23:09:27 818- 2 2 COAL -- Harita Para6/18/2012 23:08:11 6/18/2012 23:11:30 702-- 2 2 COAL -- Harita Para6/18/2012 23:10:47 6/18/2012 23:14:45 831- 2 2 COAL -- Harita Para

Page 70: June Per Shift (Truckscale Port)

6/18/2012 23:16:34 6/18/2012 23:21:12 812- 2 2 COAL -- Harita Para6/18/2012 23:17:38 6/18/2012 23:22:17 851 2 2 COAL -- MIL6/18/2012 23:19:23 6/18/2012 23:23:12 839- 2 2 COAL -- Harita Para6/18/2012 23:19:49 6/18/2012 23:25:26 705-- 2 2 COAL -- Harita Para6/18/2012 23:24:53 6/18/2012 23:29:38 713-- 2 2 COAL -- Harita Para6/18/2012 23:40:06 6/18/2012 23:44:37 830- 2 2 COAL -- Harita Para6/18/2012 23:41:50 6/18/2012 23:48:11 810 2 2 COAL -- MIL6/18/2012 23:42:11 6/18/2012 23:48:38 113 2 2 COAL -- Harita Para6/18/2012 23:42:47 6/18/2012 23:49:59 712-- 2 2 COAL -- Harita Para6/18/2012 23:47:19 6/18/2012 23:50:04 707-- 2 2 COAL -- Harita Para6/18/2012 23:54:20 6/18/2012 23:59:01 701-- 2 2 COAL -- Harita Para6/18/2012 23:58:15 6/19/2012 00:02:04 709-- 2 3 COAL -- Harita Para6/19/2012 00:08:42 6/19/2012 00:14:55 706-- 3 3 COAL -- Harita Para6/19/2012 00:09:53 6/19/2012 00:14:58 708-- 3 3 COAL -- Harita Para6/19/2012 00:17:33 6/19/2012 00:21:32 836- 3 3 COAL -- Harita Para6/19/2012 00:18:07 6/19/2012 00:31:51 852 3 3 COAL -- MIL6/19/2012 00:30:02 6/19/2012 00:35:00 850- 3 3 COAL -- Harita Para6/19/2012 00:36:08 6/19/2012 00:40:38 710-- 3 3 COAL -- Harita Para6/19/2012 00:36:41 6/19/2012 00:43:23 703-- 3 3 COAL -- Harita Para6/19/2012 00:48:05 6/19/2012 00:53:53 829- 3 3 COAL -- Harita Para6/19/2012 00:52:22 6/19/2012 00:56:58 812- 3 3 COAL -- Harita Para6/19/2012 01:03:58 6/19/2012 01:22:40 704-- 3 3 COAL -- Harita Para6/19/2012 01:04:20 6/19/2012 01:11:08 702-- 3 3 COAL -- Harita Para6/19/2012 01:19:00 6/19/2012 01:22:50 818- 3 3 COAL -- Harita Para6/19/2012 01:31:43 6/19/2012 01:37:15 712-- 3 3 COAL -- Harita Para6/19/2012 01:32:14 6/19/2012 01:39:13 853 3 3 COAL -- MIL6/19/2012 01:32:40 6/19/2012 01:40:22 707-- 3 3 COAL -- Harita Para6/19/2012 01:36:11 6/19/2012 01:42:18 714-- 3 3 COAL -- Harita Para6/19/2012 01:36:31 6/19/2012 01:44:18 713-- 3 3 COAL -- Harita Para6/19/2012 01:42:58 6/19/2012 01:47:18 701-- 3 3 COAL -- Harita Para6/19/2012 01:52:34 6/19/2012 01:58:17 708-- 3 3 COAL -- Harita Para6/19/2012 01:56:02 6/19/2012 02:00:49 836- 3 3 COAL -- Harita Para6/19/2012 01:56:27 6/19/2012 02:01:33 839- 3 3 COAL -- Harita Para6/19/2012 01:56:56 6/19/2012 02:01:58 709-- 3 3 COAL -- Harita Para6/19/2012 01:57:23 6/19/2012 02:04:09 705-- 3 3 COAL -- Harita Para6/19/2012 02:11:34 6/19/2012 02:16:24 113 3 3 COAL -- Harita Para6/19/2012 02:19:15 6/19/2012 02:30:24 852 3 3 COAL -- MIL6/19/2012 02:29:27 6/19/2012 02:34:08 710-- 3 3 COAL -- Harita Para6/19/2012 02:33:14 6/19/2012 02:40:23 855 3 3 COAL -- MIL6/19/2012 02:38:54 6/19/2012 02:43:20 703-- 3 3 COAL -- Harita Para6/19/2012 02:42:39 6/19/2012 02:46:55 851 3 3 COAL -- MIL6/19/2012 02:48:43 6/19/2012 02:54:59 810 3 3 COAL -- MIL6/19/2012 07:49:42 6/19/2012 08:11:37 115 3 1 COAL -- Harita Para6/19/2012 08:04:38 6/19/2012 08:11:40 702-- 1 1 COAL -- Harita Para6/19/2012 08:08:47 6/19/2012 08:14:07 707-- 1 1 COAL -- Harita Para6/19/2012 08:12:25 6/19/2012 08:14:10 710-- 1 1 COAL -- Harita Para6/19/2012 08:15:39 6/19/2012 08:20:00 709-- 1 1 COAL -- Harita Para6/19/2012 08:26:20 6/19/2012 08:36:24 708-- 1 1 COAL -- Harita Para6/19/2012 08:27:52 6/19/2012 08:37:08 113 1 1 COAL -- Harita Para6/19/2012 08:28:25 6/19/2012 08:39:44 713-- 1 1 COAL -- Harita Para

Page 71: June Per Shift (Truckscale Port)

6/19/2012 08:30:41 6/19/2012 08:41:01 701-- 1 1 COAL -- Harita Para6/19/2012 08:34:48 6/19/2012 08:41:05 714-- 1 1 COAL -- Harita Para6/19/2012 08:38:00 6/19/2012 08:46:08 705-- 1 1 COAL -- Harita Para6/19/2012 08:55:57 6/19/2012 09:01:06 706-- 1 1 COAL -- Harita Para6/19/2012 09:09:24 6/19/2012 09:13:53 712-- 1 1 COAL -- Harita Para6/19/2012 09:15:09 6/19/2012 09:18:53 818- 1 1 COAL -- Harita Para6/19/2012 09:21:22 6/19/2012 09:26:26 703-- 1 1 COAL -- Harita Para6/19/2012 09:31:14 6/19/2012 09:36:52 115 1 1 COAL -- Harita Para6/19/2012 09:32:20 6/19/2012 09:37:14 836- 1 1 COAL -- Harita Para6/19/2012 09:40:57 6/19/2012 09:45:33 839- 1 1 COAL -- Harita Para6/19/2012 09:47:18 6/19/2012 09:51:46 707-- 1 1 COAL -- Harita Para6/19/2012 09:50:13 6/19/2012 09:57:44 855 1 1 COAL -- MIL6/19/2012 09:54:48 6/19/2012 10:00:17 856 1 1 COAL -- MIL6/19/2012 09:58:28 6/19/2012 10:02:56 812- 1 1 COAL -- Harita Para6/19/2012 09:59:36 6/19/2012 10:03:14 810 1 1 COAL -- MIL6/19/2012 10:00:53 6/19/2012 10:06:57 851 1 1 COAL -- MIL6/19/2012 10:01:10 6/19/2012 10:08:45 702-- 1 1 COAL -- Harita Para6/19/2012 10:01:43 6/19/2012 10:11:20 709-- 1 1 COAL -- Harita Para6/19/2012 10:03:54 6/19/2012 10:11:42 710-- 1 1 COAL -- Harita Para6/19/2012 10:04:19 6/19/2012 10:13:59 713-- 1 1 COAL -- Harita Para6/19/2012 10:06:20 6/19/2012 10:15:31 830- 1 1 COAL -- Harita Para6/19/2012 10:12:22 6/19/2012 10:16:39 828- 1 1 COAL -- Harita Para6/19/2012 10:12:46 6/19/2012 10:18:14 714-- 1 1 COAL -- Harita Para6/19/2012 10:17:35 6/19/2012 10:24:39 705-- 1 1 COAL -- Harita Para6/19/2012 10:18:57 6/19/2012 10:23:49 853 1 1 COAL -- MIL6/19/2012 10:21:38 6/19/2012 10:31:47 701-- 1 1 COAL -- Harita Para6/19/2012 10:30:56 6/19/2012 10:36:28 852 1 1 COAL -- MIL6/19/2012 10:39:55 6/19/2012 10:46:50 706-- 1 1 COAL -- Harita Para6/19/2012 10:44:36 6/19/2012 10:49:40 712-- 1 1 COAL -- Harita Para6/19/2012 10:47:33 6/19/2012 10:52:07 818- 1 1 COAL -- Harita Para6/19/2012 10:56:01 6/19/2012 11:01:45 704-- 1 1 COAL -- Harita Para6/19/2012 10:59:09 6/19/2012 11:04:28 703-- 1 1 COAL -- Harita Para6/19/2012 11:10:27 6/19/2012 11:14:48 836- 1 1 COAL -- Harita Para6/19/2012 11:11:25 6/19/2012 11:16:09 115 1 1 COAL -- Harita Para6/19/2012 11:17:04 6/19/2012 11:21:05 707-- 1 1 COAL -- Harita Para6/19/2012 11:24:33 6/19/2012 11:28:08 839- 1 1 COAL -- Harita Para6/19/2012 11:33:45 6/19/2012 11:37:49 812- 1 1 COAL -- Harita Para6/19/2012 11:43:57 6/19/2012 11:48:50 702-- 1 1 COAL -- Harita Para6/19/2012 11:44:20 6/19/2012 11:52:16 830- 1 1 COAL -- Harita Para6/19/2012 11:48:02 6/19/2012 11:54:10 709-- 1 1 COAL -- Harita Para6/19/2012 11:50:34 6/19/2012 11:55:11 815- 1 1 COAL -- Harita Para6/19/2012 11:51:21 6/19/2012 11:57:09 713-- 1 1 COAL -- Harita Para6/19/2012 11:53:29 6/19/2012 11:59:01 828- 1 1 COAL -- Harita Para6/19/2012 11:57:50 6/19/2012 12:02:40 714-- 1 1 COAL -- Harita Para6/19/2012 12:09:50 6/19/2012 12:13:49 705-- 1 1 COAL -- Harita Para6/19/2012 12:16:04 6/19/2012 12:20:49 701-- 1 1 COAL -- Harita Para6/19/2012 12:24:06 6/19/2012 12:30:45 855 1 1 COAL -- MIL6/19/2012 12:24:30 6/19/2012 12:36:49 706-- 1 1 COAL -- Harita Para6/19/2012 12:24:54 6/19/2012 12:31:34 710-- 1 1 COAL -- Harita Para6/19/2012 12:25:35 6/19/2012 12:32:44 833- 1 1 COAL -- Harita Para

Page 72: June Per Shift (Truckscale Port)

6/19/2012 12:29:47 6/19/2012 12:34:59 818- 1 1 COAL -- Harita Para6/19/2012 12:37:37 6/19/2012 12:44:25 853 1 1 COAL -- MIL6/19/2012 12:49:41 6/19/2012 12:54:01 836- 1 1 COAL -- Harita Para6/19/2012 12:52:28 6/19/2012 12:57:44 856 1 1 COAL -- MIL6/19/2012 12:54:59 6/19/2012 12:57:49 851 1 1 COAL -- MIL6/19/2012 13:00:09 6/19/2012 13:00:55 810 1 1 COAL -- MIL6/19/2012 13:07:39 6/19/2012 13:13:16 703-- 1 1 COAL -- Harita Para6/19/2012 13:12:22 6/19/2012 13:13:19 712-- 1 1 COAL -- Harita Para6/19/2012 13:23:50 6/19/2012 13:28:57 852 1 1 COAL -- MIL6/19/2012 13:54:04 6/19/2012 13:59:32 819- 1 1 COAL -- Harita Para6/19/2012 13:57:50 6/19/2012 14:06:23 855 1 1 COAL -- MIL6/19/2012 13:58:22 6/19/2012 14:03:45 709-- 1 1 COAL -- Harita Para6/19/2012 14:01:35 6/19/2012 14:08:40 829- 1 1 COAL -- Harita Para6/19/2012 14:05:01 6/19/2012 14:08:43 702-- 1 1 COAL -- Harita Para6/19/2012 14:05:43 6/19/2012 14:09:32 115 1 1 COAL -- Harita Para6/19/2012 14:10:28 6/19/2012 14:12:10 707-- 1 1 COAL -- Harita Para6/19/2012 14:10:56 6/19/2012 14:18:47 853 1 1 COAL -- MIL6/19/2012 14:16:50 6/19/2012 14:25:11 705-- 1 1 COAL -- Harita Para6/19/2012 14:18:08 6/19/2012 14:36:34 812- 1 1 COAL -- Harita Para6/19/2012 14:24:15 6/19/2012 14:37:55 851 1 1 COAL -- MIL6/19/2012 14:24:31 6/19/2012 14:38:05 810 1 1 COAL -- MIL6/19/2012 14:30:24 6/19/2012 14:41:09 714-- 1 1 COAL -- Harita Para6/19/2012 14:31:04 6/19/2012 14:41:11 710-- 1 1 COAL -- Harita Para6/19/2012 14:34:10 6/19/2012 14:46:38 815- 1 1 COAL -- Harita Para6/19/2012 14:38:59 6/19/2012 14:46:43 828- 1 1 COAL -- Harita Para6/19/2012 14:39:26 6/19/2012 14:47:58 713-- 1 1 COAL -- Harita Para6/19/2012 14:56:13 6/19/2012 15:00:11 706-- 1 1 COAL -- Harita Para6/19/2012 14:56:33 6/19/2012 15:00:14 701-- 1 1 COAL -- Harita Para6/19/2012 14:59:24 6/19/2012 15:04:34 818- 1 1 COAL -- Harita Para6/19/2012 15:00:51 6/19/2012 15:07:10 856 1 1 COAL -- MIL6/19/2012 15:08:54 6/19/2012 15:14:22 703-- 1 1 COAL -- Harita Para6/19/2012 15:10:49 6/19/2012 15:14:25 830- 1 1 COAL -- Harita Para6/19/2012 15:30:45 6/19/2012 15:35:41 836- 1 1 COAL -- Harita Para6/19/2012 15:33:12 6/19/2012 15:37:50 852 1 1 COAL -- MIL6/19/2012 15:35:00 6/19/2012 15:39:48 709-- 1 1 COAL -- Harita Para6/19/2012 15:40:43 6/19/2012 15:56:34 855 1 1 COAL -- MIL6/19/2012 15:40:58 6/19/2012 15:48:11 702-- 1 1 COAL -- Harita Para6/19/2012 15:41:24 6/19/2012 15:48:15 831- 1 1 COAL -- Harita Para6/19/2012 15:42:07 6/19/2012 15:49:53 707-- 1 1 COAL -- Harita Para6/19/2012 15:46:26 6/19/2012 15:56:39 853 1 1 COAL -- MIL6/19/2012 15:47:10 6/19/2012 15:52:41 833- 1 1 COAL -- Harita Para6/19/2012 15:47:32 6/19/2012 15:52:46 115 1 1 COAL -- Harita Para6/19/2012 15:50:58 6/19/2012 15:56:03 712-- 1 1 COAL -- Harita Para6/19/2012 15:52:01 6/19/2012 15:56:09 705-- 1 1 COAL -- Harita Para6/19/2012 15:53:48 6/19/2012 15:58:53 832- 1 1 COAL -- Harita Para6/19/2012 15:57:49 6/19/2012 16:04:58 819- 1 2 COAL -- Harita Para6/19/2012 16:01:34 6/19/2012 16:05:45 810 2 2 COAL -- MIL6/19/2012 16:04:19 6/19/2012 16:14:17 829- 2 2 COAL -- Harita Para6/19/2012 16:08:51 6/19/2012 16:17:06 851 2 2 COAL -- MIL6/19/2012 16:10:55 6/19/2012 16:17:53 812- 2 2 COAL -- Harita Para

Page 73: June Per Shift (Truckscale Port)

6/19/2012 16:19:37 6/19/2012 16:25:40 713-- 2 2 COAL -- Harita Para6/19/2012 16:42:57 6/19/2012 16:46:20 714-- 2 2 COAL -- Harita Para6/19/2012 18:25:18 6/19/2012 18:31:35 713-- 2 2 COAL -- Harita Para6/19/2012 18:35:41 6/19/2012 18:39:13 707-- 2 2 COAL -- Harita Para6/19/2012 18:37:13 6/19/2012 18:39:16 115 2 2 COAL -- Harita Para6/19/2012 18:37:36 6/19/2012 18:41:16 701-- 2 2 COAL -- Harita Para6/19/2012 18:43:02 6/19/2012 18:43:48 709-- 2 2 COAL -- Harita Para6/19/2012 18:45:01 6/19/2012 18:47:01 703-- 2 2 COAL -- Harita Para6/19/2012 18:50:18 6/19/2012 18:54:58 113 2 2 COAL -- Harita Para6/19/2012 18:50:46 6/19/2012 18:55:02 712-- 2 2 COAL -- Harita Para6/19/2012 18:51:08 6/19/2012 18:57:28 702-- 2 2 COAL -- Harita Para6/19/2012 18:51:31 6/19/2012 18:57:31 706-- 2 2 COAL -- Harita Para6/19/2012 18:59:41 6/19/2012 19:03:40 818- 2 2 COAL -- Harita Para6/19/2012 19:12:57 6/19/2012 19:17:27 836- 2 2 COAL -- Harita Para6/19/2012 19:15:08 6/19/2012 19:21:56 855 2 2 COAL -- MIL6/19/2012 19:18:54 6/19/2012 19:23:31 856 2 2 COAL -- MIL6/19/2012 19:30:19 6/19/2012 19:34:36 710-- 2 2 COAL -- Harita Para6/19/2012 19:31:23 6/19/2012 19:36:25 714-- 2 2 COAL -- Harita Para6/19/2012 19:44:37 6/19/2012 19:48:47 851 2 2 COAL -- MIL6/19/2012 19:46:00 6/19/2012 19:51:51 810 2 2 COAL -- MIL6/19/2012 19:46:26 6/19/2012 19:53:20 713-- 2 2 COAL -- Harita Para6/19/2012 19:49:30 6/19/2012 19:57:11 853 2 2 COAL -- MIL6/19/2012 19:50:22 6/19/2012 19:56:35 830- 2 2 COAL -- Harita Para6/19/2012 19:55:43 6/19/2012 20:00:07 850- 2 2 COAL -- Harita Para6/19/2012 19:57:55 6/19/2012 20:02:10 701-- 2 2 COAL -- Harita Para6/19/2012 20:00:39 6/19/2012 20:04:25 709-- 2 2 COAL -- Harita Para6/19/2012 20:07:14 6/19/2012 20:11:19 707-- 2 2 COAL -- Harita Para6/19/2012 20:19:04 6/19/2012 20:23:29 832- 2 2 COAL -- Harita Para6/19/2012 20:20:38 6/19/2012 20:25:21 703-- 2 2 COAL -- Harita Para6/19/2012 20:22:53 6/19/2012 20:29:08 115 2 2 COAL -- Harita Para6/19/2012 20:32:45 6/19/2012 20:37:19 113 2 2 COAL -- Harita Para6/19/2012 20:34:41 6/19/2012 20:39:43 702-- 2 2 COAL -- Harita Para6/19/2012 20:38:20 6/19/2012 20:45:08 852 2 2 COAL -- MIL6/19/2012 20:41:03 6/19/2012 20:46:34 712 2 2 COAL -- Harita Para6/19/2012 20:42:32 6/19/2012 20:49:12 706-- 2 2 COAL -- Harita Para6/19/2012 20:47:24 6/19/2012 20:51:37 818- 2 2 COAL -- Harita Para6/19/2012 20:59:04 6/19/2012 21:05:07 710-- 2 2 COAL -- Harita Para6/19/2012 21:03:38 6/19/2012 21:11:38 836- 2 2 COAL -- Harita Para6/19/2012 21:06:10 6/19/2012 21:17:08 855 2 2 COAL -- MIL6/19/2012 21:07:23 6/19/2012 21:12:56 817- 2 2 COAL -- Harita Para6/19/2012 21:11:00 6/19/2012 21:16:37 714-- 2 2 COAL -- Harita Para6/19/2012 21:15:10 6/19/2012 21:18:20 856 2 2 COAL -- MIL6/19/2012 21:15:37 6/19/2012 21:20:57 819- 2 2 COAL -- Harita Para6/19/2012 21:17:44 6/19/2012 21:22:28 701-- 2 2 COAL -- Harita Para6/19/2012 21:19:05 6/19/2012 21:24:17 713-- 2 2 COAL -- Harita Para6/19/2012 21:26:29 6/19/2012 21:31:19 709-- 2 2 COAL -- Harita Para6/19/2012 21:27:45 6/19/2012 21:32:37 851 2 2 COAL -- MIL6/19/2012 21:30:50 6/19/2012 21:35:18 812- 2 2 COAL -- Harita Para6/19/2012 21:32:00 6/19/2012 21:37:14 707-- 2 2 COAL -- Harita Para6/19/2012 21:39:27 6/19/2012 21:43:06 830- 2 2 COAL -- Harita Para

Page 74: June Per Shift (Truckscale Port)

6/19/2012 21:46:58 6/19/2012 21:53:07 810 2 2 COAL -- MIL6/19/2012 21:58:23 6/19/2012 22:02:08 115 2 2 COAL -- Harita Para6/19/2012 22:08:20 6/19/2012 22:17:09 832- 2 2 COAL -- Harita Para6/19/2012 22:12:16 6/19/2012 22:16:38 703-- 2 2 COAL -- Harita Para6/19/2012 22:18:42 6/19/2012 22:23:25 113 2 2 COAL -- Harita Para6/19/2012 22:22:35 6/19/2012 22:32:47 702-- 2 2 COAL -- Harita Para6/19/2012 22:27:02 6/19/2012 22:32:41 712-- 2 2 COAL -- Harita Para6/19/2012 22:34:38 6/19/2012 22:42:51 852 2 2 COAL -- MIL6/19/2012 22:35:12 6/19/2012 22:43:31 710-- 2 2 COAL -- Harita Para6/19/2012 22:35:35 6/19/2012 22:43:53 701-- 2 2 COAL -- Harita Para6/19/2012 22:37:46 6/19/2012 22:46:08 706-- 2 2 COAL -- Harita Para6/19/2012 22:38:03 6/19/2012 22:46:25 713-- 2 2 COAL -- Harita Para6/19/2012 22:45:34 6/19/2012 22:48:54 709-- 2 2 COAL -- Harita Para6/19/2012 22:47:01 6/19/2012 22:57:06 855 2 2 COAL -- MIL6/19/2012 22:49:45 6/19/2012 22:54:16 818- 2 2 COAL -- Harita Para6/19/2012 22:52:33 6/19/2012 22:56:07 707-- 2 2 COAL -- Harita Para6/19/2012 23:01:56 6/19/2012 23:05:02 856 2 2 COAL -- MIL6/19/2012 23:04:28 6/19/2012 23:09:00 714-- 2 2 COAL -- Harita Para6/19/2012 23:24:23 6/19/2012 23:28:29 851 2 2 COAL -- MIL6/19/2012 23:24:49 6/19/2012 23:29:55 817- 2 2 COAL -- Harita Para6/19/2012 23:25:23 6/19/2012 23:31:14 836- 2 2 COAL -- Harita Para6/19/2012 23:25:53 6/19/2012 23:31:21 830- 2 2 COAL -- Harita Para6/19/2012 23:33:18 6/19/2012 23:38:09 819- 2 2 COAL -- Harita Para6/19/2012 23:47:51 6/19/2012 23:54:47 853 2 2 COAL -- MIL6/19/2012 23:58:09 6/20/2012 00:03:31 810 2 3 COAL -- MIL6/20/2012 00:00:10 6/20/2012 00:07:58 703-- 3 3 COAL -- Harita Para6/20/2012 00:04:42 6/20/2012 00:09:06 115 3 3 COAL -- Harita Para6/20/2012 00:05:52 6/20/2012 00:08:03 710-- 3 3 COAL -- Harita Para6/20/2012 00:06:16 6/20/2012 00:11:37 708-- 3 3 COAL -- Harita Para6/20/2012 00:06:34 6/20/2012 00:11:41 713-- 3 3 COAL -- Harita Para6/20/2012 00:07:13 6/20/2012 00:14:19 113 3 3 COAL -- Harita Para6/20/2012 00:10:41 6/20/2012 00:19:08 701-- 3 3 COAL -- Harita Para6/20/2012 00:23:27 6/20/2012 00:28:22 702-- 3 3 COAL -- Harita Para6/20/2012 00:29:31 6/20/2012 00:34:01 709-- 3 3 COAL -- Harita Para6/20/2012 00:32:02 6/20/2012 00:36:14 707-- 3 3 COAL -- Harita Para6/20/2012 00:46:28 6/20/2012 00:50:43 706-- 3 3 COAL -- Harita Para6/20/2012 00:49:03 6/20/2012 00:56:05 852 3 3 COAL -- MIL6/20/2012 00:55:07 6/20/2012 00:59:06 714-- 3 3 COAL -- Harita Para6/20/2012 01:13:56 6/20/2012 01:18:32 712-- 3 3 COAL -- Harita Para6/20/2012 01:23:09 6/20/2012 01:26:43 851 3 3 COAL -- MIL6/20/2012 01:31:14 6/20/2012 01:37:52 853 3 3 COAL -- MIL6/20/2012 01:40:39 6/20/2012 01:47:37 855 3 3 COAL -- MIL6/20/2012 01:48:16 6/20/2012 01:52:01 856 3 3 COAL -- MIL6/20/2012 01:59:23 6/20/2012 02:04:40 819- 3 3 COAL -- Harita Para6/20/2012 02:01:25 6/20/2012 02:07:57 810 3 3 COAL -- MIL6/20/2012 02:07:00 6/20/2012 02:11:58 817- 3 3 COAL -- Harita Para6/20/2012 02:13:33 6/20/2012 02:17:12 115 3 3 COAL -- Harita Para6/20/2012 02:13:59 6/20/2012 02:17:54 832- 3 3 COAL -- Harita Para6/20/2012 02:18:38 6/20/2012 02:27:16 836- 3 3 COAL -- Harita Para6/20/2012 02:26:01 6/20/2012 02:30:59 113 3 3 COAL -- Harita Para

Page 75: June Per Shift (Truckscale Port)

6/20/2012 02:28:20 6/20/2012 02:32:32 710-- 3 3 COAL -- Harita Para6/20/2012 02:28:40 6/20/2012 02:34:09 709-- 3 3 COAL -- Harita Para6/20/2012 02:33:31 6/20/2012 02:37:37 714-- 3 3 COAL -- Harita Para6/20/2012 02:36:46 6/20/2012 02:40:37 708-- 3 3 COAL -- Harita Para6/20/2012 02:38:21 6/20/2012 02:45:44 852 3 3 COAL -- MIL6/20/2012 02:38:46 6/20/2012 02:44:50 707-- 3 3 COAL -- Harita Para6/20/2012 02:39:10 6/20/2012 02:47:19 705-- 3 3 COAL -- Harita Para6/20/2012 02:46:27 6/20/2012 02:50:50 703-- 3 3 COAL -- Harita Para6/20/2012 03:38:12 6/20/2012 03:41:49 115 3 3 COAL -- Harita Para6/20/2012 03:45:34 6/20/2012 03:49:58 818- 3 3 COAL -- Harita Para6/20/2012 03:57:04 6/20/2012 04:02:45 817- 3 3 COAL -- Harita Para6/20/2012 03:57:32 6/20/2012 04:01:58 832- 3 3 COAL -- Harita Para6/20/2012 07:17:15 6/20/2012 07:21:18 709-- 3 3 COAL -- Harita Para6/20/2012 07:23:35 6/20/2012 07:26:42 710-- 3 3 COAL -- Harita Para6/20/2012 07:24:02 6/20/2012 07:30:04 713-- 3 3 COAL -- Harita Para6/20/2012 07:24:25 6/20/2012 07:30:47 701-- 3 3 COAL -- Harita Para6/20/2012 07:27:26 6/20/2012 07:33:16 115 3 3 COAL -- Harita Para6/20/2012 07:28:08 6/20/2012 07:34:20 712-- 3 3 COAL -- Harita Para6/20/2012 07:29:06 6/20/2012 07:35:39 702-- 3 3 COAL -- Harita Para6/20/2012 07:29:31 6/20/2012 07:36:55 113 3 3 COAL -- Harita Para6/20/2012 07:32:25 6/20/2012 07:39:28 704-- 3 3 COAL -- Harita Para6/20/2012 07:37:43 6/20/2012 07:43:25 851 3 3 COAL -- MIL6/20/2012 07:38:39 6/20/2012 07:46:24 707-- 3 3 COAL -- Harita Para6/20/2012 07:41:25 6/20/2012 07:49:39 855 3 3 COAL -- MIL6/20/2012 07:44:14 6/20/2012 07:50:04 856 3 3 COAL -- MIL6/20/2012 07:44:37 6/20/2012 07:51:13 714-- 3 3 COAL -- Harita Para6/20/2012 07:45:47 6/20/2012 07:52:38 706-- 3 3 COAL -- Harita Para6/20/2012 07:46:58 6/20/2012 07:53:08 852 3 3 COAL -- MIL6/20/2012 07:48:02 6/20/2012 07:54:41 818- 3 3 COAL -- Harita Para6/20/2012 07:51:49 6/20/2012 07:58:11 853 3 3 COAL -- MIL6/20/2012 08:02:39 6/20/2012 08:06:54 703-- 1 1 COAL -- Harita Para6/20/2012 08:06:17 6/20/2012 08:10:17 705-- 1 1 COAL -- Harita Para6/20/2012 08:17:57 6/20/2012 08:21:14 810 1 1 COAL -- MIL6/20/2012 08:43:03 6/20/2012 08:47:10 832- 1 1 COAL -- Harita Para6/20/2012 08:54:25 6/20/2012 08:58:29 701-- 1 1 COAL -- Harita Para6/20/2012 08:55:20 6/20/2012 08:59:05 712-- 1 1 COAL -- Harita Para6/20/2012 08:55:59 6/20/2012 09:02:05 702-- 1 1 COAL -- Harita Para6/20/2012 09:00:30 6/20/2012 09:04:43 713-- 1 1 COAL -- Harita Para6/20/2012 09:01:01 6/20/2012 09:08:08 704-- 1 1 COAL -- Harita Para6/20/2012 09:01:28 6/20/2012 09:09:00 113 1 1 COAL -- Harita Para6/20/2012 09:07:04 6/20/2012 09:11:39 836- 1 1 COAL -- Harita Para6/20/2012 09:07:23 6/20/2012 09:13:24 707-- 1 1 COAL -- Harita Para6/20/2012 09:10:37 6/20/2012 09:24:58 709-- 1 1 COAL -- Harita Para6/20/2012 09:17:28 6/20/2012 09:23:38 113 1 1 COAL -- Harita Para6/20/2012 09:20:11 6/20/2012 09:24:11 714-- 1 1 COAL -- Harita Para6/20/2012 09:21:15 6/20/2012 09:26:43 818 1 1 COAL -- MIL6/20/2012 09:21:34 6/20/2012 09:28:31 851 1 1 COAL -- MIL6/20/2012 09:22:03 6/20/2012 09:29:46 703-- 1 1 COAL -- Harita Para6/20/2012 09:25:53 6/20/2012 09:31:49 706-- 1 1 COAL -- Harita Para6/20/2012 09:29:06 6/20/2012 09:36:44 855 1 1 COAL -- MIL

Page 76: June Per Shift (Truckscale Port)

6/20/2012 09:32:55 6/20/2012 09:37:07 856 1 1 COAL -- MIL6/20/2012 09:45:26 6/20/2012 09:50:24 705-- 1 1 COAL -- Harita Para6/20/2012 09:45:54 6/20/2012 09:59:14 852 1 1 COAL -- MIL6/20/2012 09:52:32 6/20/2012 10:00:07 829 1 1 COAL -- MIL6/20/2012 09:52:51 6/20/2012 09:59:25 810 1 1 COAL -- MIL6/20/2012 09:53:11 6/20/2012 10:02:39 853 1 1 COAL -- MIL6/20/2012 09:54:11 6/20/2012 10:04:12 833 1 1 COAL -- MIL6/20/2012 09:58:21 6/20/2012 10:04:37 815- 1 1 COAL -- Harita Para6/20/2012 10:03:11 6/20/2012 10:06:28 809 1 1 COAL -- MIL6/20/2012 10:09:17 6/20/2012 10:13:18 817 1 1 COAL -- MIL6/20/2012 10:18:09 6/20/2012 10:22:26 712-- 1 1 COAL -- Harita Para6/20/2012 10:26:51 6/20/2012 10:30:55 701-- 1 1 COAL -- Harita Para6/20/2012 10:28:45 6/20/2012 10:33:57 832 1 1 COAL -- MIL6/20/2012 10:31:29 6/20/2012 10:35:31 704-- 1 1 COAL -- Harita Para6/20/2012 10:32:58 6/20/2012 10:38:48 713-- 1 1 COAL -- Harita Para6/20/2012 10:33:16 6/20/2012 10:39:08 113 1 1 COAL -- Harita Para6/20/2012 10:34:58 6/20/2012 10:40:31 830- 1 1 COAL -- Harita Para6/20/2012 10:36:20 6/20/2012 10:41:10 707-- 1 1 COAL -- Harita Para6/20/2012 10:39:53 6/20/2012 10:44:35 702-- 1 1 COAL -- Harita Para6/20/2012 10:42:50 6/20/2012 10:47:10 703-- 1 1 COAL -- Harita Para6/20/2012 10:43:58 6/20/2012 10:49:01 115 1 1 COAL -- Harita Para6/20/2012 10:45:34 6/20/2012 10:52:20 818 1 1 COAL -- MIL6/20/2012 10:51:10 6/20/2012 10:54:37 714-- 1 1 COAL -- Harita Para6/20/2012 10:51:37 6/20/2012 11:05:13 706-- 1 1 COAL -- Harita Para6/20/2012 10:55:38 6/20/2012 11:08:15 851 1 1 COAL -- MIL6/20/2012 11:07:44 6/20/2012 11:13:30 855 1 1 COAL -- MIL6/20/2012 11:14:15 6/20/2012 11:19:01 806 1 1 COAL -- MIL6/20/2012 11:14:35 6/20/2012 11:19:39 856 1 1 COAL -- MIL6/20/2012 11:16:28 6/20/2012 11:22:24 705-- 1 1 COAL -- Harita Para6/20/2012 11:17:21 6/20/2012 11:22:58 810 1 1 COAL -- MIL6/20/2012 11:17:54 6/20/2012 11:27:31 709-- 1 1 COAL -- Harita Para6/20/2012 11:33:40 6/20/2012 11:39:08 852 1 1 COAL -- MIL6/20/2012 11:37:15 6/20/2012 11:44:40 708-- 1 1 COAL -- Harita Para6/20/2012 11:38:06 6/20/2012 11:44:14 815 1 1 COAL -- MIL6/20/2012 11:39:58 6/20/2012 11:46:35 853 1 1 COAL -- MIL6/20/2012 11:41:46 6/20/2012 11:46:08 850 1 1 COAL -- MIL6/20/2012 11:42:18 6/20/2012 11:48:05 712-- 1 1 COAL -- Harita Para6/20/2012 11:58:27 6/20/2012 12:02:46 701-- 1 1 COAL -- Harita Para6/20/2012 12:00:05 6/20/2012 12:05:04 113 1 1 COAL -- Harita Para6/20/2012 12:06:21 6/20/2012 12:10:40 713-- 1 1 COAL -- Harita Para6/20/2012 12:07:18 6/20/2012 12:12:55 702-- 1 1 COAL -- Harita Para6/20/2012 12:13:46 6/20/2012 12:18:06 817 1 1 COAL -- MIL6/20/2012 12:14:12 6/20/2012 12:22:01 115 1 1 COAL -- Harita Para6/20/2012 12:17:27 6/20/2012 12:23:18 809 1 1 COAL -- MIL6/20/2012 12:21:21 6/20/2012 12:25:28 818 1 1 COAL -- MIL6/20/2012 12:35:34 6/20/2012 12:41:22 833 1 1 COAL -- MIL6/20/2012 12:46:16 6/20/2012 12:49:04 810 1 1 COAL -- MIL6/20/2012 12:49:59 6/20/2012 12:53:58 704-- 1 1 COAL -- Harita Para6/20/2012 12:58:40 6/20/2012 13:06:01 855 1 1 COAL -- MIL6/20/2012 13:00:52 6/20/2012 13:13:51 714-- 1 1 COAL -- Harita Para

Page 77: June Per Shift (Truckscale Port)

6/20/2012 13:04:57 6/20/2012 13:17:16 706-- 1 1 COAL -- Harita Para6/20/2012 13:06:56 6/20/2012 13:16:52 856 1 1 COAL -- MIL6/20/2012 13:11:12 6/20/2012 13:18:13 850 1 1 COAL -- MIL6/20/2012 13:19:30 6/20/2012 13:23:16 815 1 1 COAL -- MIL6/20/2012 13:24:59 6/20/2012 13:30:49 852 1 1 COAL -- MIL6/20/2012 13:38:11 6/20/2012 13:41:46 806 1 1 COAL -- MIL6/20/2012 13:49:27 6/20/2012 13:53:53 702-- 1 1 COAL -- Harita Para6/20/2012 13:50:28 6/20/2012 13:56:14 113 1 1 COAL -- Harita Para6/20/2012 13:51:05 6/20/2012 13:59:35 709-- 1 1 COAL -- Harita Para6/20/2012 13:51:39 6/20/2012 14:01:20 817 1 1 COAL -- MIL6/20/2012 13:52:58 6/20/2012 14:03:15 712-- 1 1 COAL -- Harita Para6/20/2012 13:58:48 6/20/2012 14:03:47 809 1 1 COAL -- MIL6/20/2012 14:07:38 6/20/2012 14:11:17 115 1 1 COAL -- Harita Para6/20/2012 14:13:32 6/20/2012 14:18:02 701-- 1 1 COAL -- Harita Para6/20/2012 14:25:29 6/20/2012 14:29:27 818 1 1 COAL -- MIL6/20/2012 14:26:37 6/20/2012 14:32:05 704-- 1 1 COAL -- Harita Para6/20/2012 14:30:52 6/20/2012 14:34:37 713-- 1 1 COAL -- Harita Para6/20/2012 14:32:46 6/20/2012 14:35:56 710-- 1 1 COAL -- Harita Para6/20/2012 14:33:38 6/20/2012 14:38:24 828- 1 1 COAL -- Harita Para6/20/2012 14:39:27 6/20/2012 14:44:49 855 1 1 COAL -- MIL6/20/2012 14:40:06 6/20/2012 14:46:31 706-- 1 1 COAL -- Harita Para6/20/2012 14:48:40 6/20/2012 14:53:14 812- 1 1 COAL -- Harita Para6/20/2012 14:52:23 6/20/2012 14:59:07 851 1 1 COAL -- MIL6/20/2012 14:54:59 6/20/2012 15:02:07 833 1 1 COAL -- MIL6/20/2012 14:56:16 6/20/2012 15:01:29 815 1 1 COAL -- MIL6/20/2012 14:57:49 6/20/2012 15:03:16 714-- 1 1 COAL -- Harita Para6/20/2012 15:06:29 6/20/2012 15:10:24 705-- 1 1 COAL -- Harita Para6/20/2012 15:11:22 6/20/2012 15:14:58 806 1 1 COAL -- MIL6/20/2012 15:12:03 6/20/2012 15:16:39 850 1 1 COAL -- MIL6/20/2012 15:24:56 6/20/2012 15:30:02 702-- 1 1 COAL -- Harita Para6/20/2012 15:25:19 6/20/2012 15:29:14 809 1 1 COAL -- MIL6/20/2012 15:26:12 6/20/2012 15:30:27 810 1 1 COAL -- MIL6/20/2012 15:28:00 6/20/2012 15:32:24 712-- 1 1 COAL -- Harita Para6/20/2012 15:33:55 6/20/2012 15:39:07 113 1 1 COAL -- Harita Para6/20/2012 15:35:33 6/20/2012 15:40:32 115 1 1 COAL -- Harita Para6/20/2012 15:37:32 6/20/2012 15:44:03 709-- 1 1 COAL -- Harita Para6/20/2012 15:39:53 6/20/2012 15:45:45 819 1 1 COAL -- MIL6/20/2012 15:47:57 6/20/2012 15:50:52 710-- 1 1 COAL -- Harita Para6/20/2012 16:01:16 6/20/2012 16:04:58 836 2 2 COAL -- MIL6/20/2012 16:06:35 6/20/2012 16:11:33 856 2 2 COAL -- MIL6/20/2012 16:22:36 6/20/2012 16:26:28 817 2 2 COAL -- MIL6/20/2012 16:24:27 6/20/2012 16:28:00 714-- 2 2 COAL -- Harita Para6/20/2012 18:12:50 6/20/2012 18:16:43 702-- 2 2 COAL -- Harita Para6/20/2012 18:13:06 6/20/2012 18:19:42 705-- 2 2 COAL -- Harita Para6/20/2012 18:13:25 6/20/2012 18:21:36 701-- 2 2 COAL -- Harita Para6/20/2012 18:16:06 6/20/2012 18:23:00 708-- 2 2 COAL -- Harita Para6/20/2012 18:17:46 6/20/2012 18:24:59 115 2 2 COAL -- Harita Para6/20/2012 18:18:53 6/20/2012 18:27:54 704-- 2 2 COAL -- Harita Para6/20/2012 18:20:54 6/20/2012 18:28:41 113 2 2 COAL -- Harita Para6/20/2012 18:22:24 6/20/2012 18:30:29 707-- 2 2 COAL -- Harita Para

Page 78: June Per Shift (Truckscale Port)

6/20/2012 18:26:22 6/20/2012 18:32:22 710-- 2 2 COAL -- Harita Para6/20/2012 18:26:51 6/20/2012 18:34:12 709-- 2 2 COAL -- Harita Para6/20/2012 18:27:15 6/20/2012 18:36:20 712-- 2 2 COAL -- Harita Para6/20/2012 18:37:24 6/20/2012 18:43:22 706-- 2 2 COAL -- Harita Para6/20/2012 18:49:30 6/20/2012 18:53:30 818 2 2 COAL -- MIL6/20/2012 18:57:48 6/20/2012 19:03:25 852 2 2 COAL -- MIL6/20/2012 19:01:43 6/20/2012 19:06:17 714-- 2 2 COAL -- Harita Para6/20/2012 19:24:46 6/20/2012 19:29:08 856 2 2 COAL -- MIL6/20/2012 19:30:00 6/20/2012 19:35:13 853 2 2 COAL -- MIL6/20/2012 19:30:18 6/20/2012 19:36:34 702-- 2 2 COAL -- Harita Para6/20/2012 19:32:39 6/20/2012 19:37:59 851 2 2 COAL -- MIL6/20/2012 19:33:04 6/20/2012 19:39:07 705-- 2 2 COAL -- Harita Para6/20/2012 19:35:46 6/20/2012 19:43:14 855 2 2 COAL -- MIL6/20/2012 19:39:45 6/20/2012 19:44:41 708-- 2 2 COAL -- Harita Para6/20/2012 19:46:32 6/20/2012 19:50:31 115 2 2 COAL -- Harita Para6/20/2012 19:46:56 6/20/2012 19:55:13 701-- 2 2 COAL -- Harita Para6/20/2012 19:47:43 6/20/2012 19:55:34 833 2 2 COAL -- MIL6/20/2012 19:49:49 6/20/2012 19:56:58 704-- 2 2 COAL -- Harita Para6/20/2012 19:54:41 6/20/2012 19:58:31 707-- 2 2 COAL -- Harita Para6/20/2012 20:06:11 6/20/2012 20:11:09 710-- 2 2 COAL -- Harita Para6/20/2012 20:08:06 6/20/2012 20:12:51 809 2 2 COAL -- MIL6/20/2012 20:09:27 6/20/2012 20:15:27 712-- 2 2 COAL -- Harita Para6/20/2012 20:09:56 6/20/2012 20:20:49 850 2 2 COAL -- MIL6/20/2012 20:10:16 6/20/2012 20:22:25 709-- 2 2 COAL -- Harita Para6/20/2012 20:12:07 6/20/2012 20:25:11 113 2 2 COAL -- Harita Para6/20/2012 20:19:39 6/20/2012 20:52:32 706-- 2 2 COAL -- Harita Para6/20/2012 20:30:10 6/20/2012 20:37:03 714-- 2 2 COAL -- Harita Para6/20/2012 20:30:49 6/20/2012 20:40:08 812 2 2 COAL -- MIL6/20/2012 20:36:17 6/20/2012 20:43:02 810 2 2 COAL -- MIL6/20/2012 20:49:17 6/20/2012 20:56:38 839 2 2 COAL -- MIL6/20/2012 20:54:43 6/20/2012 20:58:22 702-- 2 2 COAL -- Harita Para6/20/2012 20:55:02 6/20/2012 20:58:46 705-- 2 2 COAL -- Harita Para6/20/2012 21:01:29 6/20/2012 21:06:05 818 2 2 COAL -- MIL6/20/2012 21:10:11 6/20/2012 21:13:35 115 2 2 COAL -- Harita Para6/20/2012 21:14:32 6/20/2012 21:19:42 704-- 2 2 COAL -- Harita Para6/20/2012 21:15:04 6/20/2012 21:20:56 708-- 2 2 COAL -- Harita Para6/20/2012 21:17:26 6/20/2012 21:22:42 701-- 2 2 COAL -- Harita Para6/20/2012 21:18:14 6/20/2012 21:25:27 852 2 2 COAL -- MIL6/20/2012 21:18:58 6/20/2012 21:25:43 833 2 2 COAL -- MIL6/20/2012 21:32:58 6/20/2012 21:37:36 806 2 2 COAL -- MIL6/20/2012 21:33:16 6/20/2012 21:38:07 856 2 2 COAL -- MIL6/20/2012 21:33:49 6/20/2012 21:40:21 707-- 2 2 COAL -- Harita Para6/20/2012 21:44:22 6/20/2012 21:49:57 853 2 2 COAL -- MIL6/20/2012 21:45:31 6/20/2012 21:51:39 710-- 2 2 COAL -- Harita Para6/20/2012 21:45:57 6/20/2012 21:55:09 850 2 2 COAL -- MIL6/20/2012 21:47:32 6/20/2012 21:55:36 815 2 2 COAL -- MIL6/20/2012 21:53:15 6/20/2012 21:58:58 713-- 2 2 COAL -- Harita Para6/20/2012 21:56:12 6/20/2012 21:59:53 709-- 2 2 COAL -- Harita Para6/20/2012 21:57:35 6/20/2012 22:03:20 832 2 2 COAL -- MIL6/20/2012 21:58:12 6/20/2012 22:06:26 714-- 2 2 COAL -- Harita Para

Page 79: June Per Shift (Truckscale Port)

6/20/2012 22:02:27 6/20/2012 22:07:26 113 2 2 COAL -- Harita Para6/20/2012 22:05:43 6/20/2012 22:10:48 817 2 2 COAL -- MIL6/20/2012 22:09:12 6/20/2012 22:12:26 705-- 2 2 COAL -- Harita Para6/20/2012 22:19:57 6/20/2012 22:23:20 706-- 2 2 COAL -- Harita Para6/20/2012 22:21:35 6/20/2012 22:30:03 810 2 2 COAL -- MIL6/20/2012 22:26:16 6/20/2012 22:30:10 851 2 2 COAL -- MIL6/20/2012 22:32:54 6/20/2012 22:36:50 115 2 2 COAL -- Harita Para6/20/2012 22:35:21 6/20/2012 22:39:00 839 2 2 COAL -- MIL6/20/2012 22:38:01 6/20/2012 22:42:35 702-- 2 2 COAL -- Harita Para6/20/2012 22:41:03 6/20/2012 22:45:44 704-- 2 2 COAL -- Harita Para6/20/2012 22:41:51 6/20/2012 22:49:06 855 2 2 COAL -- MIL6/20/2012 22:46:34 6/20/2012 22:50:16 809 2 2 COAL -- MIL6/20/2012 22:47:27 6/20/2012 22:51:57 701-- 2 2 COAL -- Harita Para6/20/2012 22:49:46 6/20/2012 22:53:40 708-- 2 2 COAL -- Harita Para6/20/2012 22:59:44 6/20/2012 23:04:19 812 2 2 COAL -- MIL6/20/2012 23:12:34 6/20/2012 23:18:07 818 2 2 COAL -- MIL6/20/2012 23:16:18 6/20/2012 23:21:30 712-- 2 2 COAL -- Harita Para6/20/2012 23:19:42 6/20/2012 23:41:06 806 2 2 COAL -- MIL6/20/2012 23:24:19 6/20/2012 23:28:29 850 2 2 COAL -- MIL6/20/2012 23:29:21 6/20/2012 23:33:55 709-- 2 2 COAL -- Harita Para6/20/2012 23:32:00 6/20/2012 23:38:30 714-- 2 2 COAL -- Harita Para6/20/2012 23:33:17 6/20/2012 23:41:02 852 2 2 COAL -- MIL6/20/2012 23:36:27 6/20/2012 23:41:25 833 2 2 COAL -- MIL6/20/2012 23:36:48 6/20/2012 23:43:28 705-- 2 2 COAL -- Harita Para6/20/2012 23:37:23 6/20/2012 23:45:38 815 2 2 COAL -- MIL6/20/2012 23:37:44 6/20/2012 23:47:10 817 2 2 COAL -- MIL6/20/2012 23:42:23 6/20/2012 23:49:10 113 2 2 COAL -- Harita Para6/20/2012 23:44:54 6/20/2012 23:50:36 706-- 2 2 COAL -- Harita Para6/20/2012 23:54:21 6/20/2012 23:58:24 115 2 2 COAL -- Harita Para6/21/2012 00:01:12 6/21/2012 00:07:21 839 3 3 COAL -- MIL6/21/2012 00:05:31 6/21/2012 00:16:26 831 3 3 COAL -- MIL6/21/2012 00:15:17 6/21/2012 00:20:06 701-- 3 3 COAL -- Harita Para6/21/2012 00:15:43 6/21/2012 00:21:34 856 3 3 COAL -- MIL6/21/2012 00:24:50 6/21/2012 00:32:32 853 3 3 COAL -- MIL6/21/2012 00:28:11 6/21/2012 00:38:47 707-- 3 3 COAL -- Harita Para6/21/2012 00:31:12 6/21/2012 00:36:43 851 3 3 COAL -- MIL6/21/2012 00:31:50 6/21/2012 00:38:51 713-- 3 3 COAL -- Harita Para6/21/2012 00:35:07 6/21/2012 00:47:28 708-- 3 3 COAL -- Harita Para6/21/2012 00:40:37 6/21/2012 00:49:45 710-- 3 3 COAL -- Harita Para6/21/2012 00:57:38 6/21/2012 01:01:18 705-- 3 3 COAL -- Harita Para6/21/2012 01:05:04 6/21/2012 01:11:27 817 3 3 COAL -- MIL6/21/2012 01:16:14 6/21/2012 01:22:18 115 3 3 COAL -- Harita Para6/21/2012 01:21:08 6/21/2012 01:26:52 850 3 3 COAL -- MIL6/21/2012 01:26:02 6/21/2012 01:30:58 714-- 3 3 COAL -- Harita Para6/21/2012 01:29:40 6/21/2012 01:34:43 839 3 3 COAL -- MIL6/21/2012 01:32:04 6/21/2012 01:37:09 709-- 3 3 COAL -- Harita Para6/21/2012 01:41:48 6/21/2012 01:45:35 833 3 3 COAL -- MIL6/21/2012 01:53:37 6/21/2012 01:58:01 702-- 3 3 COAL -- Harita Para6/21/2012 02:00:50 6/21/2012 02:05:09 831 3 3 COAL -- MIL6/21/2012 02:01:18 6/21/2012 02:10:16 704-- 3 3 COAL -- Harita Para

Page 80: June Per Shift (Truckscale Port)

6/21/2012 02:02:11 6/21/2012 02:11:10 707-- 3 3 COAL -- Harita Para6/21/2012 02:07:40 6/21/2012 02:12:22 708-- 3 3 COAL -- Harita Para6/21/2012 02:17:08 6/21/2012 02:21:23 713-- 3 3 COAL -- Harita Para6/21/2012 02:18:55 6/21/2012 02:32:33 855 3 3 COAL -- MIL6/21/2012 02:24:42 6/21/2012 02:28:04 705-- 3 3 COAL -- Harita Para6/21/2012 02:29:45 6/21/2012 02:34:08 812 3 3 COAL -- MIL6/21/2012 02:30:08 6/21/2012 02:36:35 817 3 3 COAL -- MIL6/21/2012 02:47:54 6/21/2012 02:52:14 810 3 3 COAL -- MIL6/21/2012 02:48:12 6/21/2012 02:52:47 809 3 3 COAL -- MIL6/21/2012 02:49:27 6/21/2012 02:55:10 113 3 3 COAL -- Harita Para6/21/2012 02:50:06 6/21/2012 02:57:06 710-- 3 3 COAL -- Harita Para6/21/2012 02:53:46 6/21/2012 02:59:38 852 3 3 COAL -- MIL6/21/2012 02:58:50 6/21/2012 03:03:01 856 3 3 COAL -- MIL6/21/2012 03:03:44 6/21/2012 03:08:19 815 3 3 COAL -- MIL6/21/2012 03:07:24 6/21/2012 03:12:02 850 3 3 COAL -- MIL6/21/2012 03:16:53 6/21/2012 03:21:23 806 3 3 COAL -- MIL6/21/2012 03:19:25 6/21/2012 03:26:19 853 3 3 COAL -- MIL6/21/2012 03:41:49 6/21/2012 03:45:09 851 3 3 COAL -- MIL6/21/2012 03:42:46 6/21/2012 03:47:48 705-- 3 3 COAL -- Harita Para6/21/2012 03:45:45 6/21/2012 03:50:02 713-- 3 3 COAL -- Harita Para6/21/2012 03:50:47 6/21/2012 03:54:53 812 3 3 COAL -- MIL6/21/2012 04:12:37 6/21/2012 04:18:14 810 3 3 COAL -- MIL6/21/2012 05:15:51 6/21/2012 05:19:49 832 3 3 COAL -- MIL6/21/2012 07:19:45 6/21/2012 07:23:16 850 3 3 COAL -- MIL6/21/2012 07:28:23 6/21/2012 07:36:26 855 3 3 COAL -- MIL6/21/2012 07:28:48 6/21/2012 07:36:42 856 3 3 COAL -- MIL6/21/2012 07:30:40 6/21/2012 07:36:59 851 3 3 COAL -- MIL6/21/2012 07:34:09 6/21/2012 07:38:43 853 3 3 COAL -- MIL6/21/2012 07:34:26 6/21/2012 07:38:00 710-- 3 3 COAL -- Harita Para6/21/2012 07:34:50 6/21/2012 07:40:03 713-- 3 3 COAL -- Harita Para6/21/2012 07:35:09 6/21/2012 07:41:05 701-- 3 3 COAL -- Harita Para6/21/2012 07:35:52 6/21/2012 07:42:56 709-- 3 3 COAL -- Harita Para6/21/2012 07:39:10 6/21/2012 07:46:50 852 3 3 COAL -- MIL6/21/2012 07:42:16 6/21/2012 07:47:08 839 3 3 COAL -- MIL6/21/2012 07:43:41 6/21/2012 07:49:14 708-- 3 3 COAL -- Harita Para6/21/2012 07:44:05 6/21/2012 07:55:44 113 3 3 COAL -- Harita Para6/21/2012 07:45:05 6/21/2012 07:56:00 702-- 3 3 COAL -- Harita Para6/21/2012 07:45:39 6/21/2012 07:59:36 714-- 3 3 COAL -- Harita Para6/21/2012 07:46:05 6/21/2012 08:01:42 704-- 3 1 COAL -- Harita Para6/21/2012 07:47:51 6/21/2012 08:07:34 705-- 3 1 COAL -- Harita Para6/21/2012 07:53:06 6/21/2012 08:03:34 712-- 3 1 COAL -- Harita Para6/21/2012 07:54:36 6/21/2012 08:04:35 815 3 1 COAL -- MIL6/21/2012 08:02:42 6/21/2012 08:10:09 817 1 1 COAL -- MIL6/21/2012 08:11:58 6/21/2012 08:18:11 706-- 1 1 COAL -- Harita Para6/21/2012 08:12:24 6/21/2012 08:18:37 115 1 1 COAL -- Harita Para6/21/2012 08:21:17 6/21/2012 08:26:20 828 1 1 COAL -- MIL6/21/2012 08:30:27 6/21/2012 08:35:44 833 1 1 COAL -- MIL6/21/2012 08:38:22 6/21/2012 08:42:40 819 1 1 COAL--IN MIL6/21/2012 08:43:53 6/21/2012 08:49:59 812 1 1 COAL -- MIL6/21/2012 08:48:20 6/21/2012 08:52:15 810 1 1 COAL -- MIL

Page 81: June Per Shift (Truckscale Port)

6/21/2012 08:49:00 6/21/2012 08:52:40 850 1 1 COAL--IN MIL6/21/2012 08:49:20 6/21/2012 08:53:16 710-- 1 1 COAL -- Harita Para6/21/2012 08:54:52 6/21/2012 09:00:26 855 1 1 COAL -- MIL6/21/2012 09:01:02 6/21/2012 09:06:22 851 1 1 COAL -- MIL6/21/2012 09:04:17 6/21/2012 09:08:19 831 1 1 COAL--IN MIL6/21/2012 09:05:42 6/21/2012 09:10:44 713-- 1 1 COAL -- Harita Para6/21/2012 09:12:32 6/21/2012 09:17:33 701-- 1 1 COAL -- Harita Para6/21/2012 09:13:19 6/21/2012 09:17:54 832 1 1 COAL--IN MIL6/21/2012 09:15:01 6/21/2012 09:21:04 709-- 1 1 COAL -- Harita Para6/21/2012 09:15:41 6/21/2012 09:22:40 113 1 1 COAL -- Harita Para6/21/2012 09:18:33 6/21/2012 09:22:55 856 1 1 COAL -- MIL6/21/2012 09:19:39 6/21/2012 09:24:59 708-- 1 1 COAL -- Harita Para6/21/2012 09:21:55 6/21/2012 09:26:50 714-- 1 1 COAL -- Harita Para6/21/2012 09:31:59 6/21/2012 09:36:16 836 1 1 COAL--IN MIL6/21/2012 09:32:26 6/21/2012 09:38:36 852 1 1 COAL -- MIL6/21/2012 09:38:03 6/21/2012 09:42:52 815 1 1 COAL--IN MIL6/21/2012 09:43:58 6/21/2012 09:48:26 712-- 1 1 COAL -- Harita Para6/21/2012 09:46:24 6/21/2012 09:50:31 839 1 1 COAL--IN MIL6/21/2012 09:46:47 6/21/2012 09:51:48 115 1 1 COAL -- Harita Para6/21/2012 09:52:53 6/21/2012 09:56:54 707-- 1 1 COAL -- Harita Para6/21/2012 09:57:24 6/21/2012 10:01:45 853 1 1 COAL -- MIL6/21/2012 10:03:06 6/21/2012 10:06:57 819 1 1 COAL--IN MIL6/21/2012 10:03:57 6/21/2012 10:07:59 710-- 1 1 COAL -- Harita Para6/21/2012 10:16:43 6/21/2012 10:20:44 828 1 1 COAL--IN MIL6/21/2012 10:24:06 6/21/2012 10:28:24 810 1 1 COAL -- MIL6/21/2012 10:27:49 6/21/2012 10:31:38 812 1 1 COAL--IN MIL6/21/2012 10:29:05 6/21/2012 10:36:30 855 1 1 COAL -- MIL6/21/2012 10:30:55 6/21/2012 10:36:10 705-- 1 1 COAL -- Harita Para6/21/2012 10:34:36 6/21/2012 10:38:36 833 1 1 COAL--IN MIL6/21/2012 10:41:04 6/21/2012 10:49:08 713-- 1 1 COAL -- Harita Para6/21/2012 10:44:39 6/21/2012 10:49:36 706-- 1 1 COAL -- Harita Para6/21/2012 10:45:08 6/21/2012 10:52:32 806 1 1 COAL -- MIL6/21/2012 10:45:27 6/21/2012 10:53:22 851 1 1 COAL -- MIL6/21/2012 10:46:50 6/21/2012 10:54:39 850 1 1 COAL--IN MIL6/21/2012 10:47:36 6/21/2012 10:54:56 856 1 1 COAL -- MIL6/21/2012 10:48:15 6/21/2012 10:56:47 113 1 1 COAL -- Harita Para6/21/2012 10:51:42 6/21/2012 10:58:41 709-- 1 1 COAL -- Harita Para6/21/2012 10:53:59 6/21/2012 11:00:09 708-- 1 1 COAL -- Harita Para6/21/2012 10:57:54 6/21/2012 11:02:45 701-- 1 1 COAL -- Harita Para6/21/2012 11:03:50 6/21/2012 11:07:42 832 1 1 COAL--IN MIL6/21/2012 11:08:18 6/21/2012 11:13:37 115 1 1 COAL -- Harita Para6/21/2012 11:08:45 6/21/2012 11:13:41 714-- 1 1 COAL -- Harita Para6/21/2012 11:17:11 6/21/2012 11:20:56 809 1 1 COAL -- MIL6/21/2012 11:21:33 6/21/2012 11:25:26 831 1 1 COAL--IN MIL6/21/2012 11:22:05 6/21/2012 11:25:44 710-- 1 1 COAL -- Harita Para6/21/2012 11:22:26 6/21/2012 11:28:20 712-- 1 1 COAL -- Harita Para6/21/2012 11:27:15 6/21/2012 11:31:55 852 1 1 COAL -- MIL6/21/2012 11:29:07 6/21/2012 11:33:35 707-- 1 1 COAL -- Harita Para6/21/2012 11:40:33 6/21/2012 11:44:26 836 1 1 COAL--IN MIL6/21/2012 11:49:32 6/21/2012 11:54:17 815 1 1 COAL--IN MIL

Page 82: June Per Shift (Truckscale Port)

6/21/2012 12:00:49 6/21/2012 12:06:25 855 1 1 COAL -- MIL6/21/2012 12:07:53 6/21/2012 12:11:58 839 1 1 COAL--IN MIL6/21/2012 12:08:19 6/21/2012 12:13:19 851 1 1 COAL -- MIL6/21/2012 12:14:33 6/21/2012 12:19:08 113 1 1 COAL -- Harita Para6/21/2012 12:15:05 6/21/2012 12:19:53 856 1 1 COAL -- MIL6/21/2012 12:17:40 6/21/2012 12:21:36 705-- 1 1 COAL -- Harita Para6/21/2012 12:18:27 6/21/2012 12:23:18 819 1 1 COAL--IN MIL6/21/2012 12:28:56 6/21/2012 12:33:52 706-- 1 1 COAL -- Harita Para6/21/2012 12:29:35 6/21/2012 12:34:13 818 1 1 COAL -- MIL6/21/2012 12:38:44 6/21/2012 13:31:42 868 1 1 COAL -- MIL6/21/2012 12:41:16 6/21/2012 12:55:27 701-- 1 1 COAL -- Harita Para6/21/2012 12:44:07 6/21/2012 12:57:20 812 1 1 COAL--IN MIL6/21/2012 12:46:10 6/21/2012 12:55:31 702-- 1 1 COAL -- Harita Para6/21/2012 12:47:02 6/21/2012 12:52:14 828 1 1 COAL -- MIL6/21/2012 12:51:03 6/21/2012 12:56:00 115 1 1 COAL -- Harita Para6/21/2012 12:53:55 6/21/2012 12:58:45 709-- 1 1 COAL -- Harita Para6/21/2012 12:59:12 6/21/2012 13:04:19 710-- 1 1 COAL -- Harita Para6/21/2012 13:07:01 6/21/2012 13:12:40 714-- 1 1 COAL -- Harita Para6/21/2012 13:16:10 6/21/2012 13:22:45 815 1 1 COAL -- MIL6/21/2012 13:20:06 6/21/2012 13:24:00 833 1 1 COAL--IN MIL6/21/2012 13:20:45 6/21/2012 13:27:07 713 1 1 COAL -- Harita Para6/21/2012 13:21:11 6/21/2012 13:28:14 850 1 1 COAL--IN MIL6/21/2012 13:26:24 6/21/2012 13:31:49 852 1 1 COAL -- MIL6/21/2012 13:30:35 6/21/2012 13:34:28 707-- 1 1 COAL -- Harita Para6/21/2012 13:32:50 6/21/2012 13:38:21 708-- 1 1 COAL -- Harita Para6/21/2012 13:33:29 6/21/2012 13:37:48 832 1 1 COAL--IN MIL6/21/2012 13:51:44 6/21/2012 13:56:29 830 1 1 COAL -- MIL6/21/2012 13:52:09 6/21/2012 13:57:18 831 1 1 COAL--IN MIL6/21/2012 13:54:53 6/21/2012 13:59:26 818 1 1 COAL -- MIL6/21/2012 13:55:52 6/21/2012 14:01:12 851 1 1 COAL -- MIL6/21/2012 14:07:57 6/21/2012 14:13:11 712-- 1 1 COAL -- Harita Para6/21/2012 14:10:47 6/21/2012 14:16:38 828 1 1 COAL -- MIL6/21/2012 14:12:26 6/21/2012 14:20:11 836 1 1 COAL--IN MIL6/21/2012 14:18:46 6/21/2012 14:28:43 855 1 1 COAL -- MIL6/21/2012 14:19:23 6/21/2012 14:23:55 839 1 1 COAL--IN MIL6/21/2012 14:24:31 6/21/2012 14:29:52 853 1 1 COAL -- MIL6/21/2012 14:25:00 6/21/2012 14:30:33 710-- 1 1 COAL -- Harita Para6/21/2012 14:27:17 6/21/2012 14:32:40 702-- 1 1 COAL -- Harita Para6/21/2012 14:27:54 6/21/2012 14:34:15 113 1 1 COAL -- Harita Para6/21/2012 14:33:36 6/21/2012 14:37:31 812 1 1 COAL--IN MIL6/21/2012 14:35:25 6/21/2012 14:40:22 115 1 1 COAL -- Harita Para6/21/2012 14:42:40 6/21/2012 14:48:41 714-- 1 1 COAL -- Harita Para6/21/2012 14:47:49 6/21/2012 14:54:28 819 1 1 COAL--IN MIL6/21/2012 14:52:44 6/21/2012 14:59:41 701-- 1 1 COAL -- Harita Para6/21/2012 14:55:24 6/21/2012 15:00:15 852 1 1 COAL -- MIL6/21/2012 14:57:01 6/21/2012 15:08:59 706-- 1 1 COAL -- Harita Para6/21/2012 14:57:53 6/21/2012 15:07:07 713-- 1 1 COAL -- Harita Para6/21/2012 14:58:20 6/21/2012 15:08:51 707-- 1 1 COAL -- Harita Para6/21/2012 15:01:49 6/21/2012 15:11:23 705-- 1 1 COAL -- Harita Para6/21/2012 15:08:05 6/21/2012 15:12:34 850 1 1 COAL -- MIL

Page 83: June Per Shift (Truckscale Port)

6/21/2012 15:09:53 6/21/2012 15:12:44 833 1 1 COAL -- MIL6/21/2012 15:10:17 6/21/2012 15:17:53 709-- 1 1 COAL -- Harita Para6/21/2012 15:16:06 6/21/2012 15:18:44 832 1 1 COAL -- MIL6/21/2012 15:16:47 6/21/2012 15:22:56 851 1 1 COAL -- MIL6/21/2012 15:31:38 6/21/2012 15:36:10 708-- 1 1 COAL -- Harita Para6/21/2012 15:33:04 6/21/2012 15:37:47 831 1 1 COAL -- MIL6/21/2012 15:39:27 6/21/2012 15:43:49 815 1 1 COAL -- MIL6/21/2012 15:48:08 6/21/2012 15:51:42 113 1 1 COAL -- Harita Para6/21/2012 15:52:41 6/21/2012 15:56:28 712 1 1 COAL -- Harita Para6/21/2012 15:53:13 6/21/2012 15:57:33 818 1 1 COAL -- MIL6/21/2012 15:54:54 6/21/2012 15:59:05 115 1 1 COAL -- Harita Para6/21/2012 16:15:47 6/21/2012 16:19:42 828 2 2 COAL -- MIL6/21/2012 16:21:13 6/21/2012 16:25:33 839 2 2 COAL -- MIL6/21/2012 16:24:25 6/21/2012 16:27:30 856 2 2 COAL -- MIL6/21/2012 16:34:37 6/21/2012 16:39:46 836 2 2 COAL -- MIL6/21/2012 18:08:00 6/21/2012 18:12:55 714-- 2 2 COAL -- Harita Para6/21/2012 18:08:38 6/21/2012 18:15:38 702-- 2 2 COAL -- Harita Para6/21/2012 18:12:07 6/21/2012 18:16:19 113 2 2 COAL -- Harita Para6/21/2012 18:14:49 6/21/2012 18:18:55 705-- 2 2 COAL -- Harita Para6/21/2012 18:17:36 6/21/2012 18:21:32 712-- 2 2 COAL -- Harita Para6/21/2012 18:18:17 6/21/2012 18:22:39 709-- 2 2 COAL -- Harita Para6/21/2012 18:24:15 6/21/2012 18:28:55 701-- 2 2 COAL -- Harita Para6/21/2012 18:27:53 6/21/2012 18:32:43 710-- 2 2 COAL -- Harita Para6/21/2012 18:28:16 6/21/2012 18:37:44 708-- 2 2 COAL -- Harita Para6/21/2012 18:31:31 6/21/2012 18:35:52 115 2 2 COAL -- Harita Para6/21/2012 18:32:01 6/21/2012 18:37:47 713-- 2 2 COAL -- Harita Para6/21/2012 19:08:44 6/21/2012 19:13:46 703-- 2 2 COAL -- Harita Para6/21/2012 19:20:35 6/21/2012 19:26:37 853 2 2 COAL -- MIL6/21/2012 19:23:21 6/21/2012 19:31:39 855 2 2 COAL -- MIL6/21/2012 19:25:14 6/21/2012 19:32:35 856 2 2 COAL -- MIL6/21/2012 19:25:35 6/21/2012 19:34:51 714-- 2 2 COAL -- Harita Para6/21/2012 19:29:15 6/21/2012 19:36:41 839 2 2 COAL -- MIL6/21/2012 19:30:59 6/21/2012 19:38:08 113 2 2 COAL -- Harita Para6/21/2012 19:42:19 6/21/2012 19:47:05 851 2 2 COAL -- MIL6/21/2012 19:43:07 6/21/2012 19:48:42 712-- 2 2 COAL -- Harita Para6/21/2012 19:45:48 6/21/2012 19:50:46 709-- 2 2 COAL -- Harita Para6/21/2012 19:49:27 6/21/2012 19:53:31 850 2 2 COAL -- MIL6/21/2012 19:50:11 6/21/2012 19:55:03 702-- 2 2 COAL -- Harita Para6/21/2012 19:54:09 6/21/2012 19:58:24 701-- 2 2 COAL -- Harita Para6/21/2012 19:56:30 6/21/2012 20:00:30 831 2 2 COAL -- MIL6/21/2012 19:56:54 6/21/2012 20:01:55 705-- 2 2 COAL -- Harita Para6/21/2012 19:58:57 6/21/2012 20:04:32 852 2 2 COAL -- MIL6/21/2012 20:02:36 6/21/2012 20:07:23 818 2 2 COAL -- MIL6/21/2012 20:05:24 6/21/2012 20:10:17 710-- 2 2 COAL -- Harita Para6/21/2012 20:09:09 6/21/2012 20:13:30 115 2 2 COAL -- Harita Para6/21/2012 20:11:45 6/21/2012 20:17:56 713-- 2 2 COAL -- Harita Para6/21/2012 20:14:35 6/21/2012 20:20:34 812 2 2 COAL -- MIL6/21/2012 20:19:39 6/21/2012 20:23:29 708-- 2 2 COAL -- Harita Para6/21/2012 20:33:27 6/21/2012 20:38:30 810 2 2 COAL -- MIL6/21/2012 20:48:58 6/21/2012 20:53:43 714-- 2 2 COAL -- Harita Para

Page 84: June Per Shift (Truckscale Port)

6/21/2012 20:51:07 6/21/2012 20:55:19 703-- 2 2 COAL -- Harita Para6/21/2012 20:51:38 6/21/2012 20:58:37 853 2 2 COAL -- MIL6/21/2012 20:53:08 6/21/2012 20:59:10 855 2 2 COAL -- MIL6/21/2012 20:56:48 6/21/2012 21:01:04 113 2 2 COAL -- Harita Para6/21/2012 20:57:26 6/21/2012 21:02:30 856 2 2 COAL -- MIL6/21/2012 21:07:47 6/21/2012 21:11:24 851 2 2 COAL -- MIL6/21/2012 21:08:14 6/21/2012 21:12:40 709-- 2 2 COAL -- Harita Para6/21/2012 21:10:51 6/21/2012 21:14:43 839 2 2 COAL -- MIL6/21/2012 21:17:34 6/21/2012 21:21:41 701-- 2 2 COAL -- Harita Para6/21/2012 21:21:02 6/21/2012 21:25:02 850 2 2 COAL -- MIL6/21/2012 21:22:13 6/21/2012 21:35:51 702-- 2 2 COAL -- Harita Para6/21/2012 21:22:52 6/21/2012 21:29:13 712-- 2 2 COAL -- Harita Para6/21/2012 21:33:48 6/21/2012 21:39:38 852 2 2 COAL -- MIL6/21/2012 21:38:34 6/21/2012 21:44:58 831 2 2 COAL -- MIL6/21/2012 21:42:53 6/21/2012 21:46:25 818 2 2 COAL -- MIL6/21/2012 21:43:20 6/21/2012 21:48:29 710-- 2 2 COAL -- Harita Para6/21/2012 21:43:44 6/21/2012 21:49:48 705-- 2 2 COAL -- Harita Para6/21/2012 21:53:53 6/21/2012 21:58:00 115 2 2 COAL -- Harita Para6/21/2012 22:01:44 6/21/2012 22:05:41 713-- 2 2 COAL -- Harita Para6/21/2012 22:06:21 6/21/2012 22:10:10 708-- 2 2 COAL -- Harita Para6/21/2012 22:22:11 6/21/2012 22:26:51 113 2 2 COAL -- Harita Para6/21/2012 22:25:51 6/21/2012 22:34:05 853 2 2 COAL -- MIL6/21/2012 22:28:13 6/21/2012 22:34:20 714-- 2 2 COAL -- Harita Para6/21/2012 22:30:30 6/21/2012 22:38:34 856 2 2 COAL -- MIL6/21/2012 22:33:15 6/21/2012 22:38:15 703-- 2 2 COAL -- Harita Para6/21/2012 22:37:22 6/21/2012 22:41:55 837 2 2 COAL -- MIL6/21/2012 22:41:18 6/21/2012 22:46:57 701-- 2 2 COAL -- Harita Para6/21/2012 22:45:53 6/21/2012 22:53:21 810 2 2 COAL -- MIL6/21/2012 22:46:19 6/21/2012 22:50:14 839 2 2 COAL -- MIL6/21/2012 22:48:09 6/21/2012 22:55:33 712-- 2 2 COAL -- Harita Para6/21/2012 22:48:57 6/21/2012 22:58:14 855 2 2 COAL -- MIL6/21/2012 22:50:58 6/21/2012 22:59:53 832 2 2 COAL -- MIL6/21/2012 22:51:24 6/21/2012 23:02:30 851 2 2 COAL -- MIL6/21/2012 23:01:57 6/21/2012 23:10:23 702-- 2 2 COAL -- Harita Para6/21/2012 23:07:30 6/21/2012 23:29:46 852 2 2 COAL -- MIL6/21/2012 23:07:57 6/21/2012 23:13:17 818 2 2 COAL -- MIL6/21/2012 23:09:34 6/21/2012 23:15:41 710-- 2 2 COAL -- Harita Para6/21/2012 23:11:01 6/21/2012 23:17:01 705-- 2 2 COAL -- Harita Para6/21/2012 23:32:43 6/21/2012 23:36:12 706-- 2 2 COAL -- Harita Para6/21/2012 23:37:02 6/21/2012 23:41:09 713-- 2 2 COAL -- Harita Para6/21/2012 23:42:02 6/21/2012 23:46:39 831 2 2 COAL -- MIL6/21/2012 23:43:34 6/21/2012 23:48:38 115 2 2 COAL -- Harita Para6/21/2012 23:44:30 6/21/2012 23:51:03 850 2 2 COAL -- MIL6/21/2012 23:46:06 6/21/2012 23:52:31 708-- 2 2 COAL -- Harita Para6/22/2012 00:07:26 6/22/2012 00:14:19 853 3 3 COAL -- MIL6/22/2012 00:08:10 6/22/2012 00:14:45 701-- 3 3 COAL -- Harita Para6/22/2012 00:16:54 6/22/2012 00:20:31 714-- 3 3 COAL -- Harita Para6/22/2012 00:25:05 6/22/2012 00:29:25 703-- 3 3 COAL -- Harita Para6/22/2012 00:32:42 6/22/2012 00:37:56 712-- 3 3 COAL -- Harita Para6/22/2012 00:33:05 6/22/2012 00:39:02 702-- 3 3 COAL -- Harita Para

Page 85: June Per Shift (Truckscale Port)

6/22/2012 00:36:31 6/22/2012 00:41:18 818 3 3 COAL -- MIL6/22/2012 00:37:04 6/22/2012 00:43:52 851 3 3 COAL -- MIL6/22/2012 00:39:49 6/22/2012 00:44:53 705-- 3 3 COAL -- Harita Para6/22/2012 00:46:00 6/22/2012 00:49:18 707-- 3 3 COAL -- Harita Para6/22/2012 00:52:30 6/22/2012 00:57:07 810 3 3 COAL -- MIL6/22/2012 00:53:24 6/22/2012 01:17:50 832 3 3 COAL -- MIL6/22/2012 00:54:46 6/22/2012 01:15:41 855 3 3 COAL -- MIL6/22/2012 01:04:26 6/22/2012 01:18:17 839 3 3 COAL -- MIL6/22/2012 01:05:07 6/22/2012 01:21:15 852 3 3 COAL -- MIL6/22/2012 01:06:52 6/22/2012 01:21:45 113 3 3 COAL -- Harita Para6/22/2012 01:13:59 6/22/2012 01:23:11 856 3 3 COAL -- MIL6/22/2012 01:35:04 6/22/2012 01:43:47 853 3 3 COAL -- MIL6/22/2012 02:06:07 6/22/2012 02:09:51 705-- 3 3 COAL -- Harita Para6/22/2012 02:12:19 6/22/2012 02:24:45 710-- 3 3 COAL -- Harita Para6/22/2012 02:22:29 6/22/2012 02:26:42 714-- 3 3 COAL -- Harita Para6/22/2012 02:28:52 6/22/2012 02:39:54 115 3 3 COAL -- Harita Para6/22/2012 02:33:42 6/22/2012 02:38:34 703-- 3 3 COAL -- Harita Para6/22/2012 02:34:08 6/22/2012 02:39:59 708-- 3 3 COAL -- Harita Para6/22/2012 02:47:43 6/22/2012 02:51:48 113 3 3 COAL -- Harita Para6/22/2012 02:52:47 6/22/2012 02:57:14 713-- 3 3 COAL -- Harita Para6/22/2012 03:01:19 6/22/2012 03:04:52 837 3 3 COAL -- MIL6/22/2012 03:36:24 6/22/2012 03:40:20 705-- 3 3 COAL -- Harita Para6/22/2012 03:50:46 6/22/2012 03:58:40 852 3 3 COAL -- MIL6/22/2012 04:05:47 6/22/2012 04:12:21 855 3 3 COAL -- MIL6/22/2012 07:16:26 6/22/2012 07:19:31 710-- 3 3 COAL -- Harita Para6/22/2012 07:17:45 6/22/2012 07:21:57 115 3 3 COAL -- Harita Para6/22/2012 07:20:17 6/22/2012 07:24:33 707-- 3 3 COAL -- Harita Para6/22/2012 07:20:36 6/22/2012 07:36:50 701-- 3 3 COAL -- Harita Para6/22/2012 07:21:24 6/22/2012 07:38:40 713-- 3 3 COAL -- Harita Para6/22/2012 07:23:21 6/22/2012 07:44:03 819 3 3 COAL -- MIL6/22/2012 07:23:47 6/22/2012 07:44:24 705-- 3 3 COAL -- Harita Para6/22/2012 07:27:23 6/22/2012 07:49:18 113 3 3 COAL -- Harita Para6/22/2012 07:30:48 6/22/2012 07:48:59 702-- 3 3 COAL -- Harita Para6/22/2012 07:33:37 6/22/2012 07:53:31 712-- 3 3 COAL -- Harita Para6/22/2012 07:34:25 6/22/2012 07:53:56 856 3 3 COAL -- MIL6/22/2012 07:37:58 6/22/2012 07:55:48 714-- 3 3 COAL -- Harita Para6/22/2012 07:51:57 6/22/2012 07:58:12 706-- 3 3 COAL -- Harita Para6/22/2012 07:57:15 6/22/2012 08:02:45 703-- 3 1 COAL -- Harita Para6/22/2012 08:18:32 6/22/2012 08:22:10 810 1 1 COAL -- MIL6/22/2012 08:23:18 6/22/2012 08:29:56 852 1 1 COAL -- MIL6/22/2012 08:24:15 6/22/2012 08:29:21 708-- 1 1 COAL -- Harita Para6/22/2012 08:26:03 6/22/2012 08:31:58 818 1 1 COAL -- MIL6/22/2012 08:32:54 6/22/2012 08:37:29 115 1 1 COAL--IN Harita Para6/22/2012 08:34:07 6/22/2012 08:43:50 855 1 1 COAL -- MIL6/22/2012 08:38:25 6/22/2012 08:42:17 707-- 1 1 COAL -- Harita Para6/22/2012 08:39:39 6/22/2012 08:45:14 710-- 1 1 COAL -- Harita Para6/22/2012 08:48:46 6/22/2012 08:52:45 828 1 1 COAL -- MIL6/22/2012 08:57:43 6/22/2012 09:01:36 113 1 1 COAL--IN Harita Para6/22/2012 08:59:27 6/22/2012 09:03:26 705-- 1 1 COAL -- Harita Para6/22/2012 09:00:00 6/22/2012 09:04:42 701-- 1 1 COAL -- Harita Para

Page 86: June Per Shift (Truckscale Port)

6/22/2012 09:07:59 6/22/2012 09:12:49 713-- 1 1 COAL -- Harita Para6/22/2012 09:11:16 6/22/2012 09:15:25 853 1 1 COAL -- MIL6/22/2012 09:14:05 6/22/2012 09:16:57 856 1 1 COAL -- MIL6/22/2012 09:20:09 6/22/2012 09:24:04 839 1 1 COAL -- MIL6/22/2012 09:20:29 6/22/2012 09:25:21 702-- 1 1 COAL -- Harita Para6/22/2012 09:20:50 6/22/2012 09:25:50 706-- 1 1 COAL -- Harita Para6/22/2012 09:21:29 6/22/2012 09:27:55 714-- 1 1 COAL -- Harita Para6/22/2012 09:27:09 6/22/2012 09:30:59 837 1 1 COAL -- MIL6/22/2012 09:40:05 6/22/2012 09:45:23 703-- 1 1 COAL -- Harita Para6/22/2012 09:41:11 6/22/2012 09:45:45 712-- 1 1 COAL -- Harita Para6/22/2012 09:41:58 6/22/2012 09:48:00 851 1 1 COAL -- MIL6/22/2012 09:44:18 6/22/2012 09:51:56 115 1 1 COAL--IN Harita Para6/22/2012 09:46:34 6/22/2012 09:50:58 708-- 1 1 COAL -- Harita Para6/22/2012 09:56:31 6/22/2012 09:59:48 707-- 1 1 COAL -- Harita Para6/22/2012 10:01:58 6/22/2012 10:06:56 852 1 1 COAL -- MIL6/22/2012 10:05:14 6/22/2012 10:12:00 710-- 1 1 COAL -- Harita Para6/22/2012 10:17:44 6/22/2012 10:27:18 836 1 1 COAL -- MIL6/22/2012 10:19:47 6/22/2012 10:24:18 819 1 1 COAL -- MIL6/22/2012 10:22:29 6/22/2012 10:27:41 705-- 1 1 COAL -- Harita Para6/22/2012 10:25:09 6/22/2012 10:29:34 850 1 1 COAL -- MIL6/22/2012 10:25:34 6/22/2012 10:30:28 701-- 1 1 COAL -- Harita Para6/22/2012 10:26:08 6/22/2012 10:31:26 113 1 1 COAL--IN Harita Para6/22/2012 10:32:23 6/22/2012 10:36:31 832 1 1 COAL -- MIL6/22/2012 10:33:08 6/22/2012 10:38:02 828 1 1 COAL -- MIL6/22/2012 10:35:11 6/22/2012 10:41:14 815 1 1 COAL -- MIL6/22/2012 10:35:38 6/22/2012 10:42:02 818 1 1 COAL -- MIL6/22/2012 10:37:16 6/22/2012 10:44:53 713-- 1 1 COAL -- Harita Para6/22/2012 10:40:27 6/22/2012 10:46:06 706-- 1 1 COAL -- Harita Para6/22/2012 10:43:47 6/22/2012 10:47:46 711-- 1 1 COAL -- Harita Para6/22/2012 10:44:16 6/22/2012 10:51:12 855 1 1 COAL -- MIL6/22/2012 10:45:27 6/22/2012 10:51:16 853 1 1 COAL -- MIL6/22/2012 10:48:22 6/22/2012 10:52:04 856 1 1 COAL -- MIL6/22/2012 10:55:54 6/22/2012 11:00:39 115 1 1 COAL--IN Harita Para6/22/2012 10:59:09 6/22/2012 11:03:59 837 1 1 COAL -- MIL6/22/2012 11:02:08 6/22/2012 11:06:24 810 1 1 COAL -- MIL6/22/2012 11:05:47 6/22/2012 11:09:45 714-- 1 1 COAL -- Harita Para6/22/2012 11:10:56 6/22/2012 11:14:15 707-- 1 1 COAL -- Harita Para6/22/2012 11:18:52 6/22/2012 11:22:43 708-- 1 1 COAL -- Harita Para6/22/2012 11:20:58 6/22/2012 11:22:45 712-- 1 1 COAL -- Harita Para6/22/2012 11:43:20 6/22/2012 11:49:53 710-- 1 1 COAL -- Harita Para6/22/2012 11:47:39 6/22/2012 11:51:36 819 1 1 COAL -- MIL6/22/2012 11:48:04 6/22/2012 11:52:41 113 1 1 COAL--IN Harita Para6/22/2012 11:48:25 6/22/2012 11:54:13 701-- 1 1 COAL -- Harita Para6/22/2012 12:16:54 6/22/2012 12:21:09 706-- 1 1 COAL -- Harita Para6/22/2012 12:26:24 6/22/2012 12:29:26 856 1 1 COAL -- MIL6/22/2012 12:47:32 6/22/2012 12:53:16 852 1 1 COAL -- MIL6/22/2012 12:55:04 6/22/2012 12:58:52 837 1 1 COAL -- MIL6/22/2012 12:57:37 6/22/2012 13:01:19 810 1 1 COAL -- MIL6/22/2012 13:31:17 6/22/2012 13:37:07 853 1 1 COAL -- MIL6/22/2012 13:31:43 6/22/2012 13:40:39 855 1 1 COAL -- MIL

Page 87: June Per Shift (Truckscale Port)

6/22/2012 13:32:28 6/22/2012 13:41:17 817 1 1 COAL -- MIL6/22/2012 13:34:11 6/22/2012 13:43:35 850 1 1 COAL -- MIL6/22/2012 13:38:20 6/22/2012 13:45:43 818 1 1 COAL -- MIL6/22/2012 13:38:46 6/22/2012 13:46:21 707-- 1 1 COAL -- Harita Para6/22/2012 13:44:27 6/22/2012 13:48:41 714-- 1 1 COAL -- Harita Para6/22/2012 13:44:49 6/22/2012 13:49:04 828 1 1 COAL -- MIL6/22/2012 14:02:51 6/22/2012 14:07:06 115 1 1 COAL--IN Harita Para6/22/2012 14:03:30 6/22/2012 14:07:39 705-- 1 1 COAL -- Harita Para6/22/2012 14:08:14 6/22/2012 14:12:06 711-- 1 1 COAL -- Harita Para6/22/2012 14:21:35 6/22/2012 14:26:18 713-- 1 1 COAL -- Harita Para6/22/2012 14:22:09 6/22/2012 14:28:00 113 1 1 COAL--IN Harita Para6/22/2012 14:22:34 6/22/2012 14:28:46 706-- 1 1 COAL -- Harita Para6/22/2012 14:24:26 6/22/2012 14:31:04 852 1 1 COAL -- MIL6/22/2012 14:33:46 6/22/2012 14:38:31 701-- 1 1 COAL -- Harita Para6/22/2012 14:35:10 6/22/2012 14:39:12 712-- 1 1 COAL -- Harita Para6/22/2012 14:36:58 6/22/2012 14:42:15 819 1 1 COAL -- MIL6/22/2012 14:48:32 6/22/2012 14:51:44 856 1 1 COAL -- MIL6/22/2012 14:55:17 6/22/2012 14:58:40 837 1 1 COAL -- MIL6/22/2012 14:55:41 6/22/2012 15:06:17 710-- 1 1 COAL -- Harita Para6/22/2012 14:59:34 6/22/2012 15:04:26 853 1 1 COAL -- MIL6/22/2012 15:01:09 6/22/2012 15:06:21 707-- 1 1 COAL -- Harita Para6/22/2012 15:12:31 6/22/2012 15:18:09 115 1 1 COAL--IN Harita Para6/22/2012 15:13:10 6/22/2012 15:20:52 855 1 1 COAL -- MIL6/22/2012 15:13:32 6/22/2012 15:20:58 851 1 1 COAL -- MIL6/22/2012 15:14:06 6/22/2012 15:23:24 714-- 1 1 COAL -- Harita Para6/22/2012 15:19:01 6/22/2012 15:25:33 702-- 1 1 COAL -- Harita Para6/22/2012 15:26:26 6/22/2012 15:31:51 817 1 1 COAL -- MIL6/22/2012 15:30:38 6/22/2012 15:34:24 708-- 1 1 COAL -- Harita Para6/22/2012 15:31:08 6/22/2012 15:34:35 113 1 1 COAL--IN Harita Para6/22/2012 15:35:12 6/22/2012 15:38:37 810 1 1 COAL -- MIL6/22/2012 15:37:05 6/22/2012 15:41:32 711-- 1 1 COAL -- Harita Para6/22/2012 15:40:58 6/22/2012 15:44:58 850 1 1 COAL -- MIL6/22/2012 15:46:43 6/22/2012 15:51:30 713-- 1 1 COAL -- Harita Para6/22/2012 15:47:15 6/22/2012 15:52:59 818 1 1 COAL -- MIL6/22/2012 15:49:45 6/22/2012 15:54:04 706-- 1 1 COAL -- Harita Para6/22/2012 15:56:04 6/22/2012 16:01:49 712-- 1 2 COAL -- Harita Para6/22/2012 16:00:45 6/22/2012 16:04:54 832 2 2 COAL -- MIL6/22/2012 16:01:04 6/22/2012 16:08:02 701-- 2 2 COAL -- Harita Para6/22/2012 16:04:21 6/22/2012 16:09:01 828 2 2 COAL -- MIL6/22/2012 16:17:54 6/22/2012 16:22:33 709-- 2 2 COAL -- Harita Para6/22/2012 16:25:49 6/22/2012 16:29:52 812 2 2 COAL -- MIL6/22/2012 16:32:06 6/22/2012 16:36:17 831 2 2 COAL -- MIL6/22/2012 17:58:34 6/22/2012 18:02:02 702-- 2 2 COAL -- Harita Para6/22/2012 18:03:22 6/22/2012 18:07:07 705-- 2 2 COAL -- Harita Para6/22/2012 18:06:26 6/22/2012 18:11:30 714-- 2 2 COAL -- Harita Para6/22/2012 18:10:01 6/22/2012 18:23:44 712-- 2 2 COAL -- Harita Para6/22/2012 18:10:46 6/22/2012 18:24:12 113 2 2 COAL--IN Harita Para6/22/2012 18:15:07 6/22/2012 18:26:45 710-- 2 2 COAL -- Harita Para6/22/2012 18:15:37 6/22/2012 18:26:48 711-- 2 2 COAL -- Harita Para6/22/2012 18:16:12 6/22/2012 18:29:32 115 2 2 COAL--IN Harita Para

Page 88: June Per Shift (Truckscale Port)

6/22/2012 18:18:46 6/22/2012 18:32:02 709-- 2 2 COAL -- Harita Para6/22/2012 18:19:11 6/22/2012 18:32:07 713-- 2 2 COAL -- Harita Para6/22/2012 18:35:58 6/22/2012 18:37:29 708-- 2 2 COAL -- Harita Para6/22/2012 18:41:50 6/22/2012 18:45:23 706-- 2 2 COAL -- Harita Para6/23/2012 01:55:46 6/23/2012 02:30:12 708-- 3 3 COAL--IN Harita Para6/23/2012 01:56:19 6/23/2012 02:30:19 702-- 3 3 COAL--IN Harita Para6/23/2012 02:01:58 6/23/2012 02:32:12 714-- 3 3 COAL--IN Harita Para6/23/2012 02:02:32 6/23/2012 02:32:19 113 3 3 COAL--IN Harita Para6/23/2012 02:03:29 6/23/2012 02:38:42 705-- 3 3 COAL--IN Harita Para6/23/2012 02:07:53 6/23/2012 02:38:45 711-- 3 3 COAL--IN Harita Para6/23/2012 02:08:15 6/23/2012 02:41:21 709-- 3 3 COAL--IN Harita Para6/23/2012 02:16:17 6/23/2012 02:41:25 707-- 3 3 COAL--IN Harita Para6/23/2012 02:23:41 6/23/2012 02:42:58 713-- 3 3 COAL--IN Harita Para6/23/2012 02:26:38 6/23/2012 02:43:03 115 3 3 COAL--IN Harita Para6/23/2012 02:35:43 6/23/2012 02:48:53 833 3 3 COAL -- MIL6/23/2012 02:36:21 6/23/2012 02:48:56 837 3 3 COAL -- MIL6/23/2012 02:50:31 6/23/2012 03:20:52 855 3 3 COAL -- MIL6/23/2012 02:51:08 6/23/2012 03:11:54 819 3 3 COAL -- MIL6/23/2012 02:51:38 6/23/2012 03:21:00 853 3 3 COAL -- MIL6/23/2012 02:52:08 6/23/2012 03:12:01 817 3 3 COAL -- MIL6/23/2012 02:52:41 6/23/2012 03:39:14 850 3 3 COAL -- MIL6/23/2012 02:53:07 6/23/2012 03:26:49 852 3 3 COAL -- MIL6/23/2012 02:53:33 6/23/2012 03:27:10 851 3 3 COAL -- MIL6/23/2012 03:05:23 6/23/2012 03:27:44 810 3 3 COAL -- MIL6/23/2012 03:30:25 6/23/2012 03:36:21 710-- 3 3 COAL--IN Harita Para6/23/2012 03:43:41 6/23/2012 03:48:12 708-- 3 3 COAL--IN Harita Para6/23/2012 03:47:21 6/23/2012 03:51:54 856 3 3 COAL -- MIL6/23/2012 03:51:20 6/23/2012 03:55:44 702-- 3 3 COAL--IN Harita Para6/23/2012 03:53:40 6/23/2012 03:55:51 714-- 3 3 COAL--IN Harita Para6/23/2012 03:57:25 6/23/2012 04:00:56 113 3 3 COAL--IN Harita Para6/23/2012 04:03:00 6/23/2012 04:06:25 705-- 3 3 COAL--IN Harita Para6/23/2012 04:12:34 6/23/2012 04:17:41 711-- 3 3 COAL--IN Harita Para6/23/2012 04:12:53 6/23/2012 04:15:36 818 3 3 COAL -- MIL6/23/2012 04:13:20 6/23/2012 04:17:44 707-- 3 3 COAL--IN Harita Para6/23/2012 04:18:29 6/23/2012 04:22:34 713-- 3 3 COAL--IN Harita Para6/23/2012 04:20:54 6/23/2012 04:26:18 831 3 3 COAL--IN MIL6/23/2012 04:27:07 6/23/2012 04:30:54 115 3 3 COAL--IN Harita Para6/23/2012 05:03:52 6/23/2012 05:08:48 714-- 3 3 COAL--IN Harita Para6/23/2012 07:09:25 6/23/2012 07:13:05 705-- 3 3 COAL--IN Harita Para6/23/2012 07:20:03 6/23/2012 07:23:30 113 3 3 COAL--IN Harita Para6/23/2012 07:22:56 6/23/2012 07:26:11 710-- 3 3 COAL--IN Harita Para6/23/2012 07:27:51 6/23/2012 07:37:19 707-- 3 3 COAL--IN Harita Para6/23/2012 07:28:34 6/23/2012 07:39:14 115 3 3 COAL--IN Harita Para6/23/2012 07:45:11 6/23/2012 07:49:25 713-- 3 3 COAL--IN Harita Para6/23/2012 07:46:43 6/23/2012 07:52:18 711-- 3 3 COAL--IN Harita Para6/23/2012 07:50:08 6/23/2012 07:55:32 714-- 3 3 COAL--IN Harita Para6/23/2012 07:51:37 6/23/2012 07:56:03 850 3 3 COAL -- MIL6/23/2012 07:56:40 6/23/2012 08:01:13 819 3 1 COAL--IN MIL6/23/2012 07:57:59 6/23/2012 08:02:16 810 3 1 COAL -- MIL6/23/2012 07:58:49 6/23/2012 08:03:24 818 3 1 COAL -- MIL

Page 89: June Per Shift (Truckscale Port)

6/23/2012 07:59:10 6/23/2012 08:06:13 852 3 1 COAL -- MIL6/23/2012 07:59:27 6/23/2012 08:09:27 855 3 1 COAL -- MIL6/23/2012 07:59:48 6/23/2012 08:07:27 832 3 1 COAL -- MIL6/23/2012 08:00:29 6/23/2012 08:11:18 817 1 1 COAL -- MIL6/23/2012 08:01:46 6/23/2012 08:09:52 851 1 1 COAL -- MIL6/23/2012 08:04:13 6/23/2012 08:13:26 706-- 1 1 COAL--IN Harita Para6/23/2012 08:04:36 6/23/2012 08:14:36 856 1 1 COAL -- MIL6/23/2012 08:06:48 6/23/2012 08:17:26 833 1 1 COAL--IN MIL6/23/2012 08:08:15 6/23/2012 08:20:15 837 1 1 COAL--IN MIL6/23/2012 08:08:37 6/23/2012 08:21:48 853 1 1 COAL -- MIL6/23/2012 08:08:56 6/23/2012 08:24:44 708-- 1 1 COAL--IN Harita Para6/23/2012 08:18:12 6/23/2012 08:28:25 709-- 1 1 COAL--IN Harita Para6/23/2012 08:18:50 6/23/2012 08:29:56 701-- 1 1 COAL--IN Harita Para6/23/2012 08:27:32 6/23/2012 08:32:29 831 1 1 COAL -- MIL6/23/2012 08:40:28 6/23/2012 08:45:57 710-- 1 1 COAL--IN Harita Para6/23/2012 08:41:59 6/23/2012 08:48:23 703-- 1 1 COAL--IN Harita Para6/23/2012 08:47:25 6/23/2012 08:51:19 705-- 1 1 COAL--IN Harita Para6/23/2012 08:49:21 6/23/2012 08:53:20 113 1 1 COAL--IN Harita Para6/23/2012 08:52:04 6/23/2012 08:55:54 812 1 1 COAL -- MIL6/23/2012 08:57:28 6/23/2012 09:02:30 115 1 1 COAL--IN Harita Para6/23/2012 09:12:21 6/23/2012 09:17:05 707-- 1 1 COAL -- Harita Para6/23/2012 09:19:38 6/23/2012 09:24:46 830 1 1 COAL -- MIL6/23/2012 09:20:00 6/23/2012 09:25:10 850 1 1 COAL--IN MIL6/23/2012 09:20:34 6/23/2012 09:28:14 713-- 1 1 COAL -- Harita Para6/23/2012 09:22:18 6/23/2012 09:27:52 810 1 1 COAL -- MIL6/23/2012 09:24:10 6/23/2012 09:30:26 711-- 1 1 COAL -- Harita Para6/23/2012 09:32:44 6/23/2012 09:36:35 819 1 1 COAL--IN MIL6/23/2012 09:33:04 6/23/2012 09:46:48 706-- 1 1 COAL -- Harita Para6/23/2012 09:33:50 6/23/2012 09:41:17 852 1 1 COAL -- MIL6/23/2012 09:39:43 6/23/2012 09:48:15 851 1 1 COAL -- MIL6/23/2012 09:45:10 6/23/2012 09:50:48 818 1 1 COAL--IN MIL6/23/2012 09:50:02 6/23/2012 09:55:04 709-- 1 1 COAL -- Harita Para6/23/2012 09:53:28 6/23/2012 10:01:04 855 1 1 COAL -- MIL6/23/2012 09:53:51 6/23/2012 09:58:33 817 1 1 COAL--IN MIL6/23/2012 09:57:27 6/23/2012 10:07:20 701-- 1 1 COAL -- Harita Para6/23/2012 09:57:50 6/23/2012 10:03:30 856 1 1 COAL -- MIL6/23/2012 10:02:44 6/23/2012 10:09:13 820 1 1 COAL--IN MIL6/23/2012 10:06:08 6/23/2012 10:10:01 113 1 1 COAL--IN Harita Para6/23/2012 10:06:45 6/23/2012 10:11:29 853 1 1 COAL -- MIL6/23/2012 10:08:10 6/23/2012 10:13:15 708-- 1 1 COAL -- Harita Para6/23/2012 10:10:45 6/23/2012 10:15:13 710-- 1 1 COAL -- Harita Para6/23/2012 10:13:56 6/23/2012 10:19:44 115 1 1 COAL--IN Harita Para6/23/2012 10:16:27 6/23/2012 10:20:30 832 1 1 COAL -- MIL6/23/2012 10:16:50 6/23/2012 10:21:38 703-- 1 1 COAL -- Harita Para6/23/2012 10:26:21 6/23/2012 10:30:23 833 1 1 COAL--IN MIL6/23/2012 10:33:07 6/23/2012 10:36:23 837 1 1 COAL -- MIL6/23/2012 10:33:37 6/23/2012 10:39:16 705-- 1 1 COAL -- Harita Para6/23/2012 10:38:20 6/23/2012 10:42:39 707-- 1 1 COAL -- Harita Para6/23/2012 10:41:04 6/23/2012 10:44:32 850 1 1 COAL--IN MIL6/23/2012 10:45:44 6/23/2012 10:48:57 713-- 1 1 COAL -- Harita Para

Page 90: June Per Shift (Truckscale Port)

6/23/2012 10:48:24 6/23/2012 10:52:12 810 1 1 COAL -- MIL6/23/2012 10:53:21 6/23/2012 10:57:01 819 1 1 COAL--IN MIL6/23/2012 10:53:37 6/23/2012 10:57:45 711-- 1 1 COAL -- Harita Para6/23/2012 10:54:34 6/23/2012 10:59:40 812 1 1 COAL -- MIL6/23/2012 11:04:56 6/23/2012 11:09:33 852 1 1 COAL -- MIL6/23/2012 11:05:29 6/23/2012 11:09:54 830 1 1 COAL--IN MIL6/23/2012 11:06:39 6/23/2012 11:11:28 706-- 1 1 COAL -- Harita Para6/23/2012 11:15:29 6/23/2012 11:19:24 818 1 1 COAL--IN MIL6/23/2012 11:23:56 6/23/2012 11:28:09 831 1 1 COAL -- MIL6/23/2012 11:25:09 6/23/2012 11:31:25 701-- 1 1 COAL -- Harita Para6/23/2012 11:27:31 6/23/2012 11:34:12 817 1 1 COAL--IN MIL6/23/2012 11:29:01 6/23/2012 11:40:30 851 1 1 COAL -- MIL6/23/2012 11:29:16 6/23/2012 11:36:51 113 1 1 COAL -- Harita Para6/23/2012 11:32:20 6/23/2012 11:43:06 709-- 1 1 COAL -- Harita Para6/23/2012 11:39:25 6/23/2012 11:43:52 710-- 1 1 COAL -- Harita Para6/23/2012 11:42:15 6/23/2012 11:50:22 855 1 1 COAL -- MIL6/23/2012 11:48:04 6/23/2012 11:50:59 856 1 1 COAL -- MIL6/23/2012 11:52:03 6/23/2012 11:57:09 115 1 1 COAL -- Harita Para6/23/2012 11:57:49 6/23/2012 12:01:27 703-- 1 1 COAL -- Harita Para6/23/2012 11:59:25 6/23/2012 12:03:00 850 1 1 COAL--IN MIL6/23/2012 12:10:28 6/23/2012 12:13:43 713-- 1 1 COAL -- Harita Para6/23/2012 12:14:42 6/23/2012 12:19:22 828 1 1 COAL -- MIL6/23/2012 12:16:42 6/23/2012 12:20:38 819 1 1 COAL--IN MIL6/23/2012 12:17:04 6/23/2012 12:22:12 711-- 1 1 COAL -- Harita Para6/23/2012 12:18:49 6/23/2012 12:23:27 853 1 1 COAL -- MIL6/23/2012 12:26:49 6/23/2012 12:31:03 820 1 1 COAL -- MIL6/23/2012 12:29:30 6/23/2012 12:33:34 811 1 1 COAL -- MIL6/23/2012 12:30:10 6/23/2012 12:33:51 705-- 1 1 COAL -- Harita Para6/23/2012 12:42:15 6/23/2012 12:45:33 810 1 1 COAL -- MIL6/23/2012 12:42:37 6/23/2012 12:47:11 707-- 1 1 COAL -- Harita Para6/23/2012 13:22:58 6/23/2012 13:30:36 701-- 1 1 COAL -- Harita Para6/23/2012 13:23:49 6/23/2012 13:30:40 709-- 1 1 COAL -- Harita Para6/23/2012 13:25:22 6/23/2012 13:32:52 831 1 1 COAL -- MIL6/23/2012 13:27:14 6/23/2012 13:38:01 706-- 1 1 COAL -- Harita Para6/23/2012 13:33:39 6/23/2012 13:38:50 852 1 1 COAL -- MIL6/23/2012 13:33:59 6/23/2012 13:35:52 713-- 1 1 COAL -- Harita Para6/23/2012 13:34:30 6/23/2012 13:40:58 703-- 1 1 COAL -- Harita Para6/23/2012 13:34:50 6/23/2012 13:41:42 710-- 1 1 COAL -- Harita Para6/23/2012 13:35:07 6/23/2012 13:41:44 712-- 1 1 COAL -- Harita Para6/23/2012 13:47:07 6/23/2012 13:50:30 115 1 1 COAL -- Harita Para6/23/2012 13:53:33 6/23/2012 13:57:43 113 1 1 COAL -- Harita Para6/23/2012 14:02:57 6/23/2012 14:06:42 817 1 1 COAL--IN MIL6/23/2012 14:04:19 6/23/2012 14:08:13 702-- 1 1 COAL -- Harita Para6/23/2012 14:09:21 6/23/2012 14:13:19 830 1 1 COAL -- MIL6/23/2012 14:12:06 6/23/2012 14:29:15 853 1 1 COAL -- MIL6/23/2012 14:12:24 6/23/2012 14:27:54 711 1 1 COAL -- Harita Para6/23/2012 14:13:58 6/23/2012 14:33:41 818 1 1 COAL--IN MIL6/23/2012 14:14:21 6/23/2012 14:34:06 705-- 1 1 COAL -- Harita Para6/23/2012 14:16:34 6/23/2012 14:41:22 812 1 1 COAL -- MIL6/23/2012 14:24:41 6/23/2012 14:43:59 819 1 1 COAL--IN MIL

Page 91: June Per Shift (Truckscale Port)

6/23/2012 14:36:14 6/23/2012 14:50:24 707-- 1 1 COAL -- Harita Para6/23/2012 14:42:50 6/23/2012 14:57:09 850 1 1 COAL--IN MIL6/23/2012 14:43:21 6/23/2012 15:07:12 809 1 1 COAL -- MIL6/23/2012 14:56:29 6/23/2012 15:09:26 709-- 1 1 COAL -- Harita Para6/23/2012 14:57:48 6/23/2012 15:13:02 706-- 1 1 COAL -- Harita Para6/23/2012 15:02:34 6/23/2012 15:13:37 856 1 1 COAL -- MIL6/23/2012 15:03:28 6/23/2012 15:17:03 703-- 1 1 COAL -- Harita Para6/23/2012 15:06:00 6/23/2012 15:17:52 837 1 1 COAL -- MIL6/23/2012 15:06:33 6/23/2012 15:20:47 831 1 1 COAL -- MIL6/23/2012 15:08:37 6/23/2012 15:22:36 713-- 1 1 COAL -- Harita Para6/23/2012 15:14:59 6/23/2012 15:25:55 712-- 1 1 COAL -- Harita Para6/23/2012 15:15:45 6/23/2012 15:27:51 115 1 1 COAL -- Harita Para6/23/2012 15:16:23 6/23/2012 15:33:24 855 1 1 COAL -- MIL6/23/2012 15:19:07 6/23/2012 15:32:24 710-- 1 1 COAL -- Harita Para6/23/2012 15:24:15 6/23/2012 15:34:03 810 1 1 COAL -- MIL6/23/2012 15:28:50 6/23/2012 15:35:12 811 1 1 COAL -- MIL6/23/2012 15:31:25 6/23/2012 15:37:44 817 1 1 COAL--IN MIL6/23/2012 15:40:53 6/23/2012 15:44:46 711-- 1 1 COAL -- Harita Para6/23/2012 15:47:14 6/23/2012 15:59:58 701-- 1 1 COAL -- Harita Para6/23/2012 15:48:17 6/23/2012 15:56:58 818 1 1 COAL--IN MIL6/23/2012 15:55:26 6/23/2012 16:00:02 830 1 2 COAL -- MIL6/23/2012 16:04:08 6/23/2012 16:08:30 812 2 2 COAL -- MIL6/23/2012 16:18:14 6/23/2012 16:23:39 850 2 2 COAL--IN MIL6/23/2012 16:22:49 6/23/2012 16:26:48 809 2 2 COAL -- MIL6/23/2012 18:08:23 6/23/2012 18:11:29 705-- 2 2 COAL -- Harita Para6/23/2012 18:15:18 6/23/2012 18:19:34 714-- 2 2 COAL -- Harita Para6/23/2012 18:15:46 6/23/2012 18:20:11 701-- 2 2 COAL -- Harita Para6/23/2012 18:18:22 6/23/2012 18:24:27 708-- 2 2 COAL -- Harita Para6/23/2012 18:18:50 6/23/2012 18:24:52 113 2 2 COAL -- Harita Para6/23/2012 18:23:08 6/23/2012 18:28:50 706-- 2 2 COAL -- Harita Para6/23/2012 18:23:47 6/23/2012 18:30:50 712-- 2 2 COAL -- Harita Para6/23/2012 18:25:41 6/23/2012 18:34:46 115 2 2 COAL -- Harita Para6/23/2012 18:26:18 6/23/2012 18:35:09 711-- 2 2 COAL -- Harita Para6/23/2012 18:28:11 6/23/2012 18:36:03 710-- 2 2 COAL -- Harita Para6/23/2012 18:31:37 6/23/2012 18:36:34 707-- 2 2 COAL -- Harita Para6/23/2012 18:33:22 6/23/2012 18:38:46 702-- 2 2 COAL -- Harita Para6/23/2012 18:33:48 6/23/2012 18:40:09 713-- 2 2 COAL -- Harita Para6/23/2012 18:34:13 6/23/2012 18:41:21 709-- 2 2 COAL -- Harita Para6/23/2012 18:37:15 6/23/2012 18:44:54 703-- 2 2 COAL -- Harita Para6/23/2012 19:27:20 6/23/2012 19:30:49 705-- 2 2 COAL -- Harita Para6/23/2012 19:32:37 6/23/2012 19:37:02 817 2 2 COAL--IN MIL6/23/2012 19:34:48 6/23/2012 19:39:15 815 2 2 COAL--IN MIL6/23/2012 19:40:09 6/23/2012 19:46:32 855 2 2 COAL -- MIL6/23/2012 19:40:29 6/23/2012 19:46:54 810 2 2 COAL -- MIL6/23/2012 19:40:57 6/23/2012 19:49:11 701-- 2 2 COAL -- Harita Para6/23/2012 19:41:26 6/23/2012 19:50:11 812 2 2 COAL -- MIL6/23/2012 19:43:40 6/23/2012 19:52:39 853 2 2 COAL -- MIL6/23/2012 19:45:48 6/23/2012 19:54:46 714-- 2 2 COAL -- Harita Para6/23/2012 19:48:28 6/23/2012 19:55:50 819 2 2 COAL--IN MIL6/23/2012 19:51:17 6/23/2012 19:57:33 708-- 2 2 COAL -- Harita Para

Page 92: June Per Shift (Truckscale Port)

6/23/2012 19:52:01 6/23/2012 19:59:50 113 2 2 COAL -- Harita Para6/23/2012 19:53:29 6/23/2012 20:03:33 831 2 2 COAL--IN MIL6/23/2012 20:01:18 6/23/2012 20:06:31 710-- 2 2 COAL -- Harita Para6/23/2012 20:02:53 6/23/2012 20:08:21 115 2 2 COAL -- Harita Para6/23/2012 20:05:44 6/23/2012 20:10:06 706-- 2 2 COAL -- Harita Para6/23/2012 20:07:37 6/23/2012 20:16:41 711-- 2 2 COAL -- Harita Para6/23/2012 20:09:29 6/23/2012 20:17:06 850 2 2 COAL -- MIL6/23/2012 20:15:30 6/23/2012 20:19:18 702-- 2 2 COAL -- Harita Para6/23/2012 20:15:58 6/23/2012 20:21:49 712-- 2 2 COAL -- Harita Para6/23/2012 20:20:32 6/23/2012 20:24:34 713-- 2 2 COAL -- Harita Para6/23/2012 20:29:10 6/23/2012 20:33:30 709-- 2 2 COAL -- Harita Para6/23/2012 20:40:48 6/23/2012 21:01:03 707-- 2 2 COAL -- Harita Para6/23/2012 20:45:40 6/23/2012 21:02:44 705-- 2 2 COAL -- Harita Para6/23/2012 20:51:31 6/23/2012 21:06:02 703-- 2 2 COAL -- Harita Para6/23/2012 21:12:13 6/23/2012 21:18:39 856 2 2 COAL -- MIL6/23/2012 21:13:35 6/23/2012 21:20:19 701-- 2 2 COAL -- Harita Para6/23/2012 21:17:05 6/23/2012 21:22:01 714-- 2 2 COAL -- Harita Para6/23/2012 21:23:41 6/23/2012 21:27:34 113 2 2 COAL -- Harita Para6/23/2012 21:24:58 6/23/2012 21:40:24 855 2 2 COAL -- MIL6/23/2012 21:25:21 6/23/2012 21:32:17 812 2 2 COAL -- MIL6/23/2012 21:31:12 6/23/2012 21:37:16 708-- 2 2 COAL -- Harita Para6/23/2012 21:35:31 6/23/2012 21:40:28 810 2 2 COAL -- MIL6/23/2012 21:36:26 6/23/2012 21:42:11 710-- 2 2 COAL -- Harita Para6/23/2012 21:38:42 6/23/2012 21:45:12 811 2 2 COAL -- MIL6/23/2012 21:39:06 6/23/2012 21:46:38 706-- 2 2 COAL -- Harita Para6/23/2012 21:39:46 6/23/2012 21:48:18 853 2 2 COAL -- MIL6/23/2012 21:42:55 6/23/2012 21:50:02 115 2 2 COAL -- Harita Para6/23/2012 21:47:41 6/23/2012 21:52:29 712-- 2 2 COAL -- Harita Para6/23/2012 21:51:18 6/23/2012 21:55:40 702-- 2 2 COAL -- Harita Para6/23/2012 21:51:40 6/23/2012 21:57:15 815 2 2 COAL -- MIL6/23/2012 21:54:00 6/23/2012 21:59:08 850 2 2 COAL -- MIL6/23/2012 21:54:30 6/23/2012 22:01:10 819 2 2 COAL--IN MIL6/23/2012 22:06:10 6/23/2012 22:10:31 711-- 2 2 COAL -- Harita Para6/23/2012 22:09:45 6/23/2012 22:14:00 831 2 2 COAL -- MIL6/23/2012 22:23:00 6/23/2012 22:26:17 705-- 2 2 COAL -- Harita Para6/23/2012 22:43:07 6/23/2012 22:47:41 703-- 2 2 COAL -- Harita Para6/23/2012 22:48:23 6/23/2012 22:52:27 714-- 2 2 COAL -- Harita Para6/23/2012 22:49:41 6/23/2012 22:55:56 113 2 2 COAL -- Harita Para6/23/2012 22:54:40 6/23/2012 22:59:35 812 2 2 COAL--IN MIL6/23/2012 22:55:11 6/23/2012 23:01:03 713-- 2 2 COAL -- Harita Para6/23/2012 22:58:29 6/23/2012 23:03:13 856 2 2 COAL -- MIL6/23/2012 22:58:55 6/23/2012 23:05:14 701-- 2 2 COAL -- Harita Para6/23/2012 23:04:04 6/23/2012 23:11:31 817 2 2 COAL -- MIL6/23/2012 23:08:22 6/23/2012 23:13:04 853 2 2 COAL -- MIL6/23/2012 23:09:10 6/23/2012 23:17:17 710-- 2 2 COAL -- Harita Para6/23/2012 23:09:41 6/23/2012 23:18:52 708-- 2 2 COAL -- Harita Para6/23/2012 23:10:47 6/23/2012 23:21:10 815 2 2 COAL--IN MIL6/23/2012 23:16:20 6/23/2012 23:23:17 706-- 2 2 COAL -- Harita Para6/23/2012 23:20:02 6/23/2012 23:26:47 712-- 2 2 COAL -- Harita Para6/23/2012 23:20:29 6/23/2012 23:27:58 819 2 2 COAL--IN MIL

Page 93: June Per Shift (Truckscale Port)

6/23/2012 23:24:13 6/23/2012 23:34:33 855 2 2 COAL -- MIL6/23/2012 23:25:29 6/23/2012 23:34:03 115 2 2 COAL -- Harita Para6/23/2012 23:25:55 6/23/2012 23:35:43 810 2 2 COAL -- MIL6/23/2012 23:37:10 6/23/2012 23:44:23 702-- 2 2 COAL -- Harita Para6/23/2012 23:37:40 6/23/2012 23:43:57 709-- 2 2 COAL -- Harita Para6/23/2012 23:38:35 6/23/2012 23:44:27 705-- 2 2 COAL -- Harita Para6/23/2012 23:39:18 6/23/2012 23:45:47 711-- 2 2 COAL -- Harita Para6/23/2012 23:43:04 6/23/2012 23:50:09 811 2 2 COAL--IN MIL6/24/2012 00:13:06 6/24/2012 00:16:37 714-- 3 3 COAL -- Harita Para6/24/2012 00:20:02 6/24/2012 00:24:37 113 3 3 COAL -- Harita Para6/24/2012 00:28:50 6/24/2012 00:33:31 703-- 3 3 COAL -- Harita Para6/24/2012 00:29:13 6/24/2012 00:35:44 701-- 3 3 COAL -- Harita Para6/24/2012 00:30:22 6/24/2012 00:39:23 817 3 3 COAL--IN MIL6/24/2012 00:36:37 6/24/2012 00:41:27 819 3 3 COAL--IN MIL6/24/2012 00:38:40 6/24/2012 00:49:09 704-- 3 3 COAL -- Harita Para6/24/2012 00:43:47 6/24/2012 00:49:05 831 3 3 COAL -- MIL6/24/2012 00:56:08 6/24/2012 01:00:26 710-- 3 3 COAL -- Harita Para6/24/2012 00:56:48 6/24/2012 01:03:06 713-- 3 3 COAL -- Harita Para6/24/2012 01:02:12 6/24/2012 01:06:19 706-- 3 3 COAL -- Harita Para6/24/2012 01:04:47 6/24/2012 01:09:26 853 3 3 COAL -- MIL6/24/2012 01:05:05 6/24/2012 01:10:58 705-- 3 3 COAL -- Harita Para6/24/2012 01:08:43 6/24/2012 01:16:09 855 3 3 COAL -- MIL6/24/2012 01:23:32 6/24/2012 01:28:16 812 3 3 COAL--IN MIL6/24/2012 01:50:13 6/24/2012 01:55:52 811 3 3 COAL--IN MIL6/24/2012 01:55:08 6/24/2012 01:59:49 856 3 3 COAL -- MIL6/24/2012 02:06:17 6/24/2012 02:10:27 115 3 3 COAL -- Harita Para6/24/2012 02:07:30 6/24/2012 02:13:22 708-- 3 3 COAL -- Harita Para6/24/2012 02:15:45 6/24/2012 02:20:28 709-- 3 3 COAL -- Harita Para6/24/2012 02:21:12 6/24/2012 02:30:24 711-- 3 3 COAL -- Harita Para6/24/2012 02:26:01 6/24/2012 02:30:57 710-- 3 3 COAL -- Harita Para6/24/2012 02:29:05 6/24/2012 02:34:21 113 3 3 COAL -- Harita Para6/24/2012 02:35:55 6/24/2012 02:39:59 706-- 3 3 COAL -- Harita Para6/24/2012 02:37:15 6/24/2012 02:42:02 703-- 3 3 COAL -- Harita Para6/24/2012 02:38:30 6/24/2012 02:43:17 705-- 3 3 COAL -- Harita Para6/24/2012 02:46:15 6/24/2012 02:50:31 713-- 3 3 COAL -- Harita Para6/24/2012 02:46:32 6/24/2012 02:52:36 714-- 3 3 COAL -- Harita Para6/24/2012 02:54:11 6/24/2012 02:58:11 701-- 3 3 COAL -- Harita Para6/24/2012 02:59:17 6/24/2012 03:04:02 810 3 3 COAL -- MIL6/24/2012 03:00:28 6/24/2012 03:06:29 702-- 3 3 COAL -- Harita Para6/24/2012 03:03:16 6/24/2012 03:07:34 831 3 3 COAL -- MIL6/24/2012 03:17:17 6/24/2012 03:22:15 819 3 3 COAL--IN MIL6/24/2012 03:49:47 6/24/2012 03:53:45 711-- 3 3 COAL -- Harita Para6/24/2012 03:58:47 6/24/2012 04:03:06 709-- 3 3 COAL -- Harita Para6/24/2012 03:59:28 6/24/2012 04:03:13 705-- 3 3 COAL -- Harita Para6/24/2012 07:08:55 6/24/2012 07:12:36 705-- 3 3 COAL -- Harita Para6/24/2012 07:10:24 6/24/2012 07:14:37 708-- 3 3 COAL -- Harita Para6/24/2012 07:15:32 6/24/2012 07:21:40 702-- 3 3 COAL -- Harita Para6/24/2012 07:30:13 6/24/2012 07:41:08 706-- 3 3 COAL -- Harita Para6/24/2012 07:30:50 6/24/2012 07:36:05 713-- 3 3 COAL -- Harita Para6/24/2012 07:31:32 6/24/2012 07:38:20 712-- 3 3 COAL -- Harita Para

Page 94: June Per Shift (Truckscale Port)

6/24/2012 07:32:24 6/24/2012 07:43:27 810 3 3 COAL -- MIL6/24/2012 07:40:17 6/24/2012 07:44:59 113 3 3 COAL -- Harita Para6/24/2012 07:44:21 6/24/2012 07:49:29 711-- 3 3 COAL -- Harita Para6/24/2012 07:47:04 6/24/2012 07:51:17 812 3 3 COAL -- MIL6/24/2012 07:48:12 6/24/2012 07:55:05 855 3 3 COAL -- MIL6/24/2012 07:48:42 6/24/2012 07:59:26 701-- 3 3 COAL -- Harita Para6/24/2012 08:02:08 6/24/2012 08:06:39 703-- 1 1 COAL -- Harita Para6/24/2012 08:13:20 6/24/2012 08:19:36 853 1 1 COAL -- MIL6/24/2012 08:28:15 6/24/2012 08:33:55 831 1 1 COAL -- MIL6/24/2012 08:29:17 6/24/2012 08:35:02 817 1 1 COAL -- MIL6/24/2012 08:29:42 6/24/2012 08:36:49 708-- 1 1 COAL -- Harita Para6/24/2012 08:32:50 6/24/2012 08:37:49 710-- 1 1 COAL -- Harita Para6/24/2012 08:33:18 6/24/2012 08:47:54 705-- 1 1 COAL -- Harita Para6/24/2012 08:56:11 6/24/2012 09:00:11 713-- 1 1 COAL -- Harita Para6/24/2012 08:57:31 6/24/2012 09:02:23 706-- 1 1 COAL -- Harita Para6/24/2012 09:04:02 6/24/2012 09:08:24 113 1 1 COAL -- Harita Para6/24/2012 09:04:38 6/24/2012 09:12:52 711-- 1 1 COAL -- Harita Para6/24/2012 09:05:06 6/24/2012 09:15:27 830 1 1 COAL -- MIL6/24/2012 09:07:22 6/24/2012 09:16:01 810 1 1 COAL--IN MIL6/24/2012 09:07:42 6/24/2012 09:16:56 811 1 1 COAL -- MIL6/24/2012 09:14:49 6/24/2012 09:19:01 712-- 1 1 COAL -- Harita Para6/24/2012 09:19:45 6/24/2012 09:25:00 855 1 1 COAL--IN MIL6/24/2012 09:23:16 6/24/2012 09:27:56 703-- 1 1 COAL -- Harita Para6/24/2012 09:25:51 6/24/2012 09:30:16 812 1 1 COAL -- MIL6/24/2012 09:27:12 6/24/2012 09:32:38 115 1 1 COAL -- Harita Para6/24/2012 09:34:23 6/24/2012 09:39:21 815 1 1 COAL -- MIL6/24/2012 09:38:50 6/24/2012 09:42:59 701-- 1 1 COAL -- Harita Para6/24/2012 09:47:05 6/24/2012 09:51:06 809 1 1 COAL--IN MIL6/24/2012 09:47:43 6/24/2012 09:53:32 853 1 1 COAL--IN MIL6/24/2012 09:50:24 6/24/2012 09:54:05 708-- 1 1 COAL -- Harita Para6/24/2012 10:00:48 6/24/2012 10:04:21 710-- 1 1 COAL -- Harita Para6/24/2012 10:06:20 6/24/2012 10:10:57 817 1 1 COAL -- MIL6/24/2012 10:09:21 6/24/2012 10:13:29 705-- 1 1 COAL -- Harita Para6/24/2012 10:19:29 6/24/2012 10:23:32 713-- 1 1 COAL -- Harita Para6/24/2012 10:20:10 6/24/2012 10:24:55 839 1 1 COAL -- MIL6/24/2012 10:22:47 6/24/2012 10:28:07 706-- 1 1 COAL -- Harita Para6/24/2012 10:26:16 6/24/2012 10:30:00 831 1 1 COAL -- MIL6/24/2012 10:27:02 6/24/2012 10:32:19 810 1 1 COAL -- MIL6/24/2012 10:34:24 6/24/2012 10:38:39 113 1 1 COAL -- Harita Para6/24/2012 10:34:47 6/24/2012 10:41:03 711-- 1 1 COAL -- Harita Para6/24/2012 10:39:24 6/24/2012 10:45:17 855 1 1 COAL--IN MIL6/24/2012 10:53:55 6/24/2012 10:57:40 703-- 1 1 COAL -- Harita Para6/24/2012 11:02:25 6/24/2012 11:07:01 712-- 1 1 COAL -- Harita Para6/24/2012 11:08:21 6/24/2012 11:12:15 830 1 1 COAL -- MIL6/24/2012 11:10:52 6/24/2012 11:14:04 815 1 1 COAL -- MIL6/24/2012 11:17:29 6/24/2012 11:21:33 701-- 1 1 COAL -- Harita Para6/24/2012 11:19:55 6/24/2012 11:24:56 115 1 1 COAL -- Harita Para6/24/2012 11:24:13 6/24/2012 11:28:20 812 1 1 COAL -- MIL6/24/2012 11:30:06 6/24/2012 11:34:07 811 1 1 COAL -- MIL6/24/2012 11:40:49 6/24/2012 11:46:03 853 1 1 COAL -- MIL

Page 95: June Per Shift (Truckscale Port)

6/24/2012 11:41:07 6/24/2012 11:46:23 708-- 1 1 COAL -- Harita Para6/24/2012 11:41:51 6/24/2012 11:47:21 710-- 1 1 COAL -- Harita Para6/24/2012 11:45:10 6/24/2012 11:49:09 713-- 1 1 COAL -- Harita Para6/24/2012 11:48:22 6/24/2012 11:54:15 852 1 1 COAL -- MIL6/24/2012 11:51:15 6/24/2012 11:56:30 817 1 1 COAL -- MIL6/24/2012 11:57:13 6/24/2012 12:01:08 809 1 1 COAL -- MIL6/24/2012 11:57:40 6/24/2012 12:02:32 705-- 1 1 COAL -- Harita Para6/24/2012 12:00:21 6/24/2012 12:06:06 706-- 1 1 COAL -- Harita Para6/24/2012 12:03:06 6/24/2012 12:07:16 711-- 1 1 COAL -- Harita Para6/24/2012 12:05:06 6/24/2012 12:09:14 113 1 1 COAL -- Harita Para6/24/2012 12:15:05 6/24/2012 12:22:45 831 1 1 COAL -- MIL6/24/2012 12:16:31 6/24/2012 12:22:17 709-- 1 1 COAL -- Harita Para6/24/2012 12:17:27 6/24/2012 12:24:50 703-- 1 1 COAL -- Harita Para6/24/2012 12:20:21 6/24/2012 12:27:27 839 1 1 COAL -- MIL6/24/2012 12:23:31 6/24/2012 12:34:04 855 1 1 COAL -- MIL6/24/2012 13:19:18 6/24/2012 13:24:15 714-- 1 1 COAL -- Harita Para6/24/2012 13:19:42 6/24/2012 13:25:16 707-- 1 1 COAL -- Harita Para6/24/2012 13:20:09 6/24/2012 13:26:28 810 1 1 COAL -- MIL6/24/2012 13:20:30 6/24/2012 13:27:23 815 1 1 COAL -- MIL6/24/2012 13:20:54 6/24/2012 13:29:21 713-- 1 1 COAL -- Harita Para6/24/2012 13:21:21 6/24/2012 13:32:21 701-- 1 1 COAL -- Harita Para6/24/2012 13:21:48 6/24/2012 13:39:47 830 1 1 COAL -- MIL6/24/2012 13:22:05 6/24/2012 13:39:04 811 1 1 COAL -- MIL6/24/2012 13:23:01 6/24/2012 13:41:02 115 1 1 COAL -- Harita Para6/24/2012 13:28:24 6/24/2012 13:43:06 712-- 1 1 COAL -- Harita Para6/24/2012 14:43:07 6/24/2012 14:47:05 850 1 1 COAL -- MIL6/24/2012 15:46:25 6/24/2012 15:51:53 709-- 1 1 COAL -- Harita Para6/24/2012 15:47:03 6/24/2012 15:51:58 113 1 1 COAL -- Harita Para6/24/2012 16:10:36 6/24/2012 16:14:23 705-- 2 2 COAL -- Harita Para6/24/2012 16:18:48 6/24/2012 16:26:22 710-- 2 2 COAL -- Harita Para6/24/2012 16:20:05 6/24/2012 16:26:25 713-- 2 2 COAL -- Harita Para6/24/2012 16:24:53 6/24/2012 16:29:31 708-- 2 2 COAL -- Harita Para6/24/2012 16:28:17 6/24/2012 16:32:16 704-- 2 2 COAL -- Harita Para6/24/2012 16:31:42 6/24/2012 16:35:16 711-- 2 2 COAL -- Harita Para6/24/2012 16:37:16 6/24/2012 16:40:40 714-- 2 2 COAL -- Harita Para6/24/2012 16:45:10 6/24/2012 16:49:30 706-- 2 2 COAL -- Harita Para6/24/2012 18:14:46 6/24/2012 18:18:04 705-- 2 2 COAL -- Harita Para6/24/2012 18:17:35 6/24/2012 18:21:09 704-- 2 2 COAL -- Harita Para6/24/2012 18:18:37 6/24/2012 18:23:28 708-- 2 2 COAL -- Harita Para6/24/2012 18:18:55 6/24/2012 18:27:06 713-- 2 2 COAL -- Harita Para6/24/2012 18:21:44 6/24/2012 18:28:30 710-- 2 2 COAL -- Harita Para6/24/2012 18:22:05 6/24/2012 18:31:08 709-- 2 2 COAL -- Harita Para6/24/2012 18:22:26 6/24/2012 18:31:31 701-- 2 2 COAL -- Harita Para6/24/2012 18:22:48 6/24/2012 18:33:33 712-- 2 2 COAL -- Harita Para6/24/2012 18:26:12 6/24/2012 18:34:13 113 2 2 COAL -- Harita Para6/24/2012 18:29:58 6/24/2012 18:36:36 115 2 2 COAL -- Harita Para6/24/2012 18:30:27 6/24/2012 18:38:03 711-- 2 2 COAL -- Harita Para6/24/2012 18:34:46 6/24/2012 18:38:05 714-- 2 2 COAL -- Harita Para6/24/2012 18:39:56 6/24/2012 18:50:56 707-- 2 2 COAL -- Harita Para6/24/2012 18:45:35 6/24/2012 18:53:26 702-- 2 2 COAL -- Harita Para

Page 96: June Per Shift (Truckscale Port)

6/24/2012 18:51:52 6/24/2012 18:55:28 706-- 2 2 COAL -- Harita Para6/24/2012 19:59:10 6/24/2012 20:03:03 710-- 2 2 COAL -- Harita Para6/24/2012 19:59:28 6/24/2012 20:05:56 701-- 2 2 COAL -- Harita Para6/24/2012 20:00:33 6/24/2012 20:06:20 704-- 2 2 COAL -- Harita Para6/24/2012 20:01:03 6/24/2012 20:07:50 713-- 2 2 COAL -- Harita Para6/24/2012 20:01:40 6/24/2012 20:08:11 705-- 2 2 COAL -- Harita Para6/24/2012 20:04:21 6/24/2012 20:13:06 712-- 2 2 COAL -- Harita Para6/24/2012 20:05:14 6/24/2012 20:11:39 709-- 2 2 COAL -- Harita Para6/24/2012 20:07:08 6/24/2012 20:15:27 703-- 2 2 COAL -- Harita Para6/24/2012 20:10:21 6/24/2012 20:17:26 711-- 2 2 COAL -- Harita Para6/24/2012 20:10:46 6/24/2012 20:20:21 113 2 2 COAL -- Harita Para6/24/2012 20:18:39 6/24/2012 20:22:50 707-- 2 2 COAL -- Harita Para6/24/2012 20:18:56 6/24/2012 20:26:38 714-- 2 2 COAL -- Harita Para6/24/2012 20:28:19 6/24/2012 20:33:22 115 2 2 COAL -- Harita Para6/24/2012 20:30:44 6/24/2012 20:35:55 702-- 2 2 COAL -- Harita Para6/24/2012 20:47:27 6/24/2012 20:51:30 706-- 2 2 COAL -- Harita Para6/24/2012 21:19:17 6/24/2012 21:23:36 713-- 2 2 COAL -- Harita Para6/24/2012 21:20:18 6/24/2012 21:25:51 850 2 2 COAL -- MIL6/24/2012 21:24:29 6/24/2012 21:27:51 710-- 2 2 COAL -- Harita Para6/24/2012 21:25:02 6/24/2012 21:29:49 704-- 2 2 COAL -- Harita Para6/24/2012 21:31:22 6/24/2012 21:35:22 709-- 2 2 COAL -- Harita Para6/24/2012 21:37:39 6/24/2012 21:41:57 703-- 2 2 COAL -- Harita Para6/24/2012 21:39:34 6/24/2012 21:43:37 705-- 2 2 COAL -- Harita Para6/24/2012 21:41:05 6/24/2012 21:48:35 711-- 2 2 COAL -- Harita Para6/24/2012 21:44:38 6/24/2012 21:48:54 701-- 2 2 COAL -- Harita Para6/24/2012 21:45:22 6/24/2012 21:50:26 707-- 2 2 COAL -- Harita Para6/24/2012 21:47:45 6/24/2012 21:52:48 812 2 2 COAL -- MIL6/24/2012 21:57:04 6/24/2012 22:01:40 819 2 2 COAL -- MIL6/24/2012 22:00:56 6/24/2012 22:05:22 113 2 2 COAL -- Harita Para6/24/2012 22:12:16 6/24/2012 22:19:43 855 2 2 COAL -- MIL6/24/2012 22:13:03 6/24/2012 22:19:25 115 2 2 COAL -- Harita Para6/24/2012 22:13:52 6/24/2012 22:21:34 712-- 2 2 COAL -- Harita Para6/24/2012 22:39:23 6/24/2012 22:43:20 713-- 2 2 COAL -- Harita Para6/24/2012 22:44:17 6/24/2012 22:49:03 815 2 2 COAL -- MIL6/24/2012 22:45:10 6/24/2012 22:50:55 704-- 2 2 COAL -- Harita Para6/24/2012 22:53:30 6/24/2012 22:59:21 709-- 2 2 COAL -- Harita Para6/24/2012 22:57:46 6/24/2012 23:01:53 856 2 2 COAL -- MIL6/24/2012 23:01:09 6/24/2012 23:05:30 703-- 2 2 COAL -- Harita Para6/24/2012 23:08:13 6/24/2012 23:24:21 711-- 2 2 COAL -- Harita Para6/24/2012 23:13:41 6/24/2012 23:18:12 710-- 2 2 COAL -- Harita Para6/24/2012 23:16:35 6/24/2012 23:21:06 707-- 2 2 COAL -- Harita Para6/24/2012 23:20:09 6/24/2012 23:24:25 705-- 2 2 COAL -- Harita Para6/24/2012 23:27:04 6/24/2012 23:31:07 811 2 2 COAL -- MIL6/24/2012 23:27:22 6/24/2012 23:35:21 701-- 2 2 COAL -- Harita Para6/24/2012 23:27:53 6/24/2012 23:35:25 706-- 2 2 COAL -- Harita Para6/24/2012 23:28:24 6/24/2012 23:36:40 714-- 2 2 COAL -- Harita Para6/24/2012 23:43:21 6/24/2012 23:48:21 113 2 2 COAL -- Harita Para6/24/2012 23:46:18 6/24/2012 23:52:06 853 2 2 COAL -- MIL6/25/2012 00:01:46 6/25/2012 00:12:38 115 3 3 COAL -- Harita Para6/25/2012 00:03:26 6/25/2012 00:12:43 713-- 3 3 COAL -- Harita Para

Page 97: June Per Shift (Truckscale Port)

6/25/2012 00:04:49 6/25/2012 00:10:02 818 3 3 COAL -- MIL6/25/2012 00:05:20 6/25/2012 00:25:39 712-- 3 3 COAL -- Harita Para6/25/2012 00:21:26 6/25/2012 00:25:35 704-- 3 3 COAL -- Harita Para6/25/2012 00:27:27 6/25/2012 00:33:27 709-- 3 3 COAL -- Harita Para6/25/2012 00:31:40 6/25/2012 00:37:09 812 3 3 COAL -- MIL6/25/2012 00:32:39 6/25/2012 00:37:14 817 3 3 COAL -- MIL6/25/2012 00:40:10 6/25/2012 00:45:13 703-- 3 3 COAL -- Harita Para6/25/2012 00:47:10 6/25/2012 00:50:29 710-- 3 3 COAL -- Harita Para6/25/2012 00:47:46 6/25/2012 00:50:32 711-- 3 3 COAL -- Harita Para6/25/2012 00:49:12 6/25/2012 00:54:38 850 3 3 COAL -- MIL6/25/2012 00:51:59 6/25/2012 00:56:03 856 3 3 COAL -- MIL6/25/2012 00:53:45 6/25/2012 01:05:07 707-- 3 3 COAL -- Harita Para6/25/2012 01:06:23 6/25/2012 01:11:36 819 3 3 COAL -- MIL6/25/2012 01:09:47 6/25/2012 01:17:12 855 3 3 COAL -- MIL6/25/2012 01:10:10 6/25/2012 01:17:42 705-- 3 3 COAL -- Harita Para6/25/2012 01:15:53 6/25/2012 01:21:25 815 3 3 COAL -- MIL6/25/2012 01:20:40 6/25/2012 01:21:28 811 3 3 COAL -- MIL6/25/2012 01:23:19 6/25/2012 01:28:34 113 3 3 COAL -- Harita Para6/25/2012 01:30:04 6/25/2012 01:33:57 706-- 3 3 COAL -- Harita Para6/25/2012 01:30:22 6/25/2012 01:34:01 714-- 3 3 COAL -- Harita Para6/25/2012 01:41:20 6/25/2012 01:48:39 853 3 3 COAL -- MIL6/25/2012 01:43:02 6/25/2012 01:48:42 852 3 3 COAL -- MIL6/25/2012 01:53:04 6/25/2012 02:12:30 704-- 3 3 COAL -- Harita Para6/25/2012 02:06:43 6/25/2012 02:12:33 713-- 3 3 COAL -- Harita Para6/25/2012 02:14:25 6/25/2012 02:20:30 710-- 3 3 COAL -- Harita Para6/25/2012 02:14:54 6/25/2012 02:20:33 711-- 3 3 COAL -- Harita Para6/25/2012 02:21:38 6/25/2012 02:22:22 709-- 3 3 COAL -- Harita Para6/25/2012 02:28:59 6/25/2012 02:33:33 115 3 3 COAL -- Harita Para6/25/2012 02:30:39 6/25/2012 02:36:51 817 3 3 COAL -- MIL6/25/2012 02:31:03 6/25/2012 02:36:55 818 3 3 COAL -- MIL6/25/2012 02:31:30 6/25/2012 02:33:47 707-- 3 3 COAL -- Harita Para6/25/2012 02:34:40 6/25/2012 02:43:40 705-- 3 3 COAL -- Harita Para6/25/2012 02:35:02 6/25/2012 02:43:45 850 3 3 COAL -- MIL6/25/2012 02:35:28 6/25/2012 02:44:49 703-- 3 3 COAL -- Harita Para6/25/2012 02:42:59 6/25/2012 02:52:42 856 3 3 COAL -- MIL6/25/2012 09:01:12 6/25/2012 09:05:58 850 1 1 COAL -- MIL6/25/2012 09:01:57 6/25/2012 09:06:17 705-- 1 1 COAL -- Harita Para6/25/2012 09:02:25 6/25/2012 09:11:01 707-- 1 1 COAL -- Harita Para6/25/2012 09:02:51 6/25/2012 09:16:07 711-- 1 1 COAL -- Harita Para6/25/2012 09:03:19 6/25/2012 09:20:19 113 1 1 COAL -- Harita Para6/25/2012 09:03:51 6/25/2012 09:20:25 115 1 1 COAL -- Harita Para6/25/2012 09:04:21 6/25/2012 09:27:20 815 1 1 COAL -- MIL6/25/2012 09:04:48 6/25/2012 09:34:13 708-- 1 1 COAL -- Harita Para6/25/2012 09:05:20 6/25/2012 09:35:41 714-- 1 1 COAL -- Harita Para6/25/2012 09:07:03 6/25/2012 09:42:45 704-- 1 1 COAL -- Harita Para6/25/2012 09:07:39 6/25/2012 09:27:29 819 1 1 COAL -- MIL6/25/2012 09:08:14 6/25/2012 09:42:50 712-- 1 1 COAL -- Harita Para6/25/2012 09:08:43 6/25/2012 09:50:35 818 1 1 COAL -- MIL6/25/2012 09:09:12 6/25/2012 09:51:20 710-- 1 1 COAL -- Harita Para6/25/2012 09:09:42 6/25/2012 10:01:50 706-- 1 1 COAL -- Harita Para

Page 98: June Per Shift (Truckscale Port)

6/25/2012 09:10:04 6/25/2012 10:03:13 701-- 1 1 COAL -- Harita Para6/25/2012 09:16:51 6/25/2012 09:55:52 812 1 1 COAL -- MIL6/25/2012 09:17:54 6/25/2012 09:55:57 811 1 1 COAL -- MIL6/25/2012 09:18:46 6/25/2012 10:14:47 855 1 1 COAL -- MIL6/25/2012 09:19:11 6/25/2012 10:08:37 709-- 1 1 COAL -- Harita Para6/25/2012 09:22:49 6/25/2012 10:16:52 856 1 1 COAL -- MIL6/25/2012 09:36:36 6/25/2012 10:12:45 817 1 1 COAL -- MIL6/25/2012 09:37:24 6/25/2012 10:19:25 831 1 1 COAL -- MIL6/25/2012 09:44:18 6/25/2012 10:20:17 810 1 1 COAL -- MIL6/25/2012 09:45:10 6/25/2012 10:27:59 852 1 1 COAL -- MIL6/25/2012 09:45:33 6/25/2012 10:36:04 853 1 1 COAL -- MIL6/25/2012 09:46:18 6/25/2012 10:22:56 836 1 1 COAL -- MIL6/25/2012 09:58:38 6/25/2012 10:23:37 851 1 1 COAL -- MIL6/25/2012 10:07:15 6/25/2012 10:28:03 868 1 1 COAL -- MIL6/25/2012 10:22:06 6/25/2012 10:28:36 707-- 1 1 COAL -- Harita Para6/25/2012 10:25:17 6/25/2012 10:29:15 705-- 1 1 COAL -- Harita Para6/25/2012 10:26:36 6/25/2012 10:31:35 711-- 1 1 COAL -- Harita Para6/25/2012 10:27:23 6/25/2012 10:34:38 850 1 1 COAL -- MIL6/25/2012 10:38:02 6/25/2012 10:43:02 113 1 1 COAL -- Harita Para6/25/2012 10:43:45 6/25/2012 10:47:36 115 1 1 COAL -- Harita Para6/25/2012 10:52:18 6/25/2012 10:56:13 815 1 1 COAL -- MIL6/25/2012 10:54:15 6/25/2012 10:58:09 708-- 1 1 COAL -- Harita Para6/25/2012 10:59:29 6/25/2012 11:04:04 704-- 1 1 COAL -- Harita Para6/25/2012 11:04:53 6/25/2012 11:08:41 714-- 1 1 COAL -- Harita Para6/25/2012 11:21:03 6/25/2012 11:25:04 706-- 1 1 COAL -- Harita Para6/25/2012 11:21:43 6/25/2012 11:28:43 712-- 1 1 COAL -- Harita Para6/25/2012 11:24:19 6/25/2012 11:28:14 839 1 1 COAL -- MIL6/25/2012 11:26:01 6/25/2012 11:30:28 819 1 1 COAL -- MIL6/25/2012 11:27:39 6/25/2012 11:32:15 710-- 1 1 COAL -- Harita Para6/25/2012 11:35:25 6/25/2012 11:40:10 709-- 1 1 COAL -- Harita Para6/25/2012 11:39:36 6/25/2012 11:42:55 713-- 1 1 COAL -- Harita Para6/25/2012 11:43:51 6/25/2012 11:47:30 707-- 1 1 COAL -- Harita Para6/25/2012 11:46:26 6/25/2012 11:49:57 832 1 1 COAL -- MIL6/25/2012 11:54:56 6/25/2012 11:59:49 703-- 1 1 COAL -- Harita Para6/25/2012 11:57:16 6/25/2012 12:02:35 113 1 1 COAL -- Harita Para6/25/2012 12:00:42 6/25/2012 12:19:16 701-- 1 1 COAL -- Harita Para6/25/2012 12:01:05 6/25/2012 12:06:08 705-- 1 1 COAL -- Harita Para6/25/2012 12:04:34 6/25/2012 12:12:13 855 1 1 COAL -- MIL6/25/2012 12:12:52 6/25/2012 12:19:14 115 1 1 COAL -- Harita Para6/25/2012 12:14:12 6/25/2012 12:20:03 812 1 1 COAL -- MIL6/25/2012 12:14:44 6/25/2012 12:20:56 817 1 1 COAL -- MIL6/25/2012 12:16:32 6/25/2012 12:21:24 856 1 1 COAL -- MIL6/25/2012 12:18:21 6/25/2012 12:22:00 810 1 1 COAL -- MIL6/25/2012 12:26:57 6/25/2012 12:35:07 852 1 1 COAL -- MIL6/25/2012 12:28:05 6/25/2012 12:33:10 704-- 1 1 COAL -- Harita Para6/25/2012 12:28:28 6/25/2012 12:35:32 850 1 1 COAL -- MIL6/25/2012 12:29:04 6/25/2012 12:41:53 708-- 1 1 COAL -- Harita Para6/25/2012 12:37:27 6/25/2012 12:53:26 853 1 1 COAL -- MIL6/25/2012 12:40:17 6/25/2012 12:43:41 851 1 1 COAL -- MIL6/25/2012 12:41:02 6/25/2012 12:46:00 815 1 1 COAL -- MIL

Page 99: June Per Shift (Truckscale Port)

6/25/2012 12:46:59 6/25/2012 12:50:33 818 1 1 COAL -- MIL6/25/2012 12:48:20 6/25/2012 12:52:29 714-- 1 1 COAL -- Harita Para6/25/2012 12:57:33 6/25/2012 13:02:19 706-- 1 1 COAL -- Harita Para6/25/2012 12:59:47 6/25/2012 13:04:15 707-- 1 1 COAL -- Harita Para6/25/2012 13:05:32 6/25/2012 13:15:45 709-- 1 1 COAL -- Harita Para6/25/2012 13:10:17 6/25/2012 13:16:08 712-- 1 1 COAL -- Harita Para6/25/2012 13:14:26 6/25/2012 13:18:08 703-- 1 1 COAL -- Harita Para6/25/2012 13:19:00 6/25/2012 13:22:42 836 1 1 COAL -- MIL6/25/2012 13:19:27 6/25/2012 13:24:49 831 1 1 COAL -- MIL6/25/2012 13:23:19 6/25/2012 13:28:01 710-- 1 1 COAL -- Harita Para6/25/2012 13:33:27 6/25/2012 13:37:33 113 1 1 COAL -- Harita Para6/25/2012 13:43:48 6/25/2012 13:46:13 856 1 1 COAL -- MIL6/25/2012 13:50:23 6/25/2012 13:54:06 713-- 1 1 COAL -- Harita Para6/25/2012 13:52:33 6/25/2012 13:56:43 115 1 1 COAL -- Harita Para6/25/2012 13:59:48 6/25/2012 14:03:33 704-- 1 1 COAL -- Harita Para6/25/2012 14:04:31 6/25/2012 14:08:30 839 1 1 COAL -- MIL6/25/2012 14:11:00 6/25/2012 14:15:52 819 1 1 COAL -- MIL6/25/2012 14:13:24 6/25/2012 14:18:07 852 1 1 COAL -- MIL6/25/2012 14:13:50 6/25/2012 14:19:36 707-- 1 1 COAL -- Harita Para6/25/2012 14:14:21 6/25/2012 14:22:24 714-- 1 1 COAL -- Harita Para6/25/2012 14:14:47 6/25/2012 14:24:35 817 1 1 COAL -- MIL6/25/2012 14:21:37 6/25/2012 14:26:26 812 1 1 COAL -- MIL6/25/2012 14:23:52 6/25/2012 14:28:49 705-- 1 1 COAL -- Harita Para6/25/2012 14:27:43 6/25/2012 14:31:24 815 1 1 COAL -- MIL6/25/2012 14:28:10 6/25/2012 14:33:42 855 1 1 COAL -- MIL6/25/2012 14:29:35 6/25/2012 14:34:47 708-- 1 1 COAL -- Harita Para6/25/2012 14:32:12 6/25/2012 14:37:07 832 1 1 COAL -- MIL6/25/2012 14:32:41 6/25/2012 14:40:06 706-- 1 1 COAL -- Harita Para6/25/2012 14:35:50 6/25/2012 14:40:51 709-- 1 1 COAL -- Harita Para6/25/2012 14:38:39 6/25/2012 14:46:41 853 1 1 COAL -- MIL6/25/2012 14:39:03 6/25/2012 14:46:05 703-- 1 1 COAL -- Harita Para6/25/2012 14:43:00 6/25/2012 14:50:48 818 1 1 COAL -- MIL6/25/2012 14:43:40 6/25/2012 14:53:05 712-- 1 1 COAL -- Harita Para6/25/2012 14:52:02 6/25/2012 15:00:36 710-- 1 1 COAL -- Harita Para6/25/2012 15:04:59 6/25/2012 15:09:52 113 1 1 COAL -- Harita Para6/25/2012 15:10:51 6/25/2012 15:15:09 701-- 1 1 COAL -- Harita Para6/25/2012 15:11:18 6/25/2012 15:16:27 711-- 1 1 COAL -- Harita Para6/25/2012 15:14:01 6/25/2012 15:17:41 851 1 1 COAL -- MIL6/25/2012 15:16:01 6/25/2012 15:19:38 831 1 1 COAL -- MIL6/25/2012 15:17:10 6/25/2012 15:21:30 713-- 1 1 COAL -- Harita Para6/25/2012 15:18:38 6/25/2012 15:23:08 115 1 1 COAL -- Harita Para6/25/2012 15:27:11 6/25/2012 15:31:10 810 1 1 COAL -- MIL6/25/2012 15:28:03 6/25/2012 15:33:48 836 1 1 COAL -- MIL6/25/2012 15:28:26 6/25/2012 15:35:45 704-- 1 1 COAL -- Harita Para6/25/2012 15:33:13 6/25/2012 15:37:30 819 1 1 COAL -- MIL6/25/2012 15:51:36 6/25/2012 15:55:28 708-- 1 1 COAL -- Harita Para6/25/2012 15:53:12 6/25/2012 16:02:45 852 1 2 COAL -- MIL6/25/2012 15:56:51 6/25/2012 16:01:17 705-- 1 2 COAL -- Harita Para6/25/2012 15:58:16 6/25/2012 16:02:50 855 1 2 COAL -- MIL6/25/2012 16:00:37 6/25/2012 16:06:23 714-- 2 2 COAL -- Harita Para

Page 100: June Per Shift (Truckscale Port)

6/25/2012 16:02:09 6/25/2012 16:06:26 706-- 2 2 COAL -- Harita Para6/25/2012 16:03:46 6/25/2012 16:10:27 707-- 2 2 COAL -- Harita Para6/25/2012 16:09:43 6/25/2012 16:14:09 812 2 2 COAL -- MIL6/25/2012 16:15:07 6/25/2012 16:21:13 712-- 2 2 COAL -- Harita Para6/25/2012 16:18:16 6/25/2012 16:24:20 853 2 2 COAL -- MIL6/25/2012 16:31:42 6/25/2012 16:35:53 817 2 2 COAL -- MIL6/25/2012 18:10:42 6/25/2012 18:16:51 714-- 2 2 COAL -- Harita Para6/25/2012 18:17:49 6/25/2012 18:22:03 705-- 2 2 COAL -- Harita Para6/25/2012 18:18:54 6/25/2012 18:23:26 708-- 2 2 COAL -- Harita Para6/25/2012 18:21:10 6/25/2012 18:24:50 706-- 2 2 COAL -- Harita Para6/25/2012 18:22:48 6/25/2012 18:27:51 707-- 2 2 COAL -- Harita Para6/25/2012 18:24:06 6/25/2012 18:29:32 709-- 2 2 COAL -- Harita Para6/25/2012 18:26:17 6/25/2012 18:29:46 710-- 2 2 COAL -- Harita Para6/25/2012 18:26:38 6/25/2012 18:32:17 113 2 2 COAL -- Harita Para6/25/2012 18:27:06 6/25/2012 18:34:03 712-- 2 2 COAL -- Harita Para6/25/2012 18:31:06 6/25/2012 18:36:22 711-- 2 2 COAL -- Harita Para6/25/2012 18:31:29 6/25/2012 18:41:33 713-- 2 2 COAL -- Harita Para6/25/2012 18:37:19 6/25/2012 18:43:55 115 2 2 COAL -- Harita Para6/25/2012 18:45:02 6/25/2012 18:49:39 701-- 2 2 COAL -- Harita Para6/25/2012 19:14:29 6/25/2012 19:18:01 702-- 2 2 COAL -- Harita Para6/25/2012 19:20:22 6/25/2012 19:24:18 839 2 2 COAL -- MIL6/25/2012 19:24:54 6/25/2012 19:30:38 811 2 2 COAL -- MIL6/25/2012 19:28:41 6/25/2012 19:35:16 853 2 2 COAL -- MIL6/25/2012 19:29:07 6/25/2012 19:35:19 852 2 2 COAL -- MIL6/25/2012 19:29:29 6/25/2012 19:36:52 855 2 2 COAL -- MIL6/25/2012 19:29:48 6/25/2012 19:37:36 819 2 2 COAL -- MIL6/25/2012 19:32:34 6/25/2012 19:37:40 815 2 2 COAL -- MIL6/25/2012 19:34:42 6/25/2012 19:40:10 812 2 2 COAL -- MIL6/25/2012 19:41:37 6/25/2012 19:45:36 817 2 2 COAL -- MIL6/25/2012 19:42:03 6/25/2012 19:46:09 714-- 2 2 COAL -- Harita Para6/25/2012 19:48:19 6/25/2012 19:51:22 705-- 2 2 COAL -- Harita Para6/25/2012 19:53:37 6/25/2012 19:58:11 708-- 2 2 COAL -- Harita Para6/25/2012 19:56:10 6/25/2012 19:58:14 707-- 2 2 COAL -- Harita Para6/25/2012 19:59:05 6/25/2012 20:02:55 710-- 2 2 COAL -- Harita Para6/25/2012 20:00:49 6/25/2012 20:05:16 856 2 2 COAL -- MIL6/25/2012 20:03:33 6/25/2012 20:07:56 709-- 2 2 COAL -- Harita Para6/25/2012 20:08:39 6/25/2012 20:13:11 113 2 2 COAL -- Harita Para6/25/2012 20:11:11 6/25/2012 20:15:32 836 2 2 COAL -- MIL6/25/2012 20:11:42 6/25/2012 20:17:55 818 2 2 COAL -- MIL6/25/2012 20:13:50 6/25/2012 20:19:43 711-- 2 2 COAL -- Harita Para6/25/2012 20:24:42 6/25/2012 20:29:37 837 2 2 COAL -- MIL6/25/2012 20:28:56 6/25/2012 20:39:18 701-- 2 2 COAL -- Harita Para6/25/2012 20:41:17 6/25/2012 20:46:46 830 2 2 COAL -- MIL6/25/2012 20:42:35 6/25/2012 20:49:41 832 2 2 COAL -- MIL6/25/2012 20:44:45 6/25/2012 20:50:02 115 2 2 COAL -- Harita Para6/25/2012 20:45:20 6/25/2012 20:53:35 702-- 2 2 COAL -- Harita Para6/25/2012 20:45:59 6/25/2012 20:53:38 712-- 2 2 COAL -- Harita Para6/25/2012 20:47:41 6/25/2012 20:56:04 706-- 2 2 COAL -- Harita Para6/25/2012 20:48:56 6/25/2012 20:58:08 809 2 2 COAL -- MIL6/25/2012 21:06:43 6/25/2012 21:10:22 705-- 2 2 COAL -- Harita Para

Page 101: June Per Shift (Truckscale Port)

6/25/2012 21:08:58 6/25/2012 21:13:48 853 2 2 COAL -- MIL6/25/2012 21:15:33 6/25/2012 21:19:25 714-- 2 2 COAL -- Harita Para6/25/2012 21:21:52 6/25/2012 21:27:16 852 2 2 COAL -- MIL6/25/2012 21:24:19 6/25/2012 21:28:51 710-- 2 2 COAL -- Harita Para6/25/2012 21:26:35 6/25/2012 21:28:48 839 2 2 COAL -- MIL6/25/2012 21:33:35 6/25/2012 21:38:21 708-- 2 2 COAL -- Harita Para6/25/2012 21:34:55 6/25/2012 21:40:13 812 2 2 COAL -- MIL6/25/2012 21:35:37 6/25/2012 21:42:28 113 2 2 COAL -- Harita Para6/25/2012 21:44:14 6/25/2012 21:50:31 707-- 2 2 COAL -- Harita Para6/25/2012 21:49:53 6/25/2012 21:58:42 855 2 2 COAL -- MIL6/25/2012 21:51:10 6/25/2012 21:57:06 709-- 2 2 COAL -- Harita Para6/25/2012 21:51:52 6/25/2012 21:58:47 856 2 2 COAL -- MIL6/25/2012 21:52:26 6/25/2012 22:01:53 819 2 2 COAL -- MIL6/25/2012 21:58:03 6/25/2012 22:01:55 811 2 2 COAL -- MIL6/25/2012 22:02:56 6/25/2012 22:07:15 713-- 2 2 COAL -- Harita Para6/25/2012 22:12:46 6/25/2012 22:17:11 711-- 2 2 COAL -- Harita Para6/25/2012 22:16:36 6/25/2012 22:20:51 702-- 2 2 COAL -- Harita Para6/25/2012 22:19:57 6/25/2012 22:24:00 817 2 2 COAL -- MIL6/25/2012 22:20:19 6/25/2012 22:26:56 701-- 2 2 COAL -- Harita Para6/25/2012 22:23:07 6/25/2012 22:27:00 706-- 2 2 COAL -- Harita Para6/25/2012 22:28:14 6/25/2012 22:33:17 815 2 2 COAL -- MIL6/25/2012 22:28:39 6/25/2012 22:35:58 705-- 2 2 COAL -- Harita Para6/25/2012 22:35:09 6/25/2012 22:40:03 712-- 2 2 COAL -- Harita Para6/25/2012 22:41:17 6/25/2012 22:46:04 836 2 2 COAL -- MIL6/25/2012 22:41:57 6/25/2012 22:47:51 818 2 2 COAL -- MIL6/25/2012 22:42:12 6/25/2012 22:49:49 714-- 2 2 COAL -- Harita Para6/25/2012 22:45:27 6/25/2012 22:51:41 809 2 2 COAL -- MIL6/25/2012 22:50:38 6/25/2012 22:54:25 710-- 2 2 COAL -- Harita Para6/25/2012 22:52:57 6/25/2012 22:57:21 837 2 2 COAL -- MIL6/25/2012 22:55:53 6/25/2012 23:00:18 115 2 2 COAL -- Harita Para6/25/2012 22:56:33 6/25/2012 23:01:47 853 2 2 COAL -- MIL6/25/2012 23:06:06 6/25/2012 23:11:27 113 2 2 COAL -- Harita Para6/25/2012 23:13:27 6/25/2012 23:19:39 830 2 2 COAL -- MIL6/25/2012 23:17:24 6/25/2012 23:22:05 708-- 2 2 COAL -- Harita Para6/25/2012 23:19:01 6/25/2012 23:24:07 852 2 2 COAL -- MIL6/25/2012 23:20:20 6/25/2012 23:26:08 707-- 2 2 COAL -- Harita Para6/25/2012 23:23:10 6/25/2012 23:28:28 812 2 2 COAL -- MIL6/25/2012 23:25:33 6/25/2012 23:32:19 811 2 2 COAL -- MIL6/25/2012 23:35:32 6/25/2012 23:40:33 709-- 2 2 COAL -- Harita Para6/25/2012 23:36:06 6/25/2012 23:41:49 856 2 2 COAL -- MIL6/25/2012 23:39:23 6/25/2012 23:43:40 819 2 2 COAL -- MIL6/25/2012 23:39:47 6/25/2012 23:45:58 702-- 2 2 COAL -- Harita Para6/25/2012 23:50:39 6/25/2012 23:55:44 713-- 2 2 COAL -- Harita Para6/25/2012 23:54:53 6/25/2012 23:59:06 705-- 2 2 COAL -- Harita Para6/26/2012 00:00:53 6/26/2012 00:05:31 711-- 3 3 COAL -- Harita Para6/26/2012 00:03:42 6/26/2012 00:08:07 817 3 3 COAL -- MIL6/26/2012 00:04:29 6/26/2012 00:10:56 701-- 3 3 COAL -- Harita Para6/26/2012 00:09:41 6/26/2012 00:18:21 815 3 3 COAL -- MIL6/26/2012 00:10:08 6/26/2012 00:23:48 855 3 3 COAL -- MIL6/26/2012 00:15:10 6/26/2012 00:25:30 710-- 3 3 COAL -- Harita Para

Page 102: June Per Shift (Truckscale Port)

6/26/2012 00:20:03 6/26/2012 00:25:39 706-- 3 3 COAL -- Harita Para6/26/2012 00:22:35 6/26/2012 00:29:10 839 3 3 COAL -- MIL6/26/2012 00:24:50 6/26/2012 00:29:14 836 3 3 COAL -- MIL6/26/2012 00:26:29 6/26/2012 00:31:45 714-- 3 3 COAL -- Harita Para6/26/2012 00:27:00 6/26/2012 00:34:35 818 3 3 COAL -- MIL6/26/2012 00:33:40 6/26/2012 00:42:19 712-- 3 3 COAL -- Harita Para6/26/2012 00:36:23 6/26/2012 00:42:22 113 3 3 COAL -- Harita Para6/26/2012 00:39:53 6/26/2012 00:44:12 837 3 3 COAL -- MIL6/26/2012 00:52:08 6/26/2012 00:57:03 853 3 3 COAL -- MIL6/26/2012 00:55:23 6/26/2012 00:58:47 830 3 3 COAL -- MIL6/26/2012 00:58:05 6/26/2012 01:02:58 811 3 3 COAL -- MIL6/26/2012 01:02:14 6/26/2012 01:08:34 809 3 3 COAL -- MIL6/26/2012 01:07:17 6/26/2012 01:11:53 115 3 3 COAL -- Harita Para6/26/2012 01:16:09 6/26/2012 01:23:18 852 3 3 COAL -- MIL6/26/2012 01:21:20 6/26/2012 01:25:04 705-- 3 3 COAL -- Harita Para6/26/2012 01:33:50 6/26/2012 01:38:36 701-- 3 3 COAL -- Harita Para6/26/2012 01:39:46 6/26/2012 01:43:50 713-- 3 3 COAL -- Harita Para6/26/2012 01:52:25 6/26/2012 01:57:56 707-- 3 3 COAL -- Harita Para6/26/2012 01:55:50 6/26/2012 01:57:59 706-- 3 3 COAL -- Harita Para6/26/2012 01:57:16 6/26/2012 01:59:24 702-- 3 3 COAL -- Harita Para6/26/2012 02:00:36 6/26/2012 02:03:56 856 3 3 COAL -- MIL6/26/2012 02:05:21 6/26/2012 02:10:01 839 3 3 COAL -- MIL6/26/2012 02:09:20 6/26/2012 02:14:37 708-- 3 3 COAL -- Harita Para6/26/2012 02:13:48 6/26/2012 02:17:59 817 3 3 COAL -- MIL6/26/2012 02:22:20 6/26/2012 02:27:04 837 3 3 COAL -- MIL6/26/2012 02:23:04 6/26/2012 02:27:10 830 3 3 COAL -- MIL6/26/2012 02:31:58 6/26/2012 02:36:00 818 3 3 COAL -- MIL6/26/2012 02:44:10 6/26/2012 02:50:19 855 3 3 COAL -- MIL6/26/2012 02:44:54 6/26/2012 02:51:20 115 3 3 COAL -- Harita Para6/26/2012 02:45:29 6/26/2012 02:51:24 705-- 3 3 COAL -- Harita Para6/26/2012 02:55:46 6/26/2012 03:00:27 809 3 3 COAL -- MIL6/26/2012 02:56:10 6/26/2012 03:01:07 711-- 3 3 COAL -- Harita Para6/26/2012 02:58:34 6/26/2012 03:03:11 836 3 3 COAL -- MIL6/26/2012 02:59:01 6/26/2012 03:03:24 113 3 3 COAL -- Harita Para6/26/2012 03:12:42 6/26/2012 03:17:09 709-- 3 3 COAL -- Harita Para6/26/2012 03:13:42 6/26/2012 03:19:20 812 3 3 COAL -- MIL6/26/2012 03:14:10 6/26/2012 03:21:25 706-- 3 3 COAL -- Harita Para6/26/2012 03:14:59 6/26/2012 03:23:16 701-- 3 3 COAL -- Harita Para6/26/2012 03:24:50 6/26/2012 03:29:21 713-- 3 3 COAL -- Harita Para6/26/2012 03:31:03 6/26/2012 03:35:43 815 3 3 COAL -- MIL6/26/2012 04:03:03 6/26/2012 04:07:29 705-- 3 3 COAL -- Harita Para6/26/2012 04:06:38 6/26/2012 04:10:17 830 3 3 COAL -- MIL6/26/2012 07:17:31 6/26/2012 07:21:57 711-- 3 3 COAL -- Harita Para6/26/2012 07:19:52 6/26/2012 07:22:00 707-- 3 3 COAL -- Harita Para6/26/2012 07:20:10 6/26/2012 07:22:03 705-- 3 3 COAL -- Harita Para6/26/2012 07:22:56 6/26/2012 07:24:44 713-- 3 3 COAL -- Harita Para6/26/2012 07:23:54 6/26/2012 07:24:48 709-- 3 3 COAL -- Harita Para6/26/2012 07:27:52 6/26/2012 07:41:35 115 3 3 COAL -- Harita Para6/26/2012 07:30:08 6/26/2012 07:41:38 701-- 3 3 COAL -- Harita Para6/26/2012 07:30:44 6/26/2012 07:41:40 710-- 3 3 COAL -- Harita Para

Page 103: June Per Shift (Truckscale Port)

6/26/2012 07:31:17 6/26/2012 07:43:10 712-- 3 3 COAL -- Harita Para6/26/2012 07:35:42 6/26/2012 07:43:13 714-- 3 3 COAL -- Harita Para6/26/2012 07:40:49 6/26/2012 07:43:15 703-- 3 3 COAL -- Harita Para6/26/2012 07:43:54 6/26/2012 07:45:18 706-- 3 3 COAL -- Harita Para6/26/2012 08:30:50 6/26/2012 08:34:53 113 1 1 COAL -- Harita Para6/26/2012 08:38:11 6/26/2012 08:43:43 705-- 1 1 COAL -- Harita Para6/26/2012 08:42:09 6/26/2012 08:48:34 855 1 1 COAL -- MIL6/26/2012 08:42:44 6/26/2012 08:49:37 812 1 1 COAL -- MIL6/26/2012 08:44:36 6/26/2012 08:53:30 852 1 1 COAL -- MIL6/26/2012 08:45:47 6/26/2012 08:53:08 817 1 1 COAL -- MIL6/26/2012 08:46:08 6/26/2012 08:54:58 815 1 1 COAL -- MIL6/26/2012 08:46:35 6/26/2012 09:00:47 707-- 1 1 COAL -- Harita Para6/26/2012 08:47:02 6/26/2012 09:03:54 853 1 1 COAL -- MIL6/26/2012 08:58:47 6/26/2012 09:04:22 713-- 1 1 COAL -- Harita Para6/26/2012 09:02:52 6/26/2012 09:06:25 839 1 1 COAL -- MIL6/26/2012 09:06:59 6/26/2012 09:11:50 709-- 1 1 COAL -- Harita Para6/26/2012 09:10:18 6/26/2012 09:16:33 115 1 1 COAL -- Harita Para6/26/2012 09:13:33 6/26/2012 09:18:20 710-- 1 1 COAL -- Harita Para6/26/2012 09:15:18 6/26/2012 09:20:13 711-- 1 1 COAL -- Harita Para6/26/2012 09:15:41 6/26/2012 09:22:14 702-- 1 1 COAL -- Harita Para6/26/2012 09:19:37 6/26/2012 09:26:24 701-- 1 1 COAL -- Harita Para6/26/2012 09:25:43 6/26/2012 09:29:43 714-- 1 1 COAL -- Harita Para6/26/2012 09:27:49 6/26/2012 09:32:17 703-- 1 1 COAL -- Harita Para6/26/2012 09:31:34 6/26/2012 09:35:37 706-- 1 1 COAL -- Harita Para6/26/2012 09:44:02 6/26/2012 09:48:12 712-- 1 1 COAL -- Harita Para6/26/2012 09:44:27 6/26/2012 09:49:50 856 1 1 COAL -- MIL6/26/2012 10:00:53 6/26/2012 10:04:41 113 1 1 COAL -- Harita Para6/26/2012 10:01:14 6/26/2012 10:09:18 705-- 1 1 COAL -- Harita Para6/26/2012 10:06:31 6/26/2012 10:10:58 868 1 1 COAL -- MIL6/26/2012 10:21:12 6/26/2012 10:27:01 855 1 1 COAL -- MIL6/26/2012 10:21:43 6/26/2012 10:28:00 812 1 1 COAL -- MIL6/26/2012 10:23:28 6/26/2012 10:29:38 707-- 1 1 COAL -- Harita Para6/26/2012 10:31:59 6/26/2012 10:37:08 852 1 1 COAL -- MIL6/26/2012 10:33:19 6/26/2012 10:38:42 709-- 1 1 COAL -- Harita Para6/26/2012 10:33:49 6/26/2012 10:40:21 832 1 1 COAL -- MIL6/26/2012 10:37:57 6/26/2012 10:42:59 817 1 1 COAL -- MIL6/26/2012 10:43:38 6/26/2012 10:47:14 711-- 1 1 COAL -- Harita Para6/26/2012 10:44:39 6/26/2012 10:49:00 115 1 1 COAL -- Harita Para6/26/2012 10:52:00 6/26/2012 10:57:27 853 1 1 COAL -- MIL6/26/2012 10:53:10 6/26/2012 10:59:21 701-- 1 1 COAL -- Harita Para6/26/2012 10:55:02 6/26/2012 11:01:24 702-- 1 1 COAL -- Harita Para6/26/2012 10:58:32 6/26/2012 11:03:04 837 1 1 COAL -- MIL6/26/2012 11:00:52 6/26/2012 11:05:12 714-- 1 1 COAL -- Harita Para6/26/2012 11:11:19 6/26/2012 11:15:40 703-- 1 1 COAL -- Harita Para6/26/2012 11:16:25 6/26/2012 11:22:38 706-- 1 1 COAL -- Harita Para6/26/2012 11:21:25 6/26/2012 11:26:41 712-- 1 1 COAL -- Harita Para6/26/2012 11:21:48 6/26/2012 11:27:12 856 1 1 COAL -- MIL6/26/2012 11:35:27 6/26/2012 11:39:19 113 1 1 COAL -- Harita Para6/26/2012 11:35:59 6/26/2012 11:41:18 705-- 1 1 COAL -- Harita Para6/26/2012 11:43:08 6/26/2012 11:46:45 868 1 1 COAL -- MIL

Page 104: June Per Shift (Truckscale Port)

6/26/2012 11:50:01 6/26/2012 11:54:20 707-- 1 1 COAL -- Harita Para6/26/2012 11:53:10 6/26/2012 11:58:32 855 1 1 COAL -- MIL6/26/2012 11:53:40 6/26/2012 12:00:28 812 1 1 COAL -- MIL6/26/2012 11:56:52 6/26/2012 12:02:19 709-- 1 1 COAL -- Harita Para6/26/2012 11:59:56 6/26/2012 12:16:27 708-- 1 1 COAL -- Harita Para6/26/2012 12:09:33 6/26/2012 12:19:11 852 1 1 COAL -- MIL6/26/2012 12:10:36 6/26/2012 12:16:21 704-- 1 1 COAL -- Harita Para6/26/2012 12:18:30 6/26/2012 12:24:51 115 1 1 COAL -- Harita Para6/26/2012 12:24:15 6/26/2012 12:29:35 839 1 1 COAL -- MIL6/26/2012 12:49:03 6/26/2012 12:52:18 837 1 1 COAL -- MIL6/26/2012 12:56:42 6/26/2012 13:01:03 712-- 1 1 COAL -- Harita Para6/26/2012 12:58:46 6/26/2012 13:06:48 851 1 1 COAL -- MIL6/26/2012 12:59:09 6/26/2012 13:08:40 817 1 1 COAL -- MIL6/26/2012 13:04:11 6/26/2012 13:12:12 701-- 1 1 COAL -- Harita Para6/26/2012 13:04:27 6/26/2012 13:12:09 702-- 1 1 COAL -- Harita Para6/26/2012 13:05:42 6/26/2012 13:14:16 832 1 1 COAL -- MIL6/26/2012 13:06:08 6/26/2012 13:15:55 714-- 1 1 COAL -- Harita Para6/26/2012 13:07:34 6/26/2012 13:21:46 836 1 1 COAL -- MIL6/26/2012 13:07:57 6/26/2012 13:17:20 810 1 1 COAL -- MIL6/26/2012 13:13:13 6/26/2012 13:26:41 711-- 1 1 COAL -- Harita Para6/26/2012 13:19:56 6/26/2012 13:28:18 830 1 1 COAL -- MIL6/26/2012 13:21:03 6/26/2012 13:30:55 703-- 1 1 COAL -- Harita Para6/26/2012 13:25:48 6/26/2012 13:56:53 707-- 1 1 COAL -- Harita Para6/26/2012 13:26:08 6/26/2012 13:47:12 705-- 1 1 COAL -- Harita Para6/26/2012 13:29:50 6/26/2012 13:49:30 868 1 1 COAL -- MIL6/26/2012 13:33:12 6/26/2012 13:52:00 853 1 1 COAL -- MIL6/26/2012 13:36:21 6/26/2012 13:47:17 113 1 1 COAL -- Harita Para6/26/2012 13:52:54 6/26/2012 13:54:09 706-- 1 1 COAL -- Harita Para6/26/2012 13:53:24 6/26/2012 13:56:56 704-- 1 1 COAL -- Harita Para6/26/2012 13:57:48 6/26/2012 14:01:07 839 1 1 COAL -- MIL6/26/2012 14:07:04 6/26/2012 14:10:56 709-- 1 1 COAL -- Harita Para6/26/2012 14:24:03 6/26/2012 14:28:08 708-- 1 1 COAL -- Harita Para6/26/2012 14:29:07 6/26/2012 14:34:32 852 1 1 COAL -- MIL6/26/2012 14:29:38 6/26/2012 14:33:31 702-- 1 1 COAL -- Harita Para6/26/2012 14:39:13 6/26/2012 14:45:56 851 1 1 COAL -- MIL6/26/2012 14:42:27 6/26/2012 14:47:59 701-- 1 1 COAL -- Harita Para6/26/2012 14:44:41 6/26/2012 14:49:12 856 1 1 COAL -- MIL6/26/2012 14:45:19 6/26/2012 14:54:48 714-- 1 1 COAL -- Harita Para6/26/2012 14:51:26 6/26/2012 14:57:16 712-- 1 1 COAL -- Harita Para6/26/2012 14:52:37 6/26/2012 14:57:20 711-- 1 1 COAL -- Harita Para6/26/2012 15:07:33 6/26/2012 15:14:10 855 1 1 COAL -- MIL6/26/2012 15:11:49 6/26/2012 15:19:47 868 1 1 COAL -- MIL6/26/2012 15:13:17 6/26/2012 15:19:11 812 1 1 COAL -- MIL6/26/2012 15:16:43 6/26/2012 15:22:42 704-- 1 1 COAL -- Harita Para6/26/2012 15:20:37 6/26/2012 15:24:25 832 1 1 COAL -- MIL6/26/2012 15:20:53 6/26/2012 15:34:13 853 1 1 COAL -- MIL6/26/2012 15:21:29 6/26/2012 15:29:35 703-- 1 1 COAL -- Harita Para6/26/2012 15:21:48 6/26/2012 15:31:03 839 1 1 COAL -- MIL6/26/2012 15:27:58 6/26/2012 15:33:04 850 1 1 COAL -- MIL6/26/2012 15:28:21 6/26/2012 15:37:08 709-- 1 1 COAL -- Harita Para

Page 105: June Per Shift (Truckscale Port)

6/26/2012 15:38:03 6/26/2012 15:47:25 810 1 1 COAL -- MIL6/26/2012 15:39:10 6/26/2012 15:50:29 706-- 1 1 COAL -- Harita Para6/26/2012 15:49:52 6/26/2012 15:53:37 837 1 1 COAL -- MIL6/26/2012 15:51:08 6/26/2012 15:52:39 708-- 1 1 COAL -- Harita Para6/26/2012 16:00:21 6/26/2012 16:05:02 836 2 2 COAL -- MIL6/26/2012 16:01:07 6/26/2012 16:08:14 851 2 2 COAL -- MIL6/26/2012 16:05:42 6/26/2012 16:09:43 115 2 2 COAL -- Harita Para6/26/2012 16:13:05 6/26/2012 16:16:13 856 2 2 COAL -- MIL6/26/2012 18:13:27 6/26/2012 18:17:22 714-- 2 2 COAL -- Harita Para6/26/2012 18:18:55 6/26/2012 18:22:23 706-- 2 2 COAL -- Harita Para6/26/2012 18:23:49 6/26/2012 18:28:01 708-- 2 2 COAL -- Harita Para6/26/2012 18:24:19 6/26/2012 18:29:54 709-- 2 2 COAL -- Harita Para6/26/2012 18:24:37 6/26/2012 18:31:50 701-- 2 2 COAL -- Harita Para6/26/2012 18:35:24 6/26/2012 18:39:26 113 2 2 COAL -- Harita Para6/26/2012 18:37:09 6/26/2012 18:41:08 707-- 2 2 COAL -- Harita Para6/26/2012 18:44:52 6/26/2012 18:49:41 115 2 2 COAL -- Harita Para6/26/2012 18:45:23 6/26/2012 18:51:15 702-- 2 2 COAL -- Harita Para6/26/2012 18:45:53 6/26/2012 18:53:53 704-- 2 2 COAL -- Harita Para6/26/2012 18:46:13 6/26/2012 18:57:59 711-- 2 2 COAL -- Harita Para6/26/2012 18:48:49 6/26/2012 19:00:53 703-- 2 2 COAL -- Harita Para6/26/2012 19:07:53 6/26/2012 19:11:55 713-- 2 2 COAL -- Harita Para6/26/2012 19:12:52 6/26/2012 19:16:22 830 2 2 COAL -- MIL6/26/2012 19:27:58 6/26/2012 19:31:52 837 2 2 COAL -- MIL6/26/2012 19:32:33 6/26/2012 19:39:11 852 2 2 COAL -- MIL6/26/2012 19:33:42 6/26/2012 19:39:48 714-- 2 2 COAL -- Harita Para6/26/2012 19:35:04 6/26/2012 19:43:00 855 2 2 COAL -- MIL6/26/2012 19:37:28 6/26/2012 19:44:16 853 2 2 COAL -- MIL6/26/2012 19:38:10 6/26/2012 19:45:13 856 2 2 COAL -- MIL6/26/2012 19:52:00 6/26/2012 19:57:01 708-- 2 2 COAL -- Harita Para6/26/2012 19:57:57 6/26/2012 20:04:53 709-- 2 2 COAL -- Harita Para6/26/2012 19:58:53 6/26/2012 20:05:14 836 2 2 COAL -- MIL6/26/2012 19:59:21 6/26/2012 20:06:35 701-- 2 2 COAL -- Harita Para6/26/2012 20:02:41 6/26/2012 20:08:38 818 2 2 COAL -- MIL6/26/2012 20:03:10 6/26/2012 20:10:58 113 2 2 COAL -- Harita Para6/26/2012 20:04:13 6/26/2012 20:11:00 706-- 2 2 COAL -- Harita Para6/26/2012 20:09:15 6/26/2012 20:12:11 707-- 2 2 COAL -- Harita Para6/26/2012 20:11:35 6/26/2012 20:12:14 115 2 2 COAL -- Harita Para6/26/2012 20:19:45 6/26/2012 20:23:37 711-- 2 2 COAL -- Harita Para6/26/2012 20:25:17 6/26/2012 20:30:16 850 2 2 COAL -- MIL6/26/2012 20:26:54 6/26/2012 20:31:42 819 2 2 COAL -- MIL6/26/2012 20:29:16 6/26/2012 20:35:17 704-- 2 2 COAL -- Harita Para6/26/2012 20:33:46 6/26/2012 20:35:23 702-- 2 2 COAL -- Harita Para6/26/2012 20:34:34 6/26/2012 20:37:40 713-- 2 2 COAL -- Harita Para6/26/2012 20:42:06 6/26/2012 20:47:13 703-- 2 2 COAL -- Harita Para6/26/2012 20:53:43 6/26/2012 20:58:14 810 2 2 COAL -- MIL6/26/2012 21:04:14 6/26/2012 21:07:42 830 2 2 COAL -- MIL6/26/2012 21:04:34 6/26/2012 21:09:50 868 2 2 COAL -- MIL6/26/2012 21:12:37 6/26/2012 21:16:39 812 2 2 COAL -- MIL6/26/2012 21:23:42 6/26/2012 21:30:38 852 2 2 COAL -- MIL6/26/2012 21:23:58 6/26/2012 21:28:49 839 2 2 COAL -- MIL

Page 106: June Per Shift (Truckscale Port)

6/26/2012 21:24:44 6/26/2012 21:32:43 714-- 2 2 COAL -- Harita Para6/26/2012 21:27:10 6/26/2012 21:32:46 708-- 2 2 COAL -- Harita Para6/26/2012 21:29:29 6/26/2012 21:36:11 709-- 2 2 COAL -- Harita Para6/26/2012 21:34:13 6/26/2012 21:37:28 701-- 2 2 COAL -- Harita Para6/26/2012 21:35:04 6/26/2012 21:46:49 837 2 2 COAL -- MIL6/26/2012 21:35:26 6/26/2012 21:46:26 855 2 2 COAL -- MIL6/26/2012 21:38:06 6/26/2012 21:46:54 707-- 2 2 COAL -- Harita Para6/26/2012 21:38:28 6/26/2012 21:49:02 706-- 2 2 COAL -- Harita Para6/26/2012 21:38:52 6/26/2012 21:49:06 115 2 2 COAL -- Harita Para6/26/2012 21:42:21 6/26/2012 21:53:44 818 2 2 COAL -- MIL6/26/2012 21:45:19 6/26/2012 21:54:39 856 2 2 COAL -- MIL6/26/2012 21:45:42 6/26/2012 21:56:55 113 2 2 COAL -- Harita Para6/26/2012 21:48:17 6/26/2012 21:56:58 705-- 2 2 COAL -- Harita Para6/26/2012 21:52:53 6/26/2012 21:59:11 711-- 2 2 COAL -- Harita Para6/26/2012 21:58:23 6/26/2012 22:04:42 853 2 2 COAL -- MIL6/26/2012 22:01:29 6/26/2012 22:05:50 704-- 2 2 COAL -- Harita Para6/26/2012 22:02:06 6/26/2012 22:08:03 713-- 2 2 COAL -- Harita Para6/26/2012 22:03:31 6/26/2012 22:10:58 836 2 2 COAL -- MIL6/26/2012 22:04:06 6/26/2012 22:11:01 850 2 2 COAL -- MIL6/26/2012 22:16:14 6/26/2012 22:20:49 819 2 2 COAL -- MIL6/26/2012 22:41:00 6/26/2012 22:44:40 830 2 2 COAL -- MIL6/26/2012 22:45:34 6/26/2012 22:50:10 810 2 2 COAL -- MIL6/26/2012 22:49:26 6/26/2012 22:53:34 868 2 2 COAL -- MIL6/26/2012 22:58:38 6/26/2012 23:03:01 812 2 2 COAL -- MIL6/26/2012 23:07:47 6/26/2012 23:12:51 708-- 2 2 COAL -- Harita Para6/26/2012 23:08:43 6/26/2012 23:12:53 701-- 2 2 COAL -- Harita Para6/26/2012 23:09:12 6/26/2012 23:14:40 702-- 2 2 COAL -- Harita Para6/26/2012 23:12:05 6/26/2012 23:16:19 709-- 2 2 COAL -- Harita Para6/26/2012 23:13:38 6/26/2012 23:16:21 707-- 2 2 COAL -- Harita Para6/26/2012 23:22:24 6/26/2012 23:23:16 115 2 2 COAL -- Harita Para6/26/2012 23:26:22 6/26/2012 23:42:32 852 2 2 COAL -- MIL6/26/2012 23:26:40 6/26/2012 23:27:40 711-- 2 2 COAL -- Harita Para6/26/2012 23:28:54 6/26/2012 23:31:38 113 2 2 COAL -- Harita Para6/26/2012 23:39:46 6/26/2012 23:42:02 705-- 2 2 COAL -- Harita Para6/26/2012 23:40:24 6/26/2012 23:42:07 839 2 2 COAL -- MIL6/26/2012 23:44:17 6/27/2012 00:00:15 855 2 3 COAL -- MIL6/26/2012 23:47:35 6/27/2012 00:03:13 710-- 2 3 COAL -- Harita Para6/26/2012 23:48:01 6/27/2012 00:03:16 713-- 2 3 COAL -- Harita Para6/26/2012 23:50:24 6/27/2012 00:04:40 856 2 3 COAL -- MIL6/27/2012 00:02:27 6/27/2012 00:03:46 850 3 3 COAL -- MIL6/27/2012 00:07:57 6/27/2012 00:12:32 819 3 3 COAL -- MIL6/27/2012 00:10:25 6/27/2012 00:14:48 853 3 3 COAL -- MIL6/27/2012 00:10:47 6/27/2012 00:17:05 703-- 3 3 COAL -- Harita Para6/27/2012 00:36:04 6/27/2012 00:39:58 830 3 3 COAL -- MIL6/27/2012 00:38:12 6/27/2012 00:42:37 714-- 3 3 COAL -- Harita Para6/27/2012 00:38:31 6/27/2012 00:42:39 706-- 3 3 COAL -- Harita Para6/27/2012 00:40:53 6/27/2012 00:45:03 868 3 3 COAL -- MIL6/27/2012 01:01:12 6/27/2012 01:05:34 810 3 3 COAL -- MIL6/27/2012 01:03:55 6/27/2012 01:10:33 709-- 3 3 COAL -- Harita Para6/27/2012 01:08:39 6/27/2012 01:13:32 707-- 3 3 COAL -- Harita Para

Page 107: June Per Shift (Truckscale Port)

6/27/2012 01:09:04 6/27/2012 01:13:38 701-- 3 3 COAL -- Harita Para6/27/2012 01:09:46 6/27/2012 01:16:52 708-- 3 3 COAL -- Harita Para6/27/2012 01:11:46 6/27/2012 01:18:29 837 3 3 COAL -- MIL6/27/2012 01:14:57 6/27/2012 01:20:12 115 3 3 COAL -- Harita Para6/27/2012 01:17:32 6/27/2012 01:20:16 711-- 3 3 COAL -- Harita Para6/27/2012 01:26:43 6/27/2012 01:30:50 713-- 3 3 COAL -- Harita Para6/27/2012 01:33:32 6/27/2012 01:39:03 710-- 3 3 COAL -- Harita Para6/27/2012 02:11:49 6/27/2012 02:16:26 819 3 3 COAL -- MIL6/27/2012 02:12:45 6/27/2012 02:16:40 830 3 3 COAL -- MIL6/27/2012 02:14:42 6/27/2012 02:18:00 714-- 3 3 COAL -- Harita Para6/27/2012 02:15:06 6/27/2012 02:18:36 706-- 3 3 COAL -- Harita Para6/27/2012 02:27:10 6/27/2012 02:31:17 812 3 3 COAL -- MIL6/27/2012 02:27:48 6/27/2012 02:36:48 852 3 3 COAL -- MIL6/27/2012 02:35:00 6/27/2012 02:36:52 853 3 3 COAL -- MIL6/27/2012 02:40:32 6/27/2012 02:47:46 709-- 3 3 COAL -- Harita Para6/27/2012 02:46:04 6/27/2012 02:50:43 708-- 3 3 COAL -- Harita Para6/27/2012 02:46:28 6/27/2012 02:50:47 850 3 3 COAL -- MIL6/27/2012 02:46:55 6/27/2012 02:53:56 868 3 3 COAL -- MIL6/27/2012 02:48:51 6/27/2012 02:52:33 703-- 3 3 COAL -- Harita Para6/27/2012 02:51:50 6/27/2012 02:56:20 702-- 3 3 COAL -- Harita Para6/27/2012 02:55:22 6/27/2012 02:57:56 115 3 3 COAL -- Harita Para6/27/2012 02:57:05 6/27/2012 02:59:55 707-- 3 3 COAL -- Harita Para6/27/2012 03:01:16 6/27/2012 03:03:18 837 3 3 COAL -- MIL6/27/2012 03:04:38 6/27/2012 03:08:38 810 3 3 COAL -- MIL6/27/2012 03:04:59 6/27/2012 03:11:13 713-- 3 3 COAL -- Harita Para6/27/2012 03:05:38 6/27/2012 03:11:16 113 3 3 COAL -- Harita Para6/27/2012 03:10:24 6/27/2012 03:15:08 856 3 3 COAL -- MIL6/27/2012 03:30:58 6/27/2012 03:36:29 855 3 3 COAL -- MIL6/27/2012 03:49:17 6/27/2012 03:53:13 830 3 3 COAL -- MIL6/27/2012 04:01:36 6/27/2012 04:06:22 714-- 3 3 COAL -- Harita Para6/27/2012 04:02:15 6/27/2012 04:06:13 706-- 3 3 COAL -- Harita Para6/27/2012 04:05:32 6/27/2012 04:10:01 812 3 3 COAL -- MIL6/27/2012 07:19:57 6/27/2012 07:23:43 702-- 3 3 COAL -- Harita Para6/27/2012 07:23:07 6/27/2012 07:26:42 707-- 3 3 COAL -- Harita Para6/27/2012 07:24:27 6/27/2012 07:28:23 713-- 3 3 COAL -- Harita Para6/27/2012 07:27:27 6/27/2012 07:32:34 709-- 3 3 COAL -- Harita Para6/27/2012 07:37:20 6/27/2012 07:42:02 703-- 3 3 COAL -- Harita Para6/27/2012 07:44:11 6/27/2012 07:48:56 701-- 3 3 COAL -- Harita Para6/27/2012 07:45:16 6/27/2012 07:49:05 706-- 3 3 COAL -- Harita Para6/27/2012 07:46:34 6/27/2012 07:53:17 710-- 3 3 COAL -- Harita Para6/27/2012 07:47:15 6/27/2012 07:53:38 115 3 3 COAL -- Harita Para6/27/2012 07:50:10 6/27/2012 07:55:06 856 3 3 COAL -- MIL6/27/2012 07:50:39 6/27/2012 07:57:10 113 3 3 COAL -- Harita Para6/27/2012 07:54:32 6/27/2012 08:00:47 852 3 1 COAL -- MIL6/27/2012 07:55:48 6/27/2012 07:57:18 714-- 3 3 COAL -- Harita Para6/27/2012 07:56:35 6/27/2012 08:04:19 855 3 1 COAL -- MIL6/27/2012 07:58:26 6/27/2012 08:04:23 853 3 1 COAL -- MIL6/27/2012 07:58:54 6/27/2012 08:05:02 850 3 1 COAL -- MIL6/27/2012 07:59:27 6/27/2012 08:09:23 812 3 1 COAL -- MIL6/27/2012 08:20:23 6/27/2012 08:25:02 810 1 1 COAL -- MIL

Page 108: June Per Shift (Truckscale Port)

6/27/2012 08:42:33 6/27/2012 08:46:03 707-- 1 1 COAL -- Harita Para6/27/2012 08:49:14 6/27/2012 08:53:19 837 1 1 COAL -- MIL6/27/2012 08:49:26 6/27/2012 08:53:23 702 1 1 COAL -- Harita Para6/27/2012 08:54:42 6/27/2012 08:58:31 708-- 1 1 COAL -- Harita Para6/27/2012 09:02:16 6/27/2012 09:06:46 703-- 1 1 COAL -- Harita Para6/27/2012 09:07:31 6/27/2012 09:21:35 851 1 1 COAL -- MIL6/27/2012 09:08:07 6/27/2012 09:12:55 711-- 1 1 COAL -- Harita Para6/27/2012 09:11:19 6/27/2012 09:15:46 701-- 1 1 COAL -- Harita Para6/27/2012 09:18:16 6/27/2012 09:21:38 856 1 1 COAL -- MIL6/27/2012 09:19:05 6/27/2012 09:25:18 709-- 1 1 COAL -- Harita Para6/27/2012 09:22:50 6/27/2012 09:29:10 706-- 1 1 COAL -- Harita Para6/27/2012 09:31:22 6/27/2012 09:36:24 710-- 1 1 COAL -- Harita Para6/27/2012 09:31:38 6/27/2012 09:36:54 713-- 1 1 COAL -- Harita Para6/27/2012 09:32:49 6/27/2012 09:40:45 113 1 1 COAL -- Harita Para6/27/2012 09:33:53 6/27/2012 09:43:00 855 1 1 COAL -- MIL6/27/2012 09:35:31 6/27/2012 09:43:28 852 1 1 COAL -- MIL6/27/2012 09:37:32 6/27/2012 09:44:12 868 1 1 COAL -- MIL6/27/2012 09:39:38 6/27/2012 09:44:49 850 1 1 COAL -- MIL6/27/2012 09:42:07 6/27/2012 10:02:36 714-- 1 1 COAL -- Harita Para6/27/2012 09:48:46 6/27/2012 10:04:07 115 1 1 COAL -- Harita Para6/27/2012 09:52:55 6/27/2012 10:07:11 830 1 1 COAL -- MIL6/27/2012 09:53:20 6/27/2012 10:07:49 853 1 1 COAL -- MIL6/27/2012 10:00:38 6/27/2012 10:11:45 812 1 1 COAL -- MIL6/27/2012 10:01:19 6/27/2012 10:12:08 707-- 1 1 COAL -- Harita Para6/27/2012 10:03:22 6/27/2012 10:14:18 810 1 1 COAL -- MIL6/27/2012 10:09:32 6/27/2012 10:14:45 702-- 1 1 COAL -- Harita Para6/27/2012 10:10:46 6/27/2012 10:16:35 819 1 1 COAL -- MIL6/27/2012 10:23:14 6/27/2012 10:26:46 708-- 1 1 COAL -- Harita Para6/27/2012 10:26:11 6/27/2012 10:30:15 703-- 1 1 COAL -- Harita Para6/27/2012 10:32:25 6/27/2012 10:36:39 701-- 1 1 COAL -- Harita Para6/27/2012 10:39:03 6/27/2012 10:52:49 711-- 1 1 COAL -- Harita Para6/27/2012 10:51:17 6/27/2012 10:57:06 706-- 1 1 COAL -- Harita Para6/27/2012 10:51:55 6/27/2012 10:59:04 709-- 1 1 COAL -- Harita Para6/27/2012 10:55:05 6/27/2012 11:00:43 856 1 1 COAL -- MIL6/27/2012 11:01:46 6/27/2012 11:06:18 811 1 1 COAL -- MIL6/27/2012 11:02:19 6/27/2012 11:08:42 713-- 1 1 COAL -- Harita Para6/27/2012 11:08:02 6/27/2012 11:12:04 113 1 1 COAL -- Harita Para6/27/2012 11:14:14 6/27/2012 11:19:49 852 1 1 COAL -- MIL6/27/2012 11:16:46 6/27/2012 11:20:18 710-- 1 1 COAL -- Harita Para6/27/2012 11:27:07 6/27/2012 11:30:50 850 1 1 COAL -- MIL6/27/2012 11:27:42 6/27/2012 11:34:11 714-- 1 1 COAL -- Harita Para6/27/2012 11:28:08 6/27/2012 11:35:11 707-- 1 1 COAL -- Harita Para6/27/2012 11:32:38 6/27/2012 11:37:06 837 1 1 COAL -- MIL6/27/2012 11:33:05 6/27/2012 11:40:14 810 1 1 COAL -- MIL6/27/2012 11:33:26 6/27/2012 11:40:40 702-- 1 1 COAL -- Harita Para6/27/2012 11:38:45 6/27/2012 11:42:54 115 1 1 COAL -- Harita Para6/27/2012 11:42:17 6/27/2012 11:46:58 812 1 1 COAL -- MIL6/27/2012 11:47:33 6/27/2012 11:51:12 708-- 1 1 COAL -- Harita Para6/27/2012 11:47:57 6/27/2012 11:55:00 853 1 1 COAL -- MIL6/27/2012 11:51:46 6/27/2012 11:56:24 703-- 1 1 COAL -- Harita Para

Page 109: June Per Shift (Truckscale Port)

6/27/2012 11:54:18 6/27/2012 11:59:09 701-- 1 1 COAL -- Harita Para6/27/2012 12:00:24 6/27/2012 12:04:41 830 1 1 COAL -- MIL6/27/2012 12:03:13 6/27/2012 12:08:57 855 1 1 COAL -- MIL6/27/2012 12:05:34 6/27/2012 12:09:44 836 1 1 COAL -- MIL6/27/2012 12:06:00 6/27/2012 12:12:22 868 1 1 COAL -- MIL6/27/2012 12:08:24 6/27/2012 12:13:42 819 1 1 COAL -- MIL6/27/2012 12:20:02 6/27/2012 12:25:05 711-- 1 1 COAL -- Harita Para6/27/2012 12:22:53 6/27/2012 13:02:24 851 1 1 COAL -- MIL6/27/2012 12:23:47 6/27/2012 12:32:42 709-- 1 1 COAL -- Harita Para6/27/2012 12:30:24 6/27/2012 12:34:48 839 1 1 COAL -- MIL6/27/2012 12:31:07 6/27/2012 12:37:09 706-- 1 1 COAL -- Harita Para6/27/2012 12:33:43 6/27/2012 12:39:29 113 1 1 COAL -- Harita Para6/27/2012 12:36:27 6/27/2012 12:41:39 818 1 1 COAL -- MIL6/27/2012 12:40:48 6/27/2012 12:47:16 811 1 1 COAL -- MIL6/27/2012 12:48:01 6/27/2012 13:02:22 852 1 1 COAL -- MIL6/27/2012 12:50:29 6/27/2012 12:54:10 707-- 1 1 COAL -- Harita Para6/27/2012 13:01:11 6/27/2012 13:06:01 817 1 1 COAL -- MIL6/27/2012 13:01:37 6/27/2012 13:07:54 713-- 1 1 COAL -- Harita Para6/27/2012 13:12:28 6/27/2012 13:19:25 714-- 1 1 COAL -- Harita Para6/27/2012 13:12:48 6/27/2012 13:19:27 115 1 1 COAL -- Harita Para6/27/2012 13:25:19 6/27/2012 13:29:32 710-- 1 1 COAL -- Harita Para6/27/2012 13:31:00 6/27/2012 13:35:41 850 1 1 COAL -- MIL6/27/2012 13:35:04 6/27/2012 13:38:57 702-- 1 1 COAL -- Harita Para6/27/2012 13:37:30 6/27/2012 13:41:09 708-- 1 1 COAL -- Harita Para6/27/2012 13:43:51 6/27/2012 13:48:44 701-- 1 1 COAL -- Harita Para6/27/2012 13:52:39 6/27/2012 13:57:27 703-- 1 1 COAL -- Harita Para6/27/2012 14:05:12 6/27/2012 14:09:04 706-- 1 1 COAL -- Harita Para6/27/2012 14:05:32 6/27/2012 14:10:53 711-- 1 1 COAL -- Harita Para6/27/2012 14:13:06 6/27/2012 14:19:11 818 1 1 COAL -- MIL6/27/2012 14:18:32 6/27/2012 14:22:45 113 1 1 COAL -- Harita Para6/27/2012 14:20:50 6/27/2012 14:25:04 868 1 1 COAL -- MIL6/27/2012 14:29:11 6/27/2012 14:33:29 707-- 1 1 COAL -- Harita Para6/27/2012 14:31:48 6/27/2012 14:42:28 852 1 1 COAL -- MIL6/27/2012 14:32:08 6/27/2012 14:36:25 713-- 1 1 COAL -- Harita Para6/27/2012 14:34:19 6/27/2012 14:40:10 817 1 1 COAL -- MIL6/27/2012 14:35:29 6/27/2012 14:43:37 810 1 1 COAL -- MIL6/27/2012 14:50:45 6/27/2012 14:55:12 115 1 1 COAL -- Harita Para6/27/2012 14:51:38 6/27/2012 14:58:36 811 1 1 COAL -- MIL6/27/2012 14:52:25 6/27/2012 15:00:04 714-- 1 1 COAL -- Harita Para6/27/2012 14:52:50 6/27/2012 15:01:55 702-- 1 1 COAL -- Harita Para6/27/2012 14:57:44 6/27/2012 15:04:58 709-- 1 1 COAL -- Harita Para6/27/2012 14:59:21 6/27/2012 15:06:53 839 1 1 COAL -- MIL6/27/2012 15:06:05 6/27/2012 15:11:23 710-- 1 1 COAL -- Harita Para6/27/2012 15:09:27 6/27/2012 15:15:21 701-- 1 1 COAL -- Harita Para6/27/2012 15:14:34 6/27/2012 15:21:22 812 1 1 COAL -- MIL6/27/2012 15:15:58 6/27/2012 15:22:52 708-- 1 1 COAL -- Harita Para6/27/2012 15:18:40 6/27/2012 15:25:33 703-- 1 1 COAL -- Harita Para6/27/2012 15:26:23 6/27/2012 15:30:34 837 1 1 COAL -- MIL6/27/2012 15:28:43 6/27/2012 15:33:26 850 1 1 COAL -- MIL6/27/2012 15:31:29 6/27/2012 15:37:00 853 1 1 COAL -- MIL

Page 110: June Per Shift (Truckscale Port)

6/27/2012 15:31:54 6/27/2012 15:39:04 706-- 1 1 COAL -- Harita Para6/27/2012 15:35:48 6/27/2012 15:41:28 830 1 1 COAL -- MIL6/27/2012 15:36:27 6/27/2012 15:43:07 855 1 1 COAL -- MIL6/27/2012 15:40:39 6/27/2012 15:46:03 711-- 1 1 COAL -- Harita Para6/27/2012 15:44:50 6/27/2012 15:49:36 819 1 1 COAL -- MIL6/27/2012 15:52:51 6/27/2012 15:57:32 113 1 1 COAL -- Harita Para6/27/2012 16:00:32 6/27/2012 16:04:34 707-- 2 2 COAL -- Harita Para6/27/2012 16:03:49 6/27/2012 16:08:17 713-- 2 2 COAL -- Harita Para6/27/2012 16:07:26 6/27/2012 16:11:45 868 2 2 COAL -- MIL6/27/2012 16:16:54 6/27/2012 16:20:42 856 2 2 COAL -- MIL6/27/2012 16:22:41 6/27/2012 16:27:08 817 2 2 COAL -- MIL6/27/2012 18:19:43 6/27/2012 18:24:35 713-- 2 2 COAL -- Harita Para6/27/2012 18:23:56 6/27/2012 18:27:41 714-- 2 2 COAL -- Harita Para6/27/2012 18:29:01 6/27/2012 18:33:56 710-- 2 2 COAL -- Harita Para6/27/2012 18:30:17 6/27/2012 18:35:10 708-- 2 2 COAL -- Harita Para6/27/2012 18:32:15 6/27/2012 18:37:14 115 2 2 COAL -- Harita Para6/27/2012 18:32:42 6/27/2012 18:38:32 707-- 2 2 COAL -- Harita Para6/27/2012 18:33:00 6/27/2012 18:39:13 701-- 2 2 COAL -- Harita Para6/27/2012 18:33:23 6/27/2012 18:41:11 113 2 2 COAL -- Harita Para6/27/2012 18:43:36 6/27/2012 18:48:10 706-- 2 2 COAL -- Harita Para6/27/2012 18:44:12 6/27/2012 18:55:10 709-- 2 2 COAL -- Harita Para6/27/2012 18:51:22 6/27/2012 18:57:15 703-- 2 2 COAL -- Harita Para6/27/2012 18:51:53 6/27/2012 18:58:53 702-- 2 2 COAL -- Harita Para6/27/2012 18:52:15 6/27/2012 19:01:12 711-- 2 2 COAL -- Harita Para6/27/2012 19:14:41 6/27/2012 19:19:11 712-- 2 2 COAL -- Harita Para6/27/2012 19:25:52 6/27/2012 19:29:39 850 2 2 COAL -- MIL6/27/2012 19:34:38 6/27/2012 19:38:48 837 2 2 COAL -- MIL6/27/2012 19:35:44 6/27/2012 19:40:52 810 2 2 COAL -- MIL6/27/2012 19:36:32 6/27/2012 19:41:41 819 2 2 COAL -- MIL6/27/2012 19:37:46 6/27/2012 19:47:24 855 2 2 COAL -- MIL6/27/2012 19:39:20 6/27/2012 19:46:10 830 2 2 COAL -- MIL6/27/2012 19:42:19 6/27/2012 19:46:45 713-- 2 2 COAL -- Harita Para6/27/2012 19:43:09 6/27/2012 19:48:44 868 2 2 COAL -- MIL6/27/2012 19:43:54 6/27/2012 19:49:06 853 2 2 COAL -- MIL6/27/2012 19:44:14 6/27/2012 19:50:28 852 2 2 COAL -- MIL6/27/2012 19:48:02 6/27/2012 19:51:54 714-- 2 2 COAL -- Harita Para6/27/2012 19:49:52 6/27/2012 19:54:28 812 2 2 COAL -- MIL6/27/2012 19:56:35 6/27/2012 20:05:02 839 2 2 COAL -- MIL6/27/2012 19:59:38 6/27/2012 20:09:23 818 2 2 COAL -- MIL6/27/2012 20:00:02 6/27/2012 20:05:22 113 2 2 COAL -- Harita Para6/27/2012 20:00:28 6/27/2012 20:05:45 811 2 2 COAL -- MIL6/27/2012 20:02:34 6/27/2012 20:07:27 710-- 2 2 COAL -- Harita Para6/27/2012 20:03:17 6/27/2012 20:09:19 817 2 2 COAL -- MIL6/27/2012 20:08:23 6/27/2012 20:16:40 707-- 2 2 COAL -- Harita Para6/27/2012 20:14:53 6/27/2012 20:19:10 708-- 2 2 COAL -- Harita Para6/27/2012 20:15:11 6/27/2012 20:20:25 702-- 2 2 COAL -- Harita Para6/27/2012 20:31:26 6/27/2012 20:36:35 815 2 2 COAL -- MIL6/27/2012 20:31:55 6/27/2012 20:41:16 709-- 2 2 COAL -- Harita Para6/27/2012 20:34:10 6/27/2012 20:47:39 115 2 2 COAL -- Harita Para6/27/2012 20:35:38 6/27/2012 20:49:32 706-- 2 2 COAL -- Harita Para

Page 111: June Per Shift (Truckscale Port)

6/27/2012 20:39:10 6/27/2012 20:52:50 711-- 2 2 COAL -- Harita Para6/27/2012 20:46:02 6/27/2012 20:55:01 832 2 2 COAL -- MIL6/27/2012 20:52:07 6/27/2012 20:58:04 703-- 2 2 COAL -- Harita Para6/27/2012 20:57:10 6/27/2012 21:02:01 712-- 2 2 COAL -- Harita Para6/27/2012 20:58:41 6/27/2012 21:03:18 713-- 2 2 COAL -- Harita Para6/27/2012 21:01:12 6/27/2012 21:04:46 850 2 2 COAL -- MIL6/27/2012 21:12:05 6/27/2012 21:16:11 810 2 2 COAL -- MIL6/27/2012 21:19:13 6/27/2012 21:23:34 113 2 2 COAL -- Harita Para6/27/2012 21:21:27 6/27/2012 21:25:21 837 2 2 COAL -- MIL6/27/2012 21:30:02 6/27/2012 21:34:26 819 2 2 COAL -- MIL6/27/2012 21:32:42 6/27/2012 21:36:34 714-- 2 2 COAL -- Harita Para6/27/2012 21:33:45 6/27/2012 21:38:49 830 2 2 COAL -- MIL6/27/2012 21:39:33 6/27/2012 21:42:51 710-- 2 2 COAL -- Harita Para6/27/2012 21:40:16 6/27/2012 21:48:50 855 2 2 COAL -- MIL6/27/2012 21:44:22 6/27/2012 21:49:05 702-- 2 2 COAL -- Harita Para6/27/2012 21:47:05 6/27/2012 21:50:42 707-- 2 2 COAL -- Harita Para6/27/2012 21:48:12 6/27/2012 21:53:54 839 2 2 COAL -- MIL6/27/2012 21:56:25 6/27/2012 22:00:34 868 2 2 COAL -- MIL6/27/2012 21:59:08 6/27/2012 22:03:48 853 2 2 COAL -- MIL6/27/2012 21:59:50 6/27/2012 22:05:56 708-- 2 2 COAL -- Harita Para6/27/2012 22:07:23 6/27/2012 22:16:18 852 2 2 COAL -- MIL6/27/2012 22:14:03 6/27/2012 22:17:58 812 2 2 COAL -- MIL6/27/2012 22:14:36 6/27/2012 22:19:12 115 2 2 COAL -- Harita Para6/27/2012 22:14:55 6/27/2012 22:20:12 713-- 2 2 COAL -- Harita Para6/27/2012 22:15:18 6/27/2012 22:22:45 704-- 2 2 COAL -- Harita Para6/27/2012 22:21:16 6/27/2012 22:25:10 818 2 2 COAL -- MIL6/27/2012 22:26:18 6/27/2012 22:30:22 711-- 2 2 COAL -- Harita Para6/27/2012 22:38:53 6/27/2012 22:42:39 817 2 2 COAL -- MIL6/27/2012 22:40:57 6/27/2012 22:42:36 811 2 2 COAL -- MIL6/27/2012 22:48:04 6/27/2012 22:54:29 709-- 2 2 COAL -- Harita Para6/27/2012 22:48:30 6/27/2012 22:58:32 113 2 2 COAL -- Harita Para6/27/2012 22:49:02 6/27/2012 22:57:39 850 2 2 COAL -- MIL6/27/2012 22:53:51 6/27/2012 23:02:07 703-- 2 2 COAL -- Harita Para6/27/2012 23:01:18 6/27/2012 23:05:19 712-- 2 2 COAL -- Harita Para6/27/2012 23:06:59 6/27/2012 23:13:31 710-- 2 2 COAL -- Harita Para6/27/2012 23:11:01 6/27/2012 23:16:08 815 2 2 COAL -- MIL6/27/2012 23:11:36 6/27/2012 23:19:08 706-- 2 2 COAL -- Harita Para6/27/2012 23:12:18 6/27/2012 23:21:28 810 2 2 COAL -- MIL6/27/2012 23:12:56 6/27/2012 23:23:38 702-- 2 2 COAL -- Harita Para6/27/2012 23:20:51 6/27/2012 23:26:18 819 2 2 COAL -- MIL6/27/2012 23:24:28 6/27/2012 23:28:58 701-- 2 2 COAL -- Harita Para6/27/2012 23:24:54 6/27/2012 23:37:25 707-- 2 2 COAL -- Harita Para6/27/2012 23:33:00 6/27/2012 23:37:29 714-- 2 2 COAL -- Harita Para6/27/2012 23:33:21 6/27/2012 23:39:25 713-- 2 2 COAL -- Harita Para6/27/2012 23:36:47 6/27/2012 23:46:32 855 2 2 COAL -- MIL6/27/2012 23:45:54 6/27/2012 23:50:26 853 2 2 COAL -- MIL6/27/2012 23:51:27 6/27/2012 23:56:17 708-- 2 2 COAL -- Harita Para6/27/2012 23:54:37 6/28/2012 00:01:42 852 2 3 COAL -- MIL6/27/2012 23:58:29 6/28/2012 00:02:43 704-- 2 3 COAL -- Harita Para6/28/2012 00:05:04 6/28/2012 00:10:21 711-- 3 3 COAL -- Harita Para

Page 112: June Per Shift (Truckscale Port)

6/28/2012 00:09:31 6/28/2012 00:16:37 832 3 3 COAL -- MIL6/28/2012 00:12:59 6/28/2012 00:16:41 830 3 3 COAL -- MIL6/28/2012 00:15:36 6/28/2012 00:19:55 818 3 3 COAL -- MIL6/28/2012 00:19:12 6/28/2012 00:23:00 837 3 3 COAL -- MIL6/28/2012 00:23:42 6/28/2012 00:28:05 113 3 3 COAL -- Harita Para6/28/2012 00:35:10 6/28/2012 00:38:48 811 3 3 COAL -- MIL6/28/2012 00:36:41 6/28/2012 00:42:35 850 3 3 COAL -- MIL6/28/2012 00:37:16 6/28/2012 00:43:29 839 3 3 COAL -- MIL6/28/2012 00:41:44 6/28/2012 00:49:17 710-- 3 3 COAL -- Harita Para6/28/2012 00:44:17 6/28/2012 00:50:41 712-- 3 3 COAL -- Harita Para6/28/2012 00:48:42 6/28/2012 00:52:54 701-- 3 3 COAL -- Harita Para6/28/2012 00:53:32 6/28/2012 00:57:57 810 3 3 COAL -- MIL6/28/2012 00:58:35 6/28/2012 01:02:54 713-- 3 3 COAL -- Harita Para6/28/2012 01:00:47 6/28/2012 01:07:43 709-- 3 3 COAL -- Harita Para6/28/2012 01:02:08 6/28/2012 01:07:47 703-- 3 3 COAL -- Harita Para6/28/2012 01:06:10 6/28/2012 01:09:34 702-- 3 3 COAL -- Harita Para6/28/2012 01:10:43 6/28/2012 01:14:11 707-- 3 3 COAL -- Harita Para6/28/2012 01:11:04 6/28/2012 01:16:15 714-- 3 3 COAL -- Harita Para6/28/2012 01:13:02 6/28/2012 01:18:13 868 3 3 COAL -- MIL6/28/2012 01:19:06 6/28/2012 01:26:29 855 3 3 COAL -- MIL6/28/2012 01:25:33 6/28/2012 01:30:15 853 3 3 COAL -- MIL6/28/2012 01:31:55 6/28/2012 01:37:22 852 3 3 COAL -- MIL6/28/2012 01:32:18 6/28/2012 01:41:22 812 3 3 COAL -- MIL6/28/2012 01:39:53 6/28/2012 01:47:03 704-- 3 3 COAL -- Harita Para6/28/2012 01:53:29 6/28/2012 01:58:18 708-- 3 3 COAL -- Harita Para6/28/2012 01:54:00 6/28/2012 02:00:46 113 3 3 COAL -- Harita Para6/28/2012 02:10:29 6/28/2012 02:14:12 830 3 3 COAL -- MIL6/28/2012 02:13:35 6/28/2012 02:17:33 810 3 3 COAL -- MIL6/28/2012 02:15:20 6/28/2012 02:19:05 710-- 3 3 COAL -- Harita Para6/28/2012 02:20:43 6/28/2012 02:24:59 819 3 3 COAL -- MIL6/28/2012 02:21:17 6/28/2012 02:26:31 811 3 3 COAL -- MIL6/28/2012 02:24:20 6/28/2012 02:28:52 818 3 3 COAL -- MIL6/28/2012 02:35:19 6/28/2012 02:39:27 701-- 3 3 COAL -- Harita Para6/28/2012 02:37:03 6/28/2012 02:43:35 711-- 3 3 COAL -- Harita Para6/28/2012 02:41:45 6/28/2012 02:46:03 839 3 3 COAL -- MIL6/28/2012 03:11:48 6/28/2012 03:17:36 712-- 3 3 COAL -- Harita Para6/28/2012 03:12:30 6/28/2012 03:18:18 703-- 3 3 COAL -- Harita Para6/28/2012 03:24:03 6/28/2012 03:28:45 709-- 3 3 COAL -- Harita Para6/28/2012 03:26:25 6/28/2012 03:30:58 812 3 3 COAL -- MIL6/28/2012 16:00:44 6/28/2012 16:05:02 839 2 2 COAL -- MIL6/28/2012 16:12:33 6/28/2012 16:16:12 818 2 2 COAL -- MIL6/28/2012 16:27:38 6/28/2012 16:31:08 811 2 2 COAL -- MIL6/28/2012 16:27:57 6/28/2012 16:33:07 819 2 2 COAL -- MIL6/28/2012 16:30:34 6/28/2012 16:35:12 868 2 2 COAL -- MIL6/28/2012 18:54:49 6/28/2012 18:58:39 713-- 2 2 COAL -- Harita Para6/28/2012 18:56:06 6/28/2012 19:00:46 709-- 2 2 COAL -- Harita Para6/28/2012 18:56:28 6/28/2012 19:04:19 704-- 2 2 COAL -- Harita Para6/28/2012 19:02:09 6/28/2012 19:07:29 701-- 2 2 COAL -- Harita Para6/28/2012 19:12:56 6/28/2012 19:17:23 703-- 2 2 COAL -- Harita Para6/28/2012 19:14:39 6/28/2012 19:20:30 113 2 2 COAL -- Harita Para

Page 113: June Per Shift (Truckscale Port)

6/28/2012 19:15:58 6/28/2012 19:21:52 714-- 2 2 COAL -- Harita Para6/28/2012 19:18:59 6/28/2012 19:23:41 702-- 2 2 COAL -- Harita Para6/28/2012 19:19:39 6/28/2012 19:26:45 712-- 2 2 COAL -- Harita Para6/28/2012 19:30:50 6/28/2012 19:35:43 711-- 2 2 COAL -- Harita Para6/28/2012 19:34:49 6/28/2012 19:40:16 706-- 2 2 COAL -- Harita Para6/28/2012 19:37:48 6/28/2012 19:41:09 856 2 2 COAL -- MIL6/28/2012 19:46:52 6/28/2012 19:52:26 855 2 2 COAL -- MIL6/28/2012 19:48:52 6/28/2012 19:53:43 868 2 2 COAL -- MIL6/28/2012 19:49:14 6/28/2012 19:54:10 853 2 2 COAL -- MIL6/28/2012 19:49:40 6/28/2012 19:55:56 837 2 2 COAL -- MIL6/28/2012 19:50:00 6/28/2012 19:58:04 850 2 2 COAL -- MIL6/28/2012 19:50:23 6/28/2012 19:58:28 852 2 2 COAL -- MIL6/28/2012 20:03:06 6/28/2012 20:07:06 818 2 2 COAL -- MIL6/28/2012 20:15:39 6/28/2012 20:19:37 830 2 2 COAL -- MIL6/28/2012 20:29:57 6/28/2012 20:33:51 819 2 2 COAL -- MIL6/28/2012 20:39:30 6/28/2012 20:43:10 811 2 2 COAL -- MIL6/28/2012 20:42:09 6/28/2012 20:46:24 710-- 2 2 COAL -- Harita Para6/28/2012 20:43:49 6/28/2012 20:47:58 713-- 2 2 COAL -- Harita Para6/28/2012 21:07:11 6/28/2012 21:12:30 701-- 2 2 COAL -- Harita Para6/28/2012 21:09:17 6/28/2012 21:14:30 711-- 2 2 COAL -- Harita Para6/28/2012 21:19:15 6/28/2012 21:22:58 812 2 2 COAL -- MIL6/28/2012 21:19:57 6/28/2012 21:24:31 856 2 2 COAL -- MIL6/28/2012 21:36:49 6/28/2012 21:41:24 853 2 2 COAL -- MIL6/28/2012 21:39:49 6/28/2012 21:43:42 817 2 2 COAL -- MIL6/28/2012 21:40:54 6/28/2012 21:46:27 714-- 2 2 COAL -- Harita Para6/28/2012 21:45:25 6/28/2012 21:52:45 855 2 2 COAL -- MIL6/28/2012 21:47:34 6/28/2012 21:53:16 113 2 2 COAL -- Harita Para6/28/2012 21:49:47 6/28/2012 21:55:38 868 2 2 COAL -- MIL6/28/2012 21:50:05 6/28/2012 21:57:01 852 2 2 COAL -- MIL6/28/2012 21:54:35 6/28/2012 21:58:30 708-- 2 2 COAL -- Harita Para6/28/2012 21:54:56 6/28/2012 22:00:39 706-- 2 2 COAL -- Harita Para6/28/2012 21:56:21 6/28/2012 22:02:29 837 2 2 COAL -- MIL6/28/2012 22:01:18 6/28/2012 22:05:36 712-- 2 2 COAL -- Harita Para6/28/2012 22:07:55 6/28/2012 22:12:10 850 2 2 COAL -- MIL6/28/2012 22:09:16 6/28/2012 22:13:50 703-- 2 2 COAL -- Harita Para6/28/2012 22:10:48 6/28/2012 22:15:50 818 2 2 COAL -- MIL6/28/2012 22:20:39 6/28/2012 22:24:08 713-- 2 2 COAL -- Harita Para6/28/2012 22:21:44 6/28/2012 22:26:26 702-- 2 2 COAL -- Harita Para6/28/2012 22:22:46 6/28/2012 22:29:43 851 2 2 COAL -- MIL6/28/2012 22:24:56 6/28/2012 22:31:05 830 2 2 COAL -- MIL6/28/2012 22:31:51 6/28/2012 22:36:10 701-- 2 2 COAL -- Harita Para6/28/2012 22:34:29 6/28/2012 22:38:16 704-- 2 2 COAL -- Harita Para6/28/2012 22:44:33 6/28/2012 22:48:10 710-- 2 2 COAL -- Harita Para6/28/2012 22:49:43 6/28/2012 22:53:37 811 2 2 COAL -- MIL6/28/2012 22:52:14 6/28/2012 22:56:37 709-- 2 2 COAL -- Harita Para6/28/2012 23:04:36 6/28/2012 23:08:38 819 2 2 COAL -- MIL6/28/2012 23:07:45 6/28/2012 23:11:44 711-- 2 2 COAL -- Harita Para6/28/2012 23:09:20 6/28/2012 23:13:23 856 2 2 COAL -- MIL6/28/2012 23:16:16 6/28/2012 23:20:08 714-- 2 2 COAL -- Harita Para6/28/2012 23:22:19 6/28/2012 23:26:21 708-- 2 2 COAL -- Harita Para

Page 114: June Per Shift (Truckscale Port)

6/28/2012 23:22:45 6/28/2012 23:30:15 812 2 2 COAL -- MIL6/28/2012 23:24:29 6/28/2012 23:30:40 853 2 2 COAL -- MIL6/28/2012 23:28:50 6/28/2012 23:32:50 706-- 2 2 COAL -- Harita Para6/28/2012 23:29:16 6/28/2012 23:35:21 113 2 2 COAL -- Harita Para6/28/2012 23:29:36 6/28/2012 23:36:54 712-- 2 2 COAL -- Harita Para6/28/2012 23:37:56 6/28/2012 23:42:56 817 2 2 COAL -- MIL6/28/2012 23:40:13 6/28/2012 23:46:19 855 2 2 COAL -- MIL6/28/2012 23:41:15 6/28/2012 23:48:11 852 2 2 COAL -- MIL6/28/2012 23:41:36 6/28/2012 23:49:19 703-- 2 2 COAL -- Harita Para6/28/2012 23:42:02 6/28/2012 23:49:49 837 2 2 COAL -- MIL6/28/2012 23:52:01 6/28/2012 23:56:06 713-- 2 2 COAL -- Harita Para6/28/2012 23:53:59 6/28/2012 23:58:06 868 2 2 COAL -- MIL6/28/2012 23:54:31 6/28/2012 23:59:22 850 2 2 COAL -- MIL6/28/2012 23:55:02 6/29/2012 00:02:49 702-- 2 3 COAL -- Harita Para6/28/2012 23:57:17 6/29/2012 00:05:38 701-- 2 3 COAL -- Harita Para6/29/2012 00:00:28 6/29/2012 00:07:51 818 3 3 COAL -- MIL6/29/2012 00:04:45 6/29/2012 00:16:39 851 3 3 COAL -- MIL6/29/2012 00:13:47 6/29/2012 00:17:52 704-- 3 3 COAL -- Harita Para6/29/2012 00:14:15 6/29/2012 00:19:05 830 3 3 COAL -- MIL6/29/2012 00:28:17 6/29/2012 00:32:10 711-- 3 3 COAL -- Harita Para6/29/2012 00:41:23 6/29/2012 00:44:29 856 3 3 COAL -- MIL6/29/2012 00:47:10 6/29/2012 00:52:26 709-- 3 3 COAL -- Harita Para6/29/2012 01:00:51 6/29/2012 01:04:25 819 3 3 COAL -- MIL6/29/2012 01:07:42 6/29/2012 01:11:49 710-- 3 3 COAL -- Harita Para6/29/2012 01:08:21 6/29/2012 01:14:33 708-- 3 3 COAL -- Harita Para6/29/2012 01:08:53 6/29/2012 01:18:48 714-- 3 3 COAL -- Harita Para6/29/2012 01:09:22 6/29/2012 01:18:56 712-- 3 3 COAL -- Harita Para6/29/2012 01:29:57 6/29/2012 01:35:36 837 3 3 COAL -- MIL6/29/2012 01:30:30 6/29/2012 01:39:01 701-- 3 3 COAL -- Harita Para6/29/2012 01:33:20 6/29/2012 01:39:05 703-- 3 3 COAL -- Harita Para6/29/2012 01:40:04 6/29/2012 01:44:59 853 3 3 COAL -- MIL6/29/2012 01:40:32 6/29/2012 01:45:11 852 3 3 COAL -- MIL6/29/2012 01:40:57 6/29/2012 01:48:54 704-- 3 3 COAL -- Harita Para6/29/2012 01:53:07 6/29/2012 01:59:50 855 3 3 COAL -- MIL6/29/2012 02:07:14 6/29/2012 02:10:54 850 3 3 COAL -- MIL6/29/2012 02:17:35 6/29/2012 02:21:41 817 3 3 COAL -- MIL6/29/2012 02:24:40 6/29/2012 02:28:59 856 3 3 COAL -- MIL6/29/2012 02:26:50 6/29/2012 02:30:31 818 3 3 COAL -- MIL6/29/2012 02:37:09 6/29/2012 02:41:33 113 3 3 COAL -- Harita Para6/29/2012 02:38:27 6/29/2012 02:43:18 830 3 3 COAL -- MIL6/29/2012 02:38:45 6/29/2012 02:43:57 713-- 3 3 COAL -- Harita Para6/29/2012 02:51:03 6/29/2012 02:55:12 708-- 3 3 COAL -- Harita Para6/29/2012 02:53:05 6/29/2012 02:59:06 702-- 3 3 COAL -- Harita Para6/29/2012 02:57:34 6/29/2012 03:01:52 711-- 3 3 COAL -- Harita Para6/29/2012 02:57:56 6/29/2012 03:04:03 712-- 3 3 COAL -- Harita Para6/29/2012 03:00:07 6/29/2012 03:05:38 815 3 3 COAL -- MIL6/29/2012 03:03:19 6/29/2012 03:08:06 812 3 3 COAL -- MIL6/29/2012 03:07:30 6/29/2012 03:11:33 706-- 3 3 COAL -- Harita Para6/29/2012 03:13:16 6/29/2012 03:18:12 703-- 3 3 COAL -- Harita Para6/29/2012 03:15:33 6/29/2012 03:18:59 701-- 3 3 COAL -- Harita Para

Page 115: June Per Shift (Truckscale Port)

6/29/2012 03:36:01 6/29/2012 03:40:16 709-- 3 3 COAL -- Harita Para6/29/2012 03:46:18 6/29/2012 03:50:00 850 3 3 COAL -- MIL6/29/2012 04:04:33 6/29/2012 04:08:31 817 3 3 COAL -- MIL6/29/2012 04:09:13 6/29/2012 04:13:25 818 3 3 COAL -- MIL6/29/2012 04:15:25 6/29/2012 04:18:50 856 3 3 COAL -- MIL6/29/2012 04:15:54 6/29/2012 04:20:29 819 3 3 COAL -- MIL6/29/2012 07:26:57 6/29/2012 07:31:19 702-- 3 3 COAL -- Harita Para6/29/2012 07:27:36 6/29/2012 07:32:53 708-- 3 3 COAL -- Harita Para6/29/2012 07:27:58 6/29/2012 07:35:29 709-- 3 3 COAL -- Harita Para6/29/2012 07:28:19 6/29/2012 07:37:09 706-- 3 3 COAL -- Harita Para6/29/2012 07:29:34 6/29/2012 07:39:22 113 3 3 COAL -- Harita Para6/29/2012 07:30:05 6/29/2012 07:42:12 712-- 3 3 COAL -- Harita Para6/29/2012 07:30:36 6/29/2012 07:43:02 713-- 3 3 COAL -- Harita Para6/29/2012 07:34:10 6/29/2012 07:45:13 711-- 3 3 COAL -- Harita Para6/29/2012 07:38:41 6/29/2012 07:48:02 853 3 3 COAL -- MIL6/29/2012 07:40:13 6/29/2012 07:48:33 703-- 3 3 COAL -- Harita Para6/29/2012 07:41:10 6/29/2012 07:51:03 714-- 3 3 COAL -- Harita Para6/29/2012 07:44:09 6/29/2012 07:53:47 852 3 3 COAL -- MIL6/29/2012 07:44:31 6/29/2012 07:54:06 855 3 3 COAL -- MIL6/29/2012 07:46:59 6/29/2012 07:56:33 710-- 3 3 COAL -- Harita Para6/29/2012 07:51:44 6/29/2012 07:58:18 815 3 3 COAL -- MIL6/29/2012 07:52:20 6/29/2012 08:01:57 850 3 1 COAL -- MIL6/29/2012 08:11:14 6/29/2012 08:14:56 704-- 1 1 COAL -- Harita Para6/29/2012 08:11:50 6/29/2012 08:17:22 701-- 1 1 COAL -- Harita Para6/29/2012 08:25:22 6/29/2012 08:29:27 810 1 1 COAL -- MIL6/29/2012 08:45:56 6/29/2012 08:49:54 702-- 1 1 COAL -- Harita Para6/29/2012 08:52:26 6/29/2012 09:01:14 709-- 1 1 COAL -- Harita Para6/29/2012 08:59:49 6/29/2012 09:03:13 706-- 1 1 COAL -- Harita Para6/29/2012 09:09:21 6/29/2012 09:13:06 832 1 1 COAL -- MIL6/29/2012 09:10:04 6/29/2012 09:17:19 708-- 1 1 COAL -- Harita Para6/29/2012 09:10:48 6/29/2012 09:18:45 868 1 1 COAL -- MIL6/29/2012 09:13:58 6/29/2012 09:20:27 856 1 1 COAL -- MIL6/29/2012 09:16:18 6/29/2012 09:21:37 812 1 1 COAL -- MIL6/29/2012 09:16:40 6/29/2012 09:24:40 113 1 1 COAL -- Harita Para6/29/2012 09:23:34 6/29/2012 09:27:36 818 1 1 COAL -- MIL6/29/2012 09:23:59 6/29/2012 09:28:38 713-- 1 1 COAL -- Harita Para6/29/2012 09:30:46 6/29/2012 09:35:13 819 1 1 COAL -- MIL6/29/2012 09:31:41 6/29/2012 09:37:18 704-- 1 1 COAL -- Harita Para6/29/2012 09:35:59 6/29/2012 09:40:27 711-- 1 1 COAL -- Harita Para6/29/2012 09:36:39 6/29/2012 09:40:29 701-- 1 1 COAL -- Harita Para6/29/2012 09:41:20 6/29/2012 09:49:16 853 1 1 COAL -- MIL6/29/2012 09:48:15 6/29/2012 09:53:16 712-- 1 1 COAL -- Harita Para6/29/2012 09:50:05 6/29/2012 09:56:19 852 1 1 COAL -- MIL6/29/2012 10:01:43 6/29/2012 10:06:41 710-- 1 1 COAL -- Harita Para6/29/2012 10:02:10 6/29/2012 10:08:17 850 1 1 COAL -- MIL6/29/2012 10:05:19 6/29/2012 10:10:20 702-- 1 1 COAL -- Harita Para6/29/2012 10:09:42 6/29/2012 10:15:28 855 1 1 COAL -- MIL6/29/2012 10:14:46 6/29/2012 10:17:52 830 1 1 COAL -- MIL6/29/2012 10:20:09 6/29/2012 10:23:24 706-- 1 1 COAL -- Harita Para6/29/2012 10:25:02 6/29/2012 10:28:46 115 1 1 COAL -- Harita Para

Page 116: June Per Shift (Truckscale Port)

6/29/2012 10:29:30 6/29/2012 10:33:52 709-- 1 1 COAL -- Harita Para6/29/2012 10:33:11 6/29/2012 10:36:53 837 1 1 COAL -- MIL6/29/2012 10:43:27 6/29/2012 10:47:11 708-- 1 1 COAL -- Harita Para6/29/2012 10:48:28 6/29/2012 10:51:21 810 1 1 COAL -- MIL6/29/2012 10:50:08 6/29/2012 10:56:17 113 1 1 COAL -- Harita Para6/29/2012 10:54:27 6/29/2012 10:58:24 832 1 1 COAL -- MIL6/29/2012 10:54:50 6/29/2012 11:00:37 711-- 1 1 COAL -- Harita Para6/29/2012 10:55:15 6/29/2012 11:01:38 856 1 1 COAL -- MIL6/29/2012 10:57:06 6/29/2012 11:03:32 713-- 1 1 COAL -- Harita Para6/29/2012 10:59:02 6/29/2012 11:04:21 701-- 1 1 COAL -- Harita Para6/29/2012 11:04:58 6/29/2012 11:09:04 812 1 1 COAL -- MIL6/29/2012 11:06:59 6/29/2012 11:25:25 818 1 1 COAL -- MIL6/29/2012 11:18:47 6/29/2012 11:23:16 851 1 1 COAL -- MIL6/29/2012 11:22:33 6/29/2012 11:25:43 868 1 1 COAL -- MIL6/29/2012 11:27:30 6/29/2012 11:31:12 702-- 1 1 COAL -- Harita Para6/29/2012 11:42:21 6/29/2012 11:48:14 852 1 1 COAL -- MIL6/29/2012 11:45:15 6/29/2012 11:50:20 115 1 1 COAL--IN Harita Para6/29/2012 11:49:22 6/29/2012 11:56:32 710-- 1 1 COAL -- Harita Para6/29/2012 11:54:36 6/29/2012 12:01:02 817 1 1 COAL -- MIL6/29/2012 12:00:09 6/29/2012 12:04:50 709-- 1 1 COAL--IN Harita Para6/29/2012 12:06:54 6/29/2012 12:12:15 811 1 1 COAL -- MIL6/29/2012 12:46:28 6/29/2012 12:50:31 850 1 1 COAL--IN MIL6/29/2012 12:49:41 6/29/2012 12:58:41 855 1 1 COAL--IN MIL6/29/2012 13:08:47 6/29/2012 13:14:55 853 1 1 COAL--IN MIL6/29/2012 13:14:11 6/29/2012 13:17:34 830 1 1 COAL--IN MIL6/30/2012 00:16:21 6/30/2012 00:19:45 830 3 3 COAL--IN MIL6/30/2012 00:16:43 6/30/2012 00:21:20 818 3 3 COAL -- MIL6/30/2012 00:23:24 6/30/2012 00:29:21 850 3 3 COAL -- MIL6/30/2012 00:25:29 6/30/2012 00:30:55 868 3 3 COAL -- MIL6/30/2012 00:26:05 6/30/2012 00:33:26 832 3 3 COAL -- MIL6/30/2012 00:28:34 6/30/2012 00:34:49 812 3 3 COAL -- MIL6/30/2012 00:31:54 6/30/2012 00:39:42 851 3 3 COAL -- MIL6/30/2012 00:39:09 6/30/2012 00:44:13 853 3 3 COAL -- MIL6/30/2012 00:41:17 6/30/2012 00:47:18 855 3 3 COAL -- MIL6/30/2012 00:42:05 6/30/2012 00:49:19 819 3 3 COAL -- MIL6/30/2012 00:42:35 6/30/2012 00:47:26 856 3 3 COAL--IN MIL6/30/2012 00:43:10 6/30/2012 00:48:10 810 3 3 COAL -- MIL6/30/2012 12:11:57 6/30/2012 12:16:35 856 1 1 COAL--IN MIL6/30/2012 12:12:54 6/30/2012 12:17:01 855 1 1 COAL--IN MIL6/30/2012 12:13:21 6/30/2012 12:20:41 817 1 1 COAL--IN MIL6/30/2012 12:13:52 6/30/2012 12:21:05 851 1 1 COAL--IN MIL6/30/2012 12:14:20 6/30/2012 12:27:24 850 1 1 COAL--IN MIL6/30/2012 12:15:51 6/30/2012 12:35:50 830 1 1 COAL--IN MIL6/30/2012 12:18:46 6/30/2012 12:32:21 853 1 1 COAL--IN MIL6/30/2012 12:19:14 6/30/2012 12:35:23 810 1 1 COAL--IN MIL6/30/2012 12:23:06 6/30/2012 12:37:45 832 1 1 COAL--IN MIL6/30/2012 12:25:35 6/30/2012 12:41:18 852 1 1 COAL--IN MIL6/30/2012 12:28:09 6/30/2012 12:43:45 812 1 1 COAL--IN MIL6/30/2012 12:30:32 6/30/2012 12:43:49 819 1 1 COAL--IN MIL6/30/2012 15:50:55 6/30/2012 16:03:45 853 1 2 COAL--IN MIL

Page 117: June Per Shift (Truckscale Port)

6/30/2012 15:51:38 6/30/2012 16:04:13 714-- 1 2 COAL--IN Harita Para6/30/2012 15:55:07 6/30/2012 16:04:46 710-- 1 2 COAL--IN Harita Para6/30/2012 15:55:42 6/30/2012 16:05:16 702-- 1 2 COAL--IN Harita Para6/30/2012 15:56:09 6/30/2012 16:09:39 113 1 2 COAL--IN Harita Para6/30/2012 15:56:43 6/30/2012 16:05:42 703-- 1 2 COAL--IN Harita Para6/30/2012 15:57:36 6/30/2012 16:10:01 856 1 2 COAL--IN MIL6/30/2012 15:58:14 6/30/2012 16:15:14 701-- 1 2 COAL--IN Harita Para6/30/2012 15:58:42 6/30/2012 16:14:32 704-- 1 2 COAL--IN Harita Para6/30/2012 15:59:10 6/30/2012 16:20:56 851 1 2 COAL--IN MIL6/30/2012 15:59:35 6/30/2012 16:21:51 115 1 2 COAL--IN Harita Para6/30/2012 16:00:37 6/30/2012 16:26:14 713-- 2 2 COAL--IN Harita Para6/30/2012 16:01:08 6/30/2012 16:08:37 706-- 2 2 COAL -- Harita Para6/30/2012 16:01:51 6/30/2012 16:29:09 850 2 2 COAL--IN MIL6/30/2012 16:02:20 6/30/2012 16:31:29 708-- 2 2 COAL--IN Harita Para6/30/2012 16:03:04 6/30/2012 16:21:05 852 2 2 COAL--IN MIL6/30/2012 16:06:27 6/30/2012 16:39:00 868 2 2 COAL--IN MIL6/30/2012 16:06:55 6/30/2012 16:40:05 709-- 2 2 COAL--IN Harita Para6/30/2012 16:07:47 6/30/2012 16:34:24 855 2 2 COAL--IN MIL6/30/2012 16:10:56 6/30/2012 16:44:04 817 2 2 COAL--IN MIL6/30/2012 16:12:46 6/30/2012 16:44:08 811 2 2 COAL--IN MIL6/30/2012 16:19:25 6/30/2012 16:49:50 812 2 2 COAL--IN MIL6/30/2012 16:29:49 6/30/2012 16:49:56 819 2 2 COAL--IN MIL6/30/2012 16:30:38 6/30/2012 16:58:11 711-- 2 2 COAL--IN Harita Para6/30/2012 16:32:08 6/30/2012 16:58:17 832 2 2 COAL--IN MIL6/30/2012 16:36:12 6/30/2012 16:42:57 810 2 2 COAL--IN MIL6/30/2012 18:19:51 6/30/2012 18:23:23 713-- 2 2 COAL -- Harita Para6/30/2012 18:20:23 6/30/2012 18:24:56 710-- 2 2 COAL -- Harita Para6/30/2012 18:22:26 6/30/2012 18:31:21 701-- 2 2 COAL -- Harita Para6/30/2012 18:30:44 6/30/2012 18:38:47 702-- 2 2 COAL -- Harita Para6/30/2012 18:41:45 6/30/2012 18:46:07 113 2 2 COAL -- Harita Para6/30/2012 18:42:54 6/30/2012 18:48:27 703-- 2 2 COAL -- Harita Para6/30/2012 18:44:35 6/30/2012 19:02:00 706-- 2 2 COAL -- Harita Para6/30/2012 19:12:50 6/30/2012 19:16:38 856 2 2 COAL--IN MIL6/30/2012 19:17:31 6/30/2012 19:24:25 115 2 2 COAL -- Harita Para6/30/2012 19:19:37 6/30/2012 19:24:45 851 2 2 COAL--IN MIL6/30/2012 19:21:53 6/30/2012 19:26:03 812 2 2 COAL--IN MIL6/30/2012 19:22:13 6/30/2012 19:27:24 852 2 2 COAL--IN MIL6/30/2012 19:22:43 6/30/2012 19:29:04 714-- 2 2 COAL -- Harita Para6/30/2012 19:23:04 6/30/2012 19:29:22 708-- 2 2 COAL -- Harita Para6/30/2012 19:23:34 6/30/2012 19:31:04 711-- 2 2 COAL -- Harita Para6/30/2012 19:25:30 6/30/2012 19:30:50 832 2 2 COAL--IN MIL6/30/2012 19:28:15 6/30/2012 19:35:52 853 2 2 COAL--IN MIL6/30/2012 19:30:12 6/30/2012 19:36:33 850 2 2 COAL--IN MIL6/30/2012 19:31:48 6/30/2012 19:36:13 709-- 2 2 COAL -- Harita Para6/30/2012 19:42:06 6/30/2012 19:45:25 713-- 2 2 COAL -- Harita Para6/30/2012 19:45:57 6/30/2012 19:49:10 710-- 2 2 COAL -- Harita Para6/30/2012 19:49:56 6/30/2012 19:53:52 817 2 2 COAL--IN MIL6/30/2012 19:52:54 6/30/2012 19:57:21 701-- 2 2 COAL -- Harita Para6/30/2012 19:58:24 6/30/2012 20:03:37 712-- 2 2 COAL -- Harita Para6/30/2012 20:01:38 6/30/2012 20:05:11 702-- 2 2 COAL -- Harita Para

Page 118: June Per Shift (Truckscale Port)

6/30/2012 20:06:00 6/30/2012 20:09:59 830 2 2 COAL--IN MIL6/30/2012 20:08:34 6/30/2012 20:12:53 811 2 2 COAL--IN MIL6/30/2012 20:23:12 6/30/2012 20:27:55 703-- 2 2 COAL -- Harita Para6/30/2012 20:26:17 6/30/2012 20:32:00 818 2 2 COAL--IN MIL6/30/2012 20:31:15 6/30/2012 20:35:29 113 2 2 COAL -- Harita Para6/30/2012 20:39:51 6/30/2012 20:44:28 819 2 2 COAL--IN MIL6/30/2012 20:46:20 6/30/2012 20:51:29 115 2 2 COAL -- Harita Para6/30/2012 20:50:13 6/30/2012 21:00:56 706-- 2 2 COAL -- Harita Para6/30/2012 20:50:36 6/30/2012 21:01:19 714-- 2 2 COAL -- Harita Para6/30/2012 20:52:52 6/30/2012 21:03:58 856 2 2 COAL -- MIL6/30/2012 20:54:39 6/30/2012 20:59:38 839 2 2 COAL--IN MIL6/30/2012 21:00:12 6/30/2012 21:06:00 711-- 2 2 COAL -- Harita Para6/30/2012 21:04:38 6/30/2012 21:11:16 851 2 2 COAL -- MIL6/30/2012 21:06:59 6/30/2012 21:12:03 708-- 2 2 COAL -- Harita Para6/30/2012 21:09:52 6/30/2012 21:15:07 709-- 2 2 COAL -- Harita Para6/30/2012 21:14:24 6/30/2012 21:17:27 713-- 2 2 COAL -- Harita Para6/30/2012 21:18:09 6/30/2012 21:22:02 812 2 2 COAL -- MIL6/30/2012 21:20:10 6/30/2012 21:31:37 816 2 2 COAL--IN MIL6/30/2012 21:21:11 6/30/2012 21:27:00 701-- 2 2 COAL -- Harita Para6/30/2012 21:26:05 6/30/2012 21:29:57 702-- 2 2 COAL -- Harita Para6/30/2012 21:29:02 6/30/2012 21:33:11 832 2 2 COAL -- MIL6/30/2012 21:29:24 6/30/2012 21:33:32 830 2 2 COAL--IN MIL6/30/2012 21:30:31 6/30/2012 21:34:17 710-- 2 2 COAL -- Harita Para6/30/2012 21:30:54 6/30/2012 21:35:06 811 2 2 COAL--IN MIL6/30/2012 21:36:37 6/30/2012 21:40:58 852 2 2 COAL -- MIL6/30/2012 21:37:59 6/30/2012 21:43:34 712-- 2 2 COAL -- Harita Para6/30/2012 21:45:06 6/30/2012 21:52:39 853 2 2 COAL -- MIL6/30/2012 21:52:02 6/30/2012 21:55:34 850 2 2 COAL -- MIL6/30/2012 21:56:33 6/30/2012 22:00:38 818 2 2 COAL--IN MIL6/30/2012 21:56:53 6/30/2012 22:01:03 703-- 2 2 COAL -- Harita Para6/30/2012 22:05:02 6/30/2012 22:09:45 113 2 2 COAL -- Harita Para6/30/2012 22:07:09 6/30/2012 22:12:28 817 2 2 COAL -- MIL6/30/2012 22:08:59 6/30/2012 22:13:29 704-- 2 2 COAL -- Harita Para6/30/2012 22:11:14 6/30/2012 22:16:48 819 2 2 COAL--IN MIL6/30/2012 22:23:04 6/30/2012 22:31:25 706-- 2 2 COAL -- Harita Para6/30/2012 22:26:01 6/30/2012 22:33:10 115 2 2 COAL -- Harita Para6/30/2012 22:29:32 6/30/2012 22:36:29 839 2 2 COAL--IN MIL6/30/2012 22:35:49 6/30/2012 22:41:09 713-- 2 2 COAL -- Harita Para6/30/2012 22:38:05 6/30/2012 22:42:04 714-- 2 2 COAL -- Harita Para6/30/2012 22:40:34 6/30/2012 22:44:39 856 2 2 COAL -- MIL6/30/2012 22:42:40 6/30/2012 22:47:06 711-- 2 2 COAL -- Harita Para6/30/2012 22:43:45 6/30/2012 22:48:55 709-- 2 2 COAL -- Harita Para6/30/2012 22:46:25 6/30/2012 23:41:20 851 2 2 COAL -- MIL6/30/2012 22:49:34 6/30/2012 22:53:17 702-- 2 2 COAL -- Harita Para6/30/2012 22:50:06 6/30/2012 22:56:20 701-- 2 2 COAL -- Harita Para6/30/2012 22:55:41 6/30/2012 22:59:26 708-- 2 2 COAL -- Harita Para6/30/2012 22:57:26 6/30/2012 23:02:02 710-- 2 2 COAL -- Harita Para6/30/2012 23:01:14 6/30/2012 23:05:33 812 2 2 COAL -- MIL6/30/2012 23:13:24 6/30/2012 23:17:59 712-- 2 2 COAL -- Harita Para6/30/2012 23:14:47 6/30/2012 23:19:50 830 2 2 COAL -- MIL

Page 119: June Per Shift (Truckscale Port)

6/30/2012 23:28:49 6/30/2012 23:33:23 703-- 2 2 COAL -- Harita Para6/30/2012 23:35:33 6/30/2012 23:40:15 832 2 2 COAL -- MIL6/30/2012 23:35:59 6/30/2012 23:41:16 852 2 2 COAL -- MIL6/30/2012 23:37:01 6/30/2012 23:43:46 113 2 2 COAL -- Harita Para6/30/2012 23:38:44 6/30/2012 23:45:39 704-- 2 2 COAL -- Harita Para6/30/2012 23:46:24 6/30/2012 23:53:44 853 2 2 COAL -- MIL6/30/2012 23:52:35 6/30/2012 23:56:00 850 2 2 COAL -- MIL6/30/2012 23:53:05 6/30/2012 23:58:04 115 2 2 COAL -- Harita Para6/30/2012 23:54:16 6/30/2012 23:59:45 713-- 2 2 COAL -- Harita Para

Page 120: June Per Shift (Truckscale Port)
Page 121: June Per Shift (Truckscale Port)

Lokasi Stok File In Weight Out Weight Net Weight--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

PIT B 26 - 001 45750 18260 27490PIT B 26 - 001 45730 18330 27400PIT B 26 - 001 46360 18330 28030PIT B 26- 001 49660 19540 30120PIT D 46- 001 50670 18720 31950PIT B 26 - 001 46520 18340 28180PIT D 46- 001 47300 18210 29090PIT B 26 - 001 45960 18170 27790PIT D 46- 001 49120 18560 30560PIT D 46- 001 47840 18560 29280PIT B 26 - 001 45740 18160 27580PIT B 26 - 001 46070 18170 27900PIT B 26 - 001 46060 18120 27940PIT B 26- 001 32050 11170 20880PIT B 26 - 001 45670 18250 27420PIT B 26 - 001 44870 18430 26440PIT B 26 - 001 46300 18410 27890PIT D 46- 001 47730 18190 29540PIT D 46- 001 49740 18590 31150PIT D 46- 001 32940 11070 21870PIT D 46- 001 33360 11310 22050PIT D 46- 001 47680 17910 29770PIT D 46- 001 51700 18450 33250PIT D 46- 001 31950 10980 20970PIT D 46- 001 32360 10960 21400PIT D 46- 001 32280 11050 21230PIT D 46- 001 50320 17860 32460PIT D 46- 001 51230 17950 33280PIT D 46- 001 49780 18020 31760PIT B 26 - 001 46510 18310 28200PIT B 26 - 001 46870 18270 28600PIT D 46- 001 51620 18870 32750PIT A 85- 001 47340 18250 29090PIT D 46- 001 50380 18700 31680PIT A 85- 001 48100 18340 29760PIT B 26 - 001 47460 18050 29410PIT D 46- 001 48600 18180 30420PIT B 26 - 001 47450 17940 29510PIT D 46- 001 52860 18570 34290PIT B 26 - 001 47320 18180 29140PIT B 26 - 001 46710 18220 28490PIT A 85- 001 49730 18280 31450

Page 122: June Per Shift (Truckscale Port)

PIT D 46- 001 50880 18070 32810PIT B 26 - 001 47110 18380 28730PIT D 46- 001 33800 11150 22650PIT D 46- 001 51740 18340 33400PIT D 46- 001 47700 17960 29740PIT D 46- 001 32700 10960 21740PIT D 46- 001 28750 10850 17900PIT D 46- 001 33630 11060 22570PIT D 46- 001 34780 11130 23650PIT D 46- 001 49170 17930 31240PIT D 46- 001 35060 11080 23980PIT A 85- 001 46210 18130 28080PIT D 46- 001 51390 17930 33460PIT D 46- 001 51460 18190 33270PIT D 46- 001 52780 18840 33940PIT C 64- 001 47500 18830 28670PIT C 64- 001 44350 18220 26130PIT D 46- 001 32240 10980 21260PIT D 46- 001 50650 17940 32710PIT B 26 - 001 46170 18140 28030PIT B 26 - 001 45460 18150 27310PIT D 46- 001 47160 17880 29280PIT D 46- 001 50350 17960 32390PIT D 46- 001 30970 10800 20170PIT D 46- 001 49880 18030 31850PIT D 46- 001 33480 10890 22590PIT B 26 - 001 46050 18120 27930PIT A 85- 001 46180 18050 28130PIT B 26 - 001 45650 18130 27520PIT B 26 - 001 45300 18250 27050PIT D 46- 001 51940 18930 33010PIT A 85- 001 47010 18250 28760PIT B 26 - 001 44760 18130 26630PIT A 65 - 001 32110 11130 20980PIT D 46- 001 49560 18610 30950PIT D 46- 001 33560 11100 22460PIT A 65 - 001 31310 11090 20220PIT B 26 - 001 45830 18390 27440PIT D 46- 001 48500 18430 30070PIT B 26 - 001 46640 18070 28570PIT B 26 - 001 45660 18110 27550PIT A 85- 001 47110 17990 29120PIT D 46- 001 50830 18470 32360PIT B 26 - 001 44940 18330 26610PIT D 46- 001 49590 18460 31130PIT A 65 - 001 31360 11020 20340PIT A 65 - 001 43840 17880 25960PIT D 46- 001 45590 17820 27770PIT A 65 - 001 31840 10990 20850PIT D 46- 001 48000 18140 29860

Page 123: June Per Shift (Truckscale Port)

PIT A 65 - 001 31340 11040 20300PIT A 65 - 001 48100 18140 29960PIT D 46- 001 49980 17990 31990PIT A 65 - 001 48630 17990 30640PIT B 26 - 001 48100 18010 30090PIT B 26 - 001 47290 18110 29180PIT D 46- 001 37810 11200 26610PIT B 26 - 001 46650 18160 28490PIT B 26 - 001 45730 18040 27690PIT B 26 - 001 46280 18380 27900PIT B 26 - 001 45210 17970 27240PIT B 26 - 001 46630 18240 28390PIT B 26 - 001 46450 18270 28180PIT B 26 - 001 44970 18090 26880PIT B 26 - 001 46240 18130 28110PIT A 85- 001 46200 19590 26610PIT A 65 - 001 47420 18600 28820PIT B 26 - 001 45620 18020 27600PIT A 65 - 001 48130 18980 29150PIT A 65 - 001 32560 11000 21560PIT A 65 - 001 32470 11010 21460PIT A 65 - 001 46010 18140 27870PIT A 65 - 001 46580 18070 28510PIT B 26 - 001 43510 17930 25580PIT B 26 - 001 44480 18300 26180PIT A 65 - 001 31640 11000 20640PIT B 26- 001 45460 17880 27580PIT A 65 - 001 32700 11110 21590PIT A 65 - 001 47150 18430 28720PIT B 26- 001 46880 18590 28290PIT A 65 - 001 46330 17950 28380PIT B 26- 001 46020 17960 28060PIT B 26 - 001 44670 18250 26420PIT A 65 - 001 47400 19380 28020PIT B 26- 001 44950 17970 26980PIT B 26- 001 30810 11100 19710PIT B 26 - 002 45690 18310 27380PIT B 26 - 002 46120 18300 27820PIT B 26 - 002 43790 18160 25630PIT B 26 - 002 44610 18380 26230PIT B 26 - 002 47020 18260 28760PIT B 26 - 002 45210 18220 26990PIT B 26 - 002 46500 18220 28280PIT B 26 - 002 45640 18040 27600PIT B 26 - 001 46060 18250 27810PIT B 26 - 001 45200 18280 26920PIT B 26 - 001 46310 18390 27920PIT B 26 - 001 45440 18300 27140PIT B 26 - 001 45020 18280 26740PIT B 26 - 001 46380 18220 28160

Page 124: June Per Shift (Truckscale Port)

PIT B 26 - 001 45790 18090 27700PIT A 65 - 001 32100 11040 21060PIT A 65 - 001 33180 11200 21980PIT A 65 - 001 49770 18140 31630PIT B 26 - 001 42470 18160 24310PIT A 65 - 001 32160 11050 21110PIT A 65 - 001 45340 17740 27600PIT A 65 - 001 44850 18070 26780PIT B 26 - 001 47080 18150 28930PIT B 26 - 001 46360 18190 28170PIT A 65 - 001 47540 17930 29610PIT A 65 - 001 46970 18890 28080PIT B 26 - 001 46800 18220 28580PIT B 26 - 001 46640 18100 28540PIT B 26 - 001 48380 18030 30350PIT A 65 - 001 33960 11000 22960PIT B 26 - 001 47980 18140 29840PIT A 65 - 001 46430 17910 28520PIT B 26 - 001 47250 18090 29160PIT B 26 - 001 46170 17950 28220PIT B 26 - 001 47270 18190 29080PIT B 26 - 001 47610 18190 29420PIT A 65 - 001 48980 18640 30340PIT B 26 - 001 46620 18210 28410PIT A 65 - 001 45960 17880 28080PIT A 65 - 001 46740 18160 28580PIT B 26 - 001 48100 18060 30040PIT A 65 - 001 43790 18130 25660PIT B 26 - 001 47400 18060 29340PIT B 26 - 001 43460 18030 25430PIT A 65 - 001 31740 10950 20790PIT B 26 - 001 47580 18080 29500PIT B 26 - 001 47400 18190 29210PIT A 85 - 001 46280 18200 28080PIT A 85 - 001 49050 18040 31010PIT A 85 - 001 33100 11160 21940PIT A 85 - 001 46990 18030 28960PIT A 85 - 001 49430 18290 31140PIT B 26 - 001 48710 18430 30280PIT B 26 - 001 50230 18160 32070PIT A 85 - 001 48720 18680 30040PIT A 85 - 001 32280 11320 20960PIT A 85 - 001 48820 18330 30490PIT B 26 - 001 48780 18400 30380PIT A 85 - 001 33120 11320 21800PIT B 26 - 001 49260 18400 30860PIT A 85 - 001 31070 11230 19840PIT B 26 - 001 46560 18420 28140PIT B 26 - 001 46940 18480 28460PIT B 26 - 001 46520 18190 28330

Page 125: June Per Shift (Truckscale Port)

PIT B 26 - 001 48320 18210 30110PIT B 26 - 001 46360 18430 27930PIT B 26 - 001 49270 18220 31050PIT B 26 - 001 48120 18070 30050PIT B 26 - 001 46450 18480 27970PIT B 26 - 001 48040 18390 29650PIT A 85 - 001 31320 11190 20130PIT B 26 - 001 48770 18320 30450PIT B 27- 001 31050 11080 19970PIT B 26 - 001 46260 18350 27910PIT B 26 - 001 46500 18140 28360PIT B 26 - 001 44850 18100 26750PIT B 26 - 001 45130 18330 26800PIT B 26 - 001 46740 18130 28610PIT B 26 - 001 49310 18010 31300PIT B 26 - 001 46040 17940 28100PIT B 26 - 001 46160 18270 27890PIT B 27- 001 45400 18290 27110PIT B 26 - 001 45250 18200 27050PIT B 26 - 001 45630 18220 27410PIT A 27- 001 29080 11050 18030PIT A 85 - 002 31010 11270 19740PIT A 27- 002 47780 18710 29070PIT A 27- 002 46920 18070 28850PIT B 26 - 002 45330 18260 27070PIT B 26 - 002 45810 18260 27550PIT B 26 - 002 45290 18230 27060PIT A 27- 002 47750 18680 29070PIT B 26 - 002 46200 18060 28140PIT A 27- 002 47440 18470 28970PIT B 26 - 002 46340 18130 28210PIT A 27- 002 31950 11040 20910PIT B 26 - 002 45950 18280 27670PIT A 85 - 002 46400 18260 28140PIT A 85 - 002 47440 18050 29390PIT B 26 - 002 46960 18060 28900PIT B 26 - 002 44930 18290 26640PIT A 27- 002 47220 18310 28910PIT A 27- 002 47300 18050 29250PIT B 26 - 002 47860 18240 29620PIT A 27- 002 31090 11040 20050PIT A 27- 002 44970 18220 26750PIT B 26 - 002 45940 18130 27810PIT B 26 - 002 46510 18210 28300PIT B 26 - 002 46100 18210 27890PIT B 26 - 002 45510 18250 27260PIT A 27- 002 48520 18270 30250PIT B 26 - 002 46080 18340 27740PIT B 26 - 002 47620 18180 29440PIT A 27- 002 49220 18630 30590

Page 126: June Per Shift (Truckscale Port)

PIT B 26 - 002 46990 18030 28960PIT A 85 - 002 51730 19110 32620PIT A 85 - 002 50780 18500 32280PIT A 27- 002 47740 18090 29650PIT B 26 - 002 46140 18200 27940PIT A 27- 002 48380 18300 30080PIT B 26 - 002 46220 18130 28090PIT A 85 - 002 33490 11000 22490PIT A 27- 002 46680 18020 28660PIT B 26 - 002 45600 18190 27410PIT A 85 - 002 48680 17910 30770PIT B 26 - 002 46880 18290 28590PIT A 27- 002 32120 10970 21150PIT A 27- 002 45690 18170 27520PIT B 26 - 002 47030 18210 28820PIT A 85 - 002 47870 18380 29490PIT B 26 - 002 46090 18280 27810PIT B 26 - 002 47800 18410 29390PIT A 27- 002 48200 18400 29800PIT A 27- 002 47200 18440 28760PIT B 26 - 002 46830 18360 28470PIT B 26 - 002 44600 18090 26510PIT A 85 - 002 52650 18450 34200PIT B 26 - 002 45710 18180 27530PIT B 26 - 002 46650 18040 28610PIT A 27- 002 48280 18120 30160PIT B 26 - 002 48080 18130 29950PIT B 26 - 002 39290 18150 21140PIT B 26 - 002 45530 18250 27280PIT A 27- 002 48030 18360 29670PIT A 27- 002 48250 18370 29880PIT A 27- 002 31590 10970 20620PIT B 26 - 002 47000 18140 28860PIT A 27- 002 44780 18050 26730PIT B 26 - 002 46730 18030 28700PIT A 27- 002 32420 11040 21380PIT A 85 - 002 48010 18040 29970PIT A 27- 002 47900 18520 29380PIT B 26 - 002 46960 17930 29030PIT B 26 - 002 45950 18310 27640PIT B 26 - 002 47520 18120 29400PIT B 26 - 002 46300 18040 28260PIT B 26 - 002 45020 18230 26790PIT B 26 - 002 46110 18290 27820PIT B 26 - 002 46070 18050 28020PIT B 26 - 002 45590 18060 27530PIT B 26 - 002 44320 17970 26350PIT B 26 - 002 43420 17930 25490PIT B 26 - 002 45110 17970 27140PIT B 26 - 002 46130 18440 27690

Page 127: June Per Shift (Truckscale Port)

PIT B 26 - 002 44830 18120 26710PIT B 26 - 002 44590 18080 26510PIT B 26 - 002 44710 18110 26600PIT B 26 - 002 45410 18180 27230PIT B 26 - 002 46320 18210 28110PIT B 26 - 002 44900 17980 26920PIT A 85 - 002 32180 11020 21160PIT A 85 - 002 33370 10980 22390PIT B 26 - 002 45250 17910 27340PIT B 26 - 002 45860 17980 27880PIT A 85 - 002 32510 11000 21510PIT B 26 - 002 45400 18420 26980PIT A 85 - 002 47080 18240 28840PIT A 85 - 002 48560 18850 29710PIT B 26 - 002 45090 18420 26670PIT B 26 - 002 45280 18200 27080PIT B 26 - 002 45640 18000 27640PIT A 85 - 002 31000 11200 19800PIT B 26 - 002 45410 18020 27390PIT B 26 - 002 44190 18150 26040PIT B 26- 002 46220 18490 27730PIT B 26 - 002 44900 18200 26700PIT A 85 - 002 49020 21680 27340PIT A 85 - 002 32600 10980 21620PIT A 85 - 002 49320 18060 31260PIT B 26 - 002 45150 18050 27100PIT B 26 - 002 45680 17950 27730PIT B 26- 002 45190 17990 27200PIT B 26 - 002 45670 18020 27650PIT B 26 - 002 46890 18390 28500PIT A 85 - 002 50160 18280 31880PIT A 85 - 002 32890 11020 21870PIT B 26 - 002 46310 18340 27970PIT B 26- 002 48170 18950 29220PIT B 26- 001 46840 18950 27890PIT B 26 - 001 45510 18110 27400PIT B 26- 001 30990 11050 19940PIT B 26 - 001 44320 18000 26320PIT B 26 - 001 45550 18000 27550PIT B 26 - 001 44460 18210 26250PIT A 85 - 001 34410 11000 23410PIT B 26 - 001 45480 18170 27310PIT A 85 - 001 32800 10930 21870PIT B 26 - 001 44800 17960 26840PIT B 26 - 001 44940 18140 26800PIT A 85 - 001 33330 11100 22230PIT B 26 - 001 44790 17910 26880PIT B 26- 001 46310 18930 27380PIT B 26- 001 46580 18460 28120PIT B 26 - 001 44960 18400 26560

Page 128: June Per Shift (Truckscale Port)

PIT B 26 - 001 44020 18090 25930PIT B 26 - 001 44950 17950 27000PIT B 26 - 001 43750 18010 25740PIT B 26- 001 48170 17930 30240PIT B 26 - 001 45370 18250 27120PIT B 26 - 001 44540 18050 26490PIT B 26 - 001 43690 18010 25680PIT B 26 - 001 45150 18280 26870PIT A 85 - 001 51100 18590 32510PIT B 26 - 001 46170 18150 28020PIT B 26- 001 30870 11140 19730PIT B 26 - 001 45300 18280 27020PIT B 26 - 001 45580 18340 27240PIT B 26 - 001 46410 18330 28080PIT B 26 - 001 45450 17990 27460PIT B 26 - 001 45980 18150 27830PIT B 26 - 001 45880 18140 27740PIT A 65 - 001 45130 18720 26410PIT B 26- 001 33500 11090 22410PIT B 26- 001 33700 11080 22620PIT A 65 - 001 46980 18920 28060PIT B 26- 001 33670 11100 22570PIT B 26- 001 33150 11070 22080PIT B 26- 001 32640 11130 21510PIT A 65 - 001 46040 18540 27500PIT A 65 - 001 43640 17980 25660PIT B 26 - 001 45510 17980 27530PIT B 26 - 001 45270 18150 27120PIT B 26 - 001 44990 18010 26980PIT B 26 - 001 45310 17980 27330PIT B 26 - 001 46160 18170 27990PIT A 65 - 001 47740 18660 29080PIT B 26 - 001 45160 18260 26900PIT B 26- 001 32900 11010 21890PIT B 26- 001 32570 11010 21560PIT B 26 - 001 45600 18270 27330PIT B 26 - 001 47410 18250 29160PIT B 26 - 001 45800 18240 27560

PIT B 26 - 001 46550 18270 28280PIT B 26 - 001 44620 18060 26560PIT B 26 - 001 50140 18240 31900PIT C 64-1 001 31910 11100 20810PIT B 26 - 001 45970 17890 28080PIT B 26 - 001 45300 18080 27220PIT B 26 - 001 46180 17950 28230PIT B 26 - 001 48760 18240 30520PIT B 26 - 001 44620 18250 26370PIT B 26 - 001 44370 18220 26150

Page 129: June Per Shift (Truckscale Port)

PIT B 26 - 001 44220 18200 26020PIT B 26 - 001 44990 17880 27110PIT C 64-1 001 32510 11150 21360PIT B 26 - 001 45580 18240 27340PIT B 26 - 001 43360 17970 25390PIT B 26 - 001 45340 18300 27040PIT C 64-1 001 33210 11060 22150PIT C 64-1 001 34250 11020 23230PIT B 26 - 001 45460 17820 27640PIT C 64-1 001 33230 11020 22210PIT A 65 - 001 49150 18520 30630PIT B 26 - 001 44680 18010 26670PIT A 65 - 001 48350 18100 30250PIT B 26 - 001 44590 18160 26430PIT B 26 - 001 43810 18140 25670PIT A 65 - 001 46710 18050 28660PIT B 26 - 001 45170 18230 26940PIT A 65 - 001 49920 18600 31320PIT B 26 - 001 44090 18240 25850PIT B 26 - 001 43330 18170 25160PIT C 64-1 001 32840 11090 21750PIT B 26 - 001 43540 17950 25590PIT A 65 - 001 47890 18020 29870PIT B 26 - 001 43910 18160 25750PIT C 64-1 001 33890 10880 23010PIT B 26 - 001 44500 18080 26420PIT C 64-1 001 33340 11000 22340PIT B 26 - 001 43840 18230 25610PIT C 64-1 001 32630 10940 21690PIT A 65 - 001 45330 18030 27300PIT B 26 - 001 43200 18010 25190PIT B 26 - 001 44610 17910 26700PIT B 26 - 001 43770 18050 25720PIT B 26 - 001 44220 18030 26190PIT C 64-1 001 32320 10850 21470PIT B 26 - 001 44960 18150 26810PIT B 26 - 001 44300 18150 26150PIT C 64-1 001 33330 11070 22260PIT B 26 - 001 44510 18130 26380PIT B 26 - 001 43420 17880 25540PIT B 26 - 001 43610 17890 25720PIT C 64-1 001 33720 10940 22780PIT B 26 - 001 44530 18080 26450

Page 130: June Per Shift (Truckscale Port)

PIT C 64-1 001 32970 10930 22040PIT C 64-1 001 32370 11020 21350PIT B 26 - 001 45090 17930 27160PIT C 64-1 001 49730 18480 31250PIT B 26 - 001 44100 18200 25900PIT A 65 - 001 48370 18030 30340PIT B 26 - 001 44210 17940 26270PIT A 65 - 001 47780 18590 29190PIT A 65 - 001 46790 17860 28930PIT B 26 - 001 46350 17870 28480PIT B 26 - 001 46870 17890 28980PIT C 64-1 001 30580 10810 19770PIT A 65 - 001 48190 18900 29290PIT B 26 - 001 48290 18150 30140PIT C 64-1 001 32640 10990 21650PIT B 26 - 001 46870 18180 28690PIT B 26 - 001 46940 18150 28790PIT B 26 - 001 47260 17890 29370PIT C 64-1 001 50690 18480 32210PIT A 85 - 001 48070 18030 30040PIT C 64-1 001 32440 10890 21550PIT C 64-1 001 33370 11090 22280PIT B 26 - 001 48730 18320 30410PIT B 26 - 001 46490 18340 28150PIT B 26 - 001 48050 17940 30110PIT C 64-1 001 31530 10780 20750PIT B 26 - 001 47550 18030 29520PIT B 26 - 001 46800 18010 28790PIT C 64-1 001 48840 17900 30940PIT A 85 - 001 49230 18010 31220PIT A 85 - 001 49240 18540 30700PIT C 64-1 001 51130 18930 32200PIT C 64-1 001 33330 11020 22310PIT A 85-2 001 44000 18220 25780PIT A 65 - 001 48240 17980 30260PIT C 64-1 001 49390 18430 30960PIT A 85-2 001 43610 18130 25480PIT C 64-1 001 33100 11010 22090PIT A 85 - 001 33210 11130 22080PIT A 85-2 001 45820 18190 27630PIT A 85-2 001 46220 18110 28110PIT A 85-2 001 47420 17950 29470PIT C 64-1 001 48370 17920 30450

Page 131: June Per Shift (Truckscale Port)

PIT C 64-1 001 49680 17960 31720PIT A 85 - 001 31750 10880 20870PIT A 85 - 001 33950 10880 23070PIT A 85 - 001 48730 18120 30610PIT C 64-1 001 47150 18310 28840PIT A 85-2 001 45810 18010 27800PIT A 85-2 001 45150 18040 27110PIT A 85-2 001 45840 18310 27530PIT A 85-2 001 45940 18340 27600PIT A 85-2 001 46360 18320 28040PIT A 85-2 001 44740 18220 26520PIT A 85-2 001 44970 18230 26740PIT A 85-2 001 45780 17910 27870PIT A 85-2 001 45710 18220 27490PIT A 85-2 001 45150 18040 27110PIT A 85-2 001 45640 18070 27570PIT A 85-2 001 44600 18240 26360PIT A 85-2 001 44680 17980 26700PIT A 85 - 001 32940 11110 21830PIT A 85-2 001 44230 18000 26230PIT A 85 - 001 33060 11010 22050PIT A 85-2 001 45110 18310 26800PIT A 85 - 001 33950 11160 22790PIT A 85-2 001 45670 18320 27350PIT A 85-2 001 44030 18360 25670PIT A 85-2 001 45280 18040 27240PIT A 85-2 001 44820 18200 26620PIT A 85-2 001 44940 17900 27040PIT B 26-1 001 33060 11100 21960PIT A 85-2 001 45520 18240 27280PIT A 85-2 001 43330 18110 25220PIT B 26-1 001 33480 11060 22420PIT A 85-2 001 43190 18220 24970PIT B 26-1 001 33970 11050 22920PIT A 85-2 001 44890 17980 26910PIT A 85 - 001 49170 18070 31100PIT A 85-2 001 45330 18230 27100PIT B 26-1 001 32610 11040 21570PIT A 85-2 001 45090 18350 26740PIT A 68-2 001 31050 11160 19890PIT A 85 - 001 50150 18860 31290PIT A 68-2 001 33430 11130 22300PIT A 68-2 001 32040 11070 20970

Page 132: June Per Shift (Truckscale Port)

PIT A 85-2 001 46130 18410 27720PIT A 85-2 001 44550 18410 26140PIT A 85-2 001 45020 18390 26630PIT A 68-2 001 33000 11120 21880PIT A 85-2 001 43780 18220 25560PIT A 85-2 001 44980 18070 26910PIT A 85-2 001 43970 18300 25670PIT A 85-2 001 44040 18090 25950PIT A 85-2 001 45850 18350 27500PIT A 85-2 001 44790 18120 26670PIT A 85-2 001 45900 18310 27590PIT A 68-2 001 32180 11240 20940PIT A 85-2 001 45940 18410 27530PIT A 68-2 001 33910 11200 22710PIT A 68-2 001 34820 11140 23680PIT A 68-2 001 33400 11220 22180PIT C 64-1 001 46730 18550 28180PIT A 68-2 001 33810 11100 22710PIT A 85-2 001 43800 18180 25620PIT C 64-1 001 47970 18080 29890PIT A 85-2 001 46760 18280 28480PIT A 85-2 001 44760 18430 26330PIT A 85-2 001 45230 18010 27220PIT A 85-2 001 45390 18230 27160PIT C 64-1 001 47580 18250 29330PIT C 64-1 001 39750 18050 21700PIT A 85-2 001 46370 18350 28020PIT A 85-2 001 45670 18230 27440PIT A 85-2 001 45850 18320 27530PIT A 85-2 001 44820 18150 26670PIT A 85-2 001 44280 18010 26270PIT C 64-1 001 36520 17670 18850PIT C 64-1 001 48000 18780 29220PIT A 68-2 001 34430 10990 23440PIT A 85-2 001 45100 18270 26830PIT A 68-2 001 33670 11120 22550PIT A 68-2 001 34340 10970 23370PIT A 68-2 001 34340 11200 23140PIT A 85-2 001 46700 18200 28500PIT A 85 - 001 44350 17820 26530PIT A 85-2 001 45040 18140 26900PIT A 68-2 001 35470 11120 24350PIT A 85-2 001 45670 18030 27640

Page 133: June Per Shift (Truckscale Port)

PIT A 85-2 001 46090 18230 27860PIT A 68-2 001 33450 11050 22400PIT A 85-2 001 44600 18210 26390PIT C 64-1 001 48280 18720 29560PIT A 85-2 001 45580 18010 27570PIT A 68-2 001 35240 11200 24040PIT A 68-2 001 33710 11150 22560PIT A 68-2 001 34160 11220 22940PIT A 85-2 001 45540 18310 27230PIT A 68-2 001 34100 11100 23000PIT C 64-1 001 47920 18000 29920PIT A 85-2 001 45420 18350 27070PIT C 64-1 001 49260 18670 30590PIT A 85-2 001 47020 18330 28690PIT A 85-2 001 45430 18180 27250PIT A 85-2 001 46970 18380 28590PIT A 85-2 001 44760 18310 26450PIT A 85-2 001 45600 18330 27270PIT A 85-2 001 45590 18100 27490PIT A 85-2 001 45090 18290 26800PIT A 85-2 001 46550 18240 28310PIT A 68-2 001 33780 11080 22700PIT A 85-2 001 46100 18100 28000PIT A 68-2 001 34140 11230 22910PIT A 68-2 001 33550 11090 22460PIT A 68-2 001 34070 11050 23020PIT A 85-2 001 48440 18290 30150PIT A 85-2 001 45970 18380 27590PIT C 64-1 001 44190 17830 26360PIT A 68-2 001 33980 11260 22720PIT A 85-2 001 45560 18110 27450PIT A 85-2 001 44970 18210 26760PIT A 85-2 001 47890 18300 29590PIT A 85-2 001 46840 18300 28540PIT C 64-1 001 46780 18480 28300PIT A 85-2 001 48480 18060 30420PIT A 85-2 001 47250 18170 29080PIT A 85-2 001 46100 18260 27840PIT C 64-1 001 47040 18030 29010PIT C 64-1 001 46440 18690 27750PIT A 85-2 001 46110 18110 28000PIT C 64-1 001 44490 18040 26450PIT C 64-1 001 30540 11110 19430

Page 134: June Per Shift (Truckscale Port)

PIT A 85-2 001 47710 18240 29470PIT A 68-2 001 33700 11070 22630PIT C 64-1 001 42410 18270 24140PIT C 64-1 001 43640 18010 25630PIT C 64-1 001 43650 18120 25530PIT A 85-2 001 47130 18110 29020PIT A 85-2 001 45450 18170 27280PIT C 64-1 001 31550 11090 20460PIT C 64-1 001 31670 11020 20650PIT A 85-2 001 44830 17950 26880PIT A 85-2 001 44820 18190 26630PIT A 85-2 001 44430 18150 26280PIT C 64-1 001 31860 11060 20800PIT C 64-1 001 30930 11150 19780PIT C 64-1 001 32930 11110 21820PIT C 64-1 001 48570 18280 30290PIT A 85-2 001 43510 18120 25390PIT A 85-2 001 44210 17890 26320PIT A 85-2 001 42980 17960 25020PIT A 85-2 001 43280 18070 25210PIT A 85-2 001 43480 18100 25380PIT A 85-2 001 43860 18090 25770PIT C 64-1 001 47560 18010 29550PIT A 85-2 001 44230 18210 26020PIT A 85-2 001 44350 18250 26100PIT A 85-2 001 44660 18250 26410PIT A 85-2 001 44770 18420 26350PIT C 64-1 001 45990 18150 27840PIT A 85-2 001 43830 18190 25640PIT C 64-1 001 49240 18960 30280PIT A 85-2 001 43550 18120 25430PIT A 85-2 001 45180 18090 27090PIT A 85-2 001 44910 18070 26840PIT C 64-1 001 47580 18260 29320PIT A 85-2 001 43910 17990 25920PIT A 85-2 001 45850 18340 27510PIT C 64-1 001 48090 18300 29790PIT A 85-2 001 45440 18270 27170PIT C 64-1 001 49150 18270 30880PIT B 26 - 001 47560 18220 29340PIT A 85-2 001 44840 18270 26570PIT B 26-1 001 30110 11120 18990PIT C 64-1 001 50340 18320 32020

Page 135: June Per Shift (Truckscale Port)

PIT A 85-2 001 43860 18370 25490PIT B 26-1 001 30120 11020 19100PIT B 26 - 001 45260 18190 27070PIT B 26-1 001 29930 11110 18820PIT C 64-1 001 50750 18930 31820PIT B 26 - 001 45820 18050 27770PIT C 64-1 001 30950 11230 19720PIT B 26-1 001 29350 11100 18250PIT A 85-2 001 44830 18060 26770PIT C 64-1 001 46380 18210 28170PIT B 26-1 001 44720 18350 26370PIT C 64-1 001 45030 17920 27110PIT B 26 - 001 45640 18010 27630PIT B 26 - 001 46060 18070 27990PIT B 26 - 001 45980 18170 27810PIT B 26-1 001 29110 11100 18010PIT A 85-2 001 45110 18220 26890PIT B 26 - 001 45910 18040 27870PIT A 85-2 001 45340 18300 27040PIT A 85-2 001 46100 18270 27830PIT B 26-1 001 30160 11100 19060PIT C 64-1 001 45650 17630 28020PIT B 26 - 001 46410 18140 28270PIT C 64-1 001 49480 18770 30710PIT C 64-1 001 46140 17850 28290PIT A 85-2 001 43920 18100 25820PIT B 26-1 001 29090 11150 17940PIT A 85-2 001 45670 18230 27440PIT B 26 - 001 43820 18130 25690PIT A 85-2 001 46640 18190 28450PIT B 26 - 001 45320 18090 27230PIT B 26 - 001 45420 18040 27380PIT A 85-2 001 44190 18040 26150PIT B 26-1 001 30380 11040 19340PIT B 26 - 001 46670 17970 28700PIT B 26 - 001 44050 18000 26050PIT B 26 - 001 45230 17950 27280PIT B 26-1 001 44450 18380 26070PIT B 26 - 001 43430 17960 25470PIT B 26-1 001 29720 11170 18550PIT B 26-1 001 30310 11180 19130PIT B 26-1 001 29250 11210 18040PIT A 85-2 001 45040 18110 26930

Page 136: June Per Shift (Truckscale Port)

PIT B 26-1 001 29510 11060 18450PIT C 64-1 001 53060 18710 34350PIT B 26 - 001 44920 18200 26720PIT C 64-1 001 47960 17820 30140PIT C 64-1 001 50320 18070 32250PIT A 85-2 001 44830 18360 26470PIT A 85-2 001 45320 18220 27100PIT B 26 - 001 45540 18360 27180PIT B 26 - 001 45460 18160 27300PIT B 26 - 001 43610 18330 25280PIT A 85-2 001 45630 18130 27500PIT C 64- 001 48910 18110 30800PIT C 64- 001 47440 18250 29190PIT A 85-2 001 45440 18160 27280PIT A 85-2 001 45980 18340 27640PIT C 64- 001 32770 11010 21760PIT B 26 - 001 45630 18060 27570PIT B 26 - 001 46480 18080 28400PIT C 64- 001 32460 11010 21450PIT A 27- 001 31160 11070 20090PIT C 64- 001 34180 11190 22990PIT A 27- 001 29760 10800 18960PIT A 27- 001 47260 18510 28750PIT A 27- 001 31310 11080 20230PIT A 85-2 001 44890 18300 26590PIT A 27- 001 44980 18140 26840PIT A 85-2 001 45310 18200 27110PIT A 27- 001 46210 18180 28030PIT A 27- 001 49630 18150 31480PIT A 85-2 001 45450 18050 27400PIT A 85-2 001 46160 18240 27920PIT A 85-2 001 42630 18240 24390PIT A 27- 001 31300 10980 20320PIT A 27- 001 47280 18430 28850PIT A 27- 001 46810 18320 28490PIT A 85-2 001 46200 18050 28150PIT A 85-2 001 45570 18030 27540PIT A 27- 001 46410 18030 28380PIT A 85-2 001 45410 18220 27190PIT A 27- 001 44290 17870 26420PIT A 27- 001 31920 11210 20710PIT A 27- 001 32840 11040 21800PIT A 27- 001 32560 11140 21420PIT A 27- 001 30380 10780 19600PIT A 85-2 001 43470 18180 25290PIT A 85-2 001 42040 18180 23860PIT A 85-2 001 45130 18090 27040PIT A 85-2 001 44190 18230 25960PIT A 85-2 001 43460 18260 25200

Page 137: June Per Shift (Truckscale Port)

PIT A 85-2 001 43350 18200 25150PIT A 85-2 001 44660 18010 26650PIT A 85-2 001 46800 18000 28800PIT A 85-2 001 44660 18140 26520PIT A 85-2 001 44110 18060 26050PIT A 85-2 001 45120 18170 26950PIT A 27- 001 47620 18600 29020PIT A 27- 001 31010 11160 19850PIT A 27- 001 31680 11140 20540PIT A 27- 001 31180 11100 20080PIT A 27- 001 46080 18150 27930PIT A 27- 001 45340 18050 27290PIT A 27- 001 32070 11050 21020PIT A 27- 001 30800 10960 19840PIT A 85-2 001 44790 18220 26570PIT A 85-2 001 45920 18130 27790PIT C 64- 002 48700 18330 30370PIT C 64- 002 44770 18590 26180PIT C 64- 002 50170 18660 31510PIT A 85-2 001 45620 17980 27640PIT C 64- 002 50170 18580 31590PIT A 85-2 001 46660 18040 28620PIT A 85-2 001 45040 18190 26850PIT A 85-2 001 45810 18220 27590PIT A 85-2 001 45630 18020 27610PIT A 85-2 001 45040 18100 26940PIT A 85-2 001 44720 18100 26620PIT C 64- 002 48480 18110 30370PIT A 85-2 001 45220 17940 27280PIT C 64- 002 44810 18100 26710PIT C 64- 002 45370 17700 27670PIT A 85-2 001 44550 18270 26280PIT A 27- 001 46300 18160 28140PIT C 64- 002 47780 18080 29700PIT C 64- 002 48250 18390 29860PIT A 85-2 001 45850 18290 27560PIT C 64- 002 43500 17910 25590PIT C 64- 002 48090 18500 29590PIT A 85-2 001 45500 18230 27270PIT C 64- 002 47870 18720 29150PIT A 85-2 001 46130 18090 28040PIT A 85-2 001 45750 18190 27560PIT A 85-2 001 46800 18250 28550PIT A 85-2 001 44340 18350 25990PIT A 85-2 001 46670 18170 28500PIT C 64- 002 46950 18210 28740PIT C 64- 002 45860 17780 28080PIT A 85-2 001 45740 18210 27530PIT C 64- 002 49210 18320 30890PIT A 85-2 001 45740 18210 27530

Page 138: June Per Shift (Truckscale Port)

PIT A 85-2 001 45470 18130 27340PIT A 85-2 001 46410 18420 27990PIT C 64- 002 51600 18440 33160PIT B 26- 001 29680 11190 18490PIT A 85-2 001 45880 18300 27580PIT B 26- 001 30240 11160 19080PIT A 85-2 001 45240 18290 26950PIT C 64- 002 44760 18260 26500PIT B 26- 001 30170 11120 19050PIT A 85-2 001 45720 18130 27590PIT B 26- 001 30190 11130 19060PIT A 85-2 001 46630 18260 28370PIT C 64- 002 44590 17910 26680PIT A 85-2 001 46300 18330 27970PIT A 85-2 001 46590 18410 28180PIT A 85-2 001 46990 18120 28870PIT B 26- 001 45430 18210 27220PIT C 64- 002 46220 18340 27880PIT C 64- 002 48950 18510 30440PIT A 85-2 001 46280 18170 28110PIT A 85-2 001 45970 18270 27700PIT C 64- 002 49960 18690 31270PIT A 85-2 001 46780 18430 28350PIT C 64- 002 46850 18040 28810PIT C 64- 002 48280 18280 30000PIT C 64- 002 51480 18590 32890PIT A 85-2 001 46680 18160 28520PIT A 85-2 001 45740 18190 27550PIT C 64- 002 39000 17820 21180PIT B 26- 001 30520 11190 19330PIT A 85-2 001 46860 18190 28670PIT A 85-2 001 45470 18250 27220PIT B 26- 001 30670 11150 19520PIT A 85-2 001 45720 18300 27420PIT B 26- 001 31320 11270 20050PIT C 64- 002 50690 18670 32020PIT B 26- 001 30680 11100 19580PIT B 26- 001 31040 11120 19920PIT A 85-2 001 45330 18290 27040PIT A 85-2 001 45180 18240 26940PIT A 85-2 001 44010 18080 25930PIT A 85-2 001 45820 18240 27580PIT B 26- 001 31620 11260 20360PIT B 26- 001 30680 11090 19590PIT B 26- 001 31420 11170 20250PIT B 26- 001 31350 11140 20210PIT B 26- 001 31230 11080 20150PIT A 85-2 001 45750 18400 27350PIT A 85-2 001 45250 18230 27020PIT B 26- 001 46320 18110 28210

Page 139: June Per Shift (Truckscale Port)

PIT B 26- 001 31150 11210 19940PIT A 85-2 001 45920 18110 27810PIT A 85-2 001 44760 18190 26570PIT A 85-2 001 44870 18280 26590PIT A 85-2 001 44880 18290 26590PIT A 85-2 001 45980 18190 27790PIT C 64- 002 48100 18620 29480PIT C 64- 002 49900 18160 31740PIT A 85-2 001 45250 18220 27030PIT C 64- 002 47040 18210 28830PIT A 85-2 001 44270 18010 26260PIT C 64- 002 46800 18500 28300PIT A 85-2 001 44710 18310 26400PIT C 64- 002 44390 17900 26490PIT C 64- 002 45790 18250 27540PIT A 85-2 001 44730 18310 26420PIT C 64- 002 31660 11030 20630PIT C 64- 002 47200 18600 28600PIT C 64- 002 46930 18080 28850PIT A 85-2 001 44290 18310 25980PIT B 26- 001 31310 11030 20280PIT A 85-2 001 45670 18170 27500PIT A 85-2 001 44020 18230 25790PIT B 26- 001 30850 11110 19740PIT A 85-2 001 45750 18110 27640PIT A 85-2 001 44480 18280 26200PIT B 26- 001 31640 11050 20590PIT B 26- 001 30610 11140 19470PIT C 64- 002 47110 18110 29000PIT A 85-2 001 44180 18230 25950PIT A 85- 001 42150 18220 23930PIT A 85-3 001 46830 17940 28890PIT A 85- 001 44500 18170 26330PIT B 26- 001 44170 18130 26040PIT A 85-3 001 47070 18230 28840PIT B 26- 001 31040 11170 19870PIT C 64- 002 47860 18050 29810PIT B 26- 001 29430 11030 18400PIT C 64- 002 48040 18590 29450PIT A 85-3 001 47780 18320 29460PIT A 85-3 001 46370 18120 28250PIT C 64- 002 47490 18450 29040PIT A 85-3 001 42990 18080 24910PIT A 85-3 001 47330 18180 29150PIT B 26- 001 48500 18730 29770PIT C 64- 002 43300 17950 25350PIT C 64- 002 47100 18200 28900PIT B 26- 001 31740 11130 20610PIT C 64- 002 46420 18470 27950PIT A 85- 001 43980 18280 25700

Page 140: June Per Shift (Truckscale Port)

PIT A 85-3 001 45950 18180 27770PIT A 85- 001 43060 17970 25090PIT A 85-3 001 46770 18160 28610PIT A 85- 001 44510 18210 26300PIT C 64- 002 46650 18170 28480PIT B 26- 001 31030 11010 20020PIT B 26- 001 31120 11140 19980PIT C 64- 002 47440 18010 29430PIT A 85- 001 44240 18110 26130PIT A 85- 001 44190 18100 26090PIT B 26- 001 33360 11040 22320PIT A 85- 001 44520 18120 26400PIT B 26- 001 32750 11110 21640PIT C 64- 002 46010 18550 27460PIT A 85- 001 43730 18060 25670PIT A 85- 001 43150 18350 24800PIT B 26- 001 32290 11160 21130PIT C 64- 002 46190 18500 27690PIT C 64- 002 42590 17860 24730PIT A 85- 001 43410 18200 25210PIT A 85- 001 43720 18100 25620PIT A 85- 001 44290 17940 26350PIT A 85- 001 42430 18180 24250PIT C 64- 002 46200 18150 28050PIT C 64- 002 44340 18150 26190PIT A 85- 001 44780 18130 26650PIT C 64- 002 46020 18460 27560PIT C 64- 002 49490 18890 30600PIT A 85- 001 44040 18090 25950PIT A 85- 001 44580 18050 26530PIT C 64- 002 46700 18180 28520PIT A 85- 001 44480 18060 26420PIT B 26- 001 29260 10990 18270PIT C 64- 002 46950 17970 28980PIT A 85- 001 42720 18320 24400PIT B 26- 001 46490 18680 27810PIT C 64- 002 48000 18590 29410PIT B 26- 001 32290 11110 21180PIT C 64- 002 47160 18100 29060PIT C 64- 002 48530 18440 30090PIT A 85- 001 43650 18060 25590PIT B 26- 001 30900 11090 19810PIT C 64- 002 43910 17840 26070PIT B 26- 001 31960 11100 20860PIT A 85- 001 45470 18190 27280PIT B 26- 001 31210 11120 20090PIT B 26- 001 30860 11140 19720PIT A 85- 001 44870 18360 26510PIT A 85- 001 46150 18150 28000PIT A 85- 001 47430 17900 29530

Page 141: June Per Shift (Truckscale Port)

PIT C 64- 002 46540 18120 28420PIT C 64- 002 45130 18040 27090PIT A 85- 001 46830 18170 28660PIT B 26- 001 47340 18860 28480PIT A 85- 001 46530 18020 28510PIT C 64- 002 46100 18070 28030PIT B 26- 001 31150 11010 20140PIT C 64- 002 46340 17930 28410PIT A 85- 001 45010 18270 26740PIT A 85- 001 46010 18200 27810PIT A 85- 001 47330 18190 29140PIT A 85-3 001 46890 18200 28690PIT A 85- 001 46430 18110 28320PIT A 85- 001 45080 17940 27140PIT A 85- 001 46220 18250 27970PIT A 85- 001 45310 18300 27010PIT A 85- 001 45410 18350 27060PIT C 64- 002 50400 18560 31840PIT B 26- 001 31070 11150 19920PIT C 64- 002 47840 18630 29210PIT B 26- 001 32190 11070 21120PIT B 26- 001 32170 11260 20910PIT B 26- 001 31690 11290 20400PIT C 64- 002 45880 18000 27880PIT C 64- 002 44510 18110 26400PIT B 26- 001 32020 11110 20910PIT A 85- 001 45090 18140 26950PIT A 85- 001 45160 18230 26930PIT A 85- 001 45230 18220 27010PIT A 85- 001 44890 18220 26670PIT C 64- 002 47500 18880 28620PIT A 85- 001 44930 18150 26780PIT A 85- 001 44360 18550 25810PIT A 85- 001 43620 18330 25290PIT A 85- 001 42880 18160 24720PIT C 64- 002 48560 18470 30090PIT C 64- 002 47650 18540 29110PIT C 64- 002 46730 18080 28650PIT C 64- 002 48980 18570 30410PIT B 26- 001 32410 11070 21340PIT C 64- 002 48270 18110 30160PIT A 85- 001 46030 18140 27890PIT A 85- 001 47410 18300 29110PIT B 26- 001 29830 11190 18640PIT A 85- 001 44280 18330 25950PIT C 64- 002 49980 18050 31930PIT B 26- 001 31130 11130 20000PIT A 85- 001 46000 18150 27850PIT C 64- 002 46790 18200 28590PIT B 26- 001 30350 11110 19240

Page 142: June Per Shift (Truckscale Port)

PIT A 85- 001 44910 18120 26790PIT C 64- 002 48310 18420 29890PIT C 64- 002 50560 18910 31650PIT B 26- 001 30700 11070 19630PIT A 85- 001 45520 18240 27280PIT A 85- 001 46050 18360 27690PIT A 85- 001 45670 18240 27430PIT C 64- 002 49600 18550 31050PIT A 85- 001 45790 18440 27350PIT A 85- 001 45330 18200 27130PIT C 64- 002 48860 18600 30260PIT C 64- 002 48680 18640 30040PIT B 26- 001 45910 18130 27780PIT A 85- 001 46210 18020 28190PIT B 26- 001 30980 11260 19720PIT A 85- 001 44140 18130 26010PIT B 26- 001 31190 11200 19990PIT B 26- 001 31670 11090 20580PIT A 85- 001 45240 18340 26900PIT A 85- 001 44220 18310 25910PIT C 64- 002 47740 18080 29660PIT B 26- 001 31670 11120 20550PIT B 26- 001 30290 10980 19310PIT C 64- 002 46150 18060 28090PIT B 26- 001 31380 11150 20230PIT A 85- 001 46280 18280 28000PIT C 64- 002 50000 18240 31760PIT A 85- 001 46490 18160 28330PIT A 85- 001 46690 18210 28480PIT A 85- 001 45040 18220 26820PIT B 26- 001 31830 11110 20720PIT C 64- 002 49200 18930 30270PIT A 85- 001 46540 18060 28480PIT B 26- 001 30540 11160 19380PIT B 26- 001 30780 11190 19590PIT A 85- 001 44990 18350 26640PIT C 64- 002 47930 18300 29630PIT C 64- 002 45360 18170 27190PIT C 64- 002 51920 18600 33320PIT A 85- 001 45590 18290 27300PIT B 26- 001 30860 11070 19790PIT C 64- 002 51290 18650 32640PIT A 85- 001 46880 18030 28850PIT A 85- 001 45420 18330 27090PIT B 26- 001 30140 11000 19140PIT B 26- 001 30410 11140 19270PIT C 64- 002 46920 18150 28770PIT A 85- 001 47360 18180 29180PIT A 85- 001 46570 18310 28260PIT C 64- 002 48720 18640 30080

Page 143: June Per Shift (Truckscale Port)

PIT A 85- 001 46530 18180 28350PIT C 64- 002 49840 19020 30820PIT B 26- 001 30710 11160 19550PIT B 26- 001 30700 11100 19600PIT A 85- 001 45140 18220 26920PIT A 85- 001 45700 18220 27480PIT A 85- 001 47150 18340 28810PIT C 64- 002 47760 18160 29600PIT C 64- 002 50910 18640 32270PIT B 26- 001 30450 11040 19410PIT A 85- 001 46640 18100 28540PIT B 26- 001 30830 11090 19740PIT B 26- 001 30010 11080 18930PIT A 85- 001 45310 18110 27200PIT B 26- 001 31380 11130 20250PIT C 64- 002 47030 18260 28770PIT B 26- 001 31770 11050 20720PIT C 64- 002 50000 18060 31940PIT C 64- 002 32630 11110 21520PIT A 85- 001 45160 18370 26790PIT B 26- 001 30990 10950 20040PIT A 85- 001 48130 18380 29750PIT B 26- 001 31240 11110 20130PIT C 64- 002 47580 18650 28930PIT C 64- 002 44010 18100 25910PIT A 85- 001 45890 18280 27610PIT A 85- 001 46820 18230 28590PIT A 85- 001 44600 18250 26350PIT C 64- 002 48650 18940 29710PIT B 26- 001 30750 10950 19800PIT A 85- 001 45630 18050 27580PIT A 85- 001 44930 18190 26740PIT A 85- 001 46480 18140 28340PIT C 64- 002 48410 18580 29830PIT C 64- 002 47810 18100 29710PIT A 85- 001 44920 18100 26820

PIT A 85-3 001 45550 18350 27200PIT A 85-3 001 44710 18290 26420PIT C 64-1 002 46090 18130 27960PIT B 26-1 001 31270 11030 20240PIT B 26-1 001 31910 11120 20790PIT C 64-1 002 44360 17940 26420PIT B 26-1 001 32110 11070 21040PIT A 85-3 001 46240 18250 27990PIT A 85-3 001 46020 18230 27790PIT C 64-1 002 44470 18170 26300PIT B 26-1 001 32580 10910 21670PIT A 85-3 001 45340 18240 27100

Page 144: June Per Shift (Truckscale Port)

PIT A 85-3 001 44950 18170 26780PIT A 85-3 001 46440 18220 28220PIT A 85-3 001 45040 18020 27020PIT C 64-1 002 49430 18640 30790PIT B 26-1 001 32200 11070 21130PIT A 85-3 001 45790 18100 27690PIT C 64-1 002 51860 18500 33360PIT B 26-1 001 30390 10850 19540PIT C 64-1 002 47140 18050 29090PIT A 85-3 001 45210 17990 27220PIT B 26-1 001 32640 11080 21560PIT C 64-1 002 47940 18060 29880PIT C 64-1 002 46680 18890 27790PIT C 64-1 002 49230 18610 30620PIT A 85-3 001 45800 18240 27560PIT A 85-3 001 45800 18270 27530PIT C 64-1 002 48760 17910 30850PIT C 64-1 002 46430 18120 28310PIT B 26-1 001 33320 11120 22200PIT A 85-3 001 45560 18210 27350PIT A 85-3 001 45480 18180 27300PIT B 26-1 001 31610 10990 20620PIT C 64-1 002 47200 17910 29290PIT A 85-3 001 46300 18210 28090PIT B 26-1 001 32400 11050 21350PIT A 85-3 001 45700 18090 27610PIT C 64-1 002 47550 18100 29450PIT B 26-1 001 32080 10890 21190PIT C 64-1 002 47910 18560 29350PIT B 26-1 001 31990 11000 20990PIT C 64-1 002 45590 17960 27630PIT A 85-3 001 44360 18040 26320PIT B 26 - 001 44820 17990 26830PIT B 26 - 001 45930 18240 27690PIT C 64-1 002 47450 18060 29390PIT B 26 - 001 47450 17980 29470PIT C 64-1 002 48300 18890 29410PIT C 46-3 002 30410 10850 19560PIT B 26-1 001 32550 11130 21420PIT C 64-1 002 47250 18640 28610PIT C 64-1 002 48500 18740 29760PIT B 26-1 001 33270 11050 22220PIT B 26 - 001 44960 18220 26740

Page 145: June Per Shift (Truckscale Port)

PIT B 26-1 001 32430 11050 21380PIT B 26 - 001 45290 18020 27270PIT B 26-1 001 32960 11110 21850PIT C 46-3 002 31800 11000 20800PIT C 64-1 002 46620 18100 28520PIT C 64-1 002 46750 18000 28750PIT C 46-3 002 31670 10890 20780PIT C 64-1 002 45490 18060 27430PIT C 46-3 002 30530 11030 19500PIT C 64-1 002 47240 18520 28720PIT C 46-3 002 31960 11010 20950PIT C 64-1 002 42720 17790 24930PIT C 46-3 002 30120 10800 19320PIT C 64-1 002 45890 17910 27980PIT B 26 - 001 43810 18210 25600PIT B 26 - 001 44970 18250 26720PIT A 85-3 001 45120 18160 26960PIT C 64-1 002 47210 18540 28670PIT B 26 - 001 44140 18090 26050PIT B 26-1 001 31710 10960 20750PIT B 26 - 001 46160 18190 27970PIT C 46-3 002 31840 11120 20720PIT C 46-3 002 31250 10950 20300PIT C 64-1 002 46000 18170 27830PIT B 26 - 001 47550 17950 29600PIT C 64-1 002 46330 18010 28320PIT C 46-3 002 30670 10940 19730PIT C 64-1 002 46770 18790 27980PIT B 26 - 001 48420 17960 30460PIT A 85-3 001 44100 18050 26050PIT C 64-1 002 47030 18470 28560PIT C 46-3 002 31470 11040 20430PIT C 46-3 002 29940 11040 18900PIT B 26 - 001 49760 18380 31380PIT C 46-3 002 31800 11100 20700PIT B 26 - 001 45760 18190 27570PIT C 64-1 002 43170 17780 25390PIT C 46-3 002 29450 10830 18620PIT B 26 - 001 44490 18140 26350PIT C 64-1 002 44820 18120 26700PIT B 26 - 001 45710 18160 27550PIT C 46-3 002 29920 11040 18880PIT B 26 - 001 44770 17970 26800

Page 146: June Per Shift (Truckscale Port)

PIT C 64-1 002 47040 18030 29010PIT C 46-3 002 31760 10900 20860PIT C 64-1 002 45790 18000 27790PIT C 46-3 002 32590 11130 21460PIT B 26 - 001 45770 18250 27520PIT B 26 - 001 44960 18430 26530PIT B 26 - 001 46140 18220 27920PIT C 46-3 002 31190 11030 20160PIT B 26 - 001 45840 18100 27740PIT B 26 - 001 43880 18350 25530PIT B 26 - 001 47320 18220 29100PIT B 26 - 001 47630 18140 29490PIT B 26 - 001 45860 18300 27560PIT B 26 - 001 45150 18270 26880PIT C 64-1 002 47460 18210 29250PIT C 64-1 002 45770 18130 27640PIT C 64-1 002 32340 11020 21320PIT C 46-3 002 32560 11030 21530PIT C 64-1 002 46130 18910 27220PIT B 26 - 001 45180 18190 26990PIT C 46-3 002 32660 11140 21520PIT C 64-1 002 46400 18450 27950PIT C 64-1 002 48180 18590 29590PIT C 64-1 002 42460 17890 24570PIT C 46-3 002 31940 10880 21060PIT B 26 - 001 45950 18310 27640PIT B 26 - 001 45980 17870 28110PIT C 46-3 002 31710 10900 20810PIT C 46-3 002 30840 11230 19610PIT C 64-1 002 46210 18070 28140PIT B 26 - 001 44950 18390 26560PIT C 64-1 002 45810 17960 27850PIT C 64-1 002 45870 18040 27830PIT B 26 - 001 44570 18290 26280PIT B 26 - 001 45280 18310 26970PIT C 64-1 002 43610 17750 25860PIT A 85-2 001 44710 18160 26550PIT B 26 - 001 45850 18250 27600PIT A 85-2 001 44930 18230 26700PIT C 46-3 002 30170 11160 19010PIT A 85-2 001 45080 18260 26820PIT C 46-3 002 29790 11020 18770PIT A 85-2 001 45620 18280 27340

Page 147: June Per Shift (Truckscale Port)

PIT C 64-1 002 46100 18640 27460PIT A 85-2 001 46670 18080 28590PIT C 46-3 002 31080 11140 19940PIT B 26 - 001 42020 18200 23820PIT C 64-1 002 48300 18940 29360PIT C 46-3 002 30350 11010 19340PIT B 26 - 001 46190 18190 28000PIT B 26 - 001 46040 18390 27650PIT C 46-3 002 30030 11100 18930PIT B 26 - 001 46480 18360 28120PIT C 64-1 002 47370 18440 28930PIT C 46-3 002 30530 10930 19600PIT B 26 - 001 45430 18300 27130PIT C 64-1 002 48160 18620 29540PIT A 85-2 001 45890 18180 27710PIT C 46-3 002 31490 11140 20350PIT A 85-2 001 45540 18210 27330PIT A 85-2 001 46500 18130 28370PIT C 64-1 002 45380 18120 27260PIT C 64-1 002 45320 18010 27310PIT C 46-3 002 29280 10850 18430PIT C 64-1 002 47110 18210 28900PIT A 85-2 001 46710 18220 28490PIT A 85-2 001 45930 18280 27650PIT A 85-2 001 45630 18050 27580PIT C 46-3 002 30710 11030 19680PIT C 64-1 002 43720 17850 25870PIT B 26 - 001 46250 18140 28110PIT C 46-3 002 30000 11060 18940PIT B 26 - 001 45860 18130 27730PIT C 64-1 002 42010 17720 24290PIT B 26 - 001 46400 18280 28120PIT C 46-3 002 30570 11120 19450PIT C 64-1 002 45780 18830 26950PIT C 64-1 002 47080 17900 29180PIT B 26 - 001 46600 18400 28200PIT C 64-1 002 45940 18840 27100PIT C 64-1 002 46450 18570 27880PIT B 26 - 001 45450 18230 27220PIT C 46-3 002 29630 11220 18410PIT C 46-3 002 30100 11030 19070PIT B 26 - 001 44900 17800 27100PIT A 85-2 001 46060 18260 27800

Page 148: June Per Shift (Truckscale Port)

PIT C 46-3 002 30590 11050 19540PIT C 64-1 002 46480 18100 28380PIT A 85-2 001 46080 17990 28090PIT C 64-1 002 47150 18060 29090PIT C 64-1 002 46920 18020 28900PIT A 85-2 001 46180 18210 27970PIT C 46-3 002 30060 11210 18850PIT B 26 - 001 46990 18220 28770PIT C 46-3 002 30800 11010 19790PIT B 26 - 001 46130 18260 27870PIT C 46-3 002 30780 11130 19650PIT A 85-2 001 46410 18160 28250PIT C 64-1 002 44050 17960 26090PIT B 26 - 001 45980 18300 27680PIT A 85-2 001 46330 18300 28030PIT A 85-2 001 45710 18250 27460PIT C 46-3 002 29540 11050 18490PIT C 64-1 002 46090 17920 28170PIT B 26 - 001 46420 18210 28210PIT C 64-1 002 49890 18830 31060PIT C 46-3 002 30910 11120 19790PIT C 64-1 002 46700 18660 28040PIT C 64-1 002 46430 18410 28020PIT C 46-3 002 31460 11040 20420PIT B 26 - 001 45540 18240 27300PIT C 64-1 002 46780 17940 28840PIT C 64-1 002 32390 11140 21250PIT B 26 - 001 45340 18360 26980PIT C 46-3 002 31600 11100 20500PIT C 64-1 002 47110 18000 29110PIT C 64-1 002 45850 18000 27850PIT C 46-3 002 30550 10990 19560PIT A 85-2 001 44980 18170 26810PIT C 64-1 002 47410 17940 29470PIT A 85-2 001 45530 18140 27390PIT A 85-2 001 45620 18010 27610PIT C 46-3 002 29960 11030 18930PIT C 64-1 002 46250 17860 28390PIT C 64-1 002 45440 17830 27610PIT A 85-2 001 46620 18360 28260PIT B 26 - 001 46260 18180 28080PIT C 46-3 002 31050 11040 20010PIT C 64-1 002 47650 18530 29120

Page 149: June Per Shift (Truckscale Port)

PIT C 46-3 002 30760 11020 19740PIT C 46-3 002 29960 10910 19050PIT C 46-3 002 30860 11040 19820PIT C 64-1 002 46690 17810 28880PIT C 64-1 002 47910 18840 29070PIT B 26 - 001 46030 18410 27620PIT B 26 - 001 45610 18360 27250PIT B 26 - 001 46410 18310 28100PIT C 64-1 002 47190 18500 28690PIT B 26 - 001 46550 18390 28160PIT B 26 - 001 47090 18240 28850PIT C 64-1 002 47810 18360 29450PIT C 46-3 002 32210 11160 21050PIT A 85-2 001 44980 17720 27260PIT C 64-1 002 46990 17870 29120PIT A 85-2 001 47000 18170 28830PIT A 85-2 001 45850 18310 27540PIT C 64-1 002 46510 18520 27990PIT A 85-2 001 45610 18210 27400PIT B 26 - 001 45780 18300 27480PIT C 46-3 002 33010 11070 21940PIT C 46-3 002 30010 10990 19020PIT C 46-3 002 32180 10950 21230PIT A 85-2 001 45130 18370 26760PIT C 46-3 002 32420 11050 21370PIT B 26 - 001 44560 18340 26220PIT A 85-2 001 44280 17750 26530PIT C 64-1 002 47820 18450 29370PIT B 26 - 001 45050 18280 26770PIT C 64-1 002 47970 17810 30160PIT B 26 - 001 44100 18380 25720PIT C 46-3 002 31690 11030 20660PIT B 26 - 001 45660 18120 27540PIT C 64-1 002 50290 18780 31510PIT B 26 - 001 47730 18130 29600PIT C 46-3 002 31350 11130 20220PIT A 85-2 001 45910 18280 27630PIT A 85-2 001 45080 18110 26970PIT C 64-1 002 47160 18020 29140PIT C 64-1 002 49860 18340 31520PIT C 64-1 002 48760 17880 30880PIT C 64-1 002 46840 17940 28900PIT C 64-1 002 32620 11140 21480

Page 150: June Per Shift (Truckscale Port)

PIT C 64-1 002 49840 18550 31290PIT A 85-2 001 46190 18170 28020PIT C 46-3 002 31440 11050 20390PIT A 85-2 001 45430 18330 27100PIT C 46-3 002 32710 10950 21760PIT B 26 - 001 45810 18350 27460PIT B 26 - 001 45930 18260 27670PIT C 46-3 002 31330 11050 20280PIT B 26 - 001 47320 18260 29060PIT B 26 - 001 46770 18200 28570PIT A 85-2 001 45090 17720 27370PIT A 85-2 001 45100 18330 26770PIT B 26 - 001 45210 18330 26880PIT A 85-2 001 45050 18120 26930PIT C 64-1 002 49120 18700 30420PIT C 64-1 002 46340 17930 28410PIT C 46-3 002 31560 11120 20440PIT C 46-3 002 30660 11240 19420PIT C 64-1 002 48930 18500 30430PIT C 64-1 002 33040 11250 21790PIT B 26 - 001 45350 17850 27500PIT B 26 - 001 47070 18250 28820PIT B 26 - 001 45640 18290 27350PIT B 26 - 001 45620 18160 27460PIT B 26 - 001 46250 18090 28160PIT B 26 - 001 45190 18260 26930PIT C 64-1 002 50290 18680 31610PIT B 26 - 001 45300 17760 27540PIT B 26 - 001 47110 18160 28950PIT B 26 - 001 44030 17970 26060PIT B 26 - 001 43200 18260 24940PIT B 26 - 001 47360 18180 29180PIT C 64-1 002 32070 11170 20900PIT C 64-1 002 47130 18090 29040PIT C 64-1 002 46210 18110 28100PIT C 64-1 002 33690 10980 22710PIT C 64-1 002 31100 11020 20080PIT C 64-1 002 31040 11170 19870PIT C 64-1 002 47890 18980 28910PIT C 64-1 002 46970 18100 28870PIT B 26 - 001 46160 18340 27820PIT B 26 - 001 47310 17850 29460PIT C 64-1 002 46860 18160 28700

Page 151: June Per Shift (Truckscale Port)

PIT C 64-1 002 49050 18070 30980PIT B 26 - 001 47660 18220 29440PIT B 26 - 001 47760 18260 29500PIT C 64-1 002 47370 18100 29270PIT B 26 - 001 45390 18230 27160PIT B 26 - 001 47290 18080 29210PIT C 64-1 002 47400 18510 28890PIT B 26 - 001 45780 18210 27570PIT B 26 - 001 46070 18050 28020PIT B 26 - 001 47060 18130 28930PIT A 85-2 001 49020 18400 30620PIT A 85-2 001 46640 18580 28060PIT B 26 - 001 45950 18150 27800PIT A 85-2 001 44290 18060 26230PIT B 26 - 001 47900 18140 29760PIT B 26 - 001 46840 17820 29020PIT B 26 - 001 47860 18300 29560PIT B 26 - 001 45310 17970 27340PIT B 26 - 001 47690 17890 29800PIT B 26 - 001 46700 18250 28450PIT B 26 - 001 49180 18070 31110PIT B 26 - 001 46400 18060 28340PIT B 26 - 001 45240 18280 26960PIT B 26 - 001 47030 18250 28780PIT A 85-2 001 44750 18550 26200PIT A 85-2 001 49070 19050 30020PIT B 26 - 001 47140 18270 28870PIT A 85-2 001 47600 18420 29180PIT B 26 - 001 45000 18120 26880PIT A 85-2 001 47680 18040 29640PIT B 26 - 001 46350 18110 28240PIT A 85-2 001 48040 18700 29340PIT C 64-1 002 44010 17930 26080PIT B 26 - 001 47060 18000 29060PIT B 26 - 001 48010 17880 30130PIT B 26 - 001 47420 18150 29270PIT B 26 - 001 47160 18300 28860PIT B 26 - 001 46950 18060 28890PIT B 26 - 001 46590 18290 28300PIT A 85-2 001 43080 18100 24980PIT B 26 - 001 48000 17780 30220PIT A 85-2 001 44600 17850 26750PIT B 26 - 001 46660 18250 28410

Page 152: June Per Shift (Truckscale Port)

PIT B 26 - 001 45680 18060 27620PIT B 26 - 001 47010 18060 28950PIT A 85-2 001 46420 18520 27900PIT B 26 - 001 45850 18020 27830PIT A 85-2 001 48940 18920 30020PIT A 85-2 001 45510 18920 26590PIT A 85-2 001 46530 18690 27840PIT A 85-2 001 46400 18110 28290PIT A 85-2 001 43610 17910 25700PIT B 26 - 001 47270 18210 29060PIT B 26 - 001 46390 18190 28200PIT B 26 - 001 45700 18160 27540PIT B 26 - 001 45290 18100 27190PIT B 26 - 001 46960 18210 28750PIT B 26 - 001 46580 18280 28300PIT B 26 - 001 45560 18070 27490PIT A 85-2 001 43580 18050 25530PIT A 85-2 001 47130 18670 28460PIT A 85-2 001 46730 18540 28190PIT A 85-2 001 47010 18950 28060PIT A 85-2 001 46450 18610 27840PIT A 85-2 001 43040 17820 25220PIT A 85-2 001 44350 17890 26460PIT B 26 - 001 45750 18210 27540PIT A 85-2 001 46110 18170 27940PIT B 26 - 001 46940 17800 29140PIT B 26 - 001 47270 18210 29060PIT B 26 - 001 47530 18270 29260PIT B 26 - 001 45920 18110 27810PIT B 26 - 001 46890 18360 28530PIT A 85-2 001 44230 18240 25990PIT A 85-2 001 43260 17770 25490PIT B 26 - 001 46110 18220 27890PIT B 26 - 001 47250 18220 29030PIT B 26 - 001 47240 17880 29360PIT B 26 - 001 46970 18060 28910PIT B 26 - 001 48330 18220 30110PIT B 26 - 001 46730 18310 28420PIT B 26 - 001 48220 18250 29970PIT B 26 - 001 48760 18260 30500PIT B 26 - 001 46390 18260 28130PIT A 85-2 001 46390 18190 28200PIT C 64-1 002 46450 18180 28270

Page 153: June Per Shift (Truckscale Port)

PIT B 26 - 001 46350 18370 27980PIT A 85-2 001 45960 18620 27340PIT B 26 - 001 45190 18180 27010PIT A 85-2 001 43090 18090 25000PIT B 26 - 001 45670 18070 27600PIT B 26 - 001 45090 18200 26890PIT A 85-2 001 46350 18470 27880PIT B 26 - 001 44810 17830 26980PIT B 26 - 001 45160 18020 27140PIT B 26 - 001 45700 18250 27450PIT B 26 - 001 46150 18130 28020PIT B 26 - 001 45070 18160 26910PIT A 85-2 001 46950 18560 28390PIT B 26 - 001 45310 18170 27140PIT A 85-2 001 47020 19020 28000PIT A 85-2 001 45670 18160 27510PIT B 26 - 001 46620 18300 28320PIT B 26 - 001 44580 18300 26280PIT B 26 - 001 47130 18110 29020PIT A 85-2 001 45770 18200 27570PIT A 85-2 001 46180 18550 27630PIT A 85-2 001 43750 17980 25770PIT B 26 - 001 47680 18030 29650PIT B 26 - 001 45380 18150 27230PIT B 26 - 001 46960 17790 29170PIT A 85-2 001 41490 18500 22990PIT B 26 - 001 44650 18010 26640PIT B 26 - 001 46310 18230 28080PIT B 26 - 001 47560 18150 29410PIT B 26 - 001 47660 18200 29460PIT B 26 - 001 46630 18160 28470PIT C 46-3 001 30760 11250 19510PIT B 26 - 001 45550 18230 27320PIT B 26 - 001 47040 17740 29300PIT A 85-2 001 45840 18080 27760PIT A 85-2 001 47580 18930 28650PIT C 64-1 002 31490 11160 20330PIT B 26 - 001 45740 18290 27450PIT B 26 - 001 46280 18040 28240PIT B 26 - 001 46200 17980 28220PIT A 85-2 001 43570 17990 25580PIT A 85-2 001 46910 18100 28810PIT A 85-2 001 46870 18500 28370

Page 154: June Per Shift (Truckscale Port)

PIT B 26 - 001 45300 17770 27530PIT A 85-2 001 46060 18460 27600PIT A 85-2 001 45560 18100 27460PIT B 26 - 001 46520 18020 28500PIT A 85-2 001 46220 18440 27780PIT B 26 - 001 45450 18180 27270PIT B 26 - 001 46350 18280 28070PIT A 85-2 001 44690 18080 26610PIT A 85-2 001 44220 17990 26230PIT A 85-2 001 43390 17810 25580PIT B 26 - 001 45520 17730 27790PIT B 26 - 001 44940 18270 26670PIT B 26 - 001 46010 18140 27870PIT B 26 - 001 45550 18250 27300PIT B 26 - 001 44690 18010 26680PIT A 85-2 001 46550 18040 28510PIT C 46- 001 32410 11130 21280PIT C 46- 001 30860 11000 19860PIT C 46- 001 30930 11230 19700PIT A 85-2 001 46780 18480 28300PIT B 26 - 001 45450 17890 27560PIT B 26 - 001 45940 18090 27850PIT A 85-2 001 47360 18570 28790PIT B 26 - 001 44140 17750 26390PIT A 85-2 001 47130 18620 28510PIT B 26 - 001 45400 18140 27260PIT B 26 - 001 46350 17960 28390PIT A 85-2 001 42860 17930 24930PIT A 85-2 001 43960 17960 26000PIT B 26 - 001 44690 18200 26490PIT C 46- 001 30070 11060 19010PIT B 26 - 001 46510 18130 28380PIT C 46- 001 30400 10910 19490PIT B 26 - 001 45850 18200 27650PIT B 26 - 001 45800 18100 27700PIT B 26 - 001 44450 18150 26300PIT B 26 - 001 44030 17940 26090PIT C 46- 001 32480 11100 21380PIT B 26 - 001 46680 17910 28770PIT B 26 - 001 43670 18070 25600PIT A 85-2 001 46100 18440 27660PIT A 85-2 001 46650 18500 28150PIT B 26 - 001 44470 17720 26750

Page 155: June Per Shift (Truckscale Port)

PIT A 85-2 001 43720 17930 25790PIT A 85-2 001 45900 18170 27730PIT A 85-2 001 47180 18920 28260PIT C 46- 001 31150 11080 20070PIT B 26 - 001 44860 18220 26640PIT B 26 - 001 45780 18220 27560PIT B 26 - 001 46390 18250 28140PIT B 26 - 001 45250 18320 26930PIT B 26 - 001 45070 17790 27280PIT B 26 - 001 44930 18190 26740PIT B 26 - 001 44670 18180 26490PIT B 26 - 001 45250 18280 26970PIT B 26 - 001 45760 18100 27660PIT B 26 - 001 44800 18390 26410PIT B 26 - 001 45520 18190 27330PIT B 26 - 001 44970 18060 26910PIT C 46- 001 32110 11050 21060PIT A 85-2 001 43080 17880 25200PIT C 46- 001 32500 11150 21350PIT A 85-2 001 43760 18140 25620PIT A 85-2 001 48260 18500 29760PIT B 26 - 001 46530 18220 28310PIT A 85-2 001 46400 18900 27500PIT B 26 - 001 49500 18250 31250PIT A 85-2 001 46960 18440 28520PIT B 26 - 001 45420 18320 27100PIT B 26 - 001 49210 18150 31060PIT B 26 - 001 46020 17800 28220PIT B 26 - 001 48130 18230 29900PIT A 85-2 001 47020 18300 28720PIT C 46- 001 31980 11020 20960PIT B 26 - 001 46730 17790 28940PIT B 26 - 001 47750 18310 29440PIT B 26 - 001 47130 18130 29000PIT B 26 - 001 48540 18400 30140PIT B 26 - 001 46870 18220 28650PIT B 26 - 001 44690 18080 26610PIT A 85-2 001 44880 18130 26750PIT B 26 - 001 45610 18240 27370PIT A 85-2 001 43940 17900 26040PIT A 85-2 001 47470 18520 28950PIT B 26 - 001 46380 18250 28130PIT B 26 - 001 46050 18290 27760

Page 156: June Per Shift (Truckscale Port)

PIT B 26 - 001 46500 18160 28340PIT B 26 - 001 45630 18200 27430PIT A 85-2 001 46860 19040 27820PIT B 26 - 001 45540 17880 27660PIT A 85-2 001 47280 18620 28660PIT B 26 - 001 44690 17770 26920PIT C 46- 001 33150 11060 22090PIT B 26 - 001 48690 18290 30400PIT B 26 - 001 47030 18330 28700PIT B 26 - 001 46810 18100 28710PIT C 46- 001 31290 10830 20460PIT C 46- 001 30960 11000 19960PIT B 26 - 001 47390 18230 29160PIT C 46- 001 31260 11260 20000PIT B 26 - 001 48110 18070 30040PIT B 26 - 001 46160 18130 28030PIT A 85-2 001 46210 18560 27650PIT B 26 - 001 45450 18260 27190PIT B 26 - 001 46100 18250 27850PIT B 26 - 001 47570 18240 29330PIT A 85-2 001 42720 18110 24610PIT B 26 - 001 47980 18250 29730PIT B 26 - 001 46820 18100 28720PIT A 85-2 001 43060 17910 25150PIT A 85-2 001 47180 18610 28570PIT B 26 - 001 46830 18100 28730PIT B 26 - 001 48060 18300 29760PIT A 85-2 001 46500 18990 27510PIT C 46- 001 31180 11130 20050PIT B 26 - 001 46930 18130 28800PIT C 46- 001 30720 10940 19780PIT B 26 - 001 46930 18330 28600PIT C 46- 001 30590 11250 19340PIT B 26 - 001 46290 17820 28470PIT B 26 - 001 46750 18230 28520PIT B 26 - 001 46320 18180 28140PIT C 46- 001 31810 11000 20810PIT B 26 - 001 46780 18240 28540PIT A 85-2 001 46230 18030 28200PIT B 26 - 001 47180 19060 28120PIT B 26 - 001 45470 17940 27530PIT B 26 - 001 49440 18650 30790PIT B 26 - 001 47410 18200 29210

Page 157: June Per Shift (Truckscale Port)

PIT B 26 - 001 44400 18100 26300PIT A 85-2 001 45470 18130 27340PIT A 85-2 001 47620 18570 29050PIT B 26 - 001 47500 18260 29240PIT B 26 - 001 45380 18160 27220PIT B 26 - 001 44250 18140 26110PIT B 26 - 001 47580 17970 29610PIT B 26 - 001 48420 18190 30230PIT B 26 - 001 47320 18260 29060PIT B 26 - 001 46600 18550 28050PIT B 26 - 001 45640 18120 27520PIT B 26 - 001 46820 18170 28650PIT B 26 - 001 49730 18180 31550PIT B 26 - 001 48840 18100 30740PIT B 26 - 001 46240 18170 28070PIT B 26 - 001 46220 17930 28290PIT B 26 - 001 49150 17950 31200PIT B 26 - 001 49020 18090 30930PIT B 26 - 001 47970 18160 29810PIT B 26 - 001 48950 18110 30840PIT B 26 - 001 45340 17730 27610PIT B 26 - 001 49910 18610 31300PIT B 26 - 001 46520 18610 27910PIT A 65 - 001 34740 11190 23550PIT B 26 - 001 44330 18070 26260PIT B 26 - 001 44140 18140 26000PIT B 26 - 001 44920 18100 26820PIT B 26 - 001 44650 18030 26620PIT B 26 - 001 45400 18160 27240PIT B 26 - 001 44660 18160 26500PIT B 26 - 001 44640 18160 26480PIT B 26 - 001 42330 18240 24090PIT B 26 - 001 43820 18100 25720PIT A 65 - 001 31710 11170 20540PIT B 26 - 001 48850 17720 31130PIT A 65 - 001 32430 11050 21380PIT B 26 - 001 46420 18100 28320PIT B 26 - 001 45380 18020 27360PIT B 26 - 001 44670 17910 26760PIT A 65 - 001 30800 11080 19720PIT B 26 - 001 44150 17980 26170PIT B 26 - 001 45180 18020 27160PIT A 65 - 001 32040 11100 20940PIT B 26 - 001 44570 18000 26570PIT A 65 - 001 32370 11090 21280PIT B 26 - 001 45200 17700 27500PIT B 26 - 001 48220 17820 30400PIT A 65 - 001 31310 10820 20490PIT A 65 - 001 31810 10980 20830PIT B 26 - 001 44570 17710 26860

Page 158: June Per Shift (Truckscale Port)

PIT A 85- 001 45050 17870 27180PIT A 85- 001 45800 18080 27720PIT B 26 - 001 47950 18020 29930PIT A 85- 001 46260 18050 28210PIT B 26 - 001 49690 18060 31630PIT A 65 - 001 32430 11020 21410PIT B 26 - 001 46870 17830 29040PIT A 85- 001 45280 17880 27400PIT A 85- 001 46580 18000 28580PIT A 85- 001 46090 18100 27990PIT A 85- 001 46180 18040 28140PIT B 26 - 001 45170 17960 27210PIT A 65 - 001 31870 11220 20650PIT A 65 - 001 32280 11030 21250PIT B 26 - 001 45710 17970 27740PIT A 65 - 001 33190 11230 21960PIT A 85- 001 46460 18190 28270PIT B 26 - 001 42840 18100 24740PIT B 26 - 001 47260 18100 29160PIT A 65 - 001 30960 10810 20150PIT B 26 - 001 48430 18030 30400PIT A 85- 001 45180 17760 27420PIT A 85- 001 44970 18220 26750PIT B 26 - 001 47620 17950 29670PIT B 26 - 001 41650 17840 23810PIT A 85- 001 45650 18000 27650PIT B 26 - 001 44150 17950 26200PIT A 85- 001 44700 18020 26680PIT B 26 - 001 44910 18130 26780PIT A 65 - 001 33830 11030 22800PIT A 65 - 001 31910 11030 20880PIT A 85- 001 45240 17840 27400PIT B 26 - 001 45010 17890 27120PIT B 26 - 001 42580 17860 24720PIT B 26 - 001 45420 18060 27360PIT A 85- 001 45300 18210 27090PIT B 26 - 001 44450 18070 26380PIT A 65 - 001 32530 11190 21340PIT B 26 - 001 48700 18440 30260PIT A 65 - 001 31800 11090 20710PIT A 65 - 001 30760 10840 19920PIT B 26 - 001 43810 18010 25800PIT B 26 - 001 43040 18070 24970PIT A 65 - 001 32720 11220 21500PIT A 85- 001 46240 18240 28000PIT B 26 - 001 42280 17740 24540PIT B 26 - 001 48300 17730 30570PIT A 85- 001 44980 18010 26970PIT B 26 - 001 48440 17870 30570PIT B 26 - 001 45490 17980 27510

Page 159: June Per Shift (Truckscale Port)

PIT B 26 - 001 44820 18160 26660PIT B 26 - 001 44580 17900 26680PIT B 26 - 001 44570 18100 26470PIT B 26 - 001 46520 17960 28560PIT B 26 - 001 45110 18090 27020PIT B 26 - 001 46250 18280 27970PIT A 85- 001 45560 18100 27460PIT B 26 - 001 45670 18200 27470PIT B 26 - 001 45340 18060 27280PIT B 26 - 001 46220 18170 28050PIT B 26 - 001 46630 17870 28760PIT A 85- 001 46640 17890 28750PIT A 85- 001 45310 17630 27680PIT B 26 - 001 41850 18000 23850PIT A 65 - 001 32550 11150 21400PIT A 65 - 001 32860 11010 21850PIT A 65 - 001 33240 11170 22070PIT B 26 - 001 43230 18200 25030PIT B 26 - 001 47140 18130 29010PIT B 26 - 001 44880 17870 27010PIT A 65 - 001 30830 10930 19900PIT A 65 - 001 31980 11080 20900PIT B 26 - 001 50000 18830 31170PIT B 26 - 001 48030 18020 30010PIT B 26 - 001 44530 18020 26510PIT B 26 - 001 47390 18060 29330PIT B 26 - 001 43720 18260 25460PIT B 26 - 001 49760 18570 31190PIT B 26 - 001 44470 18310 26160PIT B 26 - 001 44210 18090 26120PIT B 26 - 001 45540 17810 27730PIT B 26 - 001 43680 18170 25510PIT B 26 - 001 44740 18160 26580PIT B 26 - 001 46490 18000 28490PIT C 64- 001 31980 10990 20990PIT C 64- 001 31270 10990 20280PIT B 26 - 001 43790 17860 25930PIT B 26 - 001 44000 18140 25860PIT B 26 - 001 46660 17840 28820PIT C 64- 001 32660 11140 21520PIT B 26 - 001 45140 17850 27290PIT C 64- 001 32610 11160 21450PIT B 26 - 001 48270 18010 30260PIT C 64- 001 31500 11090 20410PIT C 64- 001 32170 11100 21070PIT B 26 - 001 45000 18160 26840PIT B 26 - 001 45550 18080 27470PIT B 26 - 001 49690 18110 31580PIT B 26 - 001 44670 18050 26620PIT B 26 - 001 50350 18580 31770

Page 160: June Per Shift (Truckscale Port)

PIT B 26 - 001 44470 18160 26310PIT B 26 - 001 45320 18150 27170PIT B 26 - 001 45990 18210 27780PIT B 26 - 001 43860 17840 26020PIT B 26 - 001 44350 17920 26430PIT B 26 - 001 44630 18160 26470PIT C 64- 001 32120 11270 20850PIT B 26 - 001 44470 18130 26340PIT B 26 - 001 47860 18000 29860PIT B 26 - 001 47820 18160 29660PIT B 26 - 001 47180 17960 29220PIT B 26 - 001 44360 18060 26300PIT C 64- 001 32120 11290 20830PIT C 64- 001 32320 11270 21050PIT B 26 - 001 46270 17780 28490PIT B 26 - 001 45700 18130 27570PIT C 64- 001 33030 11100 21930PIT B 26 - 001 43880 18050 25830PIT B 26 - 001 49340 18030 31310PIT B 26 - 001 44410 18060 26350PIT B 26 - 001 44010 18140 25870PIT C 64- 001 32630 11120 21510PIT B 26 - 001 51370 19000 32370PIT B 26 - 001 46390 18110 28280PIT B 26 - 001 49580 18610 30970PIT B 26 - 001 45160 18120 27040PIT B 26 - 001 48400 18190 30210PIT B 26 - 001 44130 17820 26310PIT B 26 - 001 45040 18150 26890PIT C 64- 001 32550 11220 21330PIT B 26 - 001 43280 17990 25290PIT B 26 - 001 48110 18040 30070PIT B 26 - 001 47200 18060 29140PIT B 26 - 001 45840 17960 27880PIT B 26 - 001 44660 17930 26730PIT B 26 - 001 47660 17930 29730PIT B 26 - 001 44930 17980 26950PIT C 64- 001 31710 11020 20690PIT C 64- 001 32090 10770 21320PIT C 64- 001 33000 10930 22070PIT B 26 - 001 44140 18090 26050PIT C 64- 001 32340 10940 21400PIT C 64- 001 32160 11050 21110PIT C 64- 001 31850 11240 20610PIT B 26 - 001 46310 18360 27950PIT B 26 - 001 44930 18070 26860PIT B 26 - 001 44880 18060 26820PIT B 26 - 001 49340 18910 30430PIT B 26 - 001 48370 18080 30290PIT B 26 - 001 43620 18030 25590

Page 161: June Per Shift (Truckscale Port)

PIT B 26 - 001 50130 18460 31670PIT B 26 - 001 43370 18360 25010PIT B 26 - 001 43180 17750 25430PIT B 26 - 001 47820 17900 29920PIT B 26 - 001 47940 18050 29890PIT B 26 - 001 43410 17870 25540PIT B 26 - 001 44430 18060 26370PIT B 26 - 001 42980 18110 24870PIT B 26 - 001 44660 18000 26660PIT C 64- 001 32750 10960 21790PIT B 26 - 001 44850 17940 26910PIT B 26 - 001 48150 17920 30230PIT C 64- 001 32620 11030 21590PIT B 26 - 001 45660 17860 27800PIT B 26 - 001 45320 17850 27470PIT B 26 - 001 48210 18210 30000PIT C 64- 001 32530 11140 21390PIT B 26 - 001 46440 18020 28420PIT A 85- 001 46200 18010 28190PIT B 26 - 001 50320 18940 31380PIT B 26 - 001 47200 18050 29150PIT C 64- 001 33470 11200 22270PIT C 64- 001 32190 11180 21010PIT C 64- 001 31600 11190 20410PIT B 26 - 001 45390 18050 27340PIT B 26 - 001 45930 17910 28020PIT B 26 - 001 46710 18110 28600PIT C 64- 001 32390 11180 21210PIT C 64- 001 32680 10940 21740PIT B 26 - 001 45340 17960 27380PIT C 64- 001 32970 11000 21970PIT B 26 - 001 46960 18210 28750PIT B 26 - 001 43280 18180 25100PIT B 26 - 001 47620 18120 29500PIT B 26 - 001 48560 18170 30390PIT B 26 - 001 44030 18070 25960PIT B 26 - 001 47390 18070 29320PIT B 26 - 001 44360 17970 26390PIT B 26 - 001 47120 17730 29390PIT B 26 - 001 47310 17810 29500PIT B 26 - 001 43270 18260 25010PIT B 26 - 001 43320 18090 25230PIT B 26 - 001 43930 17740 26190PIT B 26 - 001 44270 18060 26210PIT B 26 - 001 43510 18170 25340PIT B 26 - 001 47350 18140 29210PIT B 26 - 001 44950 17900 27050PIT C 64- 001 32800 11190 21610PIT B 26 - 001 45060 18180 26880PIT B 26 - 001 46980 18050 28930

Page 162: June Per Shift (Truckscale Port)

PIT C 64- 001 31290 11010 20280PIT B 26 - 001 44960 18120 26840PIT C 64- 001 32460 11110 21350PIT C 64- 001 31360 11050 20310PIT B 26 - 001 45800 18060 27740PIT B 26 - 001 50210 18760 31450PIT C 64- 001 32310 10950 21360PIT B 26 - 001 48600 17970 30630PIT C 64- 001 33010 11060 21950PIT B 26 - 001 45290 17700 27590PIT C 64- 001 32310 11040 21270PIT B 26 - 001 47710 17760 29950PIT B 26 - 001 44670 18090 26580PIT B 26 - 001 48950 17990 30960PIT B 26 - 001 44410 18070 26340PIT B 26 - 001 49780 18100 31680PIT B 26 - 001 48790 18170 30620PIT A 85- 001 46660 18230 28430PIT B 26 - 001 45330 18060 27270PIT A 85- 001 45580 17920 27660PIT B 26 - 001 46500 17740 28760PIT B 26 - 001 44690 17970 26720PIT B 26 - 001 44740 18050 26690PIT B 26 - 001 49820 18530 31290PIT C 64- 001 33080 11190 21890PIT B 26 - 001 45760 18210 27550PIT B 26 - 001 47040 18020 29020PIT C 64- 001 31340 11030 20310PIT B 26 - 001 45650 18030 27620PIT B 26 - 001 46080 17940 28140PIT A 85- 001 46080 18000 28080PIT C 64- 001 32480 10940 21540PIT B 26 - 001 42420 17660 24760PIT C 64- 001 32560 11180 21380PIT A 85- 001 45680 18120 27560PIT B 26 - 001 45660 17830 27830PIT C 64- 001 33370 11150 22220PIT B 26 - 001 48280 18880 29400PIT C 64- 001 33720 11050 22670PIT B 26 - 001 45710 17780 27930PIT B 26 - 001 47030 18130 28900PIT B 26 - 001 45330 18040 27290PIT B 26 - 001 43850 18110 25740PIT C 64- 001 34070 11120 22950PIT C 64- 001 31410 11000 20410PIT B 26 - 001 45240 18020 27220PIT B 26 - 001 48630 18590 30040PIT B 26 - 001 46580 18100 28480PIT B 26 - 001 47490 18030 29460PIT B 26 - 001 44050 17960 26090

Page 163: June Per Shift (Truckscale Port)

PIT B 26 - 001 45080 18100 26980PIT B 26 - 001 44810 18080 26730PIT A 85- 001 46070 17720 28350PIT A 85- 001 46330 17900 28430PIT B 26 - 001 47130 18140 28990PIT A 85- 001 46370 17980 28390PIT C 64- 001 32120 11130 20990PIT B 26 - 001 44830 18000 26830PIT B 26 - 001 43670 17770 25900PIT B 26 - 001 45470 18030 27440PIT A 85- 001 46770 18110 28660PIT C 64- 001 31790 10980 20810PIT B 26 - 001 46280 18030 28250PIT B 26 - 001 49300 18820 30480PIT C 64- 001 32980 11070 21910PIT B 26 - 001 47630 17930 29700PIT B 26 - 001 50320 18510 31810PIT B 26 - 001 44250 17970 26280PIT B 26 - 001 47910 18030 29880PIT B 26 - 001 44840 17860 26980PIT B 26 - 001 46880 18540 28340PIT C 64- 001 33500 10970 22530PIT B 26 - 001 45060 18050 27010PIT B 26 - 001 48430 18050 30380PIT B 26 - 001 46170 17920 28250PIT A 85- 001 46520 17660 28860PIT B 26 - 001 46020 18090 27930PIT A 85- 001 46950 17850 29100PIT A 85- 001 46330 18070 28260PIT B 26 - 001 47270 18000 29270PIT B 26 - 001 44540 18010 26530PIT B 26 - 001 47330 18000 29330PIT C 64- 001 30910 11070 19840PIT B 26 - 001 48470 18510 29960PIT B 26 - 001 47820 18040 29780PIT A 85- 001 46070 18000 28070PIT B 26 - 001 48110 18500 29610PIT A 85- 001 48080 17960 30120PIT B 26 - 001 48200 18040 30160PIT B 26 - 001 46390 18150 28240PIT B 26 - 001 48660 18130 30530PIT B 26 - 001 48310 18130 30180PIT B 26 - 001 45540 17870 27670PIT B 26 - 001 47320 17960 29360PIT C 64- 001 31640 10960 20680PIT C 64- 001 31810 11110 20700PIT B 26 - 001 47710 18820 28890PIT C 64- 001 32100 11160 20940PIT B 26 - 001 46300 18150 28150PIT C 64- 001 32450 11100 21350

Page 164: June Per Shift (Truckscale Port)

PIT C 64- 001 32290 11060 21230PIT B 26 - 001 46190 18120 28070PIT B 26 - 001 45440 18200 27240PIT B 26 - 001 45330 18250 27080PIT B 26 - 001 45210 18160 27050PIT B 26 - 001 46820 17970 28850PIT B 26 - 001 47860 17980 29880PIT C 64- 001 32230 11090 21140PIT B 26 - 001 48380 17690 30690PIT B 26 - 001 48090 18200 29890PIT A 85- 001 47310 17880 29430PIT B 26 - 001 47730 18490 29240PIT B 26 - 001 48420 18160 30260PIT B 26 - 001 48180 18130 30050PIT B 26 - 001 47860 18560 29300PIT B 26 - 001 47590 18120 29470PIT B 26 - 001 47780 18160 29620PIT C 64- 001 31610 11020 20590PIT B 26 - 001 49180 18530 30650PIT C 64- 001 31420 11150 20270PIT A 85- 001 47350 18350 29000PIT B 26 - 001 48000 18170 29830PIT B 26 - 001 48450 18020 30430PIT B 26 - 001 46760 17950 28810PIT C 64- 001 32020 11120 20900PIT B 26 - 001 49210 18060 31150PIT A 85- 001 47030 18150 28880PIT B 26 - 001 48130 17960 30170PIT C 64- 001 32280 11090 21190PIT A 85- 001 45840 18220 27620PIT B 26 - 001 49850 18840 31010PIT C 64- 001 31260 11090 20170PIT A 85- 001 46280 18190 28090PIT B 26 - 001 48010 17730 30280PIT B 26 - 001 45050 17910 27140PIT B 26 - 001 48510 18120 30390PIT B 26 - 001 46700 18240 28460PIT B 26 - 001 49950 18160 31790PIT B 26 - 001 46030 18160 27870PIT A 85- 001 46550 17900 28650PIT B 26 - 001 49600 18160 31440PIT A 85- 001 44690 18070 26620PIT B 26 - 001 48130 18130 30000PIT B 26 - 001 49470 18510 30960PIT B 26 - 001 46930 18120 28810PIT C 64- 001 31820 11000 20820PIT B 26 - 001 49240 18530 30710PIT B 26 - 001 49090 18690 30400PIT C 64- 001 32360 11150 21210PIT B 26 - 001 49100 18010 31090

Page 165: June Per Shift (Truckscale Port)

PIT B 26 - 001 48050 18210 29840PIT C 64- 001 31940 11110 20830PIT B 26 - 001 44390 18100 26290PIT B 26 - 001 47930 17720 30210PIT B 26 - 001 45710 17970 27740PIT C 64- 001 31190 11060 20130PIT B 26 - 001 49300 18050 31250PIT B 26 - 001 45260 17980 27280PIT A 85- 001 45810 18170 27640PIT B 26 - 001 48390 18880 29510PIT A 85- 001 46460 18140 28320PIT C 64- 001 32740 11030 21710PIT C 64- 001 31950 11070 20880PIT B 26 - 001 44610 17900 26710PIT B 26 - 001 47640 18030 29610PIT A 85- 001 47050 18100 28950PIT B 26 - 001 49410 18090 31320PIT B 26 - 001 46380 18110 28270PIT B 26 - 001 48660 18070 30590PIT A 85- 001 45420 17970 27450PIT A 85- 001 46540 18200 28340PIT B 26 - 001 47930 18070 29860PIT A 85- 001 45520 18170 27350PIT C 64- 001 32120 10960 21160PIT B 26 - 001 48670 18590 30080PIT C 64- 001 31560 11130 20430PIT B 26 - 001 49540 17640 31900PIT B 26 - 001 48570 18180 30390PIT B 26 - 001 48960 18650 30310PIT B 26 - 001 47890 18090 29800PIT B 26 - 001 49640 17970 31670PIT C 64- 001 31010 11030 19980PIT C 64- 001 31410 11220 20190PIT B 26 - 001 47300 18510 28790PIT C 64- 001 31730 10930 20800PIT B 26 - 001 50100 18010 32090PIT A 85- 001 46660 18110 28550PIT C 64- 001 32180 11130 21050PIT A 85- 001 47250 18050 29200PIT A 85- 001 44510 17890 26620PIT C 64- 001 31660 11020 20640PIT A 85- 001 46710 18080 28630PIT A 85- 001 45980 17960 28020PIT B 26 - 001 48780 18140 30640PIT B 26 - 001 48410 18880 29530PIT B 26 - 001 49760 17920 31840PIT B 26 - 001 48060 17880 30180PIT C 64- 001 30920 10990 19930PIT B 26 - 001 44240 17850 26390PIT B 26 - 001 45480 18010 27470

Page 166: June Per Shift (Truckscale Port)

PIT B 26 - 001 47410 18040 29370PIT B 26 - 001 46260 18110 28150PIT B 26 - 001 45220 18060 27160PIT B 26 - 001 50480 18050 32430PIT B 26 - 001 48450 18540 29910PIT B 26 - 001 48900 18600 30300PIT B 26 - 001 46180 17900 28280PIT B 26 - 001 50180 17920 32260PIT B 26 - 001 48520 18610 29910PIT B 26 - 001 47540 18200 29340PIT B 26 - 001 49010 18130 30880PIT B 26 - 001 49330 18080 31250PIT B 26 - 001 49560 17840 31720PIT B 26 - 001 49240 17830 31410PIT B 26 - 001 44960 17960 27000PIT B 26 - 001 46050 17950 28100PIT A 85- 001 46010 18090 27920PIT B 26 - 001 45730 18200 27530PIT B 26 - 001 48850 17760 31090PIT B 26 - 001 49990 17760 32230PIT B 26 - 001 45280 18070 27210PIT B 26 - 001 50870 18120 32750PIT B 26 - 001 49440 18030 31410PIT A 85- 001 46300 18220 28080PIT C 64- 001 30590 11080 19510PIT A 85- 001 46650 17990 28660PIT C 64- 001 31850 11100 20750PIT C 64- 001 31760 11130 20630PIT C 64- 001 31550 10990 20560PIT B 26 - 001 49600 18000 31600PIT B 26 - 001 45370 18220 27150PIT B 26 - 001 49130 18440 30690PIT B 26 - 001 44860 18000 26860PIT B 26 - 001 47740 18040 29700PIT B 26 - 001 46440 17910 28530PIT C 64- 001 31860 11010 20850PIT B 26 - 001 49350 18510 30840PIT B 26 - 001 50280 18250 32030PIT B 26 - 001 45190 18520 26670PIT C 64- 001 32230 11100 21130PIT B 26 - 001 50200 18820 31380PIT B 26 - 001 49850 17800 32050PIT B 26 - 001 48680 17950 30730PIT B 26 - 001 49040 18080 30960PIT B 26 - 001 49520 18190 31330PIT B 26 - 001 45120 18090 27030PIT B 26 - 001 48750 18080 30670PIT B 26 - 001 47760 18070 29690PIT B 26 - 001 46400 18130 28270PIT B 26 - 001 47230 18210 29020

Page 167: June Per Shift (Truckscale Port)

PIT B 26 - 001 48970 18110 30860PIT A 85- 001 46640 18070 28570PIT C 64- 001 32280 11070 21210PIT A 85- 001 45800 18090 27710PIT C 64- 001 31900 10960 20940PIT A 85- 001 46740 17970 28770PIT B 26 - 001 45990 18060 27930PIT B 26 - 001 50280 18480 31800PIT C 64- 001 31430 11090 20340PIT B 26 - 001 46760 17910 28850PIT C 64- 001 32070 10970 21100PIT B 26 - 001 49460 18520 30940PIT B 26 - 001 49200 18000 31200PIT A 85- 001 46160 18130 28030PIT C 64- 001 31710 11070 20640PIT B 26 - 001 46220 17800 28420PIT B 26 - 001 50050 18750 31300PIT B 26 - 001 45360 18070 27290PIT B 26 - 001 44930 17990 26940PIT B 26 - 001 48240 18050 30190PIT B 26 - 001 46420 18050 28370PIT B 26 - 001 45790 18100 27690PIT B 26 - 001 44240 17940 26300PIT B 26 - 001 44310 18040 26270PIT B 26 - 001 46410 18150 28260PIT A 85- 001 46340 18130 28210PIT B 26 - 001 48720 18440 30280PIT B 26 - 001 46950 18060 28890PIT C 64- 001 30940 10950 19990PIT A 85- 001 46350 18010 28340PIT B 26 - 001 44820 17960 26860PIT B 26 - 001 46340 18090 28250PIT B 26 - 001 42480 17580 24900PIT C 64- 001 31900 11140 20760PIT C 64- 001 31340 11030 20310PIT B 26 - 001 43700 17770 25930PIT B 26 - 001 47720 18360 29360PIT B 26 - 001 48020 18480 29540PIT C 64- 001 31460 10990 20470PIT B 26 - 001 45620 17750 27870PIT B 26 - 001 47840 18710 29130PIT C 64- 001 31640 11060 20580PIT B 26 - 001 47890 18030 29860PIT C 64- 001 31510 10960 20550PIT A 85- 001 46310 18120 28190PIT B 26 - 001 47130 17990 29140PIT C 64- 001 31000 10940 20060PIT B 26 - 001 44600 18080 26520PIT B 26 - 001 47010 18090 28920PIT A 85- 001 45410 18100 27310

Page 168: June Per Shift (Truckscale Port)

PIT A 85- 001 46910 17970 28940PIT A 85- 001 45980 18050 27930PIT B 26 - 001 45790 18070 27720PIT B 26 - 001 45540 18040 27500PIT B 26 - 001 46000 17920 28080PIT B 26 - 001 45660 18120 27540PIT A 85- 001 45970 18060 27910PIT A 85- 001 46210 18080 28130PIT C 64- 001 32220 11010 21210PIT C 64- 001 31650 11030 20620PIT B 26 - 001 45340 17750 27590PIT B 26 - 001 47480 18410 29070PIT B 26 - 001 47700 18450 29250PIT B 26 - 001 44440 17870 26570PIT B 26 - 001 47040 18440 28600PIT C 64- 001 32270 10960 21310PIT B 26 - 001 45240 18030 27210PIT C 64- 001 31460 11060 20400PIT B 26 - 001 46730 18230 28500PIT C 64- 001 32950 11030 21920PIT B 26 - 001 47460 18650 28810PIT B 26 - 001 45990 18130 27860PIT A 85- 001 47300 17940 29360PIT B 26 - 001 45870 18100 27770PIT B 26 - 001 47480 18830 28650PIT A 85- 001 46270 17990 28280PIT B 26 - 001 45980 18010 27970PIT B 26 - 001 45930 17850 28080PIT B 26 - 001 43770 17800 25970PIT A 85- 001 44690 18140 26550PIT A 85- 001 47490 18070 29420PIT B 26 - 001 46530 18010 28520PIT A 85- 001 46960 18010 28950PIT B 26 - 001 44440 18170 26270PIT A 85- 001 47000 18070 28930PIT C 64- 001 31970 10970 21000PIT B 26 - 001 49110 18410 30700PIT B 26 - 001 47420 18030 29390PIT B 26 - 001 45620 17740 27880PIT C 64- 001 31100 11160 19940PIT B 26 - 001 45280 17910 27370PIT C 64- 001 31770 10810 20960PIT B 26 - 001 43560 17730 25830PIT A 85- 001 45430 17940 27490PIT B 26 - 001 45540 18080 27460PIT B 26 - 001 45560 18230 27330PIT A 85- 001 45300 17950 27350PIT B 26 - 001 46080 18220 27860PIT B 26 - 001 45690 18020 27670PIT B 26 - 001 47320 18100 29220

Page 169: June Per Shift (Truckscale Port)

PIT A 85- 001 45210 17870 27340PIT A 85- 001 47190 18150 29040PIT A 85- 001 47660 18190 29470PIT B 26 - 001 48570 18170 30400PIT B 26 - 001 48890 18130 30760PIT C 64- 001 31530 11010 20520PIT C 64- 001 31380 11090 20290PIT B 26 - 001 46090 18030 28060PIT B 26 - 001 47190 18140 29050PIT C 64- 001 31810 11090 20720PIT B 26 - 001 48010 18640 29370PIT A 85- 001 46160 17950 28210PIT C 64- 001 31630 10970 20660PIT A 85- 001 46280 17980 28300PIT B 26 - 001 40950 18010 22940PIT B 26 - 001 48990 17900 31090PIT B 26 - 001 47090 18560 28530PIT B 26 - 001 49340 18140 31200PIT B 26 - 001 47970 17900 30070PIT B 26 - 001 47890 17990 29900PIT C 64- 001 32480 11110 21370PIT B 26 - 001 47490 17860 29630PIT B 26 - 001 51110 18060 33050PIT A 85- 001 47900 18000 29900PIT B 26 - 001 47470 18160 29310PIT B 26 - 001 47860 18120 29740PIT A 85- 001 49160 18170 30990PIT B 26 - 001 46840 18090 28750PIT A 85- 001 48270 18050 30220PIT B 26 - 001 48210 18120 30090PIT A 85- 001 48380 17870 30510PIT C 64- 001 32040 11080 20960PIT B 26 - 001 46690 18050 28640PIT C 64- 001 32590 10890 21700PIT B 26 - 001 44980 18030 26950PIT A 85- 001 48830 18060 30770PIT B 26 - 001 45540 18140 27400PIT C 64- 001 31150 11000 20150PIT B 26 - 001 47740 18520 29220PIT B 26 - 001 46950 18470 28480PIT A 85- 001 47060 17930 29130PIT C 64- 001 31890 10930 20960PIT B 26 - 001 46620 18190 28430PIT B 26 - 001 43920 17720 26200PIT B 26 - 001 47530 18570 28960PIT B 26 - 001 46560 18050 28510PIT A 85- 001 47470 18030 29440PIT B 26 - 001 46840 17900 28940PIT A 85- 001 47790 18020 29770PIT A 85- 001 46910 18180 28730

Page 170: June Per Shift (Truckscale Port)

PIT B 26 - 001 45530 18140 27390PIT A 85-2 001 44950 18130 26820PIT A 85-2 001 47140 18160 28980PIT A 85-2 001 45600 18170 27430PIT B 26 - 001 46190 18230 27960PIT B 26 - 001 47040 18190 28850PIT A 85- 001 46290 18040 28250PIT C 64- 001 31510 11120 20390PIT A 85- 001 47460 17870 29590PIT A 85- 001 47320 18080 29240PIT B 26 - 001 48870 18220 30650PIT C 64- 001 31980 11030 20950PIT C 64- 001 32550 11130 21420PIT A 85-2 001 47380 18240 29140PIT C 64- 001 31840 11040 20800PIT A 85-2 001 46910 18200 28710PIT B 26 - 001 48490 18120 30370PIT A 85-2 001 46940 18590 28350PIT A 85-2 001 47300 18090 29210PIT A 85-2 001 43060 17810 25250PIT B 26 - 001 48260 17970 30290PIT A 85-2 001 46760 18200 28560PIT B 26 - 001 46620 18150 28470PIT A 85-2 001 47240 18210 29030PIT A 85-2 001 44510 18090 26420PIT B 26 - 001 48340 18160 30180PIT B 26 - 001 49020 18310 30710PIT B 26 - 001 49360 18250 31110PIT A 85-2 001 47020 18560 28460PIT C 64- 001 31650 10970 20680PIT A 85-2 001 45550 18130 27420PIT C 64- 001 32250 11080 21170PIT A 85-2 001 45580 17980 27600PIT A 85-2 001 47100 18130 28970PIT A 85-2 001 47630 17960 29670PIT B 26 - 001 49350 18170 31180PIT A 85-2 001 46490 18030 28460PIT A 85-2 001 46670 18050 28620PIT B 26 - 001 50770 18150 32620PIT A 85-2 001 48650 18480 30170PIT C 64- 001 31380 11050 20330PIT B 26 - 001 48170 18040 30130PIT C 64- 001 31860 10980 20880PIT C 64- 001 32690 10990 21700PIT A 85-2 001 46200 18000 28200PIT B 26 - 001 48150 18100 30050PIT A 85-2 001 43480 17770 25710PIT A 85-2 001 48120 18570 29550PIT A 85-2 001 44830 18110 26720PIT C 64- 001 31730 11080 20650

Page 171: June Per Shift (Truckscale Port)

PIT C 64- 001 32190 11130 21060PIT A 85-2 001 48510 17830 30680PIT B 26 - 001 47770 17840 29930PIT B 26 - 001 48830 18210 30620PIT B 26 - 001 48330 18100 30230PIT A 85-2 001 44780 18110 26670PIT B 26 - 001 47480 17970 29510PIT A 85-2 001 43530 17960 25570PIT B 26 - 001 48480 18080 30400PIT A 85-2 001 45580 18040 27540PIT A 85-2 001 47080 18010 29070PIT C 64- 001 31340 11110 20230PIT B 26 - 001 48170 18000 30170PIT C 64- 001 32020 10940 21080PIT A 85-2 001 46240 17870 28370PIT A 85-2 001 45770 18230 27540PIT A 85-2 001 45630 18080 27550PIT A 85-2 001 46370 18240 28130PIT A 85-2 001 47490 18510 28980PIT C 64- 001 31960 11050 20910PIT A 85-2 001 48450 18090 30360PIT C 64- 001 32250 11030 21220PIT A 85-2 001 46600 18500 28100PIT C 64- 001 32150 11030 21120PIT A 85-2 001 43580 18090 25490PIT A 85-2 001 46430 18090 28340PIT B 26 - 001 48690 18160 30530PIT B 26 - 001 49560 18190 31370PIT B 26 - 001 48030 17910 30120PIT A 85-2 001 48360 18150 30210PIT A 85-2 001 49400 18110 31290PIT A 85-2 001 48080 18540 29540PIT C 64- 001 31790 11030 20760PIT C 64- 001 32270 11080 21190PIT C 64- 001 31970 11020 20950PIT A 85-2 001 47050 18170 28880PIT B 26 - 001 49380 18180 31200PIT B 26 - 001 49170 18210 30960PIT A 85-2 001 46370 18520 27850PIT A 85-2 001 46930 18530 28400PIT A 85-2 001 47350 18210 29140PIT B 26 - 001 49930 18160 31770PIT C 64- 001 32040 11190 20850PIT A 85-2 001 47070 18110 28960PIT A 85-2 001 47410 18260 29150PIT A 85-2 001 43350 17900 25450PIT A 85-2 001 46980 18180 28800PIT A 85-2 001 46090 18190 27900PIT C 64- 001 31950 11100 20850PIT B 26 - 001 45810 18110 27700

Page 172: June Per Shift (Truckscale Port)

PIT B 26 - 001 44500 18220 26280PIT B 26 - 001 43470 17900 25570PIT B 26 - 001 44550 18100 26450PIT A 85-2 001 49290 18230 31060PIT C 64- 001 32090 10980 21110PIT C 64- 001 32340 10990 21350PIT B 26 - 001 44640 18130 26510PIT A 85-2 001 48530 18070 30460PIT B 26 - 001 45420 18170 27250PIT C 64- 001 31840 11080 20760PIT A 85- 001 50390 18520 31870PIT C 64- 001 32220 11030 21190PIT A 85-2 001 48390 18160 30230PIT A 85-2 001 48780 18340 30440PIT A 85-2 001 47170 17930 29240PIT A 85- 001 48880 18590 30290PIT C 64- 001 46140 18080 28060PIT A 85- 001 44860 18410 26450PIT A 85-2 001 47200 17950 29250PIT A 85- 001 44570 17890 26680PIT C 64- 001 30290 10980 19310PIT A 85-2 001 48560 18060 30500PIT B 26 - 001 44460 18100 26360PIT C 64- 001 31550 11060 20490PIT A 85- 001 42530 17850 24680PIT B 26 - 001 44570 18160 26410PIT A 85-2 001 45350 18100 27250PIT B 26 - 001 44300 18090 26210PIT B 26 - 001 44450 17880 26570PIT B 26 - 001 44910 18060 26850PIT C 64- 001 32130 11020 21110PIT A 85- 001 45810 18070 27740PIT C 64- 001 32170 10950 21220PIT A 85-2 001 48020 18150 29870PIT A 85-2 001 47310 18020 29290PIT B 26 - 001 44990 18110 26880PIT A 85- 001 45030 18150 26880PIT C 64- 001 31390 11040 20350PIT A 85-2 001 48090 17840 30250PIT C 64- 001 31810 11110 20700PIT A 85- 001 45950 18000 27950PIT C 64- 001 47000 17840 29160PIT A 85- 001 45790 18550 27240PIT A 85-2 001 48090 17970 30120PIT A 85- 001 45070 17940 27130PIT C 64- 001 31100 11010 20090PIT A 85-2 001 47720 17920 29800PIT A 85- 001 45380 18360 27020PIT A 85-2 001 47460 18100 29360PIT C 64- 001 31860 11080 20780

Page 173: June Per Shift (Truckscale Port)

PIT B 26 - 001 44420 17850 26570PIT A 85- 001 43760 17850 25910PIT A 85- 001 43540 17970 25570PIT B 26 - 001 43410 18090 25320PIT B 26 - 001 44230 18150 26080PIT B 26 - 001 45320 18060 27260PIT C 64- 001 32480 11000 21480PIT A 85-2 001 48000 18040 29960PIT B 26 - 001 45270 17770 27500PIT C 64- 001 45390 18150 27240PIT C 64- 001 31540 10910 20630PIT B 26 - 001 45250 18000 27250PIT A 85-2 001 48050 18040 30010PIT C 64- 001 32310 10950 21360PIT C 64- 001 32280 11060 21220PIT A 85-2 001 47680 18030 29650PIT C 64- 001 33320 11070 22250PIT A 85-2 001 47690 17710 29980PIT B 26 - 001 45620 18050 27570PIT B 26 - 001 46440 18020 28420PIT A 85-2 001 47700 17900 29800PIT B 26 - 001 45310 18010 27300PIT A 85-2 001 47990 17980 30010PIT C 64- 001 30860 10140 20720PIT B 26 - 001 46540 18040 28500PIT A 85- 001 45600 18460 27140PIT A 85-2 001 46710 18540 28170PIT A 85-2 001 49390 18470 30920PIT B 26 - 001 44700 17900 26800PIT B 26 - 001 45630 18360 27270PIT A 85- 001 48460 18470 29990PIT A 85- 001 44660 18150 26510PIT A 85- 001 43460 17990 25470PIT A 85- 001 47670 17910 29760PIT A 85-2 001 49680 17780 31900PIT A 85- 001 46270 17950 28320PIT A 85- 001 47690 18800 28890PIT A 85-2 001 47540 17960 29580PIT A 85-2 001 47450 17940 29510PIT A 85-2 001 46140 18150 27990PIT A 85-2 001 50630 18090 32540PIT A 85-2 001 47900 18070 29830PIT A 85-2 001 47070 17940 29130PIT B 26 - 001 45950 18090 27860PIT B 26 - 001 45300 17990 27310PIT B 26 - 001 45350 18160 27190PIT B 26 - 001 45550 18170 27380PIT A 85-2 001 47120 17970 29150PIT A 85-2 001 47820 18140 29680PIT B 26 - 001 44880 18140 26740

Page 174: June Per Shift (Truckscale Port)

PIT A 85-2 001 46180 18150 28030PIT A 85-2 001 48400 18160 30240PIT A 85- 001 45820 18560 27260PIT C 64- 001 31570 11030 20540PIT C 64- 001 31500 11030 20470PIT C 64- 001 32660 11000 21660PIT B 26 - 001 46900 17960 28940PIT C 64- 001 32570 11090 21480PIT A 85- 001 44960 17980 26980PIT C 64- 001 32320 10960 21360PIT C 64- 001 31900 11160 20740PIT A 85- 001 46090 18530 27560PIT A 85- 001 46740 17910 28830PIT A 85- 001 48130 18760 29370PIT B 26 - 001 41500 18130 23370PIT A 85- 001 47060 18450 28610PIT B 26 - 001 47410 18120 29290PIT A 85- 001 44470 18020 26450PIT B 26 - 001 47030 17970 29060PIT B 26 - 001 45680 17970 27710PIT A 85- 001 46480 18060 28420PIT B 26 - 001 46660 17860 28800PIT A 85- 001 46400 18130 28270PIT A 85- 001 46320 17950 28370PIT A 85- 001 44750 18040 26710PIT A 85- 001 45430 18130 27300PIT B 26 - 001 45490 17910 27580PIT A 85- 001 45930 18130 27800PIT A 85- 001 46420 18150 28270PIT A 85- 001 46540 17850 28690PIT B 26 - 001 47520 17960 29560PIT C 64- 001 31660 11010 20650PIT C 64- 001 30070 11030 19040PIT A 85- 001 48440 18520 29920PIT C 64- 001 32130 11000 21130PIT A 85- 001 45480 17980 27500PIT C 64- 001 32050 11070 20980PIT C 64- 001 32260 10970 21290PIT A 85- 001 45640 18090 27550PIT C 64- 001 32260 11110 21150PIT B 26 - 001 49020 18000 31020PIT A 85- 001 44460 17910 26550PIT A 85- 001 46820 18520 28300PIT B 26 - 001 47900 17940 29960PIT A 85- 001 45810 18060 27750PIT B 26 - 001 48200 17860 30340PIT A 85- 001 46630 17880 28750PIT A 85- 001 46240 18790 27450PIT A 85- 001 46540 18440 28100PIT A 85- 001 45490 18180 27310

Page 175: June Per Shift (Truckscale Port)

PIT A 85- 001 46970 18580 28390PIT A 85- 001 47490 18150 29340PIT B 26 - 001 47350 17940 29410PIT A 85- 001 47270 18180 29090PIT B 26 - 001 47100 17980 29120PIT A 85- 001 47130 18120 29010PIT A 85- 001 46500 17910 28590PIT A 85- 001 45880 18180 27700PIT A 85- 001 45780 18080 27700PIT A 85- 001 48130 18200 29930PIT C 64- 001 31690 11050 20640PIT A 85- 001 49930 18680 31250PIT B 26 - 001 48680 18090 30590PIT A 85- 001 46700 18130 28570PIT B 26 - 001 48280 18050 30230PIT B 26 - 001 48060 17970 30090PIT C 64- 001 32600 11090 21510PIT A 85- 001 46530 18280 28250PIT C 64- 001 32250 11180 21070PIT C 64- 001 32240 11210 21030PIT A 85- 001 45820 18130 27690PIT A 85- 001 48240 18610 29630PIT C 64- 001 32580 11050 21530PIT A 85- 001 48250 18900 29350PIT A 85- 001 42660 17970 24690PIT B 26 - 001 48470 18040 30430PIT A 85- 001 47670 18270 29400PIT B 26 - 001 48090 18090 30000PIT A 85- 001 47010 18250 28760PIT A 85- 001 44900 18020 26880PIT A 85- 001 46900 18650 28250PIT A 85- 001 47650 18200 29450PIT A 85- 001 44850 18160 26690PIT A 85- 001 45970 18200 27770PIT A 85- 001 50920 18280 32640PIT A 85- 001 46100 18140 27960PIT B 26 - 001 48300 18280 30020PIT A 85- 001 45920 18190 27730PIT B 26 - 001 47080 17940 29140PIT B 26 - 001 47910 17950 29960PIT A 85- 001 44220 18090 26130PIT C 64- 001 32340 11040 21300PIT A 85- 001 43290 17900 25390PIT A 85- 001 47370 17900 29470PIT A 85- 001 46850 18180 28670PIT A 85- 001 46510 18200 28310PIT A 85- 001 49080 18640 30440PIT C 64- 001 32290 11190 21100PIT B 26 - 001 48360 18030 30330PIT A 85- 001 48300 18260 30040

Page 176: June Per Shift (Truckscale Port)

PIT C 64- 001 31890 11090 20800PIT C 64- 001 32100 11170 20930PIT B 26 - 001 47840 18050 29790PIT A 85- 001 47680 18240 29440PIT C 64- 001 32360 11070 21290PIT B 26 - 001 46530 18250 28280PIT A 85- 001 46370 18200 28170PIT A 85- 001 47320 18170 29150PIT B 26 - 001 49620 18100 31520PIT A 85- 001 43600 18010 25590PIT A 85- 001 47060 18240 28820PIT A 85- 001 48120 19050 29070PIT A 85- 001 46950 18150 28800PIT A 85- 001 44810 17990 26820PIT B 26 - 001 48410 18190 30220PIT C 64- 001 32250 11150 21100PIT A 85- 001 48620 18660 29960PIT A 85- 001 46560 18650 27910PIT A 85- 001 49430 18790 30640PIT B 26 - 001 48870 17990 30880PIT A 85- 001 46700 18560 28140PIT B 26 - 001 46890 18000 28890PIT C 64- 001 32890 11060 21830PIT C 64- 001 32970 10970 22000PIT A 85- 001 48210 18180 30030PIT B 26 - 001 48270 18130 30140PIT A 85- 001 46720 18060 28660PIT A 85- 001 47620 18940 28680PIT B 26 - 001 49400 18100 31300PIT A 85- 001 45480 18050 27430PIT A 85- 001 46590 18070 28520PIT A 85- 001 47750 18220 29530PIT A 85- 001 47590 18510 29080PIT B 26 - 001 47510 18280 29230PIT B 26 - 001 49400 18210 31190PIT A 85- 001 47340 18120 29220PIT B 26 - 001 47460 18050 29410PIT B 26 - 001 47750 18220 29530PIT A 85- 001 47150 18170 28980PIT B 26 - 001 47550 18030 29520PIT C 64- 001 32280 11150 21130PIT C 64- 001 33240 11080 22160PIT B 26 - 001 48210 18140 30070PIT B 26 - 001 47440 18160 29280PIT B 26 - 001 47690 18260 29430PIT C 64- 001 32810 11080 21730PIT A 85- 001 46380 18170 28210PIT B 26 - 001 48120 18180 29940PIT A 85- 001 49260 18220 31040PIT C 64- 001 31720 11090 20630

Page 177: June Per Shift (Truckscale Port)

PIT A 85- 001 46730 18080 28650PIT A 85- 001 48230 18760 29470PIT A 85- 001 44810 17990 26820PIT C 64- 001 30750 11000 19750PIT A 85- 001 49930 18030 31900PIT B 26 - 001 46690 18210 28480PIT C 64- 001 30100 10890 19210PIT A 85- 001 49230 17950 31280PIT A 85- 001 48210 18010 30200PIT B 26 - 001 46710 18110 28600PIT B 26 - 001 45810 18050 27760PIT A 85- 001 42510 18120 24390PIT A 85- 001 45410 18200 27210PIT C 64- 001 31800 11090 20710PIT B 26 - 001 46180 18630 27550PIT C 64- 001 32480 11080 21400PIT A 85- 001 49230 18230 31000PIT C 64- 001 31570 11040 20530PIT A 85- 001 48750 17960 30790PIT A 85- 001 48830 18210 30620PIT A 85- 001 48840 18820 30020PIT A 85- 001 50910 18590 32320PIT C 64- 001 31590 11010 20580PIT A 85- 001 50360 18170 32190PIT B 26 - 001 44200 18070 26130PIT C 64- 001 32600 11200 21400PIT C 64- 001 30830 10860 19970PIT B 26 - 001 45630 17980 27650PIT B 26 - 001 45330 18030 27300PIT A 85- 001 46580 18190 28390PIT A 85- 001 48890 17970 30920PIT B 26 - 001 46400 18020 28380PIT A 85- 001 48870 18230 30640PIT A 85- 001 48300 18140 30160PIT C 64- 001 30320 10820 19500PIT A 85- 001 45100 17810 27290PIT B 26 - 001 45090 18210 26880PIT B 26 - 001 43150 18030 25120PIT B 26 - 001 44820 18160 26660PIT A 85- 001 50450 18590 31860PIT A 85- 001 47030 18050 28980PIT C 64- 001 31240 11010 20230PIT C 64- 001 31610 11010 20600PIT A 85- 001 48440 17900 30540PIT C 64- 001 31590 11030 20560PIT A 85- 001 47540 18110 29430PIT A 85- 001 48060 17960 30100PIT A 85- 001 51110 18770 32340PIT A 85- 001 47730 18050 29680PIT A 85- 001 49800 18520 31280

Page 178: June Per Shift (Truckscale Port)

PIT B 26 - 001 45530 18130 27400PIT A 85- 001 47920 18010 29910PIT C 64- 001 32260 10980 21280PIT B 26 - 001 46350 17900 28450PIT B 26 - 001 46550 18170 28380PIT A 85- 001 46940 17980 28960PIT B 26 - 001 46700 18110 28590PIT B 26 - 001 46230 17940 28290PIT C 64- 001 30770 10840 19930PIT A 85- 001 48320 17920 30400PIT A 85- 001 47840 17990 29850PIT B 26 - 001 45330 18140 27190PIT C 64- 001 31490 11080 20410PIT A 85- 001 47330 18040 29290PIT A 85- 001 46330 17550 28780PIT A 85- 001 50220 18750 31470PIT C 64- 001 30510 10920 19590PIT C 64- 001 31000 11000 20000PIT A 85- 001 48350 18080 30270PIT A 85- 001 47810 18900 28910PIT A 85- 001 49430 17900 31530PIT A 85- 001 48240 17930 30310PIT C 64- 001 32530 11030 21500PIT A 85- 001 49590 17910 31680PIT C 64- 001 32340 10990 21350PIT A 85- 001 48020 18080 29940PIT A 85- 001 48620 18540 30080PIT B 26 - 001 45410 18010 27400PIT B 26 - 001 45730 17880 27850PIT B 26 - 001 46360 18030 28330

Harita Parama Murti 001 49590 17980 31610PIT A 85- 001 44860 18050 26810PIT C 64- 001 31770 10940 20830PIT B 26 - 001 45620 18080 27540PIT C 64- 001 31720 11060 20660PIT B 26 - 001 43880 18130 25750PIT B 26 - 001 45060 18050 27010PIT A 85- 001 49900 18000 31900PIT A 85- 001 47740 18090 29650PIT A 85- 001 50140 17940 32200PIT A 85- 001 48500 17890 30610PIT A 85- 001 48180 18070 30110PIT A 85- 001 47890 18430 29460PIT A 85- 001 49460 18490 30970PIT A 85- 001 46300 17810 28490PIT A 85- 001 47600 18010 29590PIT C 64- 001 32000 10980 21020PIT B 26 - 001 47130 17960 29170PIT A 85- 001 48600 17870 30730PIT B 26 - 001 43820 18090 25730

Page 179: June Per Shift (Truckscale Port)

PIT A 85- 001 50980 18700 32280PIT B 26 - 001 45500 17940 27560PIT A 85- 001 50400 18820 31580PIT A 85- 001 48070 18080 29990PIT B 26 - 001 44540 18020 26520PIT A 85- 001 47640 18060 29580PIT B 26 - 001 45690 18130 27560PIT B 26 - 001 45510 18200 27310PIT C 64- 001 31280 11020 20260PIT B 26 - 001 46000 17710 28290PIT A 85- 001 43650 17940 25710PIT A 85- 001 50880 18090 32790PIT C 64- 001 31800 11020 20780PIT C 64- 001 30650 11010 19640PIT A 85- 001 47800 18110 29690PIT A 85- 001 47820 18370 29450PIT A 85- 001 49200 18450 30750PIT A 85- 001 48030 17990 30040PIT B 26 - 001 44920 18000 26920PIT A 85- 001 48200 18060 30140PIT A 85- 001 49870 18090 31780PIT A 85- 001 49990 18090 31900PIT A 85- 001 44100 17810 26290PIT A 85- 001 47070 18060 29010PIT B 26 - 001 44520 18130 26390PIT A 85- 001 47830 17950 29880PIT B 26 - 001 45780 17940 27840PIT A 85- 001 47140 18180 28960PIT B 26 - 001 46220 17860 28360PIT B 26 - 001 45820 17910 27910PIT A 85- 001 48540 18080 30460PIT B 26 - 001 44390 18080 26310PIT A 85- 001 48390 18060 30330PIT A 85- 001 49590 18040 31550PIT A 85- 001 46950 18130 28820PIT A 85- 001 49340 18410 30930PIT B 26 - 001 43490 17850 25640PIT C 64- 001 32500 11000 21500PIT C 64- 001 31790 11010 20780PIT A 85- 001 47830 18040 29790PIT B 26 - 001 45730 18210 27520PIT C 64- 001 31970 11010 20960PIT A 85- 001 48710 18700 30010PIT B 26 - 001 45650 18200 27450PIT B 26 - 001 43880 18030 25850PIT B 26 - 001 44600 18060 26540PIT A 85- 001 48600 17990 30610PIT B 26 - 001 44290 17940 26350PIT A 85- 001 49020 18400 30620PIT A 85- 001 45940 17990 27950

Page 180: June Per Shift (Truckscale Port)

PIT A 85- 001 47590 18040 29550PIT A 85- 001 48440 18050 30390PIT A 85- 001 47700 17880 29820PIT A 85- 001 46940 18010 28930PIT A 85- 001 43930 17920 26010PIT A 85- 001 47680 17910 29770PIT A 85- 001 44150 17780 26370PIT C 64- 001 32090 11000 21090PIT A 85- 001 48310 18110 30200PIT A 85- 001 47030 17870 29160PIT A 85- 001 44700 18020 26680PIT A 85- 001 46920 18110 28810PIT A 85- 001 48800 18400 30400PIT B 26 - 001 45930 18120 27810PIT B 26 - 001 47070 18150 28920PIT A 85- 001 46530 18050 28480PIT C 64- 001 31970 11000 20970PIT A 85- 001 49320 18560 30760PIT B 26 - 001 45890 17990 27900PIT C 64- 001 32290 11070 21220PIT C 64- 001 30860 10980 19880PIT C 64- 001 31970 10940 21030PIT A 85- 001 47400 18600 28800PIT A 85- 001 47290 18570 28720PIT A 85- 001 47470 18110 29360PIT C 64- 001 32190 10900 21290PIT A 85- 001 48710 18550 30160PIT A 85- 001 46170 18050 28120PIT B 26 - 001 46310 17980 28330PIT B 26 - 001 45930 18170 27760PIT B 26 - 001 45190 17970 27220PIT A 85- 001 45300 18000 27300PIT B 26 - 001 46190 17980 28210PIT B 26 - 001 46530 18130 28400PIT A 85- 001 44790 17960 26830PIT A 85- 001 47490 17840 29650PIT A 85- 001 45490 17980 27510PIT A 85- 001 48600 18080 30520PIT B 26 - 001 46550 17930 28620PIT A 85- 001 46370 17960 28410PIT A 85- 001 45030 18080 26950PIT C 64- 001 32430 11090 21340PIT A 85- 001 46240 18180 28060PIT A 85- 001 46600 18140 28460PIT C 64- 001 31990 11020 20970PIT A 85- 001 47400 18060 29340PIT C 64- 001 31890 11000 20890PIT A 85- 001 45260 17960 27300PIT A 85- 001 45810 18480 27330PIT A 85- 001 47510 18060 29450

Page 181: June Per Shift (Truckscale Port)

PIT C 64- 001 31870 10990 20880PIT A 85- 001 46720 19500 27220PIT B 26 - 001 45510 17970 27540PIT A 85- 001 47940 18030 29910PIT B 26 - 001 44590 18000 26590PIT A 85- 001 47130 18110 29020PIT B 26 - 001 45470 18210 27260PIT A 85- 001 47240 17970 29270PIT B 26 - 001 44840 17900 26940PIT A 85- 001 45470 17840 27630PIT A 85- 001 48130 18110 30020PIT B 26 - 001 44710 18220 26490PIT A 85- 001 45820 18010 27810PIT A 85- 001 45070 18030 27040PIT A 85- 001 45250 18140 27110PIT A 85- 001 47900 18080 29820PIT C 64- 001 32320 10980 21340PIT A 85- 001 48070 18090 29980PIT A 85- 001 45910 18000 27910PIT A 85- 001 48980 18460 30520PIT C 64- 001 31920 11100 20820PIT A 85- 001 46690 18130 28560PIT B 26 - 001 45280 18080 27200PIT A 85- 001 47450 18120 29330PIT B 26 - 001 45600 18200 27400PIT A 85- 001 44360 18060 26300PIT A 85- 001 48290 17990 30300PIT A 85- 001 48270 18080 30190PIT A 85- 001 45370 17960 27410PIT A 85- 001 47430 18170 29260PIT A 85- 001 45890 18110 27780PIT C 64- 001 32470 11000 21470PIT C 64- 001 32260 11010 21250PIT C 64- 001 31950 11070 20880PIT A 85- 001 47860 17970 29890PIT A 85- 001 44850 18540 26310PIT C 64- 001 32350 10990 21360PIT A 85- 001 46650 17860 28790PIT B 26 - 001 48070 17980 30090PIT B 26 - 001 48180 18020 30160PIT A 85- 001 47840 18490 29350PIT A 85- 001 49080 17970 31110PIT C 64- 001 31490 11060 20430PIT B 26 - 001 48230 18170 30060PIT B 26 - 001 44380 18140 26240PIT B 26 - 001 45860 18070 27790PIT B 26 - 001 48100 18040 30060PIT B 26 - 001 43250 18110 25140PIT A 85- 001 50230 18220 32010PIT A 85- 001 47290 17990 29300

Page 182: June Per Shift (Truckscale Port)

PIT B 26 - 001 45150 17960 27190PIT A 85- 001 50930 18500 32430PIT A 85- 001 48360 18090 30270PIT C 64- 001 31250 10930 20320PIT A 85- 001 48500 18080 30420PIT B 26 - 001 44800 18040 26760PIT C 64- 001 31210 11020 20190PIT A 85- 001 48570 17970 30600PIT B 26 - 001 45140 18020 27120PIT C 64- 001 31460 11030 20430PIT A 85- 001 49440 18520 30920PIT A 85- 001 48880 18150 30730PIT C 64- 001 32070 10980 21090PIT A 85- 001 46440 18110 28330PIT A 85- 001 51310 18370 32940PIT B 26 - 001 45780 18040 27740PIT C 64- 001 32070 11070 21000PIT A 85- 001 49510 18040 31470PIT A 85- 001 47340 18070 29270PIT B 26 - 001 42320 18010 24310PIT A 85- 001 50060 17900 32160PIT B 26 - 001 44820 18120 26700PIT B 26 - 001 44530 18080 26450PIT A 85- 001 46350 17970 28380PIT A 85- 001 42130 18080 24050PIT A 85- 001 48900 18460 30440PIT A 85- 001 49430 17980 31450PIT A 85- 001 48270 18100 30170PIT C 64- 001 31710 11020 20690PIT A 85- 001 49340 17920 31420PIT A 85- 001 47690 17980 29710PIT A 85- 001 49490 17990 31500PIT C 64- 001 31490 10930 20560PIT A 85- 001 50400 18500 31900PIT C 64- 001 31090 11060 20030PIT A 85- 001 48930 17950 30980PIT A 85- 001 49540 18010 31530PIT A 85- 001 47870 18060 29810PIT A 85- 001 51850 18500 33350PIT C 64- 001 31800 10940 20860PIT A 85- 001 48610 18100 30510PIT A 85- 001 49810 18020 31790PIT A 85- 001 48340 17910 30430PIT A 85- 001 48940 17960 30980PIT C 64- 001 31470 11040 20430PIT A 85- 001 47390 18100 29290PIT A 85- 001 49050 18480 30570PIT A 85- 001 46910 18180 28730PIT A 85- 001 46770 17960 28810PIT A 85- 001 47960 17900 30060

Page 183: June Per Shift (Truckscale Port)

PIT C 64- 001 31440 10870 20570PIT A 85- 001 48280 17890 30390PIT A 85- 001 44740 17990 26750PIT A 85- 001 47810 17910 29900PIT C 64- 001 30970 11030 19940PIT A 85- 001 47500 17920 29580PIT A 85- 001 48410 17940 30470PIT A 85- 001 47620 17990 29630PIT C 64- 001 30960 11070 19890PIT A 85- 001 48860 17880 30980PIT A 85- 001 49260 17900 31360PIT C 64- 001 30650 10990 19660PIT A 85- 001 49530 18460 31070PIT A 85- 001 48600 17950 30650PIT A 85- 001 44510 18170 26340PIT A 85- 001 48840 18140 30700PIT C 64- 001 31290 11020 20270PIT A 85- 001 49620 18300 31320PIT A 85- 001 47580 18080 29500PIT C 64- 001 31170 10980 20190PIT C 64- 001 31110 10970 20140PIT A 85- 001 46480 17880 28600PIT A 85- 001 48460 18430 30030PIT A 85- 001 48090 18170 29920PIT A 85- 001 48930 18080 30850PIT A 85- 001 47660 18090 29570PIT A 85- 001 50410 17820 32590PIT A 85- 001 47630 17950 29680PIT A 85- 001 43360 18140 25220PIT A 85- 001 48710 17840 30870PIT A 85- 001 48620 17830 30790PIT A 85- 001 50040 17870 32170PIT A 85- 001 49350 17870 31480PIT A 85- 001 48770 17940 30830PIT A 85- 001 50080 18520 31560PIT A 85- 001 45500 17880 27620PIT A 85- 001 48880 18060 30820PIT A 85- 001 47890 18170 29720PIT A 85- 001 47180 17970 29210PIT A 85- 001 49430 18000 31430PIT A 85- 001 47510 18020 29490PIT A 85- 001 48990 17930 31060PIT A 85- 001 48730 17930 30800PIT A 85- 001 47730 18050 29680PIT A 85- 001 47140 17970 29170PIT A 85- 001 48440 18050 30390PIT A 85- 001 49010 18040 30970PIT A 85- 001 49160 18050 31110PIT A 85- 001 48570 18010 30560PIT A 85- 001 48470 18010 30460

Page 184: June Per Shift (Truckscale Port)

PIT C 64- 001 30540 10970 19570PIT A 85-2 001 48010 17940 30070PIT A 85-2 001 44410 17860 26550PIT A 85- 001 46750 18570 28180PIT A 85- 001 47470 17990 29480PIT A 85- 001 50860 18580 32280PIT C 64- 001 31030 11100 19930PIT C 64- 001 31050 11020 20030PIT A 85- 001 47440 17860 29580PIT A 85- 001 45770 17980 27790PIT A 85- 001 44490 18110 26380PIT A 85- 001 49250 18090 31160PIT A 85- 001 47430 17990 29440PIT A 85- 001 45280 18780 26500PIT C 64- 001 30330 10950 19380PIT A 85- 001 46870 18090 28780PIT A 85- 001 46570 17880 28690PIT A 85- 001 43690 17920 25770PIT A 85- 001 46230 18180 28050PIT A 85- 001 45140 18150 26990PIT A 85- 001 45740 17970 27770PIT A 85- 001 45370 18020 27350PIT A 85- 001 47050 18140 28910PIT C 64- 001 33250 11110 22140PIT A 85- 001 48320 18070 30250PIT A 85- 001 44220 17780 26440PIT A 85- 001 47090 18000 29090PIT C 64- 001 33340 11000 22340PIT A 85- 001 45440 18470 26970PIT A 85- 001 47420 17830 29590PIT A 85- 001 44270 18090 26180PIT A 85- 001 48950 17880 31070PIT C 64- 001 33210 11040 22170PIT A 85- 001 46500 17970 28530PIT C 64- 001 32310 11010 21300PIT A 85- 001 44850 18090 26760PIT A 85- 001 47330 18070 29260PIT A 85- 001 41810 18040 23770PIT A 85- 001 48000 18450 29550PIT A 85- 001 44000 18800 25200PIT A 85- 001 44970 17760 27210PIT A 85- 001 43150 18040 25110PIT A 85- 001 43480 18170 25310PIT C 64- 001 32280 10940 21340PIT A 85- 001 44590 18160 26430PIT A 85- 001 46430 18000 28430PIT A 85- 001 42650 17800 24850PIT A 85- 001 46500 18020 28480PIT A 85- 001 45290 18130 27160PIT A 85- 001 46180 17990 28190

Page 185: June Per Shift (Truckscale Port)

PIT C 64- 001 32410 11020 21390PIT A 85- 001 46980 18510 28470PIT A 85- 001 42650 17810 24840PIT A 85- 001 46300 17880 28420PIT A 85- 001 46540 18030 28510PIT C 64- 001 33580 11010 22570PIT C 64- 001 32530 11070 21460PIT A 85- 001 45740 18040 27700PIT A 85- 001 44180 18840 25340PIT A 85- 001 46770 18290 28480PIT A 85- 001 44660 18150 26510PIT A 85- 001 46270 18120 28150PIT A 85- 001 46980 18510 28470PIT A 85- 001 46470 18160 28310PIT A 85- 001 42060 17890 24170PIT C 64- 001 33290 11030 22260PIT C 64- 001 33190 10980 22210PIT A 85- 001 47400 18040 29360PIT A 85- 001 43180 18040 25140PIT A 85- 001 47470 17980 29490PIT A 85- 001 46360 18020 28340PIT A 85- 001 43250 18020 25230PIT A 85- 001 44330 17860 26470PIT A 85- 001 47230 18110 29120PIT A 85- 001 43390 18120 25270PIT A 85- 001 43030 17800 25230PIT C 64- 001 32200 11090 21110PIT A 85- 001 44950 17900 27050PIT C 64- 001 33670 10980 22690PIT A 85- 001 47720 18010 29710PIT C 64- 001 32870 11010 21860PIT C 64- 001 32460 10990 21470PIT C 64- 001 33170 10920 22250PIT A 85- 001 44890 18040 26850PIT A 85- 001 42040 17840 24200PIT A 85- 001 46800 18090 28710PIT A 85- 001 44230 18060 26170PIT A 85- 001 44310 18120 26190PIT A 85- 001 47430 18750 28680PIT A 85- 001 44120 18820 25300PIT A 85- 001 46850 18080 28770PIT A 85- 001 44610 18290 26320PIT C 64- 001 31900 11050 20850PIT A 85- 001 47110 17830 29280PIT A 85- 001 45490 17920 27570PIT A 85- 001 45960 18620 27340PIT A 85- 001 43380 18170 25210PIT A 85- 001 43950 18190 25760PIT A 85- 001 47030 18130 28900PIT A 85- 001 45940 17990 27950

Page 186: June Per Shift (Truckscale Port)

PIT C 64- 001 32650 11100 21550PIT A 85- 001 45360 18000 27360PIT C 64- 001 33580 11030 22550PIT C 64- 001 33250 11080 22170PIT A 85- 001 45940 18250 27690PIT A 85- 001 45030 18270 26760PIT A 85- 001 46570 18070 28500PIT A 85- 001 46120 18130 27990PIT C 64- 001 32020 11060 20960PIT A 85- 001 45650 18060 27590PIT A 85- 001 42760 17950 24810PIT A 85- 001 45090 18920 26170PIT C 64- 001 33440 11080 22360PIT A 85- 001 45560 18620 26940PIT A 85- 001 45340 18170 27170PIT C 64- 001 30810 11010 19800PIT C 64- 001 32610 11090 21520PIT A 85- 001 44730 17930 26800PIT A 85- 001 44120 18070 26050PIT A 85- 001 45670 17900 27770PIT A 85- 001 46500 18080 28420PIT A 85- 001 47140 18030 29110PIT A 85- 001 46280 18250 28030PIT A 85- 001 41540 18390 23150PIT A 85- 001 44940 18220 26720PIT A 85- 001 43550 18000 25550PIT A 85- 001 45140 18010 27130PIT A 85- 001 44880 18120 26760PIT A 85- 001 45960 18570 27390PIT A 85- 001 45080 17960 27120PIT A 85- 001 45000 18200 26800PIT A 85- 001 43400 17930 25470PIT A 85- 001 46310 18160 28150PIT A 85- 001 46520 18880 27640PIT C 64- 001 32120 11030 21090PIT C 64- 001 31410 11050 20360PIT A 85- 001 44690 18060 26630PIT C 64- 001 31950 10890 21060PIT C 64- 001 30440 10980 19460PIT A 85- 001 44670 17970 26700PIT A 85- 001 45050 18190 26860PIT C 64- 001 32490 11030 21460PIT A 85- 001 42560 17870 24690PIT A 85- 001 48020 18620 29400PIT A 85- 001 44450 17990 26460PIT A 85- 001 44680 18060 26620PIT A 85- 001 44880 18120 26760PIT A 85- 001 47660 18330 29330PIT A 85- 001 45800 18150 27650PIT A 85- 001 44070 18170 25900

Page 187: June Per Shift (Truckscale Port)

PIT A 85- 001 45160 18170 26990PIT A 85- 001 48150 18130 30020PIT A 85- 001 45720 18530 27190PIT A 85- 001 47840 18500 29340PIT A 85- 001 47980 18150 29830PIT A 85- 001 45350 18100 27250PIT A 85- 001 46430 18910 27520PIT A 85- 001 47930 18130 29800PIT A 85- 001 46870 18160 28710PIT A 85- 001 46990 18690 28300PIT A 85- 001 46740 17940 28800PIT A 85- 001 47100 18180 28920PIT A 85- 001 48190 18120 30070PIT A 85- 001 47480 18060 29420PIT A 85- 001 46750 18550 28200PIT A 85- 001 48700 17900 30800PIT C 64- 001 31910 10980 20930PIT A 85- 001 46630 17860 28770PIT A 85- 001 45200 18100 27100PIT A 85- 001 48100 18100 30000PIT A 85- 001 48800 18210 30590PIT A 85- 001 46060 18200 27860PIT C 64- 001 31620 11010 20610PIT C 64- 001 32670 10980 21690PIT C 64- 001 31950 11020 20930PIT A 85- 001 44960 17870 27090PIT C 64- 001 32720 10910 21810PIT A 85- 001 47640 18150 29490PIT C 64- 001 32010 11000 21010PIT A 85- 001 43690 17800 25890PIT A 85- 001 44970 17910 27060PIT A 85- 001 46400 18110 28290PIT A 85- 001 45150 18070 27080PIT A 85- 001 44980 18280 26700PIT A 85- 001 47560 18880 28680PIT A 85- 001 46480 17970 28510PIT A 85- 001 45630 17870 27760PIT A 85- 001 45020 18050 26970PIT A 85- 001 45750 18020 27730PIT A 85- 001 47080 18490 28590PIT C 64- 001 31370 11040 20330PIT A 85- 001 48000 18010 29990PIT A 85- 001 47490 17990 29500PIT A 85- 001 45190 18050 27140PIT A 85- 001 46360 18020 28340PIT A 85- 001 48340 18260 30080PIT A 85- 001 48500 18120 30380PIT A 85- 001 46040 17960 28080PIT C 64- 001 30250 11010 19240PIT A 85- 001 47720 17730 29990

Page 188: June Per Shift (Truckscale Port)

PIT A 85- 001 46900 18050 28850PIT A 85- 001 46320 18070 28250PIT A 85- 001 46550 18110 28440PIT C 64- 001 31530 11070 20460PIT C 64- 001 30960 10960 20000PIT A 85- 001 47900 18010 29890PIT C 64- 001 31160 10990 20170PIT A 85- 001 47730 18490 29240PIT A 85- 001 45330 18270 27060PIT C 64- 001 31430 10920 20510PIT A 85- 001 47770 18140 29630PIT A 85- 001 47640 17860 29780PIT A 85- 001 47260 18010 29250PIT A 85- 001 50500 18430 32070PIT A 85- 001 46700 18420 28280PIT A 85- 001 46020 18040 27980PIT A 85- 001 46620 18070 28550PIT A 85- 001 45160 18000 27160PIT A 85- 001 45910 17970 27940PIT A 85- 001 47940 18030 29910PIT A 85- 001 43520 17990 25530PIT A 85- 001 40180 17740 22440PIT A 85- 001 45560 17940 27620PIT A 85- 001 47080 17960 29120PIT A 85- 001 44870 17810 27060PIT A 85- 001 47750 18120 29630PIT A 85- 001 47980 18100 29880PIT A 85- 001 46720 17850 28870PIT A 85- 001 45550 17890 27660PIT A 85- 001 45920 17800 28120PIT A 85- 001 47410 17940 29470PIT A 85- 001 47460 17990 29470PIT A 85- 001 48040 17890 30150PIT A 85- 001 48720 18060 30660PIT A 85- 001 46020 18030 27990PIT A 85- 001 47580 18040 29540PIT A 85- 001 47960 18050 29910PIT A 85- 001 46280 18060 28220PIT A 85- 001 45330 17940 27390PIT A 85- 001 46830 17940 28890PIT A 85- 001 47870 17960 29910PIT C 64- 001 32670 11090 21580PIT C 64- 001 30850 10970 19880PIT C 64- 001 31740 10950 20790PIT A 85- 001 47560 18390 29170PIT A 85- 001 46370 18040 28330PIT A 85- 001 45660 17930 27730PIT A 85- 001 48390 18790 29600PIT C 64- 001 31110 11080 20030PIT C 64- 001 30370 10990 19380

Page 189: June Per Shift (Truckscale Port)

PIT A 85- 001 47260 18110 29150PIT A 85- 001 46590 17820 28770PIT A 85- 001 45290 17920 27370PIT A 85- 001 45030 18080 26950PIT A 85- 001 45850 17850 28000PIT A 85- 001 45990 18050 27940PIT A 65 - 001 33830 11060 22770PIT A 85- 001 46440 18040 28400PIT A 85- 001 45750 18050 27700PIT A 85- 001 44870 18010 26860PIT A 85- 001 45970 18190 27780PIT A 85- 001 43690 17950 25740PIT A 85- 001 44520 17710 26810PIT A 85- 001 45480 18140 27340PIT A 65 - 001 32450 11050 21400PIT A 85- 001 44230 18200 26030PIT A 65 - 001 33510 10990 22520PIT A 85- 001 46290 17980 28310PIT A 85- 001 44300 18090 26210PIT A 65 - 001 32290 10970 21320PIT A 85- 001 45390 18610 26780PIT A 85- 001 45500 18150 27350PIT A 85- 001 45550 18030 27520PIT A 85- 001 44700 17990 26710PIT A 65 - 001 33200 11100 22100PIT A 65 - 001 30920 10990 19930PIT A 85- 001 45540 18800 26740PIT A 85- 001 46070 18070 28000PIT A 85- 001 46660 18080 28580PIT A 85- 001 45700 17930 27770PIT A 85- 001 44980 17970 27010PIT A 85- 001 46510 18040 28470PIT A 85- 001 46510 18080 28430PIT A 85- 001 47670 18070 29600PIT A 65 - 001 34520 11020 23500PIT A 85- 001 46180 18020 28160PIT A 85- 001 45490 18220 27270PIT A 85- 001 46640 17940 28700PIT A 85- 001 45230 18160 27070PIT A 65 - 001 32930 11120 21810PIT A 85- 001 45820 18180 27640PIT A 85- 001 42890 17760 25130PIT A 85- 001 44870 18180 26690PIT A 85- 001 46730 18070 28660PIT A 85- 001 46490 18040 28450PIT A 65 - 001 32970 10900 22070PIT A 65 - 001 33010 10970 22040PIT A 85- 001 47630 18680 28950PIT A 85- 001 46710 18140 28570PIT A 85- 001 46600 18090 28510

Page 190: June Per Shift (Truckscale Port)

PIT A 85- 001 48680 18790 29890PIT A 65 - 001 33630 11120 22510PIT A 85- 001 45020 17990 27030PIT A 85- 001 44700 17950 26750PIT A 85- 001 43550 18080 25470PIT A 85- 001 45900 18110 27790PIT A 65 - 001 32450 11050 21400PIT A 85- 001 44610 17930 26680PIT A 85- 001 44180 18060 26120PIT A 85- 001 44850 18050 26800PIT A 85- 001 45290 17900 27390PIT A 85- 001 45660 18030 27630PIT A 85- 001 45350 18070 27280PIT A 85- 001 45840 18060 27780PIT A 85- 001 37230 18080 19150PIT A 65 - 001 33300 11030 22270PIT A 85- 001 44410 18180 26230PIT A 85- 001 45450 18030 27420PIT A 85- 001 45000 18200 26800PIT A 85- 001 43080 17740 25340PIT A 85- 001 47500 18770 28730PIT A 85- 001 46140 17430 28710PIT A 85- 001 45500 18120 27380PIT A 85- 001 47830 18590 29240PIT A 85- 001 45360 18030 27330PIT A 65 - 001 34590 11150 23440PIT A 85- 001 45650 17990 27660PIT A 85- 001 46260 18190 28070PIT A 85- 001 45700 18000 27700PIT A 85- 001 45380 17830 27550PIT A 85- 001 46240 18030 28210PIT A 85- 001 46290 18020 28270PIT A 85- 001 45480 17870 27610PIT A 85- 001 47250 17980 29270PIT A 85- 001 45840 17870 27970PIT A 85- 001 45470 17890 27580PIT A 65 - 001 33020 11040 21980PIT A 85- 001 45900 18050 27850PIT A 65 - 001 34070 11150 22920PIT A 85- 001 44910 18110 26800PIT A 65 - 001 32830 11140 21690PIT A 65 - 001 32710 11000 21710PIT A 85- 001 46030 17920 28110PIT A 85- 001 45710 17950 27760PIT A 85- 001 48690 18120 30570PIT A 85- 001 45300 18220 27080PIT A 85- 001 47070 17920 29150PIT A 85- 001 48120 18030 30090PIT A 85- 001 46750 17980 28770PIT A 85- 001 46700 18130 28570

Page 191: June Per Shift (Truckscale Port)

PIT A 85- 001 45030 18060 26970PIT A 85- 001 46190 17950 28240PIT A 85-2 001 47910 18020 29890PIT A 85- 001 45110 18160 26950PIT A 85-2 001 44070 17990 26080PIT A 85- 001 47250 18560 28690PIT A 85-2 001 44950 18090 26860PIT A 85-2 001 43410 17920 25490PIT A 85- 001 45050 18130 26920PIT A 85- 001 45040 17860 27180PIT A 85-2 001 44890 18150 26740PIT A 65 - 001 33470 11090 22380PIT A 65 - 001 33160 11090 22070PIT A 85- 001 48330 18910 29420PIT A 65 - 001 32470 11040 21430PIT A 65 - 001 34160 11150 23010PIT A 85-2 001 44020 18150 25870PIT A 85-2 001 48910 18100 30810PIT A 85-2 001 47240 17900 29340PIT A 85-2 001 44270 17880 26390PIT A 85- 001 47870 18230 29640PIT A 85- 001 44160 17870 26290PIT A 85-2 001 49110 18010 31100PIT A 85-2 001 48720 17970 30750PIT A 65 - 001 34460 11000 23460PIT A 85-2 001 45060 18040 27020PIT A 65 - 001 34750 11110 23640PIT A 85-2 001 48620 18030 30590PIT A 85-2 001 44450 17990 26460PIT A 85- 001 47280 18620 28660PIT A 85-2 001 45310 18220 27090PIT A 85-2 001 44520 18010 26510PIT A 85- 001 45540 18060 27480PIT A 85-2 001 44730 17790 26940PIT A 85-2 001 48850 18040 30810PIT A 85- 001 44030 17910 26120PIT A 85- 001 49270 18820 30450PIT A 85-2 001 48830 18050 30780PIT A 85- 001 45830 17990 27840PIT A 85-2 001 48280 18050 30230PIT A 85- 001 47460 18580 28880PIT A 85-2 001 48340 17790 30550PIT A 85-2 001 42580 17840 24740PIT A 85-2 001 48940 17990 30950PIT A 85-2 001 48540 17860 30680PIT A 85-2 001 48760 17920 30840PIT A 65 - 001 31570 11050 20520PIT A 85-2 001 48850 17960 30890PIT A 85-2 001 43350 18080 25270PIT A 85-2 001 45970 18070 27900

Page 192: June Per Shift (Truckscale Port)

PIT A 85-2 001 46170 18570 27600PIT A 65 - 001 31200 10960 20240PIT A 85-2 001 45750 18000 27750PIT A 65 - 001 31440 11030 20410PIT A 65 - 001 30770 11030 19740PIT A 65 - 001 31010 11030 19980PIT A 85-2 001 43030 18100 24930PIT A 85-2 001 43990 18180 25810PIT A 65 - 001 31710 11060 20650PIT A 85-2 001 46500 18500 28000PIT A 65 - 001 31660 11040 20620PIT A 85-2 001 48060 17950 30110PIT A 85-2 001 41680 17830 23850PIT A 85-2 001 48250 17810 30440PIT A 85-2 001 43220 18030 25190PIT A 85-2 001 48270 17740 30530PIT A 65 - 001 31790 10810 20980PIT A 85-2 001 48300 17860 30440PIT A 85-2 001 46680 18770 27910PIT A 65 - 001 33190 10940 22250PIT A 65 - 001 32910 10950 21960PIT A 85-2 001 47670 18030 29640PIT A 85-2 001 47900 18020 29880PIT A 85-2 001 46580 18430 28150PIT A 85-2 001 42810 18440 24370PIT A 85-2 001 48360 17950 30410PIT A 85-2 001 48510 18150 30360PIT A 85-2 001 47660 18190 29470PIT A 85-2 001 45790 18570 27220PIT A 65 - 001 35170 11060 24110PIT A 85-2 001 47990 18060 29930PIT A 85-2 001 45700 18120 27580PIT A 85-2 001 46410 18040 28370PIT C 64- 001 31040 11060 19980PIT A 85-2 001 49260 17980 31280PIT C 64- 001 32310 10920 21390PIT A 85-2 001 49190 18000 31190PIT A 85-2 001 46430 17990 28440PIT A 85-2 001 44470 18030 26440PIT C 64- 001 31640 10900 20740PIT A 85-2 001 45610 17960 27650PIT A 85-2 001 46570 17980 28590PIT A 85-2 001 48380 18060 30320PIT A 85-2 001 48310 18070 30240PIT A 85-2 001 47590 17770 29820PIT A 85-2 001 47500 18060 29440PIT C 64- 001 30420 11020 19400PIT A 85-2 001 43960 17730 26230PIT C 64- 001 31240 10980 20260PIT A 85-2 001 47680 18830 28850

Page 193: June Per Shift (Truckscale Port)

PIT A 85-2 001 48880 18060 30820PIT A 85-2 001 49110 17870 31240PIT A 85-2 001 50200 17930 32270PIT A 85-2 001 47510 18080 29430PIT A 85-2 001 45580 18080 27500PIT A 85-2 001 44230 17970 26260PIT A 85-2 001 51290 17900 33390PIT A 85-2 001 45330 17950 27380PIT A 85-2 001 48330 17920 30410PIT A 85-2 001 44150 17980 26170PIT A 85-2 001 49850 17890 31960PIT A 85-2 001 48340 18040 30300PIT A 85- 001 46370 18450 27920PIT A 85- 001 47830 18050 29780PIT C 64- 001 31130 11080 20050PIT C 64- 001 31780 10950 20830PIT B 26 - 001 48690 18050 30640PIT A 85-2 001 49100 17810 31290PIT C 64- 001 32270 11060 21210PIT C 64- 001 31250 11020 20230PIT B 26 - 001 47680 17990 29690PIT C 64- 001 32020 10830 21190PIT A 85-2 001 47690 18140 29550PIT A 85- 001 45990 18200 27790PIT B 26 - 001 48890 17890 31000PIT B 26 - 001 48020 17910 30110PIT B 26 - 001 47600 18070 29530PIT A 85- 001 46180 18110 28070PIT B 26 - 001 48750 18130 30620PIT A 85-2 001 47430 17980 29450PIT A 85-2 001 46870 17970 28900PIT A 85-2 001 45240 18110 27130PIT A 65 - 001 32170 11070 21100PIT A 85-2 001 47640 18010 29630PIT A 85-2 001 43940 18210 25730PIT A 85-2 001 45860 18630 27230PIT B 26 - 001 48310 18030 30280PIT A 85-2 001 44500 18070 26430PIT A 65 - 001 31750 11070 20680PIT A 85-2 001 45340 18490 26850PIT A 85-2 001 45540 17790 27750PIT A 65 - 001 33810 10920 22890PIT A 85-2 001 46000 18560 27440PIT B 26 - 001 48350 17860 30490PIT B 26 - 001 48910 17980 30930PIT B 26 - 001 49210 17860 31350PIT A 65 - 001 33970 11120 22850PIT A 85-2 001 46910 18790 28120PIT B 26 - 001 48980 18050 30930PIT A 85-2 001 45490 18200 27290

Page 194: June Per Shift (Truckscale Port)

PIT A 65 - 001 32930 11020 21910PIT A 85-2 001 46450 17960 28490PIT A 85-2 001 45980 18020 27960PIT A 85-2 001 46200 18110 28090PIT A 85-2 001 45150 17950 27200PIT A 85-2 001 44400 17980 26420PIT A 85-2 001 44990 18010 26980PIT C 64- 001 32120 11070 21050PIT B 26 - 001 48770 18070 30700PIT B 26 - 001 48260 17860 30400PIT A 85-2 001 44800 18180 26620PIT B 26 - 001 47790 18000 29790PIT B 26 - 001 49230 17900 31330PIT C 64- 001 31240 11070 20170PIT A 85-2 001 45960 18640 27320PIT B 26 - 001 48950 18030 30920PIT C 64- 001 32130 11070 21060PIT A 85-2 001 46690 18090 28600PIT C 64- 001 31540 11120 20420PIT A 85-2 001 47220 18440 28780PIT A 85-2 001 46460 18000 28460PIT A 85-2 001 46120 18020 28100PIT A 85-2 001 47880 18510 29370PIT C 64- 001 31690 10980 20710PIT C 64- 001 31010 11010 20000PIT A 85-2 001 45750 18110 27640PIT A 85-2 001 45040 17920 27120PIT B 26 - 001 47990 18070 29920PIT A 85-2 001 45840 18010 27830PIT B 26 - 001 47800 18010 29790PIT A 85-2 001 46090 17940 28150PIT B 26 - 001 48510 18030 30480PIT A 85-2 001 45820 18070 27750PIT B 26 - 001 48810 18100 30710PIT B 26 - 001 48580 17990 30590PIT A 85-2 001 45860 18140 27720PIT C 64- 001 31430 11000 20430PIT A 85-2 001 46060 18020 28040PIT A 85-2 001 46370 17970 28400PIT C 64- 001 31460 11080 20380PIT C 64- 001 31050 10970 20080PIT C 64- 001 31000 11040 19960PIT C 64- 001 30850 11080 19770PIT A 85-2 001 46850 18640 28210PIT C 64- 001 30110 10970 19140PIT A 85-2 001 46880 18410 28470PIT A 85-2 001 46140 17900 28240PIT A 85-2 001 45780 18100 27680PIT A 85-2 001 46140 18120 28020PIT A 85-2 001 45870 17910 27960

Page 195: June Per Shift (Truckscale Port)

PIT B 26 - 001 46960 17970 28990PIT B 26 - 001 48260 18120 30140PIT A 85-2 001 45910 18000 27910PIT A 85-2 001 45450 18040 27410PIT C 64- 001 31000 11010 19990PIT B 26 - 001 47910 17960 29950PIT A 85-2 001 45490 17910 27580PIT A 85-2 001 44890 18010 26880PIT A 85-2 001 45790 17850 27940PIT A 85-2 001 48020 18560 29460PIT A 85-2 001 47660 18560 29100PIT A 85-2 001 45840 18070 27770PIT B 26 - 001 48050 18030 30020PIT A 85-2 001 48080 18090 29990PIT B 26 - 001 49570 18040 31530PIT B 26 - 001 48070 17980 30090PIT A 85-2 001 46340 17970 28370PIT A 85-2 001 45090 18000 27090PIT A 85-2 001 46850 18130 28720PIT A 85-2 001 46130 18010 28120PIT B 26 - 001 49060 18120 30940PIT C 64- 001 31390 10970 20420PIT B 26 - 001 48140 18140 30000PIT C 64- 001 31490 11050 20440PIT C 64- 001 31570 11000 20570PIT A 85-2 001 44990 18000 26990PIT A 85-2 001 47170 18120 29050PIT C 64- 001 30940 11070 19870PIT A 85-2 001 46300 18580 27720PIT C 64- 001 31730 10940 20790PIT B 26 - 001 48610 18180 30430PIT B 26 - 001 44650 17880 26770PIT C 64- 001 30720 11040 19680PIT A 85-2 001 45900 17990 27910PIT B 26 - 001 45980 17850 28130PIT B 26 - 001 44990 18020 26970PIT B 26 - 001 47010 18100 28910PIT A 85-2 001 46040 18030 28010PIT B 26 - 001 46830 18020 28810PIT A 85-2 001 46860 17930 28930PIT A 85-2 001 46700 18040 28660PIT B 26 - 001 46360 18030 28330PIT B 26 - 001 47360 18040 29320PIT B 26 - 001 45620 17940 27680PIT A 85-2 001 49730 17910 31820PIT B 26- 001 49120 18660 30460PIT C 64- 001 30980 11050 19930PIT B 26 - 001 45660 18100 27560PIT A 85-2 001 47690 18250 29440PIT C 64- 001 32470 11020 21450

Page 196: June Per Shift (Truckscale Port)

PIT C 64- 001 30870 10970 19900PIT B 26 - 001 45200 17800 27400PIT C 64- 001 32020 11010 21010PIT B 26- 001 43870 17700 26170PIT B 26- 001 31650 10950 20700PIT C 64- 001 31450 10920 20530PIT B 26- 001 47480 18050 29430PIT A 85-2 001 48040 18420 29620PIT C 64- 001 30950 10760 20190PIT B 26- 001 48200 18570 29630PIT B 26 - 001 46310 18010 28300PIT B 26 - 001 44430 17900 26530PIT B 26- 001 44930 17990 26940PIT B 26 - 001 45240 18020 27220PIT A 85-2 001 47900 17950 29950PIT A 85-2 001 49310 17990 31320PIT A 85-2 001 47760 17990 29770PIT A 85-2 001 46770 17970 28800PIT B 26 - 001 45920 18050 27870PIT B 26 - 001 44610 18100 26510PIT A 85-2 001 49270 17950 31320PIT B 26- 001 48040 18490 29550PIT A 85-2 001 47930 17880 30050PIT B 26 - 001 47270 18180 29090PIT C 64- 001 32500 10970 21530PIT C 64- 001 31540 11020 20520PIT B 26- 001 31660 10880 20780PIT C 64- 001 31430 10970 20460PIT B 26 - 001 45860 17830 28030PIT B 26- 001 31660 10960 20700PIT A 85-2 001 48530 18030 30500PIT C 64- 001 31800 11000 20800PIT B 26 - 001 46540 18010 28530PIT B 26- 001 48390 18390 30000PIT C 64- 001 31300 10880 20420PIT B 26- 001 45410 18130 27280PIT B 26 - 001 46420 18000 28420PIT B 26 - 001 46610 17850 28760PIT A 85-2 001 49660 17870 31790PIT A 85-2 001 48610 17980 30630PIT B 26 - 001 47150 18010 29140PIT B 26- 001 48150 18520 29630PIT A 85-2 001 48230 17900 30330PIT C 64- 001 30970 10750 20220PIT B 26- 001 48550 18420 30130PIT B 26- 001 48330 17990 30340PIT B 26- 001 31650 10910 20740PIT B 26 - 001 45360 17930 27430PIT C 64- 001 31370 10980 20390PIT A 85-2 001 48040 17850 30190

Page 197: June Per Shift (Truckscale Port)

PIT B 26 - 001 47650 18080 29570PIT C 64- 001 31510 11010 20500PIT B 26- 001 45100 18120 26980PIT B 26- 001 48990 18450 30540PIT C 64- 001 32610 10970 21640PIT B 26- 001 31120 10880 20240PIT B 26 - 001 46530 17970 28560PIT A 85-2 001 49720 17810 31910PIT A 85-2 001 48810 17890 30920PIT B 26- 001 49550 18470 31080PIT A 85-2 001 46390 17920 28470PIT C 64- 001 31200 10810 20390PIT A 85-2 001 48420 17860 30560PIT B 26 - 001 47200 17770 29430PIT B 26- 001 49260 18420 30840PIT B 26 - 001 45390 17910 27480PIT A 85-2 001 47340 17890 29450PIT B 26 - 001 45700 18060 27640PIT A 85-2 001 41770 17910 23860PIT C 64- 001 31810 10950 20860PIT A 85-2 001 47280 18070 29210PIT A 85-2 001 48870 18730 30140PIT C 64- 001 31740 10970 20770PIT B 26- 001 48190 18120 30070PIT B 26- 001 49200 18400 30800PIT A 85-2 001 47730 18040 29690PIT B 26 - 001 45320 17940 27380PIT B 26- 001 30670 10820 19850PIT B 26- 001 45630 18010 27620PIT B 26 - 001 44610 17970 26640PIT C 64- 001 31130 10820 20310PIT C 64- 001 29950 10930 19020PIT B 26 - 001 45900 17940 27960PIT A 85-2 001 50090 17830 32260PIT A 85-2 001 49820 17820 32000PIT A 85-2 001 48260 17850 30410PIT C 64- 001 46980 18550 28430PIT B 26 - 001 45610 18020 27590PIT C 64- 001 42530 18030 24500PIT B 26- 001 31210 10910 20300PIT B 26- 001 50080 18540 31540PIT A 85-2 001 47050 18080 28970PIT B 26 - 001 46350 18100 28250PIT B 26 - 001 46450 17880 28570PIT B 26 - 001 46900 17890 29010PIT B 26 - 001 48660 17990 30670PIT A 85-2 001 48670 18030 30640PIT B 26 - 001 46640 18090 28550PIT A 85-2 001 47860 17990 29870PIT A 85-2 001 49280 18060 31220

Page 198: June Per Shift (Truckscale Port)

PIT B 26 - 001 47340 18090 29250PIT A 85-2 001 48240 18070 30170PIT B 26 - 001 46490 18010 28480PIT B 26 - 001 49700 18090 31610PIT B 26- 001 47960 18300 29660PIT B 26- 001 33030 11000 22030PIT B 26 - 001 48620 17970 30650PIT B 26- 001 32680 11040 21640PIT B 26- 001 32750 10970 21780PIT B 26 - 001 48990 18080 30910PIT B 26- 001 31750 10950 20800PIT B 26 - 001 50010 17840 32170PIT B 26- 001 32490 11110 21380PIT B 26 - 001 49110 17920 31190PIT B 26 - 001 49110 17930 31180PIT A 85-2 001 46740 17850 28890PIT B 26- 001 48650 18030 30620PIT B 26 - 001 48790 18090 30700PIT A 85-2 001 45930 17990 27940PIT A 85-2 001 46500 18050 28450PIT B 26- 001 31250 10800 20450PIT A 85-2 001 47840 18050 29790PIT B 26- 001 47490 18250 29240PIT A 85-2 001 46750 17990 28760PIT A 85-2 001 47260 18010 29250PIT A 85-2 001 46350 17950 28400PIT B 26 - 001 49620 18030 31590PIT B 26- 001 48260 18750 29510PIT B 26- 001 31320 11000 20320PIT D 46- 001 43660 17850 25810PIT B 26 - 001 49780 18170 31610PIT B 26 - 001 48850 17850 31000PIT B 26- 001 50370 18610 31760PIT B 26 - 001 47710 17910 29800PIT B 26 - 001 49030 18060 30970PIT B 26 - 001 49080 18060 31020PIT A 85-2 001 46610 17840 28770PIT B 26- 001 31950 10940 21010PIT D 46- 001 46120 18030 28090PIT B 26- 001 32270 10910 21360PIT B 26- 001 32370 11010 21360PIT A 85-2 001 47070 17970 29100PIT B 26- 001 31960 10970 20990PIT A 85-2 001 46910 18060 28850PIT D 46- 001 44480 18280 26200PIT D 46- 001 47170 18440 28730PIT A 85-2 001 47520 17980 29540PIT A 85-2 001 46960 17970 28990PIT B 26- 001 47210 18140 29070PIT B 26 - 001 48520 18100 30420

Page 199: June Per Shift (Truckscale Port)

PIT A 85-2 001 46760 18020 28740PIT B 26- 001 48950 18510 30440PIT B 26 - 001 48600 17870 30730PIT A 85-2 001 47450 18100 29350PIT D 46- 001 31250 11040 20210PIT B 26- 001 32330 11040 21290PIT B 26 - 001 48660 17970 30690PIT D 46- 001 44730 17900 26830PIT B 26 - 001 47670 18140 29530PIT B 26 - 001 48070 18080 29990PIT B 26- 001 33500 11070 22430PIT D 46- 001 29970 10790 19180PIT A 85-2 001 46130 17790 28340PIT B 26 - 001 48090 18030 30060PIT B 26- 001 48590 18770 29820PIT B 26- 001 49840 18550 31290PIT A 85-2 001 47770 18040 29730PIT D 46- 001 29910 10980 18930PIT D 46- 001 45030 18230 26800PIT A 85-2 001 47180 18000 29180PIT B 26 - 001 47980 18010 29970PIT B 26- 001 33250 10960 22290PIT D 46- 001 47100 18170 28930PIT B 26 - 001 47670 17910 29760PIT B 26- 001 50950 18520 32430PIT D 46- 001 46840 18520 28320PIT A 85-2 001 45690 18000 27690PIT A 85-2 001 46230 18050 28180PIT B 26 - 001 46720 17950 28770PIT D 46- 001 44390 17880 26510PIT D 46- 001 46750 17960 28790PIT A 85-2 001 46440 17870 28570PIT B 26- 001 32670 11030 21640PIT B 26- 001 32710 10990 21720PIT A 85-2 001 46940 17900 29040PIT B 26- 001 32930 11000 21930PIT A 85-2 001 47350 17900 29450PIT B 26 - 001 49120 18030 31090PIT A 85-2 001 45300 18020 27280PIT B 26 - 001 47410 17930 29480PIT D 46- 001 46700 18460 28240PIT B 26 - 001 49150 17980 31170PIT D 46- 001 44390 18210 26180PIT B 26 - 001 47530 17920 29610PIT D 46- 001 44210 17890 26320PIT A 85-2 001 46470 18050 28420PIT D 46- 001 46580 18150 28430PIT B 26 - 001 48790 18090 30700PIT D 46- 001 45480 17980 27500PIT B 26 - 001 47570 18050 29520

Page 200: June Per Shift (Truckscale Port)

PIT A 85-2 001 45660 17880 27780PIT B 26 - 001 49020 17980 31040PIT A 85-2 001 48020 18070 29950PIT B 26- 001 32030 11010 21020PIT B 26 - 001 49000 18200 30800PIT B 26- 001 50400 18710 31690PIT D 46- 001 46290 18440 27850PIT B 26- 001 29650 11050 18600PIT B 26- 001 30440 10850 19590PIT A 85-2 001 48150 17930 30220PIT A 85-2 001 47630 17980 29650PIT B 26- 001 32440 10950 21490PIT B 26- 001 30730 11100 19630PIT B 26- 001 49830 18490 31340PIT D 46- 001 44140 18260 25880PIT B 26- 001 29820 10820 19000PIT B 26- 001 33640 10980 22660PIT B 26- 001 33350 10980 22370PIT B 26 - 001 47790 18020 29770PIT A 85-2 001 47520 18010 29510PIT B 26- 001 50550 18690 31860PIT D 46- 001 30040 10940 19100PIT D 46- 001 45660 18100 27560PIT D 46- 001 44360 18130 26230PIT D 46- 001 30630 11040 19590PIT D 46- 001 32710 11030 21680PIT D 46- 001 31250 10940 20310PIT D 46- 001 31420 10950 20470PIT B 26 - 001 47650 17990 29660PIT A 85-2 001 47630 17970 29660PIT A 85-2 001 46460 17970 28490PIT A 85-2 001 46110 18090 28020PIT D 46- 001 33860 11010 22850PIT D 46- 001 45090 18060 27030PIT B 26 - 001 47890 17950 29940PIT A 85-2 001 47930 18040 29890PIT B 26 - 001 48100 18210 29890PIT B 26 - 001 48410 18080 30330PIT B 26 - 001 48300 18130 30170PIT B 26 - 001 47310 17930 29380PIT A 85-2 001 48650 17980 30670PIT D 46- 001 46840 18460 28380PIT D 46- 001 46480 18650 27830PIT A 85-2 001 48250 18220 30030PIT B 26 - 001 47940 17850 30090PIT D 46- 001 44410 17910 26500PIT D 46- 001 46790 18240 28550PIT B 26- 001 50190 18510 31680PIT D 46- 001 47730 18740 28990PIT D 46- 001 30090 11050 19040

Page 201: June Per Shift (Truckscale Port)

PIT B 26- 001 46250 18020 28230PIT B 26 - 001 48080 18040 30040PIT D 46- 001 31150 11030 20120PIT D 46- 001 31390 10910 20480PIT B 26- 001 47960 18080 29880PIT B 26 - 001 47890 17990 29900PIT A 85- 001 48350 17950 30400PIT B 26- 001 48730 18120 30610PIT A 85- 001 49310 18040 31270PIT B 26 - 001 46360 17980 28380PIT D 46- 001 31310 10900 20410PIT B 26 - 001 46990 18150 28840PIT B 26 - 001 46030 18020 28010PIT B 26- 001 47800 18060 29740PIT D 46- 001 32170 11020 21150PIT B 26- 001 49610 18460 31150PIT A 85- 001 48100 17890 30210PIT D 46- 001 44760 17920 26840PIT B 26 - 001 47100 17990 29110PIT B 26 - 001 46470 18030 28440PIT D 46- 001 31440 10970 20470PIT B 26- 001 51370 18480 32890PIT B 26 - 001 47440 17840 29600PIT B 26- 001 45970 17900 28070PIT D 46- 001 30520 11020 19500PIT B 26- 001 49290 18780 30510PIT D 46- 001 31780 10980 20800PIT A 85- 001 48900 17920 30980PIT B 26- 001 49820 18040 31780PIT B 26 - 001 47950 17940 30010PIT A 85- 001 49810 18240 31570PIT D 46- 001 30850 10860 19990PIT D 46- 001 30650 11010 19640PIT B 26- 001 47630 18090 29540PIT D 46- 001 31190 10910 20280PIT B 26 - 001 47660 17970 29690PIT A 85- 001 48130 18010 30120PIT B 26 - 001 44620 18040 26580PIT A 85- 001 47510 17880 29630PIT B 26- 001 49390 17950 31440PIT B 26 - 001 45150 17900 27250PIT A 85- 001 49480 17920 31560PIT C 46- 001 30530 10830 19700PIT B 26- 001 49290 18080 31210PIT B 26 - 001 46430 17900 28530PIT A 85- 001 48470 17920 30550PIT C 46- 001 30590 10990 19600PIT A 85- 001 47830 17980 29850PIT B 26- 001 47280 18050 29230PIT B 26- 001 50280 18510 31770

Page 202: June Per Shift (Truckscale Port)

PIT C 46- 001 30780 10920 19860PIT B 26- 001 46270 17910 28360PIT C 46- 001 31480 11030 20450PIT B 26 - 001 47250 17970 29280PIT C 46- 001 31730 10960 20770PIT A 85- 001 48370 17900 30470PIT B 26- 001 49300 18480 30820PIT A 85- 001 48300 18110 30190PIT D 46- 001 50280 18490 31790PIT D 46- 001 31170 10940 20230PIT A 85- 001 47540 17880 29660PIT B 26- 001 49960 18710 31250PIT A 85- 001 47950 17870 30080PIT C 46- 001 43910 17800 26110PIT B 26 - 001 45450 17910 27540PIT A 85- 001 48660 17980 30680PIT B 26 - 001 45940 18010 27930PIT A 85- 001 48960 17960 31000PIT C 46- 001 48940 18400 30540PIT B 26- 001 48970 18000 30970PIT B 26 - 001 46700 17880 28820PIT B 26- 001 46690 18270 28420PIT C 46- 001 31280 10950 20330PIT A 85- 001 46920 17970 28950PIT B 26 - 001 45270 18080 27190PIT B 26- 001 47730 17930 29800PIT C 46- 001 46640 18130 28510PIT B 26- 001 48180 18030 30150PIT C 46- 001 49220 18450 30770PIT C 46- 001 31080 10930 20150PIT A 85- 001 48170 17930 30240PIT C 46- 001 43970 17730 26240PIT B 26- 001 46940 18040 28900PIT C 46- 001 31930 10910 21020PIT B 26- 001 45990 17840 28150PIT C 46- 001 31270 10890 20380PIT B 26 - 001 46930 17910 29020PIT A 85- 001 48430 18030 30400PIT B 26 - 001 46470 17830 28640PIT B 26- 001 48580 18690 29890PIT B 26 - 001 45640 17830 27810PIT A 85- 001 46530 17980 28550PIT B 26- 001 48330 18420 29910PIT A 85- 001 47270 17870 29400PIT C 46- 001 31430 10960 20470PIT A 85- 001 47920 17990 29930PIT B 26 - 001 48210 17870 30340PIT A 85- 001 46340 17960 28380PIT A 85- 001 46900 17910 28990PIT D 46- 001 45340 18060 27280

Page 203: June Per Shift (Truckscale Port)

PIT D 46- 001 46970 18070 28900PIT A 85- 001 47550 17930 29620PIT D 46- 001 47580 18100 29480PIT C 46- 001 31940 10940 21000PIT B 26 - 001 48410 18010 30400PIT D 46- 001 46700 17990 28710PIT C 46- 001 48380 18410 29970PIT B 26 -2 SEAM 27 47310 17850 29460PIT A 85- 001 48180 18080 30100PIT D 46- 001 48340 18410 29930PIT B 26 - 001 47930 17790 30140PIT D 46- 001 44650 17900 26750PIT D 46- 001 45230 17820 27410PIT D 46- 001 31520 10940 20580PIT D 46- 001 46620 17930 28690PIT A 85- 001 48550 18080 30470PIT A 85- 001 48100 18060 30040PIT B 26 - 001 46360 17980 28380PIT B 26 - 001 48900 17970 30930PIT B 26 - 001 45740 18050 27690PIT A 85- 001 46060 18000 28060PIT A 85- 001 47770 17860 29910PIT B 26 - 001 47260 18060 29200PIT B 26 - 001 46250 17930 28320PIT B 26 - 001 47270 17840 29430PIT B 26 - 001 46170 18050 28120PIT B 26 - 001 47440 17760 29680PIT C 46- 001 32690 10960 21730PIT C 46- 001 32910 11140 21770PIT C 46- 001 32170 11170 21000PIT B 26 - 001 48920 18020 30900PIT D 46- 001 45050 17940 27110PIT B 26 - 001 47140 18030 29110PIT C 46- 001 31670 10950 20720PIT B 26 - 001 48380 17990 30390PIT B 26 - 001 47020 18020 29000PIT D 46- 001 47110 18210 28900PIT A 85-2 001 46420 18060 28360PIT B 26 - 001 47210 17820 29390PIT B 26- 001 46910 17980 28930PIT A 85-2 001 46370 17910 28460PIT C 46- 001 31520 11040 20480PIT D 46- 001 48710 18810 29900PIT B 26 - 001 46370 18020 28350PIT A 85-2 001 46410 17890 28520PIT A 85-2 001 46900 18040 28860PIT D 46- 001 49250 18800 30450PIT A 85-2 001 45710 18040 27670PIT C 46- 001 30200 10990 19210PIT B 26 - 001 47680 18110 29570

Page 204: June Per Shift (Truckscale Port)

PIT A 85-2 001 45330 17770 27560PIT B 26- 001 32680 10990 21690PIT B 26- 001 32220 10970 21250PIT B 26 - 001 47770 18010 29760PIT B 26- 001 31690 10940 20750PIT B 26- 001 32040 11000 21040PIT B 26 - 001 48950 18020 30930PIT D 46- 001 45570 17890 27680PIT B 26 - 001 48130 18050 30080PIT D 46- 001 46140 18220 27920PIT A 85-2 001 47070 18100 28970PIT B 26 - 001 47710 17970 29740PIT B 26- 001 31290 11020 20270PIT D 46- 001 46020 18060 27960PIT D 46- 001 50860 18610 32250PIT B 26 - 001 49330 18130 31200PIT A 85-2 001 46080 18060 28020PIT A 85-2 001 45950 17800 28150PIT A 85-2 001 45930 17950 27980PIT A 85-2 001 48220 18070 30150PIT B 26 - 001 48910 17950 30960PIT B 26- 001 32180 10950 21230PIT B 26 - 001 49100 18080 31020PIT B 26- 001 32070 10990 21080PIT A 85-2 001 46340 17780 28560PIT D 46- 001 47620 18120 29500PIT B 26 - 001 47620 17940 29680PIT B 26- 001 31650 10960 20690PIT D 46- 001 45820 17950 27870PIT B 26 - 001 48450 17960 30490PIT B 26- 001 32070 11000 21070PIT D 46- 001 40790 18020 22770PIT B 26- 001 32470 11010 21460PIT A 85-2 001 46140 18080 28060PIT B 26- 001 31840 11000 20840PIT C 46- 001 49390 18560 30830PIT B 26 - 001 47510 18070 29440PIT A 85-2 001 47240 17910 29330PIT B 26 - 001 48890 18110 30780PIT A 85-2 001 48270 18020 30250PIT C 46- 001 46880 18150 28730PIT A 85-2 001 48480 18010 30470PIT C 46- 001 46380 18200 28180PIT A 85-2 001 46890 18050 28840PIT B 26- 001 32780 10950 21830PIT B 26 - 001 47700 17940 29760PIT B 26 - 001 47880 18060 29820PIT A 85-2 001 49500 17770 31730PIT B 26 - 001 47030 17920 29110PIT A 85-2 001 48630 18050 30580

Page 205: June Per Shift (Truckscale Port)

PIT C 46- 001 50740 18580 32160PIT B 26- 001 31560 11020 20540PIT A 85-2 001 47540 17890 29650PIT A 85-2 001 50310 18030 32280PIT B 26- 001 31450 10920 20530PIT C 46- 001 46800 18020 28780PIT B 26- 001 30740 11040 19700PIT C 46- 001 46720 17950 28770PIT B 26- 001 31390 10980 20410PIT B 26 - 001 48030 17980 30050PIT B 26- 001 31770 11020 20750PIT B 26- 001 30120 10960 19160PIT A 85-2 001 46950 17790 29160PIT B 26 - 001 47630 18050 29580PIT B 26 - 001 47060 18050 29010PIT A 85-2 001 47700 18030 29670PIT A 85-2 001 46060 17730 28330PIT A 85-2 001 47490 17990 29500PIT B 26 - 001 48690 17930 30760PIT A 85-2 001 45800 18010 27790PIT C 46- 001 48320 18220 30100PIT A 85-2 001 46730 17790 28940PIT A 65 - 001 35910 10950 24960PIT A 65 - 001 35700 11020 24680PIT B 26 - 001 47790 18050 29740PIT A 85-2 001 49440 17950 31490PIT B 26 - 001 51680 18000 33680PIT A 85-2 001 47950 17820 30130PIT A 85-2 001 46240 18190 28050PIT C 46- 001 49060 18520 30540PIT A 85-2 001 48380 17970 30410PIT B 26 - 001 48610 18050 30560PIT A 85-2 001 46310 18180 28130PIT B 26 - 001 47990 18040 29950PIT C 46- 001 36000 11030 24970PIT A 85-2 001 48010 18060 29950PIT B 26 - 001 47050 18160 28890PIT A 85-2 001 47660 17890 29770PIT D 46- 001 35640 11020 24620PIT D 46- 001 31700 11040 20660PIT A 85-2 001 46870 18080 28790PIT D 46- 001 52790 18660 34130PIT B 26 - 001 51980 17830 34150PIT D 46- 001 31580 11010 20570PIT B 26 - 001 46750 18050 28700PIT B 26 - 001 47140 18050 29090PIT D 46- 001 43120 17890 25230PIT B 26 - 001 50990 17990 33000PIT A 85-2 001 46390 17910 28480PIT B 26 - 001 46140 17930 28210

Page 206: June Per Shift (Truckscale Port)

PIT B 26 - 001 45910 18000 27910PIT D 46- 001 31910 10980 20930PIT D 46- 001 30670 10980 19690PIT D 46- 001 46210 18020 28190PIT A 85-2 001 46090 18070 28020PIT B 26 - 001 47600 17990 29610PIT A 85-2 001 46580 18040 28540PIT A 65 - 001 51620 18160 33460PIT A 85-2 001 45150 17880 27270PIT A 85-2 001 46560 18000 28560PIT D 46- 001 31450 11020 20430PIT B 26 - 001 50720 17870 32850PIT B 26 - 001 46660 18120 28540PIT B 26 - 001 46280 18010 28270PIT D 46- 001 31920 11010 20910PIT B 26 - 001 46670 17960 28710PIT A 65 - 001 47760 18020 29740PIT A 65 - 001 50320 18540 31780PIT A 85-2 001 46920 17890 29030PIT D 46- 001 45410 18150 27260PIT B 26 - 001 45760 17920 27840PIT B 26 - 001 51030 17950 33080PIT D 46- 001 47920 17980 29940PIT D 46- 001 42790 17870 24920PIT D 46- 001 49420 18430 30990PIT D 46- 001 46570 18650 27920PIT B 26 - 001 46070 17960 28110PIT B 26 - 001 45490 17960 27530PIT A 85-2 001 45780 17970 27810PIT D 46- 001 31780 10920 20860PIT D 46- 001 30360 10950 19410PIT D 46- 001 31060 11010 20050PIT B 26 - 001 49240 17870 31370PIT D 46- 001 46060 18140 27920PIT D 46- 001 29900 11000 18900PIT A 85-2 001 46350 18050 28300PIT B 26 - 001 45420 17930 27490PIT A 85-2 001 45830 18050 27780PIT A 85-2 001 46260 18050 28210PIT B 26 - 001 46310 17990 28320PIT D 46- 001 47470 18410 29060PIT B 26 - 001 50740 17920 32820PIT B 26 - 001 46950 17870 29080PIT B 26 - 001 46340 17950 28390PIT D 46- 001 30620 10840 19780PIT D 46- 001 30960 10960 20000PIT D 46- 001 45910 18050 27860PIT D 46- 001 29630 10980 18650PIT D 46- 001 30860 10920 19940PIT D 46- 001 30470 10990 19480

Page 207: June Per Shift (Truckscale Port)

PIT D 46- 001 47280 18540 28740PIT D 46- 001 44550 18290 26260PIT D 46- 001 46960 18610 28350PIT B 26 - 001 45700 17880 27820PIT A 85-2 001 50520 18050 32470PIT D 46- 001 41890 17880 24010PIT B 26 - 001 51330 17950 33380PIT A 85-2 001 46110 17900 28210PIT A 85-2 001 45740 17890 27850PIT B 26 - 001 46570 17950 28620PIT B 26 - 001 50630 17880 32750PIT B 26 - 001 45720 17930 27790PIT D 46- 001 30670 10940 19730PIT B 26 - 001 44580 17850 26730PIT A 85-2 001 46280 17940 28340PIT D 46- 001 45990 18520 27470PIT D 46- 001 30550 10930 19620PIT D 46- 001 44610 18020 26590PIT B 26 - 001 45420 17840 27580PIT D 46- 001 30450 10920 19530PIT B 26 - 001 45830 17870 27960PIT B 26 - 001 49350 17830 31520PIT D 46- 001 31280 10970 20310PIT D 46- 001 30590 11000 19590PIT A 85-2 001 47380 18010 29370PIT A 85-2 001 47060 17950 29110PIT A 65 - 001 48960 18560 30400PIT B 26 - 001 47360 18000 29360PIT B 26 - 001 50550 18000 32550PIT D 46- 001 30260 10930 19330PIT A 85-2 001 47180 17880 29300PIT A 65 - 001 46900 18100 28800PIT B 26 - 001 45250 17860 27390PIT A 65 - 001 48760 18520 30240PIT B 26 - 001 46410 17890 28520PIT B 26 - 001 45320 17880 27440PIT D 46- 001 46010 17920 28090PIT B 26 - 001 45350 17770 27580PIT A 65 - 001 46040 17790 28250PIT B 26 - 001 48520 17960 30560PIT A 65 - 001 51470 18760 32710PIT A 65 - 001 49790 18130 31660PIT A 85-2 001 46850 18130 28720PIT A 85-2 001 47700 17890 29810PIT A 85-2 001 46240 17980 28260PIT A 85-2 001 45610 18000 27610PIT B 26 - 001 49970 18010 31960PIT B 26 - 001 45880 17710 28170PIT A 85-2 001 46330 17780 28550PIT B 26 - 001 51110 18140 32970

Page 208: June Per Shift (Truckscale Port)

PIT B 26 - 001 50280 17900 32380PIT B 26 - 001 45670 17980 27690PIT A 85-2 001 45860 18090 27770PIT B 26 - 001 46010 18240 27770PIT B 26 - 001 48860 18360 30500PIT B 26 - 001 47380 18340 29040PIT B 26 - 001 47320 18330 28990PIT B 26 - 001 48100 18350 29750PIT B 26 - 001 48380 18200 30180PIT B 26 - 001 49560 18190 31370PIT B 26 - 001 47300 18110 29190PIT B 26 - 001 45320 18170 27150PIT B 26 - 001 48720 18070 30650PIT B 26 - 001 48360 18200 30160PIT D 46- 001 47230 18200 29030PIT A 65 - 001 49790 18170 31620PIT D 46- 001 32090 11080 21010PIT A 65 - 001 50590 18540 32050PIT D 46- 001 32350 11090 21260PIT A 65 - 001 51490 18530 32960PIT A 65 - 001 46770 18290 28480PIT D 46- 001 31880 11060 20820PIT D 46- 001 31620 11100 20520PIT D 46- 001 31660 11140 20520PIT B 26 - 001 47060 18320 28740PIT B 26 - 001 48680 18300 30380PIT D 46- 001 31920 11080 20840PIT B 26 - 001 48300 18390 29910PIT B 26 - 001 48510 18320 30190PIT B 26 - 001 47560 18160 29400PIT B 26 - 001 47450 18050 29400PIT B 26 - 001 47940 18140 29800PIT A 65 - 001 47950 18720 29230PIT B 26 - 001 47470 18130 29340PIT B 26 - 001 48150 18130 30020PIT B 26- 001 51210 18120 33090PIT B 26 - 001 49300 18160 31140PIT B 26 - 001 49670 18060 31610PIT B 26 - 001 49240 18040 31200PIT B 26 - 001 49220 18090 31130PIT B 26 - 001 49300 19200 30100PIT B 26 - 001 48880 18140 30740PIT B 26 - 001 47520 18140 29380PIT B 26 - 001 50110 18170 31940PIT B 26 - 001 49730 18050 31680PIT B 26 - 001 51870 18260 33610PIT D 46- 001 43460 18130 25330PIT B 26- 001 53610 18560 35050PIT D 46- 001 29860 11030 18830PIT D 46- 001 49070 18680 30390

Page 209: June Per Shift (Truckscale Port)

PIT D 46- 001 31780 11060 20720PIT D 46- 001 31760 10990 20770PIT D 46- 001 46520 18000 28520PIT D 46- 001 47520 18540 28980PIT D 46- 001 31350 11050 20300PIT B 26 - 001 50840 18110 32730PIT D 46- 001 31380 11050 20330PIT B 26- 001 49240 18240 31000PIT B 26- 001 51370 18250 33120PIT D 46- 001 31330 11070 20260PIT B 26 - 001 49850 18310 31540PIT B 26 - 001 50970 18020 32950PIT B 26 - 001 45710 18010 27700PIT D 46- 001 48140 18020 30120PIT B 26 - 001 50880 18140 32740PIT B 26 - 001 49540 17830 31710PIT B 26 - 001 50130 17940 32190PIT B 26 - 001 49340 18100 31240PIT D 46- 001 49180 18720 30460PIT B 26 - 001 49220 18140 31080PIT B 26 - 001 43920 18120 25800PIT D 46- 001 45140 18030 27110PIT B 26- 001 47220 18040 29180PIT B 26 - 001 45940 18170 27770PIT D 46- 001 30940 11020 19920PIT B 26 - 001 45310 17990 27320PIT B 26- 001 51380 18410 32970PIT B 26 - 001 46100 18050 28050PIT D 46- 001 31450 11020 20430PIT D 46- 001 31010 11010 20000PIT B 26- 001 48300 18640 29660PIT B 26 - 001 45730 17980 27750PIT D 46- 001 31260 10900 20360PIT B 26- 001 48710 18630 30080PIT B 26 - 001 44550 17870 26680PIT D 46- 001 31230 10980 20250PIT B 26- 001 48970 18560 30410PIT B 26 - 001 49250 18070 31180PIT D 46- 001 30620 10940 19680PIT A 85-2 001 47510 18240 29270PIT A 85-2 001 47280 18000 29280PIT B 26 - 001 49320 18030 31290PIT D 46- 001 46990 18000 28990PIT A 85-2 001 46130 17760 28370PIT B 26- 001 49060 18110 30950PIT D 46- 001 46050 18170 27880PIT A 85-2 001 45920 17820 28100PIT B 26 - 001 45800 17970 27830PIT B 26- 001 48120 18050 30070PIT B 26 - 001 46710 18110 28600

Page 210: June Per Shift (Truckscale Port)

PIT D 46- 001 30010 10940 19070PIT B 26- 001 48940 18390 30550PIT B 26 - 001 45750 17920 27830PIT D 46- 001 47950 18660 29290PIT D 46- 001 30520 10990 19530PIT B 26- 001 48280 18020 30260PIT B 26 - 001 46220 18030 28190PIT B 26- 001 48690 18560 30130PIT D 46- 001 47780 17940 29840PIT B 26 - 001 44840 17810 27030PIT B 26- 001 48480 18560 29920PIT D 46- 001 30210 11000 19210PIT B 26 - 001 44260 18070 26190PIT B 26 - 001 45820 18170 27650PIT A 85-2 001 46520 17940 28580PIT D 46- 001 30380 10910 19470PIT D 46- 001 30680 10990 19690PIT A 85-2 001 46800 17950 28850PIT A 85-2 001 45810 17750 28060PIT B 26- 001 46910 17910 29000PIT B 26 - 001 45430 18060 27370PIT D 46- 001 44340 17920 26420PIT B 26- 001 49520 18550 30970PIT B 26 - 001 44420 17910 26510PIT D 46- 001 30780 10930 19850PIT D 46- 001 46770 18390 28380PIT D 46- 001 43670 18180 25490PIT A 85-2 001 46650 17780 28870PIT D 46- 001 32320 10930 21390PIT B 26 - 001 45410 17910 27500PIT A 85-2 001 45390 18150 27240PIT B 26 - 001 45650 18110 27540PIT D 46- 001 48930 17840 31090PIT B 26 - 001 48030 17840 30190PIT D 46- 001 33080 10940 22140PIT B 26 - 001 47110 17970 29140PIT A 85-2 001 45440 17710 27730PIT A 85-2 001 44440 17900 26540PIT B 26 - 001 44750 17880 26870PIT A 85-2 001 45920 17920 28000PIT A 85-2 001 46760 17980 28780PIT B 26- 001 49930 18620 31310PIT B 26 - 001 45890 18220 27670PIT D 46- 001 48340 18130 30210PIT D 46- 001 30630 10960 19670PIT B 26 - 001 46870 17830 29040PIT B 26- 001 49710 18510 31200PIT A 85-2 001 46280 17920 28360PIT D 46- 001 47920 18760 29160PIT B 26- 001 50000 18520 31480

Page 211: June Per Shift (Truckscale Port)

PIT B 26 - 001 47660 17870 29790PIT B 26- 001 47080 18130 28950PIT D 46- 001 29720 10770 18950PIT B 26 - 001 46740 18060 28680PIT B 26 - 001 47350 17930 29420PIT D 46- 001 31410 10910 20500PIT A 85-2 001 46370 17700 28670PIT D 46- 001 46440 18090 28350PIT D 46- 001 46640 18050 28590PIT B 26 - 001 46590 17960 28630PIT B 26 - 001 46660 17960 28700PIT A 85-2 001 47110 17880 29230PIT D 46- 001 32300 10970 21330PIT A 85-2 001 47160 18060 29100PIT D 46- 001 30740 10990 19750PIT D 46- 001 48570 18360 30210PIT B 26- 001 50700 18460 32240PIT B 26 - 001 47660 17780 29880PIT B 26 - 001 47210 18090 29120PIT B 26- 001 50170 18500 31670PIT D 46- 001 46520 18070 28450PIT D 46- 001 49220 18730 30490PIT B 26- 001 46440 18120 28320PIT D 46- 001 31420 10740 20680PIT A 85-2 001 46670 17890 28780PIT B 26 - 001 48190 18210 29980PIT A 85-2 001 46120 17860 28260PIT A 85-2 001 46360 18210 28150PIT A 85-2 001 46800 18030 28770PIT B 26 - 001 47420 18090 29330PIT B 26 - 001 45900 17990 27910PIT A 85-2 001 45420 17900 27520PIT B 26 - 001 49540 17960 31580PIT A 85-2 001 45820 18040 27780PIT A 85-2 001 46060 18070 27990PIT B 26 - 001 46910 18180 28730PIT B 26 - 001 46530 18120 28410PIT B 26 - 001 46900 18050 28850PIT A 85-2 001 45690 17900 27790PIT B 26 - 001 49140 17880 31260PIT B 26- 001 49870 18630 31240PIT B 26- 001 50160 18460 31700PIT C 68 - 001 31220 10920 20300PIT C 68 - 001 30720 10960 19760PIT B 26 - 001 47580 17830 29750PIT C 68 - 001 47870 18650 29220PIT C 68 - 001 31640 10950 20690PIT B 26 - 001 48720 18160 30560PIT B 26- 001 50170 18460 31710PIT A 85-2 001 48630 18100 30530

Page 212: June Per Shift (Truckscale Port)

PIT B 26 - 001 46720 18000 28720PIT B 26- 001 47670 18050 29620PIT B 26 - 001 48440 17960 30480PIT A 85-2 001 48410 17950 30460PIT B 26 - 001 47700 18130 29570PIT A 85-2 001 49160 17870 31290PIT C 68 - 001 45730 18140 27590PIT A 85-2 001 48460 18140 30320PIT B 26 - 001 48010 17980 30030PIT A 85-2 001 49510 18090 31420PIT A 85-2 001 48250 18010 30240PIT A 85-2 001 49300 18060 31240PIT B 26 - 001 48000 17770 30230PIT A 85-2 001 48820 17890 30930PIT C 68 - 001 30390 10990 19400PIT B 26 - 001 47370 17870 29500PIT B 26 - 001 47840 18170 29670PIT B 26 - 001 47710 18030 29680PIT C 68 - 001 32760 10980 21780PIT C 68 - 001 51830 18700 33130PIT A 85-2 001 48670 18130 30540PIT C 68 - 001 31390 10970 20420PIT B 26 - 001 47210 17990 29220PIT C 68 - 001 47830 18390 29440PIT B 26 - 001 48860 18100 30760PIT C 68 - 001 32280 10970 21310PIT A 85-2 001 47690 17980 29710PIT B 26 - 001 49040 17990 31050PIT A 85-2 001 48510 18140 30370PIT C 68 - 001 47850 18530 29320PIT C 68 - 001 46280 18250 28030PIT B 26- 001 51430 18500 32930PIT A 85-2 001 47820 17890 29930PIT C 68 - 001 46940 18030 28910PIT B 26 - 001 48380 17850 30530PIT A 85-2 001 47560 17890 29670PIT B 26 - 001 48710 18160 30550PIT B 26 - 001 48500 18000 30500PIT B 26- 001 51500 18680 32820PIT A 85-2 001 47070 18050 29020PIT C 68 - 001 31480 10960 20520PIT B 26 - 001 47940 17830 30110PIT C 68 - 001 51690 18570 33120PIT C 68 - 001 33230 10940 22290PIT B 26 - 001 49050 17950 31100PIT A 85-2 001 48130 18090 30040PIT B 26- 001 52040 18460 33580PIT B 26 - 001 49820 18070 31750PIT B 26 - 001 49840 17920 31920PIT B 26- 001 52400 18450 33950

Page 213: June Per Shift (Truckscale Port)

PIT C 68 - 001 32780 10920 21860PIT A 85-2 001 48190 17860 30330PIT C 68 - 001 31650 10940 20710PIT A 85-2 001 48360 17810 30550PIT A 85-2 001 47280 18040 29240PIT B 26 - 001 49040 17820 31220PIT A 85-2 001 48690 17880 30810PIT B 26- 001 51790 18300 33490PIT B 26 - 001 48210 18140 30070PIT B 26 - 001 47850 17950 29900PIT A 85-2 001 48600 17880 30720PIT B 26 - 001 48610 17810 30800PIT B 26- 001 51060 18520 32540PIT B 26- 001 53290 18440 34850PIT A 85-2 001 48320 17990 30330PIT C 68 - 001 46630 18000 28630PIT B 26 - 001 47630 17920 29710PIT A 85-2 001 47900 18010 29890PIT B 26 - 001 48740 18050 30690PIT C 68 - 001 32060 10910 21150PIT B 26 - 001 48170 17760 30410PIT C 68 - 001 32010 10910 21100PIT B 26- 001 51790 18590 33200PIT B 26- 001 50730 18550 32180PIT C 68 - 001 31660 10930 20730PIT A 85-2 001 48180 17840 30340PIT A 85-2 001 46990 18080 28910PIT A 85-2 001 48380 18020 30360PIT A 85-2 001 48470 17850 30620PIT B 26 - 001 46310 17920 28390PIT B 26 - 001 47100 18020 29080PIT B 26 - 001 46430 17990 28440PIT A 85-2 001 47910 17830 30080PIT B 26 - 001 47050 17680 29370PIT A 85-2 001 48230 17980 30250PIT B 26 - 001 47390 18020 29370PIT B 26 - 001 46060 17800 28260PIT C 68 - 001 30800 10990 19810PIT A 85-2 001 45640 18080 27560PIT C 68 - 001 47090 18060 29030PIT B 26- 001 53140 18580 34560PIT A 85-2 001 49160 17800 31360PIT A 85-2 001 48900 17700 31200PIT B 26 - 001 45290 17710 27580PIT B 26 - 001 46810 17950 28860PIT A 85-2 001 49780 18240 31540PIT A 85-2 001 49960 18110 31850PIT B 26 - 001 46400 17930 28470PIT A 85-2 001 49660 18060 31600PIT B 26 - 001 49590 18060 31530

Page 214: June Per Shift (Truckscale Port)

PIT C 68 - 001 29430 10960 18470PIT B 26 - 001 47220 18080 29140PIT A 85-2 001 48520 17960 30560PIT C 68 - 001 49730 18760 30970PIT C 68 - 001 32010 11020 20990PIT B 26 - 001 47300 17960 29340PIT A 85-2 001 48650 17900 30750PIT C 68 - 001 31250 10890 20360PIT C 68 - 001 46810 18030 28780PIT C 68 - 001 49610 18470 31140PIT B 26 - 001 47230 18210 29020PIT B 26 - 001 47190 18010 29180PIT A 85-2 001 47450 17920 29530PIT A 85-2 001 46680 18050 28630PIT B 26 - 001 48160 18090 30070PIT A 85-2 001 47230 18090 29140PIT B 26 - 001 47150 17930 29220PIT C 68 - 001 49180 18050 31130PIT B 26- 001 32540 10920 21620PIT C 68 - 001 49740 18460 31280PIT A 85-2 001 46920 18020 28900PIT B 26- 001 33070 11000 22070PIT B 26 - 001 47040 17880 29160PIT C 68 - 001 49130 18840 30290PIT A 85-2 001 49140 18020 31120PIT C 68 - 001 49730 18460 31270PIT A 32- 001 46950 17880 29070PIT B 26- 001 31830 10830 21000PIT B 26- 001 34590 11010 23580PIT B 26 - 001 47440 18120 29320PIT A 32- 001 46530 18020 28510PIT C 68 - 001 49310 18430 30880PIT B 26 - 001 47440 17930 29510PIT A 85-2 001 46830 18000 28830PIT C 68 - 001 45530 17870 27660PIT B 26 - 001 46070 18010 28060PIT C 68 - 001 48300 17980 30320PIT B 26- 001 32810 10940 21870PIT A 85-2 001 47250 18120 29130PIT B 26 - 001 47980 17910 30070PIT B 26- 001 30500 10980 19520PIT B 26 - 001 47330 17870 29460PIT B 26 - 001 45980 17990 27990PIT C 68 - 001 49440 18050 31390PIT C 68 - 001 49940 18420 31520PIT A 85-2 001 48210 17950 30260PIT A 85-2 001 47340 17970 29370PIT C 68 - 001 50000 18770 31230PIT C 68 - 001 50360 18400 31960PIT C 68 - 001 31510 11040 20470

Page 215: June Per Shift (Truckscale Port)

PIT B 26 - 001 44950 18170 26780PIT B 26 - 001 46380 18040 28340PIT A 85-2 001 48130 17980 30150PIT C 68 - 001 31670 11050 20620PIT C 68 - 001 49380 18430 30950PIT C 68 - 001 29740 10830 18910PIT B 26 - 001 45930 17870 28060PIT B 26 - 001 46950 18010 28940PIT B 26 - 001 46790 17900 28890PIT A 85-2 001 48240 18080 30160PIT C 68 - 001 48750 17990 30760PIT A 85-2 001 47670 17930 29740PIT B 26 - 001 45250 17870 27380PIT C 68 - 001 47940 17950 29990PIT C 68 - 001 33030 10990 22040PIT A 85-2 001 48910 17960 30950PIT A 85-2 001 48780 17900 30880PIT C 68 - 001 32220 10970 21250PIT C 68 - 001 50420 18340 32080PIT A 85-2 001 48100 17920 30180PIT A 85-2 001 48620 17900 30720PIT C 68 - 001 49400 18050 31350PIT C 68 - 001 50470 18480 31990PIT A 85-2 001 48180 17930 30250PIT B 26 - 001 46140 17980 28160PIT C 68 - 001 49530 18080 31450PIT A 85-2 001 46760 17850 28910PIT A 85-2 001 47180 17910 29270PIT A 85-2 001 47480 17910 29570PIT B 26 - 001 46910 18170 28740PIT A 85-2 001 47810 18120 29690PIT B 26 - 001 47060 18260 28800PIT A 85-2 001 47470 17990 29480PIT B 26 - 001 47650 17890 29760PIT A 85-2 001 47270 18010 29260PIT B 26 - 001 48270 17980 30290PIT B 26 - 001 48070 18000 30070PIT B 26 - 001 48900 17880 31020PIT B 26 - 001 45920 18240 27680PIT B 26 - 001 46830 18070 28760PIT B 26 - 001 45890 17930 27960PIT B 26 - 001 46890 17960 28930PIT B 26 - 001 47460 17980 29480PIT B 26 - 001 48200 18100 30100PIT B 26 - 001 47030 17870 29160PIT B 26 - 001 47550 18120 29430PIT B 26 - 001 47200 18000 29200PIT B 26 - 001 48920 17960 30960PIT B 26 - 001 47890 18120 29770PIT B 26 - 001 45960 18120 27840

Page 216: June Per Shift (Truckscale Port)

PIT B 26 - 001 48050 18020 30030PIT A 85- 001 49350 17960 31390PIT A 85- 001 49150 18010 31140PIT B 26 - 001 49230 17860 31370PIT B 26 - 001 50080 18090 31990PIT A 85- 001 50210 18090 32120PIT A 85- 001 49790 18070 31720PIT B 26 - 001 49040 17930 31110PIT B 26 - 001 47630 17870 29760PIT B 26 - 001 50640 18000 32640PIT A 85- 001 48840 18120 30720PIT B 26 - 001 50860 18110 32750PIT A 85- 001 49000 18220 30780PIT B 26 - 001 48880 18110 30770PIT A 85- 001 48730 18130 30600PIT A 85- 001 50460 18020 32440PIT B 26 - 001 48300 18110 30190PIT A 65 - 001 49560 18090 31470PIT A 85- 001 50180 17990 32190PIT B 26 - 001 47420 17900 29520PIT B 26 - 001 49850 18020 31830PIT B 26 - 001 47270 17870 29400PIT A 85- 001 49080 18020 31060PIT B 26 - 001 48290 17960 30330PIT A 85- 001 49450 18030 31420PIT B 26 - 001 48740 18110 30630PIT A 65 - 001 51780 18890 32890PIT A 65 - 001 51130 18560 32570PIT A 85- 001 50610 18170 32440PIT A 65 - 001 32100 11050 21050PIT B 26 - 001 49630 18110 31520PIT A 85- 001 48790 18060 30730PIT B 26 - 001 50840 18080 32760PIT A 65 - 001 49410 18670 30740PIT B 26 - 001 49080 17880 31200PIT B 26 - 001 47650 18030 29620PIT A 65 - 001 31900 10990 20910PIT B 26 - 001 47100 17860 29240PIT B 26 - 001 47460 18030 29430PIT A 85- 001 49270 18240 31030PIT B 26 - 001 47390 18070 29320PIT A 85- 001 49540 18040 31500PIT A 65 - 001 47470 18400 29070PIT A 85- 001 48610 18050 30560PIT A 85- 001 47880 18020 29860PIT A 85- 001 50690 18220 32470PIT A 85- 001 48840 18120 30720PIT A 65 - 001 30780 10980 19800PIT B 26 - 001 47590 18050 29540PIT B 26 - 001 48850 18040 30810

Page 217: June Per Shift (Truckscale Port)

PIT A 65 - 001 48680 18620 30060PIT A 85- 001 47850 18130 29720PIT B 26 - 001 48190 18180 30010PIT B 26 - 001 47770 18040 29730PIT C 64- 001 49030 18830 30200PIT A 65 - 001 47250 18890 28360PIT B 26 - 001 49110 17900 31210PIT A 85- 001 49220 18230 30990PIT B 26 - 001 48990 18250 30740PIT A 65 - 001 44040 18100 25940PIT C 64- 001 33530 11110 22420PIT B 26 - 001 48120 18070 30050PIT A 65 - 001 44390 18640 25750PIT C 64- 001 32550 11080 21470PIT A 85- 001 49420 18070 31350PIT C 64- 001 47840 18530 29310PIT C 64- 001 48480 18610 29870PIT A 85- 001 50680 18080 32600PIT A 85- 001 47950 17970 29980PIT A 85- 001 48100 18060 30040PIT C 64- 001 32320 10950 21370PIT C 64- 001 32910 10970 21940PIT B 26 - 001 48020 17940 30080PIT B 26 - 001 49330 18050 31280PIT A 85- 001 51070 18090 32980PIT B 26 - 001 48520 18180 30340PIT B 26 - 001 48170 17950 30220PIT B 26 - 001 48050 18030 30020PIT C 64- 001 49160 18660 30500PIT C 64- 001 48830 18570 30260PIT B 26 - 001 47670 17980 29690PIT A 85- 001 49930 17990 31940PIT C 64- 001 47710 18000 29710PIT B 26 - 001 47440 17930 29510PIT C 64- 001 33410 10960 22450PIT C 64- 001 45580 18130 27450PIT A 85- 001 49510 18030 31480PIT B 26 - 001 47310 18110 29200PIT B 26 - 001 47560 17990 29570PIT A 85- 001 51580 18220 33360PIT B 26 - 001 48850 18200 30650PIT C 64- 001 48850 18450 30400PIT B 26 - 001 46810 18150 28660PIT A 85- 001 48480 18080 30400PIT B 26 - 001 48120 18030 30090PIT C 64- 001 48990 18450 30540PIT A 85- 001 50260 18030 32230PIT C 64- 001 47480 18520 28960PIT A 85- 001 50920 18080 32840PIT A 85- 001 48440 18080 30360

Page 218: June Per Shift (Truckscale Port)

PIT A 85- 001 47760 18140 29620PIT C 64- 001 49990 18510 31480PIT C 64- 001 49560 18500 31060PIT C 64- 001 32890 11000 21890PIT B 26 - 001 46890 18080 28810PIT C 64- 001 32350 10880 21470PIT C 64- 001 49420 18870 30550PIT C 64- 001 46280 18090 28190PIT C 64- 001 31080 10980 20100PIT C 64- 001 32070 11020 21050PIT C 64- 001 33320 11020 22300PIT C 64- 001 46720 17950 28770PIT C 64- 001 31910 10900 21010PIT C 64- 001 32700 10990 21710PIT B 26 - 001 49020 18040 30980PIT A 85- 001 47910 18010 29900PIT A 85- 001 49490 17980 31510PIT C 64- 001 45370 17980 27390PIT B 26 - 001 49540 18120 31420PIT B 26 - 001 49730 18030 31700PIT C 64- 001 50210 18440 31770PIT A 85- 001 47560 18130 29430PIT B 26 - 001 50440 17990 32450PIT A 85- 001 49150 17990 31160PIT B 26 - 001 48980 18030 30950PIT A 85- 001 49660 18030 31630PIT C 64- 001 44980 18070 26910PIT C 64- 001 51090 18460 32630PIT A 85- 001 47660 18010 29650PIT B 26 - 001 48970 18050 30920PIT B 26 - 001 47450 18180 29270PIT B 26 - 001 48980 17980 31000PIT C 64- 001 47780 18020 29760PIT A 85- 001 47320 18000 29320PIT B 26 - 001 49240 18170 31070PIT A 85- 001 47240 17990 29250PIT A 85- 001 49120 17910 31210PIT C 64- 001 32170 10980 21190PIT B 26 - 001 48690 18120 30570PIT C 64- 001 49400 18850 30550PIT C 64- 001 49090 18450 30640PIT C 64- 001 31350 10900 20450PIT C 64- 001 29720 10920 18800PIT C 64- 001 31810 10970 20840PIT B 26 - 001 48630 17930 30700PIT C 64- 001 44600 17980 26620PIT A 85- 001 48380 18130 30250PIT C 64- 001 31720 11030 20690PIT C 64- 001 32440 10940 21500PIT C 64- 001 48930 18380 30550

Page 219: June Per Shift (Truckscale Port)

PIT C 64- 001 49400 18420 30980PIT A 85- 001 48710 17940 30770PIT B 26 - 001 48740 18120 30620PIT B 26 - 001 47970 17970 30000PIT B 26 - 001 48840 17980 30860PIT A 85- 001 48150 17950 30200PIT B 26 - 001 49470 17880 31590PIT C 64- 001 46300 17990 28310PIT C 64- 001 46340 17860 28480PIT A 85- 001 48600 18020 30580PIT B 26 - 001 50610 17970 32640PIT C 64- 001 32810 10970 21840PIT A 85- 001 49140 18180 30960PIT B 26 - 001 49000 17910 31090PIT B 26 - 001 48170 17990 30180PIT C 64- 001 46340 17990 28350PIT C 64- 001 50980 18550 32430PIT C 64- 001 34250 11020 23230PIT B 26 - 001 48240 17950 30290PIT A 85- 001 49110 17880 31230PIT C 64- 001 50650 18370 32280PIT C 64- 001 49760 18750 31010PIT A 85- 001 48280 17970 30310PIT C 64- 001 49880 18510 31370PIT C 64- 001 32060 10990 21070PIT A 85- 001 49120 18100 31020PIT C 64- 001 46240 17990 28250PIT B 26 - 001 47760 18020 29740PIT B 26 - 001 47510 17890 29620PIT C 64- 001 33310 10870 22440PIT B 26 - 001 47110 17890 29220PIT C 64- 001 49310 18400 30910PIT A 85- 001 48440 17870 30570PIT A 85- 001 47590 17930 29660PIT B 26 - 001 46000 18080 27920PIT A 85- 001 46980 18020 28960PIT A 85- 001 47280 17770 29510PIT C 64- 001 32830 10950 21880PIT C 64- 001 48170 18020 30150PIT A 85- 001 47990 18090 29900PIT B 26 - 001 46670 17940 28730PIT C 68 - 001 30100 10910 19190PIT C 64- 001 48180 18090 30090PIT B 26 - 001 46700 17910 28790PIT C 64- 001 50060 18530 31530PIT B 26 - 001 47790 18340 29450PIT C 68 - 001 30920 10900 20020PIT B 26 - 001 48160 17940 30220PIT C 64- 001 32510 10990 21520PIT A 85- 001 48270 18120 30150

Page 220: June Per Shift (Truckscale Port)

PIT B 26 - 001 47010 18130 28880PIT B 26 - 001 47140 17940 29200PIT C 64- 001 50270 18800 31470PIT A 85- 001 48270 17870 30400PIT C 68 - 001 31020 11010 20010PIT C 64- 001 48660 18560 30100PIT A 85- 001 48210 18140 30070PIT A 85- 001 47510 17970 29540PIT A 85- 001 47530 18100 29430PIT B 26 - 001 46640 17960 28680PIT B 26 - 001 47100 18070 29030PIT B 26 - 001 46790 18060 28730PIT B 26 - 001 46980 18100 28880PIT B 26 - 001 47340 18150 29190PIT B 26 - 001 46970 17960 29010PIT A 85- 001 46220 17890 28330PIT A 85- 001 47760 17980 29780PIT B 26 - 001 46370 17980 28390PIT A 85- 001 47360 18080 29280PIT B 26 - 001 45990 18090 27900PIT C 64- 001 47260 18050 29210PIT C 64- 001 45010 18430 26580PIT C 68 - 001 30940 10930 20010PIT C 68 - 001 31470 10950 20520PIT C 68 - 001 30930 10950 19980PIT C 64- 001 47900 18500 29400PIT C 64- 001 50080 18490 31590PIT C 64- 001 47960 18420 29540PIT C 64- 001 47110 18460 28650PIT B 26 - 001 47790 18130 29660PIT B 26 - 001 46710 17950 28760PIT A 85- 001 49990 18070 31920PIT A 85- 001 50430 18100 32330PIT B 26 - 001 47240 18050 29190PIT C 68 - 001 30960 10930 20030PIT A 85- 001 50410 18020 32390PIT B 26 - 001 49120 18140 30980PIT C 64- 001 47720 18050 29670PIT C 64- 001 47670 18580 29090PIT A 85- 001 52420 17820 34600PIT C 64- 001 45460 18040 27420PIT A 85- 001 49720 18050 31670PIT C 64- 001 47840 18120 29720PIT C 64- 001 47860 18050 29810PIT A 85- 001 49650 18060 31590PIT B 26 - 001 45470 17860 27610PIT A 85- 001 49860 18010 31850PIT B 26 - 001 48280 17980 30300PIT C 68 - 001 30210 10780 19430PIT B 26 - 001 46510 17940 28570

Page 221: June Per Shift (Truckscale Port)

PIT C 68 - 001 30660 10990 19670PIT B 26 - 001 47140 18160 28980PIT C 68 - 001 32740 10960 21780PIT B 26 - 001 45940 18140 27800PIT C 68 - 001 45820 18040 27780PIT A 85- 001 46810 18070 28740PIT C 68 - 001 48270 18770 29500PIT B 26 - 001 46540 18110 28430PIT A 85- 001 48250 18050 30200PIT C 68 - 001 32110 10980 21130PIT A 85- 001 47100 18010 29090PIT C 64- 001 30940 10980 19960PIT C 68 - 001 46800 18560 28240PIT C 68 - 001 47170 18490 28680PIT A 85- 001 47190 18070 29120PIT A 85- 001 46730 17920 28810PIT B 26 - 001 46090 18000 28090PIT C 68 - 001 46350 18570 27780PIT A 85- 001 47540 18040 29500PIT B 26 - 001 47410 18100 29310PIT C 68 - 001 47090 18410 28680PIT B 26 - 001 45390 18000 27390PIT A 85- 001 47860 18000 29860PIT C 68 - 001 44570 18000 26570PIT C 68 - 001 47710 18600 29110PIT B 26 - 001 46840 18150 28690PIT C 64- 001 30120 10840 19280PIT B 26 - 001 47990 18150 29840PIT C 68 - 001 46800 18130 28670PIT A 85- 001 49300 18040 31260PIT C 64- 001 31470 10900 20570PIT B 26 - 001 47190 18110 29080PIT C 68 - 001 46860 17700 29160PIT A 85- 001 47850 18070 29780PIT C 64- 001 32400 10850 21550PIT A 85- 001 50880 18170 32710PIT C 68 - 001 47490 18840 28650PIT C 68 - 001 48540 18400 30140PIT A 85- 001 51300 17990 33310PIT C 64- 001 31390 10970 20420PIT C 68 - 001 49140 18490 30650PIT B 26 - 001 46700 17970 28730PIT A 85- 001 49110 17990 31120PIT B 26 - 001 46330 17920 28410PIT A 85- 001 48360 17830 30530PIT C 68 - 001 47870 18470 29400PIT A 85- 001 47520 18000 29520PIT C 68 - 001 47820 18380 29440PIT C 64- 001 31890 10910 20980PIT B 26 - 001 45940 17970 27970

Page 222: June Per Shift (Truckscale Port)

PIT B 26 - 001 46410 17970 28440PIT C 68 - 001 46730 18000 28730PIT C 68 - 001 47610 18000 29610PIT B 26 - 001 45920 18100 27820PIT C 68 - 001 49660 18550 31110PIT A 85- 001 48390 18050 30340PIT B 26 - 001 46880 18070 28810PIT C 68 - 001 47930 18070 29860PIT C 64- 001 31890 10910 20980PIT C 68 - 001 50050 18000 32050PIT C 68 - 001 49440 18390 31050PIT C 64- 001 30520 10910 19610PIT A 85- 001 50520 17970 32550PIT C 64- 001 31390 11020 20370PIT B 26 - 001 46320 17830 28490PIT A 85- 001 49650 17920 31730PIT A 85- 001 51470 17950 33520PIT A 85- 001 49700 18030 31670PIT B 26 - 001 47140 18030 29110PIT B 26 - 001 46270 18150 28120PIT C 64- 001 30790 11050 19740PIT C 68 - 001 46920 18030 28890PIT A 85- 001 49040 18220 30820PIT C 68 - 001 48970 18480 30490PIT C 68 - 001 48470 18000 30470PIT C 68 - 001 47770 18040 29730PIT C 68 - 001 48870 18490 30380PIT C 64- 001 31480 10960 20520PIT A 85- 001 49770 17920 31850PIT B 26 - 001 47030 17960 29070PIT C 64- 001 29990 10870 19120PIT A 85- 001 50740 17810 32930PIT C 68 - 001 47390 18020 29370PIT B 26 - 001 46490 18090 28400PIT A 85-2 001 50540 17890 32650PIT C 68 - 001 48390 18790 29600PIT B 26 - 001 48240 18130 30110PIT A 85-2 001 48200 17810 30390PIT A 85-2 001 49520 18160 31360PIT C 68 - 001 49690 18380 31310PIT B 26 - 001 47300 17770 29530PIT C 68 - 001 47680 17970 29710PIT B 26 - 001 48290 18100 30190PIT A 85- 001 49680 18020 31660PIT B 26 - 001 47170 18010 29160PIT A 85- 001 47900 18110 29790PIT A 85-2 001 48390 18110 30280PIT A 85-2 001 48050 18090 29960PIT B 26 - 001 48570 18010 30560PIT B 26 - 001 46620 18040 28580

Page 223: June Per Shift (Truckscale Port)

PIT A 85-2 001 49510 18170 31340PIT B 26 - 001 47530 17990 29540PIT B 26 - 001 47060 18020 29040PIT A 85-2 001 47020 17970 29050PIT A 85-2 001 48980 18110 30870PIT B 26 - 001 46840 17960 28880PIT C 68 - 001 31030 10990 20040PIT C 64- 001 46440 18750 27690PIT C 68 - 001 31300 11000 20300PIT C 64- 001 48590 18580 30010PIT C 64- 001 46200 18490 27710PIT A 85-2 001 48890 18030 30860PIT C 68 - 001 31410 10970 20440PIT B 26 - 001 48200 18020 30180PIT C 64- 001 46870 17920 28950PIT B 26 - 001 47870 17960 29910PIT A 85-2 001 47370 17970 29400PIT B 26 - 001 48540 17850 30690PIT B 26 - 001 48560 17940 30620PIT B 26 - 001 46910 18040 28870PIT A 85-2 001 47140 17940 29200PIT B 26 - 001 48530 18110 30420PIT A 85-2 001 48820 17820 31000PIT A 85-2 001 48570 17980 30590PIT A 85-2 001 47810 17950 29860PIT C 68 - 001 31970 11020 20950PIT A 85-2 001 49450 18070 31380PIT B 26 - 001 47290 17890 29400PIT C 68 - 001 32660 11060 21600PIT C 68 - 001 31350 10970 20380PIT C 64- 001 49190 18690 30500PIT A 85-2 001 48860 18010 30850PIT C 68 - 001 31880 10950 20930PIT B 26 - 001 48440 17900 30540PIT C 64- 001 46770 18080 28690PIT C 64- 001 48780 18490 30290PIT B 26 - 001 47500 17910 29590PIT A 85-2 001 49090 17930 31160PIT C 68 - 001 31280 10970 20310PIT A 85-2 001 49060 17830 31230PIT A 85-2 001 48660 18010 30650PIT C 64- 001 46240 18100 28140PIT A 85-2 001 48380 18060 30320PIT A 85-2 001 47070 17780 29290PIT A 85-2 001 48570 18010 30560PIT A 85-2 001 48230 17920 30310PIT C 68 - 001 31430 10970 20460PIT A 85-2 001 48390 18080 30310PIT B 26 - 001 48210 17870 30340PIT C 68 - 001 32020 11040 20980

Page 224: June Per Shift (Truckscale Port)

PIT A 85-2 001 48390 17950 30440PIT C 68 - 001 31780 10980 20800PIT C 64- 001 49340 18730 30610PIT B 26 - 001 48730 17890 30840PIT A 85-2 001 47280 18060 29220PIT C 68 - 001 31900 10960 20940PIT B 26 - 001 48940 18100 30840PIT A 85-2 001 47910 18120 29790PIT C 64- 001 44770 17790 26980PIT C 64- 001 46410 18100 28310PIT A 85-2 001 48160 17940 30220PIT C 68 - 001 31930 10740 21190PIT C 64- 001 49120 18450 30670PIT A 85-2 001 47470 17950 29520PIT A 85-2 001 47510 17870 29640PIT C 64- 001 47260 18030 29230PIT A 85-2 001 47480 18030 29450PIT C 64- 001 47900 18030 29870PIT C 68 - 001 30510 10990 19520PIT B 26 - 001 48620 17840 30780PIT C 64- 001 46180 18010 28170PIT A 85-2 001 47490 17750 29740PIT A 85-2 001 48360 17910 30450PIT B 26 - 001 46510 17870 28640PIT C 68 - 001 33210 11000 22210PIT C 68 - 001 31510 10980 20530PIT A 85-2 001 48190 17880 30310PIT A 85-2 001 47710 17960 29750PIT B 26 - 001 48080 17910 30170PIT C 64- 001 45770 17900 27870PIT B 26 - 001 48080 17860 30220PIT A 85-2 001 48290 18110 30180PIT C 68 - 001 31520 10910 20610PIT A 85-2 001 48250 17960 30290PIT C 68 - 001 31020 10880 20140PIT A 85-2 001 47440 17690 29750PIT C 68 - 001 32260 10950 21310PIT A 85-2 001 48630 17940 30690PIT A 85-2 001 48830 17740 31090PIT B 26 - 001 47460 17830 29630PIT C 68 - 001 31600 11080 20520PIT C 68 - 001 32350 10950 21400PIT C 64- 001 50710 18650 32060PIT B 26 - 001 48480 18010 30470PIT C 64- 001 49710 18010 31700PIT C 68 - 001 32130 10890 21240PIT A 85-2 001 49750 17930 31820PIT C 64- 001 46470 17860 28610PIT C 64- 001 46020 18170 27850PIT B 26 - 001 45510 17830 27680

Page 225: June Per Shift (Truckscale Port)

PIT C 68 - 001 30210 10900 19310PIT A 85-2 001 49230 18000 31230PIT C 64- 001 48210 18070 30140PIT A 85-2 001 48520 17970 30550PIT C 64- 001 47060 17980 29080PIT C 68 - 001 31290 10710 20580PIT A 85-2 001 48300 17830 30470PIT C 68 - 001 30460 10980 19480PIT A 85-2 001 49530 18120 31410PIT A 85-2 001 49650 18090 31560PIT A 85-2 001 49470 18100 31370PIT B 26 - 001 47130 17990 29140PIT A 85-2 001 48190 17850 30340PIT B 26 - 001 45570 18050 27520PIT B 26 - 001 47820 18080 29740PIT B 26 - 001 47470 17950 29520PIT A 85-2 001 47530 18040 29490PIT B 26 - 001 46780 18020 28760PIT B 26 - 001 47730 17910 29820PIT A 85-2 001 47380 17850 29530PIT B 26 - 001 48080 17950 30130PIT C 64- 001 49260 18080 31180PIT C 64- 001 47890 17970 29920PIT C 64- 001 32770 11010 21760PIT A 85-2 001 46180 18140 28040PIT C 64- 001 32010 10950 21060PIT C 64- 001 32310 10950 21360PIT C 64- 001 32720 10980 21740PIT B 26 - 001 46940 18100 28840PIT B 26 - 001 47750 17910 29840PIT C 64- 001 48470 18050 30420PIT A 85-2 001 49630 17890 31740PIT C 64- 001 51920 18370 33550PIT A 85-2 001 49040 18040 31000PIT A 85-2 001 49560 18050 31510PIT B 26 - 001 46770 18110 28660PIT B 26 - 001 46990 18050 28940PIT B 26 - 001 46130 17930 28200PIT C 64- 001 48450 18030 30420PIT C 64- 001 50410 18330 32080PIT B 26 - 001 47200 17980 29220PIT A 85-2 001 49780 17980 31800PIT B 26 - 001 46580 18080 28500PIT A 85-2 001 50040 17800 32240PIT C 68 - 001 31860 10980 20880PIT C 64- 001 48630 17910 30720PIT C 68 - 001 31330 11050 20280PIT C 64- 001 50150 18870 31280PIT C 68 - 001 31570 11040 20530PIT C 64- 001 47290 17870 29420

Page 226: June Per Shift (Truckscale Port)

PIT A 85-2 001 49570 18200 31370PIT B 26 - 001 47700 18110 29590PIT B 26 - 001 47430 18080 29350PIT A 85-2 001 49900 17970 31930PIT C 64- 001 49330 18100 31230PIT C 68 - 001 31560 10940 20620PIT B 26 - 001 48590 18090 30500PIT A 85-2 001 50300 18110 32190PIT B 26 - 001 47880 18080 29800PIT C 64- 001 51400 18400 33000PIT C 68 - 001 30680 11000 19680PIT A 85-2 001 49720 18060 31660PIT B 26 - 001 47410 18070 29340PIT B 26 - 001 47310 17780 29530PIT C 68 - 001 30940 11090 19850PIT A 85-2 001 50520 17980 32540PIT B 26 - 001 48350 17890 30460PIT C 64- 001 48090 18070 30020PIT C 64- 001 47810 18050 29760PIT C 64- 001 50010 18570 31440PIT C 64- 001 50620 17910 32710PIT C 68 - 001 30570 10970 19600PIT C 68 - 001 31920 11080 20840PIT C 64- 001 50030 18870 31160PIT B 26 - 001 48360 18090 30270PIT A 85-2 001 46870 18080 28790PIT A 85-2 001 49390 17920 31470PIT B 26 - 001 46670 18020 28650PIT B 26 - 001 47040 18040 29000PIT B 26 - 001 47370 18120 29250PIT C 68 - 001 31170 10960 20210PIT B 26 - 001 48000 17910 30090PIT A 85-2 001 49620 17860 31760PIT A 85-2 001 47710 18120 29590PIT C 64- 001 46970 18040 28930PIT C 68 - 001 31070 10970 20100PIT A 85-2 001 47400 17830 29570PIT B 26 - 001 47960 17880 30080PIT C 68 - 001 31180 10950 20230PIT C 64- 001 47230 17860 29370PIT C 64- 001 50360 18600 31760PIT C 68 - 001 31360 10970 20390PIT A 85-2 001 48390 17840 30550PIT C 64- 001 49400 18170 31230PIT A 85-2 001 48840 18060 30780PIT A 85-2 001 48740 18310 30430PIT C 68 - 001 31580 11070 20510PIT C 68 - 001 30410 10990 19420PIT B 26 - 001 47270 17920 29350PIT B 26 - 001 47490 18010 29480

Page 227: June Per Shift (Truckscale Port)

PIT A 85-2 001 50460 18020 32440PIT B 26 - 001 47200 18060 29140PIT C 64- 001 49270 17870 31400PIT B 26 - 001 45410 18160 27250PIT B 26 - 001 48650 18030 30620PIT B 26 - 001 47190 17830 29360PIT A 85-2 001 45920 17880 28040PIT C 64- 001 49750 18550 31200PIT C 64- 001 49740 18560 31180PIT A 85-2 001 49360 18130 31230PIT A 85-2 001 47610 18150 29460PIT C 64- 001 50010 18810 31200PIT C 68 - 001 30930 11000 19930PIT C 68 - 001 31480 10990 20490PIT B 26 - 001 47700 17860 29840PIT B 26 - 001 48650 17970 30680PIT C 64- 001 47310 17960 29350PIT C 68 - 001 32450 11000 21450PIT A 85-2 001 50230 18040 32190PIT A 85-2 001 48210 17820 30390PIT B 26 - 001 48120 18000 30120PIT B 26 - 001 48380 17800 30580PIT C 64- 001 49230 18090 31140PIT C 68 - 001 30090 11100 18990PIT B 26 - 001 48710 17990 30720PIT A 85-2 001 49910 18040 31870PIT C 68 - 001 31230 11110 20120PIT C 68 - 001 31110 10930 20180PIT C 64- 001 49260 18090 31170PIT A 85-2 001 48530 17970 30560PIT A 85-2 001 48710 17990 30720PIT C 64- 001 49150 18740 30410PIT A 85-2 001 48130 18080 30050PIT B 26 - 001 48850 18060 30790PIT B 26 - 001 48990 18000 30990PIT B 26 - 001 49980 17960 32020PIT A 85-2 001 47900 17930 29970PIT A 85-2 001 48630 18010 30620PIT A 85-2 001 47800 18060 29740PIT A 85-2 001 49440 17910 31530PIT B 26 - 001 50200 17980 32220PIT C 68 - 001 30280 10980 19300PIT A 85-2 001 48680 18130 30550PIT C 68 - 001 30760 10960 19800PIT A 85-2 001 45740 18110 27630PIT C 68 - 001 30050 10970 19080PIT C 68 - 001 31100 10980 20120PIT C 64- 001 48850 18150 30700PIT C 64- 001 48250 18800 29450PIT C 68 - 001 29780 10990 18790

Page 228: June Per Shift (Truckscale Port)

PIT B 26 - 001 49010 18030 30980PIT C 64- 001 49690 17980 31710PIT B 26 - 001 49670 18010 31660PIT B 26 - 001 50060 18110 31950PIT B 26 - 001 48390 17860 30530PIT C 64- 001 32800 10950 21850PIT B 26 - 001 47980 17760 30220PIT B 26 - 001 48930 17960 30970PIT C 64- 001 31770 10950 20820PIT A 85-2 001 47860 17930 29930PIT B 26 - 001 48060 18030 30030PIT A 85-2 001 47870 17880 29990PIT A 85-2 001 47310 17940 29370PIT B 26 - 001 48420 18000 30420PIT C 64- 001 32410 11030 21380PIT C 64- 001 32280 11040 21240PIT C 64- 001 32280 11080 21200PIT C 64- 001 44920 18260 26660PIT A 85-2 001 47940 18040 29900PIT A 85-2 001 47670 17890 29780PIT C 64- 001 47700 18080 29620PIT C 64- 001 30650 10930 19720PIT C 64- 001 49110 18730 30380PIT B 26 - 001 47750 18000 29750PIT C 68 - 001 29830 10950 18880PIT B 26 - 001 48300 18000 30300PIT C 64- 001 49720 18560 31160PIT A 85-2 001 47330 18110 29220PIT B 26 - 001 46660 17860 28800PIT B 26 - 001 47230 17940 29290PIT B 26 - 001 46210 17750 28460PIT B 26 - 001 47180 17980 29200PIT A 85-2 001 47050 17910 29140PIT C 68 - 001 30870 10980 19890PIT C 64- 001 50090 18420 31670PIT A 85-2 001 47490 17920 29570PIT B 26 - 001 47700 18070 29630PIT C 68 - 001 31040 11030 20010PIT A 85-2 001 46650 17850 28800PIT C 64- 001 46390 18150 28240PIT A 85-2 001 47080 17960 29120PIT B 26 - 001 47530 17950 29580PIT C 64- 001 48150 17980 30170PIT C 68 - 001 29880 11010 18870PIT B 26 - 001 46510 17960 28550PIT A 85-2 001 48260 17940 30320PIT C 64- 001 50480 18710 31770PIT A 85-2 001 47630 18110 29520PIT C 68 - 001 30860 10970 19890PIT B 26 - 001 47070 17900 29170

Page 229: June Per Shift (Truckscale Port)

PIT B 26 - 001 45560 17900 27660PIT C 64- 001 47010 18130 28880PIT C 64- 001 32080 11000 21080PIT C 64- 001 47360 18000 29360PIT C 68 - 001 31490 11030 20460PIT C 64- 001 50150 18410 31740PIT B 26 - 001 46030 17960 28070PIT C 64- 001 31880 11000 20880PIT A 85-2 001 47280 17950 29330PIT C 64- 001 44950 18010 26940PIT B 26 - 001 46440 18020 28420PIT B 26 - 001 47650 18090 29560PIT C 64- 001 49000 18450 30550PIT C 64- 001 48960 18510 30450PIT C 68 - 001 30860 10950 19910PIT B 26 - 001 46490 17910 28580PIT C 64- 001 48990 18430 30560PIT A 85-2 001 47570 17930 29640PIT A 85-2 001 48470 17850 30620PIT A 85-2 001 48760 17920 30840PIT A 85-2 001 48730 17810 30920PIT C 64- 001 46590 17970 28620PIT B 26 - 001 46590 17970 28620PIT A 85-2 001 48770 17980 30790PIT B 26 - 001 46710 17920 28790PIT B 26 - 001 46320 17830 28490PIT B 26 - 001 45930 17960 27970PIT B 26 - 001 46280 17870 28410PIT C 64- 001 52230 18520 33710PIT B 26 - 001 47110 18020 29090PIT C 68 - 001 31100 11030 20070PIT B 26 - 001 45020 17990 27030PIT C 68 - 001 30890 10980 19910PIT A 85-2 001 49270 17860 31410PIT C 64- 001 49910 18460 31450PIT C 68 - 001 29760 10940 18820PIT A 85-2 001 48890 17900 30990PIT C 64- 001 50840 18420 32420PIT A 85-2 001 49320 17970 31350PIT B 26 - 001 46970 17990 28980PIT A 85-2 001 48840 18060 30780PIT C 64- 001 46710 18040 28670PIT A 85-2 001 49000 17910 31090PIT B 26 - 001 45950 17990 27960PIT C 64- 001 49900 18890 31010PIT A 85-2 001 49270 18260 31010PIT B 26 - 001 46280 17940 28340PIT C 64- 001 46390 18100 28290PIT C 64- 001 45700 18220 27480PIT A 27- 001 31160 11010 20150

Page 230: June Per Shift (Truckscale Port)

PIT B 26 - 001 47300 18100 29200PIT C 64- 001 47040 18250 28790PIT A 27- 001 30800 10910 19890PIT B 26 - 001 47200 17930 29270PIT C 64- 001 49000 18660 30340PIT B 26 - 001 47810 18140 29670PIT B 26 - 001 45980 18030 27950PIT A 85-2 001 49500 18010 31490PIT A 27- 001 32200 11110 21090PIT A 27- 001 31550 11070 20480PIT C 64- 001 51290 18710 32580PIT A 85-2 001 47670 18090 29580PIT A 85-2 001 47570 18210 29360PIT B 26 - 001 47880 17980 29900PIT B 26 - 001 49470 18270 31200PIT A 85-2 001 49400 18040 31360PIT B 26 - 001 46980 18190 28790PIT B 26 - 001 48320 18090 30230PIT B 26 - 001 48230 18190 30040PIT B 26 - 001 47640 18150 29490PIT A 85-2 001 49680 18120 31560PIT B 26 - 001 47700 18000 29700PIT B 26 - 001 48420 18180 30240PIT B 26 - 001 48520 17840 30680PIT B 26 - 001 50370 17940 32430PIT C 64- 001 44680 18200 26480PIT C 64- 001 45800 18000 27800PIT A 27- 001 30330 11080 19250PIT C 64- 001 47510 18610 28900PIT A 27- 001 31160 10950 20210PIT C 64- 001 46960 18110 28850PIT B 26 - 001 50520 17920 32600PIT A 27- 001 31760 11040 20720PIT A 27- 001 31160 11080 20080PIT A 27- 001 30870 11020 19850PIT B 26 - 001 49760 18090 31670PIT C 64- 001 48360 18870 29490PIT C 64- 001 45490 17970 27520PIT C 64- 001 50960 18620 32340PIT B 26 - 001 50160 18170 31990PIT C 64- 001 48940 18500 30440PIT B 26 - 001 47510 18440 29070PIT C 64- 001 49100 18620 30480PIT A 85-2 001 46880 18150 28730PIT A 85-2 001 45230 18180 27050PIT B 26 - 001 49660 18190 31470PIT C 64- 001 49860 18470 31390PIT A 85-2 001 46180 18130 28050PIT A 85-2 001 46470 18130 28340PIT A 85-2 001 46910 18340 28570

Page 231: June Per Shift (Truckscale Port)

PIT A 85-2 001 46170 18020 28150PIT C 64- 001 49180 18200 30980PIT A 85-2 001 47420 18120 29300PIT A 85-2 001 46870 18070 28800PIT B 26 - 001 51500 18120 33380PIT B 26- 001 45080 18250 26830PIT B 26- 001 29760 11140 18620PIT B 26 - 001 50830 18250 32580PIT C 64- 001 49000 18300 30700PIT B 26- 001 46200 18610 27590PIT B 26 - 001 51510 18210 33300PIT C 64- 001 50120 18280 31840PIT B 26 - 001 49940 18180 31760PIT B 26- 001 31610 10980 20630PIT B 26 - 001 49980 18280 31700PIT A 85-2 001 47380 18280 29100PIT C 64- 001 47660 18010 29650PIT B 26- 001 32620 11140 21480PIT B 26- 001 31440 11020 20420PIT A 85-2 001 47700 18250 29450PIT B 26- 001 30990 11050 19940PIT B 26- 001 46660 18910 27750PIT A 85-2 001 47720 18110 29610PIT B 26 - 001 50720 18100 32620PIT B 26 - 001 48040 18050 29990PIT B 26- 001 47060 18640 28420PIT A 85-2 001 47540 17950 29590PIT B 26- 001 46930 18640 28290PIT B 26- 001 47670 18660 29010PIT A 85-2 001 47540 18110 29430PIT B 26 - 001 51340 18240 33100PIT C 64- 001 47460 18230 29230PIT A 85-2 001 47360 18070 29290PIT A 85-2 001 46850 18000 28850PIT B 26 - 001 50700 18150 32550PIT B 26- 001 46820 18460 28360PIT A 85-2 001 48200 18200 30000PIT B 26- 001 31480 11060 20420PIT B 26 - 001 50010 18250 31760PIT B 26- 001 46360 18620 27740PIT B 26 - 001 48150 18120 30030PIT A 85-2 001 47020 18060 28960PIT B 26 - 001 48170 18230 29940PIT B 26 - 001 51710 18010 33700PIT B 26- 001 31220 11010 20210PIT B 26- 001 31420 11010 20410PIT A 85-2 001 48810 18200 30610PIT B 26- 001 30230 11020 19210PIT B 26 - 001 48630 18040 30590PIT A 85-2 001 48430 17910 30520

Page 232: June Per Shift (Truckscale Port)

PIT C 64- 001 49060 18170 30890PIT C 64- 001 50480 18160 32320PIT C 65 - 001 47450 18620 28830PIT C 64- 001 48520 18180 30340PIT B 26 - 001 51750 18140 33610PIT C 65 - 001 50250 18560 31690PIT C 64- 001 46090 18140 27950PIT C 64- 001 46360 18160 28200PIT B 26 - 001 50570 18070 32500PIT A 85-2 001 45670 18000 27670PIT A 85-2 001 49240 18000 31240PIT B 26- 001 30360 10990 19370PIT B 26 - 001 48800 18000 30800PIT A 85-2 001 50920 17950 32970PIT A 85-2 001 47490 17980 29510PIT B 26 - 001 49040 18030 31010PIT A 85-2 001 49260 18140 31120PIT B 26 - 001 47440 18160 29280PIT C 65 - 001 33520 11080 22440PIT B 26- 001 30630 10970 19660PIT B 26- 001 30640 10960 19680PIT B 26- 001 31900 11040 20860PIT C 65 - 001 45630 18840 26790PIT B 26 - 001 49890 17990 31900PIT B 26 - 001 49070 18160 30910PIT B 26 - 001 50930 18150 32780PIT C 64- 001 49870 18200 31670PIT B 26- 001 30140 10980 19160PIT B 26 - 001 50110 18020 32090PIT C 64- 001 50630 18610 32020PIT C 64- 001 49120 18480 30640PIT C 65 - 001 48600 18520 30080PIT A 85-2 001 49520 17960 31560PIT A 85-2 001 47570 17870 29700PIT C 64- 001 47700 18090 29610PIT A 85-2 001 47330 17960 29370PIT A 85-2 001 48060 17900 30160PIT A 85-2 001 47910 17940 29970PIT C 64- 001 50510 18860 31650PIT C 64- 001 47120 18070 29050PIT C 64- 001 50930 18790 32140PIT C 64- 001 48800 18600 30200PIT C 64- 001 49630 18590 31040PIT A 27- 001 32520 11170 21350PIT B 26 - 001 49370 18030 31340PIT B 26 - 001 50770 18120 32650PIT B 26 - 001 50260 18150 32110PIT B 26 - 001 49270 18050 31220PIT B 26 - 001 50010 18030 31980PIT B 26 - 001 49170 18210 30960

Page 233: June Per Shift (Truckscale Port)

PIT B 26 - 001 49730 18170 31560PIT B 26 - 001 50490 18320 32170PIT B 26 - 001 49360 18030 31330PIT A 85-2 001 49900 18020 31880PIT A 85-2 001 47800 18130 29670PIT B 26- 001 31530 11040 20490PIT B 26- 001 30250 10980 19270PIT B 26- 001 32540 11150 21390PIT B 26- 001 29830 11020 18810PIT B 26- 001 45130 18150 26980PIT B 26- 001 45490 18130 27360PIT B 26- 001 31760 10980 20780PIT B 26- 001 50440 18680 31760PIT B 26- 001 46740 18250 28490PIT B 26- 001 46190 18780 27410PIT B 26- 001 47370 18540 28830PIT B 26 - 001 50570 18180 32390PIT A 85-2 001 50050 17980 32070PIT A 85-2 001 49370 18030 31340PIT A 85-2 001 48120 18060 30060PIT C 64- 001 48260 18880 29380PIT C 64- 001 33370 10990 22380PIT C 64- 001 32910 11040 21870PIT C 65 - 001 46840 18690 28150PIT A 85-2 001 49410 18110 31300PIT C 64- 001 31840 10900 20940PIT A 85-2 001 48590 18220 30370PIT C 64- 001 32510 11120 21390PIT C 64- 001 31070 10990 20080PIT A 85-2 001 47280 18230 29050PIT A 85-2 001 49920 18100 31820PIT C 64- 001 47120 18090 29030PIT A 85-2 001 48840 18020 30820PIT C 64- 001 47370 18240 29130PIT A 85-2 001 48290 17940 30350PIT C 64- 001 50080 18610 31470PIT A 85-2 001 47430 17990 29440PIT A 85-2 001 48490 18210 30280PIT C 64- 001 32240 10750 21490PIT C 64- 001 49300 18100 31200PIT B 26 - 001 49690 17980 31710PIT A 85-2 001 49610 18100 31510PIT A 85-2 001 47940 18170 29770PIT C 65 - 001 46370 18490 27880PIT A 85-2 001 48970 18040 30930PIT C 65 - 001 46410 18630 27780PIT B 26 - 001 51390 18010 33380PIT C 64- 001 32420 10970 21450PIT A 85-2 001 48020 18060 29960PIT B 26 - 001 49980 18180 31800

Page 234: June Per Shift (Truckscale Port)

PIT C 65 - 001 47120 18790 28330PIT C 64- 001 31940 10940 21000PIT B 26 - 001 49390 18040 31350PIT A 85-2 001 49640 18200 31440PIT B 26 - 001 49330 17930 31400PIT C 65 - 001 46690 18600 28090PIT C 64- 001 32740 10890 21850PIT C 64- 001 33210 10990 22220PIT B 26 - 001 49640 17920 31720PIT C 65 - 001 44960 18020 26940PIT A 85-2 001 48780 18010 30770PIT C 64- 001 33590 11220 22370PIT C 65 - 001 44510 18120 26390PIT A 85-2 001 49150 18100 31050PIT B 26 - 001 51400 17960 33440PIT C 65 - 001 45650 18550 27100PIT C 64- 001 32230 10880 21350PIT A 85-2 001 48510 18050 30460PIT C 65 - 001 45720 17970 27750PIT B 26 - 001 48870 17940 30930PIT C 64- 001 33340 10940 22400PIT A 85-2 001 48220 18000 30220PIT C 65 - 001 47800 18550 29250PIT A 85-2 001 49590 18090 31500PIT B 26 - 001 47240 18090 29150PIT A 85-2 001 49360 17910 31450PIT B 26 - 001 49260 17920 31340PIT C 65 - 001 48580 17970 30610PIT B 26 - 001 47310 17840 29470PIT B 26 - 001 47700 17840 29860PIT C 64- 001 33470 10910 22560PIT C 64- 001 33240 10910 22330PIT B 26 - 001 47660 17990 29670PIT C 64- 001 34110 10920 23190PIT C 65 - 001 45600 18050 27550PIT C 65 - 001 47660 18520 29140PIT C 64- 001 33320 10930 22390PIT C 65 - 001 48800 18490 30310PIT A 85-2 001 49680 18100 31580PIT C 65 - 001 47250 17950 29300PIT A 85-2 001 48160 17870 30290PIT B 26 - 001 47460 18060 29400PIT A 85-2 001 47800 18110 29690PIT B 26 - 001 46850 17890 28960PIT B 26 - 001 47990 17890 30100PIT C 65 - 001 49260 18580 30680PIT C 65 - 001 48290 18760 29530PIT B 26 - 001 47630 18010 29620PIT B 26 - 001 46780 17780 29000PIT B 26 - 001 47630 17790 29840

Page 235: June Per Shift (Truckscale Port)

PIT A 85-2 001 48060 17930 30130PIT C 65 - 001 45800 18060 27740PIT C 65 - 001 47960 18530 29430PIT C 65 - 001 49490 18470 31020PIT C 64- 001 31770 11030 20740PIT C 65 - 001 50330 18530 31800PIT A 85-2 001 49040 18160 30880PIT B 26 - 001 47720 18120 29600PIT A 85-2 001 49500 18000 31500PIT B 26 - 001 47570 18150 29420PIT B 26 - 001 49090 18030 31060PIT B 26 - 001 47220 17990 29230PIT A 85-2 001 48180 18070 30110PIT B 26 - 001 47650 17970 29680PIT C 64- 001 33070 10990 22080PIT B 26 - 001 47060 17940 29120PIT A 85-2 001 49020 17980 31040PIT C 64- 001 34830 10940 23890PIT C 64- 001 33480 10960 22520PIT A 85-2 001 47430 18100 29330PIT C 65 - 001 49250 18480 30770PIT C 65 - 001 45970 18150 27820PIT B 26 - 001 46750 18050 28700PIT B 26 - 001 47750 17940 29810PIT C 64- 001 30890 11130 19760PIT B 26 - 001 46950 18030 28920PIT B 26 - 001 44890 17940 26950PIT B 26 - 001 47040 18120 28920PIT C 65 - 001 45370 18250 27120PIT A 85-2 001 45490 18060 27430PIT C 64- 001 33350 11150 22200PIT C 64- 001 31780 11060 20720PIT C 64- 001 49330 18770 30560PIT A 85-2 001 45980 17970 28010PIT C 64- 001 49080 18610 30470PIT A 85-2 001 45640 18110 27530PIT C 64- 001 49420 18620 30800PIT B 26 - 001 46610 17980 28630PIT A 85-2 001 47560 17910 29650PIT B 26 - 001 46890 17880 29010PIT C 64- 001 32720 10930 21790PIT A 85-2 001 48370 17840 30530PIT C 64- 001 31820 10850 20970PIT A 85-2 001 48400 18060 30340PIT C 64- 001 45210 18050 27160PIT B 26 - 001 48560 18010 30550PIT C 64- 001 33390 10910 22480PIT C 64- 001 45780 18150 27630PIT B 26 - 001 48140 18080 30060PIT A 85-2 001 48250 17920 30330

Page 236: June Per Shift (Truckscale Port)

PIT A 85-2 001 49600 17980 31620PIT C 64- 001 45480 18060 27420PIT A 85-2 001 48550 18030 30520PIT C 64- 001 29900 11010 18890PIT A 85-2 001 49210 17950 31260PIT C 64- 001 46070 18050 28020PIT B 26 - 001 47270 17850 29420PIT C 64- 001 31760 10880 20880PIT A 85-2 001 49470 18050 31420PIT B 26 - 001 46230 17860 28370PIT C 64- 001 49150 18840 30310PIT C 64- 001 48150 18620 29530PIT C 64- 001 32570 10930 21640PIT C 64- 001 31510 11030 20480PIT B 26 - 001 46780 17960 28820PIT C 64- 001 31980 10930 21050PIT B 26 - 001 50210 17990 32220PIT A 85-2 001 50250 18010 32240PIT C 64- 001 49260 18590 30670PIT B 26 - 001 48560 17850 30710PIT C 64- 001 46050 18400 27650PIT C 65- 001 43970 18110 25860PIT C 65- 001 30980 10910 20070PIT C 65- 001 32020 10950 21070PIT C 65- 001 46350 18140 28210PIT C 65- 002 47220 18190 29030PIT C 65 - 001 51480 18680 32800PIT C 65 - 001 45330 18260 27070PIT C 64- 001 33210 11250 21960PIT C 65 - 001 47140 18130 29010PIT C 65 - 001 47770 18970 28800PIT C 64- 001 32800 11000 21800PIT C 64- 001 32560 11060 21500PIT C 64- 001 31550 11050 20500PIT C 65 - 001 48890 18670 30220PIT C 65- 002 31920 11050 20870PIT C 64- 001 31660 10920 20740PIT C 65- 002 29280 11180 18100PIT C 65- 002 30500 11050 19450PIT C 65- 002 49860 18640 31220PIT C 65- 002 31470 11510 19960PIT C 65- 002 44260 18340 25920PIT C 65- 002 46480 18540 27940PIT C 65- 002 30040 11180 18860PIT C 65- 002 30280 11030 19250PIT C 65- 002 43020 18300 24720PIT C 65- 002 32910 11090 21820PIT C 65- 002 49890 19100 30790PIT C 65- 002 49150 19070 30080PIT C 65- 002 31030 11140 19890

Page 237: June Per Shift (Truckscale Port)

PIT A 32- 002 49010 18100 30910PIT A 32- 002 48480 18100 30380PIT A 32- 002 47780 18100 29680PIT B 26 - 002 49360 18020 31340PIT A 32- 002 48140 18030 30110PIT C 65- 002 30820 11210 19610PIT B 26 - 002 48910 17930 30980PIT A 32- 002 48730 18140 30590PIT C 65- 002 30930 11310 19620PIT A 32- 002 47420 18040 29380PIT B 26 - 002 48530 18060 30470PIT B 26 - 001 47340 18150 29190PIT C 65- 002 44180 18420 25760PIT B 26 - 002 48600 18140 30460PIT C 65- 002 31040 11310 19730PIT C 65- 002 31700 11230 20470PIT B 26 - 002 48980 17980 31000PIT C 65- 002 31740 11150 20590PIT C 65- 002 49540 18740 30800PIT C 65- 002 49470 18740 30730PIT C 65- 002 49380 18970 30410PIT C 65- 002 48800 18970 29830PIT B 26 - 002 49420 17840 31580PIT C 65- 002 47190 17840 29350PIT C 65- 002 30890 11000 19890PIT B 26 - 001 47370 18000 29370PIT A 85-2 001 50060 18130 31930PIT A 85-2 001 48050 17840 30210PIT A 85-2 001 48240 18080 30160PIT B 26 - 001 49660 18040 31620PIT A 85-2 001 48500 18050 30450PIT A 85-2 001 48480 18150 30330PIT C 65- 002 31860 11110 20750PIT B 26 - 001 46420 17990 28430PIT C 65- 001 32280 11120 21160PIT C 65- 002 48200 18900 29300PIT C 65- 002 32520 11070 21450PIT B 26 - 001 47150 18030 29120PIT B 26 - 001 46720 18170 28550PIT B 26 - 001 47280 17950 29330PIT C 65- 002 47390 18100 29290PIT C 65- 002 31420 11070 20350PIT C 65- 002 44220 18280 25940PIT B 26 - 001 46130 18010 28120PIT B 26 - 001 46590 17970 28620PIT B 26 - 001 46340 18080 28260PIT C 65- 002 46370 18660 27710PIT B 26 - 001 46430 17820 28610PIT B 26 - 001 50930 17940 32990PIT B 26 - 001 47570 18040 29530

Page 238: June Per Shift (Truckscale Port)

PIT C 65- 002 50100 18460 31640PIT C 65- 002 47810 18500 29310PIT B 26 - 001 46830 17960 28870PIT C 65- 002 49430 18820 30610PIT B 26 - 001 47540 18220 29320PIT C 65- 002 48040 18760 29280PIT B 26 - 001 46700 17890 28810PIT B 26 - 001 46320 18040 28280PIT B 26 - 001 46090 17820 28270PIT C 65- 001 32560 11120 21440PIT C 65- 002 44950 18000 26950PIT B 26 - 001 46080 17840 28240PIT C 65- 001 32630 11120 21510PIT B 26 - 001 46380 18120 28260PIT B 26 - 001 46380 17900 28480PIT B 26 - 001 46880 17880 29000PIT C 65- 001 49490 18880 30610PIT C 65- 002 45640 18750 26890PIT B 26 - 001 46180 17750 28430PIT B 26 - 001 48180 17980 30200PIT C 65- 001 49270 17980 31290PIT C 65- 002 48640 18370 30270PIT A 85-2 001 48010 18000 30010PIT C 65- 002 46910 18500 28410PIT C 65- 001 33610 11070 22540PIT A 85-2 001 47500 17770 29730PIT C 65- 001 33650 11140 22510PIT C 65- 001 47550 18130 29420PIT C 65- 002 50470 18800 31670PIT B 26 - 001 47600 17910 29690PIT B 26 - 001 48340 18260 30080PIT C 65- 001 49550 18610 30940PIT B 26 - 001 48150 18040 30110PIT C 65- 002 49050 18710 30340PIT B 26 - 001 46510 18000 28510PIT B 26 - 001 48560 18060 30500PIT C 65- 002 47150 18000 29150PIT B 26 - 001 47750 17810 29940PIT A 85-2 001 46480 18100 28380PIT C 65- 001 32620 11170 21450PIT A 85-2 001 46850 17770 29080PIT B 26 - 001 46030 18080 27950PIT C 65- 001 30680 11140 19540PIT B 26 - 001 46080 18170 27910PIT A 85-2 001 46220 17700 28520PIT A 85-2 001 46940 18100 28840PIT A 85-2 001 46880 17950 28930PIT C 65- 001 49380 18850 30530PIT A 85-2 001 46870 17880 28990PIT C 65- 001 49130 18370 30760

Page 239: June Per Shift (Truckscale Port)

PIT B 26 - 001 47000 17870 29130PIT C 65- 001 49990 18170 31820PIT C 65- 001 32600 11130 21470PIT B 26 - 001 48420 18130 30290PIT A 85-2 001 46760 17980 28780PIT C 65- 001 33790 11060 22730PIT C 65- 001 45930 18180 27750PIT B 26 - 001 48520 18000 30520PIT B 26 - 001 48440 17760 30680

Page 240: June Per Shift (Truckscale Port)

253,583.600 96,440.100 157,143.500

Page 241: June Per Shift (Truckscale Port)

Detail Report Weighing TransactionPeriode 01 June 2012 - 30 June 2012( All Transaction)

Based On Date In

Date In Time In Date Out Time Out TruckID Shift In Shift Out Material Kontraktor6/1/2012 09:03:37 6/1/2012 09:09:22 703-- 1 1 COAL -- Harita Para6/1/2012 09:04:20 6/1/2012 09:11:45 709-- 1 1 COAL -- Harita Para6/1/2012 09:04:56 6/1/2012 09:11:47 714-- 1 1 COAL -- Harita Para6/1/2012 09:22:52 6/1/2012 09:30:58 708-- 1 1 COAL -- Harita Para6/1/2012 09:30:19 6/1/2012 09:49:17 701-- 1 1 COAL -- Harita Para6/1/2012 09:36:10 6/1/2012 09:49:23 707-- 1 1 COAL -- Harita Para6/1/2012 09:36:43 6/1/2012 10:00:15 713-- 1 1 COAL -- Harita Para6/1/2012 09:39:34 6/1/2012 10:00:18 712-- 1 1 COAL -- Harita Para6/1/2012 09:43:04 6/1/2012 10:08:12 710-- 1 1 COAL -- Harita Para6/1/2012 09:44:28 6/1/2012 10:10:14 704-- 1 1 COAL -- Harita Para

6/1/2012 09:47:07 6/1/2012 10:10:18 706-- 1 1 COAL -- Harita Para6/1/2012 10:45:16 6/1/2012 10:54:04 714-- 1 1 COAL -- Harita Para6/1/2012 10:46:55 6/1/2012 10:54:06 703-- 1 1 COAL -- Harita Para6/1/2012 10:52:54 6/1/2012 11:01:22 709-- 1 1 COAL -- Harita Para6/1/2012 11:02:27 6/1/2012 11:08:10 708-- 1 1 COAL -- Harita Para

6/1/2012 11:07:25 6/1/2012 11:11:27 701-- 1 1 COAL -- Harita Para6/1/2012 11:18:28 6/1/2012 11:22:14 713-- 1 1 COAL -- Harita Para6/1/2012 11:39:53 6/1/2012 11:44:04 710-- 1 1 COAL -- Harita Para6/1/2012 11:40:52 6/1/2012 11:47:59 704-- 1 1 COAL -- Harita Para6/1/2012 11:41:53 6/1/2012 11:48:13 707-- 1 1 COAL -- Harita Para6/1/2012 11:53:32 6/1/2012 11:57:57 706-- 1 1 COAL -- Harita Para6/1/2012 12:40:03 6/1/2012 12:45:38 709-- 1 1 COAL -- Harita Para6/1/2012 13:32:24 6/1/2012 13:37:02 714-- 1 1 COAL -- Harita Para6/1/2012 13:34:57 6/1/2012 13:37:25 703-- 1 1 COAL -- Harita Para6/1/2012 14:29:49 6/1/2012 14:48:08 713-- 1 1 COAL -- Harita Para6/1/2012 14:40:10 6/1/2012 14:56:11 709-- 1 1 COAL -- Harita Para6/1/2012 14:42:54 6/1/2012 14:48:03 710-- 1 1 COAL -- Harita Para6/1/2012 14:43:18 6/1/2012 14:54:54 704-- 1 1 COAL -- Harita Para6/1/2012 14:44:04 6/1/2012 14:55:48 707-- 1 1 COAL -- Harita Para6/1/2012 14:44:36 6/1/2012 14:56:14 701-- 1 1 COAL -- Harita Para6/1/2012 14:57:11 6/1/2012 15:05:40 706-- 1 1 COAL -- Harita Para6/1/2012 15:03:38 6/1/2012 15:16:51 712-- 1 1 COAL -- Harita Para6/1/2012 15:04:54 6/1/2012 15:16:54 714-- 1 1 COAL -- Harita Para6/1/2012 15:06:38 6/1/2012 15:19:39 708-- 1 1 COAL -- Harita Para

6/1/2012 15:09:28 6/1/2012 15:22:28 703-- 1 1 COAL -- Harita Para6/1/2012 09:06:57 6/1/2012 09:23:44 812 1 1 COAL -- MIL6/1/2012 09:22:30 6/1/2012 09:27:16 818 1 1 COAL -- MIL

6/1/2012 09:28:47 6/1/2012 09:46:15 850 1 1 COAL -- MIL6/1/2012 09:35:17 6/1/2012 09:54:10 820 1 1 COAL -- MIL6/1/2012 09:35:49 6/1/2012 09:54:16 830 1 1 COAL -- MIL6/1/2012 09:42:33 6/1/2012 10:05:34 852 1 1 COAL -- MIL

Page 242: June Per Shift (Truckscale Port)

6/1/2012 09:56:54 6/1/2012 10:15:35 836 1 1 COAL -- MIL6/1/2012 09:57:50 6/1/2012 10:17:39 817 1 1 COAL -- MIL6/1/2012 09:58:15 6/1/2012 10:20:45 855 1 1 COAL -- MIL

6/1/2012 09:58:39 6/1/2012 10:22:09 868 1 1 COAL -- MIL6/1/2012 09:59:07 6/1/2012 10:23:30 839 1 1 COAL -- MIL6/1/2012 09:59:31 6/1/2012 10:25:41 815 1 1 COAL -- MIL6/1/2012 10:01:12 6/1/2012 10:26:46 856 1 1 COAL -- MIL6/1/2012 10:01:33 6/1/2012 10:26:49 851 1 1 COAL -- MIL6/1/2012 10:06:35 6/1/2012 10:28:34 853 1 1 COAL -- MIL6/1/2012 10:21:28 6/1/2012 10:37:29 831 1 1 COAL -- MIL6/1/2012 10:31:38 6/1/2012 10:37:34 838 1 1 COAL -- MIL6/1/2012 10:44:52 6/1/2012 10:49:35 832 1 1 COAL -- MIL6/1/2012 10:47:19 6/1/2012 10:56:02 812 1 1 COAL -- MIL6/1/2012 10:53:24 6/1/2012 11:05:10 818 1 1 COAL -- MIL6/1/2012 11:10:49 6/1/2012 11:14:24 850 1 1 COAL -- MIL6/1/2012 11:37:28 6/1/2012 11:43:05 817 1 1 COAL -- MIL6/1/2012 11:50:26 6/1/2012 11:55:30 836 1 1 COAL -- MIL

6/1/2012 11:53:53 6/1/2012 11:59:27 868 1 1 COAL -- MIL6/1/2012 11:54:18 6/1/2012 12:01:07 815 1 1 COAL -- MIL6/1/2012 12:07:02 6/1/2012 12:10:29 839 1 1 COAL -- MIL6/1/2012 12:11:16 6/1/2012 12:14:24 856 1 1 COAL -- MIL6/1/2012 12:15:05 6/1/2012 12:18:20 806 1 1 COAL -- MIL

6/1/2012 12:19:11 6/1/2012 12:24:38 855 1 1 COAL -- MIL6/1/2012 12:21:03 6/1/2012 12:25:57 852 1 1 COAL -- MIL6/1/2012 12:29:56 6/1/2012 12:33:24 833 1 1 COAL -- MIL6/1/2012 12:37:21 6/1/2012 12:43:22 853 1 1 COAL -- MIL6/1/2012 12:48:56 6/1/2012 12:53:41 831 1 1 COAL -- MIL6/1/2012 12:52:56 6/1/2012 12:58:06 830 1 1 COAL -- MIL6/1/2012 12:55:45 6/1/2012 13:01:10 812 1 1 COAL -- MIL6/1/2012 12:56:06 6/1/2012 13:01:05 818 1 1 COAL -- MIL6/1/2012 13:00:05 6/1/2012 13:08:03 850 1 1 COAL -- MIL

6/1/2012 13:18:01 6/1/2012 13:22:57 851 1 1 COAL -- MIL6/1/2012 13:30:09 6/1/2012 13:34:23 838 1 1 COAL -- MIL6/1/2012 13:43:34 6/1/2012 13:47:53 839 1 1 COAL -- MIL6/1/2012 13:54:29 6/1/2012 13:58:23 832 1 1 COAL -- MIL6/1/2012 14:03:13 6/1/2012 14:09:12 808 1 1 COAL -- MIL6/1/2012 14:15:10 6/1/2012 14:18:37 833 1 1 COAL -- MIL

6/1/2012 14:28:28 6/1/2012 14:33:37 855 1 1 COAL -- MIL6/1/2012 14:43:42 6/1/2012 14:55:29 812 1 1 COAL -- MIL6/1/2012 14:52:50 6/1/2012 14:57:55 852 1 1 COAL -- MIL6/1/2012 14:53:16 6/1/2012 14:59:56 818 1 1 COAL -- MIL6/1/2012 14:53:38 6/1/2012 15:00:52 868 1 1 COAL -- MIL6/1/2012 14:53:59 6/1/2012 15:01:04 853 1 1 COAL -- MIL

6/1/2012 14:59:08 6/1/2012 15:05:43 831 1 1 COAL -- MIL6/1/2012 15:07:25 6/1/2012 15:29:52 815 1 1 COAL -- MIL6/1/2012 15:13:49 6/1/2012 15:29:56 817 1 1 COAL -- MIL6/1/2012 15:19:01 6/1/2012 16:16:41 856 1 2 COAL -- MIL6/1/2012 15:26:28 6/1/2012 16:19:38 839 1 2 COAL -- MIL

Page 243: June Per Shift (Truckscale Port)

6/1/2012 15:28:18 6/1/2012 16:19:42 850 1 2 COAL -- MIL6/1/2012 15:31:08 6/1/2012 16:16:54 851 1 2 COAL -- MIL6/1/2012 15:40:59 6/1/2012 16:24:35 838 1 2 COAL -- MIL6/1/2012 15:56:59 6/1/2012 16:18:06 808 1 2 COAL -- MIL6/1/2012 15:57:18 6/1/2012 16:24:38 830 1 2 COAL -- MIL6/1/2012 15:57:46 6/1/2012 16:24:43 832 1 2 COAL -- MIL6/1/2012 16:15:06 6/1/2012 16:35:15 711-- 2 2 COAL -- Harita Para6/1/2012 16:17:25 6/1/2012 16:36:16 702-- 2 2 COAL -- Harita Para

6/1/2012 16:36:55 6/1/2012 16:40:48 710-- 2 2 COAL -- Harita Para

6/1/2012 17:22:39 6/1/2012 17:26:04 712-- 2 2 COAL -- Harita Para6/1/2012 18:07:52 6/1/2012 18:12:08 704-- 2 2 COAL -- Harita Para6/1/2012 18:14:00 6/1/2012 18:17:45 711-- 2 2 COAL -- Harita Para6/1/2012 18:16:18 6/1/2012 18:21:43 708-- 2 2 COAL -- Harita Para6/1/2012 18:27:30 6/1/2012 19:06:44 714-- 2 2 COAL -- Harita Para6/1/2012 18:35:57 6/1/2012 19:10:04 703-- 2 2 COAL -- Harita Para6/1/2012 18:36:14 6/1/2012 19:10:09 710-- 2 2 COAL -- Harita Para

6/1/2012 18:45:40 6/1/2012 19:17:34 709-- 2 2 COAL -- Harita Para6/1/2012 20:54:38 6/1/2012 21:02:12 712-- 2 2 COAL -- Harita Para6/1/2012 20:58:22 6/1/2012 21:09:46 711-- 2 2 COAL -- Harita Para6/1/2012 20:58:52 6/1/2012 21:11:38 704-- 2 2 COAL -- Harita Para6/1/2012 21:08:20 6/1/2012 21:32:01 714-- 2 2 COAL -- Harita Para6/1/2012 16:04:39 6/1/2012 16:35:03 833 2 2 COAL -- MIL6/1/2012 16:33:43 6/1/2012 16:42:29 868 2 2 COAL -- MIL6/1/2012 18:48:04 6/1/2012 20:53:16 818 2 2 COAL -- MIL6/1/2012 20:55:29 6/1/2012 21:02:32 812 2 2 COAL -- MIL

6/1/2012 20:56:08 6/1/2012 21:05:48 855 2 2 COAL -- MIL6/1/2012 20:56:36 6/1/2012 21:06:16 853 2 2 COAL -- MIL6/1/2012 20:57:17 6/1/2012 21:06:40 836 2 2 COAL -- MIL6/1/2012 20:57:58 6/1/2012 21:07:20 850 2 2 COAL -- MIL6/1/2012 20:59:21 6/1/2012 21:13:21 851 2 2 COAL -- MIL6/1/2012 21:00:03 6/1/2012 21:15:24 839 2 2 COAL -- MIL6/1/2012 21:00:30 6/1/2012 21:16:36 852 2 2 COAL -- MIL6/1/2012 21:01:04 6/1/2012 21:19:40 815 2 2 COAL -- MIL6/1/2012 21:03:27 6/1/2012 21:21:25 820 2 2 COAL -- MIL6/1/2012 21:04:01 6/1/2012 21:23:45 832 2 2 COAL -- MIL6/1/2012 21:05:00 6/1/2012 21:23:48 830 2 2 COAL -- MIL6/1/2012 21:08:41 6/1/2012 21:41:49 817 2 2 COAL -- MIL6/1/2012 21:12:27 6/1/2012 21:23:55 831 2 2 COAL -- MIL6/1/2012 21:12:45 6/1/2012 21:33:44 868 2 2 COAL -- MIL6/2/2012 09:54:57 6/2/2012 09:58:51 707-- 1 1 COAL -- Harita Para6/2/2012 09:55:18 6/2/2012 10:01:25 709-- 1 1 COAL -- Harita Para6/2/2012 09:55:40 6/2/2012 10:03:51 701-- 1 1 COAL -- Harita Para6/2/2012 09:56:05 6/2/2012 10:05:47 706-- 1 1 COAL -- Harita Para6/2/2012 09:56:28 6/2/2012 10:10:03 702-- 1 1 COAL -- Harita Para6/2/2012 09:56:55 6/2/2012 10:14:58 703-- 1 1 COAL -- Harita Para6/2/2012 10:13:24 6/2/2012 10:18:21 714-- 1 1 COAL -- Harita Para

6/2/2012 10:34:32 6/2/2012 10:38:31 711-- 1 1 COAL -- Harita Para6/2/2012 11:19:36 6/2/2012 11:22:58 707-- 1 1 COAL -- Harita Para

Page 244: June Per Shift (Truckscale Port)

6/2/2012 11:26:50 6/2/2012 11:31:52 709-- 1 1 COAL -- Harita Para6/2/2012 11:30:58 6/2/2012 11:34:21 706-- 1 1 COAL -- Harita Para6/2/2012 11:41:21 6/2/2012 11:46:43 708-- 1 1 COAL -- Harita Para6/2/2012 11:44:48 6/2/2012 11:49:26 702-- 1 1 COAL -- Harita Para6/2/2012 11:47:23 6/2/2012 11:52:10 714-- 1 1 COAL -- Harita Para6/2/2012 11:54:57 6/2/2012 12:10:03 701-- 1 1 COAL -- Harita Para6/2/2012 12:07:08 6/2/2012 12:13:56 703-- 1 1 COAL -- Harita Para6/2/2012 12:47:27 6/2/2012 12:50:43 707-- 1 1 COAL -- Harita Para6/2/2012 12:48:25 6/2/2012 12:53:05 709-- 1 1 COAL -- Harita Para6/2/2012 13:21:21 6/2/2012 13:25:05 708-- 1 1 COAL -- Harita Para6/2/2012 13:26:52 6/2/2012 13:32:00 714-- 1 1 COAL -- Harita Para6/2/2012 13:29:09 6/2/2012 13:38:31 701-- 1 1 COAL -- Harita Para6/2/2012 13:56:39 6/2/2012 14:01:09 703-- 1 1 COAL -- Harita Para6/2/2012 14:04:21 6/2/2012 14:09:31 707-- 1 1 COAL -- Harita Para6/2/2012 14:08:11 6/2/2012 14:12:02 713-- 1 1 COAL -- Harita Para6/2/2012 14:16:51 6/2/2012 14:22:27 712-- 1 1 COAL -- Harita Para

6/2/2012 14:23:26 6/2/2012 14:27:58 709-- 1 1 COAL -- Harita Para6/2/2012 14:42:54 6/2/2012 14:48:08 708-- 1 1 COAL -- Harita Para6/2/2012 14:55:52 6/2/2012 15:00:33 714-- 1 1 COAL -- Harita Para

6/2/2012 14:57:39 6/2/2012 15:02:48 701-- 1 1 COAL -- Harita Para

6/2/2012 15:01:26 6/2/2012 15:02:55 710-- 1 1 COAL -- Harita Para

6/2/2012 15:30:25 6/2/2012 15:32:24 703-- 1 1 COAL -- Harita Para6/2/2012 15:30:48 6/2/2012 15:32:28 707-- 1 1 COAL -- Harita Para6/2/2012 11:58:08 6/2/2012 12:04:10 851 1 1 COAL -- MIL6/2/2012 11:58:57 6/2/2012 12:06:11 852 1 1 COAL -- MIL6/2/2012 12:05:20 6/2/2012 12:09:26 833 1 1 COAL -- MIL6/2/2012 12:30:23 6/2/2012 12:36:47 853 1 1 COAL -- MIL6/2/2012 12:30:48 6/2/2012 12:38:23 829 1 1 COAL -- MIL6/2/2012 12:36:06 6/2/2012 12:40:52 850 1 1 COAL -- MIL6/2/2012 12:48:54 6/2/2012 12:54:49 832 1 1 COAL -- MIL6/2/2012 13:04:37 6/2/2012 13:10:09 812 1 1 COAL -- MIL6/2/2012 13:39:24 6/2/2012 13:46:41 868 1 1 COAL -- MIL6/2/2012 14:04:00 6/2/2012 14:07:24 837 1 1 COAL -- MIL6/2/2012 14:42:31 6/2/2012 14:48:49 817 1 1 COAL -- MIL6/2/2012 14:43:13 6/2/2012 14:51:13 839 1 1 COAL -- MIL6/2/2012 14:50:32 6/2/2012 14:54:28 830 1 1 COAL -- MIL6/2/2012 14:57:14 6/2/2012 15:00:36 838 1 1 COAL -- MIL6/2/2012 15:13:55 6/2/2012 15:18:37 856 1 1 COAL -- MIL6/3/2012 03:03:25 6/3/2012 03:11:01 708-- 3 3 COAL -- Harita Para6/3/2012 03:04:10 6/3/2012 03:15:10 701-- 3 3 COAL -- Harita Para6/3/2012 03:12:50 6/3/2012 03:25:52 710-- 3 3 COAL -- Harita Para6/3/2012 03:16:44 6/3/2012 03:25:58 709-- 3 3 COAL -- Harita Para6/3/2012 03:23:53 6/3/2012 03:30:39 711-- 3 3 COAL -- Harita Para6/3/2012 07:28:11 6/3/2012 07:33:04 709-- 3 3 COAL -- Harita Para6/3/2012 07:28:32 6/3/2012 07:35:21 701-- 3 3 COAL -- Harita Para

6/3/2012 07:28:52 6/3/2012 07:37:11 707-- 3 3 COAL -- Harita Para6/3/2012 07:33:42 6/3/2012 07:38:50 710-- 3 3 COAL -- Harita Para6/3/2012 02:37:23 6/3/2012 02:41:27 850 3 3 COAL -- MIL6/3/2012 02:50:03 6/3/2012 02:54:06 832 3 3 COAL -- MIL

Page 245: June Per Shift (Truckscale Port)

6/3/2012 02:51:40 6/3/2012 02:59:10 853 3 3 COAL -- MIL6/3/2012 02:52:05 6/3/2012 02:54:14 839 3 3 COAL -- MIL6/3/2012 02:58:18 6/3/2012 03:08:02 830 3 3 COAL -- MIL6/3/2012 03:09:13 6/3/2012 03:18:43 817 3 3 COAL -- MIL6/3/2012 03:11:42 6/3/2012 03:19:53 852 3 3 COAL -- MIL6/3/2012 03:12:17 6/3/2012 03:22:33 836 3 3 COAL -- MIL6/3/2012 03:16:11 6/3/2012 03:20:00 851 3 3 COAL -- MIL6/3/2012 03:21:42 6/3/2012 03:27:40 808 3 3 COAL -- MIL6/3/2012 08:11:51 6/3/2012 08:15:26 702-- 1 1 COAL -- Harita Para6/3/2012 08:18:23 6/3/2012 08:22:32 711-- 1 1 COAL -- Harita Para6/3/2012 08:25:01 6/3/2012 08:29:27 708-- 1 1 COAL -- Harita Para6/3/2012 08:41:33 6/3/2012 08:45:33 704-- 1 1 COAL -- Harita Para6/3/2012 08:53:03 6/3/2012 08:57:45 709-- 1 1 COAL -- Harita Para6/3/2012 09:13:48 6/3/2012 09:18:47 710-- 1 1 COAL -- Harita Para6/3/2012 09:15:00 6/3/2012 09:20:01 701-- 1 1 COAL -- Harita Para6/3/2012 09:18:10 6/3/2012 09:22:13 707-- 1 1 COAL -- Harita Para6/3/2012 09:22:52 6/3/2012 09:24:16 714-- 1 1 COAL -- Harita Para6/3/2012 09:34:05 6/3/2012 09:37:40 702-- 1 1 COAL -- Harita Para

6/3/2012 09:34:39 6/3/2012 09:42:47 713-- 1 1 COAL -- Harita Para6/3/2012 09:41:23 6/3/2012 09:45:01 711-- 1 1 COAL -- Harita Para

6/3/2012 10:00:01 6/3/2012 10:04:36 708-- 1 1 COAL -- Harita Para6/3/2012 10:03:36 6/3/2012 10:08:08 704-- 1 1 COAL -- Harita Para6/3/2012 10:13:47 6/3/2012 10:17:36 709-- 1 1 COAL -- Harita Para6/3/2012 10:39:24 6/3/2012 10:51:51 710-- 1 1 COAL -- Harita Para6/3/2012 10:41:47 6/3/2012 10:51:59 707-- 1 1 COAL -- Harita Para6/3/2012 10:46:53 6/3/2012 10:54:05 714-- 1 1 COAL -- Harita Para6/3/2012 10:56:42 6/3/2012 11:00:59 702-- 1 1 COAL -- Harita Para6/3/2012 11:13:31 6/3/2012 11:17:19 711-- 1 1 COAL -- Harita Para6/3/2012 11:24:21 6/3/2012 11:49:54 708-- 1 1 COAL -- Harita Para6/3/2012 11:25:36 6/3/2012 11:47:53 713-- 1 1 COAL -- Harita Para6/3/2012 11:26:02 6/3/2012 11:49:50 704-- 1 1 COAL -- Harita Para6/3/2012 11:36:18 6/3/2012 12:02:53 709-- 1 1 COAL -- Harita Para6/3/2012 12:02:06 6/3/2012 12:19:04 712-- 1 1 COAL -- Harita Para6/3/2012 12:10:55 6/3/2012 12:24:17 707-- 1 1 COAL -- Harita Para6/3/2012 12:13:56 6/3/2012 12:26:07 710-- 1 1 COAL -- Harita Para6/3/2012 12:14:16 6/3/2012 12:27:58 714-- 1 1 COAL -- Harita Para6/3/2012 12:22:43 6/3/2012 12:34:05 706-- 1 1 COAL -- Harita Para6/3/2012 12:32:42 6/3/2012 12:36:36 702-- 1 1 COAL -- Harita Para6/3/2012 12:37:14 6/3/2012 12:46:39 711-- 1 1 COAL -- Harita Para6/3/2012 13:05:35 6/3/2012 13:09:18 704-- 1 1 COAL -- Harita Para6/3/2012 13:21:11 6/3/2012 13:26:55 709-- 1 1 COAL -- Harita Para

6/3/2012 13:40:44 6/3/2012 13:43:55 714-- 1 1 COAL -- Harita Para6/3/2012 13:49:28 6/3/2012 13:54:20 706-- 1 1 COAL -- Harita Para6/3/2012 13:59:16 6/3/2012 14:07:47 708-- 1 1 COAL -- Harita Para6/3/2012 14:20:41 6/3/2012 14:24:48 702-- 1 1 COAL -- Harita Para6/3/2012 14:21:26 6/3/2012 14:29:47 711-- 1 1 COAL -- Harita Para6/3/2012 14:46:30 6/3/2012 14:51:24 704-- 1 1 COAL -- Harita Para6/3/2012 14:48:32 6/3/2012 14:52:25 709-- 1 1 COAL -- Harita Para6/3/2012 14:49:44 6/3/2012 14:52:29 712-- 1 1 COAL -- Harita Para

Page 246: June Per Shift (Truckscale Port)

6/3/2012 14:50:39 6/3/2012 14:54:33 707-- 1 1 COAL -- Harita Para6/3/2012 14:59:29 6/3/2012 15:04:52 710-- 1 1 COAL -- Harita Para6/3/2012 15:11:44 6/3/2012 15:13:56 713-- 1 1 COAL -- Harita Para6/3/2012 15:18:03 6/3/2012 15:22:44 706-- 1 1 COAL -- Harita Para6/3/2012 15:30:31 6/3/2012 15:34:33 708-- 1 1 COAL -- Harita Para6/3/2012 15:38:23 6/3/2012 15:41:09 714-- 1 1 COAL -- Harita Para6/3/2012 08:42:47 6/3/2012 08:47:14 853 1 1 COAL -- MIL

6/3/2012 09:06:08 6/3/2012 09:11:46 856 1 1 COAL -- MIL

6/3/2012 10:01:38 6/3/2012 10:06:12 850 1 1 COAL -- MIL6/3/2012 10:23:32 6/3/2012 10:29:24 868 1 1 COAL -- MIL6/3/2012 10:23:52 6/3/2012 10:47:27 855 1 1 COAL -- MIL6/3/2012 10:36:07 6/3/2012 10:42:56 817 1 1 COAL -- MIL

6/3/2012 10:38:36 6/3/2012 10:45:44 832 1 1 COAL -- MIL6/3/2012 10:48:52 6/3/2012 10:57:31 818 1 1 COAL -- MIL6/3/2012 11:02:54 6/3/2012 11:09:50 820 1 1 COAL -- MIL6/3/2012 11:22:44 6/3/2012 12:04:13 851 1 1 COAL -- MIL6/3/2012 11:24:48 6/3/2012 11:43:30 838 1 1 COAL -- MIL6/3/2012 11:25:10 6/3/2012 11:44:54 839 1 1 COAL -- MIL6/3/2012 11:27:09 6/3/2012 11:53:41 815 1 1 COAL -- MIL6/3/2012 11:35:22 6/3/2012 11:57:21 833 1 1 COAL -- MIL6/3/2012 11:44:15 6/3/2012 12:04:19 856 1 1 COAL -- MIL

6/3/2012 11:55:56 6/3/2012 12:16:54 850 1 1 COAL -- MIL6/3/2012 12:21:26 6/3/2012 12:32:04 830 1 1 COAL -- MIL6/3/2012 12:35:40 6/3/2012 12:42:42 818 1 1 COAL -- MIL6/3/2012 12:43:40 6/3/2012 12:48:53 817 1 1 COAL -- MIL6/3/2012 12:50:04 6/3/2012 12:54:54 820 1 1 COAL -- MIL6/3/2012 13:02:55 6/3/2012 13:06:59 832 1 1 COAL -- MIL6/3/2012 13:20:29 6/3/2012 13:24:10 815 1 1 COAL -- MIL6/3/2012 13:30:11 6/3/2012 13:35:11 868 1 1 COAL -- MIL

6/3/2012 13:35:56 6/3/2012 13:39:41 833 1 1 COAL -- MIL6/3/2012 13:48:51 6/3/2012 13:52:58 838 1 1 COAL -- MIL6/3/2012 13:49:51 6/3/2012 13:56:08 856 1 1 COAL -- MIL6/3/2012 13:58:16 6/3/2012 14:01:42 850 1 1 COAL -- MIL

6/3/2012 14:06:49 6/3/2012 14:29:44 839 1 1 COAL -- MIL6/3/2012 14:22:43 6/3/2012 14:32:50 818 1 1 COAL -- MIL6/3/2012 14:46:11 6/3/2012 14:51:19 830 1 1 COAL -- MIL6/3/2012 14:49:16 6/3/2012 14:57:14 820 1 1 COAL -- MIL6/3/2012 14:58:10 6/3/2012 15:04:49 832 1 1 COAL -- MIL6/3/2012 15:20:07 6/3/2012 15:26:23 815 1 1 COAL -- MIL6/3/2012 15:23:57 6/3/2012 15:26:47 833 1 1 COAL -- MIL6/3/2012 15:25:35 6/3/2012 15:31:19 856 1 1 COAL -- MIL6/3/2012 15:37:44 6/3/2012 15:41:03 850 1 1 COAL -- MIL6/3/2012 15:51:52 6/3/2012 15:55:52 851 1 1 COAL -- MIL6/3/2012 15:53:12 6/3/2012 15:56:59 838 1 1 COAL -- MIL6/3/2012 15:57:43 6/3/2012 16:01:44 818 1 2 COAL -- MIL6/3/2012 16:01:02 6/3/2012 16:05:50 711-- 2 2 COAL -- Harita Para6/3/2012 18:02:37 6/3/2012 18:06:24 708-- 2 2 COAL -- Harita Para6/3/2012 18:03:01 6/3/2012 18:07:51 712-- 2 2 COAL -- Harita Para

Page 247: June Per Shift (Truckscale Port)

6/3/2012 18:04:03 6/3/2012 18:14:37 707-- 2 2 COAL -- Harita Para6/3/2012 18:23:18 6/3/2012 18:27:09 702-- 2 2 COAL -- Harita Para6/3/2012 18:25:21 6/3/2012 18:33:13 709-- 2 2 COAL -- Harita Para6/3/2012 18:37:52 6/3/2012 18:42:29 713-- 2 2 COAL -- Harita Para6/3/2012 18:38:28 6/3/2012 18:42:32 711-- 2 2 COAL -- Harita Para

6/3/2012 19:06:28 6/3/2012 19:11:00 703-- 2 2 COAL -- Harita Para6/3/2012 19:08:11 6/3/2012 19:13:05 701-- 2 2 COAL -- Harita Para6/3/2012 19:10:15 6/3/2012 19:13:07 704-- 2 2 COAL -- Harita Para6/3/2012 19:25:57 6/3/2012 19:30:41 706-- 2 2 COAL -- Harita Para6/3/2012 19:26:55 6/3/2012 19:32:07 708-- 2 2 COAL -- Harita Para6/3/2012 19:29:13 6/3/2012 19:34:40 712-- 2 2 COAL -- Harita Para6/3/2012 19:33:43 6/3/2012 19:36:57 707-- 2 2 COAL -- Harita Para6/3/2012 19:45:28 6/3/2012 19:50:16 702-- 2 2 COAL -- Harita Para6/3/2012 19:55:02 6/3/2012 19:58:45 709-- 2 2 COAL -- Harita Para6/3/2012 20:02:26 6/3/2012 20:06:47 711-- 2 2 COAL -- Harita Para6/3/2012 20:29:17 6/3/2012 20:34:20 701-- 2 2 COAL -- Harita Para6/3/2012 20:35:00 6/3/2012 20:39:10 703-- 2 2 COAL -- Harita Para

6/3/2012 20:36:43 6/3/2012 20:43:49 704-- 2 2 COAL -- Harita Para6/3/2012 20:54:08 6/3/2012 21:02:09 706-- 2 2 COAL -- Harita Para

6/3/2012 20:55:20 6/3/2012 21:03:07 708-- 2 2 COAL -- Harita Para6/3/2012 20:56:28 6/3/2012 21:05:31 712-- 2 2 COAL -- Harita Para6/3/2012 21:01:29 6/3/2012 21:10:05 707-- 2 2 COAL -- Harita Para6/3/2012 21:06:49 6/3/2012 21:11:52 702-- 2 2 COAL -- Harita Para6/3/2012 21:09:27 6/3/2012 21:15:24 709-- 2 2 COAL -- Harita Para6/3/2012 21:36:25 6/3/2012 21:40:26 711-- 2 2 COAL -- Harita Para6/3/2012 21:47:46 6/3/2012 21:51:49 701-- 2 2 COAL -- Harita Para6/3/2012 21:58:14 6/3/2012 22:02:32 703-- 2 2 COAL -- Harita Para6/3/2012 22:08:33 6/3/2012 22:13:10 704-- 2 2 COAL -- Harita Para6/3/2012 22:24:54 6/3/2012 22:30:55 706-- 2 2 COAL -- Harita Para6/3/2012 22:35:20 6/3/2012 22:39:42 708-- 2 2 COAL -- Harita Para6/3/2012 22:39:01 6/3/2012 22:45:24 712-- 2 2 COAL -- Harita Para

6/3/2012 22:40:40 6/3/2012 22:47:45 707-- 2 2 COAL -- Harita Para6/3/2012 22:46:09 6/3/2012 22:50:06 709-- 2 2 COAL -- Harita Para6/3/2012 22:54:28 6/3/2012 22:58:19 702-- 2 2 COAL -- Harita Para6/3/2012 22:59:48 6/3/2012 23:03:16 711-- 2 2 COAL -- Harita Para6/3/2012 23:26:21 6/3/2012 23:33:20 701-- 2 2 COAL -- Harita Para6/3/2012 23:35:47 6/3/2012 23:43:20 703-- 2 2 COAL -- Harita Para

6/3/2012 20:11:21 6/3/2012 20:16:31 856 2 2 COAL -- MIL6/3/2012 20:20:47 6/3/2012 20:26:07 855 2 2 COAL -- MIL6/3/2012 20:36:02 6/3/2012 20:41:34 851 2 2 COAL -- MIL6/3/2012 20:52:14 6/3/2012 20:57:10 850 2 2 COAL -- MIL6/3/2012 20:53:12 6/3/2012 20:58:58 812 2 2 COAL -- MIL6/3/2012 21:00:49 6/3/2012 21:08:13 852 2 2 COAL -- MIL6/3/2012 21:09:04 6/3/2012 21:13:05 818 2 2 COAL -- MIL6/3/2012 21:11:07 6/3/2012 21:17:05 837 2 2 COAL -- MIL6/3/2012 21:32:12 6/3/2012 21:38:13 853 2 2 COAL -- MIL6/3/2012 21:33:00 6/3/2012 21:44:51 832 2 2 COAL -- MIL6/3/2012 21:53:49 6/3/2012 22:00:22 839 2 2 COAL -- MIL

Page 248: June Per Shift (Truckscale Port)

6/3/2012 22:10:53 6/3/2012 22:16:52 830 2 2 COAL -- MIL6/3/2012 22:24:12 6/3/2012 22:29:58 856 2 2 COAL -- MIL6/3/2012 22:25:33 6/3/2012 22:33:18 812 2 2 COAL -- MIL6/3/2012 22:28:16 6/3/2012 22:33:26 818 2 2 COAL -- MIL6/3/2012 22:38:07 6/3/2012 22:45:01 852 2 2 COAL -- MIL6/3/2012 22:46:47 6/3/2012 22:53:48 855 2 2 COAL -- MIL

6/3/2012 22:56:59 6/3/2012 23:01:29 851 2 2 COAL -- MIL6/3/2012 23:34:57 6/3/2012 23:40:44 853 2 2 COAL -- MIL6/3/2012 23:49:45 6/3/2012 23:54:31 812 2 2 COAL -- MIL6/4/2012 00:12:32 6/4/2012 00:17:36 706-- 3 3 COAL -- Harita Para6/4/2012 00:19:46 6/4/2012 00:24:13 702-- 3 3 COAL -- Harita Para6/4/2012 00:22:15 6/4/2012 00:28:02 707-- 3 3 COAL -- Harita Para6/4/2012 00:23:13 6/4/2012 00:28:05 712-- 3 3 COAL -- Harita Para6/4/2012 00:34:54 6/4/2012 00:37:39 708-- 3 3 COAL -- Harita Para6/4/2012 00:48:59 6/4/2012 00:53:22 701-- 3 3 COAL -- Harita Para6/4/2012 00:56:10 6/4/2012 01:00:36 711-- 3 3 COAL -- Harita Para6/4/2012 00:58:59 6/4/2012 01:02:34 709-- 3 3 COAL -- Harita Para6/4/2012 01:19:39 6/4/2012 01:24:55 703-- 3 3 COAL -- Harita Para6/4/2012 01:41:48 6/4/2012 01:45:55 704-- 3 3 COAL -- Harita Para6/4/2012 01:49:16 6/4/2012 01:55:31 706-- 3 3 COAL -- Harita Para6/4/2012 01:52:30 6/4/2012 01:55:43 707-- 3 3 COAL -- Harita Para6/4/2012 02:08:52 6/4/2012 02:14:45 712-- 3 3 COAL -- Harita Para6/4/2012 02:10:53 6/4/2012 02:15:30 701-- 3 3 COAL -- Harita Para6/4/2012 02:57:32 6/4/2012 03:03:13 703-- 3 3 COAL -- Harita Para6/4/2012 07:10:09 6/4/2012 07:13:36 712-- 3 3 COAL -- Harita Para6/4/2012 07:10:32 6/4/2012 07:15:22 709-- 3 3 COAL -- Harita Para6/4/2012 07:15:58 6/4/2012 07:21:11 701-- 3 3 COAL -- Harita Para6/4/2012 07:16:43 6/4/2012 07:21:18 707-- 3 3 COAL -- Harita Para6/4/2012 07:22:31 6/4/2012 07:26:35 708-- 3 3 COAL -- Harita Para6/4/2012 07:32:38 6/4/2012 07:36:54 702-- 3 3 COAL -- Harita Para6/4/2012 07:38:46 6/4/2012 07:43:21 704-- 3 3 COAL -- Harita Para6/4/2012 07:47:13 6/4/2012 07:51:23 710-- 3 3 COAL -- Harita Para6/4/2012 07:47:33 6/4/2012 07:51:27 711-- 3 3 COAL -- Harita Para6/4/2012 00:01:17 6/4/2012 00:05:56 818 3 3 COAL -- MIL6/4/2012 00:31:38 6/4/2012 00:36:00 831 3 3 COAL -- MIL6/4/2012 01:18:01 6/4/2012 01:22:52 820 3 3 COAL -- MIL6/4/2012 03:37:02 6/4/2012 03:42:21 818 3 3 COAL -- MIL6/4/2012 03:53:29 6/4/2012 03:58:23 812 3 3 COAL -- MIL6/4/2012 04:06:03 6/4/2012 04:12:47 820 3 3 COAL -- MIL6/4/2012 04:09:58 6/4/2012 04:15:26 839 3 3 COAL -- MIL6/4/2012 07:29:57 6/4/2012 07:34:55 818 3 3 COAL -- MIL6/4/2012 01:37:20 6/4/2012 01:42:52 852 3 3 COAL--IN MIL6/4/2012 03:40:04 6/4/2012 03:46:47 853 3 3 COAL--IN MIL6/4/2012 03:40:28 6/4/2012 03:46:51 855 3 3 COAL--IN MIL6/4/2012 03:53:59 6/4/2012 04:00:32 851 3 3 COAL--IN MIL6/4/2012 03:56:30 6/4/2012 04:00:36 856 3 3 COAL--IN MIL6/4/2012 04:04:35 6/4/2012 04:11:09 852 3 3 COAL--IN MIL

6/4/2012 07:34:14 6/4/2012 07:39:54 853 3 3 COAL--IN MIL6/4/2012 07:36:13 6/4/2012 07:41:38 855 3 3 COAL--IN MIL

Page 249: June Per Shift (Truckscale Port)

6/4/2012 08:10:07 6/4/2012 08:14:28 706-- 1 1 COAL -- Harita Par6/4/2012 08:13:47 6/4/2012 08:17:50 703-- 1 1 COAL -- Harita Par6/4/2012 08:17:13 6/4/2012 08:21:14 714-- 1 1 COAL -- Harita Par6/4/2012 08:40:27 6/4/2012 08:43:45 712-- 1 1 COAL -- Harita Par6/4/2012 08:48:58 6/4/2012 08:52:37 707-- 1 1 COAL -- Harita Par6/4/2012 08:53:34 6/4/2012 08:57:27 701-- 1 1 COAL -- Harita Par6/4/2012 08:58:16 6/4/2012 09:02:12 708-- 1 1 COAL -- Harita Par6/4/2012 08:58:49 6/4/2012 09:03:55 702-- 1 1 COAL -- Harita Par6/4/2012 09:05:19 6/4/2012 09:09:21 704-- 1 1 COAL -- Harita Par6/4/2012 09:11:13 6/4/2012 09:14:51 710-- 1 1 COAL -- Harita Par6/4/2012 09:13:34 6/4/2012 09:23:59 711-- 1 1 COAL -- Harita Par6/4/2012 09:33:30 6/4/2012 09:36:58 706-- 1 1 COAL -- Harita Par6/4/2012 09:34:44 6/4/2012 09:38:15 703-- 1 1 COAL -- Harita Par6/4/2012 09:42:17 6/4/2012 09:45:53 714-- 1 1 COAL -- Harita Par6/4/2012 09:52:02 6/4/2012 09:55:16 712-- 1 1 COAL -- Harita Par6/4/2012 10:05:51 6/4/2012 10:09:10 707-- 1 1 COAL -- Harita Par6/4/2012 10:20:14 6/4/2012 10:24:03 709-- 1 1 COAL -- Harita Par6/4/2012 10:27:02 6/4/2012 10:30:10 702-- 1 1 COAL -- Harita Par6/4/2012 10:29:31 6/4/2012 10:35:28 708-- 1 1 COAL -- Harita Par6/4/2012 10:36:34 6/4/2012 10:41:35 704-- 1 1 COAL -- Harita Par6/4/2012 10:39:34 6/4/2012 10:43:27 710-- 1 1 COAL -- Harita Par6/4/2012 10:44:01 6/4/2012 10:48:22 711-- 1 1 COAL -- Harita Par6/4/2012 10:51:03 6/4/2012 10:54:34 706-- 1 1 COAL -- Harita Par6/4/2012 10:57:57 6/4/2012 11:01:40 713-- 1 1 COAL -- Harita Par6/4/2012 11:02:41 6/4/2012 11:08:14 714-- 1 1 COAL -- Harita Par6/4/2012 11:11:05 6/4/2012 11:16:06 703-- 1 1 COAL -- Harita Par6/4/2012 11:11:57 6/4/2012 11:17:46 701-- 1 1 COAL -- Harita Par6/4/2012 11:13:45 6/4/2012 11:19:21 712-- 1 1 COAL -- Harita Par6/4/2012 11:27:19 6/4/2012 11:30:35 707-- 1 1 COAL -- Harita Par6/4/2012 11:43:24 6/4/2012 11:49:30 709-- 1 1 COAL -- Harita Par6/4/2012 11:47:37 6/4/2012 11:52:20 702-- 1 1 COAL -- Harita Par6/4/2012 12:00:25 6/4/2012 12:03:50 710-- 1 1 COAL -- Harita Par6/4/2012 12:08:21 6/4/2012 12:14:14 704-- 1 1 COAL -- Harita Par6/4/2012 12:09:01 6/4/2012 12:14:19 711-- 1 1 COAL -- Harita Par6/4/2012 12:15:47 6/4/2012 12:26:15 706-- 1 1 COAL -- Harita Par6/4/2012 12:21:48 6/4/2012 12:32:01 713-- 1 1 COAL -- Harita Par6/4/2012 12:30:05 6/4/2012 12:34:07 714-- 1 1 COAL -- Harita Par6/4/2012 12:35:12 6/4/2012 12:38:41 703-- 1 1 COAL -- Harita Par6/4/2012 12:51:24 6/4/2012 13:02:50 701-- 1 1 COAL -- Harita Par6/4/2012 12:53:00 6/4/2012 13:03:11 712-- 1 1 COAL -- Harita Par6/4/2012 13:09:22 6/4/2012 13:19:41 709-- 1 1 COAL -- Harita Par6/4/2012 13:14:27 6/4/2012 13:19:45 702-- 1 1 COAL -- Harita Par6/4/2012 13:28:13 6/4/2012 13:31:11 710-- 1 1 COAL -- Harita Par

Page 250: June Per Shift (Truckscale Port)

6/4/2012 13:33:03 6/4/2012 13:44:34 711-- 1 1 COAL -- Harita Par6/4/2012 14:01:17 6/4/2012 14:06:31 706-- 1 1 COAL -- Harita Par6/4/2012 14:02:39 6/4/2012 14:06:33 703-- 1 1 COAL -- Harita Par6/4/2012 14:04:52 6/4/2012 14:08:52 713-- 1 1 COAL -- Harita Par6/4/2012 14:19:49 6/4/2012 14:24:30 712-- 1 1 COAL -- Harita Par6/4/2012 14:21:14 6/4/2012 14:24:35 701-- 1 1 COAL -- Harita Par6/4/2012 14:49:42 6/4/2012 14:54:48 709-- 1 1 COAL -- Harita Par6/4/2012 14:56:24 6/4/2012 15:00:58 710-- 1 1 COAL -- Harita Par6/4/2012 15:20:55 6/4/2012 15:25:17 704-- 1 1 COAL -- Harita Par6/4/2012 15:23:37 6/4/2012 15:27:40 714-- 1 1 COAL -- Harita Par6/4/2012 15:32:06 6/4/2012 15:36:02 713-- 1 1 COAL -- Harita Par6/4/2012 09:58:22 6/4/2012 10:04:25 820 1 1 COAL -- MIL6/4/2012 10:10:29 6/4/2012 10:14:01 831 1 1 COAL -- MIL6/4/2012 10:27:34 6/4/2012 10:32:57 833 1 1 COAL -- MIL6/4/2012 10:33:42 6/4/2012 10:38:12 818 1 1 COAL -- MIL

6/4/2012 10:47:39 6/4/2012 10:52:12 838 1 1 COAL -- MIL6/4/2012 11:10:42 6/4/2012 11:14:25 839 1 1 COAL -- MIL6/4/2012 12:31:09 6/4/2012 12:36:43 833 1 1 COAL -- MIL6/4/2012 12:39:20 6/4/2012 12:43:38 818 1 1 COAL -- MIL6/4/2012 12:51:02 6/4/2012 13:02:53 838 1 1 COAL -- MIL6/4/2012 13:00:03 6/4/2012 13:15:05 812 1 1 COAL -- MIL6/4/2012 13:46:31 6/4/2012 13:52:32 839 1 1 COAL -- MIL6/4/2012 14:27:03 6/4/2012 14:32:37 833 1 1 COAL -- MIL6/4/2012 14:34:14 6/4/2012 14:38:42 818 1 1 COAL -- MIL6/4/2012 14:53:32 6/4/2012 14:57:22 831 1 1 COAL -- MIL6/4/2012 15:14:07 6/4/2012 15:17:10 851 1 1 COAL -- MIL6/4/2012 15:55:16 6/4/2012 16:01:10 808 1 2 COAL -- MIL6/4/2012 15:55:40 6/4/2012 16:01:20 855 1 2 COAL -- MIL6/4/2012 08:22:13 6/4/2012 08:27:15 852 1 1 COAL--INT MIL6/4/2012 09:29:18 6/4/2012 09:32:01 851 1 1 COAL--INT MIL6/4/2012 09:42:53 6/4/2012 09:48:32 853 1 1 COAL--INT MIL6/4/2012 09:47:51 6/4/2012 09:54:23 855 1 1 COAL--INT MIL6/4/2012 09:56:07 6/4/2012 10:02:11 852 1 1 COAL--INT MIL6/4/2012 10:42:18 6/4/2012 10:45:10 851 1 1 COAL--INT MIL6/4/2012 10:57:37 6/4/2012 11:03:54 853 1 1 COAL--INT MIL6/4/2012 11:02:18 6/4/2012 11:04:00 855 1 1 COAL--INT MIL6/4/2012 11:05:58 6/4/2012 11:08:30 852 1 1 COAL--INT MIL6/4/2012 11:28:21 6/4/2012 11:34:11 806 1 1 COAL--INT MIL

6/4/2012 11:53:00 6/4/2012 11:55:35 851 1 1 COAL--INT MIL6/4/2012 12:12:38 6/4/2012 12:17:56 853 1 1 COAL--INT MIL6/4/2012 12:17:14 6/4/2012 12:25:54 855 1 1 COAL--INT MIL6/4/2012 12:20:21 6/4/2012 12:28:35 852 1 1 COAL--INT MIL

Page 251: June Per Shift (Truckscale Port)

6/4/2012 12:27:03 6/4/2012 12:33:01 820 1 1 COAL--INT MIL6/4/2012 12:56:11 6/4/2012 13:04:44 806 1 1 COAL--INT MIL6/4/2012 13:12:41 6/4/2012 13:18:35 851 1 1 COAL--INT MIL6/4/2012 13:42:35 6/4/2012 13:47:25 820 1 1 COAL--INT MIL6/4/2012 13:51:52 6/4/2012 13:58:38 855 1 1 COAL--INT MIL6/4/2012 13:56:54 6/4/2012 14:02:01 853 1 1 COAL--INT MIL6/4/2012 14:18:29 6/4/2012 14:21:56 806 1 1 COAL--INT MIL6/4/2012 14:23:47 6/4/2012 14:27:48 838 1 1 COAL--INT MIL6/4/2012 14:35:02 6/4/2012 14:40:04 812 1 1 COAL--INT MIL6/4/2012 14:41:21 6/4/2012 14:46:11 852 1 1 COAL--INT MIL6/4/2012 14:53:54 6/4/2012 14:59:25 820 1 1 COAL--INT MIL6/4/2012 15:07:59 6/4/2012 15:12:56 853 1 1 COAL--INT MIL6/4/2012 15:41:38 6/4/2012 15:46:00 838 1 1 COAL--INT MIL6/4/2012 15:48:37 6/4/2012 15:53:01 833 1 1 COAL--INT MIL6/4/2012 18:01:36 6/4/2012 18:06:49 707-- 2 2 COAL -- Harita Par6/4/2012 18:05:07 6/4/2012 18:09:43 701-- 2 2 COAL -- Harita Par6/4/2012 18:08:41 6/4/2012 18:12:54 704-- 2 2 COAL -- Harita Par6/4/2012 18:14:57 6/4/2012 18:22:33 706-- 2 2 COAL -- Harita Par6/4/2012 18:15:18 6/4/2012 18:22:36 710-- 2 2 COAL -- Harita Par6/4/2012 18:43:21 6/4/2012 18:51:58 711-- 2 2 COAL -- Harita Par6/4/2012 18:44:26 6/4/2012 18:52:01 702-- 2 2 COAL -- Harita Par6/4/2012 18:49:50 6/4/2012 18:53:26 713-- 2 2 COAL -- Harita Par6/4/2012 18:50:34 6/4/2012 18:56:47 709-- 2 2 COAL -- Harita Par6/4/2012 18:50:59 6/4/2012 18:57:48 712-- 2 2 COAL -- Harita Par6/4/2012 19:00:27 6/4/2012 19:05:33 703-- 2 2 COAL -- Harita Par6/4/2012 19:11:53 6/4/2012 19:15:44 714-- 2 2 COAL -- Harita Par6/4/2012 19:29:57 6/4/2012 19:34:11 707-- 2 2 COAL -- Harita Par6/4/2012 19:35:10 6/4/2012 19:39:36 701-- 2 2 COAL -- Harita Par6/4/2012 19:46:30 6/4/2012 19:50:52 704-- 2 2 COAL -- Harita Par6/4/2012 20:08:49 6/4/2012 20:16:40 706-- 2 2 COAL -- Harita Par6/4/2012 20:20:17 6/4/2012 20:25:02 710-- 2 2 COAL -- Harita Par6/4/2012 20:23:24 6/4/2012 20:32:50 711-- 2 2 COAL -- Harita Par6/4/2012 20:33:53 6/4/2012 20:38:19 702-- 2 2 COAL -- Harita Par6/4/2012 20:36:33 6/4/2012 20:41:40 713-- 2 2 COAL -- Harita Par6/4/2012 20:40:51 6/4/2012 20:47:12 709-- 2 2 COAL -- Harita Par6/4/2012 20:42:31 6/4/2012 20:48:08 703-- 2 2 COAL -- Harita Par6/4/2012 20:46:06 6/4/2012 20:53:37 714-- 2 2 COAL -- Harita Par

6/4/2012 21:04:51 6/4/2012 21:08:28 701-- 2 2 COAL -- Harita Par6/4/2012 21:12:39 6/4/2012 21:15:53 707-- 2 2 COAL -- Harita Par6/4/2012 21:25:48 6/4/2012 21:32:15 704-- 2 2 COAL -- Harita Par6/4/2012 22:13:56 6/4/2012 22:18:19 706-- 2 2 COAL -- Harita Par6/4/2012 22:15:14 6/4/2012 22:18:25 710-- 2 2 COAL -- Harita Par

Page 252: June Per Shift (Truckscale Port)

6/4/2012 22:15:42 6/4/2012 22:21:28 702-- 2 2 COAL -- Harita Par6/4/2012 22:22:36 6/4/2012 22:28:20 703-- 2 2 COAL -- Harita Par6/4/2012 22:24:17 6/4/2012 22:30:27 713-- 2 2 COAL -- Harita Par6/4/2012 22:25:02 6/4/2012 22:32:15 714-- 2 2 COAL -- Harita Par6/4/2012 22:29:19 6/4/2012 22:34:37 711-- 2 2 COAL -- Harita Par6/4/2012 22:38:34 6/4/2012 22:42:48 709-- 2 2 COAL -- Harita Par6/4/2012 22:42:04 6/4/2012 22:49:49 701-- 2 2 COAL -- Harita Par6/4/2012 22:48:57 6/4/2012 23:03:03 707-- 2 2 COAL -- Harita Par6/4/2012 23:04:22 6/4/2012 23:10:28 704-- 2 2 COAL -- Harita Par6/4/2012 16:15:02 6/4/2012 16:19:23 836 2 2 COAL -- MIL6/4/2012 19:33:14 6/4/2012 19:37:45 851 2 2 COAL -- MIL6/4/2012 19:36:39 6/4/2012 19:44:47 853 2 2 COAL -- MIL6/4/2012 20:05:21 6/4/2012 20:10:59 852 2 2 COAL -- MIL6/4/2012 21:06:30 6/4/2012 21:10:51 838 2 2 COAL -- MIL6/4/2012 21:41:32 6/4/2012 21:47:21 818 2 2 COAL -- MIL6/4/2012 23:34:14 6/4/2012 23:39:18 820 2 2 COAL -- MIL6/4/2012 16:16:17 6/4/2012 16:21:25 820 2 2 COAL--INT MIL6/4/2012 20:40:12 6/4/2012 20:46:52 856 2 2 COAL--INT MIL6/4/2012 20:45:36 6/4/2012 20:51:42 855 2 2 COAL--INT MIL6/4/2012 20:57:04 6/4/2012 21:00:32 868 2 2 COAL--INT MIL6/4/2012 21:23:14 6/4/2012 21:30:31 853 2 2 COAL--INT MIL6/4/2012 21:27:02 6/4/2012 21:37:46 852 2 2 COAL--INT MIL6/4/2012 21:50:03 6/4/2012 21:53:51 851 2 2 COAL--INT MIL6/4/2012 21:58:15 6/4/2012 22:03:01 856 2 2 COAL--INT MIL6/4/2012 22:19:29 6/4/2012 22:26:16 855 2 2 COAL--INT MIL6/4/2012 22:57:42 6/4/2012 23:02:23 852 2 2 COAL--INT MIL6/4/2012 23:11:09 6/4/2012 23:36:40 851 2 2 COAL--INT MIL6/4/2012 23:17:20 6/4/2012 23:21:32 868 2 2 COAL--INT MIL6/4/2012 23:31:35 6/4/2012 23:36:36 856 2 2 COAL--INT MIL6/4/2012 23:46:24 6/4/2012 23:52:09 855 2 2 COAL--INT MIL6/5/2012 00:06:02 6/5/2012 00:12:10 703-- 3 3 COAL -- Harita Par6/5/2012 00:10:50 6/5/2012 00:16:38 702-- 3 3 COAL -- Harita Par6/5/2012 00:21:48 6/5/2012 00:28:22 706-- 3 3 COAL -- Harita Par6/5/2012 00:25:17 6/5/2012 00:29:37 701-- 3 3 COAL -- Harita Par6/5/2012 00:27:22 6/5/2012 00:31:07 707-- 3 3 COAL -- Harita Par6/5/2012 00:46:07 6/5/2012 00:51:17 704-- 3 3 COAL -- Harita Par6/5/2012 00:48:21 6/5/2012 00:53:11 713-- 3 3 COAL -- Harita Par6/5/2012 00:49:24 6/5/2012 00:55:49 710-- 3 3 COAL -- Harita Par6/5/2012 00:49:54 6/5/2012 00:58:31 714-- 3 3 COAL -- Harita Par6/5/2012 00:50:26 6/5/2012 01:00:43 711-- 3 3 COAL -- Harita Par

6/5/2012 01:14:02 6/5/2012 01:17:34 709-- 3 3 COAL -- Harita Par6/5/2012 01:58:15 6/5/2012 02:03:40 702-- 3 3 COAL -- Harita Par

Page 253: June Per Shift (Truckscale Port)

6/5/2012 02:02:30 6/5/2012 02:09:04 703-- 3 3 COAL -- Harita Par6/5/2012 02:14:01 6/5/2012 02:18:13 701-- 3 3 COAL -- Harita Par6/5/2012 02:22:36 6/5/2012 02:26:10 707-- 3 3 COAL -- Harita Par6/5/2012 02:43:00 6/5/2012 02:49:31 714-- 3 3 COAL -- Harita Par6/5/2012 02:54:33 6/5/2012 02:59:35 711-- 3 3 COAL -- Harita Par6/5/2012 03:24:56 6/5/2012 03:29:15 710-- 3 3 COAL -- Harita Par6/5/2012 03:50:52 6/5/2012 03:54:57 706-- 3 3 COAL -- Harita Par6/5/2012 07:04:08 6/5/2012 07:08:02 709-- 3 3 COAL -- Harita Par6/5/2012 07:09:48 6/5/2012 07:13:28 701-- 3 3 COAL -- Harita Par6/5/2012 07:22:27 6/5/2012 07:26:01 710-- 3 3 COAL -- Harita Par6/5/2012 07:22:48 6/5/2012 07:28:08 704-- 3 3 COAL -- Harita Par6/5/2012 07:25:04 6/5/2012 07:29:43 702-- 3 3 COAL -- Harita Par6/5/2012 07:43:42 6/5/2012 07:48:31 711-- 3 3 COAL -- Harita Par6/5/2012 07:58:06 6/5/2012 08:01:30 703-- 3 1 COAL -- Harita Par6/5/2012 00:10:14 6/5/2012 00:14:19 833 3 3 COAL -- MIL6/5/2012 00:34:28 6/5/2012 00:38:31 830 3 3 COAL -- MIL6/5/2012 00:40:39 6/5/2012 00:56:55 838 3 3 COAL -- MIL6/5/2012 00:52:01 6/5/2012 01:03:01 829 3 3 COAL -- MIL6/5/2012 01:04:40 6/5/2012 01:10:02 818 3 3 COAL -- MIL6/5/2012 02:01:06 6/5/2012 02:10:13 828 3 3 COAL -- MIL6/5/2012 02:47:22 6/5/2012 02:52:36 818 3 3 COAL -- MIL6/5/2012 03:46:23 6/5/2012 03:50:05 833 3 3 COAL -- MIL6/5/2012 04:26:07 6/5/2012 04:31:22 818 3 3 COAL -- MIL6/5/2012 01:11:13 6/5/2012 01:16:39 855 3 3 COAL--INT MIL6/5/2012 01:45:58 6/5/2012 01:54:30 851 3 3 COAL--INT MIL6/5/2012 01:51:05 6/5/2012 01:56:15 856 3 3 COAL--INT MIL6/5/2012 01:51:21 6/5/2012 01:58:49 852 3 3 COAL--INT MIL6/5/2012 02:07:06 6/5/2012 02:10:52 868 3 3 COAL--INT MIL6/5/2012 02:42:39 6/5/2012 02:48:03 855 3 3 COAL--INT MIL6/5/2012 03:09:50 6/5/2012 03:14:35 852 3 3 COAL--INT MIL6/5/2012 03:13:41 6/5/2012 03:14:38 856 3 3 COAL--INT MIL6/5/2012 03:22:12 6/5/2012 03:26:18 851 3 3 COAL--INT MIL6/5/2012 03:34:11 6/5/2012 03:37:37 868 3 3 COAL--INT MIL6/5/2012 08:06:46 6/5/2012 08:10:46 708-- 1 1 COAL -- Harita Par6/5/2012 08:19:49 6/5/2012 08:24:07 713-- 1 1 COAL -- Harita Par6/5/2012 08:32:17 6/5/2012 08:36:16 709-- 1 1 COAL -- Harita Par6/5/2012 08:33:04 6/5/2012 08:38:40 706-- 1 1 COAL -- Harita Par6/5/2012 08:39:14 6/5/2012 08:45:05 701-- 1 1 COAL -- Harita Par6/5/2012 08:48:11 6/5/2012 08:52:17 710-- 1 1 COAL -- Harita Par6/5/2012 08:51:29 6/5/2012 08:55:43 704-- 1 1 COAL -- Harita Par6/5/2012 08:54:15 6/5/2012 08:58:10 702-- 1 1 COAL -- Harita Par6/5/2012 11:41:25 6/5/2012 11:48:14 711-- 1 1 COAL -- Harita Par

Page 254: June Per Shift (Truckscale Port)

6/5/2012 11:50:56 6/5/2012 11:56:00 703-- 1 1 COAL -- Harita Par6/5/2012 12:28:22 6/5/2012 12:32:40 707-- 1 1 COAL -- Harita Par6/5/2012 13:17:57 6/5/2012 13:22:49 713-- 1 1 COAL -- Harita Par6/5/2012 15:17:44 6/5/2012 15:39:04 709-- 1 1 COAL -- Harita Par6/5/2012 08:37:19 6/5/2012 08:41:32 828 1 1 COAL -- MIL6/5/2012 11:40:31 6/5/2012 11:45:16 820 1 1 COAL -- MIL6/5/2012 12:46:26 6/5/2012 12:51:19 833 1 1 COAL -- MIL6/5/2012 12:46:57 6/5/2012 12:53:52 818 1 1 COAL -- MIL6/5/2012 14:06:38 6/5/2012 14:10:59 838 1 1 COAL -- MIL6/5/2012 15:13:35 6/5/2012 15:19:07 856 1 1 COAL -- MIL6/5/2012 15:30:50 6/5/2012 15:39:32 820 1 1 COAL -- MIL6/5/2012 15:47:43 6/5/2012 15:52:08 839 1 1 COAL -- MIL6/5/2012 15:57:44 6/5/2012 16:02:12 836 1 2 COAL -- MIL6/5/2012 08:16:55 6/5/2012 08:23:13 855 1 1 COAL--INT MIL6/5/2012 08:25:13 6/5/2012 08:28:43 851 1 1 COAL--INT MIL6/5/2012 08:26:48 6/5/2012 08:30:02 868 1 1 COAL--INT MIL

6/5/2012 08:28:04 6/5/2012 08:34:04 856 1 1 COAL--INT MIL6/5/2012 08:37:56 6/5/2012 08:43:06 852 1 1 COAL--INT MIL6/5/2012 15:18:26 6/5/2012 15:41:34 853 1 1 COAL--INT MIL6/5/2012 18:20:43 6/5/2012 18:24:47 701-- 2 2 COAL -- Harita Par6/5/2012 18:58:25 6/5/2012 19:03:25 704-- 2 2 COAL -- Harita Par6/5/2012 19:10:30 6/5/2012 19:16:13 706-- 2 2 COAL -- Harita Par6/5/2012 19:12:39 6/5/2012 19:18:05 708-- 2 2 COAL -- Harita Par6/5/2012 19:15:35 6/5/2012 19:19:59 707-- 2 2 COAL -- Harita Par6/5/2012 19:33:33 6/5/2012 19:39:06 703-- 2 2 COAL -- Harita Par6/5/2012 19:40:04 6/5/2012 19:44:26 712-- 2 2 COAL -- Harita Par6/5/2012 19:41:41 6/5/2012 19:44:29 710-- 2 2 COAL -- Harita Par6/5/2012 19:42:00 6/5/2012 19:47:38 714-- 2 2 COAL -- Harita Par6/5/2012 19:48:27 6/5/2012 19:52:31 713-- 2 2 COAL -- Harita Par6/5/2012 19:54:08 6/5/2012 19:58:04 701-- 2 2 COAL -- Harita Par6/5/2012 20:35:44 6/5/2012 20:40:35 704-- 2 2 COAL -- Harita Par6/5/2012 20:50:55 6/5/2012 20:54:49 708-- 2 2 COAL -- Harita Par6/5/2012 20:51:40 6/5/2012 20:54:52 706-- 2 2 COAL -- Harita Par6/5/2012 20:57:05 6/5/2012 21:00:49 707-- 2 2 COAL -- Harita Par6/5/2012 21:21:48 6/5/2012 21:27:11 703-- 2 2 COAL -- Harita Par6/5/2012 21:31:42 6/5/2012 21:36:18 710-- 2 2 COAL -- Harita Par6/5/2012 21:32:09 6/5/2012 21:37:53 713-- 2 2 COAL -- Harita Par6/5/2012 21:38:48 6/5/2012 21:42:31 712-- 2 2 COAL -- Harita Par6/5/2012 21:40:10 6/5/2012 21:42:35 701-- 2 2 COAL -- Harita Par6/5/2012 21:56:02 6/5/2012 22:00:27 714-- 2 2 COAL -- Harita Par6/5/2012 22:10:10 6/5/2012 22:14:14 704-- 2 2 COAL -- Harita Par6/5/2012 22:18:57 6/5/2012 22:23:20 706-- 2 2 COAL -- Harita Par

Page 255: June Per Shift (Truckscale Port)

6/5/2012 22:22:20 6/5/2012 22:26:18 708-- 2 2 COAL -- Harita Par6/5/2012 22:29:36 6/5/2012 22:38:26 707-- 2 2 COAL -- Harita Par6/5/2012 22:54:03 6/5/2012 22:59:54 703-- 2 2 COAL -- Harita Par6/5/2012 23:06:55 6/5/2012 23:13:13 713-- 2 2 COAL -- Harita Par6/5/2012 23:12:21 6/5/2012 23:23:33 701-- 2 2 COAL -- Harita Par6/5/2012 23:31:25 6/5/2012 23:39:06 712-- 2 2 COAL -- Harita Par6/5/2012 23:37:12 6/5/2012 23:47:43 710-- 2 2 COAL -- Harita Par6/5/2012 23:44:58 6/5/2012 23:49:41 706-- 2 2 COAL -- Harita Par6/5/2012 23:50:27 6/5/2012 23:55:50 704-- 2 2 COAL -- Harita Par6/5/2012 23:57:30 6/6/2012 00:04:24 711-- 2 3 COAL -- Harita Par6/5/2012 19:07:22 6/5/2012 19:13:32 855 2 2 COAL -- MIL6/5/2012 19:10:01 6/5/2012 19:13:36 856 2 2 COAL -- MIL6/5/2012 19:17:14 6/5/2012 19:23:46 853 2 2 COAL -- MIL6/5/2012 19:19:11 6/5/2012 19:25:01 851 2 2 COAL -- MIL6/5/2012 19:30:24 6/5/2012 19:34:27 868 2 2 COAL -- MIL6/5/2012 19:32:38 6/5/2012 19:36:53 830 2 2 COAL -- MIL6/5/2012 20:04:14 6/5/2012 20:08:11 833 2 2 COAL -- MIL6/5/2012 21:08:07 6/5/2012 21:16:51 838 2 2 COAL -- MIL6/5/2012 21:26:21 6/5/2012 21:32:54 818 2 2 COAL -- MIL6/5/2012 21:39:32 6/5/2012 21:44:43 850 2 2 COAL -- MIL6/5/2012 21:57:45 6/5/2012 22:03:14 836 2 2 COAL -- MIL6/5/2012 22:13:33 6/5/2012 22:17:30 833 2 2 COAL -- MIL6/5/2012 22:22:40 6/5/2012 22:28:57 856 2 2 COAL -- MIL6/5/2012 22:28:01 6/5/2012 22:38:32 831 2 2 COAL -- MIL6/5/2012 22:41:27 6/5/2012 23:00:52 855 2 2 COAL -- MIL6/5/2012 22:56:02 6/5/2012 23:00:57 853 2 2 COAL -- MIL6/5/2012 23:05:26 6/5/2012 23:09:18 818 2 2 COAL -- MIL6/5/2012 23:11:18 6/5/2012 23:15:58 852 2 2 COAL -- MIL6/5/2012 23:11:53 6/5/2012 23:21:58 851 2 2 COAL -- MIL6/5/2012 23:22:47 6/5/2012 23:27:15 850 2 2 COAL -- MIL6/5/2012 23:30:18 6/5/2012 23:34:56 830 2 2 COAL -- MIL6/5/2012 23:30:53 6/5/2012 23:36:00 828 2 2 COAL -- MIL6/5/2012 23:48:59 6/5/2012 23:53:39 856 2 2 COAL -- MIL6/6/2012 00:06:58 6/6/2012 00:10:37 707-- 3 3 COAL -- Harita Par6/6/2012 00:15:45 6/6/2012 00:20:01 708-- 3 3 COAL -- Harita Par6/6/2012 00:39:11 6/6/2012 00:44:34 703-- 3 3 COAL -- Harita Par6/6/2012 01:30:54 6/6/2012 01:35:03 701-- 3 3 COAL -- Harita Par6/6/2012 01:38:25 6/6/2012 01:42:10 704-- 3 3 COAL -- Harita Par6/6/2012 01:39:33 6/6/2012 01:43:57 706-- 3 3 COAL -- Harita Par6/6/2012 01:44:47 6/6/2012 01:48:34 707-- 3 3 COAL -- Harita Par6/6/2012 01:55:06 6/6/2012 01:59:16 713-- 3 3 COAL -- Harita Par6/6/2012 02:02:42 6/6/2012 02:07:16 710-- 3 3 COAL -- Harita Par6/6/2012 02:03:05 6/6/2012 02:07:19 708-- 3 3 COAL -- Harita Par

Page 256: June Per Shift (Truckscale Port)

6/6/2012 02:08:06 6/6/2012 02:15:00 711-- 3 3 COAL -- Harita Par6/6/2012 02:14:12 6/6/2012 02:15:02 703-- 3 3 COAL -- Harita Par6/6/2012 02:34:50 6/6/2012 02:39:26 712-- 3 3 COAL -- Harita Par6/6/2012 02:52:09 6/6/2012 02:57:27 701-- 3 3 COAL -- Harita Par6/6/2012 03:17:22 6/6/2012 03:21:06 707-- 3 3 COAL -- Harita Par6/6/2012 03:31:28 6/6/2012 03:38:33 713-- 3 3 COAL -- Harita Par6/6/2012 00:29:09 6/6/2012 00:33:39 855 3 3 COAL -- MIL6/6/2012 00:36:28 6/6/2012 00:41:06 829 3 3 COAL -- MIL6/6/2012 01:12:23 6/6/2012 01:18:13 818 3 3 COAL -- MIL6/6/2012 01:26:51 6/6/2012 01:32:52 828 3 3 COAL -- MIL6/6/2012 01:31:35 6/6/2012 01:40:10 853 3 3 COAL -- MIL6/6/2012 02:05:33 6/6/2012 02:11:29 851 3 3 COAL -- MIL6/6/2012 02:43:32 6/6/2012 02:47:48 830 3 3 COAL -- MIL6/6/2012 02:53:28 6/6/2012 03:01:45 856 3 3 COAL -- MIL6/6/2012 02:55:58 6/6/2012 03:09:20 855 3 3 COAL -- MIL6/6/2012 03:02:21 6/6/2012 03:09:22 852 3 3 COAL -- MIL6/6/2012 03:18:12 6/6/2012 03:27:08 853 3 3 COAL -- MIL6/6/2012 03:31:02 6/6/2012 03:35:50 818 3 3 COAL -- MIL6/6/2012 03:36:51 6/6/2012 03:41:24 828 3 3 COAL -- MIL6/6/2012 03:40:37 6/6/2012 03:44:48 838 3 3 COAL -- MIL6/6/2012 11:58:53 6/6/2012 12:02:55 708-- 1 1 COAL -- Harita Para6/6/2012 11:59:30 6/6/2012 12:04:41 710-- 1 1 COAL -- Harita Para6/6/2012 12:00:23 6/6/2012 12:06:30 701-- 1 1 COAL -- Harita Para6/6/2012 12:09:03 6/6/2012 12:13:41 711-- 1 1 COAL -- Harita Para

6/6/2012 12:11:03 6/6/2012 12:15:01 703-- 1 1 COAL -- Harita Para6/6/2012 12:13:01 6/6/2012 12:20:00 706-- 1 1 COAL -- Harita Para6/6/2012 12:39:41 6/6/2012 12:47:40 712-- 1 1 COAL -- Harita Para6/6/2012 12:40:50 6/6/2012 12:51:46 704-- 1 1 COAL -- Harita Para6/6/2012 12:41:49 6/6/2012 12:54:59 707-- 1 1 COAL -- Harita Para6/6/2012 12:43:54 6/6/2012 12:59:51 713-- 1 1 COAL -- Harita Para6/6/2012 14:23:52 6/6/2012 14:28:06 704-- 1 1 COAL -- Harita Para6/6/2012 14:43:03 6/6/2012 14:49:05 710-- 1 1 COAL -- Harita Para6/6/2012 14:57:46 6/6/2012 15:01:29 713-- 1 1 COAL -- Harita Para6/6/2012 14:58:32 6/6/2012 15:03:09 703-- 1 1 COAL -- Harita Para6/6/2012 15:05:47 6/6/2012 15:09:47 701-- 1 1 COAL -- Harita Para6/6/2012 15:16:57 6/6/2012 15:21:58 706-- 1 1 COAL -- Harita Para6/6/2012 15:27:38 6/6/2012 15:31:56 707-- 1 1 COAL -- Harita Para6/6/2012 15:39:50 6/6/2012 15:43:59 714-- 1 1 COAL -- Harita Para

6/6/2012 12:38:15 6/6/2012 12:43:08 836 1 1 COAL -- MIL6/6/2012 12:38:51 6/6/2012 12:45:15 850 1 1 COAL -- MIL6/6/2012 12:41:16 6/6/2012 12:54:11 853 1 1 COAL -- MIL6/6/2012 13:54:54 6/6/2012 14:02:38 855 1 1 COAL -- MIL6/6/2012 13:59:40 6/6/2012 14:03:07 868 1 1 COAL -- MIL6/6/2012 14:00:18 6/6/2012 14:04:44 852 1 1 COAL -- MIL6/6/2012 14:04:02 6/6/2012 14:07:40 808 1 1 COAL -- MIL6/6/2012 14:08:44 6/6/2012 14:13:16 818 1 1 COAL -- MIL

Page 257: June Per Shift (Truckscale Port)

6/6/2012 14:21:19 6/6/2012 14:26:02 851 1 1 COAL -- MIL6/6/2012 14:24:18 6/6/2012 14:29:57 850 1 1 COAL -- MIL6/6/2012 14:47:45 6/6/2012 14:51:56 836 1 1 COAL -- MIL6/6/2012 14:49:48 6/6/2012 14:54:10 833 1 1 COAL -- MIL6/6/2012 15:09:11 6/6/2012 15:14:39 853 1 1 COAL -- MIL6/6/2012 15:10:41 6/6/2012 15:16:04 819 1 1 COAL -- MIL6/6/2012 15:15:27 6/6/2012 15:19:28 815 1 1 COAL -- MIL6/6/2012 15:29:55 6/6/2012 15:33:36 832 1 1 COAL -- MIL6/6/2012 15:45:25 6/6/2012 15:49:53 828 1 1 COAL -- MIL6/6/2012 15:47:33 6/6/2012 15:53:15 856 1 1 COAL -- MIL6/6/2012 15:56:31 6/6/2012 15:59:58 868 1 1 COAL -- MIL6/6/2012 18:12:08 6/6/2012 18:15:39 706-- 2 2 COAL -- Harita Para6/6/2012 18:12:47 6/6/2012 18:18:28 701-- 2 2 COAL -- Harita Para6/6/2012 18:16:29 6/6/2012 18:20:29 712-- 2 2 COAL -- Harita Para6/6/2012 18:17:50 6/6/2012 18:23:23 708-- 2 2 COAL -- Harita Para6/6/2012 18:22:42 6/6/2012 18:28:05 704-- 2 2 COAL -- Harita Para6/6/2012 18:26:00 6/6/2012 18:31:20 703-- 2 2 COAL -- Harita Para6/6/2012 18:26:26 6/6/2012 18:33:11 702-- 2 2 COAL -- Harita Para6/6/2012 18:27:06 6/6/2012 18:35:19 713-- 2 2 COAL -- Harita Para6/6/2012 18:27:24 6/6/2012 18:37:02 709-- 2 2 COAL -- Harita Para6/6/2012 18:30:26 6/6/2012 18:38:49 707-- 2 2 COAL -- Harita Para6/6/2012 18:34:00 6/6/2012 18:40:54 710-- 2 2 COAL -- Harita Para6/6/2012 19:55:55 6/6/2012 20:00:57 714-- 2 2 COAL -- Harita Para6/6/2012 19:59:46 6/6/2012 20:03:13 706-- 2 2 COAL -- Harita Para

6/6/2012 20:21:36 6/6/2012 20:26:07 712-- 2 2 COAL -- Harita Para6/6/2012 20:24:22 6/6/2012 20:29:24 701-- 2 2 COAL -- Harita Para6/6/2012 20:27:04 6/6/2012 20:31:05 708-- 2 2 COAL -- Harita Para

6/6/2012 20:35:41 6/6/2012 20:40:43 704-- 2 2 COAL -- Harita Para6/6/2012 20:45:59 6/6/2012 20:50:24 703-- 2 2 COAL -- Harita Para6/6/2012 20:46:22 6/6/2012 20:52:21 709-- 2 2 COAL -- Harita Para6/6/2012 20:53:07 6/6/2012 20:57:46 710-- 2 2 COAL -- Harita Para6/6/2012 20:54:55 6/6/2012 20:59:38 713-- 2 2 COAL -- Harita Para

6/6/2012 21:06:24 6/6/2012 21:11:23 707-- 2 2 COAL -- Harita Para6/6/2012 21:44:56 6/6/2012 21:50:10 714-- 2 2 COAL -- Harita Para

6/6/2012 22:01:52 6/6/2012 22:06:07 706-- 2 2 COAL -- Harita Para6/6/2012 22:09:49 6/6/2012 22:14:55 712-- 2 2 COAL -- Harita Para6/6/2012 22:13:18 6/6/2012 22:17:49 701-- 2 2 COAL -- Harita Para

6/6/2012 22:24:21 6/6/2012 22:28:07 708-- 2 2 COAL -- Harita Para

6/6/2012 22:29:47 6/6/2012 22:33:33 704-- 2 2 COAL -- Harita Para6/6/2012 22:30:47 6/6/2012 22:35:42 709-- 2 2 COAL -- Harita Para

6/6/2012 22:44:11 6/6/2012 22:49:11 703-- 2 2 COAL -- Harita Para6/6/2012 22:58:06 6/6/2012 23:05:06 710-- 2 2 COAL -- Harita Para6/6/2012 22:58:32 6/6/2012 23:05:57 713-- 2 2 COAL -- Harita Para6/6/2012 23:02:49 6/6/2012 23:08:24 707-- 2 2 COAL -- Harita Para6/6/2012 23:25:10 6/6/2012 23:29:31 714-- 2 2 COAL -- Harita Para6/6/2012 23:35:22 6/6/2012 23:39:05 706-- 2 2 COAL -- Harita Para6/6/2012 23:56:12 6/7/2012 00:02:11 712-- 2 3 COAL -- Harita Para

6/6/2012 16:05:52 6/6/2012 16:10:06 852 2 2 COAL -- MIL

Page 258: June Per Shift (Truckscale Port)

6/6/2012 16:19:51 6/6/2012 16:23:33 808 2 2 COAL -- MIL6/6/2012 18:47:20 6/6/2012 18:51:05 818 2 2 COAL -- MIL6/6/2012 18:54:54 6/6/2012 19:00:08 852 2 2 COAL -- MIL6/6/2012 19:01:08 6/6/2012 19:05:48 856 2 2 COAL -- MIL6/6/2012 19:04:06 6/6/2012 19:10:15 855 2 2 COAL -- MIL6/6/2012 19:14:09 6/6/2012 19:17:57 833 2 2 COAL -- MIL6/6/2012 19:16:59 6/6/2012 19:20:53 850 2 2 COAL -- MIL6/6/2012 19:17:19 6/6/2012 19:21:51 851 2 2 COAL -- MIL6/6/2012 19:35:53 6/6/2012 19:43:04 853 2 2 COAL -- MIL6/6/2012 20:00:11 6/6/2012 20:07:44 815 2 2 COAL -- MIL6/6/2012 20:04:38 6/6/2012 20:10:33 839 2 2 COAL -- MIL6/6/2012 20:09:47 6/6/2012 20:14:14 819 2 2 COAL -- MIL6/6/2012 20:23:40 6/6/2012 20:27:57 818 2 2 COAL -- MIL6/6/2012 20:53:33 6/6/2012 20:58:11 833 2 2 COAL -- MIL

6/6/2012 21:00:48 6/6/2012 21:05:43 850 2 2 COAL -- MIL6/6/2012 21:04:18 6/6/2012 21:09:06 829 2 2 COAL -- MIL6/6/2012 21:17:13 6/6/2012 21:23:53 838 2 2 COAL -- MIL6/6/2012 21:27:31 6/6/2012 21:33:33 831 2 2 COAL -- MIL6/6/2012 21:28:05 6/6/2012 21:39:00 815 2 2 COAL -- MIL6/6/2012 21:47:00 6/6/2012 21:50:52 839 2 2 COAL -- MIL6/6/2012 21:49:19 6/6/2012 21:53:03 819 2 2 COAL -- MIL6/6/2012 22:05:21 6/6/2012 22:10:48 818 2 2 COAL -- MIL6/6/2012 22:34:19 6/6/2012 22:54:00 850 2 2 COAL -- MIL6/6/2012 22:38:21 6/6/2012 22:59:14 829 2 2 COAL -- MIL6/6/2012 22:55:13 6/6/2012 23:29:37 833 2 2 COAL -- MIL6/6/2012 23:03:09 6/7/2012 00:16:52 815 2 3 COAL -- MIL6/6/2012 23:24:29 6/6/2012 23:32:08 851 2 2 COAL -- MIL6/6/2012 23:30:23 6/6/2012 23:37:24 853 2 2 COAL -- MIL6/6/2012 23:41:03 6/7/2012 00:14:21 839 2 3 COAL -- MIL6/6/2012 23:41:48 6/6/2012 23:47:46 856 2 2 COAL -- MIL6/6/2012 23:59:40 6/7/2012 00:07:57 855 2 3 COAL -- MIL6/7/2012 00:25:16 6/7/2012 00:31:16 703-- 3 3 COAL -- Harita Para6/7/2012 00:36:51 6/7/2012 00:41:31 701-- 3 3 COAL -- Harita Para6/7/2012 00:39:33 6/7/2012 00:43:37 708-- 3 3 COAL -- Harita Para6/7/2012 00:47:59 6/7/2012 00:52:15 713-- 3 3 COAL -- Harita Para6/7/2012 01:32:36 6/7/2012 01:36:34 709-- 3 3 COAL -- Harita Para6/7/2012 01:43:45 6/7/2012 01:50:54 710-- 3 3 COAL -- Harita Para6/7/2012 01:44:49 6/7/2012 01:54:00 707-- 3 3 COAL -- Harita Para6/7/2012 02:00:14 6/7/2012 02:04:34 714-- 3 3 COAL -- Harita Para

6/7/2012 02:03:56 6/7/2012 02:07:21 706-- 3 3 COAL -- Harita Para6/7/2012 02:20:52 6/7/2012 02:27:07 703-- 3 3 COAL -- Harita Para6/7/2012 02:21:21 6/7/2012 02:28:43 701-- 3 3 COAL -- Harita Para6/7/2012 02:36:24 6/7/2012 02:40:06 708-- 3 3 COAL -- Harita Para6/7/2012 03:03:53 6/7/2012 03:12:11 704-- 3 3 COAL -- Harita Para6/7/2012 03:43:15 6/7/2012 03:47:21 713-- 3 3 COAL -- Harita Para6/7/2012 03:48:40 6/7/2012 03:53:57 714-- 3 3 COAL -- Harita Para6/7/2012 03:57:14 6/7/2012 04:01:05 710-- 3 3 COAL -- Harita Para

6/7/2012 07:38:00 6/7/2012 07:44:13 704-- 3 3 COAL -- Harita Para6/7/2012 07:40:34 6/7/2012 07:46:31 709-- 3 3 COAL -- Harita Para

Page 259: June Per Shift (Truckscale Port)

6/7/2012 07:49:53 6/7/2012 07:55:59 713-- 3 3 COAL -- Harita Para6/7/2012 07:51:55 6/7/2012 08:01:50 701-- 3 1 COAL -- Harita Para6/7/2012 07:54:40 6/7/2012 08:04:14 710-- 3 1 COAL -- Harita Para6/7/2012 07:58:37 6/7/2012 08:06:58 706-- 3 1 COAL -- Harita Para6/7/2012 00:35:54 6/7/2012 00:40:08 829 3 3 COAL -- MIL6/7/2012 00:55:07 6/7/2012 01:01:47 831 3 3 COAL -- MIL6/7/2012 01:11:01 6/7/2012 01:15:24 850 3 3 COAL -- MIL6/7/2012 01:25:14 6/7/2012 01:29:25 819 3 3 COAL -- MIL6/7/2012 01:44:19 6/7/2012 01:49:41 818 3 3 COAL -- MIL

6/7/2012 01:52:12 6/7/2012 01:59:15 839 3 3 COAL -- MIL6/7/2012 01:58:01 6/7/2012 02:02:18 833 3 3 COAL -- MIL6/7/2012 01:58:31 6/7/2012 02:02:56 815 3 3 COAL -- MIL

6/7/2012 02:13:00 6/7/2012 02:16:47 829 3 3 COAL -- MIL6/7/2012 02:15:13 6/7/2012 02:23:18 856 3 3 COAL -- MIL

6/7/2012 02:26:11 6/7/2012 02:30:28 851 3 3 COAL -- MIL

6/7/2012 02:42:17 6/7/2012 02:48:27 852 3 3 COAL -- MIL6/7/2012 02:51:10 6/7/2012 02:55:40 819 3 3 COAL -- MIL6/7/2012 02:52:36 6/7/2012 02:58:09 855 3 3 COAL -- MIL6/7/2012 03:02:29 6/7/2012 03:08:31 853 3 3 COAL -- MIL6/7/2012 04:19:29 6/7/2012 04:26:05 852 3 3 COAL -- MIL6/7/2012 07:23:54 6/7/2012 07:31:54 855 3 3 COAL -- MIL6/7/2012 07:35:08 6/7/2012 07:39:39 851 3 3 COAL -- MIL6/7/2012 07:35:32 6/7/2012 07:39:43 853 3 3 COAL -- MIL6/7/2012 07:37:15 6/7/2012 07:41:59 852 3 3 COAL -- MIL

6/7/2012 07:47:16 6/7/2012 07:51:16 836 3 3 COAL -- MIL6/7/2012 07:47:39 6/7/2012 07:52:55 856 3 3 COAL -- MIL6/7/2012 08:02:44 6/7/2012 08:08:37 708-- 1 1 COAL -- Harita Para6/7/2012 08:21:15 6/7/2012 08:25:16 714-- 1 1 COAL -- Harita Para6/7/2012 08:26:57 6/7/2012 08:32:07 702-- 1 1 COAL -- Harita Para6/7/2012 08:39:19 6/7/2012 08:42:36 703-- 1 1 COAL -- Harita Para6/7/2012 08:47:21 6/7/2012 08:51:00 707-- 1 1 COAL -- Harita Para6/7/2012 09:07:53 6/7/2012 09:11:50 704-- 1 1 COAL -- Harita Para6/7/2012 09:10:10 6/7/2012 09:16:51 709-- 1 1 COAL -- Harita Para6/7/2012 09:17:49 6/7/2012 09:25:09 712-- 1 1 COAL -- Harita Para6/7/2012 09:22:20 6/7/2012 09:40:12 713-- 1 1 COAL -- Harita Para6/7/2012 09:29:03 6/7/2012 09:42:15 710-- 1 1 COAL -- Harita Para6/7/2012 10:06:42 6/7/2012 10:10:39 706-- 1 1 COAL -- Harita Para6/7/2012 10:09:40 6/7/2012 10:14:25 701-- 1 1 COAL -- Harita Para6/7/2012 10:13:01 6/7/2012 10:17:58 702-- 1 1 COAL -- Harita Para6/7/2012 10:13:43 6/7/2012 10:19:53 714-- 1 1 COAL -- Harita Para6/7/2012 10:26:47 6/7/2012 10:30:52 707-- 1 1 COAL -- Harita Para6/7/2012 10:43:38 6/7/2012 10:47:16 704-- 1 1 COAL -- Harita Para6/7/2012 10:51:41 6/7/2012 10:55:46 709-- 1 1 COAL -- Harita Para6/7/2012 10:59:44 6/7/2012 11:03:40 713-- 1 1 COAL -- Harita Para6/7/2012 11:01:50 6/7/2012 11:05:57 712-- 1 1 COAL -- Harita Para6/7/2012 11:40:33 6/7/2012 11:46:50 706-- 1 1 COAL -- Harita Para6/7/2012 11:41:34 6/7/2012 11:45:04 701-- 1 1 COAL -- Harita Para6/7/2012 11:43:28 6/7/2012 11:48:11 702-- 1 1 COAL -- Harita Para6/7/2012 11:49:17 6/7/2012 11:53:06 714-- 1 1 COAL -- Harita Para

Page 260: June Per Shift (Truckscale Port)

6/7/2012 11:56:36 6/7/2012 12:00:03 707-- 1 1 COAL -- Harita Para6/7/2012 12:22:57 6/7/2012 12:27:55 709-- 1 1 COAL -- Harita Para6/7/2012 12:28:36 6/7/2012 12:35:33 704-- 1 1 COAL -- Harita Para6/7/2012 12:30:11 6/7/2012 12:35:38 712-- 1 1 COAL -- Harita Para6/7/2012 12:44:40 6/7/2012 12:48:49 713-- 1 1 COAL -- Harita Para6/7/2012 12:45:06 6/7/2012 12:50:08 703-- 1 1 COAL -- Harita Para6/7/2012 13:27:26 6/7/2012 13:32:40 706-- 1 1 COAL -- Harita Para6/7/2012 13:30:06 6/7/2012 13:35:25 714-- 1 1 COAL -- Harita Para6/7/2012 13:30:53 6/7/2012 13:37:02 702-- 1 1 COAL -- Harita Para6/7/2012 13:34:27 6/7/2012 13:38:59 707-- 1 1 COAL -- Harita Para6/7/2012 14:01:43 6/7/2012 14:05:47 701-- 1 1 COAL -- Harita Para6/7/2012 14:13:10 6/7/2012 14:17:52 712-- 1 1 COAL -- Harita Para6/7/2012 14:18:32 6/7/2012 14:22:55 713-- 1 1 COAL -- Harita Para6/7/2012 14:26:20 6/7/2012 14:30:39 709-- 1 1 COAL -- Harita Para6/7/2012 14:32:46 6/7/2012 14:37:26 703-- 1 1 COAL -- Harita Para6/7/2012 14:59:42 6/7/2012 15:03:53 714-- 1 1 COAL -- Harita Para6/7/2012 15:10:56 6/7/2012 15:16:36 706-- 1 1 COAL -- Harita Para6/7/2012 15:22:39 6/7/2012 15:38:36 707-- 1 1 COAL -- Harita Para6/7/2012 15:33:28 6/7/2012 15:46:31 701-- 1 1 COAL -- Harita Para6/7/2012 15:36:31 6/7/2012 15:47:35 702-- 1 1 COAL -- Harita Para

6/7/2012 15:44:51 6/7/2012 15:49:25 704-- 1 1 COAL -- Harita Para6/7/2012 15:53:17 6/7/2012 15:58:51 712-- 1 1 COAL -- Harita Para

6/7/2012 08:16:17 6/7/2012 08:20:28 819 1 1 COAL -- MIL

6/7/2012 08:17:51 6/7/2012 08:22:53 830 1 1 COAL -- MIL6/7/2012 08:25:58 6/7/2012 08:30:53 833 1 1 COAL -- MIL6/7/2012 08:29:12 6/7/2012 08:34:12 815 1 1 COAL -- MIL6/7/2012 08:39:51 6/7/2012 08:43:59 828 1 1 COAL -- MIL

6/7/2012 08:40:15 6/7/2012 08:44:18 850 1 1 COAL -- MIL6/7/2012 08:47:46 6/7/2012 08:51:32 868 1 1 COAL -- MIL6/7/2012 08:48:16 6/7/2012 08:56:02 818 1 1 COAL -- MIL6/7/2012 08:58:32 6/7/2012 09:06:54 831 1 1 COAL -- MIL6/7/2012 09:08:24 6/7/2012 09:15:42 855 1 1 COAL -- MIL6/7/2012 09:21:58 6/7/2012 09:26:05 851 1 1 COAL -- MIL6/7/2012 09:41:44 6/7/2012 09:45:38 853 1 1 COAL -- MIL6/7/2012 09:42:52 6/7/2012 09:47:29 852 1 1 COAL -- MIL6/7/2012 09:57:05 6/7/2012 10:02:04 836 1 1 COAL -- MIL6/7/2012 10:22:27 6/7/2012 10:25:52 850 1 1 COAL -- MIL6/7/2012 10:30:12 6/7/2012 10:35:19 856 1 1 COAL -- MIL6/7/2012 10:32:16 6/7/2012 10:36:53 838 1 1 COAL -- MIL6/7/2012 10:34:05 6/7/2012 10:38:44 810 1 1 COAL -- MIL6/7/2012 10:43:20 6/7/2012 10:50:17 819 1 1 COAL -- MIL

6/7/2012 10:52:06 6/7/2012 10:56:10 815 1 1 COAL -- MIL6/7/2012 11:15:22 6/7/2012 11:19:30 818 1 1 COAL -- MIL6/7/2012 11:21:47 6/7/2012 11:25:38 828 1 1 COAL -- MIL6/7/2012 11:27:56 6/7/2012 11:32:33 833 1 1 COAL -- MIL6/7/2012 11:31:44 6/7/2012 11:34:48 868 1 1 COAL -- MIL6/7/2012 11:36:40 6/7/2012 11:42:17 820 1 1 COAL -- MIL6/7/2012 11:57:22 6/7/2012 12:02:11 830 1 1 COAL -- MIL6/7/2012 11:57:46 6/7/2012 12:04:57 855 1 1 COAL -- MIL

Page 261: June Per Shift (Truckscale Port)

6/7/2012 12:17:45 6/7/2012 12:23:34 851 1 1 COAL -- MIL6/7/2012 12:22:37 6/7/2012 12:26:06 838 1 1 COAL -- MIL6/7/2012 12:29:52 6/7/2012 12:33:52 853 1 1 COAL -- MIL6/7/2012 12:38:39 6/7/2012 12:43:01 852 1 1 COAL -- MIL

6/7/2012 12:44:20 6/7/2012 12:48:16 819 1 1 COAL -- MIL6/7/2012 12:47:17 6/7/2012 12:53:26 856 1 1 COAL -- MIL6/7/2012 12:56:16 6/7/2012 13:00:17 815 1 1 COAL -- MIL6/7/2012 13:14:06 6/7/2012 13:18:40 828 1 1 COAL -- MIL6/7/2012 13:49:26 6/7/2012 13:54:20 833 1 1 COAL -- MIL6/7/2012 13:58:19 6/7/2012 14:03:27 836 1 1 COAL -- MIL6/7/2012 14:02:46 6/7/2012 14:07:05 820 1 1 COAL -- MIL6/7/2012 14:11:32 6/7/2012 14:16:53 812 1 1 COAL -- MIL6/7/2012 14:22:10 6/7/2012 14:27:49 830 1 1 COAL -- MIL

6/7/2012 14:27:06 6/7/2012 14:35:24 810 1 1 COAL -- MIL6/7/2012 14:28:42 6/7/2012 14:34:01 838 1 1 COAL -- MIL6/7/2012 14:34:36 6/7/2012 14:40:25 818 1 1 COAL -- MIL6/7/2012 14:36:26 6/7/2012 14:40:55 819 1 1 COAL -- MIL6/7/2012 14:49:41 6/7/2012 14:56:38 855 1 1 COAL -- MIL6/7/2012 14:51:06 6/7/2012 14:55:05 832 1 1 COAL -- MIL6/7/2012 14:53:31 6/7/2012 14:57:53 815 1 1 COAL -- MIL6/7/2012 15:00:54 6/7/2012 15:07:34 851 1 1 COAL -- MIL6/7/2012 15:04:51 6/7/2012 15:09:24 828 1 1 COAL -- MIL6/7/2012 15:10:31 6/7/2012 15:14:23 853 1 1 COAL -- MIL6/7/2012 15:17:24 6/7/2012 15:21:44 852 1 1 COAL -- MIL6/7/2012 15:21:04 6/7/2012 15:26:34 856 1 1 COAL -- MIL6/7/2012 15:42:31 6/7/2012 15:47:02 836 1 1 COAL -- MIL

6/7/2012 15:42:57 6/7/2012 15:48:20 850 1 1 COAL -- MIL6/7/2012 15:52:32 6/7/2012 15:56:28 812 1 1 COAL -- MIL6/7/2012 18:21:30 6/7/2012 18:24:55 704-- 2 2 COAL -- Harita Para6/7/2012 18:29:11 6/7/2012 18:33:23 701-- 2 2 COAL -- Harita Para6/7/2012 18:30:38 6/7/2012 18:36:29 703-- 2 2 COAL -- Harita Para6/7/2012 18:35:40 6/7/2012 18:40:57 713-- 2 2 COAL -- Harita Para6/7/2012 18:39:11 6/7/2012 18:42:37 709-- 2 2 COAL -- Harita Para6/7/2012 18:39:42 6/7/2012 18:49:41 712-- 2 2 COAL -- Harita Para6/7/2012 18:40:05 6/7/2012 18:47:28 710-- 2 2 COAL -- Harita Para6/7/2012 18:45:55 6/7/2012 18:50:07 706-- 2 2 COAL -- Harita Para6/7/2012 18:52:29 6/7/2012 18:57:21 707-- 2 2 COAL -- Harita Para6/7/2012 19:42:33 6/7/2012 19:50:27 702-- 2 2 COAL -- Harita Para6/7/2012 19:49:47 6/7/2012 19:53:19 704-- 2 2 COAL -- Harita Para6/7/2012 20:04:12 6/7/2012 20:09:00 701-- 2 2 COAL -- Harita Para6/7/2012 20:12:57 6/7/2012 20:17:04 703-- 2 2 COAL -- Harita Para

6/7/2012 20:13:50 6/7/2012 20:18:54 709-- 2 2 COAL -- Harita Para6/7/2012 20:25:56 6/7/2012 20:29:29 706-- 2 2 COAL -- Harita Para6/7/2012 20:40:09 6/7/2012 20:47:54 707-- 2 2 COAL -- Harita Para

6/7/2012 20:40:45 6/7/2012 20:48:43 710-- 2 2 COAL -- Harita Para6/7/2012 21:16:41 6/7/2012 21:20:47 702-- 2 2 COAL -- Harita Para6/7/2012 21:17:11 6/7/2012 21:22:53 714-- 2 2 COAL -- Harita Para6/7/2012 21:21:23 6/7/2012 21:25:30 704-- 2 2 COAL -- Harita Para6/7/2012 21:35:12 6/7/2012 21:42:36 701-- 2 2 COAL -- Harita Para

Page 262: June Per Shift (Truckscale Port)

6/7/2012 21:41:27 6/7/2012 21:48:08 709-- 2 2 COAL -- Harita Para6/7/2012 21:53:20 6/7/2012 22:00:47 703-- 2 2 COAL -- Harita Para6/7/2012 21:53:44 6/7/2012 22:02:14 706-- 2 2 COAL -- Harita Para6/7/2012 22:16:59 6/7/2012 22:21:31 708-- 2 2 COAL -- Harita Para6/7/2012 22:27:59 6/7/2012 22:33:14 707-- 2 2 COAL -- Harita Para6/7/2012 22:31:54 6/7/2012 22:37:05 710-- 2 2 COAL -- Harita Para6/7/2012 22:40:11 6/7/2012 22:44:42 712-- 2 2 COAL -- Harita Para6/7/2012 22:49:07 6/7/2012 22:54:35 702-- 2 2 COAL -- Harita Para6/7/2012 22:52:56 6/7/2012 22:58:30 714-- 2 2 COAL -- Harita Para6/7/2012 22:59:31 6/7/2012 23:03:59 704-- 2 2 COAL -- Harita Para6/7/2012 23:32:48 6/7/2012 23:38:33 706-- 2 2 COAL -- Harita Para6/7/2012 23:39:49 6/7/2012 23:46:08 701-- 2 2 COAL -- Harita Para

6/7/2012 23:44:18 6/7/2012 23:49:47 703-- 2 2 COAL -- Harita Para6/7/2012 23:47:17 6/7/2012 23:52:30 709-- 2 2 COAL -- Harita Para6/7/2012 16:02:44 6/7/2012 16:06:45 830 2 2 COAL -- MIL6/7/2012 16:04:32 6/7/2012 16:08:13 810 2 2 COAL -- MIL6/7/2012 16:17:48 6/7/2012 16:21:36 838 2 2 COAL -- MIL6/7/2012 19:01:50 6/7/2012 19:05:43 818 2 2 COAL -- MIL6/7/2012 19:06:42 6/7/2012 19:13:28 856 2 2 COAL -- MIL6/7/2012 19:07:47 6/7/2012 19:12:30 819 2 2 COAL -- MIL

6/7/2012 19:09:41 6/7/2012 19:15:15 851 2 2 COAL -- MIL6/7/2012 19:10:08 6/7/2012 19:21:36 855 2 2 COAL -- MIL6/7/2012 19:10:27 6/7/2012 19:21:38 852 2 2 COAL -- MIL6/7/2012 19:18:09 6/7/2012 19:22:51 830 2 2 COAL -- MIL6/7/2012 19:23:36 6/7/2012 19:27:43 850 2 2 COAL -- MIL6/7/2012 19:42:08 6/7/2012 19:48:58 853 2 2 COAL -- MIL6/7/2012 20:13:28 6/7/2012 20:17:46 812 2 2 COAL -- MIL6/7/2012 20:41:12 6/7/2012 20:45:30 818 2 2 COAL -- MIL6/7/2012 20:44:31 6/7/2012 20:49:16 820 2 2 COAL -- MIL6/7/2012 20:46:37 6/7/2012 20:51:28 832 2 2 COAL -- MIL6/7/2012 20:47:03 6/7/2012 20:53:47 819 2 2 COAL -- MIL6/7/2012 20:52:22 6/7/2012 20:56:27 868 2 2 COAL -- MIL6/7/2012 21:15:07 6/7/2012 21:18:38 838 2 2 COAL -- MIL6/7/2012 21:19:24 6/7/2012 21:23:38 852 2 2 COAL -- MIL6/7/2012 21:27:58 6/7/2012 21:32:09 837 2 2 COAL -- MIL6/7/2012 21:34:36 6/7/2012 21:38:53 851 2 2 COAL -- MIL6/7/2012 21:37:19 6/7/2012 21:43:57 850 2 2 COAL -- MIL6/7/2012 21:41:08 6/7/2012 21:46:43 855 2 2 COAL -- MIL6/7/2012 21:41:49 6/7/2012 21:45:16 815 2 2 COAL -- MIL6/7/2012 21:50:08 6/7/2012 21:54:37 812 2 2 COAL -- MIL6/7/2012 21:53:00 6/7/2012 21:58:31 853 2 2 COAL -- MIL6/7/2012 22:20:19 6/7/2012 22:23:57 818 2 2 COAL -- MIL6/7/2012 22:32:24 6/7/2012 22:37:25 820 2 2 COAL -- MIL

6/7/2012 22:36:15 6/7/2012 22:40:59 819 2 2 COAL -- MIL6/7/2012 22:38:11 6/7/2012 22:42:22 832 2 2 COAL -- MIL6/7/2012 22:47:31 6/7/2012 22:51:31 856 2 2 COAL -- MIL6/7/2012 22:50:14 6/7/2012 22:54:53 852 2 2 COAL -- MIL6/7/2012 22:52:33 6/7/2012 22:56:39 868 2 2 COAL -- MIL

6/7/2012 23:06:10 6/7/2012 23:09:56 838 2 2 COAL -- MIL

Page 263: June Per Shift (Truckscale Port)

6/7/2012 23:11:32 6/7/2012 23:17:34 855 2 2 COAL -- MIL6/7/2012 23:21:28 6/7/2012 23:26:27 810 2 2 COAL -- MIL6/7/2012 23:25:26 6/7/2012 23:29:07 837 2 2 COAL -- MIL6/7/2012 23:32:30 6/7/2012 23:37:26 851 2 2 COAL -- MIL6/7/2012 23:39:18 6/7/2012 23:43:21 830 2 2 COAL -- MIL6/7/2012 23:48:22 6/7/2012 23:55:47 853 2 2 COAL -- MIL6/7/2012 23:50:54 6/7/2012 23:55:28 812 2 2 COAL -- MIL6/8/2012 00:19:11 6/8/2012 00:24:12 712-- 3 3 COAL -- Harita Para6/8/2012 00:25:07 6/8/2012 00:33:50 707-- 3 3 COAL -- Harita Para

6/8/2012 00:58:40 6/8/2012 01:02:19 704-- 3 3 COAL -- Harita Para6/8/2012 01:06:12 6/8/2012 01:10:58 702-- 3 3 COAL -- Harita Para6/8/2012 01:08:47 6/8/2012 01:12:48 714-- 3 3 COAL -- Harita Para6/8/2012 01:46:23 6/8/2012 01:50:26 710-- 3 3 COAL -- Harita Para6/8/2012 01:49:34 6/8/2012 01:53:13 706-- 3 3 COAL -- Harita Para6/8/2012 01:56:33 6/8/2012 02:02:24 701-- 3 3 COAL -- Harita Para6/8/2012 02:13:55 6/8/2012 02:19:37 709-- 3 3 COAL -- Harita Para6/8/2012 02:17:27 6/8/2012 02:19:40 703-- 3 3 COAL -- Harita Para6/8/2012 02:22:41 6/8/2012 02:27:30 707-- 3 3 COAL -- Harita Para

6/8/2012 02:41:22 6/8/2012 02:55:42 702-- 3 3 COAL -- Harita Para6/8/2012 03:22:22 6/8/2012 03:26:23 710-- 3 3 COAL -- Harita Para6/8/2012 06:49:07 6/8/2012 06:52:44 707-- 3 3 COAL -- Harita Para6/8/2012 07:16:55 6/8/2012 07:20:43 703-- 3 3 COAL -- Harita Para6/8/2012 07:18:43 6/8/2012 07:23:15 704-- 3 3 COAL -- Harita Para6/8/2012 07:20:06 6/8/2012 07:25:27 709-- 3 3 COAL -- Harita Para6/8/2012 07:21:18 6/8/2012 07:28:26 710-- 3 3 COAL -- Harita Para6/8/2012 07:30:42 6/8/2012 07:34:18 702-- 3 3 COAL -- Harita Para6/8/2012 07:32:19 6/8/2012 07:38:07 714-- 3 3 COAL -- Harita Para6/8/2012 07:36:26 6/8/2012 07:41:52 712-- 3 3 COAL -- Harita Para6/8/2012 07:51:40 6/8/2012 07:56:10 713-- 3 3 COAL -- Harita Para6/8/2012 00:23:10 6/8/2012 00:27:53 852 3 3 COAL -- MIL6/8/2012 00:23:28 6/8/2012 00:30:59 856 3 3 COAL -- MIL6/8/2012 00:25:34 6/8/2012 00:29:55 850 3 3 COAL -- MIL6/8/2012 00:51:25 6/8/2012 00:56:27 832 3 3 COAL -- MIL6/8/2012 00:55:29 6/8/2012 01:00:34 820 3 3 COAL -- MIL6/8/2012 01:03:17 6/8/2012 01:09:23 855 3 3 COAL -- MIL

6/8/2012 01:05:23 6/8/2012 01:09:42 819 3 3 COAL -- MIL6/8/2012 01:20:19 6/8/2012 01:25:26 810 3 3 COAL -- MIL6/8/2012 01:22:28 6/8/2012 01:28:35 851 3 3 COAL -- MIL6/8/2012 01:45:10 6/8/2012 01:48:52 837 3 3 COAL -- MIL6/8/2012 01:55:49 6/8/2012 02:00:07 818 3 3 COAL -- MIL6/8/2012 02:00:55 6/8/2012 02:07:10 812 3 3 COAL -- MIL6/8/2012 02:01:12 6/8/2012 02:06:00 852 3 3 COAL -- MIL6/8/2012 02:01:30 6/8/2012 02:06:04 856 3 3 COAL -- MIL6/8/2012 02:22:56 6/8/2012 02:26:53 830 3 3 COAL -- MIL6/8/2012 02:39:36 6/8/2012 02:46:07 820 3 3 COAL -- MIL6/8/2012 02:40:44 6/8/2012 02:46:46 855 3 3 COAL -- MIL6/8/2012 02:55:00 6/8/2012 03:00:19 851 3 3 COAL -- MIL6/8/2012 03:19:06 6/8/2012 03:24:18 810 3 3 COAL -- MIL6/8/2012 03:36:07 6/8/2012 03:41:34 852 3 3 COAL -- MIL6/8/2012 03:37:49 6/8/2012 03:43:51 850 3 3 COAL -- MIL

Page 264: June Per Shift (Truckscale Port)

6/8/2012 04:02:50 6/8/2012 04:06:49 868 3 3 COAL -- MIL6/8/2012 04:03:18 6/8/2012 04:07:14 837 3 3 COAL -- MIL6/8/2012 04:03:46 6/8/2012 04:09:04 856 3 3 COAL -- MIL6/8/2012 07:11:28 6/8/2012 07:19:25 855 3 3 COAL -- MIL6/8/2012 07:17:16 6/8/2012 07:22:38 852 3 3 COAL -- MIL6/8/2012 07:17:39 6/8/2012 07:21:54 820 3 3 COAL -- MIL6/8/2012 07:18:00 6/8/2012 07:23:51 850 3 3 COAL -- MIL6/8/2012 07:24:51 6/8/2012 07:30:02 812 3 3 COAL -- MIL6/8/2012 07:29:23 6/8/2012 07:35:52 856 3 3 COAL -- MIL6/8/2012 07:49:17 6/8/2012 07:53:07 819 3 3 COAL -- MIL6/8/2012 07:50:03 6/8/2012 07:55:51 831 3 3 COAL -- MIL

6/8/2012 08:09:28 6/8/2012 08:14:41 706-- 1 1 COAL -- Harita Par6/8/2012 08:12:51 6/8/2012 08:16:30 707-- 1 1 COAL -- Harita Par6/8/2012 08:38:21 6/8/2012 08:45:21 701-- 1 1 COAL -- Harita Par

6/8/2012 08:42:38 6/8/2012 08:47:55 703-- 1 1 COAL -- Harita Par6/8/2012 08:47:06 6/8/2012 08:55:24 704-- 1 1 COAL -- Harita Par6/8/2012 08:51:14 6/8/2012 08:57:35 709-- 1 1 COAL -- Harita Par6/8/2012 08:56:12 6/8/2012 09:00:20 710-- 1 1 COAL -- Harita Par6/8/2012 08:59:42 6/8/2012 09:04:06 702-- 1 1 COAL -- Harita Par6/8/2012 09:04:52 6/8/2012 09:12:48 714-- 1 1 COAL -- Harita Par6/8/2012 09:17:19 6/8/2012 09:21:12 713-- 1 1 COAL -- Harita Par6/8/2012 09:37:03 6/8/2012 09:40:47 707-- 1 1 COAL -- Harita Par6/8/2012 09:42:49 6/8/2012 09:46:50 706-- 1 1 COAL -- Harita Par6/8/2012 10:08:49 6/8/2012 10:12:40 701-- 1 1 COAL -- Harita Par6/8/2012 10:13:49 6/8/2012 10:17:48 703-- 1 1 COAL -- Harita Par6/8/2012 10:16:03 6/8/2012 10:20:36 704-- 1 1 COAL -- Harita Par6/8/2012 10:21:29 6/8/2012 10:25:13 709-- 1 1 COAL -- Harita Par6/8/2012 10:36:56 6/8/2012 10:41:05 714-- 1 1 COAL -- Harita Par6/8/2012 10:39:03 6/8/2012 10:42:26 702-- 1 1 COAL -- Harita Par6/8/2012 10:44:15 6/8/2012 10:47:24 710-- 1 1 COAL -- Harita Par6/8/2012 10:51:28 6/8/2012 10:55:42 713-- 1 1 COAL -- Harita Par6/8/2012 11:27:32 6/8/2012 11:31:11 701-- 1 1 COAL -- Harita Par6/8/2012 11:52:37 6/8/2012 11:56:18 714-- 1 1 COAL -- Harita Par6/8/2012 13:14:02 6/8/2012 13:17:27 710-- 1 1 COAL -- Harita Par6/8/2012 13:15:21 6/8/2012 13:18:53 708-- 1 1 COAL -- Harita Par6/8/2012 13:29:36 6/8/2012 13:33:39 703-- 1 1 COAL -- Harita Par6/8/2012 13:36:14 6/8/2012 13:40:01 709-- 1 1 COAL -- Harita Par6/8/2012 13:37:34 6/8/2012 13:42:26 702-- 1 1 COAL -- Harita Par6/8/2012 13:59:23 6/8/2012 14:03:28 713-- 1 1 COAL -- Harita Par6/8/2012 14:17:37 6/8/2012 14:21:36 714-- 1 1 COAL -- Harita Par6/8/2012 14:19:35 6/8/2012 14:22:57 713-- 1 1 COAL -- Harita Par6/8/2012 14:46:35 6/8/2012 14:49:57 710-- 1 1 COAL -- Harita Par6/8/2012 14:57:20 6/8/2012 15:01:07 702-- 1 1 COAL -- Harita Par6/8/2012 15:02:01 6/8/2012 15:05:39 709-- 1 1 COAL -- Harita Par

Page 265: June Per Shift (Truckscale Port)

6/8/2012 15:11:49 6/8/2012 15:16:38 703-- 1 1 COAL -- Harita Par

6/8/2012 15:20:53 6/8/2012 15:25:31 713-- 1 1 COAL -- Harita Par6/8/2012 08:23:58 6/8/2012 08:28:10 830 1 1 COAL -- MIL6/8/2012 08:30:51 6/8/2012 08:34:36 810 1 1 COAL -- MIL6/8/2012 08:31:15 6/8/2012 08:35:43 868 1 1 COAL -- MIL6/8/2012 08:32:40 6/8/2012 08:36:03 837 1 1 COAL -- MIL6/8/2012 08:37:53 6/8/2012 08:41:59 852 1 1 COAL -- MIL6/8/2012 08:46:12 6/8/2012 08:50:31 836 1 1 COAL -- MIL6/8/2012 08:46:44 6/8/2012 08:54:57 855 1 1 COAL -- MIL6/8/2012 09:01:05 6/8/2012 09:05:38 820 1 1 COAL -- MIL6/8/2012 09:03:23 6/8/2012 09:08:42 856 1 1 COAL -- MIL6/8/2012 09:10:45 6/8/2012 09:15:21 817 1 1 COAL -- MIL6/8/2012 09:11:12 6/8/2012 09:15:00 809 1 1 COAL -- MIL6/8/2012 09:11:59 6/8/2012 09:16:46 850 1 1 COAL -- MIL6/8/2012 09:24:22 6/8/2012 09:30:03 851 1 1 COAL -- MIL6/8/2012 09:25:14 6/8/2012 09:29:44 832 1 1 COAL -- MIL6/8/2012 09:26:17 6/8/2012 09:30:23 812 1 1 COAL -- MIL6/8/2012 09:33:41 6/8/2012 09:41:05 819 1 1 COAL -- MIL6/8/2012 09:57:18 6/8/2012 10:02:05 831 1 1 COAL -- MIL6/8/2012 10:02:47 6/8/2012 10:07:00 830 1 1 COAL -- MIL6/8/2012 10:03:29 6/8/2012 10:06:30 868 1 1 COAL -- MIL6/8/2012 10:14:51 6/8/2012 10:18:55 810 1 1 COAL -- MIL6/8/2012 10:15:31 6/8/2012 10:19:22 837 1 1 COAL -- MIL6/8/2012 10:16:31 6/8/2012 10:22:26 852 1 1 COAL -- MIL6/8/2012 10:25:55 6/8/2012 10:29:32 836 1 1 COAL -- MIL6/8/2012 10:26:24 6/8/2012 10:39:42 855 1 1 COAL -- MIL6/8/2012 10:26:49 6/8/2012 10:31:29 820 1 1 COAL -- MIL6/8/2012 10:33:42 6/8/2012 10:40:22 856 1 1 COAL -- MIL6/8/2012 10:35:30 6/8/2012 10:40:02 850 1 1 COAL -- MIL6/8/2012 10:50:55 6/8/2012 10:54:43 832 1 1 COAL -- MIL6/8/2012 11:01:42 6/8/2012 11:05:41 812 1 1 COAL -- MIL6/8/2012 11:14:32 6/8/2012 11:20:39 809 1 1 COAL -- MIL6/8/2012 11:15:02 6/8/2012 11:20:58 851 1 1 COAL -- MIL6/8/2012 11:15:20 6/8/2012 11:21:27 819 1 1 COAL -- MIL6/8/2012 11:24:03 6/8/2012 11:28:25 818 1 1 COAL -- MIL6/8/2012 11:25:30 6/8/2012 11:28:59 868 1 1 COAL -- MIL6/8/2012 11:41:54 6/8/2012 11:46:24 852 1 1 COAL -- MIL6/8/2012 11:56:55 6/8/2012 12:01:27 853 1 1 COAL -- MIL6/8/2012 12:00:59 6/8/2012 12:10:24 856 1 1 COAL -- MIL6/8/2012 12:02:56 6/8/2012 12:07:09 830 1 1 COAL -- MIL6/8/2012 12:13:49 6/8/2012 12:18:30 831 1 1 COAL -- MIL6/8/2012 12:16:22 6/8/2012 12:24:06 855 1 1 COAL -- MIL

Page 266: June Per Shift (Truckscale Port)

6/8/2012 12:23:18 6/8/2012 12:28:44 836 1 1 COAL -- MIL6/8/2012 12:27:43 6/8/2012 12:31:57 810 1 1 COAL -- MIL6/8/2012 12:32:49 6/8/2012 12:36:28 820 1 1 COAL -- MIL6/8/2012 12:45:16 6/8/2012 12:48:17 868 1 1 COAL -- MIL6/8/2012 12:51:14 6/8/2012 12:55:35 828 1 1 COAL -- MIL6/8/2012 12:54:50 6/8/2012 13:00:03 809 1 1 COAL -- MIL6/8/2012 13:02:09 6/8/2012 13:05:49 850 1 1 COAL -- MIL6/8/2012 13:32:55 6/8/2012 13:38:19 819 1 1 COAL -- MIL6/8/2012 13:37:09 6/8/2012 13:41:38 853 1 1 COAL -- MIL6/8/2012 13:41:04 6/8/2012 13:45:44 852 1 1 COAL -- MIL

6/8/2012 13:54:16 6/8/2012 14:00:37 855 1 1 COAL -- MIL6/8/2012 13:56:47 6/8/2012 14:01:22 830 1 1 COAL -- MIL6/8/2012 14:10:01 6/8/2012 14:14:24 836 1 1 COAL -- MIL6/8/2012 14:10:29 6/8/2012 14:21:00 856 1 1 COAL -- MIL6/8/2012 14:13:42 6/8/2012 14:18:22 812 1 1 COAL -- MIL6/8/2012 14:27:35 6/8/2012 14:31:30 820 1 1 COAL -- MIL6/8/2012 14:34:50 6/8/2012 14:40:19 851 1 1 COAL -- MIL6/8/2012 14:37:08 6/8/2012 14:40:25 810 1 1 COAL -- MIL6/8/2012 14:52:29 6/8/2012 14:55:21 868 1 1 COAL -- MIL6/8/2012 14:59:15 6/8/2012 15:03:31 828 1 1 COAL -- MIL6/8/2012 15:00:23 6/8/2012 15:09:23 809 1 1 COAL -- MIL6/8/2012 15:02:24 6/8/2012 15:08:42 850 1 1 COAL -- MIL6/8/2012 15:15:58 6/8/2012 15:21:26 853 1 1 COAL -- MIL6/8/2012 15:24:28 6/8/2012 15:29:05 832 1 1 COAL -- MIL6/8/2012 15:46:36 6/8/2012 16:04:05 856 1 2 COAL -- MIL6/8/2012 15:58:24 6/8/2012 16:03:01 831 1 2 COAL -- MIL6/8/2012 18:18:36 6/8/2012 18:22:39 709-- 2 2 COAL -- Harita Par6/8/2012 18:27:44 6/8/2012 18:31:08 704-- 2 2 COAL -- Harita Par6/8/2012 18:32:01 6/8/2012 18:36:43 703-- 2 2 COAL -- Harita Par6/8/2012 18:39:30 6/8/2012 18:47:10 713-- 2 2 COAL -- Harita Par6/8/2012 18:44:44 6/8/2012 18:48:44 706-- 2 2 COAL -- Harita Par6/8/2012 18:50:18 6/8/2012 18:54:25 712-- 2 2 COAL -- Harita Par6/8/2012 18:50:40 6/8/2012 18:56:34 701-- 2 2 COAL -- Harita Par6/8/2012 18:57:26 6/8/2012 19:01:11 710-- 2 2 COAL -- Harita Par6/8/2012 19:03:30 6/8/2012 19:07:47 714-- 2 2 COAL -- Harita Par6/8/2012 19:34:43 6/8/2012 19:40:15 708-- 2 2 COAL -- Harita Par6/8/2012 19:47:56 6/8/2012 19:53:29 709-- 2 2 COAL -- Harita Par6/8/2012 19:51:08 6/8/2012 20:00:09 705-- 2 2 COAL -- Harita Par6/8/2012 19:57:51 6/8/2012 20:02:47 704-- 2 2 COAL -- Harita Par6/8/2012 20:07:16 6/8/2012 20:12:22 703-- 2 2 COAL -- Harita Par6/8/2012 20:11:33 6/8/2012 20:12:25 706-- 2 2 COAL -- Harita Par6/8/2012 20:25:22 6/8/2012 20:30:34 701-- 2 2 COAL -- Harita Par

Page 267: June Per Shift (Truckscale Port)

6/8/2012 20:29:23 6/8/2012 20:33:52 707-- 2 2 COAL -- Harita Par6/8/2012 20:29:44 6/8/2012 20:33:55 712-- 2 2 COAL -- Harita Par6/8/2012 20:44:05 6/8/2012 20:48:47 710-- 2 2 COAL -- Harita Par6/8/2012 20:46:23 6/8/2012 20:51:14 714-- 2 2 COAL -- Harita Par6/8/2012 20:52:42 6/8/2012 20:56:42 713-- 2 2 COAL -- Harita Par6/8/2012 21:13:47 6/8/2012 21:18:34 708-- 2 2 COAL -- Harita Par6/8/2012 21:28:40 6/8/2012 21:32:50 709-- 2 2 COAL -- Harita Par6/8/2012 21:33:38 6/8/2012 21:37:16 704-- 2 2 COAL -- Harita Par6/8/2012 21:44:12 6/8/2012 21:48:01 706-- 2 2 COAL -- Harita Par6/8/2012 21:53:00 6/8/2012 21:57:43 703-- 2 2 COAL -- Harita Par6/8/2012 22:02:09 6/8/2012 22:06:01 701-- 2 2 COAL -- Harita Par6/8/2012 22:11:10 6/8/2012 22:16:30 707-- 2 2 COAL -- Harita Par6/8/2012 22:12:01 6/8/2012 22:18:18 712-- 2 2 COAL -- Harita Par6/8/2012 22:33:21 6/8/2012 22:37:35 714-- 2 2 COAL -- Harita Par6/8/2012 22:33:42 6/8/2012 22:37:37 713-- 2 2 COAL -- Harita Par6/8/2012 22:34:03 6/8/2012 22:39:31 710-- 2 2 COAL -- Harita Par6/8/2012 22:53:33 6/8/2012 22:58:28 708-- 2 2 COAL -- Harita Par6/8/2012 22:55:28 6/8/2012 22:58:31 709-- 2 2 COAL -- Harita Par6/8/2012 23:01:05 6/8/2012 23:04:38 704-- 2 2 COAL -- Harita Par6/8/2012 23:18:20 6/8/2012 23:22:24 706-- 2 2 COAL -- Harita Par6/8/2012 23:27:25 6/8/2012 23:31:51 703-- 2 2 COAL -- Harita Par6/8/2012 23:39:49 6/8/2012 23:43:29 705-- 2 2 COAL -- Harita Par6/8/2012 23:47:13 6/8/2012 23:51:33 701-- 2 2 COAL -- Harita Par6/8/2012 16:31:50 6/8/2012 16:34:57 868 2 2 COAL -- MIL6/8/2012 18:35:08 6/8/2012 18:41:18 855 2 2 COAL -- MIL6/8/2012 19:14:44 6/8/2012 19:18:22 830 2 2 COAL -- MIL6/8/2012 19:22:24 6/8/2012 19:27:07 850 2 2 COAL -- MIL6/8/2012 19:25:30 6/8/2012 19:30:38 856 2 2 COAL -- MIL6/8/2012 19:27:50 6/8/2012 19:32:51 851 2 2 COAL -- MIL6/8/2012 19:28:30 6/8/2012 19:36:04 812 2 2 COAL -- MIL6/8/2012 19:35:16 6/8/2012 19:40:45 852 2 2 COAL -- MIL6/8/2012 19:38:49 6/8/2012 19:43:03 815 2 2 COAL -- MIL6/8/2012 19:39:29 6/8/2012 19:44:43 818 2 2 COAL -- MIL6/8/2012 19:47:06 6/8/2012 19:53:53 828 2 2 COAL -- MIL6/8/2012 19:47:39 6/8/2012 19:59:14 853 2 2 COAL -- MIL6/8/2012 19:52:34 6/8/2012 19:59:18 810 2 2 COAL -- MIL6/8/2012 19:55:52 6/8/2012 20:42:27 809 2 2 COAL -- MIL6/8/2012 19:57:01 6/8/2012 20:04:06 832 2 2 COAL -- MIL6/8/2012 19:58:26 6/8/2012 20:05:45 831 2 2 COAL -- MIL6/8/2012 20:06:39 6/8/2012 20:10:52 837 2 2 COAL -- MIL6/8/2012 20:13:51 6/8/2012 20:19:53 829 2 2 COAL -- MIL6/8/2012 20:39:11 6/8/2012 20:42:30 868 2 2 COAL -- MIL6/8/2012 20:45:33 6/8/2012 20:51:33 855 2 2 COAL -- MIL

Page 268: June Per Shift (Truckscale Port)

6/8/2012 20:52:19 6/8/2012 20:57:03 817 2 2 COAL -- MIL6/8/2012 21:11:19 6/8/2012 21:17:10 852 2 2 COAL -- MIL6/8/2012 21:14:29 6/8/2012 21:20:01 812 2 2 COAL -- MIL6/8/2012 21:23:03 6/8/2012 21:29:22 851 2 2 COAL -- MIL6/8/2012 21:37:56 6/8/2012 21:45:13 856 2 2 COAL -- MIL6/8/2012 21:44:40 6/8/2012 21:48:36 815 2 2 COAL -- MIL6/8/2012 21:49:18 6/8/2012 21:54:49 853 2 2 COAL -- MIL6/8/2012 21:53:34 6/8/2012 21:58:08 818 2 2 COAL -- MIL6/8/2012 22:10:25 6/8/2012 22:13:38 868 2 2 COAL -- MIL6/8/2012 22:14:26 6/8/2012 22:18:44 850 2 2 COAL -- MIL6/8/2012 22:25:55 6/8/2012 22:29:35 837 2 2 COAL -- MIL6/8/2012 22:26:25 6/8/2012 22:31:21 809 2 2 COAL -- MIL6/8/2012 22:30:42 6/8/2012 22:34:46 832 2 2 COAL -- MIL6/8/2012 22:36:29 6/8/2012 22:42:51 855 2 2 COAL -- MIL6/8/2012 22:38:34 6/8/2012 22:44:49 828 2 2 COAL -- MIL6/8/2012 22:54:06 6/8/2012 22:59:42 810 2 2 COAL -- MIL6/8/2012 22:56:04 6/8/2012 23:00:27 829 2 2 COAL -- MIL6/8/2012 23:06:20 6/8/2012 23:11:41 852 2 2 COAL -- MIL6/8/2012 23:12:32 6/8/2012 23:25:16 815 2 2 COAL -- MIL6/8/2012 23:13:29 6/8/2012 23:19:07 831 2 2 COAL -- MIL6/8/2012 23:20:05 6/8/2012 23:25:11 812 2 2 COAL -- MIL6/8/2012 23:20:54 6/8/2012 23:25:52 818 2 2 COAL -- MIL6/8/2012 23:29:01 6/8/2012 23:34:43 851 2 2 COAL -- MIL6/8/2012 23:39:32 6/8/2012 23:44:48 856 2 2 COAL -- MIL6/8/2012 23:52:18 6/8/2012 23:58:25 853 2 2 COAL -- MIL6/9/2012 00:09:50 6/9/2012 00:14:00 713-- 3 3 COAL -- Harita Par6/9/2012 00:26:21 6/9/2012 00:30:47 707-- 3 3 COAL -- Harita Par6/9/2012 00:29:35 6/9/2012 00:34:40 709-- 3 3 COAL -- Harita Par6/9/2012 00:40:39 6/9/2012 00:45:02 706-- 3 3 COAL -- Harita Par6/9/2012 00:52:24 6/9/2012 01:01:42 712-- 3 3 COAL -- Harita Par

6/9/2012 00:58:27 6/9/2012 01:02:22 704-- 3 3 COAL -- Harita Par6/9/2012 01:09:34 6/9/2012 01:14:51 714-- 3 3 COAL -- Harita Par6/9/2012 01:09:57 6/9/2012 01:17:13 710-- 3 3 COAL -- Harita Par6/9/2012 01:31:00 6/9/2012 01:38:00 708-- 3 3 COAL -- Harita Par6/9/2012 01:49:58 6/9/2012 01:54:41 703-- 3 3 COAL -- Harita Par6/9/2012 02:29:41 6/9/2012 02:35:30 709-- 3 3 COAL -- Harita Par6/9/2012 02:34:39 6/9/2012 02:39:53 701-- 3 3 COAL -- Harita Par6/9/2012 02:40:44 6/9/2012 02:45:35 707-- 3 3 COAL -- Harita Par6/9/2012 02:43:32 6/9/2012 02:47:56 713-- 3 3 COAL -- Harita Par6/9/2012 06:54:36 6/9/2012 06:58:25 707-- 3 3 COAL -- Harita Par6/9/2012 07:13:47 6/9/2012 07:17:22 708-- 3 3 COAL -- Harita Par6/9/2012 07:37:41 6/9/2012 07:42:17 706-- 3 3 COAL -- Harita Par

Page 269: June Per Shift (Truckscale Port)

6/9/2012 07:38:15 6/9/2012 07:45:09 710-- 3 3 COAL -- Harita Par6/9/2012 07:38:57 6/9/2012 07:47:15 714-- 3 3 COAL -- Harita Par6/9/2012 07:40:37 6/9/2012 07:49:24 704-- 3 3 COAL -- Harita Par6/9/2012 07:41:09 6/9/2012 07:51:39 709-- 3 3 COAL -- Harita Par6/9/2012 07:56:45 6/9/2012 08:02:03 705-- 3 1 COAL -- Harita Par6/9/2012 00:00:38 6/9/2012 00:05:06 850 3 3 COAL -- MIL6/9/2012 00:18:53 6/9/2012 00:23:21 832 3 3 COAL -- MIL6/9/2012 00:20:39 6/9/2012 00:27:50 837 3 3 COAL -- MIL6/9/2012 00:26:39 6/9/2012 00:30:29 868 3 3 COAL -- MIL6/9/2012 00:37:10 6/9/2012 00:42:57 855 3 3 COAL -- MIL6/9/2012 00:44:29 6/9/2012 00:53:56 852 3 3 COAL -- MIL6/9/2012 00:55:36 6/9/2012 01:00:28 828 3 3 COAL -- MIL6/9/2012 01:13:58 6/9/2012 01:19:57 810 3 3 COAL -- MIL6/9/2012 01:28:39 6/9/2012 01:33:24 831 3 3 COAL -- MIL6/9/2012 01:36:22 6/9/2012 01:42:33 812 3 3 COAL -- MIL6/9/2012 01:36:59 6/9/2012 01:42:50 851 3 3 COAL -- MIL6/9/2012 01:39:59 6/9/2012 01:44:18 818 3 3 COAL -- MIL6/9/2012 01:40:35 6/9/2012 01:44:53 815 3 3 COAL -- MIL6/9/2012 01:46:23 6/9/2012 01:51:25 856 3 3 COAL -- MIL6/9/2012 02:12:28 6/9/2012 02:16:27 837 3 3 COAL -- MIL6/9/2012 02:17:16 6/9/2012 02:21:30 868 3 3 COAL -- MIL6/9/2012 02:31:22 6/9/2012 02:37:49 855 3 3 COAL -- MIL6/9/2012 02:33:02 6/9/2012 02:38:06 832 3 3 COAL -- MIL6/9/2012 02:33:28 6/9/2012 02:38:58 850 3 3 COAL -- MIL6/9/2012 02:33:49 6/9/2012 02:42:38 853 3 3 COAL -- MIL6/9/2012 02:37:07 6/9/2012 02:55:41 839 3 3 COAL -- MIL6/9/2012 02:58:46 6/9/2012 03:05:00 810 3 3 COAL -- MIL6/9/2012 03:25:15 6/9/2012 03:30:01 831 3 3 COAL -- MIL6/9/2012 04:53:52 6/9/2012 04:58:24 828 3 3 COAL -- MIL6/9/2012 07:22:34 6/9/2012 07:28:04 851 3 3 COAL -- MIL6/9/2012 07:25:12 6/9/2012 07:30:20 818 3 3 COAL -- MIL6/9/2012 07:25:34 6/9/2012 07:34:08 856 3 3 COAL -- MIL6/9/2012 07:28:42 6/9/2012 07:34:26 853 3 3 COAL -- MIL6/9/2012 07:29:42 6/9/2012 07:41:41 855 3 3 COAL -- MIL6/9/2012 07:32:31 6/9/2012 07:41:59 839 3 3 COAL -- MIL6/9/2012 07:33:27 6/9/2012 07:45:36 812 3 3 COAL -- MIL6/9/2012 07:39:40 6/9/2012 07:51:02 837 3 3 COAL -- MIL6/9/2012 07:50:18 6/9/2012 07:55:03 815 3 3 COAL -- MIL6/9/2012 07:56:09 6/9/2012 08:01:12 852 3 1 COAL -- MIL6/9/2012 08:20:10 6/9/2012 08:23:44 713-- 1 1 COAL -- Harita Par6/9/2012 08:21:26 6/9/2012 08:25:29 707-- 1 1 COAL -- Harita Par6/9/2012 08:40:57 6/9/2012 08:44:36 708-- 1 1 COAL -- Harita Par6/9/2012 08:50:15 6/9/2012 08:54:27 703-- 1 1 COAL -- Harita Par

Page 270: June Per Shift (Truckscale Port)

6/9/2012 09:22:52 6/9/2012 09:28:44 706-- 1 1 COAL -- Harita Par6/9/2012 09:27:22 6/9/2012 09:33:15 710-- 1 1 COAL -- Harita Par6/9/2012 09:27:45 6/9/2012 09:33:43 705-- 1 1 COAL -- Harita Par6/9/2012 09:29:30 6/9/2012 09:36:28 714-- 1 1 COAL -- Harita Par6/9/2012 09:34:43 6/9/2012 09:38:39 704-- 1 1 COAL -- Harita Par6/9/2012 09:37:11 6/9/2012 09:42:43 709-- 1 1 COAL -- Harita Par6/9/2012 09:42:10 6/9/2012 09:47:10 701-- 1 1 COAL -- Harita Par6/9/2012 09:46:24 6/9/2012 09:53:10 707-- 1 1 COAL -- Harita Par6/9/2012 09:50:35 6/9/2012 09:54:26 713-- 1 1 COAL -- Harita Par6/9/2012 10:16:00 6/9/2012 10:19:44 708-- 1 1 COAL -- Harita Par6/9/2012 10:24:11 6/9/2012 10:28:04 703-- 1 1 COAL -- Harita Par6/9/2012 10:47:23 6/9/2012 10:51:10 710-- 1 1 COAL -- Harita Par6/9/2012 10:50:31 6/9/2012 10:54:45 714-- 1 1 COAL -- Harita Par6/9/2012 10:57:49 6/9/2012 11:02:55 704-- 1 1 COAL -- Harita Par6/9/2012 11:00:28 6/9/2012 11:04:53 709-- 1 1 COAL -- Harita Par6/9/2012 11:03:43 6/9/2012 11:08:25 705-- 1 1 COAL -- Harita Par6/9/2012 11:06:18 6/9/2012 11:10:52 706-- 1 1 COAL -- Harita Par6/9/2012 11:06:37 6/9/2012 11:10:56 701-- 1 1 COAL -- Harita Par6/9/2012 11:10:10 6/9/2012 11:13:39 707-- 1 1 COAL -- Harita Par6/9/2012 08:19:26 6/9/2012 08:22:44 850 1 1 COAL -- MIL6/9/2012 08:32:23 6/9/2012 08:36:49 817 1 1 COAL -- MIL6/9/2012 08:51:43 6/9/2012 08:59:44 851 1 1 COAL -- MIL6/9/2012 08:58:42 6/9/2012 09:02:22 810 1 1 COAL -- MIL6/9/2012 09:03:21 6/9/2012 09:07:44 853 1 1 COAL -- MIL6/9/2012 09:26:57 6/9/2012 09:33:59 855 1 1 COAL -- MIL6/9/2012 09:28:04 6/9/2012 09:35:43 818 1 1 COAL -- MIL6/9/2012 09:30:16 6/9/2012 09:40:55 839 1 1 COAL -- MIL6/9/2012 09:35:01 6/9/2012 09:42:59 856 1 1 COAL -- MIL6/9/2012 09:41:35 6/9/2012 09:45:53 812 1 1 COAL -- MIL6/9/2012 09:45:17 6/9/2012 09:52:23 852 1 1 COAL -- MIL6/9/2012 09:51:13 6/9/2012 09:54:56 838 1 1 COAL -- MIL6/9/2012 09:51:38 6/9/2012 09:55:33 815 1 1 COAL -- MIL6/9/2012 09:56:24 6/9/2012 09:59:52 837 1 1 COAL -- MIL6/9/2012 09:58:57 6/9/2012 10:03:19 850 1 1 COAL -- MIL6/9/2012 10:04:40 6/9/2012 10:09:28 868 1 1 COAL -- MIL6/9/2012 10:15:34 6/9/2012 10:19:17 817 1 1 COAL -- MIL6/9/2012 10:20:27 6/9/2012 10:27:25 851 1 1 COAL -- MIL6/9/2012 10:36:19 6/9/2012 10:40:36 853 1 1 COAL -- MIL6/9/2012 10:54:03 6/9/2012 11:01:53 855 1 1 COAL -- MIL6/9/2012 11:14:51 6/9/2012 11:19:35 818 1 1 COAL -- MIL6/9/2012 11:16:29 6/9/2012 11:21:04 839 1 1 COAL -- MIL6/9/2012 11:16:49 6/9/2012 11:21:31 856 1 1 COAL -- MIL6/9/2012 11:25:01 6/9/2012 11:31:35 852 1 1 COAL -- MIL

Page 271: June Per Shift (Truckscale Port)

6/9/2012 11:34:04 6/9/2012 11:38:13 815 1 1 COAL -- MIL6/9/2012 18:42:56 6/9/2012 18:46:45 705-- 2 2 COAL -- Harita Par6/9/2012 18:43:37 6/9/2012 18:50:23 704-- 2 2 COAL -- Harita Par6/9/2012 18:44:04 6/9/2012 18:51:31 708-- 2 2 COAL -- Harita Par6/9/2012 18:44:30 6/9/2012 19:05:10 712-- 2 2 COAL -- Harita Par6/9/2012 18:44:55 6/9/2012 19:05:14 707-- 2 2 COAL -- Harita Par6/9/2012 18:45:21 6/9/2012 19:06:31 713-- 2 2 COAL -- Harita Par6/9/2012 18:49:36 6/9/2012 19:16:21 115 2 2 COAL -- Harita Par6/9/2012 18:52:20 6/9/2012 19:09:16 714-- 2 2 COAL -- Harita Par6/9/2012 18:55:00 6/9/2012 19:22:40 701-- 2 2 COAL -- Harita Par6/9/2012 18:59:11 6/9/2012 19:23:02 710-- 2 2 COAL -- Harita Par6/9/2012 19:12:51 6/9/2012 19:25:17 709-- 2 2 COAL -- Harita Par6/9/2012 19:51:29 6/9/2012 19:56:17 703-- 2 2 COAL -- Harita Par

6/9/2012 20:05:21 6/9/2012 20:09:11 705-- 2 2 COAL -- Harita Par6/9/2012 20:11:46 6/9/2012 20:16:30 704-- 2 2 COAL -- Harita Par6/9/2012 20:19:05 6/9/2012 20:23:37 708-- 2 2 COAL -- Harita Par6/9/2012 20:26:36 6/9/2012 20:31:20 707-- 2 2 COAL -- Harita Par6/9/2012 20:28:48 6/9/2012 20:32:55 713-- 2 2 COAL -- Harita Par6/9/2012 20:33:40 6/9/2012 20:37:04 710-- 2 2 COAL -- Harita Par6/9/2012 20:39:18 6/9/2012 20:43:29 712-- 2 2 COAL -- Harita Par6/9/2012 20:45:25 6/9/2012 20:49:35 709-- 2 2 COAL -- Harita Par6/9/2012 20:47:24 6/9/2012 20:51:54 815- 2 2 COAL -- Harita Par6/9/2012 20:56:56 6/9/2012 21:01:11 818- 2 2 COAL -- Harita Par6/9/2012 20:57:58 6/9/2012 21:02:27 706-- 2 2 COAL -- Harita Par6/9/2012 21:11:51 6/9/2012 21:16:07 850- 2 2 COAL -- Harita Par6/9/2012 21:12:25 6/9/2012 21:17:53 702-- 2 2 COAL -- Harita Par6/9/2012 21:25:23 6/9/2012 21:33:06 115 2 2 COAL -- Harita Par6/9/2012 21:30:12 6/9/2012 21:35:02 703-- 2 2 COAL -- Harita Par6/9/2012 21:30:36 6/9/2012 21:37:33 701-- 2 2 COAL -- Harita Par6/9/2012 21:32:11 6/9/2012 21:38:45 705-- 2 2 COAL -- Harita Par6/9/2012 21:36:54 6/9/2012 21:41:04 704-- 2 2 COAL -- Harita Par6/9/2012 21:52:32 6/9/2012 21:56:22 713-- 2 2 COAL -- Harita Par6/9/2012 22:01:34 6/9/2012 22:06:20 712-- 2 2 COAL -- Harita Par6/9/2012 22:02:57 6/9/2012 22:08:22 708-- 2 2 COAL -- Harita Par6/9/2012 22:09:09 6/9/2012 22:15:20 707-- 2 2 COAL -- Harita Par6/9/2012 22:10:19 6/9/2012 22:17:27 817- 2 2 COAL -- Harita Par6/9/2012 22:14:35 6/9/2012 22:18:31 812- 2 2 COAL -- Harita Par6/9/2012 22:16:07 6/9/2012 22:19:55 710-- 2 2 COAL -- Harita Par6/9/2012 22:16:29 6/9/2012 22:21:54 815- 2 2 COAL -- Harita Par6/9/2012 22:19:23 6/9/2012 22:23:34 706-- 2 2 COAL -- Harita Par6/9/2012 22:24:50 6/9/2012 22:29:34 832- 2 2 COAL -- Harita Par6/9/2012 22:27:52 6/9/2012 22:32:56 702-- 2 2 COAL -- Harita Par

Page 272: June Per Shift (Truckscale Port)

6/9/2012 22:37:46 6/9/2012 22:41:23 818- 2 2 COAL -- Harita Par6/9/2012 22:56:50 6/9/2012 23:00:45 701-- 2 2 COAL -- Harita Par6/9/2012 22:59:20 6/9/2012 23:03:48 705-- 2 2 COAL -- Harita Par

6/9/2012 23:02:56 6/9/2012 23:06:54 704-- 2 2 COAL -- Harita Par6/9/2012 23:08:01 6/9/2012 23:12:05 709-- 2 2 COAL -- Harita Par6/9/2012 23:13:41 6/9/2012 23:17:57 713-- 2 2 COAL -- Harita Par6/9/2012 23:18:44 6/9/2012 23:23:13 703-- 2 2 COAL -- Harita Par6/9/2012 23:19:23 6/9/2012 23:25:35 850- 2 2 COAL -- Harita Par6/9/2012 23:31:46 6/9/2012 23:36:59 115 2 2 COAL -- Harita Par6/9/2012 23:35:29 6/9/2012 23:40:35 839- 2 2 COAL -- Harita Par6/9/2012 23:39:37 6/9/2012 23:44:18 712-- 2 2 COAL -- Harita Par6/9/2012 23:39:57 6/9/2012 23:45:39 706-- 2 2 COAL -- Harita Par6/9/2012 23:43:15 6/9/2012 23:45:44 702-- 2 2 COAL -- Harita Par6/9/2012 23:48:12 6/9/2012 23:54:09 817- 2 2 COAL -- Harita Par6/9/2012 23:51:33 6/9/2012 23:56:51 708-- 2 2 COAL -- Harita Par6/9/2012 23:53:14 6/9/2012 23:58:16 812- 2 2 COAL -- Harita Par6/9/2012 23:54:54 6/9/2012 23:58:49 815- 2 2 COAL -- Harita Par6/9/2012 16:39:47 6/9/2012 16:44:59 856 2 2 COAL -- MIL6/9/2012 18:46:06 6/9/2012 18:50:46 818 2 2 COAL -- MIL6/9/2012 19:20:28 6/9/2012 19:26:15 851 2 2 COAL -- MIL6/9/2012 19:21:38 6/9/2012 19:29:04 836 2 2 COAL -- MIL6/9/2012 19:23:58 6/9/2012 19:31:00 850 2 2 COAL -- MIL6/9/2012 19:24:36 6/9/2012 19:35:10 855 2 2 COAL -- MIL6/9/2012 19:28:02 6/9/2012 19:38:47 853 2 2 COAL -- MIL6/9/2012 19:36:53 6/9/2012 19:41:38 856 2 2 COAL -- MIL6/9/2012 19:43:28 6/9/2012 19:48:36 812 2 2 COAL -- MIL6/9/2012 19:47:48 6/9/2012 19:52:27 839 2 2 COAL -- MIL6/9/2012 20:08:27 6/9/2012 20:13:48 830 2 2 COAL -- MIL6/9/2012 20:11:12 6/9/2012 20:16:04 832 2 2 COAL -- MIL6/9/2012 20:21:01 6/9/2012 20:25:42 838 2 2 COAL -- MIL6/9/2012 20:29:12 6/9/2012 20:34:34 817 2 2 COAL -- MIL6/9/2012 22:47:21 6/9/2012 22:52:01 828 2 2 COAL -- MIL

6/10/2012 00:10:38 6/10/2012 00:14:38 818- 3 3 COAL -- Harita Par6/10/2012 00:27:07 6/10/2012 00:31:03 832- 3 3 COAL -- Harita Par6/10/2012 00:29:06 6/10/2012 00:33:36 828- 3 3 COAL -- Harita Par6/10/2012 00:34:41 6/10/2012 00:38:49 709-- 3 3 COAL -- Harita Par

6/10/2012 01:20:17 6/10/2012 01:24:03 701-- 3 3 COAL -- Harita Par6/10/2012 01:25:09 6/10/2012 01:29:45 707-- 3 3 COAL -- Harita Par6/10/2012 01:35:53 6/10/2012 01:39:34 706-- 3 3 COAL -- Harita Par6/10/2012 01:43:16 6/10/2012 01:47:52 712-- 3 3 COAL -- Harita Par6/10/2012 01:46:50 6/10/2012 01:50:35 702-- 3 3 COAL -- Harita Par6/10/2012 01:53:07 6/10/2012 01:58:09 713-- 3 3 COAL -- Harita Par

Page 273: June Per Shift (Truckscale Port)

6/10/2012 01:53:45 6/10/2012 01:59:57 850- 3 3 COAL -- Harita Par6/10/2012 01:54:11 6/10/2012 02:02:40 817- 3 3 COAL -- Harita Par6/10/2012 01:57:24 6/10/2012 02:05:04 815- 3 3 COAL -- Harita Par6/10/2012 02:04:22 6/10/2012 02:08:02 812- 3 3 COAL -- Harita Par6/10/2012 02:16:04 6/10/2012 02:19:43 818- 3 3 COAL -- Harita Par6/10/2012 02:27:52 6/10/2012 02:34:35 829- 3 3 COAL -- Harita Par6/10/2012 02:37:55 6/10/2012 02:43:04 828- 3 3 COAL -- Harita Par6/10/2012 02:41:53 6/10/2012 02:46:14 709-- 3 3 COAL -- Harita Par6/10/2012 02:44:13 6/10/2012 02:46:23 832- 3 3 COAL -- Harita Par6/10/2012 02:47:24 6/10/2012 02:52:18 115 3 3 COAL -- Harita Par6/10/2012 02:53:34 6/10/2012 02:58:13 703-- 3 3 COAL -- Harita Par6/10/2012 02:53:58 6/10/2012 02:58:16 707-- 3 3 COAL -- Harita Par6/10/2012 03:03:22 6/10/2012 03:09:25 712-- 3 3 COAL -- Harita Par6/10/2012 03:22:12 6/10/2012 03:26:12 704-- 3 3 COAL -- Harita Par6/10/2012 03:52:40 6/10/2012 03:56:55 850- 3 3 COAL -- Harita Par6/10/2012 04:00:25 6/10/2012 04:04:13 829- 3 3 COAL -- Harita Par6/10/2012 07:24:29 6/10/2012 07:29:05 713-- 3 3 COAL -- Harita Par6/10/2012 07:24:54 6/10/2012 07:30:55 707-- 3 3 COAL -- Harita Par6/10/2012 07:27:34 6/10/2012 07:32:57 115 3 3 COAL -- Harita Par

6/10/2012 07:33:41 6/10/2012 07:37:52 712-- 3 3 COAL -- Harita Par6/10/2012 07:34:08 6/10/2012 07:42:30 702-- 3 3 COAL -- Harita Par6/10/2012 07:36:38 6/10/2012 07:42:06 704-- 3 3 COAL -- Harita Par6/10/2012 07:40:25 6/10/2012 07:44:14 708-- 3 3 COAL -- Harita Par6/10/2012 07:44:56 6/10/2012 07:52:58 706-- 3 3 COAL -- Harita Par6/10/2012 07:45:23 6/10/2012 07:53:03 703-- 3 3 COAL -- Harita Par6/10/2012 07:52:12 6/10/2012 08:04:45 818- 3 1 COAL -- Harita Par6/10/2012 07:59:42 6/10/2012 08:04:51 833 3 1 COAL -- MIL6/10/2012 08:01:56 6/10/2012 08:23:33 710-- 1 1 COAL -- Harita Par6/10/2012 08:03:16 6/10/2012 08:27:13 817- 1 1 COAL -- Harita Par6/10/2012 08:05:57 6/10/2012 08:25:30 714-- 1 1 COAL -- Harita Par6/10/2012 08:12:36 6/10/2012 08:29:15 850- 1 1 COAL -- Harita Par6/10/2012 08:49:16 6/10/2012 08:54:08 713-- 1 1 COAL -- Harita Par6/10/2012 08:51:13 6/10/2012 08:55:14 707-- 1 1 COAL -- Harita Par6/10/2012 08:59:19 6/10/2012 09:03:29 815- 1 1 COAL -- Harita Par6/10/2012 08:59:49 6/10/2012 09:05:40 115 1 1 COAL -- Harita Par6/10/2012 09:01:51 6/10/2012 09:10:34 712-- 1 1 COAL -- Harita Par6/10/2012 09:04:31 6/10/2012 09:13:20 704-- 1 1 COAL -- Harita Par6/10/2012 09:11:47 6/10/2012 09:15:31 702-- 1 1 COAL -- Harita Par6/10/2012 09:12:35 6/10/2012 09:18:30 708-- 1 1 COAL -- Harita Par6/10/2012 09:17:48 6/10/2012 09:22:29 820- 1 1 COAL -- Harita Par6/10/2012 09:21:43 6/10/2012 09:25:59 706-- 1 1 COAL -- Harita Par6/10/2012 09:25:05 6/10/2012 09:29:15 812- 1 1 COAL -- Harita Par

Page 274: June Per Shift (Truckscale Port)

6/10/2012 09:37:12 6/10/2012 09:40:48 832- 1 1 COAL -- Harita Par6/10/2012 09:38:04 6/10/2012 09:42:47 703-- 1 1 COAL -- Harita Par6/10/2012 09:49:38 6/10/2012 09:56:02 710-- 1 1 COAL -- Harita Par6/10/2012 09:51:00 6/10/2012 09:56:29 714-- 1 1 COAL -- Harita Par6/10/2012 09:55:13 6/10/2012 09:59:25 830- 1 1 COAL -- Harita Par6/10/2012 10:02:13 6/10/2012 10:06:08 817- 1 1 COAL -- Harita Par6/10/2012 10:04:10 6/10/2012 10:07:22 850- 1 1 COAL -- Harita Par6/10/2012 10:11:17 6/10/2012 10:14:26 713-- 1 1 COAL -- Harita Par6/10/2012 10:11:42 6/10/2012 10:18:30 707-- 1 1 COAL -- Harita Par6/10/2012 10:13:44 6/10/2012 10:17:47 705-- 1 1 COAL -- Harita Par6/10/2012 10:24:25 6/10/2012 10:28:32 820- 1 1 COAL -- Harita Par6/10/2012 10:27:53 6/10/2012 10:31:48 712-- 1 1 COAL -- Harita Par6/10/2012 10:37:04 6/10/2012 10:41:13 704-- 1 1 COAL -- Harita Par6/10/2012 10:39:42 6/10/2012 10:43:19 702-- 1 1 COAL -- Harita Par6/10/2012 10:40:12 6/10/2012 10:45:01 708-- 1 1 COAL -- Harita Par6/10/2012 10:48:25 6/10/2012 10:52:37 706-- 1 1 COAL -- Harita Par6/10/2012 11:07:27 6/10/2012 11:11:31 703-- 1 1 COAL -- Harita Par6/10/2012 11:08:40 6/10/2012 11:14:12 113 1 1 COAL -- Harita Par6/10/2012 11:12:12 6/10/2012 11:16:31 832- 1 1 COAL -- Harita Par6/10/2012 11:13:23 6/10/2012 11:18:02 812- 1 1 COAL -- Harita Par6/10/2012 11:22:26 6/10/2012 11:26:15 710-- 1 1 COAL -- Harita Par6/10/2012 11:23:05 6/10/2012 11:28:03 714-- 1 1 COAL -- Harita Par6/10/2012 11:28:52 6/10/2012 11:32:30 713-- 1 1 COAL -- Harita Par6/10/2012 11:31:53 6/10/2012 11:35:10 850- 1 1 COAL -- Harita Par6/10/2012 11:37:12 6/10/2012 11:41:10 833- 1 1 COAL -- Harita Par6/10/2012 11:48:33 6/10/2012 11:53:12 817- 1 1 COAL -- Harita Par6/10/2012 11:51:00 6/10/2012 11:56:12 705-- 1 1 COAL -- Harita Par6/10/2012 11:52:28 6/10/2012 11:57:12 820- 1 1 COAL -- Harita Par6/10/2012 11:53:59 6/10/2012 12:03:18 830- 1 1 COAL -- Harita Par6/10/2012 11:55:31 6/10/2012 12:01:44 712-- 1 1 COAL -- Harita Par6/10/2012 12:09:12 6/10/2012 12:13:51 815- 1 1 COAL -- Harita Par6/10/2012 12:11:14 6/10/2012 12:15:35 708-- 1 1 COAL -- Harita Par6/10/2012 12:44:48 6/10/2012 12:48:57 703-- 1 1 COAL -- Harita Par6/10/2012 12:49:49 6/10/2012 12:53:32 832- 1 1 COAL -- Harita Par6/10/2012 13:02:59 6/10/2012 13:06:19 850- 1 1 COAL -- Harita Par6/10/2012 13:25:18 6/10/2012 13:29:10 839- 1 1 COAL -- Harita Par6/10/2012 13:33:40 6/10/2012 13:38:05 113 1 1 COAL -- Harita Par6/10/2012 13:34:42 6/10/2012 13:41:26 710-- 1 1 COAL -- Harita Par6/10/2012 13:35:09 6/10/2012 13:42:46 706-- 1 1 COAL -- Harita Par

6/10/2012 13:36:22 6/10/2012 13:44:45 704-- 1 1 COAL -- Harita Par6/10/2012 13:39:00 6/10/2012 13:46:09 714-- 1 1 COAL -- Harita Par6/10/2012 13:39:22 6/10/2012 13:47:42 830- 1 1 COAL -- Harita Par

Page 275: June Per Shift (Truckscale Port)

6/10/2012 13:43:31 6/10/2012 13:56:27 820- 1 1 COAL -- Harita Par6/10/2012 13:43:59 6/10/2012 13:58:10 713-- 1 1 COAL -- Harita Par6/10/2012 13:53:33 6/10/2012 13:59:57 702-- 1 1 COAL -- Harita Par6/10/2012 13:55:40 6/10/2012 14:01:52 815- 1 1 COAL -- Harita Par6/10/2012 14:09:45 6/10/2012 14:13:19 115 1 1 COAL -- Harita Par6/10/2012 14:15:00 6/10/2012 14:19:22 817- 1 1 COAL -- Harita Par6/10/2012 14:21:47 6/10/2012 14:25:56 708-- 1 1 COAL -- Harita Par6/10/2012 14:22:13 6/10/2012 14:27:59 712-- 1 1 COAL -- Harita Par6/10/2012 14:23:28 6/10/2012 14:30:29 828- 1 1 COAL -- Harita Par6/10/2012 14:35:01 6/10/2012 14:38:33 850- 1 1 COAL -- Harita Par6/10/2012 14:36:51 6/10/2012 14:41:22 703-- 1 1 COAL -- Harita Par6/10/2012 14:47:42 6/10/2012 14:53:14 709-- 1 1 COAL -- Harita Par6/10/2012 15:06:01 6/10/2012 15:10:20 710-- 1 1 COAL -- Harita Par6/10/2012 15:06:46 6/10/2012 15:12:32 706-- 1 1 COAL -- Harita Par6/10/2012 15:07:51 6/10/2012 15:15:05 704-- 1 1 COAL -- Harita Par6/10/2012 15:13:27 6/10/2012 15:17:05 714-- 1 1 COAL -- Harita Par6/10/2012 15:17:49 6/10/2012 15:23:39 713-- 1 1 COAL -- Harita Par6/10/2012 15:22:11 6/10/2012 15:25:47 702-- 1 1 COAL -- Harita Par6/10/2012 15:22:40 6/10/2012 15:28:00 820- 1 1 COAL -- Harita Par6/10/2012 15:29:56 6/10/2012 15:34:29 815- 1 1 COAL -- Harita Par6/10/2012 15:30:35 6/10/2012 15:49:07 115 1 1 COAL -- Harita Par6/10/2012 15:38:24 6/10/2012 15:41:54 839- 1 1 COAL -- Harita Par6/10/2012 15:49:48 6/10/2012 15:56:43 830- 1 1 COAL -- Harita Par6/10/2012 15:52:17 6/10/2012 16:00:02 812- 1 2 COAL -- Harita Par6/10/2012 10:59:20 6/10/2012 11:05:41 856 1 1 COAL -- MIL6/10/2012 11:19:18 6/10/2012 11:25:44 852 1 1 COAL -- MIL6/10/2012 13:40:03 6/10/2012 13:50:23 852 1 1 COAL -- MIL6/10/2012 13:40:40 6/10/2012 13:52:37 855 1 1 COAL -- MIL6/10/2012 13:42:03 6/10/2012 13:54:12 856 1 1 COAL -- MIL6/10/2012 14:39:27 6/10/2012 14:44:07 810 1 1 COAL -- MIL6/10/2012 14:52:27 6/10/2012 14:56:27 807 1 1 COAL -- MIL6/10/2012 15:14:08 6/10/2012 15:20:13 852 1 1 COAL -- MIL6/10/2012 18:20:39 6/10/2012 18:24:25 709-- 2 2 COAL -- Harita Par6/10/2012 18:25:16 6/10/2012 18:29:07 708-- 2 2 COAL -- Harita Par6/10/2012 18:27:01 6/10/2012 18:31:56 712-- 2 2 COAL -- Harita Par6/10/2012 18:28:16 6/10/2012 18:32:33 710-- 2 2 COAL -- Harita Par6/10/2012 18:30:29 6/10/2012 18:35:50 115 2 2 COAL -- Harita Par6/10/2012 18:30:52 6/10/2012 18:37:02 702-- 2 2 COAL -- Harita Par6/10/2012 18:31:13 6/10/2012 18:38:39 706-- 2 2 COAL -- Harita Par6/10/2012 18:34:36 6/10/2012 18:40:19 703-- 2 2 COAL -- Harita Par6/10/2012 18:35:02 6/10/2012 18:42:22 713-- 2 2 COAL -- Harita Par6/10/2012 18:49:18 6/10/2012 18:53:33 704-- 2 2 COAL -- Harita Par6/10/2012 18:56:08 6/10/2012 19:03:33 714-- 2 2 COAL -- Harita Par

Page 276: June Per Shift (Truckscale Port)

6/10/2012 19:00:09 6/10/2012 19:04:00 701-- 2 2 COAL -- Harita Par6/10/2012 19:16:30 6/10/2012 19:20:54 828- 2 2 COAL -- Harita Par6/10/2012 19:33:58 6/10/2012 19:37:27 850- 2 2 COAL -- Harita Par6/10/2012 19:36:10 6/10/2012 19:40:50 815- 2 2 COAL -- Harita Par6/10/2012 19:42:53 6/10/2012 19:47:50 709-- 2 2 COAL -- Harita Par6/10/2012 19:46:04 6/10/2012 19:51:25 812- 2 2 COAL -- Harita Par6/10/2012 19:47:00 6/10/2012 19:53:29 708-- 2 2 COAL -- Harita Par6/10/2012 19:49:15 6/10/2012 19:55:14 820- 2 2 COAL -- Harita Par6/10/2012 19:49:50 6/10/2012 19:56:57 710-- 2 2 COAL -- Harita Par6/10/2012 19:52:02 6/10/2012 19:59:29 712-- 2 2 COAL -- Harita Par6/10/2012 19:58:19 6/10/2012 20:03:11 115 2 2 COAL -- Harita Par6/10/2012 19:58:49 6/10/2012 20:05:38 706-- 2 2 COAL -- Harita Par6/10/2012 20:05:00 6/10/2012 20:10:21 830- 2 2 COAL -- Harita Par6/10/2012 20:18:50 6/10/2012 20:22:46 705-- 2 2 COAL -- Harita Par6/10/2012 20:20:24 6/10/2012 20:24:13 703-- 2 2 COAL -- Harita Par6/10/2012 20:20:45 6/10/2012 20:26:04 713-- 2 2 COAL -- Harita Par6/10/2012 20:21:05 6/10/2012 20:28:16 704-- 2 2 COAL -- Harita Par6/10/2012 20:31:30 6/10/2012 20:40:35 714-- 2 2 COAL -- Harita Par6/10/2012 20:45:45 6/10/2012 20:49:43 701-- 2 2 COAL -- Harita Par6/10/2012 21:06:27 6/10/2012 21:10:22 850- 2 2 COAL -- Harita Par6/10/2012 21:06:56 6/10/2012 21:12:28 709-- 2 2 COAL -- Harita Par

6/10/2012 21:08:16 6/10/2012 21:14:36 828- 2 2 COAL -- Harita Par6/10/2012 21:09:38 6/10/2012 21:17:15 815- 2 2 COAL -- Harita Par6/10/2012 21:16:28 6/10/2012 21:20:42 708-- 2 2 COAL -- Harita Par6/10/2012 21:18:06 6/10/2012 21:22:01 710-- 2 2 COAL -- Harita Par6/10/2012 21:19:10 6/10/2012 21:23:34 712-- 2 2 COAL -- Harita Par6/10/2012 21:24:49 6/10/2012 21:27:53 706-- 2 2 COAL -- Harita Par6/10/2012 21:32:33 6/10/2012 21:36:59 812- 2 2 COAL -- Harita Par6/10/2012 21:35:42 6/10/2012 21:40:38 115 2 2 COAL -- Harita Par6/10/2012 21:36:18 6/10/2012 21:42:15 820- 2 2 COAL -- Harita Par6/10/2012 21:39:50 6/10/2012 21:43:36 705-- 2 2 COAL -- Harita Par6/10/2012 21:50:44 6/10/2012 21:53:57 703-- 2 2 COAL -- Harita Par6/10/2012 21:51:04 6/10/2012 21:55:34 704-- 2 2 COAL -- Harita Par6/10/2012 21:51:25 6/10/2012 21:57:35 713-- 2 2 COAL -- Harita Par6/10/2012 22:02:59 6/10/2012 22:12:41 714-- 2 2 COAL -- Harita Par6/10/2012 22:11:27 6/10/2012 22:15:26 701-- 2 2 COAL -- Harita Par6/10/2012 22:30:08 6/10/2012 22:34:01 709-- 2 2 COAL -- Harita Par6/10/2012 22:36:31 6/10/2012 22:40:59 817- 2 2 COAL -- Harita Par6/10/2012 22:39:13 6/10/2012 22:42:54 710-- 2 2 COAL -- Harita Par6/10/2012 22:40:18 6/10/2012 22:43:03 712-- 2 2 COAL -- Harita Par6/10/2012 22:41:48 6/10/2012 22:46:41 708-- 2 2 COAL -- Harita Par6/10/2012 22:42:15 6/10/2012 22:48:10 850- 2 2 COAL -- Harita Par

Page 277: June Per Shift (Truckscale Port)

6/10/2012 22:46:01 6/10/2012 22:49:28 706-- 2 2 COAL -- Harita Par6/10/2012 22:56:17 6/10/2012 23:00:18 707-- 2 2 COAL -- Harita Par6/10/2012 22:57:22 6/10/2012 23:02:32 828- 2 2 COAL -- Harita Par6/10/2012 22:58:36 6/10/2012 23:04:10 815- 2 2 COAL -- Harita Par6/10/2012 23:13:59 6/10/2012 23:17:51 705-- 2 2 COAL -- Harita Par6/10/2012 23:17:07 6/10/2012 23:20:21 703-- 2 2 COAL -- Harita Par6/10/2012 23:18:50 6/10/2012 23:23:06 812- 2 2 COAL -- Harita Par6/10/2012 23:21:27 6/10/2012 23:27:06 713-- 2 2 COAL -- Harita Par6/10/2012 23:27:42 6/10/2012 23:31:41 704-- 2 2 COAL -- Harita Par6/10/2012 23:34:45 6/10/2012 23:40:19 115 2 2 COAL -- Harita Par6/10/2012 23:35:12 6/10/2012 23:41:46 714-- 2 2 COAL -- Harita Par6/10/2012 23:35:33 6/10/2012 23:41:49 701-- 2 2 COAL -- Harita Par6/10/2012 23:58:56 6/11/2012 00:03:12 709-- 2 3 COAL -- Harita Par6/10/2012 16:07:09 6/10/2012 16:11:51 810 2 2 COAL -- MIL6/10/2012 19:09:20 6/10/2012 19:15:34 853 2 2 COAL -- MIL6/10/2012 19:17:48 6/10/2012 19:24:26 852 2 2 COAL -- MIL

6/10/2012 20:08:12 6/10/2012 20:15:39 855 2 2 COAL -- MIL6/10/2012 21:45:42 6/10/2012 21:49:58 853 2 2 COAL -- MIL6/10/2012 21:52:09 6/10/2012 22:00:04 852 2 2 COAL -- MIL6/10/2012 21:58:40 6/10/2012 22:06:17 855 2 2 COAL -- MIL6/10/2012 22:05:18 6/10/2012 22:10:48 856 2 2 COAL -- MIL6/10/2012 23:20:59 6/10/2012 23:25:32 853 2 2 COAL -- MIL6/10/2012 23:23:53 6/10/2012 23:29:08 852 2 2 COAL -- MIL6/10/2012 23:32:54 6/10/2012 23:37:26 856 2 2 COAL -- MIL6/10/2012 23:47:43 6/10/2012 23:55:54 855 2 2 COAL -- MIL6/11/2012 00:28:25 6/11/2012 00:32:20 836- 3 3 COAL -- Harita Par6/12/2012 02:00:34 6/12/2012 02:06:55 812- 3 3 COAL -- Harita Par6/12/2012 02:01:44 6/12/2012 02:07:37 839- 3 3 COAL -- Harita Par6/12/2012 02:02:38 6/12/2012 02:10:31 815- 3 3 COAL -- Harita Par6/12/2012 02:03:45 6/12/2012 02:12:28 836- 3 3 COAL -- Harita Par6/12/2012 02:04:25 6/12/2012 02:14:25 828- 3 3 COAL -- Harita Par6/12/2012 02:05:03 6/12/2012 02:16:12 850- 3 3 COAL -- Harita Par6/12/2012 02:05:43 6/12/2012 02:19:30 817- 3 3 COAL -- Harita Par6/12/2012 02:09:24 6/12/2012 02:24:22 830- 3 3 COAL -- Harita Par6/12/2012 08:50:10 6/12/2012 08:54:19 707-- 1 1 COAL -- Harita Para6/12/2012 08:50:36 6/12/2012 08:56:54 703-- 1 1 COAL -- Harita Para6/12/2012 08:50:59 6/12/2012 08:57:59 705-- 1 1 COAL -- Harita Para6/12/2012 08:51:30 6/12/2012 09:07:07 704-- 1 1 COAL -- Harita Para6/12/2012 08:51:58 6/12/2012 09:07:12 712-- 1 1 COAL -- Harita Para6/12/2012 08:56:06 6/12/2012 09:11:08 817- 1 1 COAL -- Harita Para6/12/2012 08:59:01 6/12/2012 09:12:51 836- 1 1 COAL -- Harita Para6/12/2012 08:59:36 6/12/2012 09:08:31 710-- 1 1 COAL -- Harita Para6/12/2012 09:00:06 6/12/2012 09:36:36 709-- 1 1 COAL -- Harita Para6/12/2012 09:00:47 6/12/2012 09:26:22 713-- 1 1 COAL -- Harita Para

Page 278: June Per Shift (Truckscale Port)

6/12/2012 09:02:25 6/12/2012 09:36:41 706-- 1 1 COAL -- Harita Para6/12/2012 09:04:11 6/12/2012 09:37:57 839- 1 1 COAL -- Harita Para6/12/2012 09:04:52 6/12/2012 09:40:08 115 1 1 COAL -- Harita Para6/12/2012 09:05:14 6/12/2012 09:46:00 701-- 1 1 COAL -- Harita Para6/12/2012 09:05:39 6/12/2012 09:45:01 708-- 1 1 COAL -- Harita Para6/12/2012 09:27:34 6/12/2012 09:47:04 714-- 1 1 COAL -- Harita Para6/12/2012 09:28:23 6/12/2012 09:51:59 113 1 1 COAL -- Harita Para6/12/2012 09:53:58 6/12/2012 10:05:41 812- 1 1 COAL -- Harita Para6/12/2012 09:56:32 6/12/2012 10:05:35 815- 1 1 COAL -- Harita Para6/12/2012 10:54:46 6/12/2012 11:08:24 707-- 1 1 COAL -- Harita Para6/12/2012 10:55:11 6/12/2012 11:11:06 705-- 1 1 COAL -- Harita Para6/12/2012 10:56:55 6/12/2012 11:09:04 829- 1 1 COAL -- Harita Para6/12/2012 10:57:34 6/12/2012 11:08:44 850- 1 1 COAL -- Harita Para6/12/2012 10:58:01 6/12/2012 11:11:10 703-- 1 1 COAL -- Harita Para6/12/2012 10:58:32 6/12/2012 11:11:15 712-- 1 1 COAL -- Harita Para6/12/2012 10:58:50 6/12/2012 11:11:19 713-- 1 1 COAL -- Harita Para6/12/2012 10:59:19 6/12/2012 11:37:16 710-- 1 1 COAL -- Harita Para

6/12/2012 11:00:24 6/12/2012 11:09:13 828- 1 1 COAL -- Harita Para6/12/2012 11:01:40 6/12/2012 12:35:51 830- 1 1 COAL -- Harita Para6/12/2012 11:02:29 6/12/2012 11:08:53 839- 1 1 COAL -- Harita Para6/12/2012 11:06:31 6/12/2012 11:42:39 706-- 1 1 COAL -- Harita Para6/12/2012 11:07:09 6/12/2012 12:39:09 115 1 1 COAL -- Harita Para6/12/2012 11:30:10 6/12/2012 11:35:18 701-- 1 1 COAL -- Harita Para6/12/2012 11:30:31 6/12/2012 11:35:23 708-- 1 1 COAL -- Harita Para6/12/2012 11:32:13 6/12/2012 11:42:34 714-- 1 1 COAL -- Harita Para6/12/2012 11:33:05 6/12/2012 11:48:11 113 1 1 COAL -- Harita Para6/12/2012 11:34:20 6/12/2012 11:50:17 837- 1 1 COAL -- Harita Para6/12/2012 12:30:56 6/12/2012 12:35:56 829- 1 1 COAL -- Harita Para6/12/2012 12:34:52 6/12/2012 12:39:13 705-- 1 1 COAL -- Harita Para6/12/2012 12:38:28 6/12/2012 12:42:14 707-- 1 1 COAL -- Harita Para

6/12/2012 12:44:28 6/12/2012 12:48:53 836- 1 1 COAL -- Harita Para6/12/2012 12:45:29 6/12/2012 12:51:42 703-- 1 1 COAL -- Harita Para6/12/2012 12:50:07 6/12/2012 12:54:41 830- 1 1 COAL -- Harita Para

6/12/2012 12:57:31 6/12/2012 13:02:28 839- 1 1 COAL -- Harita Para6/12/2012 13:07:17 6/12/2012 13:12:03 115 1 1 COAL -- Harita Para

6/12/2012 13:10:27 6/12/2012 13:14:39 712-- 1 1 COAL -- Harita Para6/12/2012 13:17:33 6/12/2012 13:22:55 710-- 1 1 COAL -- Harita Para6/12/2012 13:20:01 6/12/2012 13:25:57 706-- 1 1 COAL -- Harita Para6/12/2012 13:31:00 6/12/2012 13:34:57 701-- 1 1 COAL -- Harita Para6/12/2012 13:36:57 6/12/2012 13:42:34 714-- 1 1 COAL -- Harita Para6/12/2012 13:41:00 6/12/2012 13:45:34 708-- 1 1 COAL -- Harita Para6/12/2012 13:50:21 6/12/2012 13:54:10 850- 1 1 COAL -- Harita Para6/12/2012 13:55:31 6/12/2012 14:00:04 702-- 1 1 COAL -- Harita Para6/12/2012 14:17:40 6/12/2012 14:21:40 830- 1 1 COAL -- Harita Para6/12/2012 14:18:43 6/12/2012 14:29:37 705-- 1 1 COAL -- Harita Para

6/12/2012 14:24:01 6/12/2012 14:31:55 707-- 1 1 COAL -- Harita Para6/12/2012 14:26:56 6/12/2012 14:34:16 832- 1 1 COAL -- Harita Para

6/12/2012 14:30:33 6/12/2012 14:38:54 829- 1 1 COAL -- Harita Para

Page 279: June Per Shift (Truckscale Port)

6/12/2012 14:40:16 6/12/2012 14:44:49 703-- 1 1 COAL -- Harita Para6/12/2012 14:47:04 6/12/2012 14:50:58 839- 1 1 COAL -- Harita Para6/12/2012 14:48:05 6/12/2012 14:53:39 712-- 1 1 COAL -- Harita Para6/12/2012 14:54:27 6/12/2012 14:58:52 710-- 1 1 COAL -- Harita Para6/12/2012 15:06:12 6/12/2012 15:10:07 115 1 1 COAL -- Harita Para6/12/2012 15:07:11 6/12/2012 15:13:28 714-- 1 1 COAL -- Harita Para6/12/2012 15:11:12 6/12/2012 15:17:42 828- 1 1 COAL -- Harita Para6/12/2012 15:11:58 6/12/2012 15:19:43 701-- 1 1 COAL -- Harita Para6/12/2012 15:12:21 6/12/2012 15:20:28 706-- 1 1 COAL -- Harita Para6/12/2012 15:12:43 6/12/2012 15:22:23 708-- 1 1 COAL -- Harita Para6/12/2012 15:16:46 6/12/2012 15:26:35 817- 1 1 COAL -- Harita Para

6/12/2012 15:25:17 6/12/2012 15:31:20 836- 1 1 COAL -- Harita Para6/12/2012 15:27:25 6/12/2012 15:33:22 850- 1 1 COAL -- Harita Para6/12/2012 15:52:49 6/12/2012 15:57:27 707-- 1 1 COAL -- Harita Para

6/12/2012 15:56:29 6/12/2012 16:00:06 829- 1 2 COAL -- Harita Para6/12/2012 15:59:28 6/12/2012 16:00:10 832- 1 2 COAL -- Harita Para6/12/2012 10:54:24 6/12/2012 11:13:15 851 1 1 COAL -- MIL6/12/2012 11:01:15 6/12/2012 11:13:19 856 1 1 COAL -- MIL6/12/2012 11:02:08 6/12/2012 11:29:10 855 1 1 COAL -- MIL6/12/2012 11:07:42 6/12/2012 11:29:04 810 1 1 COAL -- MIL6/12/2012 11:31:48 6/12/2012 11:40:35 853 1 1 COAL -- MIL6/12/2012 11:32:35 6/12/2012 11:40:39 852 1 1 COAL -- MIL6/12/2012 11:59:45 6/12/2012 12:03:57 809 1 1 COAL -- MIL6/12/2012 12:30:23 6/12/2012 12:37:05 851 1 1 COAL -- MIL6/12/2012 12:53:53 6/12/2012 13:00:23 855 1 1 COAL -- MIL6/12/2012 13:31:37 6/12/2012 13:39:23 852 1 1 COAL -- MIL6/12/2012 13:33:32 6/12/2012 13:40:25 853 1 1 COAL -- MIL6/12/2012 13:38:36 6/12/2012 13:43:21 856 1 1 COAL -- MIL6/12/2012 14:00:45 6/12/2012 14:05:09 809 1 1 COAL -- MIL6/12/2012 14:55:34 6/12/2012 15:08:01 855 1 1 COAL -- MIL6/12/2012 15:00:56 6/12/2012 15:07:41 851 1 1 COAL -- MIL6/12/2012 15:14:37 6/12/2012 15:23:34 856 1 1 COAL -- MIL6/12/2012 15:18:43 6/12/2012 15:28:23 853 1 1 COAL -- MIL

6/12/2012 15:19:01 6/12/2012 15:30:23 808 1 1 COAL -- MIL6/12/2012 15:35:27 6/12/2012 15:41:27 852 1 1 COAL -- MIL6/12/2012 16:01:14 6/12/2012 16:11:07 705-- 2 2 COAL -- Harita Para6/12/2012 16:02:18 6/12/2012 16:03:20 830- 2 2 COAL -- Harita Para

6/12/2012 16:05:34 6/12/2012 16:11:05 703-- 2 2 COAL -- Harita Para6/12/2012 16:08:26 6/12/2012 16:12:20 704-- 2 2 COAL -- Harita Para6/12/2012 16:10:16 6/12/2012 16:14:51 713-- 2 2 COAL -- Harita Para6/12/2012 18:21:22 6/12/2012 18:26:23 701-- 2 2 COAL -- Harita Para6/12/2012 18:21:50 6/12/2012 18:27:40 713-- 2 2 COAL -- Harita Para6/12/2012 18:24:54 6/12/2012 18:30:10 714-- 2 2 COAL -- Harita Para6/12/2012 18:25:41 6/12/2012 18:32:02 710-- 2 2 COAL -- Harita Para6/12/2012 18:28:25 6/12/2012 18:34:45 708-- 2 2 COAL -- Harita Para6/12/2012 18:33:56 6/12/2012 18:37:33 703-- 2 2 COAL -- Harita Para6/12/2012 18:35:29 6/12/2012 18:40:07 702-- 2 2 COAL -- Harita Para6/12/2012 18:38:43 6/12/2012 19:03:22 706-- 2 2 COAL -- Harita Para6/12/2012 18:40:50 6/12/2012 18:45:17 705-- 2 2 COAL -- Harita Para

Page 280: June Per Shift (Truckscale Port)

6/12/2012 18:52:22 6/12/2012 18:56:58 115 2 2 COAL -- Harita Para6/12/2012 18:52:44 6/12/2012 18:58:59 113 2 2 COAL -- Harita Para6/12/2012 18:59:49 6/12/2012 19:04:07 850- 2 2 COAL -- Harita Para6/12/2012 19:06:34 6/12/2012 19:13:16 709-- 2 2 COAL -- Harita Para6/12/2012 19:11:00 6/12/2012 19:17:03 836- 2 2 COAL -- Harita Para6/12/2012 19:11:26 6/12/2012 19:17:47 828- 2 2 COAL -- Harita Para6/12/2012 19:35:46 6/12/2012 19:40:57 812- 2 2 COAL -- Harita Para6/12/2012 19:47:23 6/12/2012 19:51:40 701-- 2 2 COAL -- Harita Para

6/12/2012 19:50:32 6/12/2012 19:51:44 713-- 2 2 COAL -- Harita Para

6/12/2012 19:55:58 6/12/2012 19:59:58 708-- 2 2 COAL -- Harita Para6/12/2012 19:56:18 6/12/2012 20:01:30 710-- 2 2 COAL -- Harita Para6/12/2012 20:06:55 6/12/2012 20:11:02 819- 2 2 COAL -- Harita Para6/12/2012 20:07:51 6/12/2012 20:11:10 703-- 2 2 COAL -- Harita Para6/12/2012 20:13:41 6/12/2012 20:17:55 702-- 2 2 COAL -- Harita Para6/12/2012 20:21:21 6/12/2012 20:25:39 705-- 2 2 COAL -- Harita Para6/12/2012 20:23:20 6/12/2012 20:30:05 707-- 2 2 COAL -- Harita Para6/12/2012 20:28:22 6/12/2012 20:30:09 712-- 2 2 COAL -- Harita Para6/12/2012 20:29:27 6/12/2012 20:39:00 850- 2 2 COAL -- Harita Para6/12/2012 20:41:46 6/12/2012 20:46:50 115 2 2 COAL -- Harita Para6/12/2012 20:43:31 6/12/2012 20:48:58 706-- 2 2 COAL -- Harita Para6/12/2012 20:49:46 6/12/2012 21:02:36 828- 2 2 COAL -- Harita Para6/12/2012 20:51:30 6/12/2012 21:02:42 839- 2 2 COAL -- Harita Para6/12/2012 21:01:54 6/12/2012 21:12:18 714-- 2 2 COAL -- Harita Para6/12/2012 21:13:15 6/12/2012 21:16:41 701-- 2 2 COAL -- Harita Para

6/12/2012 21:17:30 6/12/2012 21:24:03 713-- 2 2 COAL -- Harita Para6/12/2012 21:23:24 6/12/2012 21:24:07 812- 2 2 COAL -- Harita Para6/12/2012 21:24:53 6/12/2012 21:26:56 710-- 2 2 COAL -- Harita Para6/12/2012 22:00:59 6/12/2012 22:05:41 819- 2 2 COAL -- Harita Para6/12/2012 22:17:56 6/12/2012 22:22:46 709-- 2 2 COAL -- Harita Para6/12/2012 22:26:29 6/12/2012 22:30:23 708-- 2 2 COAL -- Harita Para6/12/2012 22:26:48 6/12/2012 22:32:33 702-- 2 2 COAL -- Harita Para6/12/2012 22:27:06 6/12/2012 22:34:26 705-- 2 2 COAL -- Harita Para6/12/2012 22:27:30 6/12/2012 22:37:22 115 2 2 COAL -- Harita Para

6/12/2012 22:27:57 6/12/2012 22:39:03 706-- 2 2 COAL -- Harita Para

6/12/2012 22:28:44 6/12/2012 22:42:33 707-- 2 2 COAL -- Harita Para6/12/2012 22:31:29 6/12/2012 22:44:52 850- 2 2 COAL -- Harita Para6/12/2012 22:36:21 6/12/2012 22:46:59 836- 2 2 COAL -- Harita Para6/12/2012 22:41:24 6/12/2012 22:51:17 839- 2 2 COAL -- Harita Para6/12/2012 22:43:11 6/12/2012 22:51:49 701-- 2 2 COAL -- Harita Para

6/12/2012 22:49:12 6/12/2012 22:56:05 828- 2 2 COAL -- Harita Para6/12/2012 22:49:39 6/12/2012 22:58:10 714-- 2 2 COAL -- Harita Para6/12/2012 22:50:25 6/12/2012 23:01:53 713-- 2 2 COAL -- Harita Para6/12/2012 22:52:42 6/12/2012 23:02:58 837- 2 2 COAL -- Harita Para6/12/2012 23:00:12 6/12/2012 23:06:07 712-- 2 2 COAL -- Harita Para6/12/2012 23:01:18 6/12/2012 23:06:47 710-- 2 2 COAL -- Harita Para

6/12/2012 23:04:29 6/12/2012 23:10:24 812- 2 2 COAL -- Harita Para6/12/2012 23:26:48 6/12/2012 23:31:26 703-- 2 2 COAL -- Harita Para6/12/2012 23:33:56 6/12/2012 23:38:15 819- 2 2 COAL -- Harita Para

Page 281: June Per Shift (Truckscale Port)

6/12/2012 23:45:42 6/12/2012 23:50:34 709-- 2 2 COAL -- Harita Para6/12/2012 23:49:27 6/12/2012 23:53:34 708-- 2 2 COAL -- Harita Para6/12/2012 23:49:47 6/12/2012 23:56:27 705-- 2 2 COAL -- Harita Para6/12/2012 23:55:25 6/12/2012 23:59:57 702-- 2 2 COAL -- Harita Para6/12/2012 19:02:07 6/12/2012 19:09:06 855 2 2 COAL -- MIL6/12/2012 19:02:36 6/12/2012 19:09:37 856 2 2 COAL -- MIL6/12/2012 19:05:59 6/12/2012 19:13:31 852 2 2 COAL -- MIL6/12/2012 19:15:47 6/12/2012 19:25:04 851 2 2 COAL -- MIL6/12/2012 19:16:18 6/12/2012 19:21:58 810 2 2 COAL -- MIL

6/12/2012 20:37:24 6/12/2012 20:42:52 853 2 2 COAL -- MIL6/12/2012 20:37:51 6/12/2012 20:42:56 856 2 2 COAL -- MIL6/12/2012 20:51:01 6/12/2012 21:04:00 852 2 2 COAL -- MIL6/12/2012 20:52:11 6/12/2012 21:04:03 855 2 2 COAL -- MIL6/12/2012 21:04:47 6/12/2012 21:16:15 810 2 2 COAL -- MIL6/12/2012 21:05:23 6/12/2012 21:16:20 851 2 2 COAL -- MIL6/12/2012 22:28:19 6/12/2012 22:40:29 856 2 2 COAL -- MIL6/12/2012 22:45:33 6/12/2012 22:53:26 852 2 2 COAL -- MIL6/12/2012 22:48:46 6/12/2012 22:53:30 851 2 2 COAL -- MIL6/12/2012 22:50:07 6/12/2012 22:59:17 810 2 2 COAL -- MIL6/12/2012 23:04:10 6/12/2012 23:12:40 855 2 2 COAL -- MIL6/13/2012 00:15:45 6/13/2012 00:20:36 701-- 3 3 COAL -- Harita Para6/13/2012 00:19:11 6/13/2012 00:23:24 836- 3 3 COAL -- Harita Para6/13/2012 00:22:14 6/13/2012 00:23:28 850- 3 3 COAL -- Harita Para6/13/2012 00:22:40 6/13/2012 00:25:59 839- 3 3 COAL -- Harita Para6/13/2012 00:28:48 6/13/2012 00:32:17 713-- 3 3 COAL -- Harita Para6/13/2012 00:33:07 6/13/2012 00:37:25 837- 3 3 COAL -- Harita Para6/13/2012 00:36:48 6/13/2012 00:40:31 828- 3 3 COAL -- Harita Para6/13/2012 00:51:05 6/13/2012 00:56:20 714-- 3 3 COAL -- Harita Para6/13/2012 01:32:50 6/13/2012 01:36:14 710-- 3 3 COAL -- Harita Para6/13/2012 01:41:10 6/13/2012 01:45:13 707-- 3 3 COAL -- Harita Para6/13/2012 01:49:08 6/13/2012 01:53:31 709-- 3 3 COAL -- Harita Para6/13/2012 01:49:51 6/13/2012 01:55:23 812- 3 3 COAL -- Harita Para6/13/2012 01:50:48 6/13/2012 01:57:29 832- 3 3 COAL -- Harita Para6/13/2012 01:51:15 6/13/2012 01:59:38 712-- 3 3 COAL -- Harita Para6/13/2012 01:51:44 6/13/2012 02:02:16 819- 3 3 COAL -- Harita Para6/13/2012 01:54:11 6/13/2012 02:02:41 705-- 3 3 COAL -- Harita Para6/13/2012 02:00:20 6/13/2012 02:04:50 115 3 3 COAL -- Harita Para6/13/2012 02:00:46 6/13/2012 02:06:30 703-- 3 3 COAL -- Harita Para6/13/2012 02:03:57 6/13/2012 02:09:30 836- 3 3 COAL -- Harita Para6/13/2012 02:05:22 6/13/2012 02:10:37 702-- 3 3 COAL -- Harita Para6/13/2012 02:08:43 6/13/2012 02:12:37 708-- 3 3 COAL -- Harita Para6/13/2012 02:11:43 6/13/2012 02:16:15 714-- 3 3 COAL -- Harita Para6/13/2012 02:14:15 6/13/2012 02:19:30 713-- 3 3 COAL -- Harita Para

6/13/2012 02:18:33 6/13/2012 02:25:56 828- 3 3 COAL -- Harita Para6/13/2012 02:24:03 6/13/2012 02:26:02 837- 3 3 COAL -- Harita Para6/13/2012 02:25:05 6/13/2012 02:28:00 850- 3 3 COAL -- Harita Para6/13/2012 02:33:29 6/13/2012 02:38:01 839- 3 3 COAL -- Harita Para6/13/2012 02:42:35 6/13/2012 02:47:38 706-- 3 3 COAL -- Harita Para6/13/2012 03:13:25 6/13/2012 03:17:56 709-- 3 3 COAL -- Harita Para

Page 282: June Per Shift (Truckscale Port)

6/13/2012 03:13:50 6/13/2012 03:18:00 707-- 3 3 COAL -- Harita Para6/13/2012 03:27:11 6/13/2012 03:31:19 812- 3 3 COAL -- Harita Para6/13/2012 03:38:02 6/13/2012 03:42:07 832- 3 3 COAL -- Harita Para6/13/2012 07:39:04 6/13/2012 07:49:49 850- 3 3 COAL -- Harita Para6/13/2012 07:39:25 6/13/2012 07:52:21 839- 3 3 COAL -- Harita Para6/13/2012 07:39:46 6/13/2012 07:53:35 836- 3 3 COAL -- Harita Para6/13/2012 07:50:26 6/13/2012 08:03:20 704-- 3 1 COAL -- Harita Para6/13/2012 07:54:27 6/13/2012 07:58:42 714-- 3 3 COAL -- Harita Para6/13/2012 07:55:38 6/13/2012 08:02:30 702-- 3 1 COAL -- Harita Para6/13/2012 07:58:02 6/13/2012 08:02:33 707-- 3 1 COAL -- Harita Para6/13/2012 00:03:09 6/13/2012 00:08:51 856 3 3 COAL -- MIL6/13/2012 00:38:32 6/13/2012 00:43:02 853 3 3 COAL -- MIL6/13/2012 00:41:15 6/13/2012 00:44:49 851 3 3 COAL -- MIL6/13/2012 00:41:36 6/13/2012 00:44:52 852 3 3 COAL -- MIL6/13/2012 01:03:02 6/13/2012 01:09:11 855 3 3 COAL -- MIL6/13/2012 01:03:22 6/13/2012 01:09:17 810 3 3 COAL -- MIL6/13/2012 01:26:17 6/13/2012 01:34:11 856 3 3 COAL -- MIL

6/13/2012 02:17:02 6/13/2012 02:22:57 853 3 3 COAL -- MIL6/13/2012 02:24:35 6/13/2012 02:29:50 851 3 3 COAL -- MIL6/13/2012 03:08:17 6/13/2012 03:14:29 856 3 3 COAL -- MIL6/13/2012 07:37:35 6/13/2012 07:41:18 856 3 3 COAL -- MIL6/13/2012 07:38:13 6/13/2012 07:41:38 855 3 3 COAL -- MIL

6/13/2012 07:38:36 6/13/2012 07:42:03 810 3 3 COAL -- MIL6/13/2012 07:42:54 6/13/2012 07:59:12 851 3 3 COAL -- MIL6/13/2012 07:44:04 6/13/2012 08:18:00 852 3 1 COAL -- MIL6/13/2012 07:51:00 6/13/2012 07:54:58 853 3 3 COAL -- MIL6/13/2012 08:01:25 6/13/2012 08:08:26 706-- 1 1 COAL -- Harita Para6/13/2012 08:01:52 6/13/2012 08:11:38 701-- 1 1 COAL -- Harita Para6/13/2012 08:10:50 6/13/2012 08:14:57 703-- 1 1 COAL -- Harita Para6/13/2012 08:12:57 6/13/2012 08:17:36 115 1 1 COAL -- Harita Para6/13/2012 08:16:27 6/13/2012 08:22:13 113 1 1 COAL -- Harita Para6/13/2012 08:19:16 6/13/2012 08:23:17 837- 1 1 COAL -- Harita Para6/13/2012 08:21:07 6/13/2012 08:31:30 710-- 1 1 COAL -- Harita Para

6/13/2012 08:21:27 6/13/2012 08:33:33 709-- 1 1 COAL -- Harita Para6/13/2012 08:29:56 6/13/2012 08:35:38 829- 1 1 COAL -- Harita Para6/13/2012 08:38:17 6/13/2012 08:42:01 713-- 1 1 COAL -- Harita Para

6/13/2012 09:14:54 6/13/2012 09:18:31 704-- 1 1 COAL -- Harita Para6/13/2012 09:15:54 6/13/2012 09:21:10 836- 1 1 COAL -- Harita Para6/13/2012 09:20:27 6/13/2012 09:24:12 702-- 1 1 COAL -- Harita Para6/13/2012 09:28:32 6/13/2012 09:32:17 707-- 1 1 COAL -- Harita Para

6/13/2012 09:30:18 6/13/2012 09:34:11 850- 1 1 COAL -- Harita Para6/13/2012 09:35:02 6/13/2012 09:38:29 706-- 1 1 COAL -- Harita Para6/13/2012 09:42:32 6/13/2012 09:46:25 701-- 1 1 COAL -- Harita Para6/13/2012 09:52:54 6/13/2012 09:58:29 812- 1 1 COAL -- Harita Para6/13/2012 09:57:49 6/13/2012 10:03:31 833- 1 1 COAL -- Harita Para6/13/2012 10:04:36 6/13/2012 10:08:21 829- 1 1 COAL -- Harita Para6/13/2012 10:24:07 6/13/2012 10:27:54 837- 1 1 COAL -- Harita Para6/13/2012 10:36:49 6/13/2012 10:40:17 714-- 1 1 COAL -- Harita Para6/13/2012 10:38:03 6/13/2012 10:42:47 832- 1 1 COAL -- Harita Para

Page 283: June Per Shift (Truckscale Port)

6/13/2012 10:38:57 6/13/2012 10:45:11 709-- 1 1 COAL -- Harita Para6/13/2012 10:41:37 6/13/2012 10:47:07 703-- 1 1 COAL -- Harita Para6/13/2012 10:44:35 6/13/2012 10:48:51 704-- 1 1 COAL -- Harita Para6/13/2012 10:45:59 6/13/2012 10:50:49 710-- 1 1 COAL -- Harita Para6/13/2012 10:46:27 6/13/2012 10:55:14 713-- 1 1 COAL -- Harita Para6/13/2012 10:53:04 6/13/2012 10:57:36 115 1 1 COAL -- Harita Para6/13/2012 10:53:25 6/13/2012 10:59:38 113 1 1 COAL -- Harita Para6/13/2012 10:53:48 6/13/2012 11:01:25 702-- 1 1 COAL -- Harita Para6/13/2012 11:02:23 6/13/2012 11:05:36 706-- 1 1 COAL -- Harita Para6/13/2012 11:06:24 6/13/2012 11:10:54 817- 1 1 COAL -- Harita Para6/13/2012 11:08:06 6/13/2012 11:12:54 707-- 1 1 COAL -- Harita Para6/13/2012 11:12:07 6/13/2012 11:15:25 836- 1 1 COAL -- Harita Para6/13/2012 11:16:46 6/13/2012 11:20:17 850- 1 1 COAL -- Harita Para6/13/2012 11:24:26 6/13/2012 11:27:46 833- 1 1 COAL -- Harita Para6/13/2012 11:29:22 6/13/2012 11:33:36 701-- 1 1 COAL -- Harita Para6/13/2012 11:34:35 6/13/2012 11:42:58 829- 1 1 COAL -- Harita Para6/13/2012 11:41:56 6/13/2012 11:46:33 712-- 1 1 COAL -- Harita Para6/13/2012 11:48:43 6/13/2012 11:52:42 831- 1 1 COAL -- Harita Para6/13/2012 11:50:38 6/13/2012 11:56:57 812- 1 1 COAL -- Harita Para6/13/2012 12:05:42 6/13/2012 12:12:44 837- 1 1 COAL -- Harita Para6/13/2012 12:10:48 6/13/2012 12:15:26 703-- 1 1 COAL -- Harita Para6/13/2012 12:21:27 6/13/2012 12:25:59 714-- 1 1 COAL -- Harita Para6/13/2012 12:42:39 6/13/2012 12:46:24 704-- 1 1 COAL -- Harita Para6/13/2012 12:53:14 6/13/2012 12:57:01 850- 1 1 COAL -- Harita Para6/13/2012 13:01:55 6/13/2012 13:08:58 817- 1 1 COAL -- Harita Para6/13/2012 13:09:43 6/13/2012 13:13:51 833- 1 1 COAL -- Harita Para6/13/2012 13:12:04 6/13/2012 13:16:14 706-- 1 1 COAL -- Harita Para6/13/2012 13:12:22 6/13/2012 13:18:23 702-- 1 1 COAL -- Harita Para6/13/2012 13:12:42 6/13/2012 13:19:10 707-- 1 1 COAL -- Harita Para6/13/2012 13:15:12 6/13/2012 13:21:11 709-- 1 1 COAL -- Harita Para6/13/2012 13:15:37 6/13/2012 13:23:33 113 1 1 COAL -- Harita Para6/13/2012 13:16:56 6/13/2012 13:27:02 115 1 1 COAL -- Harita Para6/13/2012 13:17:42 6/13/2012 13:27:22 710-- 1 1 COAL -- Harita Para6/13/2012 13:27:56 6/13/2012 13:31:48 701-- 1 1 COAL -- Harita Para6/13/2012 13:43:26 6/13/2012 13:47:27 703-- 1 1 COAL -- Harita Para6/13/2012 13:47:58 6/13/2012 13:52:44 829- 1 1 COAL -- Harita Para6/13/2012 13:52:06 6/13/2012 13:56:10 714-- 1 1 COAL -- Harita Para6/13/2012 14:01:25 6/13/2012 14:08:12 712-- 1 1 COAL -- Harita Para6/13/2012 14:07:15 6/13/2012 14:11:15 704-- 1 1 COAL -- Harita Para6/13/2012 14:09:50 6/13/2012 14:15:05 812- 1 1 COAL -- Harita Para6/13/2012 14:17:09 6/13/2012 14:23:45 837- 1 1 COAL -- Harita Para6/13/2012 14:18:41 6/13/2012 14:26:12 815- 1 1 COAL -- Harita Para6/13/2012 14:32:14 6/13/2012 14:35:32 706-- 1 1 COAL -- Harita Para6/13/2012 14:37:53 6/13/2012 14:41:31 833- 1 1 COAL -- Harita Para6/13/2012 14:38:37 6/13/2012 14:43:14 702-- 1 1 COAL -- Harita Para6/13/2012 14:44:17 6/13/2012 14:48:59 817- 1 1 COAL -- Harita Para6/13/2012 14:45:22 6/13/2012 14:56:45 707-- 1 1 COAL -- Harita Para6/13/2012 14:49:55 6/13/2012 14:56:48 709-- 1 1 COAL -- Harita Para6/13/2012 14:50:19 6/13/2012 14:58:29 839- 1 1 COAL -- Harita Para

6/13/2012 14:54:51 6/13/2012 15:00:46 113 1 1 COAL -- Harita Para

Page 284: June Per Shift (Truckscale Port)

6/13/2012 14:57:50 6/13/2012 15:03:32 850- 1 1 COAL -- Harita Para6/13/2012 15:02:44 6/13/2012 15:07:39 115 1 1 COAL -- Harita Para6/13/2012 15:05:42 6/13/2012 15:08:13 701-- 1 1 COAL -- Harita Para

6/13/2012 15:13:48 6/13/2012 15:18:27 831- 1 1 COAL -- Harita Para6/13/2012 15:22:36 6/13/2012 15:27:22 703-- 1 1 COAL -- Harita Para6/13/2012 15:23:21 6/13/2012 15:27:27 714-- 1 1 COAL -- Harita Para6/13/2012 15:40:54 6/13/2012 15:45:51 815- 1 1 COAL -- Harita Para6/13/2012 15:46:57 6/13/2012 15:50:51 713-- 1 1 COAL -- Harita Para6/13/2012 09:23:04 6/13/2012 09:31:29 856 1 1 COAL -- MIL6/13/2012 09:30:48 6/13/2012 09:35:54 807 1 1 COAL -- MIL6/13/2012 09:37:19 6/13/2012 09:44:14 852 1 1 COAL -- MIL6/13/2012 09:37:49 6/13/2012 09:43:53 810 1 1 COAL -- MIL6/13/2012 09:57:11 6/13/2012 10:02:00 851 1 1 COAL -- MIL6/13/2012 10:00:32 6/13/2012 10:05:59 855 1 1 COAL -- MIL6/13/2012 10:15:12 6/13/2012 10:22:24 853 1 1 COAL -- MIL

6/13/2012 11:07:43 6/13/2012 11:14:15 856 1 1 COAL -- MIL6/13/2012 11:13:32 6/13/2012 11:18:24 810 1 1 COAL -- MIL6/13/2012 11:34:12 6/13/2012 11:38:13 851 1 1 COAL -- MIL6/13/2012 11:36:43 6/13/2012 11:45:26 852 1 1 COAL -- MIL6/13/2012 11:49:04 6/13/2012 11:55:25 855 1 1 COAL -- MIL6/13/2012 12:04:41 6/13/2012 12:11:50 853 1 1 COAL -- MIL6/13/2012 12:44:37 6/13/2012 12:48:59 856 1 1 COAL -- MIL6/13/2012 12:47:25 6/13/2012 12:52:17 810 1 1 COAL -- MIL6/13/2012 13:38:34 6/13/2012 13:45:54 852 1 1 COAL -- MIL

6/13/2012 14:01:55 6/13/2012 14:09:03 851 1 1 COAL -- MIL

6/13/2012 14:16:08 6/13/2012 14:22:15 855 1 1 COAL -- MIL6/13/2012 14:44:48 6/13/2012 14:52:54 853 1 1 COAL -- MIL6/13/2012 15:26:38 6/13/2012 15:33:42 810 1 1 COAL -- MIL

6/13/2012 16:14:08 6/13/2012 16:22:11 712-- 2 2 COAL -- Harita Para

6/13/2012 16:16:17 6/13/2012 16:24:01 817- 2 2 COAL -- Harita Para6/13/2012 19:02:54 6/13/2012 19:07:12 115 2 2 COAL -- Harita Para6/13/2012 19:03:15 6/13/2012 19:08:20 713-- 2 2 COAL -- Harita Para6/13/2012 19:06:12 6/13/2012 19:10:38 709-- 2 2 COAL -- Harita Para6/13/2012 19:11:29 6/13/2012 19:15:47 701-- 2 2 COAL -- Harita Para6/13/2012 19:12:26 6/13/2012 19:19:37 714-- 2 2 COAL -- Harita Para6/13/2012 19:14:03 6/13/2012 19:23:09 839- 2 2 COAL -- Harita Para6/13/2012 19:14:54 6/13/2012 19:23:33 837- 2 2 COAL -- Harita Para6/13/2012 19:20:41 6/13/2012 19:28:14 812- 2 2 COAL -- Harita Para6/13/2012 19:21:56 6/13/2012 19:31:37 702-- 2 2 COAL -- Harita Para6/13/2012 19:41:54 6/13/2012 19:47:05 850- 2 2 COAL -- Harita Para6/13/2012 19:42:20 6/13/2012 20:05:28 704-- 2 2 COAL -- Harita Para6/13/2012 19:42:40 6/13/2012 19:50:11 707-- 2 2 COAL -- Harita Para6/13/2012 19:43:16 6/13/2012 19:52:34 703-- 2 2 COAL -- Harita Para6/13/2012 19:51:22 6/13/2012 19:57:39 706-- 2 2 COAL -- Harita Para6/13/2012 19:51:46 6/13/2012 19:59:10 712-- 2 2 COAL -- Harita Para6/13/2012 20:11:06 6/13/2012 20:15:14 113 2 2 COAL -- Harita Para6/13/2012 20:30:25 6/13/2012 20:34:09 713-- 2 2 COAL -- Harita Para6/13/2012 20:36:27 6/13/2012 20:40:58 705-- 2 2 COAL -- Harita Para

Page 285: June Per Shift (Truckscale Port)

6/13/2012 20:39:05 6/13/2012 20:43:28 815- 2 2 COAL -- Harita Para6/13/2012 20:41:51 6/13/2012 20:46:03 709-- 2 2 COAL -- Harita Para6/13/2012 20:47:37 6/13/2012 20:51:30 701-- 2 2 COAL -- Harita Para6/13/2012 20:48:03 6/13/2012 20:54:00 818- 2 2 COAL -- Harita Para

6/13/2012 20:48:27 6/13/2012 20:55:26 832- 2 2 COAL -- Harita Para6/13/2012 20:53:12 6/13/2012 20:57:13 714-- 2 2 COAL -- Harita Para

6/13/2012 20:58:28 6/13/2012 21:05:36 817- 2 2 COAL -- Harita Para6/13/2012 21:10:40 6/13/2012 21:14:55 707-- 2 2 COAL -- Harita Para6/13/2012 21:11:09 6/13/2012 21:16:07 830- 2 2 COAL -- Harita Para

6/13/2012 21:11:37 6/13/2012 21:17:56 712-- 2 2 COAL -- Harita Para6/13/2012 21:14:12 6/13/2012 21:20:20 839- 2 2 COAL -- Harita Para6/13/2012 21:21:22 6/13/2012 21:26:20 115 2 2 COAL -- Harita Para6/13/2012 21:24:34 6/13/2012 21:29:16 702-- 2 2 COAL -- Harita Para6/13/2012 21:25:26 6/13/2012 21:30:57 837- 2 2 COAL -- Harita Para6/13/2012 21:28:40 6/13/2012 21:33:51 703-- 2 2 COAL -- Harita Para6/13/2012 21:32:12 6/13/2012 21:37:12 812- 2 2 COAL -- Harita Para6/13/2012 21:36:00 6/13/2012 21:42:07 704-- 2 2 COAL -- Harita Para6/13/2012 21:36:25 6/13/2012 21:44:23 113 2 2 COAL -- Harita Para

6/13/2012 21:43:11 6/13/2012 21:47:54 828- 2 2 COAL -- Harita Para6/13/2012 21:49:52 6/13/2012 21:53:40 713-- 2 2 COAL -- Harita Para6/13/2012 22:02:05 6/13/2012 22:06:32 706-- 2 2 COAL -- Harita Para6/13/2012 22:08:23 6/13/2012 22:12:44 709-- 2 2 COAL -- Harita Para6/13/2012 22:09:17 6/13/2012 22:15:22 850- 2 2 COAL -- Harita Para6/13/2012 22:14:35 6/13/2012 22:19:10 705-- 2 2 COAL -- Harita Para6/13/2012 22:18:24 6/13/2012 22:22:14 714-- 2 2 COAL -- Harita Para6/13/2012 22:23:31 6/13/2012 22:27:54 701-- 2 2 COAL -- Harita Para6/13/2012 22:26:09 6/13/2012 22:31:00 832- 2 2 COAL -- Harita Para6/13/2012 22:28:52 6/13/2012 22:33:32 815- 2 2 COAL -- Harita Para6/13/2012 22:30:01 6/13/2012 22:36:07 833- 2 2 COAL -- Harita Para6/13/2012 22:40:10 6/13/2012 22:44:06 817- 2 2 COAL -- Harita Para6/13/2012 22:40:59 6/13/2012 22:46:24 818- 2 2 COAL -- Harita Para6/13/2012 22:51:53 6/13/2012 22:58:12 115 2 2 COAL -- Harita Para6/13/2012 22:55:07 6/13/2012 22:59:19 830- 2 2 COAL -- Harita Para6/13/2012 22:57:02 6/13/2012 23:02:58 710-- 2 2 COAL -- Harita Para6/13/2012 22:57:23 6/13/2012 23:04:51 113 2 2 COAL -- Harita Para6/13/2012 23:00:24 6/13/2012 23:07:43 839- 2 2 COAL -- Harita Para6/13/2012 23:06:00 6/13/2012 23:10:52 713-- 2 2 COAL -- Harita Para6/13/2012 23:07:04 6/13/2012 23:12:18 837- 2 2 COAL -- Harita Para6/13/2012 23:08:39 6/13/2012 23:15:57 703-- 2 2 COAL -- Harita Para6/13/2012 23:13:04 6/13/2012 23:18:54 812- 2 2 COAL -- Harita Para6/13/2012 23:15:00 6/13/2012 23:21:44 704-- 2 2 COAL -- Harita Para

6/13/2012 23:22:47 6/13/2012 23:29:35 828- 2 2 COAL -- Harita Para6/13/2012 23:26:23 6/13/2012 23:32:01 836- 2 2 COAL -- Harita Para6/13/2012 23:36:26 6/13/2012 23:39:57 702-- 2 2 COAL -- Harita Para6/13/2012 23:43:51 6/13/2012 23:49:10 709-- 2 2 COAL -- Harita Para6/13/2012 23:44:54 6/13/2012 23:50:43 850- 2 2 COAL -- Harita Para6/13/2012 23:47:26 6/13/2012 23:53:16 714-- 2 2 COAL -- Harita Para6/13/2012 19:16:44 6/13/2012 19:25:15 851 2 2 COAL -- MIL6/13/2012 19:17:12 6/13/2012 19:26:39 856 2 2 COAL -- MIL

Page 286: June Per Shift (Truckscale Port)

6/13/2012 19:21:33 6/13/2012 19:29:38 852 2 2 COAL -- MIL6/13/2012 19:22:25 6/13/2012 19:32:44 853 2 2 COAL -- MIL6/13/2012 19:24:19 6/13/2012 19:36:20 855 2 2 COAL -- MIL6/13/2012 20:04:45 6/13/2012 20:07:57 810 2 2 COAL -- MIL6/13/2012 20:57:51 6/13/2012 21:03:16 851 2 2 COAL -- MIL6/13/2012 21:04:01 6/13/2012 21:13:02 856 2 2 COAL -- MIL6/13/2012 21:18:38 6/13/2012 21:23:29 852 2 2 COAL -- MIL6/13/2012 21:27:50 6/13/2012 21:32:51 853 2 2 COAL -- MIL6/13/2012 21:35:16 6/13/2012 21:41:46 855 2 2 COAL -- MIL6/13/2012 22:32:00 6/13/2012 22:37:37 851 2 2 COAL -- MIL6/13/2012 22:41:51 6/13/2012 22:47:27 856 2 2 COAL -- MIL6/13/2012 22:56:33 6/13/2012 23:01:32 852 2 2 COAL -- MIL

6/13/2012 23:00:53 6/13/2012 23:09:18 810 2 2 COAL -- MIL6/13/2012 23:17:39 6/13/2012 23:23:45 853 2 2 COAL -- MIL6/13/2012 23:20:52 6/13/2012 23:27:59 855 2 2 COAL -- MIL6/14/2012 00:02:16 6/14/2012 00:08:25 705-- 3 3 COAL -- Harita Para6/14/2012 00:04:06 6/14/2012 00:14:43 701-- 3 3 COAL -- Harita Para6/14/2012 00:06:20 6/14/2012 00:12:22 832- 3 3 COAL -- Harita Para6/14/2012 00:07:03 6/14/2012 00:14:52 706-- 3 3 COAL -- Harita Para6/14/2012 00:13:54 6/14/2012 00:20:34 815- 3 3 COAL -- Harita Para6/14/2012 00:23:23 6/14/2012 00:28:03 113 3 3 COAL -- Harita Para6/14/2012 00:25:33 6/14/2012 00:29:29 712-- 3 3 COAL -- Harita Para6/14/2012 00:27:17 6/14/2012 00:31:38 818- 3 3 COAL -- Harita Para6/14/2012 00:37:04 6/14/2012 00:42:12 830- 3 3 COAL -- Harita Para6/14/2012 00:41:11 6/14/2012 00:44:43 713-- 3 3 COAL -- Harita Para6/14/2012 01:01:59 6/14/2012 01:05:59 817- 3 3 COAL -- Harita Para6/14/2012 01:15:34 6/14/2012 01:22:56 115 3 3 COAL -- Harita Para6/14/2012 01:21:59 6/14/2012 01:25:59 703-- 3 3 COAL -- Harita Para6/14/2012 01:34:05 6/14/2012 01:40:02 702-- 3 3 COAL -- Harita Para

6/14/2012 01:48:20 6/14/2012 01:52:32 705-- 3 3 COAL -- Harita Para

6/14/2012 01:50:40 6/14/2012 01:58:04 710 3 3 COAL -- Harita Para

6/14/2012 01:57:28 6/14/2012 02:03:22 701-- 3 3 COAL -- Harita Para6/14/2012 02:04:52 6/14/2012 02:10:56 712-- 3 3 COAL -- Harita Para6/14/2012 02:09:57 6/14/2012 02:15:02 812- 3 3 COAL -- Harita Para6/14/2012 02:10:17 6/14/2012 02:16:37 713-- 3 3 COAL -- Harita Para

6/14/2012 02:13:18 6/14/2012 02:19:09 113 3 3 COAL -- Harita Para6/14/2012 02:15:57 6/14/2012 02:22:08 828- 3 3 COAL -- Harita Para6/14/2012 02:27:27 6/14/2012 02:32:21 839- 3 3 COAL -- Harita Para6/14/2012 02:33:32 6/14/2012 02:37:40 714-- 3 3 COAL -- Harita Para6/14/2012 02:35:50 6/14/2012 02:39:27 836- 3 3 COAL -- Harita Para6/14/2012 02:38:41 6/14/2012 02:42:43 850- 3 3 COAL -- Harita Para6/14/2012 02:41:00 6/14/2012 02:45:28 709-- 3 3 COAL -- Harita Para6/14/2012 02:41:57 6/14/2012 02:48:34 815- 3 3 COAL -- Harita Para6/14/2012 02:47:36 6/14/2012 02:51:56 818- 3 3 COAL -- Harita Para

6/14/2012 02:53:06 6/14/2012 03:00:37 704-- 3 3 COAL -- Harita Para6/14/2012 02:53:30 6/14/2012 03:00:40 115 3 3 COAL -- Harita Para6/14/2012 03:10:04 6/14/2012 03:14:36 817- 3 3 COAL -- Harita Para6/14/2012 03:10:33 6/14/2012 03:16:50 830- 3 3 COAL -- Harita Para

Page 287: June Per Shift (Truckscale Port)

6/14/2012 03:27:06 6/14/2012 03:31:36 832- 3 3 COAL -- Harita Para6/14/2012 03:28:17 6/14/2012 03:34:08 712-- 3 3 COAL -- Harita Para

6/14/2012 03:33:23 6/14/2012 03:37:04 713-- 3 3 COAL -- Harita Para6/14/2012 03:44:09 6/14/2012 03:48:22 113 3 3 COAL -- Harita Para6/14/2012 03:54:37 6/14/2012 03:58:55 828- 3 3 COAL -- Harita Para6/14/2012 04:00:35 6/14/2012 04:06:11 850- 3 3 COAL -- Harita Para6/14/2012 04:04:20 6/14/2012 04:08:20 706-- 3 3 COAL -- Harita Para6/14/2012 04:05:23 6/14/2012 04:09:56 710-- 3 3 COAL -- Harita Para6/14/2012 07:16:31 6/14/2012 07:20:58 113 3 3 COAL -- Harita Para6/14/2012 07:17:54 6/14/2012 07:21:01 115 3 3 COAL -- Harita Para6/14/2012 07:23:00 6/14/2012 07:26:59 701-- 3 3 COAL -- Harita Para

6/14/2012 07:23:57 6/14/2012 07:31:33 709-- 3 3 COAL -- Harita Para6/14/2012 07:26:03 6/14/2012 07:31:25 713-- 3 3 COAL -- Harita Para

6/14/2012 07:28:41 6/14/2012 07:34:05 703-- 3 3 COAL -- Harita Para6/14/2012 07:30:05 6/14/2012 07:45:44 702-- 3 3 COAL -- Harita Para6/14/2012 07:38:29 6/14/2012 07:45:50 714-- 3 3 COAL -- Harita Para6/14/2012 07:39:16 6/14/2012 07:48:25 707-- 3 3 COAL -- Harita Para6/14/2012 07:40:24 6/14/2012 07:50:30 815- 3 3 COAL -- Harita Para6/14/2012 07:44:53 6/14/2012 07:52:22 708-- 3 3 COAL -- Harita Para6/14/2012 07:47:44 6/14/2012 07:57:30 836- 3 3 COAL -- Harita Para6/14/2012 07:49:24 6/14/2012 07:56:56 839- 3 3 COAL -- Harita Para

6/14/2012 07:58:45 6/14/2012 08:02:11 818- 3 1 COAL -- Harita Para6/14/2012 07:59:45 6/14/2012 08:05:31 712-- 3 1 COAL -- Harita Para6/14/2012 00:07:30 6/14/2012 00:16:47 851 3 3 COAL -- MIL6/14/2012 00:17:43 6/14/2012 00:24:12 856 3 3 COAL -- MIL6/14/2012 00:41:33 6/14/2012 00:46:01 810 3 3 COAL -- MIL6/14/2012 00:55:24 6/14/2012 01:03:57 852 3 3 COAL -- MIL

6/14/2012 01:14:22 6/14/2012 01:18:57 853 3 3 COAL -- MIL6/14/2012 01:31:10 6/14/2012 01:38:24 855 3 3 COAL -- MIL6/14/2012 01:50:05 6/14/2012 01:56:30 851 3 3 COAL -- MIL6/14/2012 02:14:19 6/14/2012 02:20:14 810 3 3 COAL -- MIL6/14/2012 07:29:41 6/14/2012 07:37:21 810 3 3 COAL -- MIL6/14/2012 07:33:25 6/14/2012 07:41:55 855 3 3 COAL -- MIL6/14/2012 07:35:25 6/14/2012 07:42:26 856 3 3 COAL -- MIL6/14/2012 07:35:44 6/14/2012 07:43:46 851 3 3 COAL -- MIL6/14/2012 07:49:53 6/14/2012 08:00:27 853 3 1 COAL -- MIL6/14/2012 08:10:54 6/14/2012 08:15:32 817- 1 1 COAL -- Harita Para6/14/2012 08:43:53 6/14/2012 08:49:54 812- 1 1 COAL -- Harita Para6/14/2012 08:47:00 6/14/2012 08:52:36 113 1 1 COAL -- Harita Para6/14/2012 08:49:11 6/14/2012 08:54:28 115 1 1 COAL -- Harita Para6/14/2012 08:53:41 6/14/2012 08:58:45 832- 1 1 COAL -- Harita Para

6/14/2012 08:57:40 6/14/2012 09:01:30 830- 1 1 COAL -- Harita Para6/14/2012 08:58:04 6/14/2012 09:03:54 709-- 1 1 COAL -- Harita Para6/14/2012 09:02:29 6/14/2012 09:07:34 713-- 1 1 COAL -- Harita Para6/14/2012 09:06:04 6/14/2012 09:12:32 837- 1 1 COAL -- Harita Para6/14/2012 09:06:45 6/14/2012 09:12:54 707-- 1 1 COAL -- Harita Para6/14/2012 09:10:32 6/14/2012 09:15:41 703-- 1 1 COAL -- Harita Para6/14/2012 09:11:28 6/14/2012 09:19:01 701-- 1 1 COAL -- Harita Para6/14/2012 09:13:50 6/14/2012 09:31:13 714-- 1 1 COAL -- Harita Para

Page 288: June Per Shift (Truckscale Port)

6/14/2012 09:17:03 6/14/2012 09:26:49 702-- 1 1 COAL -- Harita Para

6/14/2012 09:24:50 6/14/2012 09:29:31 708-- 1 1 COAL -- Harita Para6/14/2012 09:25:10 6/14/2012 09:31:08 706-- 1 1 COAL -- Harita Para6/14/2012 09:25:35 6/14/2012 09:32:46 818- 1 1 COAL -- Harita Para6/14/2012 09:42:54 6/14/2012 09:46:54 839- 1 1 COAL -- Harita Para6/14/2012 09:46:12 6/14/2012 09:53:58 817- 1 1 COAL -- Harita Para6/14/2012 09:48:50 6/14/2012 09:55:51 831- 1 1 COAL -- Harita Para6/14/2012 10:00:29 6/14/2012 10:05:08 712-- 1 1 COAL -- Harita Para6/14/2012 10:12:56 6/14/2012 10:27:41 113 1 1 COAL -- Harita Para6/14/2012 10:13:33 6/14/2012 10:27:11 812- 1 1 COAL -- Harita Para6/14/2012 10:17:21 6/14/2012 10:29:23 115 1 1 COAL -- Harita Para6/14/2012 10:20:49 6/14/2012 10:29:28 709-- 1 1 COAL -- Harita Para6/14/2012 10:28:41 6/14/2012 10:32:59 832- 1 1 COAL -- Harita Para6/14/2012 10:30:55 6/14/2012 10:33:06 713-- 1 1 COAL -- Harita Para6/14/2012 10:35:57 6/14/2012 10:40:40 707-- 1 1 COAL -- Harita Para6/14/2012 10:37:59 6/14/2012 10:41:45 828- 1 1 COAL -- Harita Para6/14/2012 10:45:19 6/14/2012 10:52:36 701-- 1 1 COAL -- Harita Para6/14/2012 10:47:18 6/14/2012 10:54:20 703-- 1 1 COAL -- Harita Para

6/14/2012 10:49:42 6/14/2012 10:55:30 702-- 1 1 COAL -- Harita Para6/14/2012 10:51:42 6/14/2012 10:57:27 818- 1 1 COAL -- Harita Para6/14/2012 10:53:27 6/14/2012 10:59:40 837- 1 1 COAL -- Harita Para6/14/2012 11:00:31 6/14/2012 11:03:51 706-- 1 1 COAL -- Harita Para6/14/2012 11:02:04 6/14/2012 11:05:54 850- 1 1 COAL -- Harita Para

6/14/2012 11:03:08 6/14/2012 11:08:32 708-- 1 1 COAL -- Harita Para6/14/2012 11:07:51 6/14/2012 11:11:38 829- 1 1 COAL -- Harita Para6/14/2012 11:25:45 6/14/2012 11:28:59 839- 1 1 COAL -- Harita Para6/14/2012 11:26:02 6/14/2012 11:31:41 815- 1 1 COAL -- Harita Para6/14/2012 11:33:54 6/14/2012 11:38:10 817- 1 1 COAL -- Harita Para6/14/2012 11:44:57 6/14/2012 11:49:21 113 1 1 COAL -- Harita Para6/14/2012 11:50:20 6/14/2012 11:55:02 812- 1 1 COAL -- Harita Para6/14/2012 12:25:46 6/14/2012 12:32:41 837- 1 1 COAL -- Harita Para6/14/2012 12:39:54 6/14/2012 12:44:11 703-- 1 1 COAL -- Harita Para6/14/2012 12:46:23 6/14/2012 12:51:01 832- 1 1 COAL -- Harita Para6/14/2012 12:48:40 6/14/2012 12:56:11 850- 1 1 COAL -- Harita Para6/14/2012 12:57:39 6/14/2012 13:01:14 830- 1 1 COAL -- Harita Para6/14/2012 13:12:21 6/14/2012 13:17:59 712-- 1 1 COAL -- Harita Para6/14/2012 13:23:11 6/14/2012 13:30:10 706-- 1 1 COAL -- Harita Para6/14/2012 13:24:13 6/14/2012 13:30:48 702-- 1 1 COAL -- Harita Para6/14/2012 13:25:38 6/14/2012 13:33:00 713-- 1 1 COAL -- Harita Para6/14/2012 13:27:01 6/14/2012 13:37:20 701-- 1 1 COAL -- Harita Para6/14/2012 13:27:27 6/14/2012 13:37:55 115 1 1 COAL -- Harita Para6/14/2012 13:28:36 6/14/2012 13:40:05 709-- 1 1 COAL -- Harita Para6/14/2012 13:29:11 6/14/2012 13:41:55 707-- 1 1 COAL -- Harita Para6/14/2012 13:29:32 6/14/2012 13:43:53 708-- 1 1 COAL -- Harita Para6/14/2012 13:58:36 6/14/2012 14:03:19 113 1 1 COAL -- Harita Para6/14/2012 14:06:44 6/14/2012 14:10:47 819- 1 1 COAL -- Harita Para6/14/2012 14:07:06 6/14/2012 14:12:29 815- 1 1 COAL -- Harita Para6/14/2012 14:17:55 6/14/2012 14:22:34 839- 1 1 COAL -- Harita Para6/14/2012 14:21:42 6/14/2012 14:28:04 817- 1 1 COAL -- Harita Para6/14/2012 14:34:07 6/14/2012 14:41:15 850- 1 1 COAL -- Harita Para

Page 289: June Per Shift (Truckscale Port)

6/14/2012 14:39:14 6/14/2012 14:42:47 830- 1 1 COAL -- Harita Para6/14/2012 14:40:23 6/14/2012 14:46:11 818- 1 1 COAL -- Harita Para6/14/2012 14:50:00 6/14/2012 14:57:18 713-- 1 1 COAL -- Harita Para6/14/2012 14:50:43 6/14/2012 14:58:43 706-- 1 1 COAL -- Harita Para

6/14/2012 14:53:20 6/14/2012 15:00:48 832- 1 1 COAL -- Harita Para6/14/2012 14:53:47 6/14/2012 15:03:08 812- 1 1 COAL -- Harita Para6/14/2012 14:54:08 6/14/2012 15:04:23 702-- 1 1 COAL -- Harita Para6/14/2012 14:56:10 6/14/2012 15:07:28 701-- 1 1 COAL -- Harita Para6/14/2012 14:59:35 6/14/2012 15:08:52 115 1 1 COAL -- Harita Para6/14/2012 14:59:54 6/14/2012 15:11:15 829- 1 1 COAL -- Harita Para6/14/2012 15:05:47 6/14/2012 15:17:12 707-- 1 1 COAL -- Harita Para6/14/2012 15:09:57 6/14/2012 15:17:15 703-- 1 1 COAL -- Harita Para6/14/2012 15:14:38 6/14/2012 15:21:13 837- 1 1 COAL -- Harita Para6/14/2012 15:15:14 6/14/2012 15:19:28 712-- 1 1 COAL -- Harita Para6/14/2012 15:15:32 6/14/2012 15:24:00 709-- 1 1 COAL -- Harita Para6/14/2012 15:16:02 6/14/2012 15:26:12 708-- 1 1 COAL -- Harita Para6/14/2012 15:27:22 6/14/2012 15:32:08 815- 1 1 COAL -- Harita Para6/14/2012 15:30:09 6/14/2012 15:33:55 836- 1 1 COAL -- Harita Para6/14/2012 15:30:35 6/14/2012 15:36:56 113 1 1 COAL -- Harita Para6/14/2012 15:41:52 6/14/2012 15:44:58 839- 1 1 COAL -- Harita Para

6/14/2012 08:28:50 6/14/2012 08:34:50 852 1 1 COAL -- MIL6/14/2012 09:16:40 6/14/2012 09:24:06 855 1 1 COAL -- MIL6/14/2012 09:23:41 6/14/2012 09:27:51 851 1 1 COAL -- MIL6/14/2012 09:26:01 6/14/2012 09:34:08 856 1 1 COAL -- MIL

6/14/2012 09:43:52 6/14/2012 09:52:46 853 1 1 COAL -- MIL6/14/2012 10:12:32 6/14/2012 10:23:49 852 1 1 COAL -- MIL

6/14/2012 10:53:44 6/14/2012 11:01:08 851 1 1 COAL -- MIL6/14/2012 11:12:36 6/14/2012 11:15:11 856 1 1 COAL -- MIL6/14/2012 11:16:36 6/14/2012 11:21:30 855 1 1 COAL -- MIL

6/14/2012 11:34:22 6/14/2012 11:42:19 853 1 1 COAL -- MIL

6/14/2012 11:57:54 6/14/2012 12:11:14 852 1 1 COAL -- MIL6/14/2012 12:30:05 6/14/2012 12:34:25 851 1 1 COAL -- MIL6/14/2012 12:48:22 6/14/2012 12:55:13 855 1 1 COAL -- MIL6/14/2012 13:46:21 6/14/2012 13:50:42 852 1 1 COAL -- MIL6/14/2012 13:48:56 6/14/2012 13:51:43 856 1 1 COAL -- MIL6/14/2012 14:30:55 6/14/2012 14:37:02 853 1 1 COAL -- MIL6/14/2012 14:38:48 6/14/2012 14:44:07 851 1 1 COAL -- MIL

6/14/2012 14:40:02 6/14/2012 14:49:04 855 1 1 COAL -- MIL6/14/2012 15:18:29 6/14/2012 15:29:13 856 1 1 COAL -- MIL6/14/2012 15:37:53 6/14/2012 15:44:13 852 1 1 COAL -- MIL6/14/2012 16:33:30 6/14/2012 16:37:16 829- 2 2 COAL -- Harita Para6/14/2012 18:11:42 6/14/2012 18:15:45 705-- 2 2 COAL -- Harita Para6/14/2012 18:22:06 6/14/2012 18:25:48 713-- 2 2 COAL -- Harita Para

6/14/2012 18:22:58 6/14/2012 18:36:52 707-- 2 2 COAL -- Harita Para6/14/2012 18:26:51 6/14/2012 18:30:51 115 2 2 COAL -- Harita Para6/14/2012 18:27:18 6/14/2012 18:33:00 709-- 2 2 COAL -- Harita Para6/14/2012 18:28:41 6/14/2012 18:34:34 701-- 2 2 COAL -- Harita Para6/14/2012 18:31:37 6/14/2012 18:39:46 706-- 2 2 COAL -- Harita Para

Page 290: June Per Shift (Truckscale Port)

6/14/2012 18:32:13 6/14/2012 18:40:55 113 2 2 COAL -- Harita Para6/14/2012 18:35:31 6/14/2012 18:42:21 702-- 2 2 COAL -- Harita Para6/14/2012 18:39:00 6/14/2012 18:44:16 703-- 2 2 COAL -- Harita Para6/14/2012 18:56:08 6/14/2012 19:15:08 704-- 2 2 COAL -- Harita Para6/14/2012 18:59:24 6/14/2012 19:02:43 710-- 2 2 COAL -- Harita Para6/14/2012 19:11:57 6/14/2012 19:17:56 839- 2 2 COAL -- Harita Para6/14/2012 19:14:26 6/14/2012 19:21:00 832- 2 2 COAL -- Harita Para6/14/2012 19:18:45 6/14/2012 19:24:55 819- 2 2 COAL -- Harita Para6/14/2012 19:19:11 6/14/2012 19:25:17 712-- 2 2 COAL -- Harita Para6/14/2012 19:19:56 6/14/2012 19:35:04 708-- 2 2 COAL -- Harita Para6/14/2012 19:23:51 6/14/2012 19:31:04 837- 2 2 COAL -- Harita Para6/14/2012 19:38:23 6/14/2012 19:42:12 714-- 2 2 COAL -- Harita Para6/14/2012 19:45:35 6/14/2012 19:49:52 817- 2 2 COAL -- Harita Para6/14/2012 19:53:16 6/14/2012 19:57:03 707-- 2 2 COAL -- Harita Para6/14/2012 20:01:51 6/14/2012 20:05:41 836- 2 2 COAL -- Harita Para6/14/2012 20:02:17 6/14/2012 20:07:50 701-- 2 2 COAL -- Harita Para6/14/2012 20:03:19 6/14/2012 20:11:35 705-- 2 2 COAL -- Harita Para6/14/2012 20:06:16 6/14/2012 20:13:15 702-- 2 2 COAL -- Harita Para6/14/2012 20:06:37 6/14/2012 20:16:50 713-- 2 2 COAL -- Harita Para6/14/2012 20:12:23 6/14/2012 20:19:00 830- 2 2 COAL -- Harita Para

6/14/2012 20:14:09 6/14/2012 20:20:38 703-- 2 2 COAL -- Harita Para

6/14/2012 20:14:36 6/14/2012 20:22:42 709-- 2 2 COAL -- Harita Para6/14/2012 20:23:47 6/14/2012 20:27:47 706-- 2 2 COAL -- Harita Para

6/14/2012 20:24:13 6/14/2012 20:30:14 115 2 2 COAL -- Harita Para6/14/2012 20:24:33 6/14/2012 20:31:23 710-- 2 2 COAL -- Harita Para6/14/2012 20:24:51 6/14/2012 20:33:27 113 2 2 COAL -- Harita Para6/14/2012 20:51:55 6/14/2012 20:59:34 832- 2 2 COAL -- Harita Para6/14/2012 20:56:10 6/14/2012 21:02:08 839- 2 2 COAL -- Harita Para6/14/2012 20:56:28 6/14/2012 21:04:45 712-- 2 2 COAL -- Harita Para6/14/2012 20:57:52 6/14/2012 21:06:44 704-- 2 2 COAL -- Harita Para6/14/2012 21:11:03 6/14/2012 21:15:50 819- 2 2 COAL -- Harita Para6/14/2012 21:12:20 6/14/2012 21:17:58 815- 2 2 COAL -- Harita Para6/14/2012 21:12:53 6/14/2012 21:20:17 714-- 2 2 COAL -- Harita Para6/14/2012 21:16:42 6/14/2012 21:22:54 707-- 2 2 COAL -- Harita Para

6/14/2012 21:19:22 6/14/2012 21:25:14 829- 2 2 COAL -- Harita Para6/14/2012 21:31:54 6/14/2012 21:35:44 817- 2 2 COAL -- Harita Para6/14/2012 21:36:34 6/14/2012 21:40:17 701-- 2 2 COAL -- Harita Para6/14/2012 21:38:03 6/14/2012 21:45:11 713-- 2 2 COAL -- Harita Para6/14/2012 21:43:28 6/14/2012 21:51:28 705-- 2 2 COAL -- Harita Para

6/14/2012 21:46:20 6/14/2012 21:51:50 708-- 2 2 COAL -- Harita Para6/14/2012 21:50:42 6/14/2012 21:55:18 709-- 2 2 COAL -- Harita Para

6/14/2012 21:53:41 6/14/2012 21:57:20 702-- 2 2 COAL -- Harita Para6/14/2012 22:02:58 6/14/2012 22:07:17 836- 2 2 COAL -- Harita Para

6/14/2012 22:04:21 6/14/2012 22:09:36 706-- 2 2 COAL -- Harita Para6/14/2012 22:05:07 6/14/2012 22:11:32 830- 2 2 COAL -- Harita Para6/14/2012 22:06:26 6/14/2012 22:13:12 703-- 2 2 COAL -- Harita Para6/14/2012 22:10:23 6/14/2012 22:16:06 710-- 2 2 COAL -- Harita Para6/14/2012 22:14:28 6/14/2012 22:19:20 115 2 2 COAL -- Harita Para

Page 291: June Per Shift (Truckscale Port)

6/14/2012 22:15:23 6/14/2012 22:21:29 113 2 2 COAL -- Harita Para6/14/2012 22:26:16 6/14/2012 22:30:11 712-- 2 2 COAL -- Harita Para6/14/2012 22:31:11 6/14/2012 22:36:26 704-- 2 2 COAL -- Harita Para6/14/2012 22:56:15 6/14/2012 22:59:53 707-- 2 2 COAL -- Harita Para6/14/2012 23:00:58 6/14/2012 23:05:50 832- 2 2 COAL -- Harita Para6/14/2012 23:03:55 6/14/2012 23:07:54 701-- 2 2 COAL -- Harita Para6/14/2012 23:11:08 6/14/2012 23:17:45 819- 2 2 COAL -- Harita Para6/14/2012 23:16:03 6/14/2012 23:21:17 713-- 2 2 COAL -- Harita Para6/14/2012 23:16:54 6/14/2012 23:24:53 829- 2 2 COAL -- Harita Para6/14/2012 23:19:47 6/14/2012 23:27:26 705-- 2 2 COAL -- Harita Para6/14/2012 23:22:19 6/14/2012 23:28:13 714-- 2 2 COAL -- Harita Para6/14/2012 23:24:12 6/14/2012 23:29:41 702-- 2 2 COAL -- Harita Para6/14/2012 23:31:34 6/14/2012 23:36:34 709-- 2 2 COAL -- Harita Para6/14/2012 23:32:16 6/14/2012 23:38:44 839- 2 2 COAL -- Harita Para6/14/2012 23:34:17 6/14/2012 23:41:59 706-- 2 2 COAL -- Harita Para6/14/2012 23:37:38 6/14/2012 23:43:21 703-- 2 2 COAL -- Harita Para6/14/2012 23:40:31 6/14/2012 23:43:50 710-- 2 2 COAL -- Harita Para6/14/2012 23:41:12 6/14/2012 23:47:40 817- 2 2 COAL -- Harita Para6/14/2012 23:46:23 6/14/2012 23:52:19 836- 2 2 COAL -- Harita Para6/14/2012 23:55:22 6/14/2012 23:59:20 708-- 2 2 COAL -- Harita Para6/14/2012 16:02:38 6/14/2012 16:06:06 806 2 2 COAL -- MIL6/14/2012 19:08:50 6/14/2012 19:17:20 855 2 2 COAL -- MIL

6/14/2012 19:10:55 6/14/2012 19:16:29 856 2 2 COAL -- MIL6/14/2012 19:15:47 6/14/2012 19:21:42 851 2 2 COAL -- MIL6/14/2012 19:19:38 6/14/2012 19:27:31 853 2 2 COAL -- MIL6/14/2012 20:02:45 6/14/2012 20:09:32 852 2 2 COAL -- MIL6/14/2012 20:43:06 6/14/2012 20:47:32 856 2 2 COAL -- MIL6/14/2012 20:55:41 6/14/2012 21:02:42 855 2 2 COAL -- MIL6/14/2012 21:04:04 6/14/2012 21:08:42 851 2 2 COAL -- MIL6/14/2012 21:13:14 6/14/2012 21:21:12 853 2 2 COAL -- MIL6/14/2012 22:15:02 6/14/2012 22:22:03 856 2 2 COAL -- MIL6/14/2012 22:44:19 6/14/2012 22:51:14 855 2 2 COAL -- MIL6/14/2012 22:49:33 6/14/2012 22:54:50 851 2 2 COAL -- MIL6/14/2012 22:56:44 6/14/2012 23:01:49 853 2 2 COAL -- MIL6/14/2012 23:45:55 6/14/2012 23:51:51 852 2 2 COAL -- MIL6/14/2012 23:46:49 6/14/2012 23:53:45 856 2 2 COAL -- MIL6/15/2012 00:00:35 6/15/2012 00:04:09 830- 3 3 COAL -- Harita Para

6/15/2012 00:05:49 6/15/2012 00:11:40 115 3 3 COAL -- Harita Para6/15/2012 00:09:15 6/15/2012 00:15:10 704-- 3 3 COAL -- Harita Para6/15/2012 00:09:41 6/15/2012 00:17:52 113 3 3 COAL -- Harita Para6/15/2012 00:10:09 6/15/2012 00:17:57 712-- 3 3 COAL -- Harita Para6/15/2012 00:19:12 6/15/2012 00:23:36 707-- 3 3 COAL -- Harita Para6/15/2012 00:32:24 6/15/2012 00:36:34 815- 3 3 COAL -- Harita Para6/15/2012 00:39:13 6/15/2012 00:43:26 701-- 3 3 COAL -- Harita Para6/15/2012 00:49:26 6/15/2012 00:54:13 713-- 3 3 COAL -- Harita Para6/15/2012 01:12:49 6/15/2012 01:16:32 710-- 3 3 COAL -- Harita Para6/15/2012 01:13:25 6/15/2012 01:21:03 829- 3 3 COAL -- Harita Para6/15/2012 01:14:19 6/15/2012 01:21:36 819- 3 3 COAL -- Harita Para6/15/2012 01:19:38 6/15/2012 01:24:00 714-- 3 3 COAL -- Harita Para6/15/2012 01:26:32 6/15/2012 01:44:57 818- 3 3 COAL -- Harita Para

Page 292: June Per Shift (Truckscale Port)

6/15/2012 01:41:02 6/15/2012 01:45:01 705-- 3 3 COAL -- Harita Para6/15/2012 01:49:30 6/15/2012 01:53:21 703-- 3 3 COAL -- Harita Para6/15/2012 01:54:32 6/15/2012 02:00:43 704-- 3 3 COAL -- Harita Para6/15/2012 01:59:04 6/15/2012 02:03:31 709-- 3 3 COAL -- Harita Para6/15/2012 02:04:38 6/15/2012 02:09:08 701-- 3 3 COAL -- Harita Para

6/15/2012 02:06:30 6/15/2012 02:11:37 839- 3 3 COAL -- Harita Para6/15/2012 02:09:50 6/15/2012 02:13:39 702-- 3 3 COAL -- Harita Para6/15/2012 02:12:58 6/15/2012 02:18:23 836- 3 3 COAL -- Harita Para6/15/2012 02:15:21 6/15/2012 02:24:15 712-- 3 3 COAL -- Harita Para6/15/2012 02:19:34 6/15/2012 02:29:44 708-- 3 3 COAL -- Harita Para6/15/2012 02:20:52 6/15/2012 02:33:16 115 3 3 COAL -- Harita Para6/15/2012 02:23:15 6/15/2012 02:37:39 830- 3 3 COAL -- Harita Para6/15/2012 02:25:12 6/15/2012 02:35:17 707-- 3 3 COAL -- Harita Para6/15/2012 02:32:21 6/15/2012 02:37:45 832- 3 3 COAL -- Harita Para6/15/2012 02:39:41 6/15/2012 02:44:19 817- 3 3 COAL -- Harita Para6/15/2012 02:43:32 6/15/2012 03:01:58 706-- 3 3 COAL -- Harita Para6/15/2012 02:59:56 6/15/2012 03:06:28 819- 3 3 COAL -- Harita Para6/15/2012 03:55:19 6/15/2012 03:59:46 839- 3 3 COAL -- Harita Para6/15/2012 03:59:00 6/15/2012 04:00:01 815- 3 3 COAL -- Harita Para6/15/2012 07:21:41 6/15/2012 07:27:51 702-- 3 3 COAL -- Harita Para6/15/2012 07:22:46 6/15/2012 07:28:24 704-- 3 3 COAL -- Harita Para6/15/2012 07:25:35 6/15/2012 07:29:01 705-- 3 3 COAL -- Harita Para6/15/2012 07:26:02 6/15/2012 07:31:43 710-- 3 3 COAL -- Harita Para6/15/2012 07:26:31 6/15/2012 07:36:35 708-- 3 3 COAL -- Harita Para6/15/2012 07:27:07 6/15/2012 07:35:59 819- 3 3 COAL -- Harita Para

6/15/2012 07:30:54 6/15/2012 07:43:21 709-- 3 3 COAL -- Harita Para6/15/2012 07:32:45 6/15/2012 07:43:16 703-- 3 3 COAL -- Harita Para6/15/2012 07:33:25 6/15/2012 07:43:18 701-- 3 3 COAL -- Harita Para6/15/2012 07:33:56 6/15/2012 07:50:38 817- 3 3 COAL -- Harita Para6/15/2012 07:34:26 6/15/2012 07:50:42 815- 3 3 COAL -- Harita Para

6/15/2012 07:34:52 6/15/2012 07:46:11 714-- 3 3 COAL -- Harita Para6/15/2012 07:37:27 6/15/2012 07:46:16 706-- 3 3 COAL -- Harita Para6/15/2012 07:42:33 6/15/2012 07:47:49 713-- 3 3 COAL -- Harita Para6/15/2012 07:45:21 6/15/2012 07:53:07 115 3 3 COAL -- Harita Para6/15/2012 00:34:09 6/15/2012 00:40:15 851 3 3 COAL -- MIL6/15/2012 00:44:20 6/15/2012 00:48:39 853 3 3 COAL -- MIL6/15/2012 00:45:30 6/15/2012 00:54:52 855 3 3 COAL -- MIL6/15/2012 01:20:23 6/15/2012 01:27:18 852 3 3 COAL -- MIL6/15/2012 01:25:54 6/15/2012 01:35:53 856 3 3 COAL -- MIL6/15/2012 02:16:36 6/15/2012 02:27:10 851 3 3 COAL -- MIL6/15/2012 02:20:03 6/15/2012 02:31:13 853 3 3 COAL -- MIL

6/15/2012 02:42:36 6/15/2012 02:48:38 855 3 3 COAL -- MIL6/15/2012 02:56:04 6/15/2012 03:05:07 852 3 3 COAL -- MIL6/15/2012 03:03:29 6/15/2012 03:05:13 856 3 3 COAL -- MIL6/15/2012 07:29:46 6/15/2012 07:38:46 855 3 3 COAL -- MIL6/15/2012 07:30:15 6/15/2012 07:40:26 856 3 3 COAL -- MIL6/15/2012 07:30:37 6/15/2012 07:41:15 853 3 3 COAL -- MIL6/15/2012 07:38:07 6/15/2012 07:57:46 851 3 3 COAL -- MIL6/15/2012 08:02:10 6/15/2012 08:09:27 839- 1 1 COAL -- Harita Para

Page 293: June Per Shift (Truckscale Port)

6/15/2012 08:04:02 6/15/2012 08:08:13 707-- 1 1 COAL -- Harita Para6/15/2012 08:07:10 6/15/2012 08:12:00 836- 1 1 COAL -- Harita Para6/15/2012 08:40:00 6/15/2012 08:44:23 702-- 1 1 COAL -- Harita Para6/15/2012 08:45:13 6/15/2012 08:48:32 704-- 1 1 COAL -- Harita Para6/15/2012 08:49:10 6/15/2012 08:52:20 705-- 1 1 COAL -- Harita Para6/15/2012 08:58:58 6/15/2012 09:03:52 710-- 1 1 COAL -- Harita Para6/15/2012 09:03:04 6/15/2012 09:07:29 712-- 1 1 COAL -- Harita Para6/15/2012 09:17:07 6/15/2012 09:23:13 703-- 1 1 COAL -- Harita Para6/15/2012 09:17:31 6/15/2012 09:25:53 701-- 1 1 COAL -- Harita Para6/15/2012 09:19:20 6/15/2012 09:30:26 708-- 1 1 COAL -- Harita Para6/15/2012 09:28:42 6/15/2012 09:34:02 817- 1 1 COAL -- Harita Para6/15/2012 09:29:43 6/15/2012 09:36:31 709-- 1 1 COAL -- Harita Para6/15/2012 09:39:04 6/15/2012 09:43:09 113 1 1 COAL -- Harita Para6/15/2012 09:41:08 6/15/2012 09:47:24 707-- 1 1 COAL -- Harita Para6/15/2012 09:48:07 6/15/2012 09:52:52 819- 1 1 COAL -- Harita Para6/15/2012 09:51:57 6/15/2012 09:57:36 815- 1 1 COAL -- Harita Para6/15/2012 09:56:33 6/15/2012 10:00:48 115 1 1 COAL -- Harita Para6/15/2012 09:59:14 6/15/2012 10:07:39 829- 1 1 COAL -- Harita Para

6/15/2012 10:08:24 6/15/2012 10:12:28 713-- 1 1 COAL -- Harita Para6/15/2012 10:14:17 6/15/2012 10:18:20 706-- 1 1 COAL -- Harita Para6/15/2012 10:16:36 6/15/2012 10:21:58 839- 1 1 COAL -- Harita Para6/15/2012 10:16:55 6/15/2012 10:18:31 702-- 1 1 COAL -- Harita Para6/15/2012 10:20:48 6/15/2012 10:25:49 850- 1 1 COAL -- Harita Para6/15/2012 10:23:40 6/15/2012 10:24:22 704-- 1 1 COAL -- Harita Para6/15/2012 10:31:17 6/15/2012 10:34:45 705-- 1 1 COAL -- Harita Para6/15/2012 10:41:07 6/15/2012 10:44:52 710-- 1 1 COAL -- Harita Para

6/15/2012 10:52:20 6/15/2012 10:57:47 836- 1 1 COAL -- Harita Para6/15/2012 10:55:23 6/15/2012 11:02:30 712-- 1 1 COAL -- Harita Para6/15/2012 10:55:52 6/15/2012 11:04:12 701-- 1 1 COAL -- Harita Para6/15/2012 10:56:42 6/15/2012 11:06:28 708-- 1 1 COAL -- Harita Para6/15/2012 11:01:05 6/15/2012 11:09:16 703-- 1 1 COAL -- Harita Para6/15/2012 11:13:08 6/15/2012 11:17:00 113 1 1 COAL -- Harita Para6/15/2012 11:21:19 6/15/2012 11:25:10 833- 1 1 COAL -- Harita Para6/15/2012 11:32:20 6/15/2012 11:38:14 819- 1 1 COAL -- Harita Para6/15/2012 11:35:44 6/15/2012 11:40:17 115 1 1 COAL -- Harita Para

6/15/2012 11:41:02 6/15/2012 11:44:52 831- 1 1 COAL -- Harita Para6/15/2012 11:41:58 6/15/2012 12:27:04 817- 1 1 COAL -- Harita Para6/15/2012 11:42:20 6/15/2012 12:01:11 815- 1 1 COAL -- Harita Para6/15/2012 11:50:49 6/15/2012 11:55:10 706-- 1 1 COAL -- Harita Para6/15/2012 11:58:21 6/15/2012 12:04:54 705-- 1 1 COAL -- Harita Para6/15/2012 12:23:16 6/15/2012 12:27:07 839- 1 1 COAL -- Harita Para6/15/2012 13:13:25 6/15/2012 13:17:28 850- 1 1 COAL -- Harita Para6/15/2012 13:25:59 6/15/2012 13:29:17 702-- 1 1 COAL -- Harita Para6/15/2012 13:27:10 6/15/2012 13:31:52 704-- 1 1 COAL -- Harita Para6/15/2012 13:39:25 6/15/2012 13:43:40 710-- 1 1 COAL -- Harita Para6/15/2012 13:52:47 6/15/2012 13:58:17 713-- 1 1 COAL -- Harita Para6/15/2012 13:59:11 6/15/2012 14:03:06 705-- 1 1 COAL -- Harita Para6/15/2012 14:10:12 6/15/2012 14:16:41 708-- 1 1 COAL -- Harita Para6/15/2012 14:31:17 6/15/2012 14:35:08 706-- 1 1 COAL -- Harita Para

Page 294: June Per Shift (Truckscale Port)

6/15/2012 14:45:37 6/15/2012 14:51:19 712-- 1 1 COAL -- Harita Para6/15/2012 14:47:56 6/15/2012 14:54:10 113 1 1 COAL -- Harita Para6/15/2012 14:56:16 6/15/2012 15:01:04 704-- 1 1 COAL -- Harita Para6/15/2012 14:57:57 6/15/2012 15:03:47 703-- 1 1 COAL -- Harita Para6/15/2012 14:58:39 6/15/2012 15:05:51 115 1 1 COAL -- Harita Para6/15/2012 14:59:04 6/15/2012 15:08:59 702-- 1 1 COAL -- Harita Para6/15/2012 15:07:50 6/15/2012 15:17:36 701-- 1 1 COAL -- Harita Para6/15/2012 15:16:41 6/15/2012 15:20:50 710-- 1 1 COAL -- Harita Para6/15/2012 15:22:08 6/15/2012 15:27:39 819- 1 1 COAL -- Harita Para6/15/2012 15:22:57 6/15/2012 15:30:45 839- 1 1 COAL -- Harita Para6/15/2012 15:23:19 6/15/2012 15:30:55 818- 1 1 COAL -- Harita Para6/15/2012 15:26:46 6/15/2012 15:32:11 705-- 1 1 COAL -- Harita Para

6/15/2012 15:35:34 6/15/2012 15:45:10 708-- 1 1 COAL -- Harita Para6/15/2012 15:39:42 6/15/2012 15:45:05 815- 1 1 COAL -- Harita Para

6/15/2012 15:43:25 6/15/2012 15:47:00 833- 1 1 COAL -- Harita Para6/15/2012 15:46:24 6/15/2012 15:48:06 850- 1 1 COAL -- Harita Para6/15/2012 15:51:23 6/15/2012 15:55:29 831- 1 1 COAL -- Harita Para6/15/2012 15:54:42 6/15/2012 15:58:47 713-- 1 1 COAL -- Harita Para6/15/2012 15:57:04 6/15/2012 16:01:30 837- 1 2 COAL -- Harita Para

6/15/2012 08:19:21 6/15/2012 08:25:26 852 1 1 COAL -- MIL

6/15/2012 09:10:12 6/15/2012 09:14:57 855 1 1 COAL -- MIL6/15/2012 09:16:33 6/15/2012 09:21:19 853 1 1 COAL -- MIL6/15/2012 09:20:40 6/15/2012 09:31:02 856 1 1 COAL -- MIL6/15/2012 09:29:05 6/15/2012 09:35:01 851 1 1 COAL -- MIL6/15/2012 09:51:29 6/15/2012 09:55:31 832 1 1 COAL -- MIL

6/15/2012 10:03:37 6/15/2012 10:09:21 810 1 1 COAL -- MIL6/15/2012 10:16:07 6/15/2012 10:22:55 852 1 1 COAL -- MIL6/15/2012 10:45:24 6/15/2012 10:50:22 855 1 1 COAL -- MIL6/15/2012 10:52:43 6/15/2012 10:59:04 853 1 1 COAL -- MIL6/15/2012 11:01:33 6/15/2012 11:10:26 851 1 1 COAL -- MIL6/15/2012 11:17:38 6/15/2012 11:20:32 856 1 1 COAL -- MIL6/15/2012 11:31:51 6/15/2012 11:44:48 832 1 1 COAL -- MIL6/15/2012 11:41:25 6/15/2012 11:47:21 810 1 1 COAL -- MIL6/15/2012 11:56:40 6/15/2012 12:21:38 852 1 1 COAL -- MIL6/15/2012 13:52:23 6/15/2012 13:58:33 852 1 1 COAL -- MIL6/15/2012 14:04:09 6/15/2012 14:07:49 832 1 1 COAL -- MIL6/15/2012 14:09:42 6/15/2012 14:14:45 853 1 1 COAL -- MIL6/15/2012 14:39:45 6/15/2012 14:46:20 855 1 1 COAL -- MIL6/15/2012 14:43:20 6/15/2012 14:49:26 851 1 1 COAL -- MIL6/15/2012 14:47:28 6/15/2012 14:51:36 856 1 1 COAL -- MIL6/15/2012 15:12:31 6/15/2012 15:30:19 810 1 1 COAL -- MIL6/15/2012 16:06:20 6/15/2012 16:11:26 812- 2 2 COAL -- Harita Para6/15/2012 16:20:28 6/15/2012 16:27:11 706-- 2 2 COAL -- Harita Para6/15/2012 16:22:41 6/15/2012 16:27:30 832- 2 2 COAL -- Harita Para6/15/2012 16:26:20 6/15/2012 16:30:08 817- 2 2 COAL -- Harita Para6/15/2012 18:11:38 6/15/2012 18:16:10 713-- 2 2 COAL -- Harita Para6/15/2012 18:14:24 6/15/2012 18:18:58 712-- 2 2 COAL -- Harita Para6/15/2012 18:14:50 6/15/2012 18:20:07 113 2 2 COAL -- Harita Para6/15/2012 18:17:39 6/15/2012 18:24:07 710-- 2 2 COAL -- Harita Para

Page 295: June Per Shift (Truckscale Port)

6/15/2012 18:18:12 6/15/2012 18:24:27 708-- 2 2 COAL -- Harita Para6/15/2012 18:21:10 6/15/2012 18:25:16 702-- 2 2 COAL -- Harita Para

6/15/2012 18:22:17 6/15/2012 18:27:11 704-- 2 2 COAL -- Harita Para

6/15/2012 18:23:07 6/15/2012 18:31:02 115 2 2 COAL -- Harita Para6/15/2012 18:23:32 6/15/2012 18:35:24 701-- 2 2 COAL -- Harita Para

6/15/2012 18:26:07 6/15/2012 18:39:52 705-- 2 2 COAL -- Harita Para6/15/2012 18:30:06 6/15/2012 18:39:57 706-- 2 2 COAL -- Harita Para6/15/2012 18:32:44 6/15/2012 18:41:46 703-- 2 2 COAL -- Harita Para6/15/2012 19:00:40 6/15/2012 19:04:41 819- 2 2 COAL -- Harita Para6/15/2012 19:06:48 6/15/2012 19:13:22 714-- 2 2 COAL -- Harita Para6/15/2012 19:14:15 6/15/2012 19:18:35 839- 2 2 COAL -- Harita Para6/15/2012 19:38:18 6/15/2012 19:43:10 818- 2 2 COAL -- Harita Para6/15/2012 19:40:48 6/15/2012 19:46:26 831- 2 2 COAL -- Harita Para6/15/2012 19:45:15 6/15/2012 19:49:15 812- 2 2 COAL -- Harita Para6/15/2012 19:45:35 6/15/2012 19:50:32 710-- 2 2 COAL -- Harita Para6/15/2012 19:48:14 6/15/2012 19:53:33 815- 2 2 COAL -- Harita Para6/15/2012 19:55:03 6/15/2012 19:58:43 707-- 2 2 COAL -- Harita Para6/15/2012 19:56:13 6/15/2012 20:01:02 708-- 2 2 COAL -- Harita Para6/15/2012 19:56:35 6/15/2012 20:02:42 713-- 2 2 COAL -- Harita Para6/15/2012 20:00:20 6/15/2012 20:04:10 712-- 2 2 COAL -- Harita Para6/15/2012 20:01:39 6/15/2012 20:06:38 832- 2 2 COAL -- Harita Para

6/15/2012 20:05:57 6/15/2012 20:09:59 113 2 2 COAL -- Harita Para

6/15/2012 20:08:53 6/15/2012 20:12:12 703-- 2 2 COAL -- Harita Para6/15/2012 20:09:23 6/15/2012 20:13:59 837- 2 2 COAL -- Harita Para6/15/2012 20:13:02 6/15/2012 20:17:26 701-- 2 2 COAL -- Harita Para6/15/2012 20:15:53 6/15/2012 20:22:41 706-- 2 2 COAL -- Harita Para6/15/2012 20:16:29 6/15/2012 20:23:06 115 2 2 COAL -- Harita Para6/15/2012 20:20:06 6/15/2012 20:24:24 702-- 2 2 COAL -- Harita Para6/15/2012 20:20:59 6/15/2012 20:26:30 704-- 2 2 COAL -- Harita Para6/15/2012 20:21:58 6/15/2012 20:28:17 705-- 2 2 COAL -- Harita Para6/15/2012 20:36:35 6/15/2012 20:40:22 714-- 2 2 COAL -- Harita Para6/15/2012 20:47:09 6/15/2012 20:51:46 819- 2 2 COAL -- Harita Para6/15/2012 20:54:35 6/15/2012 21:02:34 839- 2 2 COAL -- Harita Para6/15/2012 21:14:12 6/15/2012 21:18:18 710-- 2 2 COAL -- Harita Para6/15/2012 21:16:22 6/15/2012 21:21:19 713-- 2 2 COAL -- Harita Para6/15/2012 21:17:39 6/15/2012 21:23:24 828- 2 2 COAL -- Harita Para

6/15/2012 21:20:30 6/15/2012 21:25:24 818- 2 2 COAL -- Harita Para6/15/2012 21:21:54 6/15/2012 21:26:55 712-- 2 2 COAL -- Harita Para6/15/2012 21:26:04 6/15/2012 21:29:39 708-- 2 2 COAL -- Harita Para6/15/2012 21:28:53 6/15/2012 21:32:21 113 2 2 COAL -- Harita Para6/15/2012 21:31:02 6/15/2012 21:34:54 831- 2 2 COAL -- Harita Para6/15/2012 21:33:22 6/15/2012 21:37:28 812- 2 2 COAL -- Harita Para6/15/2012 21:39:33 6/15/2012 21:43:46 815- 2 2 COAL -- Harita Para6/15/2012 21:45:36 6/15/2012 21:49:11 703-- 2 2 COAL -- Harita Para6/15/2012 21:48:07 6/15/2012 21:51:56 817- 2 2 COAL -- Harita Para6/15/2012 21:48:33 6/15/2012 21:53:36 707-- 2 2 COAL -- Harita Para6/15/2012 21:55:11 6/15/2012 21:59:42 115 2 2 COAL -- Harita Para6/15/2012 21:58:58 6/15/2012 22:03:20 706-- 2 2 COAL -- Harita Para6/15/2012 22:00:36 6/15/2012 22:06:06 714-- 2 2 COAL -- Harita Para

Page 296: June Per Shift (Truckscale Port)

6/15/2012 22:01:10 6/15/2012 22:16:09 832- 2 2 COAL -- Harita Para6/15/2012 22:01:59 6/15/2012 22:10:01 705-- 2 2 COAL -- Harita Para6/15/2012 22:04:50 6/15/2012 22:11:13 704-- 2 2 COAL -- Harita Para6/15/2012 22:09:13 6/15/2012 22:13:29 701-- 2 2 COAL -- Harita Para6/15/2012 22:14:29 6/15/2012 22:22:33 702-- 2 2 COAL -- Harita Para6/15/2012 22:28:32 6/15/2012 22:32:35 819- 2 2 COAL -- Harita Para6/15/2012 22:30:16 6/15/2012 22:34:58 713-- 2 2 COAL -- Harita Para6/15/2012 22:33:18 6/15/2012 22:37:36 837- 2 2 COAL -- Harita Para6/15/2012 22:35:43 6/15/2012 22:39:07 712-- 2 2 COAL -- Harita Para6/15/2012 22:43:01 6/15/2012 22:46:35 113 2 2 COAL -- Harita Para

6/15/2012 22:44:30 6/15/2012 22:50:32 710-- 2 2 COAL -- Harita Para6/15/2012 22:54:30 6/15/2012 22:58:29 708-- 2 2 COAL -- Harita Para6/15/2012 22:56:17 6/15/2012 23:00:46 818- 2 2 COAL -- Harita Para6/15/2012 23:09:38 6/15/2012 23:13:34 812- 2 2 COAL -- Harita Para6/15/2012 23:10:32 6/15/2012 23:15:41 828- 2 2 COAL -- Harita Para6/15/2012 23:16:49 6/15/2012 23:20:49 115 2 2 COAL -- Harita Para6/15/2012 23:17:30 6/15/2012 23:22:28 707-- 2 2 COAL -- Harita Para6/15/2012 23:23:41 6/15/2012 23:29:46 714-- 2 2 COAL -- Harita Para6/15/2012 23:28:14 6/15/2012 23:32:39 703-- 2 2 COAL -- Harita Para6/15/2012 23:28:46 6/15/2012 23:34:52 839- 2 2 COAL -- Harita Para6/15/2012 23:30:37 6/15/2012 23:36:51 817- 2 2 COAL -- Harita Para6/15/2012 23:39:34 6/15/2012 23:45:10 704-- 2 2 COAL -- Harita Para6/15/2012 23:40:23 6/15/2012 23:48:01 701-- 2 2 COAL -- Harita Para6/15/2012 23:46:07 6/15/2012 23:52:27 706-- 2 2 COAL -- Harita Para6/15/2012 23:51:33 6/16/2012 00:00:15 815- 2 3 COAL -- Harita Para6/15/2012 23:53:17 6/15/2012 23:59:13 831- 2 2 COAL -- Harita Para6/15/2012 23:54:39 6/16/2012 00:00:20 712-- 2 3 COAL -- Harita Para6/15/2012 23:55:51 6/16/2012 00:01:50 702-- 2 3 COAL -- Harita Para6/15/2012 23:56:25 6/16/2012 00:04:00 113 2 3 COAL -- Harita Para6/15/2012 23:56:42 6/16/2012 00:04:03 713-- 2 3 COAL -- Harita Para6/15/2012 23:57:42 6/16/2012 00:09:30 832- 2 3 COAL -- Harita Para6/15/2012 19:02:31 6/15/2012 19:08:00 851 2 2 COAL -- MIL6/15/2012 19:02:50 6/15/2012 19:09:24 810 2 2 COAL -- MIL

6/15/2012 19:06:17 6/15/2012 19:11:58 855 2 2 COAL -- MIL6/15/2012 19:08:46 6/15/2012 19:16:06 852 2 2 COAL -- MIL6/15/2012 19:19:16 6/15/2012 19:23:41 853 2 2 COAL -- MIL6/15/2012 19:19:44 6/15/2012 19:24:12 856 2 2 COAL -- MIL

6/15/2012 20:41:03 6/15/2012 20:48:13 851 2 2 COAL -- MIL6/15/2012 20:41:34 6/15/2012 20:49:03 810 2 2 COAL -- MIL6/15/2012 20:53:49 6/15/2012 20:59:32 855 2 2 COAL -- MIL6/15/2012 21:03:53 6/15/2012 21:10:32 852 2 2 COAL -- MIL6/15/2012 21:08:49 6/15/2012 21:13:09 853 2 2 COAL -- MIL6/15/2012 21:16:01 6/15/2012 21:19:07 856 2 2 COAL -- MIL6/15/2012 22:20:22 6/15/2012 22:27:39 851 2 2 COAL -- MIL6/15/2012 22:44:03 6/15/2012 22:49:38 855 2 2 COAL -- MIL6/15/2012 22:46:04 6/15/2012 22:52:51 852 2 2 COAL -- MIL6/15/2012 22:51:19 6/15/2012 22:55:09 856 2 2 COAL -- MIL6/15/2012 23:06:52 6/15/2012 23:11:48 853 2 2 COAL -- MIL6/15/2012 23:58:09 6/16/2012 00:11:58 851 2 3 COAL -- MIL6/16/2012 00:04:55 6/16/2012 00:14:21 705-- 3 3 COAL -- Harita Para

Page 297: June Per Shift (Truckscale Port)

6/16/2012 00:06:04 6/16/2012 00:14:25 819- 3 3 COAL -- Harita Para6/16/2012 00:17:57 6/16/2012 00:23:25 837- 3 3 COAL -- Harita Para6/16/2012 00:29:04 6/16/2012 00:33:27 710-- 3 3 COAL -- Harita Para6/16/2012 00:34:20 6/16/2012 00:38:48 818- 3 3 COAL -- Harita Para6/16/2012 00:40:47 6/16/2012 00:46:22 115 3 3 COAL -- Harita Para6/16/2012 00:47:50 6/16/2012 00:52:13 707-- 3 3 COAL -- Harita Para6/16/2012 00:56:53 6/16/2012 01:07:59 714-- 3 3 COAL -- Harita Para6/16/2012 01:28:38 6/16/2012 01:33:25 708-- 3 3 COAL -- Harita Para6/16/2012 01:32:40 6/16/2012 01:36:38 712-- 3 3 COAL -- Harita Para6/16/2012 01:41:46 6/16/2012 01:46:29 704-- 3 3 COAL -- Harita Para6/16/2012 01:42:14 6/16/2012 01:48:35 701-- 3 3 COAL -- Harita Para6/16/2012 01:42:37 6/16/2012 01:50:26 713-- 3 3 COAL -- Harita Para6/16/2012 01:43:16 6/16/2012 01:52:48 828- 3 3 COAL -- Harita Para6/16/2012 01:51:36 6/16/2012 01:55:30 703-- 3 3 COAL -- Harita Para

6/16/2012 01:52:02 6/16/2012 01:57:17 812- 3 3 COAL -- Harita Para6/16/2012 02:00:58 6/16/2012 02:04:46 831- 3 3 COAL -- Harita Para6/16/2012 02:03:04 6/16/2012 02:07:24 839- 3 3 COAL -- Harita Para6/16/2012 02:05:26 6/16/2012 02:09:47 707-- 3 3 COAL -- Harita Para6/16/2012 02:10:22 6/16/2012 02:16:44 817- 3 3 COAL -- Harita Para6/16/2012 02:14:34 6/16/2012 02:16:49 837- 3 3 COAL -- Harita Para6/16/2012 02:24:22 6/16/2012 02:28:58 818- 3 3 COAL -- Harita Para

6/16/2012 02:30:14 6/16/2012 02:34:38 115 3 3 COAL -- Harita Para

6/16/2012 02:31:25 6/16/2012 02:36:54 819- 3 3 COAL -- Harita Para6/16/2012 02:33:40 6/16/2012 02:39:06 714-- 3 3 COAL -- Harita Para6/16/2012 02:57:53 6/16/2012 03:02:42 706-- 3 3 COAL -- Harita Para6/16/2012 02:58:38 6/16/2012 03:04:27 702-- 3 3 COAL -- Harita Para6/16/2012 03:10:23 6/16/2012 03:15:29 701-- 3 3 COAL -- Harita Para6/16/2012 03:23:00 6/16/2012 03:26:48 812- 3 3 COAL -- Harita Para6/16/2012 03:24:35 6/16/2012 03:28:45 707-- 3 3 COAL -- Harita Para6/16/2012 03:31:06 6/16/2012 03:35:07 828- 3 3 COAL -- Harita Para6/16/2012 03:37:01 6/16/2012 03:40:59 831- 3 3 COAL -- Harita Para6/16/2012 04:08:16 6/16/2012 04:12:21 832- 3 3 COAL -- Harita Para6/16/2012 07:14:45 6/16/2012 07:19:52 819- 3 3 COAL -- Harita Para6/16/2012 07:23:31 6/16/2012 07:29:37 707-- 3 3 COAL -- Harita Para6/16/2012 07:24:04 6/16/2012 07:30:02 712-- 3 3 COAL -- Harita Para6/16/2012 07:24:33 6/16/2012 07:31:08 701-- 3 3 COAL -- Harita Para6/16/2012 07:25:13 6/16/2012 07:33:24 113 3 3 COAL -- Harita Para6/16/2012 07:25:41 6/16/2012 07:35:08 706-- 3 3 COAL -- Harita Para6/16/2012 07:26:19 6/16/2012 07:36:48 708-- 3 3 COAL -- Harita Para6/16/2012 07:27:38 6/16/2012 07:40:24 115 3 3 COAL -- Harita Para6/16/2012 07:28:57 6/16/2012 07:45:15 713-- 3 3 COAL -- Harita Para6/16/2012 07:35:52 6/16/2012 07:46:23 703-- 3 3 COAL -- Harita Para6/16/2012 07:39:33 6/16/2012 07:46:29 702-- 3 3 COAL -- Harita Para6/16/2012 07:44:25 6/16/2012 07:48:28 710-- 3 3 COAL -- Harita Para6/16/2012 07:56:15 6/16/2012 08:00:08 714-- 3 1 COAL -- Harita Para6/16/2012 07:57:48 6/16/2012 08:00:12 812- 3 1 COAL -- Harita Para6/16/2012 00:39:39 6/16/2012 00:43:58 856 3 3 COAL -- MIL6/16/2012 00:56:00 6/16/2012 01:04:11 855 3 3 COAL -- MIL6/16/2012 00:56:26 6/16/2012 01:07:12 852 3 3 COAL -- MIL

Page 298: June Per Shift (Truckscale Port)

6/16/2012 01:29:55 6/16/2012 01:34:48 853 3 3 COAL -- MIL

6/16/2012 02:09:06 6/16/2012 02:15:12 851 3 3 COAL -- MIL6/16/2012 02:51:15 6/16/2012 02:59:31 855 3 3 COAL -- MIL6/16/2012 02:53:56 6/16/2012 02:59:43 852 3 3 COAL -- MIL6/16/2012 07:28:08 6/16/2012 07:40:44 851 3 3 COAL -- MIL6/16/2012 07:28:33 6/16/2012 07:42:55 855 3 3 COAL -- MIL6/16/2012 07:41:32 6/16/2012 07:52:12 853 3 3 COAL -- MIL6/16/2012 08:17:24 6/16/2012 08:22:09 837- 1 1 COAL -- Harita Para6/16/2012 08:18:13 6/16/2012 08:22:51 818- 1 1 COAL -- Harita Para6/16/2012 08:20:58 6/16/2012 08:25:29 839- 1 1 COAL -- Harita Para6/16/2012 08:49:01 6/16/2012 08:52:30 833- 1 1 COAL -- Harita Para6/16/2012 08:49:27 6/16/2012 08:54:39 707-- 1 1 COAL -- Harita Para6/16/2012 09:05:06 6/16/2012 09:09:33 831- 1 1 COAL -- Harita Para6/16/2012 09:05:49 6/16/2012 09:09:37 832- 1 1 COAL -- Harita Para6/16/2012 09:06:33 6/16/2012 09:11:12 701-- 1 1 COAL -- Harita Para6/16/2012 09:07:09 6/16/2012 09:13:32 706-- 1 1 COAL -- Harita Para6/16/2012 09:07:38 6/16/2012 09:13:37 828- 1 1 COAL -- Harita Para6/16/2012 09:08:45 6/16/2012 09:15:17 819- 1 1 COAL -- Harita Para6/16/2012 09:14:19 6/16/2012 09:19:37 703-- 1 1 COAL -- Harita Para6/16/2012 09:18:03 6/16/2012 09:23:07 113 1 1 COAL -- Harita Para6/16/2012 09:23:56 6/16/2012 09:27:43 713-- 1 1 COAL -- Harita Para

6/16/2012 09:26:43 6/16/2012 09:31:20 708-- 1 1 COAL -- Harita Para6/16/2012 09:29:39 6/16/2012 09:35:49 812- 1 1 COAL -- Harita Para6/16/2012 09:39:56 6/16/2012 09:47:44 815- 1 1 COAL -- Harita Para6/16/2012 09:51:10 6/16/2012 09:57:30 709-- 1 1 COAL -- Harita Para6/16/2012 09:53:14 6/16/2012 09:57:37 702-- 1 1 COAL -- Harita Para6/16/2012 10:08:25 6/16/2012 10:15:27 115 1 1 COAL -- Harita Para6/16/2012 10:10:02 6/16/2012 10:15:38 714-- 1 1 COAL -- Harita Para

6/16/2012 10:10:30 6/16/2012 10:17:01 839- 1 1 COAL -- Harita Para6/16/2012 10:11:28 6/16/2012 10:19:00 710-- 1 1 COAL -- Harita Para6/16/2012 10:18:04 6/16/2012 10:21:43 707-- 1 1 COAL -- Harita Para6/16/2012 10:19:54 6/16/2012 10:24:48 837- 1 1 COAL -- Harita Para6/16/2012 10:23:02 6/16/2012 10:27:06 833- 1 1 COAL -- Harita Para

6/16/2012 10:33:05 6/16/2012 10:37:53 829- 1 1 COAL -- Harita Para6/16/2012 10:35:11 6/16/2012 10:39:21 706-- 1 1 COAL -- Harita Para6/16/2012 10:40:31 6/16/2012 10:44:47 701-- 1 1 COAL -- Harita Para6/16/2012 10:45:25 6/16/2012 10:49:39 703-- 1 1 COAL -- Harita Para6/16/2012 10:46:24 6/16/2012 10:53:25 819- 1 1 COAL -- Harita Para6/16/2012 10:47:04 6/16/2012 10:53:42 828- 1 1 COAL -- Harita Para6/16/2012 11:02:30 6/16/2012 11:06:44 113 1 1 COAL -- Harita Para6/16/2012 11:03:55 6/16/2012 11:10:07 713-- 1 1 COAL -- Harita Para

6/16/2012 11:07:30 6/16/2012 11:12:32 831- 1 1 COAL -- Harita Para

6/16/2012 11:10:40 6/16/2012 11:15:25 812- 1 1 COAL -- Harita Para6/16/2012 11:11:51 6/16/2012 11:16:42 708-- 1 1 COAL -- Harita Para6/16/2012 11:14:09 6/16/2012 11:18:39 815- 1 1 COAL -- Harita Para6/16/2012 11:14:49 6/16/2012 11:21:26 702-- 1 1 COAL -- Harita Para6/16/2012 11:20:49 6/16/2012 11:25:12 709-- 1 1 COAL -- Harita Para6/16/2012 11:39:15 6/16/2012 11:45:58 714-- 1 1 COAL -- Harita Para6/16/2012 11:43:33 6/16/2012 11:50:10 707-- 1 1 COAL -- Harita Para

Page 299: June Per Shift (Truckscale Port)

6/16/2012 11:49:10 6/16/2012 11:52:55 710-- 1 1 COAL -- Harita Para6/16/2012 11:57:07 6/16/2012 12:00:52 706-- 1 1 COAL -- Harita Para6/16/2012 12:02:12 6/16/2012 12:07:34 115 1 1 COAL -- Harita Para6/16/2012 12:03:57 6/16/2012 12:10:02 833- 1 1 COAL -- Harita Para6/16/2012 12:04:45 6/16/2012 12:10:07 839- 1 1 COAL -- Harita Para6/16/2012 12:15:16 6/16/2012 12:19:37 703-- 1 1 COAL -- Harita Para6/16/2012 12:22:12 6/16/2012 12:27:46 832- 1 1 COAL -- Harita Para6/16/2012 12:25:59 6/16/2012 12:29:50 829- 1 1 COAL -- Harita Para6/16/2012 12:34:25 6/16/2012 12:39:12 812- 1 1 COAL -- Harita Para6/16/2012 12:42:42 6/16/2012 12:55:32 837- 1 1 COAL -- Harita Para6/16/2012 12:45:15 6/16/2012 12:56:48 818- 1 1 COAL -- Harita Para6/16/2012 12:49:09 6/16/2012 12:58:52 113 1 1 COAL -- Harita Para6/16/2012 12:54:35 6/16/2012 13:01:11 709-- 1 1 COAL -- Harita Para6/16/2012 13:01:45 6/16/2012 13:05:29 831- 1 1 COAL -- Harita Para6/16/2012 13:15:29 6/16/2012 13:19:22 713-- 1 1 COAL -- Harita Para6/16/2012 13:15:54 6/16/2012 13:21:30 819- 1 1 COAL -- Harita Para6/16/2012 13:26:23 6/16/2012 13:32:39 701-- 1 1 COAL -- Harita Para6/16/2012 13:31:21 6/16/2012 13:38:10 115 1 1 COAL -- Harita Para6/16/2012 13:31:51 6/16/2012 13:49:35 702-- 1 1 COAL -- Harita Para6/16/2012 13:35:56 6/16/2012 13:41:39 708 1 1 COAL -- Harita Parama Murti 6/16/2012 13:37:04 6/16/2012 13:42:29 706 1 1 COAL -- Harita Para6/16/2012 13:52:54 6/16/2012 14:00:29 703-- 1 1 COAL -- Harita Para6/16/2012 13:59:40 6/16/2012 14:05:19 714-- 1 1 COAL -- Harita Para

6/16/2012 14:01:50 6/16/2012 14:05:23 707-- 1 1 COAL -- Harita Para6/16/2012 14:11:38 6/16/2012 14:15:26 712-- 1 1 COAL -- Harita Para6/16/2012 14:14:05 6/16/2012 14:17:01 839- 1 1 COAL -- Harita Para6/16/2012 14:23:00 6/16/2012 14:27:09 113 1 1 COAL -- Harita Para6/16/2012 14:24:35 6/16/2012 14:30:01 709-- 1 1 COAL -- Harita Para6/16/2012 14:34:02 6/16/2012 14:38:26 832- 1 1 COAL -- Harita Para6/16/2012 14:48:56 6/16/2012 14:53:24 819- 1 1 COAL -- Harita Para6/16/2012 14:49:37 6/16/2012 14:53:36 710-- 1 1 COAL -- Harita Para6/16/2012 14:50:03 6/16/2012 14:54:58 829- 1 1 COAL -- Harita Para6/16/2012 14:50:25 6/16/2012 14:55:01 713-- 1 1 COAL -- Harita Para6/16/2012 14:57:45 6/16/2012 15:01:23 115 1 1 COAL -- Harita Para6/16/2012 15:05:02 6/16/2012 15:08:58 831- 1 1 COAL -- Harita Para6/16/2012 15:05:19 6/16/2012 15:09:02 701-- 1 1 COAL -- Harita Para6/16/2012 15:05:46 6/16/2012 15:15:14 818- 1 1 COAL -- Harita Para6/16/2012 15:07:34 6/16/2012 15:11:11 702-- 1 1 COAL -- Harita Para6/16/2012 15:13:32 6/16/2012 15:18:03 812- 1 1 COAL -- Harita Para6/16/2012 15:14:22 6/16/2012 15:22:39 708-- 1 1 COAL -- Harita Para6/16/2012 15:17:24 6/16/2012 15:22:43 706-- 1 1 COAL -- Harita Para6/16/2012 15:20:29 6/16/2012 15:24:20 837- 1 1 COAL -- Harita Para6/16/2012 15:22:02 6/16/2012 15:24:23 704-- 1 1 COAL -- Harita Para6/16/2012 15:25:24 6/16/2012 15:27:26 703-- 1 1 COAL -- Harita Para6/16/2012 15:28:32 6/16/2012 15:34:38 714-- 1 1 COAL -- Harita Para6/16/2012 15:31:07 6/16/2012 15:42:30 850- 1 1 COAL -- Harita Para

6/16/2012 15:32:05 6/16/2012 15:52:02 815- 1 1 COAL -- Harita Para6/16/2012 15:45:50 6/16/2012 15:52:06 712-- 1 1 COAL -- Harita Para6/16/2012 15:50:14 6/16/2012 15:53:53 833- 1 1 COAL -- Harita Para6/16/2012 15:51:10 6/16/2012 15:54:01 705-- 1 1 COAL -- Harita Para

Page 300: June Per Shift (Truckscale Port)

6/16/2012 15:56:02 6/16/2012 16:00:04 113 1 2 COAL -- Harita Para

6/16/2012 15:56:58 6/16/2012 16:00:08 707-- 1 2 COAL -- Harita Para6/16/2012 08:05:02 6/16/2012 08:28:51 806 1 1 COAL -- MIL6/16/2012 08:24:32 6/16/2012 08:28:55 810 1 1 COAL -- MIL6/16/2012 09:00:47 6/16/2012 09:04:19 809 1 1 COAL -- MIL6/16/2012 09:10:16 6/16/2012 09:20:27 856 1 1 COAL -- MIL6/16/2012 09:14:38 6/16/2012 09:20:39 855 1 1 COAL -- MIL6/16/2012 09:22:29 6/16/2012 09:27:19 851 1 1 COAL -- MIL6/16/2012 09:50:32 6/16/2012 09:56:49 853 1 1 COAL -- MIL6/16/2012 10:07:16 6/16/2012 10:12:26 852 1 1 COAL -- MIL6/16/2012 10:07:42 6/16/2012 10:13:13 806 1 1 COAL -- MIL6/16/2012 10:26:08 6/16/2012 10:30:34 809 1 1 COAL -- MIL

6/16/2012 10:52:40 6/16/2012 10:57:35 851 1 1 COAL -- MIL6/16/2012 10:58:54 6/16/2012 11:04:46 855 1 1 COAL -- MIL6/16/2012 11:03:20 6/16/2012 11:08:01 856 1 1 COAL -- MIL6/16/2012 11:38:49 6/16/2012 11:45:25 853 1 1 COAL -- MIL6/16/2012 12:03:41 6/16/2012 12:08:18 806 1 1 COAL -- MIL6/16/2012 12:21:49 6/16/2012 12:27:26 852 1 1 COAL -- MIL

6/16/2012 12:34:42 6/16/2012 12:40:48 810 1 1 COAL -- MIL6/16/2012 12:42:03 6/16/2012 12:56:32 851 1 1 COAL -- MIL6/16/2012 12:57:28 6/16/2012 13:02:24 856 1 1 COAL -- MIL6/16/2012 13:11:32 6/16/2012 13:18:17 855 1 1 COAL -- MIL6/16/2012 13:51:06 6/16/2012 13:57:35 853 1 1 COAL -- MIL6/16/2012 13:59:16 6/16/2012 14:03:16 852 1 1 COAL -- MIL6/16/2012 14:51:00 6/16/2012 15:02:29 856 1 1 COAL -- MIL6/16/2012 15:28:06 6/16/2012 15:46:40 810 1 1 COAL -- MIL6/16/2012 15:36:38 6/16/2012 15:46:45 852 1 1 COAL -- MIL6/16/2012 15:40:39 6/16/2012 15:46:50 806 1 1 COAL -- MIL6/16/2012 16:09:45 6/16/2012 16:14:25 709-- 2 2 COAL -- Harita Para6/16/2012 16:20:08 6/16/2012 16:23:53 832- 2 2 COAL -- Harita Para6/16/2012 16:21:34 6/16/2012 16:23:57 710-- 2 2 COAL -- Harita Para6/16/2012 16:26:26 6/16/2012 16:30:37 829- 2 2 COAL -- Harita Para

6/16/2012 18:17:40 6/16/2012 18:21:50 701-- 2 2 COAL -- Harita Para6/16/2012 18:18:10 6/16/2012 18:23:44 702-- 2 2 COAL -- Harita Para6/16/2012 18:18:35 6/16/2012 18:23:59 710-- 2 2 COAL -- Harita Para6/16/2012 18:18:58 6/16/2012 18:27:28 115 2 2 COAL -- Harita Para6/16/2012 18:19:33 6/16/2012 18:28:18 714-- 2 2 COAL -- Harita Para6/16/2012 18:19:58 6/16/2012 18:30:29 113 2 2 COAL -- Harita Para6/16/2012 18:24:36 6/16/2012 18:32:01 705-- 2 2 COAL -- Harita Para6/16/2012 18:26:51 6/16/2012 18:34:18 708-- 2 2 COAL -- Harita Para6/16/2012 18:29:11 6/16/2012 18:38:30 707-- 2 2 COAL -- Harita Para6/16/2012 18:29:37 6/16/2012 18:39:56 712-- 2 2 COAL -- Harita Para6/16/2012 18:32:40 6/16/2012 18:41:46 709-- 2 2 COAL -- Harita Para6/16/2012 18:42:31 6/16/2012 18:51:19 706-- 2 2 COAL -- Harita Para6/16/2012 19:06:46 6/16/2012 19:10:29 819- 2 2 COAL -- Harita Para6/16/2012 19:07:12 6/16/2012 19:12:00 713-- 2 2 COAL -- Harita Para6/16/2012 19:19:25 6/16/2012 19:26:03 839- 2 2 COAL -- Harita Para6/16/2012 19:20:51 6/16/2012 19:28:07 703-- 2 2 COAL -- Harita Para

Page 301: June Per Shift (Truckscale Port)

6/16/2012 19:29:36 6/16/2012 19:33:44 818- 2 2 COAL -- Harita Para6/16/2012 19:31:21 6/16/2012 19:35:31 704-- 2 2 COAL -- Harita Para6/16/2012 19:36:42 6/16/2012 19:43:37 701-- 2 2 COAL -- Harita Para6/16/2012 19:41:42 6/16/2012 19:45:50 702-- 2 2 COAL -- Harita Para6/16/2012 19:42:09 6/16/2012 19:46:08 710-- 2 2 COAL -- Harita Para6/16/2012 19:52:05 6/16/2012 19:56:18 705-- 2 2 COAL -- Harita Para6/16/2012 19:53:51 6/16/2012 19:58:09 815- 2 2 COAL -- Harita Para6/16/2012 20:00:38 6/16/2012 20:04:15 831- 2 2 COAL -- Harita Para6/16/2012 20:00:59 6/16/2012 20:06:09 708-- 2 2 COAL -- Harita Para6/16/2012 20:01:45 6/16/2012 20:07:47 714-- 2 2 COAL -- Harita Para6/16/2012 20:04:48 6/16/2012 20:09:56 709-- 2 2 COAL -- Harita Para6/16/2012 20:08:34 6/16/2012 20:12:53 837- 2 2 COAL -- Harita Para6/16/2012 20:10:40 6/16/2012 20:14:47 850- 2 2 COAL -- Harita Para6/16/2012 20:11:10 6/16/2012 20:17:52 115 2 2 COAL -- Harita Para6/16/2012 20:11:36 6/16/2012 20:19:15 113 2 2 COAL -- Harita Para6/16/2012 20:32:06 6/16/2012 20:38:06 706-- 2 2 COAL -- Harita Para6/16/2012 20:32:35 6/16/2012 20:40:14 713-- 2 2 COAL -- Harita Para6/16/2012 20:37:14 6/16/2012 20:41:41 712-- 2 2 COAL -- Harita Para6/16/2012 20:43:38 6/16/2012 20:47:46 832- 2 2 COAL -- Harita Para6/16/2012 20:44:03 6/16/2012 20:49:48 819- 2 2 COAL -- Harita Para6/16/2012 20:54:26 6/16/2012 20:57:37 703-- 2 2 COAL -- Harita Para6/16/2012 20:58:59 6/16/2012 21:03:18 704-- 2 2 COAL -- Harita Para6/16/2012 21:01:34 6/16/2012 21:06:20 839- 2 2 COAL -- Harita Para6/16/2012 21:07:34 6/16/2012 21:14:39 818- 2 2 COAL -- Harita Para

6/16/2012 21:07:57 6/16/2012 21:16:06 701-- 2 2 COAL -- Harita Para6/16/2012 23:58:45 6/17/2012 00:02:32 819- 2 3 COAL -- Harita Para6/16/2012 19:12:40 6/16/2012 19:23:19 855 2 2 COAL -- MIL6/16/2012 19:16:45 6/16/2012 19:24:19 851 2 2 COAL -- MIL6/16/2012 19:22:36 6/16/2012 19:30:20 856 2 2 COAL -- MIL

6/16/2012 20:17:12 6/16/2012 20:21:04 853 2 2 COAL -- MIL6/16/2012 21:07:04 6/16/2012 21:15:00 855 2 2 COAL -- MIL6/16/2012 21:18:59 6/16/2012 21:22:42 856 2 2 COAL -- MIL6/16/2012 21:32:29 6/16/2012 21:36:16 810 2 2 COAL -- MIL6/16/2012 21:55:58 6/16/2012 22:00:15 853 2 2 COAL -- MIL6/17/2012 00:00:18 6/17/2012 00:02:40 815- 3 3 COAL -- Harita Para

6/17/2012 00:05:01 6/17/2012 00:10:09 832- 3 3 COAL -- Harita Para6/17/2012 00:28:00 6/17/2012 00:32:01 818- 3 3 COAL -- Harita Para6/17/2012 00:29:42 6/17/2012 00:34:39 713-- 3 3 COAL -- Harita Para6/17/2012 00:33:17 6/17/2012 00:44:31 702-- 3 3 COAL -- Harita Para6/17/2012 00:33:42 6/17/2012 00:44:59 704-- 3 3 COAL -- Harita Para6/17/2012 00:34:06 6/17/2012 00:45:24 709-- 3 3 COAL -- Harita Para

6/17/2012 00:35:18 6/17/2012 00:47:02 712-- 3 3 COAL -- Harita Para6/17/2012 00:35:41 6/17/2012 00:47:44 701-- 3 3 COAL -- Harita Para6/17/2012 00:39:03 6/17/2012 00:49:55 703-- 3 3 COAL -- Harita Para6/17/2012 00:39:58 6/17/2012 00:52:53 115 3 3 COAL -- Harita Para

6/17/2012 00:40:24 6/17/2012 00:54:38 113 3 3 COAL -- Harita Para6/17/2012 00:40:46 6/17/2012 00:56:17 708-- 3 3 COAL -- Harita Para6/17/2012 00:41:13 6/17/2012 01:00:22 714-- 3 3 COAL -- Harita Para6/17/2012 00:41:45 6/17/2012 01:02:38 705-- 3 3 COAL -- Harita Para

Page 302: June Per Shift (Truckscale Port)

6/17/2012 00:42:11 6/17/2012 01:04:30 831- 3 3 COAL -- Harita Para6/17/2012 00:43:03 6/17/2012 01:06:48 850- 3 3 COAL -- Harita Para6/17/2012 00:53:54 6/17/2012 01:10:55 837- 3 3 COAL -- Harita Para6/17/2012 00:55:27 6/17/2012 01:13:43 706-- 3 3 COAL -- Harita Para6/17/2012 01:23:08 6/17/2012 01:30:09 710-- 3 3 COAL -- Harita Para6/17/2012 01:42:44 6/17/2012 01:47:59 839- 3 3 COAL -- Harita Para6/17/2012 01:46:27 6/17/2012 01:51:33 815- 3 3 COAL -- Harita Para6/17/2012 01:50:09 6/17/2012 01:54:47 713-- 3 3 COAL -- Harita Para6/17/2012 02:02:04 6/17/2012 02:06:24 819- 3 3 COAL -- Harita Para6/17/2012 02:02:27 6/17/2012 02:31:39 709-- 3 3 COAL -- Harita Para6/17/2012 02:08:28 6/17/2012 02:33:51 712-- 3 3 COAL -- Harita Para6/17/2012 02:10:34 6/17/2012 02:38:21 702-- 3 3 COAL -- Harita Para6/17/2012 02:13:50 6/17/2012 02:38:50 832- 3 3 COAL -- Harita Para6/17/2012 02:16:51 6/17/2012 02:39:38 704-- 3 3 COAL -- Harita Para6/17/2012 02:25:49 6/17/2012 02:42:14 115 3 3 COAL -- Harita Para6/17/2012 02:26:13 6/17/2012 02:44:27 701-- 3 3 COAL -- Harita Para6/17/2012 02:26:35 6/17/2012 02:47:13 113 3 3 COAL -- Harita Para6/17/2012 02:30:58 6/17/2012 02:54:26 714-- 3 3 COAL -- Harita Para6/17/2012 02:36:40 6/17/2012 02:49:13 703-- 3 3 COAL -- Harita Para6/17/2012 02:37:10 6/17/2012 02:50:31 831- 3 3 COAL -- Harita Para6/17/2012 02:37:35 6/17/2012 02:52:08 850- 3 3 COAL -- Harita Para

6/17/2012 02:47:59 6/17/2012 02:56:21 708-- 3 3 COAL -- Harita Para6/17/2012 03:04:48 6/17/2012 03:10:30 710-- 3 3 COAL -- Harita Para

6/17/2012 03:15:05 6/17/2012 03:19:56 713-- 3 3 COAL -- Harita Para

6/17/2012 03:24:02 6/17/2012 03:29:00 839- 3 3 COAL -- Harita Para6/17/2012 03:31:27 6/17/2012 03:36:35 815- 3 3 COAL -- Harita Para6/17/2012 07:19:08 6/17/2012 07:24:21 709-- 3 3 COAL -- Harita Para6/17/2012 07:23:39 6/17/2012 07:28:07 702-- 3 3 COAL -- Harita Para

6/17/2012 07:25:00 6/17/2012 07:30:27 714-- 3 3 COAL -- Harita Para6/17/2012 07:25:25 6/17/2012 07:32:53 704-- 3 3 COAL -- Harita Para6/17/2012 07:25:46 6/17/2012 07:34:46 701-- 3 3 COAL -- Harita Para6/17/2012 07:26:05 6/17/2012 07:37:00 713-- 3 3 COAL -- Harita Para6/17/2012 07:26:53 6/17/2012 07:39:21 712-- 3 3 COAL -- Harita Para6/17/2012 07:27:27 6/17/2012 07:41:21 113 3 3 COAL -- Harita Para6/17/2012 07:35:41 6/17/2012 07:44:57 830- 3 3 COAL -- Harita Para6/17/2012 07:37:40 6/17/2012 07:43:10 708-- 3 3 COAL -- Harita Para6/17/2012 07:52:24 6/17/2012 07:57:10 710-- 3 3 COAL -- Harita Para6/17/2012 07:52:59 6/17/2012 07:59:55 819- 3 3 COAL -- Harita Para6/17/2012 07:59:06 6/17/2012 08:04:32 831- 3 1 COAL -- Harita Para6/17/2012 00:05:34 6/17/2012 00:15:11 853 3 3 COAL -- MIL6/17/2012 00:43:34 6/17/2012 01:09:15 856 3 3 COAL -- MIL6/17/2012 01:19:58 6/17/2012 01:28:32 855 3 3 COAL -- MIL6/17/2012 01:29:12 6/17/2012 01:36:43 810 3 3 COAL -- MIL6/17/2012 01:57:16 6/17/2012 02:04:02 853 3 3 COAL -- MIL

6/17/2012 03:12:00 6/17/2012 03:20:40 855 3 3 COAL -- MIL6/17/2012 03:48:04 6/17/2012 03:51:46 856 3 3 COAL -- MIL

6/17/2012 07:40:47 6/17/2012 07:48:43 851 3 3 COAL -- MIL6/17/2012 07:45:36 6/17/2012 07:49:42 856 3 3 COAL -- MIL

Page 303: June Per Shift (Truckscale Port)

6/17/2012 07:46:14 6/17/2012 07:55:22 855 3 3 COAL -- MIL6/17/2012 07:53:37 6/17/2012 08:04:59 853 3 1 COAL -- MIL6/17/2012 08:02:57 6/17/2012 08:07:16 703-- 1 1 COAL -- Harita Para6/17/2012 08:26:05 6/17/2012 08:31:54 115 1 1 COAL -- Harita Para6/17/2012 08:30:25 6/17/2012 08:35:13 815- 1 1 COAL -- Harita Para6/17/2012 08:38:45 6/17/2012 08:43:03 832- 1 1 COAL -- Harita Para6/17/2012 08:42:30 6/17/2012 08:47:02 709-- 1 1 COAL -- Harita Para6/17/2012 08:49:21 6/17/2012 08:56:08 714-- 1 1 COAL -- Harita Para6/17/2012 08:52:39 6/17/2012 08:56:15 701-- 1 1 COAL -- Harita Para

6/17/2012 08:53:03 6/17/2012 08:57:43 706-- 1 1 COAL -- Harita Para6/17/2012 08:58:40 6/17/2012 09:00:04 704-- 1 1 COAL -- Harita Para6/17/2012 08:59:21 6/17/2012 09:03:03 113 1 1 COAL -- Harita Para6/17/2012 09:02:26 6/17/2012 09:06:37 839- 1 1 COAL -- Harita Para6/17/2012 09:04:13 6/17/2012 09:08:52 713-- 1 1 COAL -- Harita Para6/17/2012 09:11:21 6/17/2012 09:16:47 818- 1 1 COAL -- Harita Para6/17/2012 09:12:57 6/17/2012 09:19:01 708-- 1 1 COAL -- Harita Para6/17/2012 09:20:41 6/17/2012 09:24:42 830- 1 1 COAL -- Harita Para6/17/2012 09:22:33 6/17/2012 09:31:12 702-- 1 1 COAL -- Harita Para6/17/2012 09:28:48 6/17/2012 09:33:38 710-- 1 1 COAL -- Harita Para6/17/2012 09:29:14 6/17/2012 09:35:18 712-- 1 1 COAL -- Harita Para6/17/2012 09:30:01 6/17/2012 09:39:53 819- 1 1 COAL -- Harita Para6/17/2012 09:32:07 6/17/2012 09:46:57 831- 1 1 COAL -- Harita Para6/17/2012 09:41:45 6/17/2012 09:47:00 703-- 1 1 COAL -- Harita Para6/17/2012 10:05:07 6/17/2012 10:09:39 815- 1 1 COAL -- Harita Para6/17/2012 10:08:15 6/17/2012 10:12:24 709-- 1 1 COAL -- Harita Para

6/17/2012 10:24:29 6/17/2012 10:28:18 832- 1 1 COAL -- Harita Para6/17/2012 10:25:05 6/17/2012 10:28:42 706-- 1 1 COAL -- Harita Para6/17/2012 10:25:31 6/17/2012 10:30:14 714-- 1 1 COAL -- Harita Para6/17/2012 10:25:54 6/17/2012 10:39:09 115 1 1 COAL -- Harita Para6/17/2012 10:32:30 6/17/2012 10:38:34 704-- 1 1 COAL -- Harita Para6/17/2012 10:37:20 6/17/2012 10:41:58 713-- 1 1 COAL -- Harita Para6/17/2012 10:40:56 6/17/2012 10:44:39 839- 1 1 COAL -- Harita Para6/17/2012 10:41:15 6/17/2012 10:46:49 850- 1 1 COAL -- Harita Para6/17/2012 10:45:23 6/17/2012 10:49:49 818- 1 1 COAL -- Harita Para6/17/2012 10:49:21 6/17/2012 10:53:21 708-- 1 1 COAL -- Harita Para6/17/2012 10:56:17 6/17/2012 11:00:07 830- 1 1 COAL -- Harita Para6/17/2012 10:59:30 6/17/2012 11:09:04 702-- 1 1 COAL -- Harita Para6/17/2012 11:03:27 6/17/2012 11:10:32 710-- 1 1 COAL -- Harita Para6/17/2012 11:04:09 6/17/2012 11:10:35 712-- 1 1 COAL -- Harita Para6/17/2012 11:11:19 6/17/2012 11:15:51 819- 1 1 COAL -- Harita Para

6/17/2012 11:22:22 6/17/2012 11:26:01 113 1 1 COAL -- Harita Para6/17/2012 11:23:50 6/17/2012 11:28:21 703-- 1 1 COAL -- Harita Para6/17/2012 11:24:27 6/17/2012 11:30:13 831- 1 1 COAL -- Harita Para6/17/2012 11:34:48 6/17/2012 11:39:29 815- 1 1 COAL -- Harita Para6/17/2012 11:41:04 6/17/2012 11:45:36 709-- 1 1 COAL -- Harita Para6/17/2012 11:55:50 6/17/2012 11:59:32 706-- 1 1 COAL -- Harita Para6/17/2012 12:02:34 6/17/2012 12:06:27 115 1 1 COAL -- Harita Para6/17/2012 12:03:53 6/17/2012 12:07:00 713-- 1 1 COAL -- Harita Para6/17/2012 12:10:35 6/17/2012 12:14:55 704-- 1 1 COAL -- Harita Para6/17/2012 12:14:15 6/17/2012 12:17:55 818- 1 1 COAL -- Harita Para

Page 304: June Per Shift (Truckscale Port)

6/17/2012 12:19:14 6/17/2012 12:22:47 839- 1 1 COAL -- Harita Para6/17/2012 12:20:26 6/17/2012 12:22:51 850- 1 1 COAL -- Harita Para6/17/2012 12:26:00 6/17/2012 12:45:59 708-- 1 1 COAL -- Harita Para6/17/2012 12:40:23 6/17/2012 12:46:02 710-- 1 1 COAL -- Harita Para6/17/2012 12:40:47 6/17/2012 12:47:08 714-- 1 1 COAL -- Harita Para6/17/2012 12:52:01 6/17/2012 12:56:34 830- 1 1 COAL -- Harita Para

6/17/2012 12:59:28 6/17/2012 13:04:05 712-- 1 1 COAL -- Harita Para6/17/2012 13:11:52 6/17/2012 13:18:25 703-- 1 1 COAL -- Harita Para6/17/2012 13:12:42 6/17/2012 13:19:07 831- 1 1 COAL -- Harita Para6/17/2012 13:37:04 6/17/2012 13:43:12 702-- 1 1 COAL -- Harita Para6/17/2012 13:38:01 6/17/2012 13:43:16 113 1 1 COAL -- Harita Para6/17/2012 13:38:47 6/17/2012 13:45:03 815- 1 1 COAL -- Harita Para6/17/2012 13:40:26 6/17/2012 13:50:30 706-- 1 1 COAL -- Harita Para6/17/2012 13:49:30 6/17/2012 13:53:08 850- 1 1 COAL -- Harita Para6/17/2012 13:49:51 6/17/2012 13:53:12 709-- 1 1 COAL -- Harita Para6/17/2012 13:55:16 6/17/2012 14:01:57 818- 1 1 COAL -- Harita Para

6/17/2012 14:12:23 6/17/2012 14:18:24 713-- 1 1 COAL -- Harita Para6/17/2012 14:22:06 6/17/2012 14:28:26 839- 1 1 COAL -- Harita Para6/17/2012 14:30:30 6/17/2012 14:36:26 819- 1 1 COAL -- Harita Para

6/17/2012 14:35:36 6/17/2012 14:39:18 830- 1 1 COAL -- Harita Para6/17/2012 14:44:30 6/17/2012 14:48:45 704-- 1 1 COAL -- Harita Para6/17/2012 14:56:33 6/17/2012 15:01:34 703-- 1 1 COAL -- Harita Para6/17/2012 15:02:21 6/17/2012 15:08:41 712-- 1 1 COAL -- Harita Para6/17/2012 15:02:47 6/17/2012 15:08:48 831- 1 1 COAL -- Harita Para6/17/2012 15:06:48 6/17/2012 15:11:37 714-- 1 1 COAL -- Harita Para6/17/2012 15:15:06 6/17/2012 15:20:59 710-- 1 1 COAL -- Harita Para6/17/2012 15:15:40 6/17/2012 15:21:02 115 1 1 COAL -- Harita Para6/17/2012 15:23:35 6/17/2012 15:28:58 113 1 1 COAL -- Harita Para6/17/2012 15:27:23 6/17/2012 15:29:03 706-- 1 1 COAL -- Harita Para6/17/2012 15:33:46 6/17/2012 15:41:22 709-- 1 1 COAL -- Harita Para6/17/2012 15:36:05 6/17/2012 15:43:43 818- 1 1 COAL -- Harita Para6/17/2012 15:38:18 6/17/2012 15:50:40 850- 1 1 COAL -- Harita Para6/17/2012 15:42:48 6/17/2012 15:53:27 713-- 1 1 COAL -- Harita Para6/17/2012 15:44:18 6/17/2012 15:50:44 832- 1 1 COAL -- Harita Para6/17/2012 08:39:41 6/17/2012 08:44:40 852 1 1 COAL -- MIL6/17/2012 09:15:44 6/17/2012 09:21:55 851 1 1 COAL -- MIL

6/17/2012 09:26:08 6/17/2012 09:30:44 856 1 1 COAL -- MIL

6/17/2012 09:29:40 6/17/2012 09:37:26 855 1 1 COAL -- MIL6/17/2012 09:38:41 6/17/2012 09:44:51 853 1 1 COAL -- MIL6/17/2012 10:18:25 6/17/2012 10:23:55 852 1 1 COAL -- MIL6/17/2012 10:57:14 6/17/2012 11:00:57 856 1 1 COAL -- MIL6/17/2012 11:07:07 6/17/2012 11:13:19 851 1 1 COAL -- MIL6/17/2012 11:12:53 6/17/2012 11:20:26 855 1 1 COAL -- MIL6/17/2012 11:37:14 6/17/2012 11:42:53 853 1 1 COAL -- MIL6/17/2012 12:07:59 6/17/2012 12:12:34 852 1 1 COAL -- MIL6/17/2012 12:37:42 6/17/2012 12:42:35 851 1 1 COAL -- MIL6/17/2012 12:52:30 6/17/2012 12:58:10 810 1 1 COAL -- MIL6/17/2012 13:29:36 6/17/2012 13:32:17 856 1 1 COAL -- MIL6/17/2012 13:38:30 6/17/2012 13:48:00 852 1 1 COAL -- MIL

Page 305: June Per Shift (Truckscale Port)

6/17/2012 13:55:00 6/17/2012 14:01:07 855 1 1 COAL -- MIL6/17/2012 14:19:39 6/17/2012 14:23:37 851 1 1 COAL -- MIL6/17/2012 14:19:57 6/17/2012 14:23:50 853 1 1 COAL -- MIL6/17/2012 16:20:28 6/17/2012 16:35:42 708-- 2 2 COAL -- Harita Para6/17/2012 18:05:16 6/17/2012 18:08:59 702-- 2 2 COAL -- Harita Para6/17/2012 18:21:14 6/17/2012 18:25:09 713-- 2 2 COAL -- Harita Para6/17/2012 18:23:42 6/17/2012 18:28:42 113 2 2 COAL -- Harita Para6/17/2012 18:27:29 6/17/2012 18:31:42 115 2 2 COAL -- Harita Para6/17/2012 18:29:27 6/17/2012 18:33:46 704-- 2 2 COAL -- Harita Para6/17/2012 18:32:52 6/17/2012 18:37:54 710-- 2 2 COAL -- Harita Para

6/17/2012 18:33:12 6/17/2012 18:41:14 709-- 2 2 COAL -- Harita Para6/17/2012 18:34:32 6/17/2012 18:41:17 703-- 2 2 COAL -- Harita Para6/17/2012 18:35:20 6/17/2012 18:41:39 708-- 2 2 COAL -- Harita Para6/17/2012 18:42:15 6/17/2012 18:43:35 712-- 2 2 COAL -- Harita Para

6/17/2012 18:56:00 6/17/2012 18:59:57 714-- 2 2 COAL -- Harita Para6/17/2012 19:22:27 6/17/2012 19:28:58 702-- 2 2 COAL -- Harita Para6/17/2012 19:25:34 6/17/2012 19:30:57 705-- 2 2 COAL -- Harita Para6/17/2012 19:35:26 6/17/2012 19:39:24 818- 2 2 COAL -- Harita Para6/17/2012 19:36:50 6/17/2012 19:41:09 713-- 2 2 COAL -- Harita Para6/17/2012 19:37:14 6/17/2012 19:43:28 819- 2 2 COAL -- Harita Para6/17/2012 19:44:30 6/17/2012 19:52:13 113 2 2 COAL -- Harita Para6/17/2012 19:59:43 6/17/2012 20:03:57 709-- 2 2 COAL -- Harita Para6/17/2012 20:02:28 6/17/2012 20:07:22 850- 2 2 COAL -- Harita Para6/17/2012 20:06:37 6/17/2012 20:13:18 706-- 2 2 COAL -- Harita Para6/17/2012 20:11:31 6/17/2012 20:16:19 710-- 2 2 COAL -- Harita Para6/17/2012 20:12:01 6/17/2012 20:18:23 812- 2 2 COAL -- Harita Para6/17/2012 20:15:07 6/17/2012 20:22:52 703-- 2 2 COAL -- Harita Para

6/17/2012 20:19:13 6/17/2012 20:26:07 712-- 2 2 COAL -- Harita Para6/17/2012 20:24:56 6/17/2012 20:29:35 115 2 2 COAL -- Harita Para6/17/2012 20:25:23 6/17/2012 20:31:06 704-- 2 2 COAL -- Harita Para

6/17/2012 20:26:49 6/17/2012 20:31:09 708-- 2 2 COAL -- Harita Para6/17/2012 20:32:43 6/17/2012 20:37:53 839- 2 2 COAL -- Harita Para6/17/2012 20:34:26 6/17/2012 20:41:06 714-- 2 2 COAL -- Harita Para6/17/2012 20:48:12 6/17/2012 20:53:01 707-- 2 2 COAL -- Harita Para6/17/2012 21:01:34 6/17/2012 21:05:40 713-- 2 2 COAL -- Harita Para

6/17/2012 21:03:00 6/17/2012 21:08:38 829- 2 2 COAL -- Harita Para6/17/2012 21:03:57 6/17/2012 21:10:19 702-- 2 2 COAL -- Harita Para6/17/2012 21:13:53 6/17/2012 21:18:10 818- 2 2 COAL -- Harita Para6/17/2012 21:17:24 6/17/2012 21:22:28 113 2 2 COAL -- Harita Para6/17/2012 21:19:59 6/17/2012 21:25:23 837- 2 2 COAL -- Harita Para6/17/2012 21:28:25 6/17/2012 21:32:59 831- 2 2 COAL -- Harita Para6/17/2012 21:29:54 6/17/2012 21:39:26 709-- 2 2 COAL -- Harita Para6/17/2012 21:41:45 6/17/2012 21:47:51 850- 2 2 COAL -- Harita Para6/17/2012 21:43:08 6/17/2012 21:50:03 706-- 2 2 COAL -- Harita Para6/17/2012 21:43:34 6/17/2012 21:50:06 705-- 2 2 COAL -- Harita Para

6/17/2012 21:51:16 6/17/2012 21:55:29 815- 2 2 COAL -- Harita Para6/17/2012 21:53:49 6/17/2012 21:58:40 812- 2 2 COAL -- Harita Para6/17/2012 21:57:57 6/17/2012 22:01:29 712-- 2 2 COAL -- Harita Para

Page 306: June Per Shift (Truckscale Port)

6/17/2012 22:08:55 6/17/2012 22:13:52 710-- 2 2 COAL -- Harita Para6/17/2012 22:09:25 6/17/2012 22:15:29 704-- 2 2 COAL -- Harita Para6/17/2012 22:12:40 6/17/2012 22:20:36 703-- 2 2 COAL -- Harita Para6/17/2012 22:19:20 6/17/2012 22:23:19 115 2 2 COAL -- Harita Para6/17/2012 22:19:46 6/17/2012 22:26:09 701-- 2 2 COAL -- Harita Para6/17/2012 22:25:30 6/17/2012 22:29:19 713-- 2 2 COAL -- Harita Para6/17/2012 22:27:37 6/17/2012 22:33:37 707-- 2 2 COAL -- Harita Para

6/17/2012 22:32:55 6/17/2012 22:37:14 714-- 2 2 COAL -- Harita Para6/17/2012 22:51:56 6/17/2012 22:56:22 818- 2 2 COAL -- Harita Para6/17/2012 22:52:53 6/17/2012 22:58:30 829- 2 2 COAL -- Harita Para

6/17/2012 22:53:32 6/17/2012 23:02:14 113 2 2 COAL -- Harita Para6/17/2012 23:04:39 6/17/2012 23:11:50 709-- 2 2 COAL -- Harita Para6/17/2012 23:34:02 6/17/2012 23:40:07 705-- 2 2 COAL -- Harita Para6/17/2012 23:35:51 6/17/2012 23:43:13 812- 2 2 COAL -- Harita Para6/17/2012 23:37:42 6/17/2012 23:43:41 712-- 2 2 COAL -- Harita Para6/17/2012 23:38:27 6/17/2012 23:46:35 850- 2 2 COAL -- Harita Para

6/17/2012 23:41:04 6/17/2012 23:48:14 706-- 2 2 COAL -- Harita Para6/17/2012 23:42:15 6/17/2012 23:50:05 815- 2 2 COAL -- Harita Para6/17/2012 23:51:06 6/17/2012 23:55:27 704-- 2 2 COAL -- Harita Para6/17/2012 23:59:04 6/18/2012 00:02:45 831- 2 3 COAL -- Harita Para6/17/2012 19:22:00 6/17/2012 19:27:25 851 2 2 COAL -- MIL

6/17/2012 19:37:51 6/17/2012 19:47:28 852 2 2 COAL -- MIL6/17/2012 19:40:22 6/17/2012 19:53:05 853 2 2 COAL -- MIL

6/17/2012 20:12:32 6/17/2012 20:20:57 810 2 2 COAL -- MIL6/17/2012 20:58:12 6/17/2012 21:04:35 855 2 2 COAL -- MIL6/17/2012 21:08:00 6/17/2012 21:14:28 851 2 2 COAL -- MIL6/17/2012 21:28:55 6/17/2012 21:46:34 853 2 2 COAL -- MIL6/17/2012 21:40:54 6/17/2012 21:46:38 852 2 2 COAL -- MIL6/17/2012 22:10:19 6/17/2012 22:18:01 810 2 2 COAL -- MIL6/17/2012 22:35:27 6/17/2012 22:40:23 855 2 2 COAL -- MIL6/17/2012 23:21:32 6/17/2012 23:27:27 851 2 2 COAL -- MIL6/17/2012 23:33:38 6/17/2012 23:39:29 852 2 2 COAL -- MIL6/17/2012 23:59:25 6/18/2012 00:07:44 853 2 3 COAL -- MIL6/18/2012 00:06:24 6/18/2012 00:11:56 710-- 3 3 COAL -- Harita Para

6/18/2012 00:06:48 6/18/2012 00:12:00 703-- 3 3 COAL -- Harita Para

6/18/2012 00:09:04 6/18/2012 00:16:21 115 3 3 COAL -- Harita Para6/18/2012 00:09:25 6/18/2012 00:21:36 713-- 3 3 COAL -- Harita Para6/18/2012 00:09:47 6/18/2012 00:21:40 702-- 3 3 COAL -- Harita Para6/18/2012 00:10:10 6/18/2012 00:22:34 701-- 3 3 COAL -- Harita Para6/18/2012 00:20:05 6/18/2012 00:26:23 714-- 3 3 COAL -- Harita Para6/18/2012 00:20:48 6/18/2012 00:26:26 707-- 3 3 COAL -- Harita Para6/18/2012 00:30:16 6/18/2012 00:34:58 829- 3 3 COAL -- Harita Para

6/18/2012 00:57:49 6/18/2012 01:07:22 113 3 3 COAL -- Harita Para6/18/2012 01:08:43 6/18/2012 01:42:43 709-- 3 3 COAL -- Harita Para6/18/2012 01:55:16 6/18/2012 01:59:30 705-- 3 3 COAL -- Harita Para6/18/2012 02:11:16 6/18/2012 02:15:37 829- 3 3 COAL -- Harita Para6/18/2012 02:14:36 6/18/2012 02:19:43 706-- 3 3 COAL -- Harita Para6/18/2012 02:18:55 6/18/2012 02:23:35 713-- 3 3 COAL -- Harita Para

Page 307: June Per Shift (Truckscale Port)

6/18/2012 02:21:08 6/18/2012 02:27:48 704-- 3 3 COAL -- Harita Para6/18/2012 02:22:43 6/18/2012 02:28:18 818- 3 3 COAL -- Harita Para6/18/2012 02:25:21 6/18/2012 02:31:14 812- 3 3 COAL -- Harita Para6/18/2012 02:32:18 6/18/2012 02:38:42 707-- 3 3 COAL -- Harita Para6/18/2012 02:32:41 6/18/2012 02:40:44 850- 3 3 COAL -- Harita Para6/18/2012 02:35:32 6/18/2012 02:45:30 701-- 3 3 COAL -- Harita Para6/18/2012 02:47:16 6/18/2012 02:52:04 115 3 3 COAL -- Harita Para6/18/2012 02:50:38 6/18/2012 02:54:10 815- 3 3 COAL -- Harita Para

6/18/2012 02:55:14 6/18/2012 02:59:50 837- 3 3 COAL -- Harita Para6/18/2012 02:56:28 6/18/2012 03:02:20 703-- 3 3 COAL -- Harita Para6/18/2012 02:56:55 6/18/2012 03:02:26 702-- 3 3 COAL -- Harita Para6/18/2012 02:57:22 6/18/2012 03:03:49 113 3 3 COAL -- Harita Para6/18/2012 03:14:41 6/18/2012 03:19:17 710-- 3 3 COAL -- Harita Para6/18/2012 07:15:34 6/18/2012 07:26:30 707-- 3 3 COAL -- Harita Para6/18/2012 07:28:23 6/18/2012 07:31:25 710-- 3 3 COAL -- Harita Para6/18/2012 07:30:17 6/18/2012 07:33:43 704-- 3 3 COAL -- Harita Para

6/18/2012 07:30:40 6/18/2012 07:36:17 713-- 3 3 COAL -- Harita Para6/18/2012 07:35:07 6/18/2012 07:44:37 113 3 3 COAL -- Harita Para6/18/2012 07:38:07 6/18/2012 07:45:12 701-- 3 3 COAL -- Harita Para6/18/2012 07:42:48 6/18/2012 07:49:50 812- 3 3 COAL -- Harita Para6/18/2012 07:49:11 6/18/2012 07:53:54 818- 3 3 COAL -- Harita Para6/18/2012 07:50:25 6/18/2012 07:55:42 837- 3 3 COAL -- Harita Para6/18/2012 00:03:44 6/18/2012 00:07:48 855 3 3 COAL -- MIL6/18/2012 00:48:03 6/18/2012 00:52:46 810 3 3 COAL -- MIL6/18/2012 01:08:16 6/18/2012 01:15:00 851 3 3 COAL -- MIL6/18/2012 01:32:00 6/18/2012 01:39:00 852 3 3 COAL -- MIL6/18/2012 01:39:33 6/18/2012 01:44:55 855 3 3 COAL -- MIL6/18/2012 01:43:29 6/18/2012 01:50:12 853 3 3 COAL -- MIL6/18/2012 02:35:04 6/18/2012 02:43:41 810 3 3 COAL -- MIL6/18/2012 03:08:29 6/18/2012 03:13:17 851 3 3 COAL -- MIL6/18/2012 03:28:53 6/18/2012 03:34:27 852 3 3 COAL -- MIL6/18/2012 03:29:49 6/18/2012 03:38:22 855 3 3 COAL -- MIL6/18/2012 07:34:33 6/18/2012 07:41:02 855 3 3 COAL -- MIL6/18/2012 07:45:56 6/18/2012 07:51:16 852 3 3 COAL -- MIL6/18/2012 08:24:46 6/18/2012 08:28:28 705-- 1 1 COAL -- Harita Para6/18/2012 08:27:12 6/18/2012 08:30:48 702-- 1 1 COAL -- Harita Para6/18/2012 08:29:48 6/18/2012 08:34:20 115 1 1 COAL -- Harita Para6/18/2012 08:37:19 6/18/2012 08:42:52 709-- 1 1 COAL -- Harita Para6/18/2012 08:45:34 6/18/2012 08:49:23 710-- 1 1 COAL -- Harita Para6/18/2012 08:48:21 6/18/2012 08:52:55 706-- 1 1 COAL -- Harita Para6/18/2012 08:48:42 6/18/2012 08:53:08 703-- 1 1 COAL -- Harita Para6/18/2012 08:50:01 6/18/2012 08:54:56 707-- 1 1 COAL -- Harita Para6/18/2012 08:57:02 6/18/2012 09:01:00 708-- 1 1 COAL -- Harita Para6/18/2012 08:57:29 6/18/2012 09:01:03 704-- 1 1 COAL -- Harita Para

6/18/2012 09:02:21 6/18/2012 09:06:06 713-- 1 1 COAL -- Harita Para6/18/2012 09:08:22 6/18/2012 09:12:04 815- 1 1 COAL -- Harita Para

6/18/2012 09:13:05 6/18/2012 09:17:13 701-- 1 1 COAL -- Harita Para6/18/2012 09:13:23 6/18/2012 09:19:34 714-- 1 1 COAL -- Harita Para6/18/2012 09:15:38 6/18/2012 09:21:49 113 1 1 COAL -- Harita Para

Page 308: June Per Shift (Truckscale Port)

6/18/2012 09:18:43 6/18/2012 09:19:42 833- 1 1 COAL -- Harita Para6/18/2012 09:20:20 6/18/2012 09:25:13 812- 1 1 COAL -- Harita Para6/18/2012 09:51:20 6/18/2012 09:55:30 837- 1 1 COAL -- Harita Para6/18/2012 10:07:22 6/18/2012 10:10:54 705-- 1 1 COAL -- Harita Para6/18/2012 10:12:12 6/18/2012 10:16:10 702-- 1 1 COAL -- Harita Para

6/18/2012 10:24:04 6/18/2012 10:29:23 710-- 1 1 COAL -- Harita Para6/18/2012 10:27:45 6/18/2012 10:31:37 818- 1 1 COAL -- Harita Para6/18/2012 10:33:12 6/18/2012 10:37:24 115 1 1 COAL -- Harita Para6/18/2012 10:35:02 6/18/2012 10:40:30 709-- 1 1 COAL -- Harita Para6/18/2012 10:38:05 6/18/2012 10:40:34 839- 1 1 COAL -- Harita Para6/18/2012 10:47:34 6/18/2012 10:51:58 703-- 1 1 COAL -- Harita Para6/18/2012 10:50:50 6/18/2012 11:07:47 706-- 1 1 COAL -- Harita Para

6/18/2012 10:54:23 6/18/2012 11:07:50 829- 1 1 COAL -- Harita Para6/18/2012 10:55:00 6/18/2012 11:15:29 707-- 1 1 COAL -- Harita Para6/18/2012 10:59:46 6/18/2012 11:15:32 708-- 1 1 COAL -- Harita Para6/18/2012 11:00:11 6/18/2012 11:18:54 815- 1 1 COAL -- Harita Para6/18/2012 11:06:51 6/18/2012 11:19:02 704-- 1 1 COAL -- Harita Para

6/18/2012 11:11:15 6/18/2012 11:21:36 812- 1 1 COAL -- Harita Para6/18/2012 11:12:31 6/18/2012 11:21:38 712-- 1 1 COAL -- Harita Para6/18/2012 11:14:51 6/18/2012 11:24:13 714-- 1 1 COAL -- Harita Para

6/18/2012 11:17:25 6/18/2012 11:26:12 830- 1 1 COAL -- Harita Para6/18/2012 11:22:26 6/18/2012 11:26:16 113 1 1 COAL -- Harita Para6/18/2012 11:25:05 6/18/2012 11:27:44 701-- 1 1 COAL -- Harita Para6/18/2012 11:32:38 6/18/2012 11:36:09 837- 1 1 COAL -- Harita Para6/18/2012 11:39:55 6/18/2012 11:50:31 833- 1 1 COAL -- Harita Para6/18/2012 11:48:28 6/18/2012 11:50:37 705-- 1 1 COAL -- Harita Para6/18/2012 11:54:29 6/18/2012 11:58:03 702-- 1 1 COAL -- Harita Para6/18/2012 12:00:58 6/18/2012 12:05:52 818- 1 1 COAL -- Harita Para6/18/2012 12:06:31 6/18/2012 12:10:56 710-- 1 1 COAL -- Harita Para6/18/2012 12:10:21 6/18/2012 12:18:56 115 1 1 COAL -- Harita Para6/18/2012 12:16:35 6/18/2012 12:20:24 850- 1 1 COAL -- Harita Para6/18/2012 12:16:55 6/18/2012 12:20:28 703-- 1 1 COAL -- Harita Para6/18/2012 12:17:12 6/18/2012 12:21:40 709-- 1 1 COAL -- Harita Para6/18/2012 12:17:47 6/18/2012 12:21:44 713-- 1 1 COAL -- Harita Para6/18/2012 12:36:43 6/18/2012 12:40:50 839- 1 1 COAL -- Harita Para6/18/2012 12:46:42 6/18/2012 12:51:49 706-- 1 1 COAL -- Harita Para6/18/2012 13:04:35 6/18/2012 13:11:11 829- 1 1 COAL -- Harita Para6/18/2012 13:05:08 6/18/2012 13:13:03 708-- 1 1 COAL -- Harita Para6/18/2012 13:08:44 6/18/2012 13:13:06 830- 1 1 COAL -- Harita Para6/18/2012 13:11:59 6/18/2012 13:14:51 714-- 1 1 COAL -- Harita Para6/18/2012 13:16:20 6/18/2012 13:19:57 704-- 1 1 COAL -- Harita Para

6/18/2012 13:21:20 6/18/2012 13:25:37 812- 1 1 COAL -- Harita Para6/18/2012 13:24:58 6/18/2012 13:28:42 837- 1 1 COAL -- Harita Para6/18/2012 13:35:48 6/18/2012 13:40:33 113 1 1 COAL -- Harita Para6/18/2012 13:44:03 6/18/2012 13:47:37 707-- 1 1 COAL -- Harita Para6/18/2012 13:50:19 6/18/2012 13:54:11 712-- 1 1 COAL -- Harita Para

6/18/2012 13:51:21 6/18/2012 13:55:52 818- 1 1 COAL -- Harita Para6/18/2012 13:53:25 6/18/2012 14:01:27 709-- 1 1 COAL -- Harita Para

Page 309: June Per Shift (Truckscale Port)

6/18/2012 13:55:03 6/18/2012 14:01:31 702-- 1 1 COAL -- Harita Para6/18/2012 13:58:30 6/18/2012 14:03:43 850- 1 1 COAL -- Harita Para

6/18/2012 13:59:06 6/18/2012 14:03:47 705-- 1 1 COAL -- Harita Para

6/18/2012 14:00:11 6/18/2012 14:05:28 713-- 1 1 COAL -- Harita Para6/18/2012 14:03:02 6/18/2012 14:05:32 710-- 1 1 COAL -- Harita Para

6/18/2012 14:07:15 6/18/2012 14:10:16 701-- 1 1 COAL -- Harita Para6/18/2012 14:13:29 6/18/2012 14:17:20 115 1 1 COAL -- Harita Para

6/18/2012 14:20:49 6/18/2012 14:26:10 706-- 1 1 COAL -- Harita Para6/18/2012 14:23:24 6/18/2012 14:26:15 703-- 1 1 COAL -- Harita Para6/18/2012 14:25:32 6/18/2012 14:28:17 833- 1 1 COAL -- Harita Para6/18/2012 14:41:58 6/18/2012 14:46:29 708-- 1 1 COAL -- Harita Para6/18/2012 14:47:21 6/18/2012 14:53:52 714-- 1 1 COAL -- Harita Para6/18/2012 14:49:22 6/18/2012 14:53:55 704-- 1 1 COAL -- Harita Para6/18/2012 15:04:10 6/18/2012 15:09:12 830- 1 1 COAL -- Harita Para6/18/2012 15:11:18 6/18/2012 15:16:54 113 1 1 COAL -- Harita Para6/18/2012 15:15:15 6/18/2012 15:18:48 707-- 1 1 COAL -- Harita Para6/18/2012 15:25:50 6/18/2012 15:29:50 818- 1 1 COAL -- Harita Para6/18/2012 15:27:05 6/18/2012 15:30:00 709-- 1 1 COAL -- Harita Para6/18/2012 15:33:38 6/18/2012 15:37:15 850- 1 1 COAL -- Harita Para6/18/2012 15:34:29 6/18/2012 15:37:20 712-- 1 1 COAL -- Harita Para6/18/2012 15:34:50 6/18/2012 15:39:37 713-- 1 1 COAL -- Harita Para6/18/2012 15:35:11 6/18/2012 15:41:39 702-- 1 1 COAL -- Harita Para6/18/2012 15:38:20 6/18/2012 15:41:43 839- 1 1 COAL -- Harita Para

6/18/2012 15:40:39 6/18/2012 15:43:42 829- 1 1 COAL -- Harita Para6/18/2012 15:42:39 6/18/2012 15:48:08 705-- 1 1 COAL -- Harita Para6/18/2012 15:44:27 6/18/2012 15:46:07 710-- 1 1 COAL -- Harita Para6/18/2012 15:47:08 6/18/2012 15:49:49 701-- 1 1 COAL -- Harita Para

6/18/2012 15:52:16 6/18/2012 15:52:59 115 1 1 COAL -- Harita Para6/18/2012 08:10:05 6/18/2012 08:13:35 810 1 1 COAL -- MIL6/18/2012 08:20:41 6/18/2012 08:26:18 851 1 1 COAL -- MIL6/18/2012 09:42:06 6/18/2012 09:49:56 855 1 1 COAL -- MIL6/18/2012 09:49:08 6/18/2012 09:49:59 852 1 1 COAL -- MIL6/18/2012 10:00:42 6/18/2012 10:06:11 856 1 1 COAL -- MIL

6/18/2012 10:05:43 6/18/2012 10:06:16 810 1 1 COAL -- MIL6/18/2012 10:20:17 6/18/2012 10:25:05 851 1 1 COAL -- MIL6/18/2012 12:09:55 6/18/2012 12:18:35 855 1 1 COAL -- MIL6/18/2012 12:19:49 6/18/2012 12:26:53 852 1 1 COAL -- MIL6/18/2012 12:28:19 6/18/2012 12:31:59 853 1 1 COAL -- MIL6/18/2012 12:30:37 6/18/2012 12:32:02 810 1 1 COAL -- MIL6/18/2012 12:45:11 6/18/2012 12:49:49 856 1 1 COAL -- MIL6/18/2012 12:53:14 6/18/2012 13:09:19 851 1 1 COAL -- MIL6/18/2012 13:52:34 6/18/2012 14:12:18 855 1 1 COAL -- MIL6/18/2012 14:08:47 6/18/2012 14:12:20 810 1 1 COAL -- MIL

6/18/2012 14:29:17 6/18/2012 14:30:40 852 1 1 COAL -- MIL6/18/2012 14:36:45 6/18/2012 14:40:38 853 1 1 COAL -- MIL6/18/2012 14:45:49 6/18/2012 14:50:47 856 1 1 COAL -- MIL6/18/2012 15:01:40 6/18/2012 15:07:43 851 1 1 COAL -- MIL6/18/2012 16:02:05 6/18/2012 16:05:59 703-- 2 2 COAL -- Harita Para

Page 310: June Per Shift (Truckscale Port)

6/18/2012 16:29:27 6/18/2012 16:34:50 833- 2 2 COAL -- Harita Para6/18/2012 18:22:15 6/18/2012 18:25:56 712-- 2 2 COAL -- Harita Para6/18/2012 18:27:55 6/18/2012 18:32:03 113 2 2 COAL -- Harita Para

6/18/2012 18:30:31 6/18/2012 18:35:25 701-- 2 2 COAL -- Harita Para6/18/2012 18:32:47 6/18/2012 18:36:20 707-- 2 2 COAL -- Harita Para6/18/2012 18:34:14 6/18/2012 18:36:26 708-- 2 2 COAL -- Harita Para6/18/2012 18:34:52 6/18/2012 18:37:58 713-- 2 2 COAL -- Harita Para6/18/2012 18:43:04 6/18/2012 18:47:31 710-- 2 2 COAL -- Harita Para6/18/2012 18:43:34 6/18/2012 18:47:34 709-- 2 2 COAL -- Harita Para6/18/2012 18:44:01 6/18/2012 18:47:38 115 2 2 COAL -- Harita Para6/18/2012 18:45:01 6/18/2012 18:49:09 706-- 2 2 COAL -- Harita Para6/18/2012 18:45:29 6/18/2012 18:49:12 714-- 2 2 COAL -- Harita Para6/18/2012 18:46:05 6/18/2012 18:51:19 704-- 2 2 COAL -- Harita Para6/18/2012 18:46:42 6/18/2012 18:51:24 703-- 2 2 COAL -- Harita Para6/18/2012 19:05:40 6/18/2012 19:09:37 705-- 2 2 COAL -- Harita Para6/18/2012 19:19:57 6/18/2012 19:24:09 818- 2 2 COAL -- Harita Para6/18/2012 19:25:01 6/18/2012 19:33:56 836- 2 2 COAL -- Harita Para6/18/2012 19:34:59 6/18/2012 19:39:16 839- 2 2 COAL -- Harita Para6/18/2012 19:35:28 6/18/2012 19:41:27 812- 2 2 COAL -- Harita Para6/18/2012 20:01:45 6/18/2012 20:06:16 712-- 2 2 COAL -- Harita Para6/18/2012 20:04:52 6/18/2012 20:08:59 113 2 2 COAL -- Harita Para

6/18/2012 20:05:32 6/18/2012 20:11:16 701-- 2 2 COAL -- Harita Para6/18/2012 20:13:35 6/18/2012 20:17:56 713-- 2 2 COAL -- Harita Para6/18/2012 20:16:05 6/18/2012 20:19:31 708-- 2 2 COAL -- Harita Para6/18/2012 20:17:18 6/18/2012 20:21:16 707-- 2 2 COAL -- Harita Para6/18/2012 20:24:05 6/18/2012 20:30:20 709-- 2 2 COAL -- Harita Para6/18/2012 20:25:08 6/18/2012 20:33:22 850- 2 2 COAL -- Harita Para6/18/2012 20:32:29 6/18/2012 20:36:50 710-- 2 2 COAL -- Harita Para6/18/2012 20:40:43 6/18/2012 20:44:59 706-- 2 2 COAL -- Harita Para6/18/2012 20:41:10 6/18/2012 20:48:21 714-- 2 2 COAL -- Harita Para6/18/2012 20:42:53 6/18/2012 20:49:31 829- 2 2 COAL -- Harita Para6/18/2012 20:47:33 6/18/2012 20:52:33 704-- 2 2 COAL -- Harita Para6/18/2012 20:56:32 6/18/2012 21:03:19 703-- 2 2 COAL -- Harita Para6/18/2012 21:02:12 6/18/2012 21:08:05 115 2 2 COAL -- Harita Para

6/18/2012 21:05:55 6/18/2012 21:10:26 831- 2 2 COAL -- Harita Para6/18/2012 21:12:31 6/18/2012 21:20:39 818- 2 2 COAL -- Harita Para6/18/2012 21:18:56 6/18/2012 21:25:03 702-- 2 2 COAL -- Harita Para6/18/2012 21:27:37 6/18/2012 21:33:45 705-- 2 2 COAL -- Harita Para6/18/2012 21:31:52 6/18/2012 21:36:45 839- 2 2 COAL -- Harita Para6/18/2012 21:32:49 6/18/2012 21:39:54 812- 2 2 COAL -- Harita Para6/18/2012 21:33:06 6/18/2012 21:41:35 712-- 2 2 COAL -- Harita Para6/18/2012 21:38:39 6/18/2012 21:41:40 713-- 2 2 COAL -- Harita Para6/18/2012 21:40:36 6/18/2012 21:44:39 113 2 2 COAL -- Harita Para6/18/2012 21:40:57 6/18/2012 21:44:44 701-- 2 2 COAL -- Harita Para6/18/2012 21:56:11 6/18/2012 21:59:43 707-- 2 2 COAL -- Harita Para6/18/2012 22:00:59 6/18/2012 22:04:35 708-- 2 2 COAL -- Harita Para6/18/2012 22:04:01 6/18/2012 22:08:09 709-- 2 2 COAL -- Harita Para6/18/2012 22:18:29 6/18/2012 22:23:48 710-- 2 2 COAL -- Harita Para6/18/2012 22:22:06 6/18/2012 22:26:12 706-- 2 2 COAL -- Harita Para

Page 311: June Per Shift (Truckscale Port)

6/18/2012 22:29:59 6/18/2012 22:34:14 714-- 2 2 COAL -- Harita Para6/18/2012 22:31:07 6/18/2012 22:37:02 850- 2 2 COAL -- Harita Para6/18/2012 22:42:03 6/18/2012 22:52:20 704-- 2 2 COAL -- Harita Para6/18/2012 22:43:56 6/18/2012 22:59:01 829- 2 2 COAL -- Harita Para6/18/2012 22:47:46 6/18/2012 22:52:25 703-- 2 2 COAL -- Harita Para6/18/2012 22:48:59 6/18/2012 22:53:52 836- 2 2 COAL -- Harita Para6/18/2012 22:57:45 6/18/2012 23:03:18 115 2 2 COAL -- Harita Para6/18/2012 23:04:36 6/18/2012 23:09:27 818- 2 2 COAL -- Harita Para6/18/2012 23:08:11 6/18/2012 23:11:30 702-- 2 2 COAL -- Harita Para6/18/2012 23:10:47 6/18/2012 23:14:45 831- 2 2 COAL -- Harita Para6/18/2012 23:16:34 6/18/2012 23:21:12 812- 2 2 COAL -- Harita Para6/18/2012 23:19:23 6/18/2012 23:23:12 839- 2 2 COAL -- Harita Para6/18/2012 23:19:49 6/18/2012 23:25:26 705-- 2 2 COAL -- Harita Para6/18/2012 23:24:53 6/18/2012 23:29:38 713-- 2 2 COAL -- Harita Para

6/18/2012 23:40:06 6/18/2012 23:44:37 830- 2 2 COAL -- Harita Para6/18/2012 23:42:11 6/18/2012 23:48:38 113 2 2 COAL -- Harita Para

6/18/2012 23:42:47 6/18/2012 23:49:59 712-- 2 2 COAL -- Harita Para6/18/2012 23:47:19 6/18/2012 23:50:04 707-- 2 2 COAL -- Harita Para6/18/2012 23:54:20 6/18/2012 23:59:01 701-- 2 2 COAL -- Harita Para6/18/2012 23:58:15 6/19/2012 00:02:04 709-- 2 3 COAL -- Harita Para6/18/2012 19:12:00 6/18/2012 19:18:26 855 2 2 COAL -- MIL6/18/2012 19:13:15 6/18/2012 19:18:54 856 2 2 COAL -- MIL6/18/2012 19:15:34 6/18/2012 19:22:15 853 2 2 COAL -- MIL6/18/2012 19:37:34 6/18/2012 19:47:15 851 2 2 COAL -- MIL6/18/2012 19:44:07 6/18/2012 19:50:32 810 2 2 COAL -- MIL6/18/2012 20:23:47 6/18/2012 20:29:29 852 2 2 COAL -- MIL6/18/2012 20:53:47 6/18/2012 21:02:49 855 2 2 COAL -- MIL6/18/2012 21:00:04 6/18/2012 21:03:51 856 2 2 COAL -- MIL

6/18/2012 21:07:01 6/18/2012 21:14:16 853 2 2 COAL -- MIL6/18/2012 21:32:08 6/18/2012 21:36:27 851 2 2 COAL -- MIL6/18/2012 21:32:26 6/18/2012 21:39:33 810 2 2 COAL -- MIL6/18/2012 22:15:30 6/18/2012 22:21:23 852 2 2 COAL -- MIL6/18/2012 22:35:20 6/18/2012 22:42:41 855 2 2 COAL -- MIL6/18/2012 22:59:53 6/18/2012 23:03:39 856 2 2 COAL -- MIL6/18/2012 23:02:24 6/18/2012 23:08:55 853 2 2 COAL -- MIL6/18/2012 23:17:38 6/18/2012 23:22:17 851 2 2 COAL -- MIL6/18/2012 23:41:50 6/18/2012 23:48:11 810 2 2 COAL -- MIL6/19/2012 00:08:42 6/19/2012 00:14:55 706-- 3 3 COAL -- Harita Para6/19/2012 00:09:53 6/19/2012 00:14:58 708-- 3 3 COAL -- Harita Para6/19/2012 00:17:33 6/19/2012 00:21:32 836- 3 3 COAL -- Harita Para6/19/2012 00:30:02 6/19/2012 00:35:00 850- 3 3 COAL -- Harita Para6/19/2012 00:36:08 6/19/2012 00:40:38 710-- 3 3 COAL -- Harita Para6/19/2012 00:36:41 6/19/2012 00:43:23 703-- 3 3 COAL -- Harita Para6/19/2012 00:48:05 6/19/2012 00:53:53 829- 3 3 COAL -- Harita Para6/19/2012 00:52:22 6/19/2012 00:56:58 812- 3 3 COAL -- Harita Para6/19/2012 01:03:58 6/19/2012 01:22:40 704-- 3 3 COAL -- Harita Para6/19/2012 01:04:20 6/19/2012 01:11:08 702-- 3 3 COAL -- Harita Para6/19/2012 01:19:00 6/19/2012 01:22:50 818- 3 3 COAL -- Harita Para6/19/2012 01:31:43 6/19/2012 01:37:15 712-- 3 3 COAL -- Harita Para

Page 312: June Per Shift (Truckscale Port)

6/19/2012 01:32:40 6/19/2012 01:40:22 707-- 3 3 COAL -- Harita Para6/19/2012 01:36:11 6/19/2012 01:42:18 714-- 3 3 COAL -- Harita Para

6/19/2012 01:36:31 6/19/2012 01:44:18 713-- 3 3 COAL -- Harita Para6/19/2012 01:42:58 6/19/2012 01:47:18 701-- 3 3 COAL -- Harita Para6/19/2012 01:52:34 6/19/2012 01:58:17 708-- 3 3 COAL -- Harita Para6/19/2012 01:56:02 6/19/2012 02:00:49 836- 3 3 COAL -- Harita Para6/19/2012 01:56:27 6/19/2012 02:01:33 839- 3 3 COAL -- Harita Para6/19/2012 01:56:56 6/19/2012 02:01:58 709-- 3 3 COAL -- Harita Para6/19/2012 01:57:23 6/19/2012 02:04:09 705-- 3 3 COAL -- Harita Para6/19/2012 02:11:34 6/19/2012 02:16:24 113 3 3 COAL -- Harita Para6/19/2012 02:29:27 6/19/2012 02:34:08 710-- 3 3 COAL -- Harita Para

6/19/2012 02:38:54 6/19/2012 02:43:20 703-- 3 3 COAL -- Harita Para6/19/2012 07:49:42 6/19/2012 08:11:37 115 3 1 COAL -- Harita Para6/19/2012 00:18:07 6/19/2012 00:31:51 852 3 3 COAL -- MIL6/19/2012 01:32:14 6/19/2012 01:39:13 853 3 3 COAL -- MIL6/19/2012 02:19:15 6/19/2012 02:30:24 852 3 3 COAL -- MIL6/19/2012 02:33:14 6/19/2012 02:40:23 855 3 3 COAL -- MIL6/19/2012 02:42:39 6/19/2012 02:46:55 851 3 3 COAL -- MIL6/19/2012 02:48:43 6/19/2012 02:54:59 810 3 3 COAL -- MIL6/19/2012 08:04:38 6/19/2012 08:11:40 702-- 1 1 COAL -- Harita Para6/19/2012 08:08:47 6/19/2012 08:14:07 707-- 1 1 COAL -- Harita Para

6/19/2012 08:12:25 6/19/2012 08:14:10 710-- 1 1 COAL -- Harita Para6/19/2012 08:15:39 6/19/2012 08:20:00 709-- 1 1 COAL -- Harita Para6/19/2012 08:26:20 6/19/2012 08:36:24 708-- 1 1 COAL -- Harita Para6/19/2012 08:27:52 6/19/2012 08:37:08 113 1 1 COAL -- Harita Para

6/19/2012 08:28:25 6/19/2012 08:39:44 713-- 1 1 COAL -- Harita Para6/19/2012 08:30:41 6/19/2012 08:41:01 701-- 1 1 COAL -- Harita Para6/19/2012 08:34:48 6/19/2012 08:41:05 714-- 1 1 COAL -- Harita Para6/19/2012 08:38:00 6/19/2012 08:46:08 705-- 1 1 COAL -- Harita Para6/19/2012 08:55:57 6/19/2012 09:01:06 706-- 1 1 COAL -- Harita Para6/19/2012 09:09:24 6/19/2012 09:13:53 712-- 1 1 COAL -- Harita Para6/19/2012 09:15:09 6/19/2012 09:18:53 818- 1 1 COAL -- Harita Para6/19/2012 09:21:22 6/19/2012 09:26:26 703-- 1 1 COAL -- Harita Para6/19/2012 09:31:14 6/19/2012 09:36:52 115 1 1 COAL -- Harita Para6/19/2012 09:32:20 6/19/2012 09:37:14 836- 1 1 COAL -- Harita Para6/19/2012 09:40:57 6/19/2012 09:45:33 839- 1 1 COAL -- Harita Para6/19/2012 09:47:18 6/19/2012 09:51:46 707-- 1 1 COAL -- Harita Para6/19/2012 09:58:28 6/19/2012 10:02:56 812- 1 1 COAL -- Harita Para6/19/2012 10:01:10 6/19/2012 10:08:45 702-- 1 1 COAL -- Harita Para6/19/2012 10:01:43 6/19/2012 10:11:20 709-- 1 1 COAL -- Harita Para

6/19/2012 10:03:54 6/19/2012 10:11:42 710-- 1 1 COAL -- Harita Para6/19/2012 10:04:19 6/19/2012 10:13:59 713-- 1 1 COAL -- Harita Para6/19/2012 10:06:20 6/19/2012 10:15:31 830- 1 1 COAL -- Harita Para6/19/2012 10:12:22 6/19/2012 10:16:39 828- 1 1 COAL -- Harita Para6/19/2012 10:12:46 6/19/2012 10:18:14 714-- 1 1 COAL -- Harita Para6/19/2012 10:17:35 6/19/2012 10:24:39 705-- 1 1 COAL -- Harita Para6/19/2012 10:21:38 6/19/2012 10:31:47 701-- 1 1 COAL -- Harita Para6/19/2012 10:39:55 6/19/2012 10:46:50 706-- 1 1 COAL -- Harita Para6/19/2012 10:44:36 6/19/2012 10:49:40 712-- 1 1 COAL -- Harita Para

Page 313: June Per Shift (Truckscale Port)

6/19/2012 10:47:33 6/19/2012 10:52:07 818- 1 1 COAL -- Harita Para6/19/2012 10:56:01 6/19/2012 11:01:45 704-- 1 1 COAL -- Harita Para6/19/2012 10:59:09 6/19/2012 11:04:28 703-- 1 1 COAL -- Harita Para6/19/2012 11:10:27 6/19/2012 11:14:48 836- 1 1 COAL -- Harita Para6/19/2012 11:11:25 6/19/2012 11:16:09 115 1 1 COAL -- Harita Para6/19/2012 11:17:04 6/19/2012 11:21:05 707-- 1 1 COAL -- Harita Para6/19/2012 11:24:33 6/19/2012 11:28:08 839- 1 1 COAL -- Harita Para

6/19/2012 11:33:45 6/19/2012 11:37:49 812- 1 1 COAL -- Harita Para6/19/2012 11:43:57 6/19/2012 11:48:50 702-- 1 1 COAL -- Harita Para6/19/2012 11:44:20 6/19/2012 11:52:16 830- 1 1 COAL -- Harita Para6/19/2012 11:48:02 6/19/2012 11:54:10 709-- 1 1 COAL -- Harita Para6/19/2012 11:50:34 6/19/2012 11:55:11 815- 1 1 COAL -- Harita Para6/19/2012 11:51:21 6/19/2012 11:57:09 713-- 1 1 COAL -- Harita Para6/19/2012 11:53:29 6/19/2012 11:59:01 828- 1 1 COAL -- Harita Para6/19/2012 11:57:50 6/19/2012 12:02:40 714-- 1 1 COAL -- Harita Para6/19/2012 12:09:50 6/19/2012 12:13:49 705-- 1 1 COAL -- Harita Para6/19/2012 12:16:04 6/19/2012 12:20:49 701-- 1 1 COAL -- Harita Para6/19/2012 12:24:30 6/19/2012 12:36:49 706-- 1 1 COAL -- Harita Para6/19/2012 12:24:54 6/19/2012 12:31:34 710-- 1 1 COAL -- Harita Para6/19/2012 12:25:35 6/19/2012 12:32:44 833- 1 1 COAL -- Harita Para6/19/2012 12:29:47 6/19/2012 12:34:59 818- 1 1 COAL -- Harita Para6/19/2012 12:49:41 6/19/2012 12:54:01 836- 1 1 COAL -- Harita Para6/19/2012 13:07:39 6/19/2012 13:13:16 703-- 1 1 COAL -- Harita Para6/19/2012 13:12:22 6/19/2012 13:13:19 712-- 1 1 COAL -- Harita Para6/19/2012 13:54:04 6/19/2012 13:59:32 819- 1 1 COAL -- Harita Para6/19/2012 13:58:22 6/19/2012 14:03:45 709-- 1 1 COAL -- Harita Para6/19/2012 14:01:35 6/19/2012 14:08:40 829- 1 1 COAL -- Harita Para6/19/2012 14:05:01 6/19/2012 14:08:43 702-- 1 1 COAL -- Harita Para6/19/2012 14:05:43 6/19/2012 14:09:32 115 1 1 COAL -- Harita Para

6/19/2012 14:10:28 6/19/2012 14:12:10 707-- 1 1 COAL -- Harita Para6/19/2012 14:16:50 6/19/2012 14:25:11 705-- 1 1 COAL -- Harita Para6/19/2012 14:18:08 6/19/2012 14:36:34 812- 1 1 COAL -- Harita Para6/19/2012 14:30:24 6/19/2012 14:41:09 714-- 1 1 COAL -- Harita Para6/19/2012 14:31:04 6/19/2012 14:41:11 710-- 1 1 COAL -- Harita Para6/19/2012 14:34:10 6/19/2012 14:46:38 815- 1 1 COAL -- Harita Para6/19/2012 14:38:59 6/19/2012 14:46:43 828- 1 1 COAL -- Harita Para6/19/2012 14:39:26 6/19/2012 14:47:58 713-- 1 1 COAL -- Harita Para6/19/2012 14:56:13 6/19/2012 15:00:11 706-- 1 1 COAL -- Harita Para6/19/2012 14:56:33 6/19/2012 15:00:14 701-- 1 1 COAL -- Harita Para6/19/2012 14:59:24 6/19/2012 15:04:34 818- 1 1 COAL -- Harita Para6/19/2012 15:08:54 6/19/2012 15:14:22 703-- 1 1 COAL -- Harita Para6/19/2012 15:10:49 6/19/2012 15:14:25 830- 1 1 COAL -- Harita Para

6/19/2012 15:30:45 6/19/2012 15:35:41 836- 1 1 COAL -- Harita Para6/19/2012 15:35:00 6/19/2012 15:39:48 709-- 1 1 COAL -- Harita Para6/19/2012 15:40:58 6/19/2012 15:48:11 702-- 1 1 COAL -- Harita Para6/19/2012 15:41:24 6/19/2012 15:48:15 831- 1 1 COAL -- Harita Para

6/19/2012 15:42:07 6/19/2012 15:49:53 707-- 1 1 COAL -- Harita Para6/19/2012 15:47:10 6/19/2012 15:52:41 833- 1 1 COAL -- Harita Para6/19/2012 15:47:32 6/19/2012 15:52:46 115 1 1 COAL -- Harita Para

Page 314: June Per Shift (Truckscale Port)

6/19/2012 15:50:58 6/19/2012 15:56:03 712-- 1 1 COAL -- Harita Para6/19/2012 15:52:01 6/19/2012 15:56:09 705-- 1 1 COAL -- Harita Para6/19/2012 15:53:48 6/19/2012 15:58:53 832- 1 1 COAL -- Harita Para6/19/2012 15:57:49 6/19/2012 16:04:58 819- 1 2 COAL -- Harita Para

6/19/2012 09:50:13 6/19/2012 09:57:44 855 1 1 COAL -- MIL6/19/2012 09:54:48 6/19/2012 10:00:17 856 1 1 COAL -- MIL6/19/2012 09:59:36 6/19/2012 10:03:14 810 1 1 COAL -- MIL6/19/2012 10:00:53 6/19/2012 10:06:57 851 1 1 COAL -- MIL6/19/2012 10:18:57 6/19/2012 10:23:49 853 1 1 COAL -- MIL6/19/2012 10:30:56 6/19/2012 10:36:28 852 1 1 COAL -- MIL6/19/2012 12:24:06 6/19/2012 12:30:45 855 1 1 COAL -- MIL6/19/2012 12:37:37 6/19/2012 12:44:25 853 1 1 COAL -- MIL6/19/2012 12:52:28 6/19/2012 12:57:44 856 1 1 COAL -- MIL6/19/2012 12:54:59 6/19/2012 12:57:49 851 1 1 COAL -- MIL6/19/2012 13:00:09 6/19/2012 13:00:55 810 1 1 COAL -- MIL6/19/2012 13:23:50 6/19/2012 13:28:57 852 1 1 COAL -- MIL6/19/2012 13:57:50 6/19/2012 14:06:23 855 1 1 COAL -- MIL

6/19/2012 14:10:56 6/19/2012 14:18:47 853 1 1 COAL -- MIL6/19/2012 14:24:15 6/19/2012 14:37:55 851 1 1 COAL -- MIL6/19/2012 14:24:31 6/19/2012 14:38:05 810 1 1 COAL -- MIL6/19/2012 15:00:51 6/19/2012 15:07:10 856 1 1 COAL -- MIL6/19/2012 15:33:12 6/19/2012 15:37:50 852 1 1 COAL -- MIL6/19/2012 15:40:43 6/19/2012 15:56:34 855 1 1 COAL -- MIL6/19/2012 15:46:26 6/19/2012 15:56:39 853 1 1 COAL -- MIL6/19/2012 16:04:19 6/19/2012 16:14:17 829- 2 2 COAL -- Harita Para6/19/2012 16:10:55 6/19/2012 16:17:53 812- 2 2 COAL -- Harita Para6/19/2012 16:19:37 6/19/2012 16:25:40 713-- 2 2 COAL -- Harita Para6/19/2012 16:42:57 6/19/2012 16:46:20 714-- 2 2 COAL -- Harita Para

6/19/2012 18:25:18 6/19/2012 18:31:35 713-- 2 2 COAL -- Harita Para6/19/2012 18:35:41 6/19/2012 18:39:13 707-- 2 2 COAL -- Harita Para6/19/2012 18:37:13 6/19/2012 18:39:16 115 2 2 COAL -- Harita Para

6/19/2012 18:37:36 6/19/2012 18:41:16 701-- 2 2 COAL -- Harita Para6/19/2012 18:43:02 6/19/2012 18:43:48 709-- 2 2 COAL -- Harita Para6/19/2012 18:45:01 6/19/2012 18:47:01 703-- 2 2 COAL -- Harita Para6/19/2012 18:50:18 6/19/2012 18:54:58 113 2 2 COAL -- Harita Para6/19/2012 18:50:46 6/19/2012 18:55:02 712-- 2 2 COAL -- Harita Para6/19/2012 18:51:08 6/19/2012 18:57:28 702-- 2 2 COAL -- Harita Para6/19/2012 18:51:31 6/19/2012 18:57:31 706-- 2 2 COAL -- Harita Para

6/19/2012 18:59:41 6/19/2012 19:03:40 818- 2 2 COAL -- Harita Para6/19/2012 19:12:57 6/19/2012 19:17:27 836- 2 2 COAL -- Harita Para6/19/2012 19:30:19 6/19/2012 19:34:36 710-- 2 2 COAL -- Harita Para6/19/2012 19:31:23 6/19/2012 19:36:25 714-- 2 2 COAL -- Harita Para6/19/2012 19:46:26 6/19/2012 19:53:20 713-- 2 2 COAL -- Harita Para6/19/2012 19:50:22 6/19/2012 19:56:35 830- 2 2 COAL -- Harita Para6/19/2012 19:55:43 6/19/2012 20:00:07 850- 2 2 COAL -- Harita Para6/19/2012 19:57:55 6/19/2012 20:02:10 701-- 2 2 COAL -- Harita Para6/19/2012 20:00:39 6/19/2012 20:04:25 709-- 2 2 COAL -- Harita Para6/19/2012 20:07:14 6/19/2012 20:11:19 707-- 2 2 COAL -- Harita Para

Page 315: June Per Shift (Truckscale Port)

6/19/2012 20:19:04 6/19/2012 20:23:29 832- 2 2 COAL -- Harita Para6/19/2012 20:20:38 6/19/2012 20:25:21 703-- 2 2 COAL -- Harita Para6/19/2012 20:22:53 6/19/2012 20:29:08 115 2 2 COAL -- Harita Para6/19/2012 20:32:45 6/19/2012 20:37:19 113 2 2 COAL -- Harita Para6/19/2012 20:34:41 6/19/2012 20:39:43 702-- 2 2 COAL -- Harita Para6/19/2012 20:41:03 6/19/2012 20:46:34 712 2 2 COAL -- Harita Para6/19/2012 20:42:32 6/19/2012 20:49:12 706-- 2 2 COAL -- Harita Para6/19/2012 20:47:24 6/19/2012 20:51:37 818- 2 2 COAL -- Harita Para6/19/2012 20:59:04 6/19/2012 21:05:07 710-- 2 2 COAL -- Harita Para6/19/2012 21:03:38 6/19/2012 21:11:38 836- 2 2 COAL -- Harita Para6/19/2012 21:07:23 6/19/2012 21:12:56 817- 2 2 COAL -- Harita Para6/19/2012 21:11:00 6/19/2012 21:16:37 714-- 2 2 COAL -- Harita Para6/19/2012 21:15:37 6/19/2012 21:20:57 819- 2 2 COAL -- Harita Para6/19/2012 21:17:44 6/19/2012 21:22:28 701-- 2 2 COAL -- Harita Para6/19/2012 21:19:05 6/19/2012 21:24:17 713-- 2 2 COAL -- Harita Para6/19/2012 21:26:29 6/19/2012 21:31:19 709-- 2 2 COAL -- Harita Para6/19/2012 21:30:50 6/19/2012 21:35:18 812- 2 2 COAL -- Harita Para6/19/2012 21:32:00 6/19/2012 21:37:14 707-- 2 2 COAL -- Harita Para6/19/2012 21:39:27 6/19/2012 21:43:06 830- 2 2 COAL -- Harita Para

6/19/2012 21:58:23 6/19/2012 22:02:08 115 2 2 COAL -- Harita Para6/19/2012 22:08:20 6/19/2012 22:17:09 832- 2 2 COAL -- Harita Para

6/19/2012 22:12:16 6/19/2012 22:16:38 703-- 2 2 COAL -- Harita Para6/19/2012 22:18:42 6/19/2012 22:23:25 113 2 2 COAL -- Harita Para6/19/2012 22:22:35 6/19/2012 22:32:47 702-- 2 2 COAL -- Harita Para6/19/2012 22:27:02 6/19/2012 22:32:41 712-- 2 2 COAL -- Harita Para6/19/2012 22:35:12 6/19/2012 22:43:31 710-- 2 2 COAL -- Harita Para6/19/2012 22:35:35 6/19/2012 22:43:53 701-- 2 2 COAL -- Harita Para

6/19/2012 22:37:46 6/19/2012 22:46:08 706-- 2 2 COAL -- Harita Para6/19/2012 22:38:03 6/19/2012 22:46:25 713-- 2 2 COAL -- Harita Para6/19/2012 22:45:34 6/19/2012 22:48:54 709-- 2 2 COAL -- Harita Para6/19/2012 22:49:45 6/19/2012 22:54:16 818- 2 2 COAL -- Harita Para6/19/2012 22:52:33 6/19/2012 22:56:07 707-- 2 2 COAL -- Harita Para6/19/2012 23:04:28 6/19/2012 23:09:00 714-- 2 2 COAL -- Harita Para6/19/2012 23:24:49 6/19/2012 23:29:55 817- 2 2 COAL -- Harita Para6/19/2012 23:25:23 6/19/2012 23:31:14 836- 2 2 COAL -- Harita Para6/19/2012 23:25:53 6/19/2012 23:31:21 830- 2 2 COAL -- Harita Para

6/19/2012 23:33:18 6/19/2012 23:38:09 819- 2 2 COAL -- Harita Para

6/19/2012 16:01:34 6/19/2012 16:05:45 810 2 2 COAL -- MIL

6/19/2012 16:08:51 6/19/2012 16:17:06 851 2 2 COAL -- MIL

6/19/2012 19:15:08 6/19/2012 19:21:56 855 2 2 COAL -- MIL

6/19/2012 19:18:54 6/19/2012 19:23:31 856 2 2 COAL -- MIL

6/19/2012 19:44:37 6/19/2012 19:48:47 851 2 2 COAL -- MIL6/19/2012 19:46:00 6/19/2012 19:51:51 810 2 2 COAL -- MIL

6/19/2012 19:49:30 6/19/2012 19:57:11 853 2 2 COAL -- MIL6/19/2012 20:38:20 6/19/2012 20:45:08 852 2 2 COAL -- MIL6/19/2012 21:06:10 6/19/2012 21:17:08 855 2 2 COAL -- MIL6/19/2012 21:15:10 6/19/2012 21:18:20 856 2 2 COAL -- MIL6/19/2012 21:27:45 6/19/2012 21:32:37 851 2 2 COAL -- MIL

Page 316: June Per Shift (Truckscale Port)

6/19/2012 21:46:58 6/19/2012 21:53:07 810 2 2 COAL -- MIL6/19/2012 22:34:38 6/19/2012 22:42:51 852 2 2 COAL -- MIL6/19/2012 22:47:01 6/19/2012 22:57:06 855 2 2 COAL -- MIL6/19/2012 23:01:56 6/19/2012 23:05:02 856 2 2 COAL -- MIL6/19/2012 23:24:23 6/19/2012 23:28:29 851 2 2 COAL -- MIL6/19/2012 23:47:51 6/19/2012 23:54:47 853 2 2 COAL -- MIL6/19/2012 23:58:09 6/20/2012 00:03:31 810 2 3 COAL -- MIL6/20/2012 00:00:10 6/20/2012 00:07:58 703-- 3 3 COAL -- Harita Para

6/20/2012 00:04:42 6/20/2012 00:09:06 115 3 3 COAL -- Harita Para6/20/2012 00:05:52 6/20/2012 00:08:03 710-- 3 3 COAL -- Harita Para6/20/2012 00:06:16 6/20/2012 00:11:37 708-- 3 3 COAL -- Harita Para6/20/2012 00:06:34 6/20/2012 00:11:41 713-- 3 3 COAL -- Harita Para6/20/2012 00:07:13 6/20/2012 00:14:19 113 3 3 COAL -- Harita Para6/20/2012 00:10:41 6/20/2012 00:19:08 701-- 3 3 COAL -- Harita Para6/20/2012 00:23:27 6/20/2012 00:28:22 702-- 3 3 COAL -- Harita Para6/20/2012 00:29:31 6/20/2012 00:34:01 709-- 3 3 COAL -- Harita Para6/20/2012 00:32:02 6/20/2012 00:36:14 707-- 3 3 COAL -- Harita Para6/20/2012 00:46:28 6/20/2012 00:50:43 706-- 3 3 COAL -- Harita Para6/20/2012 00:55:07 6/20/2012 00:59:06 714-- 3 3 COAL -- Harita Para6/20/2012 01:13:56 6/20/2012 01:18:32 712-- 3 3 COAL -- Harita Para6/20/2012 01:59:23 6/20/2012 02:04:40 819- 3 3 COAL -- Harita Para6/20/2012 02:07:00 6/20/2012 02:11:58 817- 3 3 COAL -- Harita Para6/20/2012 02:13:33 6/20/2012 02:17:12 115 3 3 COAL -- Harita Para6/20/2012 02:13:59 6/20/2012 02:17:54 832- 3 3 COAL -- Harita Para6/20/2012 02:18:38 6/20/2012 02:27:16 836- 3 3 COAL -- Harita Para6/20/2012 02:26:01 6/20/2012 02:30:59 113 3 3 COAL -- Harita Para6/20/2012 02:28:20 6/20/2012 02:32:32 710-- 3 3 COAL -- Harita Para6/20/2012 02:28:40 6/20/2012 02:34:09 709-- 3 3 COAL -- Harita Para6/20/2012 02:33:31 6/20/2012 02:37:37 714-- 3 3 COAL -- Harita Para6/20/2012 02:36:46 6/20/2012 02:40:37 708-- 3 3 COAL -- Harita Para

6/20/2012 02:38:46 6/20/2012 02:44:50 707-- 3 3 COAL -- Harita Para6/20/2012 02:39:10 6/20/2012 02:47:19 705-- 3 3 COAL -- Harita Para

6/20/2012 02:46:27 6/20/2012 02:50:50 703-- 3 3 COAL -- Harita Para6/20/2012 03:38:12 6/20/2012 03:41:49 115 3 3 COAL -- Harita Para6/20/2012 03:45:34 6/20/2012 03:49:58 818- 3 3 COAL -- Harita Para6/20/2012 03:57:04 6/20/2012 04:02:45 817- 3 3 COAL -- Harita Para6/20/2012 03:57:32 6/20/2012 04:01:58 832- 3 3 COAL -- Harita Para6/20/2012 07:17:15 6/20/2012 07:21:18 709-- 3 3 COAL -- Harita Para6/20/2012 07:23:35 6/20/2012 07:26:42 710-- 3 3 COAL -- Harita Para6/20/2012 07:24:02 6/20/2012 07:30:04 713-- 3 3 COAL -- Harita Para6/20/2012 07:24:25 6/20/2012 07:30:47 701-- 3 3 COAL -- Harita Para6/20/2012 07:27:26 6/20/2012 07:33:16 115 3 3 COAL -- Harita Para6/20/2012 07:28:08 6/20/2012 07:34:20 712-- 3 3 COAL -- Harita Para6/20/2012 07:29:06 6/20/2012 07:35:39 702-- 3 3 COAL -- Harita Para6/20/2012 07:29:31 6/20/2012 07:36:55 113 3 3 COAL -- Harita Para6/20/2012 07:32:25 6/20/2012 07:39:28 704-- 3 3 COAL -- Harita Para6/20/2012 07:38:39 6/20/2012 07:46:24 707-- 3 3 COAL -- Harita Para6/20/2012 07:44:37 6/20/2012 07:51:13 714-- 3 3 COAL -- Harita Para6/20/2012 07:45:47 6/20/2012 07:52:38 706-- 3 3 COAL -- Harita Para

Page 317: June Per Shift (Truckscale Port)

6/20/2012 07:48:02 6/20/2012 07:54:41 818- 3 3 COAL -- Harita Para6/20/2012 00:49:03 6/20/2012 00:56:05 852 3 3 COAL -- MIL6/20/2012 01:23:09 6/20/2012 01:26:43 851 3 3 COAL -- MIL6/20/2012 01:31:14 6/20/2012 01:37:52 853 3 3 COAL -- MIL

6/20/2012 01:40:39 6/20/2012 01:47:37 855 3 3 COAL -- MIL6/20/2012 01:48:16 6/20/2012 01:52:01 856 3 3 COAL -- MIL6/20/2012 02:01:25 6/20/2012 02:07:57 810 3 3 COAL -- MIL6/20/2012 02:38:21 6/20/2012 02:45:44 852 3 3 COAL -- MIL6/20/2012 07:37:43 6/20/2012 07:43:25 851 3 3 COAL -- MIL6/20/2012 07:41:25 6/20/2012 07:49:39 855 3 3 COAL -- MIL6/20/2012 07:44:14 6/20/2012 07:50:04 856 3 3 COAL -- MIL6/20/2012 07:46:58 6/20/2012 07:53:08 852 3 3 COAL -- MIL6/20/2012 07:51:49 6/20/2012 07:58:11 853 3 3 COAL -- MIL6/20/2012 08:02:39 6/20/2012 08:06:54 703-- 1 1 COAL -- Harita Para6/20/2012 08:06:17 6/20/2012 08:10:17 705-- 1 1 COAL -- Harita Para6/20/2012 08:43:03 6/20/2012 08:47:10 832- 1 1 COAL -- Harita Para6/20/2012 08:54:25 6/20/2012 08:58:29 701-- 1 1 COAL -- Harita Para

6/20/2012 08:55:20 6/20/2012 08:59:05 712-- 1 1 COAL -- Harita Para6/20/2012 08:55:59 6/20/2012 09:02:05 702-- 1 1 COAL -- Harita Para6/20/2012 09:00:30 6/20/2012 09:04:43 713-- 1 1 COAL -- Harita Para6/20/2012 09:01:01 6/20/2012 09:08:08 704-- 1 1 COAL -- Harita Para6/20/2012 09:01:28 6/20/2012 09:09:00 113 1 1 COAL -- Harita Para6/20/2012 09:07:04 6/20/2012 09:11:39 836- 1 1 COAL -- Harita Para6/20/2012 09:07:23 6/20/2012 09:13:24 707-- 1 1 COAL -- Harita Para

6/20/2012 09:10:37 6/20/2012 09:24:58 709-- 1 1 COAL -- Harita Para6/20/2012 09:17:28 6/20/2012 09:23:38 113 1 1 COAL -- Harita Para

6/20/2012 09:20:11 6/20/2012 09:24:11 714-- 1 1 COAL -- Harita Para6/20/2012 09:22:03 6/20/2012 09:29:46 703-- 1 1 COAL -- Harita Para6/20/2012 09:25:53 6/20/2012 09:31:49 706-- 1 1 COAL -- Harita Para

6/20/2012 09:45:26 6/20/2012 09:50:24 705-- 1 1 COAL -- Harita Para6/20/2012 09:58:21 6/20/2012 10:04:37 815- 1 1 COAL -- Harita Para6/20/2012 10:18:09 6/20/2012 10:22:26 712-- 1 1 COAL -- Harita Para6/20/2012 10:26:51 6/20/2012 10:30:55 701-- 1 1 COAL -- Harita Para6/20/2012 10:31:29 6/20/2012 10:35:31 704-- 1 1 COAL -- Harita Para6/20/2012 10:32:58 6/20/2012 10:38:48 713-- 1 1 COAL -- Harita Para6/20/2012 10:33:16 6/20/2012 10:39:08 113 1 1 COAL -- Harita Para6/20/2012 10:34:58 6/20/2012 10:40:31 830- 1 1 COAL -- Harita Para6/20/2012 10:36:20 6/20/2012 10:41:10 707-- 1 1 COAL -- Harita Para6/20/2012 10:39:53 6/20/2012 10:44:35 702-- 1 1 COAL -- Harita Para6/20/2012 10:42:50 6/20/2012 10:47:10 703-- 1 1 COAL -- Harita Para6/20/2012 10:43:58 6/20/2012 10:49:01 115 1 1 COAL -- Harita Para6/20/2012 10:51:10 6/20/2012 10:54:37 714-- 1 1 COAL -- Harita Para6/20/2012 10:51:37 6/20/2012 11:05:13 706-- 1 1 COAL -- Harita Para6/20/2012 11:16:28 6/20/2012 11:22:24 705-- 1 1 COAL -- Harita Para6/20/2012 11:17:54 6/20/2012 11:27:31 709-- 1 1 COAL -- Harita Para6/20/2012 11:37:15 6/20/2012 11:44:40 708-- 1 1 COAL -- Harita Para6/20/2012 11:42:18 6/20/2012 11:48:05 712-- 1 1 COAL -- Harita Para6/20/2012 11:58:27 6/20/2012 12:02:46 701-- 1 1 COAL -- Harita Para6/20/2012 12:00:05 6/20/2012 12:05:04 113 1 1 COAL -- Harita Para

Page 318: June Per Shift (Truckscale Port)

6/20/2012 12:06:21 6/20/2012 12:10:40 713-- 1 1 COAL -- Harita Para6/20/2012 12:07:18 6/20/2012 12:12:55 702-- 1 1 COAL -- Harita Para6/20/2012 12:14:12 6/20/2012 12:22:01 115 1 1 COAL -- Harita Para

6/20/2012 12:49:59 6/20/2012 12:53:58 704-- 1 1 COAL -- Harita Para6/20/2012 13:00:52 6/20/2012 13:13:51 714-- 1 1 COAL -- Harita Para6/20/2012 13:04:57 6/20/2012 13:17:16 706-- 1 1 COAL -- Harita Para6/20/2012 13:49:27 6/20/2012 13:53:53 702-- 1 1 COAL -- Harita Para6/20/2012 13:50:28 6/20/2012 13:56:14 113 1 1 COAL -- Harita Para6/20/2012 13:51:05 6/20/2012 13:59:35 709-- 1 1 COAL -- Harita Para

6/20/2012 13:52:58 6/20/2012 14:03:15 712-- 1 1 COAL -- Harita Para6/20/2012 14:07:38 6/20/2012 14:11:17 115 1 1 COAL -- Harita Para6/20/2012 14:13:32 6/20/2012 14:18:02 701-- 1 1 COAL -- Harita Para6/20/2012 14:26:37 6/20/2012 14:32:05 704-- 1 1 COAL -- Harita Para6/20/2012 14:30:52 6/20/2012 14:34:37 713-- 1 1 COAL -- Harita Para6/20/2012 14:32:46 6/20/2012 14:35:56 710-- 1 1 COAL -- Harita Para6/20/2012 14:33:38 6/20/2012 14:38:24 828- 1 1 COAL -- Harita Para6/20/2012 14:40:06 6/20/2012 14:46:31 706-- 1 1 COAL -- Harita Para6/20/2012 14:48:40 6/20/2012 14:53:14 812- 1 1 COAL -- Harita Para6/20/2012 14:57:49 6/20/2012 15:03:16 714-- 1 1 COAL -- Harita Para6/20/2012 15:06:29 6/20/2012 15:10:24 705-- 1 1 COAL -- Harita Para6/20/2012 15:24:56 6/20/2012 15:30:02 702-- 1 1 COAL -- Harita Para6/20/2012 15:28:00 6/20/2012 15:32:24 712-- 1 1 COAL -- Harita Para6/20/2012 15:33:55 6/20/2012 15:39:07 113 1 1 COAL -- Harita Para6/20/2012 15:35:33 6/20/2012 15:40:32 115 1 1 COAL -- Harita Para6/20/2012 15:37:32 6/20/2012 15:44:03 709-- 1 1 COAL -- Harita Para6/20/2012 15:47:57 6/20/2012 15:50:52 710-- 1 1 COAL -- Harita Para6/20/2012 08:17:57 6/20/2012 08:21:14 810 1 1 COAL -- MIL6/20/2012 09:21:15 6/20/2012 09:26:43 818 1 1 COAL -- MIL6/20/2012 09:21:34 6/20/2012 09:28:31 851 1 1 COAL -- MIL6/20/2012 09:29:06 6/20/2012 09:36:44 855 1 1 COAL -- MIL6/20/2012 09:32:55 6/20/2012 09:37:07 856 1 1 COAL -- MIL6/20/2012 09:45:54 6/20/2012 09:59:14 852 1 1 COAL -- MIL6/20/2012 09:52:32 6/20/2012 10:00:07 829 1 1 COAL -- MIL

6/20/2012 09:52:51 6/20/2012 09:59:25 810 1 1 COAL -- MIL6/20/2012 09:53:11 6/20/2012 10:02:39 853 1 1 COAL -- MIL6/20/2012 09:54:11 6/20/2012 10:04:12 833 1 1 COAL -- MIL6/20/2012 10:03:11 6/20/2012 10:06:28 809 1 1 COAL -- MIL

6/20/2012 10:09:17 6/20/2012 10:13:18 817 1 1 COAL -- MIL6/20/2012 10:28:45 6/20/2012 10:33:57 832 1 1 COAL -- MIL6/20/2012 10:45:34 6/20/2012 10:52:20 818 1 1 COAL -- MIL6/20/2012 10:55:38 6/20/2012 11:08:15 851 1 1 COAL -- MIL6/20/2012 11:07:44 6/20/2012 11:13:30 855 1 1 COAL -- MIL

6/20/2012 11:14:15 6/20/2012 11:19:01 806 1 1 COAL -- MIL6/20/2012 11:14:35 6/20/2012 11:19:39 856 1 1 COAL -- MIL6/20/2012 11:17:21 6/20/2012 11:22:58 810 1 1 COAL -- MIL6/20/2012 11:33:40 6/20/2012 11:39:08 852 1 1 COAL -- MIL6/20/2012 11:38:06 6/20/2012 11:44:14 815 1 1 COAL -- MIL6/20/2012 11:39:58 6/20/2012 11:46:35 853 1 1 COAL -- MIL

Page 319: June Per Shift (Truckscale Port)

6/20/2012 11:41:46 6/20/2012 11:46:08 850 1 1 COAL -- MIL6/20/2012 12:13:46 6/20/2012 12:18:06 817 1 1 COAL -- MIL6/20/2012 12:17:27 6/20/2012 12:23:18 809 1 1 COAL -- MIL6/20/2012 12:21:21 6/20/2012 12:25:28 818 1 1 COAL -- MIL6/20/2012 12:35:34 6/20/2012 12:41:22 833 1 1 COAL -- MIL6/20/2012 12:46:16 6/20/2012 12:49:04 810 1 1 COAL -- MIL6/20/2012 12:58:40 6/20/2012 13:06:01 855 1 1 COAL -- MIL6/20/2012 13:06:56 6/20/2012 13:16:52 856 1 1 COAL -- MIL6/20/2012 13:11:12 6/20/2012 13:18:13 850 1 1 COAL -- MIL6/20/2012 13:19:30 6/20/2012 13:23:16 815 1 1 COAL -- MIL

6/20/2012 13:24:59 6/20/2012 13:30:49 852 1 1 COAL -- MIL6/20/2012 13:38:11 6/20/2012 13:41:46 806 1 1 COAL -- MIL6/20/2012 13:51:39 6/20/2012 14:01:20 817 1 1 COAL -- MIL6/20/2012 13:58:48 6/20/2012 14:03:47 809 1 1 COAL -- MIL6/20/2012 14:25:29 6/20/2012 14:29:27 818 1 1 COAL -- MIL6/20/2012 14:39:27 6/20/2012 14:44:49 855 1 1 COAL -- MIL6/20/2012 14:52:23 6/20/2012 14:59:07 851 1 1 COAL -- MIL6/20/2012 14:54:59 6/20/2012 15:02:07 833 1 1 COAL -- MIL6/20/2012 14:56:16 6/20/2012 15:01:29 815 1 1 COAL -- MIL6/20/2012 15:11:22 6/20/2012 15:14:58 806 1 1 COAL -- MIL6/20/2012 15:12:03 6/20/2012 15:16:39 850 1 1 COAL -- MIL6/20/2012 15:25:19 6/20/2012 15:29:14 809 1 1 COAL -- MIL6/20/2012 15:26:12 6/20/2012 15:30:27 810 1 1 COAL -- MIL6/20/2012 15:39:53 6/20/2012 15:45:45 819 1 1 COAL -- MIL6/20/2012 16:24:27 6/20/2012 16:28:00 714-- 2 2 COAL -- Harita Para6/20/2012 18:12:50 6/20/2012 18:16:43 702-- 2 2 COAL -- Harita Para6/20/2012 18:13:06 6/20/2012 18:19:42 705-- 2 2 COAL -- Harita Para6/20/2012 18:13:25 6/20/2012 18:21:36 701-- 2 2 COAL -- Harita Para6/20/2012 18:16:06 6/20/2012 18:23:00 708-- 2 2 COAL -- Harita Para6/20/2012 18:17:46 6/20/2012 18:24:59 115 2 2 COAL -- Harita Para6/20/2012 18:18:53 6/20/2012 18:27:54 704-- 2 2 COAL -- Harita Para6/20/2012 18:20:54 6/20/2012 18:28:41 113 2 2 COAL -- Harita Para6/20/2012 18:22:24 6/20/2012 18:30:29 707-- 2 2 COAL -- Harita Para6/20/2012 18:26:22 6/20/2012 18:32:22 710-- 2 2 COAL -- Harita Para6/20/2012 18:26:51 6/20/2012 18:34:12 709-- 2 2 COAL -- Harita Para6/20/2012 18:27:15 6/20/2012 18:36:20 712-- 2 2 COAL -- Harita Para6/20/2012 18:37:24 6/20/2012 18:43:22 706-- 2 2 COAL -- Harita Para6/20/2012 19:01:43 6/20/2012 19:06:17 714-- 2 2 COAL -- Harita Para

6/20/2012 19:30:18 6/20/2012 19:36:34 702-- 2 2 COAL -- Harita Para6/20/2012 19:33:04 6/20/2012 19:39:07 705-- 2 2 COAL -- Harita Para6/20/2012 19:39:45 6/20/2012 19:44:41 708-- 2 2 COAL -- Harita Para6/20/2012 19:46:32 6/20/2012 19:50:31 115 2 2 COAL -- Harita Para6/20/2012 19:46:56 6/20/2012 19:55:13 701-- 2 2 COAL -- Harita Para6/20/2012 19:49:49 6/20/2012 19:56:58 704-- 2 2 COAL -- Harita Para

6/20/2012 19:54:41 6/20/2012 19:58:31 707-- 2 2 COAL -- Harita Para6/20/2012 20:06:11 6/20/2012 20:11:09 710-- 2 2 COAL -- Harita Para

6/20/2012 20:09:27 6/20/2012 20:15:27 712-- 2 2 COAL -- Harita Para6/20/2012 20:10:16 6/20/2012 20:22:25 709-- 2 2 COAL -- Harita Para6/20/2012 20:12:07 6/20/2012 20:25:11 113 2 2 COAL -- Harita Para

Page 320: June Per Shift (Truckscale Port)

6/20/2012 20:19:39 6/20/2012 20:52:32 706-- 2 2 COAL -- Harita Para6/20/2012 20:30:10 6/20/2012 20:37:03 714-- 2 2 COAL -- Harita Para6/20/2012 20:54:43 6/20/2012 20:58:22 702-- 2 2 COAL -- Harita Para6/20/2012 20:55:02 6/20/2012 20:58:46 705-- 2 2 COAL -- Harita Para

6/20/2012 21:10:11 6/20/2012 21:13:35 115 2 2 COAL -- Harita Para6/20/2012 21:14:32 6/20/2012 21:19:42 704-- 2 2 COAL -- Harita Para6/20/2012 21:15:04 6/20/2012 21:20:56 708-- 2 2 COAL -- Harita Para

6/20/2012 21:17:26 6/20/2012 21:22:42 701-- 2 2 COAL -- Harita Para6/20/2012 21:33:49 6/20/2012 21:40:21 707-- 2 2 COAL -- Harita Para6/20/2012 21:45:31 6/20/2012 21:51:39 710-- 2 2 COAL -- Harita Para6/20/2012 21:53:15 6/20/2012 21:58:58 713-- 2 2 COAL -- Harita Para6/20/2012 21:56:12 6/20/2012 21:59:53 709-- 2 2 COAL -- Harita Para6/20/2012 21:58:12 6/20/2012 22:06:26 714-- 2 2 COAL -- Harita Para6/20/2012 22:02:27 6/20/2012 22:07:26 113 2 2 COAL -- Harita Para6/20/2012 22:09:12 6/20/2012 22:12:26 705-- 2 2 COAL -- Harita Para6/20/2012 22:19:57 6/20/2012 22:23:20 706-- 2 2 COAL -- Harita Para6/20/2012 22:32:54 6/20/2012 22:36:50 115 2 2 COAL -- Harita Para6/20/2012 22:38:01 6/20/2012 22:42:35 702-- 2 2 COAL -- Harita Para6/20/2012 22:41:03 6/20/2012 22:45:44 704-- 2 2 COAL -- Harita Para6/20/2012 22:47:27 6/20/2012 22:51:57 701-- 2 2 COAL -- Harita Para6/20/2012 22:49:46 6/20/2012 22:53:40 708-- 2 2 COAL -- Harita Para6/20/2012 23:16:18 6/20/2012 23:21:30 712-- 2 2 COAL -- Harita Para6/20/2012 23:29:21 6/20/2012 23:33:55 709-- 2 2 COAL -- Harita Para6/20/2012 23:32:00 6/20/2012 23:38:30 714-- 2 2 COAL -- Harita Para6/20/2012 23:36:48 6/20/2012 23:43:28 705-- 2 2 COAL -- Harita Para6/20/2012 23:42:23 6/20/2012 23:49:10 113 2 2 COAL -- Harita Para6/20/2012 23:44:54 6/20/2012 23:50:36 706-- 2 2 COAL -- Harita Para6/20/2012 23:54:21 6/20/2012 23:58:24 115 2 2 COAL -- Harita Para6/20/2012 16:01:16 6/20/2012 16:04:58 836 2 2 COAL -- MIL6/20/2012 16:06:35 6/20/2012 16:11:33 856 2 2 COAL -- MIL6/20/2012 16:22:36 6/20/2012 16:26:28 817 2 2 COAL -- MIL6/20/2012 18:49:30 6/20/2012 18:53:30 818 2 2 COAL -- MIL6/20/2012 18:57:48 6/20/2012 19:03:25 852 2 2 COAL -- MIL

6/20/2012 19:24:46 6/20/2012 19:29:08 856 2 2 COAL -- MIL6/20/2012 19:30:00 6/20/2012 19:35:13 853 2 2 COAL -- MIL

6/20/2012 19:32:39 6/20/2012 19:37:59 851 2 2 COAL -- MIL

6/20/2012 19:35:46 6/20/2012 19:43:14 855 2 2 COAL -- MIL6/20/2012 19:47:43 6/20/2012 19:55:34 833 2 2 COAL -- MIL6/20/2012 20:08:06 6/20/2012 20:12:51 809 2 2 COAL -- MIL6/20/2012 20:09:56 6/20/2012 20:20:49 850 2 2 COAL -- MIL

6/20/2012 20:30:49 6/20/2012 20:40:08 812 2 2 COAL -- MIL6/20/2012 20:36:17 6/20/2012 20:43:02 810 2 2 COAL -- MIL6/20/2012 20:49:17 6/20/2012 20:56:38 839 2 2 COAL -- MIL6/20/2012 21:01:29 6/20/2012 21:06:05 818 2 2 COAL -- MIL6/20/2012 21:18:14 6/20/2012 21:25:27 852 2 2 COAL -- MIL6/20/2012 21:18:58 6/20/2012 21:25:43 833 2 2 COAL -- MIL6/20/2012 21:32:58 6/20/2012 21:37:36 806 2 2 COAL -- MIL6/20/2012 21:33:16 6/20/2012 21:38:07 856 2 2 COAL -- MIL

Page 321: June Per Shift (Truckscale Port)

6/20/2012 21:44:22 6/20/2012 21:49:57 853 2 2 COAL -- MIL6/20/2012 21:45:57 6/20/2012 21:55:09 850 2 2 COAL -- MIL

6/20/2012 21:47:32 6/20/2012 21:55:36 815 2 2 COAL -- MIL6/20/2012 21:57:35 6/20/2012 22:03:20 832 2 2 COAL -- MIL6/20/2012 22:05:43 6/20/2012 22:10:48 817 2 2 COAL -- MIL6/20/2012 22:21:35 6/20/2012 22:30:03 810 2 2 COAL -- MIL6/20/2012 22:26:16 6/20/2012 22:30:10 851 2 2 COAL -- MIL6/20/2012 22:35:21 6/20/2012 22:39:00 839 2 2 COAL -- MIL6/20/2012 22:41:51 6/20/2012 22:49:06 855 2 2 COAL -- MIL6/20/2012 22:46:34 6/20/2012 22:50:16 809 2 2 COAL -- MIL6/20/2012 22:59:44 6/20/2012 23:04:19 812 2 2 COAL -- MIL6/20/2012 23:12:34 6/20/2012 23:18:07 818 2 2 COAL -- MIL6/20/2012 23:19:42 6/20/2012 23:41:06 806 2 2 COAL -- MIL6/20/2012 23:24:19 6/20/2012 23:28:29 850 2 2 COAL -- MIL6/20/2012 23:33:17 6/20/2012 23:41:02 852 2 2 COAL -- MIL6/20/2012 23:36:27 6/20/2012 23:41:25 833 2 2 COAL -- MIL6/20/2012 23:37:23 6/20/2012 23:45:38 815 2 2 COAL -- MIL6/20/2012 23:37:44 6/20/2012 23:47:10 817 2 2 COAL -- MIL6/21/2012 00:15:17 6/21/2012 00:20:06 701-- 3 3 COAL -- Harita Para6/21/2012 00:28:11 6/21/2012 00:38:47 707-- 3 3 COAL -- Harita Para6/21/2012 00:31:50 6/21/2012 00:38:51 713-- 3 3 COAL -- Harita Para6/21/2012 00:35:07 6/21/2012 00:47:28 708-- 3 3 COAL -- Harita Para6/21/2012 00:40:37 6/21/2012 00:49:45 710-- 3 3 COAL -- Harita Para6/21/2012 00:57:38 6/21/2012 01:01:18 705-- 3 3 COAL -- Harita Para6/21/2012 01:16:14 6/21/2012 01:22:18 115 3 3 COAL -- Harita Para

6/21/2012 01:26:02 6/21/2012 01:30:58 714-- 3 3 COAL -- Harita Para6/21/2012 01:32:04 6/21/2012 01:37:09 709-- 3 3 COAL -- Harita Para6/21/2012 01:53:37 6/21/2012 01:58:01 702-- 3 3 COAL -- Harita Para6/21/2012 02:01:18 6/21/2012 02:10:16 704-- 3 3 COAL -- Harita Para

6/21/2012 02:02:11 6/21/2012 02:11:10 707-- 3 3 COAL -- Harita Para6/21/2012 02:07:40 6/21/2012 02:12:22 708-- 3 3 COAL -- Harita Para6/21/2012 02:17:08 6/21/2012 02:21:23 713-- 3 3 COAL -- Harita Para6/21/2012 02:24:42 6/21/2012 02:28:04 705-- 3 3 COAL -- Harita Para6/21/2012 02:49:27 6/21/2012 02:55:10 113 3 3 COAL -- Harita Para6/21/2012 02:50:06 6/21/2012 02:57:06 710-- 3 3 COAL -- Harita Para

6/21/2012 03:42:46 6/21/2012 03:47:48 705-- 3 3 COAL -- Harita Para6/21/2012 03:45:45 6/21/2012 03:50:02 713-- 3 3 COAL -- Harita Para6/21/2012 07:34:26 6/21/2012 07:38:00 710-- 3 3 COAL -- Harita Para6/21/2012 07:34:50 6/21/2012 07:40:03 713-- 3 3 COAL -- Harita Para6/21/2012 07:35:09 6/21/2012 07:41:05 701-- 3 3 COAL -- Harita Para6/21/2012 07:35:52 6/21/2012 07:42:56 709-- 3 3 COAL -- Harita Para6/21/2012 07:43:41 6/21/2012 07:49:14 708-- 3 3 COAL -- Harita Para6/21/2012 07:44:05 6/21/2012 07:55:44 113 3 3 COAL -- Harita Para6/21/2012 07:45:05 6/21/2012 07:56:00 702-- 3 3 COAL -- Harita Para6/21/2012 07:45:39 6/21/2012 07:59:36 714-- 3 3 COAL -- Harita Para6/21/2012 07:46:05 6/21/2012 08:01:42 704-- 3 1 COAL -- Harita Para6/21/2012 07:47:51 6/21/2012 08:07:34 705-- 3 1 COAL -- Harita Para6/21/2012 07:53:06 6/21/2012 08:03:34 712-- 3 1 COAL -- Harita Para6/21/2012 00:01:12 6/21/2012 00:07:21 839 3 3 COAL -- MIL

Page 322: June Per Shift (Truckscale Port)

6/21/2012 00:05:31 6/21/2012 00:16:26 831 3 3 COAL -- MIL

6/21/2012 00:15:43 6/21/2012 00:21:34 856 3 3 COAL -- MIL6/21/2012 00:24:50 6/21/2012 00:32:32 853 3 3 COAL -- MIL6/21/2012 00:31:12 6/21/2012 00:36:43 851 3 3 COAL -- MIL6/21/2012 01:05:04 6/21/2012 01:11:27 817 3 3 COAL -- MIL6/21/2012 01:21:08 6/21/2012 01:26:52 850 3 3 COAL -- MIL6/21/2012 01:29:40 6/21/2012 01:34:43 839 3 3 COAL -- MIL

6/21/2012 01:41:48 6/21/2012 01:45:35 833 3 3 COAL -- MIL

6/21/2012 02:00:50 6/21/2012 02:05:09 831 3 3 COAL -- MIL6/21/2012 02:18:55 6/21/2012 02:32:33 855 3 3 COAL -- MIL6/21/2012 02:29:45 6/21/2012 02:34:08 812 3 3 COAL -- MIL

6/21/2012 02:30:08 6/21/2012 02:36:35 817 3 3 COAL -- MIL6/21/2012 02:47:54 6/21/2012 02:52:14 810 3 3 COAL -- MIL6/21/2012 02:48:12 6/21/2012 02:52:47 809 3 3 COAL -- MIL6/21/2012 02:53:46 6/21/2012 02:59:38 852 3 3 COAL -- MIL

6/21/2012 02:58:50 6/21/2012 03:03:01 856 3 3 COAL -- MIL6/21/2012 03:03:44 6/21/2012 03:08:19 815 3 3 COAL -- MIL6/21/2012 03:07:24 6/21/2012 03:12:02 850 3 3 COAL -- MIL6/21/2012 03:16:53 6/21/2012 03:21:23 806 3 3 COAL -- MIL6/21/2012 03:19:25 6/21/2012 03:26:19 853 3 3 COAL -- MIL6/21/2012 03:41:49 6/21/2012 03:45:09 851 3 3 COAL -- MIL6/21/2012 03:50:47 6/21/2012 03:54:53 812 3 3 COAL -- MIL6/21/2012 04:12:37 6/21/2012 04:18:14 810 3 3 COAL -- MIL6/21/2012 05:15:51 6/21/2012 05:19:49 832 3 3 COAL -- MIL6/21/2012 07:19:45 6/21/2012 07:23:16 850 3 3 COAL -- MIL6/21/2012 07:28:23 6/21/2012 07:36:26 855 3 3 COAL -- MIL6/21/2012 07:28:48 6/21/2012 07:36:42 856 3 3 COAL -- MIL6/21/2012 07:30:40 6/21/2012 07:36:59 851 3 3 COAL -- MIL6/21/2012 07:34:09 6/21/2012 07:38:43 853 3 3 COAL -- MIL6/21/2012 07:39:10 6/21/2012 07:46:50 852 3 3 COAL -- MIL6/21/2012 07:42:16 6/21/2012 07:47:08 839 3 3 COAL -- MIL6/21/2012 07:54:36 6/21/2012 08:04:35 815 3 1 COAL -- MIL6/21/2012 08:11:58 6/21/2012 08:18:11 706-- 1 1 COAL -- Harita Para6/21/2012 08:12:24 6/21/2012 08:18:37 115 1 1 COAL -- Harita Para6/21/2012 08:49:20 6/21/2012 08:53:16 710-- 1 1 COAL -- Harita Para6/21/2012 09:05:42 6/21/2012 09:10:44 713-- 1 1 COAL -- Harita Para6/21/2012 09:12:32 6/21/2012 09:17:33 701-- 1 1 COAL -- Harita Para6/21/2012 09:15:01 6/21/2012 09:21:04 709-- 1 1 COAL -- Harita Para6/21/2012 09:15:41 6/21/2012 09:22:40 113 1 1 COAL -- Harita Para

6/21/2012 09:19:39 6/21/2012 09:24:59 708-- 1 1 COAL -- Harita Para6/21/2012 09:21:55 6/21/2012 09:26:50 714-- 1 1 COAL -- Harita Para

6/21/2012 09:43:58 6/21/2012 09:48:26 712-- 1 1 COAL -- Harita Para6/21/2012 09:46:47 6/21/2012 09:51:48 115 1 1 COAL -- Harita Para6/21/2012 09:52:53 6/21/2012 09:56:54 707-- 1 1 COAL -- Harita Para6/21/2012 10:03:57 6/21/2012 10:07:59 710-- 1 1 COAL -- Harita Para6/21/2012 10:30:55 6/21/2012 10:36:10 705-- 1 1 COAL -- Harita Para6/21/2012 10:41:04 6/21/2012 10:49:08 713-- 1 1 COAL -- Harita Para6/21/2012 10:44:39 6/21/2012 10:49:36 706-- 1 1 COAL -- Harita Para

Page 323: June Per Shift (Truckscale Port)

6/21/2012 10:48:15 6/21/2012 10:56:47 113 1 1 COAL -- Harita Para6/21/2012 10:51:42 6/21/2012 10:58:41 709-- 1 1 COAL -- Harita Para6/21/2012 10:53:59 6/21/2012 11:00:09 708-- 1 1 COAL -- Harita Para6/21/2012 10:57:54 6/21/2012 11:02:45 701-- 1 1 COAL -- Harita Para6/21/2012 11:08:18 6/21/2012 11:13:37 115 1 1 COAL -- Harita Para6/21/2012 11:08:45 6/21/2012 11:13:41 714-- 1 1 COAL -- Harita Para

6/21/2012 11:22:05 6/21/2012 11:25:44 710-- 1 1 COAL -- Harita Para6/21/2012 11:22:26 6/21/2012 11:28:20 712-- 1 1 COAL -- Harita Para6/21/2012 11:29:07 6/21/2012 11:33:35 707-- 1 1 COAL -- Harita Para6/21/2012 12:14:33 6/21/2012 12:19:08 113 1 1 COAL -- Harita Para6/21/2012 12:17:40 6/21/2012 12:21:36 705-- 1 1 COAL -- Harita Para6/21/2012 12:28:56 6/21/2012 12:33:52 706-- 1 1 COAL -- Harita Para6/21/2012 12:41:16 6/21/2012 12:55:27 701-- 1 1 COAL -- Harita Para6/21/2012 12:46:10 6/21/2012 12:55:31 702-- 1 1 COAL -- Harita Para6/21/2012 12:51:03 6/21/2012 12:56:00 115 1 1 COAL -- Harita Para6/21/2012 12:53:55 6/21/2012 12:58:45 709-- 1 1 COAL -- Harita Para6/21/2012 12:59:12 6/21/2012 13:04:19 710-- 1 1 COAL -- Harita Para6/21/2012 13:07:01 6/21/2012 13:12:40 714-- 1 1 COAL -- Harita Para6/21/2012 13:20:45 6/21/2012 13:27:07 713 1 1 COAL -- Harita Para6/21/2012 13:30:35 6/21/2012 13:34:28 707-- 1 1 COAL -- Harita Para6/21/2012 13:32:50 6/21/2012 13:38:21 708-- 1 1 COAL -- Harita Para6/21/2012 14:07:57 6/21/2012 14:13:11 712-- 1 1 COAL -- Harita Para6/21/2012 14:25:00 6/21/2012 14:30:33 710-- 1 1 COAL -- Harita Para6/21/2012 14:27:17 6/21/2012 14:32:40 702-- 1 1 COAL -- Harita Para6/21/2012 14:27:54 6/21/2012 14:34:15 113 1 1 COAL -- Harita Para6/21/2012 14:35:25 6/21/2012 14:40:22 115 1 1 COAL -- Harita Para6/21/2012 14:42:40 6/21/2012 14:48:41 714-- 1 1 COAL -- Harita Para6/21/2012 14:52:44 6/21/2012 14:59:41 701-- 1 1 COAL -- Harita Para6/21/2012 14:57:01 6/21/2012 15:08:59 706-- 1 1 COAL -- Harita Para6/21/2012 14:57:53 6/21/2012 15:07:07 713-- 1 1 COAL -- Harita Para6/21/2012 14:58:20 6/21/2012 15:08:51 707-- 1 1 COAL -- Harita Para

6/21/2012 15:01:49 6/21/2012 15:11:23 705-- 1 1 COAL -- Harita Para6/21/2012 15:10:17 6/21/2012 15:17:53 709-- 1 1 COAL -- Harita Para

6/21/2012 15:31:38 6/21/2012 15:36:10 708-- 1 1 COAL -- Harita Para6/21/2012 15:48:08 6/21/2012 15:51:42 113 1 1 COAL -- Harita Para6/21/2012 15:52:41 6/21/2012 15:56:28 712 1 1 COAL -- Harita Para6/21/2012 15:54:54 6/21/2012 15:59:05 115 1 1 COAL -- Harita Para6/21/2012 08:02:42 6/21/2012 08:10:09 817 1 1 COAL -- MIL

6/21/2012 08:21:17 6/21/2012 08:26:20 828 1 1 COAL -- MIL6/21/2012 08:30:27 6/21/2012 08:35:44 833 1 1 COAL -- MIL6/21/2012 08:43:53 6/21/2012 08:49:59 812 1 1 COAL -- MIL6/21/2012 08:48:20 6/21/2012 08:52:15 810 1 1 COAL -- MIL6/21/2012 08:54:52 6/21/2012 09:00:26 855 1 1 COAL -- MIL6/21/2012 09:01:02 6/21/2012 09:06:22 851 1 1 COAL -- MIL6/21/2012 09:18:33 6/21/2012 09:22:55 856 1 1 COAL -- MIL6/21/2012 09:32:26 6/21/2012 09:38:36 852 1 1 COAL -- MIL6/21/2012 09:57:24 6/21/2012 10:01:45 853 1 1 COAL -- MIL6/21/2012 10:24:06 6/21/2012 10:28:24 810 1 1 COAL -- MIL

6/21/2012 10:29:05 6/21/2012 10:36:30 855 1 1 COAL -- MIL

Page 324: June Per Shift (Truckscale Port)

6/21/2012 10:45:08 6/21/2012 10:52:32 806 1 1 COAL -- MIL6/21/2012 10:45:27 6/21/2012 10:53:22 851 1 1 COAL -- MIL6/21/2012 10:47:36 6/21/2012 10:54:56 856 1 1 COAL -- MIL6/21/2012 11:17:11 6/21/2012 11:20:56 809 1 1 COAL -- MIL6/21/2012 11:27:15 6/21/2012 11:31:55 852 1 1 COAL -- MIL6/21/2012 12:00:49 6/21/2012 12:06:25 855 1 1 COAL -- MIL6/21/2012 12:08:19 6/21/2012 12:13:19 851 1 1 COAL -- MIL6/21/2012 12:15:05 6/21/2012 12:19:53 856 1 1 COAL -- MIL6/21/2012 12:29:35 6/21/2012 12:34:13 818 1 1 COAL -- MIL6/21/2012 12:38:44 6/21/2012 13:31:42 868 1 1 COAL -- MIL6/21/2012 12:47:02 6/21/2012 12:52:14 828 1 1 COAL -- MIL6/21/2012 13:16:10 6/21/2012 13:22:45 815 1 1 COAL -- MIL6/21/2012 13:26:24 6/21/2012 13:31:49 852 1 1 COAL -- MIL6/21/2012 13:51:44 6/21/2012 13:56:29 830 1 1 COAL -- MIL6/21/2012 13:54:53 6/21/2012 13:59:26 818 1 1 COAL -- MIL6/21/2012 13:55:52 6/21/2012 14:01:12 851 1 1 COAL -- MIL6/21/2012 14:10:47 6/21/2012 14:16:38 828 1 1 COAL -- MIL6/21/2012 14:18:46 6/21/2012 14:28:43 855 1 1 COAL -- MIL6/21/2012 14:24:31 6/21/2012 14:29:52 853 1 1 COAL -- MIL6/21/2012 14:55:24 6/21/2012 15:00:15 852 1 1 COAL -- MIL6/21/2012 15:08:05 6/21/2012 15:12:34 850 1 1 COAL -- MIL6/21/2012 15:09:53 6/21/2012 15:12:44 833 1 1 COAL -- MIL6/21/2012 15:16:06 6/21/2012 15:18:44 832 1 1 COAL -- MIL6/21/2012 15:16:47 6/21/2012 15:22:56 851 1 1 COAL -- MIL6/21/2012 15:33:04 6/21/2012 15:37:47 831 1 1 COAL -- MIL6/21/2012 15:39:27 6/21/2012 15:43:49 815 1 1 COAL -- MIL6/21/2012 15:53:13 6/21/2012 15:57:33 818 1 1 COAL -- MIL6/21/2012 08:38:22 6/21/2012 08:42:40 819 1 1 COAL--IN MIL

6/21/2012 08:49:00 6/21/2012 08:52:40 850 1 1 COAL--IN MIL6/21/2012 09:04:17 6/21/2012 09:08:19 831 1 1 COAL--IN MIL6/21/2012 09:13:19 6/21/2012 09:17:54 832 1 1 COAL--IN MIL6/21/2012 09:31:59 6/21/2012 09:36:16 836 1 1 COAL--IN MIL6/21/2012 09:38:03 6/21/2012 09:42:52 815 1 1 COAL--IN MIL

6/21/2012 09:46:24 6/21/2012 09:50:31 839 1 1 COAL--IN MIL6/21/2012 10:03:06 6/21/2012 10:06:57 819 1 1 COAL--IN MIL6/21/2012 10:16:43 6/21/2012 10:20:44 828 1 1 COAL--IN MIL6/21/2012 10:27:49 6/21/2012 10:31:38 812 1 1 COAL--IN MIL6/21/2012 10:34:36 6/21/2012 10:38:36 833 1 1 COAL--IN MIL6/21/2012 10:46:50 6/21/2012 10:54:39 850 1 1 COAL--IN MIL6/21/2012 11:03:50 6/21/2012 11:07:42 832 1 1 COAL--IN MIL6/21/2012 11:21:33 6/21/2012 11:25:26 831 1 1 COAL--IN MIL6/21/2012 11:40:33 6/21/2012 11:44:26 836 1 1 COAL--IN MIL6/21/2012 11:49:32 6/21/2012 11:54:17 815 1 1 COAL--IN MIL6/21/2012 12:07:53 6/21/2012 12:11:58 839 1 1 COAL--IN MIL6/21/2012 12:18:27 6/21/2012 12:23:18 819 1 1 COAL--IN MIL6/21/2012 12:44:07 6/21/2012 12:57:20 812 1 1 COAL--IN MIL6/21/2012 13:20:06 6/21/2012 13:24:00 833 1 1 COAL--IN MIL6/21/2012 13:21:11 6/21/2012 13:28:14 850 1 1 COAL--IN MIL6/21/2012 13:33:29 6/21/2012 13:37:48 832 1 1 COAL--IN MIL

Page 325: June Per Shift (Truckscale Port)

6/21/2012 13:52:09 6/21/2012 13:57:18 831 1 1 COAL--IN MIL6/21/2012 14:12:26 6/21/2012 14:20:11 836 1 1 COAL--IN MIL6/21/2012 14:19:23 6/21/2012 14:23:55 839 1 1 COAL--IN MIL6/21/2012 14:33:36 6/21/2012 14:37:31 812 1 1 COAL--IN MIL6/21/2012 14:47:49 6/21/2012 14:54:28 819 1 1 COAL--IN MIL6/21/2012 18:08:00 6/21/2012 18:12:55 714-- 2 2 COAL -- Harita Para6/21/2012 18:08:38 6/21/2012 18:15:38 702-- 2 2 COAL -- Harita Para6/21/2012 18:12:07 6/21/2012 18:16:19 113 2 2 COAL -- Harita Para6/21/2012 18:14:49 6/21/2012 18:18:55 705-- 2 2 COAL -- Harita Para6/21/2012 18:17:36 6/21/2012 18:21:32 712-- 2 2 COAL -- Harita Para6/21/2012 18:18:17 6/21/2012 18:22:39 709-- 2 2 COAL -- Harita Para6/21/2012 18:24:15 6/21/2012 18:28:55 701-- 2 2 COAL -- Harita Para6/21/2012 18:27:53 6/21/2012 18:32:43 710-- 2 2 COAL -- Harita Para6/21/2012 18:28:16 6/21/2012 18:37:44 708-- 2 2 COAL -- Harita Para6/21/2012 18:31:31 6/21/2012 18:35:52 115 2 2 COAL -- Harita Para6/21/2012 18:32:01 6/21/2012 18:37:47 713-- 2 2 COAL -- Harita Para

6/21/2012 19:08:44 6/21/2012 19:13:46 703-- 2 2 COAL -- Harita Para6/21/2012 19:25:35 6/21/2012 19:34:51 714-- 2 2 COAL -- Harita Para6/21/2012 19:30:59 6/21/2012 19:38:08 113 2 2 COAL -- Harita Para6/21/2012 19:43:07 6/21/2012 19:48:42 712-- 2 2 COAL -- Harita Para

6/21/2012 19:45:48 6/21/2012 19:50:46 709-- 2 2 COAL -- Harita Para6/21/2012 19:50:11 6/21/2012 19:55:03 702-- 2 2 COAL -- Harita Para6/21/2012 19:54:09 6/21/2012 19:58:24 701-- 2 2 COAL -- Harita Para6/21/2012 19:56:54 6/21/2012 20:01:55 705-- 2 2 COAL -- Harita Para6/21/2012 20:05:24 6/21/2012 20:10:17 710-- 2 2 COAL -- Harita Para6/21/2012 20:09:09 6/21/2012 20:13:30 115 2 2 COAL -- Harita Para6/21/2012 20:11:45 6/21/2012 20:17:56 713-- 2 2 COAL -- Harita Para6/21/2012 20:19:39 6/21/2012 20:23:29 708-- 2 2 COAL -- Harita Para6/21/2012 20:48:58 6/21/2012 20:53:43 714-- 2 2 COAL -- Harita Para6/21/2012 20:51:07 6/21/2012 20:55:19 703-- 2 2 COAL -- Harita Para

6/21/2012 20:56:48 6/21/2012 21:01:04 113 2 2 COAL -- Harita Para6/21/2012 21:08:14 6/21/2012 21:12:40 709-- 2 2 COAL -- Harita Para6/21/2012 21:17:34 6/21/2012 21:21:41 701-- 2 2 COAL -- Harita Para6/21/2012 21:22:13 6/21/2012 21:35:51 702-- 2 2 COAL -- Harita Para6/21/2012 21:22:52 6/21/2012 21:29:13 712-- 2 2 COAL -- Harita Para6/21/2012 21:43:20 6/21/2012 21:48:29 710-- 2 2 COAL -- Harita Para6/21/2012 21:43:44 6/21/2012 21:49:48 705-- 2 2 COAL -- Harita Para6/21/2012 21:53:53 6/21/2012 21:58:00 115 2 2 COAL -- Harita Para6/21/2012 22:01:44 6/21/2012 22:05:41 713-- 2 2 COAL -- Harita Para6/21/2012 22:06:21 6/21/2012 22:10:10 708-- 2 2 COAL -- Harita Para6/21/2012 22:22:11 6/21/2012 22:26:51 113 2 2 COAL -- Harita Para6/21/2012 22:28:13 6/21/2012 22:34:20 714-- 2 2 COAL -- Harita Para6/21/2012 22:33:15 6/21/2012 22:38:15 703-- 2 2 COAL -- Harita Para

6/21/2012 22:41:18 6/21/2012 22:46:57 701-- 2 2 COAL -- Harita Para6/21/2012 22:48:09 6/21/2012 22:55:33 712-- 2 2 COAL -- Harita Para6/21/2012 23:01:57 6/21/2012 23:10:23 702-- 2 2 COAL -- Harita Para6/21/2012 23:09:34 6/21/2012 23:15:41 710-- 2 2 COAL -- Harita Para6/21/2012 23:11:01 6/21/2012 23:17:01 705-- 2 2 COAL -- Harita Para6/21/2012 23:32:43 6/21/2012 23:36:12 706-- 2 2 COAL -- Harita Para

Page 326: June Per Shift (Truckscale Port)

6/21/2012 23:37:02 6/21/2012 23:41:09 713-- 2 2 COAL -- Harita Para6/21/2012 23:43:34 6/21/2012 23:48:38 115 2 2 COAL -- Harita Para6/21/2012 23:46:06 6/21/2012 23:52:31 708-- 2 2 COAL -- Harita Para6/21/2012 16:15:47 6/21/2012 16:19:42 828 2 2 COAL -- MIL6/21/2012 16:21:13 6/21/2012 16:25:33 839 2 2 COAL -- MIL6/21/2012 16:24:25 6/21/2012 16:27:30 856 2 2 COAL -- MIL6/21/2012 16:34:37 6/21/2012 16:39:46 836 2 2 COAL -- MIL6/21/2012 19:20:35 6/21/2012 19:26:37 853 2 2 COAL -- MIL

6/21/2012 19:23:21 6/21/2012 19:31:39 855 2 2 COAL -- MIL6/21/2012 19:25:14 6/21/2012 19:32:35 856 2 2 COAL -- MIL6/21/2012 19:29:15 6/21/2012 19:36:41 839 2 2 COAL -- MIL6/21/2012 19:42:19 6/21/2012 19:47:05 851 2 2 COAL -- MIL

6/21/2012 19:49:27 6/21/2012 19:53:31 850 2 2 COAL -- MIL6/21/2012 19:56:30 6/21/2012 20:00:30 831 2 2 COAL -- MIL6/21/2012 19:58:57 6/21/2012 20:04:32 852 2 2 COAL -- MIL6/21/2012 20:02:36 6/21/2012 20:07:23 818 2 2 COAL -- MIL6/21/2012 20:14:35 6/21/2012 20:20:34 812 2 2 COAL -- MIL6/21/2012 20:33:27 6/21/2012 20:38:30 810 2 2 COAL -- MIL6/21/2012 20:51:38 6/21/2012 20:58:37 853 2 2 COAL -- MIL6/21/2012 20:53:08 6/21/2012 20:59:10 855 2 2 COAL -- MIL6/21/2012 20:57:26 6/21/2012 21:02:30 856 2 2 COAL -- MIL6/21/2012 21:07:47 6/21/2012 21:11:24 851 2 2 COAL -- MIL

6/21/2012 21:10:51 6/21/2012 21:14:43 839 2 2 COAL -- MIL6/21/2012 21:21:02 6/21/2012 21:25:02 850 2 2 COAL -- MIL6/21/2012 21:33:48 6/21/2012 21:39:38 852 2 2 COAL -- MIL6/21/2012 21:38:34 6/21/2012 21:44:58 831 2 2 COAL -- MIL6/21/2012 21:42:53 6/21/2012 21:46:25 818 2 2 COAL -- MIL6/21/2012 22:25:51 6/21/2012 22:34:05 853 2 2 COAL -- MIL6/21/2012 22:30:30 6/21/2012 22:38:34 856 2 2 COAL -- MIL6/21/2012 22:37:22 6/21/2012 22:41:55 837 2 2 COAL -- MIL

6/21/2012 22:45:53 6/21/2012 22:53:21 810 2 2 COAL -- MIL6/21/2012 22:46:19 6/21/2012 22:50:14 839 2 2 COAL -- MIL6/21/2012 22:48:57 6/21/2012 22:58:14 855 2 2 COAL -- MIL6/21/2012 22:50:58 6/21/2012 22:59:53 832 2 2 COAL -- MIL6/21/2012 22:51:24 6/21/2012 23:02:30 851 2 2 COAL -- MIL6/21/2012 23:07:30 6/21/2012 23:29:46 852 2 2 COAL -- MIL

6/21/2012 23:07:57 6/21/2012 23:13:17 818 2 2 COAL -- MIL6/21/2012 23:42:02 6/21/2012 23:46:39 831 2 2 COAL -- MIL6/21/2012 23:44:30 6/21/2012 23:51:03 850 2 2 COAL -- MIL

6/22/2012 00:08:10 6/22/2012 00:14:45 701-- 3 3 COAL -- Harita Para6/22/2012 00:16:54 6/22/2012 00:20:31 714-- 3 3 COAL -- Harita Para6/22/2012 00:25:05 6/22/2012 00:29:25 703-- 3 3 COAL -- Harita Para6/22/2012 00:32:42 6/22/2012 00:37:56 712-- 3 3 COAL -- Harita Para6/22/2012 00:33:05 6/22/2012 00:39:02 702-- 3 3 COAL -- Harita Para6/22/2012 00:39:49 6/22/2012 00:44:53 705-- 3 3 COAL -- Harita Para6/22/2012 00:46:00 6/22/2012 00:49:18 707-- 3 3 COAL -- Harita Para6/22/2012 01:06:52 6/22/2012 01:21:45 113 3 3 COAL -- Harita Para6/22/2012 02:06:07 6/22/2012 02:09:51 705-- 3 3 COAL -- Harita Para6/22/2012 02:12:19 6/22/2012 02:24:45 710-- 3 3 COAL -- Harita Para

Page 327: June Per Shift (Truckscale Port)

6/22/2012 02:22:29 6/22/2012 02:26:42 714-- 3 3 COAL -- Harita Para6/22/2012 02:28:52 6/22/2012 02:39:54 115 3 3 COAL -- Harita Para6/22/2012 02:33:42 6/22/2012 02:38:34 703-- 3 3 COAL -- Harita Para6/22/2012 02:34:08 6/22/2012 02:39:59 708-- 3 3 COAL -- Harita Para6/22/2012 02:47:43 6/22/2012 02:51:48 113 3 3 COAL -- Harita Para6/22/2012 02:52:47 6/22/2012 02:57:14 713-- 3 3 COAL -- Harita Para6/22/2012 03:36:24 6/22/2012 03:40:20 705-- 3 3 COAL -- Harita Para6/22/2012 07:16:26 6/22/2012 07:19:31 710-- 3 3 COAL -- Harita Para6/22/2012 07:17:45 6/22/2012 07:21:57 115 3 3 COAL -- Harita Para6/22/2012 07:20:17 6/22/2012 07:24:33 707-- 3 3 COAL -- Harita Para6/22/2012 07:20:36 6/22/2012 07:36:50 701-- 3 3 COAL -- Harita Para6/22/2012 07:21:24 6/22/2012 07:38:40 713-- 3 3 COAL -- Harita Para6/22/2012 07:23:47 6/22/2012 07:44:24 705-- 3 3 COAL -- Harita Para6/22/2012 07:27:23 6/22/2012 07:49:18 113 3 3 COAL -- Harita Para6/22/2012 07:30:48 6/22/2012 07:48:59 702-- 3 3 COAL -- Harita Para6/22/2012 07:33:37 6/22/2012 07:53:31 712-- 3 3 COAL -- Harita Para

6/22/2012 07:37:58 6/22/2012 07:55:48 714-- 3 3 COAL -- Harita Para6/22/2012 07:51:57 6/22/2012 07:58:12 706-- 3 3 COAL -- Harita Para6/22/2012 07:57:15 6/22/2012 08:02:45 703-- 3 1 COAL -- Harita Para

6/22/2012 00:07:26 6/22/2012 00:14:19 853 3 3 COAL -- MIL

6/22/2012 00:36:31 6/22/2012 00:41:18 818 3 3 COAL -- MIL6/22/2012 00:37:04 6/22/2012 00:43:52 851 3 3 COAL -- MIL6/22/2012 00:52:30 6/22/2012 00:57:07 810 3 3 COAL -- MIL6/22/2012 00:53:24 6/22/2012 01:17:50 832 3 3 COAL -- MIL6/22/2012 00:54:46 6/22/2012 01:15:41 855 3 3 COAL -- MIL6/22/2012 01:04:26 6/22/2012 01:18:17 839 3 3 COAL -- MIL6/22/2012 01:05:07 6/22/2012 01:21:15 852 3 3 COAL -- MIL6/22/2012 01:13:59 6/22/2012 01:23:11 856 3 3 COAL -- MIL6/22/2012 01:35:04 6/22/2012 01:43:47 853 3 3 COAL -- MIL6/22/2012 03:01:19 6/22/2012 03:04:52 837 3 3 COAL -- MIL6/22/2012 03:50:46 6/22/2012 03:58:40 852 3 3 COAL -- MIL6/22/2012 04:05:47 6/22/2012 04:12:21 855 3 3 COAL -- MIL6/22/2012 07:23:21 6/22/2012 07:44:03 819 3 3 COAL -- MIL6/22/2012 07:34:25 6/22/2012 07:53:56 856 3 3 COAL -- MIL6/22/2012 08:24:15 6/22/2012 08:29:21 708-- 1 1 COAL -- Harita Para6/22/2012 08:38:25 6/22/2012 08:42:17 707-- 1 1 COAL -- Harita Para6/22/2012 08:39:39 6/22/2012 08:45:14 710-- 1 1 COAL -- Harita Para

6/22/2012 08:59:27 6/22/2012 09:03:26 705-- 1 1 COAL -- Harita Para6/22/2012 09:00:00 6/22/2012 09:04:42 701-- 1 1 COAL -- Harita Para6/22/2012 09:07:59 6/22/2012 09:12:49 713-- 1 1 COAL -- Harita Para6/22/2012 09:20:29 6/22/2012 09:25:21 702-- 1 1 COAL -- Harita Para6/22/2012 09:20:50 6/22/2012 09:25:50 706-- 1 1 COAL -- Harita Para6/22/2012 09:21:29 6/22/2012 09:27:55 714-- 1 1 COAL -- Harita Para6/22/2012 09:40:05 6/22/2012 09:45:23 703-- 1 1 COAL -- Harita Para

6/22/2012 09:41:11 6/22/2012 09:45:45 712-- 1 1 COAL -- Harita Para6/22/2012 09:46:34 6/22/2012 09:50:58 708-- 1 1 COAL -- Harita Para6/22/2012 09:56:31 6/22/2012 09:59:48 707-- 1 1 COAL -- Harita Para6/22/2012 10:05:14 6/22/2012 10:12:00 710-- 1 1 COAL -- Harita Para

Page 328: June Per Shift (Truckscale Port)

6/22/2012 10:22:29 6/22/2012 10:27:41 705-- 1 1 COAL -- Harita Para6/22/2012 10:25:34 6/22/2012 10:30:28 701-- 1 1 COAL -- Harita Para6/22/2012 10:37:16 6/22/2012 10:44:53 713-- 1 1 COAL -- Harita Para6/22/2012 10:40:27 6/22/2012 10:46:06 706-- 1 1 COAL -- Harita Para6/22/2012 10:43:47 6/22/2012 10:47:46 711-- 1 1 COAL -- Harita Para6/22/2012 11:05:47 6/22/2012 11:09:45 714-- 1 1 COAL -- Harita Para6/22/2012 11:10:56 6/22/2012 11:14:15 707-- 1 1 COAL -- Harita Para6/22/2012 11:18:52 6/22/2012 11:22:43 708-- 1 1 COAL -- Harita Para6/22/2012 11:20:58 6/22/2012 11:22:45 712-- 1 1 COAL -- Harita Para6/22/2012 11:43:20 6/22/2012 11:49:53 710-- 1 1 COAL -- Harita Para6/22/2012 11:48:25 6/22/2012 11:54:13 701-- 1 1 COAL -- Harita Para6/22/2012 12:16:54 6/22/2012 12:21:09 706-- 1 1 COAL -- Harita Para6/22/2012 13:38:46 6/22/2012 13:46:21 707-- 1 1 COAL -- Harita Para6/22/2012 13:44:27 6/22/2012 13:48:41 714-- 1 1 COAL -- Harita Para6/22/2012 14:03:30 6/22/2012 14:07:39 705-- 1 1 COAL -- Harita Para6/22/2012 14:08:14 6/22/2012 14:12:06 711-- 1 1 COAL -- Harita Para6/22/2012 14:21:35 6/22/2012 14:26:18 713-- 1 1 COAL -- Harita Para6/22/2012 14:22:34 6/22/2012 14:28:46 706-- 1 1 COAL -- Harita Para6/22/2012 14:33:46 6/22/2012 14:38:31 701-- 1 1 COAL -- Harita Para6/22/2012 14:35:10 6/22/2012 14:39:12 712-- 1 1 COAL -- Harita Para6/22/2012 14:55:41 6/22/2012 15:06:17 710-- 1 1 COAL -- Harita Para6/22/2012 15:01:09 6/22/2012 15:06:21 707-- 1 1 COAL -- Harita Para6/22/2012 15:14:06 6/22/2012 15:23:24 714-- 1 1 COAL -- Harita Para6/22/2012 15:19:01 6/22/2012 15:25:33 702-- 1 1 COAL -- Harita Para6/22/2012 15:30:38 6/22/2012 15:34:24 708-- 1 1 COAL -- Harita Para6/22/2012 15:37:05 6/22/2012 15:41:32 711-- 1 1 COAL -- Harita Para6/22/2012 15:46:43 6/22/2012 15:51:30 713-- 1 1 COAL -- Harita Para6/22/2012 15:49:45 6/22/2012 15:54:04 706-- 1 1 COAL -- Harita Para6/22/2012 15:56:04 6/22/2012 16:01:49 712-- 1 2 COAL -- Harita Para6/22/2012 08:32:54 6/22/2012 08:37:29 115 1 1 COAL--IN Harita Para

6/22/2012 08:57:43 6/22/2012 09:01:36 113 1 1 COAL--IN Harita Para6/22/2012 09:44:18 6/22/2012 09:51:56 115 1 1 COAL--IN Harita Para6/22/2012 10:26:08 6/22/2012 10:31:26 113 1 1 COAL--IN Harita Para6/22/2012 10:55:54 6/22/2012 11:00:39 115 1 1 COAL--IN Harita Para6/22/2012 11:48:04 6/22/2012 11:52:41 113 1 1 COAL--IN Harita Para

6/22/2012 14:02:51 6/22/2012 14:07:06 115 1 1 COAL--IN Harita Para6/22/2012 14:22:09 6/22/2012 14:28:00 113 1 1 COAL--IN Harita Para

6/22/2012 15:12:31 6/22/2012 15:18:09 115 1 1 COAL--IN Harita Para6/22/2012 15:31:08 6/22/2012 15:34:35 113 1 1 COAL--IN Harita Para6/22/2012 08:18:32 6/22/2012 08:22:10 810 1 1 COAL -- MIL6/22/2012 08:23:18 6/22/2012 08:29:56 852 1 1 COAL -- MIL6/22/2012 08:26:03 6/22/2012 08:31:58 818 1 1 COAL -- MIL6/22/2012 08:34:07 6/22/2012 08:43:50 855 1 1 COAL -- MIL6/22/2012 08:48:46 6/22/2012 08:52:45 828 1 1 COAL -- MIL6/22/2012 09:11:16 6/22/2012 09:15:25 853 1 1 COAL -- MIL6/22/2012 09:14:05 6/22/2012 09:16:57 856 1 1 COAL -- MIL6/22/2012 09:20:09 6/22/2012 09:24:04 839 1 1 COAL -- MIL6/22/2012 09:27:09 6/22/2012 09:30:59 837 1 1 COAL -- MIL6/22/2012 09:41:58 6/22/2012 09:48:00 851 1 1 COAL -- MIL6/22/2012 10:01:58 6/22/2012 10:06:56 852 1 1 COAL -- MIL

Page 329: June Per Shift (Truckscale Port)

6/22/2012 10:17:44 6/22/2012 10:27:18 836 1 1 COAL -- MIL6/22/2012 10:19:47 6/22/2012 10:24:18 819 1 1 COAL -- MIL6/22/2012 10:25:09 6/22/2012 10:29:34 850 1 1 COAL -- MIL6/22/2012 10:32:23 6/22/2012 10:36:31 832 1 1 COAL -- MIL6/22/2012 10:33:08 6/22/2012 10:38:02 828 1 1 COAL -- MIL6/22/2012 10:35:11 6/22/2012 10:41:14 815 1 1 COAL -- MIL6/22/2012 10:35:38 6/22/2012 10:42:02 818 1 1 COAL -- MIL6/22/2012 10:44:16 6/22/2012 10:51:12 855 1 1 COAL -- MIL6/22/2012 10:45:27 6/22/2012 10:51:16 853 1 1 COAL -- MIL6/22/2012 10:48:22 6/22/2012 10:52:04 856 1 1 COAL -- MIL6/22/2012 10:59:09 6/22/2012 11:03:59 837 1 1 COAL -- MIL6/22/2012 11:02:08 6/22/2012 11:06:24 810 1 1 COAL -- MIL6/22/2012 11:47:39 6/22/2012 11:51:36 819 1 1 COAL -- MIL6/22/2012 12:26:24 6/22/2012 12:29:26 856 1 1 COAL -- MIL6/22/2012 12:47:32 6/22/2012 12:53:16 852 1 1 COAL -- MIL6/22/2012 12:55:04 6/22/2012 12:58:52 837 1 1 COAL -- MIL

6/22/2012 12:57:37 6/22/2012 13:01:19 810 1 1 COAL -- MIL6/22/2012 13:31:17 6/22/2012 13:37:07 853 1 1 COAL -- MIL6/22/2012 13:31:43 6/22/2012 13:40:39 855 1 1 COAL -- MIL6/22/2012 13:32:28 6/22/2012 13:41:17 817 1 1 COAL -- MIL6/22/2012 13:34:11 6/22/2012 13:43:35 850 1 1 COAL -- MIL6/22/2012 13:38:20 6/22/2012 13:45:43 818 1 1 COAL -- MIL6/22/2012 13:44:49 6/22/2012 13:49:04 828 1 1 COAL -- MIL6/22/2012 14:24:26 6/22/2012 14:31:04 852 1 1 COAL -- MIL6/22/2012 14:36:58 6/22/2012 14:42:15 819 1 1 COAL -- MIL6/22/2012 14:48:32 6/22/2012 14:51:44 856 1 1 COAL -- MIL

6/22/2012 14:55:17 6/22/2012 14:58:40 837 1 1 COAL -- MIL6/22/2012 14:59:34 6/22/2012 15:04:26 853 1 1 COAL -- MIL6/22/2012 15:13:10 6/22/2012 15:20:52 855 1 1 COAL -- MIL6/22/2012 15:13:32 6/22/2012 15:20:58 851 1 1 COAL -- MIL6/22/2012 15:26:26 6/22/2012 15:31:51 817 1 1 COAL -- MIL6/22/2012 15:35:12 6/22/2012 15:38:37 810 1 1 COAL -- MIL6/22/2012 15:40:58 6/22/2012 15:44:58 850 1 1 COAL -- MIL6/22/2012 15:47:15 6/22/2012 15:52:59 818 1 1 COAL -- MIL6/22/2012 16:01:04 6/22/2012 16:08:02 701-- 2 2 COAL -- Harita Para6/22/2012 16:17:54 6/22/2012 16:22:33 709-- 2 2 COAL -- Harita Para6/22/2012 17:58:34 6/22/2012 18:02:02 702-- 2 2 COAL -- Harita Para

6/22/2012 18:03:22 6/22/2012 18:07:07 705-- 2 2 COAL -- Harita Para

6/22/2012 18:06:26 6/22/2012 18:11:30 714-- 2 2 COAL -- Harita Para6/22/2012 18:10:01 6/22/2012 18:23:44 712-- 2 2 COAL -- Harita Para6/22/2012 18:15:07 6/22/2012 18:26:45 710-- 2 2 COAL -- Harita Para6/22/2012 18:15:37 6/22/2012 18:26:48 711-- 2 2 COAL -- Harita Para6/22/2012 18:18:46 6/22/2012 18:32:02 709-- 2 2 COAL -- Harita Para6/22/2012 18:19:11 6/22/2012 18:32:07 713-- 2 2 COAL -- Harita Para6/22/2012 18:35:58 6/22/2012 18:37:29 708-- 2 2 COAL -- Harita Para6/22/2012 18:41:50 6/22/2012 18:45:23 706-- 2 2 COAL -- Harita Para6/22/2012 18:10:46 6/22/2012 18:24:12 113 2 2 COAL--IN Harita Para6/22/2012 18:16:12 6/22/2012 18:29:32 115 2 2 COAL--IN Harita Para6/22/2012 16:00:45 6/22/2012 16:04:54 832 2 2 COAL -- MIL

Page 330: June Per Shift (Truckscale Port)

6/22/2012 16:04:21 6/22/2012 16:09:01 828 2 2 COAL -- MIL6/22/2012 16:25:49 6/22/2012 16:29:52 812 2 2 COAL -- MIL6/22/2012 16:32:06 6/22/2012 16:36:17 831 2 2 COAL -- MIL6/23/2012 01:55:46 6/23/2012 02:30:12 708-- 3 3 COAL--IN Harita Para6/23/2012 01:56:19 6/23/2012 02:30:19 702-- 3 3 COAL--IN Harita Para6/23/2012 02:01:58 6/23/2012 02:32:12 714-- 3 3 COAL--IN Harita Para

6/23/2012 02:02:32 6/23/2012 02:32:19 113 3 3 COAL--IN Harita Para6/23/2012 02:03:29 6/23/2012 02:38:42 705-- 3 3 COAL--IN Harita Para6/23/2012 02:07:53 6/23/2012 02:38:45 711-- 3 3 COAL--IN Harita Para6/23/2012 02:08:15 6/23/2012 02:41:21 709-- 3 3 COAL--IN Harita Para6/23/2012 02:16:17 6/23/2012 02:41:25 707-- 3 3 COAL--IN Harita Para6/23/2012 02:23:41 6/23/2012 02:42:58 713-- 3 3 COAL--IN Harita Para6/23/2012 02:26:38 6/23/2012 02:43:03 115 3 3 COAL--IN Harita Para6/23/2012 03:30:25 6/23/2012 03:36:21 710-- 3 3 COAL--IN Harita Para

6/23/2012 03:43:41 6/23/2012 03:48:12 708-- 3 3 COAL--IN Harita Para6/23/2012 03:51:20 6/23/2012 03:55:44 702-- 3 3 COAL--IN Harita Para6/23/2012 03:53:40 6/23/2012 03:55:51 714-- 3 3 COAL--IN Harita Para6/23/2012 03:57:25 6/23/2012 04:00:56 113 3 3 COAL--IN Harita Para6/23/2012 04:03:00 6/23/2012 04:06:25 705-- 3 3 COAL--IN Harita Para6/23/2012 04:12:34 6/23/2012 04:17:41 711-- 3 3 COAL--IN Harita Para6/23/2012 04:13:20 6/23/2012 04:17:44 707-- 3 3 COAL--IN Harita Para6/23/2012 04:18:29 6/23/2012 04:22:34 713-- 3 3 COAL--IN Harita Para6/23/2012 04:27:07 6/23/2012 04:30:54 115 3 3 COAL--IN Harita Para6/23/2012 05:03:52 6/23/2012 05:08:48 714-- 3 3 COAL--IN Harita Para6/23/2012 07:09:25 6/23/2012 07:13:05 705-- 3 3 COAL--IN Harita Para6/23/2012 07:20:03 6/23/2012 07:23:30 113 3 3 COAL--IN Harita Para6/23/2012 07:22:56 6/23/2012 07:26:11 710-- 3 3 COAL--IN Harita Para

6/23/2012 07:27:51 6/23/2012 07:37:19 707-- 3 3 COAL--IN Harita Para6/23/2012 07:28:34 6/23/2012 07:39:14 115 3 3 COAL--IN Harita Para

6/23/2012 07:45:11 6/23/2012 07:49:25 713-- 3 3 COAL--IN Harita Para6/23/2012 07:46:43 6/23/2012 07:52:18 711-- 3 3 COAL--IN Harita Para6/23/2012 07:50:08 6/23/2012 07:55:32 714-- 3 3 COAL--IN Harita Para6/23/2012 02:35:43 6/23/2012 02:48:53 833 3 3 COAL -- MIL

6/23/2012 02:36:21 6/23/2012 02:48:56 837 3 3 COAL -- MIL6/23/2012 02:50:31 6/23/2012 03:20:52 855 3 3 COAL -- MIL

6/23/2012 02:51:08 6/23/2012 03:11:54 819 3 3 COAL -- MIL

6/23/2012 02:51:38 6/23/2012 03:21:00 853 3 3 COAL -- MIL6/23/2012 02:52:08 6/23/2012 03:12:01 817 3 3 COAL -- MIL6/23/2012 02:52:41 6/23/2012 03:39:14 850 3 3 COAL -- MIL6/23/2012 02:53:07 6/23/2012 03:26:49 852 3 3 COAL -- MIL6/23/2012 02:53:33 6/23/2012 03:27:10 851 3 3 COAL -- MIL6/23/2012 03:05:23 6/23/2012 03:27:44 810 3 3 COAL -- MIL6/23/2012 03:47:21 6/23/2012 03:51:54 856 3 3 COAL -- MIL6/23/2012 04:12:53 6/23/2012 04:15:36 818 3 3 COAL -- MIL6/23/2012 07:51:37 6/23/2012 07:56:03 850 3 3 COAL -- MIL6/23/2012 07:57:59 6/23/2012 08:02:16 810 3 1 COAL -- MIL6/23/2012 07:58:49 6/23/2012 08:03:24 818 3 1 COAL -- MIL6/23/2012 07:59:10 6/23/2012 08:06:13 852 3 1 COAL -- MIL

Page 331: June Per Shift (Truckscale Port)

6/23/2012 07:59:27 6/23/2012 08:09:27 855 3 1 COAL -- MIL6/23/2012 07:59:48 6/23/2012 08:07:27 832 3 1 COAL -- MIL

6/23/2012 04:20:54 6/23/2012 04:26:18 831 3 3 COAL--IN MIL6/23/2012 07:56:40 6/23/2012 08:01:13 819 3 1 COAL--IN MIL6/23/2012 09:12:21 6/23/2012 09:17:05 707-- 1 1 COAL -- Harita Para6/23/2012 09:20:34 6/23/2012 09:28:14 713-- 1 1 COAL -- Harita Para6/23/2012 09:24:10 6/23/2012 09:30:26 711-- 1 1 COAL -- Harita Para6/23/2012 09:33:04 6/23/2012 09:46:48 706-- 1 1 COAL -- Harita Para6/23/2012 09:50:02 6/23/2012 09:55:04 709-- 1 1 COAL -- Harita Para6/23/2012 09:57:27 6/23/2012 10:07:20 701-- 1 1 COAL -- Harita Para6/23/2012 10:08:10 6/23/2012 10:13:15 708-- 1 1 COAL -- Harita Para6/23/2012 10:10:45 6/23/2012 10:15:13 710-- 1 1 COAL -- Harita Para6/23/2012 10:16:50 6/23/2012 10:21:38 703-- 1 1 COAL -- Harita Para6/23/2012 10:33:37 6/23/2012 10:39:16 705-- 1 1 COAL -- Harita Para6/23/2012 10:38:20 6/23/2012 10:42:39 707-- 1 1 COAL -- Harita Para6/23/2012 10:45:44 6/23/2012 10:48:57 713-- 1 1 COAL -- Harita Para6/23/2012 10:53:37 6/23/2012 10:57:45 711-- 1 1 COAL -- Harita Para

6/23/2012 11:06:39 6/23/2012 11:11:28 706-- 1 1 COAL -- Harita Para6/23/2012 11:25:09 6/23/2012 11:31:25 701-- 1 1 COAL -- Harita Para6/23/2012 11:29:16 6/23/2012 11:36:51 113 1 1 COAL -- Harita Para6/23/2012 11:32:20 6/23/2012 11:43:06 709-- 1 1 COAL -- Harita Para6/23/2012 11:39:25 6/23/2012 11:43:52 710-- 1 1 COAL -- Harita Para6/23/2012 11:52:03 6/23/2012 11:57:09 115 1 1 COAL -- Harita Para6/23/2012 11:57:49 6/23/2012 12:01:27 703-- 1 1 COAL -- Harita Para6/23/2012 12:10:28 6/23/2012 12:13:43 713-- 1 1 COAL -- Harita Para6/23/2012 12:17:04 6/23/2012 12:22:12 711-- 1 1 COAL -- Harita Para6/23/2012 12:30:10 6/23/2012 12:33:51 705-- 1 1 COAL -- Harita Para6/23/2012 12:42:37 6/23/2012 12:47:11 707-- 1 1 COAL -- Harita Para6/23/2012 13:22:58 6/23/2012 13:30:36 701-- 1 1 COAL -- Harita Para6/23/2012 13:23:49 6/23/2012 13:30:40 709-- 1 1 COAL -- Harita Para6/23/2012 13:27:14 6/23/2012 13:38:01 706-- 1 1 COAL -- Harita Para6/23/2012 13:33:59 6/23/2012 13:35:52 713-- 1 1 COAL -- Harita Para6/23/2012 13:34:30 6/23/2012 13:40:58 703-- 1 1 COAL -- Harita Para6/23/2012 13:34:50 6/23/2012 13:41:42 710-- 1 1 COAL -- Harita Para6/23/2012 13:35:07 6/23/2012 13:41:44 712-- 1 1 COAL -- Harita Para6/23/2012 13:47:07 6/23/2012 13:50:30 115 1 1 COAL -- Harita Para

6/23/2012 13:53:33 6/23/2012 13:57:43 113 1 1 COAL -- Harita Para6/23/2012 14:04:19 6/23/2012 14:08:13 702-- 1 1 COAL -- Harita Para6/23/2012 14:12:24 6/23/2012 14:27:54 711 1 1 COAL -- Harita Para6/23/2012 14:14:21 6/23/2012 14:34:06 705-- 1 1 COAL -- Harita Para6/23/2012 14:36:14 6/23/2012 14:50:24 707-- 1 1 COAL -- Harita Para6/23/2012 14:56:29 6/23/2012 15:09:26 709-- 1 1 COAL -- Harita Para6/23/2012 14:57:48 6/23/2012 15:13:02 706-- 1 1 COAL -- Harita Para6/23/2012 15:03:28 6/23/2012 15:17:03 703-- 1 1 COAL -- Harita Para6/23/2012 15:08:37 6/23/2012 15:22:36 713-- 1 1 COAL -- Harita Para6/23/2012 15:14:59 6/23/2012 15:25:55 712-- 1 1 COAL -- Harita Para6/23/2012 15:15:45 6/23/2012 15:27:51 115 1 1 COAL -- Harita Para

6/23/2012 15:19:07 6/23/2012 15:32:24 710-- 1 1 COAL -- Harita Para6/23/2012 15:40:53 6/23/2012 15:44:46 711-- 1 1 COAL -- Harita Para

Page 332: June Per Shift (Truckscale Port)

6/23/2012 15:47:14 6/23/2012 15:59:58 701-- 1 1 COAL -- Harita Para6/23/2012 08:04:13 6/23/2012 08:13:26 706-- 1 1 COAL--IN Harita Para6/23/2012 08:08:56 6/23/2012 08:24:44 708-- 1 1 COAL--IN Harita Para6/23/2012 08:18:12 6/23/2012 08:28:25 709-- 1 1 COAL--IN Harita Para6/23/2012 08:18:50 6/23/2012 08:29:56 701-- 1 1 COAL--IN Harita Para6/23/2012 08:40:28 6/23/2012 08:45:57 710-- 1 1 COAL--IN Harita Para6/23/2012 08:41:59 6/23/2012 08:48:23 703-- 1 1 COAL--IN Harita Para6/23/2012 08:47:25 6/23/2012 08:51:19 705-- 1 1 COAL--IN Harita Para6/23/2012 08:49:21 6/23/2012 08:53:20 113 1 1 COAL--IN Harita Para6/23/2012 08:57:28 6/23/2012 09:02:30 115 1 1 COAL--IN Harita Para6/23/2012 10:06:08 6/23/2012 10:10:01 113 1 1 COAL--IN Harita Para6/23/2012 10:13:56 6/23/2012 10:19:44 115 1 1 COAL--IN Harita Para

6/23/2012 08:00:29 6/23/2012 08:11:18 817 1 1 COAL -- MIL6/23/2012 08:01:46 6/23/2012 08:09:52 851 1 1 COAL -- MIL6/23/2012 08:04:36 6/23/2012 08:14:36 856 1 1 COAL -- MIL6/23/2012 08:08:37 6/23/2012 08:21:48 853 1 1 COAL -- MIL6/23/2012 08:27:32 6/23/2012 08:32:29 831 1 1 COAL -- MIL6/23/2012 08:52:04 6/23/2012 08:55:54 812 1 1 COAL -- MIL6/23/2012 09:19:38 6/23/2012 09:24:46 830 1 1 COAL -- MIL6/23/2012 09:22:18 6/23/2012 09:27:52 810 1 1 COAL -- MIL6/23/2012 09:33:50 6/23/2012 09:41:17 852 1 1 COAL -- MIL6/23/2012 09:39:43 6/23/2012 09:48:15 851 1 1 COAL -- MIL6/23/2012 09:53:28 6/23/2012 10:01:04 855 1 1 COAL -- MIL6/23/2012 09:57:50 6/23/2012 10:03:30 856 1 1 COAL -- MIL6/23/2012 10:06:45 6/23/2012 10:11:29 853 1 1 COAL -- MIL

6/23/2012 10:16:27 6/23/2012 10:20:30 832 1 1 COAL -- MIL6/23/2012 10:33:07 6/23/2012 10:36:23 837 1 1 COAL -- MIL6/23/2012 10:48:24 6/23/2012 10:52:12 810 1 1 COAL -- MIL6/23/2012 10:54:34 6/23/2012 10:59:40 812 1 1 COAL -- MIL6/23/2012 11:04:56 6/23/2012 11:09:33 852 1 1 COAL -- MIL6/23/2012 11:23:56 6/23/2012 11:28:09 831 1 1 COAL -- MIL6/23/2012 11:29:01 6/23/2012 11:40:30 851 1 1 COAL -- MIL6/23/2012 11:42:15 6/23/2012 11:50:22 855 1 1 COAL -- MIL

6/23/2012 11:48:04 6/23/2012 11:50:59 856 1 1 COAL -- MIL6/23/2012 12:14:42 6/23/2012 12:19:22 828 1 1 COAL -- MIL6/23/2012 12:18:49 6/23/2012 12:23:27 853 1 1 COAL -- MIL6/23/2012 12:26:49 6/23/2012 12:31:03 820 1 1 COAL -- MIL6/23/2012 12:29:30 6/23/2012 12:33:34 811 1 1 COAL -- MIL6/23/2012 12:42:15 6/23/2012 12:45:33 810 1 1 COAL -- MIL6/23/2012 13:25:22 6/23/2012 13:32:52 831 1 1 COAL -- MIL6/23/2012 13:33:39 6/23/2012 13:38:50 852 1 1 COAL -- MIL6/23/2012 14:09:21 6/23/2012 14:13:19 830 1 1 COAL -- MIL6/23/2012 14:12:06 6/23/2012 14:29:15 853 1 1 COAL -- MIL6/23/2012 14:16:34 6/23/2012 14:41:22 812 1 1 COAL -- MIL6/23/2012 14:43:21 6/23/2012 15:07:12 809 1 1 COAL -- MIL

6/23/2012 15:02:34 6/23/2012 15:13:37 856 1 1 COAL -- MIL6/23/2012 15:06:00 6/23/2012 15:17:52 837 1 1 COAL -- MIL6/23/2012 15:06:33 6/23/2012 15:20:47 831 1 1 COAL -- MIL6/23/2012 15:16:23 6/23/2012 15:33:24 855 1 1 COAL -- MIL

Page 333: June Per Shift (Truckscale Port)

6/23/2012 15:24:15 6/23/2012 15:34:03 810 1 1 COAL -- MIL6/23/2012 15:28:50 6/23/2012 15:35:12 811 1 1 COAL -- MIL

6/23/2012 15:55:26 6/23/2012 16:00:02 830 1 2 COAL -- MIL6/23/2012 08:06:48 6/23/2012 08:17:26 833 1 1 COAL--IN MIL6/23/2012 08:08:15 6/23/2012 08:20:15 837 1 1 COAL--IN MIL6/23/2012 09:20:00 6/23/2012 09:25:10 850 1 1 COAL--IN MIL6/23/2012 09:32:44 6/23/2012 09:36:35 819 1 1 COAL--IN MIL6/23/2012 09:45:10 6/23/2012 09:50:48 818 1 1 COAL--IN MIL6/23/2012 09:53:51 6/23/2012 09:58:33 817 1 1 COAL--IN MIL6/23/2012 10:02:44 6/23/2012 10:09:13 820 1 1 COAL--IN MIL

6/23/2012 10:26:21 6/23/2012 10:30:23 833 1 1 COAL--IN MIL6/23/2012 10:41:04 6/23/2012 10:44:32 850 1 1 COAL--IN MIL6/23/2012 10:53:21 6/23/2012 10:57:01 819 1 1 COAL--IN MIL6/23/2012 11:05:29 6/23/2012 11:09:54 830 1 1 COAL--IN MIL6/23/2012 11:15:29 6/23/2012 11:19:24 818 1 1 COAL--IN MIL6/23/2012 11:27:31 6/23/2012 11:34:12 817 1 1 COAL--IN MIL6/23/2012 11:59:25 6/23/2012 12:03:00 850 1 1 COAL--IN MIL6/23/2012 12:16:42 6/23/2012 12:20:38 819 1 1 COAL--IN MIL6/23/2012 14:02:57 6/23/2012 14:06:42 817 1 1 COAL--IN MIL6/23/2012 14:13:58 6/23/2012 14:33:41 818 1 1 COAL--IN MIL6/23/2012 14:24:41 6/23/2012 14:43:59 819 1 1 COAL--IN MIL6/23/2012 14:42:50 6/23/2012 14:57:09 850 1 1 COAL--IN MIL6/23/2012 15:31:25 6/23/2012 15:37:44 817 1 1 COAL--IN MIL6/23/2012 15:48:17 6/23/2012 15:56:58 818 1 1 COAL--IN MIL6/23/2012 18:08:23 6/23/2012 18:11:29 705-- 2 2 COAL -- Harita Para6/23/2012 18:15:18 6/23/2012 18:19:34 714-- 2 2 COAL -- Harita Para6/23/2012 18:15:46 6/23/2012 18:20:11 701-- 2 2 COAL -- Harita Para6/23/2012 18:18:22 6/23/2012 18:24:27 708-- 2 2 COAL -- Harita Para6/23/2012 18:18:50 6/23/2012 18:24:52 113 2 2 COAL -- Harita Para6/23/2012 18:23:08 6/23/2012 18:28:50 706-- 2 2 COAL -- Harita Para

6/23/2012 18:23:47 6/23/2012 18:30:50 712-- 2 2 COAL -- Harita Para6/23/2012 18:25:41 6/23/2012 18:34:46 115 2 2 COAL -- Harita Para6/23/2012 18:26:18 6/23/2012 18:35:09 711-- 2 2 COAL -- Harita Para6/23/2012 18:28:11 6/23/2012 18:36:03 710-- 2 2 COAL -- Harita Para6/23/2012 18:31:37 6/23/2012 18:36:34 707-- 2 2 COAL -- Harita Para6/23/2012 18:33:22 6/23/2012 18:38:46 702-- 2 2 COAL -- Harita Para6/23/2012 18:33:48 6/23/2012 18:40:09 713-- 2 2 COAL -- Harita Para6/23/2012 18:34:13 6/23/2012 18:41:21 709-- 2 2 COAL -- Harita Para6/23/2012 18:37:15 6/23/2012 18:44:54 703-- 2 2 COAL -- Harita Para

6/23/2012 19:27:20 6/23/2012 19:30:49 705-- 2 2 COAL -- Harita Para6/23/2012 19:40:57 6/23/2012 19:49:11 701-- 2 2 COAL -- Harita Para6/23/2012 19:45:48 6/23/2012 19:54:46 714-- 2 2 COAL -- Harita Para6/23/2012 19:51:17 6/23/2012 19:57:33 708-- 2 2 COAL -- Harita Para

6/23/2012 19:52:01 6/23/2012 19:59:50 113 2 2 COAL -- Harita Para6/23/2012 20:01:18 6/23/2012 20:06:31 710-- 2 2 COAL -- Harita Para

6/23/2012 20:02:53 6/23/2012 20:08:21 115 2 2 COAL -- Harita Para6/23/2012 20:05:44 6/23/2012 20:10:06 706-- 2 2 COAL -- Harita Para

6/23/2012 20:07:37 6/23/2012 20:16:41 711-- 2 2 COAL -- Harita Para

Page 334: June Per Shift (Truckscale Port)

6/23/2012 20:15:30 6/23/2012 20:19:18 702-- 2 2 COAL -- Harita Para6/23/2012 20:15:58 6/23/2012 20:21:49 712-- 2 2 COAL -- Harita Para6/23/2012 20:20:32 6/23/2012 20:24:34 713-- 2 2 COAL -- Harita Para6/23/2012 20:29:10 6/23/2012 20:33:30 709-- 2 2 COAL -- Harita Para6/23/2012 20:40:48 6/23/2012 21:01:03 707-- 2 2 COAL -- Harita Para6/23/2012 20:45:40 6/23/2012 21:02:44 705-- 2 2 COAL -- Harita Para6/23/2012 20:51:31 6/23/2012 21:06:02 703-- 2 2 COAL -- Harita Para6/23/2012 21:13:35 6/23/2012 21:20:19 701-- 2 2 COAL -- Harita Para6/23/2012 21:17:05 6/23/2012 21:22:01 714-- 2 2 COAL -- Harita Para6/23/2012 21:23:41 6/23/2012 21:27:34 113 2 2 COAL -- Harita Para

6/23/2012 21:31:12 6/23/2012 21:37:16 708-- 2 2 COAL -- Harita Para6/23/2012 21:36:26 6/23/2012 21:42:11 710-- 2 2 COAL -- Harita Para6/23/2012 21:39:06 6/23/2012 21:46:38 706-- 2 2 COAL -- Harita Para6/23/2012 21:42:55 6/23/2012 21:50:02 115 2 2 COAL -- Harita Para6/23/2012 21:47:41 6/23/2012 21:52:29 712-- 2 2 COAL -- Harita Para6/23/2012 21:51:18 6/23/2012 21:55:40 702-- 2 2 COAL -- Harita Para6/23/2012 22:06:10 6/23/2012 22:10:31 711-- 2 2 COAL -- Harita Para

6/23/2012 22:23:00 6/23/2012 22:26:17 705-- 2 2 COAL -- Harita Para6/23/2012 22:43:07 6/23/2012 22:47:41 703-- 2 2 COAL -- Harita Para6/23/2012 22:48:23 6/23/2012 22:52:27 714-- 2 2 COAL -- Harita Para6/23/2012 22:49:41 6/23/2012 22:55:56 113 2 2 COAL -- Harita Para6/23/2012 22:55:11 6/23/2012 23:01:03 713-- 2 2 COAL -- Harita Para6/23/2012 22:58:55 6/23/2012 23:05:14 701-- 2 2 COAL -- Harita Para6/23/2012 23:09:10 6/23/2012 23:17:17 710-- 2 2 COAL -- Harita Para6/23/2012 23:09:41 6/23/2012 23:18:52 708-- 2 2 COAL -- Harita Para6/23/2012 23:16:20 6/23/2012 23:23:17 706-- 2 2 COAL -- Harita Para6/23/2012 23:20:02 6/23/2012 23:26:47 712-- 2 2 COAL -- Harita Para6/23/2012 23:25:29 6/23/2012 23:34:03 115 2 2 COAL -- Harita Para

6/23/2012 23:37:10 6/23/2012 23:44:23 702-- 2 2 COAL -- Harita Para6/23/2012 23:37:40 6/23/2012 23:43:57 709-- 2 2 COAL -- Harita Para6/23/2012 23:38:35 6/23/2012 23:44:27 705-- 2 2 COAL -- Harita Para6/23/2012 23:39:18 6/23/2012 23:45:47 711-- 2 2 COAL -- Harita Para6/23/2012 16:04:08 6/23/2012 16:08:30 812 2 2 COAL -- MIL6/23/2012 16:22:49 6/23/2012 16:26:48 809 2 2 COAL -- MIL6/23/2012 19:40:09 6/23/2012 19:46:32 855 2 2 COAL -- MIL6/23/2012 19:40:29 6/23/2012 19:46:54 810 2 2 COAL -- MIL6/23/2012 19:41:26 6/23/2012 19:50:11 812 2 2 COAL -- MIL6/23/2012 19:43:40 6/23/2012 19:52:39 853 2 2 COAL -- MIL6/23/2012 20:09:29 6/23/2012 20:17:06 850 2 2 COAL -- MIL6/23/2012 21:12:13 6/23/2012 21:18:39 856 2 2 COAL -- MIL6/23/2012 21:24:58 6/23/2012 21:40:24 855 2 2 COAL -- MIL

6/23/2012 21:25:21 6/23/2012 21:32:17 812 2 2 COAL -- MIL6/23/2012 21:35:31 6/23/2012 21:40:28 810 2 2 COAL -- MIL6/23/2012 21:38:42 6/23/2012 21:45:12 811 2 2 COAL -- MIL6/23/2012 21:39:46 6/23/2012 21:48:18 853 2 2 COAL -- MIL6/23/2012 21:51:40 6/23/2012 21:57:15 815 2 2 COAL -- MIL

6/23/2012 21:54:00 6/23/2012 21:59:08 850 2 2 COAL -- MIL6/23/2012 22:09:45 6/23/2012 22:14:00 831 2 2 COAL -- MIL6/23/2012 22:58:29 6/23/2012 23:03:13 856 2 2 COAL -- MIL

Page 335: June Per Shift (Truckscale Port)

6/23/2012 23:04:04 6/23/2012 23:11:31 817 2 2 COAL -- MIL6/23/2012 23:08:22 6/23/2012 23:13:04 853 2 2 COAL -- MIL

6/23/2012 23:24:13 6/23/2012 23:34:33 855 2 2 COAL -- MIL6/23/2012 23:25:55 6/23/2012 23:35:43 810 2 2 COAL -- MIL6/23/2012 16:18:14 6/23/2012 16:23:39 850 2 2 COAL--IN MIL6/23/2012 19:32:37 6/23/2012 19:37:02 817 2 2 COAL--IN MIL6/23/2012 19:34:48 6/23/2012 19:39:15 815 2 2 COAL--IN MIL6/23/2012 19:48:28 6/23/2012 19:55:50 819 2 2 COAL--IN MIL6/23/2012 19:53:29 6/23/2012 20:03:33 831 2 2 COAL--IN MIL6/23/2012 21:54:30 6/23/2012 22:01:10 819 2 2 COAL--IN MIL6/23/2012 22:54:40 6/23/2012 22:59:35 812 2 2 COAL--IN MIL6/23/2012 23:10:47 6/23/2012 23:21:10 815 2 2 COAL--IN MIL6/23/2012 23:20:29 6/23/2012 23:27:58 819 2 2 COAL--IN MIL6/23/2012 23:43:04 6/23/2012 23:50:09 811 2 2 COAL--IN MIL

6/24/2012 00:13:06 6/24/2012 00:16:37 714-- 3 3 COAL -- Harita Para6/24/2012 00:20:02 6/24/2012 00:24:37 113 3 3 COAL -- Harita Para6/24/2012 00:28:50 6/24/2012 00:33:31 703-- 3 3 COAL -- Harita Para6/24/2012 00:29:13 6/24/2012 00:35:44 701-- 3 3 COAL -- Harita Para6/24/2012 00:38:40 6/24/2012 00:49:09 704-- 3 3 COAL -- Harita Para6/24/2012 00:56:08 6/24/2012 01:00:26 710-- 3 3 COAL -- Harita Para6/24/2012 00:56:48 6/24/2012 01:03:06 713-- 3 3 COAL -- Harita Para

6/24/2012 01:02:12 6/24/2012 01:06:19 706-- 3 3 COAL -- Harita Para6/24/2012 01:05:05 6/24/2012 01:10:58 705-- 3 3 COAL -- Harita Para6/24/2012 02:06:17 6/24/2012 02:10:27 115 3 3 COAL -- Harita Para6/24/2012 02:07:30 6/24/2012 02:13:22 708-- 3 3 COAL -- Harita Para6/24/2012 02:15:45 6/24/2012 02:20:28 709-- 3 3 COAL -- Harita Para6/24/2012 02:21:12 6/24/2012 02:30:24 711-- 3 3 COAL -- Harita Para6/24/2012 02:26:01 6/24/2012 02:30:57 710-- 3 3 COAL -- Harita Para6/24/2012 02:29:05 6/24/2012 02:34:21 113 3 3 COAL -- Harita Para6/24/2012 02:35:55 6/24/2012 02:39:59 706-- 3 3 COAL -- Harita Para6/24/2012 02:37:15 6/24/2012 02:42:02 703-- 3 3 COAL -- Harita Para6/24/2012 02:38:30 6/24/2012 02:43:17 705-- 3 3 COAL -- Harita Para6/24/2012 02:46:15 6/24/2012 02:50:31 713-- 3 3 COAL -- Harita Para6/24/2012 02:46:32 6/24/2012 02:52:36 714-- 3 3 COAL -- Harita Para

6/24/2012 02:54:11 6/24/2012 02:58:11 701-- 3 3 COAL -- Harita Para6/24/2012 03:00:28 6/24/2012 03:06:29 702-- 3 3 COAL -- Harita Para6/24/2012 03:49:47 6/24/2012 03:53:45 711-- 3 3 COAL -- Harita Para6/24/2012 03:58:47 6/24/2012 04:03:06 709-- 3 3 COAL -- Harita Para6/24/2012 03:59:28 6/24/2012 04:03:13 705-- 3 3 COAL -- Harita Para6/24/2012 07:08:55 6/24/2012 07:12:36 705-- 3 3 COAL -- Harita Para6/24/2012 07:10:24 6/24/2012 07:14:37 708-- 3 3 COAL -- Harita Para6/24/2012 07:15:32 6/24/2012 07:21:40 702-- 3 3 COAL -- Harita Para6/24/2012 07:30:13 6/24/2012 07:41:08 706-- 3 3 COAL -- Harita Para6/24/2012 07:30:50 6/24/2012 07:36:05 713-- 3 3 COAL -- Harita Para6/24/2012 07:31:32 6/24/2012 07:38:20 712-- 3 3 COAL -- Harita Para6/24/2012 07:40:17 6/24/2012 07:44:59 113 3 3 COAL -- Harita Para6/24/2012 07:44:21 6/24/2012 07:49:29 711-- 3 3 COAL -- Harita Para6/24/2012 07:48:42 6/24/2012 07:59:26 701-- 3 3 COAL -- Harita Para

6/24/2012 00:43:47 6/24/2012 00:49:05 831 3 3 COAL -- MIL

Page 336: June Per Shift (Truckscale Port)

6/24/2012 01:04:47 6/24/2012 01:09:26 853 3 3 COAL -- MIL6/24/2012 01:08:43 6/24/2012 01:16:09 855 3 3 COAL -- MIL6/24/2012 01:55:08 6/24/2012 01:59:49 856 3 3 COAL -- MIL6/24/2012 02:59:17 6/24/2012 03:04:02 810 3 3 COAL -- MIL6/24/2012 03:03:16 6/24/2012 03:07:34 831 3 3 COAL -- MIL6/24/2012 07:32:24 6/24/2012 07:43:27 810 3 3 COAL -- MIL

6/24/2012 07:47:04 6/24/2012 07:51:17 812 3 3 COAL -- MIL6/24/2012 07:48:12 6/24/2012 07:55:05 855 3 3 COAL -- MIL6/24/2012 00:30:22 6/24/2012 00:39:23 817 3 3 COAL--IN MIL6/24/2012 00:36:37 6/24/2012 00:41:27 819 3 3 COAL--IN MIL6/24/2012 01:23:32 6/24/2012 01:28:16 812 3 3 COAL--IN MIL

6/24/2012 01:50:13 6/24/2012 01:55:52 811 3 3 COAL--IN MIL6/24/2012 03:17:17 6/24/2012 03:22:15 819 3 3 COAL--IN MIL6/24/2012 08:02:08 6/24/2012 08:06:39 703-- 1 1 COAL -- Harita Para6/24/2012 08:29:42 6/24/2012 08:36:49 708-- 1 1 COAL -- Harita Para6/24/2012 08:32:50 6/24/2012 08:37:49 710-- 1 1 COAL -- Harita Para6/24/2012 08:33:18 6/24/2012 08:47:54 705-- 1 1 COAL -- Harita Para6/24/2012 08:56:11 6/24/2012 09:00:11 713-- 1 1 COAL -- Harita Para

6/24/2012 08:57:31 6/24/2012 09:02:23 706-- 1 1 COAL -- Harita Para6/24/2012 09:04:02 6/24/2012 09:08:24 113 1 1 COAL -- Harita Para6/24/2012 09:04:38 6/24/2012 09:12:52 711-- 1 1 COAL -- Harita Para6/24/2012 09:14:49 6/24/2012 09:19:01 712-- 1 1 COAL -- Harita Para6/24/2012 09:23:16 6/24/2012 09:27:56 703-- 1 1 COAL -- Harita Para6/24/2012 09:27:12 6/24/2012 09:32:38 115 1 1 COAL -- Harita Para6/24/2012 09:38:50 6/24/2012 09:42:59 701-- 1 1 COAL -- Harita Para6/24/2012 09:50:24 6/24/2012 09:54:05 708-- 1 1 COAL -- Harita Para6/24/2012 10:00:48 6/24/2012 10:04:21 710-- 1 1 COAL -- Harita Para6/24/2012 10:09:21 6/24/2012 10:13:29 705-- 1 1 COAL -- Harita Para6/24/2012 10:19:29 6/24/2012 10:23:32 713-- 1 1 COAL -- Harita Para6/24/2012 10:22:47 6/24/2012 10:28:07 706-- 1 1 COAL -- Harita Para6/24/2012 10:34:24 6/24/2012 10:38:39 113 1 1 COAL -- Harita Para6/24/2012 10:34:47 6/24/2012 10:41:03 711-- 1 1 COAL -- Harita Para6/24/2012 10:53:55 6/24/2012 10:57:40 703-- 1 1 COAL -- Harita Para6/24/2012 11:02:25 6/24/2012 11:07:01 712-- 1 1 COAL -- Harita Para6/24/2012 11:17:29 6/24/2012 11:21:33 701-- 1 1 COAL -- Harita Para6/24/2012 11:19:55 6/24/2012 11:24:56 115 1 1 COAL -- Harita Para6/24/2012 11:41:07 6/24/2012 11:46:23 708-- 1 1 COAL -- Harita Para6/24/2012 11:41:51 6/24/2012 11:47:21 710-- 1 1 COAL -- Harita Para6/24/2012 11:45:10 6/24/2012 11:49:09 713-- 1 1 COAL -- Harita Para6/24/2012 11:57:40 6/24/2012 12:02:32 705-- 1 1 COAL -- Harita Para6/24/2012 12:00:21 6/24/2012 12:06:06 706-- 1 1 COAL -- Harita Para6/24/2012 12:03:06 6/24/2012 12:07:16 711-- 1 1 COAL -- Harita Para6/24/2012 12:05:06 6/24/2012 12:09:14 113 1 1 COAL -- Harita Para6/24/2012 12:16:31 6/24/2012 12:22:17 709-- 1 1 COAL -- Harita Para6/24/2012 12:17:27 6/24/2012 12:24:50 703-- 1 1 COAL -- Harita Para6/24/2012 13:19:18 6/24/2012 13:24:15 714-- 1 1 COAL -- Harita Para6/24/2012 13:19:42 6/24/2012 13:25:16 707-- 1 1 COAL -- Harita Para6/24/2012 13:20:54 6/24/2012 13:29:21 713-- 1 1 COAL -- Harita Para6/24/2012 13:21:21 6/24/2012 13:32:21 701-- 1 1 COAL -- Harita Para

Page 337: June Per Shift (Truckscale Port)

6/24/2012 13:23:01 6/24/2012 13:41:02 115 1 1 COAL -- Harita Para6/24/2012 13:28:24 6/24/2012 13:43:06 712-- 1 1 COAL -- Harita Para6/24/2012 15:46:25 6/24/2012 15:51:53 709-- 1 1 COAL -- Harita Para6/24/2012 15:47:03 6/24/2012 15:51:58 113 1 1 COAL -- Harita Para6/24/2012 08:13:20 6/24/2012 08:19:36 853 1 1 COAL -- MIL6/24/2012 08:28:15 6/24/2012 08:33:55 831 1 1 COAL -- MIL6/24/2012 08:29:17 6/24/2012 08:35:02 817 1 1 COAL -- MIL6/24/2012 09:05:06 6/24/2012 09:15:27 830 1 1 COAL -- MIL6/24/2012 09:07:42 6/24/2012 09:16:56 811 1 1 COAL -- MIL6/24/2012 09:25:51 6/24/2012 09:30:16 812 1 1 COAL -- MIL6/24/2012 09:34:23 6/24/2012 09:39:21 815 1 1 COAL -- MIL6/24/2012 10:06:20 6/24/2012 10:10:57 817 1 1 COAL -- MIL6/24/2012 10:20:10 6/24/2012 10:24:55 839 1 1 COAL -- MIL6/24/2012 10:26:16 6/24/2012 10:30:00 831 1 1 COAL -- MIL

6/24/2012 10:27:02 6/24/2012 10:32:19 810 1 1 COAL -- MIL6/24/2012 11:08:21 6/24/2012 11:12:15 830 1 1 COAL -- MIL6/24/2012 11:10:52 6/24/2012 11:14:04 815 1 1 COAL -- MIL6/24/2012 11:24:13 6/24/2012 11:28:20 812 1 1 COAL -- MIL

6/24/2012 11:30:06 6/24/2012 11:34:07 811 1 1 COAL -- MIL6/24/2012 11:40:49 6/24/2012 11:46:03 853 1 1 COAL -- MIL6/24/2012 11:48:22 6/24/2012 11:54:15 852 1 1 COAL -- MIL6/24/2012 11:51:15 6/24/2012 11:56:30 817 1 1 COAL -- MIL

6/24/2012 11:57:13 6/24/2012 12:01:08 809 1 1 COAL -- MIL6/24/2012 12:15:05 6/24/2012 12:22:45 831 1 1 COAL -- MIL6/24/2012 12:20:21 6/24/2012 12:27:27 839 1 1 COAL -- MIL6/24/2012 12:23:31 6/24/2012 12:34:04 855 1 1 COAL -- MIL6/24/2012 13:20:09 6/24/2012 13:26:28 810 1 1 COAL -- MIL6/24/2012 13:20:30 6/24/2012 13:27:23 815 1 1 COAL -- MIL

6/24/2012 13:21:48 6/24/2012 13:39:47 830 1 1 COAL -- MIL6/24/2012 13:22:05 6/24/2012 13:39:04 811 1 1 COAL -- MIL6/24/2012 14:43:07 6/24/2012 14:47:05 850 1 1 COAL -- MIL6/24/2012 09:07:22 6/24/2012 09:16:01 810 1 1 COAL--IN MIL6/24/2012 09:19:45 6/24/2012 09:25:00 855 1 1 COAL--IN MIL

6/24/2012 09:47:05 6/24/2012 09:51:06 809 1 1 COAL--IN MIL6/24/2012 09:47:43 6/24/2012 09:53:32 853 1 1 COAL--IN MIL6/24/2012 10:39:24 6/24/2012 10:45:17 855 1 1 COAL--IN MIL6/24/2012 16:10:36 6/24/2012 16:14:23 705-- 2 2 COAL -- Harita Para6/24/2012 16:18:48 6/24/2012 16:26:22 710-- 2 2 COAL -- Harita Para6/24/2012 16:20:05 6/24/2012 16:26:25 713-- 2 2 COAL -- Harita Para6/24/2012 16:24:53 6/24/2012 16:29:31 708-- 2 2 COAL -- Harita Para6/24/2012 16:28:17 6/24/2012 16:32:16 704-- 2 2 COAL -- Harita Para6/24/2012 16:31:42 6/24/2012 16:35:16 711-- 2 2 COAL -- Harita Para6/24/2012 16:37:16 6/24/2012 16:40:40 714-- 2 2 COAL -- Harita Para6/24/2012 16:45:10 6/24/2012 16:49:30 706-- 2 2 COAL -- Harita Para6/24/2012 18:14:46 6/24/2012 18:18:04 705-- 2 2 COAL -- Harita Para6/24/2012 18:17:35 6/24/2012 18:21:09 704-- 2 2 COAL -- Harita Para6/24/2012 18:18:37 6/24/2012 18:23:28 708-- 2 2 COAL -- Harita Para6/24/2012 18:18:55 6/24/2012 18:27:06 713-- 2 2 COAL -- Harita Para6/24/2012 18:21:44 6/24/2012 18:28:30 710-- 2 2 COAL -- Harita Para

Page 338: June Per Shift (Truckscale Port)

6/24/2012 18:22:05 6/24/2012 18:31:08 709-- 2 2 COAL -- Harita Para6/24/2012 18:22:26 6/24/2012 18:31:31 701-- 2 2 COAL -- Harita Para6/24/2012 18:22:48 6/24/2012 18:33:33 712-- 2 2 COAL -- Harita Para

6/24/2012 18:26:12 6/24/2012 18:34:13 113 2 2 COAL -- Harita Para6/24/2012 18:29:58 6/24/2012 18:36:36 115 2 2 COAL -- Harita Para6/24/2012 18:30:27 6/24/2012 18:38:03 711-- 2 2 COAL -- Harita Para6/24/2012 18:34:46 6/24/2012 18:38:05 714-- 2 2 COAL -- Harita Para

6/24/2012 18:39:56 6/24/2012 18:50:56 707-- 2 2 COAL -- Harita Para6/24/2012 18:45:35 6/24/2012 18:53:26 702-- 2 2 COAL -- Harita Para6/24/2012 18:51:52 6/24/2012 18:55:28 706-- 2 2 COAL -- Harita Para6/24/2012 19:59:10 6/24/2012 20:03:03 710-- 2 2 COAL -- Harita Para6/24/2012 19:59:28 6/24/2012 20:05:56 701-- 2 2 COAL -- Harita Para6/24/2012 20:00:33 6/24/2012 20:06:20 704-- 2 2 COAL -- Harita Para6/24/2012 20:01:03 6/24/2012 20:07:50 713-- 2 2 COAL -- Harita Para6/24/2012 20:01:40 6/24/2012 20:08:11 705-- 2 2 COAL -- Harita Para6/24/2012 20:04:21 6/24/2012 20:13:06 712-- 2 2 COAL -- Harita Para

6/24/2012 20:05:14 6/24/2012 20:11:39 709-- 2 2 COAL -- Harita Para6/24/2012 20:07:08 6/24/2012 20:15:27 703-- 2 2 COAL -- Harita Para6/24/2012 20:10:21 6/24/2012 20:17:26 711-- 2 2 COAL -- Harita Para6/24/2012 20:10:46 6/24/2012 20:20:21 113 2 2 COAL -- Harita Para6/24/2012 20:18:39 6/24/2012 20:22:50 707-- 2 2 COAL -- Harita Para6/24/2012 20:18:56 6/24/2012 20:26:38 714-- 2 2 COAL -- Harita Para6/24/2012 20:28:19 6/24/2012 20:33:22 115 2 2 COAL -- Harita Para6/24/2012 20:30:44 6/24/2012 20:35:55 702-- 2 2 COAL -- Harita Para6/24/2012 20:47:27 6/24/2012 20:51:30 706-- 2 2 COAL -- Harita Para6/24/2012 21:19:17 6/24/2012 21:23:36 713-- 2 2 COAL -- Harita Para6/24/2012 21:24:29 6/24/2012 21:27:51 710-- 2 2 COAL -- Harita Para6/24/2012 21:25:02 6/24/2012 21:29:49 704-- 2 2 COAL -- Harita Para6/24/2012 21:31:22 6/24/2012 21:35:22 709-- 2 2 COAL -- Harita Para6/24/2012 21:37:39 6/24/2012 21:41:57 703-- 2 2 COAL -- Harita Para6/24/2012 21:39:34 6/24/2012 21:43:37 705-- 2 2 COAL -- Harita Para6/24/2012 21:41:05 6/24/2012 21:48:35 711-- 2 2 COAL -- Harita Para

6/24/2012 21:44:38 6/24/2012 21:48:54 701-- 2 2 COAL -- Harita Para6/24/2012 21:45:22 6/24/2012 21:50:26 707-- 2 2 COAL -- Harita Para6/24/2012 22:00:56 6/24/2012 22:05:22 113 2 2 COAL -- Harita Para6/24/2012 22:13:03 6/24/2012 22:19:25 115 2 2 COAL -- Harita Para6/24/2012 22:13:52 6/24/2012 22:21:34 712-- 2 2 COAL -- Harita Para6/24/2012 22:39:23 6/24/2012 22:43:20 713-- 2 2 COAL -- Harita Para6/24/2012 22:45:10 6/24/2012 22:50:55 704-- 2 2 COAL -- Harita Para6/24/2012 22:53:30 6/24/2012 22:59:21 709-- 2 2 COAL -- Harita Para6/24/2012 23:01:09 6/24/2012 23:05:30 703-- 2 2 COAL -- Harita Para6/24/2012 23:08:13 6/24/2012 23:24:21 711-- 2 2 COAL -- Harita Para6/24/2012 23:13:41 6/24/2012 23:18:12 710-- 2 2 COAL -- Harita Para6/24/2012 23:16:35 6/24/2012 23:21:06 707-- 2 2 COAL -- Harita Para6/24/2012 23:20:09 6/24/2012 23:24:25 705-- 2 2 COAL -- Harita Para6/24/2012 23:27:22 6/24/2012 23:35:21 701-- 2 2 COAL -- Harita Para6/24/2012 23:27:53 6/24/2012 23:35:25 706-- 2 2 COAL -- Harita Para6/24/2012 23:28:24 6/24/2012 23:36:40 714-- 2 2 COAL -- Harita Para6/24/2012 23:43:21 6/24/2012 23:48:21 113 2 2 COAL -- Harita Para

Page 339: June Per Shift (Truckscale Port)

6/24/2012 21:20:18 6/24/2012 21:25:51 850 2 2 COAL -- MIL6/24/2012 21:47:45 6/24/2012 21:52:48 812 2 2 COAL -- MIL6/24/2012 21:57:04 6/24/2012 22:01:40 819 2 2 COAL -- MIL6/24/2012 22:12:16 6/24/2012 22:19:43 855 2 2 COAL -- MIL6/24/2012 22:44:17 6/24/2012 22:49:03 815 2 2 COAL -- MIL6/24/2012 22:57:46 6/24/2012 23:01:53 856 2 2 COAL -- MIL6/24/2012 23:27:04 6/24/2012 23:31:07 811 2 2 COAL -- MIL6/24/2012 23:46:18 6/24/2012 23:52:06 853 2 2 COAL -- MIL6/25/2012 00:01:46 6/25/2012 00:12:38 115 3 3 COAL -- Harita Para6/25/2012 00:03:26 6/25/2012 00:12:43 713-- 3 3 COAL -- Harita Para6/25/2012 00:05:20 6/25/2012 00:25:39 712-- 3 3 COAL -- Harita Para6/25/2012 00:21:26 6/25/2012 00:25:35 704-- 3 3 COAL -- Harita Para6/25/2012 00:27:27 6/25/2012 00:33:27 709-- 3 3 COAL -- Harita Para6/25/2012 00:40:10 6/25/2012 00:45:13 703-- 3 3 COAL -- Harita Para6/25/2012 00:47:10 6/25/2012 00:50:29 710-- 3 3 COAL -- Harita Para6/25/2012 00:47:46 6/25/2012 00:50:32 711-- 3 3 COAL -- Harita Para

6/25/2012 00:53:45 6/25/2012 01:05:07 707-- 3 3 COAL -- Harita Para6/25/2012 01:10:10 6/25/2012 01:17:42 705-- 3 3 COAL -- Harita Para6/25/2012 01:23:19 6/25/2012 01:28:34 113 3 3 COAL -- Harita Para6/25/2012 01:30:04 6/25/2012 01:33:57 706-- 3 3 COAL -- Harita Para6/25/2012 01:30:22 6/25/2012 01:34:01 714-- 3 3 COAL -- Harita Para6/25/2012 01:53:04 6/25/2012 02:12:30 704-- 3 3 COAL -- Harita Para6/25/2012 02:06:43 6/25/2012 02:12:33 713-- 3 3 COAL -- Harita Para6/25/2012 02:14:25 6/25/2012 02:20:30 710-- 3 3 COAL -- Harita Para6/25/2012 02:14:54 6/25/2012 02:20:33 711-- 3 3 COAL -- Harita Para6/25/2012 02:21:38 6/25/2012 02:22:22 709-- 3 3 COAL -- Harita Para6/25/2012 02:28:59 6/25/2012 02:33:33 115 3 3 COAL -- Harita Para6/25/2012 02:31:30 6/25/2012 02:33:47 707-- 3 3 COAL -- Harita Para6/25/2012 02:34:40 6/25/2012 02:43:40 705-- 3 3 COAL -- Harita Para6/25/2012 02:35:28 6/25/2012 02:44:49 703-- 3 3 COAL -- Harita Para6/25/2012 00:04:49 6/25/2012 00:10:02 818 3 3 COAL -- MIL6/25/2012 00:31:40 6/25/2012 00:37:09 812 3 3 COAL -- MIL6/25/2012 00:32:39 6/25/2012 00:37:14 817 3 3 COAL -- MIL6/25/2012 00:49:12 6/25/2012 00:54:38 850 3 3 COAL -- MIL6/25/2012 00:51:59 6/25/2012 00:56:03 856 3 3 COAL -- MIL6/25/2012 01:06:23 6/25/2012 01:11:36 819 3 3 COAL -- MIL6/25/2012 01:09:47 6/25/2012 01:17:12 855 3 3 COAL -- MIL6/25/2012 01:15:53 6/25/2012 01:21:25 815 3 3 COAL -- MIL6/25/2012 01:20:40 6/25/2012 01:21:28 811 3 3 COAL -- MIL6/25/2012 01:41:20 6/25/2012 01:48:39 853 3 3 COAL -- MIL6/25/2012 01:43:02 6/25/2012 01:48:42 852 3 3 COAL -- MIL6/25/2012 02:30:39 6/25/2012 02:36:51 817 3 3 COAL -- MIL6/25/2012 02:31:03 6/25/2012 02:36:55 818 3 3 COAL -- MIL6/25/2012 02:35:02 6/25/2012 02:43:45 850 3 3 COAL -- MIL6/25/2012 02:42:59 6/25/2012 02:52:42 856 3 3 COAL -- MIL6/25/2012 09:01:57 6/25/2012 09:06:17 705-- 1 1 COAL -- Harita Para6/25/2012 09:02:25 6/25/2012 09:11:01 707-- 1 1 COAL -- Harita Para6/25/2012 09:02:51 6/25/2012 09:16:07 711-- 1 1 COAL -- Harita Para6/25/2012 09:03:19 6/25/2012 09:20:19 113 1 1 COAL -- Harita Para6/25/2012 09:03:51 6/25/2012 09:20:25 115 1 1 COAL -- Harita Para

Page 340: June Per Shift (Truckscale Port)

6/25/2012 09:04:48 6/25/2012 09:34:13 708-- 1 1 COAL -- Harita Para6/25/2012 09:05:20 6/25/2012 09:35:41 714-- 1 1 COAL -- Harita Para6/25/2012 09:07:03 6/25/2012 09:42:45 704-- 1 1 COAL -- Harita Para6/25/2012 09:08:14 6/25/2012 09:42:50 712-- 1 1 COAL -- Harita Para6/25/2012 09:09:12 6/25/2012 09:51:20 710-- 1 1 COAL -- Harita Para6/25/2012 09:09:42 6/25/2012 10:01:50 706-- 1 1 COAL -- Harita Para6/25/2012 09:10:04 6/25/2012 10:03:13 701-- 1 1 COAL -- Harita Para6/25/2012 09:19:11 6/25/2012 10:08:37 709-- 1 1 COAL -- Harita Para6/25/2012 10:22:06 6/25/2012 10:28:36 707-- 1 1 COAL -- Harita Para6/25/2012 10:25:17 6/25/2012 10:29:15 705-- 1 1 COAL -- Harita Para6/25/2012 10:26:36 6/25/2012 10:31:35 711-- 1 1 COAL -- Harita Para6/25/2012 10:38:02 6/25/2012 10:43:02 113 1 1 COAL -- Harita Para6/25/2012 10:43:45 6/25/2012 10:47:36 115 1 1 COAL -- Harita Para6/25/2012 10:54:15 6/25/2012 10:58:09 708-- 1 1 COAL -- Harita Para6/25/2012 10:59:29 6/25/2012 11:04:04 704-- 1 1 COAL -- Harita Para

6/25/2012 11:04:53 6/25/2012 11:08:41 714-- 1 1 COAL -- Harita Para6/25/2012 11:21:03 6/25/2012 11:25:04 706-- 1 1 COAL -- Harita Para6/25/2012 11:21:43 6/25/2012 11:28:43 712-- 1 1 COAL -- Harita Para6/25/2012 11:27:39 6/25/2012 11:32:15 710-- 1 1 COAL -- Harita Para

6/25/2012 11:35:25 6/25/2012 11:40:10 709-- 1 1 COAL -- Harita Para6/25/2012 11:39:36 6/25/2012 11:42:55 713-- 1 1 COAL -- Harita Para6/25/2012 11:43:51 6/25/2012 11:47:30 707-- 1 1 COAL -- Harita Para6/25/2012 11:54:56 6/25/2012 11:59:49 703-- 1 1 COAL -- Harita Para6/25/2012 11:57:16 6/25/2012 12:02:35 113 1 1 COAL -- Harita Para6/25/2012 12:00:42 6/25/2012 12:19:16 701-- 1 1 COAL -- Harita Para6/25/2012 12:01:05 6/25/2012 12:06:08 705-- 1 1 COAL -- Harita Para

6/25/2012 12:12:52 6/25/2012 12:19:14 115 1 1 COAL -- Harita Para6/25/2012 12:28:05 6/25/2012 12:33:10 704-- 1 1 COAL -- Harita Para6/25/2012 12:29:04 6/25/2012 12:41:53 708-- 1 1 COAL -- Harita Para6/25/2012 12:48:20 6/25/2012 12:52:29 714-- 1 1 COAL -- Harita Para6/25/2012 12:57:33 6/25/2012 13:02:19 706-- 1 1 COAL -- Harita Para

6/25/2012 12:59:47 6/25/2012 13:04:15 707-- 1 1 COAL -- Harita Para6/25/2012 13:05:32 6/25/2012 13:15:45 709-- 1 1 COAL -- Harita Para6/25/2012 13:10:17 6/25/2012 13:16:08 712-- 1 1 COAL -- Harita Para6/25/2012 13:14:26 6/25/2012 13:18:08 703-- 1 1 COAL -- Harita Para6/25/2012 13:23:19 6/25/2012 13:28:01 710-- 1 1 COAL -- Harita Para6/25/2012 13:33:27 6/25/2012 13:37:33 113 1 1 COAL -- Harita Para6/25/2012 13:50:23 6/25/2012 13:54:06 713-- 1 1 COAL -- Harita Para6/25/2012 13:52:33 6/25/2012 13:56:43 115 1 1 COAL -- Harita Para6/25/2012 13:59:48 6/25/2012 14:03:33 704-- 1 1 COAL -- Harita Para6/25/2012 14:13:50 6/25/2012 14:19:36 707-- 1 1 COAL -- Harita Para6/25/2012 14:14:21 6/25/2012 14:22:24 714-- 1 1 COAL -- Harita Para6/25/2012 14:23:52 6/25/2012 14:28:49 705-- 1 1 COAL -- Harita Para6/25/2012 14:29:35 6/25/2012 14:34:47 708-- 1 1 COAL -- Harita Para6/25/2012 14:32:41 6/25/2012 14:40:06 706-- 1 1 COAL -- Harita Para6/25/2012 14:35:50 6/25/2012 14:40:51 709-- 1 1 COAL -- Harita Para6/25/2012 14:39:03 6/25/2012 14:46:05 703-- 1 1 COAL -- Harita Para6/25/2012 14:43:40 6/25/2012 14:53:05 712-- 1 1 COAL -- Harita Para6/25/2012 14:52:02 6/25/2012 15:00:36 710-- 1 1 COAL -- Harita Para

Page 341: June Per Shift (Truckscale Port)

6/25/2012 15:04:59 6/25/2012 15:09:52 113 1 1 COAL -- Harita Para6/25/2012 15:10:51 6/25/2012 15:15:09 701-- 1 1 COAL -- Harita Para6/25/2012 15:11:18 6/25/2012 15:16:27 711-- 1 1 COAL -- Harita Para6/25/2012 15:17:10 6/25/2012 15:21:30 713-- 1 1 COAL -- Harita Para6/25/2012 15:18:38 6/25/2012 15:23:08 115 1 1 COAL -- Harita Para6/25/2012 15:28:26 6/25/2012 15:35:45 704-- 1 1 COAL -- Harita Para6/25/2012 15:51:36 6/25/2012 15:55:28 708-- 1 1 COAL -- Harita Para6/25/2012 15:56:51 6/25/2012 16:01:17 705-- 1 2 COAL -- Harita Para

6/25/2012 09:01:12 6/25/2012 09:05:58 850 1 1 COAL -- MIL6/25/2012 09:04:21 6/25/2012 09:27:20 815 1 1 COAL -- MIL6/25/2012 09:07:39 6/25/2012 09:27:29 819 1 1 COAL -- MIL6/25/2012 09:08:43 6/25/2012 09:50:35 818 1 1 COAL -- MIL6/25/2012 09:16:51 6/25/2012 09:55:52 812 1 1 COAL -- MIL6/25/2012 09:17:54 6/25/2012 09:55:57 811 1 1 COAL -- MIL6/25/2012 09:18:46 6/25/2012 10:14:47 855 1 1 COAL -- MIL6/25/2012 09:22:49 6/25/2012 10:16:52 856 1 1 COAL -- MIL6/25/2012 09:36:36 6/25/2012 10:12:45 817 1 1 COAL -- MIL6/25/2012 09:37:24 6/25/2012 10:19:25 831 1 1 COAL -- MIL6/25/2012 09:44:18 6/25/2012 10:20:17 810 1 1 COAL -- MIL6/25/2012 09:45:10 6/25/2012 10:27:59 852 1 1 COAL -- MIL6/25/2012 09:45:33 6/25/2012 10:36:04 853 1 1 COAL -- MIL6/25/2012 09:46:18 6/25/2012 10:22:56 836 1 1 COAL -- MIL6/25/2012 09:58:38 6/25/2012 10:23:37 851 1 1 COAL -- MIL6/25/2012 10:07:15 6/25/2012 10:28:03 868 1 1 COAL -- MIL6/25/2012 10:27:23 6/25/2012 10:34:38 850 1 1 COAL -- MIL6/25/2012 10:52:18 6/25/2012 10:56:13 815 1 1 COAL -- MIL6/25/2012 11:24:19 6/25/2012 11:28:14 839 1 1 COAL -- MIL6/25/2012 11:26:01 6/25/2012 11:30:28 819 1 1 COAL -- MIL6/25/2012 11:46:26 6/25/2012 11:49:57 832 1 1 COAL -- MIL6/25/2012 12:04:34 6/25/2012 12:12:13 855 1 1 COAL -- MIL6/25/2012 12:14:12 6/25/2012 12:20:03 812 1 1 COAL -- MIL6/25/2012 12:14:44 6/25/2012 12:20:56 817 1 1 COAL -- MIL6/25/2012 12:16:32 6/25/2012 12:21:24 856 1 1 COAL -- MIL6/25/2012 12:18:21 6/25/2012 12:22:00 810 1 1 COAL -- MIL

6/25/2012 12:26:57 6/25/2012 12:35:07 852 1 1 COAL -- MIL6/25/2012 12:28:28 6/25/2012 12:35:32 850 1 1 COAL -- MIL6/25/2012 12:37:27 6/25/2012 12:53:26 853 1 1 COAL -- MIL6/25/2012 12:40:17 6/25/2012 12:43:41 851 1 1 COAL -- MIL

6/25/2012 12:41:02 6/25/2012 12:46:00 815 1 1 COAL -- MIL6/25/2012 12:46:59 6/25/2012 12:50:33 818 1 1 COAL -- MIL6/25/2012 13:19:00 6/25/2012 13:22:42 836 1 1 COAL -- MIL6/25/2012 13:19:27 6/25/2012 13:24:49 831 1 1 COAL -- MIL6/25/2012 13:43:48 6/25/2012 13:46:13 856 1 1 COAL -- MIL6/25/2012 14:04:31 6/25/2012 14:08:30 839 1 1 COAL -- MIL6/25/2012 14:11:00 6/25/2012 14:15:52 819 1 1 COAL -- MIL6/25/2012 14:13:24 6/25/2012 14:18:07 852 1 1 COAL -- MIL6/25/2012 14:14:47 6/25/2012 14:24:35 817 1 1 COAL -- MIL6/25/2012 14:21:37 6/25/2012 14:26:26 812 1 1 COAL -- MIL6/25/2012 14:27:43 6/25/2012 14:31:24 815 1 1 COAL -- MIL

Page 342: June Per Shift (Truckscale Port)

6/25/2012 14:28:10 6/25/2012 14:33:42 855 1 1 COAL -- MIL6/25/2012 14:32:12 6/25/2012 14:37:07 832 1 1 COAL -- MIL6/25/2012 14:38:39 6/25/2012 14:46:41 853 1 1 COAL -- MIL6/25/2012 14:43:00 6/25/2012 14:50:48 818 1 1 COAL -- MIL6/25/2012 15:14:01 6/25/2012 15:17:41 851 1 1 COAL -- MIL6/25/2012 15:16:01 6/25/2012 15:19:38 831 1 1 COAL -- MIL6/25/2012 15:27:11 6/25/2012 15:31:10 810 1 1 COAL -- MIL6/25/2012 15:28:03 6/25/2012 15:33:48 836 1 1 COAL -- MIL6/25/2012 15:33:13 6/25/2012 15:37:30 819 1 1 COAL -- MIL6/25/2012 15:53:12 6/25/2012 16:02:45 852 1 2 COAL -- MIL6/25/2012 15:58:16 6/25/2012 16:02:50 855 1 2 COAL -- MIL6/25/2012 16:00:37 6/25/2012 16:06:23 714-- 2 2 COAL -- Harita Para6/25/2012 16:02:09 6/25/2012 16:06:26 706-- 2 2 COAL -- Harita Para6/25/2012 16:03:46 6/25/2012 16:10:27 707-- 2 2 COAL -- Harita Para6/25/2012 16:15:07 6/25/2012 16:21:13 712-- 2 2 COAL -- Harita Para6/25/2012 18:10:42 6/25/2012 18:16:51 714-- 2 2 COAL -- Harita Para6/25/2012 18:17:49 6/25/2012 18:22:03 705-- 2 2 COAL -- Harita Para

6/25/2012 18:18:54 6/25/2012 18:23:26 708-- 2 2 COAL -- Harita Para6/25/2012 18:21:10 6/25/2012 18:24:50 706-- 2 2 COAL -- Harita Para6/25/2012 18:22:48 6/25/2012 18:27:51 707-- 2 2 COAL -- Harita Para6/25/2012 18:24:06 6/25/2012 18:29:32 709-- 2 2 COAL -- Harita Para6/25/2012 18:26:17 6/25/2012 18:29:46 710-- 2 2 COAL -- Harita Para6/25/2012 18:26:38 6/25/2012 18:32:17 113 2 2 COAL -- Harita Para6/25/2012 18:27:06 6/25/2012 18:34:03 712-- 2 2 COAL -- Harita Para6/25/2012 18:31:06 6/25/2012 18:36:22 711-- 2 2 COAL -- Harita Para6/25/2012 18:31:29 6/25/2012 18:41:33 713-- 2 2 COAL -- Harita Para6/25/2012 18:37:19 6/25/2012 18:43:55 115 2 2 COAL -- Harita Para6/25/2012 18:45:02 6/25/2012 18:49:39 701-- 2 2 COAL -- Harita Para6/25/2012 19:14:29 6/25/2012 19:18:01 702-- 2 2 COAL -- Harita Para

6/25/2012 19:42:03 6/25/2012 19:46:09 714-- 2 2 COAL -- Harita Para6/25/2012 19:48:19 6/25/2012 19:51:22 705-- 2 2 COAL -- Harita Para6/25/2012 19:53:37 6/25/2012 19:58:11 708-- 2 2 COAL -- Harita Para

6/25/2012 19:56:10 6/25/2012 19:58:14 707-- 2 2 COAL -- Harita Para6/25/2012 19:59:05 6/25/2012 20:02:55 710-- 2 2 COAL -- Harita Para6/25/2012 20:03:33 6/25/2012 20:07:56 709-- 2 2 COAL -- Harita Para6/25/2012 20:08:39 6/25/2012 20:13:11 113 2 2 COAL -- Harita Para6/25/2012 20:13:50 6/25/2012 20:19:43 711-- 2 2 COAL -- Harita Para6/25/2012 20:28:56 6/25/2012 20:39:18 701-- 2 2 COAL -- Harita Para6/25/2012 20:44:45 6/25/2012 20:50:02 115 2 2 COAL -- Harita Para6/25/2012 20:45:20 6/25/2012 20:53:35 702-- 2 2 COAL -- Harita Para6/25/2012 20:45:59 6/25/2012 20:53:38 712-- 2 2 COAL -- Harita Para6/25/2012 20:47:41 6/25/2012 20:56:04 706-- 2 2 COAL -- Harita Para6/25/2012 21:06:43 6/25/2012 21:10:22 705-- 2 2 COAL -- Harita Para6/25/2012 21:15:33 6/25/2012 21:19:25 714-- 2 2 COAL -- Harita Para6/25/2012 21:24:19 6/25/2012 21:28:51 710-- 2 2 COAL -- Harita Para6/25/2012 21:33:35 6/25/2012 21:38:21 708-- 2 2 COAL -- Harita Para6/25/2012 21:35:37 6/25/2012 21:42:28 113 2 2 COAL -- Harita Para6/25/2012 21:44:14 6/25/2012 21:50:31 707-- 2 2 COAL -- Harita Para6/25/2012 21:51:10 6/25/2012 21:57:06 709-- 2 2 COAL -- Harita Para6/25/2012 22:02:56 6/25/2012 22:07:15 713-- 2 2 COAL -- Harita Para

Page 343: June Per Shift (Truckscale Port)

6/25/2012 22:12:46 6/25/2012 22:17:11 711-- 2 2 COAL -- Harita Para6/25/2012 22:16:36 6/25/2012 22:20:51 702-- 2 2 COAL -- Harita Para6/25/2012 22:20:19 6/25/2012 22:26:56 701-- 2 2 COAL -- Harita Para6/25/2012 22:23:07 6/25/2012 22:27:00 706-- 2 2 COAL -- Harita Para6/25/2012 22:28:39 6/25/2012 22:35:58 705-- 2 2 COAL -- Harita Para6/25/2012 22:35:09 6/25/2012 22:40:03 712-- 2 2 COAL -- Harita Para6/25/2012 22:42:12 6/25/2012 22:49:49 714-- 2 2 COAL -- Harita Para6/25/2012 22:50:38 6/25/2012 22:54:25 710-- 2 2 COAL -- Harita Para6/25/2012 22:55:53 6/25/2012 23:00:18 115 2 2 COAL -- Harita Para6/25/2012 23:06:06 6/25/2012 23:11:27 113 2 2 COAL -- Harita Para6/25/2012 23:17:24 6/25/2012 23:22:05 708-- 2 2 COAL -- Harita Para6/25/2012 23:20:20 6/25/2012 23:26:08 707-- 2 2 COAL -- Harita Para6/25/2012 23:35:32 6/25/2012 23:40:33 709-- 2 2 COAL -- Harita Para6/25/2012 23:39:47 6/25/2012 23:45:58 702-- 2 2 COAL -- Harita Para

6/25/2012 23:50:39 6/25/2012 23:55:44 713-- 2 2 COAL -- Harita Para6/25/2012 23:54:53 6/25/2012 23:59:06 705-- 2 2 COAL -- Harita Para6/25/2012 16:09:43 6/25/2012 16:14:09 812 2 2 COAL -- MIL6/25/2012 16:18:16 6/25/2012 16:24:20 853 2 2 COAL -- MIL

6/25/2012 16:31:42 6/25/2012 16:35:53 817 2 2 COAL -- MIL6/25/2012 19:20:22 6/25/2012 19:24:18 839 2 2 COAL -- MIL6/25/2012 19:24:54 6/25/2012 19:30:38 811 2 2 COAL -- MIL6/25/2012 19:28:41 6/25/2012 19:35:16 853 2 2 COAL -- MIL6/25/2012 19:29:07 6/25/2012 19:35:19 852 2 2 COAL -- MIL6/25/2012 19:29:29 6/25/2012 19:36:52 855 2 2 COAL -- MIL

6/25/2012 19:29:48 6/25/2012 19:37:36 819 2 2 COAL -- MIL6/25/2012 19:32:34 6/25/2012 19:37:40 815 2 2 COAL -- MIL6/25/2012 19:34:42 6/25/2012 19:40:10 812 2 2 COAL -- MIL6/25/2012 19:41:37 6/25/2012 19:45:36 817 2 2 COAL -- MIL6/25/2012 20:00:49 6/25/2012 20:05:16 856 2 2 COAL -- MIL6/25/2012 20:11:11 6/25/2012 20:15:32 836 2 2 COAL -- MIL6/25/2012 20:11:42 6/25/2012 20:17:55 818 2 2 COAL -- MIL6/25/2012 20:24:42 6/25/2012 20:29:37 837 2 2 COAL -- MIL6/25/2012 20:41:17 6/25/2012 20:46:46 830 2 2 COAL -- MIL6/25/2012 20:42:35 6/25/2012 20:49:41 832 2 2 COAL -- MIL6/25/2012 20:48:56 6/25/2012 20:58:08 809 2 2 COAL -- MIL6/25/2012 21:08:58 6/25/2012 21:13:48 853 2 2 COAL -- MIL6/25/2012 21:21:52 6/25/2012 21:27:16 852 2 2 COAL -- MIL6/25/2012 21:26:35 6/25/2012 21:28:48 839 2 2 COAL -- MIL6/25/2012 21:34:55 6/25/2012 21:40:13 812 2 2 COAL -- MIL6/25/2012 21:49:53 6/25/2012 21:58:42 855 2 2 COAL -- MIL6/25/2012 21:51:52 6/25/2012 21:58:47 856 2 2 COAL -- MIL6/25/2012 21:52:26 6/25/2012 22:01:53 819 2 2 COAL -- MIL6/25/2012 21:58:03 6/25/2012 22:01:55 811 2 2 COAL -- MIL6/25/2012 22:19:57 6/25/2012 22:24:00 817 2 2 COAL -- MIL

6/25/2012 22:28:14 6/25/2012 22:33:17 815 2 2 COAL -- MIL6/25/2012 22:41:17 6/25/2012 22:46:04 836 2 2 COAL -- MIL6/25/2012 22:41:57 6/25/2012 22:47:51 818 2 2 COAL -- MIL6/25/2012 22:45:27 6/25/2012 22:51:41 809 2 2 COAL -- MIL6/25/2012 22:52:57 6/25/2012 22:57:21 837 2 2 COAL -- MIL

Page 344: June Per Shift (Truckscale Port)

6/25/2012 22:56:33 6/25/2012 23:01:47 853 2 2 COAL -- MIL6/25/2012 23:13:27 6/25/2012 23:19:39 830 2 2 COAL -- MIL6/25/2012 23:19:01 6/25/2012 23:24:07 852 2 2 COAL -- MIL6/25/2012 23:23:10 6/25/2012 23:28:28 812 2 2 COAL -- MIL6/25/2012 23:25:33 6/25/2012 23:32:19 811 2 2 COAL -- MIL6/25/2012 23:36:06 6/25/2012 23:41:49 856 2 2 COAL -- MIL6/25/2012 23:39:23 6/25/2012 23:43:40 819 2 2 COAL -- MIL6/26/2012 00:00:53 6/26/2012 00:05:31 711-- 3 3 COAL -- Harita Para6/26/2012 00:04:29 6/26/2012 00:10:56 701-- 3 3 COAL -- Harita Para6/26/2012 00:15:10 6/26/2012 00:25:30 710-- 3 3 COAL -- Harita Para6/26/2012 00:20:03 6/26/2012 00:25:39 706-- 3 3 COAL -- Harita Para6/26/2012 00:26:29 6/26/2012 00:31:45 714-- 3 3 COAL -- Harita Para6/26/2012 00:33:40 6/26/2012 00:42:19 712-- 3 3 COAL -- Harita Para6/26/2012 00:36:23 6/26/2012 00:42:22 113 3 3 COAL -- Harita Para6/26/2012 01:07:17 6/26/2012 01:11:53 115 3 3 COAL -- Harita Para

6/26/2012 01:21:20 6/26/2012 01:25:04 705-- 3 3 COAL -- Harita Para

6/26/2012 01:33:50 6/26/2012 01:38:36 701-- 3 3 COAL -- Harita Para6/26/2012 01:39:46 6/26/2012 01:43:50 713-- 3 3 COAL -- Harita Para6/26/2012 01:52:25 6/26/2012 01:57:56 707-- 3 3 COAL -- Harita Para6/26/2012 01:55:50 6/26/2012 01:57:59 706-- 3 3 COAL -- Harita Para6/26/2012 01:57:16 6/26/2012 01:59:24 702-- 3 3 COAL -- Harita Para6/26/2012 02:09:20 6/26/2012 02:14:37 708-- 3 3 COAL -- Harita Para

6/26/2012 02:44:54 6/26/2012 02:51:20 115 3 3 COAL -- Harita Para6/26/2012 02:45:29 6/26/2012 02:51:24 705-- 3 3 COAL -- Harita Para6/26/2012 02:56:10 6/26/2012 03:01:07 711-- 3 3 COAL -- Harita Para6/26/2012 02:59:01 6/26/2012 03:03:24 113 3 3 COAL -- Harita Para6/26/2012 03:12:42 6/26/2012 03:17:09 709-- 3 3 COAL -- Harita Para6/26/2012 03:14:10 6/26/2012 03:21:25 706-- 3 3 COAL -- Harita Para6/26/2012 03:14:59 6/26/2012 03:23:16 701-- 3 3 COAL -- Harita Para6/26/2012 03:24:50 6/26/2012 03:29:21 713-- 3 3 COAL -- Harita Para6/26/2012 04:03:03 6/26/2012 04:07:29 705-- 3 3 COAL -- Harita Para6/26/2012 07:17:31 6/26/2012 07:21:57 711-- 3 3 COAL -- Harita Para6/26/2012 07:19:52 6/26/2012 07:22:00 707-- 3 3 COAL -- Harita Para

6/26/2012 07:20:10 6/26/2012 07:22:03 705-- 3 3 COAL -- Harita Para6/26/2012 07:22:56 6/26/2012 07:24:44 713-- 3 3 COAL -- Harita Para

6/26/2012 07:23:54 6/26/2012 07:24:48 709-- 3 3 COAL -- Harita Para6/26/2012 07:27:52 6/26/2012 07:41:35 115 3 3 COAL -- Harita Para6/26/2012 07:30:08 6/26/2012 07:41:38 701-- 3 3 COAL -- Harita Para6/26/2012 07:30:44 6/26/2012 07:41:40 710-- 3 3 COAL -- Harita Para6/26/2012 07:31:17 6/26/2012 07:43:10 712-- 3 3 COAL -- Harita Para6/26/2012 07:35:42 6/26/2012 07:43:13 714-- 3 3 COAL -- Harita Para6/26/2012 07:40:49 6/26/2012 07:43:15 703-- 3 3 COAL -- Harita Para6/26/2012 07:43:54 6/26/2012 07:45:18 706-- 3 3 COAL -- Harita Para6/26/2012 00:03:42 6/26/2012 00:08:07 817 3 3 COAL -- MIL6/26/2012 00:09:41 6/26/2012 00:18:21 815 3 3 COAL -- MIL6/26/2012 00:10:08 6/26/2012 00:23:48 855 3 3 COAL -- MIL6/26/2012 00:22:35 6/26/2012 00:29:10 839 3 3 COAL -- MIL6/26/2012 00:24:50 6/26/2012 00:29:14 836 3 3 COAL -- MIL6/26/2012 00:27:00 6/26/2012 00:34:35 818 3 3 COAL -- MIL

Page 345: June Per Shift (Truckscale Port)

6/26/2012 00:39:53 6/26/2012 00:44:12 837 3 3 COAL -- MIL6/26/2012 00:52:08 6/26/2012 00:57:03 853 3 3 COAL -- MIL6/26/2012 00:55:23 6/26/2012 00:58:47 830 3 3 COAL -- MIL6/26/2012 00:58:05 6/26/2012 01:02:58 811 3 3 COAL -- MIL6/26/2012 01:02:14 6/26/2012 01:08:34 809 3 3 COAL -- MIL6/26/2012 01:16:09 6/26/2012 01:23:18 852 3 3 COAL -- MIL6/26/2012 02:00:36 6/26/2012 02:03:56 856 3 3 COAL -- MIL6/26/2012 02:05:21 6/26/2012 02:10:01 839 3 3 COAL -- MIL

6/26/2012 02:13:48 6/26/2012 02:17:59 817 3 3 COAL -- MIL6/26/2012 02:22:20 6/26/2012 02:27:04 837 3 3 COAL -- MIL6/26/2012 02:23:04 6/26/2012 02:27:10 830 3 3 COAL -- MIL6/26/2012 02:31:58 6/26/2012 02:36:00 818 3 3 COAL -- MIL6/26/2012 02:44:10 6/26/2012 02:50:19 855 3 3 COAL -- MIL6/26/2012 02:55:46 6/26/2012 03:00:27 809 3 3 COAL -- MIL6/26/2012 02:58:34 6/26/2012 03:03:11 836 3 3 COAL -- MIL6/26/2012 03:13:42 6/26/2012 03:19:20 812 3 3 COAL -- MIL6/26/2012 03:31:03 6/26/2012 03:35:43 815 3 3 COAL -- MIL6/26/2012 04:06:38 6/26/2012 04:10:17 830 3 3 COAL -- MIL6/26/2012 08:30:50 6/26/2012 08:34:53 113 1 1 COAL -- Harita Para6/26/2012 08:38:11 6/26/2012 08:43:43 705-- 1 1 COAL -- Harita Para6/26/2012 08:46:35 6/26/2012 09:00:47 707-- 1 1 COAL -- Harita Para6/26/2012 08:58:47 6/26/2012 09:04:22 713-- 1 1 COAL -- Harita Para6/26/2012 09:06:59 6/26/2012 09:11:50 709-- 1 1 COAL -- Harita Para6/26/2012 09:10:18 6/26/2012 09:16:33 115 1 1 COAL -- Harita Para6/26/2012 09:13:33 6/26/2012 09:18:20 710-- 1 1 COAL -- Harita Para6/26/2012 09:15:18 6/26/2012 09:20:13 711-- 1 1 COAL -- Harita Para6/26/2012 09:15:41 6/26/2012 09:22:14 702-- 1 1 COAL -- Harita Para6/26/2012 09:19:37 6/26/2012 09:26:24 701-- 1 1 COAL -- Harita Para6/26/2012 09:25:43 6/26/2012 09:29:43 714-- 1 1 COAL -- Harita Para

6/26/2012 09:27:49 6/26/2012 09:32:17 703-- 1 1 COAL -- Harita Para6/26/2012 09:31:34 6/26/2012 09:35:37 706-- 1 1 COAL -- Harita Para6/26/2012 09:44:02 6/26/2012 09:48:12 712-- 1 1 COAL -- Harita Para6/26/2012 10:00:53 6/26/2012 10:04:41 113 1 1 COAL -- Harita Para6/26/2012 10:01:14 6/26/2012 10:09:18 705-- 1 1 COAL -- Harita Para6/26/2012 10:23:28 6/26/2012 10:29:38 707-- 1 1 COAL -- Harita Para6/26/2012 10:33:19 6/26/2012 10:38:42 709-- 1 1 COAL -- Harita Para6/26/2012 10:43:38 6/26/2012 10:47:14 711-- 1 1 COAL -- Harita Para6/26/2012 10:44:39 6/26/2012 10:49:00 115 1 1 COAL -- Harita Para

6/26/2012 10:53:10 6/26/2012 10:59:21 701-- 1 1 COAL -- Harita Para6/26/2012 10:55:02 6/26/2012 11:01:24 702-- 1 1 COAL -- Harita Para6/26/2012 11:00:52 6/26/2012 11:05:12 714-- 1 1 COAL -- Harita Para6/26/2012 11:11:19 6/26/2012 11:15:40 703-- 1 1 COAL -- Harita Para6/26/2012 11:16:25 6/26/2012 11:22:38 706-- 1 1 COAL -- Harita Para6/26/2012 11:21:25 6/26/2012 11:26:41 712-- 1 1 COAL -- Harita Para6/26/2012 11:35:27 6/26/2012 11:39:19 113 1 1 COAL -- Harita Para6/26/2012 11:35:59 6/26/2012 11:41:18 705-- 1 1 COAL -- Harita Para6/26/2012 11:50:01 6/26/2012 11:54:20 707-- 1 1 COAL -- Harita Para6/26/2012 11:56:52 6/26/2012 12:02:19 709-- 1 1 COAL -- Harita Para6/26/2012 11:59:56 6/26/2012 12:16:27 708-- 1 1 COAL -- Harita Para

Page 346: June Per Shift (Truckscale Port)

6/26/2012 12:10:36 6/26/2012 12:16:21 704-- 1 1 COAL -- Harita Para6/26/2012 12:18:30 6/26/2012 12:24:51 115 1 1 COAL -- Harita Para6/26/2012 12:56:42 6/26/2012 13:01:03 712-- 1 1 COAL -- Harita Para6/26/2012 13:04:11 6/26/2012 13:12:12 701-- 1 1 COAL -- Harita Para6/26/2012 13:04:27 6/26/2012 13:12:09 702-- 1 1 COAL -- Harita Para6/26/2012 13:06:08 6/26/2012 13:15:55 714-- 1 1 COAL -- Harita Para6/26/2012 13:13:13 6/26/2012 13:26:41 711-- 1 1 COAL -- Harita Para6/26/2012 13:21:03 6/26/2012 13:30:55 703-- 1 1 COAL -- Harita Para6/26/2012 13:25:48 6/26/2012 13:56:53 707-- 1 1 COAL -- Harita Para6/26/2012 13:26:08 6/26/2012 13:47:12 705-- 1 1 COAL -- Harita Para6/26/2012 13:36:21 6/26/2012 13:47:17 113 1 1 COAL -- Harita Para6/26/2012 13:52:54 6/26/2012 13:54:09 706-- 1 1 COAL -- Harita Para6/26/2012 13:53:24 6/26/2012 13:56:56 704-- 1 1 COAL -- Harita Para6/26/2012 14:07:04 6/26/2012 14:10:56 709-- 1 1 COAL -- Harita Para6/26/2012 14:24:03 6/26/2012 14:28:08 708-- 1 1 COAL -- Harita Para6/26/2012 14:29:38 6/26/2012 14:33:31 702-- 1 1 COAL -- Harita Para6/26/2012 14:42:27 6/26/2012 14:47:59 701-- 1 1 COAL -- Harita Para6/26/2012 14:45:19 6/26/2012 14:54:48 714-- 1 1 COAL -- Harita Para6/26/2012 14:51:26 6/26/2012 14:57:16 712-- 1 1 COAL -- Harita Para6/26/2012 14:52:37 6/26/2012 14:57:20 711-- 1 1 COAL -- Harita Para6/26/2012 15:16:43 6/26/2012 15:22:42 704-- 1 1 COAL -- Harita Para6/26/2012 15:21:29 6/26/2012 15:29:35 703-- 1 1 COAL -- Harita Para6/26/2012 15:28:21 6/26/2012 15:37:08 709-- 1 1 COAL -- Harita Para6/26/2012 15:39:10 6/26/2012 15:50:29 706-- 1 1 COAL -- Harita Para6/26/2012 15:51:08 6/26/2012 15:52:39 708-- 1 1 COAL -- Harita Para6/26/2012 08:42:09 6/26/2012 08:48:34 855 1 1 COAL -- MIL6/26/2012 08:42:44 6/26/2012 08:49:37 812 1 1 COAL -- MIL6/26/2012 08:44:36 6/26/2012 08:53:30 852 1 1 COAL -- MIL6/26/2012 08:45:47 6/26/2012 08:53:08 817 1 1 COAL -- MIL6/26/2012 08:46:08 6/26/2012 08:54:58 815 1 1 COAL -- MIL

6/26/2012 08:47:02 6/26/2012 09:03:54 853 1 1 COAL -- MIL6/26/2012 09:02:52 6/26/2012 09:06:25 839 1 1 COAL -- MIL6/26/2012 09:44:27 6/26/2012 09:49:50 856 1 1 COAL -- MIL6/26/2012 10:06:31 6/26/2012 10:10:58 868 1 1 COAL -- MIL6/26/2012 10:21:12 6/26/2012 10:27:01 855 1 1 COAL -- MIL

6/26/2012 10:21:43 6/26/2012 10:28:00 812 1 1 COAL -- MIL6/26/2012 10:31:59 6/26/2012 10:37:08 852 1 1 COAL -- MIL6/26/2012 10:33:49 6/26/2012 10:40:21 832 1 1 COAL -- MIL6/26/2012 10:37:57 6/26/2012 10:42:59 817 1 1 COAL -- MIL6/26/2012 10:52:00 6/26/2012 10:57:27 853 1 1 COAL -- MIL6/26/2012 10:58:32 6/26/2012 11:03:04 837 1 1 COAL -- MIL6/26/2012 11:21:48 6/26/2012 11:27:12 856 1 1 COAL -- MIL6/26/2012 11:43:08 6/26/2012 11:46:45 868 1 1 COAL -- MIL6/26/2012 11:53:10 6/26/2012 11:58:32 855 1 1 COAL -- MIL6/26/2012 11:53:40 6/26/2012 12:00:28 812 1 1 COAL -- MIL6/26/2012 12:09:33 6/26/2012 12:19:11 852 1 1 COAL -- MIL6/26/2012 12:24:15 6/26/2012 12:29:35 839 1 1 COAL -- MIL6/26/2012 12:49:03 6/26/2012 12:52:18 837 1 1 COAL -- MIL

6/26/2012 12:58:46 6/26/2012 13:06:48 851 1 1 COAL -- MIL

Page 347: June Per Shift (Truckscale Port)

6/26/2012 12:59:09 6/26/2012 13:08:40 817 1 1 COAL -- MIL6/26/2012 13:05:42 6/26/2012 13:14:16 832 1 1 COAL -- MIL6/26/2012 13:07:34 6/26/2012 13:21:46 836 1 1 COAL -- MIL6/26/2012 13:07:57 6/26/2012 13:17:20 810 1 1 COAL -- MIL6/26/2012 13:19:56 6/26/2012 13:28:18 830 1 1 COAL -- MIL6/26/2012 13:29:50 6/26/2012 13:49:30 868 1 1 COAL -- MIL6/26/2012 13:33:12 6/26/2012 13:52:00 853 1 1 COAL -- MIL6/26/2012 13:57:48 6/26/2012 14:01:07 839 1 1 COAL -- MIL6/26/2012 14:29:07 6/26/2012 14:34:32 852 1 1 COAL -- MIL6/26/2012 14:39:13 6/26/2012 14:45:56 851 1 1 COAL -- MIL6/26/2012 14:44:41 6/26/2012 14:49:12 856 1 1 COAL -- MIL6/26/2012 15:07:33 6/26/2012 15:14:10 855 1 1 COAL -- MIL6/26/2012 15:11:49 6/26/2012 15:19:47 868 1 1 COAL -- MIL6/26/2012 15:13:17 6/26/2012 15:19:11 812 1 1 COAL -- MIL6/26/2012 15:20:37 6/26/2012 15:24:25 832 1 1 COAL -- MIL6/26/2012 15:20:53 6/26/2012 15:34:13 853 1 1 COAL -- MIL6/26/2012 15:21:48 6/26/2012 15:31:03 839 1 1 COAL -- MIL6/26/2012 15:27:58 6/26/2012 15:33:04 850 1 1 COAL -- MIL6/26/2012 15:38:03 6/26/2012 15:47:25 810 1 1 COAL -- MIL6/26/2012 15:49:52 6/26/2012 15:53:37 837 1 1 COAL -- MIL6/26/2012 16:05:42 6/26/2012 16:09:43 115 2 2 COAL -- Harita Para6/26/2012 18:13:27 6/26/2012 18:17:22 714-- 2 2 COAL -- Harita Para

6/26/2012 18:18:55 6/26/2012 18:22:23 706-- 2 2 COAL -- Harita Para6/26/2012 18:23:49 6/26/2012 18:28:01 708-- 2 2 COAL -- Harita Para6/26/2012 18:24:19 6/26/2012 18:29:54 709-- 2 2 COAL -- Harita Para6/26/2012 18:24:37 6/26/2012 18:31:50 701-- 2 2 COAL -- Harita Para6/26/2012 18:35:24 6/26/2012 18:39:26 113 2 2 COAL -- Harita Para6/26/2012 18:37:09 6/26/2012 18:41:08 707-- 2 2 COAL -- Harita Para6/26/2012 18:44:52 6/26/2012 18:49:41 115 2 2 COAL -- Harita Para6/26/2012 18:45:23 6/26/2012 18:51:15 702-- 2 2 COAL -- Harita Para6/26/2012 18:45:53 6/26/2012 18:53:53 704-- 2 2 COAL -- Harita Para6/26/2012 18:46:13 6/26/2012 18:57:59 711-- 2 2 COAL -- Harita Para6/26/2012 18:48:49 6/26/2012 19:00:53 703-- 2 2 COAL -- Harita Para6/26/2012 19:07:53 6/26/2012 19:11:55 713-- 2 2 COAL -- Harita Para6/26/2012 19:33:42 6/26/2012 19:39:48 714-- 2 2 COAL -- Harita Para6/26/2012 19:52:00 6/26/2012 19:57:01 708-- 2 2 COAL -- Harita Para6/26/2012 19:57:57 6/26/2012 20:04:53 709-- 2 2 COAL -- Harita Para6/26/2012 19:59:21 6/26/2012 20:06:35 701-- 2 2 COAL -- Harita Para6/26/2012 20:03:10 6/26/2012 20:10:58 113 2 2 COAL -- Harita Para6/26/2012 20:04:13 6/26/2012 20:11:00 706-- 2 2 COAL -- Harita Para6/26/2012 20:09:15 6/26/2012 20:12:11 707-- 2 2 COAL -- Harita Para6/26/2012 20:11:35 6/26/2012 20:12:14 115 2 2 COAL -- Harita Para6/26/2012 20:19:45 6/26/2012 20:23:37 711-- 2 2 COAL -- Harita Para6/26/2012 20:29:16 6/26/2012 20:35:17 704-- 2 2 COAL -- Harita Para6/26/2012 20:33:46 6/26/2012 20:35:23 702-- 2 2 COAL -- Harita Para6/26/2012 20:34:34 6/26/2012 20:37:40 713-- 2 2 COAL -- Harita Para6/26/2012 20:42:06 6/26/2012 20:47:13 703-- 2 2 COAL -- Harita Para

6/26/2012 21:24:44 6/26/2012 21:32:43 714-- 2 2 COAL -- Harita Para

6/26/2012 21:27:10 6/26/2012 21:32:46 708-- 2 2 COAL -- Harita Para

Page 348: June Per Shift (Truckscale Port)

6/26/2012 21:29:29 6/26/2012 21:36:11 709-- 2 2 COAL -- Harita Para6/26/2012 21:34:13 6/26/2012 21:37:28 701-- 2 2 COAL -- Harita Para6/26/2012 21:38:06 6/26/2012 21:46:54 707-- 2 2 COAL -- Harita Para6/26/2012 21:38:28 6/26/2012 21:49:02 706-- 2 2 COAL -- Harita Para6/26/2012 21:38:52 6/26/2012 21:49:06 115 2 2 COAL -- Harita Para6/26/2012 21:45:42 6/26/2012 21:56:55 113 2 2 COAL -- Harita Para6/26/2012 21:48:17 6/26/2012 21:56:58 705-- 2 2 COAL -- Harita Para6/26/2012 21:52:53 6/26/2012 21:59:11 711-- 2 2 COAL -- Harita Para6/26/2012 22:01:29 6/26/2012 22:05:50 704-- 2 2 COAL -- Harita Para6/26/2012 22:02:06 6/26/2012 22:08:03 713-- 2 2 COAL -- Harita Para6/26/2012 23:07:47 6/26/2012 23:12:51 708-- 2 2 COAL -- Harita Para6/26/2012 23:08:43 6/26/2012 23:12:53 701-- 2 2 COAL -- Harita Para6/26/2012 23:09:12 6/26/2012 23:14:40 702-- 2 2 COAL -- Harita Para6/26/2012 23:12:05 6/26/2012 23:16:19 709-- 2 2 COAL -- Harita Para6/26/2012 23:13:38 6/26/2012 23:16:21 707-- 2 2 COAL -- Harita Para6/26/2012 23:22:24 6/26/2012 23:23:16 115 2 2 COAL -- Harita Para6/26/2012 23:26:40 6/26/2012 23:27:40 711-- 2 2 COAL -- Harita Para6/26/2012 23:28:54 6/26/2012 23:31:38 113 2 2 COAL -- Harita Para6/26/2012 23:39:46 6/26/2012 23:42:02 705-- 2 2 COAL -- Harita Para6/26/2012 23:47:35 6/27/2012 00:03:13 710-- 2 3 COAL -- Harita Para6/26/2012 23:48:01 6/27/2012 00:03:16 713-- 2 3 COAL -- Harita Para6/26/2012 16:00:21 6/26/2012 16:05:02 836 2 2 COAL -- MIL6/26/2012 16:01:07 6/26/2012 16:08:14 851 2 2 COAL -- MIL6/26/2012 16:13:05 6/26/2012 16:16:13 856 2 2 COAL -- MIL6/26/2012 19:12:52 6/26/2012 19:16:22 830 2 2 COAL -- MIL6/26/2012 19:27:58 6/26/2012 19:31:52 837 2 2 COAL -- MIL6/26/2012 19:32:33 6/26/2012 19:39:11 852 2 2 COAL -- MIL6/26/2012 19:35:04 6/26/2012 19:43:00 855 2 2 COAL -- MIL6/26/2012 19:37:28 6/26/2012 19:44:16 853 2 2 COAL -- MIL6/26/2012 19:38:10 6/26/2012 19:45:13 856 2 2 COAL -- MIL6/26/2012 19:58:53 6/26/2012 20:05:14 836 2 2 COAL -- MIL6/26/2012 20:02:41 6/26/2012 20:08:38 818 2 2 COAL -- MIL6/26/2012 20:25:17 6/26/2012 20:30:16 850 2 2 COAL -- MIL6/26/2012 20:26:54 6/26/2012 20:31:42 819 2 2 COAL -- MIL6/26/2012 20:53:43 6/26/2012 20:58:14 810 2 2 COAL -- MIL6/26/2012 21:04:14 6/26/2012 21:07:42 830 2 2 COAL -- MIL6/26/2012 21:04:34 6/26/2012 21:09:50 868 2 2 COAL -- MIL6/26/2012 21:12:37 6/26/2012 21:16:39 812 2 2 COAL -- MIL6/26/2012 21:23:42 6/26/2012 21:30:38 852 2 2 COAL -- MIL6/26/2012 21:23:58 6/26/2012 21:28:49 839 2 2 COAL -- MIL6/26/2012 21:35:04 6/26/2012 21:46:49 837 2 2 COAL -- MIL6/26/2012 21:35:26 6/26/2012 21:46:26 855 2 2 COAL -- MIL6/26/2012 21:42:21 6/26/2012 21:53:44 818 2 2 COAL -- MIL6/26/2012 21:45:19 6/26/2012 21:54:39 856 2 2 COAL -- MIL6/26/2012 21:58:23 6/26/2012 22:04:42 853 2 2 COAL -- MIL6/26/2012 22:03:31 6/26/2012 22:10:58 836 2 2 COAL -- MIL6/26/2012 22:04:06 6/26/2012 22:11:01 850 2 2 COAL -- MIL6/26/2012 22:16:14 6/26/2012 22:20:49 819 2 2 COAL -- MIL6/26/2012 22:41:00 6/26/2012 22:44:40 830 2 2 COAL -- MIL6/26/2012 22:45:34 6/26/2012 22:50:10 810 2 2 COAL -- MIL

Page 349: June Per Shift (Truckscale Port)

6/26/2012 22:49:26 6/26/2012 22:53:34 868 2 2 COAL -- MIL

6/26/2012 22:58:38 6/26/2012 23:03:01 812 2 2 COAL -- MIL6/26/2012 23:26:22 6/26/2012 23:42:32 852 2 2 COAL -- MIL6/26/2012 23:40:24 6/26/2012 23:42:07 839 2 2 COAL -- MIL6/26/2012 23:44:17 6/27/2012 00:00:15 855 2 3 COAL -- MIL6/26/2012 23:50:24 6/27/2012 00:04:40 856 2 3 COAL -- MIL6/27/2012 00:10:47 6/27/2012 00:17:05 703-- 3 3 COAL -- Harita Para6/27/2012 00:38:12 6/27/2012 00:42:37 714-- 3 3 COAL -- Harita Para6/27/2012 00:38:31 6/27/2012 00:42:39 706-- 3 3 COAL -- Harita Para

6/27/2012 01:03:55 6/27/2012 01:10:33 709-- 3 3 COAL -- Harita Para6/27/2012 01:08:39 6/27/2012 01:13:32 707-- 3 3 COAL -- Harita Para6/27/2012 01:09:04 6/27/2012 01:13:38 701-- 3 3 COAL -- Harita Para6/27/2012 01:09:46 6/27/2012 01:16:52 708-- 3 3 COAL -- Harita Para6/27/2012 01:14:57 6/27/2012 01:20:12 115 3 3 COAL -- Harita Para6/27/2012 01:17:32 6/27/2012 01:20:16 711-- 3 3 COAL -- Harita Para6/27/2012 01:26:43 6/27/2012 01:30:50 713-- 3 3 COAL -- Harita Para

6/27/2012 01:33:32 6/27/2012 01:39:03 710-- 3 3 COAL -- Harita Para6/27/2012 02:14:42 6/27/2012 02:18:00 714-- 3 3 COAL -- Harita Para6/27/2012 02:15:06 6/27/2012 02:18:36 706-- 3 3 COAL -- Harita Para6/27/2012 02:40:32 6/27/2012 02:47:46 709-- 3 3 COAL -- Harita Para6/27/2012 02:46:04 6/27/2012 02:50:43 708-- 3 3 COAL -- Harita Para6/27/2012 02:48:51 6/27/2012 02:52:33 703-- 3 3 COAL -- Harita Para6/27/2012 02:51:50 6/27/2012 02:56:20 702-- 3 3 COAL -- Harita Para6/27/2012 02:55:22 6/27/2012 02:57:56 115 3 3 COAL -- Harita Para6/27/2012 02:57:05 6/27/2012 02:59:55 707-- 3 3 COAL -- Harita Para6/27/2012 03:04:59 6/27/2012 03:11:13 713-- 3 3 COAL -- Harita Para6/27/2012 03:05:38 6/27/2012 03:11:16 113 3 3 COAL -- Harita Para6/27/2012 04:01:36 6/27/2012 04:06:22 714-- 3 3 COAL -- Harita Para6/27/2012 04:02:15 6/27/2012 04:06:13 706-- 3 3 COAL -- Harita Para6/27/2012 07:19:57 6/27/2012 07:23:43 702-- 3 3 COAL -- Harita Para6/27/2012 07:23:07 6/27/2012 07:26:42 707-- 3 3 COAL -- Harita Para6/27/2012 07:24:27 6/27/2012 07:28:23 713-- 3 3 COAL -- Harita Para6/27/2012 07:27:27 6/27/2012 07:32:34 709-- 3 3 COAL -- Harita Para6/27/2012 07:37:20 6/27/2012 07:42:02 703-- 3 3 COAL -- Harita Para6/27/2012 07:44:11 6/27/2012 07:48:56 701-- 3 3 COAL -- Harita Para6/27/2012 07:45:16 6/27/2012 07:49:05 706-- 3 3 COAL -- Harita Para6/27/2012 07:46:34 6/27/2012 07:53:17 710-- 3 3 COAL -- Harita Para6/27/2012 07:47:15 6/27/2012 07:53:38 115 3 3 COAL -- Harita Para6/27/2012 07:50:39 6/27/2012 07:57:10 113 3 3 COAL -- Harita Para6/27/2012 07:55:48 6/27/2012 07:57:18 714-- 3 3 COAL -- Harita Para6/27/2012 00:02:27 6/27/2012 00:03:46 850 3 3 COAL -- MIL6/27/2012 00:07:57 6/27/2012 00:12:32 819 3 3 COAL -- MIL6/27/2012 00:10:25 6/27/2012 00:14:48 853 3 3 COAL -- MIL6/27/2012 00:36:04 6/27/2012 00:39:58 830 3 3 COAL -- MIL6/27/2012 00:40:53 6/27/2012 00:45:03 868 3 3 COAL -- MIL6/27/2012 01:01:12 6/27/2012 01:05:34 810 3 3 COAL -- MIL6/27/2012 01:11:46 6/27/2012 01:18:29 837 3 3 COAL -- MIL6/27/2012 02:11:49 6/27/2012 02:16:26 819 3 3 COAL -- MIL6/27/2012 02:12:45 6/27/2012 02:16:40 830 3 3 COAL -- MIL

Page 350: June Per Shift (Truckscale Port)

6/27/2012 02:27:10 6/27/2012 02:31:17 812 3 3 COAL -- MIL6/27/2012 02:27:48 6/27/2012 02:36:48 852 3 3 COAL -- MIL6/27/2012 02:35:00 6/27/2012 02:36:52 853 3 3 COAL -- MIL6/27/2012 02:46:28 6/27/2012 02:50:47 850 3 3 COAL -- MIL

6/27/2012 02:46:55 6/27/2012 02:53:56 868 3 3 COAL -- MIL6/27/2012 03:01:16 6/27/2012 03:03:18 837 3 3 COAL -- MIL

6/27/2012 03:04:38 6/27/2012 03:08:38 810 3 3 COAL -- MIL6/27/2012 03:10:24 6/27/2012 03:15:08 856 3 3 COAL -- MIL6/27/2012 03:30:58 6/27/2012 03:36:29 855 3 3 COAL -- MIL6/27/2012 03:49:17 6/27/2012 03:53:13 830 3 3 COAL -- MIL6/27/2012 04:05:32 6/27/2012 04:10:01 812 3 3 COAL -- MIL6/27/2012 07:50:10 6/27/2012 07:55:06 856 3 3 COAL -- MIL6/27/2012 07:54:32 6/27/2012 08:00:47 852 3 1 COAL -- MIL6/27/2012 07:56:35 6/27/2012 08:04:19 855 3 1 COAL -- MIL6/27/2012 07:58:26 6/27/2012 08:04:23 853 3 1 COAL -- MIL6/27/2012 07:58:54 6/27/2012 08:05:02 850 3 1 COAL -- MIL6/27/2012 07:59:27 6/27/2012 08:09:23 812 3 1 COAL -- MIL6/27/2012 08:42:33 6/27/2012 08:46:03 707-- 1 1 COAL -- Harita Para6/27/2012 08:49:26 6/27/2012 08:53:23 702 1 1 COAL -- Harita Para6/27/2012 08:54:42 6/27/2012 08:58:31 708-- 1 1 COAL -- Harita Para6/27/2012 09:02:16 6/27/2012 09:06:46 703-- 1 1 COAL -- Harita Para6/27/2012 09:08:07 6/27/2012 09:12:55 711-- 1 1 COAL -- Harita Para6/27/2012 09:11:19 6/27/2012 09:15:46 701-- 1 1 COAL -- Harita Para6/27/2012 09:19:05 6/27/2012 09:25:18 709-- 1 1 COAL -- Harita Para6/27/2012 09:22:50 6/27/2012 09:29:10 706-- 1 1 COAL -- Harita Para6/27/2012 09:31:22 6/27/2012 09:36:24 710-- 1 1 COAL -- Harita Para6/27/2012 09:31:38 6/27/2012 09:36:54 713-- 1 1 COAL -- Harita Para6/27/2012 09:32:49 6/27/2012 09:40:45 113 1 1 COAL -- Harita Para6/27/2012 09:42:07 6/27/2012 10:02:36 714-- 1 1 COAL -- Harita Para6/27/2012 09:48:46 6/27/2012 10:04:07 115 1 1 COAL -- Harita Para6/27/2012 10:01:19 6/27/2012 10:12:08 707-- 1 1 COAL -- Harita Para6/27/2012 10:09:32 6/27/2012 10:14:45 702-- 1 1 COAL -- Harita Para6/27/2012 10:23:14 6/27/2012 10:26:46 708-- 1 1 COAL -- Harita Para6/27/2012 10:26:11 6/27/2012 10:30:15 703-- 1 1 COAL -- Harita Para6/27/2012 10:32:25 6/27/2012 10:36:39 701-- 1 1 COAL -- Harita Para6/27/2012 10:39:03 6/27/2012 10:52:49 711-- 1 1 COAL -- Harita Para6/27/2012 10:51:17 6/27/2012 10:57:06 706-- 1 1 COAL -- Harita Para6/27/2012 10:51:55 6/27/2012 10:59:04 709-- 1 1 COAL -- Harita Para6/27/2012 11:02:19 6/27/2012 11:08:42 713-- 1 1 COAL -- Harita Para6/27/2012 11:08:02 6/27/2012 11:12:04 113 1 1 COAL -- Harita Para6/27/2012 11:16:46 6/27/2012 11:20:18 710-- 1 1 COAL -- Harita Para6/27/2012 11:27:42 6/27/2012 11:34:11 714-- 1 1 COAL -- Harita Para6/27/2012 11:28:08 6/27/2012 11:35:11 707-- 1 1 COAL -- Harita Para6/27/2012 11:33:26 6/27/2012 11:40:40 702-- 1 1 COAL -- Harita Para6/27/2012 11:38:45 6/27/2012 11:42:54 115 1 1 COAL -- Harita Para6/27/2012 11:47:33 6/27/2012 11:51:12 708-- 1 1 COAL -- Harita Para6/27/2012 11:51:46 6/27/2012 11:56:24 703-- 1 1 COAL -- Harita Para6/27/2012 11:54:18 6/27/2012 11:59:09 701-- 1 1 COAL -- Harita Para6/27/2012 12:20:02 6/27/2012 12:25:05 711-- 1 1 COAL -- Harita Para

Page 351: June Per Shift (Truckscale Port)

6/27/2012 12:23:47 6/27/2012 12:32:42 709-- 1 1 COAL -- Harita Para6/27/2012 12:31:07 6/27/2012 12:37:09 706-- 1 1 COAL -- Harita Para6/27/2012 12:33:43 6/27/2012 12:39:29 113 1 1 COAL -- Harita Para6/27/2012 12:50:29 6/27/2012 12:54:10 707-- 1 1 COAL -- Harita Para6/27/2012 13:01:37 6/27/2012 13:07:54 713-- 1 1 COAL -- Harita Para6/27/2012 13:12:28 6/27/2012 13:19:25 714-- 1 1 COAL -- Harita Para

6/27/2012 13:12:48 6/27/2012 13:19:27 115 1 1 COAL -- Harita Para6/27/2012 13:25:19 6/27/2012 13:29:32 710-- 1 1 COAL -- Harita Para

6/27/2012 13:35:04 6/27/2012 13:38:57 702-- 1 1 COAL -- Harita Para6/27/2012 13:37:30 6/27/2012 13:41:09 708-- 1 1 COAL -- Harita Para6/27/2012 13:43:51 6/27/2012 13:48:44 701-- 1 1 COAL -- Harita Para6/27/2012 13:52:39 6/27/2012 13:57:27 703-- 1 1 COAL -- Harita Para6/27/2012 14:05:12 6/27/2012 14:09:04 706-- 1 1 COAL -- Harita Para6/27/2012 14:05:32 6/27/2012 14:10:53 711-- 1 1 COAL -- Harita Para6/27/2012 14:18:32 6/27/2012 14:22:45 113 1 1 COAL -- Harita Para6/27/2012 14:29:11 6/27/2012 14:33:29 707-- 1 1 COAL -- Harita Para6/27/2012 14:32:08 6/27/2012 14:36:25 713-- 1 1 COAL -- Harita Para6/27/2012 14:50:45 6/27/2012 14:55:12 115 1 1 COAL -- Harita Para6/27/2012 14:52:25 6/27/2012 15:00:04 714-- 1 1 COAL -- Harita Para6/27/2012 14:52:50 6/27/2012 15:01:55 702-- 1 1 COAL -- Harita Para6/27/2012 14:57:44 6/27/2012 15:04:58 709-- 1 1 COAL -- Harita Para6/27/2012 15:06:05 6/27/2012 15:11:23 710-- 1 1 COAL -- Harita Para6/27/2012 15:09:27 6/27/2012 15:15:21 701-- 1 1 COAL -- Harita Para6/27/2012 15:15:58 6/27/2012 15:22:52 708-- 1 1 COAL -- Harita Para6/27/2012 15:18:40 6/27/2012 15:25:33 703-- 1 1 COAL -- Harita Para6/27/2012 15:31:54 6/27/2012 15:39:04 706-- 1 1 COAL -- Harita Para6/27/2012 15:40:39 6/27/2012 15:46:03 711-- 1 1 COAL -- Harita Para6/27/2012 15:52:51 6/27/2012 15:57:32 113 1 1 COAL -- Harita Para6/27/2012 08:20:23 6/27/2012 08:25:02 810 1 1 COAL -- MIL6/27/2012 08:49:14 6/27/2012 08:53:19 837 1 1 COAL -- MIL6/27/2012 09:07:31 6/27/2012 09:21:35 851 1 1 COAL -- MIL6/27/2012 09:18:16 6/27/2012 09:21:38 856 1 1 COAL -- MIL6/27/2012 09:33:53 6/27/2012 09:43:00 855 1 1 COAL -- MIL6/27/2012 09:35:31 6/27/2012 09:43:28 852 1 1 COAL -- MIL6/27/2012 09:37:32 6/27/2012 09:44:12 868 1 1 COAL -- MIL6/27/2012 09:39:38 6/27/2012 09:44:49 850 1 1 COAL -- MIL6/27/2012 09:52:55 6/27/2012 10:07:11 830 1 1 COAL -- MIL6/27/2012 09:53:20 6/27/2012 10:07:49 853 1 1 COAL -- MIL

6/27/2012 10:00:38 6/27/2012 10:11:45 812 1 1 COAL -- MIL6/27/2012 10:03:22 6/27/2012 10:14:18 810 1 1 COAL -- MIL6/27/2012 10:10:46 6/27/2012 10:16:35 819 1 1 COAL -- MIL6/27/2012 10:55:05 6/27/2012 11:00:43 856 1 1 COAL -- MIL6/27/2012 11:01:46 6/27/2012 11:06:18 811 1 1 COAL -- MIL6/27/2012 11:14:14 6/27/2012 11:19:49 852 1 1 COAL -- MIL6/27/2012 11:27:07 6/27/2012 11:30:50 850 1 1 COAL -- MIL6/27/2012 11:32:38 6/27/2012 11:37:06 837 1 1 COAL -- MIL6/27/2012 11:33:05 6/27/2012 11:40:14 810 1 1 COAL -- MIL6/27/2012 11:42:17 6/27/2012 11:46:58 812 1 1 COAL -- MIL6/27/2012 11:47:57 6/27/2012 11:55:00 853 1 1 COAL -- MIL

Page 352: June Per Shift (Truckscale Port)

6/27/2012 12:00:24 6/27/2012 12:04:41 830 1 1 COAL -- MIL6/27/2012 12:03:13 6/27/2012 12:08:57 855 1 1 COAL -- MIL6/27/2012 12:05:34 6/27/2012 12:09:44 836 1 1 COAL -- MIL6/27/2012 12:06:00 6/27/2012 12:12:22 868 1 1 COAL -- MIL6/27/2012 12:08:24 6/27/2012 12:13:42 819 1 1 COAL -- MIL6/27/2012 12:22:53 6/27/2012 13:02:24 851 1 1 COAL -- MIL6/27/2012 12:30:24 6/27/2012 12:34:48 839 1 1 COAL -- MIL6/27/2012 12:36:27 6/27/2012 12:41:39 818 1 1 COAL -- MIL6/27/2012 12:40:48 6/27/2012 12:47:16 811 1 1 COAL -- MIL6/27/2012 12:48:01 6/27/2012 13:02:22 852 1 1 COAL -- MIL6/27/2012 13:01:11 6/27/2012 13:06:01 817 1 1 COAL -- MIL6/27/2012 13:31:00 6/27/2012 13:35:41 850 1 1 COAL -- MIL6/27/2012 14:13:06 6/27/2012 14:19:11 818 1 1 COAL -- MIL6/27/2012 14:20:50 6/27/2012 14:25:04 868 1 1 COAL -- MIL6/27/2012 14:31:48 6/27/2012 14:42:28 852 1 1 COAL -- MIL6/27/2012 14:34:19 6/27/2012 14:40:10 817 1 1 COAL -- MIL6/27/2012 14:35:29 6/27/2012 14:43:37 810 1 1 COAL -- MIL6/27/2012 14:51:38 6/27/2012 14:58:36 811 1 1 COAL -- MIL6/27/2012 14:59:21 6/27/2012 15:06:53 839 1 1 COAL -- MIL6/27/2012 15:14:34 6/27/2012 15:21:22 812 1 1 COAL -- MIL6/27/2012 15:26:23 6/27/2012 15:30:34 837 1 1 COAL -- MIL6/27/2012 15:28:43 6/27/2012 15:33:26 850 1 1 COAL -- MIL6/27/2012 15:31:29 6/27/2012 15:37:00 853 1 1 COAL -- MIL6/27/2012 15:35:48 6/27/2012 15:41:28 830 1 1 COAL -- MIL6/27/2012 15:36:27 6/27/2012 15:43:07 855 1 1 COAL -- MIL6/27/2012 15:44:50 6/27/2012 15:49:36 819 1 1 COAL -- MIL6/27/2012 16:00:32 6/27/2012 16:04:34 707-- 2 2 COAL -- Harita Para6/27/2012 16:03:49 6/27/2012 16:08:17 713-- 2 2 COAL -- Harita Para6/27/2012 18:19:43 6/27/2012 18:24:35 713-- 2 2 COAL -- Harita Para6/27/2012 18:23:56 6/27/2012 18:27:41 714-- 2 2 COAL -- Harita Para6/27/2012 18:29:01 6/27/2012 18:33:56 710-- 2 2 COAL -- Harita Para6/27/2012 18:30:17 6/27/2012 18:35:10 708-- 2 2 COAL -- Harita Para6/27/2012 18:32:15 6/27/2012 18:37:14 115 2 2 COAL -- Harita Para

6/27/2012 18:32:42 6/27/2012 18:38:32 707-- 2 2 COAL -- Harita Para6/27/2012 18:33:00 6/27/2012 18:39:13 701-- 2 2 COAL -- Harita Para6/27/2012 18:33:23 6/27/2012 18:41:11 113 2 2 COAL -- Harita Para6/27/2012 18:43:36 6/27/2012 18:48:10 706-- 2 2 COAL -- Harita Para

6/27/2012 18:44:12 6/27/2012 18:55:10 709-- 2 2 COAL -- Harita Para6/27/2012 18:51:22 6/27/2012 18:57:15 703-- 2 2 COAL -- Harita Para6/27/2012 18:51:53 6/27/2012 18:58:53 702-- 2 2 COAL -- Harita Para6/27/2012 18:52:15 6/27/2012 19:01:12 711-- 2 2 COAL -- Harita Para6/27/2012 19:14:41 6/27/2012 19:19:11 712-- 2 2 COAL -- Harita Para6/27/2012 19:42:19 6/27/2012 19:46:45 713-- 2 2 COAL -- Harita Para6/27/2012 19:48:02 6/27/2012 19:51:54 714-- 2 2 COAL -- Harita Para6/27/2012 20:00:02 6/27/2012 20:05:22 113 2 2 COAL -- Harita Para6/27/2012 20:02:34 6/27/2012 20:07:27 710-- 2 2 COAL -- Harita Para6/27/2012 20:08:23 6/27/2012 20:16:40 707-- 2 2 COAL -- Harita Para6/27/2012 20:14:53 6/27/2012 20:19:10 708-- 2 2 COAL -- Harita Para6/27/2012 20:15:11 6/27/2012 20:20:25 702-- 2 2 COAL -- Harita Para

Page 353: June Per Shift (Truckscale Port)

6/27/2012 20:31:55 6/27/2012 20:41:16 709-- 2 2 COAL -- Harita Para6/27/2012 20:34:10 6/27/2012 20:47:39 115 2 2 COAL -- Harita Para6/27/2012 20:35:38 6/27/2012 20:49:32 706-- 2 2 COAL -- Harita Para6/27/2012 20:39:10 6/27/2012 20:52:50 711-- 2 2 COAL -- Harita Para6/27/2012 20:52:07 6/27/2012 20:58:04 703-- 2 2 COAL -- Harita Para6/27/2012 20:57:10 6/27/2012 21:02:01 712-- 2 2 COAL -- Harita Para6/27/2012 20:58:41 6/27/2012 21:03:18 713-- 2 2 COAL -- Harita Para6/27/2012 21:19:13 6/27/2012 21:23:34 113 2 2 COAL -- Harita Para6/27/2012 21:32:42 6/27/2012 21:36:34 714-- 2 2 COAL -- Harita Para6/27/2012 21:39:33 6/27/2012 21:42:51 710-- 2 2 COAL -- Harita Para6/27/2012 21:44:22 6/27/2012 21:49:05 702-- 2 2 COAL -- Harita Para6/27/2012 21:47:05 6/27/2012 21:50:42 707-- 2 2 COAL -- Harita Para6/27/2012 21:59:50 6/27/2012 22:05:56 708-- 2 2 COAL -- Harita Para6/27/2012 22:14:36 6/27/2012 22:19:12 115 2 2 COAL -- Harita Para6/27/2012 22:14:55 6/27/2012 22:20:12 713-- 2 2 COAL -- Harita Para6/27/2012 22:15:18 6/27/2012 22:22:45 704-- 2 2 COAL -- Harita Para6/27/2012 22:26:18 6/27/2012 22:30:22 711-- 2 2 COAL -- Harita Para6/27/2012 22:48:04 6/27/2012 22:54:29 709-- 2 2 COAL -- Harita Para6/27/2012 22:48:30 6/27/2012 22:58:32 113 2 2 COAL -- Harita Para6/27/2012 22:53:51 6/27/2012 23:02:07 703-- 2 2 COAL -- Harita Para6/27/2012 23:01:18 6/27/2012 23:05:19 712-- 2 2 COAL -- Harita Para6/27/2012 23:06:59 6/27/2012 23:13:31 710-- 2 2 COAL -- Harita Para6/27/2012 23:11:36 6/27/2012 23:19:08 706-- 2 2 COAL -- Harita Para6/27/2012 23:12:56 6/27/2012 23:23:38 702-- 2 2 COAL -- Harita Para6/27/2012 23:24:28 6/27/2012 23:28:58 701-- 2 2 COAL -- Harita Para6/27/2012 23:24:54 6/27/2012 23:37:25 707-- 2 2 COAL -- Harita Para6/27/2012 23:33:00 6/27/2012 23:37:29 714-- 2 2 COAL -- Harita Para6/27/2012 23:33:21 6/27/2012 23:39:25 713-- 2 2 COAL -- Harita Para6/27/2012 23:51:27 6/27/2012 23:56:17 708-- 2 2 COAL -- Harita Para6/27/2012 23:58:29 6/28/2012 00:02:43 704-- 2 3 COAL -- Harita Para6/27/2012 16:07:26 6/27/2012 16:11:45 868 2 2 COAL -- MIL6/27/2012 16:16:54 6/27/2012 16:20:42 856 2 2 COAL -- MIL6/27/2012 16:22:41 6/27/2012 16:27:08 817 2 2 COAL -- MIL6/27/2012 19:25:52 6/27/2012 19:29:39 850 2 2 COAL -- MIL6/27/2012 19:34:38 6/27/2012 19:38:48 837 2 2 COAL -- MIL6/27/2012 19:35:44 6/27/2012 19:40:52 810 2 2 COAL -- MIL6/27/2012 19:36:32 6/27/2012 19:41:41 819 2 2 COAL -- MIL6/27/2012 19:37:46 6/27/2012 19:47:24 855 2 2 COAL -- MIL6/27/2012 19:39:20 6/27/2012 19:46:10 830 2 2 COAL -- MIL6/27/2012 19:43:09 6/27/2012 19:48:44 868 2 2 COAL -- MIL6/27/2012 19:43:54 6/27/2012 19:49:06 853 2 2 COAL -- MIL6/27/2012 19:44:14 6/27/2012 19:50:28 852 2 2 COAL -- MIL

6/27/2012 19:49:52 6/27/2012 19:54:28 812 2 2 COAL -- MIL6/27/2012 19:56:35 6/27/2012 20:05:02 839 2 2 COAL -- MIL6/27/2012 19:59:38 6/27/2012 20:09:23 818 2 2 COAL -- MIL6/27/2012 20:00:28 6/27/2012 20:05:45 811 2 2 COAL -- MIL6/27/2012 20:03:17 6/27/2012 20:09:19 817 2 2 COAL -- MIL6/27/2012 20:31:26 6/27/2012 20:36:35 815 2 2 COAL -- MIL6/27/2012 20:46:02 6/27/2012 20:55:01 832 2 2 COAL -- MIL6/27/2012 21:01:12 6/27/2012 21:04:46 850 2 2 COAL -- MIL

Page 354: June Per Shift (Truckscale Port)

6/27/2012 21:12:05 6/27/2012 21:16:11 810 2 2 COAL -- MIL6/27/2012 21:21:27 6/27/2012 21:25:21 837 2 2 COAL -- MIL6/27/2012 21:30:02 6/27/2012 21:34:26 819 2 2 COAL -- MIL6/27/2012 21:33:45 6/27/2012 21:38:49 830 2 2 COAL -- MIL6/27/2012 21:40:16 6/27/2012 21:48:50 855 2 2 COAL -- MIL6/27/2012 21:48:12 6/27/2012 21:53:54 839 2 2 COAL -- MIL6/27/2012 21:56:25 6/27/2012 22:00:34 868 2 2 COAL -- MIL6/27/2012 21:59:08 6/27/2012 22:03:48 853 2 2 COAL -- MIL6/27/2012 22:07:23 6/27/2012 22:16:18 852 2 2 COAL -- MIL6/27/2012 22:14:03 6/27/2012 22:17:58 812 2 2 COAL -- MIL6/27/2012 22:21:16 6/27/2012 22:25:10 818 2 2 COAL -- MIL6/27/2012 22:38:53 6/27/2012 22:42:39 817 2 2 COAL -- MIL6/27/2012 22:40:57 6/27/2012 22:42:36 811 2 2 COAL -- MIL6/27/2012 22:49:02 6/27/2012 22:57:39 850 2 2 COAL -- MIL6/27/2012 23:11:01 6/27/2012 23:16:08 815 2 2 COAL -- MIL6/27/2012 23:12:18 6/27/2012 23:21:28 810 2 2 COAL -- MIL6/27/2012 23:20:51 6/27/2012 23:26:18 819 2 2 COAL -- MIL6/27/2012 23:36:47 6/27/2012 23:46:32 855 2 2 COAL -- MIL6/27/2012 23:45:54 6/27/2012 23:50:26 853 2 2 COAL -- MIL6/27/2012 23:54:37 6/28/2012 00:01:42 852 2 3 COAL -- MIL6/28/2012 00:05:04 6/28/2012 00:10:21 711-- 3 3 COAL -- Harita Para6/28/2012 00:23:42 6/28/2012 00:28:05 113 3 3 COAL -- Harita Para6/28/2012 00:41:44 6/28/2012 00:49:17 710-- 3 3 COAL -- Harita Para6/28/2012 00:44:17 6/28/2012 00:50:41 712-- 3 3 COAL -- Harita Para6/28/2012 00:48:42 6/28/2012 00:52:54 701-- 3 3 COAL -- Harita Para6/28/2012 00:58:35 6/28/2012 01:02:54 713-- 3 3 COAL -- Harita Para6/28/2012 01:00:47 6/28/2012 01:07:43 709-- 3 3 COAL -- Harita Para6/28/2012 01:02:08 6/28/2012 01:07:47 703-- 3 3 COAL -- Harita Para6/28/2012 01:06:10 6/28/2012 01:09:34 702-- 3 3 COAL -- Harita Para6/28/2012 01:10:43 6/28/2012 01:14:11 707-- 3 3 COAL -- Harita Para6/28/2012 01:11:04 6/28/2012 01:16:15 714-- 3 3 COAL -- Harita Para

6/28/2012 01:39:53 6/28/2012 01:47:03 704-- 3 3 COAL -- Harita Para6/28/2012 01:53:29 6/28/2012 01:58:18 708-- 3 3 COAL -- Harita Para6/28/2012 01:54:00 6/28/2012 02:00:46 113 3 3 COAL -- Harita Para6/28/2012 02:15:20 6/28/2012 02:19:05 710-- 3 3 COAL -- Harita Para

6/28/2012 02:35:19 6/28/2012 02:39:27 701-- 3 3 COAL -- Harita Para6/28/2012 02:37:03 6/28/2012 02:43:35 711-- 3 3 COAL -- Harita Para6/28/2012 03:11:48 6/28/2012 03:17:36 712-- 3 3 COAL -- Harita Para6/28/2012 03:12:30 6/28/2012 03:18:18 703-- 3 3 COAL -- Harita Para6/28/2012 03:24:03 6/28/2012 03:28:45 709-- 3 3 COAL -- Harita Para6/28/2012 00:09:31 6/28/2012 00:16:37 832 3 3 COAL -- MIL6/28/2012 00:12:59 6/28/2012 00:16:41 830 3 3 COAL -- MIL6/28/2012 00:15:36 6/28/2012 00:19:55 818 3 3 COAL -- MIL

6/28/2012 00:19:12 6/28/2012 00:23:00 837 3 3 COAL -- MIL6/28/2012 00:35:10 6/28/2012 00:38:48 811 3 3 COAL -- MIL6/28/2012 00:36:41 6/28/2012 00:42:35 850 3 3 COAL -- MIL6/28/2012 00:37:16 6/28/2012 00:43:29 839 3 3 COAL -- MIL6/28/2012 00:53:32 6/28/2012 00:57:57 810 3 3 COAL -- MIL6/28/2012 01:13:02 6/28/2012 01:18:13 868 3 3 COAL -- MIL

Page 355: June Per Shift (Truckscale Port)

6/28/2012 01:19:06 6/28/2012 01:26:29 855 3 3 COAL -- MIL6/28/2012 01:25:33 6/28/2012 01:30:15 853 3 3 COAL -- MIL6/28/2012 01:31:55 6/28/2012 01:37:22 852 3 3 COAL -- MIL6/28/2012 01:32:18 6/28/2012 01:41:22 812 3 3 COAL -- MIL6/28/2012 02:10:29 6/28/2012 02:14:12 830 3 3 COAL -- MIL6/28/2012 02:13:35 6/28/2012 02:17:33 810 3 3 COAL -- MIL6/28/2012 02:20:43 6/28/2012 02:24:59 819 3 3 COAL -- MIL6/28/2012 02:21:17 6/28/2012 02:26:31 811 3 3 COAL -- MIL6/28/2012 02:24:20 6/28/2012 02:28:52 818 3 3 COAL -- MIL6/28/2012 02:41:45 6/28/2012 02:46:03 839 3 3 COAL -- MIL6/28/2012 03:26:25 6/28/2012 03:30:58 812 3 3 COAL -- MIL6/28/2012 18:54:49 6/28/2012 18:58:39 713-- 2 2 COAL -- Harita Para6/28/2012 18:56:06 6/28/2012 19:00:46 709-- 2 2 COAL -- Harita Para6/28/2012 18:56:28 6/28/2012 19:04:19 704-- 2 2 COAL -- Harita Para6/28/2012 19:02:09 6/28/2012 19:07:29 701-- 2 2 COAL -- Harita Para6/28/2012 19:12:56 6/28/2012 19:17:23 703-- 2 2 COAL -- Harita Para6/28/2012 19:14:39 6/28/2012 19:20:30 113 2 2 COAL -- Harita Para6/28/2012 19:15:58 6/28/2012 19:21:52 714-- 2 2 COAL -- Harita Para6/28/2012 19:18:59 6/28/2012 19:23:41 702-- 2 2 COAL -- Harita Para6/28/2012 19:19:39 6/28/2012 19:26:45 712-- 2 2 COAL -- Harita Para6/28/2012 19:30:50 6/28/2012 19:35:43 711-- 2 2 COAL -- Harita Para6/28/2012 19:34:49 6/28/2012 19:40:16 706-- 2 2 COAL -- Harita Para6/28/2012 20:42:09 6/28/2012 20:46:24 710-- 2 2 COAL -- Harita Para6/28/2012 20:43:49 6/28/2012 20:47:58 713-- 2 2 COAL -- Harita Para6/28/2012 21:07:11 6/28/2012 21:12:30 701-- 2 2 COAL -- Harita Para6/28/2012 21:09:17 6/28/2012 21:14:30 711-- 2 2 COAL -- Harita Para6/28/2012 21:40:54 6/28/2012 21:46:27 714-- 2 2 COAL -- Harita Para6/28/2012 21:47:34 6/28/2012 21:53:16 113 2 2 COAL -- Harita Para6/28/2012 21:54:35 6/28/2012 21:58:30 708-- 2 2 COAL -- Harita Para6/28/2012 21:54:56 6/28/2012 22:00:39 706-- 2 2 COAL -- Harita Para6/28/2012 22:01:18 6/28/2012 22:05:36 712-- 2 2 COAL -- Harita Para6/28/2012 22:09:16 6/28/2012 22:13:50 703-- 2 2 COAL -- Harita Para

6/28/2012 22:20:39 6/28/2012 22:24:08 713-- 2 2 COAL -- Harita Para6/28/2012 22:21:44 6/28/2012 22:26:26 702-- 2 2 COAL -- Harita Para6/28/2012 22:31:51 6/28/2012 22:36:10 701-- 2 2 COAL -- Harita Para6/28/2012 22:34:29 6/28/2012 22:38:16 704-- 2 2 COAL -- Harita Para6/28/2012 22:44:33 6/28/2012 22:48:10 710-- 2 2 COAL -- Harita Para6/28/2012 22:52:14 6/28/2012 22:56:37 709-- 2 2 COAL -- Harita Para6/28/2012 23:07:45 6/28/2012 23:11:44 711-- 2 2 COAL -- Harita Para6/28/2012 23:16:16 6/28/2012 23:20:08 714-- 2 2 COAL -- Harita Para6/28/2012 23:22:19 6/28/2012 23:26:21 708-- 2 2 COAL -- Harita Para6/28/2012 23:28:50 6/28/2012 23:32:50 706-- 2 2 COAL -- Harita Para6/28/2012 23:29:16 6/28/2012 23:35:21 113 2 2 COAL -- Harita Para6/28/2012 23:29:36 6/28/2012 23:36:54 712-- 2 2 COAL -- Harita Para6/28/2012 23:41:36 6/28/2012 23:49:19 703-- 2 2 COAL -- Harita Para6/28/2012 23:52:01 6/28/2012 23:56:06 713-- 2 2 COAL -- Harita Para6/28/2012 23:55:02 6/29/2012 00:02:49 702-- 2 3 COAL -- Harita Para6/28/2012 23:57:17 6/29/2012 00:05:38 701-- 2 3 COAL -- Harita Para6/28/2012 16:00:44 6/28/2012 16:05:02 839 2 2 COAL -- MIL6/28/2012 16:12:33 6/28/2012 16:16:12 818 2 2 COAL -- MIL

Page 356: June Per Shift (Truckscale Port)

6/28/2012 16:27:38 6/28/2012 16:31:08 811 2 2 COAL -- MIL6/28/2012 16:27:57 6/28/2012 16:33:07 819 2 2 COAL -- MIL

6/28/2012 16:30:34 6/28/2012 16:35:12 868 2 2 COAL -- MIL6/28/2012 19:37:48 6/28/2012 19:41:09 856 2 2 COAL -- MIL6/28/2012 19:46:52 6/28/2012 19:52:26 855 2 2 COAL -- MIL6/28/2012 19:48:52 6/28/2012 19:53:43 868 2 2 COAL -- MIL6/28/2012 19:49:14 6/28/2012 19:54:10 853 2 2 COAL -- MIL6/28/2012 19:49:40 6/28/2012 19:55:56 837 2 2 COAL -- MIL6/28/2012 19:50:00 6/28/2012 19:58:04 850 2 2 COAL -- MIL6/28/2012 19:50:23 6/28/2012 19:58:28 852 2 2 COAL -- MIL6/28/2012 20:03:06 6/28/2012 20:07:06 818 2 2 COAL -- MIL6/28/2012 20:15:39 6/28/2012 20:19:37 830 2 2 COAL -- MIL6/28/2012 20:29:57 6/28/2012 20:33:51 819 2 2 COAL -- MIL6/28/2012 20:39:30 6/28/2012 20:43:10 811 2 2 COAL -- MIL6/28/2012 21:19:15 6/28/2012 21:22:58 812 2 2 COAL -- MIL6/28/2012 21:19:57 6/28/2012 21:24:31 856 2 2 COAL -- MIL6/28/2012 21:36:49 6/28/2012 21:41:24 853 2 2 COAL -- MIL6/28/2012 21:39:49 6/28/2012 21:43:42 817 2 2 COAL -- MIL6/28/2012 21:45:25 6/28/2012 21:52:45 855 2 2 COAL -- MIL6/28/2012 21:49:47 6/28/2012 21:55:38 868 2 2 COAL -- MIL6/28/2012 21:50:05 6/28/2012 21:57:01 852 2 2 COAL -- MIL6/28/2012 21:56:21 6/28/2012 22:02:29 837 2 2 COAL -- MIL6/28/2012 22:07:55 6/28/2012 22:12:10 850 2 2 COAL -- MIL6/28/2012 22:10:48 6/28/2012 22:15:50 818 2 2 COAL -- MIL6/28/2012 22:22:46 6/28/2012 22:29:43 851 2 2 COAL -- MIL6/28/2012 22:24:56 6/28/2012 22:31:05 830 2 2 COAL -- MIL6/28/2012 22:49:43 6/28/2012 22:53:37 811 2 2 COAL -- MIL6/28/2012 23:04:36 6/28/2012 23:08:38 819 2 2 COAL -- MIL6/28/2012 23:09:20 6/28/2012 23:13:23 856 2 2 COAL -- MIL

6/28/2012 23:22:45 6/28/2012 23:30:15 812 2 2 COAL -- MIL6/28/2012 23:24:29 6/28/2012 23:30:40 853 2 2 COAL -- MIL6/28/2012 23:37:56 6/28/2012 23:42:56 817 2 2 COAL -- MIL6/28/2012 23:40:13 6/28/2012 23:46:19 855 2 2 COAL -- MIL

6/28/2012 23:41:15 6/28/2012 23:48:11 852 2 2 COAL -- MIL6/28/2012 23:42:02 6/28/2012 23:49:49 837 2 2 COAL -- MIL6/28/2012 23:53:59 6/28/2012 23:58:06 868 2 2 COAL -- MIL6/28/2012 23:54:31 6/28/2012 23:59:22 850 2 2 COAL -- MIL6/29/2012 00:13:47 6/29/2012 00:17:52 704-- 3 3 COAL -- Harita Para6/29/2012 00:28:17 6/29/2012 00:32:10 711-- 3 3 COAL -- Harita Para6/29/2012 00:47:10 6/29/2012 00:52:26 709-- 3 3 COAL -- Harita Para6/29/2012 01:07:42 6/29/2012 01:11:49 710-- 3 3 COAL -- Harita Para6/29/2012 01:08:21 6/29/2012 01:14:33 708-- 3 3 COAL -- Harita Para6/29/2012 01:08:53 6/29/2012 01:18:48 714-- 3 3 COAL -- Harita Para6/29/2012 01:09:22 6/29/2012 01:18:56 712-- 3 3 COAL -- Harita Para6/29/2012 01:30:30 6/29/2012 01:39:01 701-- 3 3 COAL -- Harita Para6/29/2012 01:33:20 6/29/2012 01:39:05 703-- 3 3 COAL -- Harita Para6/29/2012 01:40:57 6/29/2012 01:48:54 704-- 3 3 COAL -- Harita Para6/29/2012 02:37:09 6/29/2012 02:41:33 113 3 3 COAL -- Harita Para6/29/2012 02:38:45 6/29/2012 02:43:57 713-- 3 3 COAL -- Harita Para

Page 357: June Per Shift (Truckscale Port)

6/29/2012 02:51:03 6/29/2012 02:55:12 708-- 3 3 COAL -- Harita Para6/29/2012 02:53:05 6/29/2012 02:59:06 702-- 3 3 COAL -- Harita Para6/29/2012 02:57:34 6/29/2012 03:01:52 711-- 3 3 COAL -- Harita Para6/29/2012 02:57:56 6/29/2012 03:04:03 712-- 3 3 COAL -- Harita Para6/29/2012 03:07:30 6/29/2012 03:11:33 706-- 3 3 COAL -- Harita Para6/29/2012 03:13:16 6/29/2012 03:18:12 703-- 3 3 COAL -- Harita Para6/29/2012 03:15:33 6/29/2012 03:18:59 701-- 3 3 COAL -- Harita Para6/29/2012 03:36:01 6/29/2012 03:40:16 709-- 3 3 COAL -- Harita Para6/29/2012 07:26:57 6/29/2012 07:31:19 702-- 3 3 COAL -- Harita Para6/29/2012 07:27:36 6/29/2012 07:32:53 708-- 3 3 COAL -- Harita Para6/29/2012 07:27:58 6/29/2012 07:35:29 709-- 3 3 COAL -- Harita Para6/29/2012 07:28:19 6/29/2012 07:37:09 706-- 3 3 COAL -- Harita Para6/29/2012 07:29:34 6/29/2012 07:39:22 113 3 3 COAL -- Harita Para6/29/2012 07:30:05 6/29/2012 07:42:12 712-- 3 3 COAL -- Harita Para6/29/2012 07:30:36 6/29/2012 07:43:02 713-- 3 3 COAL -- Harita Para6/29/2012 07:34:10 6/29/2012 07:45:13 711-- 3 3 COAL -- Harita Para6/29/2012 07:40:13 6/29/2012 07:48:33 703-- 3 3 COAL -- Harita Para6/29/2012 07:41:10 6/29/2012 07:51:03 714-- 3 3 COAL -- Harita Para6/29/2012 07:46:59 6/29/2012 07:56:33 710-- 3 3 COAL -- Harita Para6/29/2012 00:00:28 6/29/2012 00:07:51 818 3 3 COAL -- MIL6/29/2012 00:04:45 6/29/2012 00:16:39 851 3 3 COAL -- MIL6/29/2012 00:14:15 6/29/2012 00:19:05 830 3 3 COAL -- MIL6/29/2012 00:41:23 6/29/2012 00:44:29 856 3 3 COAL -- MIL6/29/2012 01:00:51 6/29/2012 01:04:25 819 3 3 COAL -- MIL6/29/2012 01:29:57 6/29/2012 01:35:36 837 3 3 COAL -- MIL6/29/2012 01:40:04 6/29/2012 01:44:59 853 3 3 COAL -- MIL6/29/2012 01:40:32 6/29/2012 01:45:11 852 3 3 COAL -- MIL6/29/2012 01:53:07 6/29/2012 01:59:50 855 3 3 COAL -- MIL6/29/2012 02:07:14 6/29/2012 02:10:54 850 3 3 COAL -- MIL6/29/2012 02:17:35 6/29/2012 02:21:41 817 3 3 COAL -- MIL6/29/2012 02:24:40 6/29/2012 02:28:59 856 3 3 COAL -- MIL6/29/2012 02:26:50 6/29/2012 02:30:31 818 3 3 COAL -- MIL

6/29/2012 02:38:27 6/29/2012 02:43:18 830 3 3 COAL -- MIL6/29/2012 03:00:07 6/29/2012 03:05:38 815 3 3 COAL -- MIL6/29/2012 03:03:19 6/29/2012 03:08:06 812 3 3 COAL -- MIL6/29/2012 03:46:18 6/29/2012 03:50:00 850 3 3 COAL -- MIL6/29/2012 04:04:33 6/29/2012 04:08:31 817 3 3 COAL -- MIL6/29/2012 04:09:13 6/29/2012 04:13:25 818 3 3 COAL -- MIL6/29/2012 04:15:25 6/29/2012 04:18:50 856 3 3 COAL -- MIL

6/29/2012 04:15:54 6/29/2012 04:20:29 819 3 3 COAL -- MIL6/29/2012 07:38:41 6/29/2012 07:48:02 853 3 3 COAL -- MIL6/29/2012 07:44:09 6/29/2012 07:53:47 852 3 3 COAL -- MIL6/29/2012 07:44:31 6/29/2012 07:54:06 855 3 3 COAL -- MIL6/29/2012 07:51:44 6/29/2012 07:58:18 815 3 3 COAL -- MIL6/29/2012 07:52:20 6/29/2012 08:01:57 850 3 1 COAL -- MIL6/29/2012 08:11:14 6/29/2012 08:14:56 704-- 1 1 COAL -- Harita Para6/29/2012 08:11:50 6/29/2012 08:17:22 701-- 1 1 COAL -- Harita Para6/29/2012 08:45:56 6/29/2012 08:49:54 702-- 1 1 COAL -- Harita Para6/29/2012 08:52:26 6/29/2012 09:01:14 709-- 1 1 COAL -- Harita Para6/29/2012 08:59:49 6/29/2012 09:03:13 706-- 1 1 COAL -- Harita Para

Page 358: June Per Shift (Truckscale Port)

6/29/2012 09:10:04 6/29/2012 09:17:19 708-- 1 1 COAL -- Harita Para6/29/2012 09:16:40 6/29/2012 09:24:40 113 1 1 COAL -- Harita Para6/29/2012 09:23:59 6/29/2012 09:28:38 713-- 1 1 COAL -- Harita Para6/29/2012 09:31:41 6/29/2012 09:37:18 704-- 1 1 COAL -- Harita Para6/29/2012 09:35:59 6/29/2012 09:40:27 711-- 1 1 COAL -- Harita Para6/29/2012 09:36:39 6/29/2012 09:40:29 701-- 1 1 COAL -- Harita Para6/29/2012 09:48:15 6/29/2012 09:53:16 712-- 1 1 COAL -- Harita Para6/29/2012 10:01:43 6/29/2012 10:06:41 710-- 1 1 COAL -- Harita Para6/29/2012 10:05:19 6/29/2012 10:10:20 702-- 1 1 COAL -- Harita Para

6/29/2012 10:20:09 6/29/2012 10:23:24 706-- 1 1 COAL -- Harita Para6/29/2012 10:25:02 6/29/2012 10:28:46 115 1 1 COAL -- Harita Para6/29/2012 10:29:30 6/29/2012 10:33:52 709-- 1 1 COAL -- Harita Para6/29/2012 10:43:27 6/29/2012 10:47:11 708-- 1 1 COAL -- Harita Para6/29/2012 10:50:08 6/29/2012 10:56:17 113 1 1 COAL -- Harita Para6/29/2012 10:54:50 6/29/2012 11:00:37 711-- 1 1 COAL -- Harita Para6/29/2012 10:57:06 6/29/2012 11:03:32 713-- 1 1 COAL -- Harita Para6/29/2012 10:59:02 6/29/2012 11:04:21 701-- 1 1 COAL -- Harita Para6/29/2012 11:27:30 6/29/2012 11:31:12 702-- 1 1 COAL -- Harita Para6/29/2012 11:49:22 6/29/2012 11:56:32 710-- 1 1 COAL -- Harita Para6/29/2012 11:45:15 6/29/2012 11:50:20 115 1 1 COAL--IN Harita Para6/29/2012 12:00:09 6/29/2012 12:04:50 709-- 1 1 COAL--IN Harita Para6/29/2012 08:25:22 6/29/2012 08:29:27 810 1 1 COAL -- MIL6/29/2012 09:09:21 6/29/2012 09:13:06 832 1 1 COAL -- MIL6/29/2012 09:10:48 6/29/2012 09:18:45 868 1 1 COAL -- MIL6/29/2012 09:13:58 6/29/2012 09:20:27 856 1 1 COAL -- MIL6/29/2012 09:16:18 6/29/2012 09:21:37 812 1 1 COAL -- MIL6/29/2012 09:23:34 6/29/2012 09:27:36 818 1 1 COAL -- MIL6/29/2012 09:30:46 6/29/2012 09:35:13 819 1 1 COAL -- MIL6/29/2012 09:41:20 6/29/2012 09:49:16 853 1 1 COAL -- MIL6/29/2012 09:50:05 6/29/2012 09:56:19 852 1 1 COAL -- MIL6/29/2012 10:02:10 6/29/2012 10:08:17 850 1 1 COAL -- MIL6/29/2012 10:09:42 6/29/2012 10:15:28 855 1 1 COAL -- MIL6/29/2012 10:14:46 6/29/2012 10:17:52 830 1 1 COAL -- MIL6/29/2012 10:33:11 6/29/2012 10:36:53 837 1 1 COAL -- MIL6/29/2012 10:48:28 6/29/2012 10:51:21 810 1 1 COAL -- MIL6/29/2012 10:54:27 6/29/2012 10:58:24 832 1 1 COAL -- MIL6/29/2012 10:55:15 6/29/2012 11:01:38 856 1 1 COAL -- MIL6/29/2012 11:04:58 6/29/2012 11:09:04 812 1 1 COAL -- MIL6/29/2012 11:06:59 6/29/2012 11:25:25 818 1 1 COAL -- MIL6/29/2012 11:18:47 6/29/2012 11:23:16 851 1 1 COAL -- MIL6/29/2012 11:22:33 6/29/2012 11:25:43 868 1 1 COAL -- MIL6/29/2012 11:42:21 6/29/2012 11:48:14 852 1 1 COAL -- MIL

6/29/2012 11:54:36 6/29/2012 12:01:02 817 1 1 COAL -- MIL6/29/2012 12:06:54 6/29/2012 12:12:15 811 1 1 COAL -- MIL6/29/2012 12:46:28 6/29/2012 12:50:31 850 1 1 COAL--IN MIL6/29/2012 12:49:41 6/29/2012 12:58:41 855 1 1 COAL--IN MIL6/29/2012 13:08:47 6/29/2012 13:14:55 853 1 1 COAL--IN MIL6/29/2012 13:14:11 6/29/2012 13:17:34 830 1 1 COAL--IN MIL6/30/2012 00:16:43 6/30/2012 00:21:20 818 3 3 COAL -- MIL

Page 359: June Per Shift (Truckscale Port)

6/30/2012 00:23:24 6/30/2012 00:29:21 850 3 3 COAL -- MIL6/30/2012 00:25:29 6/30/2012 00:30:55 868 3 3 COAL -- MIL

6/30/2012 00:26:05 6/30/2012 00:33:26 832 3 3 COAL -- MIL6/30/2012 00:28:34 6/30/2012 00:34:49 812 3 3 COAL -- MIL6/30/2012 00:31:54 6/30/2012 00:39:42 851 3 3 COAL -- MIL6/30/2012 00:39:09 6/30/2012 00:44:13 853 3 3 COAL -- MIL6/30/2012 00:41:17 6/30/2012 00:47:18 855 3 3 COAL -- MIL6/30/2012 00:42:05 6/30/2012 00:49:19 819 3 3 COAL -- MIL6/30/2012 00:43:10 6/30/2012 00:48:10 810 3 3 COAL -- MIL6/30/2012 00:16:21 6/30/2012 00:19:45 830 3 3 COAL--IN MIL6/30/2012 00:42:35 6/30/2012 00:47:26 856 3 3 COAL--IN MIL6/30/2012 15:51:38 6/30/2012 16:04:13 714-- 1 2 COAL--IN Harita Para6/30/2012 15:55:07 6/30/2012 16:04:46 710-- 1 2 COAL--IN Harita Para6/30/2012 15:55:42 6/30/2012 16:05:16 702-- 1 2 COAL--IN Harita Para6/30/2012 15:56:09 6/30/2012 16:09:39 113 1 2 COAL--IN Harita Para6/30/2012 15:56:43 6/30/2012 16:05:42 703-- 1 2 COAL--IN Harita Para6/30/2012 15:58:14 6/30/2012 16:15:14 701-- 1 2 COAL--IN Harita Para6/30/2012 15:58:42 6/30/2012 16:14:32 704-- 1 2 COAL--IN Harita Para6/30/2012 15:59:35 6/30/2012 16:21:51 115 1 2 COAL--IN Harita Para6/30/2012 12:11:57 6/30/2012 12:16:35 856 1 1 COAL--IN MIL6/30/2012 12:12:54 6/30/2012 12:17:01 855 1 1 COAL--IN MIL6/30/2012 12:13:21 6/30/2012 12:20:41 817 1 1 COAL--IN MIL6/30/2012 12:13:52 6/30/2012 12:21:05 851 1 1 COAL--IN MIL6/30/2012 12:14:20 6/30/2012 12:27:24 850 1 1 COAL--IN MIL6/30/2012 12:15:51 6/30/2012 12:35:50 830 1 1 COAL--IN MIL6/30/2012 12:18:46 6/30/2012 12:32:21 853 1 1 COAL--IN MIL6/30/2012 12:19:14 6/30/2012 12:35:23 810 1 1 COAL--IN MIL6/30/2012 12:23:06 6/30/2012 12:37:45 832 1 1 COAL--IN MIL6/30/2012 12:25:35 6/30/2012 12:41:18 852 1 1 COAL--IN MIL6/30/2012 12:28:09 6/30/2012 12:43:45 812 1 1 COAL--IN MIL6/30/2012 12:30:32 6/30/2012 12:43:49 819 1 1 COAL--IN MIL6/30/2012 15:50:55 6/30/2012 16:03:45 853 1 2 COAL--IN MIL6/30/2012 15:57:36 6/30/2012 16:10:01 856 1 2 COAL--IN MIL6/30/2012 15:59:10 6/30/2012 16:20:56 851 1 2 COAL--IN MIL6/30/2012 16:01:08 6/30/2012 16:08:37 706-- 2 2 COAL -- Harita Para6/30/2012 18:19:51 6/30/2012 18:23:23 713-- 2 2 COAL -- Harita Para6/30/2012 18:20:23 6/30/2012 18:24:56 710-- 2 2 COAL -- Harita Para6/30/2012 18:22:26 6/30/2012 18:31:21 701-- 2 2 COAL -- Harita Para6/30/2012 18:30:44 6/30/2012 18:38:47 702-- 2 2 COAL -- Harita Para6/30/2012 18:41:45 6/30/2012 18:46:07 113 2 2 COAL -- Harita Para6/30/2012 18:42:54 6/30/2012 18:48:27 703-- 2 2 COAL -- Harita Para6/30/2012 18:44:35 6/30/2012 19:02:00 706-- 2 2 COAL -- Harita Para6/30/2012 19:17:31 6/30/2012 19:24:25 115 2 2 COAL -- Harita Para6/30/2012 19:22:43 6/30/2012 19:29:04 714-- 2 2 COAL -- Harita Para6/30/2012 19:23:04 6/30/2012 19:29:22 708-- 2 2 COAL -- Harita Para6/30/2012 19:23:34 6/30/2012 19:31:04 711-- 2 2 COAL -- Harita Para6/30/2012 19:31:48 6/30/2012 19:36:13 709-- 2 2 COAL -- Harita Para6/30/2012 19:42:06 6/30/2012 19:45:25 713-- 2 2 COAL -- Harita Para6/30/2012 19:45:57 6/30/2012 19:49:10 710-- 2 2 COAL -- Harita Para6/30/2012 19:52:54 6/30/2012 19:57:21 701-- 2 2 COAL -- Harita Para

Page 360: June Per Shift (Truckscale Port)

6/30/2012 19:58:24 6/30/2012 20:03:37 712-- 2 2 COAL -- Harita Para6/30/2012 20:01:38 6/30/2012 20:05:11 702-- 2 2 COAL -- Harita Para6/30/2012 20:23:12 6/30/2012 20:27:55 703-- 2 2 COAL -- Harita Para6/30/2012 20:31:15 6/30/2012 20:35:29 113 2 2 COAL -- Harita Para6/30/2012 20:46:20 6/30/2012 20:51:29 115 2 2 COAL -- Harita Para6/30/2012 20:50:13 6/30/2012 21:00:56 706-- 2 2 COAL -- Harita Para6/30/2012 20:50:36 6/30/2012 21:01:19 714-- 2 2 COAL -- Harita Para6/30/2012 21:00:12 6/30/2012 21:06:00 711-- 2 2 COAL -- Harita Para6/30/2012 21:06:59 6/30/2012 21:12:03 708-- 2 2 COAL -- Harita Para6/30/2012 21:09:52 6/30/2012 21:15:07 709-- 2 2 COAL -- Harita Para6/30/2012 21:14:24 6/30/2012 21:17:27 713-- 2 2 COAL -- Harita Para6/30/2012 21:21:11 6/30/2012 21:27:00 701-- 2 2 COAL -- Harita Para

6/30/2012 21:26:05 6/30/2012 21:29:57 702-- 2 2 COAL -- Harita Para6/30/2012 21:30:31 6/30/2012 21:34:17 710-- 2 2 COAL -- Harita Para6/30/2012 21:37:59 6/30/2012 21:43:34 712-- 2 2 COAL -- Harita Para6/30/2012 21:56:53 6/30/2012 22:01:03 703-- 2 2 COAL -- Harita Para6/30/2012 22:05:02 6/30/2012 22:09:45 113 2 2 COAL -- Harita Para6/30/2012 22:08:59 6/30/2012 22:13:29 704-- 2 2 COAL -- Harita Para6/30/2012 22:23:04 6/30/2012 22:31:25 706-- 2 2 COAL -- Harita Para6/30/2012 22:26:01 6/30/2012 22:33:10 115 2 2 COAL -- Harita Para6/30/2012 22:35:49 6/30/2012 22:41:09 713-- 2 2 COAL -- Harita Para6/30/2012 22:38:05 6/30/2012 22:42:04 714-- 2 2 COAL -- Harita Para6/30/2012 22:42:40 6/30/2012 22:47:06 711-- 2 2 COAL -- Harita Para6/30/2012 22:43:45 6/30/2012 22:48:55 709-- 2 2 COAL -- Harita Para6/30/2012 22:49:34 6/30/2012 22:53:17 702-- 2 2 COAL -- Harita Para6/30/2012 22:50:06 6/30/2012 22:56:20 701-- 2 2 COAL -- Harita Para6/30/2012 22:55:41 6/30/2012 22:59:26 708-- 2 2 COAL -- Harita Para6/30/2012 22:57:26 6/30/2012 23:02:02 710-- 2 2 COAL -- Harita Para6/30/2012 23:13:24 6/30/2012 23:17:59 712-- 2 2 COAL -- Harita Para6/30/2012 23:28:49 6/30/2012 23:33:23 703-- 2 2 COAL -- Harita Para6/30/2012 23:37:01 6/30/2012 23:43:46 113 2 2 COAL -- Harita Para6/30/2012 23:38:44 6/30/2012 23:45:39 704-- 2 2 COAL -- Harita Para6/30/2012 23:53:05 6/30/2012 23:58:04 115 2 2 COAL -- Harita Para6/30/2012 23:54:16 6/30/2012 23:59:45 713-- 2 2 COAL -- Harita Para6/30/2012 16:00:37 6/30/2012 16:26:14 713-- 2 2 COAL--IN Harita Para6/30/2012 16:02:20 6/30/2012 16:31:29 708-- 2 2 COAL--IN Harita Para6/30/2012 16:06:55 6/30/2012 16:40:05 709-- 2 2 COAL--IN Harita Para6/30/2012 16:30:38 6/30/2012 16:58:11 711-- 2 2 COAL--IN Harita Para

6/30/2012 20:52:52 6/30/2012 21:03:58 856 2 2 COAL -- MIL6/30/2012 21:04:38 6/30/2012 21:11:16 851 2 2 COAL -- MIL6/30/2012 21:18:09 6/30/2012 21:22:02 812 2 2 COAL -- MIL6/30/2012 21:29:02 6/30/2012 21:33:11 832 2 2 COAL -- MIL6/30/2012 21:36:37 6/30/2012 21:40:58 852 2 2 COAL -- MIL6/30/2012 21:45:06 6/30/2012 21:52:39 853 2 2 COAL -- MIL

6/30/2012 21:52:02 6/30/2012 21:55:34 850 2 2 COAL -- MIL6/30/2012 22:07:09 6/30/2012 22:12:28 817 2 2 COAL -- MIL6/30/2012 22:40:34 6/30/2012 22:44:39 856 2 2 COAL -- MIL6/30/2012 22:46:25 6/30/2012 23:41:20 851 2 2 COAL -- MIL6/30/2012 23:01:14 6/30/2012 23:05:33 812 2 2 COAL -- MIL

Page 361: June Per Shift (Truckscale Port)

6/30/2012 23:14:47 6/30/2012 23:19:50 830 2 2 COAL -- MIL6/30/2012 23:35:33 6/30/2012 23:40:15 832 2 2 COAL -- MIL6/30/2012 23:35:59 6/30/2012 23:41:16 852 2 2 COAL -- MIL6/30/2012 23:46:24 6/30/2012 23:53:44 853 2 2 COAL -- MIL6/30/2012 23:52:35 6/30/2012 23:56:00 850 2 2 COAL -- MIL6/30/2012 16:01:51 6/30/2012 16:29:09 850 2 2 COAL--IN MIL6/30/2012 16:03:04 6/30/2012 16:21:05 852 2 2 COAL--IN MIL6/30/2012 16:06:27 6/30/2012 16:39:00 868 2 2 COAL--IN MIL6/30/2012 16:07:47 6/30/2012 16:34:24 855 2 2 COAL--IN MIL6/30/2012 16:10:56 6/30/2012 16:44:04 817 2 2 COAL--IN MIL6/30/2012 16:12:46 6/30/2012 16:44:08 811 2 2 COAL--IN MIL6/30/2012 16:19:25 6/30/2012 16:49:50 812 2 2 COAL--IN MIL6/30/2012 16:29:49 6/30/2012 16:49:56 819 2 2 COAL--IN MIL6/30/2012 16:32:08 6/30/2012 16:58:17 832 2 2 COAL--IN MIL6/30/2012 16:36:12 6/30/2012 16:42:57 810 2 2 COAL--IN MIL6/30/2012 19:12:50 6/30/2012 19:16:38 856 2 2 COAL--IN MIL6/30/2012 19:19:37 6/30/2012 19:24:45 851 2 2 COAL--IN MIL6/30/2012 19:21:53 6/30/2012 19:26:03 812 2 2 COAL--IN MIL6/30/2012 19:22:13 6/30/2012 19:27:24 852 2 2 COAL--IN MIL6/30/2012 19:25:30 6/30/2012 19:30:50 832 2 2 COAL--IN MIL6/30/2012 19:28:15 6/30/2012 19:35:52 853 2 2 COAL--IN MIL6/30/2012 19:30:12 6/30/2012 19:36:33 850 2 2 COAL--IN MIL6/30/2012 19:49:56 6/30/2012 19:53:52 817 2 2 COAL--IN MIL6/30/2012 20:06:00 6/30/2012 20:09:59 830 2 2 COAL--IN MIL6/30/2012 20:08:34 6/30/2012 20:12:53 811 2 2 COAL--IN MIL6/30/2012 20:26:17 6/30/2012 20:32:00 818 2 2 COAL--IN MIL

6/30/2012 20:39:51 6/30/2012 20:44:28 819 2 2 COAL--IN MIL6/30/2012 20:54:39 6/30/2012 20:59:38 839 2 2 COAL--IN MIL6/30/2012 21:20:10 6/30/2012 21:31:37 816 2 2 COAL--IN MIL6/30/2012 21:29:24 6/30/2012 21:33:32 830 2 2 COAL--IN MIL6/30/2012 21:30:54 6/30/2012 21:35:06 811 2 2 COAL--IN MIL6/30/2012 21:56:33 6/30/2012 22:00:38 818 2 2 COAL--IN MIL

6/30/2012 22:11:14 6/30/2012 22:16:48 819 2 2 COAL--IN MIL6/30/2012 22:29:32 6/30/2012 22:36:29 839 2 2 COAL--IN MIL

Page 362: June Per Shift (Truckscale Port)
Page 363: June Per Shift (Truckscale Port)

Lokasi Stok File In Weight Out Weight Net Weight TedcoPIT B 26 - 001 45750 18260 27490PIT B 26 - 001 45730 18330 27400PIT B 26 - 001 46360 18330 28030PIT B 26 - 001 46520 18340 28180PIT B 26 - 001 45960 18170 27790PIT B 26 - 001 45740 18160 27580PIT B 26 - 001 46070 18170 27900PIT B 26 - 001 46060 18120 27940PIT B 26 - 001 45670 18250 27420PIT B 26 - 001 44870 18430 26440

PIT B 26 - 001 46300 18410 27890PIT B 26 - 001 46510 18310 28200PIT B 26 - 001 46870 18270 28600PIT A 85- 001 47340 18250 29090PIT A 85- 001 48100 18340 29760

PIT B 26 - 001 47460 18050 29410PIT B 26 - 001 47450 17940 29510PIT B 26 - 001 47320 18180 29140PIT B 26 - 001 46710 18220 28490PIT A 85- 001 49730 18280 31450PIT B 26 - 001 47110 18380 28730PIT A 85- 001 46210 18130 28080PIT B 26 - 001 46170 18140 28030PIT B 26 - 001 45460 18150 27310PIT B 26 - 001 46050 18120 27930PIT A 85- 001 46180 18050 28130PIT B 26 - 001 45650 18130 27520PIT B 26 - 001 45300 18250 27050PIT A 85- 001 47010 18250 28760PIT B 26 - 001 44760 18130 26630PIT B 26 - 001 45830 18390 27440PIT B 26 - 001 46640 18070 28570PIT B 26 - 001 45660 18110 27550PIT A 85- 001 47110 17990 29120

PIT B 26 - 001 44940 18330 26610PIT B 26- 001 49660 19540 30120PIT D 46- 001 50670 18720 31950

PIT D 46- 001 47300 18210 29090PIT D 46- 001 49120 18560 30560PIT D 46- 001 47840 18560 29280PIT B 26- 001 32050 11170 20880

Page 364: June Per Shift (Truckscale Port)

PIT D 46- 001 47730 18190 29540PIT D 46- 001 49740 18590 31150PIT D 46- 001 32940 11070 21870

PIT D 46- 001 33360 11310 22050PIT D 46- 001 47680 17910 29770PIT D 46- 001 51700 18450 33250PIT D 46- 001 31950 10980 20970PIT D 46- 001 32360 10960 21400PIT D 46- 001 32280 11050 21230PIT D 46- 001 50320 17860 32460PIT D 46- 001 51230 17950 33280PIT D 46- 001 49780 18020 31760PIT D 46- 001 51620 18870 32750PIT D 46- 001 50380 18700 31680PIT D 46- 001 48600 18180 30420PIT D 46- 001 52860 18570 34290PIT D 46- 001 50880 18070 32810

PIT D 46- 001 33800 11150 22650PIT D 46- 001 51740 18340 33400PIT D 46- 001 47700 17960 29740PIT D 46- 001 32700 10960 21740PIT D 46- 001 28750 10850 17900

PIT D 46- 001 33630 11060 22570PIT D 46- 001 34780 11130 23650PIT D 46- 001 49170 17930 31240PIT D 46- 001 35060 11080 23980PIT D 46- 001 51390 17930 33460PIT D 46- 001 51460 18190 33270PIT D 46- 001 52780 18840 33940PIT C 64- 001 47500 18830 28670PIT C 64- 001 44350 18220 26130

PIT D 46- 001 32240 10980 21260PIT D 46- 001 50650 17940 32710PIT D 46- 001 47160 17880 29280PIT D 46- 001 50350 17960 32390PIT D 46- 001 30970 10800 20170PIT D 46- 001 49880 18030 31850

PIT D 46- 001 33480 10890 22590PIT D 46- 001 51940 18930 33010PIT A 65 - 001 32110 11130 20980PIT D 46- 001 49560 18610 30950PIT D 46- 001 33560 11100 22460PIT A 65 - 001 31310 11090 20220

PIT D 46- 001 48500 18430 30070PIT D 46- 001 50830 18470 32360PIT D 46- 001 49590 18460 31130PIT A 65 - 001 31360 11020 20340PIT A 65 - 001 43840 17880 25960

Page 365: June Per Shift (Truckscale Port)

PIT D 46- 001 45590 17820 27770PIT A 65 - 001 31840 10990 20850PIT D 46- 001 48000 18140 29860PIT A 65 - 001 31340 11040 20300PIT A 65 - 001 48100 18140 29960PIT D 46- 001 49980 17990 31990PIT B 26 - 001 48100 18010 30090PIT B 26 - 001 47290 18110 29180

PIT B 26 - 001 46650 18160 28490

PIT B 26 - 001 45730 18040 27690PIT B 26 - 001 46280 18380 27900PIT B 26 - 001 45210 17970 27240PIT B 26 - 001 46630 18240 28390PIT B 26 - 001 46450 18270 28180PIT B 26 - 001 44970 18090 26880PIT B 26 - 001 46240 18130 28110

PIT A 85- 001 46200 19590 26610PIT B 26 - 001 45620 18020 27600PIT B 26 - 001 43510 17930 25580PIT B 26 - 001 44480 18300 26180PIT B 26 - 001 44670 18250 26420PIT A 65 - 001 48630 17990 30640PIT D 46- 001 37810 11200 26610PIT A 65 - 001 47420 18600 28820PIT A 65 - 001 48130 18980 29150

PIT A 65 - 001 32560 11000 21560PIT A 65 - 001 32470 11010 21460PIT A 65 - 001 46010 18140 27870PIT A 65 - 001 46580 18070 28510PIT A 65 - 001 31640 11000 20640PIT B 26- 001 45460 17880 27580PIT A 65 - 001 32700 11110 21590PIT A 65 - 001 47150 18430 28720PIT B 26- 001 46880 18590 28290PIT A 65 - 001 46330 17950 28380PIT B 26- 001 46020 17960 28060PIT A 65 - 001 47400 19380 28020PIT B 26- 001 44950 17970 26980PIT B 26- 001 30810 11100 19710PIT B 26 - 002 45690 18310 27380PIT B 26 - 002 46120 18300 27820PIT B 26 - 002 43790 18160 25630PIT B 26 - 002 44610 18380 26230PIT B 26 - 002 47020 18260 28760PIT B 26 - 002 45210 18220 26990PIT B 26 - 002 46500 18220 28280

PIT B 26 - 002 45640 18040 27600PIT B 26 - 001 46060 18250 27810

Page 366: June Per Shift (Truckscale Port)

PIT B 26 - 001 45200 18280 26920PIT B 26 - 001 46310 18390 27920PIT B 26 - 001 45440 18300 27140PIT B 26 - 001 45020 18280 26740PIT B 26 - 001 46380 18220 28160PIT B 26 - 001 45790 18090 27700PIT B 26 - 001 42470 18160 24310PIT B 26 - 001 47080 18150 28930PIT B 26 - 001 46360 18190 28170PIT B 26 - 001 46800 18220 28580PIT B 26 - 001 46640 18100 28540PIT B 26 - 001 48380 18030 30350PIT B 26 - 001 47980 18140 29840PIT B 26 - 001 47250 18090 29160PIT B 26 - 001 46170 17950 28220PIT B 26 - 001 47270 18190 29080

PIT B 26 - 001 47610 18190 29420PIT B 26 - 001 46620 18210 28410PIT B 26 - 001 48100 18060 30040

PIT B 26 - 001 47400 18060 29340

PIT B 26 - 001 43460 18030 25430

PIT B 26 - 001 47580 18080 29500PIT B 26 - 001 47400 18190 29210PIT A 65 - 001 32100 11040 21060PIT A 65 - 001 33180 11200 21980PIT A 65 - 001 49770 18140 31630PIT A 65 - 001 32160 11050 21110PIT A 65 - 001 45340 17740 27600PIT A 65 - 001 44850 18070 26780PIT A 65 - 001 47540 17930 29610PIT A 65 - 001 46970 18890 28080PIT A 65 - 001 33960 11000 22960PIT A 65 - 001 46430 17910 28520PIT A 65 - 001 48980 18640 30340PIT A 65 - 001 45960 17880 28080PIT A 65 - 001 46740 18160 28580PIT A 65 - 001 43790 18130 25660PIT A 65 - 001 31740 10950 20790PIT B 26 - 001 48710 18430 30280PIT B 26 - 001 50230 18160 32070PIT B 26 - 001 48780 18400 30380PIT B 26 - 001 49260 18400 30860PIT B 26 - 001 46560 18420 28140PIT B 26 - 001 46940 18480 28460PIT B 26 - 001 46520 18190 28330

PIT B 26 - 001 48320 18210 30110PIT B 26 - 001 46360 18430 27930PIT A 85 - 001 46280 18200 28080PIT A 85 - 001 49050 18040 31010

Page 367: June Per Shift (Truckscale Port)

PIT A 85 - 001 33100 11160 21940PIT A 85 - 001 46990 18030 28960PIT A 85 - 001 49430 18290 31140PIT A 85 - 001 48720 18680 30040PIT A 85 - 001 32280 11320 20960PIT A 85 - 001 48820 18330 30490PIT A 85 - 001 33120 11320 21800PIT A 85 - 001 31070 11230 19840PIT B 26 - 001 49270 18220 31050PIT B 26 - 001 48120 18070 30050PIT B 26 - 001 46450 18480 27970PIT B 26 - 001 48040 18390 29650PIT B 26 - 001 48770 18320 30450PIT B 26 - 001 46260 18350 27910PIT B 26 - 001 46500 18140 28360PIT B 26 - 001 44850 18100 26750PIT B 26 - 001 45130 18330 26800PIT B 26 - 001 46740 18130 28610

PIT B 26 - 001 49310 18010 31300PIT B 26 - 001 46040 17940 28100

PIT B 26 - 001 46160 18270 27890PIT B 26 - 001 45250 18200 27050PIT B 26 - 001 45630 18220 27410PIT B 26 - 002 45330 18260 27070PIT B 26 - 002 45810 18260 27550PIT B 26 - 002 45290 18230 27060PIT B 26 - 002 46200 18060 28140PIT B 26 - 002 46340 18130 28210PIT B 26 - 002 45950 18280 27670PIT B 26 - 002 46960 18060 28900PIT B 26 - 002 44930 18290 26640PIT B 26 - 002 47860 18240 29620PIT B 26 - 002 45940 18130 27810PIT B 26 - 002 46510 18210 28300PIT B 26 - 002 46100 18210 27890PIT B 26 - 002 45510 18250 27260PIT B 26 - 002 46080 18340 27740PIT B 26 - 002 47620 18180 29440PIT B 26 - 002 46990 18030 28960PIT B 26 - 002 46140 18200 27940PIT B 26 - 002 46220 18130 28090

PIT B 26 - 002 45600 18190 27410PIT B 26 - 002 46880 18290 28590PIT B 26 - 002 47030 18210 28820PIT B 26 - 002 46090 18280 27810PIT B 26 - 002 47800 18410 29390PIT B 26 - 002 46830 18360 28470PIT B 26 - 002 44600 18090 26510PIT B 26 - 002 45710 18180 27530

Page 368: June Per Shift (Truckscale Port)

PIT B 26 - 002 46650 18040 28610PIT B 26 - 002 48080 18130 29950PIT B 26 - 002 39290 18150 21140PIT B 26 - 002 45530 18250 27280PIT B 26 - 002 47000 18140 28860PIT B 26 - 002 46730 18030 28700PIT A 85 - 001 31320 11190 20130

PIT B 27- 001 31050 11080 19970

PIT B 27- 001 45400 18290 27110PIT A 27- 001 29080 11050 18030PIT A 85 - 002 31010 11270 19740PIT A 27- 002 47780 18710 29070

PIT A 27- 002 46920 18070 28850PIT A 27- 002 47750 18680 29070PIT A 27- 002 47440 18470 28970PIT A 27- 002 31950 11040 20910PIT A 85 - 002 46400 18260 28140PIT A 85 - 002 47440 18050 29390PIT A 27- 002 47220 18310 28910PIT A 27- 002 47300 18050 29250PIT A 27- 002 31090 11040 20050

PIT A 27- 002 44970 18220 26750PIT A 27- 002 48520 18270 30250PIT A 27- 002 49220 18630 30590PIT A 85 - 002 51730 19110 32620PIT A 85 - 002 50780 18500 32280PIT A 27- 002 47740 18090 29650PIT A 27- 002 48380 18300 30080PIT A 85 - 002 33490 11000 22490

PIT A 27- 002 46680 18020 28660PIT A 85 - 002 48680 17910 30770PIT A 27- 002 32120 10970 21150PIT A 27- 002 45690 18170 27520

PIT A 85 - 002 47870 18380 29490PIT A 27- 002 48200 18400 29800PIT A 27- 002 47200 18440 28760PIT A 85 - 002 52650 18450 34200PIT A 27- 002 48280 18120 30160PIT A 27- 002 48030 18360 29670PIT A 27- 002 48250 18370 29880PIT A 27- 002 31590 10970 20620PIT A 27- 002 44780 18050 26730PIT A 27- 002 32420 11040 21380PIT A 85 - 002 48010 18040 29970PIT A 27- 002 47900 18520 29380PIT B 26 - 002 46960 17930 29030PIT B 26 - 002 45950 18310 27640PIT B 26 - 002 47520 18120 29400

Page 369: June Per Shift (Truckscale Port)

PIT B 26 - 002 46300 18040 28260PIT B 26 - 002 45020 18230 26790PIT B 26 - 002 46110 18290 27820PIT B 26 - 002 46070 18050 28020PIT B 26 - 002 45590 18060 27530

PIT B 26 - 002 44320 17970 26350PIT B 26 - 002 43420 17930 25490PIT B 26 - 002 45110 17970 27140PIT B 26 - 002 46130 18440 27690PIT B 26 - 002 44830 18120 26710PIT B 26 - 002 44590 18080 26510PIT B 26 - 002 44710 18110 26600PIT B 26 - 002 45410 18180 27230PIT B 26 - 002 46320 18210 28110PIT B 26 - 002 44900 17980 26920PIT B 26 - 002 45250 17910 27340PIT B 26 - 002 45860 17980 27880

PIT B 26 - 002 45400 18420 26980PIT B 26 - 002 45090 18420 26670

PIT B 26 - 002 45280 18200 27080PIT B 26 - 002 45640 18000 27640PIT B 26 - 002 45410 18020 27390PIT B 26 - 002 44190 18150 26040PIT B 26 - 002 44900 18200 26700PIT B 26 - 002 45150 18050 27100PIT B 26 - 002 45680 17950 27730PIT B 26 - 002 45670 18020 27650PIT B 26 - 002 46890 18390 28500PIT B 26 - 002 46310 18340 27970PIT B 26 - 001 45510 18110 27400PIT B 26 - 001 44320 18000 26320

PIT B 26 - 001 45550 18000 27550PIT B 26 - 001 44460 18210 26250PIT B 26 - 001 45480 18170 27310PIT B 26 - 001 44800 17960 26840PIT B 26 - 001 44940 18140 26800PIT B 26 - 001 44790 17910 26880

PIT A 85 - 002 32180 11020 21160PIT A 85 - 002 33370 10980 22390PIT A 85 - 002 32510 11000 21510PIT A 85 - 002 47080 18240 28840PIT A 85 - 002 48560 18850 29710PIT A 85 - 002 31000 11200 19800PIT B 26- 002 46220 18490 27730PIT A 85 - 002 49020 21680 27340PIT A 85 - 002 32600 10980 21620PIT A 85 - 002 49320 18060 31260PIT B 26- 002 45190 17990 27200

Page 370: June Per Shift (Truckscale Port)

PIT A 85 - 002 50160 18280 31880PIT A 85 - 002 32890 11020 21870PIT B 26- 002 48170 18950 29220PIT B 26- 001 46840 18950 27890PIT B 26- 001 30990 11050 19940PIT A 85 - 001 34410 11000 23410

PIT A 85 - 001 32800 10930 21870PIT A 85 - 001 33330 11100 22230PIT B 26- 001 46310 18930 27380PIT B 26 - 001 44960 18400 26560PIT B 26 - 001 44020 18090 25930PIT B 26 - 001 44950 17950 27000PIT B 26 - 001 43750 18010 25740PIT B 26 - 001 45370 18250 27120PIT B 26 - 001 44540 18050 26490PIT B 26 - 001 43690 18010 25680PIT B 26 - 001 45150 18280 26870PIT B 26 - 001 46170 18150 28020PIT B 26 - 001 45300 18280 27020PIT B 26 - 001 45580 18340 27240PIT B 26 - 001 46410 18330 28080PIT B 26 - 001 45450 17990 27460PIT B 26 - 001 45980 18150 27830PIT B 26 - 001 45880 18140 27740PIT B 26 - 001 45510 17980 27530PIT B 26 - 001 45270 18150 27120PIT B 26 - 001 44990 18010 26980PIT B 26 - 001 45310 17980 27330PIT B 26 - 001 46160 18170 27990PIT B 26 - 001 45160 18260 26900PIT B 26 - 001 45600 18270 27330PIT B 26 - 001 47410 18250 29160PIT B 26 - 001 45800 18240 27560PIT B 26- 001 46580 18460 28120PIT B 26- 001 48170 17930 30240PIT A 85 - 001 51100 18590 32510PIT A 65 - 001 45130 18720 26410PIT A 65 - 001 46980 18920 28060PIT A 65 - 001 46040 18540 27500PIT A 65 - 001 43640 17980 25660PIT A 65 - 001 47740 18660 29080PIT B 26- 001 30870 11140 19730PIT B 26- 001 33500 11090 22410PIT B 26- 001 33700 11080 22620PIT B 26- 001 33670 11100 22570PIT B 26- 001 33150 11070 22080PIT B 26- 001 32640 11130 21510

PIT B 26- 001 32900 11010 21890PIT B 26- 001 32570 11010 21560

Page 371: June Per Shift (Truckscale Port)

PIT B 26 - 001 46550 18270 28280PIT B 26 - 001 44620 18060 26560PIT B 26 - 001 50140 18240 31900PIT B 26 - 001 45970 17890 28080PIT B 26 - 001 45300 18080 27220PIT B 26 - 001 46180 17950 28230PIT B 26 - 001 48760 18240 30520PIT B 26 - 001 44620 18250 26370PIT B 26 - 001 44370 18220 26150PIT B 26 - 001 44220 18200 26020PIT B 26 - 001 44990 17880 27110PIT B 26 - 001 45580 18240 27340PIT B 26 - 001 43360 17970 25390PIT B 26 - 001 45340 18300 27040PIT B 26 - 001 45460 17820 27640PIT B 26 - 001 44680 18010 26670PIT B 26 - 001 44590 18160 26430PIT B 26 - 001 43810 18140 25670PIT B 26 - 001 45170 18230 26940PIT B 26 - 001 44090 18240 25850PIT B 26 - 001 43330 18170 25160PIT B 26 - 001 43540 17950 25590PIT B 26 - 001 43910 18160 25750PIT B 26 - 001 44500 18080 26420PIT B 26 - 001 43840 18230 25610PIT B 26 - 001 43200 18010 25190PIT B 26 - 001 44610 17910 26700PIT B 26 - 001 43770 18050 25720PIT B 26 - 001 44220 18030 26190PIT B 26 - 001 44960 18150 26810PIT B 26 - 001 44300 18150 26150PIT B 26 - 001 44510 18130 26380PIT B 26 - 001 43420 17880 25540PIT B 26 - 001 43610 17890 25720PIT B 26 - 001 44530 18080 26450PIT B 26 - 001 45090 17930 27160PIT B 26 - 001 44100 18200 25900PIT B 26 - 001 44210 17940 26270PIT B 26 - 001 46350 17870 28480PIT B 26 - 001 46870 17890 28980PIT B 26 - 001 48290 18150 30140PIT B 26 - 001 46870 18180 28690PIT B 26 - 001 46940 18150 28790

Page 372: June Per Shift (Truckscale Port)

PIT B 26 - 001 47260 17890 29370PIT B 26 - 001 48730 18320 30410PIT B 26 - 001 46490 18340 28150PIT B 26 - 001 48050 17940 30110PIT B 26 - 001 47550 18030 29520PIT B 26 - 001 46800 18010 28790PIT A 85-2 001 44000 18220 25780PIT A 85-2 001 43610 18130 25480PIT A 85-2 001 45820 18190 27630PIT A 85-2 001 46220 18110 28110PIT A 85-2 001 47420 17950 29470PIT A 65 - 001 49150 18520 30630PIT A 65 - 001 48350 18100 30250PIT A 65 - 001 46710 18050 28660PIT A 65 - 001 49920 18600 31320

PIT A 65 - 001 47890 18020 29870PIT A 65 - 001 45330 18030 27300PIT A 65 - 001 48370 18030 30340PIT A 65 - 001 47780 18590 29190PIT A 65 - 001 46790 17860 28930PIT A 65 - 001 48190 18900 29290PIT A 85 - 001 48070 18030 30040PIT A 85 - 001 49230 18010 31220PIT A 85 - 001 49240 18540 30700PIT A 65 - 001 48240 17980 30260PIT A 85 - 001 33210 11130 22080PIT A 85 - 001 31750 10880 20870PIT A 85 - 001 33950 10880 23070PIT C 64-1 001 31910 11100 20810PIT C 64-1 001 32510 11150 21360PIT C 64-1 001 33210 11060 22150PIT C 64-1 001 34250 11020 23230PIT C 64-1 001 33230 11020 22210PIT C 64-1 001 32840 11090 21750PIT C 64-1 001 33890 10880 23010PIT C 64-1 001 33340 11000 22340PIT C 64-1 001 32630 10940 21690PIT C 64-1 001 32320 10850 21470

PIT C 64-1 001 33330 11070 22260PIT C 64-1 001 33720 10940 22780PIT C 64-1 001 32970 10930 22040PIT C 64-1 001 32370 11020 21350

Page 373: June Per Shift (Truckscale Port)

PIT C 64-1 001 49730 18480 31250PIT C 64-1 001 30580 10810 19770PIT C 64-1 001 32640 10990 21650PIT C 64-1 001 50690 18480 32210PIT C 64-1 001 32440 10890 21550PIT C 64-1 001 33370 11090 22280PIT C 64-1 001 31530 10780 20750PIT C 64-1 001 48840 17900 30940PIT C 64-1 001 51130 18930 32200PIT C 64-1 001 33330 11020 22310PIT C 64-1 001 49390 18430 30960PIT C 64-1 001 33100 11010 22090PIT C 64-1 001 48370 17920 30450PIT C 64-1 001 49680 17960 31720PIT A 85-2 001 45810 18010 27800PIT A 85-2 001 45150 18040 27110PIT A 85-2 001 45840 18310 27530PIT A 85-2 001 45940 18340 27600PIT A 85-2 001 46360 18320 28040PIT A 85-2 001 44740 18220 26520PIT A 85-2 001 44970 18230 26740PIT A 85-2 001 45780 17910 27870PIT A 85-2 001 45710 18220 27490PIT A 85-2 001 45150 18040 27110PIT A 85-2 001 45640 18070 27570PIT A 85-2 001 44600 18240 26360PIT A 85-2 001 44680 17980 26700PIT A 85-2 001 44230 18000 26230PIT A 85-2 001 45110 18310 26800PIT A 85-2 001 45670 18320 27350PIT A 85-2 001 44030 18360 25670PIT A 85-2 001 45280 18040 27240PIT A 85-2 001 44820 18200 26620PIT A 85-2 001 44940 17900 27040PIT A 85-2 001 45520 18240 27280PIT A 85-2 001 43330 18110 25220PIT A 85-2 001 43190 18220 24970

PIT A 85-2 001 44890 17980 26910PIT A 85-2 001 45330 18230 27100PIT A 85-2 001 45090 18350 26740PIT A 85-2 001 46130 18410 27720PIT A 85-2 001 44550 18410 26140

Page 374: June Per Shift (Truckscale Port)

PIT A 85-2 001 45020 18390 26630PIT A 85-2 001 43780 18220 25560PIT A 85-2 001 44980 18070 26910PIT A 85-2 001 43970 18300 25670PIT A 85-2 001 44040 18090 25950PIT A 85-2 001 45850 18350 27500PIT A 85-2 001 44790 18120 26670PIT A 85-2 001 45900 18310 27590PIT A 85-2 001 45940 18410 27530PIT A 85 - 001 48730 18120 30610PIT A 85 - 001 32940 11110 21830PIT A 85 - 001 33060 11010 22050PIT A 85 - 001 33950 11160 22790PIT A 85 - 001 49170 18070 31100PIT A 85 - 001 50150 18860 31290PIT C 64-1 001 46730 18550 28180PIT C 64-1 001 47150 18310 28840PIT B 26-1 001 33060 11100 21960PIT B 26-1 001 33480 11060 22420PIT B 26-1 001 33970 11050 22920PIT B 26-1 001 32610 11040 21570PIT A 68-2 001 31050 11160 19890PIT A 68-2 001 33430 11130 22300PIT A 68-2 001 32040 11070 20970PIT A 68-2 001 33000 11120 21880PIT A 68-2 001 32180 11240 20940PIT A 68-2 001 33910 11200 22710PIT A 68-2 001 34820 11140 23680PIT A 68-2 001 33400 11220 22180PIT A 68-2 001 33810 11100 22710PIT A 85-2 001 43800 18180 25620PIT A 85-2 001 46760 18280 28480PIT A 85-2 001 44760 18430 26330PIT A 85-2 001 45230 18010 27220PIT A 85-2 001 45390 18230 27160PIT A 85-2 001 46370 18350 28020PIT A 85-2 001 45670 18230 27440PIT A 85-2 001 45850 18320 27530PIT A 85-2 001 44820 18150 26670PIT A 85-2 001 44280 18010 26270

PIT A 85-2 001 45100 18270 26830PIT A 85-2 001 46700 18200 28500

Page 375: June Per Shift (Truckscale Port)

PIT A 85-2 001 45040 18140 26900PIT A 85-2 001 45670 18030 27640PIT A 85-2 001 46090 18230 27860PIT A 85-2 001 44600 18210 26390PIT A 85-2 001 45580 18010 27570PIT A 85-2 001 45540 18310 27230PIT A 85-2 001 45420 18350 27070PIT A 85-2 001 47020 18330 28690PIT A 85-2 001 45430 18180 27250PIT A 85-2 001 46970 18380 28590PIT A 85-2 001 44760 18310 26450PIT A 85-2 001 45600 18330 27270PIT A 85-2 001 45590 18100 27490PIT A 85-2 001 45090 18290 26800PIT C 64-1 001 47970 18080 29890PIT C 64-1 001 47580 18250 29330PIT C 64-1 001 39750 18050 21700PIT C 64-1 001 36520 17670 18850PIT C 64-1 001 48000 18780 29220PIT A 85 - 001 44350 17820 26530PIT C 64-1 001 48280 18720 29560PIT C 64-1 001 47920 18000 29920PIT C 64-1 001 49260 18670 30590PIT A 68-2 001 34430 10990 23440PIT A 68-2 001 33670 11120 22550PIT A 68-2 001 34340 10970 23370PIT A 68-2 001 34340 11200 23140PIT A 68-2 001 35470 11120 24350PIT A 68-2 001 33450 11050 22400PIT A 68-2 001 35240 11200 24040PIT A 68-2 001 33710 11150 22560PIT A 68-2 001 34160 11220 22940PIT A 68-2 001 34100 11100 23000PIT A 85-2 001 46550 18240 28310PIT A 85-2 001 46100 18100 28000PIT A 85-2 001 48440 18290 30150PIT A 85-2 001 45970 18380 27590PIT A 85-2 001 45560 18110 27450PIT A 85-2 001 44970 18210 26760PIT A 85-2 001 47890 18300 29590PIT A 85-2 001 46840 18300 28540PIT A 85-2 001 48480 18060 30420

Page 376: June Per Shift (Truckscale Port)

PIT A 85-2 001 47250 18170 29080PIT A 85-2 001 46100 18260 27840PIT A 85-2 001 46110 18110 28000PIT A 85-2 001 47710 18240 29470PIT C 64-1 001 44190 17830 26360PIT C 64-1 001 46780 18480 28300PIT C 64-1 001 47040 18030 29010PIT C 64-1 001 46440 18690 27750PIT C 64-1 001 44490 18040 26450PIT C 64-1 001 30540 11110 19430PIT C 64-1 001 42410 18270 24140PIT C 64-1 001 43640 18010 25630PIT C 64-1 001 43650 18120 25530PIT A 68-2 001 33780 11080 22700PIT A 68-2 001 34140 11230 22910PIT A 68-2 001 33550 11090 22460

PIT A 68-2 001 34070 11050 23020PIT A 68-2 001 33980 11260 22720PIT A 68-2 001 33700 11070 22630PIT A 85-2 001 47130 18110 29020PIT A 85-2 001 45450 18170 27280PIT A 85-2 001 44830 17950 26880PIT A 85-2 001 44820 18190 26630PIT A 85-2 001 44430 18150 26280PIT A 85-2 001 43510 18120 25390PIT A 85-2 001 44210 17890 26320PIT A 85-2 001 42980 17960 25020PIT A 85-2 001 43280 18070 25210PIT A 85-2 001 43480 18100 25380PIT A 85-2 001 43860 18090 25770PIT A 85-2 001 44230 18210 26020PIT A 85-2 001 44350 18250 26100PIT A 85-2 001 44660 18250 26410PIT A 85-2 001 44770 18420 26350PIT A 85-2 001 43830 18190 25640PIT A 85-2 001 43550 18120 25430PIT A 85-2 001 45180 18090 27090PIT A 85-2 001 44910 18070 26840PIT A 85-2 001 43910 17990 25920PIT A 85-2 001 45850 18340 27510PIT A 85-2 001 45440 18270 27170PIT B 26 - 001 47560 18220 29340

Page 377: June Per Shift (Truckscale Port)

PIT A 85-2 001 44840 18270 26570PIT A 85-2 001 43860 18370 25490PIT B 26 - 001 45260 18190 27070PIT B 26 - 001 45820 18050 27770PIT A 85-2 001 44830 18060 26770PIT B 26 - 001 45640 18010 27630PIT B 26 - 001 46060 18070 27990PIT B 26 - 001 45980 18170 27810PIT A 85-2 001 45110 18220 26890PIT B 26 - 001 45910 18040 27870PIT C 64-1 001 31550 11090 20460PIT C 64-1 001 31670 11020 20650PIT C 64-1 001 31860 11060 20800PIT C 64-1 001 30930 11150 19780PIT C 64-1 001 32930 11110 21820PIT C 64-1 001 48570 18280 30290PIT C 64-1 001 47560 18010 29550PIT C 64-1 001 45990 18150 27840PIT C 64-1 001 49240 18960 30280PIT C 64-1 001 47580 18260 29320PIT C 64-1 001 48090 18300 29790PIT C 64-1 001 49150 18270 30880PIT B 26-1 001 30110 11120 18990PIT C 64-1 001 50340 18320 32020PIT B 26-1 001 30120 11020 19100PIT B 26-1 001 29930 11110 18820PIT C 64-1 001 50750 18930 31820PIT C 64-1 001 30950 11230 19720PIT B 26-1 001 29350 11100 18250PIT C 64-1 001 46380 18210 28170PIT B 26-1 001 44720 18350 26370PIT C 64-1 001 45030 17920 27110PIT B 26-1 001 29110 11100 18010PIT A 85-2 001 45340 18300 27040PIT A 85-2 001 46100 18270 27830PIT B 26 - 001 46410 18140 28270PIT A 85-2 001 43920 18100 25820PIT A 85-2 001 45670 18230 27440PIT B 26 - 001 43820 18130 25690PIT A 85-2 001 46640 18190 28450PIT B 26 - 001 45320 18090 27230PIT B 26 - 001 45420 18040 27380PIT A 85-2 001 44190 18040 26150

Page 378: June Per Shift (Truckscale Port)

PIT B 26 - 001 46670 17970 28700PIT B 26 - 001 44050 18000 26050PIT B 26 - 001 45230 17950 27280PIT B 26 - 001 43430 17960 25470PIT A 85-2 001 45040 18110 26930PIT B 26 - 001 44920 18200 26720PIT B 26-1 001 30160 11100 19060PIT C 64-1 001 45650 17630 28020PIT C 64-1 001 49480 18770 30710PIT C 64-1 001 46140 17850 28290PIT B 26-1 001 29090 11150 17940PIT B 26-1 001 30380 11040 19340PIT B 26-1 001 44450 18380 26070PIT B 26-1 001 29720 11170 18550PIT B 26-1 001 30310 11180 19130PIT B 26-1 001 29250 11210 18040PIT B 26-1 001 29510 11060 18450PIT C 64-1 001 53060 18710 34350PIT C 64-1 001 47960 17820 30140PIT C 64-1 001 50320 18070 32250PIT A 85-2 001 44830 18360 26470PIT A 85-2 001 45320 18220 27100PIT B 26 - 001 45540 18360 27180PIT B 26 - 001 45460 18160 27300

PIT B 26 - 001 43610 18330 25280PIT A 85-2 001 45630 18130 27500PIT A 85-2 001 45440 18160 27280PIT A 85-2 001 45980 18340 27640PIT B 26 - 001 45630 18060 27570PIT B 26 - 001 46480 18080 28400PIT A 85-2 001 44890 18300 26590PIT A 85-2 001 45310 18200 27110PIT A 85-2 001 45450 18050 27400PIT A 85-2 001 46160 18240 27920PIT A 85-2 001 42630 18240 24390PIT A 85-2 001 46200 18050 28150PIT A 85-2 001 45570 18030 27540PIT A 85-2 001 45410 18220 27190

PIT C 64- 001 48910 18110 30800PIT C 64- 001 47440 18250 29190PIT C 64- 001 32770 11010 21760PIT C 64- 001 32460 11010 21450PIT A 27- 001 31160 11070 20090PIT C 64- 001 34180 11190 22990PIT A 27- 001 29760 10800 18960PIT A 27- 001 47260 18510 28750

Page 379: June Per Shift (Truckscale Port)

PIT A 27- 001 31310 11080 20230PIT A 27- 001 44980 18140 26840PIT A 27- 001 46210 18180 28030PIT A 27- 001 49630 18150 31480PIT A 27- 001 31300 10980 20320PIT A 27- 001 47280 18430 28850PIT A 27- 001 46810 18320 28490PIT A 27- 001 46410 18030 28380PIT A 27- 001 44290 17870 26420PIT A 27- 001 31920 11210 20710PIT A 27- 001 32840 11040 21800PIT A 85-2 001 43470 18180 25290PIT A 85-2 001 42040 18180 23860PIT A 85-2 001 45130 18090 27040PIT A 85-2 001 44190 18230 25960PIT A 85-2 001 43460 18260 25200PIT A 85-2 001 43350 18200 25150PIT A 85-2 001 44660 18010 26650PIT A 85-2 001 46800 18000 28800PIT A 85-2 001 44660 18140 26520PIT A 85-2 001 44110 18060 26050PIT A 85-2 001 45120 18170 26950PIT A 85-2 001 44790 18220 26570PIT A 85-2 001 45920 18130 27790

PIT A 85-2 001 45620 17980 27640PIT A 85-2 001 46660 18040 28620PIT A 85-2 001 45040 18190 26850

PIT A 85-2 001 45810 18220 27590PIT A 85-2 001 45630 18020 27610PIT A 85-2 001 45040 18100 26940PIT A 85-2 001 44720 18100 26620PIT A 85-2 001 45220 17940 27280

PIT A 85-2 001 44550 18270 26280PIT A 85-2 001 45850 18290 27560

PIT A 85-2 001 45500 18230 27270PIT A 85-2 001 46130 18090 28040PIT A 85-2 001 45750 18190 27560

PIT A 85-2 001 46800 18250 28550

PIT A 85-2 001 44340 18350 25990PIT A 85-2 001 46670 18170 28500

PIT A 85-2 001 45740 18210 27530PIT A 85-2 001 45740 18210 27530PIT A 85-2 001 45470 18130 27340PIT A 85-2 001 46410 18420 27990PIT A 85-2 001 45880 18300 27580PIT A 85-2 001 45240 18290 26950PIT A 85-2 001 45720 18130 27590

PIT A 27- 001 32560 11140 21420

Page 380: June Per Shift (Truckscale Port)

PIT A 27- 001 30380 10780 19600PIT A 27- 001 47620 18600 29020PIT A 27- 001 31010 11160 19850PIT A 27- 001 31680 11140 20540PIT A 27- 001 31180 11100 20080PIT A 27- 001 46080 18150 27930PIT A 27- 001 45340 18050 27290PIT A 27- 001 32070 11050 21020PIT A 27- 001 30800 10960 19840PIT C 64- 002 48700 18330 30370PIT C 64- 002 44770 18590 26180PIT C 64- 002 50170 18660 31510PIT C 64- 002 50170 18580 31590PIT C 64- 002 48480 18110 30370

PIT C 64- 002 44810 18100 26710PIT C 64- 002 45370 17700 27670PIT A 27- 001 46300 18160 28140PIT C 64- 002 47780 18080 29700PIT C 64- 002 48250 18390 29860PIT C 64- 002 43500 17910 25590PIT C 64- 002 48090 18500 29590PIT C 64- 002 47870 18720 29150PIT C 64- 002 46950 18210 28740PIT C 64- 002 45860 17780 28080PIT C 64- 002 49210 18320 30890PIT C 64- 002 51600 18440 33160PIT B 26- 001 29680 11190 18490PIT B 26- 001 30240 11160 19080PIT C 64- 002 44760 18260 26500PIT B 26- 001 30170 11120 19050PIT B 26- 001 30190 11130 19060PIT A 85-2 001 46630 18260 28370PIT A 85-2 001 46300 18330 27970PIT A 85-2 001 46590 18410 28180PIT A 85-2 001 46990 18120 28870PIT A 85-2 001 46280 18170 28110PIT A 85-2 001 45970 18270 27700PIT A 85-2 001 46780 18430 28350PIT A 85-2 001 46680 18160 28520

PIT A 85-2 001 45740 18190 27550PIT A 85-2 001 46860 18190 28670PIT A 85-2 001 45470 18250 27220PIT A 85-2 001 45720 18300 27420PIT A 85-2 001 45330 18290 27040PIT A 85-2 001 45180 18240 26940PIT A 85-2 001 44010 18080 25930PIT A 85-2 001 45820 18240 27580

PIT A 85-2 001 45750 18400 27350PIT A 85-2 001 45250 18230 27020

Page 381: June Per Shift (Truckscale Port)

PIT A 85-2 001 45920 18110 27810PIT A 85-2 001 44760 18190 26570PIT A 85-2 001 44870 18280 26590PIT A 85-2 001 44880 18290 26590PIT C 64- 002 44590 17910 26680PIT B 26- 001 45430 18210 27220PIT C 64- 002 46220 18340 27880PIT C 64- 002 48950 18510 30440PIT C 64- 002 49960 18690 31270

PIT C 64- 002 46850 18040 28810PIT C 64- 002 48280 18280 30000PIT C 64- 002 51480 18590 32890

PIT C 64- 002 39000 17820 21180PIT B 26- 001 30520 11190 19330

PIT B 26- 001 30670 11150 19520

PIT B 26- 001 31320 11270 20050PIT C 64- 002 50690 18670 32020PIT B 26- 001 30680 11100 19580PIT B 26- 001 31040 11120 19920PIT B 26- 001 31620 11260 20360PIT B 26- 001 30680 11090 19590PIT B 26- 001 31420 11170 20250PIT B 26- 001 31350 11140 20210PIT B 26- 001 31230 11080 20150

PIT B 26- 001 46320 18110 28210PIT B 26- 001 31150 11210 19940PIT A 85-2 001 45980 18190 27790PIT A 85-2 001 45250 18220 27030PIT A 85-2 001 44270 18010 26260PIT A 85-2 001 44710 18310 26400PIT A 85-2 001 44730 18310 26420PIT A 85-2 001 44290 18310 25980PIT A 85-2 001 45670 18170 27500PIT A 85-2 001 44020 18230 25790PIT A 85-2 001 45750 18110 27640PIT A 85-2 001 44480 18280 26200PIT A 85-2 001 44180 18230 25950PIT A 85- 001 42150 18220 23930PIT A 85-3 001 46830 17940 28890PIT A 85- 001 44500 18170 26330PIT A 85-3 001 47070 18230 28840PIT A 85-3 001 47780 18320 29460PIT A 85-3 001 46370 18120 28250PIT A 85-3 001 42990 18080 24910PIT A 85-3 001 47330 18180 29150PIT A 85- 001 43980 18280 25700PIT A 85-3 001 45950 18180 27770PIT A 85- 001 43060 17970 25090PIT A 85-3 001 46770 18160 28610

Page 382: June Per Shift (Truckscale Port)

PIT A 85- 001 44510 18210 26300PIT A 85- 001 44240 18110 26130PIT A 85- 001 44190 18100 26090PIT A 85- 001 44520 18120 26400PIT A 85- 001 43730 18060 25670PIT A 85- 001 43150 18350 24800PIT A 85- 001 43410 18200 25210PIT A 85- 001 43720 18100 25620PIT A 85- 001 44290 17940 26350PIT A 85- 001 42430 18180 24250PIT A 85- 001 44780 18130 26650PIT A 85- 001 44040 18090 25950PIT A 85- 001 44580 18050 26530PIT A 85- 001 44480 18060 26420PIT A 85- 001 42720 18320 24400PIT A 85- 001 43650 18060 25590PIT A 85- 001 45470 18190 27280PIT A 85- 001 44870 18360 26510PIT A 85- 001 46150 18150 28000PIT A 85- 001 47430 17900 29530

PIT A 85- 001 46830 18170 28660PIT A 85- 001 46530 18020 28510

PIT C 64- 002 48100 18620 29480

PIT C 64- 002 49900 18160 31740PIT C 64- 002 47040 18210 28830PIT C 64- 002 46800 18500 28300PIT C 64- 002 44390 17900 26490

PIT C 64- 002 45790 18250 27540PIT C 64- 002 31660 11030 20630PIT C 64- 002 47200 18600 28600PIT C 64- 002 46930 18080 28850PIT B 26- 001 31310 11030 20280PIT B 26- 001 30850 11110 19740PIT B 26- 001 31640 11050 20590PIT B 26- 001 30610 11140 19470PIT C 64- 002 47110 18110 29000PIT B 26- 001 44170 18130 26040PIT B 26- 001 31040 11170 19870PIT C 64- 002 47860 18050 29810PIT B 26- 001 29430 11030 18400PIT C 64- 002 48040 18590 29450

PIT C 64- 002 47490 18450 29040PIT B 26- 001 48500 18730 29770PIT C 64- 002 43300 17950 25350PIT C 64- 002 47100 18200 28900PIT B 26- 001 31740 11130 20610PIT C 64- 002 46420 18470 27950PIT C 64- 002 46650 18170 28480PIT B 26- 001 31030 11010 20020

Page 383: June Per Shift (Truckscale Port)

PIT B 26- 001 31120 11140 19980PIT C 64- 002 47440 18010 29430PIT B 26- 001 33360 11040 22320PIT B 26- 001 32750 11110 21640

PIT C 64- 002 46010 18550 27460PIT B 26- 001 32290 11160 21130PIT C 64- 002 46190 18500 27690PIT C 64- 002 42590 17860 24730PIT C 64- 002 46200 18150 28050PIT C 64- 002 44340 18150 26190PIT C 64- 002 46020 18460 27560PIT C 64- 002 49490 18890 30600PIT C 64- 002 46700 18180 28520

PIT B 26- 001 29260 10990 18270PIT C 64- 002 46950 17970 28980PIT B 26- 001 46490 18680 27810PIT C 64- 002 48000 18590 29410PIT B 26- 001 32290 11110 21180PIT C 64- 002 47160 18100 29060PIT C 64- 002 48530 18440 30090PIT B 26- 001 30900 11090 19810PIT C 64- 002 43910 17840 26070PIT B 26- 001 31960 11100 20860PIT B 26- 001 31210 11120 20090PIT B 26- 001 30860 11140 19720PIT C 64- 002 46540 18120 28420

PIT C 64- 002 45130 18040 27090PIT B 26- 001 47340 18860 28480PIT A 85- 001 45010 18270 26740PIT A 85- 001 46010 18200 27810PIT A 85- 001 47330 18190 29140PIT A 86-3 001 46890 18200 28690PIT A 85- 001 46430 18110 28320PIT A 85- 001 45080 17940 27140PIT A 85- 001 46220 18250 27970PIT A 85- 001 45310 18300 27010PIT A 85- 001 45410 18350 27060PIT A 85- 001 45090 18140 26950PIT A 85- 001 45160 18230 26930PIT A 85- 001 45230 18220 27010PIT A 85- 001 44890 18220 26670

PIT A 85- 001 44930 18150 26780PIT A 85- 001 44360 18550 25810PIT A 85- 001 43620 18330 25290

PIT A 85- 001 42880 18160 24720PIT A 85- 001 46030 18140 27890PIT A 85- 001 47410 18300 29110PIT A 85- 001 44280 18330 25950PIT A 85- 001 46000 18150 27850

Page 384: June Per Shift (Truckscale Port)

PIT A 85- 001 44910 18120 26790PIT A 85- 001 45520 18240 27280PIT A 85- 001 46050 18360 27690PIT A 85- 001 45670 18240 27430PIT A 85- 001 45790 18440 27350PIT A 85- 001 45330 18200 27130PIT A 85- 001 46210 18020 28190PIT A 85- 001 44140 18130 26010PIT A 85- 001 45240 18340 26900PIT A 85- 001 44220 18310 25910PIT A 85- 001 46280 18280 28000PIT A 85- 001 46490 18160 28330

PIT A 85- 001 46690 18210 28480PIT A 85- 001 45040 18220 26820PIT C 64- 002 46100 18070 28030PIT B 26- 001 31150 11010 20140PIT C 64- 002 46340 17930 28410PIT C 64- 002 50400 18560 31840PIT B 26- 001 31070 11150 19920PIT C 64- 002 47840 18630 29210

PIT B 26- 001 32190 11070 21120PIT B 26- 001 32170 11260 20910PIT B 26- 001 31690 11290 20400PIT C 64- 002 45880 18000 27880PIT C 64- 002 44510 18110 26400PIT B 26- 001 32020 11110 20910PIT C 64- 002 47500 18880 28620PIT C 64- 002 48560 18470 30090PIT C 64- 002 47650 18540 29110PIT C 64- 002 46730 18080 28650PIT C 64- 002 48980 18570 30410PIT B 26- 001 32410 11070 21340PIT C 64- 002 48270 18110 30160PIT B 26- 001 29830 11190 18640PIT C 64- 002 49980 18050 31930PIT B 26- 001 31130 11130 20000PIT C 64- 002 46790 18200 28590PIT B 26- 001 30350 11110 19240PIT C 64- 002 48310 18420 29890PIT C 64- 002 50560 18910 31650PIT B 26- 001 30700 11070 19630PIT C 64- 002 49600 18550 31050PIT C 64- 002 48860 18600 30260

PIT C 64- 002 48680 18640 30040PIT B 26- 001 45910 18130 27780PIT B 26- 001 30980 11260 19720PIT B 26- 001 31190 11200 19990PIT B 26- 001 31670 11090 20580

PIT C 64- 002 47740 18080 29660

Page 385: June Per Shift (Truckscale Port)

PIT B 26- 001 31670 11120 20550PIT B 26- 001 30290 10980 19310PIT C 64- 002 46150 18060 28090PIT B 26- 001 31380 11150 20230PIT C 64- 002 50000 18240 31760PIT B 26- 001 31830 11110 20720PIT C 64- 002 49200 18930 30270PIT A 85- 001 46540 18060 28480PIT A 85- 001 44990 18350 26640

PIT A 85- 001 45590 18290 27300PIT A 85- 001 46880 18030 28850PIT A 85- 001 45420 18330 27090PIT A 85- 001 47360 18180 29180PIT A 85- 001 46570 18310 28260PIT A 85- 001 46530 18180 28350PIT A 85- 001 45140 18220 26920PIT A 85- 001 45700 18220 27480PIT A 85- 001 47150 18340 28810

PIT A 85- 001 46640 18100 28540PIT A 85- 001 45310 18110 27200PIT A 85- 001 45160 18370 26790PIT A 85- 001 48130 18380 29750PIT A 85- 001 45890 18280 27610PIT A 85- 001 46820 18230 28590PIT A 85- 001 44600 18250 26350PIT A 85- 001 45630 18050 27580PIT A 85- 001 44930 18190 26740PIT A 85- 001 46480 18140 28340PIT A 85- 001 44920 18100 26820PIT B 26- 001 30540 11160 19380PIT B 26- 001 30780 11190 19590PIT C 64- 002 47930 18300 29630PIT C 64- 002 45360 18170 27190PIT C 64- 002 51920 18600 33320PIT B 26- 001 30860 11070 19790

PIT C 64- 002 51290 18650 32640PIT B 26- 001 30140 11000 19140PIT B 26- 001 30410 11140 19270PIT C 64- 002 46920 18150 28770PIT C 64- 002 48720 18640 30080PIT C 64- 002 49840 19020 30820PIT B 26- 001 30710 11160 19550PIT B 26- 001 30700 11100 19600PIT C 64- 002 47760 18160 29600PIT C 64- 002 50910 18640 32270PIT B 26- 001 30450 11040 19410PIT B 26- 001 30830 11090 19740PIT B 26- 001 30010 11080 18930PIT B 26- 001 31380 11130 20250PIT C 64- 002 47030 18260 28770

Page 386: June Per Shift (Truckscale Port)

PIT B 26- 001 31770 11050 20720PIT C 64- 002 50000 18060 31940PIT C 64- 002 32630 11110 21520PIT B 26- 001 30990 10950 20040PIT B 26- 001 31240 11110 20130PIT C 64- 002 47580 18650 28930PIT C 64- 002 44010 18100 25910PIT C 64- 002 48650 18940 29710PIT B 26- 001 30750 10950 19800PIT C 64- 002 48410 18580 29830PIT C 64- 002 47810 18100 29710

PIT A 85-3 001 45550 18350 27200PIT A 85-3 001 44710 18290 26420PIT A 85-3 001 46240 18250 27990

PIT A 85-3 001 46020 18230 27790PIT A 85-3 001 45340 18240 27100PIT A 85-3 001 44950 18170 26780PIT A 85-3 001 46440 18220 28220PIT A 85-3 001 45040 18020 27020PIT A 85-3 001 45790 18100 27690PIT A 85-3 001 45210 17990 27220PIT A 85-3 001 45800 18240 27560PIT A 85-3 001 45800 18270 27530PIT A 85-3 001 45560 18210 27350PIT A 85-3 001 45480 18180 27300PIT A 85-3 001 46300 18210 28090PIT A 85-3 001 45700 18090 27610PIT A 85-3 001 44360 18040 26320PIT B 26 - 001 44820 17990 26830PIT B 26 - 001 45930 18240 27690PIT B 26 - 001 47450 17980 29470PIT B 26 - 001 44960 18220 26740PIT B 26 - 001 45290 18020 27270PIT B 26 - 001 43810 18210 25600PIT B 26 - 001 44970 18250 26720PIT A 85-3 001 45120 18160 26960PIT B 26 - 001 44140 18090 26050PIT B 26 - 001 46160 18190 27970PIT B 26 - 001 47550 17950 29600PIT B 26 - 001 48420 17960 30460PIT A 85-3 001 44100 18050 26050PIT B 26 - 001 49760 18380 31380PIT B 26 - 001 45760 18190 27570PIT B 26 - 001 44490 18140 26350

Page 387: June Per Shift (Truckscale Port)

PIT B 26 - 001 45710 18160 27550

PIT B 26 - 001 44770 17970 26800PIT C 64-1 002 46090 18130 27960PIT B 26-1 001 31270 11030 20240PIT B 26-1 001 31910 11120 20790PIT C 64-1 002 44360 17940 26420PIT B 26-1 001 32110 11070 21040PIT C 64-1 002 44470 18170 26300PIT B 26-1 001 32580 10910 21670PIT C 64-1 002 49430 18640 30790PIT B 26-1 001 32200 11070 21130PIT C 64-1 002 51860 18500 33360PIT B 26-1 001 30390 10850 19540PIT C 64-1 002 47140 18050 29090PIT B 26-1 001 32640 11080 21560PIT C 64-1 002 47940 18060 29880PIT C 64-1 002 46680 18890 27790PIT C 64-1 002 49230 18610 30620PIT C 64-1 002 48760 17910 30850PIT C 64-1 002 46430 18120 28310PIT B 26-1 001 33320 11120 22200PIT B 26-1 001 31610 10990 20620PIT C 64-1 002 47200 17910 29290PIT B 26-1 001 32400 11050 21350PIT C 64-1 002 47550 18100 29450PIT B 26-1 001 32080 10890 21190PIT C 64-1 002 47910 18560 29350PIT B 26-1 001 31990 11000 20990PIT C 64-1 002 45590 17960 27630PIT C 64-1 002 47450 18060 29390PIT C 64-1 002 48300 18890 29410PIT C 46-3 002 30410 10850 19560PIT B 26-1 001 32550 11130 21420PIT C 64-1 002 47250 18640 28610PIT C 64-1 002 48500 18740 29760PIT B 26-1 001 33270 11050 22220PIT B 26-1 001 32430 11050 21380PIT B 26-1 001 32960 11110 21850PIT C 46-3 002 31800 11000 20800PIT C 64-1 002 46620 18100 28520PIT C 64-1 002 46750 18000 28750PIT C 46-3 002 31670 10890 20780

Page 388: June Per Shift (Truckscale Port)

PIT C 64-1 002 45490 18060 27430PIT C 46-3 002 30530 11030 19500PIT C 64-1 002 47240 18520 28720PIT C 46-3 002 31960 11010 20950PIT C 64-1 002 42720 17790 24930PIT C 46-3 002 30120 10800 19320PIT C 64-1 002 45890 17910 27980PIT C 64-1 002 47210 18540 28670PIT B 26-1 001 31710 10960 20750PIT C 46-3 002 31840 11120 20720

PIT C 46-3 002 31250 10950 20300PIT C 64-1 002 46000 18170 27830PIT C 64-1 002 46330 18010 28320PIT C 46-3 002 30670 10940 19730PIT C 64-1 002 46770 18790 27980PIT C 64-1 002 47030 18470 28560PIT C 46-3 002 31470 11040 20430PIT C 46-3 002 29940 11040 18900PIT C 46-3 002 31800 11100 20700PIT C 64-1 002 43170 17780 25390PIT C 46-3 002 29450 10830 18620PIT C 64-1 002 44820 18120 26700PIT C 46-3 002 29920 11040 18880PIT C 64-1 002 47040 18030 29010PIT C 46-3 002 31760 10900 20860PIT C 64-1 002 45790 18000 27790PIT B 26 - 001 45770 18250 27520PIT B 26 - 001 44960 18430 26530PIT B 26 - 001 46140 18220 27920PIT B 26 - 001 45840 18100 27740PIT B 26 - 001 43880 18350 25530PIT B 26 - 001 47320 18220 29100PIT B 26 - 001 47630 18140 29490PIT B 26 - 001 45860 18300 27560PIT B 26 - 001 45150 18270 26880PIT B 26 - 001 45180 18190 26990PIT B 26 - 001 45950 18310 27640PIT B 26 - 001 45980 17870 28110PIT B 26 - 001 44950 18390 26560PIT B 26 - 001 44570 18290 26280PIT B 26 - 001 45280 18310 26970PIT A 85-2 001 44710 18160 26550

Page 389: June Per Shift (Truckscale Port)

PIT B 26 - 001 45850 18250 27600PIT A 85-2 001 44930 18230 26700PIT A 85-2 001 45080 18260 26820PIT A 85-2 001 45620 18280 27340PIT A 85-2 001 46670 18080 28590PIT B 26 - 001 42020 18200 23820PIT B 26 - 001 46190 18190 28000PIT B 26 - 001 46040 18390 27650PIT B 26 - 001 46480 18360 28120PIT B 26 - 001 45430 18300 27130PIT A 85-2 001 45890 18180 27710PIT A 85-2 001 45540 18210 27330PIT A 85-2 001 46500 18130 28370PIT A 85-2 001 46710 18220 28490PIT A 85-2 001 45930 18280 27650PIT A 85-2 001 45630 18050 27580PIT B 26 - 001 46250 18140 28110PIT B 26 - 001 45860 18130 27730PIT B 26 - 001 46400 18280 28120PIT B 26 - 001 46600 18400 28200PIT B 26 - 001 45450 18230 27220PIT B 26 - 001 44900 17800 27100PIT A 85-2 001 46060 18260 27800PIT C 46-3 002 32590 11130 21460PIT C 46-3 002 31190 11030 20160PIT C 64-1 002 47460 18210 29250PIT C 64-1 002 45770 18130 27640PIT C 64-1 002 32340 11020 21320PIT C 46-3 002 32560 11030 21530PIT C 64-1 002 46130 18910 27220PIT C 46-3 002 32660 11140 21520PIT C 64-1 002 46400 18450 27950PIT C 64-1 002 48180 18590 29590PIT C 64-1 002 42460 17890 24570PIT C 46-3 002 31940 10880 21060PIT C 46-3 002 31710 10900 20810PIT C 46-3 002 30840 11230 19610PIT C 64-1 002 46210 18070 28140PIT C 64-1 002 45810 17960 27850PIT C 64-1 002 45870 18040 27830PIT C 64-1 002 43610 17750 25860PIT C 46-3 002 30170 11160 19010PIT C 46-3 002 29790 11020 18770

Page 390: June Per Shift (Truckscale Port)

PIT C 64-1 002 46100 18640 27460PIT C 46-3 002 31080 11140 19940PIT C 64-1 002 48300 18940 29360PIT C 46-3 002 30350 11010 19340PIT C 46-3 002 30030 11100 18930PIT C 64-1 002 47370 18440 28930PIT C 46-3 002 30530 10930 19600PIT C 64-1 002 48160 18620 29540PIT C 46-3 002 31490 11140 20350PIT C 64-1 002 45380 18120 27260PIT C 64-1 002 45320 18010 27310PIT C 46-3 002 29280 10850 18430PIT C 64-1 002 47110 18210 28900PIT C 46-3 002 30710 11030 19680PIT C 64-1 002 43720 17850 25870PIT C 46-3 002 30000 11060 18940PIT C 64-1 002 42010 17720 24290PIT C 46-3 002 30570 11120 19450PIT C 64-1 002 45780 18830 26950PIT C 64-1 002 47080 17900 29180PIT C 64-1 002 45940 18840 27100PIT C 64-1 002 46450 18570 27880PIT C 46-3 002 29630 11220 18410PIT C 46-3 002 30100 11030 19070PIT C 46-3 002 30590 11050 19540PIT A 85-2 001 46080 17990 28090PIT A 85-2 001 46180 18210 27970PIT B 26 - 001 46990 18220 28770PIT B 26 - 001 46130 18260 27870PIT A 85-2 001 46410 18160 28250

PIT B 26 - 001 45980 18300 27680PIT A 85-2 001 46330 18300 28030PIT A 85-2 001 45710 18250 27460PIT B 26 - 001 46420 18210 28210PIT B 26 - 001 45540 18240 27300PIT B 26 - 001 45340 18360 26980PIT A 85-2 001 44980 18170 26810PIT A 85-2 001 45530 18140 27390PIT A 85-2 001 45620 18010 27610PIT A 85-2 001 46620 18360 28260PIT B 26 - 001 46260 18180 28080PIT B 26 - 001 46030 18410 27620

Page 391: June Per Shift (Truckscale Port)

PIT B 26 - 001 45610 18360 27250PIT B 26 - 001 46410 18310 28100PIT B 26 - 001 46550 18390 28160PIT B 26 - 001 47090 18240 28850PIT A 85-2 001 44980 17720 27260PIT C 64-1 002 46480 18100 28380PIT C 64-1 002 47150 18060 29090PIT C 64-1 002 46920 18020 28900PIT C 46-3 002 30060 11210 18850PIT C 46-3 002 30800 11010 19790PIT C 46-3 002 30780 11130 19650PIT C 64-1 002 44050 17960 26090PIT C 46-3 002 29540 11050 18490PIT C 64-1 002 46090 17920 28170PIT C 64-1 002 49890 18830 31060PIT C 46-3 002 30910 11120 19790PIT C 64-1 002 46700 18660 28040PIT C 64-1 002 46430 18410 28020PIT C 46-3 002 31460 11040 20420PIT C 64-1 002 46780 17940 28840PIT C 64-1 002 32390 11140 21250PIT C 46-3 002 31600 11100 20500PIT C 64-1 002 47110 18000 29110PIT C 64-1 002 45850 18000 27850PIT C 46-3 002 30550 10990 19560PIT C 64-1 002 47410 17940 29470PIT C 46-3 002 29960 11030 18930PIT C 64-1 002 46250 17860 28390PIT C 64-1 002 45440 17830 27610PIT C 46-3 002 31050 11040 20010PIT C 64-1 002 47650 18530 29120PIT C 46-3 002 30760 11020 19740PIT C 46-3 002 29960 10910 19050PIT C 46-3 002 30860 11040 19820PIT C 64-1 002 46690 17810 28880PIT C 64-1 002 47910 18840 29070PIT C 64-1 002 47190 18500 28690PIT C 64-1 002 47810 18360 29450PIT C 46-3 002 32210 11160 21050PIT A 85-2 001 47000 18170 28830PIT A 85-2 001 45850 18310 27540PIT A 85-2 001 45610 18210 27400PIT B 26 - 001 45780 18300 27480

Page 392: June Per Shift (Truckscale Port)

PIT A 85-2 001 45130 18370 26760PIT B 26 - 001 44560 18340 26220PIT A 85-2 001 44280 17750 26530PIT B 26 - 001 45050 18280 26770PIT B 26 - 001 44100 18380 25720PIT B 26 - 001 45660 18120 27540PIT B 26 - 001 47730 18130 29600PIT A 85-2 001 45910 18280 27630PIT A 85-2 001 45080 18110 26970PIT A 85-2 001 46190 18170 28020PIT A 85-2 001 45430 18330 27100PIT B 26 - 001 45810 18350 27460PIT B 26 - 001 45930 18260 27670PIT B 26 - 001 47320 18260 29060PIT B 26 - 001 46770 18200 28570PIT A 85-2 001 45090 17720 27370PIT A 85-2 001 45100 18330 26770PIT B 26 - 001 45210 18330 26880PIT A 85-2 001 45050 18120 26930PIT C 64-1 002 46990 17870 29120PIT C 64-1 002 46510 18520 27990PIT C 46-3 002 33010 11070 21940PIT C 46-3 002 30010 10990 19020PIT C 46-3 002 32180 10950 21230PIT C 46-3 002 32420 11050 21370PIT C 64-1 002 47820 18450 29370PIT C 64-1 002 47970 17810 30160PIT C 46-3 002 31690 11030 20660PIT C 64-1 002 50290 18780 31510PIT C 46-3 002 31350 11130 20220PIT C 64-1 002 47160 18020 29140PIT C 64-1 002 49860 18340 31520PIT C 64-1 002 48760 17880 30880PIT C 64-1 002 46840 17940 28900PIT C 64-1 002 32620 11140 21480PIT C 64-1 002 49840 18550 31290PIT C 46-3 002 31440 11050 20390PIT C 46-3 002 32710 10950 21760PIT C 46-3 002 31330 11050 20280PIT C 64-1 002 49120 18700 30420PIT C 64-1 002 46340 17930 28410PIT C 46-3 002 31560 11120 20440PIT C 46-3 002 30660 11240 19420

Page 393: June Per Shift (Truckscale Port)

PIT C 64-1 002 48930 18500 30430PIT B 26 - 001 45350 17850 27500PIT B 26 - 001 47070 18250 28820PIT B 26 - 001 45640 18290 27350PIT B 26 - 001 45620 18160 27460PIT B 26 - 001 46250 18090 28160PIT B 26 - 001 45190 18260 26930PIT B 26 - 001 45300 17760 27540PIT B 26 - 001 47110 18160 28950PIT B 26 - 001 44030 17970 26060PIT B 26 - 001 43200 18260 24940PIT B 26 - 001 47360 18180 29180PIT B 26 - 001 46160 18340 27820

PIT B 26 - 001 47310 17850 29460PIT B 26 - 001 47660 18220 29440PIT B 26 - 001 47760 18260 29500PIT B 26 - 001 45390 18230 27160PIT B 26 - 001 47290 18080 29210PIT B 26 - 001 45780 18210 27570PIT B 26 - 001 46070 18050 28020PIT B 26 - 001 47060 18130 28930PIT A 85-2 001 49020 18400 30620PIT A 85-2 001 46640 18580 28060PIT B 26 - 001 45950 18150 27800PIT A 85-2 001 44290 18060 26230PIT B 26 - 001 47900 18140 29760PIT B 26 - 001 46840 17820 29020PIT B 26 - 001 47860 18300 29560PIT B 26 - 001 45310 17970 27340PIT B 26 - 001 47690 17890 29800PIT B 26 - 001 46700 18250 28450PIT B 26 - 001 49180 18070 31110PIT B 26 - 001 46400 18060 28340PIT B 26 - 001 45240 18280 26960PIT B 26 - 001 47030 18250 28780PIT A 85-2 001 44750 18550 26200PIT A 85-2 001 49070 19050 30020PIT B 26 - 001 47140 18270 28870PIT A 85-2 001 47600 18420 29180PIT B 26 - 001 45000 18120 26880PIT A 85-2 001 47680 18040 29640PIT B 26 - 001 46350 18110 28240

Page 394: June Per Shift (Truckscale Port)

PIT A 85-2 001 48040 18700 29340PIT B 26 - 001 47060 18000 29060PIT B 26 - 001 48010 17880 30130

PIT B 26 - 001 47420 18150 29270PIT B 26 - 001 47160 18300 28860PIT B 26 - 001 46950 18060 28890PIT B 26 - 001 46590 18290 28300PIT A 85-2 001 43080 18100 24980PIT B 26 - 001 48000 17780 30220PIT A 85-2 001 44600 17850 26750PIT B 26 - 001 46660 18250 28410PIT B 26 - 001 45680 18060 27620PIT B 26 - 001 47010 18060 28950PIT A 85-2 001 46420 18520 27900PIT B 26 - 001 45850 18020 27830PIT A 85-2 001 48940 18920 30020PIT A 85-2 001 45510 18920 26590PIT C 64-1 002 33040 11250 21790PIT C 64-1 002 50290 18680 31610PIT C 64-1 002 32070 11170 20900PIT C 64-1 002 47130 18090 29040PIT C 64-1 002 46210 18110 28100PIT C 64-1 002 33690 10980 22710PIT C 64-1 002 31100 11020 20080PIT C 64-1 002 31040 11170 19870PIT C 64-1 002 47890 18980 28910PIT C 64-1 002 46970 18100 28870PIT C 64-1 002 46860 18160 28700PIT C 64-1 002 49050 18070 30980PIT C 64-1 002 47370 18100 29270PIT C 64-1 002 47400 18510 28890PIT C 64-1 002 44010 17930 26080PIT A 85-2 001 46530 18690 27840PIT A 85-2 001 46400 18110 28290PIT A 85-2 001 43610 17910 25700PIT B 26 - 001 47270 18210 29060

PIT B 26 - 001 46390 18190 28200PIT B 26 - 001 45700 18160 27540PIT B 26 - 001 45290 18100 27190PIT B 26 - 001 46960 18210 28750PIT B 26 - 001 46580 18280 28300PIT B 26 - 001 45560 18070 27490

Page 395: June Per Shift (Truckscale Port)

PIT A 85-2 001 43580 18050 25530PIT A 85-2 001 47130 18670 28460PIT A 85-2 001 46730 18540 28190PIT A 85-2 001 47010 18950 28060PIT A 85-2 001 46450 18610 27840PIT A 85-2 001 43040 17820 25220PIT A 85-2 001 44350 17890 26460PIT B 26 - 001 45750 18210 27540PIT A 85-2 001 46110 18170 27940PIT B 26 - 001 46940 17800 29140PIT B 26 - 001 47270 18210 29060PIT B 26 - 001 47530 18270 29260PIT B 26 - 001 45920 18110 27810PIT B 26 - 001 46890 18360 28530PIT A 85-2 001 44230 18240 25990PIT A 85-2 001 43260 17770 25490PIT B 26 - 001 46110 18220 27890PIT B 26 - 001 47250 18220 29030PIT B 26 - 001 47240 17880 29360

PIT B 26 - 001 46970 18060 28910PIT B 26 - 001 48330 18220 30110PIT B 26 - 001 46730 18310 28420PIT B 26 - 001 48220 18250 29970PIT B 26 - 001 48760 18260 30500PIT B 26 - 001 46390 18260 28130PIT A 85-2 001 46390 18190 28200PIT C 64-1 002 46450 18180 28270PIT B 26 - 001 46350 18370 27980PIT A 85-2 001 45960 18620 27340PIT B 26 - 001 45190 18180 27010PIT A 85-2 001 43090 18090 25000PIT B 26 - 001 45670 18070 27600PIT B 26 - 001 45090 18200 26890PIT A 85-2 001 46350 18470 27880PIT B 26 - 001 44810 17830 26980PIT B 26 - 001 45160 18020 27140PIT B 26 - 001 45700 18250 27450PIT B 26 - 001 46150 18130 28020PIT B 26 - 001 45070 18160 26910PIT A 85-2 001 46950 18560 28390PIT B 26 - 001 45310 18170 27140PIT A 85-2 001 47020 19020 28000

Page 396: June Per Shift (Truckscale Port)

PIT A 85-2 001 45670 18160 27510PIT B 26 - 001 46620 18300 28320PIT B 26 - 001 44580 18300 26280PIT B 26 - 001 47130 18110 29020PIT A 85-2 001 45770 18200 27570PIT A 85-2 001 46180 18550 27630PIT A 85-2 001 43750 17980 25770PIT B 26 - 001 47680 18030 29650PIT B 26 - 001 45380 18150 27230PIT B 26 - 001 46960 17790 29170PIT A 85-2 001 41490 18500 22990PIT B 26 - 001 44650 18010 26640PIT B 26 - 001 46310 18230 28080PIT B 26 - 001 47560 18150 29410PIT B 26 - 001 47660 18200 29460PIT B 26 - 001 46630 18160 28470PIT B 26 - 001 45550 18230 27320PIT B 26 - 001 47040 17740 29300PIT A 85-2 001 45840 18080 27760PIT A 85-2 001 47580 18930 28650PIT B 26 - 001 45740 18290 27450PIT B 26 - 001 46280 18040 28240PIT B 26 - 001 46200 17980 28220PIT A 85-2 001 43570 17990 25580PIT A 85-2 001 46910 18100 28810PIT A 85-2 001 46870 18500 28370PIT B 26 - 001 45300 17770 27530PIT A 85-2 001 46060 18460 27600PIT A 85-2 001 45560 18100 27460PIT B 26 - 001 46520 18020 28500PIT A 85-2 001 46220 18440 27780PIT B 26 - 001 45450 18180 27270PIT B 26 - 001 46350 18280 28070PIT A 85-2 001 44690 18080 26610PIT A 85-2 001 44220 17990 26230PIT A 85-2 001 43390 17810 25580PIT B 26 - 001 45520 17730 27790PIT B 26 - 001 44940 18270 26670PIT B 26 - 001 46010 18140 27870

PIT B 26 - 001 45550 18250 27300PIT B 26 - 001 44690 18010 26680PIT A 85-2 001 46550 18040 28510

Page 397: June Per Shift (Truckscale Port)

PIT A 85-2 001 46780 18480 28300PIT B 26 - 001 45450 17890 27560PIT B 26 - 001 45940 18090 27850PIT A 85-2 001 47360 18570 28790PIT B 26 - 001 44140 17750 26390PIT A 85-2 001 47130 18620 28510PIT B 26 - 001 45400 18140 27260PIT B 26 - 001 46350 17960 28390PIT A 85-2 001 42860 17930 24930PIT A 85-2 001 43960 17960 26000PIT B 26 - 001 44690 18200 26490PIT B 26 - 001 46510 18130 28380PIT B 26 - 001 45850 18200 27650PIT B 26 - 001 45800 18100 27700PIT B 26 - 001 44450 18150 26300PIT B 26 - 001 44030 17940 26090PIT B 26 - 001 46680 17910 28770PIT B 26 - 001 43670 18070 25600PIT A 85-2 001 46100 18440 27660PIT A 85-2 001 46650 18500 28150PIT B 26 - 001 44470 17720 26750PIT A 85-2 001 43720 17930 25790PIT A 85-2 001 45900 18170 27730PIT A 85-2 001 47180 18920 28260PIT C 46-3 001 30760 11250 19510PIT C 64-1 002 31490 11160 20330PIT C 46- 001 32410 11130 21280PIT C 46- 001 30860 11000 19860PIT C 46- 001 30930 11230 19700PIT C 46- 001 30070 11060 19010PIT C 46- 001 30400 10910 19490PIT C 46- 001 32480 11100 21380PIT B 26 - 001 44860 18220 26640PIT B 26 - 001 45780 18220 27560PIT B 26 - 001 46390 18250 28140PIT B 26 - 001 45250 18320 26930PIT B 26 - 001 45070 17790 27280PIT B 26 - 001 44930 18190 26740PIT B 26 - 001 44670 18180 26490PIT B 26 - 001 45250 18280 26970PIT B 26 - 001 45760 18100 27660PIT B 26 - 001 44800 18390 26410PIT B 26 - 001 45520 18190 27330

Page 398: June Per Shift (Truckscale Port)

PIT B 26 - 001 44970 18060 26910PIT A 85-2 001 43080 17880 25200PIT A 85-2 001 43760 18140 25620PIT A 85-2 001 48260 18500 29760PIT B 26 - 001 46530 18220 28310PIT A 85-2 001 46400 18900 27500PIT B 26 - 001 49500 18250 31250PIT A 85-2 001 46960 18440 28520PIT B 26 - 001 45420 18320 27100PIT B 26 - 001 49210 18150 31060PIT B 26 - 001 46020 17800 28220PIT B 26 - 001 48130 18230 29900PIT A 85-2 001 47020 18300 28720PIT B 26 - 001 46730 17790 28940PIT B 26 - 001 47750 18310 29440PIT B 26 - 001 47130 18130 29000PIT B 26 - 001 48540 18400 30140PIT B 26 - 001 46870 18220 28650PIT B 26 - 001 44690 18080 26610PIT A 85-2 001 44880 18130 26750PIT B 26 - 001 45610 18240 27370

PIT A 85-2 001 43940 17900 26040PIT A 85-2 001 47470 18520 28950PIT B 26 - 001 46380 18250 28130PIT B 26 - 001 46050 18290 27760PIT B 26 - 001 46500 18160 28340PIT B 26 - 001 45630 18200 27430PIT A 85-2 001 46860 19040 27820PIT B 26 - 001 45540 17880 27660PIT A 85-2 001 47280 18620 28660PIT B 26 - 001 44690 17770 26920PIT B 26 - 001 48690 18290 30400PIT B 26 - 001 47030 18330 28700PIT B 26 - 001 46810 18100 28710PIT B 26 - 001 47390 18230 29160PIT B 26 - 001 48110 18070 30040PIT B 26 - 001 46160 18130 28030PIT A 85-2 001 46210 18560 27650PIT B 26 - 001 45450 18260 27190PIT B 26 - 001 46100 18250 27850PIT B 26 - 001 47570 18240 29330PIT A 85-2 001 42720 18110 24610

Page 399: June Per Shift (Truckscale Port)

PIT B 26 - 001 47980 18250 29730PIT B 26 - 001 46820 18100 28720PIT A 85-2 001 43060 17910 25150PIT A 85-2 001 47180 18610 28570PIT B 26 - 001 46830 18100 28730PIT B 26 - 001 48060 18300 29760PIT A 85-2 001 46500 18990 27510PIT B 26 - 001 46930 18130 28800PIT B 26 - 001 46930 18330 28600PIT B 26 - 001 46290 17820 28470PIT B 26 - 001 46750 18230 28520PIT B 26 - 001 46320 18180 28140PIT B 26 - 001 46780 18240 28540PIT C 46- 001 31150 11080 20070PIT C 46- 001 32110 11050 21060PIT C 46- 001 32500 11150 21350

PIT C 46- 001 31980 11020 20960PIT C 46- 001 33150 11060 22090PIT C 46- 001 31290 10830 20460PIT C 46- 001 30960 11000 19960PIT C 46- 001 31260 11260 20000PIT C 46- 001 31180 11130 20050PIT C 46- 001 30720 10940 19780PIT C 46- 001 30590 11250 19340PIT C 46- 001 31810 11000 20810PIT A 85-2 001 46230 18030 28200PIT B 26 - 001 47180 19060 28120PIT B 26 - 001 45470 17940 27530PIT B 26 - 001 49440 18650 30790PIT B 26 - 001 47410 18200 29210PIT B 26 - 001 44400 18100 26300PIT A 85-2 001 45470 18130 27340PIT A 85-2 001 47620 18570 29050PIT B 26 - 001 47500 18260 29240PIT B 26 - 001 45380 18160 27220PIT B 26 - 001 44250 18140 26110PIT B 26 - 001 47580 17970 29610PIT B 26 - 001 48420 18190 30230PIT B 26 - 001 47320 18260 29060PIT B 26 - 001 46600 18550 28050PIT B 26 - 001 45640 18120 27520PIT B 26 - 001 46820 18170 28650PIT B 26 - 001 49730 18180 31550PIT B 26 - 001 48840 18100 30740

Page 400: June Per Shift (Truckscale Port)

PIT B 26 - 001 46240 18170 28070PIT B 26 - 001 46220 17930 28290PIT B 26 - 001 49150 17950 31200PIT B 26 - 001 49020 18090 30930PIT B 26 - 001 47970 18160 29810PIT B 26 - 001 48950 18110 30840PIT B 26 - 001 45340 17730 27610PIT B 26 - 001 49910 18610 31300PIT B 26 - 001 46520 18610 27910PIT B 26 - 001 44330 18070 26260PIT B 26 - 001 44140 18140 26000PIT B 26 - 001 44920 18100 26820PIT B 26 - 001 44650 18030 26620PIT B 26 - 001 45400 18160 27240PIT B 26 - 001 44660 18160 26500PIT B 26 - 001 44640 18160 26480PIT B 26 - 001 42330 18240 24090

PIT B 26 - 001 43820 18100 25720PIT B 26 - 001 48850 17720 31130PIT B 26 - 001 46420 18100 28320PIT B 26 - 001 45380 18020 27360PIT B 26 - 001 44670 17910 26760PIT B 26 - 001 44150 17980 26170PIT B 26 - 001 45180 18020 27160PIT B 26 - 001 44570 18000 26570PIT B 26 - 001 45200 17700 27500PIT B 26 - 001 48220 17820 30400PIT B 26 - 001 44570 17710 26860PIT A 85- 001 45050 17870 27180PIT A 85- 001 45800 18080 27720

PIT B 26 - 001 47950 18020 29930PIT A 85- 001 46260 18050 28210PIT B 26 - 001 49690 18060 31630

PIT B 26 - 001 46870 17830 29040PIT A 85- 001 45280 17880 27400

PIT A 85- 001 46580 18000 28580PIT A 85- 001 46090 18100 27990PIT A 85- 001 46180 18040 28140PIT B 26 - 001 45170 17960 27210PIT B 26 - 001 45710 17970 27740PIT A 85- 001 46460 18190 28270PIT B 26 - 001 42840 18100 24740PIT B 26 - 001 47260 18100 29160PIT B 26 - 001 48430 18030 30400PIT A 85- 001 45180 17760 27420

PIT A 85- 001 44970 18220 26750PIT B 26 - 001 47620 17950 29670

PIT B 26 - 001 41650 17840 23810

Page 401: June Per Shift (Truckscale Port)

PIT A 85- 001 45650 18000 27650PIT B 26 - 001 44150 17950 26200PIT A 85- 001 44700 18020 26680PIT B 26 - 001 44910 18130 26780PIT A 85- 001 45240 17840 27400PIT B 26 - 001 45010 17890 27120PIT B 26 - 001 42580 17860 24720PIT B 26 - 001 45420 18060 27360PIT A 85- 001 45300 18210 27090PIT B 26 - 001 44450 18070 26380PIT B 26 - 001 48700 18440 30260

PIT B 26 - 001 43810 18010 25800PIT B 26 - 001 43040 18070 24970PIT A 85- 001 46240 18240 28000

PIT B 26 - 001 42280 17740 24540PIT B 26 - 001 48300 17730 30570PIT A 65 - 001 34740 11190 23550PIT A 65 - 001 31710 11170 20540PIT A 65 - 001 32430 11050 21380PIT A 65 - 001 30800 11080 19720PIT A 65 - 001 32040 11100 20940PIT A 65 - 001 32370 11090 21280PIT A 65 - 001 31310 10820 20490PIT A 65 - 001 31810 10980 20830PIT A 65 - 001 32430 11020 21410PIT A 65 - 001 31870 11220 20650PIT A 65 - 001 32280 11030 21250PIT A 65 - 001 33190 11230 21960PIT A 65 - 001 30960 10810 20150PIT A 65 - 001 33830 11030 22800PIT A 65 - 001 31910 11030 20880PIT A 65 - 001 32530 11190 21340PIT A 65 - 001 31800 11090 20710

PIT A 65 - 001 30760 10840 19920PIT A 65 - 001 32720 11220 21500PIT A 85- 001 44980 18010 26970PIT B 26 - 001 48440 17870 30570

PIT B 26 - 001 45490 17980 27510PIT B 26 - 001 44820 18160 26660PIT B 26 - 001 44580 17900 26680PIT B 26 - 001 44570 18100 26470PIT B 26 - 001 46520 17960 28560PIT B 26 - 001 45110 18090 27020PIT B 26 - 001 46250 18280 27970PIT A 85- 001 45560 18100 27460PIT B 26 - 001 45670 18200 27470PIT B 26 - 001 45340 18060 27280PIT B 26 - 001 46220 18170 28050PIT B 26 - 001 46630 17870 28760

Page 402: June Per Shift (Truckscale Port)

PIT A 85- 001 46640 17890 28750PIT A 85- 001 45310 17630 27680PIT B 26 - 001 41850 18000 23850PIT B 26 - 001 43230 18200 25030PIT B 26 - 001 47140 18130 29010PIT B 26 - 001 44880 17870 27010PIT B 26 - 001 50000 18830 31170PIT B 26 - 001 48030 18020 30010

PIT B 26 - 001 44530 18020 26510

PIT B 26 - 001 47390 18060 29330PIT B 26 - 001 43720 18260 25460PIT B 26 - 001 49760 18570 31190PIT B 26 - 001 44470 18310 26160PIT B 26 - 001 44210 18090 26120PIT B 26 - 001 45540 17810 27730PIT B 26 - 001 43680 18170 25510PIT B 26 - 001 44740 18160 26580PIT B 26 - 001 46490 18000 28490PIT B 26 - 001 43790 17860 25930PIT B 26 - 001 44000 18140 25860PIT B 26 - 001 46660 17840 28820PIT B 26 - 001 45140 17850 27290PIT B 26 - 001 48270 18010 30260PIT B 26 - 001 45000 18160 26840

PIT B 26 - 001 45550 18080 27470PIT B 26 - 001 49690 18110 31580PIT B 26 - 001 44670 18050 26620PIT B 26 - 001 50350 18580 31770PIT B 26 - 001 44470 18160 26310PIT B 26 - 001 45320 18150 27170PIT B 26 - 001 45990 18210 27780PIT B 26 - 001 43860 17840 26020PIT B 26 - 001 44350 17920 26430

PIT B 26 - 001 44630 18160 26470

PIT B 26 - 001 44470 18130 26340PIT B 26 - 001 47860 18000 29860PIT B 26 - 001 47820 18160 29660PIT B 26 - 001 47180 17960 29220PIT B 26 - 001 44360 18060 26300

PIT B 26 - 001 46270 17780 28490PIT B 26 - 001 45700 18130 27570PIT B 26 - 001 43880 18050 25830PIT B 26 - 001 49340 18030 31310PIT B 26 - 001 44410 18060 26350PIT B 26 - 001 44010 18140 25870

PIT B 26 - 001 51370 19000 32370PIT B 26 - 001 46390 18110 28280PIT B 26 - 001 49580 18610 30970

Page 403: June Per Shift (Truckscale Port)

PIT B 26 - 001 45160 18120 27040PIT B 26 - 001 48400 18190 30210PIT B 26 - 001 44130 17820 26310PIT B 26 - 001 45040 18150 26890PIT A 65 - 001 32550 11150 21400PIT A 65 - 001 32860 11010 21850PIT A 65 - 001 33240 11170 22070PIT A 65 - 001 30830 10930 19900PIT A 65 - 001 31980 11080 20900

PIT C 64- 001 31980 10990 20990PIT C 64- 001 31270 10990 20280PIT C 64- 001 32660 11140 21520PIT C 64- 001 32610 11160 21450PIT C 64- 001 31500 11090 20410PIT C 64- 001 32170 11100 21070PIT C 64- 001 32120 11270 20850PIT C 64- 001 32120 11290 20830PIT C 64- 001 32320 11270 21050PIT C 64- 001 33030 11100 21930PIT C 64- 001 32630 11120 21510PIT B 26 - 001 43280 17990 25290PIT B 26 - 001 48110 18040 30070PIT B 26 - 001 47200 18060 29140PIT B 26 - 001 45840 17960 27880PIT B 26 - 001 44660 17930 26730PIT B 26 - 001 47660 17930 29730PIT B 26 - 001 44930 17980 26950PIT B 26 - 001 44140 18090 26050PIT B 26 - 001 46310 18360 27950PIT B 26 - 001 44930 18070 26860PIT B 26 - 001 44880 18060 26820PIT B 26 - 001 49340 18910 30430PIT B 26 - 001 48370 18080 30290PIT B 26 - 001 43620 18030 25590PIT B 26 - 001 50130 18460 31670PIT B 26 - 001 43370 18360 25010PIT B 26 - 001 43180 17750 25430PIT B 26 - 001 47820 17900 29920PIT B 26 - 001 47940 18050 29890PIT B 26 - 001 43410 17870 25540PIT B 26 - 001 44430 18060 26370PIT B 26 - 001 42980 18110 24870PIT B 26 - 001 44660 18000 26660

PIT B 26 - 001 44850 17940 26910PIT B 26 - 001 48150 17920 30230PIT B 26 - 001 45660 17860 27800PIT B 26 - 001 45320 17850 27470PIT B 26 - 001 48210 18210 30000PIT B 26 - 001 46440 18020 28420

Page 404: June Per Shift (Truckscale Port)

PIT A 85- 001 46200 18010 28190PIT B 26 - 001 50320 18940 31380PIT B 26 - 001 47200 18050 29150PIT B 26 - 001 45390 18050 27340PIT B 26 - 001 45930 17910 28020PIT B 26 - 001 46710 18110 28600PIT B 26 - 001 45340 17960 27380PIT B 26 - 001 46960 18210 28750PIT B 26 - 001 43280 18180 25100PIT B 26 - 001 47620 18120 29500PIT C 64- 001 32550 11220 21330PIT C 64- 001 31710 11020 20690PIT C 64- 001 32090 10770 21320PIT C 64- 001 33000 10930 22070PIT C 64- 001 32340 10940 21400PIT C 64- 001 32160 11050 21110PIT C 64- 001 31850 11240 20610

PIT C 64- 001 32750 10960 21790PIT C 64- 001 32620 11030 21590PIT C 64- 001 32530 11140 21390PIT C 64- 001 33470 11200 22270PIT C 64- 001 32190 11180 21010

PIT C 64- 001 31600 11190 20410PIT C 64- 001 32390 11180 21210PIT C 64- 001 32680 10940 21740PIT C 64- 001 32970 11000 21970PIT B 26 - 001 48560 18170 30390PIT B 26 - 001 44030 18070 25960PIT B 26 - 001 47390 18070 29320PIT B 26 - 001 44360 17970 26390PIT B 26 - 001 47120 17730 29390PIT B 26 - 001 47310 17810 29500PIT B 26 - 001 43270 18260 25010

PIT B 26 - 001 43320 18090 25230PIT B 26 - 001 43930 17740 26190PIT B 26 - 001 44270 18060 26210

PIT B 26 - 001 43510 18170 25340PIT B 26 - 001 47350 18140 29210PIT B 26 - 001 44950 17900 27050PIT B 26 - 001 45060 18180 26880

PIT B 26 - 001 46980 18050 28930PIT B 26 - 001 44960 18120 26840PIT B 26 - 001 45800 18060 27740PIT B 26 - 001 50210 18760 31450PIT B 26 - 001 48600 17970 30630PIT B 26 - 001 45290 17700 27590PIT B 26 - 001 47710 17760 29950PIT B 26 - 001 44670 18090 26580PIT B 26 - 001 48950 17990 30960

Page 405: June Per Shift (Truckscale Port)

PIT B 26 - 001 44410 18070 26340PIT B 26 - 001 49780 18100 31680PIT B 26 - 001 48790 18170 30620PIT A 85- 001 46660 18230 28430PIT B 26 - 001 45330 18060 27270PIT A 85- 001 45580 17920 27660PIT B 26 - 001 46500 17740 28760PIT B 26 - 001 44690 17970 26720PIT B 26 - 001 44740 18050 26690PIT B 26 - 001 49820 18530 31290PIT B 26 - 001 45760 18210 27550PIT B 26 - 001 47040 18020 29020PIT B 26 - 001 45650 18030 27620PIT B 26 - 001 46080 17940 28140PIT A 85- 001 46080 18000 28080PIT B 26 - 001 42420 17660 24760PIT A 85- 001 45680 18120 27560PIT B 26 - 001 45660 17830 27830PIT B 26 - 001 48280 18880 29400PIT B 26 - 001 45710 17780 27930PIT B 26 - 001 47030 18130 28900PIT B 26 - 001 45330 18040 27290PIT B 26 - 001 43850 18110 25740PIT B 26 - 001 45240 18020 27220PIT B 26 - 001 48630 18590 30040PIT B 26 - 001 46580 18100 28480PIT B 26 - 001 47490 18030 29460PIT B 26 - 001 44050 17960 26090PIT B 26 - 001 45080 18100 26980PIT B 26 - 001 44810 18080 26730PIT A 85- 001 46070 17720 28350PIT A 85- 001 46330 17900 28430PIT B 26 - 001 47130 18140 28990PIT A 85- 001 46370 17980 28390PIT B 26 - 001 44830 18000 26830PIT B 26 - 001 43670 17770 25900PIT B 26 - 001 45470 18030 27440PIT A 85- 001 46770 18110 28660PIT B 26 - 001 46280 18030 28250PIT B 26 - 001 49300 18820 30480PIT B 26 - 001 47630 17930 29700PIT B 26 - 001 50320 18510 31810PIT B 26 - 001 44250 17970 26280PIT B 26 - 001 47910 18030 29880PIT B 26 - 001 44840 17860 26980PIT B 26 - 001 46880 18540 28340PIT B 26 - 001 45060 18050 27010PIT B 26 - 001 48430 18050 30380PIT B 26 - 001 46170 17920 28250

PIT A 85- 001 46520 17660 28860

Page 406: June Per Shift (Truckscale Port)

PIT B 26 - 001 46020 18090 27930PIT A 85- 001 46950 17850 29100PIT A 85- 001 46330 18070 28260

PIT B 26 - 001 47270 18000 29270PIT B 26 - 001 44540 18010 26530PIT B 26 - 001 47330 18000 29330PIT B 26 - 001 48470 18510 29960PIT B 26 - 001 47820 18040 29780PIT C 64- 001 32800 11190 21610PIT C 64- 001 31290 11010 20280PIT C 64- 001 32460 11110 21350PIT C 64- 001 31360 11050 20310PIT C 64- 001 32310 10950 21360PIT C 64- 001 33010 11060 21950PIT C 64- 001 32310 11040 21270

PIT C 64- 001 33080 11190 21890PIT C 64- 001 31340 11030 20310PIT C 64- 001 32480 10940 21540PIT C 64- 001 32560 11180 21380PIT C 64- 001 33370 11150 22220PIT C 64- 001 33720 11050 22670PIT C 64- 001 34070 11120 22950PIT C 64- 001 31410 11000 20410PIT C 64- 001 32120 11130 20990

PIT C 64- 001 31790 10980 20810

PIT C 64- 001 32980 11070 21910PIT C 64- 001 33500 10970 22530PIT C 64- 001 30910 11070 19840

PIT A 85- 001 46070 18000 28070

PIT B 26 - 001 48110 18500 29610PIT A 85- 001 48080 17960 30120PIT B 26 - 001 48200 18040 30160PIT B 26 - 001 46390 18150 28240PIT B 26 - 001 48660 18130 30530PIT B 26 - 001 48310 18130 30180PIT B 26 - 001 45540 17870 27670PIT B 26 - 001 47320 17960 29360PIT B 26 - 001 47710 18820 28890PIT B 26 - 001 46300 18150 28150PIT B 26 - 001 46190 18120 28070PIT B 26 - 001 45440 18200 27240PIT B 26 - 001 45330 18250 27080PIT B 26 - 001 45210 18160 27050PIT B 26 - 001 46820 17970 28850PIT B 26 - 001 47860 17980 29880PIT B 26 - 001 48380 17690 30690PIT B 26 - 001 48090 18200 29890PIT A 85- 001 47310 17880 29430

Page 407: June Per Shift (Truckscale Port)

PIT B 26 - 001 47730 18490 29240PIT B 26 - 001 48420 18160 30260PIT B 26 - 001 48180 18130 30050PIT B 26 - 001 47860 18560 29300

PIT B 26 - 001 47590 18120 29470PIT B 26 - 001 47780 18160 29620

PIT B 26 - 001 49180 18530 30650PIT A 85- 001 47350 18350 29000PIT B 26 - 001 48000 18170 29830

PIT B 26 - 001 48450 18020 30430PIT B 26 - 001 46760 17950 28810PIT B 26 - 001 49210 18060 31150PIT A 85- 001 47030 18150 28880PIT B 26 - 001 48130 17960 30170PIT A 85- 001 45840 18220 27620PIT B 26 - 001 49850 18840 31010PIT A 85- 001 46280 18190 28090PIT B 26 - 001 48010 17730 30280

PIT B 26 - 001 45050 17910 27140PIT B 26 - 001 48510 18120 30390PIT B 26 - 001 46700 18240 28460PIT B 26 - 001 49950 18160 31790PIT B 26 - 001 46030 18160 27870PIT A 85- 001 46550 17900 28650PIT B 26 - 001 49600 18160 31440PIT A 85- 001 44690 18070 26620PIT B 26 - 001 48130 18130 30000PIT B 26 - 001 49470 18510 30960PIT B 26 - 001 46930 18120 28810PIT B 26 - 001 49240 18530 30710PIT B 26 - 001 49090 18690 30400PIT B 26 - 001 49100 18010 31090PIT B 26 - 001 48050 18210 29840PIT B 26 - 001 44390 18100 26290PIT B 26 - 001 47930 17720 30210PIT B 26 - 001 45710 17970 27740PIT B 26 - 001 49300 18050 31250PIT B 26 - 001 45260 17980 27280PIT A 85- 001 45810 18170 27640PIT B 26 - 001 48390 18880 29510PIT A 85- 001 46460 18140 28320

PIT B 26 - 001 44610 17900 26710PIT B 26 - 001 47640 18030 29610PIT A 85- 001 47050 18100 28950PIT B 26 - 001 49410 18090 31320PIT B 26 - 001 46380 18110 28270PIT B 26 - 001 48660 18070 30590PIT C 64- 001 31640 10960 20680PIT C 64- 001 31810 11110 20700

Page 408: June Per Shift (Truckscale Port)

PIT C 64- 001 32100 11160 20940PIT C 64- 001 32450 11100 21350PIT C 64- 001 32290 11060 21230PIT C 64- 001 32230 11090 21140PIT C 64- 001 31610 11020 20590PIT C 64- 001 31420 11150 20270PIT C 64- 001 32020 11120 20900PIT C 64- 001 32280 11090 21190PIT C 64- 001 31260 11090 20170PIT C 64- 001 31820 11000 20820PIT C 64- 001 32360 11150 21210PIT C 64- 001 31940 11110 20830

PIT C 64- 001 31190 11060 20130PIT C 64- 001 32740 11030 21710PIT C 64- 001 31950 11070 20880PIT A 85- 001 45420 17970 27450PIT A 85- 001 46540 18200 28340PIT B 26 - 001 47930 18070 29860PIT A 85- 001 45520 18170 27350PIT B 26 - 001 48670 18590 30080PIT B 26 - 001 49540 17640 31900PIT B 26 - 001 48570 18180 30390PIT B 26 - 001 48960 18650 30310PIT B 26 - 001 47890 18090 29800PIT B 26 - 001 49640 17970 31670PIT B 26 - 001 47300 18510 28790PIT B 26 - 001 50100 18010 32090PIT A 85- 001 46660 18110 28550PIT A 85- 001 47250 18050 29200

PIT A 85- 001 44510 17890 26620

PIT A 85- 001 46710 18080 28630

PIT A 85- 001 45980 17960 28020PIT B 26 - 001 48780 18140 30640PIT B 26 - 001 48410 18880 29530PIT B 26 - 001 49760 17920 31840

PIT B 26 - 001 48060 17880 30180PIT B 26 - 001 44240 17850 26390PIT B 26 - 001 45480 18010 27470PIT B 26 - 001 47410 18040 29370PIT B 26 - 001 46260 18110 28150PIT B 26 - 001 45220 18060 27160PIT B 26 - 001 50480 18050 32430PIT B 26 - 001 48450 18540 29910PIT B 26 - 001 48900 18600 30300

PIT B 26 - 001 46180 17900 28280PIT B 26 - 001 50180 17920 32260PIT B 26 - 001 48520 18610 29910PIT B 26 - 001 47540 18200 29340

Page 409: June Per Shift (Truckscale Port)

PIT B 26 - 001 49010 18130 30880PIT B 26 - 001 49330 18080 31250

PIT B 26 - 001 49560 17840 31720PIT B 26 - 001 49240 17830 31410PIT B 26 - 001 44960 17960 27000PIT B 26 - 001 46050 17950 28100PIT A 85- 001 46010 18090 27920PIT B 26 - 001 45730 18200 27530PIT B 26 - 001 48850 17760 31090PIT B 26 - 001 49990 17760 32230PIT B 26 - 001 45280 18070 27210

PIT B 26 - 001 50870 18120 32750PIT B 26 - 001 49440 18030 31410

PIT A 85- 001 46300 18220 28080PIT A 85- 001 46650 17990 28660PIT B 26 - 001 49600 18000 31600PIT B 26 - 001 45370 18220 27150PIT B 26 - 001 49130 18440 30690PIT B 26 - 001 44860 18000 26860PIT B 26 - 001 47740 18040 29700PIT B 26 - 001 46440 17910 28530

PIT B 26 - 001 49350 18510 30840PIT B 26 - 001 50280 18250 32030PIT C 64- 001 32120 10960 21160PIT C 64- 001 31560 11130 20430PIT C 64- 001 31010 11030 19980PIT C 64- 001 31410 11220 20190

PIT C 64- 001 31730 10930 20800PIT C 64- 001 32180 11130 21050PIT C 64- 001 31660 11020 20640PIT C 64- 001 30920 10990 19930PIT C 64- 001 30590 11080 19510PIT C 64- 001 31850 11100 20750PIT C 64- 001 31760 11130 20630PIT C 64- 001 31550 10990 20560PIT C 64- 001 31860 11010 20850PIT B 26 - 001 45190 18520 26670PIT B 26 - 001 50200 18820 31380PIT B 26 - 001 49850 17800 32050PIT B 26 - 001 48680 17950 30730PIT B 26 - 001 49040 18080 30960

PIT B 26 - 001 49520 18190 31330PIT B 26 - 001 45120 18090 27030PIT B 26 - 001 48750 18080 30670PIT B 26 - 001 47760 18070 29690PIT B 26 - 001 46400 18130 28270PIT B 26 - 001 47230 18210 29020PIT B 26 - 001 48970 18110 30860PIT A 85- 001 46640 18070 28570

Page 410: June Per Shift (Truckscale Port)

PIT A 85- 001 45800 18090 27710

PIT A 85- 001 46740 17970 28770PIT B 26 - 001 45990 18060 27930PIT B 26 - 001 50280 18480 31800PIT B 26 - 001 46760 17910 28850PIT B 26 - 001 49460 18520 30940PIT B 26 - 001 49200 18000 31200PIT A 85- 001 46160 18130 28030PIT B 26 - 001 46220 17800 28420PIT B 26 - 001 50050 18750 31300PIT B 26 - 001 45360 18070 27290PIT B 26 - 001 44930 17990 26940PIT B 26 - 001 48240 18050 30190PIT B 26 - 001 46420 18050 28370PIT B 26 - 001 45790 18100 27690PIT B 26 - 001 44240 17940 26300PIT B 26 - 001 44310 18040 26270PIT B 26 - 001 46410 18150 28260

PIT A 85- 001 46340 18130 28210PIT B 26 - 001 48720 18440 30280PIT B 26 - 001 46950 18060 28890PIT A 85- 001 46350 18010 28340PIT B 26 - 001 44820 17960 26860

PIT B 26 - 001 46340 18090 28250PIT B 26 - 001 42480 17580 24900PIT B 26 - 001 43700 17770 25930PIT B 26 - 001 47720 18360 29360PIT B 26 - 001 48020 18480 29540PIT B 26 - 001 45620 17750 27870PIT B 26 - 001 47840 18710 29130PIT B 26 - 001 47890 18030 29860PIT A 85- 001 46310 18120 28190PIT B 26 - 001 47130 17990 29140PIT B 26 - 001 44600 18080 26520PIT B 26 - 001 47010 18090 28920PIT A 85- 001 45410 18100 27310PIT A 85- 001 46910 17970 28940PIT A 85- 001 45980 18050 27930PIT B 26 - 001 45790 18070 27720PIT B 26 - 001 45540 18040 27500PIT B 26 - 001 46000 17920 28080PIT B 26 - 001 45660 18120 27540PIT A 85- 001 45970 18060 27910PIT A 85- 001 46210 18080 28130PIT B 26 - 001 45340 17750 27590PIT B 26 - 001 47480 18410 29070PIT B 26 - 001 47700 18450 29250PIT B 26 - 001 44440 17870 26570PIT B 26 - 001 47040 18440 28600PIT B 26 - 001 45240 18030 27210

Page 411: June Per Shift (Truckscale Port)

PIT B 26 - 001 46730 18230 28500PIT B 26 - 001 47460 18650 28810PIT B 26 - 001 45990 18130 27860PIT A 85- 001 47300 17940 29360

PIT B 26 - 001 45870 18100 27770PIT B 26 - 001 47480 18830 28650PIT A 85- 001 46270 17990 28280PIT B 26 - 001 45980 18010 27970PIT B 26 - 001 45930 17850 28080PIT B 26 - 001 43770 17800 25970PIT A 85- 001 44690 18140 26550PIT A 85- 001 47490 18070 29420PIT B 26 - 001 46530 18010 28520PIT A 85- 001 46960 18010 28950PIT B 26 - 001 44440 18170 26270PIT A 85- 001 47000 18070 28930PIT B 26 - 001 49110 18410 30700PIT B 26 - 001 47420 18030 29390PIT B 26 - 001 45620 17740 27880PIT B 26 - 001 45280 17910 27370

PIT C 64- 001 32230 11100 21130PIT C 64- 001 32280 11070 21210PIT C 64- 001 31900 10960 20940PIT C 64- 001 31430 11090 20340

PIT C 64- 001 32070 10970 21100PIT C 64- 001 31710 11070 20640

PIT C 64- 001 30940 10950 19990PIT C 64- 001 31900 11140 20760PIT C 64- 001 31340 11030 20310

PIT C 64- 001 31460 10990 20470

PIT C 64- 001 31640 11060 20580PIT C 64- 001 31510 10960 20550PIT C 64- 001 31000 10940 20060PIT C 64- 001 32220 11010 21210PIT C 64- 001 31650 11030 20620PIT C 64- 001 32270 10960 21310PIT C 64- 001 31460 11060 20400

PIT C 64- 001 32950 11030 21920PIT C 64- 001 31970 10970 21000PIT C 64- 001 31100 11160 19940PIT B 26 - 001 43560 17730 25830PIT A 85- 001 45430 17940 27490PIT B 26 - 001 45540 18080 27460

PIT B 26 - 001 45560 18230 27330PIT A 85- 001 45300 17950 27350PIT B 26 - 001 46080 18220 27860PIT B 26 - 001 45690 18020 27670PIT B 26 - 001 47320 18100 29220

Page 412: June Per Shift (Truckscale Port)

PIT A 85- 001 45210 17870 27340PIT A 85- 001 47190 18150 29040PIT A 85- 001 47660 18190 29470PIT B 26 - 001 48570 18170 30400PIT B 26 - 001 48890 18130 30760PIT B 26 - 001 46090 18030 28060PIT B 26 - 001 47190 18140 29050PIT B 26 - 001 48010 18640 29370PIT A 85- 001 46160 17950 28210PIT A 85- 001 46280 17980 28300PIT B 26 - 001 40950 18010 22940PIT B 26 - 001 48990 17900 31090PIT B 26 - 001 47090 18560 28530PIT B 26 - 001 49340 18140 31200PIT B 26 - 001 47970 17900 30070PIT B 26 - 001 47890 17990 29900PIT B 26 - 001 47490 17860 29630PIT B 26 - 001 51110 18060 33050PIT A 85- 001 47900 18000 29900PIT B 26 - 001 47470 18160 29310

PIT B 26 - 001 47860 18120 29740

PIT A 85- 001 49160 18170 30990PIT B 26 - 001 46840 18090 28750

PIT A 85- 001 48270 18050 30220PIT B 26 - 001 48210 18120 30090PIT A 85- 001 48380 17870 30510PIT B 26 - 001 46690 18050 28640PIT B 26 - 001 44980 18030 26950PIT A 85- 001 48830 18060 30770PIT B 26 - 001 45540 18140 27400PIT B 26 - 001 47740 18520 29220PIT B 26 - 001 46950 18470 28480PIT A 85- 001 47060 17930 29130PIT B 26 - 001 46620 18190 28430

PIT B 26 - 001 43920 17720 26200PIT B 26 - 001 47530 18570 28960PIT B 26 - 001 46560 18050 28510PIT A 85- 001 47470 18030 29440PIT B 26 - 001 46840 17900 28940

PIT A 85- 001 47790 18020 29770PIT A 85- 001 46910 18180 28730

PIT B 26 - 001 45530 18140 27390PIT A 85-2 001 44950 18130 26820

PIT A 85-2 001 47140 18160 28980PIT A 85-2 001 45600 18170 27430PIT B 26 - 001 46190 18230 27960PIT B 26 - 001 47040 18190 28850PIT A 85- 001 46290 18040 28250

Page 413: June Per Shift (Truckscale Port)

PIT A 85- 001 47460 17870 29590PIT A 85- 001 47320 18080 29240PIT B 26 - 001 48870 18220 30650PIT A 85-2 001 47380 18240 29140PIT A 85-2 001 46910 18200 28710PIT B 26 - 001 48490 18120 30370PIT A 85-2 001 46940 18590 28350PIT A 85-2 001 47300 18090 29210PIT A 85-2 001 43060 17810 25250PIT B 26 - 001 48260 17970 30290PIT A 85-2 001 46760 18200 28560PIT B 26 - 001 46620 18150 28470PIT A 85-2 001 47240 18210 29030PIT A 85-2 001 44510 18090 26420PIT B 26 - 001 48340 18160 30180PIT B 26 - 001 49020 18310 30710PIT B 26 - 001 49360 18250 31110PIT A 85-2 001 47020 18560 28460PIT A 85-2 001 45550 18130 27420PIT A 85-2 001 45580 17980 27600PIT C 64- 001 31770 10810 20960PIT C 64- 001 31530 11010 20520

PIT C 64- 001 31380 11090 20290PIT C 64- 001 31810 11090 20720PIT C 64- 001 31630 10970 20660PIT C 64- 001 32480 11110 21370PIT C 64- 001 32040 11080 20960PIT C 64- 001 32590 10890 21700PIT C 64- 001 31150 11000 20150PIT C 64- 001 31890 10930 20960PIT C 64- 001 31510 11120 20390PIT C 64- 001 31980 11030 20950PIT C 64- 001 32550 11130 21420PIT C 64- 001 31840 11040 20800PIT C 64- 001 31650 10970 20680PIT C 64- 001 32250 11080 21170PIT A 85-2 001 47100 18130 28970

PIT A 85-2 001 47630 17960 29670PIT B 26 - 001 49350 18170 31180PIT A 85-2 001 46490 18030 28460PIT A 85-2 001 46670 18050 28620PIT B 26 - 001 50770 18150 32620PIT A 85-2 001 48650 18480 30170PIT B 26 - 001 48170 18040 30130PIT A 85-2 001 46200 18000 28200PIT B 26 - 001 48150 18100 30050PIT A 85-2 001 43480 17770 25710PIT A 85-2 001 48120 18570 29550PIT A 85-2 001 44830 18110 26720PIT A 85-2 001 48510 17830 30680

Page 414: June Per Shift (Truckscale Port)

PIT B 26 - 001 47770 17840 29930PIT B 26 - 001 48830 18210 30620PIT B 26 - 001 48330 18100 30230PIT A 85-2 001 44780 18110 26670PIT B 26 - 001 47480 17970 29510

PIT A 85-2 001 43530 17960 25570PIT B 26 - 001 48480 18080 30400PIT A 85-2 001 45580 18040 27540PIT A 85-2 001 47080 18010 29070PIT B 26 - 001 48170 18000 30170PIT A 85-2 001 46240 17870 28370PIT A 85-2 001 45770 18230 27540PIT A 85-2 001 45630 18080 27550PIT A 85-2 001 46370 18240 28130PIT A 85-2 001 47490 18510 28980PIT A 85-2 001 48450 18090 30360PIT A 85-2 001 46600 18500 28100PIT A 85-2 001 43580 18090 25490PIT A 85-2 001 46430 18090 28340PIT B 26 - 001 48690 18160 30530PIT B 26 - 001 49560 18190 31370PIT B 26 - 001 48030 17910 30120PIT A 85-2 001 48360 18150 30210PIT A 85-2 001 49400 18110 31290PIT A 85-2 001 48080 18540 29540

PIT A 85-2 001 47050 18170 28880PIT B 26 - 001 49380 18180 31200PIT B 26 - 001 49170 18210 30960PIT A 85-2 001 46370 18520 27850PIT A 85-2 001 46930 18530 28400

PIT A 85-2 001 47350 18210 29140PIT B 26 - 001 49930 18160 31770PIT A 85-2 001 47070 18110 28960PIT A 85-2 001 47410 18260 29150PIT C 64- 001 31380 11050 20330PIT C 64- 001 31860 10980 20880PIT C 64- 001 32690 10990 21700PIT C 64- 001 31730 11080 20650PIT C 64- 001 32190 11130 21060PIT C 64- 001 31340 11110 20230PIT C 64- 001 32020 10940 21080

PIT C 64- 001 31960 11050 20910PIT C 64- 001 32250 11030 21220PIT C 64- 001 32150 11030 21120PIT C 64- 001 31790 11030 20760PIT C 64- 001 32270 11080 21190PIT C 64- 001 31970 11020 20950PIT C 64- 001 32040 11190 20850PIT A 85-2 001 43350 17900 25450

Page 415: June Per Shift (Truckscale Port)

PIT A 85-2 001 46980 18180 28800PIT A 85-2 001 46090 18190 27900PIT B 26 - 001 45810 18110 27700PIT B 26 - 001 44500 18220 26280PIT B 26 - 001 43470 17900 25570PIT B 26 - 001 44550 18100 26450PIT A 85-2 001 49290 18230 31060PIT B 26 - 001 44640 18130 26510PIT A 85-2 001 48530 18070 30460PIT B 26 - 001 45420 18170 27250PIT A 85- 001 50390 18520 31870PIT A 85-2 001 48390 18160 30230PIT A 85-2 001 48780 18340 30440PIT A 85-2 001 47170 17930 29240PIT A 85- 001 48880 18590 30290PIT A 85- 001 44860 18410 26450PIT A 85-2 001 47200 17950 29250PIT A 85- 001 44570 17890 26680

PIT A 85-2 001 48560 18060 30500PIT B 26 - 001 44460 18100 26360PIT A 85- 001 42530 17850 24680PIT B 26 - 001 44570 18160 26410PIT A 85-2 001 45350 18100 27250PIT B 26 - 001 44300 18090 26210PIT B 26 - 001 44450 17880 26570PIT B 26 - 001 44910 18060 26850

PIT A 85- 001 45810 18070 27740PIT A 85-2 001 48020 18150 29870PIT A 85-2 001 47310 18020 29290PIT B 26 - 001 44990 18110 26880PIT A 85- 001 45030 18150 26880PIT A 85-2 001 48090 17840 30250PIT A 85- 001 45950 18000 27950PIT A 85- 001 45790 18550 27240PIT A 85-2 001 48090 17970 30120

PIT A 85- 001 45070 17940 27130PIT A 85-2 001 47720 17920 29800PIT A 85- 001 45380 18360 27020PIT A 85-2 001 47460 18100 29360PIT B 26 - 001 44420 17850 26570PIT A 85- 001 43760 17850 25910PIT A 85- 001 43540 17970 25570PIT B 26 - 001 43410 18090 25320PIT B 26 - 001 44230 18150 26080PIT B 26 - 001 45320 18060 27260PIT A 85-2 001 48000 18040 29960PIT B 26 - 001 45270 17770 27500PIT B 26 - 001 45250 18000 27250PIT A 85-2 001 48050 18040 30010

Page 416: June Per Shift (Truckscale Port)

PIT A 85-2 001 47680 18030 29650PIT A 85-2 001 47690 17710 29980PIT B 26 - 001 45620 18050 27570PIT B 26 - 001 46440 18020 28420PIT A 85-2 001 47700 17900 29800PIT B 26 - 001 45310 18010 27300PIT A 85-2 001 47990 17980 30010PIT B 26 - 001 46540 18040 28500PIT A 85- 001 45600 18460 27140PIT A 85-2 001 46710 18540 28170PIT A 85-2 001 49390 18470 30920PIT B 26 - 001 44700 17900 26800

PIT B 26 - 001 45630 18360 27270PIT A 85- 001 48460 18470 29990

PIT A 85- 001 44660 18150 26510PIT A 85- 001 43460 17990 25470PIT A 85- 001 47670 17910 29760PIT A 85-2 001 49680 17780 31900PIT A 85- 001 46270 17950 28320

PIT C 64- 001 31950 11100 20850

PIT C 64- 001 32090 10980 21110PIT C 64- 001 32340 10990 21350PIT C 64- 001 31840 11080 20760PIT C 64- 001 32220 11030 21190PIT C 64- 001 46140 18080 28060

PIT C 64- 001 30290 10980 19310PIT C 64- 001 31550 11060 20490PIT C 64- 001 32130 11020 21110PIT C 64- 001 32170 10950 21220PIT C 64- 001 31390 11040 20350PIT C 64- 001 31810 11110 20700PIT C 64- 001 47000 17840 29160PIT C 64- 001 31100 11010 20090PIT C 64- 001 31860 11080 20780PIT C 64- 001 32480 11000 21480PIT C 64- 001 45390 18150 27240PIT C 64- 001 31540 10910 20630PIT C 64- 001 32310 10950 21360PIT C 64- 001 32280 11060 21220PIT C 64- 001 33320 11070 22250PIT C 64- 001 30860 10140 20720PIT A 85- 001 47690 18800 28890PIT A 85-2 001 47540 17960 29580PIT A 85-2 001 47450 17940 29510PIT A 85-2 001 46140 18150 27990PIT A 85-2 001 50630 18090 32540PIT A 85-2 001 47900 18070 29830PIT A 85-2 001 47070 17940 29130PIT B 26 - 001 45950 18090 27860

Page 417: June Per Shift (Truckscale Port)

PIT B 26 - 001 45300 17990 27310PIT B 26 - 001 45350 18160 27190

PIT B 26 - 001 45550 18170 27380

PIT A 85-2 001 47120 17970 29150PIT A 85-2 001 47820 18140 29680

PIT B 26 - 001 44880 18140 26740PIT A 85-2 001 46180 18150 28030PIT A 85-2 001 48400 18160 30240PIT A 85- 001 45820 18560 27260PIT B 26 - 001 46900 17960 28940PIT A 85- 001 44960 17980 26980PIT A 85- 001 46090 18530 27560PIT A 85- 001 46740 17910 28830PIT A 85- 001 48130 18760 29370PIT B 26 - 001 41500 18130 23370PIT A 85- 001 47060 18450 28610PIT B 26 - 001 47410 18120 29290PIT A 85- 001 44470 18020 26450PIT B 26 - 001 47030 17970 29060PIT B 26 - 001 45680 17970 27710PIT A 85- 001 46480 18060 28420

PIT B 26 - 001 46660 17860 28800

PIT A 85- 001 46400 18130 28270PIT A 85- 001 46320 17950 28370PIT A 85- 001 44750 18040 26710PIT A 85- 001 45430 18130 27300PIT B 26 - 001 45490 17910 27580PIT A 85- 001 45930 18130 27800PIT A 85- 001 46420 18150 28270PIT A 85- 001 46540 17850 28690PIT B 26 - 001 47520 17960 29560PIT A 85- 001 48440 18520 29920PIT A 85- 001 45480 17980 27500PIT A 85- 001 45640 18090 27550PIT B 26 - 001 49020 18000 31020PIT A 85- 001 44460 17910 26550

PIT A 85- 001 46820 18520 28300PIT B 26 - 001 47900 17940 29960PIT A 85- 001 45810 18060 27750PIT B 26 - 001 48200 17860 30340PIT A 85- 001 46630 17880 28750PIT A 85- 001 46240 18790 27450PIT A 85- 001 46540 18440 28100PIT A 85- 001 45490 18180 27310PIT A 85- 001 46970 18580 28390PIT A 85- 001 47490 18150 29340PIT B 26 - 001 47350 17940 29410PIT A 85- 001 47270 18180 29090PIT B 26 - 001 47100 17980 29120

Page 418: June Per Shift (Truckscale Port)

PIT A 85- 001 47130 18120 29010PIT A 85- 001 46500 17910 28590PIT A 85- 001 45880 18180 27700PIT A 85- 001 45780 18080 27700PIT A 85- 001 48130 18200 29930PIT A 85- 001 49930 18680 31250PIT B 26 - 001 48680 18090 30590PIT A 85- 001 46700 18130 28570PIT B 26 - 001 48280 18050 30230PIT B 26 - 001 48060 17970 30090

PIT A 85- 001 46530 18280 28250PIT A 85- 001 45820 18130 27690PIT A 85- 001 48240 18610 29630PIT A 85- 001 48250 18900 29350PIT A 85- 001 42660 17970 24690PIT B 26 - 001 48470 18040 30430PIT A 85- 001 47670 18270 29400PIT B 26 - 001 48090 18090 30000PIT A 85- 001 47010 18250 28760PIT A 85- 001 44900 18020 26880PIT A 85- 001 46900 18650 28250PIT A 85- 001 47650 18200 29450PIT A 85- 001 44850 18160 26690PIT A 85- 001 45970 18200 27770PIT A 85- 001 50920 18280 32640PIT A 85- 001 46100 18140 27960PIT B 26 - 001 48300 18280 30020PIT A 85- 001 45920 18190 27730PIT B 26 - 001 47080 17940 29140PIT B 26 - 001 47910 17950 29960PIT A 85- 001 44220 18090 26130PIT C 64- 001 31570 11030 20540PIT C 64- 001 31500 11030 20470

PIT C 64- 001 32660 11000 21660PIT C 64- 001 32570 11090 21480PIT C 64- 001 32320 10960 21360PIT C 64- 001 31900 11160 20740

PIT C 64- 001 31660 11010 20650PIT C 64- 001 30070 11030 19040PIT C 64- 001 32130 11000 21130PIT C 64- 001 32050 11070 20980PIT C 64- 001 32260 10970 21290PIT C 64- 001 32260 11110 21150PIT C 64- 001 31690 11050 20640PIT C 64- 001 32600 11090 21510PIT C 64- 001 32250 11180 21070PIT C 64- 001 32240 11210 21030PIT C 64- 001 32580 11050 21530PIT C 64- 001 32340 11040 21300PIT A 85- 001 43290 17900 25390

Page 419: June Per Shift (Truckscale Port)

PIT A 85- 001 47370 17900 29470PIT A 85- 001 46850 18180 28670PIT A 85- 001 46510 18200 28310PIT A 85- 001 49080 18640 30440PIT B 26 - 001 48360 18030 30330PIT A 85- 001 48300 18260 30040PIT B 26 - 001 47840 18050 29790PIT A 85- 001 47680 18240 29440PIT B 26 - 001 46530 18250 28280PIT A 85- 001 46370 18200 28170PIT A 85- 001 47320 18170 29150PIT B 26 - 001 49620 18100 31520PIT A 85- 001 43600 18010 25590PIT A 85- 001 47060 18240 28820

PIT A 85- 001 48120 19050 29070PIT A 85- 001 46950 18150 28800PIT A 85- 001 44810 17990 26820PIT B 26 - 001 48410 18190 30220PIT A 85- 001 48620 18660 29960PIT A 85- 001 46560 18650 27910PIT A 85- 001 49430 18790 30640

PIT B 26 - 001 48870 17990 30880

PIT A 85- 001 46700 18560 28140PIT B 26 - 001 46890 18000 28890PIT A 85- 001 48210 18180 30030PIT B 26 - 001 48270 18130 30140PIT A 85- 001 46720 18060 28660PIT A 85- 001 47620 18940 28680PIT B 26 - 001 49400 18100 31300PIT A 85- 001 45480 18050 27430PIT A 85- 001 46590 18070 28520PIT A 85- 001 47750 18220 29530PIT A 85- 001 47590 18510 29080PIT B 26 - 001 47510 18280 29230PIT B 26 - 001 49400 18210 31190PIT A 85- 001 47340 18120 29220PIT B 26 - 001 47460 18050 29410PIT B 26 - 001 47750 18220 29530PIT A 85- 001 47150 18170 28980PIT B 26 - 001 47550 18030 29520PIT B 26 - 001 48210 18140 30070PIT B 26 - 001 47440 18160 29280PIT B 26 - 001 47690 18260 29430PIT A 85- 001 46380 18170 28210PIT B 26 - 001 48120 18180 29940PIT A 85- 001 49260 18220 31040PIT C 64- 001 32290 11190 21100PIT C 64- 001 31890 11090 20800PIT C 64- 001 32100 11170 20930

Page 420: June Per Shift (Truckscale Port)

PIT C 64- 001 32360 11070 21290

PIT C 64- 001 32250 11150 21100PIT C 64- 001 32890 11060 21830PIT C 64- 001 32970 10970 22000PIT C 64- 001 32280 11150 21130PIT C 64- 001 33240 11080 22160PIT C 64- 001 32810 11080 21730PIT A 85- 001 46730 18080 28650PIT A 85- 001 48230 18760 29470PIT A 85- 001 44810 17990 26820PIT A 85- 001 49930 18030 31900PIT B 26 - 001 46690 18210 28480PIT A 85- 001 49230 17950 31280PIT A 85- 001 48210 18010 30200PIT B 26 - 001 46710 18110 28600PIT B 26 - 001 45810 18050 27760PIT A 85- 001 42510 18120 24390PIT A 85- 001 45410 18200 27210PIT B 26 - 001 46180 18630 27550PIT A 85- 001 49230 18230 31000PIT A 85- 001 48750 17960 30790

PIT A 85- 001 48830 18210 30620PIT A 85- 001 48840 18820 30020PIT A 85- 001 50910 18590 32320PIT A 85- 001 50360 18170 32190PIT B 26 - 001 44200 18070 26130PIT B 26 - 001 45630 17980 27650PIT B 26 - 001 45330 18030 27300

PIT A 85- 001 46580 18190 28390PIT A 85- 001 48890 17970 30920PIT B 26 - 001 46400 18020 28380PIT A 85- 001 48870 18230 30640PIT A 85- 001 48300 18140 30160

PIT A 85- 001 45100 17810 27290PIT B 26 - 001 45090 18210 26880PIT B 26 - 001 43150 18030 25120PIT B 26 - 001 44820 18160 26660PIT A 85- 001 50450 18590 31860PIT A 85- 001 47030 18050 28980PIT A 85- 001 48440 17900 30540PIT A 85- 001 47540 18110 29430

PIT A 85- 001 48060 17960 30100

PIT A 85- 001 51110 18770 32340PIT A 85- 001 47730 18050 29680PIT A 85- 001 49800 18520 31280PIT B 26 - 001 45530 18130 27400PIT A 85- 001 47920 18010 29910PIT B 26 - 001 46350 17900 28450PIT B 26 - 001 46550 18170 28380

Page 421: June Per Shift (Truckscale Port)

PIT A 85- 001 46940 17980 28960PIT B 26 - 001 46700 18110 28590PIT B 26 - 001 46230 17940 28290PIT A 85- 001 48320 17920 30400PIT A 85- 001 47840 17990 29850PIT B 26 - 001 45330 18140 27190PIT A 85- 001 47330 18040 29290PIT A 85- 001 46330 17550 28780PIT A 85- 001 50220 18750 31470PIT A 85- 001 48350 18080 30270PIT A 85- 001 47810 18900 28910PIT A 85- 001 49430 17900 31530PIT A 85- 001 48240 17930 30310PIT A 85- 001 49590 17910 31680PIT A 85- 001 48020 18080 29940PIT A 85- 001 48620 18540 30080PIT B 26 - 001 45410 18010 27400PIT B 26 - 001 45730 17880 27850PIT B 26 - 001 46360 18030 28330

Harita Parama Murti 001 49590 17980 31610PIT A 85- 001 44860 18050 26810PIT B 26 - 001 45620 18080 27540PIT B 26 - 001 43880 18130 25750

PIT B 26 - 001 45060 18050 27010PIT A 85- 001 49900 18000 31900PIT A 85- 001 47740 18090 29650PIT A 85- 001 50140 17940 32200PIT A 85- 001 48500 17890 30610PIT A 85- 001 48180 18070 30110PIT A 85- 001 47890 18430 29460PIT A 85- 001 49460 18490 30970PIT A 85- 001 46300 17810 28490PIT A 85- 001 47600 18010 29590PIT B 26 - 001 47130 17960 29170PIT A 85- 001 48600 17870 30730PIT B 26 - 001 43820 18090 25730PIT A 85- 001 50980 18700 32280PIT B 26 - 001 45500 17940 27560PIT A 85- 001 50400 18820 31580PIT A 85- 001 48070 18080 29990PIT B 26 - 001 44540 18020 26520PIT A 85- 001 47640 18060 29580PIT B 26 - 001 45690 18130 27560PIT B 26 - 001 45510 18200 27310PIT B 26 - 001 46000 17710 28290PIT A 85- 001 43650 17940 25710

PIT A 85- 001 50880 18090 32790PIT A 85- 001 47800 18110 29690PIT A 85- 001 47820 18370 29450PIT A 85- 001 49200 18450 30750

Page 422: June Per Shift (Truckscale Port)

PIT A 85- 001 48030 17990 30040

PIT B 26 - 001 44920 18000 26920PIT C 64- 001 31720 11090 20630PIT C 64- 001 30750 11000 19750PIT C 64- 001 30100 10890 19210PIT C 64- 001 31800 11090 20710PIT C 64- 001 32480 11080 21400PIT C 64- 001 31570 11040 20530PIT C 64- 001 31590 11010 20580PIT C 64- 001 32600 11200 21400PIT C 64- 001 30830 10860 19970PIT C 64- 001 30320 10820 19500

PIT C 64- 001 31240 11010 20230PIT C 64- 001 31610 11010 20600PIT C 64- 001 31590 11030 20560PIT C 64- 001 32260 10980 21280PIT C 64- 001 30770 10840 19930PIT C 64- 001 31490 11080 20410

PIT C 64- 001 30510 10920 19590PIT C 64- 001 31000 11000 20000PIT C 64- 001 32530 11030 21500PIT C 64- 001 32340 10990 21350PIT C 64- 001 31770 10940 20830PIT C 64- 001 31720 11060 20660PIT C 64- 001 32000 10980 21020PIT C 64- 001 31280 11020 20260PIT C 64- 001 31800 11020 20780PIT C 64- 001 30650 11010 19640PIT A 85- 001 48200 18060 30140PIT A 85- 001 49870 18090 31780PIT A 85- 001 49990 18090 31900PIT A 85- 001 44100 17810 26290

PIT A 85- 001 47070 18060 29010PIT B 26 - 001 44520 18130 26390PIT A 85- 001 47830 17950 29880PIT B 26 - 001 45780 17940 27840PIT A 85- 001 47140 18180 28960PIT B 26 - 001 46220 17860 28360PIT B 26 - 001 45820 17910 27910PIT A 85- 001 48540 18080 30460PIT B 26 - 001 44390 18080 26310PIT A 85- 001 48390 18060 30330PIT A 85- 001 49590 18040 31550PIT A 85- 001 46950 18130 28820PIT A 85- 001 49340 18410 30930PIT B 26 - 001 43490 17850 25640PIT A 85- 001 47830 18040 29790PIT B 26 - 001 45730 18210 27520

Page 423: June Per Shift (Truckscale Port)

PIT A 85- 001 48710 18700 30010PIT B 26 - 001 45650 18200 27450PIT B 26 - 001 43880 18030 25850PIT B 26 - 001 44600 18060 26540PIT A 85- 001 48600 17990 30610PIT B 26 - 001 44290 17940 26350PIT A 85- 001 49020 18400 30620PIT A 85- 001 45940 17990 27950PIT A 85- 001 47590 18040 29550PIT A 85- 001 48440 18050 30390PIT A 85- 001 47700 17880 29820PIT A 85- 001 46940 18010 28930PIT A 85- 001 43930 17920 26010PIT A 85- 001 47680 17910 29770PIT A 85- 001 44150 17780 26370PIT A 85- 001 48310 18110 30200PIT A 85- 001 47030 17870 29160PIT A 85- 001 44700 18020 26680PIT A 85- 001 46920 18110 28810PIT A 85- 001 48800 18400 30400PIT B 26 - 001 45930 18120 27810PIT B 26 - 001 47070 18150 28920PIT A 85- 001 46530 18050 28480PIT A 85- 001 49320 18560 30760

PIT B 26 - 001 45890 17990 27900PIT A 85- 001 47400 18600 28800PIT C 64- 001 32500 11000 21500PIT C 64- 001 31790 11010 20780PIT C 64- 001 31970 11010 20960

PIT C 64- 001 32090 11000 21090PIT C 64- 001 31970 11000 20970PIT C 64- 001 32290 11070 21220PIT C 64- 001 30860 10980 19880PIT C 64- 001 31970 10940 21030PIT A 85- 001 47290 18570 28720

PIT A 85- 001 47470 18110 29360PIT A 85- 001 48710 18550 30160PIT A 85- 001 46170 18050 28120PIT B 26 - 001 46310 17980 28330PIT B 26 - 001 45930 18170 27760PIT B 26 - 001 45190 17970 27220

PIT A 85- 001 45300 18000 27300PIT B 26 - 001 46190 17980 28210PIT B 26 - 001 46530 18130 28400PIT A 85- 001 44790 17960 26830

PIT A 85- 001 47490 17840 29650PIT A 85- 001 45490 17980 27510PIT A 85- 001 48600 18080 30520PIT B 26 - 001 46550 17930 28620

Page 424: June Per Shift (Truckscale Port)

PIT A 85- 001 46370 17960 28410PIT A 85- 001 45030 18080 26950PIT A 85- 001 46240 18180 28060PIT A 85- 001 46600 18140 28460PIT A 85- 001 47400 18060 29340PIT A 85- 001 45260 17960 27300PIT A 85- 001 45810 18480 27330PIT A 85- 001 47510 18060 29450PIT A 85- 001 46720 19500 27220PIT B 26 - 001 45510 17970 27540PIT A 85- 001 47940 18030 29910PIT B 26 - 001 44590 18000 26590PIT A 85- 001 47130 18110 29020PIT B 26 - 001 45470 18210 27260PIT A 85- 001 47240 17970 29270PIT B 26 - 001 44840 17900 26940PIT A 85- 001 45470 17840 27630PIT A 85- 001 48130 18110 30020PIT B 26 - 001 44710 18220 26490PIT A 85- 001 45820 18010 27810PIT A 85- 001 45070 18030 27040

PIT A 85- 001 45250 18140 27110PIT A 85- 001 47900 18080 29820

PIT A 85- 001 48070 18090 29980

PIT A 85- 001 45910 18000 27910PIT A 85- 001 48980 18460 30520PIT A 85- 001 46690 18130 28560PIT B 26 - 001 45280 18080 27200

PIT A 85- 001 47450 18120 29330PIT B 26 - 001 45600 18200 27400PIT A 85- 001 44360 18060 26300PIT A 85- 001 48290 17990 30300PIT A 85- 001 48270 18080 30190PIT A 85- 001 45370 17960 27410PIT A 85- 001 47430 18170 29260PIT A 85- 001 45890 18110 27780PIT A 85- 001 47860 17970 29890PIT A 85- 001 44850 18540 26310PIT A 85- 001 46650 17860 28790PIT C 64- 001 32190 10900 21290PIT C 64- 001 32430 11090 21340PIT C 64- 001 31990 11020 20970PIT C 64- 001 31890 11000 20890PIT C 64- 001 31870 10990 20880

PIT C 64- 001 32320 10980 21340PIT C 64- 001 31920 11100 20820

PIT C 64- 001 32470 11000 21470PIT C 64- 001 32260 11010 21250

Page 425: June Per Shift (Truckscale Port)

PIT C 64- 001 31950 11070 20880PIT C 64- 001 32350 10990 21360PIT B 26 - 001 48070 17980 30090PIT B 26 - 001 48180 18020 30160PIT A 85- 001 47840 18490 29350PIT A 85- 001 49080 17970 31110PIT B 26 - 001 48230 18170 30060PIT B 26 - 001 44380 18140 26240PIT B 26 - 001 45860 18070 27790

PIT B 26 - 001 48100 18040 30060PIT B 26 - 001 43250 18110 25140PIT A 85- 001 50230 18220 32010PIT A 85- 001 47290 17990 29300PIT B 26 - 001 45150 17960 27190PIT A 85- 001 50930 18500 32430PIT A 85- 001 48360 18090 30270PIT A 85- 001 48500 18080 30420PIT B 26 - 001 44800 18040 26760PIT A 85- 001 48570 17970 30600PIT B 26 - 001 45140 18020 27120PIT A 85- 001 49440 18520 30920PIT A 85- 001 48880 18150 30730PIT A 85- 001 46440 18110 28330PIT A 85- 001 51310 18370 32940PIT B 26 - 001 45780 18040 27740

PIT A 85- 001 49510 18040 31470PIT A 85- 001 47340 18070 29270PIT B 26 - 001 42320 18010 24310PIT A 85- 001 50060 17900 32160PIT B 26 - 001 44820 18120 26700PIT B 26 - 001 44530 18080 26450PIT A 85- 001 46350 17970 28380PIT A 85- 001 42130 18080 24050PIT A 85- 001 48900 18460 30440PIT A 85- 001 49430 17980 31450PIT A 85- 001 48270 18100 30170PIT A 85- 001 49340 17920 31420PIT A 85- 001 47690 17980 29710PIT A 85- 001 49490 17990 31500PIT A 85- 001 50400 18500 31900

PIT A 85- 001 48930 17950 30980PIT A 85- 001 49540 18010 31530PIT A 85- 001 47870 18060 29810PIT A 85- 001 51850 18500 33350PIT A 85- 001 48610 18100 30510PIT A 85- 001 49810 18020 31790PIT A 85- 001 48340 17910 30430PIT A 85- 001 48940 17960 30980PIT A 85- 001 47390 18100 29290PIT A 85- 001 49050 18480 30570

Page 426: June Per Shift (Truckscale Port)

PIT A 85- 001 46910 18180 28730PIT A 85- 001 46770 17960 28810PIT A 85- 001 47960 17900 30060PIT A 85- 001 48280 17890 30390PIT A 85- 001 44740 17990 26750PIT A 85- 001 47810 17910 29900

PIT A 85- 001 47500 17920 29580PIT A 85- 001 48410 17940 30470PIT A 85- 001 47620 17990 29630PIT A 85- 001 48860 17880 30980PIT A 85- 001 49260 17900 31360PIT A 85- 001 49530 18460 31070PIT A 85- 001 48600 17950 30650PIT A 85- 001 44510 18170 26340PIT A 85- 001 48840 18140 30700PIT A 85- 001 49620 18300 31320

PIT A 85- 001 47580 18080 29500PIT A 85- 001 46480 17880 28600PIT A 85- 001 48460 18430 30030

PIT A 85- 001 48090 18170 29920PIT A 85- 001 48930 18080 30850PIT A 85- 001 47660 18090 29570PIT A 85- 001 50410 17820 32590PIT A 85- 001 47630 17950 29680PIT A 85- 001 43360 18140 25220PIT A 85- 001 48710 17840 30870PIT A 85- 001 48620 17830 30790PIT A 85- 001 50040 17870 32170PIT A 85- 001 49350 17870 31480PIT A 85- 001 48770 17940 30830PIT A 85- 001 50080 18520 31560PIT A 85- 001 45500 17880 27620PIT A 85- 001 48880 18060 30820PIT A 85- 001 47890 18170 29720PIT C 64- 001 31490 11060 20430PIT C 64- 001 31250 10930 20320

PIT C 64- 001 31210 11020 20190

PIT C 64- 001 31460 11030 20430PIT C 64- 001 32070 10980 21090PIT C 64- 001 32070 11070 21000PIT C 64- 001 31710 11020 20690PIT C 64- 001 31490 10930 20560PIT C 64- 001 31090 11060 20030PIT C 64- 001 31800 10940 20860PIT C 64- 001 31470 11040 20430PIT C 64- 001 31440 10870 20570PIT C 64- 001 30970 11030 19940PIT C 64- 001 30960 11070 19890PIT C 64- 001 30650 10990 19660

Page 427: June Per Shift (Truckscale Port)

PIT C 64- 001 31290 11020 20270PIT C 64- 001 31170 10980 20190PIT C 64- 001 31110 10970 20140PIT A 85- 001 47180 17970 29210PIT A 85- 001 49430 18000 31430PIT A 85- 001 47510 18020 29490PIT A 85- 001 48990 17930 31060PIT A 85- 001 48730 17930 30800PIT A 85- 001 47730 18050 29680PIT A 85- 001 47140 17970 29170

PIT A 85- 001 48440 18050 30390PIT A 85- 001 49010 18040 30970PIT A 85- 001 49160 18050 31110PIT A 85- 001 48570 18010 30560

PIT A 85- 001 48470 18010 30460PIT A 85-2 001 48010 17940 30070PIT A 85-2 001 44410 17860 26550PIT A 85- 001 46750 18570 28180PIT A 85- 001 47470 17990 29480PIT A 85- 001 50860 18580 32280PIT A 85- 001 47440 17860 29580PIT A 85- 001 45770 17980 27790PIT A 85- 001 44490 18110 26380PIT A 85- 001 49250 18090 31160PIT A 85- 001 47430 17990 29440PIT A 85- 001 45280 18780 26500PIT A 85- 001 46870 18090 28780

PIT A 85- 001 46570 17880 28690PIT A 85- 001 43690 17920 25770PIT A 85- 001 46230 18180 28050

PIT A 85- 001 45140 18150 26990PIT A 85- 001 45740 17970 27770PIT A 85- 001 45370 18020 27350PIT A 85- 001 47050 18140 28910PIT A 85- 001 48320 18070 30250

PIT A 85- 001 44220 17780 26440PIT A 85- 001 47090 18000 29090PIT A 85- 001 45440 18470 26970PIT A 85- 001 47420 17830 29590PIT A 85- 001 44270 18090 26180PIT A 85- 001 48950 17880 31070PIT A 85- 001 46500 17970 28530PIT A 85- 001 44850 18090 26760PIT A 85- 001 47330 18070 29260PIT A 85- 001 41810 18040 23770

PIT A 85- 001 48000 18450 29550PIT A 85- 001 44000 18800 25200PIT A 85- 001 44970 17760 27210

Page 428: June Per Shift (Truckscale Port)

PIT A 85- 001 43150 18040 25110PIT A 85- 001 43480 18170 25310PIT A 85- 001 44590 18160 26430PIT A 85- 001 46430 18000 28430PIT A 85- 001 42650 17800 24850PIT A 85- 001 46500 18020 28480PIT A 85- 001 45290 18130 27160

PIT A 85- 001 46180 17990 28190PIT A 85- 001 46980 18510 28470PIT A 85- 001 42650 17810 24840

PIT A 85- 001 46300 17880 28420PIT A 85- 001 46540 18030 28510PIT A 85- 001 45740 18040 27700PIT A 85- 001 44180 18840 25340PIT A 85- 001 46770 18290 28480PIT A 85- 001 44660 18150 26510

PIT A 85- 001 46270 18120 28150PIT A 85- 001 46980 18510 28470PIT A 85- 001 46470 18160 28310PIT A 85- 001 42060 17890 24170PIT C 64- 001 30540 10970 19570

PIT C 64- 001 31030 11100 19930PIT C 64- 001 31050 11020 20030

PIT C 64- 001 30330 10950 19380PIT C 64- 001 33250 11110 22140PIT C 64- 001 33340 11000 22340PIT C 64- 001 33210 11040 22170PIT C 64- 001 32310 11010 21300PIT C 64- 001 32280 10940 21340PIT C 64- 001 32410 11020 21390PIT C 64- 001 33580 11010 22570PIT C 64- 001 32530 11070 21460PIT C 64- 001 33290 11030 22260PIT A 85- 001 47400 18040 29360

PIT A 85- 001 43180 18040 25140

PIT A 85- 001 47470 17980 29490PIT A 85- 001 46360 18020 28340PIT A 85- 001 43250 18020 25230PIT A 85- 001 44330 17860 26470PIT A 85- 001 47230 18110 29120PIT A 85- 001 43390 18120 25270PIT A 85- 001 43030 17800 25230

PIT A 85- 001 44950 17900 27050PIT A 85- 001 47720 18010 29710PIT A 85- 001 44890 18040 26850PIT A 85- 001 42040 17840 24200PIT A 85- 001 46800 18090 28710PIT A 85- 001 44230 18060 26170

Page 429: June Per Shift (Truckscale Port)

PIT A 85- 001 44310 18120 26190PIT A 85- 001 47430 18750 28680PIT A 85- 001 44120 18820 25300PIT A 85- 001 46850 18080 28770PIT A 85- 001 44610 18290 26320PIT A 85- 001 47110 17830 29280PIT A 85- 001 45490 17920 27570PIT A 85- 001 45960 18620 27340

PIT A 85- 001 43380 18170 25210PIT A 85- 001 43950 18190 25760PIT A 85- 001 47030 18130 28900PIT A 85- 001 45940 17990 27950PIT A 85- 001 45360 18000 27360PIT A 85- 001 45940 18250 27690PIT A 85- 001 45030 18270 26760PIT A 85- 001 46570 18070 28500

PIT A 85- 001 46120 18130 27990PIT A 85- 001 45650 18060 27590PIT A 85- 001 42760 17950 24810PIT A 85- 001 45090 18920 26170PIT A 85- 001 45560 18620 26940PIT A 85- 001 45340 18170 27170PIT C 64- 001 33190 10980 22210PIT C 64- 001 32200 11090 21110PIT C 64- 001 33670 10980 22690PIT C 64- 001 32870 11010 21860PIT C 64- 001 32460 10990 21470PIT C 64- 001 33170 10920 22250PIT C 64- 001 31900 11050 20850PIT C 64- 001 32650 11100 21550PIT C 64- 001 33580 11030 22550PIT C 64- 001 33250 11080 22170PIT C 64- 001 32020 11060 20960PIT C 64- 001 33440 11080 22360PIT A 85- 001 44730 17930 26800PIT A 85- 001 44120 18070 26050PIT A 85- 001 45670 17900 27770PIT A 85- 001 46500 18080 28420PIT A 85- 001 47140 18030 29110PIT A 85- 001 46280 18250 28030PIT A 85- 001 41540 18390 23150PIT A 85- 001 44940 18220 26720PIT A 85- 001 43550 18000 25550PIT A 85- 001 45140 18010 27130

PIT A 85- 001 44880 18120 26760PIT A 85- 001 45960 18570 27390

PIT A 85- 001 45080 17960 27120PIT A 85- 001 45000 18200 26800PIT A 85- 001 43400 17930 25470

Page 430: June Per Shift (Truckscale Port)

PIT A 85- 001 46310 18160 28150PIT A 85- 001 46520 18880 27640PIT A 85- 001 44690 18060 26630PIT A 85- 001 44670 17970 26700PIT A 85- 001 45050 18190 26860

PIT A 85- 001 42560 17870 24690PIT A 85- 001 48020 18620 29400PIT A 85- 001 44450 17990 26460PIT A 85- 001 44680 18060 26620PIT A 85- 001 44880 18120 26760PIT A 85- 001 47660 18330 29330PIT A 85- 001 45800 18150 27650

PIT A 85- 001 44070 18170 25900PIT A 85- 001 45160 18170 26990PIT A 85- 001 48150 18130 30020PIT A 85- 001 45720 18530 27190PIT A 85- 001 47840 18500 29340

PIT A 85- 001 47980 18150 29830PIT A 85- 001 45350 18100 27250PIT A 85- 001 46430 18910 27520

PIT A 85- 001 47930 18130 29800PIT A 85- 001 46870 18160 28710PIT A 85- 001 46990 18690 28300PIT A 85- 001 46740 17940 28800PIT A 85- 001 47100 18180 28920PIT A 85- 001 48190 18120 30070PIT A 85- 001 47480 18060 29420PIT A 85- 001 46750 18550 28200PIT A 85- 001 48700 17900 30800PIT A 85- 001 46630 17860 28770PIT A 85- 001 45200 18100 27100PIT A 85- 001 48100 18100 30000PIT A 85- 001 48800 18210 30590PIT A 85- 001 46060 18200 27860PIT A 85- 001 44960 17870 27090PIT A 85- 001 47640 18150 29490PIT A 85- 001 43690 17800 25890PIT A 85- 001 44970 17910 27060PIT A 85- 001 46400 18110 28290PIT A 85- 001 45150 18070 27080PIT A 85- 001 44980 18280 26700

PIT A 85- 001 47560 18880 28680PIT A 85- 001 46480 17970 28510PIT A 85- 001 45630 17870 27760PIT A 85- 001 45020 18050 26970PIT A 85- 001 45750 18020 27730

PIT A 85- 001 47080 18490 28590PIT A 85- 001 48000 18010 29990

Page 431: June Per Shift (Truckscale Port)

PIT A 85- 001 47490 17990 29500PIT A 85- 001 45190 18050 27140

PIT A 85- 001 46360 18020 28340

PIT A 85- 001 48340 18260 30080PIT A 85- 001 48500 18120 30380

PIT A 85- 001 46040 17960 28080PIT A 85- 001 47720 17730 29990

PIT A 85- 001 46900 18050 28850PIT A 85- 001 46320 18070 28250PIT A 85- 001 46550 18110 28440PIT A 85- 001 47900 18010 29890PIT A 85- 001 47730 18490 29240PIT A 85- 001 45330 18270 27060PIT A 85- 001 47770 18140 29630PIT A 85- 001 47640 17860 29780PIT A 85- 001 47260 18010 29250PIT A 85- 001 50500 18430 32070PIT A 85- 001 46700 18420 28280PIT A 85- 001 46020 18040 27980PIT A 85- 001 46620 18070 28550PIT A 85- 001 45160 18000 27160PIT A 85- 001 45910 17970 27940PIT A 85- 001 47940 18030 29910

PIT A 85- 001 43520 17990 25530PIT A 85- 001 40180 17740 22440PIT A 85- 001 45560 17940 27620PIT A 85- 001 47080 17960 29120

PIT A 85- 001 44870 17810 27060PIT C 64- 001 30810 11010 19800PIT C 64- 001 32610 11090 21520PIT C 64- 001 32120 11030 21090PIT C 64- 001 31410 11050 20360PIT C 64- 001 31950 10890 21060

PIT C 64- 001 30440 10980 19460PIT C 64- 001 32490 11030 21460PIT C 64- 001 31910 10980 20930PIT C 64- 001 31620 11010 20610PIT C 64- 001 32670 10980 21690PIT C 64- 001 31950 11020 20930PIT C 64- 001 32720 10910 21810PIT C 64- 001 32010 11000 21010PIT C 64- 001 31370 11040 20330PIT C 64- 001 30250 11010 19240

PIT C 64- 001 31530 11070 20460PIT C 64- 001 30960 10960 20000PIT C 64- 001 31160 10990 20170PIT C 64- 001 31430 10920 20510PIT A 85- 001 47750 18120 29630

Page 432: June Per Shift (Truckscale Port)

PIT A 85- 001 47980 18100 29880PIT A 85- 001 46720 17850 28870PIT A 85- 001 45550 17890 27660

PIT A 85- 001 45920 17800 28120PIT A 85- 001 47410 17940 29470PIT A 85- 001 47460 17990 29470PIT A 85- 001 48040 17890 30150PIT A 85- 001 48720 18060 30660PIT A 85- 001 46020 18030 27990PIT A 85- 001 47580 18040 29540PIT A 85- 001 47960 18050 29910PIT A 85- 001 46280 18060 28220PIT A 85- 001 45330 17940 27390PIT A 85- 001 46830 17940 28890PIT A 85- 001 47870 17960 29910PIT A 85- 001 47560 18390 29170PIT A 85- 001 46370 18040 28330PIT A 85- 001 45660 17930 27730PIT A 85- 001 48390 18790 29600PIT A 85- 001 47260 18110 29150PIT A 85- 001 46590 17820 28770

PIT A 85- 001 45290 17920 27370PIT A 85- 001 45030 18080 26950PIT A 85- 001 45850 17850 28000PIT A 85- 001 45990 18050 27940PIT A 85- 001 46440 18040 28400PIT A 85- 001 45750 18050 27700PIT A 85- 001 44870 18010 26860PIT A 85- 001 45970 18190 27780PIT A 85- 001 43690 17950 25740PIT A 85- 001 44520 17710 26810PIT A 85- 001 45480 18140 27340PIT A 85- 001 44230 18200 26030PIT A 85- 001 46290 17980 28310

PIT A 85- 001 44300 18090 26210PIT A 85- 001 45390 18610 26780PIT A 85- 001 45500 18150 27350PIT A 85- 001 45550 18030 27520PIT A 85- 001 44700 17990 26710PIT A 85- 001 45540 18800 26740PIT A 85- 001 46070 18070 28000PIT A 85- 001 46660 18080 28580PIT A 85- 001 45700 17930 27770PIT A 85- 001 44980 17970 27010PIT A 85- 001 46510 18040 28470PIT A 85- 001 46510 18080 28430PIT A 85- 001 47670 18070 29600PIT A 85- 001 46180 18020 28160PIT A 85- 001 45490 18220 27270

Page 433: June Per Shift (Truckscale Port)

PIT A 85- 001 46640 17940 28700PIT A 85- 001 45230 18160 27070PIT A 85- 001 45820 18180 27640PIT A 85- 001 42890 17760 25130PIT A 85- 001 44870 18180 26690PIT A 85- 001 46730 18070 28660PIT A 85- 001 46490 18040 28450PIT A 85- 001 47630 18680 28950PIT A 85- 001 46710 18140 28570PIT A 85- 001 46600 18090 28510PIT A 85- 001 48680 18790 29890PIT A 85- 001 45020 17990 27030PIT A 85- 001 44700 17950 26750PIT A 85- 001 43550 18080 25470

PIT A 85- 001 45900 18110 27790PIT A 85- 001 44610 17930 26680

PIT A 85- 001 44180 18060 26120PIT A 85- 001 44850 18050 26800PIT A 85- 001 45290 17900 27390PIT A 85- 001 45660 18030 27630PIT C 64- 001 32670 11090 21580PIT C 64- 001 30850 10970 19880PIT C 64- 001 31740 10950 20790PIT C 64- 001 31110 11080 20030PIT C 64- 001 30370 10990 19380PIT A 65 - 001 33830 11060 22770PIT A 65 - 001 32450 11050 21400PIT A 65 - 001 33510 10990 22520

PIT A 65 - 001 32290 10970 21320PIT A 65 - 001 33200 11100 22100PIT A 65 - 001 30920 10990 19930PIT A 65 - 001 34520 11020 23500PIT A 65 - 001 32930 11120 21810PIT A 65 - 001 32970 10900 22070PIT A 65 - 001 33010 10970 22040PIT A 65 - 001 33630 11120 22510PIT A 65 - 001 32450 11050 21400PIT A 85- 001 45350 18070 27280PIT A 85- 001 45840 18060 27780PIT A 85- 001 37230 18080 19150PIT A 85- 001 44410 18180 26230PIT A 85- 001 45450 18030 27420PIT A 85- 001 45000 18200 26800PIT A 85- 001 43080 17740 25340PIT A 85- 001 47500 18770 28730PIT A 85- 001 46140 17430 28710PIT A 85- 001 45500 18120 27380PIT A 85- 001 47830 18590 29240PIT A 85- 001 45360 18030 27330

Page 434: June Per Shift (Truckscale Port)

PIT A 85- 001 45650 17990 27660PIT A 85- 001 46260 18190 28070

PIT A 85- 001 45700 18000 27700PIT A 85- 001 45380 17830 27550PIT A 85- 001 46240 18030 28210PIT A 85- 001 46290 18020 28270PIT A 85- 001 45480 17870 27610PIT A 85- 001 47250 17980 29270PIT A 85- 001 45840 17870 27970PIT A 85- 001 45470 17890 27580PIT A 85- 001 45900 18050 27850

PIT A 85- 001 44910 18110 26800PIT A 85- 001 46030 17920 28110PIT A 65 - 001 33300 11030 22270PIT A 65 - 001 34590 11150 23440PIT A 65 - 001 33020 11040 21980PIT A 65 - 001 34070 11150 22920PIT A 65 - 001 32830 11140 21690PIT A 65 - 001 32710 11000 21710PIT A 85- 001 45710 17950 27760PIT A 85- 001 48690 18120 30570

PIT A 85- 001 45300 18220 27080PIT A 85- 001 47070 17920 29150PIT A 85- 001 48120 18030 30090PIT A 85- 001 46750 17980 28770

PIT A 85- 001 46700 18130 28570PIT A 85- 001 45030 18060 26970PIT A 85- 001 46190 17950 28240PIT A 85-2 001 47910 18020 29890PIT A 85- 001 45110 18160 26950PIT A 85-2 001 44070 17990 26080PIT A 85- 001 47250 18560 28690PIT A 85-2 001 44950 18090 26860PIT A 85-2 001 43410 17920 25490PIT A 85- 001 45050 18130 26920PIT A 85- 001 45040 17860 27180PIT A 85-2 001 44890 18150 26740PIT A 85- 001 48330 18910 29420PIT A 85-2 001 44020 18150 25870PIT A 85-2 001 48910 18100 30810

PIT A 85-2 001 47240 17900 29340PIT A 85-2 001 44270 17880 26390PIT A 85- 001 47870 18230 29640PIT A 85- 001 44160 17870 26290PIT A 85-2 001 49110 18010 31100PIT A 85-2 001 48720 17970 30750PIT A 85-2 001 45060 18040 27020PIT A 85-2 001 48620 18030 30590PIT A 85-2 001 44450 17990 26460

Page 435: June Per Shift (Truckscale Port)

PIT A 85- 001 47280 18620 28660PIT A 85-2 001 45310 18220 27090PIT A 85-2 001 44520 18010 26510PIT A 85- 001 45540 18060 27480PIT A 85-2 001 44730 17790 26940PIT A 85-2 001 48850 18040 30810PIT A 85- 001 44030 17910 26120

PIT A 85- 001 49270 18820 30450PIT A 85-2 001 48830 18050 30780PIT A 85- 001 45830 17990 27840PIT A 85-2 001 48280 18050 30230PIT A 85- 001 47460 18580 28880PIT A 85-2 001 48340 17790 30550PIT A 85-2 001 42580 17840 24740PIT A 85-2 001 48940 17990 30950PIT A 85-2 001 48540 17860 30680PIT A 85-2 001 48760 17920 30840PIT A 85-2 001 48850 17960 30890PIT A 85-2 001 43350 18080 25270PIT A 85-2 001 45970 18070 27900PIT A 85-2 001 46170 18570 27600PIT A 85-2 001 45750 18000 27750PIT A 85-2 001 43030 18100 24930PIT A 85-2 001 43990 18180 25810PIT A 85-2 001 46500 18500 28000PIT A 85-2 001 48060 17950 30110PIT A 85-2 001 41680 17830 23850PIT A 85-2 001 48250 17810 30440PIT A 85-2 001 43220 18030 25190

PIT A 85-2 001 48270 17740 30530PIT A 85-2 001 48300 17860 30440PIT A 85-2 001 46680 18770 27910PIT A 85-2 001 47670 18030 29640PIT A 85-2 001 47900 18020 29880PIT A 85-2 001 46580 18430 28150PIT A 85-2 001 42810 18440 24370PIT A 85-2 001 48360 17950 30410PIT A 85-2 001 48510 18150 30360PIT A 85-2 001 47660 18190 29470PIT A 85-2 001 45790 18570 27220PIT A 85-2 001 47990 18060 29930PIT A 85-2 001 45700 18120 27580

PIT A 85-2 001 46410 18040 28370PIT A 85-2 001 49260 17980 31280PIT A 85-2 001 49190 18000 31190PIT A 85-2 001 46430 17990 28440

PIT A 85-2 001 44470 18030 26440PIT A 85-2 001 45610 17960 27650PIT A 85-2 001 46570 17980 28590

Page 436: June Per Shift (Truckscale Port)

PIT A 85-2 001 48380 18060 30320PIT A 85-2 001 48310 18070 30240PIT A 85-2 001 47590 17770 29820PIT A 85-2 001 47500 18060 29440

PIT A 65 - 001 33470 11090 22380PIT A 65 - 001 33160 11090 22070PIT A 65 - 001 32470 11040 21430PIT A 65 - 001 34160 11150 23010PIT A 65 - 001 34460 11000 23460PIT A 65 - 001 34750 11110 23640PIT A 65 - 001 31570 11050 20520PIT A 65 - 001 31200 10960 20240PIT A 65 - 001 31440 11030 20410PIT A 65 - 001 30770 11030 19740PIT A 65 - 001 31010 11030 19980PIT A 65 - 001 31710 11060 20650PIT A 65 - 001 31660 11040 20620

PIT A 65 - 001 31790 10810 20980PIT A 65 - 001 33190 10940 22250PIT A 65 - 001 32910 10950 21960PIT A 65 - 001 35170 11060 24110PIT C 64- 001 31040 11060 19980PIT C 64- 001 32310 10920 21390PIT C 64- 001 31640 10900 20740PIT A 85-2 001 43960 17730 26230PIT A 85-2 001 47680 18830 28850PIT A 85-2 001 48880 18060 30820PIT A 85-2 001 49110 17870 31240

PIT A 85-2 001 50200 17930 32270PIT A 85-2 001 47510 18080 29430PIT A 85-2 001 45580 18080 27500

PIT A 85-2 001 44230 17970 26260PIT A 85-2 001 51290 17900 33390PIT A 85-2 001 45330 17950 27380PIT A 85-2 001 48330 17920 30410PIT A 85-2 001 44150 17980 26170PIT A 85-2 001 49850 17890 31960PIT A 85-2 001 48340 18040 30300

PIT A 85- 001 46370 18450 27920PIT A 85- 001 47830 18050 29780PIT B 26 - 001 48690 18050 30640PIT A 85-2 001 49100 17810 31290PIT B 26 - 001 47680 17990 29690PIT A 85-2 001 47690 18140 29550PIT A 85- 001 45990 18200 27790PIT B 26 - 001 48890 17890 31000PIT B 26 - 001 48020 17910 30110PIT B 26 - 001 47600 18070 29530

Page 437: June Per Shift (Truckscale Port)

PIT A 85- 001 46180 18110 28070PIT B 26 - 001 48750 18130 30620PIT A 85-2 001 47430 17980 29450PIT A 85-2 001 46870 17970 28900PIT A 85-2 001 45240 18110 27130PIT A 85-2 001 47640 18010 29630PIT A 85-2 001 43940 18210 25730PIT A 85-2 001 45860 18630 27230PIT B 26 - 001 48310 18030 30280PIT A 85-2 001 44500 18070 26430PIT A 85-2 001 45340 18490 26850PIT A 85-2 001 45540 17790 27750PIT A 85-2 001 46000 18560 27440PIT B 26 - 001 48350 17860 30490PIT B 26 - 001 48910 17980 30930PIT B 26 - 001 49210 17860 31350PIT A 85-2 001 46910 18790 28120PIT B 26 - 001 48980 18050 30930PIT A 85-2 001 45490 18200 27290

PIT A 85-2 001 46450 17960 28490PIT A 85-2 001 45980 18020 27960

PIT A 85-2 001 46200 18110 28090PIT A 85-2 001 45150 17950 27200PIT A 85-2 001 44400 17980 26420PIT A 85-2 001 44990 18010 26980PIT B 26 - 001 48770 18070 30700PIT B 26 - 001 48260 17860 30400

PIT A 85-2 001 44800 18180 26620PIT B 26 - 001 47790 18000 29790PIT B 26 - 001 49230 17900 31330PIT A 85-2 001 45960 18640 27320PIT B 26 - 001 48950 18030 30920PIT A 85-2 001 46690 18090 28600PIT A 85-2 001 47220 18440 28780PIT A 85-2 001 46460 18000 28460PIT A 85-2 001 46120 18020 28100

PIT A 85-2 001 47880 18510 29370

PIT C 64- 001 30420 11020 19400

PIT C 64- 001 31240 10980 20260

PIT C 64- 001 31130 11080 20050

PIT C 64- 001 31780 10950 20830

PIT C 64- 001 32270 11060 21210PIT C 64- 001 31250 11020 20230

PIT C 64- 001 32020 10830 21190PIT A 65 - 001 32170 11070 21100PIT A 65 - 001 31750 11070 20680PIT A 65 - 001 33810 10920 22890PIT A 65 - 001 33970 11120 22850

Page 438: June Per Shift (Truckscale Port)

PIT A 65 - 001 32930 11020 21910PIT C 64- 001 32120 11070 21050PIT C 64- 001 31240 11070 20170PIT C 64- 001 32130 11070 21060PIT C 64- 001 31540 11120 20420PIT C 64- 001 31690 10980 20710PIT C 64- 001 31010 11010 20000PIT A 85-2 001 45750 18110 27640

PIT A 85-2 001 45040 17920 27120PIT B 26 - 001 47990 18070 29920PIT A 85-2 001 45840 18010 27830PIT B 26 - 001 47800 18010 29790PIT A 85-2 001 46090 17940 28150PIT B 26 - 001 48510 18030 30480PIT A 85-2 001 45820 18070 27750PIT B 26 - 001 48810 18100 30710PIT B 26 - 001 48580 17990 30590PIT A 85-2 001 45860 18140 27720PIT A 85-2 001 46060 18020 28040PIT A 85-2 001 46370 17970 28400PIT A 85-2 001 46850 18640 28210PIT A 85-2 001 46880 18410 28470PIT A 85-2 001 46140 17900 28240PIT A 85-2 001 45780 18100 27680PIT A 85-2 001 46140 18120 28020PIT A 85-2 001 45870 17910 27960PIT B 26 - 001 46960 17970 28990PIT B 26 - 001 48260 18120 30140PIT A 85-2 001 45910 18000 27910PIT A 85-2 001 45450 18040 27410

PIT B 26 - 001 47910 17960 29950PIT A 85-2 001 45490 17910 27580

PIT A 85-2 001 44890 18010 26880PIT A 85-2 001 45790 17850 27940PIT A 85-2 001 48020 18560 29460PIT A 85-2 001 47660 18560 29100PIT A 85-2 001 45840 18070 27770PIT B 26 - 001 48050 18030 30020PIT A 85-2 001 48080 18090 29990PIT B 26 - 001 49570 18040 31530PIT B 26 - 001 48070 17980 30090PIT A 85-2 001 46340 17970 28370PIT A 85-2 001 45090 18000 27090PIT A 85-2 001 46850 18130 28720PIT A 85-2 001 46130 18010 28120PIT B 26 - 001 49060 18120 30940PIT B 26 - 001 48140 18140 30000PIT A 85-2 001 44990 18000 26990PIT A 85-2 001 47170 18120 29050

Page 439: June Per Shift (Truckscale Port)

PIT A 85-2 001 46300 18580 27720PIT C 64- 001 31430 11000 20430PIT C 64- 001 31460 11080 20380PIT C 64- 001 31050 10970 20080

PIT C 64- 001 31000 11040 19960PIT C 64- 001 30850 11080 19770PIT C 64- 001 30110 10970 19140PIT C 64- 001 31000 11010 19990PIT C 64- 001 31390 10970 20420PIT C 64- 001 31490 11050 20440PIT C 64- 001 31570 11000 20570PIT C 64- 001 30940 11070 19870PIT C 64- 001 31730 10940 20790PIT B 26 - 001 48610 18180 30430PIT B 26 - 001 44650 17880 26770PIT A 85-2 001 45900 17990 27910PIT B 26 - 001 45980 17850 28130

PIT B 26 - 001 44990 18020 26970PIT B 26 - 001 47010 18100 28910PIT A 85-2 001 46040 18030 28010PIT B 26 - 001 46830 18020 28810PIT A 85-2 001 46860 17930 28930PIT A 85-2 001 46700 18040 28660PIT B 26 - 001 46360 18030 28330

PIT B 26 - 001 47360 18040 29320PIT B 26 - 001 45620 17940 27680

PIT A 85-2 001 49730 17910 31820PIT B 26 - 001 45660 18100 27560PIT A 85-2 001 47690 18250 29440

PIT B 26 - 001 45200 17800 27400PIT A 85-2 001 48040 18420 29620PIT B 26 - 001 46310 18010 28300PIT B 26 - 001 44430 17900 26530PIT B 26 - 001 45240 18020 27220PIT A 85-2 001 47900 17950 29950PIT A 85-2 001 49310 17990 31320PIT A 85-2 001 47760 17990 29770PIT A 85-2 001 46770 17970 28800PIT B 26 - 001 45920 18050 27870PIT B 26 - 001 44610 18100 26510PIT A 85-2 001 49270 17950 31320PIT A 85-2 001 47930 17880 30050PIT B 26 - 001 47270 18180 29090PIT B 26 - 001 45860 17830 28030PIT A 85-2 001 48530 18030 30500PIT B 26 - 001 46540 18010 28530PIT B 26 - 001 46420 18000 28420PIT B 26 - 001 46610 17850 28760PIT A 85-2 001 49660 17870 31790

Page 440: June Per Shift (Truckscale Port)

PIT A 85-2 001 48610 17980 30630PIT B 26 - 001 47150 18010 29140PIT A 85-2 001 48230 17900 30330

PIT B 26 - 001 45360 17930 27430PIT A 85-2 001 48040 17850 30190PIT B 26 - 001 47650 18080 29570PIT B 26 - 001 46530 17970 28560PIT A 85-2 001 49720 17810 31910PIT A 85-2 001 48810 17890 30920

PIT A 85-2 001 46390 17920 28470PIT A 85-2 001 48420 17860 30560PIT B 26 - 001 47200 17770 29430PIT B 26 - 001 45390 17910 27480PIT A 85-2 001 47340 17890 29450PIT B 26 - 001 45700 18060 27640PIT A 85-2 001 41770 17910 23860PIT A 85-2 001 47280 18070 29210PIT A 85-2 001 48870 18730 30140PIT A 85-2 001 47730 18040 29690PIT B 26 - 001 45320 17940 27380PIT B 26 - 001 44610 17970 26640PIT B 26 - 001 45900 17940 27960PIT A 85-2 001 50090 17830 32260PIT A 85-2 001 49820 17820 32000PIT A 85-2 001 48260 17850 30410PIT B 26 - 001 45610 18020 27590PIT C 64- 001 30720 11040 19680PIT B 26- 001 49120 18660 30460PIT C 64- 001 30980 11050 19930PIT C 64- 001 32470 11020 21450PIT C 64- 001 30870 10970 19900PIT C 64- 001 32020 11010 21010PIT B 26- 001 43870 17700 26170

PIT B 26- 001 31650 10950 20700PIT C 64- 001 31450 10920 20530PIT B 26- 001 47480 18050 29430PIT C 64- 001 30950 10760 20190

PIT B 26- 001 48200 18570 29630PIT B 26- 001 44930 17990 26940PIT B 26- 001 48040 18490 29550PIT C 64- 001 32500 10970 21530PIT C 64- 001 31540 11020 20520

PIT B 26- 001 31660 10880 20780PIT C 64- 001 31430 10970 20460PIT B 26- 001 31660 10960 20700PIT C 64- 001 31800 11000 20800PIT B 26- 001 48390 18390 30000PIT C 64- 001 31300 10880 20420

Page 441: June Per Shift (Truckscale Port)

PIT B 26- 001 45410 18130 27280PIT B 26- 001 48150 18520 29630PIT C 64- 001 30970 10750 20220PIT B 26- 001 48550 18420 30130PIT B 26- 001 48330 17990 30340PIT B 26- 001 31650 10910 20740PIT C 64- 001 31370 10980 20390PIT C 64- 001 31510 11010 20500PIT B 26- 001 45100 18120 26980PIT B 26- 001 48990 18450 30540

PIT C 64- 001 32610 10970 21640PIT B 26- 001 31120 10880 20240PIT B 26- 001 49550 18470 31080PIT C 64- 001 31200 10810 20390PIT B 26- 001 49260 18420 30840PIT C 64- 001 31810 10950 20860PIT C 64- 001 31740 10970 20770PIT B 26- 001 48190 18120 30070PIT B 26- 001 49200 18400 30800PIT B 26- 001 30670 10820 19850PIT B 26- 001 45630 18010 27620PIT C 64- 001 31130 10820 20310PIT C 64- 001 29950 10930 19020PIT C 64- 001 46980 18550 28430PIT A 85-2 001 47050 18080 28970PIT B 26 - 001 46350 18100 28250PIT B 26 - 001 46450 17880 28570PIT B 26 - 001 46900 17890 29010PIT B 26 - 001 48660 17990 30670PIT A 85-2 001 48670 18030 30640PIT B 26 - 001 46640 18090 28550PIT A 85-2 001 47860 17990 29870PIT A 85-2 001 49280 18060 31220PIT B 26 - 001 47340 18090 29250PIT A 85-2 001 48240 18070 30170PIT B 26 - 001 46490 18010 28480PIT B 26 - 001 49700 18090 31610PIT B 26 - 001 48620 17970 30650

PIT B 26 - 001 48990 18080 30910PIT B 26 - 001 50010 17840 32170PIT B 26 - 001 49110 17920 31190PIT B 26 - 001 49110 17930 31180PIT A 85-2 001 46740 17850 28890PIT B 26 - 001 48790 18090 30700

PIT A 85-2 001 45930 17990 27940PIT A 85-2 001 46500 18050 28450

PIT A 85-2 001 47840 18050 29790PIT A 85-2 001 46750 17990 28760PIT A 85-2 001 47260 18010 29250

Page 442: June Per Shift (Truckscale Port)

PIT A 85-2 001 46350 17950 28400PIT B 26 - 001 49620 18030 31590PIT B 26 - 001 49780 18170 31610PIT B 26 - 001 48850 17850 31000

PIT B 26 - 001 47710 17910 29800PIT B 26 - 001 49030 18060 30970PIT B 26 - 001 49080 18060 31020

PIT A 85-2 001 46610 17840 28770PIT A 85-2 001 47070 17970 29100PIT A 85-2 001 46910 18060 28850PIT A 85-2 001 47520 17980 29540PIT A 85-2 001 46960 17970 28990PIT B 26 - 001 48520 18100 30420PIT A 85-2 001 46760 18020 28740PIT B 26 - 001 48600 17870 30730PIT A 85-2 001 47450 18100 29350PIT B 26 - 001 48660 17970 30690PIT B 26 - 001 47670 18140 29530PIT B 26 - 001 48070 18080 29990PIT A 85-2 001 46130 17790 28340PIT B 26 - 001 48090 18030 30060PIT A 85-2 001 47770 18040 29730PIT A 85-2 001 47180 18000 29180PIT B 26 - 001 47980 18010 29970PIT B 26 - 001 47670 17910 29760PIT A 85-2 001 45690 18000 27690PIT A 85-2 001 46230 18050 28180PIT B 26 - 001 46720 17950 28770PIT C 64- 001 42530 18030 24500PIT B 26- 001 31210 10910 20300PIT B 26- 001 50080 18540 31540PIT B 26- 001 47960 18300 29660PIT B 26- 001 33030 11000 22030

PIT B 26- 001 32680 11040 21640PIT B 26- 001 32750 10970 21780

PIT B 26- 001 31750 10950 20800

PIT B 26- 001 32490 11110 21380PIT B 26- 001 48650 18030 30620PIT B 26- 001 31250 10800 20450PIT B 26- 001 47490 18250 29240

PIT B 26- 001 48260 18750 29510PIT B 26- 001 31320 11000 20320PIT D 46- 001 43660 17850 25810PIT B 26- 001 50370 18610 31760PIT B 26- 001 31950 10940 21010PIT D 46- 001 46120 18030 28090PIT B 26- 001 32270 10910 21360PIT B 26- 001 32370 11010 21360

Page 443: June Per Shift (Truckscale Port)

PIT B 26- 001 31960 10970 20990PIT D 46- 001 44480 18280 26200

PIT D 46- 001 47170 18440 28730PIT B 26- 001 47210 18140 29070PIT B 26- 001 48950 18510 30440PIT D 46- 001 31250 11040 20210PIT B 26- 001 32330 11040 21290PIT D 46- 001 44730 17900 26830PIT B 26- 001 33500 11070 22430PIT D 46- 001 29970 10790 19180PIT B 26- 001 48590 18770 29820PIT B 26- 001 49840 18550 31290PIT D 46- 001 29910 10980 18930PIT D 46- 001 45030 18230 26800PIT B 26- 001 33250 10960 22290PIT D 46- 001 47100 18170 28930PIT B 26- 001 50950 18520 32430PIT D 46- 001 46840 18520 28320PIT A 85-2 001 46440 17870 28570PIT A 85-2 001 46940 17900 29040PIT A 85-2 001 47350 17900 29450PIT B 26 - 001 49120 18030 31090PIT A 85-2 001 45300 18020 27280PIT B 26 - 001 47410 17930 29480PIT B 26 - 001 49150 17980 31170

PIT B 26 - 001 47530 17920 29610PIT A 85-2 001 46470 18050 28420PIT B 26 - 001 48790 18090 30700PIT B 26 - 001 47570 18050 29520

PIT A 85-2 001 45660 17880 27780PIT B 26 - 001 49020 17980 31040PIT A 85-2 001 48020 18070 29950PIT B 26 - 001 49000 18200 30800PIT A 85-2 001 48150 17930 30220PIT A 85-2 001 47630 17980 29650

PIT B 26 - 001 47790 18020 29770PIT A 85-2 001 47520 18010 29510PIT B 26 - 001 47650 17990 29660PIT A 85-2 001 47630 17970 29660PIT A 85-2 001 46460 17970 28490PIT A 85-2 001 46110 18090 28020PIT B 26 - 001 47890 17950 29940PIT A 85-2 001 47930 18040 29890PIT B 26 - 001 48100 18210 29890PIT B 26 - 001 48410 18080 30330PIT B 26 - 001 48300 18130 30170PIT B 26 - 001 47310 17930 29380PIT A 85-2 001 48650 17980 30670PIT D 46- 001 44390 17880 26510

Page 444: June Per Shift (Truckscale Port)

PIT D 46- 001 46750 17960 28790

PIT B 26- 001 32670 11030 21640PIT B 26- 001 32710 10990 21720PIT B 26- 001 32930 11000 21930PIT D 46- 001 46700 18460 28240PIT D 46- 001 44390 18210 26180PIT D 46- 001 44210 17890 26320

PIT D 46- 001 46580 18150 28430

PIT D 46- 001 45480 17980 27500PIT B 26- 001 32030 11010 21020PIT B 26- 001 50400 18710 31690

PIT D 46- 001 46290 18440 27850PIT B 26- 001 29650 11050 18600PIT B 26- 001 30440 10850 19590PIT B 26- 001 32440 10950 21490

PIT B 26- 001 30730 11100 19630PIT B 26- 001 49830 18490 31340PIT D 46- 001 44140 18260 25880PIT B 26- 001 29820 10820 19000PIT B 26- 001 33640 10980 22660PIT B 26- 001 33350 10980 22370PIT B 26- 001 50550 18690 31860PIT D 46- 001 30040 10940 19100PIT D 46- 001 45660 18100 27560PIT D 46- 001 44360 18130 26230PIT D 46- 001 30630 11040 19590PIT D 46- 001 32710 11030 21680PIT D 46- 001 31250 10940 20310PIT D 46- 001 31420 10950 20470PIT D 46- 001 33860 11010 22850PIT D 46- 001 45090 18060 27030PIT D 46- 001 46840 18460 28380PIT A 85-2 001 48250 18220 30030PIT B 26 - 001 47940 17850 30090PIT B 26 - 001 48080 18040 30040PIT B 26 - 001 47890 17990 29900PIT A 85- 001 48350 17950 30400PIT A 85- 001 49310 18040 31270PIT B 26 - 001 46360 17980 28380

PIT B 26 - 001 46990 18150 28840PIT B 26 - 001 46030 18020 28010

PIT A 85- 001 48100 17890 30210PIT B 26 - 001 47100 17990 29110PIT B 26 - 001 46470 18030 28440PIT B 26 - 001 47440 17840 29600PIT A 85- 001 48900 17920 30980PIT B 26 - 001 47950 17940 30010PIT A 85- 001 49810 18240 31570

Page 445: June Per Shift (Truckscale Port)

PIT B 26 - 001 47660 17970 29690PIT A 85- 001 48130 18010 30120PIT B 26 - 001 44620 18040 26580PIT A 85- 001 47510 17880 29630PIT B 26 - 001 45150 17900 27250PIT A 85- 001 49480 17920 31560

PIT B 26 - 001 46430 17900 28530PIT A 85- 001 48470 17920 30550PIT A 85- 001 47830 17980 29850PIT B 26 - 001 47250 17970 29280PIT A 85- 001 48370 17900 30470PIT A 85- 001 48300 18110 30190PIT A 85- 001 47540 17880 29660PIT A 85- 001 47950 17870 30080PIT B 26 - 001 45450 17910 27540PIT A 85- 001 48660 17980 30680PIT B 26 - 001 45940 18010 27930PIT A 85- 001 48960 17960 31000PIT B 26 - 001 46700 17880 28820PIT A 85- 001 46920 17970 28950PIT B 26 - 001 45270 18080 27190PIT A 85- 001 48170 17930 30240PIT B 26 - 001 46930 17910 29020PIT A 85- 001 48430 18030 30400PIT B 26 - 001 46470 17830 28640PIT B 26 - 001 45640 17830 27810PIT A 85- 001 46530 17980 28550PIT A 85- 001 47270 17870 29400PIT A 85- 001 47920 17990 29930PIT B 26 - 001 48210 17870 30340PIT A 85- 001 46340 17960 28380

PIT A 85- 001 46900 17910 28990PIT A 85- 001 47550 17930 29620

PIT B 26 - 001 48410 18010 30400PIT B 26 - 001 47310 17850 29460PIT A 85- 001 48180 18080 30100PIT B 26 - 001 47930 17790 30140PIT D 46- 001 46480 18650 27830

PIT D 46- 001 44410 17910 26500PIT D 46- 001 46790 18240 28550PIT D 46- 001 47730 18740 28990PIT D 46- 001 30090 11050 19040PIT D 46- 001 31150 11030 20120PIT D 46- 001 31390 10910 20480PIT D 46- 001 31310 10900 20410PIT D 46- 001 32170 11020 21150PIT D 46- 001 31440 10970 20470PIT D 46- 001 30520 11020 19500

PIT D 46- 001 31780 10980 20800

Page 446: June Per Shift (Truckscale Port)

PIT D 46- 001 30850 10860 19990PIT D 46- 001 30650 11010 19640PIT D 46- 001 31190 10910 20280PIT C 46- 001 30530 10830 19700PIT C 46- 001 30590 10990 19600PIT C 46- 001 30780 10920 19860PIT C 46- 001 31480 11030 20450PIT C 46- 001 31730 10960 20770PIT D 46- 001 50280 18490 31790PIT D 46- 001 31170 10940 20230PIT C 46- 001 43910 17800 26110PIT C 46- 001 48940 18400 30540PIT C 46- 001 31280 10950 20330PIT C 46- 001 46640 18130 28510PIT C 46- 001 49220 18450 30770PIT C 46- 001 31080 10930 20150PIT C 46- 001 43970 17730 26240PIT C 46- 001 31930 10910 21020PIT C 46- 001 31270 10890 20380PIT C 46- 001 31430 10960 20470PIT D 46- 001 45340 18060 27280PIT D 46- 001 46970 18070 28900PIT D 46- 001 47580 18100 29480PIT C 46- 001 31940 10940 21000PIT D 46- 001 46700 17990 28710PIT C 46- 001 48380 18410 29970PIT D 46- 001 48340 18410 29930PIT B 26- 001 50190 18510 31680

PIT B 26- 001 46250 18020 28230PIT B 26- 001 47960 18080 29880PIT B 26- 001 48730 18120 30610PIT B 26- 001 47800 18060 29740PIT B 26- 001 49610 18460 31150

PIT D 46- 001 44760 17920 26840PIT B 26- 001 51370 18480 32890PIT B 26- 001 45970 17900 28070PIT B 26- 001 49290 18780 30510PIT B 26- 001 49820 18040 31780PIT B 26- 001 47630 18090 29540PIT B 26- 001 49390 17950 31440PIT B 26- 001 49290 18080 31210PIT B 26- 001 47280 18050 29230PIT B 26- 001 50280 18510 31770PIT B 26- 001 46270 17910 28360PIT B 26- 001 49300 18480 30820PIT B 26- 001 49960 18710 31250PIT B 26- 001 48970 18000 30970PIT B 26- 001 46690 18270 28420PIT B 26- 001 47730 17930 29800

Page 447: June Per Shift (Truckscale Port)

PIT B 26- 001 48180 18030 30150PIT B 26- 001 46940 18040 28900PIT B 26- 001 45990 17840 28150PIT B 26- 001 48580 18690 29890PIT B 26- 001 48330 18420 29910PIT A 85- 001 48550 18080 30470PIT A 85- 001 48100 18060 30040PIT B 26 - 001 46360 17980 28380PIT B 26 - 001 48900 17970 30930PIT B 26 - 001 45740 18050 27690PIT A 85- 001 46060 18000 28060PIT A 85- 001 47770 17860 29910PIT B 26 - 001 47260 18060 29200PIT B 26 - 001 46250 17930 28320PIT B 26 - 001 47270 17840 29430PIT B 26 - 001 46170 18050 28120

PIT B 26 - 001 47440 17760 29680PIT B 26 - 001 48920 18020 30900PIT B 26 - 001 47140 18030 29110PIT B 26 - 001 48380 17990 30390

PIT B 26 - 001 47020 18020 29000PIT A 85-2 001 46420 18060 28360PIT B 26 - 001 47210 17820 29390PIT A 85-2 001 46370 17910 28460PIT B 26 - 001 46370 18020 28350PIT A 85-2 001 46410 17890 28520PIT A 85-2 001 46900 18040 28860PIT A 85-2 001 45710 18040 27670PIT B 26 - 001 47680 18110 29570PIT A 85-2 001 45330 17770 27560

PIT B 26 - 001 47770 18010 29760PIT B 26 - 001 48950 18020 30930PIT B 26 - 001 48130 18050 30080PIT A 85-2 001 47070 18100 28970PIT B 26 - 001 47710 17970 29740PIT B 26 - 001 49330 18130 31200PIT A 85-2 001 46080 18060 28020PIT A 85-2 001 45950 17800 28150PIT A 85-2 001 45930 17950 27980PIT A 85-2 001 48220 18070 30150PIT B 26 - 001 48910 17950 30960PIT B 26 - 001 49100 18080 31020PIT A 85-2 001 46340 17780 28560

PIT B 26 - 001 47620 17940 29680PIT B 26 - 001 48450 17960 30490PIT A 85-2 001 46140 18080 28060PIT B 26 - 001 47510 18070 29440PIT A 85-2 001 47240 17910 29330PIT B 26 - 001 48890 18110 30780

Page 448: June Per Shift (Truckscale Port)

PIT A 85-2 001 48270 18020 30250PIT A 85-2 001 48480 18010 30470PIT A 85-2 001 46890 18050 28840PIT D 46- 001 44650 17900 26750PIT D 46- 001 45230 17820 27410PIT D 46- 001 31520 10940 20580PIT D 46- 001 46620 17930 28690PIT C 46- 001 32690 10960 21730

PIT C 46- 001 32910 11140 21770PIT C 46- 001 32170 11170 21000PIT D 46- 001 45050 17940 27110PIT C 46- 001 31670 10950 20720

PIT D 46- 001 47110 18210 28900PIT B 26- 001 46910 17980 28930PIT C 46- 001 31520 11040 20480PIT D 46- 001 48710 18810 29900PIT D 46- 001 49250 18800 30450PIT C 46- 001 30200 10990 19210PIT B 26- 001 32680 10990 21690PIT B 26- 001 32220 10970 21250PIT B 26- 001 31690 10940 20750PIT B 26- 001 32040 11000 21040

PIT D 46- 001 45570 17890 27680PIT D 46- 001 46140 18220 27920PIT B 26- 001 31290 11020 20270PIT D 46- 001 46020 18060 27960PIT D 46- 001 50860 18610 32250PIT B 26- 001 32180 10950 21230PIT B 26- 001 32070 10990 21080PIT D 46- 001 47620 18120 29500

PIT B 26- 001 31650 10960 20690PIT D 46- 001 45820 17950 27870PIT B 26- 001 32070 11000 21070PIT D 46- 001 40790 18020 22770PIT B 26- 001 32470 11010 21460PIT B 26- 001 31840 11000 20840

PIT C 46- 001 49390 18560 30830PIT C 46- 001 46880 18150 28730PIT C 46- 001 46380 18200 28180

PIT B 26 - 001 47700 17940 29760PIT B 26 - 001 47880 18060 29820PIT A 85-2 001 49500 17770 31730PIT B 26 - 001 47030 17920 29110PIT A 85-2 001 48630 18050 30580PIT A 85-2 001 47540 17890 29650PIT A 85-2 001 50310 18030 32280PIT B 26 - 001 48030 17980 30050PIT A 85-2 001 46950 17790 29160PIT B 26 - 001 47630 18050 29580

Page 449: June Per Shift (Truckscale Port)

PIT B 26 - 001 47060 18050 29010PIT A 85-2 001 47700 18030 29670PIT A 85-2 001 46060 17730 28330PIT A 85-2 001 47490 17990 29500PIT B 26 - 001 48690 17930 30760PIT A 85-2 001 45800 18010 27790PIT A 85-2 001 46730 17790 28940PIT B 26 - 001 47790 18050 29740PIT A 85-2 001 49440 17950 31490PIT B 26 - 001 51680 18000 33680PIT A 85-2 001 47950 17820 30130PIT A 85-2 001 46240 18190 28050PIT A 85-2 001 48380 17970 30410PIT B 26 - 001 48610 18050 30560PIT A 85-2 001 46310 18180 28130PIT B 26 - 001 47990 18040 29950

PIT A 85-2 001 48010 18060 29950PIT B 26 - 001 47050 18160 28890PIT A 85-2 001 47660 17890 29770

PIT B 26- 001 32780 10950 21830

PIT C 46- 001 50740 18580 32160PIT B 26- 001 31560 11020 20540PIT B 26- 001 31450 10920 20530PIT C 46- 001 46800 18020 28780PIT B 26- 001 30740 11040 19700PIT C 46- 001 46720 17950 28770PIT B 26- 001 31390 10980 20410PIT B 26- 001 31770 11020 20750PIT B 26- 001 30120 10960 19160PIT C 46- 001 48320 18220 30100PIT A 65 - 001 35910 10950 24960PIT A 65 - 001 35700 11020 24680PIT C 46- 001 49060 18520 30540PIT C 46- 001 36000 11030 24970PIT A 85-2 001 46870 18080 28790PIT B 26 - 001 46750 18050 28700PIT B 26 - 001 47140 18050 29090

PIT A 85-2 001 46390 17910 28480PIT B 26 - 001 46140 17930 28210PIT B 26 - 001 45910 18000 27910PIT A 85-2 001 46090 18070 28020PIT B 26 - 001 47600 17990 29610PIT A 85-2 001 46580 18040 28540PIT A 85-2 001 45150 17880 27270

PIT A 85-2 001 46560 18000 28560PIT B 26 - 001 46660 18120 28540PIT B 26 - 001 46280 18010 28270PIT B 26 - 001 46670 17960 28710

Page 450: June Per Shift (Truckscale Port)

PIT A 85-2 001 46920 17890 29030PIT B 26 - 001 45760 17920 27840PIT B 26 - 001 46070 17960 28110PIT B 26 - 001 45490 17960 27530PIT A 85-2 001 45780 17970 27810PIT A 85-2 001 46350 18050 28300PIT B 26 - 001 45420 17930 27490PIT A 85-2 001 45830 18050 27780PIT A 85-2 001 46260 18050 28210PIT B 26 - 001 46310 17990 28320PIT B 26 - 001 46950 17870 29080PIT B 26 - 001 46340 17950 28390PIT B 26 - 001 45700 17880 27820PIT A 85-2 001 50520 18050 32470PIT A 85-2 001 46110 17900 28210PIT A 85-2 001 45740 17890 27850PIT B 26 - 001 46570 17950 28620PIT B 26 - 001 45720 17930 27790PIT B 26 - 001 44580 17850 26730PIT A 85-2 001 46280 17940 28340PIT B 26 - 001 45420 17840 27580PIT B 26 - 001 45830 17870 27960PIT A 85-2 001 47380 18010 29370PIT A 85-2 001 47060 17950 29110PIT B 26 - 001 47360 18000 29360PIT A 85-2 001 47180 17880 29300PIT B 26 - 001 45250 17860 27390PIT B 26 - 001 46410 17890 28520PIT B 26 - 001 45320 17880 27440PIT B 26 - 001 51980 17830 34150

PIT B 26 - 001 50990 17990 33000PIT B 26 - 001 50720 17870 32850PIT B 26 - 001 51030 17950 33080PIT B 26 - 001 49240 17870 31370PIT B 26 - 001 50740 17920 32820

PIT B 26 - 001 51330 17950 33380PIT B 26 - 001 50630 17880 32750

PIT B 26 - 001 49350 17830 31520PIT B 26 - 001 50550 18000 32550PIT D 46- 001 35640 11020 24620PIT D 46- 001 31700 11040 20660PIT D 46- 001 52790 18660 34130PIT D 46- 001 31580 11010 20570PIT D 46- 001 43120 17890 25230PIT D 46- 001 31910 10980 20930PIT D 46- 001 30670 10980 19690PIT D 46- 001 46210 18020 28190PIT A 65 - 001 51620 18160 33460PIT D 46- 001 31450 11020 20430PIT D 46- 001 31920 11010 20910

Page 451: June Per Shift (Truckscale Port)

PIT A 65 - 001 47760 18020 29740PIT A 65 - 001 50320 18540 31780PIT D 46- 001 45410 18150 27260PIT D 46- 001 47920 17980 29940PIT D 46- 001 42790 17870 24920PIT D 46- 001 49420 18430 30990PIT D 46- 001 46570 18650 27920PIT D 46- 001 31780 10920 20860PIT D 46- 001 30360 10950 19410PIT D 46- 001 31060 11010 20050PIT D 46- 001 46060 18140 27920PIT D 46- 001 29900 11000 18900PIT D 46- 001 47470 18410 29060PIT D 46- 001 30620 10840 19780PIT D 46- 001 30960 10960 20000PIT D 46- 001 45910 18050 27860

PIT D 46- 001 29630 10980 18650PIT D 46- 001 30860 10920 19940PIT D 46- 001 30470 10990 19480PIT D 46- 001 47280 18540 28740PIT D 46- 001 44550 18290 26260PIT D 46- 001 46960 18610 28350PIT D 46- 001 41890 17880 24010PIT D 46- 001 30670 10940 19730PIT D 46- 001 45990 18520 27470PIT D 46- 001 30550 10930 19620

PIT D 46- 001 44610 18020 26590PIT D 46- 001 30450 10920 19530PIT D 46- 001 31280 10970 20310PIT D 46- 001 30590 11000 19590PIT A 65 - 001 48960 18560 30400PIT D 46- 001 30260 10930 19330PIT A 65 - 001 46900 18100 28800PIT A 65 - 001 48760 18520 30240PIT B 26 - 001 45350 17770 27580PIT B 26 - 001 48520 17960 30560PIT A 85-2 001 46850 18130 28720

PIT A 85-2 001 47700 17890 29810

PIT A 85-2 001 46240 17980 28260PIT A 85-2 001 45610 18000 27610PIT B 26 - 001 45880 17710 28170PIT A 85-2 001 46330 17780 28550PIT B 26 - 001 50280 17900 32380PIT B 26 - 001 45670 17980 27690PIT A 85-2 001 45860 18090 27770PIT B 26 - 001 46010 18240 27770PIT B 26 - 001 49970 18010 31960PIT B 26 - 001 51110 18140 32970PIT D 46- 001 46010 17920 28090

Page 452: June Per Shift (Truckscale Port)

PIT A 65 - 001 46040 17790 28250PIT A 65 - 001 51470 18760 32710PIT A 65 - 001 49790 18130 31660PIT B 26 - 001 48860 18360 30500PIT B 26 - 001 47380 18340 29040PIT B 26 - 001 47320 18330 28990

PIT B 26 - 001 48100 18350 29750PIT B 26 - 001 48380 18200 30180PIT B 26 - 001 49560 18190 31370PIT B 26 - 001 47300 18110 29190PIT B 26 - 001 45320 18170 27150PIT B 26 - 001 48720 18070 30650PIT B 26 - 001 48360 18200 30160PIT B 26 - 001 47060 18320 28740

PIT B 26 - 001 48680 18300 30380PIT B 26 - 001 48300 18390 29910PIT B 26 - 001 48510 18320 30190PIT B 26 - 001 47560 18160 29400PIT B 26 - 001 47450 18050 29400PIT B 26 - 001 47940 18140 29800PIT B 26 - 001 47470 18130 29340PIT B 26 - 001 48150 18130 30020PIT B 26 - 001 49300 18160 31140PIT B 26 - 001 49670 18060 31610PIT B 26 - 001 49240 18040 31200PIT B 26 - 001 49220 18090 31130PIT B 26 - 001 49300 19200 30100

PIT B 26 - 001 48880 18140 30740PIT B 26 - 001 47520 18140 29380

PIT B 26 - 001 50110 18170 31940PIT B 26 - 001 49730 18050 31680PIT B 26 - 001 51870 18260 33610PIT D 46- 001 47230 18200 29030

PIT A 65 - 001 49790 18170 31620PIT D 46- 001 32090 11080 21010

PIT A 65 - 001 50590 18540 32050

PIT D 46- 001 32350 11090 21260PIT A 65 - 001 51490 18530 32960PIT A 65 - 001 46770 18290 28480PIT D 46- 001 31880 11060 20820PIT D 46- 001 31620 11100 20520PIT D 46- 001 31660 11140 20520PIT D 46- 001 31920 11080 20840PIT A 65 - 001 47950 18720 29230PIT D 46- 001 43460 18130 25330PIT D 46- 001 29860 11030 18830PIT D 46- 001 49070 18680 30390PIT D 46- 001 31780 11060 20720

Page 453: June Per Shift (Truckscale Port)

PIT D 46- 001 31760 10990 20770PIT D 46- 001 46520 18000 28520

PIT B 26- 001 51210 18120 33090PIT B 26- 001 53610 18560 35050PIT B 26 - 001 43920 18120 25800PIT B 26 - 001 45940 18170 27770PIT B 26 - 001 45310 17990 27320PIT B 26 - 001 46100 18050 28050PIT B 26 - 001 45730 17980 27750PIT B 26 - 001 44550 17870 26680PIT A 85-2 001 47510 18240 29270PIT A 85-2 001 47280 18000 29280PIT A 85-2 001 46130 17760 28370PIT A 85-2 001 45920 17820 28100PIT B 26 - 001 45800 17970 27830PIT B 26 - 001 46710 18110 28600PIT B 26 - 001 45750 17920 27830

PIT B 26 - 001 46220 18030 28190PIT B 26 - 001 44840 17810 27030PIT B 26 - 001 44260 18070 26190PIT B 26 - 001 45820 18170 27650PIT A 85-2 001 46520 17940 28580PIT A 85-2 001 46800 17950 28850PIT A 85-2 001 45810 17750 28060PIT B 26 - 001 45430 18060 27370PIT B 26 - 001 44420 17910 26510PIT A 85-2 001 46650 17780 28870PIT B 26 - 001 45410 17910 27500PIT A 85-2 001 45390 18150 27240PIT B 26 - 001 45650 18110 27540PIT B 26 - 001 48030 17840 30190PIT B 26 - 001 47110 17970 29140PIT A 85-2 001 45440 17710 27730PIT A 85-2 001 44440 17900 26540PIT B 26 - 001 44750 17880 26870PIT A 85-2 001 45920 17920 28000

PIT A 85-2 001 46760 17980 28780PIT B 26 - 001 45890 18220 27670PIT B 26 - 001 46870 17830 29040PIT A 85-2 001 46280 17920 28360PIT B 26 - 001 47660 17870 29790PIT B 26 - 001 46740 18060 28680PIT B 26 - 001 47350 17930 29420PIT A 85-2 001 46370 17700 28670PIT B 26 - 001 46590 17960 28630PIT B 26 - 001 46660 17960 28700PIT A 85-2 001 47110 17880 29230

PIT A 85-2 001 47160 18060 29100PIT B 26 - 001 47660 17780 29880

Page 454: June Per Shift (Truckscale Port)

PIT B 26 - 001 47210 18090 29120PIT B 26 - 001 50840 18110 32730PIT B 26 - 001 49850 18310 31540PIT B 26 - 001 50970 18020 32950PIT B 26 - 001 45710 18010 27700PIT B 26 - 001 50880 18140 32740PIT B 26 - 001 49540 17830 31710PIT B 26 - 001 50130 17940 32190PIT B 26 - 001 49340 18100 31240PIT B 26 - 001 49220 18140 31080PIT B 26 - 001 49250 18070 31180PIT B 26 - 001 49320 18030 31290

PIT D 46- 001 47520 18540 28980PIT D 46- 001 31350 11050 20300PIT D 46- 001 31380 11050 20330PIT D 46- 001 31330 11070 20260PIT D 46- 001 48140 18020 30120PIT D 46- 001 49180 18720 30460PIT D 46- 001 45140 18030 27110PIT D 46- 001 30940 11020 19920PIT D 46- 001 31450 11020 20430PIT D 46- 001 31010 11010 20000PIT D 46- 001 31260 10900 20360PIT D 46- 001 31230 10980 20250PIT D 46- 001 30620 10940 19680

PIT D 46- 001 46990 18000 28990PIT D 46- 001 46050 18170 27880PIT D 46- 001 30010 10940 19070PIT D 46- 001 47950 18660 29290PIT D 46- 001 30520 10990 19530PIT D 46- 001 47780 17940 29840PIT D 46- 001 30210 11000 19210PIT D 46- 001 30380 10910 19470

PIT D 46- 001 30680 10990 19690PIT D 46- 001 44340 17920 26420PIT D 46- 001 30780 10930 19850PIT D 46- 001 46770 18390 28380PIT D 46- 001 43670 18180 25490PIT D 46- 001 32320 10930 21390PIT D 46- 001 48930 17840 31090PIT D 46- 001 33080 10940 22140PIT D 46- 001 48340 18130 30210PIT D 46- 001 30630 10960 19670PIT D 46- 001 47920 18760 29160PIT D 46- 001 29720 10770 18950

PIT D 46- 001 31410 10910 20500PIT D 46- 001 46440 18090 28350PIT D 46- 001 46640 18050 28590PIT D 46- 001 32300 10970 21330

Page 455: June Per Shift (Truckscale Port)

PIT D 46- 001 30740 10990 19750PIT D 46- 001 48570 18360 30210

PIT D 46- 001 46520 18070 28450PIT B 26- 001 49240 18240 31000PIT B 26- 001 51370 18250 33120PIT B 26- 001 47220 18040 29180PIT B 26- 001 51380 18410 32970PIT B 26- 001 48300 18640 29660PIT B 26- 001 48710 18630 30080PIT B 26- 001 48970 18560 30410

PIT B 26- 001 49060 18110 30950PIT B 26- 001 48120 18050 30070PIT B 26- 001 48940 18390 30550PIT B 26- 001 48280 18020 30260PIT B 26- 001 48690 18560 30130PIT B 26- 001 48480 18560 29920PIT B 26- 001 46910 17910 29000PIT B 26- 001 49520 18550 30970PIT B 26- 001 49930 18620 31310PIT B 26- 001 49710 18510 31200PIT B 26- 001 50000 18520 31480PIT B 26- 001 47080 18130 28950PIT B 26- 001 50700 18460 32240PIT B 26- 001 50170 18500 31670PIT A 85-2 001 46670 17890 28780PIT B 26 - 001 48190 18210 29980PIT A 85-2 001 46120 17860 28260PIT A 85-2 001 46360 18210 28150PIT A 85-2 001 46800 18030 28770PIT B 26 - 001 47420 18090 29330

PIT B 26 - 001 45900 17990 27910PIT A 85-2 001 45420 17900 27520PIT B 26 - 001 49540 17960 31580PIT A 85-2 001 45820 18040 27780PIT A 85-2 001 46060 18070 27990PIT B 26 - 001 46910 18180 28730PIT B 26 - 001 46530 18120 28410PIT B 26 - 001 46900 18050 28850PIT A 85-2 001 45690 17900 27790

PIT B 26 - 001 49140 17880 31260PIT B 26 - 001 47580 17830 29750PIT B 26 - 001 48720 18160 30560PIT A 85-2 001 48630 18100 30530

PIT B 26 - 001 46720 18000 28720PIT B 26 - 001 48440 17960 30480

PIT A 85-2 001 48410 17950 30460PIT B 26 - 001 47700 18130 29570

PIT A 85-2 001 49160 17870 31290

Page 456: June Per Shift (Truckscale Port)

PIT A 85-2 001 48460 18140 30320PIT B 26 - 001 48010 17980 30030PIT A 85-2 001 49510 18090 31420PIT A 85-2 001 48250 18010 30240PIT A 85-2 001 49300 18060 31240PIT B 26 - 001 48000 17770 30230PIT A 85-2 001 48820 17890 30930PIT B 26 - 001 47370 17870 29500PIT B 26 - 001 47840 18170 29670PIT B 26 - 001 47710 18030 29680

PIT A 85-2 001 48670 18130 30540PIT B 26 - 001 47210 17990 29220PIT B 26 - 001 48860 18100 30760PIT A 85-2 001 47690 17980 29710PIT B 26 - 001 49040 17990 31050PIT A 85-2 001 48510 18140 30370PIT A 85-2 001 47820 17890 29930

PIT B 26 - 001 48380 17850 30530PIT A 85-2 001 47560 17890 29670PIT B 26 - 001 48710 18160 30550PIT B 26 - 001 48500 18000 30500PIT A 85-2 001 47070 18050 29020PIT B 26 - 001 47940 17830 30110PIT B 26 - 001 49050 17950 31100PIT A 85-2 001 48130 18090 30040PIT B 26 - 001 49820 18070 31750PIT B 26 - 001 49840 17920 31920PIT A 85-2 001 48190 17860 30330

PIT A 85-2 001 48360 17810 30550PIT A 85-2 001 47280 18040 29240PIT B 26 - 001 49040 17820 31220PIT A 85-2 001 48690 17880 30810PIT D 46- 001 49220 18730 30490PIT D 46- 001 31420 10740 20680PIT C 68 - 001 31220 10920 20300PIT C 68 - 001 30720 10960 19760PIT C 68 - 001 47870 18650 29220PIT C 68 - 001 31640 10950 20690PIT C 68 - 001 45730 18140 27590PIT C 68 - 001 30390 10990 19400PIT C 68 - 001 32760 10980 21780

PIT C 68 - 001 51830 18700 33130PIT C 68 - 001 31390 10970 20420PIT C 68 - 001 47830 18390 29440PIT C 68 - 001 32280 10970 21310PIT C 68 - 001 47850 18530 29320

PIT C 68 - 001 46280 18250 28030PIT C 68 - 001 46940 18030 28910PIT C 68 - 001 31480 10960 20520

Page 457: June Per Shift (Truckscale Port)

PIT C 68 - 001 51690 18570 33120PIT C 68 - 001 33230 10940 22290

PIT C 68 - 001 32780 10920 21860PIT C 68 - 001 31650 10940 20710PIT B 26- 001 46440 18120 28320PIT B 26- 001 49870 18630 31240PIT B 26- 001 50160 18460 31700PIT B 26- 001 50170 18460 31710PIT B 26- 001 47670 18050 29620PIT B 26- 001 51430 18500 32930PIT B 26- 001 51500 18680 32820PIT B 26- 001 52040 18460 33580PIT B 26- 001 52400 18450 33950PIT B 26- 001 51790 18300 33490

PIT B 26 - 001 48210 18140 30070PIT B 26 - 001 47850 17950 29900PIT A 85-2 001 48600 17880 30720PIT B 26 - 001 48610 17810 30800PIT A 85-2 001 48320 17990 30330PIT B 26 - 001 47630 17920 29710PIT A 85-2 001 47900 18010 29890

PIT B 26 - 001 48740 18050 30690PIT B 26 - 001 48170 17760 30410PIT A 85-2 001 48180 17840 30340PIT A 85-2 001 46990 18080 28910PIT A 85-2 001 48380 18020 30360PIT A 85-2 001 48470 17850 30620PIT B 26 - 001 46310 17920 28390PIT B 26 - 001 47100 18020 29080PIT B 26 - 001 46430 17990 28440PIT A 85-2 001 47910 17830 30080PIT B 26 - 001 47050 17680 29370PIT A 85-2 001 48230 17980 30250PIT B 26 - 001 47390 18020 29370

PIT B 26 - 001 46060 17800 28260PIT A 85-2 001 45640 18080 27560PIT A 85-2 001 49160 17800 31360PIT A 85-2 001 48900 17700 31200PIT B 26 - 001 45290 17710 27580PIT B 26 - 001 46810 17950 28860PIT A 85-2 001 49780 18240 31540PIT A 85-2 001 49960 18110 31850PIT B 26 - 001 46400 17930 28470PIT A 85-2 001 49660 18060 31600PIT B 26 - 001 49590 18060 31530PIT B 26 - 001 47220 18080 29140PIT A 85-2 001 48520 17960 30560PIT B 26 - 001 47300 17960 29340

PIT C 68 - 001 46630 18000 28630

Page 458: June Per Shift (Truckscale Port)

PIT C 68 - 001 32060 10910 21150PIT C 68 - 001 32010 10910 21100PIT C 68 - 001 31660 10930 20730PIT C 68 - 001 30800 10990 19810PIT C 68 - 001 47090 18060 29030PIT C 68 - 001 29430 10960 18470

PIT C 68 - 001 49730 18760 30970PIT C 68 - 001 32010 11020 20990PIT B 26- 001 51060 18520 32540PIT B 26- 001 53290 18440 34850PIT B 26- 001 51790 18590 33200

PIT B 26- 001 50730 18550 32180PIT B 26- 001 53140 18580 34560PIT A 85-2 001 48650 17900 30750PIT B 26 - 001 47230 18210 29020PIT B 26 - 001 47190 18010 29180PIT A 85-2 001 47450 17920 29530PIT A 85-2 001 46680 18050 28630

PIT B 26 - 001 48160 18090 30070PIT A 85-2 001 47230 18090 29140PIT B 26 - 001 47150 17930 29220PIT A 85-2 001 46920 18020 28900PIT B 26 - 001 47040 17880 29160PIT A 85-2 001 49140 18020 31120PIT A 32- 001 46950 17880 29070PIT B 26 - 001 47440 18120 29320PIT A 32- 001 46530 18020 28510PIT B 26 - 001 47440 17930 29510PIT A 85-2 001 46830 18000 28830PIT B 26 - 001 46070 18010 28060PIT A 85-2 001 47250 18120 29130PIT B 26 - 001 47980 17910 30070PIT B 26 - 001 47330 17870 29460PIT B 26 - 001 45980 17990 27990PIT A 85-2 001 48210 17950 30260PIT A 85-2 001 47340 17970 29370PIT B 26 - 001 44950 18170 26780PIT B 26 - 001 46380 18040 28340PIT A 85-2 001 48130 17980 30150PIT B 26 - 001 45930 17870 28060PIT B 26 - 001 46950 18010 28940PIT B 26 - 001 46790 17900 28890PIT A 85-2 001 48240 18080 30160PIT A 85-2 001 47670 17930 29740PIT B 26 - 001 45250 17870 27380PIT A 85-2 001 48910 17960 30950PIT A 85-2 001 48780 17900 30880PIT A 85-2 001 48100 17920 30180PIT A 85-2 001 48620 17900 30720

Page 459: June Per Shift (Truckscale Port)

PIT A 85-2 001 48180 17930 30250PIT B 26 - 001 46140 17980 28160PIT A 85-2 001 46760 17850 28910PIT A 85-2 001 47180 17910 29270PIT C 68 - 001 31250 10890 20360PIT C 68 - 001 46810 18030 28780PIT C 68 - 001 49610 18470 31140PIT C 68 - 001 49180 18050 31130PIT C 68 - 001 49740 18460 31280PIT C 68 - 001 49130 18840 30290PIT C 68 - 001 49730 18460 31270PIT C 68 - 001 49310 18430 30880PIT C 68 - 001 45530 17870 27660PIT C 68 - 001 48300 17980 30320

PIT B 26- 001 32810 10940 21870PIT C 68 - 001 49440 18050 31390PIT C 68 - 001 49940 18420 31520PIT C 68 - 001 50000 18770 31230

PIT C 68 - 001 50360 18400 31960PIT C 68 - 001 31510 11040 20470PIT C 68 - 001 31670 11050 20620PIT C 68 - 001 49380 18430 30950

PIT C 68 - 001 29740 10830 18910PIT C 68 - 001 48750 17990 30760PIT C 68 - 001 47940 17950 29990PIT C 68 - 001 33030 10990 22040PIT C 68 - 001 32220 10970 21250PIT C 68 - 001 50420 18340 32080

PIT C 68 - 001 49400 18050 31350PIT C 68 - 001 50470 18480 31990PIT C 68 - 001 49530 18080 31450PIT B 26- 001 32540 10920 21620PIT B 26- 001 33070 11000 22070

PIT B 26- 001 31830 10830 21000PIT B 26- 001 34590 11010 23580PIT B 26- 001 30500 10980 19520PIT A 85-2 001 47480 17910 29570PIT B 26 - 001 46910 18170 28740PIT A 85-2 001 47810 18120 29690PIT B 26 - 001 47060 18260 28800PIT A 85-2 001 47470 17990 29480PIT B 26 - 001 47650 17890 29760PIT A 85-2 001 47270 18010 29260PIT B 26 - 001 48270 17980 30290PIT B 26 - 001 48070 18000 30070PIT B 26 - 001 48900 17880 31020PIT B 26 - 001 45920 18240 27680PIT B 26 - 001 46830 18070 28760PIT B 26 - 001 45890 17930 27960

Page 460: June Per Shift (Truckscale Port)

PIT B 26 - 001 46890 17960 28930PIT B 26 - 001 47460 17980 29480PIT B 26 - 001 48200 18100 30100

PIT B 26 - 001 47030 17870 29160PIT B 26 - 001 47550 18120 29430PIT B 26 - 001 47200 18000 29200PIT B 26 - 001 48920 17960 30960

PIT B 26 - 001 47890 18120 29770PIT B 26 - 001 45960 18120 27840PIT B 26 - 001 48050 18020 30030PIT A 85- 001 49350 17960 31390PIT A 85- 001 49150 18010 31140PIT B 26 - 001 49230 17860 31370PIT B 26 - 001 50080 18090 31990PIT A 85- 001 50210 18090 32120PIT A 85- 001 49790 18070 31720

PIT B 26 - 001 49040 17930 31110PIT B 26 - 001 47630 17870 29760PIT B 26 - 001 50640 18000 32640PIT A 85- 001 48840 18120 30720PIT B 26 - 001 50860 18110 32750PIT A 85- 001 49000 18220 30780PIT B 26 - 001 48880 18110 30770PIT A 85- 001 48730 18130 30600PIT A 85- 001 50460 18020 32440PIT B 26 - 001 48300 18110 30190PIT A 85- 001 50180 17990 32190PIT B 26 - 001 47420 17900 29520PIT B 26 - 001 49850 18020 31830PIT B 26 - 001 47270 17870 29400PIT A 85- 001 49080 18020 31060PIT B 26 - 001 48290 17960 30330

PIT A 85- 001 49450 18030 31420PIT B 26 - 001 48740 18110 30630PIT A 85- 001 50610 18170 32440PIT B 26 - 001 49630 18110 31520PIT A 85- 001 48790 18060 30730PIT B 26 - 001 50840 18080 32760PIT B 26 - 001 49080 17880 31200PIT B 26 - 001 47650 18030 29620PIT B 26 - 001 47100 17860 29240PIT B 26 - 001 47460 18030 29430PIT A 85- 001 49270 18240 31030PIT B 26 - 001 47390 18070 29320PIT A 85- 001 49540 18040 31500PIT A 85- 001 48610 18050 30560PIT A 85- 001 47880 18020 29860PIT A 85- 001 50690 18220 32470PIT A 85- 001 48840 18120 30720

Page 461: June Per Shift (Truckscale Port)

PIT A 65 - 001 49560 18090 31470PIT A 65 - 001 51780 18890 32890PIT A 65 - 001 51130 18560 32570PIT A 65 - 001 32100 11050 21050PIT A 65 - 001 49410 18670 30740PIT A 65 - 001 31900 10990 20910PIT A 65 - 001 47470 18400 29070PIT A 65 - 001 30780 10980 19800PIT B 26 - 001 47590 18050 29540PIT B 26 - 001 48850 18040 30810PIT A 85- 001 47850 18130 29720PIT B 26 - 001 48190 18180 30010PIT B 26 - 001 47770 18040 29730PIT B 26 - 001 49110 17900 31210PIT A 85- 001 49220 18230 30990PIT B 26 - 001 48990 18250 30740

PIT B 26 - 001 48120 18070 30050PIT A 85- 001 49420 18070 31350PIT A 85- 001 50680 18080 32600PIT A 85- 001 47950 17970 29980PIT A 85- 001 48100 18060 30040PIT B 26 - 001 48020 17940 30080PIT B 26 - 001 49330 18050 31280PIT A 85- 001 51070 18090 32980PIT B 26 - 001 48520 18180 30340PIT B 26 - 001 48170 17950 30220PIT B 26 - 001 48050 18030 30020PIT B 26 - 001 47670 17980 29690PIT A 85- 001 49930 17990 31940PIT B 26 - 001 47440 17930 29510PIT A 65 - 001 48680 18620 30060PIT C 64- 001 49030 18830 30200PIT A 65 - 001 47250 18890 28360PIT A 65 - 001 44040 18100 25940PIT C 64- 001 33530 11110 22420PIT A 65 - 001 44390 18640 25750PIT C 64- 001 32550 11080 21470PIT C 64- 001 47840 18530 29310PIT C 64- 001 48480 18610 29870PIT C 64- 001 32320 10950 21370PIT C 64- 001 32910 10970 21940PIT C 64- 001 49160 18660 30500PIT C 64- 001 48830 18570 30260PIT C 64- 001 47710 18000 29710PIT C 64- 001 33410 10960 22450PIT A 85- 001 49510 18030 31480PIT B 26 - 001 47310 18110 29200PIT B 26 - 001 47560 17990 29570PIT A 85- 001 51580 18220 33360PIT B 26 - 001 48850 18200 30650

Page 462: June Per Shift (Truckscale Port)

PIT B 26 - 001 46810 18150 28660PIT A 85- 001 48480 18080 30400PIT B 26 - 001 48120 18030 30090PIT A 85- 001 50260 18030 32230PIT A 85- 001 50920 18080 32840PIT A 85- 001 48440 18080 30360PIT A 85- 001 47760 18140 29620PIT B 26 - 001 46890 18080 28810PIT B 26 - 001 49020 18040 30980PIT A 85- 001 47910 18010 29900PIT A 85- 001 49490 17980 31510PIT B 26 - 001 49540 18120 31420PIT B 26 - 001 49730 18030 31700PIT A 85- 001 47560 18130 29430PIT B 26 - 001 50440 17990 32450

PIT A 85- 001 49150 17990 31160PIT B 26 - 001 48980 18030 30950PIT A 85- 001 49660 18030 31630PIT A 85- 001 47660 18010 29650

PIT B 26 - 001 48970 18050 30920PIT B 26 - 001 47450 18180 29270PIT B 26 - 001 48980 17980 31000PIT A 85- 001 47320 18000 29320PIT B 26 - 001 49240 18170 31070PIT A 85- 001 47240 17990 29250PIT A 85- 001 49120 17910 31210

PIT B 26 - 001 48690 18120 30570PIT B 26 - 001 48630 17930 30700PIT A 85- 001 48380 18130 30250PIT A 85- 001 48710 17940 30770PIT B 26 - 001 48740 18120 30620

PIT B 26 - 001 47970 17970 30000PIT B 26 - 001 48840 17980 30860PIT A 85- 001 48150 17950 30200PIT B 26 - 001 49470 17880 31590PIT A 85- 001 48600 18020 30580PIT B 26 - 001 50610 17970 32640PIT A 85- 001 49140 18180 30960PIT B 26 - 001 49000 17910 31090PIT B 26 - 001 48170 17990 30180PIT B 26 - 001 48240 17950 30290PIT A 85- 001 49110 17880 31230PIT A 85- 001 48280 17970 30310PIT A 85- 001 49120 18100 31020PIT B 26 - 001 47760 18020 29740PIT B 26 - 001 47510 17890 29620PIT B 26 - 001 47110 17890 29220PIT A 85- 001 48440 17870 30570PIT A 85- 001 47590 17930 29660

Page 463: June Per Shift (Truckscale Port)

PIT B 26 - 001 46000 18080 27920PIT A 85- 001 46980 18020 28960PIT A 85- 001 47280 17770 29510PIT A 85- 001 47990 18090 29900PIT B 26 - 001 46670 17940 28730PIT B 26 - 001 46700 17910 28790PIT B 26 - 001 47790 18340 29450PIT B 26 - 001 48160 17940 30220

PIT C 64- 001 45580 18130 27450PIT C 64- 001 48850 18450 30400PIT C 64- 001 48990 18450 30540PIT C 64- 001 47480 18520 28960PIT C 64- 001 49990 18510 31480PIT C 64- 001 49560 18500 31060PIT C 64- 001 32890 11000 21890PIT C 64- 001 32350 10880 21470PIT C 64- 001 49420 18870 30550PIT C 64- 001 46280 18090 28190PIT C 64- 001 31080 10980 20100PIT C 64- 001 32070 11020 21050PIT C 64- 001 33320 11020 22300PIT C 64- 001 46720 17950 28770PIT C 64- 001 31910 10900 21010PIT C 64- 001 32700 10990 21710PIT C 64- 001 45370 17980 27390PIT C 64- 001 50210 18440 31770PIT C 64- 001 44980 18070 26910PIT C 64- 001 51090 18460 32630PIT C 64- 001 47780 18020 29760PIT C 64- 001 32170 10980 21190PIT C 64- 001 49400 18850 30550PIT C 64- 001 49090 18450 30640PIT C 64- 001 31350 10900 20450PIT C 64- 001 29720 10920 18800

PIT C 64- 001 31810 10970 20840PIT C 64- 001 44600 17980 26620PIT C 64- 001 31720 11030 20690PIT C 64- 001 32440 10940 21500

PIT C 64- 001 48930 18380 30550PIT C 64- 001 49400 18420 30980PIT C 64- 001 46300 17990 28310PIT C 64- 001 46340 17860 28480PIT C 64- 001 32810 10970 21840PIT C 64- 001 46340 17990 28350PIT C 64- 001 50980 18550 32430PIT C 64- 001 34250 11020 23230PIT C 64- 001 50650 18370 32280PIT C 64- 001 49760 18750 31010PIT C 64- 001 49880 18510 31370

Page 464: June Per Shift (Truckscale Port)

PIT C 64- 001 32060 10990 21070PIT C 64- 001 46240 17990 28250PIT C 64- 001 33310 10870 22440PIT C 64- 001 49310 18400 30910PIT C 64- 001 32830 10950 21880PIT C 64- 001 48170 18020 30150PIT C 68 - 001 30100 10910 19190PIT C 64- 001 48180 18090 30090PIT C 64- 001 50060 18530 31530PIT C 68 - 001 30920 10900 20020PIT C 64- 001 32510 10990 21520PIT A 85- 001 48270 18120 30150PIT B 26 - 001 47010 18130 28880PIT B 26 - 001 47140 17940 29200PIT A 85- 001 48270 17870 30400PIT A 85- 001 48210 18140 30070PIT A 85- 001 47510 17970 29540

PIT A 85- 001 47530 18100 29430PIT B 26 - 001 46640 17960 28680PIT B 26 - 001 47100 18070 29030PIT B 26 - 001 46790 18060 28730PIT B 26 - 001 46980 18100 28880PIT B 26 - 001 47340 18150 29190PIT B 26 - 001 46970 17960 29010PIT A 85- 001 46220 17890 28330PIT A 85- 001 47760 17980 29780PIT B 26 - 001 46370 17980 28390PIT A 85- 001 47360 18080 29280PIT B 26 - 001 45990 18090 27900

PIT B 26 - 001 47790 18130 29660PIT B 26 - 001 46710 17950 28760PIT A 85- 001 49990 18070 31920

PIT A 85- 001 50430 18100 32330PIT B 26 - 001 47240 18050 29190PIT A 85- 001 50410 18020 32390PIT B 26 - 001 49120 18140 30980PIT A 85- 001 52420 17820 34600PIT A 85- 001 49720 18050 31670PIT A 85- 001 49650 18060 31590PIT B 26 - 001 45470 17860 27610PIT A 85- 001 49860 18010 31850PIT B 26 - 001 48280 17980 30300PIT B 26 - 001 46510 17940 28570PIT B 26 - 001 47140 18160 28980PIT B 26 - 001 45940 18140 27800PIT A 85- 001 46810 18070 28740PIT B 26 - 001 46540 18110 28430PIT A 85- 001 48250 18050 30200PIT A 85- 001 47100 18010 29090PIT A 85- 001 47190 18070 29120

Page 465: June Per Shift (Truckscale Port)

PIT A 85- 001 46730 17920 28810PIT B 26 - 001 46090 18000 28090PIT A 85- 001 47540 18040 29500PIT B 26 - 001 47410 18100 29310PIT B 26 - 001 45390 18000 27390PIT A 85- 001 47860 18000 29860PIT B 26 - 001 46840 18150 28690PIT B 26 - 001 47990 18150 29840PIT A 85- 001 49300 18040 31260PIT B 26 - 001 47190 18110 29080PIT A 85- 001 47850 18070 29780PIT A 85- 001 50880 18170 32710PIT A 85- 001 51300 17990 33310PIT B 26 - 001 46700 17970 28730

PIT A 85- 001 49110 17990 31120PIT B 26 - 001 46330 17920 28410PIT C 64- 001 50270 18800 31470PIT C 68 - 001 31020 11010 20010

PIT C 64- 001 48660 18560 30100PIT C 64- 001 47260 18050 29210PIT C 64- 001 45010 18430 26580PIT C 68 - 001 30940 10930 20010PIT C 68 - 001 31470 10950 20520PIT C 68 - 001 30930 10950 19980

PIT C 64- 001 47900 18500 29400PIT C 64- 001 50080 18490 31590PIT C 64- 001 47960 18420 29540PIT C 64- 001 47110 18460 28650PIT C 68 - 001 30960 10930 20030PIT C 64- 001 47720 18050 29670PIT C 64- 001 47670 18580 29090PIT C 64- 001 45460 18040 27420PIT C 64- 001 47840 18120 29720PIT C 64- 001 47860 18050 29810PIT C 68 - 001 30210 10780 19430PIT C 68 - 001 30660 10990 19670PIT C 68 - 001 32740 10960 21780PIT C 68 - 001 45820 18040 27780PIT C 68 - 001 48270 18770 29500PIT C 68 - 001 32110 10980 21130PIT C 64- 001 30940 10980 19960PIT C 68 - 001 46800 18560 28240PIT C 68 - 001 47170 18490 28680PIT C 68 - 001 46350 18570 27780

PIT C 68 - 001 47090 18410 28680PIT C 68 - 001 44570 18000 26570PIT C 68 - 001 47710 18600 29110PIT C 64- 001 30120 10840 19280PIT C 68 - 001 46800 18130 28670

Page 466: June Per Shift (Truckscale Port)

PIT C 64- 001 31470 10900 20570PIT C 68 - 001 46860 17700 29160PIT C 64- 001 32400 10850 21550PIT C 68 - 001 47490 18840 28650PIT C 68 - 001 48540 18400 30140PIT C 64- 001 31390 10970 20420PIT C 68 - 001 49140 18490 30650PIT A 85- 001 48360 17830 30530PIT A 85- 001 47520 18000 29520PIT B 26 - 001 45940 17970 27970PIT B 26 - 001 46410 17970 28440PIT B 26 - 001 45920 18100 27820PIT A 85- 001 48390 18050 30340PIT B 26 - 001 46880 18070 28810PIT A 85- 001 50520 17970 32550

PIT B 26 - 001 46320 17830 28490

PIT A 85- 001 49650 17920 31730PIT A 85- 001 51470 17950 33520PIT A 85- 001 49700 18030 31670PIT B 26 - 001 47140 18030 29110PIT B 26 - 001 46270 18150 28120PIT A 85- 001 49040 18220 30820

PIT A 85- 001 49770 17920 31850PIT B 26 - 001 47030 17960 29070PIT A 85- 001 50740 17810 32930PIT B 26 - 001 46490 18090 28400PIT A 85-2 001 50540 17890 32650PIT B 26 - 001 48240 18130 30110PIT A 85-2 001 48200 17810 30390PIT A 85-2 001 49520 18160 31360PIT B 26 - 001 47300 17770 29530PIT B 26 - 001 48290 18100 30190PIT A 85- 001 49680 18020 31660

PIT B 26 - 001 47170 18010 29160PIT A 85- 001 47900 18110 29790

PIT A 85-2 001 48390 18110 30280PIT A 85-2 001 48050 18090 29960PIT B 26 - 001 48570 18010 30560PIT B 26 - 001 46620 18040 28580PIT A 85-2 001 49510 18170 31340PIT B 26 - 001 47530 17990 29540PIT B 26 - 001 47060 18020 29040PIT A 85-2 001 47020 17970 29050PIT C 68 - 001 47870 18470 29400PIT C 68 - 001 47820 18380 29440PIT C 64- 001 31890 10910 20980PIT C 68 - 001 46730 18000 28730PIT C 68 - 001 47610 18000 29610PIT C 68 - 001 49660 18550 31110

Page 467: June Per Shift (Truckscale Port)

PIT C 68 - 001 47930 18070 29860PIT C 64- 001 31890 10910 20980PIT C 68 - 001 50050 18000 32050PIT C 68 - 001 49440 18390 31050PIT C 64- 001 30520 10910 19610PIT C 64- 001 31390 11020 20370PIT C 64- 001 30790 11050 19740PIT C 68 - 001 46920 18030 28890

PIT C 68 - 001 48970 18480 30490PIT C 68 - 001 48470 18000 30470PIT C 68 - 001 47770 18040 29730PIT C 68 - 001 48870 18490 30380PIT C 64- 001 31480 10960 20520PIT C 64- 001 29990 10870 19120PIT C 68 - 001 47390 18020 29370PIT C 68 - 001 48390 18790 29600PIT C 68 - 001 49690 18380 31310PIT C 68 - 001 47680 17970 29710PIT A 85-2 001 48980 18110 30870PIT B 26 - 001 46840 17960 28880PIT A 85-2 001 48890 18030 30860PIT B 26 - 001 48200 18020 30180PIT B 26 - 001 47870 17960 29910PIT A 85-2 001 47370 17970 29400PIT B 26 - 001 48540 17850 30690PIT B 26 - 001 48560 17940 30620PIT B 26 - 001 46910 18040 28870PIT A 85-2 001 47140 17940 29200PIT B 26 - 001 48530 18110 30420

PIT A 85-2 001 48820 17820 31000PIT A 85-2 001 48570 17980 30590PIT A 85-2 001 47810 17950 29860PIT A 85-2 001 49450 18070 31380PIT B 26 - 001 47290 17890 29400PIT A 85-2 001 48860 18010 30850PIT B 26 - 001 48440 17900 30540PIT B 26 - 001 47500 17910 29590PIT A 85-2 001 49090 17930 31160

PIT A 85-2 001 49060 17830 31230PIT A 85-2 001 48660 18010 30650PIT A 85-2 001 48380 18060 30320PIT A 85-2 001 47070 17780 29290PIT A 85-2 001 48570 18010 30560PIT A 85-2 001 48230 17920 30310PIT A 85-2 001 48390 18080 30310PIT B 26 - 001 48210 17870 30340PIT A 85-2 001 48390 17950 30440PIT B 26 - 001 48730 17890 30840PIT A 85-2 001 47280 18060 29220

Page 468: June Per Shift (Truckscale Port)

PIT B 26 - 001 48940 18100 30840PIT A 85-2 001 47910 18120 29790PIT A 85-2 001 48160 17940 30220PIT A 85-2 001 47470 17950 29520PIT A 85-2 001 47510 17870 29640PIT A 85-2 001 47480 18030 29450PIT B 26 - 001 48620 17840 30780PIT A 85-2 001 47490 17750 29740PIT A 85-2 001 48360 17910 30450PIT B 26 - 001 46510 17870 28640PIT A 85-2 001 48190 17880 30310PIT A 85-2 001 47710 17960 29750PIT B 26 - 001 48080 17910 30170PIT B 26 - 001 48080 17860 30220PIT A 85-2 001 48290 18110 30180PIT A 85-2 001 48250 17960 30290PIT A 85-2 001 47440 17690 29750PIT A 85-2 001 48630 17940 30690PIT A 85-2 001 48830 17740 31090PIT B 26 - 001 47460 17830 29630PIT B 26 - 001 48480 18010 30470PIT A 85-2 001 49750 17930 31820PIT B 26 - 001 45510 17830 27680PIT A 85-2 001 49230 18000 31230PIT A 85-2 001 48520 17970 30550PIT C 68 - 001 31030 10990 20040PIT C 64- 001 46440 18750 27690PIT C 68 - 001 31300 11000 20300PIT C 64- 001 48590 18580 30010PIT C 64- 001 46200 18490 27710

PIT C 68 - 001 31410 10970 20440PIT C 64- 001 46870 17920 28950PIT C 68 - 001 31970 11020 20950PIT C 68 - 001 32660 11060 21600PIT C 68 - 001 31350 10970 20380

PIT C 64- 001 49190 18690 30500PIT C 68 - 001 31880 10950 20930PIT C 64- 001 46770 18080 28690PIT C 64- 001 48780 18490 30290PIT C 68 - 001 31280 10970 20310PIT C 64- 001 46240 18100 28140PIT C 68 - 001 31430 10970 20460PIT C 68 - 001 32020 11040 20980PIT C 68 - 001 31780 10980 20800PIT C 64- 001 49340 18730 30610PIT C 68 - 001 31900 10960 20940PIT C 64- 001 44770 17790 26980PIT C 64- 001 46410 18100 28310

PIT C 68 - 001 31930 10740 21190

Page 469: June Per Shift (Truckscale Port)

PIT C 64- 001 49120 18450 30670PIT C 64- 001 47260 18030 29230PIT C 64- 001 47900 18030 29870PIT C 68 - 001 30510 10990 19520PIT C 64- 001 46180 18010 28170PIT C 68 - 001 33210 11000 22210PIT C 68 - 001 31510 10980 20530PIT C 64- 001 45770 17900 27870PIT C 68 - 001 31520 10910 20610PIT C 68 - 001 31020 10880 20140PIT C 68 - 001 32260 10950 21310PIT C 68 - 001 31600 11080 20520PIT C 68 - 001 32350 10950 21400PIT C 64- 001 50710 18650 32060PIT C 64- 001 49710 18010 31700PIT C 68 - 001 32130 10890 21240PIT C 64- 001 46470 17860 28610PIT C 64- 001 46020 18170 27850PIT C 68 - 001 30210 10900 19310PIT C 64- 001 48210 18070 30140PIT A 85-2 001 48300 17830 30470PIT A 85-2 001 49530 18120 31410

PIT A 85-2 001 49650 18090 31560PIT A 85-2 001 49470 18100 31370PIT B 26 - 001 47130 17990 29140PIT A 85-2 001 48190 17850 30340PIT B 26 - 001 45570 18050 27520PIT B 26 - 001 47820 18080 29740PIT B 26 - 001 47470 17950 29520PIT A 85-2 001 47530 18040 29490PIT B 26 - 001 46780 18020 28760PIT B 26 - 001 47730 17910 29820PIT A 85-2 001 47380 17850 29530PIT B 26 - 001 48080 17950 30130PIT A 85-2 001 46180 18140 28040PIT B 26 - 001 46940 18100 28840PIT B 26 - 001 47750 17910 29840PIT A 85-2 001 49630 17890 31740PIT A 85-2 001 49040 18040 31000PIT A 85-2 001 49560 18050 31510PIT B 26 - 001 46770 18110 28660PIT B 26 - 001 46990 18050 28940PIT B 26 - 001 46130 17930 28200PIT B 26 - 001 47200 17980 29220PIT A 85-2 001 49780 17980 31800PIT B 26 - 001 46580 18080 28500PIT A 85-2 001 50040 17800 32240

PIT A 85-2 001 49570 18200 31370

PIT B 26 - 001 47700 18110 29590

Page 470: June Per Shift (Truckscale Port)

PIT B 26 - 001 47430 18080 29350PIT A 85-2 001 49900 17970 31930PIT B 26 - 001 48590 18090 30500PIT A 85-2 001 50300 18110 32190PIT B 26 - 001 47880 18080 29800PIT A 85-2 001 49720 18060 31660PIT B 26 - 001 47410 18070 29340PIT B 26 - 001 47310 17780 29530PIT A 85-2 001 50520 17980 32540PIT B 26 - 001 48350 17890 30460PIT B 26 - 001 48360 18090 30270PIT A 85-2 001 46870 18080 28790PIT A 85-2 001 49390 17920 31470PIT B 26 - 001 46670 18020 28650PIT B 26 - 001 47040 18040 29000PIT B 26 - 001 47370 18120 29250PIT B 26 - 001 48000 17910 30090PIT A 85-2 001 49620 17860 31760PIT A 85-2 001 47710 18120 29590PIT A 85-2 001 47400 17830 29570PIT B 26 - 001 47960 17880 30080PIT C 64- 001 47060 17980 29080PIT C 68 - 001 31290 10710 20580PIT C 68 - 001 30460 10980 19480PIT C 64- 001 49260 18080 31180PIT C 64- 001 47890 17970 29920PIT C 64- 001 32770 11010 21760PIT C 64- 001 32010 10950 21060PIT C 64- 001 32310 10950 21360PIT C 64- 001 32720 10980 21740PIT C 64- 001 48470 18050 30420PIT C 64- 001 51920 18370 33550PIT C 64- 001 48450 18030 30420PIT C 64- 001 50410 18330 32080PIT C 68 - 001 31860 10980 20880PIT C 64- 001 48630 17910 30720PIT C 68 - 001 31330 11050 20280PIT C 64- 001 50150 18870 31280PIT C 68 - 001 31570 11040 20530PIT C 64- 001 47290 17870 29420PIT C 64- 001 49330 18100 31230PIT C 68 - 001 31560 10940 20620PIT C 64- 001 51400 18400 33000PIT C 68 - 001 30680 11000 19680PIT C 68 - 001 30940 11090 19850PIT C 64- 001 48090 18070 30020PIT C 64- 001 47810 18050 29760PIT C 64- 001 50010 18570 31440PIT C 64- 001 50620 17910 32710PIT C 68 - 001 30570 10970 19600

Page 471: June Per Shift (Truckscale Port)

PIT C 68 - 001 31920 11080 20840

PIT C 64- 001 50030 18870 31160PIT C 68 - 001 31170 10960 20210PIT C 64- 001 46970 18040 28930PIT C 68 - 001 31070 10970 20100PIT C 68 - 001 31180 10950 20230PIT A 85-2 001 48390 17840 30550PIT A 85-2 001 48840 18060 30780PIT A 85-2 001 48740 18310 30430

PIT B 26 - 001 47270 17920 29350PIT B 26 - 001 47490 18010 29480PIT A 85-2 001 50460 18020 32440PIT B 26 - 001 47200 18060 29140PIT B 26 - 001 45410 18160 27250PIT B 26 - 001 48650 18030 30620PIT B 26 - 001 47190 17830 29360

PIT A 85-2 001 45920 17880 28040PIT A 85-2 001 49360 18130 31230PIT A 85-2 001 47610 18150 29460PIT B 26 - 001 47700 17860 29840PIT B 26 - 001 48650 17970 30680PIT A 85-2 001 50230 18040 32190PIT A 85-2 001 48210 17820 30390PIT B 26 - 001 48120 18000 30120PIT B 26 - 001 48380 17800 30580PIT B 26 - 001 48710 17990 30720PIT A 85-2 001 49910 18040 31870PIT A 85-2 001 48530 17970 30560PIT A 85-2 001 48710 17990 30720PIT A 85-2 001 48130 18080 30050PIT B 26 - 001 48850 18060 30790PIT B 26 - 001 48990 18000 30990PIT B 26 - 001 49980 17960 32020PIT A 85-2 001 47900 17930 29970PIT A 85-2 001 48630 18010 30620PIT A 85-2 001 47800 18060 29740PIT A 85-2 001 49440 17910 31530PIT B 26 - 001 50200 17980 32220PIT A 85-2 001 48680 18130 30550PIT A 85-2 001 45740 18110 27630PIT C 64- 001 47230 17860 29370PIT C 64- 001 50360 18600 31760PIT C 68 - 001 31360 10970 20390PIT C 64- 001 49400 18170 31230PIT C 68 - 001 31580 11070 20510PIT C 68 - 001 30410 10990 19420PIT C 64- 001 49270 17870 31400PIT C 64- 001 49750 18550 31200PIT C 64- 001 49740 18560 31180

Page 472: June Per Shift (Truckscale Port)

PIT C 64- 001 50010 18810 31200PIT C 68 - 001 30930 11000 19930PIT C 68 - 001 31480 10990 20490PIT C 64- 001 47310 17960 29350

PIT C 68 - 001 32450 11000 21450PIT C 64- 001 49230 18090 31140

PIT C 68 - 001 30090 11100 18990PIT C 68 - 001 31230 11110 20120PIT C 68 - 001 31110 10930 20180PIT C 64- 001 49260 18090 31170PIT C 64- 001 49150 18740 30410PIT C 68 - 001 30280 10980 19300PIT C 68 - 001 30760 10960 19800PIT C 68 - 001 30050 10970 19080PIT C 68 - 001 31100 10980 20120PIT C 64- 001 48850 18150 30700PIT C 64- 001 48250 18800 29450PIT B 26 - 001 49010 18030 30980PIT B 26 - 001 49670 18010 31660PIT B 26 - 001 50060 18110 31950PIT B 26 - 001 48390 17860 30530PIT B 26 - 001 47980 17760 30220PIT B 26 - 001 48930 17960 30970PIT A 85-2 001 47860 17930 29930PIT B 26 - 001 48060 18030 30030PIT A 85-2 001 47870 17880 29990PIT A 85-2 001 47310 17940 29370PIT B 26 - 001 48420 18000 30420PIT A 85-2 001 47940 18040 29900PIT A 85-2 001 47670 17890 29780PIT B 26 - 001 47750 18000 29750PIT B 26 - 001 48300 18000 30300PIT A 85-2 001 47330 18110 29220PIT B 26 - 001 46660 17860 28800PIT B 26 - 001 47230 17940 29290PIT B 26 - 001 46210 17750 28460PIT B 26 - 001 47180 17980 29200PIT A 85-2 001 47050 17910 29140PIT A 85-2 001 47490 17920 29570PIT B 26 - 001 47700 18070 29630PIT A 85-2 001 46650 17850 28800PIT A 85-2 001 47080 17960 29120PIT B 26 - 001 47530 17950 29580PIT B 26 - 001 46510 17960 28550PIT A 85-2 001 48260 17940 30320PIT A 85-2 001 47630 18110 29520PIT B 26 - 001 47070 17900 29170PIT B 26 - 001 45560 17900 27660PIT B 26 - 001 46030 17960 28070

Page 473: June Per Shift (Truckscale Port)

PIT A 85-2 001 47280 17950 29330PIT B 26 - 001 46440 18020 28420PIT B 26 - 001 47650 18090 29560PIT B 26 - 001 46490 17910 28580PIT A 85-2 001 47570 17930 29640PIT A 85-2 001 48470 17850 30620

PIT A 85-2 001 48760 17920 30840PIT A 85-2 001 48730 17810 30920

PIT B 26 - 001 46590 17970 28620PIT A 85-2 001 48770 17980 30790PIT B 26 - 001 46710 17920 28790PIT B 26 - 001 46320 17830 28490PIT B 26 - 001 45930 17960 27970PIT B 26 - 001 46280 17870 28410PIT B 26 - 001 47110 18020 29090PIT B 26 - 001 45020 17990 27030PIT A 85-2 001 49270 17860 31410PIT A 85-2 001 48890 17900 30990PIT A 85-2 001 49320 17970 31350PIT B 26 - 001 46970 17990 28980PIT A 85-2 001 48840 18060 30780PIT A 85-2 001 49000 17910 31090PIT B 26 - 001 45950 17990 27960PIT A 85-2 001 49270 18260 31010PIT B 26 - 001 46280 17940 28340PIT B 26 - 001 47300 18100 29200PIT B 26 - 001 47200 17930 29270PIT B 26 - 001 47810 18140 29670PIT C 68 - 001 29780 10990 18790PIT C 64- 001 49690 17980 31710PIT C 64- 001 32800 10950 21850PIT C 64- 001 31770 10950 20820PIT C 64- 001 32410 11030 21380PIT C 64- 001 32280 11040 21240PIT C 64- 001 32280 11080 21200PIT C 64- 001 44920 18260 26660PIT C 64- 001 47700 18080 29620PIT C 64- 001 30650 10930 19720

PIT C 64- 001 49110 18730 30380PIT C 68 - 001 29830 10950 18880PIT C 64- 001 49720 18560 31160PIT C 68 - 001 30870 10980 19890PIT C 64- 001 50090 18420 31670PIT C 68 - 001 31040 11030 20010PIT C 64- 001 46390 18150 28240PIT C 64- 001 48150 17980 30170PIT C 68 - 001 29880 11010 18870PIT C 64- 001 50480 18710 31770PIT C 68 - 001 30860 10970 19890

Page 474: June Per Shift (Truckscale Port)

PIT C 64- 001 47010 18130 28880PIT C 64- 001 32080 11000 21080PIT C 64- 001 47360 18000 29360PIT C 68 - 001 31490 11030 20460PIT C 64- 001 50150 18410 31740PIT C 64- 001 31880 11000 20880PIT C 64- 001 44950 18010 26940PIT C 64- 001 49000 18450 30550PIT C 64- 001 48960 18510 30450PIT C 68 - 001 30860 10950 19910PIT C 64- 001 48990 18430 30560PIT C 64- 001 46590 17970 28620PIT C 64- 001 52230 18520 33710PIT C 68 - 001 31100 11030 20070PIT C 68 - 001 30890 10980 19910PIT C 64- 001 49910 18460 31450PIT C 68 - 001 29760 10940 18820PIT C 64- 001 50840 18420 32420PIT C 64- 001 46710 18040 28670PIT C 64- 001 49900 18890 31010PIT C 64- 001 46390 18100 28290PIT C 64- 001 45700 18220 27480PIT A 27- 001 31160 11010 20150PIT C 64- 001 47040 18250 28790PIT A 27- 001 30800 10910 19890PIT C 64- 001 49000 18660 30340PIT B 26 - 001 45980 18030 27950PIT A 85-2 001 49500 18010 31490PIT A 85-2 001 47670 18090 29580PIT A 85-2 001 47570 18210 29360PIT B 26 - 001 47880 17980 29900PIT B 26 - 001 49470 18270 31200PIT A 85-2 001 49400 18040 31360

PIT B 26 - 001 46980 18190 28790PIT B 26 - 001 48320 18090 30230PIT B 26 - 001 48230 18190 30040PIT B 26 - 001 47640 18150 29490

PIT A 85-2 001 49680 18120 31560PIT B 26 - 001 47700 18000 29700PIT B 26 - 001 48420 18180 30240PIT B 26 - 001 48520 17840 30680PIT B 26 - 001 50370 17940 32430PIT B 26 - 001 50520 17920 32600PIT B 26 - 001 49760 18090 31670PIT B 26 - 001 50160 18170 31990PIT B 26 - 001 47510 18440 29070PIT A 85-2 001 46880 18150 28730PIT A 85-2 001 45230 18180 27050PIT B 26 - 001 49660 18190 31470

Page 475: June Per Shift (Truckscale Port)

PIT A 85-2 001 46180 18130 28050PIT A 85-2 001 46470 18130 28340PIT A 85-2 001 46910 18340 28570PIT A 85-2 001 46170 18020 28150PIT A 85-2 001 47420 18120 29300PIT A 85-2 001 46870 18070 28800PIT B 26 - 001 51500 18120 33380PIT B 26 - 001 50830 18250 32580PIT B 26 - 001 51510 18210 33300PIT B 26 - 001 49940 18180 31760PIT B 26 - 001 49980 18280 31700PIT A 85-2 001 47380 18280 29100PIT A 85-2 001 47700 18250 29450PIT A 85-2 001 47720 18110 29610PIT B 26 - 001 50720 18100 32620PIT B 26 - 001 48040 18050 29990PIT A 85-2 001 47540 17950 29590PIT A 85-2 001 47540 18110 29430PIT B 26 - 001 51340 18240 33100PIT A 85-2 001 47360 18070 29290PIT A 85-2 001 46850 18000 28850PIT B 26 - 001 50700 18150 32550PIT A 85-2 001 48200 18200 30000PIT B 26 - 001 50010 18250 31760PIT B 26 - 001 48150 18120 30030PIT A 85-2 001 47020 18060 28960PIT B 26 - 001 48170 18230 29940PIT B 26 - 001 51710 18010 33700PIT A 85-2 001 48810 18200 30610PIT B 26 - 001 48630 18040 30590PIT A 27- 001 32200 11110 21090PIT A 27- 001 31550 11070 20480PIT C 64- 001 51290 18710 32580PIT C 64- 001 44680 18200 26480PIT C 64- 001 45800 18000 27800PIT A 27- 001 30330 11080 19250PIT C 64- 001 47510 18610 28900PIT A 27- 001 31160 10950 20210PIT C 64- 001 46960 18110 28850PIT A 27- 001 31760 11040 20720PIT A 27- 001 31160 11080 20080PIT A 27- 001 30870 11020 19850

PIT C 64- 001 48360 18870 29490PIT C 64- 001 45490 17970 27520PIT C 64- 001 50960 18620 32340PIT C 64- 001 48940 18500 30440PIT C 64- 001 49100 18620 30480PIT C 64- 001 49860 18470 31390PIT C 64- 001 49180 18200 30980PIT B 26- 001 45080 18250 26830

Page 476: June Per Shift (Truckscale Port)

PIT B 26- 001 29760 11140 18620PIT C 64- 001 49000 18300 30700PIT B 26- 001 46200 18610 27590PIT C 64- 001 50120 18280 31840PIT B 26- 001 31610 10980 20630PIT C 64- 001 47660 18010 29650PIT B 26- 001 32620 11140 21480PIT B 26- 001 31440 11020 20420PIT B 26- 001 30990 11050 19940PIT B 26- 001 46660 18910 27750PIT B 26- 001 47060 18640 28420PIT B 26- 001 46930 18640 28290PIT B 26- 001 47670 18660 29010PIT C 64- 001 47460 18230 29230PIT B 26- 001 46820 18460 28360PIT B 26- 001 31480 11060 20420PIT B 26- 001 46360 18620 27740PIT B 26- 001 31220 11010 20210PIT B 26- 001 31420 11010 20410PIT B 26- 001 30230 11020 19210PIT A 85-2 001 48430 17910 30520PIT B 26 - 001 51750 18140 33610PIT B 26 - 001 50570 18070 32500PIT A 85-2 001 45670 18000 27670PIT A 85-2 001 49240 18000 31240PIT B 26 - 001 48800 18000 30800PIT A 85-2 001 50920 17950 32970PIT A 85-2 001 47490 17980 29510PIT B 26 - 001 49040 18030 31010PIT A 85-2 001 49260 18140 31120PIT B 26 - 001 47440 18160 29280

PIT B 26 - 001 49890 17990 31900PIT B 26 - 001 49070 18160 30910PIT B 26 - 001 50930 18150 32780PIT B 26 - 001 50110 18020 32090

PIT A 85-2 001 49520 17960 31560PIT A 85-2 001 47570 17870 29700PIT A 85-2 001 47330 17960 29370PIT A 85-2 001 48060 17900 30160PIT A 85-2 001 47910 17940 29970PIT C 64- 001 49060 18170 30890PIT C 64- 001 50480 18160 32320PIT C 65 - 001 47450 18620 28830

PIT C 64- 001 48520 18180 30340PIT C 65 - 001 50250 18560 31690PIT C 64- 001 46090 18140 27950PIT C 64- 001 46360 18160 28200PIT B 26- 001 30360 10990 19370PIT C 65 - 001 33520 11080 22440

Page 477: June Per Shift (Truckscale Port)

PIT B 26- 001 30630 10970 19660PIT B 26- 001 30640 10960 19680PIT B 26- 001 31900 11040 20860PIT C 65 - 001 45630 18840 26790PIT C 64- 001 49870 18200 31670PIT B 26- 001 30140 10980 19160PIT C 64- 001 50630 18610 32020PIT C 64- 001 49120 18480 30640PIT C 65 - 001 48600 18520 30080PIT C 64- 001 47700 18090 29610PIT C 64- 001 50510 18860 31650PIT B 26 - 001 49370 18030 31340PIT B 26 - 001 50770 18120 32650PIT B 26 - 001 50260 18150 32110PIT B 26 - 001 49270 18050 31220PIT B 26 - 001 50010 18030 31980PIT B 26 - 001 49170 18210 30960PIT B 26 - 001 49730 18170 31560PIT B 26 - 001 50490 18320 32170PIT B 26 - 001 49360 18030 31330PIT A 85-2 001 49900 18020 31880PIT A 85-2 001 47800 18130 29670PIT B 26 - 001 50570 18180 32390PIT A 85-2 001 50050 17980 32070PIT A 85-2 001 49370 18030 31340PIT A 85-2 001 48120 18060 30060PIT A 85-2 001 49410 18110 31300PIT A 85-2 001 48590 18220 30370PIT A 85-2 001 47280 18230 29050PIT A 85-2 001 49920 18100 31820PIT A 85-2 001 48840 18020 30820PIT A 85-2 001 48290 17940 30350

PIT A 85-2 001 47430 17990 29440PIT A 85-2 001 48490 18210 30280PIT B 26 - 001 49690 17980 31710PIT A 85-2 001 49610 18100 31510PIT A 85-2 001 47940 18170 29770PIT A 85-2 001 48970 18040 30930PIT B 26 - 001 51390 18010 33380PIT A 85-2 001 48020 18060 29960PIT B 26 - 001 49980 18180 31800PIT B 26 - 001 49390 18040 31350PIT A 85-2 001 49640 18200 31440PIT B 26 - 001 49330 17930 31400PIT B 26 - 001 49640 17920 31720PIT A 85-2 001 48780 18010 30770PIT A 85-2 001 49150 18100 31050PIT B 26 - 001 51400 17960 33440PIT C 64- 001 47120 18070 29050PIT C 64- 001 50930 18790 32140

Page 478: June Per Shift (Truckscale Port)

PIT C 64- 001 48800 18600 30200PIT C 64- 001 49630 18590 31040

PIT A 27- 001 32520 11170 21350PIT B 26- 001 31530 11040 20490PIT B 26- 001 30250 10980 19270PIT B 26- 001 32540 11150 21390PIT B 26- 001 29830 11020 18810PIT B 26- 001 45130 18150 26980PIT B 26- 001 45490 18130 27360PIT B 26- 001 31760 10980 20780PIT B 26- 001 50440 18680 31760PIT B 26- 001 46740 18250 28490PIT B 26- 001 46190 18780 27410PIT B 26- 001 47370 18540 28830PIT C 64- 001 48260 18880 29380PIT C 64- 001 33370 10990 22380PIT C 64- 001 32910 11040 21870PIT C 65 - 001 46840 18690 28150PIT C 64- 001 31840 10900 20940PIT C 64- 001 32510 11120 21390PIT C 64- 001 31070 10990 20080PIT C 64- 001 47120 18090 29030PIT C 64- 001 47370 18240 29130PIT C 64- 001 50080 18610 31470PIT C 64- 001 32240 10750 21490PIT C 64- 001 49300 18100 31200PIT C 65 - 001 46370 18490 27880PIT C 65 - 001 46410 18630 27780PIT C 64- 001 32420 10970 21450

PIT C 65 - 001 47120 18790 28330PIT C 64- 001 31940 10940 21000PIT C 65 - 001 46690 18600 28090PIT C 64- 001 32740 10890 21850

PIT C 64- 001 33210 10990 22220PIT C 65 - 001 44960 18020 26940PIT C 64- 001 33590 11220 22370PIT C 65 - 001 44510 18120 26390PIT A 85-2 001 48510 18050 30460PIT B 26 - 001 48870 17940 30930PIT A 85-2 001 48220 18000 30220PIT A 85-2 001 49590 18090 31500PIT B 26 - 001 47240 18090 29150PIT A 85-2 001 49360 17910 31450PIT B 26 - 001 49260 17920 31340PIT B 26 - 001 47310 17840 29470PIT B 26 - 001 47700 17840 29860PIT B 26 - 001 47660 17990 29670PIT A 85-2 001 49680 18100 31580PIT A 85-2 001 48160 17870 30290

Page 479: June Per Shift (Truckscale Port)

PIT B 26 - 001 47460 18060 29400PIT A 85-2 001 47800 18110 29690PIT B 26 - 001 46850 17890 28960PIT B 26 - 001 47990 17890 30100PIT B 26 - 001 47630 18010 29620PIT B 26 - 001 46780 17780 29000PIT B 26 - 001 47630 17790 29840PIT A 85-2 001 48060 17930 30130PIT A 85-2 001 49040 18160 30880PIT B 26 - 001 47720 18120 29600PIT A 85-2 001 49500 18000 31500PIT B 26 - 001 47570 18150 29420PIT B 26 - 001 49090 18030 31060PIT B 26 - 001 47220 17990 29230PIT A 85-2 001 48180 18070 30110PIT B 26 - 001 47650 17970 29680PIT B 26 - 001 47060 17940 29120PIT A 85-2 001 49020 17980 31040PIT A 85-2 001 47430 18100 29330PIT C 65 - 001 45650 18550 27100PIT C 64- 001 32230 10880 21350PIT C 65 - 001 45720 17970 27750PIT C 64- 001 33340 10940 22400PIT C 65 - 001 47800 18550 29250PIT C 65 - 001 48580 17970 30610PIT C 64- 001 33470 10910 22560PIT C 64- 001 33240 10910 22330PIT C 64- 001 34110 10920 23190PIT C 65 - 001 45600 18050 27550PIT C 65 - 001 47660 18520 29140PIT C 64- 001 33320 10930 22390PIT C 65 - 001 48800 18490 30310

PIT C 65 - 001 47250 17950 29300PIT C 65 - 001 49260 18580 30680PIT C 65 - 001 48290 18760 29530PIT C 65 - 001 45800 18060 27740PIT C 65 - 001 47960 18530 29430PIT C 65 - 001 49490 18470 31020PIT C 64- 001 31770 11030 20740

PIT C 65 - 001 50330 18530 31800PIT C 64- 001 33070 10990 22080PIT C 64- 001 34830 10940 23890PIT C 64- 001 33480 10960 22520PIT C 65 - 001 49250 18480 30770PIT C 65 - 001 45970 18150 27820PIT B 26 - 001 46750 18050 28700PIT B 26 - 001 47750 17940 29810PIT B 26 - 001 46950 18030 28920PIT B 26 - 001 44890 17940 26950PIT B 26 - 001 47040 18120 28920

Page 480: June Per Shift (Truckscale Port)

PIT A 85-2 001 45490 18060 27430PIT A 85-2 001 45980 17970 28010PIT A 85-2 001 45640 18110 27530PIT B 26 - 001 46610 17980 28630PIT A 85-2 001 47560 17910 29650PIT B 26 - 001 46890 17880 29010PIT A 85-2 001 48370 17840 30530PIT A 85-2 001 48400 18060 30340PIT B 26 - 001 48560 18010 30550

PIT B 26 - 001 48140 18080 30060PIT A 85-2 001 48250 17920 30330PIT A 85-2 001 49600 17980 31620PIT A 85-2 001 48550 18030 30520PIT A 85-2 001 49210 17950 31260PIT B 26 - 001 47270 17850 29420PIT A 85-2 001 49470 18050 31420PIT B 26 - 001 46230 17860 28370PIT B 26 - 001 46780 17960 28820PIT A 85-2 001 50250 18010 32240PIT B 26 - 001 50210 17990 32220PIT B 26 - 001 48560 17850 30710PIT C 64- 001 30890 11130 19760PIT C 65 - 001 45370 18250 27120PIT C 64- 001 33350 11150 22200PIT C 64- 001 31780 11060 20720PIT C 64- 001 49330 18770 30560PIT C 64- 001 49080 18610 30470PIT C 64- 001 49420 18620 30800PIT C 64- 001 32720 10930 21790PIT C 64- 001 31820 10850 20970PIT C 64- 001 45210 18050 27160PIT C 64- 001 33390 10910 22480PIT C 64- 001 45780 18150 27630PIT C 64- 001 45480 18060 27420PIT C 64- 001 29900 11010 18890PIT C 64- 001 46070 18050 28020PIT C 64- 001 31760 10880 20880PIT C 64- 001 49150 18840 30310PIT C 64- 001 48150 18620 29530PIT C 64- 001 32570 10930 21640PIT C 64- 001 31510 11030 20480PIT C 64- 001 31980 10930 21050

PIT C 64- 001 49260 18590 30670PIT C 64- 001 46050 18400 27650PIT C 65- 001 43970 18110 25860PIT C 65- 001 30980 10910 20070PIT C 65- 001 32020 10950 21070PIT C 65- 001 46350 18140 28210PIT C 65 - 001 51480 18680 32800

Page 481: June Per Shift (Truckscale Port)

PIT C 65 - 001 45330 18260 27070PIT C 64- 001 33210 11250 21960

PIT C 65 - 001 47140 18130 29010PIT C 65 - 001 47770 18970 28800PIT C 64- 001 32800 11000 21800PIT C 64- 001 32560 11060 21500PIT C 64- 001 31550 11050 20500PIT C 65 - 001 48890 18670 30220PIT C 64- 001 31660 10920 20740PIT C 65- 002 47220 18190 29030PIT C 65- 002 31920 11050 20870PIT A 32- 002 49010 18100 30910PIT A 32- 002 48480 18100 30380PIT A 32- 002 47780 18100 29680PIT B 26 - 002 49360 18020 31340PIT A 32- 002 48140 18030 30110PIT B 26 - 002 48910 17930 30980PIT A 32- 002 48730 18140 30590PIT A 32- 002 47420 18040 29380PIT C 65- 002 29280 11180 18100PIT C 65- 002 30500 11050 19450PIT C 65- 002 49860 18640 31220PIT C 65- 002 31470 11510 19960PIT C 65- 002 44260 18340 25920PIT C 65- 002 46480 18540 27940PIT C 65- 002 30040 11180 18860PIT C 65- 002 30280 11030 19250PIT C 65- 002 43020 18300 24720PIT C 65- 002 32910 11090 21820PIT C 65- 002 49890 19100 30790PIT C 65- 002 49150 19070 30080PIT C 65- 002 31030 11140 19890PIT C 65- 002 30820 11210 19610PIT C 65- 002 30930 11310 19620PIT B 26 - 001 47340 18150 29190PIT B 26 - 001 47370 18000 29370PIT A 85-2 001 50060 18130 31930PIT A 85-2 001 48050 17840 30210PIT A 85-2 001 48240 18080 30160PIT B 26 - 001 49660 18040 31620PIT A 85-2 001 48500 18050 30450PIT A 85-2 001 48480 18150 30330PIT B 26 - 001 46420 17990 28430PIT B 26 - 001 47150 18030 29120PIT B 26 - 001 46720 18170 28550PIT B 26 - 001 47280 17950 29330PIT B 26 - 001 46130 18010 28120PIT B 26 - 001 46590 17970 28620PIT B 26 - 001 46340 18080 28260PIT B 26 - 001 46430 17820 28610

Page 482: June Per Shift (Truckscale Port)

PIT B 26 - 001 50930 17940 32990PIT B 26 - 001 47570 18040 29530PIT B 26 - 001 46830 17960 28870PIT B 26 - 001 47540 18220 29320PIT B 26 - 001 46700 17890 28810PIT B 26 - 001 46320 18040 28280PIT B 26 - 001 46090 17820 28270PIT B 26 - 001 46080 17840 28240PIT B 26 - 001 46380 18120 28260PIT B 26 - 001 46380 17900 28480PIT B 26 - 001 46880 17880 29000PIT B 26 - 001 46180 17750 28430

PIT B 26 - 001 48180 17980 30200PIT A 85-2 001 48010 18000 30010PIT A 85-2 001 47500 17770 29730PIT B 26 - 001 47600 17910 29690PIT B 26 - 001 48340 18260 30080PIT B 26 - 001 48150 18040 30110PIT B 26 - 001 46510 18000 28510PIT B 26 - 001 48560 18060 30500PIT B 26 - 001 47750 17810 29940PIT A 85-2 001 46480 18100 28380PIT A 85-2 001 46850 17770 29080PIT B 26 - 001 46030 18080 27950PIT B 26 - 001 46080 18170 27910PIT A 85-2 001 46220 17700 28520PIT A 85-2 001 46940 18100 28840PIT A 85-2 001 46880 17950 28930PIT A 85-2 001 46870 17880 28990PIT B 26 - 001 47000 17870 29130PIT B 26 - 001 48420 18130 30290PIT A 85-2 001 46760 17980 28780PIT B 26 - 001 48520 18000 30520PIT B 26 - 001 48440 17760 30680PIT B 26 - 002 48530 18060 30470PIT B 26 - 002 48600 18140 30460PIT B 26 - 002 48980 17980 31000PIT B 26 - 002 49420 17840 31580

PIT C 65- 001 32560 11120 21440PIT C 65- 001 32630 11120 21510PIT C 65- 001 49490 18880 30610PIT C 65- 001 49270 17980 31290PIT C 65- 001 33610 11070 22540PIT C 65- 001 33650 11140 22510

PIT C 65- 001 47550 18130 29420PIT C 65- 001 49550 18610 30940PIT C 65- 001 32620 11170 21450PIT C 65- 001 30680 11140 19540PIT C 65- 001 49380 18850 30530

Page 483: June Per Shift (Truckscale Port)

PIT C 65- 001 49130 18370 30760PIT C 65- 001 49990 18170 31820PIT C 65- 001 32600 11130 21470PIT C 65- 001 33790 11060 22730PIT C 65- 001 45930 18180 27750PIT C 65- 002 44180 18420 25760PIT C 65- 002 31040 11310 19730PIT C 65- 002 31700 11230 20470PIT C 65- 002 31740 11150 20590PIT C 65- 002 49540 18740 30800PIT C 65- 002 49470 18740 30730PIT C 65- 002 49380 18970 30410PIT C 65- 002 48800 18970 29830PIT C 65- 002 47190 17840 29350PIT C 65- 002 30890 11000 19890PIT C 65- 002 31860 11110 20750PIT C 65- 001 32280 11120 21160PIT C 65- 002 48200 18900 29300PIT C 65- 002 32520 11070 21450PIT C 65- 002 47390 18100 29290PIT C 65- 002 31420 11070 20350PIT C 65- 002 44220 18280 25940PIT C 65- 002 46370 18660 27710PIT C 65- 002 50100 18460 31640PIT C 65- 002 47810 18500 29310PIT C 65- 002 49430 18820 30610

PIT C 65- 002 48040 18760 29280PIT C 65- 002 44950 18000 26950PIT C 65- 002 45640 18750 26890PIT C 65- 002 48640 18370 30270PIT C 65- 002 46910 18500 28410PIT C 65- 002 50470 18800 31670

PIT C 65- 002 49050 18710 30340PIT C 65- 002 47150 18000 29150

Page 484: June Per Shift (Truckscale Port)

253,583.600 96,440.100 157,143.50 0.000

Page 485: June Per Shift (Truckscale Port)

HPMP MIL Total Per Shift Shift

985.17

Page 486: June Per Shift (Truckscale Port)

1,663.36 2,648.53 1-1

414.54

472.59 887.13 1-2

Page 487: June Per Shift (Truckscale Port)

897.61

392.78 1,290.39 2-1

266.56

Page 488: June Per Shift (Truckscale Port)

264.26 530.82 3-3

Page 489: June Per Shift (Truckscale Port)

1,322.71

1,060.44 2,383.15 3-1

Page 490: June Per Shift (Truckscale Port)

1,091.26

Page 491: June Per Shift (Truckscale Port)

504.25 1,595.51 3-2

652.68

227.58

174.37 1,054.63 4-3

Page 492: June Per Shift (Truckscale Port)

1,472.02

484.02

Page 493: June Per Shift (Truckscale Port)

678.58 2,634.62 4-1

Page 494: June Per Shift (Truckscale Port)

993.48

187.85

314.97 1,496.30 4-2

Page 495: June Per Shift (Truckscale Port)

709.27

245.59

231.79 1,186.65 5-3

Page 496: June Per Shift (Truckscale Port)

371.20

232.60

136.44 740.24 5-1

Page 497: June Per Shift (Truckscale Port)

880.86

569.84 1,450.70 5-2

Page 498: June Per Shift (Truckscale Port)

432.45

340.34 772.79 6-3

488.01

Page 499: June Per Shift (Truckscale Port)

475.54 963.55 6-1

973.24

Page 500: June Per Shift (Truckscale Port)

826.07 1,799.31 6-2

Page 501: June Per Shift (Truckscale Port)

606.35

535.50 1,141.85 7-3

Page 502: June Per Shift (Truckscale Port)

1,200.74

Page 503: June Per Shift (Truckscale Port)

1,403.87 2,604.61 7-1

Page 504: June Per Shift (Truckscale Port)

953.15

Page 505: June Per Shift (Truckscale Port)

1,073.13 2,026.28 7-2

611.67

Page 506: June Per Shift (Truckscale Port)

795.98 1,407.65 8-3

Page 507: June Per Shift (Truckscale Port)

962.25

Page 508: June Per Shift (Truckscale Port)

1,630.83 2,593.08 8-1

Page 509: June Per Shift (Truckscale Port)

1,070.55

Page 510: June Per Shift (Truckscale Port)

1,072.86 2,143.41 8-2

Page 511: June Per Shift (Truckscale Port)

612.00

841.13 1,453.13 9-3

Page 512: June Per Shift (Truckscale Port)

630.82

Page 513: June Per Shift (Truckscale Port)

637.35 1,268.17 9-1

Page 514: June Per Shift (Truckscale Port)

1,643.98

395.80 2,039.78 9-2

Page 515: June Per Shift (Truckscale Port)

1,009.40

28.27 1,037.67 10-3

Page 516: June Per Shift (Truckscale Port)

2,225.38

160.56 2,385.94 10-1

Page 517: June Per Shift (Truckscale Port)

1,851.74

245.93 2,097.67 10-2

28.20 28.20 11-3

227.58 227.58 12-3

Page 518: June Per Shift (Truckscale Port)

2,061.17

401.30 2,462.47 12-1

Page 519: June Per Shift (Truckscale Port)

1,834.51

338.01 2,172.52 12-2

Page 520: June Per Shift (Truckscale Port)

1,089.38

341.91 1,431.29 13-3

Page 521: June Per Shift (Truckscale Port)

2,282.39

427.58 2,709.97 13-1

Page 522: June Per Shift (Truckscale Port)

1,960.88

Page 523: June Per Shift (Truckscale Port)

354.74 2,315.62 13-2

Page 524: June Per Shift (Truckscale Port)

1,656.85

266.48 1,923.33 14-3

Page 525: June Per Shift (Truckscale Port)

2,368.26

414.48 2,782.74 14-1

Page 526: June Per Shift (Truckscale Port)

2,190.14

333.70 2,523.84 14-2

Page 527: June Per Shift (Truckscale Port)

1,402.67

292.93 1,695.60 15-3

Page 528: June Per Shift (Truckscale Port)

1,937.15

481.43 2,418.58 15-1

Page 529: June Per Shift (Truckscale Port)

2,514.58

377.57 2,892.15 15-2

Page 530: June Per Shift (Truckscale Port)

1,373.16

Page 531: June Per Shift (Truckscale Port)

214.07 1,587.23 16-3

Page 532: June Per Shift (Truckscale Port)

2,745.59

532.32 3,277.91 16-1

Page 533: June Per Shift (Truckscale Port)

1,323.95

167.43 1,491.38 16-2

Page 534: June Per Shift (Truckscale Port)

1,528.81

Page 535: June Per Shift (Truckscale Port)

232.49 1,761.30 17-3

Page 536: June Per Shift (Truckscale Port)

2,443.94

Page 537: June Per Shift (Truckscale Port)

366.69 2,810.63 17-1

Page 538: June Per Shift (Truckscale Port)

1,835.25

275.88 2,111.13 17-2

Page 539: June Per Shift (Truckscale Port)

1,004.59

262.03 1,266.62 18-3

Page 540: June Per Shift (Truckscale Port)

2,547.93

392.44 2,940.37 18-1

Page 541: June Per Shift (Truckscale Port)

1,958.26

365.03 2,323.29 18-2

Page 542: June Per Shift (Truckscale Port)

684.04

134.01 818.05 19-3

Page 543: June Per Shift (Truckscale Port)

2,360.64

429.56 2,790.20 19-1

Page 544: June Per Shift (Truckscale Port)

1,769.66

Page 545: June Per Shift (Truckscale Port)

376.01 2,145.67 19-2

Page 546: June Per Shift (Truckscale Port)

1,234.48

241.84 1,476.32 20-3

Page 547: June Per Shift (Truckscale Port)

1,796.31

Page 548: June Per Shift (Truckscale Port)

1,109.45 2,905.76 20-1

Page 549: June Per Shift (Truckscale Port)

1,575.91

Page 550: June Per Shift (Truckscale Port)

957.34 2,533.25 20-2

889.15

Page 551: June Per Shift (Truckscale Port)

803.44 1,692.59 21-3

Page 552: June Per Shift (Truckscale Port)

1,563.85

Page 553: June Per Shift (Truckscale Port)

925.94

Page 554: June Per Shift (Truckscale Port)

811.19 3,300.98 21-1

Page 555: June Per Shift (Truckscale Port)

1,379.23

888.69 2,267.92 21-2

Page 556: June Per Shift (Truckscale Port)

866.47

367.88 1,234.35 22-3

Page 557: June Per Shift (Truckscale Port)

1,220.45

327.47

Page 558: June Per Shift (Truckscale Port)

1,102.25 2,650.17 22-1

344.87

64.93

Page 559: June Per Shift (Truckscale Port)

120.71 530.51 22-2

876.69

Page 560: June Per Shift (Truckscale Port)

452.90

68.14 1,397.73 23-3

Page 561: June Per Shift (Truckscale Port)

1,295.77

346.35

Page 562: June Per Shift (Truckscale Port)

961.10

645.12 3,248.34 23-1

Page 563: June Per Shift (Truckscale Port)

1,674.63

Page 564: June Per Shift (Truckscale Port)

518.97

319.36 2,512.96 23-2

1,016.58

Page 565: June Per Shift (Truckscale Port)

210.88

167.33 1,394.79 24-3

Page 566: June Per Shift (Truckscale Port)

1,172.06

762.94

107.79 2,042.79 24-1

Page 567: June Per Shift (Truckscale Port)

1,886.25

Page 568: June Per Shift (Truckscale Port)

218.50 2,104.75 24-2

672.83

399.61 1,072.44 25-3

Page 569: June Per Shift (Truckscale Port)

1,886.24

Page 570: June Per Shift (Truckscale Port)

1,372.55 3,258.79 25-1

Page 571: June Per Shift (Truckscale Port)

1,634.54

Page 572: June Per Shift (Truckscale Port)

1,040.20 2,674.74 25-2

1,084.88

Page 573: June Per Shift (Truckscale Port)

652.52 1,737.40 26-3

Page 574: June Per Shift (Truckscale Port)

1,690.68

Page 575: June Per Shift (Truckscale Port)

1,090.16 2,780.84 26-1

Page 576: June Per Shift (Truckscale Port)

1,504.11

Page 577: June Per Shift (Truckscale Port)

905.12 2,409.23 26-2

1,031.91

Page 578: June Per Shift (Truckscale Port)

659.34 1,691.25 27-3

Page 579: June Per Shift (Truckscale Port)

1,777.03

Page 580: June Per Shift (Truckscale Port)

1,204.35 2,981.38 27-1

Page 581: June Per Shift (Truckscale Port)

1,609.68

Page 582: June Per Shift (Truckscale Port)

1,025.68 2,635.36 27-2

618.67

Page 583: June Per Shift (Truckscale Port)

543.85 1,162.52 28-3

1,156.39

Page 584: June Per Shift (Truckscale Port)

996.16 2,152.55 28-2

Page 585: June Per Shift (Truckscale Port)

933.63

693.25 1,626.88 29-3

Page 586: June Per Shift (Truckscale Port)

709.04

62.93

578.20

95.21 1,445.38 29-1

Page 587: June Per Shift (Truckscale Port)

254.40

49.90 304.30 30-3

243.37

347.23 590.60 30-1

Page 588: June Per Shift (Truckscale Port)

1,467.55

123.51

Page 589: June Per Shift (Truckscale Port)

416.31

778.03 2,785.40 30-2

Page 590: June Per Shift (Truckscale Port)

106,197.11 50,946.39 157,143.50157,143.50

Page 591: June Per Shift (Truckscale Port)

PT. SINGLURUS PRATAMAREPORT OF COAL WEIGHT PER SHIFT

PERIOD : YEAR 2012

COAL HAULING

DATEJUNE

SUB TOTALSHIFT 3 SHIFT 1 SHIFT 2

1 2,648.53 887.13 3,535.66

2 1,290.39 1,290.39

3 530.82 2,383.15 1,595.51 4,509.48

4 1,054.63 2,634.62 1,496.30 5,185.55

5 1,186.65 740.24 1,450.70 3,377.59

6 772.79 963.55 1,799.31 3,535.65

7 1,141.85 2,604.61 2,026.28 5,772.74

8 1,407.65 2,593.08 2,143.41 6,144.14

9 1,453.13 1,268.17 2,039.78 4,761.08

10 1,037.67 2,385.94 2,097.67 5,521.28

11 28.20 28.20

12 227.58 2,462.47 2,172.52 4,862.57

13 1,431.29 2,709.97 2,315.62 6,456.88

14 1,923.33 2,782.74 2,523.84 7,229.91

15 1,695.60 2,418.58 2,892.15 7,006.33

16 1,587.23 3,277.91 1,491.38 6,356.52

17 1,761.30 2,810.63 2,111.13 6,683.06

18 1,266.62 2,940.37 2,323.29 6,530.28

19 818.05 2,790.20 2,145.67 5,753.92

20 1,476.32 2,905.76 2,533.25 6,915.33

21 1,692.59 3,300.98 2,267.92 7,261.49

22 1,234.35 2,650.17 530.51 4,415.03

23 1,397.73 3,248.34 2,512.96 7,159.03

24 1,394.79 2,042.79 2,104.75 5,542.33

25 1,072.44 3,258.79 2,674.74 7,005.97

26 1,737.40 2,780.84 2,409.23 6,927.47

27 1,691.25 2,981.38 2,635.36 7,307.99

28 1,162.52 2,152.55 3,315.07

29 1,626.88 1,445.38 3,072.26

30 304.30 590.60 2,785.40 3,680.30

TOTAL 34,114.96 66,910.18 56,118.36 157,143.50

Page 592: June Per Shift (Truckscale Port)

PT. SINGLURUS PRATAMAREPORT OF COAL WEIGHT PER SHIFT

PERIOD : YEAR 2012HARITA PARAMA MURTI PER SHIFT

MONTH JUNE

COAL HAULING ON JUNE

DATE SHIFT 3 SHIFT 1 SHIFT 2

COAL COAL COAL COAL COAL COAL COAL COAL INTERM. INTERM. INTERM. PRODUCT INTERM.

1 985.17 414.54 1,399.71 - 1,399.71 2 897.61 897.61 - 897.61 3 266.56 1,322.71 1,091.26 2,680.53 - 2,680.53 4 652.68 1,472.02 993.48 3,118.18 - 3,118.18 5 709.27 371.20 880.86 1,961.33 - 1,961.33 6 432.45 488.01 973.24 1,893.70 - 1,893.70 7 606.35 1,200.74 953.15 2,760.24 - 2,760.24 8 611.67 962.25 1,070.55 2,644.47 - 2,644.47 9 612.00 630.82 1,643.98 2,886.80 - 2,886.80

10 1,009.40 2,225.38 1,851.74 5,086.52 - 5,086.52 11 28.20 28.20 - 28.20 12 227.58 2,061.17 1,834.51 4,123.26 - 4,123.26 13 1,089.38 2,282.39 1,960.88 5,332.65 - 5,332.65 14 1,656.85 2,368.26 2,190.14 6,215.25 - 6,215.25 15 1,402.67 1,937.15 2,514.58 5,854.40 - 5,854.40 16 1,373.16 2,745.59 1,323.95 5,442.70 - 5,442.70 17 1,528.81 2,443.94 1,835.25 5,808.00 - 5,808.00 18 1,004.59 2,547.93 1,958.26 5,510.78 - 5,510.78 19 684.04 2,360.64 1,769.66 4,814.34 - 4,814.34 20 1,234.48 1,796.31 1,575.91 4,606.70 - 4,606.70 21 889.15 1,563.85 1,379.23 3,832.23 - 3,832.23 22 866.47 1,220.45 327.47 344.87 64.93 2,431.79 392.40 2,824.19 23 876.69 1,295.77 346.35 1,674.63 2,970.40 1,223.04 4,193.44 24 1,016.58 1,172.06 1,886.25 4,074.89 - 4,074.89 25 672.83 1,886.24 1,634.54 4,193.61 - 4,193.61 26 1,084.88 1,690.68 1,504.11 4,279.67 - 4,279.67 27 1,031.91 1,777.03 1,609.68 4,418.62 - 4,418.62 28 618.67 1,156.39 1,775.06 - 1,775.06 29 933.63 709.04 62.93 1,642.67 62.93 1,705.60 30 243.37 1,467.55 123.51 1,467.55 366.88 1,834.43 31 - - -

TOTAL 22,244.26 876.69 42,414.41 980.12 39,493.19 188.44 104,151.86 2,045.25 106,197.11

TOTAL COAL HAULING ON

JUNE PRODUCT PRODUCT PRODUCT

Page 593: June Per Shift (Truckscale Port)

PT. SINGLURUS PRATAMAREPORT OF COAL WEIGHT PER SHIFT

PERIOD : YEAR 2012MITRA INDAH LESTARI PER SHIFT

MONTH JUNE

COAL HAULING ON JUNE

DATE SHIFT 3 SHIFT 1 SHIFT 2

COAL COAL COAL COAL COAL COAL COAL COAL INTERM. INTERM. INTERM. PRODUCT INTERM.

1 1,663.36 472.59 2,135.95 - 2,135.95 2 392.78 392.78 - 392.78 3 264.26 1,060.44 504.25 1,828.95 - 1,828.95 4 227.58 174.37 484.02 678.58 187.85 314.97 899.45 1,167.92 2,067.37 5 245.59 231.79 232.60 136.44 569.84 1,048.03 368.23 1,416.26 6 340.34 475.54 826.07 1,641.95 - 1,641.95 7 535.50 1,403.87 1,073.13 3,012.50 - 3,012.50 8 795.98 1,630.83 1,072.86 3,499.67 - 3,499.67 9 841.13 637.35 395.80 1,874.28 - 1,874.28

10 28.27 160.56 245.93 434.76 - 434.76 11 - - - 12 401.30 338.01 739.31 - 739.31 13 341.91 427.58 354.74 1,124.23 - 1,124.23 14 266.48 414.48 333.70 1,014.66 - 1,014.66 15 292.93 481.43 377.57 1,151.93 - 1,151.93 16 214.07 532.32 167.43 913.82 - 913.82 17 232.49 366.69 275.88 875.06 - 875.06 18 262.03 392.44 365.03 1,019.50 - 1,019.50 19 134.01 429.56 376.01 939.58 - 939.58 20 241.84 1,109.45 957.34 2,308.63 - 2,308.63 21 803.44 925.94 811.19 888.69 2,618.07 811.19 3,429.26 22 367.88 1,102.25 120.71 1,590.84 - 1,590.84 23 452.90 68.14 961.10 645.12 518.97 319.36 1,932.97 1,032.62 2,965.59 24 210.88 167.33 762.94 107.79 218.50 1,192.32 275.12 1,467.44 25 399.61 1,372.55 1,040.20 2,812.36 - 2,812.36 26 652.52 1,090.16 905.12 2,647.80 - 2,647.80 27 659.34 1,204.35 1,025.68 2,889.37 - 2,889.37 28 543.85 996.16 1,540.01 - 1,540.01 29 693.25 578.20 95.21 1,271.45 95.21 1,366.66 30 254.40 49.90 347.23 416.31 778.03 670.71 1,175.16 1,845.87 31 - - -

TOTAL 10,302.48 691.53 20,694.09 2,821.56 15,024.37 1,412.36 46,020.94 4,925.45 50,946.39

TOTAL COAL HAULING ON

JUNE PRODUCT PRODUCT PRODUCT

Page 594: June Per Shift (Truckscale Port)

PT. SINGLURUS PRATAMAREPORT OF COAL WEIGHT PER SHIFT

PERIOD : YEAR 2012HPMP & MIL PER SHIFT

MONTH JUNE

DATE SHIFT 3 SHIFT 1 SHIFT 2

COAL COAL COAL COAL COAL COAL COAL COAL INTERM. INTERM. INTERM. PRODUCT INTERM.

1 - - 2,648.53 - 887.13 - 3,535.66 - 3,535.66 2 - - 1,290.39 - - - 1,290.39 - 1,290.39 3 530.82 - 2,383.15 - 1,595.51 - 4,509.48 - 4,509.48 4 880.26 174.37 1,956.04 678.58 1,181.33 314.97 4,017.63 1,167.92 5,185.55 5 954.86 231.79 603.80 136.44 1,450.70 - 3,009.36 368.23 3,377.59 6 772.79 - 963.55 - 1,799.31 - 3,535.65 - 3,535.65 7 1,141.85 - 2,604.61 - 2,026.28 - 5,772.74 - 5,772.74 8 1,407.65 - 2,593.08 - 2,143.41 - 6,144.14 - 6,144.14 9 1,453.13 - 1,268.17 - 2,039.78 - 4,761.08 - 4,761.08

10 1,037.67 - 2,385.94 - 2,097.67 - 5,521.28 - 5,521.28 11 28.20 - - - - - 28.20 - 28.20 12 227.58 - 2,462.47 - 2,172.52 - 4,862.57 - 4,862.57 13 1,431.29 - 2,709.97 - 2,315.62 - 6,456.88 - 6,456.88 14 1,923.33 - 2,782.74 - 2,523.84 - 7,229.91 - 7,229.91 15 1,695.60 - 2,418.58 - 2,892.15 - 7,006.33 - 7,006.33 16 1,587.23 - 3,277.91 - 1,491.38 - 6,356.52 - 6,356.52 17 1,761.30 - 2,810.63 - 2,111.13 - 6,683.06 - 6,683.06 18 1,266.62 - 2,940.37 - 2,323.29 - 6,530.28 - 6,530.28 19 818.05 - 2,790.20 - 2,145.67 - 5,753.92 - 5,753.92 20 1,476.32 - 2,905.76 - 2,533.25 - 6,915.33 - 6,915.33 21 1,692.59 - 2,489.79 811.19 2,267.92 - 6,450.30 811.19 7,261.49 22 1,234.35 - 2,322.70 327.47 465.58 64.93 4,022.63 392.40 4,415.03 23 452.90 944.83 2,256.87 991.47 2,193.60 319.36 4,903.37 2,255.66 7,159.03 24 1,227.46 167.33 1,935.00 107.79 2,104.75 - 5,267.21 275.12 5,542.33 25 1,072.44 - 3,258.79 - 2,674.74 - 7,005.97 - 7,005.97 26 1,737.40 - 2,780.84 - 2,409.23 - 6,927.47 - 6,927.47 27 1,691.25 - 2,981.38 - 2,635.36 - 7,307.99 - 7,307.99 28 1,162.52 - - - 2,152.55 - 3,315.07 - 3,315.07 29 1,626.88 - 1,287.24 158.14 - - 2,914.12 158.14 3,072.26 30 254.40 49.90 - 590.60 1,883.86 901.54 2,138.26 1,542.04 3,680.30 31 - - - - - - - - -

TOTAL 32,546.74 1,568.22 63,108.50 3,801.68 54,517.56 1,600.80 150,172.80 6,970.70 157,143.50

COAL HAULING ON JUNE TOTAL COAL

HAULING ON JUNE

PRODUCT PRODUCT PRODUCT

Page 595: June Per Shift (Truckscale Port)

PT. SINGLURUS PRATAMAREPORT OF COAL WEIGHT PER SHIFT

PERIOD : YEAR 2012TRUCKSCALE PORT SITE COAL PRODUCT (PIT)

MONTH JUNE

COAL HAULING ON JUNE

DATE SHIFT 3 SHIFT 1 SHIFT 2

COAL COAL COAL COAL COAL COAL COAL COAL PRODUCT INTERMED PRODUCT INTERMED PRODUCT INTERMED PRODUCT INTERMED

1 - - 2,648.53 - 887.13 - 3,535.66 - 3,535.66 2 - - 1,290.39 - - - 1,290.39 - 1,290.39 3 530.82 - 2,383.15 - 1,595.51 - 4,509.48 - 4,509.48 4 880.26 174.37 1,956.04 678.58 1,181.33 314.97 4,017.63 1,167.92 5,185.55 5 954.86 231.79 603.80 136.44 1,450.70 - 3,009.36 368.23 3,377.59 6 772.79 - 963.55 - 1,799.31 - 3,535.65 - 3,535.65 7 1,141.85 - 2,604.61 - 2,026.28 - 5,772.74 - 5,772.74 8 1,407.65 - 2,593.08 - 2,143.41 - 6,144.14 - 6,144.14 9 1,453.13 - 1,268.17 - 2,039.78 - 4,761.08 - 4,761.08

10 1,037.67 - 2,385.94 - 2,097.67 - 5,521.28 - 5,521.28 11 28.20 - - - - - 28.20 - 28.20 12 227.58 - 2,462.47 - 2,172.52 - 4,862.57 - 4,862.57 13 1,431.29 - 2,709.97 - 2,315.62 - 6,456.88 - 6,456.88 14 1,923.33 - 2,782.74 - 2,523.84 - 7,229.91 - 7,229.91 15 1,695.60 - 2,418.58 - 2,892.15 - 7,006.33 - 7,006.33 16 1,587.23 - 3,277.91 - 1,491.38 - 6,356.52 - 6,356.52 17 1,761.30 - 2,810.63 - 2,111.13 - 6,683.06 - 6,683.06 18 1,266.62 - 2,940.37 - 2,323.29 - 6,530.28 - 6,530.28 19 818.05 - 2,790.20 - 2,145.67 - 5,753.92 - 5,753.92 20 1,476.32 - 2,905.76 - 2,533.25 - 6,915.33 - 6,915.33 21 1,692.59 - 2,489.79 811.19 2,267.92 - 6,450.30 811.19 7,261.49 22 1,234.35 - 2,322.70 327.47 465.58 64.93 4,022.63 392.40 4,415.03 23 452.90 944.83 2,256.87 991.47 2,193.60 319.36 4,903.37 2,255.66 7,159.03 24 1,227.46 167.33 1,935.00 107.79 2,104.75 - 5,267.21 275.12 5,542.33 25 1,072.44 - 3,258.79 - 2,674.74 - 7,005.97 - 7,005.97 26 1,737.40 - 2,780.84 - 2,409.23 - 6,927.47 - 6,927.47 27 1,691.25 - 2,981.38 - 2,635.36 - 7,307.99 - 7,307.99 28 1,162.52 - - - 2,152.55 - 3,315.07 - 3,315.07 29 1,626.88 - 1,287.24 158.14 - - 2,914.12 158.14 3,072.26 30 254.40 49.90 - 590.60 1,883.86 901.54 2,138.26 1,542.04 3,680.30 31 - - - - - - - - -

TOTAL 32,546.74 1,568.22 63,108.50 3,801.68 54,517.56 1,600.80 150,172.80 6,970.70 157,143.50

TOTAL COAL HAULING ON

JUNE


Recommended